1
Offshore Construction in
Brazil
March, 2013
2
Agenda
1. Petrobras Portfolio
2. Shipyards
3. Local Content
4. HSE
5. Basic Design Drivers
6. EPC Drivers & Oportunities
7. Final Comments
3
Agenda
1. Petrobras Portfolio
2. Shipyards
3. Local Content
4. HSE
5. Basic Design Drivers
6. EPC Drivers & Oportunities
7. Final Comments
4
FUNDAMENTALS OF 2012-2016 BUSINESS AND MANAGEMENT PLAN
Integrated Portfolio
Management
PERFORMANCE • Management focused in accomplishing physical and
financial targets of each project
CAPITAL DISCIPLINE • To ensure expansion with solid financial indicators
PRIORITY • Priority given to exploration and production projects of oil
and natural gas in Brazil • Realism in production targets
2012-2016 Business and Management Plan
5
3.070
4.910
4.200
2.500 2.022
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Business and Management Plan 2012-2016
-700 mbpd
-1.000 mbpd
ANNUAL OIL PRODUCTION CURVE FORECAST - 2012 REVIEW
Production Curve in Brazil – Production of Oil and NGL
Business and Management Plan 2011 – 2015
Priority: REALISM
6
S CURVES – PHYSICAL AND FINANCIAL All 2012-2016 Business and Management Plan projects under implementation and evaluation have an ‘S’ Curve as unique reference of management, planning, control and monitoring at Petrobras. The critical projects are monitored monthly by the Board of Directors and Executive Board.
Physical Monitoring Financial Monitoring
PERFORMANCE: CURVES
cost deviaton
term deviation progress deviation
Explanations for deviation
Authorization for budget review
Explanations for deviations
Recovery Plan If necessary
7
PROCOP Cost Optimization
Program
PROEF Increase of Operational
Efficiency Program in Campos Basin
PROMINP Local Content Management
Program
Integrated Management of the Company’s Portfolio - HSE
Programs Initiatives
2012-2016 Business and Management Plan
8
2011 2013 2016 2020 2012 2014 2015 2017 2018 2019
2.500
4.200
Post-salt
Pre-salt
Transfer of Rights
New Discoveries*
2011 2.022 mbpd
95%
5%
2016 2.500 mbpd
69%
30% 1%
2020 4.200 mbpd
42%
28%
19%
12%
Baleia Azul (Cid. Anchieta)
Baúna e Piracaba (Cid. Itajaí)
Iracema Norte
Maromba
Bonito
Entorno de Iara Norte Pq. Baleias (P-58)
Roncador IV
(P-62)
Sapinhoá Norte (Cid. Ilhabela)
Iracema Sul
(Cid. Mangaratiba)
Lula Alto
Lula Central
Lula Sul
Franco 1
Carioca 1
Lula Norte
Franco 2
Lula Ext. Sul
Iara Horst
NE Tupi
Carimbé
Aruanã
Iara NW
Franco 3
Franco 4
Sul de Guará
Júpiter
Carcará
Sul Pq. Baleias
Franco 5
Espadarte I
Espadarte III Florim
Piloto Sapinhoá (Cid. São Paulo)
Piloto Lula NE (Cid. Paraty)
Papa-Terra (P-61 e P-63)
Roncador III (P-55)
Oil and Gas Production Post-salt, Pre-salt and Transfer of Rights
2.022
UEPs 38 up to 2020
FPSO-R
OTHERS
Production Curve in Brazil
9
2011 2013 2016 2020 2012 2014 2015 2017 2018 2019
2.500
4.200
Post-salt
Pre-salt
Transfer of Rights
New Discoveries*
2011 2.022 mbpd
95%
5%
2016 2.500 mbpd
69%
30% 1%
2020 4.200 mbpd
42%
28%
19%
12%
2.022
New Drilling Rigs and Production Curve
Rigs
28 up to 2020
10
Offshore Main Investment Programs
Code Description
EBN-I Logistics Department Bunkers Program – Phase I
EBN-II Logistics Department Bunkers Program – Phase II
Post-Salt E&P Post-Salt Program
Pre-Salt E&P Pre-Salt Program
PROMEF-I Transport Fleet Expansion Program – Phase I
PROMEF-II Transport Fleet Expansion Program – Phase II
Sondas Drilling Units Program
11
Agenda
1. Petrobras Portfolio
2. Shipyards
3. Local Content
4. HSE
5. Basic Design Drivers
6. EPC Drivers & Oportunities
7. Final Comments
12
Shipyards
13
Large Shipyards
● Suape-PE
Rio Grande–RS ●
● Açú-RJ Rio de Janeiro-RJ ●
● Aracruz-ES
● Maragogipe-BA
● Angra dos Reis-RJ
14
Large Shipyards
Shipyard Owner Technological Partner
ERG SPE ENGEVIX and FUNCEF COSCO, China
BrasFELS KeppelFELS, Singapore KeppelFELS, Singapore
EAS Camargo Corrêa and Queiroz Galvão Ishikawajima, Japan
OSX EBX Hyundai, South Korea
EJA Jurong Shipyard Pte Ltd, Singapore Jurong, Singapore
EEP Odebrecht, OAS, UTC and Kawasaki Heavy Industries, Japan
Kawasaki, Japan
15
Capacities
Shipyard Steel(t/m) Drydock (L x W) (m) Pier (m) Cargo Handling (t)
ERG-1/2 3.000 2 VLCC (350X130) 800 2.000(future)/600 gantry
BrasFELS 2.000 Jack-up (125x70) 928 2.000(future)/660 gantry
EAS 13.300 VLCC (73x400) 1.410 2x1.500 gantry
OSX 15.000 2 VLCC (480x130) 3.525 8.000 crane/1.600 gantry
EJA 4.000 2 VLCC (380x120) 950 700 gantry
EEP (*) 5.000 VLCC (372x85) 1.440 2.400 crane/2x1.000 gantry
(*) second phase
16
Drilling Rigs
17
Integration Sites
18
Main Integration Sites
● Candeias-BA
● Suape-PE
● Rio Grande–RS ● São José do Norte-RS
● Paranaguá-PR
19
Modules Construction
Sites
20
Main Modules Construction Sites
● Charqueadas–RS
● Itaguaí-RJ
● Niteroi-RJ
● Itajai-SC
21
Agenda
1. Petrobras Portfolio
2. Shipyards
3. Local Content
4. HSE
5. Basic Design Drivers
6. EPC Drivers & Oportunities
7. Final Comments
22
Local Content Policy
PETROBRAS LOCAL CONTENT POLICY The Projects and Contracts for PETROBRAS shall support the challenges of the Business and Management Plan and therefore to maximize the Local Content, on competitive and sustainable basis, accelerating the development of the markets where PETROBRAS acts and guided by ethics and continous technological development.
December, 22nd 2011
23
Compliance with capital discipline, assuring competitiviness to the bidding processes and reducing logistics and finacial risks on projects
Capital Discipline
Coordination of the procurement processes for the same items of different investments, as pratical as possible.
Procurement Integration
Unification of criteria for Local Content in all contracts. Standard Requirements
Development of a sustainable supply chain for the industry. Local Suppliers
Development of a strong local engineering market. Local Engineering
Focus on technological local gaps. Technological Gaps
Local Content Drivers
24
Agenda
1. Petrobras Portfolio
2. Shipyards
3. Local Content
4. HSE
5. Basic Design Drivers
6. EPC Drivers & Oportunities
7. Final Comments
25
HSE
• Petrobras’ Value
• Zero Lost Time Incident (LTI)
26
Agenda
1. Petrobras Portfolio
2. Shipyards
3. Local Content
4. HSE
5. Basic Design Drivers
6. EPC Drivers & Oportunities
7. Final Comments
27
Basic Design Drivers
•Simplicity (low capex, high operability and reliability)
•International standards
•International metrics
•Local content
•High quality
•Detailed Planning – investment, term and local content
•Ethics code
28
Agenda
1. Petrobras Portfolio
2. Shipyards
3. Local Content
4. HSE
5. Basic Design Drivers
6. EPC Drivers & Oportunities
7.Final Comments
29
EPC Drivers & Opportunities
•Drivers • Same basic design directives (simplicity, international standards and
metrics, local content, high quality) • Detailed planning to achieve investment, schedule and local content • Zero Lost Time Incident (LTI) • No spills • Ethics code
Improvement Opportunities
Management Engineering Resources Technology
Logistics Training HSE Benchmarking
30
Agenda
1. Petrobras Portfolio
2. Shipyards
3. Local Content
4. HSE
5. Basic Design Drivers
6. EPC Drivers & Opportunities
7. Final Comments
31
Final Comments
•Huge business and management plan
•Sustainable and competitive basis
•Great opportunities
•International metrics & Benchmarking
•Technological gaps
•Engineering