Equipment Offshore installation and maintenance vessel MPI Resolution Sustainable EPC and Marine Contractors

Offshore installation and maintenance vessel MPI Resolution · 2019. 9. 2. · Stern thrusters 4 Aquamaster Rolls Royce US 205/3850 Azimuth Thrusters, 175 kN per unit Total power

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Offshore installation and maintenance vessel MPI Resolution · 2019. 9. 2. · Stern thrusters 4 Aquamaster Rolls Royce US 205/3850 Azimuth Thrusters, 175 kN per unit Total power

Equipment

Offshore installation and maintenance vessel MPI Resolution

Sustainable EPC and Marine Contractors

Page 2: Offshore installation and maintenance vessel MPI Resolution · 2019. 9. 2. · Stern thrusters 4 Aquamaster Rolls Royce US 205/3850 Azimuth Thrusters, 175 kN per unit Total power

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50

Name MPI Resolution

Type Offshore installation and maintenance

vessel

Classification Det Norske Veritas: 1A1 Self-elevating

offshore support unit, wind turbine

installation vessel CRANE EO

DYNPOS-AUTR

Trading area Worldwide

Year of construction 2003

Dimensions Length overall 130.00 m

Breadth overall 38.00 m

Depth 8.00 m to main deck

Draft 4.30 m (max for scantling)

Tonnage 14,310 GT

Deadweight 5,000 tons

Speed 11.0 knots

Main crane Huisman 600 PMT pedestal mounted

offshore crane

Main hoist 600 tons @ 25.00 m radius

Auxiliary hoist 30 tons @ 92.50 m radius

Auxiliary crane Kenz EHC 50/3500 Pedestal Mounted

Crane, 50 tons at any radius

Main engines 4 X Mitsubishi S16R-MPTK-2

(each 1820 kW @ 1800 rpm) 2 x Wärtsilä

6L20 (each 1110 kW @ 900 rpm)

Bow thrusters 3 Kamewa TT1650CP 102kN per unit

Stern thrusters 4 Aquamaster Rolls Royce US 205/3850

Azimuth Thrusters, 175 kN per unit

Total power installed 9.5 MW

Accommodation 70 persons

Jack-up system 6 legs - length 70.492 m -

diameter 3.80 m x 3.80 m

Clear deck area 3,200 m2

Dynamic Position system DP2 Kongsberg K-Pos DP-21

MPI Resolution

Ap

ril

201

9

Principal particulars

MPI Offshore

18 Ellerbeck Court

Stokesley Business Park

Stokesley

TS9 5PT

United Kingdom

E [email protected]

I www.mpi-offshore.com

Contact