Upload
vuongkien
View
217
Download
0
Embed Size (px)
Citation preview
OFFSHORE AND ONSHORE
EN
Growth with energy
Towers
Foundation structures
Components
Secondary steel
Service
2
Gräfenhainichen plant
Am Mellensee plant
Site of founding
Bremen plant
Cuxhaven plant
Dessau-Roßlau plant
3
YOUR SUCCESS IS OUR SUCCESS
As an experienced, competent and reliable manufacturer
of foundation structures and towers for the offshore
and onshore wind energy sector, in recent years we
have established ourselves as a market-leading supplier
to energy groups, plant manufacturers and general
contractors. Our goal is to participate actively in protec-
ting the environment through the use of innovative and
green technologies. To achieve this we turn to bundled
creativity and expertise.
We have been part of the exciting wind industry since
1999. The company was founded in 1993 by Joachim
Görlitz and his father on the Am Mellensee site, with a
workforce of 35. Today, over 750 employees work at our
five locations, with their knowledge and commitment
contributing to the success of the company.
The AMBAU corporate group comprises AMBAU GmbH,
the subsidiary AMBAU Windservice GmbH and the sister
company AMBAU Personalservice GmbH.
AMBAU GmbHGrowth with energy
AMBAU GmbH is a member of WAB e. V., the Stiftung
Offshore-Windenergie and the Bundesverband Wind-
energie e. V.
4
With us you can find a broad,
high-quality range of products and
services to satisfy the requirements
of your offshore or onshore project.
Numerous successful projects have
given us the experience necessary
to guarantee enduring quality and
reliability.
Product portfolioFollowing the wind
Foundation structuresMonopiles, transition pieces, tripods,
jackets and large-diameter pipe
components
TowersOffshore and onshore
5
ServiceRepair of towers and blades,
mechanical processing of flanges,
cleaning, erection, assembly and
maintenance of wind energy plants
ComponentsExpertise in the fields of design,
construction and delivery
Secondary steelSupplier of boat jetties, platforms and
other components
6
Observance of tolerances,
state-of-the-art production processes
and consistent documentation of all
process stages
Towers, monopiles, transition pieces,
tripods, jackets, large-diameter pipe
components, tower components and
secondary steel
Over 300,000 square metres of
storage space across all sites
Manufacturing plants with direct
deepwater access
Since 1999 AMBAU has grown with
the wind energy sector. 2006 saw the
development of the offshore segment.
In total, we have already successfully
realised over 700 projects.
With us you will find an efficient
combination of know-how, quality and
adherence to delivery dates. Our site
advantages can also contribute to the
reduction of your total project costs.
We maintain long-term customer and
supplier relationships and place value
on a high degree of flexibility and
adherence to delivery dates.
High process and product quality
Storage areas
Series production
Experience and know-how
Total cost factor
Trust-based collaboration
Direct connections to ports
8
In our five high-performance plants
we produce technically sophisticated
quality products for you.
Technical factsExperience, commitment and energy
Gräfenhainichen plantFoundation structures, towers, components,
secondary steel
Bremen plantFoundation structures, towers
Cuxhaven plantFoundation structures, towers
Dessau-Roßlau plantFoundation structures, components, secondary steel
Am Mellensee plantComponents, secondary steel
Performance TowerMonopiles/transition pieces/piles
Maximum weight 160 t/per segment 320 t
Maximum length37,000 mm/ per segment
37,000 mm
Maximum diameter 6,000 mm 7,500 mm
Maximum sheet thickness 130 mm 130 mm
Storage space 43,000 m² 35,000 m²
Production space 23,000 m² 23,000 m²
Performance Tower Piles
Maximum weight 80 t/per segment 80 t/per segment
Maximum length38,000 mm/persegment
38,000 mm/persegment
Maximum diameter 4,600 mm 4,600 mm
Maximum sheet thickness 130 mm 130 mm
Storage space 120,000 m² 120,000 m²
Production space 25,000 m² 25,000 m²
Performance TowerMonopiles/transition pieces/piles
Maximum weight 300 t/per segment 1,000 t
Maximum length45,000 mm/per segment
80,000 mm
Maximum diameter 6,500 mm 7,500 mm
Maximum sheet thickness 130 mm 130 mm
Storage space 115,000 m²115,000 m² + port area
Production space 22,500 m² 22,500 m²
Performance TowerPiles and components for foundation structures
Maximum weight – 160 t
Maximum length – 40,000 mm
Maximum diameter – 6,000 mm
Maximum sheet thickness – 90 mm
Storage space – 10,000 m²
Production space – 16,000 m²
Performance Components/secondary steel
Maximum weight 5 t
Maximum length 6,000 mm
Maximum width/diameter 3,000 mm
Maximum height 3,000 mm
Maximum sheet thickness 30 mm
Storage space ca. 1,000 m²
Production space ca. 2,000 m²
9
Regulations − GL
− DNV
− EEMUA 158
− Norsok
− DIN; DIN EN; DIN EN ISO
Quality is infiniteBenchmarks to measure us by
Approvals − DIN 18800
− DIN EN 1090-1
− DIN EN 1090-2
− DIN ISO 9001
− DIN EN ISO 3834-2
− DIN EN 50001
Materials − S235 to S690
− Various stainless steel types
Welding procedures
− SAW
− MAG
− TIG
− Electrode
in all welding positions
Surface treatment − Automatic application of shop primer
via rust-proofing lines (steel sheet and profile)
− Steel shot blasting
− Metallisation via spray galvanising
− Priming and painting in special halls
− Sweep blasting with mineral blasting material,
e. g. for duplex coatings
Test procedure − Ultrasound testing, including phased array procedure
− Surface crack testing with the magnetic particle proce-
dure and dye penetration testing
Measurement technology
− Photogrammetry
− Laser tracker
− Easy laser
− Tachymeter
− Theodolites
− Laser distance measurer
− Rotation laser
Various destructive testing methods are possible with
subcontractors
Cutting processes − Oxy-fuel cutting with Alfa torch
− DAFL and DKS multi torches
− Plasma cutting with skew rotator
− Laser (straight and chamfer)
HSE − BS OHSAS 18001
− DIN EN 14001
− SCC** manual
10
WorldwideBoundless energy
We are at home in the North Sea and Baltic.
However, we also know no maritime
boundaries beyond these: as a consequence,
all worldwide destinations can be reached
without problem. The loading options of our
plants in Bremen and Cuxhaven make them
ideally suited for the shipping of offshore
components.
Whether it is towers for onshore wind energy
plants, large offshore towers for 5-megawatt-
plus units or foundation structures: we are the
partner for you!
12
Our tailored and high-quality solutions make
us a sought-after partner worldwide. In this,
your requirements represent the impetus for
our further development. In close dialogue
with you we employ state-of-the-art produc-
tion procedures to develop solutions that both
support and promote your progress.
Together, we create the basis for an energy
policy future, driving on the expansion of re-
generative energies. We invest continuously in
research and development in order to render
our technology more environmentally friendly
and efficient.
Customer-orientedTailored solutions
13
With our five interconnected plants we are able
to react flexibly to the requirements of the
growth market of renewable energies. With
our high degree of automation and state-of-
the-art manufacturing plant we guarantee low
manufacturing tolerances and premium quality
of our products. Our sites at Cuxhaven and
Bremen are specifically focused on the market
for offshore wind energy plants.
Permanent innovations and investments are
the underlying guarantee for our success.
Consequently, we are not only experts in the
offshore field, but also pioneers in the onshore
segment. Specialisation in conical and cylind-
rical components for towers and pipe com-
ponents gives us a head start with regard to
expertise. With internal quality management,
consistent documentation of all processes
and regular inspections we ensure that our
own high standards are sustainably met. Our
manufacturer qualification is also certified by
the pertinent DIN standards.
EfficientPioneering energy use
14
We have also assembled extensive experience
as exclusive project partner in the first German
offshore wind park, alpha ventus: under the
rough conditions of the frequently stormy
North Sea we realised the pilot project with
our partners approximately 45 kilometres off
the coast of Borkum, at a depth of around 30
metres. The twelve 5-megawatt class wind
energy units of the wind park now cover the
annual energy requirements of over 50,000
households.
Each year AMBAU GmbH has a turnover of
some 450 foundation structures and 600
towers. The extensive loading area at our
Cuxhaven site enables us to ship directly
across the North Sea to numerous destinations
worldwide. Our product portfolio ranges from
towers for onshore wind energy units to large
offshore towers for 5-megawatt-plus units.
PowerfulOur capabilities
15
ReliableFor your success
Our aim is to offer you a one-stop source of all
necessary products and services at all times, at
a high standard of quality. We guarantee your
satisfaction with the continuous examination
of all processes, from design to manufacture
and delivery and comprehensive service.
The overall package of our performance and
services makes us the ideal partner for your
offshore and onshore projects.
AMBAU GmbH has a service-based specialist
subsidiary which takes care of your require-
ments: AMBAU Windservice GmbH specialises
in rotor blades and towers, offering qualified
services in erection, maintenance, servicing,
repair, corrosion protection, quality improve-
ment and assessment.
Contact
Sales / Bremen plant
Am Werfttor 22
D-28755 Bremen
Telephone: +49 421 62031-300
Telefax: +49 421 62031-309
E-Mail: [email protected]
Am Mellensee plant
Zossener Allee 29 a
D-15838 Am Mellensee
Telephone: +49 33703 919-0
Telefax: +49 33703 919-43
Gräfenhainichen plant
Rosa-Luxemburg-Straße 47
D-06773 Gräfenhainichen
Telephone: +49 34953 37-100
Telefax: +49 34953 37-109
Cuxhaven plant
Hermann-Honnef-Straße 2
D-27472 Cuxhaven
Telephone: +49 4721 5912-400
Telefax: +49 4721 5912-409
Dessau-Roßlau plant
Alte Landebahn 13
D-06846 Dessau-Roßlau
Telephone: +49 340 216913-503
Telefax: +49 340 216913-509
www.ambau.com