© 2015 Hervé Baron Oil & Gas Project demands on Engineering Hervé Baron SPE, Paris June 11 th , 2015

Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

Embed Size (px)

Citation preview

Page 1: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

Hervé Baron

SPE, Paris

June 11th, 2015

Page 2: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

The Engineering of a Process Plant

• The role of Engineering

• The work process

Page 3: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

Page 4: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

The Engineering of a Process Plant

• The role of Engineering

• The work process

Page 5: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

Process Flow

Diagrams, Heat &

Material Balance

Process Equipment

sizing

Utility consumption

Utility Units Design

Plant Layout

Equipment design by vendors

Piping & Instrumentation

Diagrams

Piping Routing

Instrumentation & Control design

Fluids composition & conditions

Material selection and specifications

Civil design ( foundations)

Structural steel design

Electrical power generation & distribution

Process Design

Civil design (UG networks)

Page 6: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

The Engineering of a Process Plant

Fast track execution

• From sequential to concurrent E/P/C

• Consequences for Engineering: Early quantity estimates and commitments

• Awareness and compliance with construction work sequence

• Knowledge and focus on fundamentals

Page 7: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

From sequential to concurrent Project execution

ENGINEERING

PROCUREMENT

CONSTRUCTION

Bill of materials

Drawings

Page 8: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

ENGINEERING

PROCUREMENT

CONSTRUCTION

From sequential to concurrent Project execution

ENGINEERING PROCUREMENT CONSTRUCTION

Page 9: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

The Engineering of a Process Plant

Fast track execution

• From sequential to concurrent E/P/C

• Consequences for Engineering: Early quantity estimates and commitments

• Awareness and compliance with construction work sequence

• Knowledge and focus on fundamentals

Page 10: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

ENGINEERING

PROCUREMENT

From sequential to concurrent Project execution

Fabrication + transport Up to 7-9 months on large projects

Page 11: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

ENGINEERING

CONSTRUCTION

From sequential to concurrent Project execution

QUANTITIES TO ERECT

Page 12: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

The Engineering of a Process Plant

Fast track execution

• From sequential to concurrent E/P/C

• Consequences for Engineering: Early quantity estimates and commitments

• Awareness and compliance with construction work sequence

• Knowledge and focus on fundamentals

Page 13: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Awareness and compliance with construction sequence

Process simulations

Equipment selection &

purchase

Foundation drawings

Process data sheet

Vendor data

Page 14: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Awareness and compliance with construction sequence

Engineering must adjust its schedule to match the construction sequence…

Page 15: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Engineering must adjust its schedule to match the construction sequence… Undergrounds are installed first but usually designed last!

Awareness and compliance with construction sequence

Page 16: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

The Engineering of a Process Plant

Fast track execution

• From sequential to concurrent E/P/C

• Consequences for Engineering: Early quantity estimates and commitments

• Awareness and compliance with construction work sequence

• Knowledge and focus on fundamentals

Page 17: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

The Engineering of a Process Plant

Fast track execution

• From sequential to concurrent E/P/C

• Consequences for Engineering: Early quantity estimates and commitments

• Awareness and compliance with construction work sequence

• Knowledge and focus on fundamentals

• Piping chain

Page 18: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

The most likely critical path of an Oil & Gas Project

Page 19: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Elementary work in Piping

Drawing + matching materials available Pre-fabrication: cutting, welding, NDE, blasting, painting (primer) Erection: fit-up, welding, NDE, PWHT, supports, hydrotest, cleaning, re-instatement, painting, insulation

Page 20: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

The Engineering of a Process Plant

Fast track execution

• From sequential to concurrent E/P/C

• Consequences for Engineering: Early quantity estimates and commitments

• Awareness and compliance with construction work sequence

• Knowledge and focus on fundamentals

• Piping chain

• Integration of Equipment

Page 21: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Management of information from Vendors

Page 22: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Management of information from Vendors

Initial package layout Final Package layout

Page 23: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Management of information from Vendors

Vendor Instrumentation &

Control

Electrical

Plant Layout

Civil

Piping

Process

Page 24: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering

The last word: Engineering in a nutshell

Page 25: Oil & Gas Project demands on Engineering - SPE France Baron SPE...Oil & Gas Project demands on Engineering Hervé Baron ... Control design ... From sequential to concurrent Project

© 2

01

5 – H

ervé Baro

n

Oil & Gas Project demands on Engineering