Project No. 140001 PID 82381 CLA-IR-70-6.69 Federal Type: MAJOR WIDENING Completion Date: 10/31/2015 Award Amount: $17,529,009.43 Contract Awarded To: JOHN R JURGENSEN COMPANY Letting Date: 1/16/2014 Engineer's Estimate: $19,010,000.00 Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director JOHN R JURGENSEN COMPANY 11641 MOSTELLER RD CINCINNATI, OH 45241 Hamilton Bidder 1 Bid $17,529,009.43 BARRETT PAVING MATERIALS INC 3751 COMMERCE DR MIDDLETOWN, OH 45005 Warren Bidder 2 Bid $19,469,822.54 SHELLY COMPANY 80 PARK DR BOX 266 THORNVILLE, OH 43076 Perry Bidder 3 Bid $21,610,801.73 140001 - Page 1

Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Project No. 140001

PID 82381

CLA-IR-70-6.69

Federal

Type: MAJOR WIDENING

Completion Date: 10/31/2015

Award Amount: $17,529,009.43

Contract Awarded To: JOHN R JURGENSEN COMPANY

Letting Date: 1/16/2014

Engineer's Estimate: $19,010,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

JOHN R JURGENSEN COMPANY

11641 MOSTELLER RD

CINCINNATI, OH 45241

Hamilton

Bidder 1

Bid $17,529,009.43

BARRETT PAVING MATERIALS INC

3751 COMMERCE DR

MIDDLETOWN, OH 45005

Warren

Bidder 2

Bid $19,469,822.54

SHELLY COMPANY

80 PARK DR BOX 266

THORNVILLE, OH 43076

Perry

Bidder 3

Bid $21,610,801.73

140001 - Page 1

Page 2: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $37,491.35$37,491.35

2 $100,000.00$100,000.00

3 $150,000.00$150,000.00

Ref #2 202E20010 HEADWALL REMOVED, (2 EACH)

Awd $3,196.30$1,598.15

2 $560.00$280.00

3 $1,000.00$500.00

Ref #3 202E23001 PAVEMENT REMOVED, AS PER PLAN, (52748 SY)

Awd $228,926.32$4.34

2 $316,488.00$6.00

3 $664,624.80$12.60

Ref #4 202E30700 CONCRETE BARRIER REMOVED, (387 FT)

Awd $7,654.86$19.78

2 $11,610.00$30.00

3 $15,480.00$40.00

Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (5601 FT)

Awd $90,176.10$16.10

2 $61,050.90$10.90

3 $140,025.00$25.00

Ref #6 202E35200 PIPE REMOVED, OVER 24", (111 FT)

Awd $3,130.20$28.20

2 $1,887.00$17.00

3 $1,665.00$15.00

Ref #7 202E38000 GUARDRAIL REMOVED, (6075 FT)

Awd $8,201.25$1.35

2 $8,201.25$1.35

3 $8,201.25$1.35

Ref #8 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (4 EACH)

Awd $800.00$200.00

2 $800.00$200.00

3 $800.00$200.00

Ref #9 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (6 EACH)

Awd $1,050.00$175.00

2 $1,050.00$175.00

3 $1,050.00$175.00

Ref #10 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B, (8 EACH)

Awd $1,600.00$200.00

2 $1,600.00$200.00

3 $1,600.00$200.00

Ref #11 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (9 EACH)

Awd $1,800.00$200.00

2 $1,800.00$200.00

3 $1,800.00$200.00

Ref #12 202E58100 CATCH BASIN REMOVED, (51 EACH)

Awd $22,792.92$446.92

2 $15,300.00$300.00

3 $20,400.00$400.00

140001 - Page 2

Page 3: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #13 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (366 FT)

Awd $11,554.62$31.57

2 $10,248.00$28.00

3 $10,980.00$30.00

Ref #14 202E98100 REMOVAL MISC.:TRAFFIC SENSORS, (4 EACH)

Awd $2,560.00$640.00

2 $1,800.00$450.00

3 $120.00$30.00

Ref #15 203E10000 EXCAVATION, (103333 CY)

Awd $824,597.34$7.98

2 $1,007,496.75$9.75

3 $1,653,328.00$16.00

Ref #16 203E20000 EMBANKMENT, (30182 CY)

Awd $98,091.50$3.25

2 $173,546.50$5.75

3 $90,546.00$3.00

Ref #17 204E10000 SUBGRADE COMPACTION, (20060 SY)

Awd $13,039.00$0.65

2 $25,075.00$1.25

3 $70,210.00$3.50

Ref #18 204E13000 EXCAVATION OF SUBGRADE, (648 CY)

Awd $10,847.52$16.74

2 $9,558.00$14.75

3 $12,960.00$20.00

Ref #19 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, (9130 CY)

Awd $78,609.30$8.61

2 $127,820.00$14.00

3 $219,120.00$24.00

Ref #20 204E20001 EMBANKMENT, AS PER PLAN, (9130 CY)

Awd $38,802.50$4.25

2 $93,126.00$10.20

3 $73,040.00$8.00

Ref #21 204E30010 GRANULAR MATERIAL, TYPE B, (648 CY)

Awd $21,403.44$33.03

2 $19,440.00$30.00

3 $22,680.00$35.00

Ref #22 204E45000 PROOF ROLLING, (62 HOUR)

Awd $9,182.20$148.10

2 $8,990.00$145.00

3 $21,700.00$350.00

Ref #23 204E50000 GEOTEXTILE FABRIC, (972 SY)

Awd $2,449.44$2.52

2 $2,430.00$2.50

3 $1,944.00$2.00

Ref #24 206E10010 LIME STABILIZED SUBGRADE, 12 INCHES DEEP, (118688 SY)

Awd $338,260.80$2.85

2 $344,195.20$2.90

3 $320,457.60$2.70

140001 - Page 3

Page 4: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #25 206E11000 CURING COAT, (117711 SY)

Awd $35,313.30$0.30

2 $35,313.30$0.30

3 $35,313.30$0.30

Ref #26 206E25100 LIME KILN DUST, (3737 TON)

Awd $250,379.00$67.00

2 $250,379.00$67.00

3 $231,694.00$62.00

Ref #27 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS, (LUMP SUM)

Awd $25,000.00$25,000.00

2 $25,000.00$25,000.00

3 $25,000.00$25,000.00

Ref #28 606E15050 GUARDRAIL, TYPE MGS, (7762.5 FT)

Awd $97,807.50$12.60

2 $97,807.50$12.60

3 $97,807.50$12.60

Ref #29 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING, (475 FT)

Awd $9,476.25$19.95

2 $9,476.25$19.95

3 $9,476.25$19.95

Ref #30 606E15250 GUARDRAIL, TYPE MGS QUARTER POST SPACING, (6.8 FT)

Awd $178.50$26.25

2 $178.50$26.25

3 $178.50$26.25

Ref #31 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS, (375 FT)

Awd $8,756.25$23.35

2 $8,756.25$23.35

3 $8,756.25$23.35

Ref #32 606E20000 FLARED END SECTION, (7 EACH)

Awd $238.00$34.00

2 $238.00$34.00

3 $238.00$34.00

Ref #33 606E26000 ANCHOR ASSEMBLY, TYPE B, (3 EACH)

Awd $4,845.00$1,615.00

2 $4,845.00$1,615.00

3 $4,845.00$1,615.00

Ref #34 606E26100 ANCHOR ASSEMBLY, TYPE E, (13 EACH)

Awd $24,245.00$1,865.00

2 $24,245.00$1,865.00

3 $24,245.00$1,865.00

Ref #35 606E26500 ANCHOR ASSEMBLY, TYPE T, (13 EACH)

Awd $8,905.00$685.00

2 $8,905.00$685.00

3 $8,905.00$685.00

Ref #36 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (13 EACH)

Awd $20,085.00$1,545.00

2 $20,085.00$1,545.00

3 $20,085.00$1,545.00

140001 - Page 4

Page 5: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #37 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2, (1 EACH)

Awd $185.00$185.00

2 $185.00$185.00

3 $185.00$185.00

Ref #38 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL), (7 EACH)

Awd $44,994.88$6,427.84

2 $29,925.00$4,275.00

3 $29,925.00$4,275.00

Ref #39 606E98000 GUARDRAIL, MISC.:TENSIONED CABLE W/CONC. FOUNDATIO, (20077 FT)

Awd $175,673.75$8.75

2 $175,673.75$8.75

3 $175,673.75$8.75

Ref #40 606E98100 GUARDRAIL, MISC.:TENSIONED CABLE ANCHOR TERMINAL, (18 EACH)

Awd $32,850.00$1,825.00

2 $32,850.00$1,825.00

3 $32,850.00$1,825.00

Ref #41 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, (274 FT)

Awd $38,360.00$140.00

2 $24,660.00$90.00

3 $38,360.00$140.00

Ref #42 622E25050 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE , (11 EACH)

Awd $33,615.89$3,055.99

2 $26,070.00$2,370.00

3 $28,820.00$2,620.00

Ref #43 690E98300 SPECIAL - MISC.:MOW STRIP, (8924 SY)

Awd $209,535.52$23.48

2 $178,480.00$20.00

3 $232,024.00$26.00

Ref #200 622E25000 CONCRETE BARRIER END SECTION, TYPE D, (11 EACH)

Awd $31,855.89$2,895.99

2 $26,070.00$2,370.00

3 $27,060.00$2,460.00

Ref #203 503E31101 ROCK EXCAVATION, AS PER PLAN, (600 CY)

Awd $31,854.00$53.09

2 $14,400.00$24.00

3 $36,000.00$60.00

Section 1 - ROADWAY - Totals

Awd $2,940,370.69

2 $3,337,615.15

3 $4,571,173.20

Ref #44 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (1 SY)

Awd $320.29$320.29

2 $675.00$675.00

3 $400.00$400.00

Ref #45 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (221 SY)

Awd $15,931.89$72.09

2 $22,100.00$100.00

3 $18,785.00$85.00

140001 - Page 5

Page 6: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #46 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (54 CY)

Awd $6,730.56$124.64

2 $8,856.00$164.00

3 $4,050.00$75.00

Ref #47 659E00100 SOIL ANALYSIS TEST, (3 EACH)

Awd $120.00$40.00

2 $120.00$40.00

3 $75.00$25.00

Ref #48 659E00300 TOPSOIL, (29439 CY)

Awd $248,170.77$8.43

2 $235,512.00$8.00

3 $176,634.00$6.00

Ref #49 659E10000 SEEDING AND MULCHING, (265211 SY)

Awd $79,563.30$0.30

2 $90,171.74$0.34

3 $71,606.97$0.27

Ref #50 659E14000 REPAIR SEEDING AND MULCHING, (13261 SY)

Awd $3,978.30$0.30

2 $4,508.74$0.34

3 $2,652.20$0.20

Ref #51 659E15000 INTER-SEEDING, (13261 SY)

Awd $2,652.20$0.20

2 $2,652.20$0.20

3 $1,591.32$0.12

Ref #52 659E20000 COMMERCIAL FERTILIZER, (25.66 TON)

Awd $10,264.00$400.00

2 $10,264.00$400.00

3 $8,981.00$350.00

Ref #53 659E31000 LIME, (6.09 ACRE)

Awd $30.45$5.00

2 $30.45$5.00

3 $152.25$25.00

Ref #54 659E35000 WATER, (752 MGAL)

Awd $376.00$0.50

2 $376.00$0.50

3 $7.52$0.01

Ref #55 670E00700 DITCH EROSION PROTECTION, (3895 SY)

Awd $5,647.75$1.45

2 $6,037.25$1.55

3 $4,284.50$1.10

Ref #56 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $17,270.00$17,270.00

2 $20,000.00$20,000.00

3 $20,000.00$20,000.00

Ref #57 832E30000 EROSION CONTROL, (715648 EACH)

Awd $715,648.00$1.00

2 $715,648.00$1.00

3 $715,648.00$1.00

140001 - Page 6

Page 7: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 2 - EROSION CONTROL - Totals

Awd $1,106,703.51

2 $1,116,951.38

3 $1,024,867.76

Ref #58 511E46610 CLASS QC1 CONCRETE, HEADWALL, (3 CY)

Awd $6,654.36$2,218.12

2 $6,300.00$2,100.00

3 $10,500.00$3,500.00

Ref #59 605E11100 6" SHALLOW PIPE UNDERDRAINS, (39936 FT)

Awd $186,900.48$4.68

2 $215,654.40$5.40

3 $239,616.00$6.00

Ref #60 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (23195 FT)

Awd $102,521.90$4.42

2 $116,438.90$5.02

3 $150,767.50$6.50

Ref #61 605E14000 6" BASE PIPE UNDERDRAINS, (79694 FT)

Awd $297,258.62$3.73

2 $390,500.60$4.90

3 $478,164.00$6.00

Ref #62 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (2844 FT)

Awd $82,049.40$28.85

2 $39,816.00$14.00

3 $68,256.00$24.00

Ref #63 611E01400 6" CONDUIT, TYPE E, (20 FT)

Awd $496.20$24.81

2 $340.00$17.00

3 $400.00$20.00

Ref #64 611E01500 6" CONDUIT, TYPE F, (620 FT)

Awd $15,394.60$24.83

2 $10,540.00$17.00

3 $14,880.00$24.00

Ref #65 611E05900 15" CONDUIT, TYPE B, (81 FT)

Awd $7,170.12$88.52

2 $3,483.00$43.00

3 $6,480.00$80.00

Ref #66 611E07600 18" CONDUIT, TYPE C, (3248 FT)

Awd $159,411.84$49.08

2 $139,664.00$43.00

3 $146,160.00$45.00

Ref #67 611E08900 21" CONDUIT, TYPE B, (120 FT)

Awd $18,132.00$151.10

2 $7,200.00$60.00

3 $10,800.00$90.00

Ref #68 611E09100 21" CONDUIT, TYPE C, (1652 FT)

Awd $100,871.12$61.06

2 $82,600.00$50.00

3 $82,600.00$50.00

140001 - Page 7

Page 8: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #69 611E10600 24" CONDUIT, TYPE C, (560 FT)

Awd $48,496.00$86.60

2 $29,120.00$52.00

3 $30,800.00$55.00

Ref #70 611E13400 30" CONDUIT, TYPE B, (119 FT)

Awd $24,682.98$207.42

2 $9,520.00$80.00

3 $14,280.00$120.00

Ref #71 611E96600 CONDUIT, BORED OR JACKED:15", TYPE B, (644 FT)

Awd $135,935.52$211.08

2 $130,732.00$203.00

3 $177,100.00$275.00

Ref #72 611E96600 CONDUIT, BORED OR JACKED:18", TYPE C, (109 FT)

Awd $28,066.41$257.49

2 $24,307.00$223.00

3 $32,700.00$300.00

Ref #73 611E98230 CATCH BASIN, NO. 4, (27 EACH)

Awd $78,081.57$2,891.91

2 $106,650.00$3,950.00

3 $108,000.00$4,000.00

Ref #74 611E98470 CATCH BASIN, NO. 2-2B, (2 EACH)

Awd $2,513.52$1,256.76

2 $2,200.00$1,100.00

3 $4,000.00$2,000.00

Ref #75 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (107 EACH)

Awd $27,546.08$257.44

2 $18,725.00$175.00

3 $32,100.00$300.00

Ref #201 611E07400 18" CONDUIT, TYPE B, (27 FT)

Awd $3,654.99$135.37

2 $1,539.00$57.00

3 $2,295.00$85.00

Ref #202 603E10400 24" CONDUIT, TYPE B, (27 FT)

Awd $4,307.58$159.54

2 $1,728.00$64.00

3 $2,700.00$100.00

Ref #204 605E13501 6" ROCK CUT UNDERDRAINS, AS PER PLAN, (3500 FT)

Awd $33,845.00$9.67

2 $42,000.00$12.00

3 $50,750.00$14.50

Section 3 - DRAINAGE - Totals

Awd $1,363,990.29

2 $1,379,057.90

3 $1,663,348.50

Ref #76 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (187509 SY)

Awd $155,632.47$0.83

2 $121,880.85$0.65

3 $196,884.45$1.05

140001 - Page 8

Page 9: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #77 302E46000 ASPHALT CONCRETE BASE, PG64-22, (41101 CY)

Awd $3,287,257.98$79.98

2 $3,740,191.00$91.00

3 $3,986,797.00$97.00

Ref #78 304E20000 AGGREGATE BASE, (24846 CY)

Awd $817,184.94$32.89

2 $869,610.00$35.00

3 $1,167,762.00$47.00

Ref #79 407E10000 TACK COAT, (14064 GAL)

Awd $31,644.00$2.25

2 $33,753.60$2.40

3 $34,456.80$2.45

Ref #80 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (11140 GAL)

Awd $25,065.00$2.25

2 $26,736.00$2.40

3 $27,293.00$2.45

Ref #81 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (13274 CY)

Awd $2,014,727.72$151.78

2 $2,190,210.00$165.00

3 $2,030,922.00$153.00

Ref #82 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A, (15426 CY)

Awd $1,754,861.76$113.76

2 $2,067,084.00$134.00

3 $1,881,972.00$122.00

Ref #83 452E17010 14" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1, (6272 SY)

Awd $452,524.80$72.15

2 $447,820.80$71.40

3 $398,272.00$63.50

Ref #84 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (16.38 MILE)

Awd $7,780.50$475.00

2 $9,909.90$605.00

3 $9,009.00$550.00

Section 4 - PAVEMENT - Totals

Awd $8,546,679.17

2 $9,507,196.15

3 $9,733,368.25

Ref #85 621E00100 RPM, (773 EACH)

Awd $14,764.30$19.10

2 $16,851.40$21.80

3 $14,957.55$19.35

Ref #86 621E54000 RAISED PAVEMENT MARKER REMOVED, (425 EACH)

Awd $5,397.50$12.70

2 $2,975.00$7.00

3 $2,550.00$6.00

Ref #87 625E32000 GROUND ROD, (9 EACH)

Awd $2,340.00$260.00

2 $2,475.00$275.00

3 $1,800.00$200.00

140001 - Page 9

Page 10: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #88 626E00100 BARRIER REFLECTOR, (142 EACH)

Awd $994.00$7.00

2 $994.00$7.00

3 $994.00$7.00

Ref #89 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (90 FT)

Awd $585.00$6.50

2 $585.00$6.50

3 $585.00$6.50

Ref #90 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (423 FT)

Awd $3,087.90$7.30

2 $3,087.90$7.30

3 $3,087.90$7.30

Ref #91 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST, (70 FT)

Awd $693.00$9.90

2 $693.00$9.90

3 $693.00$9.90

Ref #92 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9, (46 FT)

Awd $591.10$12.85

2 $591.10$12.85

3 $591.10$12.85

Ref #93 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18, (72 FT)

Awd $1,674.00$23.25

2 $1,674.00$23.25

3 $1,674.00$23.25

Ref #94 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12, (206 FT)

Awd $3,460.80$16.80

2 $3,460.80$16.80

3 $3,460.80$16.80

Ref #95 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION, (13 EACH)

Awd $3,900.00$300.00

2 $3,900.00$300.00

3 $3,900.00$300.00

Ref #96 630E20800 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 8, (5 EACH)

Awd $71,550.00$14,310.00

2 $71,550.00$14,310.00

3 $71,550.00$14,310.00

Ref #97 630E21000 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 10, (2 EACH)

Awd $39,140.00$19,570.00

2 $39,140.00$19,570.00

3 $39,140.00$19,570.00

Ref #98 630E45500 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 8, (1 EACH)

Awd $28,425.00$28,425.00

2 $28,425.00$28,425.00

3 $28,425.00$28,425.00

Ref #99 630E80100 SIGN, FLAT SHEET, (323 SF)

Awd $4,974.20$15.40

2 $4,974.20$15.40

3 $4,974.20$15.40

140001 - Page 10

Page 11: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #100 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET, (535 SF)

Awd $9,763.75$18.25

2 $9,763.75$18.25

3 $9,763.75$18.25

Ref #101 630E80224 SIGN, OVERHEAD EXTRUSHEET, (1011 SF)

Awd $18,046.35$17.85

2 $18,046.35$17.85

3 $18,046.35$17.85

Ref #102 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (13 EACH)

Awd $9,100.00$700.00

2 $9,100.00$700.00

3 $9,100.00$700.00

Ref #103 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (9 EACH)

Awd $27,000.00$3,000.00

2 $27,000.00$3,000.00

3 $27,000.00$3,000.00

Ref #104 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (44 EACH)

Awd $660.00$15.00

2 $660.00$15.00

3 $660.00$15.00

Ref #105 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (13 EACH)

Awd $1,170.00$90.00

2 $1,170.00$90.00

3 $1,170.00$90.00

Ref #106 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (34 EACH)

Awd $510.00$15.00

2 $510.00$15.00

3 $510.00$15.00

Ref #107 630E86103 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT , (24 EACH)

Awd $4,800.00$200.00

2 $4,800.00$200.00

3 $4,800.00$200.00

Ref #108 630E86293 REMOVAL OF GROUND MOUNTED WOODEN BOX BEAM SUPPORT , (4 EACH)

Awd $3,300.00$825.00

2 $3,300.00$825.00

3 $3,300.00$825.00

Ref #109 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION, (2 EACH)

Awd $1,450.00$725.00

2 $1,450.00$725.00

3 $1,450.00$725.00

Ref #110 630E89707 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (2 EACH)

Awd $2,850.00$1,425.00

2 $2,850.00$1,425.00

3 $2,850.00$1,425.00

Ref #111 630E89902 REMOVAL OF MISCELLANEOUS TRAFFIC CONTROL ITEM: GRO, (2 EACH)

Awd $550.00$275.00

2 $550.00$275.00

3 $550.00$275.00

140001 - Page 11

Page 12: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #112 631E94251 REMOVAL OF LUMINAIRE, AS PER PLAN, (4 EACH)

Awd $100.00$25.00

2 $100.00$25.00

3 $140.00$35.00

Ref #113 631E94350 REMOVAL OF DISCONNECT SWITCH, (2 EACH)

Awd $600.00$300.00

2 $300.00$150.00

3 $90.00$45.00

Ref #114 631E94470 REMOVAL OF SIGN SERVICE, (2 EACH)

Awd $400.00$200.00

2 $800.00$400.00

3 $450.00$225.00

Ref #115 631E94490 REMOVAL, MISC.:REMOVAL OF SIGN WIRED, (2 EACH)

Awd $50.00$25.00

2 $40.00$20.00

3 $170.00$85.00

Ref #116 642E30020 REMOVAL OF PAVEMENT MARKING, (3 EACH)

Awd $1,980.00$660.00

2 $1,980.00$660.00

3 $1,200.00$400.00

Ref #117 644E00104 EDGE LINE, 6", (16.99 MILE)

Awd $45,703.10$2,690.00

2 $45,703.10$2,690.00

3 $37,004.22$2,178.00

Ref #118 644E00204 LANE LINE, 6", (16.29 MILE)

Awd $13,927.95$855.00

2 $13,927.95$855.00

3 $19,710.90$1,210.00

Ref #119 644E00404 CHANNELIZING LINE, 12", (2089 FT)

Awd $3,133.50$1.50

2 $3,133.50$1.50

3 $2,945.49$1.41

Ref #120 644E01510 DOTTED LINE, 6", (4188 FT)

Awd $5,235.00$1.25

2 $5,235.00$1.25

3 $6,910.20$1.65

Ref #121 646E10010 EDGE LINE, 6", (0.93 MILE)

Awd $8,551.35$9,195.00

2 $8,551.35$9,195.00

3 $7,495.80$8,060.00

Ref #122 646E10200 CENTER LINE, (0.06 MILE)

Awd $627.00$10,450.00

2 $627.00$10,450.00

3 $1,114.20$18,570.00

Ref #123 646E10400 STOP LINE, (52 FT)

Awd $650.00$12.50

2 $650.00$12.50

3 $884.00$17.00

140001 - Page 12

Page 13: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #124 646E10600 TRANSVERSE/DIAGONAL LINE, (70 FT)

Awd $686.00$9.80

2 $686.00$9.80

3 $595.00$8.50

Ref #125 646E20300 LANE ARROW, (1 EACH)

Awd $250.00$250.00

2 $250.00$250.00

3 $240.00$240.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $342,670.80

2 $342,560.40

3 $336,532.46

Ref #126 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (1500 HOUR)

Awd $94,425.00$62.95

2 $90,000.00$60.00

3 $87,750.00$58.50

Ref #127 614E11500 WORKSITE TRAFFIC SUPERVISOR, (20 MNTH)

Awd $67,731.60$3,386.58

2 $20,000.00$1,000.00

3 $124,000.00$6,200.00

Ref #128 614E11620 LINEAR DELINEATION, (7630 FT)

Awd $13,276.20$1.74

2 $11,445.00$1.50

3 $11,445.00$1.50

Ref #129 614E12346 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), 24", (34 EACH)

Awd $55,889.54$1,643.81

2 $61,200.00$1,800.00

3 $136,000.00$4,000.00

Ref #130 614E12410 SPEED ZONE AHEAD SYMBOL SIGN, (8 EACH)

Awd $1,813.52$226.69

2 $1,200.00$150.00

3 $1,200.00$150.00

Ref #131 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $11,263.39$11,263.39

2 $6,540.00$6,540.00

3 $6,540.00$6,540.00

Ref #132 614E12470 WORK ZONE SPEED LIMIT SIGN, (8 EACH)

Awd $1,413.52$176.69

2 $1,200.00$150.00

3 $1,200.00$150.00

Ref #133 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (20 EACH)

Awd $4,533.80$226.69

2 $3,500.00$175.00

3 $3,500.00$175.00

Ref #134 614E12500 REPLACEMENT SIGN, (20 EACH)

Awd $5,284.00$264.20

2 $2,500.00$125.00

3 $2,500.00$125.00

140001 - Page 13

Page 14: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #135 614E12600 REPLACEMENT DRUM, (50 EACH)

Awd $3,102.50$62.05

2 $2,500.00$50.00

3 $4,000.00$80.00

Ref #136 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN, (4280 EACH)

Awd $57,480.40$13.43

2 $23,540.00$5.50

3 $40,660.00$9.50

Ref #137 614E13100 BARRIER REFLECTOR, (1262 EACH)

Awd $14,702.30$11.65

2 $7,572.00$6.00

3 $7,572.00$6.00

Ref #138 614E13350 OBJECT MARKER, ONE WAY, (1262 EACH)

Awd $16,771.98$13.29

2 $13,882.00$11.00

3 $13,882.00$11.00

Ref #139 614E18000 MAINTAINING TRAFFIC, MISC.:CONSTRUCTION ACCESS POI, (9 EACH)

Awd $13,636.53$1,515.17

2 $34,200.00$3,800.00

3 $46,800.00$5,200.00

Ref #140 614E20550 WORK ZONE LANE LINE, CLASS III, 642 PAINT, (16.3 MILE)

Awd $8,394.50$515.00

2 $8,394.50$515.00

3 $8,394.50$515.00

Ref #141 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.83 MILE)

Awd $5,039.76$6,072.00

2 $5,039.76$6,072.00

3 $5,039.76$6,072.00

Ref #142 614E22350 WORK ZONE EDGE LINE, CLASS III, 642 PAINT, (17.8 MILE)

Awd $11,214.00$630.00

2 $11,214.00$630.00

3 $11,214.00$630.00

Ref #143 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 740.06, TYPE, (1707 FT)

Awd $3,414.00$2.00

2 $3,414.00$2.00

3 $3,414.00$2.00

Ref #144 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 642 PAINT, (1986 FT)

Awd $1,092.30$0.55

2 $1,092.30$0.55

3 $1,092.30$0.55

Ref #145 614E24610 WORK ZONE DOTTED LINE, CLASS III, 642 PAINT, (4188 FT)

Awd $2,094.00$0.50

2 $2,094.00$0.50

3 $2,094.00$0.50

Ref #146 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (99 FT)

Awd $247.50$2.50

2 $247.50$2.50

3 $247.50$2.50

140001 - Page 14

Page 15: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #147 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $9,291.07$9,291.07

2 $35,000.00$35,000.00

3 $40,000.00$40,000.00

Ref #148 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (1650 SY)

Awd $54,747.00$33.18

2 $56,100.00$34.00

3 $57,750.00$35.00

Ref #149 616E10000 WATER, (300 MGAL)

Awd $15,321.00$51.07

2 $9,000.00$30.00

3 $18,000.00$60.00

Ref #150 618E40101 RUMBLE STRIPS, (ASPHALT CONCRETE), AS PER PLAN, (40790 FT)

Awd $123,185.80$3.02

2 $87,698.50$2.15

3 $101,975.00$2.50

Ref #151 622E41000 PORTABLE BARRIER, 32", (63175 FT)

Awd $802,954.25$12.71

2 $1,244,547.50$19.70

3 $1,105,562.50$17.50

Ref #152 622E41050 PORTABLE BARRIER, "Y" CONNECTOR, (1 EACH)

Awd $1,276.71$1,276.71

2 $1,500.00$1,500.00

3 $2,500.00$2,500.00

Ref #205 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (15.16 MILE)

Awd $1,970.80$130.00

2 $1,970.80$130.00

3 $1,970.80$130.00

Ref #206 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (47.02 MILE)

Awd $15,751.70$335.00

2 $15,751.70$335.00

3 $15,751.70$335.00

Ref #207 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (36156 FT)

Awd $9,039.00$0.25

2 $9,039.00$0.25

3 $9,039.00$0.25

Ref #208 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (5945 FT)

Awd $1,189.00$0.20

2 $1,189.00$0.20

3 $1,189.00$0.20

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $1,427,546.67

2 $1,772,571.56

3 $1,872,283.06

Ref #153 606E10200 SPECIAL - NOISE BARRIER (REFLECTIVE), 10' HEIGHT A, (576 SF)

Awd $23,552.64$40.89

2 $12,096.00$21.00

3 $12,412.80$21.55

140001 - Page 15

Page 16: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #154 606E10210 SPECIAL - NOISE BARRIER (REFLECTIVE), OVER 10' TO , (416 SF)

Awd $13,648.96$32.81

2 $8,736.00$21.00

3 $8,964.80$21.55

Ref #155 606E10220 SPECIAL - NOISE BARRIER (REFLECTIVE), OVER 14' TO , (40974 SF)

Awd $923,963.70$22.55

2 $860,454.00$21.00

3 $882,989.70$21.55

Ref #156 606E10230 SPECIAL - NOISE BARRIER (REFLECTIVE), OVER 20' TO , (504 SF)

Awd $13,255.20$26.30

2 $10,584.00$21.00

3 $10,861.20$21.55

Section 7 - NOISE BARRIERS - Totals

Awd $974,420.50

2 $891,870.00

3 $915,228.50

Ref #157 100E50200 SPECIAL - DEPARTMENT'S SHARE OF THE DISPUTE RESOLU, (24000 DLR)

Awd $24,000.00$1.00

2 $24,000.00$1.00

3 $24,000.00$1.00

Ref #158 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $79,001.59$79,001.59

2 $80,000.00$80,000.00

3 $150,000.00$150,000.00

Ref #159 108E10000 SPECIAL - CPM PROGRESS SCHEDULE, (LUMP SUM)

Awd $7,602.31$7,602.31

2 $5,000.00$5,000.00

3 $10,000.00$10,000.00

Ref #160 111E10000 SPECIAL - DEPARTMENTS SHARE FACILITATED PARTNERING, (LUMP SUM)

Awd $4,000.00$4,000.00

2 $4,000.00$4,000.00

3 $4,000.00$4,000.00

Ref #161 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $198,767.99$198,767.99

2 $700,000.00$700,000.00

3 $500,000.00$500,000.00

Ref #162 619E16020 FIELD OFFICE, TYPE C, (20 MNTH)

Awd $25,730.40$1,286.52

2 $56,000.00$2,800.00

3 $56,000.00$2,800.00

Ref #163 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $87,525.51$87,525.51

2 $100,000.00$100,000.00

3 $160,000.00$160,000.00

Ref #164 624E10000 MOBILIZATION, (LUMP SUM)

Awd $400,000.00$400,000.00

2 $153,000.00$153,000.00

3 $590,000.00$590,000.00

140001 - Page 16

Page 17: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 8 - INCIDENTALS - Totals

Awd $826,627.80

2 $1,122,000.00

3 $1,494,000.00

140001 - Page 17

Page 18: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Project No. 140013

PID 91860

GUE-SR-83-7.32, PT. 1;GUE-146-2.56, PT. 2; GUE-146-3.44, P

Federal

Type: CULVERT REPLACEMENT

Completion Date: 9/16/2014

Award Amount: $758,919.70

Contract Awarded To: OHIO-WEST VIRGINIA EXCAVATING CO

Letting Date: 1/16/2014

Engineer's Estimate: $677,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

OHIO-WEST VIRGINIA EXCAVATING CO

56461 FERRY LANDING ROAD

SHADYSIDE, OH 43947

Belmont

Bidder 1

Bid $758,919.70

CROSS ROADS CONSTRUCTION INC

3155 HARDING LANE

CAMBRIDGE, OH 43725

Guernsey

Bidder 2

Bid $778,349.95

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 3

Bid $845,591.98

COMPLETE GENERAL CONSTRUCTION COMPANY

1221 EAST FIFTH AVE

COLUMBUS, OH 43219

Franklin

Bidder 4

Bid $847,863.20

ECLIPSE CO LLC

11554 EAST WASHINGTON ST

CHAGRIN FALLS, OH 44023

Geauga

Bidder 5

Bid $865,106.93

MR EXCAVATOR INC

8616 EUCLID CHARDON RD

KIRTLAND, OH 44094

Lake

Bidder 6

Bid $894,085.54

R W ROBINSON INC

87 EAST STATE

BELLVILLE, OH 44813

Richland

Bidder 7

Bid $947,125.13

R C CONSTRUCTION COMPANY AND SON INC

8096 FEDERAL ROAD

CUTLER, OH 45724

Washington

Bidder 8

Bid $995,849.22

140013 - Page 18

Page 19: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $500.00$500.00

2 $1,000.00$1,000.00

3 $4,500.00$4,500.00

4 $3,000.00$3,000.00

5 $515.00$515.00

6 $1,608.10$1,608.10

7 $8,600.00$8,600.00

8 $2,500.00$2,500.00

Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (48 SY)

Awd $192.00$4.00

2 $480.00$10.00

3 $1,056.00$22.00

4 $864.00$18.00

5 $2,839.20$59.15

6 $154.56$3.22

7 $288.00$6.00

8 $480.00$10.00

Ref #3 202E23500 WEARING COURSE REMOVED, (310 SY)

Awd $5,270.00$17.00

2 $3,100.00$10.00

3 $4,650.00$15.00

4 $3,100.00$10.00

5 $3,193.00$10.30

6 $1,314.40$4.24

7 $3,720.00$12.00

8 $4,960.00$16.00

Ref #4 202E38000 GUARDRAIL REMOVED, (50 FT)

Awd $100.00$2.00

2 $137.50$2.75

3 $275.00$5.50

4 $100.00$2.00

5 $82.50$1.65

6 $85.00$1.70

7 $80.00$1.60

8 $150.00$3.00

Ref #5 203E10000 EXCAVATION, (246 CY)

Awd $3,198.00$13.00

2 $3,690.00$15.00

3 $5,658.00$23.00

4 $3,690.00$15.00

5 $8,041.74$32.69

6 $1,709.70$6.95

7 $3,444.00$14.00

8 $2,952.00$12.00

Ref #6 203E20000 EMBANKMENT, (245 CY)

Awd $6,615.00$27.00

2 $3,920.00$16.00

3 $2,695.00$11.00

4 $1,225.00$5.00

5 $4,931.85$20.13

6 $867.30$3.54

7 $3,430.00$14.00

8 $3,675.00$15.00

140013 - Page 19

Page 20: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #7 606E15050 GUARDRAIL, TYPE MGS, (187.5 FT)

Awd $2,812.50$15.00

2 $2,775.00$14.80

3 $2,812.50$15.00

4 $2,775.00$14.80

5 $2,857.50$15.24

6 $2,941.88$15.69

7 $2,775.00$14.80

8 $3,000.00$16.00

Ref #8 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN, (182 FT)

Awd $4,368.00$24.00

2 $3,913.00$21.50

3 $4,004.00$22.00

4 $3,913.00$21.50

5 $4,031.30$22.15

6 $4,147.78$22.79

7 $3,913.00$21.50

8 $4,368.00$24.00

Ref #9 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (4 EACH)

Awd $8,000.00$2,000.00

2 $7,300.00$1,825.00

3 $7,300.00$1,825.00

4 $7,300.00$1,825.00

5 $7,622.00$1,905.50

6 $7,738.00$1,934.50

7 $7,300.00$1,825.00

8 $7,600.00$1,900.00

Ref #10 623E38500 MONUMENT ASSEMBLY, (4 EACH)

Awd $1,460.00$365.00

2 $2,300.00$575.00

3 $4,800.00$1,200.00

4 $3,000.00$750.00

5 $5,540.48$1,385.12

6 $1,636.00$409.00

7 $3,000.00$750.00

8 $2,600.00$650.00

Ref #11 623E40520 RIGHT-OF-WAY MONUMENT, (2 EACH)

Awd $1,100.00$550.00

2 $1,050.00$525.00

3 $1,150.00$575.00

4 $1,200.00$600.00

5 $804.48$402.24

6 $818.00$409.00

7 $600.00$300.00

8 $1,400.00$700.00

Ref #12 626E00100 BARRIER REFLECTOR, (12 EACH)

Awd $84.00$7.00

2 $72.00$6.00

3 $84.00$7.00

4 $72.00$6.00

5 $74.16$6.18

6 $76.32$6.36

7 $72.00$6.00

8 $120.00$10.00

140013 - Page 20

Page 21: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 1 - ROADWAY - PART 1 - Totals

Awd $33,699.50

2 $29,737.50

3 $38,984.50

4 $30,239.00

5 $40,533.21

6 $23,097.04

7 $37,222.00

8 $33,805.00

Ref #13 653E10000 TOPSOIL FURNISHED AND PLACED, (50 CY)

Awd $2,000.00$40.00

2 $2,250.00$45.00

3 $2,450.00$49.00

4 $1,250.00$25.00

5 $2,955.50$59.11

6 $1,664.00$33.28

7 $1,500.00$30.00

8 $2,000.00$40.00

Ref #14 659E00510 SEEDING AND MULCHING, CLASS 2, (2167 SY)

Awd $4,334.00$2.00

2 $2,925.45$1.35

3 $1,798.61$0.83

4 $2,925.45$1.35

5 $3,012.13$1.39

6 $3,553.88$1.64

7 $2,708.75$1.25

8 $4,334.00$2.00

Ref #15 659E20000 COMMERCIAL FERTILIZER, (0.3 TON)

Awd $210.00$700.00

2 $122.40$408.00

3 $183.00$610.00

4 $122.40$408.00

5 $126.07$420.23

6 $129.74$432.47

7 $150.00$500.00

8 $360.00$1,200.00

Ref #16 659E31000 LIME, (0.5 ACRE)

Awd $50.00$100.00

2 $40.00$80.00

3 $70.00$140.00

4 $40.00$80.00

5 $41.20$82.40

6 $42.40$84.80

7 $10.00$20.00

8 $40.00$80.00

140013 - Page 21

Page 22: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #17 659E35000 WATER, (12 MGAL)

Awd $12.00$1.00

2 $12.00$1.00

3 $12.00$1.00

4 $12.00$1.00

5 $12.36$1.03

6 $12.72$1.06

7 $12.00$1.00

8 $0.60$0.05

Ref #18 832E30000 EROSION CONTROL, (1200 EACH)

Awd $1,200.00$1.00

2 $1,200.00$1.00

3 $1,200.00$1.00

4 $1,200.00$1.00

5 $1,200.00$1.00

6 $1,200.00$1.00

7 $1,200.00$1.00

8 $1,200.00$1.00

Section 2 - EROSION CONTROL - PART 1 - Totals

Awd $7,806.00

2 $6,549.85

3 $5,713.61

4 $5,549.85

5 $7,347.26

6 $6,602.74

7 $5,580.75

8 $7,934.60

Ref #19 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (25 CY)

Awd $1,875.00$75.00

2 $1,875.00$75.00

3 $1,925.00$77.00

4 $2,375.00$95.00

5 $3,906.25$156.25

6 $1,519.25$60.77

7 $2,000.00$80.00

8 $2,000.00$80.00

Ref #20 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (29.5 CY)

Awd $2,212.50$75.00

2 $2,212.50$75.00

3 $3,097.50$105.00

4 $2,802.50$95.00

5 $5,029.16$170.48

6 $1,792.72$60.77

7 $2,360.00$80.00

8 $2,360.00$80.00

140013 - Page 22

Page 23: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #21 611E00400 4" CONDUIT, TYPE E, (50 FT)

Awd $750.00$15.00

2 $400.00$8.00

3 $500.00$10.00

4 $400.00$8.00

5 $697.50$13.95

6 $3,443.00$68.86

7 $400.00$8.00

8 $250.00$5.00

Ref #22 611E00406 4" CONDUIT, TYPE F, (50 FT)

Awd $750.00$15.00

2 $400.00$8.00

3 $500.00$10.00

4 $400.00$8.00

5 $671.00$13.42

6 $2,723.50$54.47

7 $400.00$8.00

8 $250.00$5.00

Ref #23 611E01400 6" CONDUIT, TYPE E, (50 FT)

Awd $800.00$16.00

2 $500.00$10.00

3 $500.00$10.00

4 $500.00$10.00

5 $671.00$13.42

6 $3,486.00$69.72

7 $400.00$8.00

8 $250.00$5.00

Ref #24 611E01500 6" CONDUIT, TYPE F, (50 FT)

Awd $850.00$17.00

2 $500.00$10.00

3 $500.00$10.00

4 $500.00$10.00

5 $750.00$15.00

6 $2,766.50$55.33

7 $400.00$8.00

8 $250.00$5.00

Section 3 - DRAINAGE - PART 1 - Totals

Awd $7,237.50

2 $5,887.50

3 $7,022.50

4 $6,977.50

5 $11,724.91

6 $15,730.97

7 $5,960.00

8 $5,360.00

140013 - Page 23

Page 24: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #25 301E46000 ASPHALT CONCRETE BASE, PG64-22, (34.7 CY)

Awd $10,410.00$300.00

2 $9,785.40$282.00

3 $17,350.00$500.00

4 $9,785.40$282.00

5 $10,078.96$290.46

6 $10,372.52$298.92

7 $9,785.40$282.00

8 $10,063.00$290.00

Ref #26 304E20000 AGGREGATE BASE, (100 CY)

Awd $7,500.00$75.00

2 $8,000.00$80.00

3 $5,500.00$55.00

4 $7,000.00$70.00

5 $6,491.00$64.91

6 $5,255.00$52.55

7 $5,700.00$57.00

8 $6,000.00$60.00

Ref #27 407E10000 TACK COAT, (27.1 GAL)

Awd $135.50$5.00

2 $135.50$5.00

3 $56.91$2.10

4 $135.50$5.00

5 $139.57$5.15

6 $143.63$5.30

7 $135.50$5.00

8 $271.00$10.00

Ref #28 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (4.3 GAL)

Awd $21.50$5.00

2 $21.50$5.00

3 $9.03$2.10

4 $21.50$5.00

5 $22.15$5.15

6 $22.79$5.30

7 $21.50$5.00

8 $43.00$10.00

Ref #29 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (4.3 CY)

Awd $1,720.00$400.00

2 $1,646.90$383.00

3 $3,010.00$700.00

4 $1,646.90$383.00

5 $1,696.31$394.49

6 $1,745.71$405.98

7 $1,646.90$383.00

8 $1,655.50$385.00

Ref #30 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (62.5 CY)

Awd $25,000.00$400.00

2 $23,937.50$383.00

3 $15,625.00$250.00

4 $23,937.50$383.00

5 $24,655.63$394.49

6 $25,373.75$405.98

7 $23,937.50$383.00

8 $24,687.50$395.00

140013 - Page 24

Page 25: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 4 - PAVEMENT - PART 1 - Totals

Awd $44,787.00

2 $43,526.80

3 $41,550.94

4 $42,526.80

5 $43,083.62

6 $42,913.40

7 $41,226.80

8 $42,720.00

Ref #31 621E54000 RAISED PAVEMENT MARKER REMOVED, (4 EACH)

Awd $100.00$25.00

2 $20.00$5.00

3 $48.00$12.00

4 $60.00$15.00

5 $77.32$19.33

6 $100.00$25.00

7 $800.00$200.00

8 $80.00$20.00

Ref #32 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (4 EACH)

Awd $100.00$25.00

2 $40.00$10.00

3 $180.00$45.00

4 $200.00$50.00

5 $61.80$15.45

6 $63.60$15.90

7 $60.00$15.00

8 $80.00$20.00

Ref #33 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (4 EACH)

Awd $100.00$25.00

2 $40.00$10.00

3 $180.00$45.00

4 $200.00$50.00

5 $61.80$15.45

6 $63.60$15.90

7 $60.00$15.00

8 $80.00$20.00

Section 5 - TRAFFIC CONTROL - PART 1 - Totals

Awd $300.00

2 $100.00

3 $408.00

4 $460.00

5 $200.92

6 $227.20

7 $920.00

8 $240.00

140013 - Page 25

Page 26: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #34 614E12421 DETOUR SIGNING, AS PER PLAN, (LUMP SUM)

Awd $3,500.00$3,500.00

2 $4,000.00$4,000.00

3 $3,200.00$3,200.00

4 $7,000.00$7,000.00

5 $3,204.33$3,204.33

6 $4,302.54$4,302.54

7 $3,200.00$3,200.00

8 $7,500.00$7,500.00

Ref #35 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (60 DAY)

Awd $1,680.00$28.00

2 $1,620.00$27.00

3 $1,800.00$30.00

4 $3,600.00$60.00

5 $1,668.60$27.81

6 $3,561.60$59.36

7 $1,800.00$30.00

8 $2,100.00$35.00

Ref #36 616E10000 WATER, (2 MGAL)

Awd $10.00$5.00

2 $2.00$1.00

3 $150.00$75.00

4 $100.00$50.00

5 $2.06$1.03

6 $20.00$10.00

7 $2.00$1.00

8 $0.10$0.05

Section 6 - MAINTENANCE OF TRAFFIC - PART 1 - Totals

Awd $5,190.00

2 $5,622.00

3 $5,150.00

4 $10,700.00

5 $4,874.99

6 $7,884.14

7 $5,002.00

8 $9,600.10

Ref #37 202E11000 STRUCTURE REMOVED, (LUMP SUM)

Awd $7,500.00$7,500.00

2 $9,000.00$9,000.00

3 $4,900.00$4,900.00

4 $12,500.00$12,500.00

5 $13,264.38$13,264.38

6 $2,513.57$2,513.57

7 $10,000.00$10,000.00

8 $10,000.00$10,000.00

140013 - Page 26

Page 27: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #38 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $865.00$865.00

2 $3,000.00$3,000.00

3 $3,200.00$3,200.00

4 $5,000.00$5,000.00

5 $9,627.85$9,627.85

6 $2,500.00$2,500.00

7 $12,500.00$12,500.00

8 $10,000.00$10,000.00

Ref #39 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $4,335.00$4,335.00

2 $3,500.00$3,500.00

3 $5,250.00$5,250.00

4 $5,000.00$5,000.00

5 $2,188.50$2,188.50

6 $4,288.28$4,288.28

7 $8,000.00$8,000.00

8 $6,500.00$6,500.00

Ref #40 509E10000 EPOXY COATED REINFORCING STEEL, (3492 LB)

Awd $5,587.20$1.60

2 $3,492.00$1.00

3 $2,863.44$0.82

4 $3,841.20$1.10

5 $6,145.92$1.76

6 $5,552.28$1.59

7 $4,365.00$1.25

8 $7,857.00$2.25

Ref #41 511E46010 CLASS QC1 CONCRETE, (8.02 CY)

Awd $7,538.80$940.00

2 $10,827.00$1,350.00

3 $12,832.00$1,600.00

4 $10,426.00$1,300.00

5 $8,559.67$1,067.29

6 $6,307.89$786.52

7 $8,822.00$1,100.00

8 $4,010.00$500.00

Ref #42 511E46510 CLASS QC1 CONCRETE, FOOTING, (28.2 CY)

Awd $9,165.00$325.00

2 $16,920.00$600.00

3 $19,740.00$700.00

4 $14,100.00$500.00

5 $23,294.61$826.05

6 $20,685.26$733.52

7 $15,792.00$560.00

8 $14,100.00$500.00

Ref #43 511E46610 CLASS QC1 CONCRETE, HEADWALL, (1 CY)

Awd $4,190.00$4,190.00

2 $1,400.00$1,400.00

3 $2,500.00$2,500.00

4 $1,200.00$1,200.00

5 $1,266.63$1,266.63

6 $1,105.58$1,105.58

7 $1,500.00$1,500.00

8 $500.00$500.00

140013 - Page 27

Page 28: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #44 512E33000 TYPE 2 WATERPROOFING, (69 SY)

Awd $1,311.00$19.00

2 $1,380.00$20.00

3 $1,587.00$23.00

4 $1,380.00$20.00

5 $2,213.52$32.08

6 $1,820.91$26.39

7 $1,328.25$19.25

8 $1,518.00$22.00

Ref #45 512E33010 TYPE 3 WATERPROOFING, (75 SY)

Awd $2,512.50$33.50

2 $2,625.00$35.00

3 $2,475.00$33.00

4 $1,650.00$22.00

5 $3,723.75$49.65

6 $3,627.00$48.36

7 $2,400.00$32.00

8 $2,100.00$28.00

Ref #46 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN, (38 SF)

Awd $684.00$18.00

2 $380.00$10.00

3 $456.00$12.00

4 $304.00$8.00

5 $520.22$13.69

6 $604.20$15.90

7 $380.00$10.00

8 $760.00$20.00

Ref #47 518E21230 POROUS BACKFILL WITH FILTER FABRIC, (LUMP SUM)

Awd $3,700.00$3,700.00

2 $2,500.00$2,500.00

3 $1,750.00$1,750.00

4 $2,000.00$2,000.00

5 $6,451.57$6,451.57

6 $3,412.24$3,412.24

7 $2,500.00$2,500.00

8 $4,000.00$4,000.00

Ref #48 611E95701 12' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN, (44 FT)

Awd $28,600.00$650.00

2 $32,560.00$740.00

3 $33,000.00$750.00

4 $44,000.00$1,000.00

5 $27,743.76$630.54

6 $44,183.92$1,004.18

7 $38,676.00$879.00

8 $35,200.00$800.00

Ref #49 613E41200 LOW STRENGTH MORTAR BACKFILL, (74 CY)

Awd $9,620.00$130.00

2 $6,290.00$85.00

3 $8,140.00$110.00

4 $6,290.00$85.00

5 $9,976.68$134.82

6 $6,275.20$84.80

7 $7,400.00$100.00

8 $7,400.00$100.00

140013 - Page 28

Page 29: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER - PART - Totals

Awd $85,608.50

2 $93,874.00

3 $98,693.44

4 $107,691.20

5 $114,977.06

6 $102,876.33

7 $113,663.25

8 $103,945.00

Ref #50 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI, (5000 DLR)

Awd $50,000.00$10.00

2 $40,000.00$8.00

3 $35,000.00$7.00

4 $50,000.00$10.00

5 $10,000.00$2.00

6 $50,000.00$10.00

7 $50,000.00$10.00

8 $50,000.00$10.00

Section 8 - PART B SEGMENT 1 - Totals

Awd $50,000.00

2 $40,000.00

3 $35,000.00

4 $50,000.00

5 $10,000.00

6 $50,000.00

7 $50,000.00

8 $50,000.00

Ref #51 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $500.00$500.00

2 $1,000.00$1,000.00

3 $1,500.00$1,500.00

4 $3,000.00$3,000.00

5 $515.00$515.00

6 $1,608.10$1,608.10

7 $5,000.00$5,000.00

8 $2,500.00$2,500.00

Ref #52 202E23010 PAVEMENT REMOVED, ASPHALT, (52.7 SY)

Awd $184.45$3.50

2 $527.00$10.00

3 $579.70$11.00

4 $948.60$18.00

5 $2,099.04$39.83

6 $169.69$3.22

7 $316.20$6.00

8 $1,054.00$20.00

140013 - Page 29

Page 30: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #53 202E23500 WEARING COURSE REMOVED, (309.3 SY)

Awd $5,567.40$18.00

2 $3,093.00$10.00

3 $4,020.90$13.00

4 $3,093.00$10.00

5 $3,185.79$10.30

6 $1,311.43$4.24

7 $3,711.60$12.00

8 $9,279.00$30.00

Ref #54 202E38000 GUARDRAIL REMOVED, (200 FT)

Awd $400.00$2.00

2 $550.00$2.75

3 $400.00$2.00

4 $400.00$2.00

5 $288.00$1.44

6 $296.00$1.48

7 $280.00$1.40

8 $600.00$3.00

Ref #55 202E53100 MAILBOX REMOVED, (1 EACH)

Awd $55.00$55.00

2 $10.00$10.00

3 $100.00$100.00

4 $25.00$25.00

5 $20.60$20.60

6 $10.60$10.60

7 $10.00$10.00

8 $100.00$100.00

Ref #56 202E75000 FENCE REMOVED, (260 FT)

Awd $780.00$3.00

2 $520.00$2.00

3 $585.00$2.25

4 $520.00$2.00

5 $605.80$2.33

6 $624.00$2.40

7 $520.00$2.00

8 $1,300.00$5.00

Ref #57 203E10000 EXCAVATION, (289 CY)

Awd $3,901.50$13.50

2 $4,335.00$15.00

3 $9,248.00$32.00

4 $4,913.00$17.00

5 $7,308.81$25.29

6 $3,650.07$12.63

7 $4,046.00$14.00

8 $3,468.00$12.00

Ref #58 203E20000 EMBANKMENT, (114 CY)

Awd $3,135.00$27.50

2 $1,824.00$16.00

3 $1,368.00$12.00

4 $570.00$5.00

5 $2,045.16$17.94

6 $403.56$3.54

7 $1,596.00$14.00

8 $1,710.00$15.00

140013 - Page 30

Page 31: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #59 606E15050 GUARDRAIL, TYPE MGS, (205 FT)

Awd $3,157.00$15.40

2 $3,034.00$14.80

3 $3,075.00$15.00

4 $3,034.00$14.80

5 $3,124.20$15.24

6 $3,216.45$15.69

7 $3,034.00$14.80

8 $3,280.00$16.00

Ref #60 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN, (95 FT)

Awd $2,565.00$27.00

2 $2,061.50$21.70

3 $2,090.00$22.00

4 $2,061.50$21.70

5 $2,123.25$22.35

6 $2,185.00$23.00

7 $2,061.50$21.70

8 $2,280.00$24.00

Ref #61 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (3 EACH)

Awd $6,000.00$2,000.00

2 $5,475.00$1,825.00

3 $5,475.00$1,825.00

4 $5,475.00$1,825.00

5 $5,639.25$1,879.75

6 $5,803.50$1,934.50

7 $5,475.00$1,825.00

8 $5,700.00$1,900.00

Ref #62 606E27820 ANCHOR ASSEMBLY, MGS TYPE T, (1 EACH)

Awd $850.00$850.00

2 $820.00$820.00

3 $820.00$820.00

4 $820.00$820.00

5 $844.60$844.60

6 $869.20$869.20

7 $820.00$820.00

8 $900.00$900.00

Ref #63 607E15000 FENCE, TYPE 47, (263 FT)

Awd $4,734.00$18.00

2 $2,630.00$10.00

3 $3,945.00$15.00

4 $789.00$3.00

5 $4,008.12$15.24

6 $4,126.47$15.69

7 $3,892.40$14.80

8 $6,575.00$25.00

Ref #64 623E38500 MONUMENT ASSEMBLY, (4 EACH)

Awd $1,460.00$365.00

2 $2,100.00$525.00

3 $4,800.00$1,200.00

4 $3,000.00$750.00

5 $1,608.96$402.24

6 $1,636.00$409.00

7 $3,000.00$750.00

8 $2,600.00$650.00

140013 - Page 31

Page 32: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #65 626E00100 BARRIER REFLECTOR, (8 EACH)

Awd $64.00$8.00

2 $48.00$6.00

3 $56.00$7.00

4 $48.00$6.00

5 $49.44$6.18

6 $50.88$6.36

7 $48.00$6.00

8 $80.00$10.00

Ref #66 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (1 EACH)

Awd $110.00$110.00

2 $120.00$120.00

3 $120.00$120.00

4 $120.00$120.00

5 $123.60$123.60

6 $127.20$127.20

7 $120.00$120.00

8 $180.00$180.00

Section 9 - ROADWAY - PART 2 - Totals

Awd $33,463.35

2 $28,147.50

3 $38,182.60

4 $28,817.10

5 $33,589.62

6 $26,088.15

7 $33,930.70

8 $41,606.00

Ref #67 653E10000 TOPSOIL FURNISHED AND PLACED, (50 CY)

Awd $1,400.00$28.00

2 $2,250.00$45.00

3 $2,250.00$45.00

4 $1,250.00$25.00

5 $3,480.50$69.61

6 $1,664.00$33.28

7 $1,500.00$30.00

8 $2,000.00$40.00

Ref #68 659E00510 SEEDING AND MULCHING, CLASS 2, (1278 SY)

Awd $2,556.00$2.00

2 $1,725.30$1.35

3 $1,214.10$0.95

4 $1,725.30$1.35

5 $1,776.42$1.39

6 $2,095.92$1.64

7 $1,597.50$1.25

8 $2,556.00$2.00

140013 - Page 32

Page 33: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #69 659E20000 COMMERCIAL FERTILIZER, (0.2 TON)

Awd $130.00$650.00

2 $81.60$408.00

3 $110.00$550.00

4 $81.60$408.00

5 $84.05$420.25

6 $86.50$432.50

7 $100.00$500.00

8 $240.00$1,200.00

Ref #70 659E31000 LIME, (0.3 ACRE)

Awd $30.00$100.00

2 $24.00$80.00

3 $42.00$140.00

4 $24.00$80.00

5 $24.72$82.40

6 $25.44$84.80

7 $6.00$20.00

8 $240.00$800.00

Ref #71 659E35000 WATER, (7 MGAL)

Awd $7.00$1.00

2 $7.00$1.00

3 $7.00$1.00

4 $7.00$1.00

5 $7.21$1.03

6 $7.42$1.06

7 $7.00$1.00

8 $0.35$0.05

Ref #72 832E30000 EROSION CONTROL, (1200 EACH)

Awd $1,200.00$1.00

2 $1,200.00$1.00

3 $1,200.00$1.00

4 $1,200.00$1.00

5 $1,200.00$1.00

6 $1,200.00$1.00

7 $1,200.00$1.00

8 $1,200.00$1.00

Section 10 - EROSION CONTROL - PART 2 - Totals

Awd $5,323.00

2 $5,287.90

3 $4,823.10

4 $4,287.90

5 $6,572.90

6 $5,079.28

7 $4,410.50

8 $6,236.35

140013 - Page 33

Page 34: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #73 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (17.7 CY)

Awd $1,486.80$84.00

2 $1,327.50$75.00

3 $1,451.40$82.00

4 $1,681.50$95.00

5 $2,671.82$150.95

6 $1,075.63$60.77

7 $17.70$1.00

8 $1,416.00$80.00

Ref #74 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (32 CY)

Awd $2,400.00$75.00

2 $2,400.00$75.00

3 $2,784.00$87.00

4 $3,040.00$95.00

5 $4,567.68$142.74

6 $1,944.64$60.77

7 $2,560.00$80.00

8 $2,560.00$80.00

Ref #75 611E00400 4" CONDUIT, TYPE E, (50 FT)

Awd $750.00$15.00

2 $400.00$8.00

3 $500.00$10.00

4 $400.00$8.00

5 $693.00$13.86

6 $3,443.00$68.86

7 $400.00$8.00

8 $250.00$5.00

Ref #76 611E00406 4" CONDUIT, TYPE F, (50 FT)

Awd $850.00$17.00

2 $400.00$8.00

3 $500.00$10.00

4 $400.00$8.00

5 $649.00$12.98

6 $2,723.50$54.47

7 $400.00$8.00

8 $250.00$5.00

Ref #77 611E01400 6" CONDUIT, TYPE E, (50 FT)

Awd $900.00$18.00

2 $500.00$10.00

3 $500.00$10.00

4 $500.00$10.00

5 $754.00$15.08

6 $3,486.00$69.72

7 $400.00$8.00

8 $250.00$5.00

Ref #78 611E01500 6" CONDUIT, TYPE F, (50 FT)

Awd $900.00$18.00

2 $500.00$10.00

3 $500.00$10.00

4 $500.00$10.00

5 $689.50$13.79

6 $2,766.50$55.33

7 $400.00$8.00

8 $250.00$5.00

140013 - Page 34

Page 35: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 11 - DRAINAGE - PART 2 - Totals

Awd $7,286.80

2 $5,527.50

3 $6,235.40

4 $6,521.50

5 $10,025.00

6 $15,439.27

7 $4,177.70

8 $4,976.00

Ref #79 301E46000 ASPHALT CONCRETE BASE, PG64-22, (43.9 CY)

Awd $13,170.00$300.00

2 $12,379.80$282.00

3 $21,950.00$500.00

4 $12,379.80$282.00

5 $12,751.19$290.46

6 $13,122.59$298.92

7 $12,379.80$282.00

8 $12,731.00$290.00

Ref #80 304E20000 AGGREGATE BASE, (100 CY)

Awd $8,000.00$80.00

2 $8,000.00$80.00

3 $5,500.00$55.00

4 $7,000.00$70.00

5 $5,762.00$57.62

6 $5,255.00$52.55

7 $5,700.00$57.00

8 $6,000.00$60.00

Ref #81 407E10000 TACK COAT, (31.3 GAL)

Awd $156.50$5.00

2 $156.50$5.00

3 $65.73$2.10

4 $156.50$5.00

5 $161.20$5.15

6 $165.89$5.30

7 $156.50$5.00

8 $313.00$10.00

Ref #82 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (7.5 GAL)

Awd $37.50$5.00

2 $37.50$5.00

3 $15.75$2.10

4 $37.50$5.00

5 $38.63$5.15

6 $39.75$5.30

7 $37.50$5.00

8 $75.00$10.00

140013 - Page 35

Page 36: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #83 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (7.3 CY)

Awd $3,066.00$420.00

2 $2,795.90$383.00

3 $5,110.00$700.00

4 $2,795.90$383.00

5 $2,879.78$394.49

6 $2,963.65$405.98

7 $2,795.90$383.00

8 $2,847.00$390.00

Ref #84 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (64.6 CY)

Awd $27,132.00$420.00

2 $24,741.80$383.00

3 $16,150.00$250.00

4 $24,741.80$383.00

5 $25,484.05$394.49

6 $26,226.31$405.98

7 $24,741.80$383.00

8 $25,194.00$390.00

Section 12 - PAVEMENT - PART 2 - Totals

Awd $51,562.00

2 $48,111.50

3 $48,791.48

4 $47,111.50

5 $47,076.85

6 $47,773.19

7 $45,811.50

8 $47,160.00

Ref #85 621E54000 RAISED PAVEMENT MARKER REMOVED, (3 EACH)

Awd $75.00$25.00

2 $15.00$5.00

3 $96.00$32.00

4 $45.00$15.00

5 $30.90$10.30

6 $75.00$25.00

7 $600.00$200.00

8 $60.00$20.00

Ref #86 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)

Awd $150.00$25.00

2 $60.00$10.00

3 $90.00$15.00

4 $300.00$50.00

5 $92.70$15.45

6 $95.40$15.90

7 $90.00$15.00

8 $120.00$20.00

140013 - Page 36

Page 37: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #87 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (6 EACH)

Awd $150.00$25.00

2 $60.00$10.00

3 $90.00$15.00

4 $300.00$50.00

5 $92.70$15.45

6 $95.40$15.90

7 $90.00$15.00

8 $120.00$20.00

Section 13 - TRAFFIC CONTROL - PART 2 - Totals

Awd $375.00

2 $135.00

3 $276.00

4 $645.00

5 $216.30

6 $265.80

7 $780.00

8 $300.00

Ref #88 614E12421 DETOUR SIGNING, AS PER PLAN, (LUMP SUM)

Awd $3,500.00$3,500.00

2 $2,000.00$2,000.00

3 $1,750.00$1,750.00

4 $5,000.00$5,000.00

5 $1,756.15$1,756.15

6 $1,701.30$1,701.30

7 $1,800.00$1,800.00

8 $7,500.00$7,500.00

Ref #89 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (60 DAY)

Awd $1,800.00$30.00

2 $1,620.00$27.00

3 $1,800.00$30.00

4 $3,600.00$60.00

5 $1,668.60$27.81

6 $3,561.60$59.36

7 $1,800.00$30.00

8 $2,100.00$35.00

Ref #90 616E10000 WATER, (1.6 MGAL)

Awd $8.00$5.00

2 $1.60$1.00

3 $160.00$100.00

4 $80.00$50.00

5 $1.65$1.03

6 $16.00$10.00

7 $1.60$1.00

8 $0.08$0.05

140013 - Page 37

Page 38: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 14 - MAINTENANCE OF TRAFFIC - PART 2 - Totals

Awd $5,308.00

2 $3,621.60

3 $3,710.00

4 $8,680.00

5 $3,426.40

6 $5,278.90

7 $3,601.60

8 $9,600.08

Ref #91 202E11000 STRUCTURE REMOVED, (LUMP SUM)

Awd $7,500.00$7,500.00

2 $7,000.00$7,000.00

3 $6,000.00$6,000.00

4 $14,000.00$14,000.00

5 $8,321.39$8,321.39

6 $2,556.69$2,556.69

7 $10,000.00$10,000.00

8 $10,000.00$10,000.00

Ref #92 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $3,000.00$3,000.00

3 $3,500.00$3,500.00

4 $5,000.00$5,000.00

5 $9,627.85$9,627.85

6 $2,500.00$2,500.00

7 $11,500.00$11,500.00

8 $10,000.00$10,000.00

Ref #93 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $3,000.00$3,000.00

3 $6,100.00$6,100.00

4 $5,000.00$5,000.00

5 $2,610.08$2,610.08

6 $4,288.28$4,288.28

7 $8,000.00$8,000.00

8 $6,500.00$6,500.00

Ref #94 509E10000 EPOXY COATED REINFORCING STEEL, (6599 LB)

Awd $9,898.50$1.50

2 $6,599.00$1.00

3 $7,918.80$1.20

4 $7,258.90$1.10

5 $9,436.57$1.43

6 $10,492.41$1.59

7 $8,248.75$1.25

8 $14,847.75$2.25

140013 - Page 38

Page 39: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #95 511E46010 CLASS QC1 CONCRETE, (13.54 CY)

Awd $8,868.70$655.00

2 $13,607.70$1,005.00

3 $14,217.00$1,050.00

4 $17,602.00$1,300.00

5 $12,330.07$910.64

6 $10,649.48$786.52

7 $11,400.68$842.00

8 $6,770.00$500.00

Ref #96 511E46510 CLASS QC1 CONCRETE, FOOTING, (43 CY)

Awd $9,890.00$230.00

2 $25,800.00$600.00

3 $30,100.00$700.00

4 $19,350.00$450.00

5 $32,642.16$759.12

6 $31,541.36$733.52

7 $24,080.00$560.00

8 $21,500.00$500.00

Ref #97 511E46610 CLASS QC1 CONCRETE, HEADWALL, (2.2 CY)

Awd $4,400.00$2,000.00

2 $2,268.20$1,031.00

3 $2,640.00$1,200.00

4 $2,860.00$1,300.00

5 $4,489.83$2,040.83

6 $2,432.28$1,105.58

7 $1,680.80$764.00

8 $1,100.00$500.00

Ref #98 512E33000 TYPE 2 WATERPROOFING, (91 SY)

Awd $1,729.00$19.00

2 $1,820.00$20.00

3 $1,911.00$21.00

4 $1,820.00$20.00

5 $2,737.28$30.08

6 $2,401.49$26.39

7 $1,751.75$19.25

8 $2,002.00$22.00

Ref #99 512E33010 TYPE 3 WATERPROOFING, (105 SY)

Awd $3,465.00$33.00

2 $3,675.00$35.00

3 $3,150.00$30.00

4 $2,310.00$22.00

5 $4,542.30$43.26

6 $5,077.80$48.36

7 $3,360.00$32.00

8 $2,940.00$28.00

Ref #100 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN, (46 SF)

Awd $1,334.00$29.00

2 $460.00$10.00

3 $103.50$2.25

4 $368.00$8.00

5 $660.10$14.35

6 $731.40$15.90

7 $460.00$10.00

8 $920.00$20.00

140013 - Page 39

Page 40: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #101 518E21230 POROUS BACKFILL WITH FILTER FABRIC, (LUMP SUM)

Awd $3,650.00$3,650.00

2 $2,500.00$2,500.00

3 $2,500.00$2,500.00

4 $3,000.00$3,000.00

5 $5,127.22$5,127.22

6 $4,947.69$4,947.69

7 $3,000.00$3,000.00

8 $4,000.00$4,000.00

Ref #102 611E96441 16' X 6' CONDUIT, TYPE A, 706.05, AS PER PLAN, (49 FT)

Awd $43,120.00$880.00

2 $43,610.00$890.00

3 $49,000.00$1,000.00

4 $51,450.00$1,050.00

5 $40,492.13$826.37

6 $53,493.30$1,091.70

7 $53,655.00$1,095.00

8 $58,800.00$1,200.00

Ref #103 613E41200 LOW STRENGTH MORTAR BACKFILL, (85 CY)

Awd $10,625.00$125.00

2 $7,225.00$85.00

3 $8,500.00$100.00

4 $7,225.00$85.00

5 $9,185.95$108.07

6 $7,208.00$84.80

7 $8,500.00$100.00

8 $8,500.00$100.00

Section 15 - STRUCTURE 20 FOOT SPAN AND UNDER - PART - Totals

Awd $107,980.20

2 $120,564.90

3 $135,640.30

4 $137,243.90

5 $142,202.93

6 $138,320.18

7 $145,636.98

8 $147,879.75

Ref #104 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI, (2000 DLR)

Awd $20,000.00$10.00

2 $16,000.00$8.00

3 $14,000.00$7.00

4 $20,000.00$10.00

5 $4,000.00$2.00

6 $20,000.00$10.00

7 $20,000.00$10.00

8 $20,000.00$10.00

140013 - Page 40

Page 41: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 16 - PART B SEGMENT 2 - Totals

Awd $20,000.00

2 $16,000.00

3 $14,000.00

4 $20,000.00

5 $4,000.00

6 $20,000.00

7 $20,000.00

8 $20,000.00

Ref #105 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $600.00$600.00

2 $1,000.00$1,000.00

3 $5,000.00$5,000.00

4 $3,000.00$3,000.00

5 $515.00$515.00

6 $1,608.10$1,608.10

7 $5,000.00$5,000.00

8 $2,500.00$2,500.00

Ref #106 202E23010 PAVEMENT REMOVED, ASPHALT, (64 SY)

Awd $384.00$6.00

2 $640.00$10.00

3 $640.00$10.00

4 $1,152.00$18.00

5 $1,400.32$21.88

6 $206.08$3.22

7 $384.00$6.00

8 $1,280.00$20.00

Ref #107 202E23500 WEARING COURSE REMOVED, (320.2 SY)

Awd $5,763.60$18.00

2 $3,202.00$10.00

3 $4,002.50$12.50

4 $3,202.00$10.00

5 $3,298.06$10.30

6 $1,357.65$4.24

7 $3,842.40$12.00

8 $9,606.00$30.00

Ref #108 202E38000 GUARDRAIL REMOVED, (269 FT)

Awd $538.00$2.00

2 $739.75$2.75

3 $403.50$1.50

4 $538.00$2.00

5 $387.36$1.44

6 $398.12$1.48

7 $376.60$1.40

8 $807.00$3.00

140013 - Page 41

Page 42: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #109 203E10000 EXCAVATION, (172 CY)

Awd $2,580.00$15.00

2 $2,580.00$15.00

3 $4,644.00$27.00

4 $4,300.00$25.00

5 $5,452.40$31.70

6 $608.88$3.54

7 $2,408.00$14.00

8 $2,064.00$12.00

Ref #110 203E20000 EMBANKMENT, (507 CY)

Awd $12,675.00$25.00

2 $8,112.00$16.00

3 $7,605.00$15.00

4 $4,563.00$9.00

5 $15,438.15$30.45

6 $6,803.94$13.42

7 $21,294.00$42.00

8 $7,605.00$15.00

Ref #111 606E15050 GUARDRAIL, TYPE MGS, (321.75 FT)

Awd $4,826.25$15.00

2 $4,761.90$14.80

3 $4,826.25$15.00

4 $4,761.90$14.80

5 $4,903.47$15.24

6 $5,048.26$15.69

7 $4,761.90$14.80

8 $5,148.00$16.00

Ref #112 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN, (194 FT)

Awd $4,850.00$25.00

2 $4,171.00$21.50

3 $4,268.00$22.00

4 $4,171.00$21.50

5 $4,297.10$22.15

6 $4,421.26$22.79

7 $4,171.00$21.50

8 $4,656.00$24.00

Ref #113 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (4 EACH)

Awd $8,000.00$2,000.00

2 $7,300.00$1,825.00

3 $7,300.00$1,825.00

4 $7,300.00$1,825.00

5 $7,519.00$1,879.75

6 $7,738.00$1,934.50

7 $7,300.00$1,825.00

8 $7,600.00$1,900.00

Ref #114 623E38500 MONUMENT ASSEMBLY, (3 EACH)

Awd $1,095.00$365.00

2 $1,575.00$525.00

3 $3,600.00$1,200.00

4 $2,250.00$750.00

5 $896.10$298.70

6 $1,227.00$409.00

7 $2,250.00$750.00

8 $1,950.00$650.00

140013 - Page 42

Page 43: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #115 626E00100 BARRIER REFLECTOR, (12 EACH)

Awd $84.00$7.00

2 $72.00$6.00

3 $84.00$7.00

4 $72.00$6.00

5 $74.16$6.18

6 $76.32$6.36

7 $72.00$6.00

8 $120.00$10.00

Section 17 - ROADWAY - PART 3 - Totals

Awd $41,395.85

2 $34,153.65

3 $42,373.25

4 $35,309.90

5 $44,181.12

6 $29,493.61

7 $51,859.90

8 $43,336.00

Ref #116 653E10000 TOPSOIL FURNISHED AND PLACED, (50 CY)

Awd $2,250.00$45.00

2 $2,250.00$45.00

3 $2,250.00$45.00

4 $1,250.00$25.00

5 $2,528.00$50.56

6 $1,664.00$33.28

7 $1,500.00$30.00

8 $2,000.00$40.00

Ref #117 659E00510 SEEDING AND MULCHING, CLASS 2, (2591 SY)

Awd $5,182.00$2.00

2 $3,497.85$1.35

3 $2,072.80$0.80

4 $3,497.85$1.35

5 $3,601.49$1.39

6 $4,249.24$1.64

7 $3,238.75$1.25

8 $5,182.00$2.00

Ref #118 659E20000 COMMERCIAL FERTILIZER, (0.4 TON)

Awd $280.00$700.00

2 $163.20$408.00

3 $220.00$550.00

4 $163.20$408.00

5 $168.10$420.25

6 $172.99$432.47

7 $200.00$500.00

8 $480.00$1,200.00

140013 - Page 43

Page 44: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #119 659E31000 LIME, (0.5 ACRE)

Awd $50.00$100.00

2 $40.00$80.00

3 $85.00$170.00

4 $40.00$80.00

5 $41.20$82.40

6 $42.40$84.80

7 $10.00$20.00

8 $400.00$800.00

Ref #120 659E35000 WATER, (14 MGAL)

Awd $14.00$1.00

2 $14.00$1.00

3 $14.00$1.00

4 $14.00$1.00

5 $14.42$1.03

6 $14.84$1.06

7 $14.00$1.00

8 $0.70$0.05

Ref #121 832E30000 EROSION CONTROL, (1200 EACH)

Awd $1,200.00$1.00

2 $1,200.00$1.00

3 $1,200.00$1.00

4 $1,200.00$1.00

5 $1,200.00$1.00

6 $1,200.00$1.00

7 $1,200.00$1.00

8 $1,200.00$1.00

Section 18 - EROSION CONTROL - PART 3 - Totals

Awd $8,976.00

2 $7,165.05

3 $5,841.80

4 $6,165.05

5 $7,553.21

6 $7,343.47

7 $6,162.75

8 $9,262.70

Ref #122 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (40 CY)

Awd $3,320.00$83.00

2 $3,000.00$75.00

3 $3,200.00$80.00

4 $3,800.00$95.00

5 $4,756.40$118.91

6 $2,430.80$60.77

7 $3,200.00$80.00

8 $3,200.00$80.00

140013 - Page 44

Page 45: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #123 611E00400 4" CONDUIT, TYPE E, (50 FT)

Awd $850.00$17.00

2 $3,750.00$75.00

3 $500.00$10.00

4 $400.00$8.00

5 $691.00$13.82

6 $3,443.00$68.86

7 $400.00$8.00

8 $250.00$5.00

Ref #124 611E00406 4" CONDUIT, TYPE F, (50 FT)

Awd $850.00$17.00

2 $400.00$8.00

3 $500.00$10.00

4 $400.00$8.00

5 $691.00$13.82

6 $2,723.50$54.47

7 $400.00$8.00

8 $250.00$5.00

Ref #125 611E01400 6" CONDUIT, TYPE E, (50 FT)

Awd $900.00$18.00

2 $500.00$10.00

3 $500.00$10.00

4 $500.00$10.00

5 $770.00$15.40

6 $3,486.00$69.72

7 $400.00$8.00

8 $250.00$5.00

Ref #126 611E01500 6" CONDUIT, TYPE F, (50 FT)

Awd $900.00$18.00

2 $500.00$10.00

3 $500.00$10.00

4 $500.00$10.00

5 $770.00$15.40

6 $2,766.50$55.33

7 $400.00$8.00

8 $250.00$5.00

Section 19 - DRAINAGE - PART 3 - Totals

Awd $6,820.00

2 $8,150.00

3 $5,200.00

4 $5,600.00

5 $7,678.40

6 $14,849.80

7 $4,800.00

8 $4,200.00

140013 - Page 45

Page 46: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #127 301E46000 ASPHALT CONCRETE BASE, PG64-22, (42.4 CY)

Awd $12,720.00$300.00

2 $11,956.80$282.00

3 $21,200.00$500.00

4 $11,956.80$282.00

5 $12,315.50$290.46

6 $12,674.21$298.92

7 $11,956.80$282.00

8 $12,296.00$290.00

Ref #128 304E20000 AGGREGATE BASE, (100 CY)

Awd $8,000.00$80.00

2 $9,000.00$90.00

3 $5,500.00$55.00

4 $7,000.00$70.00

5 $6,445.00$64.45

6 $5,255.00$52.55

7 $5,700.00$57.00

8 $6,000.00$60.00

Ref #129 407E10000 TACK COAT, (28.8 GAL)

Awd $144.00$5.00

2 $144.00$5.00

3 $60.48$2.10

4 $144.00$5.00

5 $148.32$5.15

6 $152.64$5.30

7 $144.00$5.00

8 $288.00$10.00

Ref #130 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (5.8 GAL)

Awd $29.00$5.00

2 $29.00$5.00

3 $12.18$2.10

4 $29.00$5.00

5 $29.87$5.15

6 $30.74$5.30

7 $29.00$5.00

8 $58.00$10.00

Ref #131 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (5.9 CY)

Awd $2,448.50$415.00

2 $2,259.70$383.00

3 $4,130.00$700.00

4 $2,259.70$383.00

5 $2,327.49$394.49

6 $2,395.28$405.98

7 $2,259.70$383.00

8 $2,301.00$390.00

Ref #132 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (63.5 CY)

Awd $26,352.50$415.00

2 $24,320.50$383.00

3 $15,875.00$250.00

4 $24,320.50$383.00

5 $25,050.12$394.49

6 $25,779.73$405.98

7 $24,320.50$383.00

8 $24,765.00$390.00

140013 - Page 46

Page 47: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 20 - PAVEMENT - PART 3 - Totals

Awd $49,694.00

2 $47,710.00

3 $46,777.66

4 $45,710.00

5 $46,316.30

6 $46,287.60

7 $44,410.00

8 $45,708.00

Ref #133 621E54000 RAISED PAVEMENT MARKER REMOVED, (4 EACH)

Awd $100.00$25.00

2 $20.00$5.00

3 $48.00$12.00

4 $60.00$15.00

5 $41.20$10.30

6 $42.40$10.60

7 $800.00$200.00

8 $80.00$20.00

Ref #134 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (6 EACH)

Awd $150.00$25.00

2 $60.00$10.00

3 $90.00$15.00

4 $300.00$50.00

5 $92.70$15.45

6 $95.40$15.90

7 $90.00$15.00

8 $120.00$20.00

Ref #135 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (6 EACH)

Awd $150.00$25.00

2 $60.00$10.00

3 $90.00$15.00

4 $300.00$50.00

5 $92.70$15.45

6 $95.40$15.90

7 $90.00$15.00

8 $120.00$20.00

Section 21 - TRAFFIC CONTROL - PART 3 - Totals

Awd $400.00

2 $140.00

3 $228.00

4 $660.00

5 $226.60

6 $233.20

7 $980.00

8 $320.00

140013 - Page 47

Page 48: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #136 614E12421 DETOUR SIGNING, AS PER PLAN, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $2,200.00$2,200.00

3 $1,950.00$1,950.00

4 $5,000.00$5,000.00

5 $2,008.50$2,008.50

6 $1,701.30$1,701.30

7 $2,000.00$2,000.00

8 $7,500.00$7,500.00

Ref #137 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (60 DAY)

Awd $1,800.00$30.00

2 $1,620.00$27.00

3 $1,800.00$30.00

4 $3,600.00$60.00

5 $1,668.60$27.81

6 $3,561.60$59.36

7 $1,800.00$30.00

8 $2,100.00$35.00

Ref #138 616E10000 WATER, (2.7 MGAL)

Awd $13.50$5.00

2 $2.70$1.00

3 $234.90$87.00

4 $135.00$50.00

5 $2.78$1.03

6 $27.00$10.00

7 $2.70$1.00

8 $0.14$0.05

Section 22 - MAINTENANCE OF TRAFFIC - PART 3 - Totals

Awd $4,813.50

2 $3,822.70

3 $3,984.90

4 $8,735.00

5 $3,679.88

6 $5,289.90

7 $3,802.70

8 $9,600.14

Ref #139 202E11000 STRUCTURE REMOVED, (LUMP SUM)

Awd $7,000.00$7,000.00

2 $7,000.00$7,000.00

3 $12,500.00$12,500.00

4 $15,000.00$15,000.00

5 $14,233.79$14,233.79

6 $2,570.60$2,570.60

7 $18,000.00$18,000.00

8 $10,000.00$10,000.00

140013 - Page 48

Page 49: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #140 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $500.00$500.00

2 $2,500.00$2,500.00

3 $13,500.00$13,500.00

4 $5,000.00$5,000.00

5 $13,154.26$13,154.26

6 $2,500.00$2,500.00

7 $11,500.00$11,500.00

8 $10,000.00$10,000.00

Ref #141 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $2,500.00$2,500.00

3 $7,000.00$7,000.00

4 $5,000.00$5,000.00

5 $2,016.32$2,016.32

6 $4,288.28$4,288.28

7 $8,000.00$8,000.00

8 $6,500.00$6,500.00

Ref #142 509E10000 EPOXY COATED REINFORCING STEEL, (6910 LB)

Awd $11,401.50$1.65

2 $6,910.00$1.00

3 $7,601.00$1.10

4 $7,601.00$1.10

5 $9,743.10$1.41

6 $10,986.90$1.59

7 $8,637.50$1.25

8 $15,547.50$2.25

Ref #143 511E46010 CLASS QC1 CONCRETE, (25 CY)

Awd $11,700.00$468.00

2 $22,125.00$885.00

3 $22,500.00$900.00

4 $28,750.00$1,150.00

5 $23,511.75$940.47

6 $19,663.00$786.52

7 $15,925.00$637.00

8 $12,500.00$500.00

Ref #144 511E46510 CLASS QC1 CONCRETE, FOOTING, (70 CY)

Awd $15,890.00$227.00

2 $36,750.00$525.00

3 $35,000.00$500.00

4 $31,500.00$450.00

5 $39,491.90$564.17

6 $51,346.40$733.52

7 $39,200.00$560.00

8 $35,000.00$500.00

Ref #145 511E46610 CLASS QC1 CONCRETE, HEADWALL, (1.2 CY)

Awd $3,480.00$2,900.00

2 $1,140.00$950.00

3 $3,120.00$2,600.00

4 $1,800.00$1,500.00

5 $1,882.73$1,568.94

6 $1,326.70$1,105.58

7 $2,052.00$1,710.00

8 $600.00$500.00

140013 - Page 49

Page 50: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #146 512E33000 TYPE 2 WATERPROOFING, (94 SY)

Awd $1,786.00$19.00

2 $1,880.00$20.00

3 $1,974.00$21.00

4 $1,880.00$20.00

5 $2,827.52$30.08

6 $2,480.66$26.39

7 $1,809.50$19.25

8 $2,068.00$22.00

Ref #147 512E33010 TYPE 3 WATERPROOFING, (98 SY)

Awd $3,234.00$33.00

2 $3,430.00$35.00

3 $3,136.00$32.00

4 $2,156.00$22.00

5 $4,239.48$43.26

6 $4,739.28$48.36

7 $3,136.00$32.00

8 $2,744.00$28.00

Ref #148 516E13601 1" PREFORMED EXPANSION JOINT FILLER, AS PER PLAN, (55 SF)

Awd $1,430.00$26.00

2 $550.00$10.00

3 $137.50$2.50

4 $440.00$8.00

5 $566.50$10.30

6 $874.50$15.90

7 $550.00$10.00

8 $1,100.00$20.00

Ref #149 518E21230 POROUS BACKFILL WITH FILTER FABRIC, (LUMP SUM)

Awd $3,600.00$3,600.00

2 $2,000.00$2,000.00

3 $3,300.00$3,300.00

4 $4,000.00$4,000.00

5 $5,550.32$5,550.32

6 $6,653.79$6,653.79

7 $3,000.00$3,000.00

8 $4,000.00$4,000.00

Ref #150 611E96481 18' X 8' CONDUIT, TYPE A, 706.05, AS PER PLAN, (42 FT)

Awd $47,880.00$1,140.00

2 $48,300.00$1,150.00

3 $58,800.00$1,400.00

4 $48,300.00$1,150.00

5 $47,239.08$1,124.74

6 $57,113.70$1,359.85

7 $55,818.00$1,329.00

8 $67,200.00$1,600.00

Ref #151 613E41200 LOW STRENGTH MORTAR BACKFILL, (133 CY)

Awd $16,492.00$124.00

2 $11,305.00$85.00

3 $12,236.00$92.00

4 $11,305.00$85.00

5 $17,305.96$130.12

6 $11,278.40$84.80

7 $13,300.00$100.00

8 $13,300.00$100.00

140013 - Page 50

Page 51: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 23 - STRUCTURE 20 FOOT SPAN AND UNDER - PART - Totals

Awd $126,893.50

2 $146,390.00

3 $180,804.50

4 $162,732.00

5 $181,762.71

6 $175,822.21

7 $180,928.00

8 $180,559.50

Ref #152 614E15000 SPECIAL - CALENDAR DAYS OF CONTRACT TIME FOR OPENI, (2500 DLR)

Awd $25,000.00$10.00

2 $20,000.00$8.00

3 $20,000.00$8.00

4 $25,000.00$10.00

5 $5,000.00$2.00

6 $25,000.00$10.00

7 $25,000.00$10.00

8 $25,000.00$10.00

Section 24 - PART B SEGMENT 3 - Totals

Awd $25,000.00

2 $20,000.00

3 $20,000.00

4 $25,000.00

5 $5,000.00

6 $25,000.00

7 $25,000.00

8 $25,000.00

Ref #153 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $9,000.00$9,000.00

2 $27,000.00$27,000.00

3 $5,000.00$5,000.00

4 $7,000.00$7,000.00

5 $11,884.97$11,884.97

6 $9,222.00$9,222.00

7 $10,658.00$10,658.00

8 $20,000.00$20,000.00

Ref #154 614E11000 MAINTAINING TRAFFIC(PARTS 1, 2, 3), (LUMP SUM)

Awd $7,500.00$7,500.00

2 $9,000.00$9,000.00

3 $14,500.00$14,500.00

4 $10,000.00$10,000.00

5 $14,088.85$14,088.85

6 $10,813.06$10,813.06

7 $46,300.00$46,300.00

8 $55,000.00$55,000.00

140013 - Page 51

Page 52: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #155 619E16000 FIELD OFFICE, TYPE A(PARTS 1, 2, 3), (1 MNTH)

Awd $700.00$700.00

2 $125.00$125.00

3 $3,700.00$3,700.00

4 $3,500.00$3,500.00

5 $3,780.00$3,780.00

6 $10,780.00$10,780.00

7 $700.00$700.00

8 $3,500.00$3,500.00

Ref #156 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING(PARTS 1, , (LUMP SUM)

Awd $2,800.00$2,800.00

2 $8,000.00$8,000.00

3 $13,000.00$13,000.00

4 $10,000.00$10,000.00

5 $6,798.00$6,798.00

6 $3,000.00$3,000.00

7 $7,600.00$7,600.00

8 $30,000.00$30,000.00

Ref #157 624E10000 MOBILIZATION(PARTS 1, 2, 3), (LUMP SUM)

Awd $9,000.00$9,000.00

2 $14,000.00$14,000.00

3 $20,000.00$20,000.00

4 $20,000.00$20,000.00

5 $52,304.92$52,304.92

6 $48,374.10$48,374.10

7 $46,000.00$46,000.00

8 $38,000.00$38,000.00

Section 25 - INCIDENTALS - Totals

Awd $29,000.00

2 $58,125.00

3 $56,200.00

4 $50,500.00

5 $88,856.74

6 $82,189.16

7 $111,258.00

8 $146,500.00

140013 - Page 52

Page 53: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Project No. 140032

PID 88646

LUC-IR/LUC-475-1.63/0.00

Federal

Type: TWO LANE RESURFACING

Completion Date: 8/31/2014

Award Amount: $6,494,642.60

Contract Awarded To: GERKEN PAVING INC

Letting Date: 1/16/2014

Engineer's Estimate: $6,380,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

GERKEN PAVING INC

9-072 U S 24

NAPOLEON, OH 43545

Henry

Bidder 1

Bid $6,494,642.60

SHELLY COMPANY

80 PARK DR BOX 266

THORNVILLE, OH 43076

Perry

Bidder 2

Bid $6,729,542.20

KOKOSING CONSTRUCTION COMPANY INC

886 MC KINLEY AVE

COLUMBUS, OH 43222

Franklin

Bidder 3

Bid $7,088,773.65

140032 - Page 53

Page 54: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $1,500.00$1,500.00

2 $1,000.00$1,000.00

3 $750.00$750.00

Ref #2 202E23000 PAVEMENT REMOVED, (253 SY)

Awd $6,325.00$25.00

2 $5,060.00$20.00

3 $5,060.00$20.00

Ref #3 202E38000 GUARDRAIL REMOVED, (8431.25 FT)

Awd $10,117.50$1.20

2 $10,117.50$1.20

3 $10,117.50$1.20

Ref #4 202E38001 GUARDRAIL REMOVED, AS PER PLAN, (14962.5 FT)

Awd $26,932.50$1.80

2 $44,887.50$3.00

3 $26,932.50$1.80

Ref #5 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E, (22 EACH)

Awd $2,860.00$130.00

2 $2,860.00$130.00

3 $2,860.00$130.00

Ref #6 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (18 EACH)

Awd $1,080.00$60.00

2 $1,080.00$60.00

3 $1,080.00$60.00

Ref #7 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B, (7 EACH)

Awd $840.00$120.00

2 $840.00$120.00

3 $840.00$120.00

Ref #8 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (37 EACH)

Awd $2,220.00$60.00

2 $2,220.00$60.00

3 $2,220.00$60.00

Ref #9 203E10000 EXCAVATION, (102 CY)

Awd $4,590.00$45.00

2 $4,080.00$40.00

3 $4,080.00$40.00

Ref #10 203E20000 EMBANKMENT, (20 CY)

Awd $970.00$48.50

2 $970.00$48.50

3 $970.00$48.50

Ref #11 209E60201 LINEAR GRADING, AS PER PLAN, (256 STA)

Awd $37,760.00$147.50

2 $88,320.00$345.00

3 $37,760.00$147.50

Ref #12 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN, (3687.5 FT)

Awd $56,050.00$15.20

2 $54,575.00$14.80

3 $56,050.00$15.20

140032 - Page 54

Page 55: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #13 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN, (19287.5 FT)

Awd $316,315.00$16.40

2 $308,600.00$16.00

3 $319,401.00$16.56

Ref #14 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN, (75 FT)

Awd $1,635.00$21.80

2 $1,642.50$21.90

3 $1,635.00$21.80

Ref #15 606E15201 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO, (37.5 FT)

Awd $930.00$24.80

2 $930.00$24.80

3 $930.00$24.80

Ref #16 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (28 EACH)

Awd $52,640.00$1,880.00

2 $48,160.00$1,720.00

3 $52,640.00$1,880.00

Ref #17 606E27820 ANCHOR ASSEMBLY, MGS TYPE T, (18 EACH)

Awd $14,310.00$795.00

2 $14,310.00$795.00

3 $14,310.00$795.00

Ref #18 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (24 EACH)

Awd $27,600.00$1,150.00

2 $45,000.00$1,875.00

3 $27,600.00$1,150.00

Ref #19 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2, (14 EACH)

Awd $4,550.00$325.00

2 $4,550.00$325.00

3 $4,550.00$325.00

Ref #20 609E24510 CURB, TYPE 4-C, (246 FT)

Awd $11,070.00$45.00

2 $11,070.00$45.00

3 $11,070.00$45.00

Section 1 - ROADWAY - Totals

Awd $580,295.00

2 $650,272.50

3 $580,856.00

Ref #21 659E00300 TOPSOIL, (300 CY)

Awd $15,000.00$50.00

2 $15,000.00$50.00

3 $30,000.00$100.00

Ref #22 659E10000 SEEDING AND MULCHING, (2900 SY)

Awd $2,001.00$0.69

2 $2,001.00$0.69

3 $2,291.00$0.79

Ref #23 659E20000 COMMERCIAL FERTILIZER, (0.39 TON)

Awd $195.00$500.00

2 $195.00$500.00

3 $152.10$390.00

140032 - Page 55

Page 56: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #24 659E35000 WATER, (16 MGAL)

Awd $256.00$16.00

2 $16.00$1.00

3 $16.00$1.00

Ref #25 832E30000 EROSION CONTROL, (10000 EACH)

Awd $10,000.00$1.00

2 $10,000.00$1.00

3 $10,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $27,452.00

2 $27,212.00

3 $42,459.10

Ref #26 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (38 EACH)

Awd $35,150.00$925.00

2 $114,000.00$3,000.00

3 $53,200.00$1,400.00

Section 3 - DRAINAGE - Totals

Awd $35,150.00

2 $114,000.00

3 $53,200.00

Ref #27 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/2", (2626 SY)

Awd $9,847.50$3.75

2 $13,130.00$5.00

3 $8,665.80$3.30

Ref #28 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3-1/4", (190290 SY)

Awd $333,007.50$1.75

2 $313,978.50$1.65

3 $399,609.00$2.10

Ref #29 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE DEPTH, (4045 SY)

Awd $17,595.75$4.35

2 $10,274.30$2.54

3 $11,528.25$2.85

Ref #30 255E10501 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT,, (2811 SY)

Awd $590,310.00$210.00

2 $592,277.70$210.70

3 $646,530.00$230.00

Ref #31 255E20000 FULL DEPTH PAVEMENT SAWING, (12548 FT)

Awd $31,370.00$2.50

2 $31,370.00$2.50

3 $31,997.40$2.55

Ref #32 302E46000 ASPHALT CONCRETE BASE, PG64-22, (131 CY)

Awd $25,807.00$197.00

2 $32,750.00$250.00

3 $22,270.00$170.00

140032 - Page 56

Page 57: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #33 304E20000 AGGREGATE BASE, (54 CY)

Awd $6,750.00$125.00

2 $5,400.00$100.00

3 $5,400.00$100.00

Ref #34 407E10000 TACK COAT, (14770 GAL)

Awd $31,017.00$2.10

2 $29,540.00$2.00

3 $29,540.00$2.00

Ref #35 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (7778 GAL)

Awd $16,333.80$2.10

2 $15,556.00$2.00

3 $15,556.00$2.00

Ref #36 409E98010 SEALING, MISC.:LONGITUDINAL JOINT SEALER, (12048 LB)

Awd $19,276.80$1.60

2 $14,457.60$1.20

3 $12,048.00$1.00

Ref #37 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (6856 CY)

Awd $973,552.00$142.00

2 $1,048,968.00$153.00

3 $1,261,504.00$184.00

Ref #38 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (1241 CY)

Awd $206,006.00$166.00

2 $223,380.00$180.00

3 $238,272.00$192.00

Ref #39 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19MM, TYPE A, (9448 CY)

Awd $1,152,656.00$122.00

2 $1,190,448.00$126.00

3 $1,332,168.00$141.00

Ref #40 448E46061 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, UNDE, (700 CY)

Awd $161,000.00$230.00

2 $182,000.00$260.00

3 $171,500.00$245.00

Ref #41 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (110 CY)

Awd $23,100.00$210.00

2 $22,000.00$200.00

3 $22,000.00$200.00

Ref #42 617E10100 COMPACTED AGGREGATE, (1262 CY)

Awd $73,196.00$58.00

2 $50,480.00$40.00

3 $83,292.00$66.00

Ref #43 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (74964 FT)

Awd $11,244.60$0.15

2 $11,244.60$0.15

3 $11,244.60$0.15

Section 4 - PAVEMENT - Totals

Awd $3,682,069.95

2 $3,787,254.70

3 $4,303,125.05

140032 - Page 57

Page 58: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #44 620E00500 DELINEATOR, POST MOUNTED, (351 EACH)

Awd $12,811.50$36.50

2 $12,811.50$36.50

3 $12,811.50$36.50

Ref #45 621E00100 RPM, (594 EACH)

Awd $11,286.00$19.00

2 $11,286.00$19.00

3 $11,286.00$19.00

Ref #46 621E54000 RAISED PAVEMENT MARKER REMOVED, (594 EACH)

Awd $3,564.00$6.00

2 $3,564.00$6.00

3 $3,564.00$6.00

Ref #47 626E00100 BARRIER REFLECTOR, (395 EACH)

Awd $2,370.00$6.00

2 $2,370.00$6.00

3 $2,370.00$6.00

Ref #48 642E00094 EDGE LINE, 6", (18.56 MILE)

Awd $11,600.00$625.00

2 $11,600.00$625.00

3 $11,600.00$625.00

Ref #49 642E00194 LANE LINE, 6", (6.13 MILE)

Awd $2,452.00$400.00

2 $2,452.00$400.00

3 $2,452.00$400.00

Ref #50 644E00404 CHANNELIZING LINE, 12", (4484 FT)

Awd $7,847.00$1.75

2 $7,847.00$1.75

3 $7,847.00$1.75

Ref #51 644E00720 CHEVRON MARKING, (614 FT)

Awd $3,684.00$6.00

2 $3,684.00$6.00

3 $3,684.00$6.00

Ref #52 644E01510 DOTTED LINE, 6", (3202 FT)

Awd $2,401.50$0.75

2 $2,401.50$0.75

3 $2,401.50$0.75

Ref #53 644E20801 YIELD LINE, AS PER PLAN, (32 FT)

Awd $1,600.00$50.00

2 $1,600.00$50.00

3 $1,600.00$50.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $59,616.00

2 $59,616.00

3 $59,616.00

Ref #54 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (100 HOUR)

Awd $15,000.00$150.00

2 $9,000.00$90.00

3 $7,200.00$72.00

140032 - Page 58

Page 59: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #55 614E11620 LINEAR DELINEATION, (1185 FT)

Awd $2,666.25$2.25

2 $592.50$0.50

3 $11,850.00$10.00

Ref #56 614E12346 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL)FOR 24, (8 EACH)

Awd $15,080.00$1,885.00

2 $14,160.00$1,770.00

3 $14,400.00$1,800.00

Ref #57 614E12460 WORK ZONE MARKING SIGN, (10 EACH)

Awd $1,300.00$130.00

2 $1,000.00$100.00

3 $1,000.00$100.00

Ref #58 614E12500 REPLACEMENT SIGN, (5 EACH)

Awd $625.00$125.00

2 $225.00$45.00

3 $500.00$100.00

Ref #59 614E12600 REPLACEMENT DRUM, (100 EACH)

Awd $5,000.00$50.00

2 $2,500.00$25.00

3 $8,500.00$85.00

Ref #60 614E13300 BARRIER REFLECTOR, TYPE B, (115 EACH)

Awd $287.50$2.50

2 $690.00$6.00

3 $1,725.00$15.00

Ref #61 614E13350 OBJECT MARKER, ONE WAY, (254 EACH)

Awd $1,905.00$7.50

2 $2,540.00$10.00

3 $4,572.00$18.00

Ref #62 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (18 SNMT)

Awd $18,000.00$1,000.00

2 $13,500.00$750.00

3 $14,400.00$800.00

Ref #63 614E20000 WORK ZONE LANE LINE, CLASS I, (22.95 MILE)

Awd $9,180.00$400.00

2 $9,180.00$400.00

3 $9,180.00$400.00

Ref #64 614E22000 WORK ZONE EDGE LINE, CLASS I, (65.22 MILE)

Awd $32,610.00$500.00

2 $32,610.00$500.00

3 $32,610.00$500.00

Ref #65 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, (8968 FT)

Awd $4,484.00$0.50

2 $4,484.00$0.50

3 $4,484.00$0.50

Ref #66 616E10000 WATER, (1 MGAL)

Awd $45.00$45.00

2 $25.00$25.00

3 $750.00$750.00

140032 - Page 59

Page 60: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #67 622E41000 PORTABLE BARRIER, 32", (5130 FT)

Awd $67,100.40$13.08

2 $61,560.00$12.00

3 $71,820.00$14.00

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $173,283.15

2 $152,066.50

3 $182,991.00

Ref #68 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $48,700.00$48,700.00

2 $48,700.00$48,700.00

3 $48,700.00$48,700.00

Ref #69 202E23011 PAVEMENT REMOVED, ASPHALT, AS PER PLAN, (112 SY)

Awd $2,240.00$20.00

2 $2,240.00$20.00

3 $2,240.00$20.00

Ref #70 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (44 CY)

Awd $1,760.00$40.00

2 $1,760.00$40.00

3 $1,760.00$40.00

Ref #71 509E10000 EPOXY COATED REINFORCING STEEL, (23219 LB)

Awd $25,540.90$1.10

2 $25,540.90$1.10

3 $25,540.90$1.10

Ref #72 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)

Awd $250.00$5.00

2 $250.00$5.00

3 $250.00$5.00

Ref #73 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (824 EACH)

Awd $9,888.00$12.00

2 $9,888.00$12.00

3 $9,888.00$12.00

Ref #74 511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT, (8 CY)

Awd $8,800.00$1,100.00

2 $8,800.00$1,100.00

3 $8,800.00$1,100.00

Ref #75 511E60000 SPECIAL - BRIDGE DECK GROOVING, (985 SY)

Awd $4,925.00$5.00

2 $4,925.00$5.00

3 $4,925.00$5.00

Ref #76 511E71100 CONCRETE, MISC.:BRIDGE DECK (PARAPET) WITH HYCRETE, (71 CY)

Awd $44,730.00$630.00

2 $44,730.00$630.00

3 $44,730.00$630.00

Ref #77 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (115 SY)

Awd $1,150.00$10.00

2 $1,150.00$10.00

3 $1,150.00$10.00

140032 - Page 60

Page 61: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #78 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (33 SF)

Awd $99.00$3.00

2 $99.00$3.00

3 $99.00$3.00

Ref #79 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (45 SF)

Awd $135.00$3.00

2 $135.00$3.00

3 $135.00$3.00

Ref #80 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS, (196 FT)

Awd $3,528.00$18.00

2 $3,528.00$18.00

3 $3,528.00$18.00

Ref #81 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (75 SF)

Awd $9,375.00$125.00

2 $9,375.00$125.00

3 $9,375.00$125.00

Ref #82 526E25011 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (112 SY)

Awd $32,480.00$290.00

2 $32,480.00$290.00

3 $32,480.00$290.00

Ref #83 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (116 SY)

Awd $5,220.00$45.00

2 $5,220.00$45.00

3 $5,220.00$45.00

Ref #86 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1022 SY)

Awd $40,880.00$40.00

2 $40,880.00$40.00

3 $40,880.00$40.00

Ref #87 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1022 SY)

Awd $81,760.00$80.00

2 $81,760.00$80.00

3 $81,760.00$80.00

Ref #88 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (3 CY)

Awd $585.00$195.00

2 $585.00$195.00

3 $585.00$195.00

Ref #89 848E50000 HAND CHIPPING, (20 SY)

Awd $4,000.00$200.00

2 $4,000.00$200.00

3 $4,000.00$200.00

Ref #90 848E50100 TEST SLAB, (LUMP SUM)

Awd $500.00$500.00

2 $500.00$500.00

3 $500.00$500.00

Ref #91 848E50200 FULL-DEPTH REPAIR, (1 CY)

Awd $2,500.00$2,500.00

2 $2,500.00$2,500.00

3 $2,500.00$2,500.00

140032 - Page 61

Page 62: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #92 848E50301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN, (902 SY)

Awd $10,824.00$12.00

2 $7,216.00$8.00

3 $10,824.00$12.00

Ref #202 304E20000 AGGREGATE BASE, (19 CY)

Awd $1,900.00$100.00

2 $1,900.00$100.00

3 $1,900.00$100.00

Section 7 - STRUCTURE REPAIR BRIDGE NO. WOO-475-019 - Totals

Awd $341,769.90

2 $338,161.90

3 $341,769.90

Ref #93 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $48,700.00$48,700.00

2 $48,700.00$48,700.00

3 $48,700.00$48,700.00

Ref #94 202E23011 PAVEMENT REMOVED, ASPHALT, AS PER PLAN, (112 SY)

Awd $2,240.00$20.00

2 $2,240.00$20.00

3 $2,240.00$20.00

Ref #95 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (44 CY)

Awd $1,760.00$40.00

2 $1,760.00$40.00

3 $1,760.00$40.00

Ref #96 509E10000 EPOXY COATED REINFORCING STEEL, (23219 LB)

Awd $25,540.90$1.10

2 $25,540.90$1.10

3 $25,540.90$1.10

Ref #97 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)

Awd $250.00$5.00

2 $250.00$5.00

3 $250.00$5.00

Ref #98 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (824 EACH)

Awd $9,888.00$12.00

2 $9,888.00$12.00

3 $9,888.00$12.00

Ref #99 511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT, (8 CY)

Awd $8,800.00$1,100.00

2 $8,800.00$1,100.00

3 $8,800.00$1,100.00

Ref #100 511E60000 SPECIAL - BRIDGE DECK GROOVING, (985 SY)

Awd $4,925.00$5.00

2 $4,925.00$5.00

3 $4,925.00$5.00

Ref #101 511E71100 CONCRETE, MISC.:BRIDGE DECK (PARAPET) WITH HYCRETE, (71 CY)

Awd $44,730.00$630.00

2 $44,730.00$630.00

3 $44,730.00$630.00

140032 - Page 62

Page 63: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #102 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (115 SY)

Awd $1,150.00$10.00

2 $1,150.00$10.00

3 $1,150.00$10.00

Ref #103 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (33 SF)

Awd $99.00$3.00

2 $99.00$3.00

3 $99.00$3.00

Ref #104 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (45 SF)

Awd $135.00$3.00

2 $135.00$3.00

3 $135.00$3.00

Ref #105 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS, (196 FT)

Awd $3,528.00$18.00

2 $3,528.00$18.00

3 $3,528.00$18.00

Ref #106 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (75 SF)

Awd $9,375.00$125.00

2 $9,375.00$125.00

3 $9,375.00$125.00

Ref #107 526E25011 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (112 SY)

Awd $32,480.00$290.00

2 $32,480.00$290.00

3 $32,480.00$290.00

Ref #108 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (116 SY)

Awd $5,220.00$45.00

2 $5,220.00$45.00

3 $5,220.00$45.00

Ref #111 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (1022 SY)

Awd $40,880.00$40.00

2 $40,880.00$40.00

3 $40,880.00$40.00

Ref #112 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (1022 SY)

Awd $81,760.00$80.00

2 $81,760.00$80.00

3 $81,760.00$80.00

Ref #113 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (3 CY)

Awd $585.00$195.00

2 $585.00$195.00

3 $585.00$195.00

Ref #114 848E50000 HAND CHIPPING, (20 SY)

Awd $4,000.00$200.00

2 $4,000.00$200.00

3 $4,000.00$200.00

Ref #115 848E50100 TEST SLAB, (LUMP SUM)

Awd $500.00$500.00

2 $500.00$500.00

3 $500.00$500.00

140032 - Page 63

Page 64: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #116 848E50200 FULL-DEPTH REPAIR, (1 CY)

Awd $2,500.00$2,500.00

2 $2,500.00$2,500.00

3 $2,500.00$2,500.00

Ref #117 848E50301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN, (902 SY)

Awd $10,824.00$12.00

2 $7,216.00$8.00

3 $10,824.00$12.00

Ref #203 304E20000 AGGREGATE BASE, (19 CY)

Awd $1,900.00$100.00

2 $1,900.00$100.00

3 $1,900.00$100.00

Section 8 - BRIDGE NO. WOO-475-0197 R - Totals

Awd $341,769.90

2 $338,161.90

3 $341,769.90

Ref #118 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $44,670.00$44,670.00

2 $44,670.00$44,670.00

3 $44,670.00$44,670.00

Ref #119 202E23011 PAVEMENT REMOVED, ASPHALT, AS PER PLAN, (78 SY)

Awd $1,560.00$20.00

2 $1,560.00$20.00

3 $1,560.00$20.00

Ref #120 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (43 CY)

Awd $1,720.00$40.00

2 $1,720.00$40.00

3 $1,720.00$40.00

Ref #121 509E10000 EPOXY COATED REINFORCING STEEL, (19516 LB)

Awd $21,467.60$1.10

2 $21,467.60$1.10

3 $21,467.60$1.10

Ref #122 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)

Awd $250.00$5.00

2 $250.00$5.00

3 $250.00$5.00

Ref #123 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (632 EACH)

Awd $7,584.00$12.00

2 $7,584.00$12.00

3 $7,584.00$12.00

Ref #124 511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT, (7 CY)

Awd $7,700.00$1,100.00

2 $7,700.00$1,100.00

3 $7,700.00$1,100.00

Ref #125 511E60000 SPECIAL - BRIDGE DECK GROOVING, (556 SY)

Awd $2,780.00$5.00

2 $2,780.00$5.00

3 $2,780.00$5.00

140032 - Page 64

Page 65: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #126 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (54 CY)

Awd $32,400.00$600.00

2 $32,400.00$600.00

3 $32,400.00$600.00

Ref #127 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (86 SY)

Awd $860.00$10.00

2 $860.00$10.00

3 $860.00$10.00

Ref #128 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (7385 SF)

Awd $44,310.00$6.00

2 $44,310.00$6.00

3 $44,310.00$6.00

Ref #129 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (7385 SF)

Awd $14,770.00$2.00

2 $14,770.00$2.00

3 $14,770.00$2.00

Ref #130 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (7385 SF)

Awd $16,616.25$2.25

2 $16,616.25$2.25

3 $16,616.25$2.25

Ref #131 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (7385 SF)

Awd $16,247.00$2.20

2 $16,247.00$2.20

3 $16,247.00$2.20

Ref #132 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (25 MNHR)

Awd $2,500.00$100.00

2 $2,500.00$100.00

3 $2,500.00$100.00

Ref #133 514E10000 FINAL INSPECTION REPAIR, (9 EACH)

Awd $2,250.00$250.00

2 $2,250.00$250.00

3 $2,250.00$250.00

Ref #134 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (33 SF)

Awd $99.00$3.00

2 $99.00$3.00

3 $99.00$3.00

Ref #135 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (113 SF)

Awd $339.00$3.00

2 $339.00$3.00

3 $339.00$3.00

Ref #136 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS, (171 FT)

Awd $3,078.00$18.00

2 $3,078.00$18.00

3 $3,078.00$18.00

Ref #137 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (55 SF)

Awd $6,875.00$125.00

2 $6,875.00$125.00

3 $6,875.00$125.00

140032 - Page 65

Page 66: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #138 526E25011 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (112 SY)

Awd $32,480.00$290.00

2 $32,480.00$290.00

3 $32,480.00$290.00

Ref #139 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (46 SY)

Awd $2,070.00$45.00

2 $2,070.00$45.00

3 $2,070.00$45.00

Ref #141 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (782 SY)

Awd $31,280.00$40.00

2 $31,280.00$40.00

3 $31,280.00$40.00

Ref #142 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (782 SY)

Awd $62,560.00$80.00

2 $62,560.00$80.00

3 $62,560.00$80.00

Ref #143 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (2 CY)

Awd $390.00$195.00

2 $390.00$195.00

3 $390.00$195.00

Ref #144 848E50000 HAND CHIPPING, (12 SY)

Awd $2,400.00$200.00

2 $2,400.00$200.00

3 $2,400.00$200.00

Ref #145 848E50100 TEST SLAB, (LUMP SUM)

Awd $500.00$500.00

2 $500.00$500.00

3 $500.00$500.00

Ref #146 848E50200 FULL-DEPTH REPAIR, (1 CY)

Awd $2,500.00$2,500.00

2 $2,500.00$2,500.00

3 $2,500.00$2,500.00

Ref #147 848E50301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN, (670 SY)

Awd $8,040.00$12.00

2 $5,360.00$8.00

3 $8,040.00$12.00

Ref #200 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (371 SY)

Awd $7,420.00$20.00

2 $7,420.00$20.00

3 $7,420.00$20.00

Ref #204 304E20000 AGGREGATE BASE, (19 CY)

Awd $1,900.00$100.00

2 $1,900.00$100.00

3 $1,900.00$100.00

Section 9 - BRIDGE NO. WOO-475-0214 L - Totals

Awd $379,615.85

2 $376,935.85

3 $379,615.85

140032 - Page 66

Page 67: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #148 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $44,675.00$44,675.00

2 $44,675.00$44,675.00

3 $44,675.00$44,675.00

Ref #149 202E23011 PAVEMENT REMOVED, ASPHALT, AS PER PLAN, (78 SY)

Awd $1,560.00$20.00

2 $1,560.00$20.00

3 $1,560.00$20.00

Ref #150 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (43 CY)

Awd $1,720.00$40.00

2 $1,720.00$40.00

3 $1,720.00$40.00

Ref #151 509E10000 EPOXY COATED REINFORCING STEEL, (19516 LB)

Awd $21,467.60$1.10

2 $21,467.60$1.10

3 $21,467.60$1.10

Ref #152 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (50 LB)

Awd $250.00$5.00

2 $250.00$5.00

3 $250.00$5.00

Ref #153 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (632 EACH)

Awd $7,584.00$12.00

2 $7,584.00$12.00

3 $7,584.00$12.00

Ref #154 511E45712 CLASS QC1 CONCRETE WITH QC/QA, ABUTMENT, (7 CY)

Awd $7,700.00$1,100.00

2 $7,700.00$1,100.00

3 $7,700.00$1,100.00

Ref #155 511E60000 SPECIAL - BRIDGE DECK GROOVING, (556 SY)

Awd $2,780.00$5.00

2 $2,780.00$5.00

3 $2,780.00$5.00

Ref #156 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (54 CY)

Awd $32,400.00$600.00

2 $32,400.00$600.00

3 $32,400.00$600.00

Ref #157 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (86 SY)

Awd $860.00$10.00

2 $860.00$10.00

3 $860.00$10.00

Ref #158 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (7385 SF)

Awd $44,310.00$6.00

2 $44,310.00$6.00

3 $44,310.00$6.00

Ref #159 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (7385 SF)

Awd $14,770.00$2.00

2 $14,770.00$2.00

3 $14,770.00$2.00

140032 - Page 67

Page 68: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #160 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (7385 SF)

Awd $16,616.25$2.25

2 $16,616.25$2.25

3 $16,616.25$2.25

Ref #161 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (7385 SF)

Awd $16,247.00$2.20

2 $16,247.00$2.20

3 $16,247.00$2.20

Ref #162 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (25 MNHR)

Awd $2,500.00$100.00

2 $2,500.00$100.00

3 $2,500.00$100.00

Ref #163 514E10000 FINAL INSPECTION REPAIR, (9 EACH)

Awd $2,250.00$250.00

2 $2,250.00$250.00

3 $2,250.00$250.00

Ref #164 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (33 SF)

Awd $99.00$3.00

2 $99.00$3.00

3 $99.00$3.00

Ref #165 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (113 SF)

Awd $339.00$3.00

2 $339.00$3.00

3 $339.00$3.00

Ref #166 516E31250 SPECIAL - SAWING AND SEALING CONCRETE JOINTS, (171 FT)

Awd $3,078.00$18.00

2 $3,078.00$18.00

3 $3,078.00$18.00

Ref #167 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (55 SF)

Awd $6,875.00$125.00

2 $6,875.00$125.00

3 $6,875.00$125.00

Ref #168 526E25011 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (112 SY)

Awd $32,480.00$290.00

2 $32,480.00$290.00

3 $32,480.00$290.00

Ref #169 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (46 SY)

Awd $2,070.00$45.00

2 $2,070.00$45.00

3 $2,070.00$45.00

Ref #171 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (782 SY)

Awd $31,280.00$40.00

2 $31,280.00$40.00

3 $31,280.00$40.00

Ref #172 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (782 SY)

Awd $62,560.00$80.00

2 $62,560.00$80.00

3 $62,560.00$80.00

140032 - Page 68

Page 69: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #173 848E30200 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (2 CY)

Awd $390.00$195.00

2 $390.00$195.00

3 $390.00$195.00

Ref #174 848E50000 HAND CHIPPING, (12 SY)

Awd $2,400.00$200.00

2 $2,400.00$200.00

3 $2,400.00$200.00

Ref #175 848E50100 TEST SLAB, (LUMP SUM)

Awd $500.00$500.00

2 $500.00$500.00

3 $500.00$500.00

Ref #176 848E50200 FULL-DEPTH REPAIR, (1 CY)

Awd $2,500.00$2,500.00

2 $2,500.00$2,500.00

3 $2,500.00$2,500.00

Ref #177 848E50301 WEARING COURSE REMOVED, ASPHALT, AS PER PLAN, (670 SY)

Awd $8,040.00$12.00

2 $5,360.00$8.00

3 $8,040.00$12.00

Ref #201 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (371 SY)

Awd $7,420.00$20.00

2 $7,420.00$20.00

3 $7,420.00$20.00

Ref #205 304E20000 AGGREGATE BASE, (19 CY)

Awd $1,900.00$100.00

2 $1,900.00$100.00

3 $1,900.00$100.00

Section 10 - BRIDGE NO. WOO-475-0214 R - Totals

Awd $379,620.85

2 $376,940.85

3 $379,620.85

Ref #178 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)

Awd $13,000.00$13,000.00

2 $1,000.00$1,000.00

3 $8,250.00$8,250.00

Ref #179 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $34,000.00$34,000.00

2 $40,000.00$40,000.00

3 $75,000.00$75,000.00

Ref #180 108E10000 SPECIAL - CPM PROGRESS SCHEDULE, (LUMP SUM)

Awd $8,000.00$8,000.00

2 $2,000.00$2,000.00

3 $2,500.00$2,500.00

Ref #181 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $230,000.00$230,000.00

2 $259,000.00$259,000.00

3 $128,000.00$128,000.00

140032 - Page 69

Page 70: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #182 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)

Awd $9,000.00$9,000.00

2 $6,920.00$6,920.00

3 $10,000.00$10,000.00

Ref #183 624E10000 MOBILIZATION, (LUMP SUM)

Awd $200,000.00$200,000.00

2 $200,000.00$200,000.00

3 $200,000.00$200,000.00

Section 11 - INCIDENTALS - Totals

Awd $494,000.00

2 $508,920.00

3 $423,750.00

140032 - Page 70

Page 71: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Project No. 141007

PID 96837

FRA-VA-EXPO-FY14

Non-Federal

Type: MISCELLANEOUS

Completion Date: 7/1/2014

Award Amount: $1,589,163.14

Contract Awarded To: STRAWSER PAVING CO INC

Letting Date: 1/16/2014

Engineer's Estimate: $1,283,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jerry Wray, Director

STRAWSER PAVING CO INC

1595 FRANK RD

COLUMBUS, OH 43223

Franklin

Bidder 1

Bid $1,589,163.14

KARVO PAVING COMPANY

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 2

Bid $1,644,292.35

TRUCCO CONSTRUCTION CO INC

3531 AIRPORT RD

DELAWARE, OH 43015

Delaware

Bidder 3

Bid $1,829,287.67

COLUMBUS ASPHALT PAVING INC

1196 TECHNOLOGY DR

GAHANNA, OH 43230

Franklin

Bidder 4

Bid $1,878,210.50

SHELLY & SANDS INC

1515 HARMON AVE

COLUMBUS, OH 43223

Franklin

Bidder 5

Bid $1,951,582.90

KOKOSING CONSTRUCTION COMPANY INC

886 MC KINLEY AVE

COLUMBUS, OH 43222

Franklin

Bidder 6

Bid $1,997,109.14

DECKER CONSTRUCTION COMPANY

3040 MC KINLEY AVE

COLUMBUS, OH 43204

Franklin

Bidder 7

Bid $2,286,279.48

141007 - Page 71

Page 72: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #1 202E98500 REMOVAL MISC.:STOCKPILE REMOVED, (10763 CY)

Awd $107,630.00$10.00

2 $156,063.50$14.50

3 $209,878.50$19.50

4 $128,079.70$11.90

5 $154,449.05$14.35

6 $134,537.50$12.50

7 $134,537.50$12.50

Section 1 - ROADWAY - Totals

Awd $107,630.00

2 $156,063.50

3 $209,878.50

4 $128,079.70

5 $154,449.05

6 $134,537.50

7 $134,537.50

Ref #2 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

4 $1,000.00$1.00

5 $1,000.00$1.00

6 $1,000.00$1.00

7 $1,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $1,000.00

2 $1,000.00

3 $1,000.00

4 $1,000.00

5 $1,000.00

6 $1,000.00

7 $1,000.00

Ref #3 251E01000 PARTIAL DEPTH PAVEMENT REPAIR, (100 SY)

Awd $5,100.00$51.00

2 $6,700.00$67.00

3 $37,400.00$374.00

4 $5,730.00$57.30

5 $2,000.00$20.00

6 $7,475.00$74.75

7 $3,500.00$35.00

Ref #4 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (62298 SY)

Awd $89,086.14$1.43

2 $96,561.90$1.55

3 $71,642.70$1.15

4 $115,251.30$1.85

5 $93,447.00$1.50

6 $59,183.10$0.95

7 $99,053.82$1.59

141007 - Page 72

Page 73: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #5 407E10000 TACK COAT, (4672 GAL)

Awd $11,680.00$2.50

2 $9,344.00$2.00

3 $8,876.80$1.90

4 $25,696.00$5.50

5 $10,512.00$2.25

6 $8,876.80$1.90

7 $9,577.60$2.05

Ref #6 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (3461 CY)

Awd $536,455.00$155.00

2 $564,143.00$163.00

3 $467,235.00$135.00

4 $536,455.00$155.00

5 $474,157.00$137.00

6 $522,611.00$151.00

7 $514,996.80$148.80

Section 3 - PAVEMENT - Totals

Awd $642,321.14

2 $676,748.90

3 $585,154.50

4 $683,132.30

5 $580,116.00

6 $598,145.90

7 $627,128.22

Ref #7 642E00390 CHANNELIZING LINE, 8", (1150 FT)

Awd $632.50$0.55

2 $632.50$0.55

3 $632.50$0.55

4 $747.50$0.65

5 $632.50$0.55

6 $632.50$0.55

7 $655.50$0.57

Ref #8 642E01190 PARKING LOT STALL MARKING, (21330 FT)

Awd $10,238.40$0.48

2 $10,238.40$0.48

3 $10,238.40$0.48

4 $11,518.20$0.54

5 $10,665.00$0.50

6 $10,238.40$0.48

7 $10,665.00$0.50

Ref #9 642E01700 HANDICAP SYMBOL MARKING, (10 EACH)

Awd $550.00$55.00

2 $550.00$55.00

3 $550.00$55.00

4 $1,030.00$103.00

5 $560.00$56.00

6 $550.00$55.00

7 $566.50$56.65

141007 - Page 73

Page 74: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 4 - TRAFFIC CONTROL - Totals

Awd $11,420.90

2 $11,420.90

3 $11,420.90

4 $13,295.70

5 $11,857.50

6 $11,420.90

7 $11,887.00

Ref #10 202E98100 REMOVAL MISC.:CURBED ISLANDS, (6 EACH)

Awd $2,700.00$450.00

2 $6,000.00$1,000.00

3 $9,900.00$1,650.00

4 $7,680.00$1,280.00

5 $6,000.00$1,000.00

6 $5,070.00$845.00

7 $10,950.24$1,825.04

Ref #11 203E10001 EXCAVATION, AS PER PLAN, (3070 CY)

Awd $49,120.00$16.00

2 $45,282.50$14.75

3 $62,935.00$20.50

4 $76,136.00$24.80

5 $52,190.00$17.00

6 $42,980.00$14.00

7 $105,485.20$34.36

Section 5 - LANDSCAPING (EXCAVATION) - Totals

Awd $51,820.00

2 $51,282.50

3 $72,835.00

4 $83,816.00

5 $58,190.00

6 $48,050.00

7 $116,435.44

Ref #12 602E20000 CONCRETE MASONRY(HALF HEIGHT HEADWALL), (0.21 CY)

Awd $997.50$4,750.00

2 $378.00$1,800.00

3 $1,218.00$5,800.00

4 $787.50$3,750.00

5 $735.00$3,500.00

6 $1,050.00$5,000.00

7 $1,042.78$4,965.62

Ref #13 605E98000 UNDERDRAINS, MISC.:12" CORRUGATED PERFORATED DRAIN, (890 FT)

Awd $20,470.00$23.00

2 $20,470.00$23.00

3 $51,620.00$58.00

4 $24,030.00$27.00

5 $35,600.00$40.00

6 $28,435.50$31.95

7 $69,339.90$77.91

141007 - Page 74

Page 75: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #14 611E00901 6" CONDUIT, TYPE B, AS PER PLAN, (485 FT)

Awd $9,700.00$20.00

2 $9,700.00$20.00

3 $20,612.50$42.50

4 $20,273.00$41.80

5 $17,460.00$36.00

6 $42,316.25$87.25

7 $30,477.40$62.84

Ref #15 611E04401 12" CONDUIT, TYPE B, AS PER PLAN, (200 FT)

Awd $8,600.00$43.00

2 $10,000.00$50.00

3 $12,800.00$64.00

4 $16,240.00$81.20

5 $12,000.00$60.00

6 $30,000.00$150.00

7 $17,556.00$87.78

Section 6 - LANDSCAPING (STORM SEWER) - Totals

Awd $39,767.50

2 $40,548.00

3 $86,250.50

4 $61,330.50

5 $65,795.00

6 $101,801.75

7 $118,416.08

Ref #16 203E98000 ROADWAY, MISC.:#4 LIMESTONE AGGREGATE, (304 CY)

Awd $15,808.00$52.00

2 $16,066.40$52.85

3 $19,760.00$65.00

4 $17,328.00$57.00

5 $22,800.00$75.00

6 $26,514.88$87.22

7 $24,672.64$81.16

Ref #17 203E98000 ROADWAY, MISC.:#57 LIMESTONE AGGREGATE, (304 CY)

Awd $18,240.00$60.00

2 $14,592.00$48.00

3 $23,408.00$77.00

4 $19,000.00$62.50

5 $20,672.00$68.00

6 $26,514.88$87.22

7 $26,344.64$86.66

Ref #18 203E98100 ROADWAY, MISC.:GEOGRID, (387 SY)

Awd $3,483.00$9.00

2 $1,315.80$3.40

3 $6,192.00$16.00

4 $4,450.50$11.50

5 $12,771.00$33.00

6 $12,546.54$32.42

7 $5,282.55$13.65

141007 - Page 75

Page 76: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #19 204E50001 GEOTEXTILE FABRIC, AS PER PLAN, (2812 SY)

Awd $8,436.00$3.00

2 $5,624.00$2.00

3 $11,951.00$4.25

4 $10,826.20$3.85

5 $22,496.00$8.00

6 $21,905.48$7.79

7 $5,174.08$1.84

Ref #20 511E81100 CONCRETE, MISC.:SUPPORT FOOTING, (675 FT)

Awd $19,575.00$29.00

2 $15,525.00$23.00

3 $30,037.50$44.50

4 $38,272.50$56.70

5 $27,000.00$40.00

6 $31,725.00$47.00

7 $16,092.00$23.84

Ref #21 608E98000 WALKWAY, MISC.:PERMEABLE PAVERS, (14968 SF)

Awd $68,852.80$4.60

2 $73,343.20$4.90

3 $65,559.84$4.38

4 $83,072.40$5.55

5 $149,680.00$10.00

6 $137,705.60$9.20

7 $72,145.76$4.82

Ref #22 608E98000 WALKWAY, MISC.:PERMEABLE PAVERS, SOLDIER COURSE, (1396 SF)

Awd $8,376.00$6.00

2 $6,840.40$4.90

3 $7,929.28$5.68

4 $7,747.80$5.55

5 $13,960.00$10.00

6 $12,843.20$9.20

7 $8,725.00$6.25

Ref #23 608E98200 WALKWAY, MISC.:PAVER GRATE, (25 EACH)

Awd $63,750.00$2,550.00

2 $63,750.00$2,550.00

3 $70,000.00$2,800.00

4 $72,250.00$2,890.00

5 $78,750.00$3,150.00

6 $78,047.00$3,121.88

7 $79,825.00$3,193.00

Ref #24 608E98200 WALKWAY, MISC.:SILVA CELLS, (2400 EACH)

Awd $319,200.00$133.00

2 $324,000.00$135.00

3 $355,200.00$148.00

4 $348,000.00$145.00

5 $470,400.00$196.00

6 $446,616.00$186.09

7 $771,264.00$321.36

141007 - Page 76

Page 77: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #25 609E26000 CURB, TYPE 6, (16 FT)

Awd $368.00$23.00

2 $800.00$50.00

3 $976.00$61.00

4 $742.40$46.40

5 $1,440.00$90.00

6 $888.00$55.50

7 $369.60$23.10

Ref #26 609E98000 CURB, MISC.:CONCRETE BORDER, (1868 FT)

Awd $38,294.00$20.50

2 $35,959.00$19.25

3 $29,421.00$15.75

4 $65,940.40$35.30

5 $35,398.60$18.95

6 $32,690.00$17.50

7 $35,697.48$19.11

Ref #27 690E50600 SPECIAL - BOLLARD, (4 EACH)

Awd $2,800.00$700.00

2 $4,400.00$1,100.00

3 $2,600.00$650.00

4 $1,944.00$486.00

5 $2,400.00$600.00

6 $2,356.00$589.00

7 $4,620.00$1,155.00

Ref #100 304E20000 AGGREGATE BASE, (272 CY)

Awd $22,304.00$82.00

2 $17,136.00$63.00

3 $21,216.00$78.00

4 $13,192.00$48.50

5 $36,924.00$135.75

6 $36,891.36$135.63

7 $14,677.12$53.96

Section 7 - LANDSCAPING (LAYOUT) - Totals

Awd $589,486.80

2 $579,351.80

3 $644,250.62

4 $682,766.20

5 $894,691.60

6 $867,243.94

7 $1,064,889.87

Ref #28 638E98000 WATER WORK, MISC.:CONTROL VALVE, (1 EACH)

Awd $320.00$320.00

2 $250.00$250.00

3 $2,000.00$2,000.00

4 $1,890.00$1,890.00

5 $2,600.00$2,600.00

6 $2,581.25$2,581.25

7 $1,802.50$1,802.50

141007 - Page 77

Page 78: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #29 638E98100 WATER WORK, MISC.:POINT OF CONNECTION, (LUMP SUM)

Awd $7,825.00$7,825.00

2 $5,000.00$5,000.00

3 $9,000.00$9,000.00

4 $10,600.00$10,600.00

5 $10,375.00$10,375.00

6 $9,823.75$9,823.75

7 $10,118.72$10,118.72

Ref #30 638E98600 WATER WORK, MISC.:DRIP LINE BLANK TUBING, (231 FT)

Awd $242.55$1.05

2 $750.75$3.25

3 $1,155.00$5.00

4 $912.45$3.95

5 $1,617.00$7.00

6 $1,593.90$6.90

7 $866.25$3.75

Ref #31 638E98600 WATER WORK, MISC.:DRIP LINE TUBING, (461 FT)

Awd $576.25$1.25

2 $922.00$2.00

3 $1,383.00$3.00

4 $3,849.35$8.35

5 $1,383.00$3.00

6 $1,276.97$2.77

7 $3,664.95$7.95

Ref #32 638E98600 WATER WORK, MISC.:SCHEDULE 40 PVC, 1" WITH SLEEVE, (32 FT)

Awd $232.00$7.25

2 $64.00$2.00

3 $128.00$4.00

4 $1,769.60$55.30

5 $136.00$4.25

6 $132.16$4.13

7 $1,686.08$52.69

Ref #33 638E98600 WATER WORK, MISC.:SCHEDULE 40 PVC, 1.25" WITH SLEE, (1089 FT)

Awd $9,801.00$9.00

2 $2,178.00$2.00

3 $5,281.65$4.85

4 $9,038.70$8.30

5 $5,172.75$4.75

6 $4,987.62$4.58

7 $8,635.77$7.93

Section 8 - LANDSCAPING (IRRIGATION) - Totals

Awd $18,996.80

2 $9,164.75

3 $18,947.65

4 $28,060.10

5 $21,283.75

6 $20,395.65

7 $26,774.27

141007 - Page 78

Page 79: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Ref #34 661E00501 MULCH, AS PER PLAN, (2 CY)

Awd $170.00$85.00

2 $110.00$55.00

3 $300.00$150.00

4 $770.00$385.00

5 $400.00$200.00

6 $367.50$183.75

7 $133.90$66.95

Ref #35 661E40140 DECIDUOUS TREE, 4 " CALIPERBLOODGOOD, (6 EACH)

Awd $3,900.00$650.00

2 $3,240.00$540.00

3 $5,100.00$850.00

4 $8,760.00$1,460.00

5 $5,520.00$920.00

6 $5,226.54$871.09

7 $4,449.60$741.60

Ref #36 661E40140 DECIDUOUS TREE, 4 " CALIPERPRINCETON ELM, (3 EACH)

Awd $1,950.00$650.00

2 $2,430.00$810.00

3 $2,550.00$850.00

4 $4,530.00$1,510.00

5 $2,760.00$920.00

6 $2,613.27$871.09

7 $2,317.50$772.50

Ref #37 661E40140 DECIDUOUS TREE, 4 " CALIPERPRINCETON SENTRY, (10 EACH)

Awd $6,500.00$650.00

2 $10,000.00$1,000.00

3 $8,500.00$850.00

4 $15,100.00$1,510.00

5 $9,200.00$920.00

6 $8,710.90$871.09

7 $10,660.50$1,066.05

Ref #38 661E40140 DECIDUOUS TREE, 4 " CALIPERSHADEMASTER, (6 EACH)

Awd $3,900.00$650.00

2 $3,432.00$572.00

3 $5,100.00$850.00

4 $8,760.00$1,460.00

5 $5,520.00$920.00

6 $4,851.54$808.59

7 $4,449.60$741.60

Ref #39 661E99940 PLANTING, MISC.:PLANTING SOIL, (LUMP SUM)

Awd $70,200.00$70,200.00

2 $51,000.00$51,000.00

3 $65,000.00$65,000.00

4 $61,600.00$61,600.00

5 $70,000.00$70,000.00

6 $66,993.75$66,993.75

7 $92,700.00$92,700.00

141007 - Page 79

Page 80: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

Section 9 - LANDSCAPING (LANDSCAPING) - Totals

Awd $86,620.00

2 $70,212.00

3 $86,550.00

4 $99,520.00

5 $93,400.00

6 $88,763.50

7 $114,711.10

Ref #40 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $10,200.00$10,200.00

2 $15,000.00$15,000.00

3 $13,000.00$13,000.00

4 $15,200.00$15,200.00

5 $9,800.00$9,800.00

6 $8,000.00$8,000.00

7 $12,000.00$12,000.00

Ref #41 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $4,900.00$4,900.00

2 $2,000.00$2,000.00

3 $30,000.00$30,000.00

4 $17,000.00$17,000.00

5 $6,000.00$6,000.00

6 $70,750.00$70,750.00

7 $2,500.00$2,500.00

Ref #42 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $3,500.00$3,500.00

3 $30,000.00$30,000.00

4 $5,010.00$5,010.00

5 $15,000.00$15,000.00

6 $7,000.00$7,000.00

7 $6,000.00$6,000.00

Ref #43 624E10000 MOBILIZATION, (LUMP SUM)

Awd $20,000.00$20,000.00

2 $28,000.00$28,000.00

3 $40,000.00$40,000.00

4 $60,000.00$60,000.00

5 $40,000.00$40,000.00

6 $40,000.00$40,000.00

7 $50,000.00$50,000.00

Section 10 - INCIDENTALS - Totals

Awd $40,100.00

2 $48,500.00

3 $113,000.00

4 $97,210.00

5 $70,800.00

6 $125,750.00

7 $70,500.00

141007 - Page 80

Page 81: Ohio Department of Transportation Official Bid Tabulation ... › Divisions › ContractAdmin › ... · 3 $85.00 $18,785.00 140001 - page 5. ref #46 601e32200 rock channel protection,

141007 - Page 81