Project No. 100552 PID 79903 LUC-SR-65-00.83 Federal Type: BRIDGE REPAIR Completion Date: 10/1/2011 Award Amount: $1,114,006.49 Contract Awarded To: VERNON NAGEL INC Letting Date: 12/2/2010 Engineer's Estimate: $1,220,000.00 Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director VERNON NAGEL INC O-154 CO RD 11-C NAPOLEON, OH 43545 Henry Bidder 1 Bid $1,114,006.49 MILLER BROS CONST INC 1613 S DEFIANCE ST ARCHBOLD, OH 43502 Fulton Bidder 2 Bid $1,135,935.95 E S WAGNER COMPANY 840 PATCHEN RD OREGON, OH 43616 Lucas Bidder 3 Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39 POSEN CONSTRUCTION INC 50500 DESIGN LANE SHELBY TOWNSHIP, MI 48315 Bidder 5 Bid $1,424,396.48 PERK COMPANY INC 8100 GRAND AVE SUITE 300 CLEVELAND, OH 44104-3110 Bidder 6 Bid $1,429,727.89 100552 - Page 1

Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100552

PID 79903

LUC-SR-65-00.83

Federal

Type: BRIDGE REPAIR

Completion Date: 10/1/2011

Award Amount: $1,114,006.49

Contract Awarded To: VERNON NAGEL INC

Letting Date: 12/2/2010

Engineer's Estimate: $1,220,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

VERNON NAGEL INC

O-154 CO RD 11-C

NAPOLEON, OH 43545

Henry

Bidder 1

Bid $1,114,006.49

MILLER BROS CONST INC

1613 S DEFIANCE ST

ARCHBOLD, OH 43502

Fulton

Bidder 2

Bid $1,135,935.95

E S WAGNER COMPANY

840 PATCHEN RD

OREGON, OH 43616

Lucas

Bidder 3

Bid $1,139,867.24

MOSSER CONSTRUCTION INC

122 S WILSON AVE

FREMONT, OH 43420

Sandusky

Bidder 4

Bid $1,298,025.39

POSEN CONSTRUCTION INC

50500 DESIGN LANE

SHELBY TOWNSHIP, MI 48315

Bidder 5

Bid $1,424,396.48

PERK COMPANY INC

8100 GRAND AVE SUITE 300

CLEVELAND, OH 44104-3110

Bidder 6

Bid $1,429,727.89

100552 - Page 1

Page 2: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $500.00$500.00

3 $10,000.00$10,000.00

4 $10,000.00$10,000.00

5 $1,500.00$1,500.00

6 $6,850.00$6,850.00

Ref #2 202E30000 WALK REMOVED, (1045 SF)

Awd $1,045.00$1.00

2 $1,045.00$1.00

3 $1,045.00$1.00

4 $3,135.00$3.00

5 $1,045.00$1.00

6 $1,881.00$1.80

Ref #3 202E32000 CURB REMOVED, (290 FT)

Awd $290.00$1.00

2 $1,450.00$5.00

3 $435.00$1.50

4 $1,160.00$4.00

5 $2,610.00$9.00

6 $1,508.00$5.20

Ref #4 202E38000 GUARDRAIL REMOVED, (402 FT)

Awd $804.00$2.00

2 $402.00$1.00

3 $402.00$1.00

4 $402.00$1.00

5 $402.00$1.00

6 $1,909.50$4.75

Ref #5 203E10000 EXCAVATION, (584 CY)

Awd $8,760.00$15.00

2 $14,600.00$25.00

3 $11,388.00$19.50

4 $7,592.00$13.00

5 $7,008.00$12.00

6 $16,264.40$27.85

Ref #6 203E20000 EMBANKMENT, (52 CY)

Awd $1,040.00$20.00

2 $1,300.00$25.00

3 $416.00$8.00

4 $1,560.00$30.00

5 $260.00$5.00

6 $1,684.80$32.40

Ref #7 204E10000 SUBGRADE COMPACTION, (1230 SY)

Awd $1,230.00$1.00

2 $2,152.50$1.75

3 $1,845.00$1.50

4 $6,150.00$5.00

5 $6,150.00$5.00

6 $3,382.50$2.75

100552 - Page 2

Page 3: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #8 606E13000 GUARDRAIL, TYPE 5, (400 FT)

Awd $5,488.00$13.72

2 $5,488.00$13.72

3 $5,488.00$13.72

4 $5,488.00$13.72

5 $5,488.00$13.72

6 $5,500.00$13.75

Ref #9 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)

Awd $6,080.00$1,520.00

2 $6,080.00$1,520.00

3 $6,080.00$1,520.00

4 $6,080.00$1,520.00

5 $6,080.00$1,520.00

6 $6,080.00$1,520.00

Ref #10 608E10000 4" CONCRETE WALK, (1045 SF)

Awd $5,225.00$5.00

2 $5,538.50$5.30

3 $5,225.00$5.00

4 $3,396.25$3.25

5 $3,396.25$3.25

6 $6,217.75$5.95

Ref #11 609E26000 CURB, TYPE 6, (290 FT)

Awd $4,350.00$15.00

2 $5,220.00$18.00

3 $3,262.50$11.25

4 $4,060.00$14.00

5 $4,785.00$16.50

6 $5,829.00$20.10

Ref #12 625E98200 LIGHTING, MISC.:LIGHT POLE RELOCATED, (LUMP SUM)

Awd $4,500.00$4,500.00

2 $4,500.00$4,500.00

3 $4,970.00$4,970.00

4 $4,500.00$4,500.00

5 $4,970.00$4,970.00

6 $4,900.00$4,900.00

Section 1 - ROADWAY - Totals

Awd $41,812.00

2 $48,276.00

3 $50,556.50

4 $53,523.25

5 $43,694.25

6 $62,006.95

Ref #13 601E20000 CRUSHED AGGREGATE SLOPE PROTECTION, (1280 SY)

Awd $38,400.00$30.00

2 $19,200.00$15.00

3 $18,560.00$14.50

4 $40,960.00$32.00

5 $19,200.00$15.00

6 $35,264.00$27.55

100552 - Page 3

Page 4: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #14 659E10000 SEEDING AND MULCHING, (836 SY)

Awd $1,755.60$2.10

2 $2,090.00$2.50

3 $2,090.00$2.50

4 $1,755.60$2.10

5 $2,926.00$3.50

6 $2,090.00$2.50

Ref #15 659E14000 REPAIR SEEDING AND MULCHING, (200 SY)

Awd $416.00$2.08

2 $88.00$0.44

3 $88.00$0.44

4 $416.00$2.08

5 $300.00$1.50

6 $90.00$0.45

Ref #16 659E20000 COMMERCIAL FERTILIZER, (0.08 TON)

Awd $36.00$450.00

2 $52.00$650.00

3 $52.00$650.00

4 $36.00$450.00

5 $80.00$1,000.00

6 $52.00$650.00

Ref #17 659E35000 WATER, (5 MGAL)

Awd $5.00$1.00

2 $5.00$1.00

3 $5.00$1.00

4 $5.00$1.00

5 $250.00$50.00

6 $60.00$12.00

Ref #18 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

4 $1,000.00$1.00

5 $1,000.00$1.00

6 $1,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $41,612.60

2 $22,435.00

3 $21,795.00

4 $44,172.60

5 $23,756.00

6 $38,556.00

Ref #19 603E00200 4" CONDUIT, TYPE C, (50 FT)

Awd $250.00$5.00

2 $100.00$2.00

3 $200.00$4.00

4 $250.00$5.00

5 $650.00$13.00

6 $1,407.50$28.15

100552 - Page 4

Page 5: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #20 603E00400 4" CONDUIT, TYPE E, (50 FT)

Awd $250.00$5.00

2 $100.00$2.00

3 $200.00$4.00

4 $250.00$5.00

5 $700.00$14.00

6 $1,407.50$28.15

Ref #21 603E01100 6" CONDUIT, TYPE C, (50 FT)

Awd $300.00$6.00

2 $150.00$3.00

3 $400.00$8.00

4 $500.00$10.00

5 $700.00$14.00

6 $1,527.50$30.55

Ref #22 603E01400 6" CONDUIT, TYPE E, (50 FT)

Awd $300.00$6.00

2 $150.00$3.00

3 $237.50$4.75

4 $500.00$10.00

5 $800.00$16.00

6 $1,527.50$30.55

Ref #23 605E31100 AGGREGATE DRAINS, (40 FT)

Awd $400.00$10.00

2 $600.00$15.00

3 $520.00$13.00

4 $1,040.00$26.00

5 $1,000.00$25.00

6 $306.00$7.65

Section 3 - DRAINAGE - Totals

Awd $1,500.00

2 $1,100.00

3 $1,557.50

4 $2,540.00

5 $3,850.00

6 $6,176.00

Ref #24 302E46000 ASPHALT CONCRETE BASE, PG64-22, (194 CY)

Awd $31,816.00$164.00

2 $31,816.00$164.00

3 $27,160.00$140.00

4 $31,816.00$164.00

5 $36,860.00$190.00

6 $36,860.00$190.00

Ref #25 304E20000 AGGREGATE BASE, (199 CY)

Awd $7,960.00$40.00

2 $11,940.00$60.00

3 $7,363.00$37.00

4 $11,144.00$56.00

5 $9,950.00$50.00

6 $10,348.00$52.00

100552 - Page 5

Page 6: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #26 407E10000 TACK COAT, (66 GAL)

Awd $132.00$2.00

2 $132.00$2.00

3 $198.00$3.00

4 $132.00$2.00

5 $132.00$2.00

6 $132.00$2.00

Ref #27 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (35 GAL)

Awd $70.00$2.00

2 $70.00$2.00

3 $105.00$3.00

4 $70.00$2.00

5 $70.00$2.00

6 $70.00$2.00

Ref #28 442E10500 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (36 CY)

Awd $7,380.00$205.00

2 $7,380.00$205.00

3 $7,200.00$200.00

4 $7,380.00$205.00

5 $9,000.00$250.00

6 $9,000.00$250.00

Ref #29 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (43 CY)

Awd $7,912.00$184.00

2 $7,912.00$184.00

3 $7,912.00$184.00

4 $7,912.00$184.00

5 $9,675.00$225.00

6 $9,675.00$225.00

Section 4 - PAVEMENT - Totals

Awd $55,270.00

2 $59,250.00

3 $49,938.00

4 $58,454.00

5 $65,687.00

6 $66,085.00

Ref #30 642E00090 EDGE LINE, (1.023 MILE)

Awd $869.55$850.00

2 $869.55$850.00

3 $1,242.95$1,215.00

4 $1,244.99$1,217.00

5 $1,241.34$1,213.43

6 $1,242.95$1,215.00

Ref #31 642E00190 LANE LINE, (1.023 MILE)

Awd $664.95$650.00

2 $664.95$650.00

3 $1,020.95$998.00

4 $1,023.00$1,000.00

5 $1,020.00$997.07

6 $1,023.00$1,000.00

100552 - Page 6

Page 7: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #32 642E00290 CENTER LINE, (0.511 MILE)

Awd $613.20$1,200.00

2 $613.20$1,200.00

3 $769.57$1,506.01

4 $771.10$1,509.00

5 $769.59$1,506.05

6 $769.06$1,505.01

Section 5 - TRAFFIC CONTROL - Totals

Awd $2,147.70

2 $2,147.70

3 $3,033.47

4 $3,039.09

5 $3,030.93

6 $3,035.01

Ref #33 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)

Awd $2,400.00$60.00

2 $2,000.00$50.00

3 $2,400.00$60.00

4 $2,200.00$55.00

5 $2,800.00$70.00

6 $2,200.00$55.00

Ref #34 614E12730 SPECIAL - REBOUNDABLE TUBULAR PYLON, (71 EACH)

Awd $5,325.00$75.00

2 $2,130.00$30.00

3 $4,260.00$60.00

4 $4,260.00$60.00

5 $2,485.00$35.00

6 $2,556.00$36.00

Ref #35 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY)

Awd $2,750.00$275.00

2 $1,500.00$150.00

3 $800.00$80.00

4 $2,750.00$275.00

5 $800.00$80.00

6 $4,300.00$430.00

Ref #36 614E13302 BARRIER REFLECTOR, TYPE B2, (22 EACH)

Awd $121.00$5.50

2 $176.00$8.00

3 $198.00$9.00

4 $220.00$10.00

5 $132.00$6.00

6 $132.00$6.00

Ref #37 614E13360 OBJECT MARKER, TWO WAY, (22 EACH)

Awd $264.00$12.00

2 $352.00$16.00

3 $330.00$15.00

4 $330.00$15.00

5 $264.00$12.00

6 $264.00$12.00

100552 - Page 7

Page 8: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #38 614E18000 MAINTAINING TRAFFIC, MISC.:BUSINESS SIGN, (4 EACH)

Awd $229.00$57.25

2 $400.00$100.00

3 $600.00$150.00

4 $1,000.00$250.00

5 $600.00$150.00

6 $600.00$150.00

Ref #39 614E20200 WORK ZONE LANE LINE, CLASS I, 740.06, TYPE I, (0.028 MILE)

Awd $74.90$2,675.00

2 $112.00$4,000.00

3 $81.20$2,900.00

4 $70.00$2,500.00

5 $45.60$1,628.57

6 $45.64$1,630.00

Ref #40 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, (0.478 MILE)

Awd $4,603.14$9,630.00

2 $4,780.00$10,000.00

3 $4,660.50$9,750.00

4 $4,302.00$9,000.00

5 $4,888.00$10,225.94

6 $4,887.55$10,225.00

Ref #41 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (1.342 MILE)

Awd $6,461.73$4,815.00

2 $7,381.00$5,500.00

3 $6,508.70$4,850.00

4 $6,039.00$4,500.00

5 $7,075.20$5,272.13

6 $7,079.05$5,275.00

Ref #42 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 740.06, TYPE, (40 FT)

Awd $72.80$1.82

2 $160.00$4.00

3 $74.00$1.85

4 $68.00$1.70

5 $80.00$2.00

6 $80.00$2.00

Ref #43 614E24400 WORK ZONE DOTTED LINE, CLASS I, 740.06, TYPE I, (377 FT)

Awd $505.18$1.34

2 $754.00$2.00

3 $508.95$1.35

4 $471.25$1.25

5 $754.00$2.00

6 $754.00$2.00

Ref #44 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (44 FT)

Awd $240.24$5.46

2 $352.00$8.00

3 $242.00$5.50

4 $224.40$5.10

5 $264.00$6.00

6 $264.00$6.00

100552 - Page 8

Page 9: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #45 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (100 SY)

Awd $2,000.00$20.00

2 $3,500.00$35.00

3 $3,800.00$38.00

4 $8,000.00$80.00

5 $15,500.00$155.00

6 $6,000.00$60.00

Ref #46 616E10000 WATER, (3 MGAL)

Awd $3.00$1.00

2 $150.00$50.00

3 $72.00$24.00

4 $30.00$10.00

5 $150.00$50.00

6 $245.34$81.78

Ref #47 617E10100 COMPACTED AGGREGATE, (20 CY)

Awd $400.00$20.00

2 $600.00$30.00

3 $600.00$30.00

4 $1,600.00$80.00

5 $560.00$28.00

6 $2,180.00$109.00

Ref #48 622E40020 PORTABLE CONCRETE BARRIER, 32", (800 FT)

Awd $12,800.00$16.00

2 $12,000.00$15.00

3 $8,000.00$10.00

4 $9,600.00$12.00

5 $14,400.00$18.00

6 $15,720.00$19.65

Ref #49 622E40040 PORTABLE CONCRETE BARRIER, 32", BRIDGE MOUNTED, (404 FT)

Awd $6,464.00$16.00

2 $8,080.00$20.00

3 $7,575.00$18.75

4 $8,080.00$20.00

5 $8,080.00$20.00

6 $10,039.40$24.85

Ref #100 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $500.00$500.00

2 $500.00$500.00

3 $285.00$285.00

4 $4,000.00$4,000.00

5 $2,500.00$2,500.00

6 $5,000.00$5,000.00

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $45,213.99

2 $44,927.00

3 $40,995.35

4 $53,244.65

5 $61,377.80

6 $62,346.98

100552 - Page 9

Page 10: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #50 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $150,000.00$150,000.00

2 $120,000.00$120,000.00

3 $141,146.00$141,146.00

4 $185,000.00$185,000.00

5 $225,000.00$225,000.00

6 $156,120.00$156,120.00

Ref #51 202E22901 APPROACH SLAB REMOVED, AS PER PLAN, (308 SY)

Awd $7,700.00$25.00

2 $9,240.00$30.00

3 $8,624.00$28.00

4 $9,240.00$30.00

5 $2,464.00$8.00

6 $5,667.20$18.40

Ref #52 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $5,500.00$5,500.00

3 $15,000.00$15,000.00

4 $20,000.00$20,000.00

5 $13,000.00$13,000.00

6 $48,500.00$48,500.00

Ref #53 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (46 CY)

Awd $4,600.00$100.00

2 $6,900.00$150.00

3 $5,520.00$120.00

4 $2,760.00$60.00

5 $1,840.00$40.00

6 $5,349.80$116.30

Ref #54 509E10000 EPOXY COATED REINFORCING STEEL, (112411 LB)

Awd $112,411.00$1.00

2 $112,411.00$1.00

3 $112,411.00$1.00

4 $112,411.00$1.00

5 $112,411.00$1.00

6 $123,652.10$1.10

Ref #55 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)

Awd $100.00$1.00

2 $200.00$2.00

3 $100.00$1.00

4 $200.00$2.00

5 $200.00$2.00

6 $100.00$1.00

Ref #56 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (226 EACH)

Awd $4,520.00$20.00

2 $4,068.00$18.00

3 $4,181.00$18.50

4 $3,616.00$16.00

5 $2,034.00$9.00

6 $3,570.80$15.80

100552 - Page 10

Page 11: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #57 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (2319 SY)

Awd $13,914.00$6.00

2 $12,406.65$5.35

3 $15,073.50$6.50

4 $25,509.00$11.00

5 $33,625.50$14.50

6 $31,074.60$13.40

Ref #58 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (2774 LB)

Awd $15,257.00$5.50

2 $13,870.00$5.00

3 $12,483.00$4.50

4 $16,644.00$6.00

5 $12,483.00$4.50

6 $15,673.10$5.65

Ref #59 513E20000 WELDED STUD SHEAR CONNECTORS, (5406 EACH)

Awd $14,596.20$2.70

2 $14,055.60$2.60

3 $14,596.20$2.70

4 $15,136.80$2.80

5 $18,921.00$3.50

6 $16,488.30$3.05

Ref #60 513E21001 TRIMMING OF BEAM END, AS PER PLAN, (16 EACH)

Awd $3,200.00$200.00

2 $4,880.00$305.00

3 $4,502.72$281.42

4 $4,880.00$305.00

5 $4,000.00$250.00

6 $5,600.00$350.00

Ref #67 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (141 FT)

Awd $50,760.00$360.00

2 $49,350.00$350.00

3 $54,285.00$385.00

4 $56,400.00$400.00

5 $50,760.00$360.00

6 $60,848.55$431.55

Ref #68 516E44000 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (16 EACH)

Awd $10,920.00$682.50

2 $19,200.00$1,200.00

3 $19,200.00$1,200.00

4 $24,000.00$1,500.00

5 $12,240.00$765.00

6 $12,480.00$780.00

Ref #69 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $9,000.00$9,000.00

3 $12,500.00$12,500.00

4 $20,000.00$20,000.00

5 $13,000.00$13,000.00

6 $10,000.00$10,000.00

100552 - Page 11

Page 12: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #70 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (17 CY)

Awd $850.00$50.00

2 $3,400.00$200.00

3 $1,360.00$80.00

4 $1,700.00$100.00

5 $629.00$37.00

6 $1,736.55$102.15

Ref #71 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (194 FT)

Awd $1,552.00$8.00

2 $1,261.00$6.50

3 $873.00$4.50

4 $1,940.00$10.00

5 $970.00$5.00

6 $1,910.90$9.85

Ref #72 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (40 FT)

Awd $320.00$8.00

2 $1,000.00$25.00

3 $440.00$11.00

4 $480.00$12.00

5 $260.00$6.50

6 $546.00$13.65

Ref #73 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (207 SF)

Awd $14,490.00$70.00

2 $13,455.00$65.00

3 $20,286.00$98.00

4 $13,455.00$65.00

5 $16,767.00$81.00

6 $13,920.75$67.25

Ref #74 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (195 FT)

Awd $9,028.50$46.30

2 $10,296.00$52.80

3 $9,028.50$46.30

4 $9,028.50$46.30

5 $10,296.00$52.80

6 $10,881.00$55.80

Ref #75 607E39920 VANDAL PROTECTION FENCE, 10' CURVED, COATED FABRIC, (187 FT)

Awd $15,801.50$84.50

2 $17,017.00$91.00

3 $15,801.50$84.50

4 $15,801.50$84.50

5 $16,830.00$90.00

6 $17,652.80$94.40

Ref #76 625E25502 CONDUIT, 3", 725.05, (560 FT)

Awd $4,480.00$8.00

2 $4,480.00$8.00

3 $2,800.00$5.00

4 $4,480.00$8.00

5 $5,600.00$10.00

6 $3,164.00$5.65

100552 - Page 12

Page 13: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #77 625E30706 PULL BOX, 725.08, 24", (4 EACH)

Awd $4,400.00$1,100.00

2 $4,400.00$1,100.00

3 $3,600.00$900.00

4 $4,400.00$1,100.00

5 $800.00$200.00

6 $3,000.00$750.00

Ref #78 898E10201 QC/QA CONCRETE, CLASS QSC2, SUPERSTRUCTURE (DECK),, (403 CY)

Awd $221,650.00$550.00

2 $302,250.00$750.00

3 $241,800.00$600.00

4 $261,950.00$650.00

5 $243,815.00$605.00

6 $260,418.60$646.20

Ref #79 898E10705 QC/QA CONCRETE, CLASS QSC2, SUPERSTRUCTURE (APPROA, (308 SY)

Awd $61,600.00$200.00

2 $67,760.00$220.00

3 $56,980.00$185.00

4 $64,680.00$210.00

5 $64,680.00$210.00

6 $60,475.80$196.35

Ref #80 898E11000 QC/QA CONCRETE, CLASS QSC2, SUPERSTRUCTURE (PARAPE, (107 CY)

Awd $42,800.00$400.00

2 $26,750.00$250.00

3 $64,200.00$600.00

4 $55,640.00$520.00

5 $34,775.00$325.00

6 $48,610.10$454.30

Ref #81 898E20150 QC/QA CONCRETE, CLASS QSC1, SUBSTRUCTURE (ABUTMENT, (60 CY)

Awd $45,000.00$750.00

2 $45,000.00$750.00

3 $48,000.00$800.00

4 $49,200.00$820.00

5 $25,500.00$425.00

6 $50,406.00$840.10

Section 7 - STRUCTURE REPAIR BRIDGE NO. LUC-65-0083C - Totals

Awd $824,950.20

2 $878,150.25

3 $884,791.42

4 $978,551.80

5 $922,900.50

6 $967,846.95

Ref #82 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)

Awd $10,000.00$10,000.00

2 $9,850.00$9,850.00

3 $11,000.00$11,000.00

4 $12,000.00$12,000.00

5 $25,000.00$25,000.00

6 $11,110.00$11,110.00

100552 - Page 13

Page 14: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #83 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $5,500.00$5,500.00

3 $6,900.00$6,900.00

4 $15,000.00$15,000.00

5 $18,000.00$18,000.00

6 $10,500.00$10,500.00

Ref #84 108E30000 SPECIAL - CPM PROGRESS SCHEDULE SHORT DURATION PRO, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $500.00$500.00

3 $5,500.00$5,500.00

4 $1,000.00$1,000.00

5 $6,000.00$6,000.00

6 $2,200.00$2,200.00

Ref #85 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $25,000.00$25,000.00

2 $15,000.00$15,000.00

3 $15,000.00$15,000.00

4 $16,500.00$16,500.00

5 $30,000.00$30,000.00

6 $24,565.00$24,565.00

Ref #86 619E16000 FIELD OFFICE, TYPE A, (6 MNTH)

Awd $9,000.00$1,500.00

2 $4,800.00$800.00

3 $4,800.00$800.00

4 $12,000.00$2,000.00

5 $15,600.00$2,600.00

6 $11,400.00$1,900.00

Ref #87 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $4,000.00$4,000.00

3 $4,000.00$4,000.00

4 $8,000.00$8,000.00

5 $12,500.00$12,500.00

6 $4,500.00$4,500.00

Ref #88 624E10000 MOBILIZATION, (LUMP SUM)

Awd $40,000.00$40,000.00

2 $40,000.00$40,000.00

3 $40,000.00$40,000.00

4 $40,000.00$40,000.00

5 $193,000.00$193,000.00

6 $159,400.00$159,400.00

Section 8 - INCIDENTALS - Totals

Awd $101,500.00

2 $79,650.00

3 $87,200.00

4 $104,500.00

5 $300,100.00

6 $223,675.00

100552 - Page 14

Page 15: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100556

PID 82249

MOT-IR-75-17.29

Federal

Type: BRIDGE REPAIR

Completion Date: 9/30/2011

Award Amount: $1,814,973.32

Contract Awarded To: DOUBLE Z CONSTRUCTION COMPANY

Letting Date: 12/2/2010

Engineer's Estimate: $1,950,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

DOUBLE Z CONSTRUCTION COMPANY

2550 HARRISON RD

COLUMBUS, OH 43204

Franklin

Bidder 1

Bid $1,814,973.32

EAGLE BRIDGE CO

800 S VAN DEMARK RD

SIDNEY, OH 45365

Shelby

Bidder 2

Bid $1,975,742.42

RIGHTER COMPANY INC

2424 HARRISON RD

COLUMBUS, OH 43204

Franklin

Bidder 3

Bid $2,097,473.80

COMPLETE GENERAL CONSTRUCTION COMPANY

1221 EAST FIFTH AVE

COLUMBUS, OH 43219

Franklin

Bidder 4

Bid $2,153,494.55

100556 - Page 15

Page 16: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $1,250.00$1,250.00

3 $1,000.00$1,000.00

4 $1,500.00$1,500.00

Ref #2 202E23001 PAVEMENT REMOVED, AS PER PLAN, (331 SY)

Awd $11,585.00$35.00

2 $13,240.00$40.00

3 $6,620.00$20.00

4 $6,620.00$20.00

Ref #3 202E23500 WEARING COURSE REMOVED, (943 SY)

Awd $5,658.00$6.00

2 $1,886.00$2.00

3 $2,555.53$2.71

4 $1,886.00$2.00

Ref #4 202E30800 TRAFFIC ISLAND REMOVED, (160 SY)

Awd $4,000.00$25.00

2 $1,760.00$11.00

3 $3,200.00$20.00

4 $3,040.00$19.00

Ref #5 202E32000 CURB REMOVED, (315 FT)

Awd $3,150.00$10.00

2 $1,890.00$6.00

3 $1,575.00$5.00

4 $2,047.50$6.50

Ref #6 202E32500 CURB AND GUTTER REMOVED, (304 FT)

Awd $1,216.00$4.00

2 $2,432.00$8.00

3 $3,040.00$10.00

4 $2,584.00$8.50

Ref #7 202E38000 GUARDRAIL REMOVED, (712 FT)

Awd $1,424.00$2.00

2 $783.20$1.10

3 $1,424.00$2.00

4 $783.20$1.10

Ref #8 203E10000 EXCAVATION, (274 CY)

Awd $6,850.00$25.00

2 $3,562.00$13.00

3 $5,570.42$20.33

4 $8,220.00$30.00

Ref #9 203E20000 EMBANKMENT, (343 CY)

Awd $10,290.00$30.00

2 $4,802.00$14.00

3 $10,290.00$30.00

4 $5,145.00$15.00

Ref #10 204E10000 SUBGRADE COMPACTION, (413 SY)

Awd $2,065.00$5.00

2 $2,065.00$5.00

3 $826.00$2.00

4 $2,168.25$5.25

100556 - Page 16

Page 17: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #11 606E13000 GUARDRAIL, TYPE 5, (629 FT)

Awd $9,812.40$15.60

2 $9,812.40$15.60

3 $8,177.00$13.00

4 $9,812.40$15.60

Ref #12 606E22010 ANCHOR ASSEMBLY, TYPE E-98, (2 EACH)

Awd $3,750.00$1,875.00

2 $3,750.00$1,875.00

3 $3,600.00$1,800.00

4 $3,750.00$1,875.00

Ref #13 606E26500 ANCHOR ASSEMBLY, TYPE T, (1 EACH)

Awd $624.00$624.00

2 $624.00$624.00

3 $600.00$600.00

4 $624.00$624.00

Ref #14 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (3 EACH)

Awd $3,540.00$1,180.00

2 $3,540.00$1,180.00

3 $3,240.00$1,080.00

4 $3,540.00$1,180.00

Ref #15 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (304 FT)

Awd $7,904.00$26.00

2 $7,752.00$25.50

3 $7,296.00$24.00

4 $12,160.00$40.00

Ref #16 609E26000 CURB, TYPE 6, (315 FT)

Awd $6,300.00$20.00

2 $4,725.00$15.00

3 $3,150.00$10.00

4 $9,450.00$30.00

Ref #17 609E50000 4" CONCRETE TRAFFIC ISLAND, (160 SY)

Awd $4,800.00$30.00

2 $5,280.00$33.00

3 $4,000.00$25.00

4 $5,600.00$35.00

Section 1 - ROADWAY - Totals

Awd $87,968.40

2 $69,153.60

3 $66,163.95

4 $78,930.35

Ref #18 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $100.00$50.00

2 $50.00$25.00

3 $100.00$50.00

4 $72.00$36.00

Ref #19 659E00300 TOPSOIL, (193 CY)

Awd $3,860.00$20.00

2 $4,825.00$25.00

3 $3,860.00$20.00

4 $8,492.00$44.00

100556 - Page 17

Page 18: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #20 659E10000 SEEDING AND MULCHING, (1736 SY)

Awd $5,208.00$3.00

2 $6,944.00$4.00

3 $1,267.28$0.73

4 $1,267.28$0.73

Ref #21 659E14000 REPAIR SEEDING AND MULCHING, (87 SY)

Awd $43.50$0.50

2 $21.75$0.25

3 $43.50$0.50

4 $43.50$0.50

Ref #22 659E15000 INTER-SEEDING, (87 SY)

Awd $43.50$0.50

2 $21.75$0.25

3 $43.50$0.50

4 $43.50$0.50

Ref #23 659E20000 COMMERCIAL FERTILIZER, (0.24 TON)

Awd $90.00$375.00

2 $192.00$800.00

3 $90.00$375.00

4 $90.00$375.00

Ref #24 659E31000 LIME, (0.36 ACRE)

Awd $36.00$100.00

2 $90.00$250.00

3 $36.00$100.00

4 $36.00$100.00

Ref #25 659E35000 WATER, (10 MGAL)

Awd $400.00$40.00

2 $100.00$10.00

3 $400.00$40.00

4 $400.00$40.00

Ref #26 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $4,800.00$4,800.00

2 $3,600.00$3,600.00

3 $10,000.00$10,000.00

4 $4,100.00$4,100.00

Ref #27 832E30000 EROSION CONTROL, (11000 EACH)

Awd $11,000.00$1.00

2 $11,000.00$1.00

3 $11,000.00$1.00

4 $11,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $25,581.00

2 $26,844.50

3 $26,840.28

4 $25,544.28

Ref #28 604E09500 CATCH BASIN RECONSTRUCTED TO GRADE, (1 EACH)

Awd $400.00$400.00

2 $800.00$800.00

3 $1,000.00$1,000.00

4 $1,100.00$1,100.00

100556 - Page 18

Page 19: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 3 - DRAINAGE - Totals

Awd $400.00

2 $800.00

3 $1,000.00

4 $1,100.00

Ref #29 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (9135 SY)

Awd $18,270.00$2.00

2 $18,270.00$2.00

3 $18,087.30$1.98

4 $18,270.00$2.00

Ref #30 301E46000 ASPHALT CONCRETE BASE, PG64-22, (100 CY)

Awd $16,500.00$165.00

2 $16,500.00$165.00

3 $25,000.00$250.00

4 $16,500.00$165.00

Ref #31 304E20000 AGGREGATE BASE, (146 CY)

Awd $10,220.00$70.00

2 $10,950.00$75.00

3 $10,220.00$70.00

4 $10,220.00$70.00

Ref #32 407E10000 TACK COAT, (377 GAL)

Awd $942.50$2.50

2 $942.50$2.50

3 $754.00$2.00

4 $942.50$2.50

Ref #33 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (178 GAL)

Awd $445.00$2.50

2 $445.00$2.50

3 $356.00$2.00

4 $445.00$2.50

Ref #34 448E46030 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG76, (497 CY)

Awd $70,574.00$142.00

2 $70,574.00$142.00

3 $74,550.00$150.00

4 $70,574.00$142.00

Ref #35 448E50020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1H, PG76-22M, (426 CY)

Awd $66,030.00$155.00

2 $66,030.00$155.00

3 $63,900.00$150.00

4 $66,030.00$155.00

Ref #36 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2), (172 CY)

Awd $8,256.00$48.00

2 $16,168.00$94.00

3 $17,200.00$100.00

4 $13,072.00$76.00

100556 - Page 19

Page 20: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 4 - PAVEMENT - Totals

Awd $191,237.50

2 $199,879.50

3 $210,067.30

4 $196,053.50

Ref #37 625E00480 CONNECTION, UNFUSED PERMANENT, (14 EACH)

Awd $1,204.00$86.00

2 $919.24$65.66

3 $910.00$65.00

4 $1,330.00$95.00

Ref #38 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE, (615 FT)

Awd $1,476.00$2.40

2 $1,242.30$2.02

3 $1,230.00$2.00

4 $1,537.50$2.50

Ref #39 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 5000 VOLT CAB, (915 FT)

Awd $6,496.50$7.10

2 $6,240.30$6.82

3 $6,176.25$6.75

4 $5,490.00$6.00

Ref #40 625E25400 CONDUIT, 2", 725.04, (55 FT)

Awd $464.75$8.45

2 $361.35$6.57

3 $357.50$6.50

4 $550.00$10.00

Ref #41 625E29002 TRENCH, 24" DEEP, (915 FT)

Awd $4,986.75$5.45

2 $6,377.55$6.97

3 $6,313.50$6.90

4 $3,660.00$4.00

Ref #42 625E29600 TRENCH IN PAVED AREA, TYPE B, (55 FT)

Awd $1,155.00$21.00

2 $2,721.95$49.49

3 $2,695.00$49.00

4 $935.00$17.00

Ref #43 625E30700 PULL BOX, 725.08, 18", (4 EACH)

Awd $2,440.00$610.00

2 $2,727.28$681.82

3 $2,700.00$675.00

4 $2,600.00$650.00

Ref #44 625E31510 PULL BOX REMOVED, (5 EACH)

Awd $1,000.00$200.00

2 $505.05$101.01

3 $500.00$100.00

4 $1,500.00$300.00

Ref #45 625E32000 GROUND ROD, (3 EACH)

Awd $450.00$150.00

2 $424.23$141.41

3 $420.00$140.00

4 $420.00$140.00

100556 - Page 20

Page 21: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #46 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)

Awd $3,200.00$3,200.00

2 $6,358.59$6,358.59

3 $6,295.00$6,295.00

4 $2,700.00$2,700.00

Ref #47 625E75506 LUMINAIRE REMOVED, (4 EACH)

Awd $180.00$45.00

2 $666.68$166.67

3 $660.00$165.00

4 $120.00$30.00

Section 5 - LIGHTING - Totals

Awd $23,053.00

2 $28,544.52

3 $28,257.25

4 $20,842.50

Ref #48 620E00500 DELINEATOR, POST MOUNTED, (8 EACH)

Awd $308.00$38.50

2 $41.60$5.20

3 $320.00$40.00

4 $388.00$48.50

Ref #49 621E00100 RPM, (29 EACH)

Awd $1,740.00$60.00

2 $1,740.00$60.00

3 $1,740.00$60.00

4 $1,740.00$60.00

Ref #50 626E00100 BARRIER REFLECTOR, (27 EACH)

Awd $140.40$5.20

2 $1,039.50$38.50

3 $162.00$6.00

4 $140.40$5.20

Ref #51 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (400 FT)

Awd $3,000.00$7.50

2 $3,000.00$7.50

3 $2,800.00$7.00

4 $2,600.00$6.50

Ref #52 630E08004 ONE WAY SUPPORT, NO. 3 POST, (62 FT)

Awd $558.00$9.00

2 $558.00$9.00

3 $620.00$10.00

4 $496.00$8.00

Ref #53 630E08600 SIGN POST REFLECTOR, (10 EACH)

Awd $300.00$30.00

2 $300.00$30.00

3 $340.00$34.00

4 $540.00$54.00

Ref #54 630E30300 OVERHEAD SIGN SUPPORT, TYPE TC-9.30, DESIGN 3, (1 EACH)

Awd $7,625.00$7,625.00

2 $6,151.52$6,151.52

3 $6,090.00$6,090.00

4 $6,755.00$6,755.00

100556 - Page 21

Page 22: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #55 630E75000 SIGN ATTACHMENT ASSEMBLY, (1 EACH)

Awd $450.00$450.00

2 $950.00$950.00

3 $2,850.00$2,850.00

4 $2,275.00$2,275.00

Ref #56 630E80100 SIGN, FLAT SHEET, (280 SF)

Awd $3,850.00$13.75

2 $3,850.00$13.75

3 $3,864.00$13.80

4 $4,200.00$15.00

Ref #57 630E80224 SIGN, OVERHEAD EXTRUSHEET, (224 SF)

Awd $3,640.00$16.25

2 $3,640.00$16.25

3 $3,763.20$16.80

4 $3,640.00$16.25

Ref #58 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (2 EACH)

Awd $5,900.00$2,950.00

2 $1,919.20$959.60

3 $1,900.00$950.00

4 $3,700.00$1,850.00

Ref #59 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (33 EACH)

Awd $330.00$10.00

2 $330.00$10.00

3 $396.00$12.00

4 $495.00$15.00

Ref #60 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (32 EACH)

Awd $320.00$10.00

2 $815.04$25.47

3 $384.00$12.00

4 $480.00$15.00

Ref #61 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (4 EACH)

Awd $700.00$175.00

2 $700.00$175.00

3 $600.00$150.00

4 $900.00$225.00

Ref #62 630E89800 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP, (1 EACH)

Awd $850.00$850.00

2 $850.00$850.00

3 $700.00$700.00

4 $600.00$600.00

Ref #63 644E00100 EDGE LINE, (0.36 MILE)

Awd $1,260.00$3,500.00

2 $1,260.00$3,500.00

3 $1,260.00$3,500.00

4 $1,260.00$3,500.00

Ref #64 644E00200 LANE LINE, (0.27 MILE)

Awd $675.00$2,500.00

2 $675.00$2,500.00

3 $675.00$2,500.00

4 $675.00$2,500.00

100556 - Page 22

Page 23: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #65 644E00300 CENTER LINE, (0.22 MILE)

Awd $1,210.00$5,500.00

2 $1,210.00$5,500.00

3 $1,210.00$5,500.00

4 $1,210.00$5,500.00

Ref #66 644E00400 CHANNELIZING LINE, (1214 FT)

Awd $1,760.30$1.45

2 $1,760.30$1.45

3 $1,760.30$1.45

4 $1,760.30$1.45

Ref #67 644E00500 STOP LINE, (262 FT)

Awd $1,467.20$5.60

2 $1,467.20$5.60

3 $1,467.20$5.60

4 $1,467.20$5.60

Ref #68 644E00700 TRANSVERSE/DIAGONAL LINE, (365 FT)

Awd $1,825.00$5.00

2 $1,825.00$5.00

3 $1,825.00$5.00

4 $1,825.00$5.00

Ref #69 644E00900 ISLAND MARKING, (287 SF)

Awd $861.00$3.00

2 $861.00$3.00

3 $861.00$3.00

4 $861.00$3.00

Ref #70 644E01300 LANE ARROW, (19 EACH)

Awd $1,824.00$96.00

2 $1,824.00$96.00

3 $1,824.00$96.00

4 $1,824.00$96.00

Ref #71 646E10000 EDGE LINE, (0.11 MILE)

Awd $1,969.00$17,900.00

2 $1,969.00$17,900.00

3 $1,969.00$17,900.00

4 $1,969.00$17,900.00

Ref #72 646E10100 LANE LINE, (0.09 MILE)

Awd $1,620.00$18,000.00

2 $1,620.00$18,000.00

3 $1,620.00$18,000.00

4 $1,620.00$18,000.00

Ref #73 646E10200 CENTER LINE, (0.05 MILE)

Awd $1,800.00$36,000.00

2 $1,800.00$36,000.00

3 $1,800.00$36,000.00

4 $1,800.00$36,000.00

Ref #74 646E10300 CHANNELIZING LINE, (466 FT)

Awd $1,165.00$2.50

2 $1,165.00$2.50

3 $1,165.00$2.50

4 $1,165.00$2.50

100556 - Page 23

Page 24: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #75 646E10400 STOP LINE, (64 FT)

Awd $1,344.00$21.00

2 $1,344.00$21.00

3 $1,344.00$21.00

4 $1,344.00$21.00

Ref #76 646E20300 LANE ARROW, (8 EACH)

Awd $1,840.00$230.00

2 $1,840.00$230.00

3 $1,840.00$230.00

4 $1,840.00$230.00

Ref #201 625E32000 GROUND ROD, (2 EACH)

Awd $300.00$150.00

2 $282.84$141.42

3 $280.00$140.00

4 $280.00$140.00

Ref #202 630E97700 SIGNING, MISC.:COMBINATION OVERHEAD SIGN SUPPORT T, (1 EACH)

Awd $10,500.00$10,500.00

2 $10,606.06$10,606.06

3 $10,500.00$10,500.00

4 $9,420.00$9,420.00

Section 6 - TRAFFIC CONTROL - Totals

Awd $61,131.90

2 $57,394.26

3 $57,929.70

4 $59,269.90

Ref #77 625E25300 CONDUIT, 1-1/2", 725.04, (563 FT)

Awd $4,644.75$8.25

2 $3,130.28$5.56

3 $3,096.50$5.50

4 $5,630.00$10.00

Ref #78 625E25401 CONDUIT, 2", 725.04, AS PER PLAN(SCHEDULE 40), (63 FT)

Awd $532.35$8.45

2 $413.91$6.57

3 $409.50$6.50

4 $756.00$12.00

Ref #79 625E25500 CONDUIT, 3", 725.04, (828 FT)

Awd $13,910.40$16.80

2 $12,213.00$14.75

3 $12,088.80$14.60

4 $12,420.00$15.00

Ref #80 625E25601 CONDUIT, 4", 725.04, AS PER PLAN(SCHEDULE 40), (63 FT)

Awd $1,266.30$20.10

2 $1,590.75$25.25

3 $1,575.00$25.00

4 $1,575.00$25.00

Ref #81 625E25901 CONDUIT, JACKED OR DRILLED, AS PER PLAN, 3" (SCHED, (575 FT)

Awd $22,281.25$38.75

2 $11,206.75$19.49

3 $11,097.50$19.30

4 $14,950.00$26.00

100556 - Page 24

Page 25: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #82 625E25901 CONDUIT, JACKED OR DRILLED, AS PER PLAN, 4" (SCHED, (82 FT)

Awd $3,526.00$43.00

2 $1,805.64$22.02

3 $1,787.60$21.80

4 $2,460.00$30.00

Ref #83 625E29000 TRENCH, (984 FT)

Awd $5,362.80$5.45

2 $6,858.48$6.97

3 $6,789.60$6.90

4 $4,920.00$5.00

Ref #84 625E29500 TRENCH IN PAVED AREA, TYPE A, (12 FT)

Awd $217.80$18.15

2 $351.48$29.29

3 $348.00$29.00

4 $360.00$30.00

Ref #85 625E29600 TRENCH IN PAVED AREA, TYPE B, (347 FT)

Awd $8,033.05$23.15

2 $17,173.03$49.49

3 $17,003.00$49.00

4 $10,410.00$30.00

Ref #86 625E30700 PULL BOX, 725.08, 18", (22 EACH)

Awd $13,464.00$612.00

2 $15,000.04$681.82

3 $14,850.00$675.00

4 $13,200.00$600.00

Ref #87 625E30706 PULL BOX, 725.08, 24", (2 EACH)

Awd $1,416.00$708.00

2 $1,515.16$757.58

3 $1,500.00$750.00

4 $1,600.00$800.00

Ref #88 625E31600 PULL BOX, MISC.:PULL BOX, 725.08, 32", AS PER PLAN, (3 EACH)

Awd $3,420.00$1,140.00

2 $4,242.42$1,414.14

3 $4,200.00$1,400.00

4 $4,050.00$1,350.00

Ref #89 625E32000 GROUND ROD, (4 EACH)

Awd $600.00$150.00

2 $565.68$141.42

3 $560.00$140.00

4 $560.00$140.00

Ref #90 625E36000 PLASTIC CAUTION TAPE, (2000 FT)

Awd $1,500.00$0.75

2 $200.00$0.10

3 $200.00$0.10

4 $500.00$0.25

Ref #91 630E79100 SIGN HANGER ASSEMBLY, MAST ARM, (2 EACH)

Awd $440.00$220.00

2 $363.64$181.82

3 $450.00$225.00

4 $700.00$350.00

100556 - Page 25

Page 26: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #92 630E80100 SIGN, FLAT SHEET, (12 SF)

Awd $159.00$13.25

2 $193.92$16.16

3 $192.00$16.00

4 $516.00$43.00

Ref #93 632E04911 VEHICULAR SIGNAL HEAD, (LED) BLACK, 3-SECTION, 12", (15 EACH)

Awd $12,600.00$840.00

2 $11,969.70$797.98

3 $11,850.00$790.00

4 $9,750.00$650.00

Ref #94 632E04921 VEHICULAR SIGNAL HEAD, (LED) BLACK, 5-SECTION, 12", (2 EACH)

Awd $2,660.00$1,330.00

2 $2,606.06$1,303.03

3 $2,580.00$1,290.00

4 $2,200.00$1,100.00

Ref #95 632E26500 DETECTOR LOOP, (6 EACH)

Awd $6,960.00$1,160.00

2 $5,393.94$898.99

3 $5,340.00$890.00

4 $7,200.00$1,200.00

Ref #96 632E27106 LOOP DETECTOR UNIT, 4 CHANNEL, (6 EACH)

Awd $2,160.00$360.00

2 $2,212.14$368.69

3 $2,190.00$365.00

4 $1,920.00$320.00

Ref #97 632E27200 LOOP DETECTOR TIE IN, (5 EACH)

Awd $600.00$120.00

2 $328.30$65.66

3 $325.00$65.00

4 $350.00$70.00

Ref #98 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (2553 FT)

Awd $10,722.60$4.20

2 $4,901.76$1.92

3 $4,850.70$1.90

4 $4,850.70$1.90

Ref #99 632E64010 SIGNAL SUPPORT FOUNDATION, (4 EACH)

Awd $9,760.00$2,440.00

2 $11,676.76$2,919.19

3 $11,560.00$2,890.00

4 $8,000.00$2,000.00

Ref #100 632E65200 LOOP DETECTOR LEAD-IN CABLE, (4154 FT)

Awd $7,061.80$1.70

2 $6,314.08$1.52

3 $6,231.00$1.50

4 $6,231.00$1.50

Ref #101 632E68100 POWER CABLE, 1 CONDUCTOR, NO. 6 AWG, (58 FT)

Awd $159.50$2.75

2 $175.74$3.03

3 $174.00$3.00

4 $116.00$2.00

100556 - Page 26

Page 27: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #102 632E70001 POWER SERVICE, AS PER PLAN, (1 EACH)

Awd $1,955.00$1,955.00

2 $1,606.06$1,606.06

3 $1,590.00$1,590.00

4 $2,100.00$2,100.00

Ref #103 632E75052 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 4 POLE, WITH , (1 EACH)

Awd $6,320.00$6,320.00

2 $7,565.66$7,565.66

3 $7,490.00$7,490.00

4 $6,900.00$6,900.00

Ref #105 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11, (1 EACH)

Awd $5,790.00$5,790.00

2 $6,565.66$6,565.66

3 $6,500.00$6,500.00

4 $6,100.00$6,100.00

Ref #106 632E80620 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 13, (1 EACH)

Awd $8,180.00$8,180.00

2 $8,484.85$8,484.85

3 $8,400.00$8,400.00

4 $8,700.00$8,700.00

Ref #107 632E80628 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 14, (1 EACH)

Awd $8,440.00$8,440.00

2 $9,262.63$9,262.63

3 $9,170.00$9,170.00

4 $8,900.00$8,900.00

Ref #108 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, (1 EACH)

Awd $1,840.00$1,840.00

2 $2,626.26$2,626.26

3 $2,600.00$2,600.00

4 $2,900.00$2,900.00

Ref #109 633E99300 CONTROLLER ITEM, MISC.:EXISTING CONTROLLER MODIFIC, (LUMP SUM)

Awd $2,065.00$2,065.00

2 $5,036.36$5,036.36

3 $4,986.00$4,986.00

4 $4,000.00$4,000.00

Ref #110 816E30001 VIDEO DETECTION SYSTEM, AS PER PLAN, (2 EACH)

Awd $28,110.00$14,055.00

2 $32,282.84$16,141.42

3 $31,960.00$15,980.00

4 $26,000.00$13,000.00

Section 7 - TRAFFIC SIGNALS - Totals

Awd $196,157.60

2 $195,832.98

3 $193,944.20

4 $180,824.70

Ref #111 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (48 HOUR)

Awd $2,640.00$55.00

2 $3,299.04$68.73

3 $3,360.00$70.00

4 $3,120.00$65.00

100556 - Page 27

Page 28: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #112 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (9 EACH)

Awd $18,000.00$2,000.00

2 $16,200.00$1,800.00

3 $16,200.00$1,800.00

4 $16,200.00$1,800.00

Ref #113 614E12400 WORK ZONE IMPACT ATTENUATOR, MISC.:SAND BARREL ARR, (4 EACH)

Awd $5,940.00$1,485.00

2 $26,400.00$6,600.00

3 $26,400.00$6,600.00

4 $26,400.00$6,600.00

Ref #114 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $6,440.00$6,440.00

3 $6,440.00$6,440.00

4 $6,440.00$6,440.00

Ref #115 614E12500 REPLACEMENT SIGN, (5 EACH)

Awd $450.00$90.00

2 $625.00$125.00

3 $625.00$125.00

4 $625.00$125.00

Ref #116 614E12600 REPLACEMENT DRUM, (20 EACH)

Awd $1,100.00$55.00

2 $1,000.00$50.00

3 $1,000.00$50.00

4 $1,000.00$50.00

Ref #117 614E13300 BARRIER REFLECTOR, TYPE B, (41 EACH)

Awd $328.00$8.00

2 $246.00$6.00

3 $246.00$6.00

4 $246.00$6.00

Ref #118 614E13360 OBJECT MARKER, TWO WAY, (38 EACH)

Awd $760.00$20.00

2 $304.00$8.00

3 $304.00$8.00

4 $304.00$8.00

Ref #119 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (365 DAY)

Awd $27,375.00$75.00

2 $9,490.00$26.00

3 $9,490.00$26.00

4 $9,490.00$26.00

Ref #120 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (0.43 MILE)

Awd $338.41$787.00

2 $338.41$787.00

3 $338.41$787.00

4 $338.41$787.00

Ref #121 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, (0.13 MILE)

Awd $1,372.80$10,560.00

2 $1,372.80$10,560.00

3 $1,372.80$10,560.00

4 $1,372.80$10,560.00

100556 - Page 28

Page 29: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #122 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (0.3 MILE)

Awd $1,184.10$3,947.00

2 $1,184.10$3,947.00

3 $1,184.10$3,947.00

4 $1,192.20$3,974.00

Ref #123 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (0.73 MILE)

Awd $468.66$642.00

2 $468.66$642.00

3 $468.66$642.00

4 $468.66$642.00

Ref #124 614E22200 WORK ZONE EDGE LINE, CLASS I, 740.06, TYPE I, (0.71 MILE)

Awd $3,748.80$5,280.00

2 $3,748.80$5,280.00

3 $3,748.80$5,280.00

4 $3,748.80$5,280.00

Ref #125 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (5597 FT)

Awd $2,238.80$0.40

2 $2,238.80$0.40

3 $2,238.80$0.40

4 $2,238.80$0.40

Ref #126 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 740.06, TYPE, (454 FT)

Awd $908.00$2.00

2 $908.00$2.00

3 $908.00$2.00

4 $908.00$2.00

Ref #127 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (943 FT)

Awd $330.05$0.35

2 $330.05$0.35

3 $330.05$0.35

4 $330.05$0.35

Ref #128 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (151 FT)

Awd $302.00$2.00

2 $302.00$2.00

3 $302.00$2.00

4 $302.00$2.00

Ref #129 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT, (17 EACH)

Awd $680.00$40.00

2 $680.00$40.00

3 $680.00$40.00

4 $680.00$40.00

Ref #130 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I, (2 EACH)

Awd $350.00$175.00

2 $350.00$175.00

3 $350.00$175.00

4 $350.00$175.00

Ref #131 616E10000 WATER, (3 MGAL)

Awd $120.00$40.00

2 $30.00$10.00

3 $3.00$1.00

4 $141.00$47.00

100556 - Page 29

Page 30: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #132 622E40020 PORTABLE CONCRETE BARRIER, 32", (1436 FT)

Awd $14,360.00$10.00

2 $19,386.00$13.50

3 $15,078.00$10.50

4 $12,924.00$9.00

Ref #133 622E40040 PORTABLE CONCRETE BARRIER, 32", BRIDGE MOUNTED, (266 FT)

Awd $5,320.00$20.00

2 $7,980.00$30.00

3 $3,325.00$12.50

4 $3,325.00$12.50

Ref #200 614E13001 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, AS PER P, (83 CY)

Awd $24,900.00$300.00

2 $20,335.00$245.00

3 $16,600.00$200.00

4 $14,442.00$174.00

Section 8 - MAINTENANCE OF TRAFFIC - Totals

Awd $118,214.62

2 $123,656.66

3 $110,992.62

4 $106,586.72

Ref #134 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $90,000.00$90,000.00

2 $195,000.00$195,000.00

3 $110,500.00$110,500.00

4 $125,000.00$125,000.00

Ref #135 202E22901 APPROACH SLAB REMOVED, AS PER PLAN, (344 SY)

Awd $12,040.00$35.00

2 $13,760.00$40.00

3 $17,200.00$50.00

4 $13,760.00$40.00

Ref #136 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $7,200.00$7,200.00

2 $2,500.00$2,500.00

3 $10,000.00$10,000.00

4 $5,000.00$5,000.00

Ref #137 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $4,000.00$4,000.00

2 $20,000.00$20,000.00

3 $10,000.00$10,000.00

4 $5,000.00$5,000.00

Ref #138 509E10000 EPOXY COATED REINFORCING STEEL, (132942 LB)

Awd $119,647.80$0.90

2 $119,647.80$0.90

3 $132,942.00$1.00

4 $113,000.70$0.85

Ref #139 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (735 EACH)

Awd $14,700.00$20.00

2 $14,700.00$20.00

3 $18,375.00$25.00

4 $29,400.00$40.00

100556 - Page 30

Page 31: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #140 511E43200 CLASS C CONCRETE, PIER, (21 CY)

Awd $23,100.00$1,100.00

2 $34,650.00$1,650.00

3 $31,500.00$1,500.00

4 $73,500.00$3,500.00

Ref #141 511E45700 CLASS C CONCRETE, ABUTMENT, (65 CY)

Awd $48,750.00$750.00

2 $65,000.00$1,000.00

3 $65,000.00$1,000.00

4 $58,500.00$900.00

Ref #142 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1787 SY)

Awd $24,124.50$13.50

2 $25,786.41$14.43

3 $24,124.50$13.50

4 $24,124.50$13.50

Ref #143 513E10000 STRUCTURAL STEEL MEMBERS, LEVEL UF(CROSSFRAMES), (LUMP SUM)

Awd $12,000.00$12,000.00

2 $15,000.00$15,000.00

3 $15,000.00$15,000.00

4 $10,000.00$10,000.00

Ref #144 513E10020 STRUCTURAL STEEL MEMBERS, LEVEL 1, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $30,000.00$30,000.00

3 $30,000.00$30,000.00

4 $25,000.00$25,000.00

Ref #145 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (2386 SF)

Awd $16,702.00$7.00

2 $17,226.92$7.22

3 $16,702.00$7.00

4 $33,284.70$13.95

Ref #146 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (2386 SF)

Awd $16,702.00$7.00

2 $17,226.92$7.22

3 $16,702.00$7.00

4 $33,284.70$13.95

Ref #147 514E27800 FIELD PAINTING, MISC.:REPAIR PAINTING, (LUMP SUM)

Awd $27,900.00$27,900.00

2 $28,762.89$28,762.89

3 $14,400.00$14,400.00

4 $14,400.00$14,400.00

Ref #148 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (155 FT)

Awd $54,250.00$350.00

2 $65,244.15$420.93

3 $69,750.00$450.00

4 $62,000.00$400.00

Ref #149 516E45305 REFURBISH BEARING DEVICE, AS PER PLAN, (18 EACH)

Awd $4,140.00$230.00

2 $3,045.42$169.19

3 $13,500.00$750.00

4 $22,050.00$1,225.00

100556 - Page 31

Page 32: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #150 516E46701 RESET BEARING, AS PER PLAN, (27 EACH)

Awd $4,725.00$175.00

2 $6,425.46$237.98

3 $6,750.00$250.00

4 $16,200.00$600.00

Ref #151 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $27,500.00$27,500.00

3 $40,000.00$40,000.00

4 $29,500.00$29,500.00

Ref #152 518E12201 SCUPPERS, INCLUDING SUPPORTS, AS PER PLAN, (8 EACH)

Awd $5,760.00$720.00

2 $12,000.00$1,500.00

3 $8,000.00$1,000.00

4 $8,000.00$1,000.00

Ref #153 518E21230 POROUS BACKFILL WITH FILTER FABRIC, (LUMP SUM)

Awd $4,000.00$4,000.00

2 $7,500.00$7,500.00

3 $4,000.00$4,000.00

4 $5,000.00$5,000.00

Ref #154 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (400 FT)

Awd $17,800.00$44.50

2 $20,400.00$51.00

3 $14,000.00$35.00

4 $30,000.00$75.00

Ref #155 625E25500 CONDUIT, 3", 725.04, (700 FT)

Awd $14,000.00$20.00

2 $12,866.00$18.38

3 $12,740.00$18.20

4 $16,100.00$23.00

Ref #156 898E10201 QC/QA CONCRETE, CLASS QSC2, SUPERSTRUCTURE (DECK),, (471 CY)

Awd $259,050.00$550.00

2 $183,690.00$390.00

3 $353,250.00$750.00

4 $329,700.00$700.00

Ref #157 898E10689 QC/QA CONCRETE, CLASS QSC2, SUPERSTRUCTURE (APPROA, (257 SY)

Awd $41,120.00$160.00

2 $32,125.00$125.00

3 $44,975.00$175.00

4 $64,250.00$250.00

Ref #158 898E11000 QC/QA CONCRETE, CLASS QSC2, SUPERSTRUCTURE (PARAPE, (74 CY)

Awd $32,930.00$445.00

2 $26,640.00$360.00

3 $22,200.00$300.00

4 $29,600.00$400.00

Ref #203 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (2106 SF)

Awd $6,318.00$3.00

2 $6,507.54$3.09

3 $6,318.00$3.00

4 $6,318.00$3.00

100556 - Page 32

Page 33: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #204 514E00100 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (LUMP SUM)

Awd $42,120.00$42,120.00

2 $43,422.68$43,422.68

3 $35,000.00$35,000.00

4 $42,120.00$42,120.00

Ref #205 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (10 MNHR)

Awd $1,350.00$135.00

2 $1,391.80$139.18

3 $1,350.00$135.00

4 $1,350.00$135.00

Section 9 - STRUCTURE REPAIR BRIDGE NO. MOT-75-1729 - Totals

Awd $964,429.30

2 $1,048,018.99

3 $1,144,278.50

4 $1,225,442.60

Ref #159 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $24,000.00$24,000.00

2 $35,000.00$35,000.00

3 $40,000.00$40,000.00

4 $24,900.00$24,900.00

Ref #160 108E30000 SPECIAL - CPM PROGRESS SCHEDULE SHORT DURATION PRO, (LUMP SUM)

Awd $2,000.00$2,000.00

2 $9,617.41$9,617.41

3 $1,000.00$1,000.00

4 $2,000.00$2,000.00

Ref #161 614E11000 MAINTAINING TRAFFIC (WT: 39), (LUMP SUM)

Awd $60,000.00$60,000.00

2 $125,000.00$125,000.00

3 $100,000.00$100,000.00

4 $110,000.00$110,000.00

Ref #162 619E16010 FIELD OFFICE, TYPE B (WT: NR), (8 MNTH)

Awd $12,800.00$1,600.00

2 $12,000.00$1,500.00

3 $12,000.00$1,500.00

4 $12,000.00$1,500.00

Ref #163 623E10000 CONSTRUCTION LAYOUT STAKES (WT: NR), (LUMP SUM)

Awd $8,000.00$8,000.00

2 $4,000.00$4,000.00

3 $5,000.00$5,000.00

4 $10,000.00$10,000.00

Ref #164 624E10000 MOBILIZATION (WT: NR), (LUMP SUM)

Awd $40,000.00$40,000.00

2 $40,000.00$40,000.00

3 $100,000.00$100,000.00

4 $100,000.00$100,000.00

100556 - Page 33

Page 34: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 10 - INCIDENTALS - Totals

Awd $146,800.00

2 $225,617.41

3 $258,000.00

4 $258,900.00

100556 - Page 34

Page 35: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100566

PID 81688

CAR-SR-171-0.00

Federal

Type: TWO LANE RESURFACING

Completion Date: 7/31/2011

Award Amount: $3,052,890.90

Contract Awarded To: SUPERIOR PAVING & MATERIALS INC

Letting Date: 12/2/2010

Engineer's Estimate: $3,595,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

SUPERIOR PAVING & MATERIALS INC

5945 WHIPPLE AVE NW

NORTH CANTON, OH 44720

Stark

Bidder 1

Bid $3,052,890.90

CENTRAL-ALLIED ENTERPRISES INC

1243 RAFF RD S W

CANTON, OH 44710

Stark

Bidder 2

Bid $3,100,547.05

NORTHSTAR ASPHALT INC

P O BOX 2646

NORTH CANTON, OH 44720

Stark

Bidder 3

Bid $3,133,768.54

SHELLY COMPANY

80 PARK DR BOX 266

THORNVILLE, OH 43076

Perry

Bidder 4

Bid $3,241,457.80

KARVO PAVING COMPANY

4524 HUDSON DR

STOW, OH 44224-1702

Bidder 5

Bid $3,271,630.13

100566 - Page 35

Page 36: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 202E23500 WEARING COURSE REMOVED, (374 SY)

Awd $1,122.00$3.00

2 $2,431.00$6.50

3 $1,870.00$5.00

4 $748.00$2.00

5 $5,236.00$14.00

Ref #2 202E30000 WALK REMOVED, (60 SF)

Awd $300.00$5.00

2 $300.00$5.00

3 $900.00$15.00

4 $306.00$5.10

5 $1,200.00$20.00

Ref #3 607E98000 FENCE, MISC.:ORANGE PLASTIC CONSTRUCTION FENCE, (38 FT)

Awd $228.00$6.00

2 $38.00$1.00

3 $38.00$1.00

4 $228.00$6.00

5 $190.00$5.00

Ref #4 608E10000 4" CONCRETE WALK, (60 SF)

Awd $1,059.00$17.65

2 $720.00$12.00

3 $3,600.00$60.00

4 $1,059.00$17.65

5 $2,040.00$34.00

Ref #5 608E53010 TRUNCATED DOME, (40 SF)

Awd $1,694.00$42.35

2 $1,920.00$48.00

3 $1,200.00$30.00

4 $1,694.00$42.35

5 $700.00$17.50

Section 1 - ROADWAY - Totals

Awd $4,403.00

2 $5,409.00

3 $7,608.00

4 $4,035.00

5 $9,366.00

Ref #6 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

4 $1,000.00$1.00

5 $1,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $1,000.00

2 $1,000.00

3 $1,000.00

4 $1,000.00

5 $1,000.00

100566 - Page 36

Page 37: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #7 605E31101 AGGREGATE DRAINS, AS PER PLAN, (1860 FT)

Awd $6,138.00$3.30

2 $9,300.00$5.00

3 $3,720.00$2.00

4 $3,162.00$1.70

5 $3,720.00$2.00

Section 3 - DRAINAGE - Totals

Awd $6,138.00

2 $9,300.00

3 $3,720.00

4 $3,162.00

5 $3,720.00

Ref #8 253E02000 PAVEMENT REPAIR, (930 CY)

Awd $143,220.00$154.00

2 $145,080.00$156.00

3 $158,100.00$170.00

4 $193,440.00$208.00

5 $152,520.00$164.00

Ref #9 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (WT: 13), (177417 SY)

Awd $106,450.20$0.60

2 $124,191.90$0.70

3 $150,804.45$0.85

4 $230,642.10$1.30

5 $141,933.60$0.80

Ref #10 407E10000 TACK COAT, (22211 GAL)

Awd $38,869.25$1.75

2 $42,200.90$1.90

3 $42,200.90$1.90

4 $27,763.75$1.25

5 $33,316.50$1.50

Ref #11 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (10016 GAL)

Awd $17,528.00$1.75

2 $19,030.40$1.90

3 $19,030.40$1.90

4 $12,520.00$1.25

5 $15,024.00$1.50

Ref #12 408E10001 PRIME COAT, AS PER PLAN, (16023 GAL)

Awd $32,046.00$2.00

2 $32,046.00$2.00

3 $31,725.54$1.98

4 $24,034.50$1.50

5 $48,069.00$3.00

Ref #13 422E10000 SINGLE CHIP SEAL, (91699 SY)

Awd $147,635.39$1.61

2 $134,797.53$1.47

3 $151,303.35$1.65

4 $134,797.53$1.47

5 $134,797.53$1.47

100566 - Page 37

Page 38: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #14 448E46020 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (1165 CY)

Awd $125,820.00$108.00

2 $123,490.00$106.00

3 $139,800.00$120.00

4 $128,150.00$110.00

5 $130,480.00$112.00

Ref #15 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (8095 CY)

Awd $728,550.00$90.00

2 $696,170.00$86.00

3 $720,455.00$89.00

4 $688,075.00$85.00

5 $728,550.00$90.00

Ref #16 448E46905 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG70-22M,, (9434 CY)

Awd $1,141,514.00$121.00

2 $1,150,948.00$122.00

3 $1,132,080.00$120.00

4 $1,132,080.00$120.00

5 $1,179,250.00$125.00

Ref #17 448E48021 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22 (, (1396 CY)

Awd $216,380.00$155.00

2 $240,112.00$172.00

3 $181,480.00$130.00

4 $167,520.00$120.00

5 $202,420.00$145.00

Ref #18 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (2823 CY)

Awd $79,044.00$28.00

2 $28,230.00$10.00

3 $79,044.00$28.00

4 $70,575.00$25.00

5 $73,398.00$26.00

Ref #19 617E20000 SHOULDER PREPARATION, (40058 SY)

Awd $3,204.64$0.08

2 $4,005.80$0.10

3 $4,005.80$0.10

4 $6,008.70$0.15

5 $6,008.70$0.15

Ref #20 618E40101 RUMBLE STRIPS, (ASPHALT CONCRETE), AS PER PLAN, (864 FT)

Awd $2,764.80$3.20

2 $2,592.00$3.00

3 $2,764.80$3.20

4 $2,764.80$3.20

5 $2,764.80$3.20

Section 4 - PAVEMENT - Totals

Awd $2,783,026.28

2 $2,742,894.53

3 $2,812,794.24

4 $2,818,371.38

5 $2,848,532.13

100566 - Page 38

Page 39: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #21 621E00100 RPM, (2214 EACH)

Awd $30,996.00$14.00

2 $37,970.10$17.15

3 $30,996.00$14.00

4 $30,885.30$13.95

5 $30,885.30$13.95

Ref #22 621E54000 RAISED PAVEMENT MARKER REMOVED, (2214 EACH)

Awd $11,070.00$5.00

2 $6,642.00$3.00

3 $8,856.00$4.00

4 $6,088.50$2.75

5 $1,660.50$0.75

Ref #23 642E00100 EDGE LINE, TYPE 1, (34.18 MILE)

Awd $14,492.32$424.00

2 $14,492.32$424.00

3 $15,039.20$440.00

4 $14,492.32$424.00

5 $16,577.30$485.00

Ref #24 642E00300 CENTER LINE, TYPE 1, (17.19 MILE)

Awd $11,517.30$670.00

2 $11,517.30$670.00

3 $11,861.10$690.00

4 $11,517.30$670.00

5 $16,932.15$985.00

Ref #25 642E00500 STOP LINE, TYPE 1, (69 FT)

Awd $414.00$6.00

2 $414.00$6.00

3 $414.00$6.00

4 $414.00$6.00

5 $258.75$3.75

Ref #26 642E01000 RAILROAD SYMBOL MARKING, TYPE 1, (2 EACH)

Awd $460.00$230.00

2 $460.00$230.00

3 $480.00$240.00

4 $460.00$230.00

5 $350.00$175.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $68,949.62

2 $71,495.72

3 $67,646.30

4 $63,857.42

5 $66,664.00

Ref #27 614E12460 WORK ZONE MARKING SIGN, (118 EACH)

Awd $7,670.00$65.00

2 $10,030.00$85.00

3 $8,260.00$70.00

4 $7,670.00$65.00

5 $9,440.00$80.00

100566 - Page 39

Page 40: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #28 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (45.24 MILE)

Awd $54,288.00$1,200.00

2 $26,917.80$595.00

3 $45,240.00$1,000.00

4 $58,812.00$1,300.00

5 $76,908.00$1,700.00

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $61,958.00

2 $36,947.80

3 $53,500.00

4 $66,482.00

5 $86,348.00

Ref #29 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)

Awd $7,000.00$7,000.00

2 $6,500.00$6,500.00

3 $2,500.00$2,500.00

4 $5,000.00$5,000.00

5 $6,000.00$6,000.00

Ref #30 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $15,000.00$15,000.00

2 $30,000.00$30,000.00

3 $15,000.00$15,000.00

4 $10,000.00$10,000.00

5 $30,000.00$30,000.00

Ref #31 614E11000 MAINTAINING TRAFFIC (WT: 39), (LUMP SUM)

Awd $81,416.00$81,416.00

2 $120,000.00$120,000.00

3 $130,000.00$130,000.00

4 $169,550.00$169,550.00

5 $125,000.00$125,000.00

Ref #32 624E10000 MOBILIZATION (WT: NR), (LUMP SUM)

Awd $24,000.00$24,000.00

2 $77,000.00$77,000.00

3 $40,000.00$40,000.00

4 $100,000.00$100,000.00

5 $95,000.00$95,000.00

Section 7 - INCIDENTALS - Totals

Awd $127,416.00

2 $233,500.00

3 $187,500.00

4 $284,550.00

5 $256,000.00

100566 - Page 40

Page 41: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100567

PID 88577

SHE-VA-FEN-FY2011

Federal

Type: FENCING

Completion Date: 10/15/2011

Award Amount: $724,175.00

Contract Awarded To: LAKE ERIE CONSTRUCTION COMPANY

Letting Date: 12/2/2010

Engineer's Estimate: $1,040,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

LAKE ERIE CONSTRUCTION COMPANY

25 NORWALD ROAD

NORWALK, OH 44857

Huron

Bidder 1

Bid $724,175.00

RITE WAY FENCE INC

6539 BURROUGHS AVE

STERLING HEIGHTS, MI 48314

Bidder 2

Bid $775,975.40

M P DORY CO

2001 INTEGRITY DR SOUTH

COLUMBUS, OH 43209

Franklin

Bidder 3

Bid $874,291.50

FUTURE FENCE COMPANY

23450 REGENCY PARK DR

WARREN, MI 48089-

Bidder 4

Bid $928,158.80

100567 - Page 41

Page 42: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT (WT:, (5284 EACH)

Awd $75,297.00$14.25

2 $47,556.00$9.00

3 $132,100.00$25.00

4 $121,267.80$22.95

Ref #2 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN (WT: 29), (250 SF)

Awd $5,500.00$22.00

2 $18,750.00$75.00

3 $10,000.00$40.00

4 $6,250.00$25.00

Ref #3 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (7120 FT)

Awd $240,300.00$33.75

2 $313,280.00$44.00

3 $267,000.00$37.50

4 $260,592.00$36.60

Ref #4 607E39910 VANDAL PROTECTION FENCE, 8' STRAIGHT, COATED FABRI, (5160 FT)

Awd $316,050.00$61.25

2 $262,592.40$50.89

3 $327,660.00$63.50

4 $339,012.00$65.70

Ref #100 202E75261 VANDAL PROTECTION FENCE REMOVED, AS PER PLAN, (474 FT)

Awd $11,850.00$25.00

2 $8,532.00$18.00

3 $5,688.00$12.00

4 $3,555.00$7.50

Ref #101 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (690 FT)

Awd $32,430.00$47.00

2 $44,160.00$64.00

3 $34,155.00$49.50

4 $25,254.00$36.60

Ref #102 607E39931 VANDAL PROTECTION FENCE, 12' CURVED, COATED FABRIC, (223 FT)

Awd $21,408.00$96.00

2 $30,105.00$135.00

3 $22,188.50$99.50

4 $10,035.00$45.00

Section 1 - ITEMS OF WORK - Totals

Awd $702,835.00

2 $724,975.40

3 $798,791.50

4 $765,965.80

Ref #5 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $3,740.00$3,740.00

2 $6,000.00$6,000.00

3 $5,500.00$5,500.00

4 $1,850.00$1,850.00

Ref #6 614E11000 MAINTAINING TRAFFIC (WT: 39), (LUMP SUM)

Awd $12,400.00$12,400.00

2 $25,000.00$25,000.00

3 $50,000.00$50,000.00

4 $76,000.00$76,000.00

100567 - Page 42

Page 43: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #7 624E10000 MOBILIZATION (WT: NR), (LUMP SUM)

Awd $5,200.00$5,200.00

2 $20,000.00$20,000.00

3 $20,000.00$20,000.00

4 $84,343.00$84,343.00

Section 2 - INCIDENTALS - Totals

Awd $21,340.00

2 $51,000.00

3 $75,500.00

4 $162,193.00

100567 - Page 43

Page 44: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100568

PID 80867

DAR-US-127-22.25

Federal

Type: TWO LANE RESURFACING

Completion Date: 6/30/2011

Award Amount: $680,474.01

Contract Awarded To: WALLS BROS ASPHALT CO INC

Letting Date: 12/2/2010

Engineer's Estimate: $637,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

WALLS BROS ASPHALT CO INC

3690 HOLLANSBURG-SAMPSON RD

GREENVILLE, OH 45331

Darke

Bidder 1

Bid $680,474.01

100568 - Page 44

Page 45: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 202E23500 WEARING COURSE REMOVED, (1599 SY)

Awd $10,393.50$6.50

Ref #2 253E01001 PAVEMENT REPAIR, AS PER PLAN, (1376 SY)

Awd $87,802.56$63.81

Ref #3 301E46001 ASPHALT CONCRETE BASE, PG64-22, AS PER PLAN, (41 CY)

Awd $13,516.88$329.68

Ref #4 407E10000 TACK COAT, (6012 GAL)

Awd $17,795.52$2.96

Ref #5 448E46020 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (835 CY)

Awd $121,049.95$144.97

Ref #6 448E46904 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG70-22M, (2087 CY)

Awd $333,899.13$159.99

Ref #7 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (669 SY)

Awd $8,262.15$12.35

Ref #8 614E12460 WORK ZONE MARKING SIGN, (16 EACH)

Awd $1,803.20$112.70

Ref #9 614E21400 WORK ZONE CENTER LINE, CLASS II, (6.1 MILE)

Awd $4,794.60$786.00

Ref #10 617E10100 COMPACTED AGGREGATE, (596 CY)

Awd $26,241.88$44.03

Ref #11 621E00100 RPM, (198 EACH)

Awd $4,158.00$21.00

Ref #12 621E54000 RAISED PAVEMENT MARKER REMOVED, (198 EACH)

Awd $1,934.46$9.77

Ref #13 644E00100 EDGE LINE, (6.1 MILE)

Awd $12,248.80$2,008.00

Ref #14 644E00300 CENTER LINE, (3.05 MILE)

Awd $2,714.50$890.00

Ref #15 644E00500 STOP LINE, (54 FT)

Awd $1,053.00$19.50

Section 1 - ITEMS OF WORK - Totals

Awd $647,668.13

Ref #16 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $2,326.85$2,326.85

Ref #17 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $21,435.99$21,435.99

Ref #18 624E10000 MOBILIZATION, (LUMP SUM)

Awd $9,043.04$9,043.04

Section 2 - INCIDENTALS - Totals

Awd $32,805.88

100568 - Page 45

Page 46: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100569

PID 80124

LOR-SR-301-8.94

Federal

Type: BRIDGE REPLACEMENT (1 BRIDGE)

Completion Date: 5/31/2011

Award Amount: $160,102.40

Contract Awarded To: PAGE EXCAVATING INC

Letting Date: 12/2/2010

Engineer's Estimate: $214,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

PAGE EXCAVATING INC

2398 APPLEGATE RD

LUCAS, OH 44843

Richland

Bidder 1

Bid $160,102.40

V O MENUEZ & SON INC

1016 S WASHINGTON ST

MILLERSBURG, OH 44654

Holmes

Bidder 2

Bid $183,999.60

BCC OHIO INC

1199 CHENANGO RD

NEW LONDON, OH 44851

Huron

Bidder 3

Bid $190,244.29

LEIBY CONSTRUCTION INC

256 US RT 224

SULLIVAN, OH 44880

Ashland

Bidder 4

Bid $196,550.90

R W ROBINSON INC

87 EAST STATE

BELLVILLE, OH 44813

Richland

Bidder 5

Bid $203,099.90

SCHIRMER CONSTRUCTION COMPANY

31350 INDUSTRIAL PARKWAY

NORTH OLMSTED, OH 44070

Cuyahoga

Bidder 6

Bid $207,860.50

RIETSCHLIN CONSTRUCTION INC

4240 BAKER RD

CRESTLINE, OH 44827

Crawford

Bidder 7

Bid $212,240.50

MID-OHIO STRUCTURES LLC

2214 RIDGE RD

NORWALK, OH 44857

Huron

Bidder 8

Bid $218,762.74

ROCK RIVER CONSTRUCTION LTD

541 MILL PARK DR SUITE C

LANCASTER, OH 43130

Fairfield

Bidder 9

Bid $224,745.15

KOKOSING CONSTRUCTION COMPANY INC

886 MC KINLEY AVE

COLUMBUS, OH 43222

Franklin

Bidder 10

Bid $230,678.75

100569 - Page 46

Page 47: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 201E11001 CLEARING AND GRUBBING, AS PER PLAN, (LUMP SUM)

Awd $4,000.00$4,000.00

2 $3,724.00$3,724.00

3 $3,960.00$3,960.00

4 $4,800.00$4,800.00

5 $7,500.00$7,500.00

6 $2,500.00$2,500.00

7 $4,500.00$4,500.00

8 $4,000.00$4,000.00

9 $3,500.00$3,500.00

10 $5,500.00$5,500.00

Ref #2 202E35100 PIPE REMOVED, 24" AND UNDER, (29 FT)

Awd $290.00$10.00

2 $143.26$4.94

3 $37.41$1.29

4 $87.00$3.00

5 $145.00$5.00

6 $319.00$11.00

7 $725.00$25.00

8 $435.00$15.00

9 $145.00$5.00

10 $181.25$6.25

Ref #3 202E38000 GUARDRAIL REMOVED, (212.5 FT)

Awd $425.00$2.00

2 $299.63$1.41

3 $267.75$1.26

4 $255.00$1.20

5 $255.00$1.20

6 $425.00$2.00

7 $637.50$3.00

8 $850.00$4.00

9 $637.50$3.00

10 $255.00$1.20

Ref #4 202E38200 GUARDRAIL REMOVED FOR REUSE, (287.5 FT)

Awd $575.00$2.00

2 $603.75$2.10

3 $362.25$1.26

4 $345.00$1.20

5 $345.00$1.20

6 $862.50$3.00

7 $862.50$3.00

8 $2,875.00$10.00

9 $862.50$3.00

10 $345.00$1.20

Ref #5 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (4 EACH)

Awd $240.00$60.00

2 $392.00$98.00

3 $252.00$63.00

4 $240.00$60.00

5 $240.00$60.00

6 $400.00$100.00

7 $800.00$200.00

8 $400.00$100.00

9 $200.00$50.00

10 $240.00$60.00

100569 - Page 47

Page 48: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #6 202E42620 ANCHOR ASSEMBLY REMOVED FOR REUSE, TYPE E-98, (2 EACH)

Awd $300.00$150.00

2 $320.00$160.00

3 $315.00$157.50

4 $300.00$150.00

5 $300.00$150.00

6 $400.00$200.00

7 $400.00$200.00

8 $500.00$250.00

9 $250.00$125.00

10 $300.00$150.00

Ref #7 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)

Awd $260.00$65.00

2 $392.00$98.00

3 $273.00$68.25

4 $260.00$65.00

5 $260.00$65.00

6 $400.00$100.00

7 $800.00$200.00

8 $400.00$100.00

9 $400.00$100.00

10 $260.00$65.00

Ref #8 203E10000 EXCAVATION, (232 CY)

Awd $3,480.00$15.00

2 $3,524.08$15.19

3 $1,705.20$7.35

4 $1,160.00$5.00

5 $2,320.00$10.00

6 $2,784.00$12.00

7 $3,712.00$16.00

8 $2,320.00$10.00

9 $3,944.00$17.00

10 $4,408.00$19.00

Ref #9 203E20000 EMBANKMENT, (167 CY)

Awd $2,505.00$15.00

2 $2,536.73$15.19

3 $1,227.45$7.35

4 $1,670.00$10.00

5 $1,670.00$10.00

6 $2,338.00$14.00

7 $2,004.00$12.00

8 $2,505.00$15.00

9 $2,839.00$17.00

10 $584.50$3.50

Ref #10 204E10000 SUBGRADE COMPACTION, (368 SY)

Awd $736.00$2.00

2 $386.40$1.05

3 $540.96$1.47

4 $736.00$2.00

5 $1,472.00$4.00

6 $736.00$2.00

7 $736.00$2.00

8 $1,840.00$5.00

9 $736.00$2.00

10 $1,104.00$3.00

100569 - Page 48

Page 49: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #11 209E60201 LINEAR GRADING, AS PER PLAN, (6 STA)

Awd $600.00$100.00

2 $2,910.00$485.00

3 $2,551.50$425.25

4 $3,000.00$500.00

5 $3,000.00$500.00

6 $1,800.00$300.00

7 $4,290.00$715.00

8 $3,000.00$500.00

9 $1,500.00$250.00

10 $1,860.00$310.00

Ref #12 604E38500 MONUMENT ASSEMBLY, (1 EACH)

Awd $700.00$700.00

2 $700.00$700.00

3 $937.50$937.50

4 $550.00$550.00

5 $800.00$800.00

6 $750.00$750.00

7 $700.00$700.00

8 $1,000.00$1,000.00

9 $900.00$900.00

10 $800.00$800.00

Ref #13 606E13000 GUARDRAIL, TYPE 5, (100 FT)

Awd $2,000.00$20.00

2 $1,275.00$12.75

3 $1,743.00$17.43

4 $1,660.00$16.60

5 $1,660.00$16.60

6 $1,500.00$15.00

7 $1,300.00$13.00

8 $1,800.00$18.00

9 $1,250.00$12.50

10 $1,660.00$16.60

Ref #14 606E16500 GUARDRAIL REBUILT, TYPE 5, (287.5 FT)

Awd $2,875.00$10.00

2 $2,515.63$8.75

3 $2,535.75$8.82

4 $2,415.00$8.40

5 $2,415.00$8.40

6 $2,875.00$10.00

7 $2,587.50$9.00

8 $2,875.00$10.00

9 $2,443.75$8.50

10 $2,415.00$8.40

Ref #15 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN, (75 FT)

Awd $1,500.00$20.00

2 $1,406.25$18.75

3 $1,559.25$20.79

4 $1,485.00$19.80

5 $1,485.00$19.80

6 $1,500.00$20.00

7 $1,425.00$19.00

8 $1,875.00$25.00

9 $1,387.50$18.50

10 $1,485.00$19.80

100569 - Page 49

Page 50: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #16 606E26500 ANCHOR ASSEMBLY, TYPE T, (4 EACH)

Awd $2,600.00$650.00

2 $2,440.00$610.00

3 $2,667.00$666.75

4 $2,540.00$635.00

5 $2,540.00$635.00

6 $2,800.00$700.00

7 $2,448.00$612.00

8 $3,200.00$800.00

9 $2,400.00$600.00

10 $2,540.00$635.00

Ref #17 606E28050 ANCHOR ASSEMBLY REBUILT, TYPE E-98, (2 EACH)

Awd $3,000.00$1,500.00

2 $1,750.00$875.00

3 $3,108.00$1,554.00

4 $2,960.00$1,480.00

5 $2,960.00$1,480.00

6 $2,000.00$1,000.00

7 $1,734.00$867.00

8 $3,200.00$1,600.00

9 $1,700.00$850.00

10 $2,960.00$1,480.00

Section 1 - ROADWAY - Totals

Awd $26,086.00

2 $25,318.73

3 $24,043.02

4 $24,463.00

5 $29,367.00

6 $24,389.50

7 $29,661.50

8 $33,075.00

9 $25,095.25

10 $26,897.75

Ref #18 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $100.00$50.00

2 $50.00$25.00

3 $210.00$105.00

4 $200.00$100.00

5 $50.00$25.00

6 $200.00$100.00

7 $100.00$50.00

8 $100.00$50.00

9 $200.00$100.00

10 $200.00$100.00

100569 - Page 50

Page 51: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #19 659E00300 TOPSOIL, (84 CY)

Awd $840.00$10.00

2 $630.00$7.50

3 $3,351.60$39.90

4 $3,192.00$38.00

5 $1,680.00$20.00

6 $3,360.00$40.00

7 $2,520.00$30.00

8 $1,890.00$22.50

9 $2,100.00$25.00

10 $1,764.00$21.00

Ref #20 659E10000 SEEDING AND MULCHING, (752 SY)

Awd $1,504.00$2.00

2 $1,504.00$2.00

3 $631.68$0.84

4 $601.60$0.80

5 $1,692.00$2.25

6 $752.00$1.00

7 $1,128.00$1.50

8 $2,632.00$3.50

9 $752.00$1.00

10 $601.60$0.80

Ref #21 659E14000 REPAIR SEEDING AND MULCHING, (38 SY)

Awd $38.00$1.00

2 $3.80$0.10

3 $39.90$1.05

4 $38.00$1.00

5 $19.00$0.50

6 $38.00$1.00

7 $38.00$1.00

8 $57.00$1.50

9 $38.00$1.00

10 $38.00$1.00

Ref #22 659E15000 INTER-SEEDING, (38 SY)

Awd $38.00$1.00

2 $3.80$0.10

3 $39.90$1.05

4 $24.70$0.65

5 $19.00$0.50

6 $38.00$1.00

7 $38.00$1.00

8 $57.00$1.50

9 $38.00$1.00

10 $19.00$0.50

Ref #23 659E20000 COMMERCIAL FERTILIZER, (0.1 TON)

Awd $40.00$400.00

2 $80.00$800.00

3 $84.00$840.00

4 $80.00$800.00

5 $30.00$300.00

6 $100.00$1,000.00

7 $85.00$850.00

8 $30.00$300.00

9 $80.00$800.00

10 $80.00$800.00

100569 - Page 51

Page 52: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #24 659E31000 LIME, (0.16 ACRE)

Awd $48.00$300.00

2 $32.00$200.00

3 $105.00$656.25

4 $16.00$100.00

5 $16.00$100.00

6 $160.00$1,000.00

7 $16.00$100.00

8 $16.00$100.00

9 $80.00$500.00

10 $16.00$100.00

Ref #25 659E35000 WATER, (4 MGAL)

Awd $4.00$1.00

2 $20.00$5.00

3 $4.20$1.05

4 $4.00$1.00

5 $4.00$1.00

6 $40.00$10.00

7 $60.00$15.00

8 $4.00$1.00

9 $20.00$5.00

10 $20.00$5.00

Ref #26 832E30000 EROSION CONTROL, (3000 EACH)

Awd $3,000.00$1.00

2 $3,000.00$1.00

3 $3,000.00$1.00

4 $3,000.00$1.00

5 $3,000.00$1.00

6 $3,000.00$1.00

7 $3,000.00$1.00

8 $3,000.00$1.00

9 $3,000.00$1.00

10 $3,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $5,612.00

2 $5,323.60

3 $7,466.28

4 $7,156.30

5 $6,510.00

6 $7,688.00

7 $6,985.00

8 $7,786.00

9 $6,308.00

10 $5,738.60

100569 - Page 52

Page 53: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #27 603E04600 12" CONDUIT, TYPE C, (101 FT)

Awd $2,020.00$20.00

2 $3,030.00$30.00

3 $3,864.26$38.26

4 $4,040.00$40.00

5 $4,040.00$40.00

6 $3,030.00$30.00

7 $2,424.00$24.00

8 $2,020.00$20.00

9 $2,222.00$22.00

10 $3,535.00$35.00

Ref #28 603E04900 12" CONDUIT, TYPE D, (30 FT)

Awd $540.00$18.00

2 $900.00$30.00

3 $1,047.00$34.90

4 $1,350.00$45.00

5 $1,200.00$40.00

6 $900.00$30.00

7 $1,200.00$40.00

8 $750.00$25.00

9 $600.00$20.00

10 $1,140.00$38.00

Ref #29 605E31100 AGGREGATE DRAINS, (84 FT)

Awd $1,260.00$15.00

2 $504.00$6.00

3 $631.68$7.52

4 $672.00$8.00

5 $588.00$7.00

6 $1,512.00$18.00

7 $588.00$7.00

8 $1,260.00$15.00

9 $756.00$9.00

10 $840.00$10.00

Section 3 - DRAINAGE - Totals

Awd $3,820.00

2 $4,434.00

3 $5,542.94

4 $6,062.00

5 $5,828.00

6 $5,442.00

7 $4,212.00

8 $4,030.00

9 $3,578.00

10 $5,515.00

100569 - Page 53

Page 54: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #30 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (156 SY)

Awd $2,340.00$15.00

2 $2,184.00$14.00

3 $3,411.72$21.87

4 $2,106.00$13.50

5 $2,106.00$13.50

6 $2,340.00$15.00

7 $3,120.00$20.00

8 $2,499.12$16.02

9 $2,340.00$15.00

10 $1,950.00$12.50

Ref #31 301E46000 ASPHALT CONCRETE BASE, PG64-22, (105 CY)

Awd $18,900.00$180.00

2 $18,375.00$175.00

3 $18,963.00$180.60

4 $18,060.00$172.00

5 $18,060.00$172.00

6 $18,900.00$180.00

7 $18,375.00$175.00

8 $18,375.00$175.00

9 $18,060.00$172.00

10 $19,425.00$185.00

Ref #32 304E20000 AGGREGATE BASE, (123 CY)

Awd $6,150.00$50.00

2 $6,997.47$56.89

3 $7,927.35$64.45

4 $5,166.00$42.00

5 $5,412.00$44.00

6 $4,920.00$40.00

7 $6,273.00$51.00

8 $3,075.00$25.00

9 $5,535.00$45.00

10 $9,225.00$75.00

Ref #33 407E10000 TACK COAT, (38 GAL)

Awd $114.00$3.00

2 $117.80$3.10

3 $119.70$3.15

4 $114.00$3.00

5 $114.00$3.00

6 $190.00$5.00

7 $152.00$4.00

8 $152.00$4.00

9 $114.00$3.00

10 $114.00$3.00

Ref #34 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (10 GAL)

Awd $30.00$3.00

2 $31.00$3.10

3 $31.50$3.15

4 $30.00$3.00

5 $30.00$3.00

6 $50.00$5.00

7 $40.00$4.00

8 $40.00$4.00

9 $30.00$3.00

10 $30.00$3.00

100569 - Page 54

Page 55: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #35 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (17 CY)

Awd $3,570.00$210.00

2 $3,536.00$208.00

3 $3,659.25$215.25

4 $3,485.00$205.00

5 $3,485.00$205.00

6 $3,570.00$210.00

7 $3,553.00$209.00

8 $3,570.00$210.00

9 $3,485.00$205.00

10 $5,746.00$338.00

Ref #36 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (16 CY)

Awd $3,200.00$200.00

2 $3,088.00$193.00

3 $3,192.00$199.50

4 $3,040.00$190.00

5 $3,040.00$190.00

6 $3,200.00$200.00

7 $3,104.00$194.00

8 $3,200.00$200.00

9 $3,040.00$190.00

10 $4,448.00$278.00

Ref #37 448E46061 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, UNDE, (16 CY)

Awd $4,800.00$300.00

2 $4,400.00$275.00

3 $4,536.00$283.50

4 $4,320.00$270.00

5 $4,320.00$270.00

6 $4,800.00$300.00

7 $4,400.00$275.00

8 $4,800.00$300.00

9 $5,184.00$324.00

10 $5,632.00$352.00

Section 4 - PAVEMENT - Totals

Awd $39,104.00

2 $38,729.27

3 $41,840.52

4 $36,321.00

5 $36,567.00

6 $37,970.00

7 $39,017.00

8 $35,711.12

9 $37,788.00

10 $46,570.00

100569 - Page 55

Page 56: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #38 626E00100 BARRIER REFLECTOR, (10 EACH)

Awd $60.00$6.00

2 $70.00$7.00

3 $57.80$5.78

4 $60.00$6.00

5 $55.00$5.50

6 $80.00$8.00

7 $80.00$8.00

8 $100.00$10.00

9 $60.00$6.00

10 $55.00$5.50

Ref #39 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (11 FT)

Awd $110.00$10.00

2 $165.00$15.00

3 $115.50$10.50

4 $143.00$13.00

5 $110.00$10.00

6 $110.00$10.00

7 $143.00$13.00

8 $165.00$15.00

9 $93.50$8.50

10 $110.00$10.00

Ref #40 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)

Awd $50.00$50.00

2 $50.00$50.00

3 $42.00$42.00

4 $45.00$45.00

5 $40.00$40.00

6 $50.00$50.00

7 $50.00$50.00

8 $50.00$50.00

9 $100.00$100.00

10 $40.00$40.00

Ref #41 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)

Awd $30.00$30.00

2 $10.00$10.00

3 $10.50$10.50

4 $25.00$25.00

5 $10.00$10.00

6 $15.00$15.00

7 $25.00$25.00

8 $50.00$50.00

9 $100.00$100.00

10 $10.00$10.00

Ref #42 642E00100 EDGE LINE, TYPE 1, (0.06 MILE)

Awd $633.60$10,560.00

2 $660.00$11,000.00

3 $665.28$11,088.00

4 $633.60$10,560.00

5 $633.60$10,560.00

6 $900.00$15,000.00

7 $765.00$12,750.00

8 $1,500.00$25,000.00

9 $633.60$10,560.00

10 $874.74$14,579.00

100569 - Page 56

Page 57: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #43 642E00300 CENTER LINE, TYPE 1, (0.03 MILE)

Awd $316.80$10,560.00

2 $330.00$11,000.00

3 $332.64$11,088.00

4 $316.80$10,560.00

5 $316.80$10,560.00

6 $900.00$30,000.00

7 $765.00$25,500.00

8 $750.00$25,000.00

9 $316.80$10,560.00

10 $466.86$15,562.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $1,200.40

2 $1,285.00

3 $1,223.72

4 $1,223.40

5 $1,165.40

6 $2,055.00

7 $1,828.00

8 $2,615.00

9 $1,303.90

10 $1,556.60

Ref #44 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (0.03 MILE)

Awd $396.00$13,200.00

2 $30.00$1,000.00

3 $415.80$13,860.00

4 $396.00$13,200.00

5 $396.00$13,200.00

6 $1,200.00$40,000.00

7 $1,071.00$35,700.00

8 $1,050.00$35,000.00

9 $396.00$13,200.00

10 $150.00$5,000.00

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $396.00

2 $30.00

3 $415.80

4 $396.00

5 $396.00

6 $1,200.00

7 $1,071.00

8 $1,050.00

9 $396.00

10 $150.00

100569 - Page 57

Page 58: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #45 202E11000 STRUCTURE REMOVED, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $11,083.00$11,083.00

3 $3,409.50$3,409.50

4 $10,500.00$10,500.00

5 $10,000.00$10,000.00

6 $8,000.00$8,000.00

7 $8,400.00$8,400.00

8 $10,000.00$10,000.00

9 $15,000.00$15,000.00

10 $5,500.00$5,500.00

Ref #46 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $2,000.00$2,000.00

2 $2,000.00$2,000.00

3 $975.00$975.00

4 $2,800.00$2,800.00

5 $1,500.00$1,500.00

6 $3,000.00$3,000.00

7 $4,500.00$4,500.00

8 $2,000.00$2,000.00

9 $7,500.00$7,500.00

10 $4,200.00$4,200.00

Ref #47 503E21300 UNCLASSIFIED EXCAVATION(WINGWALL FOOTING), (LUMP SUM)

Awd $1,500.00$1,500.00

2 $3,000.00$3,000.00

3 $2,100.00$2,100.00

4 $3,800.00$3,800.00

5 $4,000.00$4,000.00

6 $7,000.00$7,000.00

7 $4,500.00$4,500.00

8 $3,000.00$3,000.00

9 $3,000.00$3,000.00

10 $4,500.00$4,500.00

Ref #48 509E10000 EPOXY COATED REINFORCING STEEL, (4522 LB)

Awd $9,044.00$2.00

2 $5,878.60$1.30

3 $5,652.50$1.25

4 $7,235.20$1.60

5 $2,261.00$0.50

6 $9,044.00$2.00

7 $9,044.00$2.00

8 $15,827.00$3.50

9 $9,044.00$2.00

10 $8,591.80$1.90

Ref #49 511E46001 CLASS C CONCRETE, AS PER PLAN, RET WALL/WINGWALL, , (13 CY)

Awd $5,850.00$450.00

2 $10,270.00$790.00

3 $10,705.50$823.50

4 $6,500.00$500.00

5 $10,543.00$811.00

6 $8,450.00$650.00

7 $8,502.00$654.00

8 $3,900.00$300.00

9 $9,750.00$750.00

10 $14,560.00$1,120.00

100569 - Page 58

Page 59: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #50 511E46501 CLASS C CONCRETE, FOOTING, AS PER PLAN, (39 CY)

Awd $15,600.00$400.00

2 $12,870.00$330.00

3 $19,416.15$497.85

4 $10,530.00$270.00

5 $19,500.00$500.00

6 $14,820.00$380.00

7 $12,285.00$315.00

8 $14,625.00$375.00

9 $13,650.00$350.00

10 $13,845.00$355.00

Ref #51 511E46601 CLASS C CONCRETE, HEADWALL, AS PER PLAN, (2 CY)

Awd $1,200.00$600.00

2 $1,580.00$790.00

3 $1,474.50$737.25

4 $1,000.00$500.00

5 $1,300.00$650.00

6 $1,300.00$650.00

7 $1,308.00$654.00

8 $1,000.00$500.00

9 $900.00$450.00

10 $1,200.00$600.00

Ref #52 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (61 SY)

Awd $610.00$10.00

2 $841.80$13.80

3 $1,287.10$21.10

4 $1,891.00$31.00

5 $2,135.00$35.00

6 $1,525.00$25.00

7 $3,050.00$50.00

8 $1,037.00$17.00

9 $1,220.00$20.00

10 $1,647.00$27.00

Ref #53 512E33000 TYPE 2 WATERPROOFING, (81 SY)

Awd $1,215.00$15.00

2 $1,279.80$15.80

3 $1,344.60$16.60

4 $2,673.00$33.00

5 $1,984.50$24.50

6 $2,430.00$30.00

7 $2,025.00$25.00

8 $1,822.50$22.50

9 $1,620.00$20.00

10 $2,187.00$27.00

Ref #54 512E33010 TYPE 3 WATERPROOFING, (100 SY)

Awd $2,500.00$25.00

2 $2,650.00$26.50

3 $2,650.00$26.50

4 $4,300.00$43.00

5 $3,450.00$34.50

6 $4,000.00$40.00

7 $3,500.00$35.00

8 $2,750.00$27.50

9 $3,000.00$30.00

10 $3,200.00$32.00

100569 - Page 59

Page 60: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #55 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (34 SF)

Awd $340.00$10.00

2 $340.00$10.00

3 $77.86$2.29

4 $170.00$5.00

5 $510.00$15.00

6 $272.00$8.00

7 $102.00$3.00

8 $85.00$2.50

9 $102.00$3.00

10 $204.00$6.00

Ref #56 518E21230 POROUS BACKFILL WITH FILTER FABRIC, (LUMP SUM)

Awd $500.00$500.00

2 $2,000.00$2,000.00

3 $1,725.00$1,725.00

4 $2,800.00$2,800.00

5 $2,500.00$2,500.00

6 $2,000.00$2,000.00

7 $2,650.00$2,650.00

8 $2,750.00$2,750.00

9 $3,000.00$3,000.00

10 $3,500.00$3,500.00

Ref #57 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (35 CY)

Awd $2,625.00$75.00

2 $2,585.80$73.88

3 $4,221.00$120.60

4 $3,150.00$90.00

5 $3,535.00$101.00

6 $2,975.00$85.00

7 $2,660.00$76.00

8 $3,500.00$100.00

9 $2,450.00$70.00

10 $3,500.00$100.00

Ref #58 603E96311 14' X 5' CONDUIT, TYPE A, 706.05, AS PER PLAN, (52 FT)

Awd $24,700.00$475.00

2 $39,936.00$768.00

3 $43,908.80$844.40

4 $48,880.00$940.00

5 $38,948.00$749.00

6 $40,300.00$775.00

7 $47,840.00$920.00

8 $47,999.12$923.06

9 $55,640.00$1,070.00

10 $57,616.00$1,108.00

100569 - Page 60

Page 61: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER BRIDGE - Totals

Awd $70,684.00

2 $96,315.00

3 $98,947.51

4 $106,229.20

5 $102,166.50

6 $105,116.00

7 $110,366.00

8 $110,295.62

9 $125,876.00

10 $124,250.80

Ref #59 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $1,790.00$1,790.00

3 $2,348.00$2,348.00

4 $6,000.00$6,000.00

5 $3,300.00$3,300.00

6 $2,500.00$2,500.00

7 $3,900.00$3,900.00

8 $7,000.00$7,000.00

9 $5,000.00$5,000.00

10 $2,000.00$2,000.00

Ref #60 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $5,000.00$5,000.00

3 $1,863.00$1,863.00

4 $3,000.00$3,000.00

5 $3,000.00$3,000.00

6 $3,500.00$3,500.00

7 $2,000.00$2,000.00

8 $3,700.00$3,700.00

9 $4,000.00$4,000.00

10 $2,000.00$2,000.00

Ref #61 619E16000 FIELD OFFICE, TYPE A, (2 MNTH)

Awd $200.00$100.00

2 $1,200.00$600.00

3 $2,668.50$1,334.25

4 $1,700.00$850.00

5 $1,100.00$550.00

6 $5,000.00$2,500.00

7 $5,000.00$2,500.00

8 $1,000.00$500.00

9 $2,400.00$1,200.00

10 $5,000.00$2,500.00

100569 - Page 61

Page 62: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #62 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)

Awd $2,000.00$2,000.00

2 $574.00$574.00

3 $1,260.00$1,260.00

4 $1,200.00$1,200.00

5 $1,500.00$1,500.00

6 $3,000.00$3,000.00

7 $2,200.00$2,200.00

8 $2,500.00$2,500.00

9 $3,000.00$3,000.00

10 $1,000.00$1,000.00

Ref #63 624E10000 MOBILIZATION, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $4,000.00$4,000.00

3 $2,625.00$2,625.00

4 $2,800.00$2,800.00

5 $12,200.00$12,200.00

6 $10,000.00$10,000.00

7 $6,000.00$6,000.00

8 $10,000.00$10,000.00

9 $10,000.00$10,000.00

10 $10,000.00$10,000.00

Section 8 - INCIDENTALS - Totals

Awd $13,200.00

2 $12,564.00

3 $10,764.50

4 $14,700.00

5 $21,100.00

6 $24,000.00

7 $19,100.00

8 $24,200.00

9 $24,400.00

10 $20,000.00

100569 - Page 62

Page 63: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100572

PID 83888

MRW-SR-95-11.75

Federal

Type: BRIDGE REPAIR

Completion Date: 8/30/2011

Award Amount: $697,663.43

Contract Awarded To: DOT CONSTRUCTION CORP

Letting Date: 12/2/2010

Engineer's Estimate: $643,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

DOT CONSTRUCTION CORP

535 NORTH BROAD ST STE 5

CANFIELD, OH 44406

Mahoning

Bidder 1

Bid $697,663.43

RIGHTER COMPANY INC

2424 HARRISON RD

COLUMBUS, OH 43204

Franklin

Bidder 2

Bid $703,211.33

SHELLY & SANDS INC

3570 SOUTH RIVER RD

ZANESVILLE, OH 43701

Muskingum

Bidder 3

Bid $763,910.60

BCC OHIO INC

1199 CHENANGO RD

NEW LONDON, OH 44851

Huron

Bidder 4

Bid $816,063.39

EAGLE BRIDGE CO

800 S VAN DEMARK RD

SIDNEY, OH 45365

Shelby

Bidder 5

Bid $825,082.66

COMPLETE GENERAL CONSTRUCTION COMPANY

1221 EAST FIFTH AVE

COLUMBUS, OH 43219

Franklin

Bidder 6

Bid $904,495.86

100572 - Page 63

Page 64: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $2,000.00$2,000.00

2 $1,000.00$1,000.00

3 $10,000.00$10,000.00

4 $1,470.00$1,470.00

5 $3,000.00$3,000.00

6 $4,000.00$4,000.00

Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (694 SY)

Awd $6,940.00$10.00

2 $4,858.00$7.00

3 $9,022.00$13.00

4 $5,760.20$8.30

5 $9,716.00$14.00

6 $10,410.00$15.00

Ref #3 202E38001 GUARDRAIL REMOVED, AS PER PLAN, (707 FT)

Awd $1,060.50$1.50

2 $1,767.50$2.50

3 $1,873.55$2.65

4 $1,117.06$1.58

5 $1,767.50$2.50

6 $1,060.50$1.50

Ref #4 203E10000 EXCAVATION, (277 CY)

Awd $4,155.00$15.00

2 $4,155.00$15.00

3 $2,493.00$9.00

4 $2,035.95$7.35

5 $4,709.00$17.00

6 $11,080.00$40.00

Ref #5 203E20000 EMBANKMENT, (297 CY)

Awd $5,940.00$20.00

2 $4,455.00$15.00

3 $3,861.00$13.00

4 $2,182.95$7.35

5 $7,128.00$24.00

6 $5,940.00$20.00

Ref #6 203E20001 EMBANKMENT, AS PER PLAN, (310 CY)

Awd $6,200.00$20.00

2 $4,650.00$15.00

3 $6,200.00$20.00

4 $6,612.30$21.33

5 $6,200.00$20.00

6 $6,820.00$22.00

Ref #7 204E10000 SUBGRADE COMPACTION, (1528 SY)

Awd $2,292.00$1.50

2 $1,528.00$1.00

3 $1,528.00$1.00

4 $2,597.60$1.70

5 $7,640.00$5.00

6 $3,056.00$2.00

100572 - Page 64

Page 65: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #8 604E40500 REFERENCE MONUMENT, (4 EACH)

Awd $3,400.00$850.00

2 $500.00$125.00

3 $1,000.00$250.00

4 $3,622.52$905.63

5 $740.00$185.00

6 $1,900.00$475.00

Ref #9 606E13000 GUARDRAIL, TYPE 5, (771.5 FT)

Awd $9,875.20$12.80

2 $9,103.70$11.80

3 $9,643.75$12.50

4 $10,368.96$13.44

5 $9,119.13$11.82

6 $9,875.20$12.80

Ref #10 606E20000 FLARED END SECTION, (2 EACH)

Awd $100.00$50.00

2 $90.00$45.00

3 $100.00$50.00

4 $105.00$52.50

5 $90.16$45.08

6 $100.00$50.00

Ref #11 606E26100 ANCHOR ASSEMBLY, TYPE E, (4 EACH)

Awd $7,500.00$1,875.00

2 $6,720.00$1,680.00

3 $7,120.00$1,780.00

4 $7,875.00$1,968.75

5 $6,731.44$1,682.86

6 $7,500.00$1,875.00

Ref #12 606E26500 ANCHOR ASSEMBLY, TYPE T, (2 EACH)

Awd $1,250.00$625.00

2 $1,160.00$580.00

3 $1,228.00$614.00

4 $1,312.50$656.25

5 $1,161.98$580.99

6 $1,250.00$625.00

Ref #13 606E32160 BRIDGE TERMINAL ASSEMBLY, TYPE TST, (4 EACH)

Awd $5,000.00$1,250.00

2 $5,200.00$1,300.00

3 $5,200.00$1,300.00

4 $5,250.00$1,312.50

5 $5,208.84$1,302.21

6 $5,000.00$1,250.00

Section 1 - ROADWAY - Totals

Awd $55,712.70

2 $45,187.20

3 $59,269.30

4 $50,310.04

5 $63,212.05

6 $67,991.70

100572 - Page 65

Page 66: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #14 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (222 CY)

Awd $13,320.00$60.00

2 $8,880.00$40.00

3 $14,430.00$65.00

4 $21,975.78$98.99

5 $16,650.00$75.00

6 $12,210.00$55.00

Ref #15 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $300.00$150.00

2 $300.00$150.00

3 $62.00$31.00

4 $315.00$157.50

5 $130.00$65.00

6 $70.00$35.00

Ref #16 659E00300 TOPSOIL, (1072 CY)

Awd $15,276.00$14.25

2 $10,720.00$10.00

3 $5,360.00$5.00

4 $16,037.12$14.96

5 $13,936.00$13.00

6 $10,720.00$10.00

Ref #17 659E10000 SEEDING AND MULCHING, (9651 SY)

Awd $4,149.93$0.43

2 $4,149.93$0.43

3 $4,825.50$0.50

4 $4,342.95$0.45

5 $4,342.95$0.45

6 $4,439.46$0.46

Ref #18 659E14000 REPAIR SEEDING AND MULCHING, (483 SY)

Awd $338.10$0.70

2 $338.10$0.70

3 $193.20$0.40

4 $357.42$0.74

5 $48.30$0.10

6 $193.20$0.40

Ref #19 659E15000 INTER-SEEDING, (483 SY)

Awd $48.30$0.10

2 $48.30$0.10

3 $96.60$0.20

4 $9.66$0.02

5 $48.30$0.10

6 $173.88$0.36

Ref #20 659E20000 COMMERCIAL FERTILIZER, (1.35 TON)

Awd $1,012.50$750.00

2 $1,012.50$750.00

3 $299.70$222.00

4 $1,063.13$787.50

5 $742.50$550.00

6 $607.50$450.00

100572 - Page 66

Page 67: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #21 659E31000 LIME, (2 ACRE)

Awd $100.00$50.00

2 $60.00$30.00

3 $20.00$10.00

4 $1.06$0.53

5 $100.00$50.00

6 $60.00$30.00

Ref #22 659E35000 WATER, (64 MGAL)

Awd $64.00$1.00

2 $64.00$1.00

3 $128.00$2.00

4 $67.20$1.05

5 $320.00$5.00

6 $64.00$1.00

Ref #23 670E00500 SLOPE EROSION PROTECTION, (626 SY)

Awd $939.00$1.50

2 $939.00$1.50

3 $1,252.00$2.00

4 $989.08$1.58

5 $1,565.00$2.50

6 $1,126.80$1.80

Ref #24 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

4 $1,000.00$1.00

5 $1,000.00$1.00

6 $1,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $36,547.83

2 $27,511.83

3 $27,667.00

4 $46,158.40

5 $38,883.05

6 $30,664.84

Ref #25 603E00900 6" CONDUIT, TYPE B, (50 FT)

Awd $600.00$12.00

2 $200.00$4.00

3 $250.00$5.00

4 $319.50$6.39

5 $600.00$12.00

6 $750.00$15.00

Ref #26 603E01500 6" CONDUIT, TYPE F, (50 FT)

Awd $600.00$12.00

2 $200.00$4.00

3 $250.00$5.00

4 $319.50$6.39

5 $600.00$12.00

6 $500.00$10.00

100572 - Page 67

Page 68: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #27 605E31100 AGGREGATE DRAINS, (266 FT)

Awd $3,990.00$15.00

2 $1,330.00$5.00

3 $2,128.00$8.00

4 $1,862.00$7.00

5 $2,660.00$10.00

6 $2,926.00$11.00

Section 3 - DRAINAGE - Totals

Awd $5,190.00

2 $1,730.00

3 $2,628.00

4 $2,501.00

5 $3,860.00

6 $4,176.00

Ref #28 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (287 SY)

Awd $4,018.00$14.00

2 $3,444.00$12.00

3 $3,444.00$12.00

4 $7,226.66$25.18

5 $4,305.00$15.00

6 $4,018.00$14.00

Ref #29 301E46000 ASPHALT CONCRETE BASE, PG64-22, (160 CY)

Awd $32,000.00$200.00

2 $30,400.00$190.00

3 $30,400.00$190.00

4 $33,600.00$210.00

5 $32,000.00$200.00

6 $32,000.00$200.00

Ref #30 304E20000 AGGREGATE BASE, (219 CY)

Awd $10,950.00$50.00

2 $10,950.00$50.00

3 $13,140.00$60.00

4 $14,114.55$64.45

5 $16,425.00$75.00

6 $14,235.00$65.00

Ref #31 407E10000 TACK COAT, (22 GAL)

Awd $44.00$2.00

2 $44.00$2.00

3 $44.00$2.00

4 $69.30$3.15

5 $44.00$2.00

6 $44.00$2.00

Ref #32 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (49 GAL)

Awd $98.00$2.00

2 $98.00$2.00

3 $98.00$2.00

4 $154.35$3.15

5 $98.00$2.00

6 $98.00$2.00

100572 - Page 68

Page 69: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #33 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (99 CY)

Awd $19,800.00$200.00

2 $21,780.00$220.00

3 $21,780.00$220.00

4 $27,027.00$273.00

5 $19,833.66$200.34

6 $19,800.00$200.00

Section 4 - PAVEMENT - Totals

Awd $66,910.00

2 $66,716.00

3 $68,906.00

4 $82,191.86

5 $72,705.66

6 $70,195.00

Ref #34 620E00500 DELINEATOR, POST MOUNTED, (2 EACH)

Awd $70.00$35.00

2 $80.00$40.00

3 $84.00$42.00

4 $73.50$36.75

5 $80.14$40.07

6 $70.00$35.00

Ref #35 621E00100 RPM, (13 EACH)

Awd $1,131.00$87.00

2 $1,131.00$87.00

3 $442.00$34.00

4 $1,610.18$123.86

5 $1,132.95$87.15

6 $1,131.00$87.00

Ref #36 621E54000 RAISED PAVEMENT MARKER REMOVED, (13 EACH)

Awd $1,300.00$100.00

2 $65.00$5.00

3 $130.00$10.00

4 $19.50$1.50

5 $130.00$10.00

6 $325.00$25.00

Ref #37 626E00100 BARRIER REFLECTOR, (15 EACH)

Awd $78.00$5.20

2 $82.50$5.50

3 $90.00$6.00

4 $81.90$5.46

5 $90.00$6.00

6 $78.00$5.20

Ref #38 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (14 FT)

Awd $210.00$15.00

2 $350.00$25.00

3 $140.00$10.00

4 $367.50$26.25

5 $140.28$10.02

6 $210.00$15.00

100572 - Page 69

Page 70: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #39 630E80100 SIGN, FLAT SHEET, (2 SF)

Awd $60.00$30.00

2 $50.00$25.00

3 $62.00$31.00

4 $63.00$31.50

5 $60.04$30.02

6 $60.00$30.00

Ref #40 642E00090 EDGE LINE, (0.28 MILE)

Awd $632.80$2,260.00

2 $632.80$2,260.00

3 $1,022.00$3,650.00

4 $882.00$3,150.00

5 $633.88$2,263.86

6 $632.80$2,260.00

Ref #41 642E00290 CENTER LINE, (0.18 MILE)

Awd $792.00$4,400.00

2 $792.00$4,400.00

3 $1,080.00$6,000.00

4 $1,134.00$6,300.00

5 $793.35$4,407.50

6 $792.00$4,400.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $4,273.80

2 $3,183.30

3 $3,050.00

4 $4,231.58

5 $3,060.64

6 $3,298.80

Ref #42 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), (6 EACH)

Awd $11,160.00$1,860.00

2 $10,800.00$1,800.00

3 $11,400.00$1,900.00

4 $12,253.50$2,042.25

5 $10,818.36$1,803.06

6 $11,160.00$1,860.00

Ref #43 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (50 CY)

Awd $8,750.00$175.00

2 $12,560.00$251.20

3 $3,750.00$75.00

4 $15,900.00$318.00

5 $7,500.00$150.00

6 $5,500.00$110.00

Ref #44 614E13202 BARRIER REFLECTOR, TYPE A2, (34 EACH)

Awd $195.50$5.75

2 $195.50$5.75

3 $238.00$7.00

4 $205.70$6.05

5 $243.44$7.16

6 $272.00$8.00

100572 - Page 70

Page 71: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #45 614E13360 OBJECT MARKER, TWO WAY, (34 EACH)

Awd $569.50$16.75

2 $569.50$16.75

3 $238.00$7.00

4 $598.06$17.59

5 $340.00$10.00

6 $544.00$16.00

Ref #46 614E21000 WORK ZONE CENTER LINE, CLASS I, (0.06 MILE)

Awd $600.00$10,000.00

2 $600.00$10,000.00

3 $318.00$5,300.00

4 $630.00$10,500.00

5 $150.26$2,504.33

6 $1,020.00$17,000.00

Ref #47 614E22000 WORK ZONE EDGE LINE, CLASS I, (0.38 MILE)

Awd $1,330.00$3,500.00

2 $1,330.00$3,500.00

3 $1,007.00$2,650.00

4 $1,396.50$3,675.00

5 $2,475.72$6,515.05

6 $3,230.00$8,500.00

Ref #48 614E26000 WORK ZONE STOP LINE, CLASS I, (24 FT)

Awd $96.00$4.00

2 $96.00$4.00

3 $240.00$10.00

4 $101.76$4.24

5 $120.24$5.01

6 $240.00$10.00

Ref #49 616E10000 WATER, (2 MGAL)

Awd $2.00$1.00

2 $2.00$1.00

3 $120.00$60.00

4 $2.10$1.05

5 $20.00$10.00

6 $180.00$90.00

Ref #50 622E40020 PORTABLE CONCRETE BARRIER, 32", (1570 FT)

Awd $18,840.00$12.00

2 $23,550.00$15.00

3 $17,270.00$11.00

4 $25,622.40$16.32

5 $26,690.00$17.00

6 $15,700.00$10.00

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $41,543.00

2 $49,703.00

3 $34,581.00

4 $56,710.02

5 $48,358.02

6 $37,846.00

100572 - Page 71

Page 72: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #51 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $60,000.00$60,000.00

2 $72,200.00$72,200.00

3 $50,000.00$50,000.00

4 $62,913.00$62,913.00

5 $60,000.00$60,000.00

6 $175,000.00$175,000.00

Ref #52 202E22900 APPROACH SLAB REMOVED, (134 SY)

Awd $3,350.00$25.00

2 $6,030.00$45.00

3 $2,680.00$20.00

4 $3,805.60$28.40

5 $5,360.00$40.00

6 $3,752.00$28.00

Ref #53 202E23500 WEARING COURSE REMOVED, (134 SY)

Awd $1,340.00$10.00

2 $3,216.00$24.00

3 $569.50$4.25

4 $5,145.60$38.40

5 $1,474.00$11.00

6 $2,278.00$17.00

Ref #54 202E38600 BRIDGE RAILING REMOVED FOR STORAGE, (186 FT)

Awd $660.30$3.55

2 $1,023.00$5.50

3 $744.00$4.00

4 $693.78$3.73

5 $930.00$5.00

6 $1,488.00$8.00

Ref #55 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)

Awd $20,000.00$20,000.00

2 $10,000.00$10,000.00

3 $35,000.00$35,000.00

4 $51,900.00$51,900.00

5 $55,000.00$55,000.00

6 $60,000.00$60,000.00

Ref #56 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $8,000.00$8,000.00

2 $5,000.00$5,000.00

3 $8,000.00$8,000.00

4 $5,614.50$5,614.50

5 $15,000.00$15,000.00

6 $20,000.00$20,000.00

Ref #57 507E71200 SPECIAL - PILE ENCASEMENT, (148 FT)

Awd $18,500.00$125.00

2 $22,200.00$150.00

3 $20,424.00$138.00

4 $18,272.08$123.46

5 $22,200.00$150.00

6 $22,200.00$150.00

100572 - Page 72

Page 73: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #58 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (32472 LB)

Awd $45,460.80$1.40

2 $64,944.00$2.00

3 $45,460.80$1.40

4 $60,073.20$1.85

5 $48,708.00$1.50

6 $29,549.52$0.91

Ref #59 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (1300 LB)

Awd $2,600.00$2.00

2 $1,300.00$1.00

3 $1,131.00$0.87

4 $1,404.00$1.08

5 $1,300.00$1.00

6 $1,560.00$1.20

Ref #60 511E34400 CLASS S CONCRETE, SUPERSTRUCTURE, (90 CY)

Awd $54,000.00$600.00

2 $63,000.00$700.00

3 $81,000.00$900.00

4 $100,658.70$1,118.43

5 $99,000.00$1,100.00

6 $99,000.00$1,100.00

Ref #61 511E43500 CLASS C CONCRETE, ABUTMENT INCLUDING FOOTING, (56 CY)

Awd $28,000.00$500.00

2 $28,000.00$500.00

3 $47,600.00$850.00

4 $38,414.88$685.98

5 $25,200.00$450.00

6 $39,200.00$700.00

Ref #62 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (102 SY)

Awd $2,550.00$25.00

2 $2,397.00$23.50

3 $2,550.00$25.00

4 $1,849.26$18.13

5 $2,040.00$20.00

6 $2,397.00$23.50

Ref #63 512E33000 TYPE 2 WATERPROOFING, (4 SY)

Awd $400.00$100.00

2 $200.00$50.00

3 $760.00$190.00

4 $72.00$18.00

5 $180.00$45.00

6 $200.00$50.00

Ref #64 516E13200 1/2" PREFORMED EXPANSION JOINT FILLER, (72 SF)

Awd $216.00$3.00

2 $288.00$4.00

3 $288.00$4.00

4 $163.44$2.27

5 $360.00$5.00

6 $576.00$8.00

100572 - Page 73

Page 74: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #65 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (94 SF)

Awd $470.00$5.00

2 $564.00$6.00

3 $376.00$4.00

4 $211.50$2.25

5 $564.00$6.00

6 $799.00$8.50

Ref #66 516E14015 INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PER PLA, (122 FT)

Awd $3,660.00$30.00

2 $3,050.00$25.00

3 $3,294.00$27.00

4 $5,169.14$42.37

5 $3,050.00$25.00

6 $3,660.00$30.00

Ref #67 517E70000 RAILING (TWIN STEEL TUBE), (196 FT)

Awd $23,471.00$119.75

2 $22,344.00$114.00

3 $23,520.00$120.00

4 $24,645.04$125.74

5 $22,087.24$112.69

6 $24,108.00$123.00

Ref #68 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (56 CY)

Awd $2,800.00$50.00

2 $2,800.00$50.00

3 $5,600.00$100.00

4 $3,917.76$69.96

5 $3,920.00$70.00

6 $5,600.00$100.00

Ref #69 518E22300 SPECIAL - STEEL DRIP STRIP, (224 FT)

Awd $3,360.00$15.00

2 $1,792.00$8.00

3 $4,480.00$20.00

4 $2,076.48$9.27

5 $2,240.00$10.00

6 $3,136.00$14.00

Ref #70 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (104 FT)

Awd $1,248.00$12.00

2 $832.00$8.00

3 $312.00$3.00

4 $468.00$4.50

5 $1,040.00$10.00

6 $780.00$7.50

Ref #71 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (100 FT)

Awd $1,200.00$12.00

2 $1,200.00$12.00

3 $300.00$3.00

4 $308.00$3.08

5 $1,000.00$10.00

6 $1,200.00$12.00

100572 - Page 74

Page 75: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #72 526E25000 REINFORCED CONCRETE APPROACH SLABS (T=15"), (246 SY)

Awd $49,200.00$200.00

2 $43,050.00$175.00

3 $55,350.00$225.00

4 $51,837.12$210.72

5 $49,200.00$200.00

6 $49,200.00$200.00

Ref #73 848E10000 MICRO SILICA MODIFIED CONCRETE OVERLAY USING HYDRO, (460 SY)

Awd $27,600.00$60.00

2 $23,000.00$50.00

3 $29,440.00$64.00

4 $22,402.00$48.70

5 $34,500.00$75.00

6 $23,000.00$50.00

Ref #74 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (300 SY)

Awd $39,000.00$130.00

2 $42,900.00$143.00

3 $39,000.00$130.00

4 $32,103.00$107.01

5 $43,500.00$145.00

6 $33,000.00$110.00

Ref #75 848E30000 MICRO SILICA MODIFIED CONCRETE OVERLAY (VARIABLE T, (10 CY)

Awd $2,000.00$200.00

2 $1,500.00$150.00

3 $1,040.00$104.00

4 $2,070.00$207.00

5 $1,250.00$125.00

6 $1,000.00$100.00

Ref #76 848E50000 HAND CHIPPING, (10 SY)

Awd $1,000.00$100.00

2 $1,000.00$100.00

3 $1,600.00$160.00

4 $1,191.00$119.10

5 $1,000.00$100.00

6 $750.00$75.00

Ref #77 848E50100 TEST SLAB, (LUMP SUM)

Awd $900.00$900.00

2 $750.00$750.00

3 $1,500.00$1,500.00

4 $687.00$687.00

5 $1,000.00$1,000.00

6 $1,400.00$1,400.00

Ref #78 848E50200 FULL-DEPTH REPAIR, (4 CY)

Awd $2,000.00$500.00

2 $4,000.00$1,000.00

3 $1,000.00$250.00

4 $2,778.00$694.50

5 $2,000.00$500.00

6 $1,400.00$350.00

100572 - Page 75

Page 76: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #79 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 1-1/4" NOMINAL , (300 SY)

Awd $4,500.00$15.00

2 $7,800.00$26.00

3 $11,400.00$38.00

4 $5,145.00$17.15

5 $12,000.00$40.00

6 $11,100.00$37.00

Ref #80 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (30 SY)

Awd $3,000.00$100.00

2 $1,800.00$60.00

3 $2,190.00$73.00

4 $276.00$9.20

5 $1,500.00$50.00

6 $990.00$33.00

Section 7 - STRUCTURE REPAIR BRIDGE NO. MRW-95-1175 - Totals

Awd $410,486.10

2 $438,180.00

3 $476,609.30

4 $506,265.08

5 $516,603.24

6 $618,323.52

Ref #81 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $7,000.00$7,000.00

2 $14,000.00$14,000.00

3 $4,200.00$4,200.00

4 $10,075.00$10,075.00

5 $6,000.00$6,000.00

6 $7,500.00$7,500.00

Ref #82 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $28,000.00$28,000.00

3 $37,500.00$37,500.00

4 $38,530.50$38,530.50

5 $38,000.00$38,000.00

6 $30,000.00$30,000.00

Ref #83 619E16010 FIELD OFFICE, TYPE B, (7 MNTH)

Awd $7,000.00$1,000.00

2 $7,000.00$1,000.00

3 $17,500.00$2,500.00

4 $9,127.51$1,303.93

5 $8,400.00$1,200.00

6 $10,500.00$1,500.00

Ref #84 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $2,000.00$2,000.00

3 $12,000.00$12,000.00

4 $1,617.00$1,617.00

5 $6,000.00$6,000.00

6 $4,000.00$4,000.00

100572 - Page 76

Page 77: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #85 624E10000 MOBILIZATION, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $20,000.00$20,000.00

3 $20,000.00$20,000.00

4 $8,345.40$8,345.40

5 $20,000.00$20,000.00

6 $20,000.00$20,000.00

Section 8 - INCIDENTALS - Totals

Awd $77,000.00

2 $71,000.00

3 $91,200.00

4 $67,695.41

5 $78,400.00

6 $72,000.00

100572 - Page 77

Page 78: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100573

PID 76452

MUS-SR-60-28.36

Federal

Type: TWO LANE RESURFACING

Completion Date: 10/15/2011

Award Amount: $1,819,138.73

Contract Awarded To: SHELLY COMPANY

Letting Date: 12/2/2010

Engineer's Estimate: $1,936,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

SHELLY COMPANY

80 PARK DR BOX 266

THORNVILLE, OH 43076

Perry

Bidder 1

Bid $1,819,138.73

SHELLY & SANDS INC

3570 SOUTH RIVER RD

ZANESVILLE, OH 43701

Muskingum

Bidder 2

Bid $1,968,188.80

100573 - Page 78

Page 79: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 202E23500 WEARING COURSE REMOVED (WT: NR), (4352 SY)

Awd $19,584.00$4.50

2 $10,880.00$2.50

Ref #2 203E10000 EXCAVATION, (39 CY)

Awd $2,301.00$59.00

2 $1,950.00$50.00

Ref #3 203E20000 EMBANKMENT, (5 CY)

Awd $210.00$42.00

2 $2,000.00$400.00

Ref #4 204E10000 SUBGRADE COMPACTION, (106 SY)

Awd $583.00$5.50

2 $1,060.00$10.00

Ref #5 209E60500 LINEAR GRADING, (6 MILE)

Awd $7,500.00$1,250.00

2 $12,000.00$2,000.00

Section 1 - ROADWAY - Totals

Awd $30,178.00

2 $27,890.00

Ref #6 659E00500 SEEDING AND MULCHING, CLASS 1, (138 SY)

Awd $414.00$3.00

2 $2,760.00$20.00

Ref #7 659E20000 COMMERCIAL FERTILIZER, (0.01 TON)

Awd $10.00$1,000.00

2 $20.00$2,000.00

Ref #8 659E31000 LIME, (0.03 ACRE)

Awd $1.50$50.00

2 $150.00$5,000.00

Ref #9 832E30000 EROSION CONTROL, (1800 EACH)

Awd $1,800.00$1.00

2 $1,800.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $2,225.50

2 $4,730.00

Ref #10 253E02000 PAVEMENT REPAIR, (250 CY)

Awd $55,000.00$220.00

2 $56,250.00$225.00

Ref #11 254E01001 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN, (120398 SY)

Awd $84,278.60$0.70

2 $156,517.40$1.30

Ref #12 301E46000 ASPHALT CONCRETE BASE, PG64-22, (27 CY)

Awd $4,050.00$150.00

2 $6,750.00$250.00

Ref #13 407E10000 TACK COAT (WT: 10), (9706 GAL)

Awd $17,956.10$1.85

2 $18,926.70$1.95

100573 - Page 79

Page 80: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #14 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (5957 GAL)

Awd $11,020.45$1.85

2 $11,616.15$1.95

Ref #15 408E10001 PRIME COAT, AS PER PLAN, (6008 GAL)

Awd $18,024.00$3.00

2 $19,526.00$3.25

Ref #16 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (5791 CY)

Awd $609,502.75$105.25

2 $648,592.00$112.00

Ref #17 448E46904 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG70-22M , (4520 CY)

Awd $621,500.00$137.50

2 $641,840.00$142.00

Ref #18 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (255 FT)

Awd $2,550.00$10.00

2 $6,630.00$26.00

Ref #19 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (835 CY)

Awd $33,817.50$40.50

2 $42,376.25$50.75

Ref #20 690E98800 SPECIAL - MISC.:HAULING RACP, (4500 TON)

Awd $16,875.00$3.75

2 $14,625.00$3.25

Section 3 - PAVEMENT - Totals

Awd $1,474,574.40

2 $1,623,649.50

Ref #21 621E00100 RPM, (591 EACH)

Awd $9,101.40$15.40

2 $9,751.50$16.50

Ref #22 621E54000 RAISED PAVEMENT MARKER REMOVED, (553 EACH)

Awd $3,594.50$6.50

2 $6,636.00$12.00

Ref #23 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (4 EACH)

Awd $329.60$82.40

2 $274.00$68.50

Ref #24 630E80100 SIGN, FLAT SHEET, (18.4 SF)

Awd $335.80$18.25

2 $487.60$26.50

Ref #25 644E00400 CHANNELIZING LINE, (1252 FT)

Awd $1,252.00$1.00

2 $1,252.00$1.00

Ref #26 644E00500 STOP LINE, (360 FT)

Awd $2,016.00$5.60

2 $1,980.00$5.50

Ref #27 644E00700 TRANSVERSE/DIAGONAL LINE, (685 FT)

Awd $3,425.00$5.00

2 $3,596.25$5.25

100573 - Page 80

Page 81: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #28 644E01300 LANE ARROW, (19 EACH)

Awd $1,710.00$90.00

2 $1,643.50$86.50

Ref #29 644E01410 WORD ON PAVEMENT, 96", (5 EACH)

Awd $510.00$102.00

2 $485.00$97.00

Ref #30 817E00100 EDGE LINE, (12.8 MILE)

Awd $13,363.20$1,044.00

2 $12,800.00$1,000.00

Ref #31 817E00300 CENTER LINE, (7.18 MILE)

Awd $13,376.34$1,863.00

2 $12,816.30$1,785.00

Section 4 - TRAFFIC CONTROL - Totals

Awd $49,013.84

2 $51,722.15

Ref #32 625E25402 CONDUIT, 2", 725.05, (880 FT)

Awd $1,936.00$2.20

2 $1,408.00$1.60

Ref #33 625E25502 CONDUIT, 3", 725.05, (32 FT)

Awd $209.60$6.55

2 $160.00$5.00

Ref #34 625E29003 TRENCH, 24" DEEP, AS PER PLAN, (896 FT)

Awd $5,286.40$5.90

2 $3,808.00$4.25

Ref #35 625E30700 PULL BOX, 725.08, 18", (8 EACH)

Awd $5,632.00$704.00

2 $5,080.00$635.00

Ref #36 625E30706 PULL BOX, 725.08, 24", (1 EACH)

Awd $922.00$922.00

2 $850.00$850.00

Ref #37 625E32000 GROUND ROD, (5 EACH)

Awd $865.00$173.00

2 $800.00$160.00

Ref #38 632E04911 VEHICULAR SIGNAL HEAD, (LED) BLACK, 3-SECTION, 12", (6 EACH)

Awd $4,518.00$753.00

2 $4,050.00$675.00

Ref #39 632E04925 VEHICULAR SIGNAL HEAD, (LED) BLACK, 4-SECTION, 12", (2 EACH)

Awd $2,360.00$1,180.00

2 $1,800.00$900.00

Ref #40 632E25000 COVERING OF VEHICULAR SIGNAL HEAD, (8 EACH)

Awd $248.00$31.00

2 $212.00$26.50

Ref #41 632E26500 DETECTOR LOOP, (10 EACH)

Awd $10,700.00$1,070.00

2 $9,500.00$950.00

100573 - Page 81

Page 82: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #42 632E26501 DETECTOR LOOP, AS PER PLAN, (27 EACH)

Awd $28,890.00$1,070.00

2 $28,350.00$1,050.00

Ref #43 632E29900 MESSENGER WIRE, 7 STRAND, 1/4" DIAMETER WITH ACCES, (323 FT)

Awd $3,956.75$12.25

2 $2,390.20$7.40

Ref #44 632E30600 TETHER WIRE, WITH ACCESSORIES, (323 FT)

Awd $3,746.80$11.60

2 $3,068.50$9.50

Ref #45 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG, (742 FT)

Awd $2,485.70$3.35

2 $2,745.40$3.70

Ref #46 632E64000 STRAIN POLE FOUNDATION, (4 EACH)

Awd $11,288.00$2,822.00

2 $7,600.00$1,900.00

Ref #47 632E65200 LOOP DETECTOR LEAD-IN CABLE, (3708 FT)

Awd $5,117.04$1.38

2 $5,932.80$1.60

Ref #48 632E67200 POWER CABLE, 2 CONDUCTOR, NO. 8 AWG, (48 FT)

Awd $134.40$2.80

2 $177.60$3.70

Ref #49 632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG, (82 FT)

Awd $328.00$4.00

2 $303.40$3.70

Ref #50 632E70001 POWER SERVICE, AS PER PLAN, (1 EACH)

Awd $2,000.00$2,000.00

2 $1,275.00$1,275.00

Ref #51 632E82800 STRAIN POLE, TYPE TC-81.10, DESIGN 8, (4 EACH)

Awd $17,200.00$4,300.00

2 $13,500.00$3,375.00

Ref #52 632E90300 SIGNALIZATION, MISC.:CHANGE SIGNAL HEAD AND DETECT, (LUMP SUM)

Awd $1,500.00$1,500.00

2 $1,050.00$1,050.00

Ref #53 633E01581 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T, (1 EACH)

Awd $9,000.00$9,000.00

2 $8,450.00$8,450.00

Ref #54 633E67000 CABINET RISER, (1 EACH)

Awd $420.00$420.00

2 $525.00$525.00

Ref #55 633E67200 CONTROLLER WORK PAD, (1 EACH)

Awd $378.00$378.00

2 $200.00$200.00

Section 5 - TRAFFIC SIGNALS - Totals

Awd $119,121.69

2 $103,235.90

100573 - Page 82

Page 83: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #56 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)

Awd $2,200.00$55.00

2 $2,400.00$60.00

Ref #57 614E12460 WORK ZONE MARKING SIGN, (61 EACH)

Awd $9,150.00$150.00

2 $8,540.00$140.00

Ref #58 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (3 CY)

Awd $300.00$100.00

2 $600.00$200.00

Ref #59 614E21400 WORK ZONE CENTER LINE, CLASS II, (6.29 MILE)

Awd $2,516.00$400.00

2 $2,358.75$375.00

Ref #60 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (6.29 MILE)

Awd $7,359.30$1,170.00

2 $7,862.50$1,250.00

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $21,525.30

2 $21,761.25

Ref #61 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $8,000.00$8,000.00

Ref #62 614E11000 MAINTAINING TRAFFIC (WT: 39), (LUMP SUM)

Awd $66,500.00$66,500.00

2 $65,000.00$65,000.00

Ref #63 619E16000 FIELD OFFICE, TYPE A (WT: NR), (3 MNTH)

Awd $3,000.00$1,000.00

2 $10,200.00$3,400.00

Ref #64 623E10000 CONSTRUCTION LAYOUT STAKES (WT: NR), (LUMP SUM)

Awd $3,000.00$3,000.00

2 $12,000.00$12,000.00

Ref #65 624E10000 MOBILIZATION (WT: NR), (LUMP SUM)

Awd $40,000.00$40,000.00

2 $40,000.00$40,000.00

Section 7 - INCIDENTALS - Totals

Awd $122,500.00

2 $135,200.00

100573 - Page 83

Page 84: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100576

PID 86737

ERI-VA-LG-FY2011

Non-Federal

Type: LIGHTING

Completion Date: 8/31/2011

Award Amount: $107,701.21

Contract Awarded To: LAFAYETTE ELECTRIC INC

Letting Date: 12/2/2010

Engineer's Estimate: $87,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

LAFAYETTE ELECTRIC INC

1050 LAFAYETTE RD

MEDINA, OH 44256-3549

Bidder 1

Bid $107,701.21

THOMPSON ELECTRIC INC

49 NORTHMORELAND AVE

MUNROE FALLS, OH 44262

Summit

Bidder 2

Bid $109,094.22

HENNING USU INC

5030 ADVANTAGE DR STE 201

TOLEDO, OH 43612

Lucas

Bidder 3

Bid $111,721.69

HILSCHER-CLARKE ELECTRIC CO

519 4TH ST NW

CANTON, OH 44703

Stark

Bidder 4

Bid $119,647.00

MILLER CABLE COMPANY

210 S BROADWAY ST P O BOX 68

GREEN SPRINGS, OH 44836

Seneca

Bidder 5

Bid $119,750.00

PERRAM ELECTRIC INC

6882 RIDGE RD

WADSWORTH, OH 44281

Medina

Bidder 6

Bid $121,551.00

CORNERSTONE ELECTRIC INC

14375 WEST CALLA RD

SALEM, OH 44460

Columbiana

Bidder 7

Bid $121,583.00

100576 - Page 84

Page 85: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 201E11001 CLEARING AND GRUBBING, AS PER PLAN, (LUMP SUM)

Awd $500.00$500.00

2 $2,800.00$2,800.00

3 $1,640.00$1,640.00

4 $567.63$567.63

5 $250.00$250.00

6 $1,895.00$1,895.00

7 $5,000.00$5,000.00

Ref #2 603E00401 4" CONDUIT, TYPE E, AS PER PLAN, (360 FT)

Awd $360.00$1.00

2 $2,062.80$5.73

3 $2,851.20$7.92

4 $2,052.00$5.70

5 $900.00$2.50

6 $1,314.00$3.65

7 $1,080.00$3.00

Ref #3 625E00480 CONNECTION, UNFUSED PERMANENT, (22 EACH)

Awd $1,012.00$46.00

2 $1,496.00$68.00

3 $1,408.00$64.00

4 $2,613.60$118.80

5 $1,760.00$80.00

6 $1,677.50$76.25

7 $1,430.00$65.00

Ref #4 625E00500 CONNECTOR KIT, TYPE II, (4 EACH)

Awd $232.00$58.00

2 $264.00$66.00

3 $294.40$73.60

4 $487.80$121.95

5 $320.00$80.00

6 $337.00$84.25

7 $240.00$60.00

Ref #5 625E00600 CONNECTOR KIT, TYPE III, (4 EACH)

Awd $224.00$56.00

2 $256.00$64.00

3 $308.80$77.20

4 $500.40$125.10

5 $320.00$80.00

6 $341.00$85.25

7 $240.00$60.00

Ref #6 625E02501 TRANSFORMER BASE, TYPE AT-A, AS PER PLAN, (4 EACH)

Awd $1,260.00$315.00

2 $2,080.00$520.00

3 $2,307.68$576.92

4 $1,756.80$439.20

5 $1,600.00$400.00

6 $1,440.00$360.00

7 $1,600.00$400.00

100576 - Page 85

Page 86: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #7 625E14600 LIGHT POLE FOUNDATION, MISC.:ADJUST TO GRADE, (4 EACH)

Awd $2,548.00$637.00

2 $5,092.00$1,273.00

3 $2,040.00$510.00

4 $2,166.00$541.50

5 $5,700.00$1,425.00

6 $3,260.00$815.00

7 $3,000.00$750.00

Ref #8 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE, (3884 FT)

Awd $9,476.96$2.44

2 $9,943.04$2.56

3 $10,642.16$2.74

4 $9,321.60$2.40

5 $11,457.80$2.95

6 $9,515.80$2.45

7 $11,652.00$3.00

Ref #9 625E23201 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE, AS PER PLA, (500 FT)

Awd $1,395.00$2.79

2 $1,280.00$2.56

3 $1,410.00$2.82

4 $1,450.00$2.90

5 $1,800.00$3.60

6 $1,225.00$2.45

7 $1,500.00$3.00

Ref #10 625E23300 NO. 2 AWG 5000 VOLT DISTRIBUTION CABLE, (726 FT)

Awd $2,831.40$3.90

2 $2,562.78$3.53

3 $2,700.72$3.72

4 $2,758.80$3.80

5 $2,686.20$3.70

6 $2,395.80$3.30

7 $2,541.00$3.50

Ref #11 625E23401 NO. 10 AWG POLE AND BRACKET CABLE, AS PER PLAN, (480 FT)

Awd $480.00$1.00

2 $547.20$1.14

3 $700.80$1.46

4 $480.00$1.00

5 $720.00$1.50

6 $360.00$0.75

7 $480.00$1.00

Ref #12 625E25400 CONDUIT, 2", 725.04, (155 FT)

Awd $1,271.00$8.20

2 $1,085.00$7.00

3 $892.80$5.76

4 $2,604.00$16.80

5 $1,395.00$9.00

6 $1,875.50$12.10

7 $1,240.00$8.00

100576 - Page 86

Page 87: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #13 625E25500 CONDUIT, 3", 725.04, (228 FT)

Awd $2,793.00$12.25

2 $3,091.68$13.56

3 $2,416.80$10.60

4 $6,042.00$26.50

5 $3,420.00$15.00

6 $3,807.60$16.70

7 $3,420.00$15.00

Ref #14 625E25600 CONDUIT, 4", 725.04, (49 FT)

Awd $1,281.35$26.15

2 $871.71$17.79

3 $733.53$14.97

4 $1,631.70$33.30

5 $980.00$20.00

6 $1,362.20$27.80

7 $1,225.00$25.00

Ref #15 625E25903 CONDUIT, JACKED OR DRILLED, 725.04, AS PER PLAN, 3, (200 FT)

Awd $5,600.00$28.00

2 $6,350.00$31.75

3 $5,000.00$25.00

4 $5,030.00$25.15

5 $6,600.00$33.00

6 $5,710.00$28.55

7 $5,000.00$25.00

Ref #16 625E29001 TRENCH, AS PER PLAN, (277 FT)

Awd $1,246.50$4.50

2 $1,421.01$5.13

3 $1,772.80$6.40

4 $1,108.00$4.00

5 $2,216.00$8.00

6 $1,662.00$6.00

7 $1,385.00$5.00

Ref #17 625E30701 PULL BOX, 725.08, 18", AS PER PLAN, (2 EACH)

Awd $1,156.00$578.00

2 $1,210.00$605.00

3 $1,091.20$545.60

4 $1,379.10$689.55

5 $1,000.00$500.00

6 $1,560.00$780.00

7 $1,200.00$600.00

Ref #18 625E30707 PULL BOX, 725.08, 24", AS PER PLAN, (3 EACH)

Awd $2,019.00$673.00

2 $2,166.00$722.00

3 $1,986.00$662.00

4 $2,644.50$881.50

5 $1,830.00$610.00

6 $2,610.00$870.00

7 $2,100.00$700.00

100576 - Page 87

Page 88: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #19 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN, 18", (39 EACH)

Awd $27,222.00$698.00

2 $23,088.00$592.00

3 $27,518.40$705.60

4 $30,092.40$771.60

5 $30,810.00$790.00

6 $35,490.00$910.00

7 $27,300.00$700.00

Ref #20 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN, 24", (11 EACH)

Awd $8,723.00$793.00

2 $8,184.00$744.00

3 $9,042.00$822.00

4 $10,637.00$967.00

5 $9,900.00$900.00

6 $10,670.00$970.00

7 $8,800.00$800.00

Ref #21 625E31510 PULL BOX REMOVED, (2 EACH)

Awd $240.00$120.00

2 $450.00$225.00

3 $320.00$160.00

4 $803.40$401.70

5 $580.00$290.00

6 $240.00$120.00

7 $500.00$250.00

Ref #22 625E31600 PULL BOX, MISC.:ADJUST TO GRADE IN PAVED AREA, (1 EACH)

Awd $660.00$660.00

2 $413.00$413.00

3 $840.00$840.00

4 $412.20$412.20

5 $905.00$905.00

6 $1,150.00$1,150.00

7 $400.00$400.00

Ref #23 625E34001 POWER SERVICE, AS PER PLAN"A", (2 EACH)

Awd $12,800.00$6,400.00

2 $12,258.00$6,129.00

3 $5,509.60$2,754.80

4 $8,392.50$4,196.25

5 $9,000.00$4,500.00

6 $12,130.00$6,065.00

7 $10,000.00$5,000.00

Ref #24 625E34001 POWER SERVICE, AS PER PLAN"B", (1 EACH)

Awd $8,865.00$8,865.00

2 $7,729.00$7,729.00

3 $2,704.80$2,704.80

4 $5,567.40$5,567.40

5 $7,200.00$7,200.00

6 $7,600.00$7,600.00

7 $10,000.00$10,000.00

100576 - Page 88

Page 89: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #25 625E35010 REMOVE AND REERECT EXISTING LIGHT POLE, (4 EACH)

Awd $1,100.00$275.00

2 $1,460.00$365.00

3 $2,560.00$640.00

4 $2,961.60$740.40

5 $2,240.00$560.00

6 $1,420.00$355.00

7 $1,200.00$300.00

Ref #26 625E75511 POWER SERVICE REMOVED, AS PER PLAN, (4 EACH)

Awd $1,900.00$475.00

2 $1,540.00$385.00

3 $1,920.00$480.00

4 $1,236.00$309.00

5 $660.00$165.00

6 $1,420.00$355.00

7 $2,000.00$500.00

Ref #27 625E98000 LIGHTING, MISC.:ADJUST WOOD POLE, (1 EACH)

Awd $460.00$460.00

2 $575.00$575.00

3 $460.00$460.00

4 $761.40$761.40

5 $400.00$400.00

6 $600.00$600.00

7 $1,000.00$1,000.00

Ref #28 632E70600 CONDUIT RISER, 3" DIAMETER, (2 EACH)

Awd $970.00$485.00

2 $912.00$456.00

3 $1,020.00$510.00

4 $2,040.00$1,020.00

5 $600.00$300.00

6 $1,200.00$600.00

7 $1,000.00$500.00

Ref #29 632E89300 WOOD POLE, (1 EACH)

Awd $850.00$850.00

2 $1,040.00$1,040.00

3 $720.00$720.00

4 $963.00$963.00

5 $750.00$750.00

6 $1,060.00$1,060.00

7 $1,000.00$1,000.00

Ref #30 633E67201 CONTROLLER WORK PAD, AS PER PLAN, (3 EACH)

Awd $1,125.00$375.00

2 $1,560.00$520.00

3 $750.00$250.00

4 $1,316.04$438.68

5 $675.00$225.00

6 $606.00$202.00

7 $1,050.00$350.00

100576 - Page 89

Page 90: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 1 - ITEMS OF WORK - Totals

Awd $100,601.21

2 $103,788.22

3 $93,561.69

4 $109,776.87

5 $108,675.00

6 $115,934.40

7 $108,583.00

Ref #31 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $1,700.00$1,700.00

2 $756.00$756.00

3 $12,000.00$12,000.00

4 $1,184.63$1,184.63

5 $925.00$925.00

6 $566.60$566.60

7 $2,000.00$2,000.00

Ref #32 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $750.00$750.00

3 $3,200.00$3,200.00

4 $10.00$10.00

5 $5,850.00$5,850.00

6 $800.00$800.00

7 $5,000.00$5,000.00

Ref #33 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)

Awd $400.00$400.00

2 $1,300.00$1,300.00

3 $960.00$960.00

4 $10.50$10.50

5 $300.00$300.00

6 $250.00$250.00

7 $1,000.00$1,000.00

Ref #34 624E10000 MOBILIZATION, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $2,500.00$2,500.00

3 $2,000.00$2,000.00

4 $8,665.00$8,665.00

5 $4,000.00$4,000.00

6 $4,000.00$4,000.00

7 $5,000.00$5,000.00

Section 2 - INCIDENTALS - Totals

Awd $7,100.00

2 $5,306.00

3 $18,160.00

4 $9,870.13

5 $11,075.00

6 $5,616.60

7 $13,000.00

100576 - Page 90

Page 91: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100577

PID 86967

BEL-VA-MOW-FY2011(A)

Non-Federal

Type: MOWING

Completion Date: 10/31/2012

Award Amount: $236,000.00

Contract Awarded To: TOM MAYLE & SONS CONSTRUCTION INC

Letting Date: 12/2/2010

Engineer's Estimate: $255,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

TOM MAYLE & SONS CONSTRUCTION INC

P O BOX 151

BARTLETT, OH 45713

Washington

Bidder 1

Bid $236,000.00

BRYPAN LLC

1525 DITMORE STROLL

NEWARK, OH 43055

Licking

Bidder 2

Bid $278,250.00

THOMPSON INTERSTATE MOWING INC

12878 ST RT 62 N

LEESBURG, OH 45135

Highland

Bidder 3

Bid $279,005.56

100577 - Page 91

Page 92: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 832E30000 EROSION CONTROL, (1000 EACH)

Awd $1,000.00$1.00

2 $1,000.00$1.00

3 $1,000.00$1.00

Section 1 - EROSION CONTROL - Totals

Awd $1,000.00

2 $1,000.00

3 $1,000.00

Ref #2 692E10000 SPECIAL - FIRST MOWING, (121 MILE)

Awd $36,300.00$300.00

2 $36,300.00$300.00

3 $20,499.82$169.42

Ref #3 692E20000 SPECIAL - SECOND MOWING, (121 MILE)

Awd $26,620.00$220.00

2 $27,225.00$225.00

3 $20,499.82$169.42

Ref #4 692E30000 SPECIAL - THIRD MOWING, (121 MILE)

Awd $24,200.00$200.00

2 $24,200.00$200.00

3 $20,499.82$169.42

Ref #5 692E30250 SPECIAL - FOURTH MOWING, (121 MILE)

Awd $12,100.00$100.00

2 $24,200.00$200.00

3 $20,499.82$169.42

Ref #6 692E30280 SPECIAL - FIFTH MOWING, (121 MILE)

Awd $36,300.00$300.00

2 $36,300.00$300.00

3 $20,499.82$169.42

Ref #7 692E30290 SPECIAL - SIXTH MOWING, (121 MILE)

Awd $26,620.00$220.00

2 $27,225.00$225.00

3 $20,499.82$169.42

Ref #8 692E30300 SPECIAL - SEVENTH MOWING, (121 MILE)

Awd $24,200.00$200.00

2 $24,200.00$200.00

3 $20,499.82$169.42

Ref #9 692E30310 SPECIAL - EIGHTH MOWING, (121 LIMI)

Awd $12,100.00$100.00

2 $24,200.00$200.00

3 $20,499.82$169.42

Ref #10 692E30400 SPECIAL - MOWBACK(EIGHTH MOWING), (475 ACRE)

Awd $3,800.00$8.00

2 $4,750.00$10.00

3 $24,001.75$50.53

Ref #11 692E30400 SPECIAL - MOWBACK(FOURTH MOWING), (475 ACRE)

Awd $3,800.00$8.00

2 $4,750.00$10.00

3 $24,001.75$50.53

100577 - Page 92

Page 93: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #12 692E30400 SPECIAL - MOWBACK(SECOND MOWING), (475 ACRE)

Awd $3,800.00$8.00

2 $4,750.00$10.00

3 $24,001.75$50.53

Ref #13 692E30400 SPECIAL - MOWBACK(SIXTH MOWING), (475 ACRE)

Awd $3,800.00$8.00

2 $4,750.00$10.00

3 $24,001.75$50.53

Section 2 - LANDSCAPING - Totals

Awd $213,640.00

2 $242,850.00

3 $260,005.56

Ref #14 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $5,360.00$5,360.00

2 $20,000.00$20,000.00

3 $14,000.00$14,000.00

Ref #15 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $8,000.00$8,000.00

2 $2,400.00$2,400.00

3 $2,000.00$2,000.00

Ref #16 624E10000 MOBILIZATION, (LUMP SUM)

Awd $8,000.00$8,000.00

2 $12,000.00$12,000.00

3 $2,000.00$2,000.00

Section 3 - INCIDENTALS - Totals

Awd $21,360.00

2 $34,400.00

3 $18,000.00

100577 - Page 93

Page 94: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100578

PID 78161

HAR-SR-67-18.57/21.35

Non-Federal

Type: CULVERT REPLACEMENT

Completion Date: 7/31/2011

Award Amount: $257,729.06

Contract Awarded To: VTF EXCAVATING LLC

Letting Date: 12/2/2010

Engineer's Estimate: $321,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

VTF EXCAVATING LLC

8398 CELINA-MENDON RD

CELINA, OH 45822

Mercer

Bidder 1

Bid $257,729.06

J & J SCHLAEGEL INC

518 MIAMI ST

URBANA, OH 43078

Champaign

Bidder 2

Bid $273,881.05

HUME SUPPLY INC

1359 E HANTHORN RD

LIMA, OH 45804

Allen

Bidder 3

Bid $275,679.04

MILLER CONTRACTING GROUP INC

17359 STATE ROUTE 66

OTTOVILLE, OH 45876-0162

Bidder 4

Bid $278,991.25

RIETSCHLIN CONSTRUCTION INC

4240 BAKER RD

CRESTLINE, OH 44827

Crawford

Bidder 5

Bid $283,413.50

R W ROBINSON INC

87 EAST STATE

BELLVILLE, OH 44813

Richland

Bidder 6

Bid $296,538.19

SCHALK BROTHERS INC

3481 NORTH TWP RD 69

TIFFIN, OH 44883

Seneca

Bidder 7

Bid $302,978.40

TRUCCO CONSTRUCTION CO INC

3531 AIRPORT RD

DELAWARE, OH 43015

Delaware

Bidder 8

Bid $303,104.89

BCC OHIO INC

1199 CHENANGO RD

NEW LONDON, OH 44851

Huron

Bidder 9

Bid $306,932.35

ROCK RIVER CONSTRUCTION LTD

541 MILL PARK DR SUITE C

LANCASTER, OH 43130

Fairfield

Bidder 10

Bid $322,483.63

100578 - Page 94

Page 95: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

ALAN STONE CO INC

1324 ELLIS RUN RD

CUTLER, OH 45724

Washington

Bidder 11

Bid $355,650.78

100578 - Page 95

Page 96: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $575.00$575.00

2 $3,500.00$3,500.00

3 $1,333.33$1,333.33

4 $15,000.00$15,000.00

5 $500.00$500.00

6 $5,000.00$5,000.00

7 $6,000.00$6,000.00

8 $500.00$500.00

9 $1,176.00$1,176.00

10 $250.00$250.00

11 $3,000.00$3,000.00

Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (387 SY)

Awd $1,764.72$4.56

2 $3,870.00$10.00

3 $2,798.01$7.23

4 $3,096.00$8.00

5 $4,644.00$12.00

6 $2,322.00$6.00

7 $1,935.00$5.00

8 $3,715.20$9.60

9 $5,638.59$14.57

10 $3,870.00$10.00

11 $3,134.70$8.10

Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (316 FT)

Awd $3,409.64$10.79

2 $2,212.00$7.00

3 $2,752.36$8.71

4 $1,659.00$5.25

5 $3,476.00$11.00

6 $1,580.00$5.00

7 $316.00$1.00

8 $3,570.80$11.30

9 $1,769.60$5.60

10 $948.00$3.00

11 $1,580.00$5.00

Ref #4 202E58100 CATCH BASIN REMOVED, (4 EACH)

Awd $685.44$171.36

2 $400.00$100.00

3 $550.68$137.67

4 $860.00$215.00

5 $600.00$150.00

6 $1,400.00$350.00

7 $200.00$50.00

8 $1,376.00$344.00

9 $588.00$147.00

10 $400.00$100.00

11 $800.00$200.00

100578 - Page 96

Page 97: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #5 203E10000 EXCAVATION, (669 CY)

Awd $5,378.76$8.04

2 $6,690.00$10.00

3 $3,766.47$5.63

4 $4,683.00$7.00

5 $6,021.00$9.00

6 $6,690.00$10.00

7 $6,021.00$9.00

8 $15,387.00$23.00

9 $5,927.34$8.86

10 $5,352.00$8.00

11 $4,014.00$6.00

Ref #6 203E20000 EMBANKMENT, (1145 CY)

Awd $13,820.15$12.07

2 $13,740.00$12.00

3 $12,217.15$10.67

4 $12,595.00$11.00

5 $8,015.00$7.00

6 $11,450.00$10.00

7 $17,175.00$15.00

8 $22,900.00$20.00

9 $8,770.70$7.66

10 $13,740.00$12.00

11 $5,725.00$5.00

Ref #7 204E10000 SUBGRADE COMPACTION, (455 SY)

Awd $300.30$0.66

2 $682.50$1.50

3 $591.50$1.30

4 $568.75$1.25

5 $910.00$2.00

6 $1,820.00$4.00

7 $910.00$2.00

8 $1,774.50$3.90

9 $682.50$1.50

10 $682.50$1.50

11 $682.50$1.50

Section 1 - ROADWAY - Totals

Awd $25,934.01

2 $31,094.50

3 $24,009.50

4 $38,461.75

5 $24,166.00

6 $30,262.00

7 $32,557.00

8 $49,223.50

9 $24,552.73

10 $25,242.50

11 $18,936.20

100578 - Page 97

Page 98: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #8 659E10000 SEEDING AND MULCHING, (6103 SY)

Awd $6,713.30$1.10

2 $3,356.65$0.55

3 $5,736.82$0.94

4 $7,628.75$1.25

5 $6,103.00$1.00

6 $4,150.04$0.68

7 $6,103.00$1.00

8 $2,319.14$0.38

9 $5,431.67$0.89

10 $4,577.25$0.75

11 $5,492.70$0.90

Ref #9 659E20000 COMMERCIAL FERTILIZER, (0.83 TON)

Awd $715.88$862.51

2 $415.00$500.00

3 $415.00$500.00

4 $269.75$325.00

5 $664.00$800.00

6 $622.50$750.00

7 $249.00$300.00

8 $332.00$400.00

9 $187.37$225.75

10 $622.50$750.00

11 $187.58$226.00

Ref #10 659E35000 WATER, (33 MGAL)

Awd $75.90$2.30

2 $165.00$5.00

3 $183.48$5.56

4 $33.00$1.00

5 $165.00$5.00

6 $33.00$1.00

7 $33.00$1.00

8 $330.00$10.00

9 $34.65$1.05

10 $165.00$5.00

11 $33.00$1.00

Ref #11 832E30000 EROSION CONTROL, (5000 EACH)

Awd $5,000.00$1.00

2 $5,000.00$1.00

3 $5,000.00$1.00

4 $5,000.00$1.00

5 $5,000.00$1.00

6 $5,000.00$1.00

7 $5,000.00$1.00

8 $5,000.00$1.00

9 $5,000.00$1.00

10 $5,000.00$1.00

11 $5,000.00$1.00

100578 - Page 98

Page 99: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 2 - EROSION CONTROL - Totals

Awd $12,505.08

2 $8,936.65

3 $11,335.30

4 $12,931.50

5 $11,932.00

6 $9,805.54

7 $11,385.00

8 $7,981.14

9 $10,653.69

10 $10,364.75

11 $10,713.28

Ref #12 603E00406 4" CONDUIT, TYPE F, (25 FT)

Awd $218.25$8.73

2 $100.00$4.00

3 $84.50$3.38

4 $225.00$9.00

5 $250.00$10.00

6 $250.00$10.00

7 $25.00$1.00

8 $300.00$12.00

9 $133.50$5.34

10 $175.00$7.00

11 $125.00$5.00

Ref #13 603E01500 6" CONDUIT, TYPE F, (15 FT)

Awd $150.15$10.01

2 $90.00$6.00

3 $92.25$6.15

4 $165.00$11.00

5 $180.00$12.00

6 $150.00$10.00

7 $37.50$2.50

8 $210.00$14.00

9 $135.00$9.00

10 $165.00$11.00

11 $75.00$5.00

Ref #14 603E06100 15" CONDUIT, TYPE C, (35 FT)

Awd $644.35$18.41

2 $927.50$26.50

3 $810.60$23.16

4 $700.00$20.00

5 $945.00$27.00

6 $1,120.00$32.00

7 $840.00$24.00

8 $1,155.00$33.00

9 $1,714.65$48.99

10 $875.00$25.00

11 $2,100.00$60.00

100578 - Page 99

Page 100: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #15 603E07400 18" CONDUIT, TYPE B, (199 FT)

Awd $11,677.32$58.68

2 $6,965.00$35.00

3 $8,268.45$41.55

4 $8,159.00$41.00

5 $8,358.00$42.00

6 $7,960.00$40.00

7 $15,920.00$80.00

8 $11,542.00$58.00

9 $15,171.76$76.24

10 $7,960.00$40.00

11 $18,308.00$92.00

Ref #16 603E07600 18" CONDUIT, TYPE C, (150 FT)

Awd $4,386.00$29.24

2 $4,200.00$28.00

3 $4,479.00$29.86

4 $4,200.00$28.00

5 $5,100.00$34.00

6 $5,250.00$35.00

7 $4,500.00$30.00

8 $4,950.00$33.00

9 $9,240.00$61.60

10 $4,500.00$30.00

11 $12,225.00$81.50

Ref #17 604E04500 CATCH BASIN, NO. 2-2B, (6 EACH)

Awd $6,547.92$1,091.32

2 $6,450.00$1,075.00

3 $7,835.04$1,305.84

4 $4,830.00$805.00

5 $7,290.00$1,215.00

6 $3,792.00$632.00

7 $9,000.00$1,500.00

8 $5,706.00$951.00

9 $7,636.50$1,272.75

10 $6,000.00$1,000.00

11 $9,000.00$1,500.00

Ref #18 605E31100 AGGREGATE DRAINS, (459 FT)

Awd $3,993.30$8.70

2 $3,672.00$8.00

3 $3,144.15$6.85

4 $5,049.00$11.00

5 $2,754.00$6.00

6 $3,213.00$7.00

7 $1,836.00$4.00

8 $3,672.00$8.00

9 $3,295.62$7.18

10 $2,065.50$4.50

11 $4,590.00$10.00

100578 - Page 100

Page 101: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #19 613E41200 LOW STRENGTH MORTAR BACKFILL, (3 CY)

Awd $241.50$80.50

2 $360.00$120.00

3 $176.46$58.82

4 $456.00$152.00

5 $450.00$150.00

6 $313.50$104.50

7 $240.00$80.00

8 $465.00$155.00

9 $388.50$129.50

10 $210.00$70.00

11 $195.00$65.00

Section 3 - DRAINAGE - Totals

Awd $27,858.79

2 $22,764.50

3 $24,890.45

4 $23,784.00

5 $25,327.00

6 $22,048.50

7 $32,398.50

8 $28,000.00

9 $37,715.53

10 $21,950.50

11 $46,618.00

Ref #20 301E46000 ASPHALT CONCRETE BASE, PG64-22, (85 CY)

Awd $17,008.50$200.10

2 $14,790.00$174.00

3 $16,433.05$193.33

4 $17,425.00$205.00

5 $15,130.00$178.00

6 $14,875.00$175.00

7 $19,125.00$225.00

8 $14,790.00$174.00

9 $15,529.50$182.70

10 $14,790.00$174.00

11 $15,725.00$185.00

Ref #21 304E20000 AGGREGATE BASE, (177 CY)

Awd $5,711.79$32.27

2 $7,965.00$45.00

3 $7,720.74$43.62

4 $7,965.00$45.00

5 $8,142.00$46.00

6 $7,788.00$44.00

7 $9,558.00$54.00

8 $9,912.00$56.00

9 $12,690.90$71.70

10 $7,257.00$41.00

11 $5,310.00$30.00

100578 - Page 101

Page 102: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #22 407E10000 TACK COAT, (41 GAL)

Awd $141.45$3.45

2 $123.00$3.00

3 $136.53$3.33

4 $246.00$6.00

5 $164.00$4.00

6 $123.00$3.00

7 $82.00$2.00

8 $123.00$3.00

9 $129.15$3.15

10 $123.00$3.00

11 $129.15$3.15

Ref #23 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (41 GAL)

Awd $141.45$3.45

2 $123.00$3.00

3 $136.53$3.33

4 $246.00$6.00

5 $164.00$4.00

6 $123.00$3.00

7 $82.00$2.00

8 $123.00$3.00

9 $129.15$3.15

10 $123.00$3.00

11 $129.15$3.15

Ref #24 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (30 CY)

Awd $6,210.00$207.00

2 $5,400.00$180.00

3 $6,000.00$200.00

4 $7,500.00$250.00

5 $5,520.00$184.00

6 $5,400.00$180.00

7 $8,250.00$275.00

8 $5,400.00$180.00

9 $5,670.00$189.00

10 $5,400.00$180.00

11 $5,700.00$190.00

Ref #25 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (19 CY)

Awd $4,020.40$211.60

2 $3,496.00$184.00

3 $3,884.36$204.44

4 $4,750.00$250.00

5 $3,572.00$188.00

6 $3,496.00$184.00

7 $5,700.00$300.00

8 $3,496.00$184.00

9 $3,670.80$193.20

10 $3,496.00$184.00

11 $3,705.00$195.00

100578 - Page 102

Page 103: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 4 - PAVEMENT - Totals

Awd $33,233.59

2 $31,897.00

3 $34,311.21

4 $38,132.00

5 $32,692.00

6 $31,805.00

7 $42,797.00

8 $33,844.00

9 $37,819.50

10 $31,189.00

11 $30,698.30

Ref #26 621E54000 RAISED PAVEMENT MARKER REMOVED, (3 EACH)

Awd $189.75$63.25

2 $45.00$15.00

3 $185.58$61.86

4 $90.00$30.00

5 $150.00$50.00

6 $150.00$50.00

7 $60.00$20.00

8 $24.00$8.00

9 $73.50$24.50

10 $150.00$50.00

11 $15.00$5.00

Ref #27 642E00090 EDGE LINE, (0.06 MILE)

Awd $934.33$15,572.17

2 $633.60$10,560.00

3 $1,333.33$22,222.17

4 $1,380.00$23,000.00

5 $1,224.00$20,400.00

6 $812.46$13,541.00

7 $633.60$10,560.00

8 $633.60$10,560.00

9 $665.70$11,095.00

10 $633.60$10,560.00

11 $666.00$11,100.00

Ref #28 642E00290 CENTER LINE, (0.03 MILE)

Awd $934.36$31,145.33

2 $316.80$10,560.00

3 $1,000.00$33,333.33

4 $1,020.00$34,000.00

5 $918.00$30,600.00

6 $812.49$27,083.00

7 $316.80$10,560.00

8 $316.80$10,560.00

9 $332.85$11,095.00

10 $316.80$10,560.00

11 $333.00$11,100.00

100578 - Page 103

Page 104: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 5 - TRAFFIC CONTROL - Totals

Awd $2,058.44

2 $995.40

3 $2,518.91

4 $2,490.00

5 $2,292.00

6 $1,774.95

7 $1,010.40

8 $974.40

9 $1,072.05

10 $1,100.40

11 $1,014.00

Ref #29 253E02000 PAVEMENT REPAIR, (20 CY)

Awd $4,600.00$230.00

2 $4,600.00$230.00

3 $4,444.40$222.22

4 $6,000.00$300.00

5 $5,000.00$250.00

6 $4,000.00$200.00

7 $4,000.00$200.00

8 $4,000.00$200.00

9 $4,200.00$210.00

10 $4,000.00$200.00

11 $4,200.00$210.00

Ref #30 407E10000 TACK COAT, (20 GAL)

Awd $69.00$3.45

2 $60.00$3.00

3 $66.60$3.33

4 $120.00$6.00

5 $80.00$4.00

6 $60.00$3.00

7 $60.00$3.00

8 $60.00$3.00

9 $63.00$3.15

10 $60.00$3.00

11 $63.00$3.15

Ref #31 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (10 CY)

Awd $2,530.00$253.00

2 $2,200.00$220.00

3 $2,444.40$244.44

4 $2,500.00$250.00

5 $2,250.00$225.00

6 $2,200.00$220.00

7 $2,200.00$220.00

8 $2,200.00$220.00

9 $2,310.00$231.00

10 $2,200.00$220.00

11 $2,310.00$231.00

100578 - Page 104

Page 105: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #32 616E10000 WATER, (5 MGAL)

Awd $115.00$23.00

2 $25.00$5.00

3 $27.80$5.56

4 $5.00$1.00

5 $75.00$15.00

6 $5.00$1.00

7 $5.00$1.00

8 $250.00$50.00

9 $150.00$30.00

10 $50.00$10.00

11 $10.00$2.00

Ref #33 617E10100 COMPACTED AGGREGATE, (50 CY)

Awd $1,406.50$28.13

2 $1,750.00$35.00

3 $1,990.00$39.80

4 $1,500.00$30.00

5 $2,300.00$46.00

6 $2,200.00$44.00

7 $1,000.00$20.00

8 $2,000.00$40.00

9 $3,585.00$71.70

10 $2,000.00$40.00

11 $1,750.00$35.00

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $8,720.50

2 $8,635.00

3 $8,973.20

4 $10,125.00

5 $9,705.00

6 $8,465.00

7 $7,265.00

8 $8,510.00

9 $10,308.00

10 $8,310.00

11 $8,333.00

Ref #34 202E11000 STRUCTURE REMOVED, (LUMP SUM)

Awd $7,383.28$7,383.28

2 $5,500.00$5,500.00

3 $2,799.50$2,799.50

4 $3,400.00$3,400.00

5 $5,250.00$5,250.00

6 $7,000.00$7,000.00

7 $7,000.00$7,000.00

8 $1,673.00$1,673.00

9 $4,410.00$4,410.00

10 $15,000.00$15,000.00

11 $5,000.00$5,000.00

100578 - Page 105

Page 106: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #35 202E20010 HEADWALL REMOVED, (2 EACH)

Awd $342.72$171.36

2 $650.00$325.00

3 $2,799.50$1,399.75

4 $1,240.00$620.00

5 $2,500.00$1,250.00

6 $1,000.00$500.00

7 $600.00$300.00

8 $556.00$278.00

9 $1,470.00$735.00

10 $300.00$150.00

11 $400.00$200.00

Ref #36 509E10000 EPOXY COATED REINFORCING STEEL, (2498 LB)

Awd $2,248.20$0.90

2 $3,122.50$1.25

3 $2,547.96$1.02

4 $3,247.40$1.30

5 $3,747.00$1.50

6 $1,249.00$0.50

7 $3,747.00$1.50

8 $3,771.98$1.51

9 $3,297.36$1.32

10 $4,996.00$2.00

11 $4,371.50$1.75

Ref #37 511E46001 CLASS C CONCRETE, AS PER PLAN, (9 CY)

Awd $2,593.89$288.21

2 $5,625.00$625.00

3 $7,383.06$820.34

4 $4,590.00$510.00

5 $7,371.00$819.00

6 $8,694.00$966.00

7 $4,050.00$450.00

8 $5,130.00$570.00

9 $7,729.47$858.83

10 $6,750.00$750.00

11 $10,980.00$1,220.00

Ref #38 511E46501 CLASS C CONCRETE, FOOTING, AS PER PLAN, (29 CY)

Awd $8,358.09$288.21

2 $8,555.00$295.00

3 $8,331.70$287.30

4 $7,830.00$270.00

5 $11,426.00$394.00

6 $15,399.00$531.00

7 $12,325.00$425.00

8 $10,121.00$349.00

9 $12,449.99$429.31

10 $10,150.00$350.00

11 $25,665.00$885.00

100578 - Page 106

Page 107: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #39 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (49 SY)

Awd $1,141.21$23.29

2 $735.00$15.00

3 $1,102.50$22.50

4 $980.00$20.00

5 $1,029.00$21.00

6 $1,715.00$35.00

7 $980.00$20.00

8 $980.00$20.00

9 $1,106.42$22.58

10 $980.00$20.00

11 $980.00$20.00

Ref #40 512E33000 TYPE 2 WATERPROOFING, (98 SY)

Awd $2,383.36$24.32

2 $1,274.00$13.00

3 $2,303.00$23.50

4 $1,470.00$15.00

5 $2,156.00$22.00

6 $1,822.80$18.60

7 $1,666.00$17.00

8 $1,523.90$15.55

9 $1,496.46$15.27

10 $1,666.98$17.01

11 $1,666.00$17.00

Ref #41 512E33010 TYPE 3 WATERPROOFING, (102 SY)

Awd $3,260.94$31.97

2 $2,346.00$23.00

3 $3,150.78$30.89

4 $3,366.00$33.00

5 $2,907.00$28.50

6 $3,039.60$29.80

7 $2,703.00$26.50

8 $2,652.00$26.00

9 $2,857.02$28.01

10 $2,703.00$26.50

11 $2,754.00$27.00

Ref #42 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (54 CY)

Awd $3,380.40$62.60

2 $3,510.00$65.00

3 $5,226.12$96.78

4 $3,456.00$64.00

5 $3,024.00$56.00

6 $5,724.00$106.00

7 $6,480.00$120.00

8 $3,996.00$74.00

9 $4,954.50$91.75

10 $3,240.00$60.00

11 $2,700.00$50.00

100578 - Page 107

Page 108: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #43 603E94800 8' X 4' CONDUIT, TYPE A, 706.05(DESIGN EARTH COVER, (84 FT)

Awd $30,285.36$360.54

2 $33,600.00$400.00

3 $34,226.64$407.46

4 $31,080.00$370.00

5 $34,776.00$414.00

6 $33,516.00$399.00

7 $33,600.00$400.00

8 $38,892.00$463.00

9 $39,995.76$476.14

10 $48,720.00$580.00

11 $41,160.00$490.00

Ref #44 613E41200 LOW STRENGTH MORTAR BACKFILL, (33 CY)

Awd $2,277.00$69.00

2 $3,960.00$120.00

3 $2,523.51$76.47

4 $3,036.00$92.00

5 $2,673.00$81.00

6 $2,458.50$74.50

7 $1,650.00$50.00

8 $3,795.00$115.00

9 $3,538.59$107.23

10 $2,310.00$70.00

11 $2,145.00$65.00

Section 7 - CULVERT STRUCTURE CULVERT NO. HAR-67-185 - Totals

Awd $63,654.45

2 $68,877.50

3 $72,394.27

4 $63,695.40

5 $76,859.00

6 $81,617.90

7 $74,801.00

8 $73,090.88

9 $83,305.57

10 $96,815.98

11 $97,821.50

Ref #45 202E11000 STRUCTURE REMOVED, (LUMP SUM)

Awd $7,383.28$7,383.28

2 $5,500.00$5,500.00

3 $2,799.50$2,799.50

4 $3,280.00$3,280.00

5 $5,250.00$5,250.00

6 $7,000.00$7,000.00

7 $7,000.00$7,000.00

8 $1,673.00$1,673.00

9 $4,410.00$4,410.00

10 $15,000.00$15,000.00

11 $5,000.00$5,000.00

100578 - Page 108

Page 109: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #46 202E20010 HEADWALL REMOVED, (2 EACH)

Awd $342.72$171.36

2 $650.00$325.00

3 $2,799.50$1,399.75

4 $1,500.00$750.00

5 $2,500.00$1,250.00

6 $1,000.00$500.00

7 $600.00$300.00

8 $556.00$278.00

9 $1,470.00$735.00

10 $300.00$150.00

11 $400.00$200.00

Ref #47 509E10000 EPOXY COATED REINFORCING STEEL, (2222 LB)

Awd $1,999.80$0.90

2 $2,777.50$1.25

3 $2,266.44$1.02

4 $2,888.60$1.30

5 $3,333.00$1.50

6 $1,111.00$0.50

7 $3,333.00$1.50

8 $3,355.22$1.51

9 $2,977.48$1.34

10 $4,444.00$2.00

11 $3,888.50$1.75

Ref #48 511E46001 CLASS C CONCRETE, AS PER PLAN, (8 CY)

Awd $2,305.68$288.21

2 $5,000.00$625.00

3 $7,288.96$911.12

4 $4,040.00$505.00

5 $7,104.00$888.00

6 $9,824.00$1,228.00

7 $3,600.00$450.00

8 $5,024.00$628.00

9 $6,954.00$869.25

10 $6,000.00$750.00

11 $11,456.00$1,432.00

Ref #49 511E46501 CLASS C CONCRETE, FOOTING, AS PER PLAN, (27 CY)

Awd $7,781.67$288.21

2 $7,965.00$295.00

3 $8,193.96$303.48

4 $6,750.00$250.00

5 $11,232.00$416.00

6 $14,445.00$535.00

7 $11,475.00$425.00

8 $9,585.00$355.00

9 $11,428.56$423.28

10 $9,450.00$350.00

11 $24,975.00$925.00

100578 - Page 109

Page 110: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #50 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (39 SY)

Awd $908.31$23.29

2 $585.00$15.00

3 $877.50$22.50

4 $975.00$25.00

5 $819.00$21.00

6 $1,365.00$35.00

7 $780.00$20.00

8 $780.00$20.00

9 $950.43$24.37

10 $780.00$20.00

11 $780.00$20.00

Ref #51 512E33000 TYPE 2 WATERPROOFING, (105 SY)

Awd $2,553.60$24.32

2 $1,365.00$13.00

3 $2,467.50$23.50

4 $1,470.00$14.00

5 $2,310.00$22.00

6 $1,953.00$18.60

7 $1,785.00$17.00

8 $1,632.75$15.55

9 $1,673.70$15.94

10 $1,785.00$17.00

11 $1,785.00$17.00

Ref #52 512E33010 TYPE 3 WATERPROOFING, (111 SY)

Awd $3,548.67$31.97

2 $2,553.00$23.00

3 $3,428.79$30.89

4 $3,108.00$28.00

5 $3,163.50$28.50

6 $3,307.80$29.80

7 $2,941.50$26.50

8 $2,886.00$26.00

9 $3,132.42$28.22

10 $2,941.50$26.50

11 $2,997.00$27.00

Ref #53 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (68 CY)

Awd $4,169.08$61.31

2 $4,420.00$65.00

3 $6,016.64$88.48

4 $4,420.00$65.00

5 $3,400.00$50.00

6 $7,208.00$106.00

7 $8,160.00$120.00

8 $5,032.00$74.00

9 $6,188.68$91.01

10 $4,080.00$60.00

11 $4,420.00$65.00

100578 - Page 110

Page 111: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #54 603E93500 6' X 3' CONDUIT, TYPE A, 706.05(DESIGN EARTH COVE, (112 FT)

Awd $29,357.44$262.12

2 $39,200.00$350.00

3 $32,795.84$292.82

4 $29,120.00$260.00

5 $33,712.00$301.00

6 $37,296.00$333.00

7 $24,640.00$220.00

8 $40,992.00$366.00

9 $37,301.60$333.05

10 $48,160.00$430.00

11 $44,800.00$400.00

Ref #55 613E41200 LOW STRENGTH MORTAR BACKFILL, (51 CY)

Awd $3,519.00$69.00

2 $6,120.00$120.00

3 $3,899.97$76.47

4 $4,590.00$90.00

5 $3,417.00$67.00

6 $3,799.50$74.50

7 $2,550.00$50.00

8 $5,865.00$115.00

9 $5,962.41$116.91

10 $3,570.00$70.00

11 $3,315.00$65.00

Section 8 - CULVERT NO. HAR-67-2135 - Totals

Awd $63,869.25

2 $76,135.50

3 $72,834.60

4 $62,141.60

5 $76,240.50

6 $88,309.30

7 $66,864.50

8 $77,380.97

9 $82,449.28

10 $96,510.50

11 $103,816.50

Ref #56 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $2,190.65$2,190.65

2 $4,000.00$4,000.00

3 $8,120.59$8,120.59

4 $4,545.00$4,545.00

5 $3,900.00$3,900.00

6 $4,700.00$4,700.00

7 $4,500.00$4,500.00

8 $2,000.00$2,000.00

9 $3,789.00$3,789.00

10 $6,000.00$6,000.00

11 $8,000.00$8,000.00

100578 - Page 111

Page 112: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #57 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $5,169.30$5,169.30

2 $1,000.00$1,000.00

3 $4,444.44$4,444.44

4 $5,800.00$5,800.00

5 $4,500.00$4,500.00

6 $3,600.00$3,600.00

7 $5,000.00$5,000.00

8 $4,000.00$4,000.00

9 $2,352.00$2,352.00

10 $7,500.00$7,500.00

11 $4,200.00$4,200.00

Ref #58 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)

Awd $6,900.00$2,300.00

2 $2,250.00$750.00

3 $3,191.25$1,063.75

4 $1,500.00$500.00

5 $6,000.00$2,000.00

6 $1,650.00$550.00

7 $900.00$300.00

8 $7,500.00$2,500.00

9 $3,465.00$1,155.00

10 $4,500.00$1,500.00

11 $4,500.00$1,500.00

Ref #59 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)

Awd $1,610.00$1,610.00

2 $5,500.00$5,500.00

3 $1,555.56$1,555.56

4 $3,200.00$3,200.00

5 $2,200.00$2,200.00

6 $2,000.00$2,000.00

7 $3,500.00$3,500.00

8 $2,000.00$2,000.00

9 $3,150.00$3,150.00

10 $3,000.00$3,000.00

11 $5,000.00$5,000.00

Ref #60 624E10000 MOBILIZATION, (LUMP SUM)

Awd $4,025.00$4,025.00

2 $11,795.00$11,795.00

3 $7,099.76$7,099.76

4 $12,185.00$12,185.00

5 $7,600.00$7,600.00

6 $10,500.00$10,500.00

7 $20,000.00$20,000.00

8 $8,600.00$8,600.00

9 $6,300.00$6,300.00

10 $10,000.00$10,000.00

11 $16,000.00$16,000.00

100578 - Page 112

Page 113: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 9 - INCIDENTALS - Totals

Awd $19,894.95

2 $24,545.00

3 $24,411.60

4 $27,230.00

5 $24,200.00

6 $22,450.00

7 $33,900.00

8 $24,100.00

9 $19,056.00

10 $31,000.00

11 $37,700.00

100578 - Page 113

Page 114: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100579

PID 25508

MAH-IR-680-4.29

Non-Federal

Type: BRIDGE REPAIR

Completion Date: 6/20/2013

Award Amount: $12,642,000.00

Contract Awarded To: A P O'HORO COMPANY

Letting Date: 12/2/2010

Engineer's Estimate: $12,510,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

A P O'HORO COMPANY

3130 BELMONT AVE

YOUNGSTOWN, OH 44504

Mahoning

Bidder 1

Bid $12,642,000.00

MARUCCI & GAFFNEY EXCAVATING CO

18 HOGUE ST

YOUNGSTOWN, OH 44502

Mahoning

Bidder 2

Bid $13,193,023.17

J D WILLIAMSON CONSTRUCTION CO INC

441 GENEVA AVE

TALLMADGE, OH 44278

Summit

Bidder 3

Bid $13,679,363.37

RUHLIN COMPANY

P O BOX 190

SHARON CENTER, OH 44274

Medina

Bidder 4

Bid $13,713,783.11

BEAVER EXCAVATING COMPANY

P O BOX 6059

CANTON, OH 44706

Stark

Bidder 5

Bid $13,991,431.49

GREAT LAKES CONSTRUCTION CO

2608 GREAT LAKES WAY

HINCKLEY, OH 44233

Medina

Bidder 6

Bid $14,213,191.76

100579 - Page 114

Page 115: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $20,000.00$20,000.00

2 $36,000.00$36,000.00

3 $30,000.00$30,000.00

4 $20,000.00$20,000.00

5 $30,000.00$30,000.00

6 $10,000.00$10,000.00

Ref #2 202E23000 PAVEMENT REMOVED, (27268 SY)

Awd $231,778.00$8.50

2 $231,778.00$8.50

3 $402,203.00$14.75

4 $354,484.00$13.00

5 $272,680.00$10.00

6 $190,876.00$7.00

Ref #3 202E30000 WALK REMOVED, (1736 SF)

Awd $3,906.00$2.25

2 $2,170.00$1.25

3 $1,302.00$0.75

4 $1,736.00$1.00

5 $3,472.00$2.00

6 $3,472.00$2.00

Ref #4 202E30700 CONCRETE BARRIER REMOVED, (2566 FT)

Awd $35,924.00$14.00

2 $51,320.00$20.00

3 $30,792.00$12.00

4 $25,660.00$10.00

5 $56,452.00$22.00

6 $38,490.00$15.00

Ref #5 202E32000 CURB REMOVED, (207 FT)

Awd $1,242.00$6.00

2 $724.50$3.50

3 $1,138.50$5.50

4 $465.75$2.25

5 $621.00$3.00

6 $621.00$3.00

Ref #6 202E32800 CONCRETE SLOPE PROTECTION REMOVED, (18 SY)

Awd $360.00$20.00

2 $252.00$14.00

3 $360.00$20.00

4 $198.00$11.00

5 $162.00$9.00

6 $900.00$50.00

Ref #7 202E38000 GUARDRAIL REMOVED, (1553 FT)

Awd $1,941.25$1.25

2 $1,553.00$1.00

3 $1,941.25$1.25

4 $1,941.25$1.25

5 $1,941.25$1.25

6 $2,018.90$1.30

100579 - Page 115

Page 116: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #8 202E58200 INLET REMOVED, (1 EACH)

Awd $450.00$450.00

2 $400.00$400.00

3 $250.00$250.00

4 $175.00$175.00

5 $260.00$260.00

6 $3,500.00$3,500.00

Ref #9 202E75801 DISCONNECT EXISTING CIRCUIT, AS PER PLAN, (28 EACH)

Awd $4,200.00$150.00

2 $4,200.00$150.00

3 $4,200.00$150.00

4 $7,980.00$285.00

5 $4,200.00$150.00

6 $4,340.00$155.00

Ref #10 203E10000 EXCAVATION, (733 CY)

Awd $10,995.00$15.00

2 $10,995.00$15.00

3 $10,995.00$15.00

4 $8,796.00$12.00

5 $10,445.25$14.25

6 $14,660.00$20.00

Ref #11 203E20000 EMBANKMENT, (596 CY)

Awd $6,556.00$11.00

2 $8,940.00$15.00

3 $8,940.00$15.00

4 $4,470.00$7.50

5 $9,238.00$15.50

6 $5,960.00$10.00

Ref #12 204E10000 SUBGRADE COMPACTION, (3963 SY)

Awd $6,340.80$1.60

2 $6,935.25$1.75

3 $11,889.00$3.00

4 $5,944.50$1.50

5 $11,889.00$3.00

6 $7,926.00$2.00

Ref #13 204E13000 EXCAVATION OF SUBGRADE, (950 CY)

Awd $19,000.00$20.00

2 $26,600.00$28.00

3 $22,800.00$24.00

4 $14,250.00$15.00

5 $22,325.00$23.50

6 $19,000.00$20.00

Ref #14 204E30010 GRANULAR MATERIAL, TYPE B, (950 CY)

Awd $33,250.00$35.00

2 $23,750.00$25.00

3 $36,575.00$38.50

4 $33,250.00$35.00

5 $26,600.00$28.00

6 $34,200.00$36.00

100579 - Page 116

Page 117: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #15 606E13000 GUARDRAIL, TYPE 5, (1973 FT)

Awd $26,142.25$13.25

2 $26,635.50$13.50

3 $26,142.25$13.25

4 $26,142.25$13.25

5 $26,142.25$13.25

6 $27,030.10$13.70

Ref #16 606E20000 FLARED END SECTION, (1 EACH)

Awd $50.00$50.00

2 $50.00$50.00

3 $50.00$50.00

4 $50.00$50.00

5 $50.00$50.00

6 $52.00$52.00

Ref #17 606E26100 ANCHOR ASSEMBLY, TYPE E, (3 EACH)

Awd $5,625.00$1,875.00

2 $5,550.00$1,850.00

3 $5,340.00$1,780.00

4 $5,625.00$1,875.00

5 $5,625.00$1,875.00

6 $5,790.00$1,930.00

Ref #18 606E26500 ANCHOR ASSEMBLY, TYPE T, (10 EACH)

Awd $6,250.00$625.00

2 $6,500.00$650.00

3 $5,650.00$565.00

4 $6,250.00$625.00

5 $6,250.00$625.00

6 $6,400.00$640.00

Ref #19 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (26 EACH)

Awd $32,500.00$1,250.00

2 $31,200.00$1,200.00

3 $34,450.00$1,325.00

4 $32,500.00$1,250.00

5 $32,500.00$1,250.00

6 $33,540.00$1,290.00

Ref #20 607E35000 FENCE REMOVED AND REBUILT, (310 FT)

Awd $8,866.00$28.60

2 $7,750.00$25.00

3 $8,990.00$29.00

4 $8,866.00$28.60

5 $8,866.00$28.60

6 $8,990.00$29.00

Ref #21 608E10000 4" CONCRETE WALK, (1768 SF)

Awd $7,956.00$4.50

2 $8,840.00$5.00

3 $8,486.40$4.80

4 $7,072.00$4.00

5 $9,724.00$5.50

6 $8,840.00$5.00

100579 - Page 117

Page 118: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #22 621E54000 RAISED PAVEMENT MARKER REMOVED, (367 EACH)

Awd $2,936.00$8.00

2 $2,202.00$6.00

3 $7,340.00$20.00

4 $1,835.00$5.00

5 $2,936.00$8.00

6 $3,670.00$10.00

Ref #23 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, (108 FT)

Awd $8,640.00$80.00

2 $9,720.00$90.00

3 $7,560.00$70.00

4 $4,860.00$45.00

5 $7,938.00$73.50

6 $10,800.00$100.00

Ref #24 622E23401 CONCRETE BARRIER, TYPE B, AS PER PLAN, (2137 FT)

Awd $96,165.00$45.00

2 $128,220.00$60.00

3 $153,864.00$72.00

4 $267,125.00$125.00

5 $106,850.00$50.00

6 $149,590.00$70.00

Ref #25 622E23403 CONCRETE BARRIER, TYPE B, REINFORCED, AS PER PLAN, (85 FT)

Awd $14,025.00$165.00

2 $17,000.00$200.00

3 $10,625.00$125.00

4 $21,250.00$250.00

5 $19,125.00$225.00

6 $14,875.00$175.00

Ref #26 622E25000 CONCRETE BARRIER END SECTION, TYPE D, (2 EACH)

Awd $5,800.00$2,900.00

2 $6,400.00$3,200.00

3 $12,000.00$6,000.00

4 $5,000.00$2,500.00

5 $5,600.00$2,800.00

6 $5,000.00$2,500.00

Ref #27 626E00100 BARRIER REFLECTOR, (130 EACH)

Awd $721.50$5.55

2 $650.00$5.00

3 $520.00$4.00

4 $721.50$5.55

5 $910.00$7.00

6 $741.00$5.70

Ref #28 690E98000 SPECIAL - MISC.:VERTICAL CLEARANCE, (6 EACH)

Awd $1,500.00$250.00

2 $3,000.00$500.00

3 $3,000.00$500.00

4 $1,500.00$250.00

5 $1,500.00$250.00

6 $3,000.00$500.00

100579 - Page 118

Page 119: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 1 - ROADWAY - Totals

Awd $593,119.80

2 $659,335.25

3 $847,403.40

4 $868,147.25

5 $684,301.75

6 $614,282.00

Ref #29 601E21000 CONCRETE SLOPE PROTECTION, (18 SY)

Awd $1,080.00$60.00

2 $3,420.00$190.00

3 $1,800.00$100.00

4 $1,080.00$60.00

5 $1,728.00$96.00

6 $900.00$50.00

Ref #30 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH FABRIC FILTER, (38 CY)

Awd $2,660.00$70.00

2 $2,470.00$65.00

3 $3,040.00$80.00

4 $2,850.00$75.00

5 $4,750.00$125.00

6 $4,370.00$115.00

Ref #31 659E00100 SOIL ANALYSIS TEST, (2 EACH)

Awd $250.00$125.00

2 $20.00$10.00

3 $400.00$200.00

4 $200.00$100.00

5 $200.00$100.00

6 $420.00$210.00

Ref #32 659E00300 TOPSOIL, (186 CY)

Awd $3,720.00$20.00

2 $3,720.00$20.00

3 $11,160.00$60.00

4 $3,720.00$20.00

5 $4,278.00$23.00

6 $5,208.00$28.00

Ref #33 659E10000 SEEDING AND MULCHING, (1677 SY)

Awd $3,354.00$2.00

2 $3,354.00$2.00

3 $1,677.00$1.00

4 $3,354.00$2.00

5 $3,354.00$2.00

6 $1,593.15$0.95

Ref #34 659E14000 REPAIR SEEDING AND MULCHING, (84 SY)

Awd $54.60$0.65

2 $8.40$0.10

3 $168.00$2.00

4 $54.60$0.65

5 $54.60$0.65

6 $176.40$2.10

100579 - Page 119

Page 120: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #35 659E15000 INTER-SEEDING, (84 SY)

Awd $8.40$0.10

2 $8.40$0.10

3 $21.00$0.25

4 $8.40$0.10

5 $8.40$0.10

6 $42.00$0.50

Ref #36 659E20000 COMMERCIAL FERTILIZER, (0.23 TON)

Awd $115.00$500.00

2 $92.00$400.00

3 $230.00$1,000.00

4 $115.00$500.00

5 $115.00$500.00

6 $236.90$1,030.00

Ref #37 659E31000 LIME, (0.35 ACRE)

Awd $35.00$100.00

2 $140.00$400.00

3 $3.50$10.00

4 $35.00$100.00

5 $35.00$100.00

6 $0.19$0.54

Ref #38 659E35000 WATER, (9 MGAL)

Awd $9.00$1.00

2 $9.00$1.00

3 $45.00$5.00

4 $9.00$1.00

5 $9.00$1.00

6 $4.50$0.50

Ref #39 659E40000 MOWING, (4 MSF)

Awd $4.00$1.00

2 $60.00$15.00

3 $20.00$5.00

4 $4.00$1.00

5 $4.00$1.00

6 $2.00$0.50

Ref #40 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $20,000.00$20,000.00

2 $12,000.00$12,000.00

3 $15,000.00$15,000.00

4 $50,000.00$50,000.00

5 $15,000.00$15,000.00

6 $5,000.00$5,000.00

Ref #41 832E30000 EROSION CONTROL, (60000 EACH)

Awd $60,000.00$1.00

2 $60,000.00$1.00

3 $60,000.00$1.00

4 $60,000.00$1.00

5 $60,000.00$1.00

6 $60,000.00$1.00

100579 - Page 120

Page 121: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 2 - EROSION CONTROL - Totals

Awd $91,290.00

2 $85,301.80

3 $93,564.50

4 $121,430.00

5 $89,536.00

6 $77,953.14

Ref #42 511E46600 CLASS C CONCRETE, HEADWALL, (2 CY)

Awd $2,000.00$1,000.00

2 $1,600.00$800.00

3 $3,200.00$1,600.00

4 $2,800.00$1,400.00

5 $2,450.00$1,225.00

6 $2,200.00$1,100.00

Ref #43 603E01500 6" CONDUIT, TYPE F, (64 FT)

Awd $896.00$14.00

2 $896.00$14.00

3 $960.00$15.00

4 $1,408.00$22.00

5 $1,088.00$17.00

6 $1,152.00$18.00

Ref #44 603E04400 12" CONDUIT, TYPE B, (103 FT)

Awd $4,120.00$40.00

2 $4,635.00$45.00

3 $4,944.00$48.00

4 $4,326.00$42.00

5 $3,502.00$34.00

6 $4,223.00$41.00

Ref #45 603E05900 15" CONDUIT, TYPE B, (106 FT)

Awd $4,770.00$45.00

2 $5,088.00$48.00

3 $5,300.00$50.00

4 $4,770.00$45.00

5 $3,710.00$35.00

6 $5,194.00$49.00

Ref #46 603E06100 15" CONDUIT, TYPE C, (55 FT)

Awd $2,200.00$40.00

2 $2,090.00$38.00

3 $2,200.00$40.00

4 $2,750.00$50.00

5 $2,145.00$39.00

6 $2,310.00$42.00

Ref #47 603E06700 15" CONDUIT, TYPE F, (26 FT)

Awd $1,560.00$60.00

2 $2,080.00$80.00

3 $1,170.00$45.00

4 $1,092.00$42.00

5 $715.00$27.50

6 $2,366.00$91.00

100579 - Page 121

Page 122: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #48 604E00800 CATCH BASIN, NO. 3A, (6 EACH)

Awd $8,400.00$1,400.00

2 $10,500.00$1,750.00

3 $8,100.00$1,350.00

4 $9,600.00$1,600.00

5 $12,600.00$2,100.00

6 $12,000.00$2,000.00

Ref #49 604E14601 INLET, NO. 3B, AS PER PLAN, (10 EACH)

Awd $50,000.00$5,000.00

2 $50,000.00$5,000.00

3 $65,750.00$6,575.00

4 $65,000.00$6,500.00

5 $48,000.00$4,800.00

6 $45,000.00$4,500.00

Ref #50 604E31500 MANHOLE, NO. 3, (3 EACH)

Awd $6,000.00$2,000.00

2 $8,100.00$2,700.00

3 $4,500.00$1,500.00

4 $6,600.00$2,200.00

5 $5,400.00$1,800.00

6 $7,500.00$2,500.00

Ref #51 605E05100 4" SHALLOW PIPE UNDERDRAINS, (1000 FT)

Awd $7,500.00$7.50

2 $12,000.00$12.00

3 $4,000.00$4.00

4 $8,000.00$8.00

5 $10,500.00$10.50

6 $10,000.00$10.00

Ref #52 605E11100 6" SHALLOW PIPE UNDERDRAINS, (669 FT)

Awd $5,686.50$8.50

2 $9,366.00$14.00

3 $5,352.00$8.00

4 $6,021.00$9.00

5 $7,024.50$10.50

6 $7,359.00$11.00

Section 3 - DRAINAGE - Totals

Awd $93,132.50

2 $106,355.00

3 $105,476.00

4 $112,367.00

5 $97,134.50

6 $99,304.00

Ref #53 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (93290 SY)

Awd $139,935.00$1.50

2 $139,935.00$1.50

3 $170,720.70$1.83

4 $139,935.00$1.50

5 $139,935.00$1.50

6 $139,935.00$1.50

100579 - Page 122

Page 123: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #54 302E46000 ASPHALT CONCRETE BASE, PG64-22, (61 CY)

Awd $15,250.00$250.00

2 $15,250.00$250.00

3 $16,775.00$275.00

4 $15,250.00$250.00

5 $15,250.00$250.00

6 $15,555.00$255.00

Ref #55 304E20001 AGGREGATE BASE, AS PER PLAN, (733 CY)

Awd $32,985.00$45.00

2 $36,650.00$50.00

3 $28,220.50$38.50

4 $30,053.00$41.00

5 $25,655.00$35.00

6 $36,650.00$50.00

Ref #56 305E13000 9" CONCRETE BASE, (1204 SY)

Awd $54,180.00$45.00

2 $57,792.00$48.00

3 $57,792.00$48.00

4 $66,220.00$55.00

5 $69,230.00$57.50

6 $72,240.00$60.00

Ref #57 407E13900 TACK COAT, 702.13, (87 GAL)

Awd $1,305.00$15.00

2 $435.00$5.00

3 $870.00$10.00

4 $435.00$5.00

5 $435.00$5.00

6 $435.00$5.00

Ref #58 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (55 GAL)

Awd $825.00$15.00

2 $178.75$3.25

3 $550.00$10.00

4 $178.75$3.25

5 $178.75$3.25

6 $165.00$3.00

Ref #59 448E46050 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, PG64, (67 CY)

Awd $16,750.00$250.00

2 $16,750.00$250.00

3 $18,760.00$280.00

4 $16,750.00$250.00

5 $16,750.00$250.00

6 $17,085.00$255.00

Ref #60 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (3864 CY)

Awd $579,600.00$150.00

2 $579,600.00$150.00

3 $637,560.00$165.00

4 $579,600.00$150.00

5 $579,600.00$150.00

6 $579,600.00$150.00

100579 - Page 123

Page 124: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #61 451E30000 SPECIAL - PRESSURE RELIEF JOINT, TYPE A, (650 FT)

Awd $74,750.00$115.00

2 $104,000.00$160.00

3 $71,500.00$110.00

4 $78,000.00$120.00

5 $87,750.00$135.00

6 $84,500.00$130.00

Ref #62 609E14000 CURB, TYPE 2-A, (53 FT)

Awd $954.00$18.00

2 $636.00$12.00

3 $636.00$12.00

4 $530.00$10.00

5 $636.00$12.00

6 $265.00$5.00

Ref #63 609E24510 CURB, TYPE 4-C, (226 FT)

Awd $3,616.00$16.00

2 $4,520.00$20.00

3 $4,520.00$20.00

4 $2,712.00$12.00

5 $5,876.00$26.00

6 $8,814.00$39.00

Ref #401 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (24217 FT)

Awd $8,475.95$0.35

2 $24,217.00$1.00

3 $4,843.40$0.20

4 $4,359.06$0.18

5 $7,991.61$0.33

6 $5,812.08$0.24

Section 4 - PAVEMENT - Totals

Awd $928,625.95

2 $979,963.75

3 $1,012,747.60

4 $934,022.81

5 $949,287.36

6 $961,056.08

Ref #64 625E00500 CONNECTOR KIT, TYPE II, (94 EACH)

Awd $5,640.00$60.00

2 $5,640.00$60.00

3 $5,640.00$60.00

4 $6,063.00$64.50

5 $5,640.00$60.00

6 $5,828.00$62.00

Ref #65 625E14306 MEDIAN LIGHT POLE FOUNDATION, 10' DEEP, (6 EACH)

Awd $12,600.00$2,100.00

2 $9,600.00$1,600.00

3 $9,780.00$1,630.00

4 $15,000.00$2,500.00

5 $13,950.00$2,325.00

6 $16,440.00$2,740.00

100579 - Page 124

Page 125: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #66 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, (3934 FT)

Awd $7,868.00$2.00

2 $7,868.00$2.00

3 $7,868.00$2.00

4 $7,671.30$1.95

5 $7,868.00$2.00

6 $8,261.40$2.10

Ref #67 625E23200 NO. 4 AWG 5000 VOLT DISTRIBUTION CABLE, (19311 FT)

Awd $43,449.75$2.25

2 $43,449.75$2.25

3 $43,449.75$2.25

4 $42,484.20$2.20

5 $43,449.75$2.25

6 $44,415.30$2.30

Ref #68 625E25400 CONDUIT, 2", 725.04, (3533 FT)

Awd $24,731.00$7.00

2 $24,731.00$7.00

3 $25,260.95$7.15

4 $24,731.00$7.00

5 $24,731.00$7.00

6 $25,437.60$7.20

Ref #69 625E25401 CONDUIT, 2", 725.04, AS PER PLAN, (651 FT)

Awd $6,510.00$10.00

2 $6,510.00$10.00

3 $6,672.75$10.25

4 $6,672.75$10.25

5 $6,510.00$10.00

6 $6,705.30$10.30

Ref #70 625E25900 CONDUIT, JACKED OR DRILLED, 2", (787 FT)

Awd $19,675.00$25.00

2 $19,675.00$25.00

3 $20,029.15$25.45

4 $18,769.95$23.85

5 $19,675.00$25.00

6 $20,462.00$26.00

Ref #71 625E25910 CONDUIT CLEANED AND CABLES REMOVED, (862 FT)

Awd $862.00$1.00

2 $862.00$1.00

3 $862.00$1.00

4 $1,896.40$2.20

5 $862.00$1.00

6 $862.00$1.00

Ref #72 625E27561 LUMINAIRE, INSTALLATION ONLY, AS PER PLAN, (8 EACH)

Awd $400.00$50.00

2 $400.00$50.00

3 $400.00$50.00

4 $1,200.00$150.00

5 $400.00$50.00

6 $416.00$52.00

100579 - Page 125

Page 126: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #73 625E29002 TRENCH, 24" DEEP, (2963 FT)

Awd $11,852.00$4.00

2 $11,852.00$4.00

3 $12,000.15$4.05

4 $14,370.55$4.85

5 $11,852.00$4.00

6 $12,148.30$4.10

Ref #74 625E29910 TRANSITION JUNCTION BOX, (5 EACH)

Awd $8,000.00$1,600.00

2 $8,000.00$1,600.00

3 $8,150.00$1,630.00

4 $7,925.00$1,585.00

5 $8,000.00$1,600.00

6 $8,250.00$1,650.00

Ref #75 625E29920 STRUCTURE JUNCTION BOX, (2 EACH)

Awd $3,200.00$1,600.00

2 $3,200.00$1,600.00

3 $3,260.00$1,630.00

4 $3,080.00$1,540.00

5 $3,200.00$1,600.00

6 $3,300.00$1,650.00

Ref #76 625E29940 BARRIER JUNCTION BOX, (17 EACH)

Awd $27,200.00$1,600.00

2 $27,200.00$1,600.00

3 $27,710.00$1,630.00

4 $26,945.00$1,585.00

5 $39,525.00$2,325.00

6 $32,130.00$1,890.00

Ref #77 625E30700 PULL BOX, 725.08, 18", (15 EACH)

Awd $8,250.00$550.00

2 $8,250.00$550.00

3 $8,400.00$560.00

4 $8,250.00$550.00

5 $8,250.00$550.00

6 $8,550.00$570.00

Ref #78 625E31510 PULL BOX REMOVED, (7 EACH)

Awd $1,750.00$250.00

2 $1,750.00$250.00

3 $1,750.00$250.00

4 $1,715.00$245.00

5 $1,750.00$250.00

6 $1,820.00$260.00

Ref #79 625E35001 REERECT EXISTING LIGHT POLE, AS PER PLAN, (6 EACH)

Awd $1,500.00$250.00

2 $1,500.00$250.00

3 $1,500.00$250.00

4 $1,740.00$290.00

5 $1,500.00$250.00

6 $1,560.00$260.00

100579 - Page 126

Page 127: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #80 625E36000 PLASTIC CAUTION TAPE, (2963 FT)

Awd $592.60$0.20

2 $592.60$0.20

3 $740.75$0.25

4 $1,333.35$0.45

5 $592.60$0.20

6 $592.60$0.20

Ref #81 625E39520 PULL BOX CLEANED, (12 EACH)

Awd $1,200.00$100.00

2 $1,200.00$100.00

3 $1,200.00$100.00

4 $2,688.00$224.00

5 $1,200.00$100.00

6 $1,236.00$103.00

Ref #82 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)

Awd $9,000.00$9,000.00

2 $10,000.00$10,000.00

3 $10,000.00$10,000.00

4 $7,093.00$7,093.00

5 $10,000.00$10,000.00

6 $10,300.00$10,300.00

Ref #83 625E40010 SPECIAL - REPLACEMENT OF EXISTING LIGHTING UNIT, (3 EACH)

Awd $3,000.00$1,000.00

2 $3,000.00$1,000.00

3 $3,000.00$1,000.00

4 $2,985.00$995.00

5 $3,000.00$1,000.00

6 $3,090.00$1,030.00

Ref #84 625E75402 LIGHT POLE REMOVED FOR STORAGE, (6 EACH)

Awd $1,500.00$250.00

2 $1,500.00$250.00

3 $1,500.00$250.00

4 $1,350.00$225.00

5 $1,500.00$250.00

6 $1,560.00$260.00

Ref #85 625E75500 LIGHT POLE FOUNDATION REMOVED, (6 EACH)

Awd $1,500.00$250.00

2 $1,500.00$250.00

3 $1,500.00$250.00

4 $1,500.00$250.00

5 $1,500.00$250.00

6 $1,560.00$260.00

Ref #86 625E75508 LUMINAIRE REMOVED FOR REUSE, (8 EACH)

Awd $400.00$50.00

2 $400.00$50.00

3 $400.00$50.00

4 $1,080.00$135.00

5 $400.00$50.00

6 $416.00$52.00

100579 - Page 127

Page 128: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 5 - LIGHTING - Totals

Awd $200,680.35

2 $198,680.35

3 $201,073.50

4 $206,543.50

5 $215,355.35

6 $215,340.50

Ref #87 621E00100 RPM, (367 EACH)

Awd $7,707.00$21.00

2 $10,863.20$29.60

3 $14,680.00$40.00

4 $7,395.05$20.15

5 $7,395.05$20.15

6 $7,707.00$21.00

Ref #88 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (32 FT)

Awd $320.00$10.00

2 $320.00$10.00

3 $320.00$10.00

4 $320.00$10.00

5 $320.00$10.00

6 $329.60$10.30

Ref #89 630E79610 SIGN SUPPORT ASSEMBLY, BARRIER MOUNTED, (5 EACH)

Awd $825.00$165.00

2 $4,250.00$850.00

3 $825.00$165.00

4 $825.00$165.00

5 $1,250.00$250.00

6 $850.00$170.00

Ref #90 630E80100 SIGN, FLAT SHEET, (4 SF)

Awd $75.00$18.75

2 $100.00$25.00

3 $80.00$20.00

4 $75.00$18.75

5 $100.00$25.00

6 $76.00$19.00

Ref #91 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (25 EACH)

Awd $875.00$35.00

2 $2,000.00$80.00

3 $887.50$35.50

4 $875.00$35.00

5 $1,250.00$50.00

6 $900.00$36.00

Ref #92 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT, (19 EACH)

Awd $1,520.00$80.00

2 $2,375.00$125.00

3 $1,520.00$80.00

4 $1,520.00$80.00

5 $475.00$25.00

6 $1,558.00$82.00

100579 - Page 128

Page 129: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #93 646E10000 EDGE LINE, (6.85 MILE)

Awd $17,638.75$2,575.00

2 $21,509.00$3,140.00

3 $19,522.50$2,850.00

4 $19,180.00$2,800.00

5 $19,180.00$2,800.00

6 $19,796.50$2,890.00

Ref #94 646E10100 LANE LINE, (6.19 MILE)

Awd $9,285.00$1,500.00

2 $11,575.30$1,870.00

3 $10,739.65$1,735.00

4 $10,523.00$1,700.00

5 $10,523.00$1,700.00

6 $10,832.50$1,750.00

Ref #95 646E10200 CENTER LINE, (0.12 MILE)

Awd $1,224.00$10,200.00

2 $3,240.00$27,000.00

3 $818.40$6,820.00

4 $802.20$6,685.00

5 $802.20$6,685.00

6 $828.00$6,900.00

Ref #96 646E10300 CHANNELIZING LINE, (5323 FT)

Awd $7,984.50$1.50

2 $9,687.86$1.82

3 $10,113.70$1.90

4 $10,113.70$1.90

5 $10,113.70$1.90

6 $10,646.00$2.00

Ref #97 646E10600 TRANSVERSE/DIAGONAL LINE, (242 FT)

Awd $1,694.00$7.00

2 $2,093.30$8.65

3 $3,206.50$13.25

4 $3,146.00$13.00

5 $3,146.00$13.00

6 $3,211.34$13.27

Section 6 - TRAFFIC CONTROL - Totals

Awd $49,148.25

2 $68,013.66

3 $62,713.25

4 $54,774.95

5 $54,554.95

6 $56,734.94

Ref #98 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (500 HOUR)

Awd $25,000.00$50.00

2 $30,000.00$60.00

3 $22,000.00$44.00

4 $30,000.00$60.00

5 $25,000.00$50.00

6 $30,000.00$60.00

100579 - Page 129

Page 130: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #99 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL, (2 EACH)

Awd $17,000.00$8,500.00

2 $4,000.00$2,000.00

3 $20,000.00$10,000.00

4 $21,000.00$10,500.00

5 $20,000.00$10,000.00

6 $20,600.00$10,300.00

Ref #100 614E11500 WORKSITE TRAFFIC SUPERVISOR, (18 MNTH)

Awd $18,000.00$1,000.00

2 $72,000.00$4,000.00

3 $25,200.00$1,400.00

4 $72,000.00$4,000.00

5 $117,000.00$6,500.00

6 $9,000.00$500.00

Ref #101 614E11620 LINEAR DELINEATION, (17360 FT)

Awd $23,436.00$1.35

2 $34,720.00$2.00

3 $35,588.00$2.05

4 $34,720.00$2.00

5 $34,720.00$2.00

6 $34,720.00$2.00

Ref #102 614E12350 WORK ZONE IMPACT ATTENUATOR, (34 EACH)

Awd $57,800.00$1,700.00

2 $76,500.00$2,250.00

3 $68,000.00$2,000.00

4 $57,630.00$1,695.00

5 $64,600.00$1,900.00

6 $76,500.00$2,250.00

Ref #103 614E12410 SPEED ZONE AHEAD SYMBOL SIGN, (14 EACH)

Awd $1,470.00$105.00

2 $1,680.00$120.00

3 $1,680.00$120.00

4 $1,680.00$120.00

5 $1,470.00$105.00

6 $1,736.00$124.00

Ref #104 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $50,000.00$50,000.00

2 $15,380.00$15,380.00

3 $30,000.00$30,000.00

4 $15,380.00$15,380.00

5 $20,000.00$20,000.00

6 $20,000.00$20,000.00

Ref #105 614E12470 WORK ZONE SPEED LIMIT SIGN, (27 EACH)

Awd $2,835.00$105.00

2 $3,240.00$120.00

3 $3,240.00$120.00

4 $3,240.00$120.00

5 $3,240.00$120.00

6 $3,348.00$124.00

100579 - Page 130

Page 131: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #106 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (47 EACH)

Awd $5,640.00$120.00

2 $7,050.00$150.00

3 $7,050.00$150.00

4 $7,050.00$150.00

5 $7,050.00$150.00

6 $7,285.00$155.00

Ref #107 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM, (3 EACH)

Awd $90,000.00$30,000.00

2 $81,000.00$27,000.00

3 $82,500.00$27,500.00

4 $84,540.00$28,180.00

5 $81,000.00$27,000.00

6 $90,000.00$30,000.00

Ref #108 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN, (5582 EACH)

Awd $16,746.00$3.00

2 $22,328.00$4.00

3 $22,328.00$4.00

4 $22,328.00$4.00

5 $22,328.00$4.00

6 $22,886.20$4.10

Ref #109 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (700 CY)

Awd $70,000.00$100.00

2 $35,000.00$50.00

3 $73,500.00$105.00

4 $105,000.00$150.00

5 $66,129.00$94.47

6 $70,000.00$100.00

Ref #110 614E13300 BARRIER REFLECTOR, TYPE B, (766 EACH)

Awd $2,298.00$3.00

2 $3,830.00$5.00

3 $3,830.00$5.00

4 $3,830.00$5.00

5 $5,362.00$7.00

6 $3,983.20$5.20

Ref #111 614E13350 OBJECT MARKER, ONE WAY, (528 EACH)

Awd $4,488.00$8.50

2 $2,640.00$5.00

3 $2,640.00$5.00

4 $2,640.00$5.00

5 $6,336.00$12.00

6 $2,745.60$5.20

Ref #112 614E13360 OBJECT MARKER, TWO WAY, (238 EACH)

Awd $2,261.00$9.50

2 $1,904.00$8.00

3 $1,904.00$8.00

4 $1,904.00$8.00

5 $2,856.00$12.00

6 $1,951.60$8.20

100579 - Page 131

Page 132: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #113 614E18002 MAINTAINING TRAFFIC, MISC.:TEMPORARY DRAINAGE, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $10,000.00$10,000.00

3 $10,000.00$10,000.00

4 $25,000.00$25,000.00

5 $12,000.00$12,000.00

6 $10,700.00$10,700.00

Ref #114 614E18401 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (2190 DAY)

Awd $43,800.00$20.00

2 $32,850.00$15.00

3 $65,700.00$30.00

4 $43,800.00$20.00

5 $65,700.00$30.00

6 $65,700.00$30.00

Ref #115 614E20001 WORK ZONE LANE LINE, CLASS I, AS PER PLAN, (8.2 MILE)

Awd $3,280.00$400.00

2 $3,690.00$450.00

3 $3,772.00$460.00

4 $3,690.00$450.00

5 $3,690.00$450.00

6 $3,772.00$460.00

Ref #116 614E21000 WORK ZONE CENTER LINE, CLASS I, (0.1 MILE)

Awd $500.00$5,000.00

2 $80.00$800.00

3 $81.50$815.00

4 $80.00$800.00

5 $80.00$800.00

6 $82.00$820.00

Ref #117 614E22000 WORK ZONE EDGE LINE, CLASS I, (0.4 MILE)

Awd $2,000.00$5,000.00

2 $280.00$700.00

3 $286.00$715.00

4 $280.00$700.00

5 $280.00$700.00

6 $288.00$720.00

Ref #118 614E22001 WORK ZONE EDGE LINE, CLASS I, AS PER PLAN, (33.54 MILE)

Awd $18,447.00$550.00

2 $23,478.00$700.00

3 $23,981.10$715.00

4 $23,478.00$700.00

5 $23,478.00$700.00

6 $24,148.80$720.00

Ref #119 614E23001 WORK ZONE CHANNELIZING LINE, CLASS I, AS PER PLAN, (75602 FT)

Awd $41,581.10$0.55

2 $37,801.00$0.50

3 $37,801.00$0.50

4 $37,801.00$0.50

5 $37,801.00$0.50

6 $37,801.00$0.50

100579 - Page 132

Page 133: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #120 614E24001 WORK ZONE DOTTED LINE, CLASS I, AS PER PLAN, (6909 FT)

Awd $3,109.05$0.45

2 $6,909.00$1.00

3 $6,909.00$1.00

4 $6,909.00$1.00

5 $6,909.00$1.00

6 $6,909.00$1.00

Ref #121 614E26000 WORK ZONE STOP LINE, CLASS I, (24 FT)

Awd $96.00$4.00

2 $72.00$3.00

3 $72.00$3.00

4 $72.00$3.00

5 $72.00$3.00

6 $74.40$3.10

Ref #122 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER , (28715 SY)

Awd $1,722,900.00$60.00

2 $1,722,900.00$60.00

3 $1,737,257.50$60.50

4 $1,866,475.00$65.00

5 $1,780,330.00$62.00

6 $1,579,325.00$55.00

Ref #123 616E10000 WATER, (50 MGAL)

Awd $1,250.00$25.00

2 $50.00$1.00

3 $250.00$5.00

4 $1,500.00$30.00

5 $3,500.00$70.00

6 $3,000.00$60.00

Ref #124 622E40020 PORTABLE CONCRETE BARRIER, 32", (24020 FT)

Awd $132,110.00$5.50

2 $235,396.00$9.80

3 $224,587.00$9.35

4 $168,140.00$7.00

5 $168,140.00$7.00

6 $240,200.00$10.00

Ref #125 622E40031 PORTABLE CONCRETE BARRIER, 50", AS PER PLAN, (12330 FT)

Awd $73,980.00$6.00

2 $120,834.00$9.80

3 $177,552.00$14.40

4 $147,960.00$12.00

5 $129,465.00$10.50

6 $197,280.00$16.00

Ref #126 622E40040 PORTABLE CONCRETE BARRIER, 32", BRIDGE MOUNTED, (380 FT)

Awd $4,560.00$12.00

2 $3,724.00$9.80

3 $5,130.00$13.50

4 $5,700.00$15.00

5 $5,958.40$15.68

6 $7,600.00$20.00

100579 - Page 133

Page 134: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #127 690E13000 SPECIAL - RUMBLE STRIPS, (756 FT)

Awd $27,216.00$36.00

2 $3,591.00$4.75

3 $27,216.00$36.00

4 $6,048.00$8.00

5 $249.48$0.33

6 $3,477.60$4.60

Ref #400 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $300,000.00$300,000.00

2 $300,000.00$300,000.00

3 $260,000.00$260,000.00

4 $250,000.00$250,000.00

5 $210,000.00$210,000.00

6 $350,000.00$350,000.00

Section 7 - MAINTENANCE OF TRAFFIC - Totals

Awd $2,771,803.15

2 $2,892,927.00

3 $2,980,055.10

4 $3,049,875.00

5 $2,924,743.88

6 $2,925,113.40

Ref #128 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $125,000.00$125,000.00

2 $98,000.00$98,000.00

3 $110,000.00$110,000.00

4 $75,000.00$75,000.00

5 $120,000.00$120,000.00

6 $185,000.00$185,000.00

Ref #129 202E22900 APPROACH SLAB REMOVED, (89 SY)

Awd $1,513.00$17.00

2 $1,602.00$18.00

3 $1,958.00$22.00

4 $1,958.00$22.00

5 $2,670.00$30.00

6 $2,670.00$30.00

Ref #130 202E23500 WEARING COURSE REMOVED(FROM APPRACH SLABS), (89 SY)

Awd $267.00$3.00

2 $267.00$3.00

3 $801.00$9.00

4 $178.00$2.00

5 $801.00$9.00

6 $890.00$10.00

Ref #131 503E21100 UNCLASSIFIED EXCAVATION, (74 CY)

Awd $11,100.00$150.00

2 $3,774.00$51.00

3 $4,440.00$60.00

4 $18,500.00$250.00

5 $7,104.00$96.00

6 $4,070.00$55.00

100579 - Page 134

Page 135: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #132 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (88057 LB)

Awd $72,206.74$0.82

2 $72,206.74$0.82

3 $79,251.30$0.90

4 $83,654.15$0.95

5 $73,087.31$0.83

6 $88,057.00$1.00

Ref #133 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (422 EACH)

Awd $4,220.00$10.00

2 $5,064.00$12.00

3 $6,752.00$16.00

4 $6,330.00$15.00

5 $8,018.00$19.00

6 $8,440.00$20.00

Ref #134 511E43200 CLASS C CONCRETE, PIER, (22 CY)

Awd $12,100.00$550.00

2 $16,500.00$750.00

3 $21,120.00$960.00

4 $18,700.00$850.00

5 $18,150.00$825.00

6 $24,420.00$1,110.00

Ref #135 511E45700 CLASS C CONCRETE, ABUTMENT, (49 CY)

Awd $19,600.00$400.00

2 $20,090.00$410.00

3 $35,035.00$715.00

4 $31,850.00$650.00

5 $23,520.00$480.00

6 $43,610.00$890.00

Ref #136 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (95 CY)

Awd $30,875.00$325.00

2 $33,060.00$348.00

3 $48,450.00$510.00

4 $38,000.00$400.00

5 $38,000.00$400.00

6 $38,950.00$410.00

Ref #137 511E51001 CLASS HP CONCRETE, SUPERSTRUCTURE, AS PER PLAN, (274 CY)

Awd $104,120.00$380.00

2 $126,040.00$460.00

3 $117,820.00$430.00

4 $123,300.00$450.00

5 $158,920.00$580.00

6 $153,440.00$560.00

Ref #138 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $300.00$300.00

2 $300.00$300.00

3 $1,000.00$1,000.00

4 $500.00$500.00

5 $550.00$550.00

6 $500.00$500.00

100579 - Page 135

Page 136: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #139 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1014 SY)

Awd $13,182.00$13.00

2 $15,210.00$15.00

3 $13,435.50$13.25

4 $13,182.00$13.00

5 $13,182.00$13.00

6 $15,210.00$15.00

Ref #140 512E44400 TYPE B WATERPROOFING, (5 SY)

Awd $400.00$80.00

2 $175.00$35.00

3 $100.00$20.00

4 $300.00$60.00

5 $200.00$40.00

6 $250.00$50.00

Ref #141 513E10201 STRUCTURAL STEEL MEMBERS, LEVEL UF, AS PER PLAN, (70 LB)

Awd $1,809.50$25.85

2 $2,030.00$29.00

3 $2,100.00$30.00

4 $4,550.00$65.00

5 $1,815.10$25.93

6 $1,750.00$25.00

Ref #142 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2, (8333 LB)

Awd $18,332.60$2.20

2 $16,666.00$2.00

3 $22,915.75$2.75

4 $20,832.50$2.50

5 $18,499.26$2.22

6 $17,499.30$2.10

Ref #143 513E10241 STRUCTURAL STEEL MEMBERS, LEVEL 2, AS PER PLAN, (616 LB)

Awd $3,911.60$6.35

2 $3,757.60$6.10

3 $5,544.00$9.00

4 $3,388.00$5.50

5 $3,942.40$6.40

6 $3,264.80$5.30

Ref #144 513E20000 WELDED STUD SHEAR CONNECTORS, (3270 EACH)

Awd $8,992.50$2.75

2 $8,829.00$2.70

3 $8,829.00$2.70

4 $8,829.00$2.70

5 $9,156.00$2.80

6 $9,156.00$2.80

Ref #145 513E95000 STRUCTURAL STEEL, MISC.:REPAIR OF DAMAGED MAIN MEM, (4 FT)

Awd $640.00$160.00

2 $640.00$160.00

3 $1,100.00$275.00

4 $3,500.00$875.00

5 $2,640.00$660.00

6 $660.00$165.00

100579 - Page 136

Page 137: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #146 513E95030 STRUCTURAL STEEL, MISC.:REPAIR OF DAMAGED MEMBERS,, (2 EACH)

Awd $100.00$50.00

2 $100.00$50.00

3 $1,150.00$575.00

4 $1,650.00$825.00

5 $100.00$50.00

6 $120.00$60.00

Ref #147 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (12670 SF)

Awd $76,020.00$6.00

2 $87,423.00$6.90

3 $76,020.00$6.00

4 $76,020.00$6.00

5 $101,360.00$8.00

6 $78,554.00$6.20

Ref #148 514E00056 FIELD PAINTING OF EXISTING STRUCTURAL STEEL, PRIM, (12670 SF)

Awd $25,340.00$2.00

2 $36,109.50$2.85

3 $31,675.00$2.50

4 $31,675.00$2.50

5 $28,507.50$2.25

6 $32,942.00$2.60

Ref #149 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (13133 SF)

Awd $26,266.00$2.00

2 $37,429.05$2.85

3 $32,832.50$2.50

4 $32,832.50$2.50

5 $29,549.25$2.25

6 $34,145.80$2.60

Ref #150 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (13133 SF)

Awd $26,266.00$2.00

2 $30,205.90$2.30

3 $26,266.00$2.00

4 $26,266.00$2.00

5 $29,549.25$2.25

6 $27,579.30$2.10

Ref #151 514E00504 GRINDING FINS, TEARS, SLIVERS ON EXISTING STRUCTUR, (22 MNHR)

Awd $2,200.00$100.00

2 $2,530.00$115.00

3 $2,200.00$100.00

4 $2,200.00$100.00

5 $2,640.00$120.00

6 $2,200.00$100.00

Ref #152 514E10000 FINAL INSPECTION REPAIR, (13 EACH)

Awd $3,900.00$300.00

2 $5,200.00$400.00

3 $4,550.00$350.00

4 $4,550.00$350.00

5 $4,550.00$350.00

6 $4,680.00$360.00

100579 - Page 137

Page 138: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #153 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (195 SF)

Awd $780.00$4.00

2 $1,560.00$8.00

3 $1,267.50$6.50

4 $1,267.50$6.50

5 $1,072.50$5.50

6 $2,340.00$12.00

Ref #154 516E14021 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PE, (68 FT)

Awd $1,360.00$20.00

2 $1,496.00$22.00

3 $3,400.00$50.00

4 $1,632.00$24.00

5 $1,632.00$24.00

6 $3,400.00$50.00

Ref #155 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (5 EACH)

Awd $4,500.00$900.00

2 $4,160.00$832.00

3 $4,350.00$870.00

4 $6,250.00$1,250.00

5 $5,000.00$1,000.00

6 $5,000.00$1,000.00

Ref #156 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (5 EACH)

Awd $5,500.00$1,100.00

2 $4,990.00$998.00

3 $5,225.00$1,045.00

4 $6,625.00$1,325.00

5 $5,750.00$1,150.00

6 $5,500.00$1,100.00

Ref #157 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (15 EACH)

Awd $9,750.00$650.00

2 $9,255.00$617.00

3 $9,675.00$645.00

4 $13,125.00$875.00

5 $9,750.00$650.00

6 $9,750.00$650.00

Ref #158 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $28,000.00$28,000.00

2 $20,000.00$20,000.00

3 $22,500.00$22,500.00

4 $30,000.00$30,000.00

5 $25,000.00$25,000.00

6 $75,000.00$75,000.00

Ref #159 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (69 CY)

Awd $3,795.00$55.00

2 $3,450.00$50.00

3 $4,140.00$60.00

4 $4,140.00$60.00

5 $4,140.00$60.00

6 $3,450.00$50.00

100579 - Page 138

Page 139: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #160 518E40001 6" PERFORATED CORRUGATED PLASTIC PIPE, AS PER PLAN, (90 FT)

Awd $450.00$5.00

2 $720.00$8.00

3 $1,305.00$14.50

4 $1,080.00$12.00

5 $900.00$10.00

6 $900.00$10.00

Ref #161 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (60 FT)

Awd $420.00$7.00

2 $480.00$8.00

3 $870.00$14.50

4 $1,080.00$18.00

5 $600.00$10.00

6 $1,200.00$20.00

Ref #162 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (134 SF)

Awd $9,380.00$70.00

2 $8,710.00$65.00

3 $9,112.00$68.00

4 $8,710.00$65.00

5 $8,040.00$60.00

6 $8,040.00$60.00

Ref #163 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER, (134 SY)

Awd $20,770.00$155.00

2 $22,110.00$165.00

3 $25,460.00$190.00

4 $22,780.00$170.00

5 $28,810.00$215.00

6 $26,800.00$200.00

Ref #164 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (520 FT)

Awd $24,050.00$46.25

2 $28,600.00$55.00

3 $20,800.00$40.00

4 $20,670.00$39.75

5 $20,800.00$40.00

6 $21,320.00$41.00

Section 8 - STRUCTURE REPAIR BRIDGE NO. MAH-680-0429 - Totals

Awd $697,416.94

2 $728,739.79

3 $763,449.55

4 $745,104.65

5 $808,005.57

6 $940,758.20

Ref #165 513E95030 STRUCTURAL STEEL, MISC.:STOP DRILLING WEB CRACKS, (8 EACH)

Awd $8,000.00$1,000.00

2 $8,000.00$1,000.00

3 $14,000.00$1,750.00

4 $20,000.00$2,500.00

5 $17,600.00$2,200.00

6 $9,920.00$1,240.00

100579 - Page 139

Page 140: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #166 514E27700 FIELD PAINTING, MISC.:REPAIR PAINTING, (250 SF)

Awd $12,500.00$50.00

2 $8,625.00$34.50

3 $7,500.00$30.00

4 $7,500.00$30.00

5 $37,500.00$150.00

6 $7,750.00$31.00

Section 9 - BRIDGE NO. MAH-680-0476 - Totals

Awd $20,500.00

2 $16,625.00

3 $21,500.00

4 $27,500.00

5 $55,100.00

6 $17,670.00

Ref #167 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $150,000.00$150,000.00

2 $84,025.00$84,025.00

3 $135,000.00$135,000.00

4 $100,000.00$100,000.00

5 $100,000.00$100,000.00

6 $185,000.00$185,000.00

Ref #168 202E22900 APPROACH SLAB REMOVED, (413 SY)

Awd $6,195.00$15.00

2 $7,434.00$18.00

3 $9,086.00$22.00

4 $9,086.00$22.00

5 $12,390.00$30.00

6 $12,390.00$30.00

Ref #169 202E23500 WEARING COURSE REMOVED, (413 SY)

Awd $826.00$2.00

2 $1,239.00$3.00

3 $3,200.75$7.75

4 $826.00$2.00

5 $2,478.00$6.00

6 $4,130.00$10.00

Ref #170 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $8,000.00$8,000.00

2 $24,000.00$24,000.00

3 $6,000.00$6,000.00

4 $10,000.00$10,000.00

5 $35,000.00$35,000.00

6 $55,000.00$55,000.00

Ref #171 503E21100 UNCLASSIFIED EXCAVATION, (174 CY)

Awd $5,742.00$33.00

2 $8,874.00$51.00

3 $10,440.00$60.00

4 $11,310.00$65.00

5 $16,530.00$95.00

6 $8,700.00$50.00

100579 - Page 140

Page 141: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #172 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (90779 LB)

Awd $74,438.78$0.82

2 $75,346.57$0.83

3 $81,701.10$0.90

4 $86,240.05$0.95

5 $75,346.57$0.83

6 $90,779.00$1.00

Ref #173 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (446 EACH)

Awd $4,460.00$10.00

2 $5,352.00$12.00

3 $7,136.00$16.00

4 $6,690.00$15.00

5 $8,474.00$19.00

6 $8,920.00$20.00

Ref #174 511E45700 CLASS C CONCRETE, ABUTMENT, (46 CY)

Awd $17,250.00$375.00

2 $18,860.00$410.00

3 $29,900.00$650.00

4 $29,900.00$650.00

5 $24,840.00$540.00

6 $40,940.00$890.00

Ref #175 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (269 CY)

Awd $118,360.00$440.00

2 $123,740.00$460.00

3 $121,050.00$450.00

4 $127,775.00$475.00

5 $189,645.00$705.00

6 $150,640.00$560.00

Ref #176 511E51501 CLASS HP CONCRETE, SIDEWALK, AS PER PLAN, (52 CY)

Awd $13,520.00$260.00

2 $17,680.00$340.00

3 $12,220.00$235.00

4 $13,000.00$250.00

5 $14,040.00$270.00

6 $17,680.00$340.00

Ref #177 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $300.00$300.00

2 $300.00$300.00

3 $1,000.00$1,000.00

4 $500.00$500.00

5 $550.00$550.00

6 $500.00$500.00

Ref #178 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1354 SY)

Awd $17,602.00$13.00

2 $20,310.00$15.00

3 $20,310.00$15.00

4 $17,602.00$13.00

5 $17,602.00$13.00

6 $20,310.00$15.00

100579 - Page 141

Page 142: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #179 512E10300 SEALING CONCRETE BRIDGE DECKS WITH HMWM RESIN, (33 SY)

Awd $660.00$20.00

2 $363.00$11.00

3 $660.00$20.00

4 $825.00$25.00

5 $990.00$30.00

6 $561.00$17.00

Ref #180 512E33000 TYPE 2 WATERPROOFING, (3 SY)

Awd $300.00$100.00

2 $45.00$15.00

3 $60.00$20.00

4 $75.00$25.00

5 $75.00$25.00

6 $114.00$38.00

Ref #181 513E20000 WELDED STUD SHEAR CONNECTORS, (3879 EACH)

Awd $10,667.25$2.75

2 $10,473.30$2.70

3 $10,473.30$2.70

4 $10,473.30$2.70

5 $10,861.20$2.80

6 $10,861.20$2.80

Ref #182 514E00050 SURFACE PREPARATION OF EXISTING STRUCTURAL STEEL, (2066 SF)

Awd $18,594.00$9.00

2 $35,638.50$17.25

3 $30,990.00$15.00

4 $30,990.00$15.00

5 $46,485.00$22.50

6 $30,990.00$15.00

Ref #183 514E10000 FINAL INSPECTION REPAIR, (1 EACH)

Awd $300.00$300.00

2 $570.00$570.00

3 $500.00$500.00

4 $500.00$500.00

5 $500.00$500.00

6 $520.00$520.00

Ref #184 514E27700 FIELD PAINTING, MISC.:REPAIR PAINTING, (2066 SF)

Awd $18,594.00$9.00

2 $11,879.50$5.75

3 $10,330.00$5.00

4 $10,330.00$5.00

5 $46,485.00$22.50

6 $10,743.20$5.20

Ref #185 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (171 FT)

Awd $68,400.00$400.00

2 $60,363.00$353.00

3 $62,415.00$365.00

4 $58,140.00$340.00

5 $59,850.00$350.00

6 $68,400.00$400.00

100579 - Page 142

Page 143: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #186 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)

Awd $7,800.00$650.00

2 $7,104.00$592.00

3 $7,440.00$620.00

4 $10,200.00$850.00

5 $7,500.00$625.00

6 $9,600.00$800.00

Ref #187 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (8 EACH)

Awd $4,800.00$600.00

2 $4,328.00$541.00

3 $4,520.00$565.00

4 $6,200.00$775.00

5 $4,800.00$600.00

6 $7,200.00$900.00

Ref #188 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $12,000.00$12,000.00

2 $8,000.00$8,000.00

3 $10,500.00$10,500.00

4 $30,000.00$30,000.00

5 $10,000.00$10,000.00

6 $35,000.00$35,000.00

Ref #189 517E75125 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI, (299 FT)

Awd $43,355.00$145.00

2 $37,375.00$125.00

3 $40,365.00$135.00

4 $37,375.00$125.00

5 $43,355.00$145.00

6 $56,810.00$190.00

Ref #190 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (64 CY)

Awd $3,840.00$60.00

2 $3,200.00$50.00

3 $3,840.00$60.00

4 $3,840.00$60.00

5 $4,288.00$67.00

6 $3,200.00$50.00

Ref #191 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (172 FT)

Awd $860.00$5.00

2 $1,376.00$8.00

3 $2,408.00$14.00

4 $2,064.00$12.00

5 $1,892.00$11.00

6 $1,720.00$10.00

Ref #192 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (74 FT)

Awd $518.00$7.00

2 $592.00$8.00

3 $1,036.00$14.00

4 $1,332.00$18.00

5 $814.00$11.00

6 $1,480.00$20.00

100579 - Page 143

Page 144: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #193 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (208 SF)

Awd $14,560.00$70.00

2 $13,520.00$65.00

3 $14,144.00$68.00

4 $12,480.00$60.00

5 $12,480.00$60.00

6 $12,480.00$60.00

Ref #194 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER, (325 SY)

Awd $56,875.00$175.00

2 $53,625.00$165.00

3 $65,000.00$200.00

4 $55,250.00$170.00

5 $66,625.00$205.00

6 $65,000.00$200.00

Ref #195 607E39930 VANDAL PROTECTION FENCE, 12' CURVED, COATED FABRIC, (265 FT)

Awd $27,825.00$105.00

2 $33,125.00$125.00

3 $26,500.00$100.00

4 $26,102.50$98.50

5 $26,102.50$98.50

6 $26,500.00$100.00

Ref #196 625E10614 LIGHT POLE ANCHOR BOLTS ON STRUCTURE, (8 EACH)

Awd $800.00$100.00

2 $800.00$100.00

3 $800.00$100.00

4 $800.00$100.00

5 $800.00$100.00

6 $800.00$100.00

Ref #197 625E25400 CONDUIT, 2", 725.04, (417 FT)

Awd $2,919.00$7.00

2 $2,919.00$7.00

3 $2,981.55$7.15

4 $4,232.55$10.15

5 $2,919.00$7.00

6 $2,919.00$7.00

Ref #198 625E29920 STRUCTURE JUNCTION BOX, (2 EACH)

Awd $3,200.00$1,600.00

2 $3,200.00$1,600.00

3 $3,300.00$1,650.00

4 $3,170.00$1,585.00

5 $3,200.00$1,600.00

6 $3,300.00$1,650.00

Ref #199 625E30700 PULL BOX, 725.08, 18", (4 EACH)

Awd $2,200.00$550.00

2 $2,200.00$550.00

3 $2,240.00$560.00

4 $2,200.00$550.00

5 $2,200.00$550.00

6 $2,280.00$570.00

100579 - Page 144

Page 145: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 10 - BRIDGE NO. MAH-680-0594 - Totals

Awd $715,761.03

2 $677,856.87

3 $737,546.70

4 $719,508.40

5 $849,117.27

6 $945,467.40

Ref #200 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $285,000.00$285,000.00

2 $207,900.00$207,900.00

3 $200,000.00$200,000.00

4 $130,000.00$130,000.00

5 $260,000.00$260,000.00

6 $150,000.00$150,000.00

Ref #201 202E22900 APPROACH SLAB REMOVED, (267 SY)

Awd $4,005.00$15.00

2 $4,806.00$18.00

3 $5,874.00$22.00

4 $5,874.00$22.00

5 $8,010.00$30.00

6 $8,010.00$30.00

Ref #202 202E23500 WEARING COURSE REMOVED, (267 SY)

Awd $534.00$2.00

2 $801.00$3.00

3 $2,136.00$8.00

4 $534.00$2.00

5 $2,403.00$9.00

6 $2,670.00$10.00

Ref #203 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $12,000.00$12,000.00

2 $36,000.00$36,000.00

3 $10,000.00$10,000.00

4 $7,500.00$7,500.00

5 $45,000.00$45,000.00

6 $50,000.00$50,000.00

Ref #204 503E21100 UNCLASSIFIED EXCAVATION, (350 CY)

Awd $12,250.00$35.00

2 $15,750.00$45.00

3 $21,000.00$60.00

4 $22,750.00$65.00

5 $23,450.00$67.00

6 $17,500.00$50.00

Ref #205 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (249289 LB)

Awd $204,416.98$0.82

2 $204,416.98$0.82

3 $224,360.10$0.90

4 $236,824.55$0.95

5 $206,909.87$0.83

6 $249,289.00$1.00

100579 - Page 145

Page 146: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #206 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (650 LB)

Awd $487.50$0.75

2 $650.00$1.00

3 $1,300.00$2.00

4 $1,625.00$2.50

5 $650.00$1.00

6 $650.00$1.00

Ref #207 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (1276 EACH)

Awd $12,760.00$10.00

2 $15,312.00$12.00

3 $20,416.00$16.00

4 $19,140.00$15.00

5 $24,244.00$19.00

6 $25,520.00$20.00

Ref #208 511E43200 CLASS C CONCRETE, PIER, (158 CY)

Awd $79,000.00$500.00

2 $109,020.00$690.00

3 $113,760.00$720.00

4 $86,900.00$550.00

5 $63,990.00$405.00

6 $96,380.00$610.00

Ref #209 511E45700 CLASS C CONCRETE, ABUTMENT, (113 CY)

Awd $45,200.00$400.00

2 $46,330.00$410.00

3 $65,540.00$580.00

4 $73,450.00$650.00

5 $64,975.00$575.00

6 $100,570.00$890.00

Ref #210 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (556 CY)

Awd $222,400.00$400.00

2 $255,760.00$460.00

3 $216,840.00$390.00

4 $250,200.00$450.00

5 $341,940.00$615.00

6 $311,360.00$560.00

Ref #211 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (135 CY)

Awd $45,225.00$335.00

2 $54,810.00$406.00

3 $60,750.00$450.00

4 $54,000.00$400.00

5 $54,675.00$405.00

6 $55,350.00$410.00

Ref #212 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $300.00$300.00

2 $300.00$300.00

3 $1,000.00$1,000.00

4 $500.00$500.00

5 $550.00$550.00

6 $500.00$500.00

100579 - Page 146

Page 147: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #213 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1794 SY)

Awd $23,322.00$13.00

2 $26,910.00$15.00

3 $23,770.50$13.25

4 $23,322.00$13.00

5 $23,322.00$13.00

6 $26,910.00$15.00

Ref #214 512E33000 TYPE 2 WATERPROOFING, (57 SY)

Awd $2,280.00$40.00

2 $1,710.00$30.00

3 $1,140.00$20.00

4 $1,425.00$25.00

5 $1,425.00$25.00

6 $2,280.00$40.00

Ref #215 513E10300 STRUCTURAL STEEL MEMBERS, LEVEL 5, (439600 LB)

Awd $633,024.00$1.44

2 $720,944.00$1.64

3 $668,192.00$1.52

4 $769,300.00$1.75

5 $650,608.00$1.48

6 $769,300.00$1.75

Ref #216 513E20000 WELDED STUD SHEAR CONNECTORS, (8916 EACH)

Awd $24,519.00$2.75

2 $24,073.20$2.70

3 $24,073.20$2.70

4 $24,073.20$2.70

5 $24,964.80$2.80

6 $24,964.80$2.80

Ref #217 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (5160 SF)

Awd $18,060.00$3.50

2 $13,674.00$2.65

3 $11,868.00$2.30

4 $11,868.00$2.30

5 $36,120.00$7.00

6 $12,384.00$2.40

Ref #218 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (5160 SF)

Awd $18,060.00$3.50

2 $13,674.00$2.65

3 $11,868.00$2.30

4 $11,868.00$2.30

5 $36,120.00$7.00

6 $12,384.00$2.40

Ref #219 514E10000 FINAL INSPECTION REPAIR, (5 EACH)

Awd $5.00$1.00

2 $2,000.00$400.00

3 $1,750.00$350.00

4 $1,750.00$350.00

5 $1,000.00$200.00

6 $1,800.00$360.00

100579 - Page 147

Page 148: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #220 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (279 FT)

Awd $94,860.00$340.00

2 $96,813.00$347.00

3 $92,070.00$330.00

4 $94,860.00$340.00

5 $89,280.00$320.00

6 $111,600.00$400.00

Ref #221 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (2 EACH)

Awd $1,200.00$600.00

2 $1,092.00$546.00

3 $1,140.00$570.00

4 $1,600.00$800.00

5 $1,200.00$600.00

6 $1,400.00$700.00

Ref #222 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (7 EACH)

Awd $4,025.00$575.00

2 $3,640.00$520.00

3 $3,815.00$545.00

4 $5,425.00$775.00

5 $4,200.00$600.00

6 $4,200.00$600.00

Ref #223 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (2 EACH)

Awd $1,600.00$800.00

2 $1,470.00$735.00

3 $1,540.00$770.00

4 $2,300.00$1,150.00

5 $1,600.00$800.00

6 $1,600.00$800.00

Ref #224 516E44201 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (9 EACH)

Awd $7,650.00$850.00

2 $7,272.00$808.00

3 $7,605.00$845.00

4 $11,250.00$1,250.00

5 $8,100.00$900.00

6 $8,100.00$900.00

Ref #225 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (2 EACH)

Awd $1,200.00$600.00

2 $1,128.00$564.00

3 $1,180.00$590.00

4 $1,650.00$825.00

5 $1,300.00$650.00

6 $1,200.00$600.00

Ref #226 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (9 EACH)

Awd $8,550.00$950.00

2 $8,316.00$924.00

3 $8,685.00$965.00

4 $11,700.00$1,300.00

5 $9,000.00$1,000.00

6 $9,000.00$1,000.00

100579 - Page 148

Page 149: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #227 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (2 EACH)

Awd $1,700.00$850.00

2 $1,616.00$808.00

3 $1,700.00$850.00

4 $2,300.00$1,150.00

5 $1,700.00$850.00

6 $1,800.00$900.00

Ref #228 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (2 EACH)

Awd $2,400.00$1,200.00

2 $2,354.00$1,177.00

3 $2,470.00$1,235.00

4 $3,450.00$1,725.00

5 $2,500.00$1,250.00

6 $2,600.00$1,300.00

Ref #229 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (9 EACH)

Awd $10,800.00$1,200.00

2 $10,260.00$1,140.00

3 $10,485.00$1,165.00

4 $14,850.00$1,650.00

5 $10,800.00$1,200.00

6 $10,800.00$1,200.00

Ref #230 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $35,000.00$35,000.00

2 $24,000.00$24,000.00

3 $26,500.00$26,500.00

4 $50,000.00$50,000.00

5 $26,000.00$26,000.00

6 $50,000.00$50,000.00

Ref #231 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (140 CY)

Awd $7,700.00$55.00

2 $7,000.00$50.00

3 $8,400.00$60.00

4 $7,700.00$55.00

5 $9,100.00$65.00

6 $7,000.00$50.00

Ref #232 518E40001 6" PERFORATED CORRUGATED PLASTIC PIPE, AS PER PLAN, (335 FT)

Awd $1,675.00$5.00

2 $2,680.00$8.00

3 $4,690.00$14.00

4 $4,020.00$12.00

5 $3,350.00$10.00

6 $3,350.00$10.00

Ref #233 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (65 FT)

Awd $455.00$7.00

2 $520.00$8.00

3 $910.00$14.00

4 $1,170.00$18.00

5 $650.00$10.00

6 $1,300.00$20.00

100579 - Page 149

Page 150: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #234 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (87 SF)

Awd $6,090.00$70.00

2 $5,655.00$65.00

3 $5,916.00$68.00

4 $5,655.00$65.00

5 $5,220.00$60.00

6 $5,220.00$60.00

Ref #235 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (463 SY)

Awd $78,710.00$170.00

2 $81,025.00$175.00

3 $98,619.00$213.00

4 $87,970.00$190.00

5 $104,175.00$225.00

6 $92,600.00$200.00

Section 11 - BRIDGE NO. MAH-680-0632 - Totals

Awd $1,906,463.48

2 $2,009,682.18

3 $1,961,362.80

4 $2,038,803.75

5 $2,148,531.67

6 $2,229,591.80

Ref #236 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $150,000.00$150,000.00

2 $199,350.00$199,350.00

3 $160,000.00$160,000.00

4 $80,000.00$80,000.00

5 $165,000.00$165,000.00

6 $175,000.00$175,000.00

Ref #237 202E22900 APPROACH SLAB REMOVED, (467 SY)

Awd $7,005.00$15.00

2 $8,406.00$18.00

3 $10,274.00$22.00

4 $10,274.00$22.00

5 $14,010.00$30.00

6 $14,010.00$30.00

Ref #238 202E23500 WEARING COURSE REMOVED, (467 SY)

Awd $934.00$2.00

2 $1,401.00$3.00

3 $3,736.00$8.00

4 $934.00$2.00

5 $3,736.00$8.00

6 $4,670.00$10.00

Ref #239 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $28,000.00$28,000.00

3 $15,500.00$15,500.00

4 $15,000.00$15,000.00

5 $45,000.00$45,000.00

6 $50,000.00$50,000.00

100579 - Page 150

Page 151: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #240 503E21100 UNCLASSIFIED EXCAVATION, (419 CY)

Awd $11,732.00$28.00

2 $18,855.00$45.00

3 $25,140.00$60.00

4 $27,235.00$65.00

5 $29,330.00$70.00

6 $20,950.00$50.00

Ref #241 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (169445 LB)

Awd $138,944.90$0.82

2 $138,944.90$0.82

3 $152,500.50$0.90

4 $160,972.75$0.95

5 $140,639.35$0.83

6 $169,445.00$1.00

Ref #242 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (505 EACH)

Awd $5,050.00$10.00

2 $6,060.00$12.00

3 $8,080.00$16.00

4 $7,575.00$15.00

5 $9,595.00$19.00

6 $10,100.00$20.00

Ref #243 511E45700 CLASS C CONCRETE, ABUTMENT, (47 CY)

Awd $18,800.00$400.00

2 $19,270.00$410.00

3 $29,375.00$625.00

4 $30,550.00$650.00

5 $28,200.00$600.00

6 $41,830.00$890.00

Ref #244 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (87 CY)

Awd $30,450.00$350.00

2 $37,149.00$427.00

3 $46,110.00$530.00

4 $34,800.00$400.00

5 $38,715.00$445.00

6 $35,670.00$410.00

Ref #245 511E51001 CLASS HP CONCRETE, SUPERSTRUCTURE, AS PER PLAN, (570 CY)

Awd $242,250.00$425.00

2 $262,200.00$460.00

3 $222,300.00$390.00

4 $256,500.00$450.00

5 $322,614.30$565.99

6 $319,200.00$560.00

Ref #246 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $300.00$300.00

2 $300.00$300.00

3 $1,000.00$1,000.00

4 $500.00$500.00

5 $550.00$550.00

6 $500.00$500.00

100579 - Page 151

Page 152: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #247 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1345 SY)

Awd $17,485.00$13.00

2 $20,175.00$15.00

3 $17,821.25$13.25

4 $17,485.00$13.00

5 $17,485.00$13.00

6 $20,175.00$15.00

Ref #248 512E33000 TYPE 2 WATERPROOFING, (7 SY)

Awd $350.00$50.00

2 $105.00$15.00

3 $140.00$20.00

4 $175.00$25.00

5 $175.00$25.00

6 $280.00$40.00

Ref #249 512E44400 TYPE B WATERPROOFING, (4 SY)

Awd $400.00$100.00

2 $120.00$30.00

3 $80.00$20.00

4 $240.00$60.00

5 $240.00$60.00

6 $200.00$50.00

Ref #250 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (264271 LB)

Awd $327,696.04$1.24

2 $338,266.88$1.28

3 $346,195.01$1.31

4 $383,192.95$1.45

5 $338,266.88$1.28

6 $396,406.50$1.50

Ref #251 513E20000 WELDED STUD SHEAR CONNECTORS, (9813 EACH)

Awd $26,985.75$2.75

2 $26,495.10$2.70

3 $26,495.10$2.70

4 $26,495.10$2.70

5 $27,476.40$2.80

6 $27,476.40$2.80

Ref #252 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (1064 SF)

Awd $10,640.00$10.00

2 $18,354.00$17.25

3 $15,960.00$15.00

4 $15,960.00$15.00

5 $26,600.00$25.00

6 $15,960.00$15.00

Ref #253 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (1064 SF)

Awd $10,640.00$10.00

2 $9,416.40$8.85

3 $8,299.20$7.80

4 $8,192.80$7.70

5 $26,600.00$25.00

6 $8,405.60$7.90

100579 - Page 152

Page 153: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #254 514E10000 FINAL INSPECTION REPAIR, (2 EACH)

Awd $2.00$1.00

2 $1,200.00$600.00

3 $1,000.00$500.00

4 $1,000.00$500.00

5 $400.00$200.00

6 $1,040.00$520.00

Ref #255 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (300 SF)

Awd $1,200.00$4.00

2 $2,400.00$8.00

3 $1,965.00$6.55

4 $1,950.00$6.50

5 $1,650.00$5.50

6 $3,600.00$12.00

Ref #256 516E14021 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PE, (245 FT)

Awd $4,900.00$20.00

2 $5,390.00$22.00

3 $12,250.00$50.00

4 $5,880.00$24.00

5 $5,880.00$24.00

6 $12,250.00$50.00

Ref #257 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (34 EACH)

Awd $23,800.00$700.00

2 $22,134.00$651.00

3 $23,120.00$680.00

4 $30,600.00$900.00

5 $23,800.00$700.00

6 $27,200.00$800.00

Ref #258 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (34 EACH)

Awd $28,900.00$850.00

2 $27,302.00$803.00

3 $28,560.00$840.00

4 $37,400.00$1,100.00

5 $28,900.00$850.00

6 $30,600.00$900.00

Ref #259 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (103 CY)

Awd $5,665.00$55.00

2 $5,150.00$50.00

3 $6,180.00$60.00

4 $5,665.00$55.00

5 $6,695.00$65.00

6 $5,150.00$50.00

Ref #260 518E40001 6" PERFORATED CORRUGATED PLASTIC PIPE, AS PER PLAN, (252 FT)

Awd $1,260.00$5.00

2 $2,016.00$8.00

3 $3,528.00$14.00

4 $3,024.00$12.00

5 $2,520.00$10.00

6 $2,520.00$10.00

100579 - Page 153

Page 154: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #261 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (65 FT)

Awd $455.00$7.00

2 $520.00$8.00

3 $910.00$14.00

4 $1,170.00$18.00

5 $650.00$10.00

6 $1,300.00$20.00

Ref #262 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (27 SF)

Awd $1,890.00$70.00

2 $1,755.00$65.00

3 $1,836.00$68.00

4 $2,700.00$100.00

5 $1,620.00$60.00

6 $1,620.00$60.00

Ref #263 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (637 SY)

Awd $101,920.00$160.00

2 $111,475.00$175.00

3 $130,585.00$205.00

4 $121,030.00$190.00

5 $130,585.00$205.00

6 $127,400.00$200.00

Section 12 - BRIDGE NO. MAH-680-0687 - Totals

Awd $1,199,654.69

2 $1,312,210.28

3 $1,298,940.06

4 $1,286,500.60

5 $1,436,932.93

6 $1,522,958.50

Ref #264 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $150,000.00$150,000.00

2 $236,404.00$236,404.00

3 $185,000.00$185,000.00

4 $90,000.00$90,000.00

5 $205,000.00$205,000.00

6 $175,000.00$175,000.00

Ref #265 202E22900 APPROACH SLAB REMOVED, (473 SY)

Awd $7,095.00$15.00

2 $8,514.00$18.00

3 $10,406.00$22.00

4 $10,406.00$22.00

5 $14,190.00$30.00

6 $14,190.00$30.00

Ref #266 202E23500 WEARING COURSE REMOVED, (473 SY)

Awd $946.00$2.00

2 $1,419.00$3.00

3 $3,784.00$8.00

4 $946.00$2.00

5 $4,257.00$9.00

6 $4,730.00$10.00

100579 - Page 154

Page 155: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #267 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)

Awd $28,000.00$28,000.00

2 $28,000.00$28,000.00

3 $15,500.00$15,500.00

4 $22,000.00$22,000.00

5 $50,000.00$50,000.00

6 $50,000.00$50,000.00

Ref #268 503E21100 UNCLASSIFIED EXCAVATION, (732 CY)

Awd $20,496.00$28.00

2 $32,940.00$45.00

3 $43,920.00$60.00

4 $47,580.00$65.00

5 $57,096.00$78.00

6 $36,600.00$50.00

Ref #269 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (203489 LB)

Awd $166,860.98$0.82

2 $166,860.98$0.82

3 $183,140.10$0.90

4 $193,314.55$0.95

5 $168,895.87$0.83

6 $203,489.00$1.00

Ref #270 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (594 EACH)

Awd $5,940.00$10.00

2 $7,128.00$12.00

3 $9,504.00$16.00

4 $8,910.00$15.00

5 $11,286.00$19.00

6 $11,880.00$20.00

Ref #271 511E43200 CLASS C CONCRETE, PIER, (3 CY)

Awd $3,750.00$1,250.00

2 $3,000.00$1,000.00

3 $15,000.00$5,000.00

4 $6,000.00$2,000.00

5 $13,800.00$4,600.00

6 $11,010.00$3,670.00

Ref #272 511E45700 CLASS C CONCRETE, ABUTMENT, (58 CY)

Awd $23,200.00$400.00

2 $23,780.00$410.00

3 $32,770.00$565.00

4 $37,700.00$650.00

5 $29,870.00$515.00

6 $51,620.00$890.00

Ref #273 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (90 CY)

Awd $31,500.00$350.00

2 $41,040.00$456.00

3 $48,600.00$540.00

4 $36,000.00$400.00

5 $41,850.00$465.00

6 $36,900.00$410.00

100579 - Page 155

Page 156: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #274 511E51001 CLASS HP CONCRETE, SUPERSTRUCTURE, AS PER PLAN, (604 CY)

Awd $256,700.00$425.00

2 $277,840.00$460.00

3 $232,540.00$385.00

4 $271,800.00$450.00

5 $308,040.00$510.00

6 $338,240.00$560.00

Ref #275 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $300.00$300.00

2 $300.00$300.00

3 $1,000.00$1,000.00

4 $500.00$500.00

5 $550.00$550.00

6 $500.00$500.00

Ref #276 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1918 SY)

Awd $24,934.00$13.00

2 $28,770.00$15.00

3 $25,413.50$13.25

4 $24,934.00$13.00

5 $27,811.00$14.50

6 $28,770.00$15.00

Ref #277 512E33000 TYPE 2 WATERPROOFING, (8 SY)

Awd $400.00$50.00

2 $120.00$15.00

3 $160.00$20.00

4 $200.00$25.00

5 $200.00$25.00

6 $320.00$40.00

Ref #278 512E44400 TYPE B WATERPROOFING, (9 SY)

Awd $675.00$75.00

2 $315.00$35.00

3 $180.00$20.00

4 $540.00$60.00

5 $540.00$60.00

6 $450.00$50.00

Ref #279 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (280012 LB)

Awd $352,815.12$1.26

2 $364,015.60$1.30

3 $372,415.96$1.33

4 $406,017.40$1.45

5 $364,015.60$1.30

6 $448,019.20$1.60

Ref #280 513E20000 WELDED STUD SHEAR CONNECTORS, (11010 EACH)

Awd $30,277.50$2.75

2 $29,727.00$2.70

3 $29,727.00$2.70

4 $29,727.00$2.70

5 $30,828.00$2.80

6 $30,828.00$2.80

100579 - Page 156

Page 157: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #281 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (347 SF)

Awd $1,735.00$5.00

2 $2,776.00$8.00

3 $2,255.50$6.50

4 $2,255.50$6.50

5 $1,908.50$5.50

6 $4,164.00$12.00

Ref #282 516E14021 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PE, (250 FT)

Awd $5,000.00$20.00

2 $5,500.00$22.00

3 $12,500.00$50.00

4 $6,000.00$24.00

5 $6,000.00$24.00

6 $12,500.00$50.00

Ref #283 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (34 EACH)

Awd $25,500.00$750.00

2 $24,208.00$712.00

3 $25,500.00$750.00

4 $34,000.00$1,000.00

5 $25,500.00$750.00

6 $30,600.00$900.00

Ref #284 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (17 EACH)

Awd $14,450.00$850.00

2 $13,651.00$803.00

3 $14,365.00$845.00

4 $18,700.00$1,100.00

5 $14,450.00$850.00

6 $16,150.00$950.00

Ref #285 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (17 EACH)

Awd $15,300.00$900.00

2 $14,943.00$879.00

3 $15,725.00$925.00

4 $20,400.00$1,200.00

5 $16,150.00$950.00

6 $17,000.00$1,000.00

Ref #286 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (159 CY)

Awd $8,745.00$55.00

2 $7,950.00$50.00

3 $9,540.00$60.00

4 $8,745.00$55.00

5 $10,971.00$69.00

6 $7,950.00$50.00

Ref #287 518E40001 6" PERFORATED CORRUGATED PLASTIC PIPE, AS PER PLAN, (262 FT)

Awd $1,310.00$5.00

2 $2,096.00$8.00

3 $3,668.00$14.00

4 $3,144.00$12.00

5 $2,620.00$10.00

6 $2,620.00$10.00

100579 - Page 157

Page 158: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #288 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (72 FT)

Awd $504.00$7.00

2 $576.00$8.00

3 $1,008.00$14.00

4 $1,296.00$18.00

5 $720.00$10.00

6 $1,440.00$20.00

Ref #289 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (21 SF)

Awd $1,470.00$70.00

2 $1,365.00$65.00

3 $1,428.00$68.00

4 $2,100.00$100.00

5 $1,260.00$60.00

6 $1,260.00$60.00

Ref #290 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (673 SY)

Awd $107,680.00$160.00

2 $117,775.00$175.00

3 $137,965.00$205.00

4 $127,870.00$190.00

5 $137,965.00$205.00

6 $134,600.00$200.00

Section 13 - BRIDGE NO. MAH-680-0693 - Totals

Awd $1,285,583.60

2 $1,441,013.58

3 $1,433,015.06

4 $1,411,085.45

5 $1,545,773.97

6 $1,670,830.20

Ref #291 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $135,000.00$135,000.00

2 $225,558.00$225,558.00

3 $210,000.00$210,000.00

4 $115,000.00$115,000.00

5 $140,000.00$140,000.00

6 $175,000.00$175,000.00

Ref #292 202E22900 APPROACH SLAB REMOVED, (315 SY)

Awd $4,725.00$15.00

2 $5,670.00$18.00

3 $6,930.00$22.00

4 $6,930.00$22.00

5 $9,450.00$30.00

6 $9,450.00$30.00

Ref #293 202E23500 WEARING COURSE REMOVED, (270 SY)

Awd $540.00$2.00

2 $810.00$3.00

3 $2,160.00$8.00

4 $540.00$2.00

5 $2,430.00$9.00

6 $2,700.00$10.00

100579 - Page 158

Page 159: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #294 503E21100 UNCLASSIFIED EXCAVATION, (350 CY)

Awd $9,800.00$28.00

2 $17,850.00$51.00

3 $21,000.00$60.00

4 $22,750.00$65.00

5 $19,250.00$55.00

6 $17,500.00$50.00

Ref #295 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (110743 LB)

Awd $90,809.26$0.82

2 $90,809.26$0.82

3 $99,668.70$0.90

4 $105,205.85$0.95

5 $91,916.69$0.83

6 $110,743.00$1.00

Ref #296 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (200 LB)

Awd $150.00$0.75

2 $200.00$1.00

3 $400.00$2.00

4 $500.00$2.50

5 $200.00$1.00

6 $200.00$1.00

Ref #297 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (222 EACH)

Awd $2,220.00$10.00

2 $2,664.00$12.00

3 $3,552.00$16.00

4 $3,330.00$15.00

5 $4,218.00$19.00

6 $4,440.00$20.00

Ref #298 511E43200 CLASS C CONCRETE, PIER, (90 CY)

Awd $45,000.00$500.00

2 $62,100.00$690.00

3 $59,850.00$665.00

4 $49,500.00$550.00

5 $43,650.00$485.00

6 $55,800.00$620.00

Ref #299 511E45700 CLASS C CONCRETE, ABUTMENT, (28 CY)

Awd $11,480.00$410.00

2 $11,480.00$410.00

3 $18,900.00$675.00

4 $18,200.00$650.00

5 $13,580.00$485.00

6 $24,920.00$890.00

Ref #300 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (340 CY)

Awd $136,000.00$400.00

2 $156,400.00$460.00

3 $144,500.00$425.00

4 $153,000.00$450.00

5 $195,500.00$575.00

6 $190,400.00$560.00

100579 - Page 159

Page 160: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #301 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (37 CY)

Awd $13,505.00$365.00

2 $18,500.00$500.00

3 $21,090.00$570.00

4 $14,800.00$400.00

5 $31,450.00$850.00

6 $15,170.00$410.00

Ref #302 511E51001 CLASS HP CONCRETE, SUPERSTRUCTURE, AS PER PLAN, (47 CY)

Awd $15,275.00$325.00

2 $18,800.00$400.00

3 $17,625.00$375.00

4 $18,800.00$400.00

5 $20,445.00$435.00

6 $26,320.00$560.00

Ref #303 511E51501 CLASS HP CONCRETE, SIDEWALK, AS PER PLAN, (42 CY)

Awd $10,500.00$250.00

2 $14,280.00$340.00

3 $10,500.00$250.00

4 $10,500.00$250.00

5 $9,450.00$225.00

6 $14,280.00$340.00

Ref #304 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $300.00$300.00

2 $300.00$300.00

3 $1,000.00$1,000.00

4 $500.00$500.00

5 $550.00$550.00

6 $500.00$500.00

Ref #305 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1115 SY)

Awd $14,495.00$13.00

2 $16,725.00$15.00

3 $14,773.75$13.25

4 $14,495.00$13.00

5 $14,495.00$13.00

6 $16,725.00$15.00

Ref #306 512E33000 TYPE 2 WATERPROOFING, (5 SY)

Awd $250.00$50.00

2 $75.00$15.00

3 $100.00$20.00

4 $125.00$25.00

5 $125.00$25.00

6 $190.00$38.00

Ref #307 513E10240 STRUCTURAL STEEL MEMBERS, LEVEL 2, (192000 LB)

Awd $263,040.00$1.37

2 $268,800.00$1.40

3 $276,480.00$1.44

4 $307,200.00$1.60

5 $268,800.00$1.40

6 $288,000.00$1.50

100579 - Page 160

Page 161: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #308 513E20000 WELDED STUD SHEAR CONNECTORS, (6432 EACH)

Awd $17,688.00$2.75

2 $17,366.40$2.70

3 $17,366.40$2.70

4 $17,366.40$2.70

5 $18,009.60$2.80

6 $18,009.60$2.80

Ref #309 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (15800 SF)

Awd $55,300.00$3.50

2 $38,236.00$2.42

3 $33,180.00$2.10

4 $33,180.00$2.10

5 $51,350.00$3.25

6 $33,812.00$2.14

Ref #310 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (15800 SF)

Awd $55,300.00$3.50

2 $38,236.00$2.42

3 $33,180.00$2.10

4 $33,180.00$2.10

5 $51,350.00$3.25

6 $33,812.00$2.14

Ref #311 514E10000 FINAL INSPECTION REPAIR, (3 EACH)

Awd $3.00$1.00

2 $1,680.00$560.00

3 $1,500.00$500.00

4 $1,500.00$500.00

5 $600.00$200.00

6 $1,560.00$520.00

Ref #312 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (135 SF)

Awd $540.00$4.00

2 $1,080.00$8.00

3 $877.50$6.50

4 $877.50$6.50

5 $742.50$5.50

6 $1,620.00$12.00

Ref #313 516E14021 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PE, (112 FT)

Awd $2,240.00$20.00

2 $2,464.00$22.00

3 $5,600.00$50.00

4 $2,688.00$24.00

5 $2,688.00$24.00

6 $5,600.00$50.00

Ref #314 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (24 EACH)

Awd $18,600.00$775.00

2 $17,976.00$749.00

3 $18,840.00$785.00

4 $24,600.00$1,025.00

5 $19,200.00$800.00

6 $19,200.00$800.00

100579 - Page 161

Page 162: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #315 516E44300 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (16 EACH)

Awd $15,200.00$950.00

2 $14,496.00$906.00

3 $15,200.00$950.00

4 $19,200.00$1,200.00

5 $15,200.00$950.00

6 $16,000.00$1,000.00

Ref #316 517E75125 RAILING (CONCRETE PARAPET WITH TWIN STEEL TUBE RAI, (235 FT)

Awd $32,900.00$140.00

2 $32,900.00$140.00

3 $30,550.00$130.00

4 $29,375.00$125.00

5 $29,375.00$125.00

6 $58,750.00$250.00

Ref #317 518E21200 POROUS BACKFILL WITH FILTER FABRIC, (75 CY)

Awd $4,125.00$55.00

2 $3,750.00$50.00

3 $4,500.00$60.00

4 $4,500.00$60.00

5 $5,100.00$68.00

6 $3,750.00$50.00

Ref #318 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (180 FT)

Awd $900.00$5.00

2 $1,440.00$8.00

3 $2,520.00$14.00

4 $2,160.00$12.00

5 $1,800.00$10.00

6 $1,800.00$10.00

Ref #319 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (92 FT)

Awd $644.00$7.00

2 $736.00$8.00

3 $1,288.00$14.00

4 $1,656.00$18.00

5 $920.00$10.00

6 $1,840.00$20.00

Ref #320 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (60 SF)

Awd $4,200.00$70.00

2 $3,900.00$65.00

3 $4,080.00$68.00

4 $3,900.00$65.00

5 $3,600.00$60.00

6 $3,600.00$60.00

Ref #321 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER, (250 SY)

Awd $36,250.00$145.00

2 $44,500.00$178.00

3 $46,250.00$185.00

4 $42,500.00$170.00

5 $50,000.00$200.00

6 $50,000.00$200.00

100579 - Page 162

Page 163: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #322 607E39900 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (205 FT)

Awd $10,660.00$52.00

2 $11,890.00$58.00

3 $9,430.00$46.00

4 $9,327.50$45.50

5 $9,327.50$45.50

6 $10,250.00$50.00

Ref #323 607E39930 VANDAL PROTECTION FENCE, 12' CURVED, COATED FABRIC, (221 FT)

Awd $22,210.50$100.50

2 $25,857.00$117.00

3 $20,995.00$95.00

4 $20,774.00$94.00

5 $20,774.00$94.00

6 $22,100.00$100.00

Ref #324 625E10614 LIGHT POLE ANCHOR BOLTS ON STRUCTURE, (8 EACH)

Awd $800.00$100.00

2 $800.00$100.00

3 $800.00$100.00

4 $800.00$100.00

5 $800.00$100.00

6 $800.00$100.00

Ref #325 625E25400 CONDUIT, 2", 725.04, (530 FT)

Awd $3,710.00$7.00

2 $3,710.00$7.00

3 $3,789.50$7.15

4 $5,379.50$10.15

5 $3,710.00$7.00

6 $3,710.00$7.00

Ref #326 625E29920 STRUCTURE JUNCTION BOX, (2 EACH)

Awd $3,200.00$1,600.00

2 $3,200.00$1,600.00

3 $3,300.00$1,650.00

4 $3,080.00$1,540.00

5 $3,200.00$1,600.00

6 $3,300.00$1,650.00

Ref #327 625E30700 PULL BOX, 725.08, 18", (4 EACH)

Awd $2,200.00$550.00

2 $2,200.00$550.00

3 $2,240.00$560.00

4 $2,200.00$550.00

5 $2,200.00$550.00

6 $2,280.00$570.00

Section 14 - BRIDGE NO. MAH-680-1751 - Totals

Awd $1,039,759.76

2 $1,177,438.66

3 $1,164,015.85

4 $1,099,619.75

5 $1,155,456.29

6 $1,244,131.60

100579 - Page 163

Page 164: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #328 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)

Awd $12,060.50$12,060.50

2 $5,880.00$5,880.00

3 $15,000.00$15,000.00

4 $7,500.00$7,500.00

5 $20,000.00$20,000.00

6 $21,000.00$21,000.00

Ref #329 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $75,000.00$75,000.00

2 $66,000.00$66,000.00

3 $136,000.00$136,000.00

4 $105,000.00$105,000.00

5 $72,000.00$72,000.00

6 $129,000.00$129,000.00

Ref #330 108E10000 SPECIAL - CPM PROGRESS SCHEDULE, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $8,000.00$8,000.00

3 $2,500.00$2,500.00

4 $5,000.00$5,000.00

5 $5,000.00$5,000.00

6 $1,000.00$1,000.00

Ref #331 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $485,000.00$485,000.00

2 $300,000.00$300,000.00

3 $308,000.00$308,000.00

4 $346,000.00$346,000.00

5 $380,000.00$380,000.00

6 $90,000.00$90,000.00

Ref #332 619E16020 FIELD OFFICE, TYPE C, (18 MNTH)

Awd $27,000.00$1,500.00

2 $9,000.00$500.00

3 $45,000.00$2,500.00

4 $45,000.00$2,500.00

5 $30,600.00$1,700.00

6 $36,000.00$2,000.00

Ref #333 623E10000 CONSTRUCTION LAYOUT STAKES, (LUMP SUM)

Awd $40,000.00$40,000.00

2 $50,000.00$50,000.00

3 $90,000.00$90,000.00

4 $130,000.00$130,000.00

5 $70,000.00$70,000.00

6 $15,000.00$15,000.00

Ref #334 624E10000 MOBILIZATION, (LUMP SUM)

Awd $400,000.00$400,000.00

2 $400,000.00$400,000.00

3 $400,000.00$400,000.00

4 $400,000.00$400,000.00

5 $400,000.00$400,000.00

6 $400,000.00$400,000.00

100579 - Page 164

Page 165: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 15 - INCIDENTALS - Totals

Awd $1,049,060.50

2 $838,880.00

3 $996,500.00

4 $1,038,500.00

5 $977,600.00

6 $692,000.00

100579 - Page 165

Page 166: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 100580

PID 89092

MIA-IR-75-8.85

Non-Federal

Type: BRIDGE REPAIR

Completion Date: 5/16/2011

Award Amount: $32,402.00

Contract Awarded To: VELOTTA COMPANY

Letting Date: 12/2/2010

Engineer's Estimate: $40,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

VELOTTA COMPANY

6740 RIDGE RD

SHARON CENTER, OH 44274

Medina

Bidder 1

Bid $32,402.00

RIGHTER COMPANY INC

2424 HARRISON RD

COLUMBUS, OH 43204

Franklin

Bidder 2

Bid $44,075.00

PROSHOT CONCRETE INC

4158 MUSGROVE DR

FLORENCE, AL 35630

Bidder 3

Bid $45,750.00

DOT CONSTRUCTION CORP

535 NORTH BROAD ST STE 5

CANFIELD, OH 44406

Mahoning

Bidder 4

Bid $49,550.00

VASTA CONSTRUCTION COMPANY INC

12980 AVON BELDEN RD

EATON, OH 44044

Lorain

Bidder 5

Bid $68,070.00

SUBURBAN MAINTENANCE & CONSTRUCTION INC

16330 YORK RD UNIT 2

NORTH ROYALTON, OH 44133

Cuyahoga

Bidder 6

Bid $92,900.00

R B JERGENS CONTRACTORS INC

11418 N DIXIE DR

VANDALIA, OH 45377

Montgomery

Bidder 7

Bid $98,227.00

100580 - Page 166

Page 167: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (50 HOUR)

Awd $3,250.00$65.00

2 $3,000.00$60.00

3 $3,000.00$60.00

4 $3,000.00$60.00

5 $3,250.00$65.00

6 $5,000.00$100.00

7 $4,900.00$98.00

Ref #2 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $5,000.00$5,000.00

2 $1,500.00$1,500.00

3 $4,500.00$4,500.00

4 $3,000.00$3,000.00

5 $4,500.00$4,500.00

6 $10,000.00$10,000.00

7 $3,920.00$3,920.00

Section 1 - MAINTENANCE OF TRAFFIC - Totals

Awd $8,250.00

2 $4,500.00

3 $7,500.00

4 $6,000.00

5 $7,750.00

6 $15,000.00

7 $8,820.00

Ref #3 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (16 SY)

Awd $400.00$25.00

2 $2,400.00$150.00

3 $2,800.00$175.00

4 $1,600.00$100.00

5 $1,120.00$70.00

6 $1,600.00$100.00

7 $2,816.00$176.00

Ref #4 512E10600 CONCRETE REPAIR BY EPOXY INJECTION, (105 FT)

Awd $8,190.00$78.00

2 $7,875.00$75.00

3 $8,400.00$80.00

4 $8,400.00$80.00

5 $26,250.00$250.00

6 $10,500.00$100.00

7 $11,130.00$106.00

Ref #5 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (7 SF)

Awd $1,750.00$250.00

2 $700.00$100.00

3 $4,200.00$600.00

4 $1,750.00$250.00

5 $3,500.00$500.00

6 $7,000.00$1,000.00

7 $3,661.00$523.00

100580 - Page 167

Page 168: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #6 530E00600 SPECIAL - STRUCTURE, MISC.:FIBER WRAP SYSTEM FOR P, (22 SF)

Awd $2,112.00$96.00

2 $5,500.00$250.00

3 $9,350.00$425.00

4 $8,800.00$400.00

5 $4,950.00$225.00

6 $8,800.00$400.00

7 $25,960.00$1,180.00

Section 2 - STRUCTURE REPAIR BRIDGE NO. MIA-75-0885 - Totals

Awd $12,452.00

2 $16,475.00

3 $24,750.00

4 $20,550.00

5 $35,820.00

6 $27,900.00

7 $43,567.00

Ref #7 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $500.00$500.00

2 $1,000.00$1,000.00

3 $1,000.00$1,000.00

4 $1,000.00$1,000.00

5 $2,500.00$2,500.00

6 $5,000.00$5,000.00

7 $1,040.00$1,040.00

Ref #8 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $17,100.00$17,100.00

3 $7,500.00$7,500.00

4 $12,000.00$12,000.00

5 $15,000.00$15,000.00

6 $15,000.00$15,000.00

7 $35,900.00$35,900.00

Ref #9 624E10000 MOBILIZATION, (LUMP SUM)

Awd $10,200.00$10,200.00

2 $5,000.00$5,000.00

3 $5,000.00$5,000.00

4 $10,000.00$10,000.00

5 $7,000.00$7,000.00

6 $30,000.00$30,000.00

7 $8,900.00$8,900.00

Section 3 - INCIDENTALS - Totals

Awd $11,700.00

2 $23,100.00

3 $13,500.00

4 $23,000.00

5 $24,500.00

6 $50,000.00

7 $45,840.00

100580 - Page 168

Page 169: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 101078

PID 25869

ATB-IR-90-22.06

Federal

Type: MAJOR RECONSTRUCTION

Completion Date: 8/29/2013

Award Amount: $41,632,169.25

Contract Awarded To: ANTHONY ALLEGA CEMENT CONTRACTOR INC

Letting Date: 12/2/2010

Engineer's Estimate: $37,980,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

ANTHONY ALLEGA CEMENT CONTRACTOR INC

5585 CANAL RD

VALLEY VIEW, OH 44125

Cuyahoga

Bidder 1

Bid $41,632,169.25

SHELLY & SANDS INC

3570 SOUTH RIVER RD

ZANESVILLE, OH 43701

Muskingum

Bidder 2

Bid $45,360,226.63

PERK COMPANY INC/MR EXCAVATOR INC - JV

8100 GRAND AVE SUITE 300

CLEVELAND, OH 44094

Lake

Bidder 3

Bid $49,701,097.11

101078 - Page 169

Page 170: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)

Awd $59,000.00$59,000.00

2 $5,000.00$5,000.00

3 $543,200.00$543,200.00

Ref #2 201E11001 CLEARING AND GRUBBING, AS PER PLAN, (LUMP SUM)

Awd $9,500.00$9,500.00

2 $9,500.00$9,500.00

3 $21,600.00$21,600.00

Ref #3 202E20010 HEADWALL REMOVED, (50 EACH)

Awd $29,800.00$596.00

2 $25,000.00$500.00

3 $43,375.00$867.50

Ref #4 202E23010 PAVEMENT REMOVED, ASPHALT, (343046 SY)

Awd $240,132.20$0.70

2 $754,701.20$2.20

3 $967,389.72$2.82

Ref #5 202E23500 WEARING COURSE REMOVED, (267 SY)

Awd $6,541.50$24.50

2 $667.50$2.50

3 $752.94$2.82

Ref #6 202E23800 BASE REMOVED, (343046 SY)

Awd $205,827.60$0.60

2 $686,092.00$2.00

3 $377,350.60$1.10

Ref #7 202E23900 CONCRETE BASE REMOVED, (211814 SY)

Awd $1,544,124.06$7.29

2 $677,804.80$3.20

3 $468,108.94$2.21

Ref #8 202E30700 CONCRETE BARRIER REMOVED, (1097 FT)

Awd $7,679.00$7.00

2 $14,480.40$13.20

3 $5,024.26$4.58

Ref #9 202E35100 PIPE REMOVED, 24" AND UNDER (WT: NR), (2741 FT)

Awd $44,404.20$16.20

2 $37,003.50$13.50

3 $40,758.67$14.87

Ref #10 202E35200 PIPE REMOVED, OVER 24", (2536 FT)

Awd $30,432.00$12.00

2 $24,599.20$9.70

3 $16,255.76$6.41

Ref #11 202E38000 GUARDRAIL REMOVED, (28801 FT)

Awd $30,241.05$1.05

2 $30,241.05$1.05

3 $28,801.00$1.00

Ref #12 202E38001 GUARDRAIL REMOVED, AS PER PLAN, (750 FT)

Awd $787.50$1.05

2 $787.50$1.05

3 $750.00$1.00

101078 - Page 170

Page 171: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #13 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN, (713 FT)

Awd $934.03$1.31

2 $926.90$1.30

3 $891.25$1.25

Ref #14 202E42206 ANCHOR ASSEMBLY REMOVED, (51 EACH)

Awd $5,355.00$105.00

2 $5,457.00$107.00

3 $5,100.00$100.00

Ref #15 202E42210 ANCHOR ASSEMBLY REMOVED, BARRIER DESIGN, (2 EACH)

Awd $315.00$157.50

2 $320.00$160.00

3 $300.00$150.00

Ref #16 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (36 EACH)

Awd $2,457.00$68.25

2 $2,484.00$69.00

3 $2,340.00$65.00

Ref #17 202E58000 MANHOLE REMOVED, (1 EACH)

Awd $1,600.00$1,600.00

2 $330.00$330.00

3 $250.00$250.00

Ref #18 202E58100 CATCH BASIN REMOVED (WT: NR), (57 EACH)

Awd $16,530.00$290.00

2 $10,260.00$180.00

3 $15,404.25$270.25

Ref #19 202E58300 CATCH BASIN OR INLET REMOVED, (1 EACH)

Awd $2,600.00$2,600.00

2 $180.00$180.00

3 $245.10$245.10

Ref #20 202E58500 CATCH BASIN ABANDONED, (3 EACH)

Awd $3,480.00$1,160.00

2 $1,110.00$370.00

3 $1,221.48$407.16

Ref #21 202E70000 SPECIAL - FILL AND PLUG EXISTING CONDUIT, (880 FT)

Awd $21,340.00$24.25

2 $19,800.00$22.50

3 $25,599.20$29.09

Ref #22 202E70100 SPECIAL - PIPE CLEANOUT, (1769 FT)

Awd $27,861.75$15.75

2 $14,152.00$8.00

3 $28,657.80$16.20

Ref #23 202E98000 REMOVAL MISC.:CONCRETE PADS, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $1,200.00$1,200.00

3 $736.67$736.67

Ref #24 202E98300 REMOVAL MISC.:RIPRAP REMOVED, (613 SY)

Awd $15,325.00$25.00

2 $3,065.00$5.00

3 $1,354.73$2.21

101078 - Page 171

Page 172: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #25 203E10000 EXCAVATION (WT: 04), (127562 CY)

Awd $988,605.50$7.75

2 $1,275,620.00$10.00

3 $922,273.26$7.23

Ref #26 203E20000 EMBANKMENT (WT: 04), (20413 CY)

Awd $487,870.70$23.90

2 $204,130.00$10.00

3 $37,764.05$1.85

Ref #27 203E20001 EMBANKMENT, AS PER PLAN, (15365 CY)

Awd $113,854.65$7.41

2 $92,190.00$6.00

3 $51,165.45$3.33

Ref #28 203E20001 EMBANKMENT, AS PER PLAN(TYPE B) (WT: 04), (9303 CY)

Awd $252,576.45$27.15

2 $83,727.00$9.00

3 $30,978.99$3.33

Ref #29 203E98600 ROADWAY, MISC.:VERTICAL CLEARANCE MEASUREMENT, (12 EACH)

Awd $5,280.00$440.00

2 $4,800.00$400.00

3 $12,000.00$1,000.00

Ref #30 204E10000 SUBGRADE COMPACTION (WT: 04), (23113 SY)

Awd $18,490.40$0.80

2 $46,226.00$2.00

3 $15,023.45$0.65

Ref #31 204E13000 EXCAVATION OF SUBGRADE, (22760 CY)

Awd $273,120.00$12.00

2 $191,184.00$8.40

3 $219,406.40$9.64

Ref #32 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN, (11380 CY)

Awd $475,115.00$41.75

2 $546,240.00$48.00

3 $452,241.20$39.74

Ref #33 204E45000 PROOF ROLLING (WT: 04), (186 HOUR)

Awd $43,710.00$235.00

2 $55,800.00$300.00

3 $13,950.00$75.00

Ref #34 204E50000 GEOTEXTILE FABRIC, (33777 SY)

Awd $20,266.20$0.60

2 $33,777.00$1.00

3 $25,670.52$0.76

Ref #35 206E11000 CURING COAT, (346895 SY)

Awd $90,192.70$0.26

2 $86,723.75$0.25

3 $93,661.65$0.27

Ref #36 206E15000 CEMENT STABILIZED SUBGRADE, (346895 SY)

Awd $693,790.00$2.00

2 $693,790.00$2.00

3 $589,721.50$1.70

101078 - Page 172

Page 173: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #37 209E10000 DITCH CLEANOUT, (2565 FT)

Awd $60,790.50$23.70

2 $13,081.50$5.10

3 $14,389.65$5.61

Ref #38 209E60201 LINEAR GRADING, AS PER PLAN, (298 STA)

Awd $36,907.30$123.85

2 $8,940.00$30.00

3 $75,394.00$253.00

Ref #39 604E38500 MONUMENT ASSEMBLY, (62 EACH)

Awd $37,324.00$602.00

2 $52,700.00$850.00

3 $36,890.00$595.00

Ref #40 606E13000 GUARDRAIL, TYPE 5 (WT: 36), (30901 FT)

Awd $356,906.55$11.55

2 $358,451.60$11.60

3 $339,911.00$11.00

Ref #41 606E22000 ANCHOR ASSEMBLY, TYPE B-98, (40 EACH)

Awd $61,320.00$1,533.00

2 $61,600.00$1,540.00

3 $58,400.00$1,460.00

Ref #42 606E22010 ANCHOR ASSEMBLY, TYPE E-98, (5 EACH)

Awd $9,371.25$1,874.25

2 $9,425.00$1,885.00

3 $8,925.00$1,785.00

Ref #43 606E26500 ANCHOR ASSEMBLY, TYPE T (WT: 36), (28 EACH)

Awd $18,375.00$656.25

2 $18,480.00$660.00

3 $17,500.00$625.00

Ref #44 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (31 EACH)

Awd $38,246.25$1,233.75

2 $38,440.00$1,240.00

3 $36,425.00$1,175.00

Ref #45 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2, (8 EACH)

Awd $2,688.00$336.00

2 $2,704.00$338.00

3 $2,560.00$320.00

Ref #46 607E15001 FENCE, TYPE 47, AS PER PLAN, (1500 FT)

Awd $21,180.00$14.12

2 $21,300.00$14.20

3 $20,175.00$13.45

Ref #47 622E10160 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, (808 FT)

Awd $60,575.76$74.97

2 $69,488.00$86.00

3 $144,632.00$179.00

Ref #48 622E25000 CONCRETE BARRIER END SECTION, TYPE D, (12 EACH)

Awd $31,500.00$2,625.00

2 $40,800.00$3,400.00

3 $31,800.00$2,650.00

101078 - Page 173

Page 174: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #49 622E25010 CONCRETE BARRIER END SECTION, TYPE D, REINFORCED, (12 EACH)

Awd $31,500.00$2,625.00

2 $11,400.00$950.00

3 $30,300.00$2,525.00

Ref #50 626E00100 BARRIER REFLECTOR, (395 EACH)

Awd $3,239.00$8.20

2 $1,975.00$5.00

3 $1,935.50$4.90

Ref #51 690E12020 SPECIAL - GEOGRID, TYPE P1 (WT: 06), (5690 SY)

Awd $17,354.50$3.05

2 $25,605.00$4.50

3 $20,028.80$3.52

Ref #52 690E12020 SPECIAL - GEOGRID, TYPE P2, (2269 SY)

Awd $5,332.15$2.35

2 $10,664.30$4.70

3 $7,850.74$3.46

Ref #53 690E12020 SPECIAL - GEOGRID, TYPE S1 (WT: 06), (2509 SY)

Awd $5,896.15$2.35

2 $12,043.20$4.80

3 $8,681.14$3.46

Ref #54 690E98400 SPECIAL - MISC.:IDENTIFICATION OF BAT HABITAT TREE, (LUMP SUM)

Awd $3,675.00$3,675.00

2 $3,400.00$3,400.00

3 $5,000.00$5,000.00

Ref #603 206E10500 CEMENT, (13738 TON)

Awd $1,237,793.80$90.10

2 $1,305,110.00$95.00

3 $1,335,333.60$97.20

Ref #605 605E11001 6" CONSTRUCTION UNDERDRAINS, AS PER PLAN, (71209 FT)

Awd $398,770.40$5.60

2 $427,254.00$6.00

3 $535,491.68$7.52

Ref #606 204E30040 GRANULAR MATERIAL, TYPE E, (11380 CY)

Awd $301,001.00$26.45

2 $318,640.00$28.00

3 $466,466.20$40.99

Ref #607 861E10000 GEOGRID FOR SUBGRADE STABILIZATION, (33777 SY)

Awd $62,487.45$1.85

2 $101,331.00$3.00

3 $102,006.54$3.02

Ref #608 603E00406 4" CONDUIT, TYPE F, 707.45, (600 FT)

Awd $3,000.00$5.00

2 $11,400.00$19.00

3 $11,694.00$19.49

Ref #609 605E13301 6" UNCLASSIFIED PIPE UNDERDRAINS, AS PER PLAN, (800 FT)

Awd $8,600.00$10.75

2 $20,000.00$25.00

3 $14,912.00$18.64

101078 - Page 174

Page 175: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #610 605E98300 UNDERDRAINS, MISC.:UNDERDRAIN CLEANOUT, (100 EACH)

Awd $29,400.00$294.00

2 $24,500.00$245.00

3 $35,868.00$358.68

Ref #611 605E11000 6" CONSTRUCTION UNDERDRAINS, (158 FT)

Awd $3,160.00$20.00

2 $6,557.00$41.50

3 $2,774.48$17.56

Section 1 - ROADWAY - Totals

Awd $8,618,532.55

2 $8,614,659.40

3 $8,424,668.17

Ref #55 601E11000 RIPRAP USING 6" REINFORCED CONCRETE SLAB, (353 SY)

Awd $73,071.00$207.00

2 $45,184.00$128.00

3 $26,475.00$75.00

Ref #56 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (186 SY)

Awd $21,948.00$118.00

2 $20,460.00$110.00

3 $45,153.36$242.76

Ref #57 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER (WT: , (495 CY)

Awd $53,460.00$108.00

2 $26,730.00$54.00

3 $46,030.05$92.99

Ref #58 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (265 CY)

Awd $30,342.50$114.50

2 $15,900.00$60.00

3 $23,176.90$87.46

Ref #59 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER (WT: , (57 CY)

Awd $8,721.00$153.00

2 $6,270.00$110.00

3 $4,753.80$83.40

Ref #60 601E34400 ROCK CHANNEL PROTECTION, WITH GROUT, TYPE A, (118 CY)

Awd $16,461.00$139.50

2 $16,284.00$138.00

3 $16,006.70$135.65

Ref #61 659E00100 SOIL ANALYSIS TEST (WT: NR), (7 EACH)

Awd $1,834.00$262.00

2 $350.00$50.00

3 $189.00$27.00

Ref #62 659E00300 TOPSOIL (WT: 46), (49120 CY)

Awd $201,392.00$4.10

2 $417,520.00$8.50

3 $809,497.60$16.48

Ref #63 659E10000 SEEDING AND MULCHING (WT: 46), (442529 SY)

Awd $110,632.25$0.25

2 $146,034.57$0.33

3 $146,034.57$0.33

101078 - Page 175

Page 176: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #64 659E14000 REPAIR SEEDING AND MULCHING (WT: 46), (22127 SY)

Awd $4,425.40$0.20

2 $7,301.91$0.33

3 $7,301.91$0.33

Ref #65 659E15000 INTER-SEEDING (WT: 46), (22127 SY)

Awd $221.27$0.01

2 $221.27$0.01

3 $4,425.40$0.20

Ref #66 659E20000 COMMERCIAL FERTILIZER (WT: 46), (61.71 TON)

Awd $37,643.10$610.00

2 $4,566.54$74.00

3 $4,665.28$75.60

Ref #67 659E31000 LIME (WT: 46), (91.43 ACRE)

Awd $0.91$0.01

2 $0.91$0.01

3 $0.91$0.01

Ref #68 659E35000 WATER (WT: 46), (2450 MGAL)

Awd $24.50$0.01

2 $24.50$0.01

3 $24.50$0.01

Ref #69 659E40000 MOWING (WT: 46), (996 MSF)

Awd $1,035.84$1.04

2 $1,045.80$1.05

3 $1,075.68$1.08

Ref #70 660E20000 SODDING REINFORCED (WT: 46), (313 SY)

Awd $4,538.50$14.50

2 $1,643.25$5.25

3 $1,690.20$5.40

Ref #71 670E00700 DITCH EROSION PROTECTION, (11480 SY)

Awd $17,794.00$1.55

2 $13,776.00$1.20

3 $14,235.20$1.24

Ref #72 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)

Awd $73,000.00$73,000.00

2 $105,000.00$105,000.00

3 $25,000.00$25,000.00

Ref #73 832E30000 EROSION CONTROL, (600000 EACH)

Awd $600,000.00$1.00

2 $600,000.00$1.00

3 $600,000.00$1.00

Ref #74 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING , (309 SY)

Awd $2,039.40$6.60

2 $1,467.75$4.75

3 $1,501.74$4.86

Section 2 - EROSION CONTROL - Totals

Awd $1,258,584.67

2 $1,429,780.50

3 $1,777,237.80

101078 - Page 176

Page 177: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #75 602E20000 CONCRETE MASONRY (WT: 35), (52.2 CY)

Awd $62,640.00$1,200.00

2 $99,963.00$1,915.00

3 $42,205.27$808.53

Ref #76 603E00100 4" CONDUIT, TYPE B, (300 FT)

Awd $1,575.00$5.25

2 $3,900.00$13.00

3 $7,200.00$24.00

Ref #77 603E00400 4" CONDUIT, TYPE E, (300 FT)

Awd $1,755.00$5.85

2 $2,250.00$7.50

3 $4,107.00$13.69

Ref #78 603E00406 4" CONDUIT, TYPE F, (300 FT)

Awd $1,530.00$5.10

2 $3,000.00$10.00

3 $4,170.00$13.90

Ref #79 603E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (6699 FT)

Awd $120,582.00$18.00

2 $93,786.00$14.00

3 $77,507.43$11.57

Ref #80 603E00900 6" CONDUIT, TYPE B, (4452 FT)

Awd $77,910.00$17.50

2 $71,232.00$16.00

3 $85,611.96$19.23

Ref #81 603E01400 6" CONDUIT, TYPE E, (300 FT)

Awd $2,055.00$6.85

2 $2,400.00$8.00

3 $4,275.00$14.25

Ref #82 603E01500 6" CONDUIT, TYPE F, (300 FT)

Awd $1,830.00$6.10

2 $3,300.00$11.00

3 $4,341.00$14.47

Ref #83 603E05900 15" CONDUIT, TYPE B, (1385 FT)

Awd $60,870.75$43.95

2 $177,280.00$128.00

3 $61,161.60$44.16

Ref #84 603E06100 15" CONDUIT, TYPE C, (1217 FT)

Awd $43,142.65$35.45

2 $51,114.00$42.00

3 $46,221.66$37.98

Ref #85 603E06700 15" CONDUIT, TYPE F (WT: 35), (1399 FT)

Awd $89,326.15$63.85

2 $62,955.00$45.00

3 $77,378.69$55.31

Ref #86 603E07400 18" CONDUIT, TYPE B, (131 FT)

Awd $6,189.75$47.25

2 $18,209.00$139.00

3 $6,726.85$51.35

101078 - Page 177

Page 178: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #87 603E07600 18" CONDUIT, TYPE C (WT: 35), (108 FT)

Awd $5,027.40$46.55

2 $7,992.00$74.00

3 $4,829.76$44.72

Ref #88 603E09100 21" CONDUIT, TYPE C, (8 FT)

Awd $808.00$101.00

2 $536.00$67.00

3 $410.00$51.25

Ref #89 603E10200 24" CONDUIT, TYPE A, 706.02, (48 FT)

Awd $4,968.00$103.50

2 $3,216.00$67.00

3 $3,412.80$71.10

Ref #90 603E13200 30" CONDUIT, TYPE A, (64 FT)

Awd $8,000.00$125.00

2 $5,504.00$86.00

3 $5,784.96$90.39

Ref #91 603E13200 30" CONDUIT, TYPE A, 706.02, 707.05 TYPE C, OR 707, (35 FT)

Awd $4,025.00$115.00

2 $2,765.00$79.00

3 $3,202.15$91.49

Ref #92 603E16200 36" CONDUIT, TYPE A, 706.02, (24 FT)

Awd $4,204.80$175.20

2 $2,928.00$122.00

3 $2,667.36$111.14

Ref #93 603E19200 42" CONDUIT, TYPE A, 706.02, (337 FT)

Awd $59,160.35$175.55

2 $56,616.00$168.00

3 $50,263.55$149.15

Ref #94 603E19200 42" CONDUIT, TYPE A, 706.02, OR 48" 707.01 (0.079", (239 FT)

Awd $50,668.00$212.00

2 $44,215.00$185.00

3 $26,024.71$108.89

Ref #95 603E19200 42" CONDUIT, TYPE A, 707.01 (0.109") OR 707.01 AL , (108 FT)

Awd $23,436.00$217.00

2 $17,496.00$162.00

3 $14,146.92$130.99

Ref #96 603E20700 48" CONDUIT, TYPE A, 707.01 (0.109") OR 707.01 AL , (100 FT)

Awd $27,700.00$277.00

2 $16,100.00$161.00

3 $12,881.00$128.81

Ref #97 603E23600 60" CONDUIT, TYPE A, 706.02, (282 FT)

Awd $86,292.00$306.00

2 $86,292.00$306.00

3 $66,735.30$236.65

Ref #98 603E28000 84" CONDUIT, TYPE A, 706.02, (253 FT)

Awd $127,195.75$502.75

2 $133,837.00$529.00

3 $108,253.64$427.88

101078 - Page 178

Page 179: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #99 603E29000 90" CONDUIT, TYPE A, 706.02, (221 FT)

Awd $121,550.00$550.00

2 $134,589.00$609.00

3 $105,324.18$476.58

Ref #100 603E52800 32" X 49" CONDUIT, TYPE A, 706.04(HE-II), (240 FT)

Awd $60,624.00$252.60

2 $56,400.00$235.00

3 $41,469.60$172.79

Ref #101 603E52900 34" X 53" CONDUIT, TYPE A, 706.04(HE-II), (233 FT)

Awd $69,201.00$297.00

2 $56,153.00$241.00

3 $40,260.07$172.79

Ref #102 603E53000 38" X 60" CONDUIT, TYPE A, 706.04(HE-II), (484 FT)

Awd $154,396.00$319.00

2 $120,516.00$249.00

3 $103,856.72$214.58

Ref #103 603E53200 48" X 76" CONDUIT, TYPE A, 706.04(HE-II), (245 FT)

Awd $92,487.50$377.50

2 $76,440.00$312.00

3 $59,353.70$242.26

Ref #104 603E96600 CONDUIT, BORED OR JACKED:36", 748.06, (140 FT)

Awd $46,295.20$330.68

2 $52,920.00$378.00

3 $55,945.40$399.61

Ref #105 603E96600 CONDUIT, BORED OR JACKED:42", 748.06, (311 FT)

Awd $136,236.66$438.06

2 $140,883.00$453.00

3 $153,372.76$493.16

Ref #106 603E96600 CONDUIT, BORED OR JACKED:48", 748.06, (362 FT)

Awd $215,118.50$594.25

2 $184,258.00$509.00

3 $235,908.16$651.68

Ref #107 604E00800 CATCH BASIN, NO. 3A (WT: 35), (19 EACH)

Awd $49,685.00$2,615.00

2 $35,150.00$1,850.00

3 $34,008.86$1,789.94

Ref #108 604E01200 CATCH BASIN, NO. 4, (46 EACH)

Awd $137,540.00$2,990.00

2 $159,850.00$3,475.00

3 $114,173.38$2,482.03

Ref #109 604E01400 CATCH BASIN, NO. 4A, (5 EACH)

Awd $22,815.00$4,563.00

2 $18,625.00$3,725.00

3 $17,613.95$3,522.79

Ref #110 604E01600 CATCH BASIN, NO. 5, (3 EACH)

Awd $10,329.00$3,443.00

2 $9,225.00$3,075.00

3 $7,125.24$2,375.08

101078 - Page 179

Page 180: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #111 604E01800 CATCH BASIN, NO. 5A, (1 EACH)

Awd $5,027.00$5,027.00

2 $3,425.00$3,425.00

3 $3,157.08$3,157.08

Ref #112 604E02000 CATCH BASIN, NO. 6, (1 EACH)

Awd $2,754.00$2,754.00

2 $2,425.00$2,425.00

3 $1,798.25$1,798.25

Ref #113 604E02800 CATCH BASIN, NO. 8, (6 EACH)

Awd $17,142.00$2,857.00

2 $14,100.00$2,350.00

3 $13,348.50$2,224.75

Ref #114 604E31500 MANHOLE, NO. 3, (2 EACH)

Awd $5,290.00$2,645.00

2 $5,000.00$2,500.00

3 $5,328.02$2,664.01

Ref #115 604E36600 PRECAST REINFORCED CONCRETE OUTLET, (134 EACH)

Awd $20,636.00$154.00

2 $21,172.00$158.00

3 $40,689.10$303.65

Ref #116 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS, (1122 FT)

Awd $9,312.60$8.30

2 $4,936.80$4.40

3 $7,147.14$6.37

Ref #117 605E06000 4" BASE PIPE UNDERDRAINS, (64579 FT)

Awd $206,652.80$3.20

2 $248,629.15$3.85

3 $388,119.79$6.01

Ref #118 605E11100 6" SHALLOW PIPE UNDERDRAINS, (142418 FT)

Awd $683,606.40$4.80

2 $783,299.00$5.50

3 $996,926.00$7.00

Ref #119 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (4535 FT)

Awd $41,268.50$9.10

2 $20,861.00$4.60

3 $34,103.20$7.52

Ref #120 605E13402 6" UNCLASSIFIED PIPE UNDERDRAINS FOR SPRINGS, (200 FT)

Awd $2,020.00$10.10

2 $3,140.00$15.70

3 $1,938.00$9.69

Ref #121 605E31100 AGGREGATE DRAINS, (220 FT)

Awd $1,815.00$8.25

2 $7,700.00$35.00

3 $3,623.40$16.47

Ref #122 605E32200 AGGREGATE DRAINS FOR SPRINGS, (200 FT)

Awd $2,700.00$13.50

2 $3,500.00$17.50

3 $3,294.00$16.47

101078 - Page 180

Page 181: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #123 837E10001 LINER PIPE, AS PER PLAN, 108" SS837 OR 108" SS937, (364 FT)

Awd $175,812.00$483.00

2 $200,200.00$550.00

3 $206,977.68$568.62

Ref #124 837E20000 BACKFILL FOR LINER PIPE, (250 CY)

Awd $49,875.00$199.50

2 $69,750.00$279.00

3 $54,540.00$218.16

Ref #125 843E50001 PATCHING CONCRETE STRUCTURES WITH TROWELABLE MORTA, (112 SF)

Awd $13,524.00$120.75

2 $26,096.00$233.00

3 $7,862.40$70.20

Section 3 - DRAINAGE - Totals

Awd $3,224,604.76

2 $3,426,128.95

3 $3,456,783.19

Ref #126 301E46000 ASPHALT CONCRETE BASE, PG64-22, (88 CY)

Awd $24,640.00$280.00

2 $19,800.00$225.00

3 $24,640.00$280.00

Ref #127 304E20001 AGGREGATE BASE, AS PER PLAN (WT: 09), (61214 CY)

Awd $2,645,056.94$43.21

2 $2,448,560.00$40.00

3 $2,320,010.60$37.90

Ref #128 407E10000 TACK COAT (WT: 10), (108 GAL)

Awd $324.00$3.00

2 $216.00$2.00

3 $324.00$3.00

Ref #129 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (47 GAL)

Awd $143.35$3.05

2 $94.00$2.00

3 $143.35$3.05

Ref #130 408E10000 PRIME COAT, (503 GAL)

Awd $2,414.40$4.80

2 $2,515.00$5.00

3 $2,414.40$4.80

Ref #131 408E10001 PRIME COAT, AS PER PLAN, (10606 GAL)

Awd $58,863.30$5.55

2 $37,121.00$3.50

3 $58,863.30$5.55

Ref #132 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5MM, TYPE A (4, (10 CY)

Awd $5,830.00$583.00

2 $2,250.00$225.00

3 $5,830.00$583.00

Ref #133 448E46061 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, UNDE, (1937 CY)

Awd $387,593.70$200.10

2 $435,825.00$225.00

3 $426,140.00$220.00

101078 - Page 181

Page 182: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #134 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (55 CY)

Awd $16,335.00$297.00

2 $12,375.00$225.00

3 $16,335.00$297.00

Ref #135 451E30000 SPECIAL - PRESSURE RELIEF JOINT, TYPE A, (230 FT)

Awd $13,110.00$57.00

2 $38,180.00$166.00

3 $43,240.00$188.00

Ref #136 452E15004 12.5" NON-REINFORCED CONCRETE PAVEMENT, (506 SY)

Awd $20,240.00$40.00

2 $32,510.50$64.25

3 $38,709.00$76.50

Ref #137 609E10000 ASPHALT CONCRETE CURB, TYPE 1, (465 FT)

Awd $6,045.00$13.00

2 $16,275.00$35.00

3 $8,602.50$18.50

Ref #138 609E24510 CURB, TYPE 4-C, (276 FT)

Awd $2,442.60$8.85

2 $8,666.40$31.40

3 $3,394.80$12.30

Ref #139 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (1473 CY)

Awd $71,735.10$48.70

2 $66,285.00$45.00

3 $66,285.00$45.00

Ref #140 618E40600 RUMBLE STRIPS, (ASPHALT CONCRETE), (29 MILE)

Awd $26,528.33$914.77

2 $12,325.00$425.00

3 $11,745.00$405.00

Ref #141 880E15000 ASPHALT CONCRETE (7 YEAR WARRANTY), (121996 CY)

Awd $11,589,620.00$95.00

2 $13,175,568.00$108.00

3 $12,077,604.00$99.00

Section 4 - PAVEMENT - Totals

Awd $14,870,921.72

2 $16,308,565.90

3 $15,104,280.95

Ref #142 620E00500 DELINEATOR, POST MOUNTED, (438 EACH)

Awd $10,117.80$23.10

2 $13,884.60$31.70

3 $13,140.00$30.00

Ref #143 621E00100 RPM, (905 EACH)

Awd $15,348.80$16.96

2 $16,199.50$17.90

3 $26,199.75$28.95

Ref #144 625E32000 GROUND ROD, (3 EACH)

Awd $425.25$141.75

2 $810.00$270.00

3 $450.00$150.00

101078 - Page 182

Page 183: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #145 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (1722 FT)

Awd $9,953.16$5.78

2 $12,398.40$7.20

3 $11,193.00$6.50

Ref #146 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST, (46 FT)

Awd $338.10$7.35

2 $432.40$9.40

3 $391.00$8.50

Ref #147 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7, (198 FT)

Awd $2,807.64$14.18

2 $2,851.20$14.40

3 $2,574.00$13.00

Ref #148 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9, (182 FT)

Awd $2,771.86$15.23

2 $2,912.00$16.00

3 $2,639.00$14.50

Ref #149 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18, (93 FT)

Awd $2,338.95$25.15

2 $2,464.50$26.50

3 $2,232.00$24.00

Ref #150 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22, (164 FT)

Awd $4,821.60$29.40

2 $4,887.20$29.80

3 $4,428.00$27.00

Ref #151 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12, (304 FT)

Awd $5,745.60$18.90

2 $5,715.20$18.80

3 $3,952.00$13.00

Ref #152 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30, (295 FT)

Awd $11,227.70$38.06

2 $11,800.00$40.00

3 $8,555.00$29.00

Ref #153 630E08100 ONE WAY SUPPORT, NO. 4 POST, (101 FT)

Awd $742.35$7.35

2 $782.75$7.75

3 $1,111.00$11.00

Ref #154 630E08600 SIGN POST REFLECTOR, (37 EACH)

Awd $1,748.25$47.25

2 $1,221.00$33.00

3 $1,295.00$35.00

Ref #155 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION, (56 EACH)

Awd $18,522.00$330.75

2 $20,160.00$360.00

3 $15,680.00$280.00

Ref #156 630E20500 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 5, (1 EACH)

Awd $10,384.50$10,384.50

2 $10,700.00$10,700.00

3 $9,200.00$9,200.00

101078 - Page 183

Page 184: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #157 630E20600 OVERHEAD SIGN SUPPORT, TYPE TC-12.30, DESIGN 6, (1 EACH)

Awd $10,710.00$10,710.00

2 $11,745.00$11,745.00

3 $10,200.00$10,200.00

Ref #158 630E75000 SIGN ATTACHMENT ASSEMBLY, (4 EACH)

Awd $1,575.00$393.75

2 $1,700.00$425.00

3 $340.00$85.00

Ref #159 630E80100 SIGN, FLAT SHEET, (1075 SF)

Awd $14,673.75$13.65

2 $15,426.25$14.35

3 $14,512.50$13.50

Ref #160 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET, (1621 SF)

Awd $20,424.60$12.60

2 $30,474.80$18.80

3 $23,504.50$14.50

Ref #161 630E80201 SIGN, GROUND MOUNTED EXTRUSHEET, AS PER PLAN, (60 SF)

Awd $945.00$15.75

2 $1,161.00$19.35

3 $1,050.00$17.50

Ref #162 630E80224 SIGN, OVERHEAD EXTRUSHEET, (119 SF)

Awd $1,749.30$14.70

2 $2,368.10$19.90

3 $2,082.50$17.50

Ref #163 630E82000 SIGN BACKING ASSEMBLY, (2 EACH)

Awd $315.00$157.50

2 $276.00$138.00

3 $174.00$87.00

Ref #164 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (56 EACH)

Awd $30,870.00$551.25

2 $29,400.00$525.00

3 $36,400.00$650.00

Ref #165 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (3 EACH)

Awd $10,080.00$3,360.00

2 $10,530.00$3,510.00

3 $11,100.00$3,700.00

Ref #166 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (160 EACH)

Awd $3,360.00$21.00

2 $1,760.00$11.00

3 $1,920.00$12.00

Ref #167 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (4 EACH)

Awd $273.00$68.25

2 $154.80$38.70

3 $400.00$100.00

Ref #168 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL, (13 EACH)

Awd $682.50$52.50

2 $1,006.20$77.40

3 $975.00$75.00

101078 - Page 184

Page 185: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #169 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO, (5 EACH)

Awd $2,100.00$420.00

2 $1,075.00$215.00

3 $2,250.00$450.00

Ref #170 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (129 EACH)

Awd $3,386.25$26.25

2 $1,419.00$11.00

3 $1,548.00$12.00

Ref #171 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT , (48 EACH)

Awd $7,560.00$157.50

2 $7,200.00$150.00

3 $9,600.00$200.00

Ref #172 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION, (1 EACH)

Awd $210.00$210.00

2 $300.00$300.00

3 $600.00$600.00

Ref #173 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL, (2 EACH)

Awd $105.00$52.50

2 $156.00$78.00

3 $400.00$200.00

Ref #174 630E89100 REMOVAL OF OVERHEAD SIGN SUPPORT AND REERECTION, T, (1 EACH)

Awd $2,310.00$2,310.00

2 $5,360.00$5,360.00

3 $5,000.00$5,000.00

Ref #175 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, (2 EACH)

Awd $2,520.00$1,260.00

2 $1,940.00$970.00

3 $2,500.00$1,250.00

Ref #176 630E97700 SIGNING, MISC.:REMOVAL OF GROUND MOUNTED BEAM SUPP, (6 EACH)

Awd $598.50$99.75

2 $900.00$150.00

3 $1,200.00$200.00

Ref #177 646E10000 EDGE LINE, (35.23 MILE)

Awd $83,230.88$2,362.50

2 $88,075.00$2,500.00

3 $86,313.50$2,450.00

Ref #178 646E10100 LANE LINE, (16.46 MILE)

Awd $19,011.30$1,155.00

2 $18,764.40$1,140.00

3 $24,690.00$1,500.00

Ref #179 646E10200 CENTER LINE, (0.24 MILE)

Awd $1,134.00$4,725.00

2 $4,155.60$17,315.00

3 $1,080.00$4,500.00

Ref #180 646E10300 CHANNELIZING LINE, (5554 FT)

Awd $7,608.98$1.37

2 $10,830.30$1.95

3 $7,775.60$1.40

101078 - Page 185

Page 186: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #181 646E10400 STOP LINE, (110 FT)

Awd $924.00$8.40

2 $1,595.00$14.50

3 $990.00$9.00

Ref #182 646E10600 TRANSVERSE/DIAGONAL LINE, (90 FT)

Awd $472.50$5.25

2 $972.00$10.80

3 $540.00$6.00

Ref #183 646E20300 LANE ARROW, (13 EACH)

Awd $1,979.25$152.25

2 $2,314.00$178.00

3 $1,885.00$145.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $326,102.37

2 $358,277.20

3 $352,070.35

Ref #184 632E90104 REUSE OF TRAFFIC CONTROL ITEM: INSTALLATION OF RWI, (4 EACH)

Awd $5,250.00$1,312.50

2 $5,280.00$1,320.00

3 $5,000.00$1,250.00

Ref #185 632E90400 SIGNALIZATION, MISC.:REMOVAL AND STORAGE OF RWIS S, (4 EACH)

Awd $3,570.00$892.50

2 $3,600.00$900.00

3 $3,400.00$850.00

Ref #186 690E98000 SPECIAL - MISC.:ROAD WEATHER INFORMATION SYSTEM (R, (1 EACH)

Awd $2,940.00$2,940.00

2 $2,950.00$2,950.00

3 $2,800.00$2,800.00

Section 6 - TRAFFIC SIGNALS - Totals

Awd $11,760.00

2 $11,830.00

3 $11,200.00

Ref #187 202E38200 GUARDRAIL REMOVED FOR REUSE, (225 FT)

Awd $294.75$1.31

2 $292.50$1.30

3 $675.00$3.00

Ref #188 202E42806 ANCHOR ASSEMBLY REMOVED FOR REUSE, (1 EACH)

Awd $131.25$131.25

2 $132.00$132.00

3 $125.00$125.00

Ref #189 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE, (1 EACH)

Awd $84.00$84.00

2 $85.00$85.00

3 $80.00$80.00

101078 - Page 186

Page 187: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #190 202E58501 CATCH BASIN ABANDONED, AS PER PLAN, (2 EACH)

Awd $4,650.00$2,325.00

2 $1,800.00$900.00

3 $814.32$407.16

Ref #191 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (57302 SY)

Awd $85,953.00$1.50

2 $71,627.50$1.25

3 $71,627.50$1.25

Ref #192 411E10000 STABILIZED CRUSHED AGGREGATE, (341 CY)

Awd $27,280.00$80.00

2 $20,460.00$60.00

3 $12,923.90$37.90

Ref #193 603E04400 12" CONDUIT, TYPE B, (770 FT)

Awd $38,423.00$49.90

2 $28,490.00$37.00

3 $33,649.00$43.70

Ref #194 603E05900 15" CONDUIT, TYPE B, (700 FT)

Awd $37,695.00$53.85

2 $28,700.00$41.00

3 $31,185.00$44.55

Ref #195 604E04500 CATCH BASIN, NO. 2-2B, (4 EACH)

Awd $8,504.00$2,126.00

2 $5,800.00$1,450.00

3 $4,625.60$1,156.40

Ref #196 606E13000 GUARDRAIL, TYPE 5, (3431.25 FT)

Awd $40,351.50$11.76

2 $38,773.13$11.30

3 $38,430.00$11.20

Ref #197 606E22000 ANCHOR ASSEMBLY, TYPE B-98, (9 EACH)

Awd $13,797.00$1,533.00

2 $13,140.00$1,460.00

3 $13,140.00$1,460.00

Ref #198 606E26500 ANCHOR ASSEMBLY, TYPE T, (2 EACH)

Awd $1,312.50$656.25

2 $1,250.00$625.00

3 $1,250.00$625.00

Ref #199 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)

Awd $4,935.00$1,233.75

2 $4,700.00$1,175.00

3 $4,700.00$1,175.00

Ref #200 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (400 HOUR)

Awd $27,600.00$69.00

2 $26,000.00$65.00

3 $24,600.00$61.50

Ref #201 614E11500 WORKSITE TRAFFIC SUPERVISOR, (18 MNTH)

Awd $151,200.00$8,400.00

2 $94,950.00$5,275.00

3 $360,000.00$20,000.00

101078 - Page 187

Page 188: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #202 614E11600 TRANSITION AREA DELINEATION, (39698 FT)

Awd $39,698.00$1.00

2 $43,667.80$1.10

3 $79,396.00$2.00

Ref #203 614E11620 LINEAR DELINEATION, (24261 FT)

Awd $33,965.40$1.40

2 $30,326.25$1.25

3 $41,243.70$1.70

Ref #204 614E12346 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL)FOR 24, (17 EACH)

Awd $30,940.00$1,820.00

2 $32,045.00$1,885.00

3 $37,060.00$2,180.00

Ref #205 614E12410 SPEED ZONE AHEAD SYMBOL SIGN, (2 EACH)

Awd $740.00$370.00

2 $380.00$190.00

3 $240.00$120.00

Ref #206 614E12460 WORK ZONE MARKING SIGN, (30 EACH)

Awd $3,307.50$110.25

2 $3,150.00$105.00

3 $3,600.00$120.00

Ref #207 614E12470 WORK ZONE SPEED LIMIT SIGN, (45 EACH)

Awd $4,961.25$110.25

2 $7,875.00$175.00

3 $5,400.00$120.00

Ref #208 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (26 EACH)

Awd $2,866.50$110.25

2 $5,850.00$225.00

3 $3,900.00$150.00

Ref #209 614E12756 WORK ZONE CROSSOVER LIGHTING SYSTEM, (6 EACH)

Awd $107,100.00$17,850.00

2 $159,000.00$26,500.00

3 $271,290.00$45,215.00

Ref #210 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN, (4537 EACH)

Awd $51,494.95$11.35

2 $81,439.15$17.95

3 $96,411.25$21.25

Ref #211 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (500 CY)

Awd $111,245.00$222.49

2 $112,500.00$225.00

3 $87,500.00$175.00

Ref #212 614E13200 BARRIER REFLECTOR, TYPE A, (40 EACH)

Awd $170.00$4.25

2 $340.00$8.50

3 $200.00$5.00

Ref #213 614E13300 BARRIER REFLECTOR, TYPE B, (4800 EACH)

Awd $25,920.00$5.40

2 $21,600.00$4.50

3 $24,000.00$5.00

101078 - Page 188

Page 189: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #214 614E13350 OBJECT MARKER, ONE WAY, (2468 EACH)

Awd $38,871.00$15.75

2 $23,446.00$9.50

3 $19,744.00$8.00

Ref #215 614E13360 OBJECT MARKER, TWO WAY, (1485 EACH)

Awd $24,948.00$16.80

2 $15,592.50$10.50

3 $14,850.00$10.00

Ref #216 614E18010 MAINTAINING TRAFFIC, MISC.:3" PARTIAL DEPTH PAVEME, (30000 SF)

Awd $153,000.00$5.10

2 $105,000.00$3.50

3 $105,000.00$3.50

Ref #217 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (18 SNMT)

Awd $15,696.00$872.00

2 $18,000.00$1,000.00

3 $36,000.00$2,000.00

Ref #218 614E20100 WORK ZONE LANE LINE, CLASS I, 642 PAINT, (49.4 MILE)

Awd $15,561.00$315.00

2 $15,314.00$310.00

3 $14,820.00$300.00

Ref #219 614E22100 WORK ZONE EDGE LINE, CLASS I, 642 PAINT, (187.17 MILE)

Awd $134,032.44$716.10

2 $133,826.55$715.00

3 $127,649.94$682.00

Ref #220 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 642 PAINT, (62274 FT)

Awd $36,118.92$0.58

2 $37,364.40$0.60

3 $34,250.70$0.55

Ref #221 614E24200 WORK ZONE DOTTED LINE, CLASS I, 642 PAINT, (26509 FT)

Awd $14,049.77$0.53

2 $13,254.50$0.50

3 $13,254.50$0.50

Ref #222 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (143 FT)

Awd $1,501.50$10.50

2 $1,501.50$10.50

3 $1,430.00$10.00

Ref #223 615E20001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, AS PER , (186570 SY)

Awd $2,770,564.50$14.85

2 $3,731,400.00$20.00

3 $6,511,293.00$34.90

Ref #224 616E10000 WATER (WT: NR), (920 MGAL)

Awd $58,144.00$63.20

2 $25,760.00$28.00

3 $9,200.00$10.00

Ref #225 616E20000 CALCIUM CHLORIDE, (20 TON)

Awd $2,460.00$123.00

2 $7,000.00$350.00

3 $2,500.00$125.00

101078 - Page 189

Page 190: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #226 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE), (1034 FT)

Awd $51.70$0.05

2 $2,843.50$2.75

3 $2,202.42$2.13

Ref #227 620E00500 DELINEATOR, POST MOUNTED, (2684 EACH)

Awd $62,000.40$23.10

2 $87,230.00$32.50

3 $107,360.00$40.00

Ref #228 622E40020 PORTABLE CONCRETE BARRIER, 32", (92343 FT)

Awd $484,800.75$5.25

2 $738,744.00$8.00

3 $863,407.05$9.35

Ref #229 622E40031 PORTABLE CONCRETE BARRIER, 50", AS PER PLAN, (74117 FT)

Awd $589,230.15$7.95

2 $889,404.00$12.00

3 $1,148,813.50$15.50

Ref #230 622E40040 PORTABLE CONCRETE BARRIER, 32", BRIDGE MOUNTED, (858 FT)

Awd $22,951.50$26.75

2 $10,982.40$12.80

3 $22,822.80$26.60

Ref #231 622E40100 PORTABLE CONCRETE BARRIER, "Y" CONNECTOR, (2 EACH)

Awd $1,564.00$782.00

2 $4,000.00$2,000.00

3 $3,334.00$1,667.00

Ref #600 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)

Awd $732,500.00$732,500.00

2 $500,000.00$500,000.00

3 $576,871.00$576,871.00

Ref #601 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $17,325.00$17,325.00

2 $24,800.00$24,800.00

3 $17,320.00$17,320.00

Ref #602 614E18002 MAINTAINING TRAFFIC, MISC.:TEMPORARY SHEET PILING, (LUMP SUM)

Awd $29,862.00$29,862.00

2 $72,000.00$72,000.00

3 $95,000.00$95,000.00

Ref #604 614E50000 AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) SIGN, (2 EACH)

Awd $3,570.00$1,785.00

2 $5,800.00$2,900.00

3 $3,900.00$1,950.00

Section 7 - MAINTENANCE OF TRAFFIC - Totals

Awd $6,063,422.23

2 $7,297,636.68

3 $10,979,089.18

Ref #232 607E98000 FENCE, MISC.:FILTER FABRIC FENCE, (7200 FT)

Awd $37,800.00$5.25

2 $14,400.00$2.00

3 $10,800.00$1.50

101078 - Page 190

Page 191: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #233 607E98000 FENCE, MISC.:TEMPORARY CONSTRUCTION FENCE, (7200 FT)

Awd $37,800.00$5.25

2 $24,840.00$3.45

3 $14,400.00$2.00

Section 8 - ENVIRONMENTAL - Totals

Awd $75,600.00

2 $39,240.00

3 $25,200.00

Ref #234 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $99,750.00$99,750.00

2 $100,300.00$100,300.00

3 $133,081.50$133,081.50

Ref #235 202E22900 APPROACH SLAB REMOVED, (134 SY)

Awd $5,065.20$37.80

2 $5,092.00$38.00

3 $4,321.50$32.25

Ref #236 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $24,150.00$24,150.00

2 $24,285.00$24,285.00

3 $74,834.00$74,834.00

Ref #237 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $26,250.00$26,250.00

2 $26,400.00$26,400.00

3 $18,492.00$18,492.00

Ref #238 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)

Awd $10,500.00$10,500.00

2 $10,560.00$10,560.00

3 $15,487.00$15,487.00

Ref #239 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE, (680 FT)

Awd $11,424.00$16.80

2 $11,492.00$16.90

3 $44,404.00$65.30

Ref #240 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI, (800 FT)

Awd $25,200.00$31.50

2 $25,360.00$31.70

3 $15,640.00$19.55

Ref #241 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (56559 LB)

Awd $50,337.51$0.89

2 $50,903.10$0.90

3 $50,903.10$0.90

Ref #242 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)

Awd $89.00$0.89

2 $90.00$0.90

3 $300.00$3.00

Ref #243 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (192 EACH)

Awd $3,830.40$19.95

2 $3,840.00$20.00

3 $5,174.40$26.95

101078 - Page 191

Page 192: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #244 511E41000 CLASS C CONCRETE, PIER ABOVE FOOTINGS, (11 CY)

Awd $6,930.00$630.00

2 $6,974.00$634.00

3 $16,464.25$1,496.75

Ref #245 511E42500 CLASS C CONCRETE, PIER CAP, (9 CY)

Awd $16,065.00$1,785.00

2 $16,155.00$1,795.00

3 $21,555.00$2,395.00

Ref #246 511E43500 CLASS C CONCRETE, ABUTMENT INCLUDING FOOTING, (61 CY)

Awd $28,822.50$472.50

2 $28,975.00$475.00

3 $39,152.85$641.85

Ref #247 511E46500 CLASS C CONCRETE, FOOTING, (15 CY)

Awd $5,512.50$367.50

2 $5,550.00$370.00

3 $8,289.75$552.65

Ref #248 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (144 CY)

Awd $113,400.00$787.50

2 $113,760.00$790.00

3 $109,123.20$757.80

Ref #249 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (37 CY)

Awd $23,853.90$644.70

2 $24,050.00$650.00

3 $24,357.10$658.30

Ref #250 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $110.00$110.00

3 $890.80$890.80

Ref #251 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (468 SY)

Awd $8,845.20$18.90

2 $7,020.00$15.00

3 $7,183.80$15.35

Ref #252 512E33000 TYPE 2 WATERPROOFING, (12 SY)

Awd $126.00$10.50

2 $132.00$11.00

3 $234.00$19.50

Ref #253 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (11 SF)

Awd $115.50$10.50

2 $121.00$11.00

3 $83.60$7.60

Ref #254 518E21201 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (96 CY)

Awd $9,676.80$100.80

2 $10,560.00$110.00

3 $10,166.40$105.90

Ref #255 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (139 FT)

Awd $875.70$6.30

2 $903.50$6.50

3 $1,063.35$7.65

101078 - Page 192

Page 193: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #256 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (56 FT)

Awd $764.40$13.65

2 $784.00$14.00

3 $428.40$7.65

Ref #257 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (152 SF)

Awd $11,650.80$76.65

2 $10,944.00$72.00

3 $9,104.80$59.90

Ref #258 523E20000 DYNAMIC LOAD TESTING, (2 EACH)

Awd $10,500.00$5,250.00

2 $10,560.00$5,280.00

3 $4,650.00$2,325.00

Ref #259 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (295 SY)

Awd $58,852.50$199.50

2 $59,000.00$200.00

3 $71,050.75$240.85

Ref #260 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (404 SY)

Awd $11,453.40$28.35

2 $11,716.00$29.00

3 $16,665.00$41.25

Ref #261 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (655 SY)

Awd $33,012.00$50.40

2 $33,208.50$50.70

3 $30,785.00$47.00

Ref #262 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (429 SY)

Awd $27,927.90$65.10

2 $28,099.50$65.50

3 $26,383.50$61.50

Ref #263 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (14 CY)

Awd $2,940.00$210.00

2 $2,968.00$212.00

3 $3,498.60$249.90

Ref #264 848E50000 HAND CHIPPING, (13 SY)

Awd $1,365.00$105.00

2 $1,378.00$106.00

3 $1,257.75$96.75

Ref #265 848E50100 TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $106.00$106.00

3 $959.45$959.45

Ref #266 848E50200 FULL-DEPTH REPAIR, (8 CY)

Awd $1,680.00$210.00

2 $1,696.00$212.00

3 $1,000.00$125.00

Ref #267 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 2-1/4" THICK, (429 SY)

Awd $6,306.30$14.70

2 $6,435.00$15.00

3 $5,169.45$12.05

101078 - Page 193

Page 194: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #268 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (207 SY)

Awd $2,804.85$13.55

2 $2,898.00$14.00

3 $9,511.65$45.95

Section 9 - STRUCTURE REPAIR BRIDGE NO. ATB-90-2272 - Totals

Awd $640,286.36

2 $642,425.60

3 $781,665.95

Ref #269 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $94,500.00$94,500.00

2 $80,000.00$80,000.00

3 $132,781.00$132,781.00

Ref #270 202E22900 APPROACH SLAB REMOVED, (134 SY)

Awd $5,205.90$38.85

2 $5,226.00$39.00

3 $4,314.80$32.20

Ref #271 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $3,150.00$3,150.00

2 $3,000.00$3,000.00

3 $1.00$1.00

Ref #272 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $18,900.00$18,900.00

2 $19,000.00$19,000.00

3 $8,733.00$8,733.00

Ref #273 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)

Awd $10,500.00$10,500.00

2 $10,000.00$10,000.00

3 $15,487.00$15,487.00

Ref #274 507E00500 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, DRIVE, (300 FT)

Awd $5,355.00$17.85

2 $5,370.00$17.90

3 $28,245.00$94.15

Ref #275 507E00550 12" CAST-IN-PLACE REINFORCED CONCRETE PILES, FURNI, (360 FT)

Awd $11,718.00$32.55

2 $11,772.00$32.70

3 $7,092.00$19.70

Ref #276 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (35059 LB)

Awd $31,553.10$0.90

2 $31,553.10$0.90

3 $31,553.10$0.90

Ref #277 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)

Awd $64.00$0.64

2 $85.00$0.85

3 $300.00$3.00

Ref #278 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (176 EACH)

Awd $3,696.00$21.00

2 $3,696.00$21.00

3 $4,743.20$26.95

101078 - Page 194

Page 195: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #279 511E42500 CLASS C CONCRETE, PIER CAP, (3 CY)

Awd $12,600.00$4,200.00

2 $12,600.00$4,200.00

3 $11,175.45$3,725.15

Ref #280 511E43500 CLASS C CONCRETE, ABUTMENT INCLUDING FOOTING, (37 CY)

Awd $17,094.00$462.00

2 $17,020.00$460.00

3 $24,915.80$673.40

Ref #281 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (91 CY)

Awd $78,351.00$861.00

2 $78,715.00$865.00

3 $77,058.80$846.80

Ref #282 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (37 CY)

Awd $21,950.25$593.25

2 $21,830.00$590.00

3 $24,357.10$658.30

Ref #283 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $105.00$105.00

3 $959.45$959.45

Ref #284 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (432 SY)

Awd $8,164.80$18.90

2 $6,350.40$14.70

3 $6,609.60$15.30

Ref #285 512E33000 TYPE 2 WATERPROOFING, (8 SY)

Awd $168.00$21.00

2 $168.00$21.00

3 $156.00$19.50

Ref #286 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (11 SF)

Awd $115.50$10.50

2 $110.00$10.00

3 $83.60$7.60

Ref #287 518E21201 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (52 CY)

Awd $5,350.80$102.90

2 $5,200.00$100.00

3 $5,506.80$105.90

Ref #288 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (124 FT)

Awd $781.20$6.30

2 $744.00$6.00

3 $948.60$7.65

Ref #289 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (36 FT)

Awd $491.40$13.65

2 $486.00$13.50

3 $275.40$7.65

Ref #290 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (120 SF)

Awd $9,324.00$77.70

2 $8,400.00$70.00

3 $7,188.00$59.90

101078 - Page 195

Page 196: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #291 523E20000 DYNAMIC LOAD TESTING, (1 EACH)

Awd $5,250.00$5,250.00

2 $5,200.00$5,200.00

3 $2,325.00$2,325.00

Ref #292 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (250 SY)

Awd $49,875.00$199.50

2 $50,000.00$200.00

3 $59,187.50$236.75

Ref #293 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (342 SY)

Awd $9,695.70$28.35

2 $9,576.00$28.00

3 $14,107.50$41.25

Ref #294 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (555 SY)

Awd $25,058.25$45.15

2 $24,975.00$45.00

3 $21,367.50$38.50

Ref #295 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (429 SY)

Awd $27,927.90$65.10

2 $27,885.00$65.00

3 $26,126.10$60.90

Ref #296 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (9 CY)

Awd $1,890.00$210.00

2 $1,899.00$211.00

3 $2,249.10$249.90

Ref #297 848E50000 HAND CHIPPING, (8 SY)

Awd $840.00$105.00

2 $840.00$105.00

3 $870.80$108.85

Ref #298 848E50100 TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $105.00$105.00

3 $959.45$959.45

Ref #299 848E50200 FULL-DEPTH REPAIR, (9 CY)

Awd $1,890.00$210.00

2 $1,890.00$210.00

3 $1,125.00$125.00

Ref #300 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 2-1/4" THICK, (429 SY)

Awd $6,306.30$14.70

2 $6,177.60$14.40

3 $5,169.45$12.05

Ref #301 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (207 SY)

Awd $2,804.85$13.55

2 $2,898.00$14.00

3 $9,511.65$45.95

Section 10 - BRIDGE NO. ATB-90-2272 R - Totals

Awd $470,780.95

2 $452,876.10

3 $535,483.75

101078 - Page 196

Page 197: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #302 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $99,750.00$99,750.00

2 $80,000.00$80,000.00

3 $117,105.00$117,105.00

Ref #303 202E22900 APPROACH SLAB REMOVED, (134 SY)

Awd $5,065.20$37.80

2 $5,092.00$38.00

3 $4,314.80$32.20

Ref #304 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $24,150.00$24,150.00

2 $25,000.00$25,000.00

3 $54,569.00$54,569.00

Ref #305 503E21302 UNCLASSIFIED EXCAVATION INCLUDING SHALE, (LUMP SUM)

Awd $21,000.00$21,000.00

2 $22,000.00$22,000.00

3 $17,801.00$17,801.00

Ref #306 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)

Awd $8,400.00$8,400.00

2 $8,450.00$8,450.00

3 $15,487.00$15,487.00

Ref #307 507E00100 STEEL PILES HP10X42, FURNISHED, (400 FT)

Awd $11,760.00$29.40

2 $12,000.00$30.00

3 $8,340.00$20.85

Ref #308 507E00150 STEEL PILES HP10X42, DRIVEN, (320 FT)

Awd $5,040.00$15.75

2 $5,120.00$16.00

3 $12,896.00$40.30

Ref #309 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (56041 LB)

Awd $49,876.49$0.89

2 $56,041.00$1.00

3 $50,436.90$0.90

Ref #310 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)

Awd $85.00$0.85

2 $100.00$1.00

3 $300.00$3.00

Ref #311 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (180 EACH)

Awd $3,591.00$19.95

2 $3,600.00$20.00

3 $4,851.00$26.95

Ref #312 511E41000 CLASS C CONCRETE, PIER ABOVE FOOTINGS, (11 CY)

Awd $6,930.00$630.00

2 $6,963.00$633.00

3 $16,464.25$1,496.75

Ref #313 511E42500 CLASS C CONCRETE, PIER CAP, (9 CY)

Awd $16,537.50$1,837.50

2 $16,650.00$1,850.00

3 $21,827.25$2,425.25

101078 - Page 197

Page 198: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #314 511E43500 CLASS C CONCRETE, ABUTMENT INCLUDING FOOTING, (48 CY)

Awd $20,916.00$435.75

2 $21,024.00$438.00

3 $29,704.80$618.85

Ref #315 511E46500 CLASS C CONCRETE, FOOTING, (12 CY)

Awd $4,095.00$341.25

2 $4,116.00$343.00

3 $7,416.60$618.05

Ref #316 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (147 CY)

Awd $104,958.00$714.00

2 $105,546.00$718.00

3 $111,161.40$756.20

Ref #317 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (38 CY)

Awd $23,940.00$630.00

2 $24,130.00$635.00

3 $24,812.10$652.95

Ref #318 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $106.00$106.00

3 $959.45$959.45

Ref #319 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (581 SY)

Awd $10,980.90$18.90

2 $8,569.75$14.75

3 $8,889.30$15.30

Ref #320 512E33000 TYPE 2 WATERPROOFING, (7 SY)

Awd $147.00$21.00

2 $147.00$21.00

3 $136.15$19.45

Ref #321 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (12 SF)

Awd $126.00$10.50

2 $132.00$11.00

3 $91.20$7.60

Ref #322 518E21201 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (43 CY)

Awd $4,515.00$105.00

2 $4,558.00$106.00

3 $4,553.70$105.90

Ref #323 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (139 FT)

Awd $875.70$6.30

2 $903.50$6.50

3 $1,063.35$7.65

Ref #324 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (26 FT)

Awd $382.20$14.70

2 $390.00$15.00

3 $198.90$7.65

Ref #325 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (114 SF)

Awd $8,738.10$76.65

2 $8,208.00$72.00

3 $6,828.60$59.90

101078 - Page 198

Page 199: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #326 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (295 SY)

Awd $57,303.75$194.25

2 $57,525.00$195.00

3 $71,050.75$240.85

Ref #327 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (459 SY)

Awd $13,012.65$28.35

2 $13,311.00$29.00

3 $18,933.75$41.25

Ref #328 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (670 SY)

Awd $37,285.50$55.65

2 $37,520.00$56.00

3 $35,945.50$53.65

Ref #329 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (438 SY)

Awd $28,513.80$65.10

2 $28,908.00$66.00

3 $26,937.00$61.50

Ref #330 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (7 CY)

Awd $1,470.00$210.00

2 $1,484.00$212.00

3 $1,749.30$249.90

Ref #331 848E50000 HAND CHIPPING, (7 SY)

Awd $735.00$105.00

2 $742.00$106.00

3 $798.70$114.10

Ref #332 848E50100 TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $106.00$106.00

3 $959.45$959.45

Ref #333 848E50200 FULL-DEPTH REPAIR, (12 CY)

Awd $2,520.00$210.00

2 $2,520.00$210.00

3 $1,500.00$125.00

Ref #334 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 2" THICK, (438 SY)

Awd $6,438.60$14.70

2 $6,570.00$15.00

3 $5,212.20$11.90

Ref #335 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (46 SY)

Awd $623.30$13.55

2 $644.00$14.00

3 $2,113.70$45.95

Section 11 - BRIDGE NO. ATB-90-2770 L - Totals

Awd $579,971.69

2 $568,176.25

3 $685,408.10

Ref #336 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $94,500.00$94,500.00

2 $96,000.00$96,000.00

3 $117,105.00$117,105.00

101078 - Page 199

Page 200: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #337 202E22900 APPROACH SLAB REMOVED, (134 SY)

Awd $5,065.20$37.80

2 $5,092.00$38.00

3 $4,314.80$32.20

Ref #338 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $525.00$525.00

2 $530.00$530.00

3 $1.00$1.00

Ref #339 503E21302 UNCLASSIFIED EXCAVATION INCLUDING SHALE, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $19,000.00$19,000.00

3 $14,878.95$14,878.95

Ref #340 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)

Awd $8,400.00$8,400.00

2 $8,450.00$8,450.00

3 $15,487.10$15,487.10

Ref #341 507E00100 STEEL PILES HP10X42, FURNISHED, (300 FT)

Awd $9,450.00$31.50

2 $9,600.00$32.00

3 $6,255.00$20.85

Ref #342 507E00150 STEEL PILES HP10X42, DRIVEN, (240 FT)

Awd $4,032.00$16.80

2 $4,080.00$17.00

3 $12,768.00$53.20

Ref #343 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (35038 LB)

Awd $31,534.20$0.90

2 $35,038.00$1.00

3 $31,534.20$0.90

Ref #344 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)

Awd $87.00$0.87

2 $100.00$1.00

3 $300.00$3.00

Ref #345 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (168 EACH)

Awd $3,528.00$21.00

2 $3,528.00$21.00

3 $4,527.60$26.95

Ref #346 511E42500 CLASS C CONCRETE, PIER CAP, (3 CY)

Awd $12,600.00$4,200.00

2 $12,675.00$4,225.00

3 $11,297.10$3,765.70

Ref #347 511E43500 CLASS C CONCRETE, ABUTMENT INCLUDING FOOTING, (31 CY)

Awd $14,647.50$472.50

2 $14,725.00$475.00

3 $20,954.45$675.95

Ref #348 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (93 CY)

Awd $79,584.75$855.75

2 $79,980.00$860.00

3 $78,454.80$843.60

101078 - Page 200

Page 201: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #349 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (38 CY)

Awd $22,344.00$588.00

2 $22,496.00$592.00

3 $24,812.10$652.95

Ref #350 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $106.00$106.00

3 $959.45$959.45

Ref #351 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (513 SY)

Awd $9,695.70$18.90

2 $7,566.75$14.75

3 $7,848.90$15.30

Ref #352 512E33000 TYPE 2 WATERPROOFING, (7 SY)

Awd $147.00$21.00

2 $147.00$21.00

3 $136.15$19.45

Ref #353 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (12 SF)

Awd $126.00$10.50

2 $132.00$11.00

3 $90.60$7.55

Ref #354 518E21201 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (27 CY)

Awd $3,685.50$136.50

2 $3,699.00$137.00

3 $2,859.30$105.90

Ref #355 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (127 FT)

Awd $800.10$6.30

2 $825.50$6.50

3 $971.55$7.65

Ref #356 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (11 FT)

Awd $161.70$14.70

2 $165.00$15.00

3 $84.15$7.65

Ref #357 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (68 SF)

Awd $5,212.20$76.65

2 $4,896.00$72.00

3 $4,073.20$59.90

Ref #358 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (250 SY)

Awd $49,875.00$199.50

2 $50,250.00$201.00

3 $59,187.50$236.75

Ref #359 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (315 SY)

Awd $8,930.25$28.35

2 $9,135.00$29.00

3 $12,993.75$41.25

Ref #360 848E10201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY USING HYDR, (567 SY)

Awd $28,576.80$50.40

2 $28,917.00$51.00

3 $25,458.30$44.90

101078 - Page 201

Page 202: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #361 848E20000 SURFACE PREPARATION USING HYDRODEMOLITION, (438 SY)

Awd $28,513.80$65.10

2 $28,908.00$66.00

3 $26,674.20$60.90

Ref #362 848E30201 SUPERPLASTICIZED DENSE CONCRETE OVERLAY (VARIABLE , (7 CY)

Awd $1,470.00$210.00

2 $1,484.00$212.00

3 $1,749.30$249.90

Ref #363 848E50000 HAND CHIPPING, (7 SY)

Awd $735.00$105.00

2 $742.00$106.00

3 $798.70$114.10

Ref #364 848E50100 TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $106.00$106.00

3 $959.45$959.45

Ref #365 848E50200 FULL-DEPTH REPAIR, (5 CY)

Awd $1,050.00$210.00

2 $1,060.00$212.00

3 $625.00$125.00

Ref #366 848E50320 EXISTING CONCRETE OVERLAY REMOVED, 2" THICK, (438 SY)

Awd $6,438.60$14.70

2 $6,570.00$15.00

3 $5,212.20$11.90

Ref #367 848E50340 REMOVAL OF DEBONDED OR DETERIORATED EXISTING VARIA, (46 SY)

Awd $623.30$13.55

2 $644.00$14.00

3 $2,113.70$45.95

Section 12 - BRIDGE NO. ATB-90-2770 R - Totals

Awd $442,548.60

2 $456,647.25

3 $495,485.50

Ref #368 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $141,750.00$141,750.00

2 $138,000.00$138,000.00

3 $67,678.00$67,678.00

Ref #369 202E22900 APPROACH SLAB REMOVED, (134 SY)

Awd $4,783.80$35.70

2 $4,824.00$36.00

3 $4,314.80$32.20

Ref #370 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $50,400.00$50,400.00

2 $51,000.00$51,000.00

3 $83,785.00$83,785.00

Ref #371 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $29,400.00$29,400.00

2 $30,000.00$30,000.00

3 $32,891.60$32,891.60

101078 - Page 202

Page 203: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #372 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)

Awd $8,400.00$8,400.00

2 $8,450.00$8,450.00

3 $15,487.10$15,487.10

Ref #373 507E00100 STEEL PILES HP10X42, FURNISHED, (990 FT)

Awd $29,106.00$29.40

2 $29,700.00$30.00

3 $20,641.50$20.85

Ref #374 507E00150 STEEL PILES HP10X42, DRIVEN, (830 FT)

Awd $13,072.50$15.75

2 $13,280.00$16.00

3 $38,180.00$46.00

Ref #375 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (166083 LB)

Awd $151,135.53$0.91

2 $166,083.00$1.00

3 $149,474.70$0.90

Ref #376 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (572 EACH)

Awd $9,609.60$16.80

2 $9,724.00$17.00

3 $15,415.40$26.95

Ref #377 511E42000 CLASS C CONCRETE, PIER ABOVE FOOTINGS, (200 CY)

Awd $130,200.00$651.00

2 $131,000.00$655.00

3 $164,450.00$822.25

Ref #378 511E43500 CLASS C CONCRETE, ABUTMENT INCLUDING FOOTING, (106 CY)

Awd $50,641.50$477.75

2 $50,880.00$480.00

3 $62,921.60$593.60

Ref #379 511E46500 CLASS C CONCRETE, FOOTING, (28 CY)

Awd $9,702.00$346.50

2 $9,800.00$350.00

3 $13,147.40$469.55

Ref #380 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (400 CY)

Awd $235,200.00$588.00

2 $236,800.00$592.00

3 $252,120.00$630.30

Ref #381 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (64 CY)

Awd $36,086.40$563.85

2 $36,288.00$567.00

3 $39,033.60$609.90

Ref #382 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $106.00$106.00

3 $959.45$959.45

Ref #383 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1195 SY)

Awd $21,330.75$17.85

2 $17,626.25$14.75

3 $18,283.50$15.30

101078 - Page 203

Page 204: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #384 512E33000 TYPE 2 WATERPROOFING, (9 SY)

Awd $189.00$21.00

2 $189.00$21.00

3 $175.50$19.50

Ref #385 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (257700 LB)

Awd $301,509.00$1.17

2 $322,125.00$1.25

3 $335,010.00$1.30

Ref #386 513E20000 WELDED STUD SHEAR CONNECTORS, (3528 EACH)

Awd $12,983.04$3.68

2 $13,053.60$3.70

3 $9,172.80$2.60

Ref #387 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (65 SF)

Awd $1,023.75$15.75

2 $1,040.00$16.00

3 $494.00$7.60

Ref #388 516E14021 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PE, (172 FT)

Awd $8,668.80$50.40

2 $8,772.00$51.00

3 $5,701.80$33.15

Ref #389 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (14 EACH)

Awd $8,379.00$598.50

2 $8,428.00$602.00

3 $13,968.50$997.75

Ref #390 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (14 EACH)

Awd $13,009.50$929.25

2 $13,090.00$935.00

3 $19,323.50$1,380.25

Ref #391 518E21201 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (115 CY)

Awd $9,297.75$80.85

2 $9,430.00$82.00

3 $9,941.75$86.45

Ref #392 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (187 FT)

Awd $1,178.10$6.30

2 $1,215.50$6.50

3 $1,430.55$7.65

Ref #393 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (56 FT)

Awd $705.60$12.60

2 $728.00$13.00

3 $428.40$7.65

Ref #394 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (54 SF)

Awd $4,139.10$76.65

2 $3,888.00$72.00

3 $3,234.60$59.90

Ref #395 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (295 SY)

Awd $58,852.50$199.50

2 $59,000.00$200.00

3 $71,050.75$240.85

101078 - Page 204

Page 205: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #396 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (836 SY)

Awd $23,700.60$28.35

2 $23,826.00$28.50

3 $34,485.00$41.25

Section 13 - BRIDGE NO. ATB-90-2838 L - Totals

Awd $1,364,558.82

2 $1,398,346.35

3 $1,483,200.80

Ref #397 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $136,500.00$136,500.00

2 $130,000.00$130,000.00

3 $67,647.20$67,647.20

Ref #398 202E22900 APPROACH SLAB REMOVED, (134 SY)

Awd $5,346.60$39.90

2 $5,360.00$40.00

3 $4,314.80$32.20

Ref #399 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)

Awd $12,600.00$12,600.00

2 $13,000.00$13,000.00

3 $48,858.00$48,858.00

Ref #400 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)

Awd $23,100.00$23,100.00

2 $24,000.00$24,000.00

3 $21,150.00$21,150.00

Ref #401 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)

Awd $8,400.00$8,400.00

2 $8,450.00$8,450.00

3 $15,487.00$15,487.00

Ref #402 507E00100 STEEL PILES HP10X42, FURNISHED, (405 FT)

Awd $12,332.25$30.45

2 $12,555.00$31.00

3 $8,444.25$20.85

Ref #403 507E00150 STEEL PILES HP10X42, DRIVEN, (360 FT)

Awd $6,048.00$16.80

2 $6,120.00$17.00

3 $25,056.00$69.60

Ref #404 509E10001 EPOXY COATED REINFORCING STEEL, AS PER PLAN, (120885 LB)

Awd $111,214.20$0.92

2 $120,885.00$1.00

3 $108,796.50$0.90

Ref #405 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (524 EACH)

Awd $9,353.40$17.85

2 $9,405.80$17.95

3 $14,121.80$26.95

Ref #406 511E42000 CLASS C CONCRETE, PIER ABOVE FOOTINGS, (119 CY)

Awd $84,966.00$714.00

2 $85,442.00$718.00

3 $102,232.90$859.10

101078 - Page 205

Page 206: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #407 511E43500 CLASS C CONCRETE, ABUTMENT INCLUDING FOOTING, (87 CY)

Awd $46,588.50$535.50

2 $46,980.00$540.00

3 $48,972.30$562.90

Ref #408 511E50001 CLASS HP CONCRETE, BRIDGE DECK, AS PER PLAN, (344 CY)

Awd $187,824.00$546.00

2 $189,200.00$550.00

3 $211,009.60$613.40

Ref #409 511E50101 CLASS HP CONCRETE, BRIDGE DECK (PARAPET), AS PER P, (64 CY)

Awd $34,003.20$531.30

2 $34,240.00$535.00

3 $39,001.60$609.40

Ref #410 511E52000 CLASS HP CONCRETE, TEST SLAB, (LUMP SUM)

Awd $105.00$105.00

2 $106.00$106.00

3 $959.45$959.45

Ref #411 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1050 SY)

Awd $19,845.00$18.90

2 $15,487.50$14.75

3 $16,065.00$15.30

Ref #412 513E10260 STRUCTURAL STEEL MEMBERS, LEVEL 3, (220000 LB)

Awd $261,800.00$1.19

2 $275,000.00$1.25

3 $286,000.00$1.30

Ref #413 513E20000 WELDED STUD SHEAR CONNECTORS, (3024 EACH)

Awd $11,128.32$3.68

2 $11,188.80$3.70

3 $7,862.40$2.60

Ref #414 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (65 SF)

Awd $1,023.75$15.75

2 $1,040.00$16.00

3 $494.00$7.60

Ref #415 516E14021 SEMI-INTEGRAL ABUTMENT EXPANSION JOINT SEAL, AS PE, (151 FT)

Awd $7,768.95$51.45

2 $7,852.00$52.00

3 $5,005.65$33.15

Ref #416 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)

Awd $7,182.00$598.50

2 $7,224.00$602.00

3 $11,973.00$997.75

Ref #417 516E44301 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)

Awd $11,151.00$929.25

2 $11,220.00$935.00

3 $16,563.00$1,380.25

Ref #418 518E21201 POROUS BACKFILL WITH FILTER FABRIC, AS PER PLAN, (104 CY)

Awd $9,063.60$87.15

2 $9,152.00$88.00

3 $8,122.40$78.10

101078 - Page 206

Page 207: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #419 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (167 FT)

Awd $876.75$5.25

2 $918.50$5.50

3 $1,277.55$7.65

Ref #420 518E40011 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (56 FT)

Awd $705.60$12.60

2 $728.00$13.00

3 $428.40$7.65

Ref #421 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (42 SF)

Awd $3,528.00$84.00

2 $3,024.00$72.00

3 $2,515.80$59.90

Ref #422 526E25001 REINFORCED CONCRETE APPROACH SLABS (T=15"), AS PER, (250 SY)

Awd $51,450.00$205.80

2 $51,750.00$207.00

3 $59,187.50$236.75

Ref #423 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (743 SY)

Awd $21,064.05$28.35

2 $21,175.50$28.50

3 $30,648.75$41.25

Section 14 - BRIDGE NO. ATB-90-2838 R - Totals

Awd $1,084,968.17

2 $1,101,504.10

3 $1,162,194.85

Ref #424 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $25,200.00$25,200.00

2 $26,000.00$26,000.00

3 $46,351.00$46,351.00

Ref #425 202E23501 WEARING COURSE REMOVED, AS PER PLAN, (1092 SY)

Awd $9,828.00$9.00

2 $10,920.00$10.00

3 $2,074.80$1.90

Ref #426 407E10000 TACK COAT, (83 GAL)

Awd $261.45$3.15

2 $166.00$2.00

3 $261.45$3.15

Ref #427 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (44 GAL)

Awd $140.80$3.20

2 $88.00$2.00

3 $140.80$3.20

Ref #428 448E46020 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (38 CY)

Awd $9,120.00$240.00

2 $8,550.00$225.00

3 $9,120.00$240.00

Ref #429 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (38 CY)

Awd $8,588.00$226.00

2 $8,550.00$225.00

3 $8,588.00$226.00

101078 - Page 207

Page 208: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #430 509E10000 EPOXY COATED REINFORCING STEEL, (1140 LB)

Awd $1,197.00$1.05

2 $1,254.00$1.10

3 $1,026.00$0.90

Ref #431 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)

Awd $105.00$1.05

2 $110.00$1.10

3 $300.00$3.00

Ref #432 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (160 EACH)

Awd $2,688.00$16.80

2 $2,720.00$17.00

3 $4,312.00$26.95

Ref #433 511E34400 CLASS S CONCRETE, SUPERSTRUCTURE, (6 CY)

Awd $12,600.00$2,100.00

2 $12,690.00$2,115.00

3 $10,104.60$1,684.10

Ref #434 511E45700 CLASS C CONCRETE, ABUTMENT, (6 CY)

Awd $3,528.00$588.00

2 $3,570.00$595.00

3 $1,680.00$280.00

Ref #435 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1145 SY)

Awd $19,236.00$16.80

2 $16,888.75$14.75

3 $17,518.50$15.30

Ref #436 512E33010 TYPE 3 WATERPROOFING, (959 SY)

Awd $20,139.00$21.00

2 $20,139.00$21.00

3 $11,172.35$11.65

Ref #437 513E21500 REPLACEMENT OF DETERIORATED END CROSSFRAMES, (1860 LB)

Awd $12,703.80$6.83

2 $13,020.00$7.00

3 $12,276.00$6.60

Ref #438 514E00301 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (LUMP SUM)

Awd $5,250.00$5,250.00

2 $5,500.00$5,500.00

3 $4,173.00$4,173.00

Ref #439 514E00401 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (LUMP SUM)

Awd $5,250.00$5,250.00

2 $5,500.00$5,500.00

3 $4,173.00$4,173.00

Ref #440 514E10000 FINAL INSPECTION REPAIR, (1 EACH)

Awd $315.00$315.00

2 $330.00$330.00

3 $300.00$300.00

Ref #441 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (74 FT)

Awd $32,634.00$441.00

2 $32,930.00$445.00

3 $26,462.40$357.60

101078 - Page 208

Page 209: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #442 516E46701 RESET BEARING, AS PER PLAN, (5 EACH)

Awd $1,680.00$336.00

2 $1,700.00$340.00

3 $4,678.25$935.65

Ref #443 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $3,045.00$3,045.00

2 $3,060.00$3,060.00

3 $7,544.00$7,544.00

Ref #444 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (47 SF)

Awd $3,257.10$69.30

2 $3,384.00$72.00

3 $2,815.30$59.90

Ref #445 519E11710 SPECIAL - PATCHING CONCRETE STRUCTURES, MISC.:BRID, (440 SY)

Awd $91,938.00$208.95

2 $121,000.00$275.00

3 $95,172.00$216.30

Ref #446 519E11900 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.:BRIDG, (3 CY)

Awd $630.00$210.00

2 $630.00$210.00

3 $561.30$187.10

Ref #447 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (520 SY)

Awd $13,650.00$26.25

2 $13,728.00$26.40

3 $21,450.00$41.25

Section 15 - BRIDGE NO. ATB-90-2387 - Totals

Awd $282,984.15

2 $312,427.75

3 $292,254.75

Ref #448 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $16,800.00$16,800.00

2 $18,000.00$18,000.00

3 $46,351.00$46,351.00

Ref #449 509E10000 EPOXY COATED REINFORCING STEEL, (920 LB)

Awd $966.00$1.05

2 $1,012.00$1.10

3 $828.00$0.90

Ref #450 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)

Awd $105.00$1.05

2 $110.00$1.10

3 $300.00$3.00

Ref #451 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (136 EACH)

Awd $2,284.80$16.80

2 $2,312.00$17.00

3 $3,665.20$26.95

Ref #452 511E34400 CLASS S CONCRETE, SUPERSTRUCTURE, (5 CY)

Awd $9,975.00$1,995.00

2 $10,050.00$2,010.00

3 $8,421.25$1,684.25

101078 - Page 209

Page 210: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #453 511E45700 CLASS C CONCRETE, ABUTMENT, (5 CY)

Awd $2,625.00$525.00

2 $2,650.00$530.00

3 $1,399.25$279.85

Ref #454 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (900 SY)

Awd $16,065.00$17.85

2 $13,275.00$14.75

3 $13,770.00$15.30

Ref #455 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (885 SY)

Awd $6,504.75$7.35

2 $9,735.00$11.00

3 $5,796.75$6.55

Ref #456 513E21000 TRIMMING OF BEAM END, (8 EACH)

Awd $1,008.00$126.00

2 $1,016.00$127.00

3 $8,646.40$1,080.80

Ref #457 513E21500 REPLACEMENT OF DETERIORATED END CROSSFRAMES, (1300 LB)

Awd $8,879.00$6.83

2 $9,100.00$7.00

3 $10,205.00$7.85

Ref #458 514E00301 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (LUMP SUM)

Awd $5,250.00$5,250.00

2 $5,500.00$5,500.00

3 $4,173.00$4,173.00

Ref #459 514E00401 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (LUMP SUM)

Awd $5,250.00$5,250.00

2 $5,500.00$5,500.00

3 $4,173.00$4,173.00

Ref #460 514E10000 FINAL INSPECTION REPAIR, (1 EACH)

Awd $315.00$315.00

2 $330.00$330.00

3 $300.00$300.00

Ref #461 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (61 FT)

Awd $26,901.00$441.00

2 $27,145.00$445.00

3 $23,027.50$377.50

Ref #462 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (15 SF)

Awd $1,575.00$105.00

2 $1,469.25$97.95

3 $898.50$59.90

Ref #463 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (360 SY)

Awd $9,450.00$26.25

2 $9,504.00$26.40

3 $14,850.00$41.25

Section 16 - BRIDGE NO. ATB-90-2457 - Totals

Awd $113,953.55

2 $116,708.25

3 $146,804.85

101078 - Page 210

Page 211: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #464 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $22,050.00$22,050.00

2 $23,000.00$23,000.00

3 $46,351.00$46,351.00

Ref #465 202E23501 WEARING COURSE REMOVED, AS PER PLAN, (889 SY)

Awd $9,876.79$11.11

2 $8,890.00$10.00

3 $1,689.10$1.90

Ref #466 407E10000 TACK COAT, (68 GAL)

Awd $214.88$3.16

2 $136.00$2.00

3 $214.88$3.16

Ref #467 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (36 GAL)

Awd $117.72$3.27

2 $72.00$2.00

3 $113.76$3.16

Ref #468 448E46020 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (32 CY)

Awd $8,314.88$259.84

2 $7,200.00$225.00

3 $8,315.20$259.85

Ref #469 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (32 CY)

Awd $7,834.24$244.82

2 $7,200.00$225.00

3 $7,833.60$244.80

Ref #470 509E10000 EPOXY COATED REINFORCING STEEL, (1013 LB)

Awd $1,063.65$1.05

2 $1,114.30$1.10

3 $921.83$0.91

Ref #471 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)

Awd $105.00$1.05

2 $110.00$1.10

3 $300.00$3.00

Ref #472 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (140 EACH)

Awd $2,352.00$16.80

2 $2,380.00$17.00

3 $3,773.00$26.95

Ref #473 511E34400 CLASS S CONCRETE, SUPERSTRUCTURE, (5 CY)

Awd $9,975.00$1,995.00

2 $10,050.00$2,010.00

3 $8,421.25$1,684.25

Ref #474 511E45700 CLASS C CONCRETE, ABUTMENT, (5 CY)

Awd $3,018.75$603.75

2 $3,035.00$607.00

3 $1,407.50$281.50

Ref #475 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (913 SY)

Awd $16,297.05$17.85

2 $13,466.75$14.75

3 $13,968.90$15.30

101078 - Page 211

Page 212: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #476 512E33010 TYPE 3 WATERPROOFING, (756 SY)

Awd $15,876.00$21.00

2 $15,876.00$21.00

3 $10,168.20$13.45

Ref #477 513E21500 REPLACEMENT OF DETERIORATED END CROSSFRAMES, (1300 LB)

Awd $8,879.00$6.83

2 $9,100.00$7.00

3 $10,530.00$8.10

Ref #478 514E00301 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (LUMP SUM)

Awd $5,250.00$5,250.00

2 $5,500.00$5,500.00

3 $4,173.50$4,173.50

Ref #479 514E00401 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (LUMP SUM)

Awd $5,250.00$5,250.00

2 $5,500.00$5,500.00

3 $4,173.50$4,173.50

Ref #480 514E10000 FINAL INSPECTION REPAIR, (1 EACH)

Awd $315.00$315.00

2 $330.00$330.00

3 $300.00$300.00

Ref #481 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (61 FT)

Awd $26,901.00$441.00

2 $27,145.00$445.00

3 $22,298.55$365.55

Ref #482 516E46701 RESET BEARING, AS PER PLAN, (6 EACH)

Awd $2,028.60$338.10

2 $2,040.00$340.00

3 $5,614.80$935.80

Ref #483 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $3,029.25$3,029.25

2 $3,050.00$3,050.00

3 $7,544.45$7,544.45

Ref #484 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (104 SF)

Awd $7,207.20$69.30

2 $7,488.00$72.00

3 $6,229.60$59.90

Ref #485 519E11710 SPECIAL - PATCHING CONCRETE STRUCTURES, MISC.:BRID, (178 SY)

Awd $37,193.10$208.95

2 $37,380.00$210.00

3 $38,679.40$217.30

Ref #486 519E11900 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.:BRIDG, (3 CY)

Awd $472.50$157.50

2 $477.00$159.00

3 $561.30$187.10

Ref #487 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (315 SY)

Awd $8,268.75$26.25

2 $8,316.00$26.40

3 $12,993.75$41.25

101078 - Page 212

Page 213: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Section 17 - BRIDGE NO. ATB-90-2651 - Totals

Awd $201,890.36

2 $198,856.05

3 $216,577.07

Ref #488 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)

Awd $23,100.00$23,100.00

2 $23,230.00$23,230.00

3 $46,351.00$46,351.00

Ref #489 202E23501 WEARING COURSE REMOVED, AS PER PLAN, (970 SY)

Awd $9,700.00$10.00

2 $9,700.00$10.00

3 $1,843.00$1.90

Ref #490 407E10000 TACK COAT, (73 GAL)

Awd $233.60$3.20

2 $146.00$2.00

3 $233.60$3.20

Ref #491 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (39 GAL)

Awd $124.80$3.20

2 $78.00$2.00

3 $124.80$3.20

Ref #492 448E46020 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (34 CY)

Awd $8,568.00$252.00

2 $7,650.00$225.00

3 $8,568.00$252.00

Ref #493 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (34 CY)

Awd $8,092.00$238.00

2 $7,650.00$225.00

3 $8,092.00$238.00

Ref #494 509E10000 EPOXY COATED REINFORCING STEEL, (1087 LB)

Awd $1,141.35$1.05

2 $1,195.70$1.10

3 $978.30$0.90

Ref #495 509E20001 REINFORCING STEEL, REPLACEMENT OF EXISTING REINFOR, (100 LB)

Awd $105.00$1.05

2 $110.00$1.10

3 $300.00$3.00

Ref #496 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (152 EACH)

Awd $2,553.60$16.80

2 $2,584.00$17.00

3 $4,096.40$26.95

Ref #497 511E34400 CLASS S CONCRETE, SUPERSTRUCTURE, (6 CY)

Awd $12,285.00$2,047.50

2 $12,360.00$2,060.00

3 $10,104.90$1,684.15

Ref #498 511E45700 CLASS C CONCRETE, ABUTMENT, (6 CY)

Awd $3,528.00$588.00

2 $3,540.00$590.00

3 $1,680.00$280.00

101078 - Page 213

Page 214: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #499 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1009 SY)

Awd $18,010.65$17.85

2 $14,882.75$14.75

3 $15,437.70$15.30

Ref #500 512E33010 TYPE 3 WATERPROOFING, (837 SY)

Awd $17,577.00$21.00

2 $17,577.00$21.00

3 $10,713.60$12.80

Ref #501 513E21500 REPLACEMENT OF DETERIORATED END CROSSFRAMES, (1705 LB)

Awd $11,645.15$6.83

2 $11,935.00$7.00

3 $11,253.00$6.60

Ref #502 514E00301 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (LUMP SUM)

Awd $5,250.00$5,250.00

2 $5,500.00$5,500.00

3 $4,173.50$4,173.50

Ref #503 514E00401 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, AS P, (LUMP SUM)

Awd $5,250.00$5,250.00

2 $5,500.00$5,500.00

3 $4,173.50$4,173.50

Ref #504 514E10000 FINAL INSPECTION REPAIR, (1 EACH)

Awd $315.00$315.00

2 $330.00$330.00

3 $300.00$300.00

Ref #505 516E11211 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (68 FT)

Awd $29,988.00$441.00

2 $30,260.00$445.00

3 $25,350.40$372.80

Ref #506 516E46701 RESET BEARING, AS PER PLAN, (3 EACH)

Awd $1,102.50$367.50

2 $1,110.00$370.00

3 $2,807.40$935.80

Ref #507 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $3,045.00$3,045.00

2 $3,065.00$3,065.00

3 $7,544.45$7,544.45

Ref #508 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (149 SF)

Awd $10,325.70$69.30

2 $10,430.00$70.00

3 $8,925.10$59.90

Ref #509 519E11710 SPECIAL - PATCHING CONCRETE STRUCTURES, MISC.:BRID, (98 SY)

Awd $20,477.10$208.95

2 $26,656.00$272.00

3 $21,545.30$219.85

Ref #510 519E11900 SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.:BRIDG, (3 CY)

Awd $472.50$157.50

2 $474.00$158.00

3 $561.30$187.10

101078 - Page 214

Page 215: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #511 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (370 SY)

Awd $9,712.50$26.25

2 $9,768.00$26.40

3 $15,262.50$41.25

Section 18 - BRIDGE NO. ATB-90-2724 - Totals

Awd $202,602.45

2 $205,731.45

3 $210,419.75

Ref #512 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (861 SY)

Awd $15,368.85$17.85

2 $12,699.75$14.75

3 $13,173.30$15.30

Ref #513 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1221 SY)

Awd $10,256.40$8.40

2 $11,294.25$9.25

3 $7,814.40$6.40

Ref #514 514E27700 FIELD PAINTING, MISC.:REPAIR DEFICIENT PAINT, AS P, (1625 SF)

Awd $68,250.00$42.00

2 $90,252.50$55.54

3 $56,875.00$35.00

Ref #515 516E46701 RESET BEARING, AS PER PLAN, (4 EACH)

Awd $1,894.20$473.55

2 $1,904.00$476.00

3 $3,743.80$935.95

Ref #516 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $4,410.00$4,410.00

2 $4,450.00$4,450.00

3 $7,544.00$7,544.00

Ref #517 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (23 SF)

Awd $1,762.95$76.65

2 $1,656.00$72.00

3 $1,377.70$59.90

Ref #518 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (613 SY)

Awd $17,378.55$28.35

2 $17,470.50$28.50

3 $25,286.25$41.25

Section 19 - BRIDGE NO. ATB-7-2888 L - Totals

Awd $119,320.95

2 $139,727.00

3 $115,814.45

Ref #519 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (861 SY)

Awd $16,272.90$18.90

2 $12,699.75$14.75

3 $13,173.30$15.30

101078 - Page 215

Page 216: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #520 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1221 SY)

Awd $10,256.40$8.40

2 $11,294.25$9.25

3 $7,814.40$6.40

Ref #521 514E27700 FIELD PAINTING, MISC.:REPAIR DEFICIENT PAINT, AS P, (680 SF)

Awd $28,560.00$42.00

2 $37,767.20$55.54

3 $23,800.00$35.00

Ref #522 516E46701 RESET BEARING, AS PER PLAN, (3 EACH)

Awd $1,417.50$472.50

2 $1,425.00$475.00

3 $2,807.40$935.80

Ref #523 516E47001 JACKING AND TEMPORARY SUPPORT OF SUPERSTRUCTURE, A, (LUMP SUM)

Awd $4,336.50$4,336.50

2 $4,360.00$4,360.00

3 $7,544.00$7,544.00

Ref #524 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (17 SF)

Awd $1,303.05$76.65

2 $1,665.15$97.95

3 $1,018.30$59.90

Ref #525 601E20001 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN, (613 SY)

Awd $17,378.55$28.35

2 $17,470.50$28.50

3 $25,286.25$41.25

Section 20 - BRIDGE NO. ATB-7-2888 R - Totals

Awd $79,524.90

2 $86,681.85

3 $81,443.65

Ref #526 100E00300 SPECIAL - PREMIUM ON RAILROADS' PROTECTIVE PUBLIC , (LUMP SUM)

Awd $24,750.00$24,750.00

2 $24,000.00$24,000.00

3 $17,431.00$17,431.00

Ref #527 103E06000 PREMIUM FOR CONTRACT PERFORMANCE BOND, PAYMENT BON, (LUMP SUM)

Awd $149,000.00$149,000.00

2 $220,000.00$220,000.00

3 $402,984.00$402,984.00

Ref #528 108E10000 SPECIAL - CPM PROGRESS SCHEDULE (WT: NR), (LUMP SUM)

Awd $22,000.00$22,000.00

2 $7,000.00$7,000.00

3 $22,900.00$22,900.00

Ref #529 614E11000 MAINTAINING TRAFFIC (WT: 39), (LUMP SUM)

Awd $187,000.00$187,000.00

2 $575,000.00$575,000.00

3 $1,385,967.00$1,385,967.00

Ref #530 619E16020 FIELD OFFICE, TYPE C (WT: NR), (30 MNTH)

Awd $124,500.00$4,150.00

2 $48,000.00$1,600.00

3 $75,000.00$2,500.00

101078 - Page 216

Page 217: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #531 623E10000 CONSTRUCTION LAYOUT STAKES (WT: NR), (LUMP SUM)

Awd $292,000.00$292,000.00

2 $120,000.00$120,000.00

3 $405,909.00$405,909.00

Ref #532 624E10000 MOBILIZATION (WT: NR), (LUMP SUM)

Awd $800,000.00$800,000.00

2 $1,200,000.00$1,200,000.00

3 $1,053,623.00$1,053,623.00

Section 21 - INCIDENTALS - Totals

Awd $1,599,250.00

2 $2,194,000.00

3 $3,363,814.00

101078 - Page 217

Page 218: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 101085

PID 82885

NOB-SR-339-0.00

Federal

Type: TWO LANE RESURFACING

Completion Date: 7/15/2011

Award Amount: $1,281,260.10

Contract Awarded To: SHELLY & SANDS INC

Letting Date: 12/2/2010

Engineer's Estimate: $1,220,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

SHELLY & SANDS INC

3570 SOUTH RIVER RD

ZANESVILLE, OH 43701

Muskingum

Bidder 1

Bid $1,281,260.10

101085 - Page 218

Page 219: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 209E60200 LINEAR GRADING, (28 STA)

Awd $1,260.00$45.00

Section 1 - ROADWAY - Totals

Awd $1,260.00

Ref #2 407E10000 TACK COAT, (9096 GAL)

Awd $18,192.00$2.00

Ref #3 407E14000 TACK COAT FOR INTERMEDIATE COURSE, (6498 GAL)

Awd $12,996.00$2.00

Ref #4 408E10000 PRIME COAT, (9218 GAL)

Awd $29,497.60$3.20

Ref #5 448E46020 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, PG64, (2712 CY)

Awd $374,256.00$138.00

Ref #6 448E47020 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, PG64-22, (4513 CY)

Awd $622,794.00$138.00

Ref #7 617E10100 COMPACTED AGGREGATE, (1600 CY)

Awd $78,400.00$49.00

Ref #8 617E25000 WATER, (24 MGAL)

Awd $24.00$1.00

Section 2 - PAVEMENT - Totals

Awd $1,136,159.60

Ref #9 621E00100 RPM, (1208 EACH)

Awd $18,724.00$15.50

Ref #10 621E54000 RAISED PAVEMENT MARKER REMOVED, (1208 EACH)

Awd $7,852.00$6.50

Ref #11 642E00090 EDGE LINE, (19.64 MILE)

Awd $9,034.40$460.00

Ref #12 642E00290 CENTER LINE, (9.82 MILE)

Awd $6,972.20$710.00

Ref #13 644E00500 STOP LINE, (370 FT)

Awd $3,330.00$9.00

Section 3 - TRAFFIC CONTROL - Totals

Awd $45,912.60

Ref #14 614E12460 WORK ZONE MARKING SIGN, (20 EACH)

Awd $2,700.00$135.00

Ref #15 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (9.82 MILE)

Awd $14,975.50$1,525.00

Ref #16 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (19.64 MILE)

Awd $3,142.40$160.00

Ref #17 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (20 FT)

Awd $360.00$18.00

101085 - Page 219

Page 220: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #18 614E50010 AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) SIGN, (4 EACH)

Awd $3,200.00$800.00

Section 4 - MAINTENANCE OF TRAFFIC - Totals

Awd $24,377.90

Ref #19 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)

Awd $5,000.00$5,000.00

Ref #20 108E30000 SPECIAL - CPM PROGRESS SCHEDULE SHORT DURATION PRO, (LUMP SUM)

Awd $2,000.00$2,000.00

Ref #21 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)

Awd $45,000.00$45,000.00

Ref #22 623E10001 CONSTRUCTION LAYOUT STAKES, AS PER PLAN, (LUMP SUM)

Awd $1,550.00$1,550.00

Ref #23 624E10000 MOBILIZATION, (LUMP SUM)

Awd $20,000.00$20,000.00

Section 5 - INCIDENTALS - Totals

Awd $73,550.00

101085 - Page 220

Page 221: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Project No. 103021

PID 84631

TRU-US-422-19.94

Federal

Type: BRIDGE REPLACEMENT (1 BRIDGE)

Completion Date: 9/30/2011

Award Amount: $782,000.00

Contract Awarded To: A P O'HORO COMPANY

Letting Date: 12/2/2010

Engineer's Estimate: $1,000,000.00

Ohio Department of Transportation

Official Bid Tabulation

Jolene M. Molitoris, Director

A P O'HORO COMPANY

3130 BELMONT AVE

YOUNGSTOWN, OH 44504

Mahoning

Bidder 1

Bid $782,000.00

MARUCCI & GAFFNEY EXCAVATING CO

18 HOGUE ST

YOUNGSTOWN, OH 44502

Mahoning

Bidder 2

Bid $834,871.00

J D WILLIAMSON CONSTRUCTION CO INC

441 GENEVA AVE

TALLMADGE, OH 44278

Summit

Bidder 3

Bid $985,500.00

SHELLY & SANDS INC

3570 SOUTH RIVER RD

ZANESVILLE, OH 43701

Muskingum

Bidder 4

Bid $1,036,626.00

PERK COMPANY INC

8100 GRAND AVE SUITE 300

CLEVELAND, OH 44104-3110

Bidder 5

Bid $1,040,019.00

GREAT LAKES CONSTRUCTION CO

2608 GREAT LAKES WAY

HINCKLEY, OH 44233

Medina

Bidder 6

Bid $1,050,350.00

103021 - Page 221

Page 222: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #1 201E99000 SPECIAL - CLEARING AND GRUBBING, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $5,500.00$5,500.00

3 $3,000.00$3,000.00

4 $2,000.00$2,000.00

5 $345.72$345.72

6 $10,000.00$10,000.00

Ref #2 203E99000 SPECIAL - EARTHWORK, (LUMP SUM)

Awd $18,000.00$18,000.00

2 $4,500.00$4,500.00

3 $25,000.00$25,000.00

4 $36,000.00$36,000.00

5 $20,040.14$20,040.14

6 $15,000.00$15,000.00

Ref #3 606E99000 SPECIAL - GUARDRAIL, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $14,000.00$14,000.00

3 $12,000.00$12,000.00

4 $15,000.00$15,000.00

5 $7,087.37$7,087.37

6 $12,000.00$12,000.00

Section 1 - ROADWAY - Totals

Awd $29,000.00

2 $24,000.00

3 $40,000.00

4 $53,000.00

5 $27,473.23

6 $37,000.00

Ref #4 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)

Awd $600.00$600.00

2 $7,000.00$7,000.00

3 $5,000.00$5,000.00

4 $2,000.00$2,000.00

5 $455.60$455.60

6 $500.00$500.00

Ref #5 832E99100 SPECIAL - CONSTRUCTION EROSION CONTROL, (10000 EACH)

Awd $10,000.00$1.00

2 $10,000.00$1.00

3 $10,000.00$1.00

4 $10,000.00$1.00

5 $10,000.00$1.00

6 $10,000.00$1.00

Section 2 - EROSION CONTROL - Totals

Awd $10,600.00

2 $17,000.00

3 $15,000.00

4 $12,000.00

5 $10,455.60

6 $10,500.00

103021 - Page 222

Page 223: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #6 603E99000 SPECIAL - DRAINAGE, (LUMP SUM)

Awd $6,000.00$6,000.00

2 $1,000.00$1,000.00

3 $5,000.00$5,000.00

4 $3,000.00$3,000.00

5 $3,874.40$3,874.40

6 $6,000.00$6,000.00

Section 3 - DRAINAGE - Totals

Awd $6,000.00

2 $1,000.00

3 $5,000.00

4 $3,000.00

5 $3,874.40

6 $6,000.00

Ref #7 310E99000 SPECIAL - SUBBASE AND BASE, (LUMP SUM)

Awd $6,000.00$6,000.00

2 $5,700.00$5,700.00

3 $25,000.00$25,000.00

4 $7,000.00$7,000.00

5 $8,456.00$8,456.00

6 $15,000.00$15,000.00

Ref #8 448E99000 SPECIAL - FLEXIBLE PAVEMENT, (LUMP SUM)

Awd $20,000.00$20,000.00

2 $23,450.00$23,450.00

3 $5,000.00$5,000.00

4 $15,000.00$15,000.00

5 $19,595.00$19,595.00

6 $30,000.00$30,000.00

Ref #9 452E99000 SPECIAL - NON-REINFORCED CONCRETE PAVEMENT, AS PER, (LUMP SUM)

Awd $30,000.00$30,000.00

2 $27,100.00$27,100.00

3 $30,000.00$30,000.00

4 $40,000.00$40,000.00

5 $17,190.35$17,190.35

6 $30,000.00$30,000.00

Section 4 - PAVEMENT - Totals

Awd $56,000.00

2 $56,250.00

3 $60,000.00

4 $62,000.00

5 $45,241.35

6 $75,000.00

Ref #10 626E99000 SPECIAL - BARRIER REFLECTORS, (LUMP SUM)

Awd $125.00$125.00

2 $120.00$120.00

3 $200.00$200.00

4 $200.00$200.00

5 $54.99$54.99

6 $100.00$100.00

103021 - Page 223

Page 224: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #11 642E99000 SPECIAL - PAVEMENT MARKING, (LUMP SUM)

Awd $3,500.00$3,500.00

2 $2,000.00$2,000.00

3 $2,000.00$2,000.00

4 $3,000.00$3,000.00

5 $559.63$559.63

6 $2,000.00$2,000.00

Section 5 - TRAFFIC CONTROL - Totals

Awd $3,625.00

2 $2,120.00

3 $2,200.00

4 $3,200.00

5 $614.62

6 $2,100.00

Ref #12 614E12420 DETOUR SIGNING, (LUMP SUM)

Awd $1,500.00$1,500.00

2 $4,500.00$4,500.00

3 $3,000.00$3,000.00

4 $3,000.00$3,000.00

5 $5,080.07$5,080.07

6 $2,000.00$2,000.00

Ref #13 616E99000 SPECIAL - DUST CONTROL, (LUMP SUM)

Awd $250.00$250.00

2 $500.00$500.00

3 $500.00$500.00

4 $500.00$500.00

5 $284.83$284.83

6 $250.00$250.00

Section 6 - MAINTENANCE OF TRAFFIC - Totals

Awd $1,750.00

2 $5,000.00

3 $3,500.00

4 $3,500.00

5 $5,364.90

6 $2,250.00

Ref #14 202E99010 SPECIAL - PORTIONS OF STRUCTURE REMOVED, (LUMP SUM)

Awd $80,000.00$80,000.00

2 $50,000.00$50,000.00

3 $120,000.00$120,000.00

4 $90,000.00$90,000.00

5 $95,684.09$95,684.09

6 $210,000.00$210,000.00

Ref #15 512E99000 SPECIAL - SEALING OF CONCRETE, (LUMP SUM)

Awd $10,000.00$10,000.00

2 $10,000.00$10,000.00

3 $9,000.00$9,000.00

4 $9,000.00$9,000.00

5 $10,225.04$10,225.04

6 $10,000.00$10,000.00

103021 - Page 224

Page 225: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #16 519E11100 PATCHING CONCRETE STRUCTURE, (200 SF)

Awd $12,400.00$62.00

2 $13,000.00$65.00

3 $12,000.00$60.00

4 $15,000.00$75.00

5 $13,590.00$67.95

6 $9,000.00$45.00

Ref #17 526E99000 SPECIAL - REINFORCED CONCRETE APPROACH SLABS, AS P, (LUMP SUM)

Awd $55,000.00$55,000.00

2 $66,000.00$66,000.00

3 $60,000.00$60,000.00

4 $65,000.00$65,000.00

5 $83,800.34$83,800.34

6 $70,000.00$70,000.00

Ref #18 530E99030 SPECIAL - STRUCTURE REHABILITATION, (LUMP SUM)

Awd $378,000.00$378,000.00

2 $368,000.00$368,000.00

3 $470,000.00$470,000.00

4 $520,000.00$520,000.00

5 $479,308.83$479,308.83

6 $450,000.00$450,000.00

Section 7 - STRUCTURE 20 FOOT SPAN AND OVER BRIDGE N - Totals

Awd $535,400.00

2 $507,000.00

3 $671,000.00

4 $699,000.00

5 $682,608.30

6 $749,000.00

Ref #19 107E99000 SPECIAL - UTILITY COORDINATION, (LUMP SUM)

Awd $1,122.40$1,122.40

2 $1,240.00$1,240.00

3 $10,000.00$10,000.00

4 $9,000.00$9,000.00

5 $9,200.00$9,200.00

6 $14,000.00$14,000.00

Ref #20 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)

Awd $1,000.00$1,000.00

2 $2,635.00$2,635.00

3 $4,000.00$4,000.00

4 $5,000.00$5,000.00

5 $5,000.00$5,000.00

6 $5,000.00$5,000.00

Ref #21 690E20020 SPECIAL - FIELD SURVEYS, (LUMP SUM)

Awd $2,500.00$2,500.00

2 $6,545.00$6,545.00

3 $9,000.00$9,000.00

4 $3,000.00$3,000.00

5 $7,200.00$7,200.00

6 $5,000.00$5,000.00

103021 - Page 225

Page 226: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #22 690E20040 SPECIAL - PRELIMINARY DESIGN, (LUMP SUM)

Awd $65,000.00$65,000.00

2 $82,274.00$82,274.00

3 $27,000.00$27,000.00

4 $45,000.00$45,000.00

5 $46,700.00$46,700.00

6 $25,000.00$25,000.00

Ref #23 690E20050 SPECIAL - FINAL DESIGN, (LUMP SUM)

Awd $21,000.00$21,000.00

2 $53,790.00$53,790.00

3 $38,800.00$38,800.00

4 $12,000.00$12,000.00

5 $36,600.00$36,600.00

6 $25,000.00$25,000.00

Ref #24 690E20220 SPECIAL - CONSTRUCTION PLANS FOR DESIGN-BUILD, (LUMP SUM)

Awd $3,000.00$3,000.00

2 $21,516.00$21,516.00

3 $3,000.00$3,000.00

4 $18,000.00$18,000.00

5 $8,300.00$8,300.00

6 $10,000.00$10,000.00

Section 8 - ENGINEERING AND SURVEYING SERVICES - Totals

Awd $93,622.40

2 $168,000.00

3 $91,800.00

4 $92,000.00

5 $113,000.00

6 $84,000.00

Ref #25 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)

Awd $500.00$500.00

2 $1.00$1.00

3 $1,000.00$1,000.00

4 $1.00$1.00

5 $2,600.00$2,600.00

6 $3,000.00$3,000.00

Ref #26 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)

Awd $4,336.60$4,336.60

2 $6,800.00$6,800.00

3 $10,000.00$10,000.00

4 $8,425.00$8,425.00

5 $8,148.30$8,148.30

6 $10,000.00$10,000.00

Ref #27 108E99000 SPECIAL - CPM PROGRESS SCHEDULE, (LUMP SUM)

Awd $500.00$500.00

2 $2,000.00$2,000.00

3 $2,000.00$2,000.00

4 $500.00$500.00

5 $2,006.69$2,006.69

6 $500.00$500.00

103021 - Page 226

Page 227: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39

Ref #28 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)

Awd $20,000.00$20,000.00

2 $17,500.00$17,500.00

3 $50,000.00$50,000.00

4 $35,000.00$35,000.00

5 $63,943.22$63,943.22

6 $16,000.00$16,000.00

Ref #29 619E99000 SPECIAL - FIELD OFFICE, (LUMP SUM)

Awd $2,000.00$2,000.00

2 $5,500.00$5,500.00

3 $6,000.00$6,000.00

4 $15,000.00$15,000.00

5 $14,795.36$14,795.36

6 $10,000.00$10,000.00

Ref #30 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES, (LUMP SUM)

Awd $1,992.00$1,992.00

2 $2,700.00$2,700.00

3 $8,000.00$8,000.00

4 $10,000.00$10,000.00

5 $2,880.00$2,880.00

6 $5,000.00$5,000.00

Ref #31 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)

Awd $16,674.00$16,674.00

2 $20,000.00$20,000.00

3 $20,000.00$20,000.00

4 $40,000.00$40,000.00

5 $57,013.03$57,013.03

6 $40,000.00$40,000.00

Section 9 - INCIDENTALS - Totals

Awd $46,002.60

2 $54,501.00

3 $97,000.00

4 $108,926.00

5 $151,386.60

6 $84,500.00

103021 - Page 227

Page 228: Ohio Department of Transportation Official Bid Tabulation ......2010/12/02  · Bid $1,139,867.24 MOSSER CONSTRUCTION INC 122 S WILSON AVE FREMONT, OH 43420 Sandusky Bidder 4 Bid $1,298,025.39