OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010034 PID. 19179 GEA-87-2.73 NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 02/07/01 COMPLETION DATE: 08/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: NORTHERN OHIO PAVING COMPANY AWARDED AMOUNT: $ 1,568,025.39 ENGINEERS ESTIMATE: $ 1,675,000.00 BIDDER 1 BIDDER 2 NORTHERN OHIO PAVING COMPANY SCHLOSS PAVING CO 1749 HIGHLAND RD 13700 MC CRACKEN RD TWINSBURG ,OH 44087 CLEVELAND ,OH 44125 BIDDER 3 BIDDER 4 MC COURT CONSTRUCTION COMPANY ROMANO PAVING & EXCAVATING INC 720 HOME AVE 1103 EAST POLAND AVE AKRON ,OH 44310 BESSEMER ,PA 16112

OFFICIAL BID TABULATION AWARDED PROJECT - Pages€¦ · 19 601e34200 rock ch prot, ... ref no. alt. item quantity bidder unit price extension 32 606e22010 anchor assembly, ... official

  • Upload
    vucong

  • View
    219

  • Download
    2

Embed Size (px)

Citation preview

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010034 PID. 19179 GEA-87-2.73 NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 02/07/01 COMPLETION DATE: 08/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: NORTHERN OHIO PAVING COMPANY AWARDED AMOUNT: $ 1,568,025.39 ENGINEERS ESTIMATE: $ 1,675,000.00 BIDDER 1 BIDDER 2 NORTHERN OHIO PAVING COMPANY SCHLOSS PAVING CO 1749 HIGHLAND RD 13700 MC CRACKEN RD TWINSBURG ,OH 44087 CLEVELAND ,OH 44125 BIDDER 3 BIDDER 4 MC COURT CONSTRUCTION COMPANY ROMANO PAVING & EXCAVATING INC 720 HOME AVE 1103 EAST POLAND AVE AKRON ,OH 44310 BESSEMER ,PA 16112

PROJ. NO. 010034 PAGE NO. 1 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 201E11000 CLEARING AND GRUBBING LUMP SUM AWD $ 18,500.00000 $ 18,500.00 2 $ 8,500.00000 $ 8,500.00 3 $ 18,000.00000 $ 18,000.00 4 $ 15,000.00000 $ 15,000.00 2 202E38000 GUARDRAIL REMOVED 6,925.000 LIN FT AWD $ 1.00000 $ 6,925.00 2 $ 0.80000 $ 5,540.00 3 $ 1.00000 $ 6,925.00 4 $ 1.75000 $ 12,118.75 3 202E54101 RSD PVMT MRK RMVD/STRG, APP 1,072.000 EACH AWD $ 5.59000 $ 5,992.48 2 $ 4.00000 $ 4,288.00 3 $ 5.50000 $ 5,896.00 4 $ 6.00000 $ 6,432.00 4 203E55000 DITCH CLEANOUT 15,000.000 LIN FT AWD $ 2.60000 $ 39,000.00 2 $ 2.50000 $ 37,500.00 3 $ 1.25000 $ 18,750.00 4 $ 1.25000 $ 18,750.00 5 203E60200 LIN. GRADING, METH. A 93.000 STATION AWD $ 33.84000 $ 3,147.12 2 $ 50.00000 $ 4,650.00 3 $ 440.00000 $ 40,920.00 4 $ 100.00000 $ 9,300.00 6 203E60204 LIN. GRADING, METH. B 940.000 STATION AWD $ 10.06000 $ 9,456.40 2 $ 10.00000 $ 9,400.00 3 $ 12.00000 $ 11,280.00 4 $ 60.00000 $ 56,400.00 7 251E01000 PRTL DEPTH PVMT REPAIR 3,200.000 SQ YD AWD $ 5.00000 $ 16,000.00 2 $ 10.00000 $ 32,000.00 3 $ 9.00000 $ 28,800.00 4 $ 11.00000 $ 35,200.00

PROJ. NO. 010034 PAGE NO. 2 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 8 254E01000 PAVEMENT PLANING, BITUMINOUS 3,415.000 SQ YD AWD $ 5.18000 $ 17,689.70 2 $ 4.00000 $ 13,660.00 3 $ 7.00000 $ 23,905.00 4 $ 3.00000 $ 10,245.00 9 254E01010 PAVEMENT PLANING, PCC 171.000 SQ YD AWD $ 5.00000 $ 855.00 2 $ 4.00000 $ 684.00 3 $ 12.00000 $ 2,052.00 4 $ 10.00000 $ 1,710.00 10 822E10000 HOT IN-PLACE RECYCLING, INTERMEDIATE 162,605.000 SQ YD AWD $ 2.93000 $ 476,432.65 2 $ 2.84000 $ 461,798.20 3 $ 2.96000 $ 481,310.80 4 $ 3.50000 $ 569,117.50 12 407E10000 TACK COAT 16,515.000 GALLON AWD $ 0.50000 $ 8,257.50 2 $ 0.65000 $ 10,734.75 3 $ 0.70000 $ 11,560.50 4 $ 1.00000 $ 16,515.00 15 448E46060 ASPH CONC INT CRS, TYPE 1, UNDER GR 251.000 CU YD AWD $ 126.02000 $ 31,631.02 2 $ 125.00000 $ 31,375.00 3 $ 150.00000 $ 37,650.00 4 $ 105.00000 $ 26,355.00 16 448E48020 ASPH CONC SURF, T1, PG64-22 (DRIVEWAYS) 80.000 CU YD AWD $ 160.18000 $ 12,814.40 2 $ 125.00000 $ 10,000.00 3 $ 230.00000 $ 18,400.00 4 $ 95.00000 $ 7,600.00 17 448E90000 ASPHALT CONCRETE, MISC.: ASPHALT CONCRETE SURFACE COURSE, TYPE 1 6,881.000 CU YD AWD $ 70.44000 $ 484,697.64 2 $ 78.00000 $ 536,718.00 3 $ 83.00000 $ 571,123.00 4 $ 96.80000 $ 666,080.80

PROJ. NO. 010034 PAGE NO. 3 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 18 601E32200 ROCK CH PROT, C W/FILTER 28.000 CU YD AWD $ 50.00000 $ 1,400.00 2 $ 90.00000 $ 2,520.00 3 $ 147.00000 $ 4,116.00 4 $ 100.00000 $ 2,800.00 19 601E34200 ROCK CH PROT, C W/O FILTER 25.000 CU YD AWD $ 50.00000 $ 1,250.00 2 $ 95.00000 $ 2,375.00 3 $ 150.00000 $ 3,750.00 4 $ 70.00000 $ 1,750.00 20 602E20000 CONCRETE MASONRY 1.200 CU YD AWD $ 850.00000 $ 1,020.00 2 $ 800.00000 $ 960.00 3 $ 950.00000 $ 1,140.00 4 $ 500.00000 $ 600.00 21 603E04600 12" CONDUIT, TYPE C 30.000 LIN FT AWD $ 20.00000 $ 600.00 2 $ 35.00000 $ 1,050.00 3 $ 55.00000 $ 1,650.00 4 $ 50.00000 $ 1,500.00 22 603E13201 30" CONDUIT, TYPE A, APP 68.000 LIN FT AWD $ 175.00000 $ 11,900.00 2 $ 100.00000 $ 6,800.00 3 $ 160.00000 $ 10,880.00 4 $ 100.00000 $ 6,800.00 23 604E04500 CATCH BASIN, NO. 2-2B 1.000 EACH AWD $ 1,000.00000 $ 1,000.00 2 $ 800.00000 $ 800.00 3 $ 1,000.00000 $ 1,000.00 4 $ 1,600.00000 $ 1,600.00 24 604E09500 CATCH BASIN RECON TO GRADE 1.000 EACH AWD $ 250.00000 $ 250.00 2 $ 650.00000 $ 650.00 3 $ 1,000.00000 $ 1,000.00 4 $ 600.00000 $ 600.00

PROJ. NO. 010034 PAGE NO. 4 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 25 604E30101 MANHOLE, NO. 1, APP 1.000 EACH AWD $ 1,500.00000 $ 1,500.00 2 $ 1,500.00000 $ 1,500.00 3 $ 2,150.00000 $ 2,150.00 4 $ 1,800.00000 $ 1,800.00 26 604E34501 MANHOLE ADJUSTED TO GRADE,APP 2.000 EACH AWD $ 150.00000 $ 300.00 2 $ 350.00000 $ 700.00 3 $ 500.00000 $ 1,000.00 4 $ 350.00000 $ 700.00 27 604E35500 MANHOLE RECONST TO GRADE 2.000 EACH AWD $ 500.00000 $ 1,000.00 2 $ 600.00000 $ 1,200.00 3 $ 800.00000 $ 1,600.00 4 $ 750.00000 $ 1,500.00 28 604E39501 MON BOX ADJ TO GRADE, APP 11.000 EACH AWD $ 250.00000 $ 2,750.00 2 $ 250.00000 $ 2,750.00 3 $ 225.00000 $ 2,475.00 4 $ 200.00000 $ 2,200.00 29 604E39600 MON BOX RECONST TO GRADE 3.000 EACH AWD $ 350.00000 $ 1,050.00 2 $ 450.00000 $ 1,350.00 3 $ 240.00000 $ 720.00 4 $ 350.00000 $ 1,050.00 30 604E50000 MISCELLANEOUS METAL 3,000.000 POUND AWD $ 0.70000 $ 2,100.00 2 $ 0.50000 $ 1,500.00 3 $ 1.00000 $ 3,000.00 4 $ 1.00000 $ 3,000.00 31 606E13000 GUARDRAIL, TYPE 5 6,925.000 LIN FT AWD $ 8.00000 $ 55,400.00 2 $ 8.20000 $ 56,785.00 3 $ 8.00000 $ 55,400.00 4 $ 15.60000 $ 108,030.00

PROJ. NO. 010034 PAGE NO. 5 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 32 606E22010 ANCHOR ASSEMBLY, TYPE E-98 48.000 EACH AWD $ 1,550.00000 $ 74,400.00 2 $ 1,625.00000 $ 78,000.00 3 $ 1,600.00000 $ 76,800.00 4 $ 2,050.00000 $ 98,400.00 33 606E26500 ANCHOR ASSEMBLY, TYPE T 14.000 EACH AWD $ 400.00000 $ 5,600.00 2 $ 420.00000 $ 5,880.00 3 $ 400.00000 $ 5,600.00 4 $ 840.00000 $ 11,760.00 34 614E12460 WORK ZONE MARKING SIGN 38.000 EACH AWD $ 65.59000 $ 2,492.42 2 $ 75.00000 $ 2,850.00 3 $ 65.00000 $ 2,470.00 4 $ 70.00000 $ 2,660.00 35 614E13000 BIT CONC FOR MAINT TRAF 150.000 CU YD AWD $ 40.00000 $ 6,000.00 2 $ 40.00000 $ 6,000.00 3 $ 85.00000 $ 12,750.00 4 $ 65.00000 $ 9,750.00 36 614E21100 TEMP CL, CL I, 642 PAINT 10.180 MILE AWD $ 297.12000 $ 3,024.68 2 $ 760.00000 $ 7,736.80 3 $ 650.00000 $ 6,617.00 4 $ 1,440.00000 $ 14,659.20 37 614E21500 TEMP CL, CL II, 642 PAINT 10.180 MILE AWD $ 175.31000 $ 1,784.66 2 $ 395.00000 $ 4,021.10 3 $ 350.00000 $ 3,563.00 4 $ 600.00000 $ 6,108.00 38 614E23200 TEMP CH LINE, CL I, 642 PT 870.000 LIN FT AWD $ 0.79000 $ 687.30 2 $ 0.90000 $ 783.00 3 $ 0.65000 $ 565.50 4 $ 1.00000 $ 870.00

PROJ. NO. 010034 PAGE NO. 6 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 39 614E26200 TEMP STOP LINE, CL I, 642 PT 206.000 LIN FT AWD $ 4.79000 $ 986.74 2 $ 5.00000 $ 1,030.00 3 $ 3.50000 $ 721.00 4 $ 3.60000 $ 741.60 40 614E31650 TEMP WORD ON PVMT, 96", CL. 1, 642 PAINT 4.000 EACH AWD $ 66.87000 $ 267.48 2 $ 200.00000 $ 800.00 3 $ 80.00000 $ 320.00 4 $ 210.00000 $ 840.00 41 617E10100 COMP AGGREGATE, TYPE A 1,275.000 CU YD AWD $ 16.00000 $ 20,400.00 2 $ 20.00000 $ 25,500.00 3 $ 35.00000 $ 44,625.00 4 $ 36.00000 $ 45,900.00 42 621E00201 RAISED PVMT MARKER, INSTALL ONLY, APP 721.000 EACH AWD $ 7.00000 $ 5,047.00 2 $ 7.00000 $ 5,047.00 3 $ 7.00000 $ 5,047.00 4 $ 15.00000 $ 10,815.00 43 626E00100 BARRIER REFLECTOR, TYPE A 147.000 EACH AWD $ 5.00000 $ 735.00 2 $ 5.00000 $ 735.00 3 $ 5.00000 $ 735.00 4 $ 7.20000 $ 1,058.40 44 632E26501 DETECTOR LOOP, APP 9.000 EACH AWD $ 950.00000 $ 8,550.00 2 $ 1,000.00000 $ 9,000.00 3 $ 975.00000 $ 8,775.00 4 $ 1,020.00000 $ 9,180.00 45 638E10800 VALVE BOX ADJUSTED TO GRADE 2.000 EACH AWD $ 50.00000 $ 100.00 2 $ 250.00000 $ 500.00 3 $ 200.00000 $ 400.00 4 $ 150.00000 $ 300.00

PROJ. NO. 010034 PAGE NO. 7 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 46 690E50000 MAILBOX SUPPORT 13.000 EACH AWD $ 85.00000 $ 1,105.00 2 $ 75.00000 $ 975.00 3 $ 80.00000 $ 1,040.00 4 $ 150.00000 $ 1,950.00 47 828E10000 EDGE LINE 19.560 MILE AWD $ 1,685.00000 $ 32,958.60 2 $ 1,600.00000 $ 31,296.00 3 $ 1,685.00000 $ 32,958.60 4 $ 2,640.00000 $ 51,638.40 48 828E10200 CENTER LINE 10.180 MILE AWD $ 2,890.00000 $ 29,420.20 2 $ 2,800.00000 $ 28,504.00 3 $ 2,890.00000 $ 29,420.20 4 $ 4,560.00000 $ 46,420.80 49 828E10300 CHANNELIZING LINE 435.000 LIN FT AWD $ 1.40000 $ 609.00 2 $ 1.40000 $ 609.00 3 $ 1.40000 $ 609.00 4 $ 2.15000 $ 935.25 50 828E10400 STOP LINE 103.000 LIN FT AWD $ 6.80000 $ 700.40 2 $ 6.80000 $ 700.40 3 $ 6.80000 $ 700.40 4 $ 18.00000 $ 1,854.00 51 828E10600 TRANSVERSE LINE 1,180.000 LIN FT AWD $ 3.10000 $ 3,658.00 2 $ 3.10000 $ 3,658.00 3 $ 3.10000 $ 3,658.00 4 $ 9.00000 $ 10,620.00 52 828E20110 SCHOOL SYMBOL MARKING, 96" 2.000 EACH AWD $ 400.00000 $ 800.00 2 $ 400.00000 $ 800.00 3 $ 400.00000 $ 800.00 4 $ 600.00000 $ 1,200.00

PROJ. NO. 010034 PAGE NO. 8 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 53 828E20300 LANE ARROW 5.000 EACH AWD $ 145.00000 $ 725.00 2 $ 145.00000 $ 725.00 3 $ 145.00000 $ 725.00 4 $ 150.00000 $ 750.00 54 828E20410 WORD ON PAVEMENT, 96" 4.000 EACH AWD $ 260.00000 $ 1,040.00 2 $ 260.00000 $ 1,040.00 3 $ 260.00000 $ 1,040.00 4 $ 210.00000 $ 840.00 55 870E20000 COMMERCIAL FERTILIZER 2.500 TON AWD $ 400.00000 $ 1,000.00 2 $ 500.00000 $ 1,250.00 3 $ 960.00000 $ 2,400.00 4 $ 50.00000 $ 125.00 56 870E35000 WATER 60.000 M GAL AWD $ 1.00000 $ 60.00 2 $ 1.00000 $ 60.00 3 $ 1.00000 $ 60.00 4 $ 10.00000 $ 600.00 57 877E10000 TEMPORARY SEEDING AND MULCHING 20,800.000 SQ YD AWD $ 0.10000 $ 2,080.00 2 $ 0.25000 $ 5,200.00 3 $ 0.55000 $ 11,440.00 4 $ 0.50000 $ 10,400.00 58 877E30100 TEMPORARY PERIMETER FILTER FABRIC FENCE 500.000 LIN FT AWD $ 1.50000 $ 750.00 2 $ 1.00000 $ 500.00 3 $ 2.65000 $ 1,325.00 4 $ 2.75000 $ 1,375.00 59 877E30200 TEMP DITCH CHECK FILTER FABRIC FENCE 500.000 LIN FT AWD $ 1.50000 $ 750.00 2 $ 1.00000 $ 500.00 3 $ 4.28000 $ 2,140.00 4 $ 2.75000 $ 1,375.00

PROJ. NO. 010034 PAGE NO. 9 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 60 877E55500 TEMPORARY DITCH PROTECTION 27,750.000 SQ YD AWD $ 0.50000 $ 13,875.00 2 $ 0.50000 $ 13,875.00 3 $ 1.20000 $ 33,300.00 4 $ 1.00000 $ 27,750.00 61 877E60000 SEDIMENT REMOVAL 25.000 CU YD AWD $ 20.00000 $ 500.00 2 $ 25.00000 $ 625.00 3 $ 40.90000 $ 1,022.50 4 $ 20.00000 $ 500.00

S.1 ITEMS OF WORK TOTALS AWD $ 1,433,025.39 2 $ 1,485,988.25 3 $ 1,658,080.50 4 $ 1,956,129.70 62 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 10,000.00000 $ 10,000.00 2 $ 6,900.00000 $ 6,900.00 3 $ 8,500.00000 $ 8,500.00 4 $ 20,000.00000 $ 20,000.00 63 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 84,000.00000 $ 84,000.00 2 $ 69,100.00000 $ 69,100.00 3 $ 127,000.00000 $ 127,000.00 4 $ 100,000.00000 $ 100,000.00 64 623E10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 1,000.00000 $ 1,000.00 2 $ 2,400.00000 $ 2,400.00 3 $ 3,000.00000 $ 3,000.00 4 $ 10,000.00000 $ 10,000.00 65 624E10000 MOBILIZATION LUMP SUM AWD $ 40,000.00000 $ 40,000.00 2 $ 50,000.00000 $ 50,000.00 3 $ 40,000.00000 $ 40,000.00 4 $ 10,000.00000 $ 10,000.00

S.2 INCIDENTALS TOTALS AWD $ 135,000.00 2 $ 128,400.00 3 $ 178,500.00 4 $ 140,000.00

PROJ. NO. 010034 PAGE NO. 10 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

TOTAL AMOUNT OF THE BID AWD $ 1,568,025.39 2 $ 1,614,388.25 3 $ 1,836,580.50 4 $ 2,096,129.70

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010037 PID. 21325 LOG-117-6.71 TE21-G010(006) TYPE: BRIDGE REPAIR LETTING: 02/07/01 COMPLETION DATE: 07/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: BRIDGE OVERLAY SYSTEMS INC AWARDED AMOUNT: $ 219,719.60 ENGINEERS ESTIMATE: $ 290,000.00 BIDDER 1 BIDDER 2 BRIDGE OVERLAY SYSTEMS INC DOT CONSTRUCTION CORP 325 RUSSO DR 535 NORTH BROAD ST STE 5 CANFIELD ,OH 44406 CANFIELD ,OH 44406 BIDDER 3 BIDDER 4 COMPLETE GENERAL CONSTRUCTION COMPANY BECDIR CONSTRUCTION COMPANY 1221 EAST FIFTH AVE 4990 MAHONING AVE COLUMBUS ,OH 43219 YOUNGSTOWN ,OH 44515 BIDDER 5 BIDDER 6 VELOTTA COMPANY R M H CONCRETE & FOUNDATIONS INC 6740 RIDGE RD 4623 WEST COLLINS RD SHARON CENTER ,OH 44274 COLLINS ,OH 44826

PROJ. NO. 010037 PAGE NO. 12 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E47000 BR TERM ASSY REM 4.000 EACH AWD $ 90.00000 $ 360.00 2 $ 90.00000 $ 360.00 3 $ 80.00000 $ 320.00 4 $ 90.00000 $ 360.00 5 $ 90.00000 $ 360.00 6 $ 94.50000 $ 378.00 2 606E35000 BRIDGE TERM. ASSY, TYPE 1 4.000 EACH AWD $ 1,185.00000 $ 4,740.00 2 $ 1,185.00000 $ 4,740.00 3 $ 1,185.00000 $ 4,740.00 4 $ 750.00000 $ 3,000.00 5 $ 1,200.00000 $ 4,800.00 6 $ 1,244.25000 $ 4,977.00

S.1 ROADWAY TOTALS AWD $ 5,100.00 2 $ 5,100.00 3 $ 5,060.00 4 $ 3,360.00 5 $ 5,160.00 6 $ 5,355.00 3 642E00102 EDGE LINE, TYPE 2 0.316 MILE AWD $ 1,553.00000 $ 490.75 2 $ 1,553.00000 $ 490.75 3 $ 1,523.51000 $ 481.43 4 $ 1,500.00000 $ 474.00 5 $ 1,600.00000 $ 505.60 6 $ 2,562.00000 $ 809.59 4 642E00302 CENTER LINE, TYPE 2 0.215 MILE AWD $ 2,790.00000 $ 599.85 2 $ 2,790.00000 $ 599.85 3 $ 2,725.12000 $ 585.90 4 $ 2,800.00000 $ 602.00 5 $ 2,800.00000 $ 602.00 6 $ 2,562.00000 $ 550.83

S.2 TRAFFIC CONTROL TOTALS AWD $ 1,090.60 2 $ 1,090.60 3 $ 1,067.33 4 $ 1,076.00 5 $ 1,107.60 6 $ 1,360.42

PROJ. NO. 010037 PAGE NO. 13 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 5 512E67502 SEALING OF CONC. SURF.(EPOXY) 2,028.000 SQ YD AWD $ 5.00000 $ 10,140.00 2 $ 7.50000 $ 15,210.00 3 $ 10.00000 $ 20,280.00 4 $ 4.00000 $ 8,112.00 5 $ 10.00000 $ 20,280.00 6 $ 12.87000 $ 26,100.36 6 516E31000 JOINT SEALER, 705.04 118.000 LIN FT AWD $ 8.00000 $ 944.00 2 $ 5.00000 $ 590.00 3 $ 18.00000 $ 2,124.00 4 $ 19.00000 $ 2,242.00 5 $ 3.00000 $ 354.00 6 $ 20.60000 $ 2,430.80 7 517E76201 RAILING FACED, APP 1,156.000 LIN FT AWD $ 85.00000 $ 98,260.00 2 $ 75.00000 $ 86,700.00 3 $ 80.00000 $ 92,480.00 4 $ 50.00000 $ 57,800.00 5 $ 81.50000 $ 94,214.00 6 $ 95.50000 $ 110,398.00 8 847E30400 EXISTING CONCRETE OVERLAY REMOVED , 1.25" 1,781.000 SQ YD AWD $ 10.00000 $ 17,810.00 2 $ 3.00000 $ 5,343.00 3 $ 4.00000 $ 7,124.00 4 $ 6.50000 $ 11,576.50 5 $ 6.00000 $ 10,686.00 6 $ 11.95000 $ 21,282.95 9 848E10000 MICRO SILICA MOD CONC OVERLY/HYDRO , (2") 1,935.000 SQ YD AWD $ 16.00000 $ 30,960.00 2 $ 25.00000 $ 48,375.00 3 $ 21.00000 $ 40,635.00 4 $ 30.00000 $ 58,050.00 5 $ 25.00000 $ 48,375.00 6 $ 38.55000 $ 74,594.25

PROJ. NO. 010037 PAGE NO. 14 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 10 848E20000 SURFACE PREP USING HYDRODEMOLITION 1,935.000 SQ YD AWD $ 19.00000 $ 36,765.00 2 $ 21.00000 $ 40,635.00 3 $ 23.00000 $ 44,505.00 4 $ 39.00000 $ 75,465.00 5 $ 24.00000 $ 46,440.00 6 $ 23.70000 $ 45,859.50 11 848E30000 MICRO SILICA MOD CONC OVERLY, MAT ONLY 19.000 CU YD AWD $ 150.00000 $ 2,850.00 2 $ 200.00000 $ 3,800.00 3 $ 138.00000 $ 2,622.00 4 $ 175.00000 $ 3,325.00 5 $ 159.00000 $ 3,021.00 6 $ 145.00000 $ 2,755.00 12 848E50000 HAND CHIPPING 167.000 SQ YD AWD $ 25.00000 $ 4,175.00 2 $ 40.00000 $ 6,680.00 3 $ 50.00000 $ 8,350.00 4 $ 70.00000 $ 11,690.00 5 $ 120.00000 $ 20,040.00 6 $ 70.86000 $ 11,833.62 13 848E50100 TEST SLAB LUMP SUM AWD $ 1,000.00000 $ 1,000.00 2 $ 900.00000 $ 900.00 3 $ 500.00000 $ 500.00 4 $ 750.00000 $ 750.00 5 $ 1,500.00000 $ 1,500.00 6 $ 750.00000 $ 750.00 14 848E50200 FULL-DEPTH REPAIR , (MICRO-SILICA) 2.000 CU YD AWD $ 150.00000 $ 300.00 2 $ 700.00000 $ 1,400.00 3 $ 138.00000 $ 276.00 4 $ 500.00000 $ 1,000.00 5 $ 231.00000 $ 462.00 6 $ 898.07000 $ 1,796.14

S.3 STRUCTURE REPAIR TOTALS AWD $ 203,204.00 2 $ 209,633.00 3 $ 218,896.00 4 $ 230,010.50 5 $ 245,372.00 6 $ 297,800.62

PROJ. NO. 010037 PAGE NO. 15 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 15 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 4,825.00000 $ 4,825.00 2 $ 1,560.00000 $ 1,560.00 3 $ 2,000.00000 $ 2,000.00 4 $ 10,000.00000 $ 10,000.00 5 $ 2,900.00000 $ 2,900.00 6 $ 9,075.00000 $ 9,075.00 16 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 2,000.00000 $ 2,000.00 2 $ 4,000.00000 $ 4,000.00 3 $ 3,000.00000 $ 3,000.00 4 $ 12,000.00000 $ 12,000.00 5 $ 2,500.00000 $ 2,500.00 6 $ 11,551.54000 $ 11,551.54 17 624E10000 MOBILIZATION LUMP SUM AWD $ 2,000.00000 $ 2,000.00 2 $ 10,000.00000 $ 10,000.00 3 $ 10,000.00000 $ 10,000.00 4 $ 10,000.00000 $ 10,000.00 5 $ 10,000.00000 $ 10,000.00 6 $ 21,635.25000 $ 21,635.25 18 806E16000 FIELD OFFICE, TYPE A 3.000 MONTH AWD $ 500.00000 $ 1,500.00 2 $ 1,000.00000 $ 3,000.00 3 $ 700.00000 $ 2,100.00 4 $ 750.00000 $ 2,250.00 5 $ 1,800.00000 $ 5,400.00 6 $ 167.66700 $ 503.00

S.4 INCIDENTALS TOTALS AWD $ 10,325.00 2 $ 18,560.00 3 $ 17,100.00 4 $ 34,250.00 5 $ 20,800.00 6 $ 42,764.79

TOTAL AMOUNT OF THE BID AWD $ 219,719.60 2 $ 234,383.60 3 $ 242,123.33 4 $ 268,696.50 5 $ 272,439.60 6 $ 347,280.83

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010038 PID. 20953 MAR-95-13.96 TE21-G000(657) TYPE: TWO LANE RESURFACING LETTING: 02/07/01 COMPLETION DATE: 07/15/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: MANSFIELD ASPHALT PAVING COMPANY AWARDED AMOUNT: $ 752,815.36 ENGINEERS ESTIMATE: $ 860,000.00 BIDDER 1 BIDDER 2 MANSFIELD ASPHALT PAVING COMPANY KOKOSING CONSTRUCTION COMPANY INC 1300 WEST FOURTH ST 886 MC KINLEY AVE MANSFIELD ,OH 44901 COLUMBUS ,OH 43222 BIDDER 3 BIDDER 4 MC DANIELS CONSTRUCTION CORP INC S E JOHNSON COMPANIES INC 901 OAK ST 1345 FORD ST COLUMBUS ,OH 43205 MAUMEE ,OH 43537 BIDDER 5 NORTHWOOD STONE & ASPHALT INC 1558 COUNTY RD 105 BELLE CENTER ,OH 43310

PROJ. NO. 010038 PAGE NO. 17 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E30000 WALK REMOVED 132.000 SQ FT AWD $ 11.15000 $ 1,471.80 2 $ 4.00000 $ 528.00 3 $ 10.00000 $ 1,320.00 4 $ 6.00000 $ 792.00 5 $ 3.00000 $ 396.00 2 202E32000 CURB REMOVED 60.000 LIN FT AWD $ 14.76000 $ 885.60 2 $ 5.00000 $ 300.00 3 $ 20.00000 $ 1,200.00 4 $ 8.00000 $ 480.00 5 $ 4.40000 $ 264.00 3 202E54100 RAISED PVMT MRK RMVD/STRG 987.000 EACH AWD $ 4.09000 $ 4,036.83 2 $ 5.40000 $ 5,329.80 3 $ 3.00000 $ 2,961.00 4 $ 4.00000 $ 3,948.00 5 $ 3.08000 $ 3,039.96 4 251E01000 PRTL DEPTH PVMT REPAIR 500.000 SQ YD AWD $ 18.42000 $ 9,210.00 2 $ 21.00000 $ 10,500.00 3 $ 20.00000 $ 10,000.00 4 $ 21.00000 $ 10,500.00 5 $ 21.36000 $ 10,680.00 5 253E01000 PAVEMENT REPAIR 590.000 SQ YD AWD $ 25.25000 $ 14,897.50 2 $ 20.00000 $ 11,800.00 3 $ 34.00000 $ 20,060.00 4 $ 22.00000 $ 12,980.00 5 $ 43.75000 $ 25,812.50 6 254E01000 PAVEMENT PLANING, BITUMINOUS 10,807.000 SQ YD AWD $ 1.36000 $ 14,697.52 2 $ 1.15000 $ 12,428.05 3 $ 1.40000 $ 15,129.80 4 $ 1.65000 $ 17,831.55 5 $ 2.00000 $ 21,614.00

PROJ. NO. 010038 PAGE NO. 18 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 7 407E10000 TACK COAT 13,583.000 GALLON AWD $ 0.78000 $ 10,594.74 2 $ 0.75000 $ 10,187.25 3 $ 0.80000 $ 10,866.40 4 $ 0.75000 $ 10,187.25 5 $ 0.77000 $ 10,458.91 8 407E14000 TACK COAT FOR INTERMEDIATE COURSE 8,417.000 GALLON AWD $ 0.77000 $ 6,481.09 2 $ 0.75000 $ 6,312.75 3 $ 0.80000 $ 6,733.60 4 $ 0.75000 $ 6,312.75 5 $ 0.77000 $ 6,481.09 9 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 3,506.000 CU YD AWD $ 58.08000 $ 203,628.48 2 $ 62.00000 $ 217,372.00 3 $ 63.00000 $ 220,878.00 4 $ 65.00000 $ 227,890.00 5 $ 62.75000 $ 220,001.50 10 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 6,340.000 CU YD AWD $ 58.81000 $ 372,855.40 2 $ 62.50000 $ 396,250.00 3 $ 63.00000 $ 399,420.00 4 $ 65.00000 $ 412,100.00 5 $ 62.75000 $ 397,835.00 11 516E31200 SAWING & SEALING BIT CONC JTS 280.000 LIN FT AWD $ 5.84000 $ 1,635.20 2 $ 10.00000 $ 2,800.00 3 $ 11.50000 $ 3,220.00 4 $ 8.00000 $ 2,240.00 5 $ 6.84000 $ 1,915.20 12 604E38500 MONUMENT ASSEMBLY 4.000 EACH AWD $ 787.06000 $ 3,148.24 2 $ 915.00000 $ 3,660.00 3 $ 500.00000 $ 2,000.00 4 $ 525.00000 $ 2,100.00 5 $ 1,380.00000 $ 5,520.00

PROJ. NO. 010038 PAGE NO. 19 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 13 604E39500 MON BOX ADJ TO GRADE 2.000 EACH AWD $ 498.76000 $ 997.52 2 $ 375.00000 $ 750.00 3 $ 500.00000 $ 1,000.00 4 $ 175.00000 $ 350.00 5 $ 345.00000 $ 690.00 14 608E52000 CURB RAMP 132.000 SQ FT AWD $ 19.05000 $ 2,514.60 2 $ 10.00000 $ 1,320.00 3 $ 15.00000 $ 1,980.00 4 $ 12.00000 $ 1,584.00 5 $ 52.75000 $ 6,963.00 15 614E12460 WORK ZONE MARKING SIGN 90.000 EACH AWD $ 67.99000 $ 6,119.10 2 $ 75.00000 $ 6,750.00 3 $ 35.00000 $ 3,150.00 4 $ 53.00000 $ 4,770.00 5 $ 51.10000 $ 4,599.00 16 614E20400 TEMP LANE LINE, CL II 22.520 MILE AWD $ 149.65000 $ 3,370.12 2 $ 185.00000 $ 4,166.20 3 $ 100.00000 $ 2,252.00 4 $ 145.00000 $ 3,265.40 5 $ 200.00000 $ 4,504.00 17 614E21400 TEMP CL, CL II 0.360 MILE AWD $ 583.97000 $ 210.23 2 $ 315.00000 $ 113.40 3 $ 500.00000 $ 180.00 4 $ 300.00000 $ 108.00 5 $ 200.00000 $ 72.00 18 617E10100 COMP AGGREGATE, TYPE A 821.000 CU YD AWD $ 32.07000 $ 26,329.47 2 $ 34.00000 $ 27,914.00 3 $ 22.00000 $ 18,062.00 4 $ 26.00000 $ 21,346.00 5 $ 23.61000 $ 19,383.81

PROJ. NO. 010038 PAGE NO. 20 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 19 621E00200 RAISED PAVEMENT MARKER, INSTALL ONLY 831.000 EACH AWD $ 7.33000 $ 6,091.23 2 $ 6.90000 $ 5,733.90 3 $ 6.94000 $ 5,767.14 4 $ 7.00000 $ 5,817.00 5 $ 7.20000 $ 5,983.20 20 632E26500 DETECTOR LOOP 8.000 EACH AWD $ 1,530.48000 $ 12,243.84 2 $ 945.00000 $ 7,560.00 3 $ 945.00000 $ 7,560.00 4 $ 1,095.00000 $ 8,760.00 5 $ 1,450.00000 $ 11,600.00 21 632E27200 LOOP DETECTOR TIE IN 8.000 EACH AWD $ 105.55000 $ 844.40 2 $ 65.00000 $ 520.00 3 $ 65.00000 $ 520.00 4 $ 520.00000 $ 4,160.00 5 $ 100.00000 $ 800.00 22 642E00090 EDGE LINE 21.920 MILE AWD $ 213.21000 $ 4,673.56 2 $ 220.00000 $ 4,822.40 3 $ 202.00000 $ 4,427.84 4 $ 202.00000 $ 4,427.84 5 $ 219.00000 $ 4,800.48 23 642E00290 CENTER LINE 10.960 MILE AWD $ 317.71000 $ 3,482.10 2 $ 200.00000 $ 2,192.00 3 $ 301.00000 $ 3,298.96 4 $ 301.00000 $ 3,298.96 5 $ 199.00000 $ 2,181.04 24 644E00200 LANE LINE 0.180 MILE AWD $ 923.56000 $ 166.24 2 $ 1,100.00000 $ 198.00 3 $ 875.00000 $ 157.50 4 $ 875.00000 $ 157.50 5 $ 1,100.00000 $ 198.00

PROJ. NO. 010038 PAGE NO. 21 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 25 644E00300 CENTER LINE 0.250 MILE AWD $ 2,939.60000 $ 734.90 2 $ 3,775.00000 $ 943.75 3 $ 2,785.00000 $ 696.25 4 $ 2,785.00000 $ 696.25 5 $ 3,800.00000 $ 950.00 26 644E00400 CHANNELIZING LINE 892.000 LIN FT AWD $ 1.21000 $ 1,079.32 2 $ 1.00000 $ 892.00 3 $ 1.15000 $ 1,025.80 4 $ 1.15000 $ 1,025.80 5 $ 1.00000 $ 892.00 27 644E00500 STOP LINE 120.000 LIN FT AWD $ 4.91000 $ 589.20 2 $ 5.00000 $ 600.00 3 $ 4.65000 $ 558.00 4 $ 4.65000 $ 558.00 5 $ 4.90000 $ 588.00 28 644E00600 CROSSWALK LINE 460.000 LIN FT AWD $ 2.80000 $ 1,288.00 2 $ 1.90000 $ 874.00 3 $ 2.65000 $ 1,219.00 4 $ 2.65000 $ 1,219.00 5 $ 2.00000 $ 920.00 29 644E00700 TRANSVERSE LINE 195.000 LIN FT AWD $ 4.75000 $ 926.25 2 $ 4.70000 $ 916.50 3 $ 4.50000 $ 877.50 4 $ 4.50000 $ 877.50 5 $ 4.70000 $ 916.50 30 644E01110 SCHOOL SYMBOL MARKING, 96" 3.000 EACH AWD $ 316.65000 $ 949.95 2 $ 300.00000 $ 900.00 3 $ 300.00000 $ 900.00 4 $ 300.00000 $ 900.00 5 $ 300.00000 $ 900.00

PROJ. NO. 010038 PAGE NO. 22 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 31 644E01300 LANE ARROW 10.000 EACH AWD $ 68.61000 $ 686.10 2 $ 80.00000 $ 800.00 3 $ 65.00000 $ 650.00 4 $ 65.00000 $ 650.00 5 $ 80.00000 $ 800.00 32 644E01400 WORD ON PAVEMENT, 72" 6.000 EACH AWD $ 89.72000 $ 538.32 2 $ 85.00000 $ 510.00 3 $ 85.00000 $ 510.00 4 $ 85.00000 $ 510.00 5 $ 85.00000 $ 510.00 33 841E10000 TREATING OF CONCRETE SURFACES WITH SRS 354.000 SQ YD AWD $ 13.73000 $ 4,860.42 2 $ 10.50000 $ 3,717.00 3 $ 20.00000 $ 7,080.00 4 $ 10.50000 $ 3,717.00 5 $ 9.36000 $ 3,313.44

S.1 ITEMS OF WORK TOTALS AWD $ 722,237.27 2 $ 749,661.00 3 $ 755,660.79 4 $ 775,559.80 5 $ 775,582.63 34 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 3,272.07000 $ 3,272.07 2 $ 1,500.00000 $ 1,500.00 3 $ 3,950.00000 $ 3,950.00 4 $ 3,300.00000 $ 3,300.00 5 $ 1,075.00000 $ 1,075.00 35 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 18,719.21000 $ 18,719.21 2 $ 15,250.00000 $ 15,250.00 3 $ 30,000.00000 $ 30,000.00 4 $ 19,555.00000 $ 19,555.00 5 $ 29,900.00000 $ 29,900.00

PROJ. NO. 010038 PAGE NO. 23 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 36 623E10001 CONST LAYOUT STAKES, APP LUMP SUM AWD $ 3,175.97000 $ 3,175.97 2 $ 900.00000 $ 900.00 3 $ 3,000.00000 $ 3,000.00 4 $ 3,000.00000 $ 3,000.00 5 $ 3,400.00000 $ 3,400.00 37 624E10000 MOBILIZATION LUMP SUM AWD $ 3,630.48000 $ 3,630.48 2 $ 17,000.00000 $ 17,000.00 3 $ 5,000.00000 $ 5,000.00 4 $ 20,000.00000 $ 20,000.00 5 $ 20,000.00000 $ 20,000.00 38 806E16001 FIELD OFFICE, TYPE A, APP 2.000 MONTH AWD $ 890.18000 $ 1,780.36 2 $ 2,500.00000 $ 5,000.00 3 $ 500.00000 $ 1,000.00 4 $ 1,200.00000 $ 2,400.00 5 $ 820.00000 $ 1,640.00

S.2 INCIDENTALS TOTALS AWD $ 30,578.09 2 $ 39,650.00 3 $ 42,950.00 4 $ 48,255.00 5 $ 56,015.00

TOTAL AMOUNT OF THE BID AWD $ 752,815.36 2 $ 789,311.00 3 $ 798,610.79 4 $ 823,814.80 5 $ 831,597.63

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010041 PID. 19164 ADA-32-0.00 & VARIOUS NON-FEDERAL TYPE: HERBICIDAL SPRAYING LETTING: 02/07/01 COMPLETION DATE: 05/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: CHEMI-TROL CHEMICAL CO AWARDED AMOUNT: $ 65,537.13 ENGINEERS ESTIMATE: $ 95,000.00 BIDDER 1 BIDDER 2 CHEMI-TROL CHEMICAL CO DEANGELO BROTHERS INC 2776 C.R. 69 100 NORTH CONAHAN DR GIBSONBURG ,OH 43431 HAZLETON ,PA 18201 BIDDER 3 D J GROUP INC P O BOX 337 6TH & CENTER ST BEVERLY ,OH 45715

PROJ. NO. 010041 PAGE NO. 25 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 817E41200 HERBICIDAL SPRAYING , KARMEX DF OR DIURON CONCENTRATE 678.000 POUND AWD $ 17.07000 $ 11,573.46 2 $ 22.20000 $ 15,051.60 3 $ 23.70000 $ 16,068.60 2 817E60050 HERBICIDAL SPRAYING, MISC. ROUNDUP PRO CONCENTRATE 339.000 QUART AWD $ 34.15000 $ 11,576.85 2 $ 44.40000 $ 15,051.60 3 $ 63.75000 $ 21,611.25 3 817E60050 HERBICIDAL SPRAYING, MISC. WEEDAR IVM44 CONCENTRATE 170.000 QUART AWD $ 68.10000 $ 11,577.00 2 $ 88.52000 $ 15,048.40 3 $ 17.70000 $ 3,009.00 4 817E60060 HERBICIDAL SPRAYING, MISC. OUST CONCENTRATE 509.000 OUNCE AWD $ 22.75000 $ 11,579.75 2 $ 29.56000 $ 15,046.04 3 $ 68.50000 $ 34,866.50

S.1 NON SELECTIVE VEGETATION CONTROL TOTALS AWD $ 46,307.06 2 $ 60,197.64 3 $ 75,555.35 5 817E60060 HERBICIDAL SPRAYING, MISC. ESCORT CONCENTRATE 147.000 OUNCE AWD $ 60.64000 $ 8,914.08 2 $ 74.83000 $ 11,000.01 3 $ 117.00000 $ 17,199.00 6 817E60070 SPECIAL - HERBICIDAL SPRAYING, MISC. TORDON K CONCENTRATE 293.000 PINT AWD $ 30.43000 $ 8,915.99 2 $ 34.13000 $ 10,000.09 3 $ 71.30000 $ 20,890.90

S.2 BROADLEAF WEED CONTROL TOTALS AWD $ 17,830.07 2 $ 21,000.10 3 $ 38,089.90

PROJ. NO. 010041 PAGE NO. 26 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 7 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 1,200.00000 $ 1,200.00 2 $ 2,794.26000 $ 2,794.26 3 $ 1,500.00000 $ 1,500.00 8 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 100.00000 $ 100.00 2 $ 1,000.00000 $ 1,000.00 3 $ 7,000.00000 $ 7,000.00 9 624E10000 MOBILIZATION LUMP SUM AWD $ 100.00000 $ 100.00 2 $ 1,000.00000 $ 1,000.00 3 $ 3,000.00000 $ 3,000.00

S.3 INCIDENTALS TOTALS AWD $ 1,400.00 2 $ 4,794.26 3 $ 11,500.00

TOTAL AMOUNT OF THE BID AWD $ 65,537.13 2 $ 85,992.00 3 $ 125,145.25

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010042 PID. 21953 ALL-75-0.00 NON-FEDERAL TYPE: HERBICIDAL SPRAYING LETTING: 02/07/01 COMPLETION DATE: 08/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: CHEMI-TROL CHEMICAL CO AWARDED AMOUNT: $ 191,000.00 ENGINEERS ESTIMATE: $ 242,000.00 BIDDER 1 BIDDER 2 CHEMI-TROL CHEMICAL CO DEANGELO BROTHERS INC 2776 C.R. 69 100 NORTH CONAHAN DR GIBSONBURG ,OH 43431 HAZLETON ,PA 18201 BIDDER 3 BIDDER 4 BIG TREES INC TOWNSEND TREE SERVICE CO INC 27201 ROYALTON RD 101 S MAIN ST COLUMBIA STATION ,OH 44028 PARKER CITY ,IN 47368-0128

PROJ. NO. 010042 PAGE NO. 28 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 817E10000 HERB SPRYNG, WD & BR FROM RD 2,260.000 ACRE AWD $ 29.94000 $ 67,664.40 2 $ 23.79500 $ 53,776.70 3 $ 20.93000 $ 47,301.80 4 $ 31.93000 $ 72,161.80 2 817E41000 HERBICIDAL SPRAYING 335.000 LIN MILE AWD $ 181.43000 $ 60,779.05 2 $ 217.01300 $ 72,699.36 3 $ 225.67000 $ 75,599.45 4 $ 220.68000 $ 73,927.80 3 817E42000 HERB SPRYG, NON SEL VEG CONTR 151.000 LIN MILE AWD $ 189.97000 $ 28,685.47 2 $ 304.11600 $ 45,921.52 3 $ 184.77000 $ 27,900.27 4 $ 297.57000 $ 44,933.07 4 817E50100 HERB SPRYG, R/W FENCE 328.000 LIN MILE AWD $ 86.30000 $ 28,306.40 2 $ 73.98900 $ 24,268.39 3 $ 155.32000 $ 50,944.96 4 $ 75.00000 $ 24,600.00

S.1 ITEMS OF WORK TOTALS AWD $ 185,435.32 2 $ 196,665.97 3 $ 201,746.48 4 $ 215,622.67 5 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 2,900.00000 $ 2,900.00 2 $ 1,001.61000 $ 1,001.61 3 $ 2,000.00000 $ 2,000.00 4 $ 1,000.00000 $ 1,000.00 6 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 1,332.34000 $ 1,332.34 2 $ 1,000.00000 $ 1,000.00 3 $ 500.00000 $ 500.00 4 $ 5,000.00000 $ 5,000.00

PROJ. NO. 010042 PAGE NO. 29 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 7 624E10000 MOBILIZATION LUMP SUM AWD $ 1,332.34000 $ 1,332.34 2 $ 1,000.00000 $ 1,000.00 3 $ 500.00000 $ 500.00 4 $ 1,000.00000 $ 1,000.00

S.2 INCIDENTALS TOTALS AWD $ 5,564.68 2 $ 3,001.61 3 $ 3,000.00 4 $ 7,000.00

TOTAL AMOUNT OF THE BID AWD $ 191,000.00 2 $ 199,667.58 3 $ 204,746.48 4 $ 222,622.67

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010044 PID. 22098 ATB-MAH-TRU-VAR NON-FEDERAL TYPE: PAVEMENT MARKING LETTING: 02/07/01 COMPLETION DATE: 10/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: OGLESBY CONSTRUCTION INC AWARDED AMOUNT: $ 408,683.11 ENGINEERS ESTIMATE: $ 436,000.00 BIDDER 1 BIDDER 2 OGLESBY CONSTRUCTION INC CHEMI-TROL CHEMICAL CO 1600 TOLEDO RD RT 20 WEST 2776 C.R. 69 NORWALK ,OH 44857 GIBSONBURG ,OH 43431 BIDDER 3 BIDDER 4 AERO-MARK INC TRAFFTECH INC 7600-B BOND ST 1754 E 47TH ST GLENWILLOW ,OH 44139 CLEVELAND ,OH 44103

PROJ. NO. 010044 PAGE NO. 31 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 614E11100 LEO WITH PATROL CAR 100.000 HOUR AWD $ 30.00000 $ 3,000.00 2 $ 35.50000 $ 3,550.00 3 $ 35.00000 $ 3,500.00 4 $ 25.00000 $ 2,500.00 2 642E00101 EDGE LINE, TYPE 1, APP 2,046.480 MILE AWD $ 127.20000 $ 260,312.26 2 $ 127.57000 $ 261,069.45 3 $ 131.00000 $ 268,088.88 4 $ 160.00000 $ 327,436.80 3 642E00201 LANE LINE, TYPE 1, APP 451.049 MILE AWD $ 66.89000 $ 30,170.67 2 $ 71.50000 $ 32,250.00 3 $ 69.00000 $ 31,122.38 4 $ 95.00000 $ 42,849.66 4 642E00301 CENTER LINE, TYPE 1, AS PER PLAN 692.856 MILE AWD $ 158.85000 $ 110,060.18 2 $ 163.21000 $ 113,081.03 3 $ 157.00000 $ 108,778.39 4 $ 205.00000 $ 142,035.48

S.1 ITEMS OF WORK TOTALS AWD $ 403,543.11 2 $ 409,950.48 3 $ 411,489.65 4 $ 514,821.94 5 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 3,000.00000 $ 3,000.00 2 $ 2,000.00000 $ 2,000.00 3 $ 1,850.00000 $ 1,850.00 4 $ 3,000.00000 $ 3,000.00 6 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 1,400.00000 $ 1,400.00 2 $ 50.00000 $ 50.00 3 $ 160.35000 $ 160.35 4 $ 1,000.00000 $ 1,000.00

PROJ. NO. 010044 PAGE NO. 32 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 7 624E10000 MOBILIZATION LUMP SUM AWD $ 740.00000 $ 740.00 2 $ 25.00000 $ 25.00 3 $ 500.00000 $ 500.00 4 $ 3,000.00000 $ 3,000.00

S.2 INCIDENTALS TOTALS AWD $ 5,140.00 2 $ 2,075.00 3 $ 2,510.35 4 $ 7,000.00

TOTAL AMOUNT OF THE BID AWD $ 408,683.11 2 $ 412,025.48 3 $ 414,000.00 4 $ 521,821.94

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010045 PID. 16846 AUG-197-7.44 NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 02/07/01 COMPLETION DATE: 06/30/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: NORTHWOOD STONE & ASPHALT INC AWARDED AMOUNT: $ 429,337.77 ENGINEERS ESTIMATE: $ 480,000.00 BIDDER 1 BIDDER 2 NORTHWOOD STONE & ASPHALT INC S E JOHNSON COMPANIES INC 1558 COUNTY RD 105 1345 FORD ST BELLE CENTER ,OH 43310 MAUMEE ,OH 43537

PROJ. NO. 010045 PAGE NO. 34 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E23500 WEARING COURSE REMOVED 1,261.000 SQ YD AWD $ 8.50000 $ 10,718.50 2 $ 6.00000 $ 7,566.00 2 202E54100 RAISED PVMT MRK RMVD/STRG 810.000 EACH AWD $ 5.00000 $ 4,050.00 2 $ 4.00000 $ 3,240.00 3 203E60700 GRADING MAILBOX APPROACHES 4.000 EACH AWD $ 150.00000 $ 600.00 2 $ 125.00000 $ 500.00 4 254E01000 PAVEMENT PLANING, BITUMINOUS 2,733.000 SQ YD AWD $ 3.90000 $ 10,658.70 2 $ 3.25000 $ 8,882.25 5 407E10000 TACK COAT 13,312.000 GALLON AWD $ 0.60000 $ 7,987.20 2 $ 0.80000 $ 10,649.60 6 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 2,454.000 CU YD AWD $ 53.00000 $ 130,062.00 2 $ 68.75000 $ 168,712.50 7 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 3,703.000 CU YD AWD $ 53.00000 $ 196,259.00 2 $ 68.75000 $ 254,581.25 8 516E31000 JOINT SEALER, 705.04 65.000 LIN FT AWD $ 25.00000 $ 1,625.00 2 $ 8.00000 $ 520.00 9 604E39500 MON BOX ADJ TO GRADE 12.000 EACH AWD $ 75.00000 $ 900.00 2 $ 150.00000 $ 1,800.00

PROJ. NO. 010045 PAGE NO. 35 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 10 614E12460 WORK ZONE MARKING SIGN 85.000 EACH AWD $ 50.00000 $ 4,250.00 2 $ 50.00000 $ 4,250.00 11 614E21400 TEMP CL, CL II 17.180 MILE AWD $ 150.00000 $ 2,577.00 2 $ 125.00000 $ 2,147.50 12 617E10100 COMP AGGREGATE, TYPE A 1,054.000 CU YD AWD $ 20.00000 $ 21,080.00 2 $ 22.00000 $ 23,188.00 13 621E00200 RAISED PAVEMENT MARKER, INSTALL ONLY 666.000 EACH AWD $ 6.96000 $ 4,635.36 2 $ 7.00000 $ 4,662.00 14 642E00102 EDGE LINE, TYPE 2 16.180 MILE AWD $ 271.00000 $ 4,384.78 2 $ 271.00000 $ 4,384.78 15 642E00302 CENTER LINE, TYPE 2 8.590 MILE AWD $ 418.00000 $ 3,590.62 2 $ 418.00000 $ 3,590.62 16 644E00500 STOP LINE 478.000 LIN FT AWD $ 4.52000 $ 2,160.56 2 $ 4.52000 $ 2,160.56 17 644E00600 CROSSWALK LINE 172.000 LIN FT AWD $ 2.65000 $ 455.80 2 $ 2.65000 $ 455.80 18 644E01000 RAILROAD SYMBOL MARKING 2.000 EACH AWD $ 249.00000 $ 498.00 2 $ 249.00000 $ 498.00

PROJ. NO. 010045 PAGE NO. 36 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 19 644E01110 SCHOOL SYMBOL MARKING, 96" 2.000 EACH AWD $ 350.00000 $ 700.00 2 $ 350.00000 $ 700.00 20 690E50000 MAILBOX SUPPORT 4.000 EACH AWD $ 200.00000 $ 800.00 2 $ 100.00000 $ 400.00

S.1 ITEMS OF WORK TOTALS AWD $ 407,992.52 2 $ 502,888.86 21 100E00300 RAILROAD INSURANCE BOND LUMP SUM AWD $ 500.00000 $ 500.00 2 $ 450.00000 $ 450.00 22 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 2,270.00000 $ 2,270.00 2 $ 3,200.00000 $ 3,200.00 23 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 8,575.25000 $ 8,575.25 2 $ 25,000.00000 $ 25,000.00 24 624E10000 MOBILIZATION LUMP SUM AWD $ 10,000.00000 $ 10,000.00 2 $ 10,000.00000 $ 10,000.00

S.2 INCIDENTALS TOTALS AWD $ 21,345.25 2 $ 38,650.00

TOTAL AMOUNT OF THE BID AWD $ 429,337.77 2 $ 541,538.86

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010046 PID. 19476 BEL-7-8.70 & VAR NON-FEDERAL TYPE: PAVEMENT MARKING LETTING: 02/07/01 COMPLETION DATE: 09/30/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: LAKE ERIE CONSTRUCTION COMPANY AWARDED AMOUNT: $ 241,880.00 ENGINEERS ESTIMATE: $ 285,000.00 BIDDER 1 BIDDER 2 LAKE ERIE CONSTRUCTION COMPANY INTERNATIONAL CONTR 25 SOUTH NORWALK RD 450 E. STARR AVE NORWALK ,OH 44857 COLUMBUS ,OH 43201 BIDDER 3 BIDDER 4 TRAFFIC SPECIALISTS INC BARBOUR COMPANY 5009 CINCINNATI-BROOKVILLE RD 1784 STATE ROUTE 63 OKEANA ,OH 45053-0190 LEBANON ,OH 45036 BIDDER 5 W L MARKERS, INC 639 GLENMOOR DRIVE COLUMBUS ,OH 43228

PROJ. NO. 010046 PAGE NO. 38 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E54001 RAISED PVMT MARKER RMVD, APP 415.000 EACH AWD $ 6.00000 $ 2,490.00 2 $ 4.00000 $ 1,660.00 3 $ 6.00000 $ 2,490.00 4 $ 28.81000 $ 11,956.15 5 $ 9.00000 $ 3,735.00 2 256E10100 BONDED PTCHG/RIGID PVMT, B , TYPE 2 830.000 SQ FT AWD $ 1.56000 $ 1,294.80 2 $ 0.25000 $ 207.50 3 $ 7.25000 $ 6,017.50 4 $ 19.63000 $ 16,292.90 5 $ 26.00000 $ 21,580.00 3 621E00300 PRISMATIC RETROREFLECTOR 54,917.000 EACH AWD $ 3.65000 $ 200,447.05 2 $ 3.86000 $ 211,979.62 3 $ 3.92000 $ 215,274.64 4 $ 3.75000 $ 205,938.75 5 $ 3.97000 $ 218,020.49 4 621E00301 PRISMATIC RETROREFLECTOR, APP 500.000 EACH AWD $ 3.60000 $ 1,800.00 2 $ 3.86000 $ 1,930.00 3 $ 3.92000 $ 1,960.00 4 $ 3.75000 $ 1,875.00 5 $ 3.97000 $ 1,985.00 5 621E00600 RAISED PVMT MARKER CASTING, INSTALL ONLY 759.000 EACH AWD $ 7.85000 $ 5,958.15 2 $ 6.00000 $ 4,554.00 3 $ 13.00000 $ 9,867.00 4 $ 6.87000 $ 5,214.33 5 $ 7.50000 $ 5,692.50 6 621E90000 RAISED PAVEMENT MARKER, MISC. REPLACEMENT OF RAISED PAVEMENT MARKER 300.000 EACH AWD $ 10.00000 $ 3,000.00 2 $ 6.00000 $ 1,800.00 3 $ 15.00000 $ 4,500.00 4 $ 9.62000 $ 2,886.00 5 $ 12.00000 $ 3,600.00

PROJ. NO. 010046 PAGE NO. 39 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 7 642E20000 TWO-WAY RADIO EQUIPMENT LUMP SUM AWD $ 40.00000 $ 40.00 2 $ 259.00000 $ 259.00 3 $ 100.00000 $ 100.00 4 $ 100.00000 $ 100.00 5 $ 100.00000 $ 100.00

S.1 TRAFFIC CONTROL TOTALS AWD $ 215,030.00 2 $ 222,390.12 3 $ 240,209.14 4 $ 244,263.13 5 $ 254,712.99 8 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 2,020.00000 $ 2,020.00 2 $ 4,000.00000 $ 4,000.00 3 $ 3,000.00000 $ 3,000.00 4 $ 1,475.00000 $ 1,475.00 5 $ 4,000.00000 $ 4,000.00 9 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 22,150.00000 $ 22,150.00 2 $ 15,000.00000 $ 15,000.00 3 $ 12,000.00000 $ 12,000.00 4 $ 23,000.00000 $ 23,000.00 5 $ 32,000.00000 $ 32,000.00 10 624E10000 MOBILIZATION LUMP SUM AWD $ 1,480.00000 $ 1,480.00 2 $ 6,000.00000 $ 6,000.00 3 $ 10,000.00000 $ 10,000.00 4 $ 1,500.00000 $ 1,500.00 5 $ 7,400.00000 $ 7,400.00 11 806E16001 FIELD OFFICE, TYPE A, APP 6.000 MONTH AWD $ 200.00000 $ 1,200.00 2 $ 390.33200 $ 2,341.99 3 $ 100.00000 $ 600.00 4 $ 200.00000 $ 1,200.00 5 $ 300.00000 $ 1,800.00

S.2 INCIDENTALS TOTALS AWD $ 26,850.00 2 $ 27,341.99 3 $ 25,600.00 4 $ 27,175.00 5 $ 45,200.00

PROJ. NO. 010046 PAGE NO. 40 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

TOTAL AMOUNT OF THE BID AWD $ 241,880.00 2 $ 249,732.11 3 $ 265,809.14 4 $ 271,438.13 5 $ 299,912.99

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010049 PID. 22316 LAK-HEADLANDS BEACH STATE PARK NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 02/07/01 COMPLETION DATE: 10/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: BURTON SCOT CORPORATION AWARDED AMOUNT: $ 665,170.50 ENGINEERS ESTIMATE: $ 815,000.00 BIDDER 1 BIDDER 2 BURTON SCOT CORPORATION KARVO PAVING COMPANY 14728 MAPLEWOOD RD 449 MUNROE FALLS RD BURTON ,OH 44021 TALLMADGE ,OH 44278 BIDDER 3 BIDDER 4 SCHLOSS PAVING CO DIORIO PAVING CO INC 13700 MC CRACKEN RD 8024 JOHN WHITE RD CLEVELAND ,OH 44125 HUBBARD ,OH 44425 BIDDER 5 BIDDER 6 CARRON ASPHALT PAVING INC ROMANO PAVING & EXCAVATING INC 7615 BOND ST 1103 EAST POLAND AVE GLENWILLOW ,OH 44139 BESSEMER ,PA 16112 BIDDER 7 BIDDER 8 NORTHEASTERN ROAD IMPROVEMENT COMPANY KOSKI CONSTRUCTION CO 38700 PELTON RD 5841 WOODMAN AVE WILLOUGHBY ,OH 44094 ASHTABULA ,OH 44004 BIDDER 9 G R OSTERLAND COMPANY 2100 WEST 3RD ST CLEVELAND ,OH 44113

PROJ. NO. 010049 PAGE NO. 42 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E35100 PIPE REMOVED, 24" & UNDER 3.000 LIN FT AWD $ 50.00000 $ 150.00 2 $ 20.00000 $ 60.00 3 $ 150.00000 $ 450.00 4 $ 100.00000 $ 300.00 5 $ 35.00000 $ 105.00 6 $ 50.00000 $ 150.00 7 $ 100.00000 $ 300.00 8 $ 40.00000 $ 120.00 9 $ 115.00000 $ 345.00 2 202E38800 GUARD POST REMOVED 14.000 EACH AWD $ 3.00000 $ 42.00 2 $ 15.00000 $ 210.00 3 $ 15.00000 $ 210.00 4 $ 10.00000 $ 140.00 5 $ 45.00000 $ 630.00 6 $ 50.00000 $ 700.00 7 $ 52.00000 $ 728.00 8 $ 25.00000 $ 350.00 9 $ 15.00000 $ 210.00 3 202E52990 PARKING BLOCK REMOVED 4,250.000 EACH AWD $ 3.00000 $ 12,750.00 2 $ 2.00000 $ 8,500.00 3 $ 5.00000 $ 21,250.00 4 $ 5.00000 $ 21,250.00 5 $ 3.25000 $ 13,812.50 6 $ 1.25000 $ 5,312.50 7 $ 1.60000 $ 6,800.00 8 $ 5.20000 $ 22,100.00 9 $ 10.00000 $ 42,500.00 4 203E12000 EXCAVATION W/O EMBANKMENT 1,503.000 CU YD AWD $ 13.00000 $ 19,539.00 2 $ 11.00000 $ 16,533.00 3 $ 25.00000 $ 37,575.00 4 $ 13.97000 $ 20,996.91 5 $ 21.00000 $ 31,563.00 6 $ 6.50000 $ 9,769.50 7 $ 15.00000 $ 22,545.00 8 $ 22.00000 $ 33,066.00 9 $ 20.00000 $ 30,060.00

PROJ. NO. 010049 PAGE NO. 43 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 5 606E17900 GUARD POST 25.000 EACH AWD $ 100.00000 $ 2,500.00 2 $ 30.00000 $ 750.00 3 $ 78.00000 $ 1,950.00 4 $ 71.50000 $ 1,787.50 5 $ 100.00000 $ 2,500.00 6 $ 165.00000 $ 4,125.00 7 $ 95.00000 $ 2,375.00 8 $ 65.00000 $ 1,625.00 9 $ 78.00000 $ 1,950.00 6 653E10000 TOPSOIL FRNSHD & PLACED 37.000 CU YD AWD $ 100.00000 $ 3,700.00 2 $ 30.00000 $ 1,110.00 3 $ 50.00000 $ 1,850.00 4 $ 52.43000 $ 1,939.91 5 $ 35.00000 $ 1,295.00 6 $ 65.00000 $ 2,405.00 7 $ 70.00000 $ 2,590.00 8 $ 100.00000 $ 3,700.00 9 $ 70.00000 $ 2,590.00 7 690E50500 CONCRETE PARKING BLOCK 3,092.000 EACH AWD $ 30.00000 $ 92,760.00 2 $ 35.00000 $ 108,220.00 3 $ 30.00000 $ 92,760.00 4 $ 43.28000 $ 133,821.76 5 $ 49.00000 $ 151,508.00 6 $ 28.00000 $ 86,576.00 7 $ 46.00000 $ 142,232.00 8 $ 36.00000 $ 111,312.00 9 $ 40.00000 $ 123,680.00

S.1 ROADWAY TOTALS AWD $ 131,441.00 2 $ 135,383.00 3 $ 156,045.00 4 $ 180,236.08 5 $ 201,413.50 6 $ 109,038.00 7 $ 177,570.00 8 $ 172,273.00 9 $ 201,335.00

PROJ. NO. 010049 PAGE NO. 44 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 8 877E30100 TEMPORARY PERIMETER FILTER FABRIC FENCE 120.000 LIN FT AWD $ 2.50000 $ 300.00 2 $ 3.00000 $ 360.00 3 $ 2.00000 $ 240.00 4 $ 4.00000 $ 480.00 5 $ 1.00000 $ 120.00 6 $ 3.50000 $ 420.00 7 $ 5.00000 $ 600.00 8 $ 3.50000 $ 420.00 9 $ 2.00000 $ 240.00

S.2 EROSION CONTROL TOTALS AWD $ 300.00 2 $ 360.00 3 $ 240.00 4 $ 480.00 5 $ 120.00 6 $ 420.00 7 $ 600.00 8 $ 420.00 9 $ 240.00 9 603E07600 18" CONDUIT, TYPE C 3.000 LIN FT AWD $ 100.00000 $ 300.00 2 $ 150.00000 $ 450.00 3 $ 50.00000 $ 150.00 4 $ 400.00000 $ 1,200.00 5 $ 180.00000 $ 540.00 6 $ 100.00000 $ 300.00 7 $ 500.00000 $ 1,500.00 8 $ 75.00000 $ 225.00 9 $ 200.00000 $ 600.00

S.3 DRAINAGE TOTALS AWD $ 300.00 2 $ 450.00 3 $ 150.00 4 $ 1,200.00 5 $ 540.00 6 $ 300.00 7 $ 1,500.00 8 $ 225.00 9 $ 600.00

PROJ. NO. 010049 PAGE NO. 45 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 10 253E02000 PAVEMENT REPAIR 305.000 CU YD AWD $ 100.00000 $ 30,500.00 2 $ 88.00000 $ 26,840.00 3 $ 125.00000 $ 38,125.00 4 $ 107.00000 $ 32,635.00 5 $ 100.00000 $ 30,500.00 6 $ 76.70000 $ 23,393.50 7 $ 166.00000 $ 50,630.00 8 $ 132.00000 $ 40,260.00 9 $ 110.00000 $ 33,550.00 11 304E20000 AGGREGATE BASE 473.000 CU YD AWD $ 28.50000 $ 13,480.50 2 $ 33.00000 $ 15,609.00 3 $ 35.00000 $ 16,555.00 4 $ 31.01000 $ 14,667.73 5 $ 35.00000 $ 16,555.00 6 $ 36.00000 $ 17,028.00 7 $ 35.00000 $ 16,555.00 8 $ 52.00000 $ 24,596.00 9 $ 33.00000 $ 15,609.00 12 407E13900 TACK COAT, 702.13 11,709.000 GALLON AWD $ 1.60000 $ 18,734.40 2 $ 1.20000 $ 14,050.80 3 $ 0.65000 $ 7,610.85 4 $ 1.05000 $ 12,294.45 5 $ 1.10000 $ 12,879.90 6 $ 1.00000 $ 11,709.00 7 $ 1.10000 $ 12,879.90 8 $ 1.75000 $ 20,490.75 9 $ 1.00000 $ 11,709.00 13 408E10000 BITUMINOUS PRIME COAT 798.000 GALLON AWD $ 1.50000 $ 1,197.00 2 $ 1.75000 $ 1,396.50 3 $ 1.50000 $ 1,197.00 4 $ 1.30000 $ 1,037.40 5 $ 2.00000 $ 1,596.00 6 $ 3.00000 $ 2,394.00 7 $ 1.60000 $ 1,276.80 8 $ 2.65000 $ 2,114.70 9 $ 2.00000 $ 1,596.00

PROJ. NO. 010049 PAGE NO. 46 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 14 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 149.000 CU YD AWD $ 70.00000 $ 10,430.00 2 $ 85.00000 $ 12,665.00 3 $ 80.00000 $ 11,920.00 4 $ 121.49000 $ 18,102.01 5 $ 90.00000 $ 13,410.00 6 $ 87.00000 $ 12,963.00 7 $ 125.00000 $ 18,625.00 8 $ 110.00000 $ 16,390.00 9 $ 105.00000 $ 15,645.00 15 448E47020 ASPH CONC SURFACE, TYPE 1, PG64-22 6,505.000 CU YD AWD $ 64.00000 $ 416,320.00 2 $ 63.00000 $ 409,815.00 3 $ 66.00000 $ 429,330.00 4 $ 67.43000 $ 438,632.15 5 $ 70.00000 $ 455,350.00 6 $ 80.05000 $ 520,725.25 7 $ 73.00000 $ 474,865.00 8 $ 72.00000 $ 468,360.00 9 $ 78.50000 $ 510,642.50

S.4 PAVEMENT TOTALS AWD $ 490,661.90 2 $ 480,376.30 3 $ 504,737.85 4 $ 517,368.74 5 $ 530,290.90 6 $ 588,212.75 7 $ 574,831.70 8 $ 572,211.45 9 $ 588,751.50 16 630E02100 GR MTD SUPP, #2 POST 725.000 LIN FT AWD $ 4.95000 $ 3,588.75 2 $ 4.50000 $ 3,262.50 3 $ 5.20000 $ 3,770.00 4 $ 4.20000 $ 3,045.00 5 $ 10.00000 $ 7,250.00 6 $ 5.75000 $ 4,168.75 7 $ 5.00000 $ 3,625.00 8 $ 7.50000 $ 5,437.50 9 $ 5.20000 $ 3,770.00

PROJ. NO. 010049 PAGE NO. 47 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 17 630E80100 SIGN, FLAT SHEET 119.000 SQ FT AWD $ 16.25000 $ 1,933.75 2 $ 14.00000 $ 1,666.00 3 $ 15.00000 $ 1,785.00 4 $ 13.50000 $ 1,606.50 5 $ 41.00000 $ 4,879.00 6 $ 18.95000 $ 2,255.05 7 $ 20.00000 $ 2,380.00 8 $ 27.50000 $ 3,272.50 9 $ 15.00000 $ 1,785.00 18 642E00102 EDGE LINE, TYPE 2 2.920 MILE AWD $ 350.00000 $ 1,022.00 2 $ 400.00000 $ 1,168.00 3 $ 530.00000 $ 1,547.60 4 $ 600.00000 $ 1,752.00 5 $ 1,056.00000 $ 3,083.52 6 $ 1,050.00000 $ 3,066.00 7 $ 575.00000 $ 1,679.00 8 $ 650.00000 $ 1,898.00 9 $ 900.00000 $ 2,628.00 19 642E00202 LANE LINE, TYPE 2 0.280 MILE AWD $ 300.00000 $ 84.00 2 $ 200.00000 $ 56.00 3 $ 500.00000 $ 140.00 4 $ 400.00000 $ 112.00 5 $ 1,056.00000 $ 295.68 6 $ 815.00000 $ 228.20 7 $ 540.00000 $ 151.20 8 $ 650.00000 $ 182.00 9 $ 700.00000 $ 196.00 20 642E00502 STOP LINE, TYPE 2 412.000 LIN FT AWD $ 1.00000 $ 412.00 2 $ 2.75000 $ 1,133.00 3 $ 3.70000 $ 1,524.40 4 $ 2.00000 $ 824.00 5 $ 0.95000 $ 391.40 6 $ 3.60000 $ 1,483.20 7 $ 4.00000 $ 1,648.00 8 $ 4.44000 $ 1,829.28 9 $ 3.10000 $ 1,277.20

PROJ. NO. 010049 PAGE NO. 48 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 21 642E00702 TRANSVERSE LINE, TYPE 2 3,929.000 LIN FT AWD $ 0.70000 $ 2,750.30 2 $ 2.75000 $ 10,804.75 3 $ 0.37000 $ 1,453.73 4 $ 0.75000 $ 2,946.75 5 $ 0.20000 $ 785.80 6 $ 1.25000 $ 4,911.25 7 $ 0.40000 $ 1,571.60 8 $ 0.44000 $ 1,728.76 9 $ 1.00000 $ 3,929.00 22 642E01202 PARKING LOT STALL MKG, TYPE 2 65,459.000 LIN FT AWD $ 0.20000 $ 13,091.80 2 $ 0.12000 $ 7,855.08 3 $ 0.29000 $ 18,983.11 4 $ 0.40000 $ 26,183.60 5 $ 0.20000 $ 13,091.80 6 $ 0.58000 $ 37,966.22 7 $ 0.35000 $ 22,910.65 8 $ 0.34000 $ 22,256.06 9 $ 0.55000 $ 36,002.45 23 642E01302 LANE ARROW, TYPE 2 180.000 EACH AWD $ 17.75000 $ 3,195.00 2 $ 35.00000 $ 6,300.00 3 $ 28.00000 $ 5,040.00 4 $ 33.00000 $ 5,940.00 5 $ 20.00000 $ 3,600.00 6 $ 48.00000 $ 8,640.00 7 $ 30.00000 $ 5,400.00 8 $ 34.00000 $ 6,120.00 9 $ 41.00000 $ 7,380.00 24 642E01704 HANDICAP SYMBOL MARKING, TYPE 2 60.000 EACH AWD $ 25.00000 $ 1,500.00 2 $ 35.00000 $ 2,100.00 3 $ 30.00000 $ 1,800.00 4 $ 33.00000 $ 1,980.00 5 $ 15.00000 $ 900.00 6 $ 120.00000 $ 7,200.00 7 $ 32.00000 $ 1,920.00 8 $ 36.00000 $ 2,160.00 9 $ 103.00000 $ 6,180.00

PROJ. NO. 010049 PAGE NO. 49 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

S.5 TRAFFIC CONTROL TOTALS AWD $ 27,577.60 2 $ 34,345.33 3 $ 36,043.84 4 $ 44,389.85 5 $ 34,277.20 6 $ 69,918.67 7 $ 41,285.45 8 $ 44,884.10 9 $ 63,147.65 25 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 6,590.00000 $ 6,590.00 2 $ 5,000.00000 $ 5,000.00 3 $ 3,400.00000 $ 3,400.00 4 $ 7,800.00000 $ 7,800.00 5 $ 8,000.00000 $ 8,000.00 6 $ 6,900.00000 $ 6,900.00 7 $ 8,500.00000 $ 8,500.00 8 $ 12,210.20000 $ 12,210.20 9 $ 2,500.00000 $ 2,500.00 26 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 6,100.00000 $ 6,100.00 2 $ 1,000.00000 $ 1,000.00 3 $ 13,500.00000 $ 13,500.00 4 $ 9,000.00000 $ 9,000.00 5 $ 1,000.00000 $ 1,000.00 6 $ 10,000.00000 $ 10,000.00 7 $ 6,500.00000 $ 6,500.00 8 $ 6,000.00000 $ 6,000.00 9 $ 8,800.00000 $ 8,800.00 27 623E10000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 1,000.00000 $ 1,000.00 2 $ 1,000.00000 $ 1,000.00 3 $ 1,500.00000 $ 1,500.00 4 $ 1,500.00000 $ 1,500.00 5 $ 1,000.00000 $ 1,000.00 6 $ 1,500.00000 $ 1,500.00 7 $ 5,400.00000 $ 5,400.00 8 $ 5,000.00000 $ 5,000.00 9 $ 2,000.00000 $ 2,000.00

PROJ. NO. 010049 PAGE NO. 50 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 28 624E10000 MOBILIZATION LUMP SUM AWD $ 1,200.00000 $ 1,200.00 2 $ 9,000.00000 $ 9,000.00 3 $ 3,000.00000 $ 3,000.00 4 $ 6,100.00000 $ 6,100.00 5 $ 4,000.00000 $ 4,000.00 6 $ 5,000.00000 $ 5,000.00 7 $ 5,000.00000 $ 5,000.00 8 $ 13,000.00000 $ 13,000.00 9 $ 4,000.00000 $ 4,000.00

S.6 INCIDENTALS TOTALS AWD $ 14,890.00 2 $ 16,000.00 3 $ 21,400.00 4 $ 24,400.00 5 $ 14,000.00 6 $ 23,400.00 7 $ 25,400.00 8 $ 36,210.20 9 $ 17,300.00

TOTAL AMOUNT OF THE BID AWD $ 665,170.50 2 $ 666,914.63 3 $ 718,616.69 4 $ 768,074.67 5 $ 780,641.60 6 $ 791,289.42 7 $ 821,187.15 8 $ 826,223.75 9 $ 871,374.15

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010050 PID. 21587 MRG-78-10.27 NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 02/07/01 COMPLETION DATE: 07/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: SHELLY & SANDS INC AWARDED AMOUNT: $ 582,400.15 ENGINEERS ESTIMATE: $ 584,000.00 BIDDER 1 SHELLY & SANDS INC 3570 SOUTH RIVER RD ZANESVILLE ,OH 43702-1585

PROJ. NO. 010050 PAGE NO. 52 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E54100 RAISED PVMT MRK RMVD/STRG 854.000 EACH AWD $ 4.00000 $ 3,416.00 2 203E60001 LINEAR GRADING, APP 20.000 STATION AWD $ 50.00000 $ 1,000.00 3 407E10000 TACK COAT 4,205.000 GALLON AWD $ 0.85000 $ 3,574.25 4 407E14000 TACK COAT FOR INTERMEDIATE COURSE 2,524.000 GALLON AWD $ 0.85000 $ 2,145.40 5 408E10000 BITUMINOUS PRIME COAT (MC 30 OR MC 70 OR PRIMER 20) 5,470.000 GALLON AWD $ 1.40000 $ 7,658.00 6 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 2,948.000 CU YD AWD $ 72.25000 $ 212,993.00 7 448E47021 ASPH CONC SURFACE, T1, PG64-22, APP 3,348.000 CU YD AWD $ 72.25000 $ 241,893.00 8 614E12460 WORK ZONE MARKING SIGN 28.000 EACH AWD $ 50.00000 $ 1,400.00 9 614E21500 TEMP CL, CL II, 642 PAINT 13.320 MILE AWD $ 225.00000 $ 2,997.00 10 617E10101 COMP AGGREGATE, TYPE A, APP 1,194.000 CU YD AWD $ 40.50000 $ 48,357.00 11 617E25000 WATER 18.000 M GAL AWD $ 10.00000 $ 180.00

PROJ. NO. 010050 PAGE NO. 53 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 12 621E00300 PRISMATIC RETROREFLECTOR 806.000 EACH AWD $ 3.05000 $ 2,458.30 13 621E00600 RAISED PVMT MARKER CASTING, INSTALL ONLY 806.000 EACH AWD $ 7.50000 $ 6,045.00 14 642E00090 EDGE LINE 13.320 MILE AWD $ 230.00000 $ 3,063.60 15 642E00290 CENTER LINE 6.660 MILE AWD $ 410.00000 $ 2,730.60 16 644E00500 STOP LINE 182.000 LIN FT AWD $ 14.50000 $ 2,639.00

S.1 ITEMS OF WORK TOTALS AWD $ 542,550.15 17 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 2,500.00000 $ 2,500.00 18 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 17,500.00000 $ 17,500.00 19 623E10001 CONST LAYOUT STAKES, APP LUMP SUM AWD $ 1,350.00000 $ 1,350.00 20 624E10000 MOBILIZATION LUMP SUM AWD $ 18,500.00000 $ 18,500.00

S.2 INCIDENTALS TOTALS AWD $ 39,850.00

TOTAL AMOUNT OF THE BID AWD $ 582,400.15

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010052 PID. 22100 POR-VAR-VAR NON-FEDERAL TYPE: PAVEMENT MARKING LETTING: 02/07/01 COMPLETION DATE: 08/31/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: AERO-MARK INC AWARDED AMOUNT: $ 292,000.00 ENGINEERS ESTIMATE: $ 310,000.00 BIDDER 1 BIDDER 2 AERO-MARK INC OGLESBY CONSTRUCTION INC 7600-B BOND ST 1600 TOLEDO RD RT 20 WEST GLENWILLOW ,OH 44139 NORWALK ,OH 44857 BIDDER 3 BIDDER 4 TRAFFTECH INC CHEMI-TROL CHEMICAL CO 1754 E 47TH ST 2776 C.R. 69 CLEVELAND ,OH 44103 GIBSONBURG ,OH 43431

PROJ. NO. 010052 PAGE NO. 55 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 614E11100 LEO WITH PATROL CAR 100.000 HOUR AWD $ 35.00000 $ 3,500.00 2 $ 30.00000 $ 3,000.00 3 $ 25.00000 $ 2,500.00 4 $ 39.00000 $ 3,900.00 2 642E00101 EDGE LINE, TYPE 1, APP 1,396.374 MILE AWD $ 134.00000 $ 187,114.12 2 $ 130.03000 $ 181,570.51 3 $ 160.00000 $ 223,419.84 4 $ 172.96000 $ 241,516.85 3 642E00201 LANE LINE, TYPE 1, APP 331.691 MILE AWD $ 72.00000 $ 23,881.75 2 $ 71.62000 $ 23,755.71 3 $ 95.00000 $ 31,510.65 4 $ 95.20000 $ 31,576.98 4 642E00301 CENTER LINE, TYPE 1, AS PER PLAN 442.985 MILE AWD $ 171.00000 $ 75,750.44 2 $ 181.71000 $ 80,494.80 3 $ 205.00000 $ 90,811.93 4 $ 196.12000 $ 86,878.22

S.1 ITEMS OF WORK TOTALS AWD $ 290,246.31 2 $ 288,821.02 3 $ 348,242.42 4 $ 363,872.05 5 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 1,400.00000 $ 1,400.00 2 $ 2,500.00000 $ 2,500.00 3 $ 3,000.00000 $ 3,000.00 4 $ 3,000.00000 $ 3,000.00 6 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 200.00000 $ 200.00 2 $ 2,000.00000 $ 2,000.00 3 $ 1,000.00000 $ 1,000.00 4 $ 1,000.00000 $ 1,000.00

PROJ. NO. 010052 PAGE NO. 56 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 7 624E10000 MOBILIZATION LUMP SUM AWD $ 153.69000 $ 153.69 2 $ 1,000.00000 $ 1,000.00 3 $ 3,000.00000 $ 3,000.00 4 $ 1,000.00000 $ 1,000.00

S.2 INCIDENTALS TOTALS AWD $ 1,753.69 2 $ 5,500.00 3 $ 7,000.00 4 $ 5,000.00

TOTAL AMOUNT OF THE BID AWD $ 292,000.00 2 $ 294,321.02 3 $ 355,242.42 4 $ 368,872.05

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 010053 PID. 21404 PUT-224-20.04 NON-FEDERAL TYPE: TWO LANE RESURFACING LETTING: 02/07/01 COMPLETION DATE: 06/30/01 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: S E JOHNSON COMPANIES INC AWARDED AMOUNT: $ 568,332.19 ENGINEERS ESTIMATE: $ 566,000.00 BIDDER 1 BIDDER 2 S E JOHNSON COMPANIES INC NORTHWOOD STONE & ASPHALT INC 1345 FORD ST 1558 COUNTY RD 105 MAUMEE ,OH 43537 BELLE CENTER ,OH 43310 BIDDER 3 GERKEN PAVING INC 9-072 U S 24 NAPOLEON ,OH 43545

PROJ. NO. 010053 PAGE NO. 58 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E23000 PAVEMENT REMOVED 2,164.000 SQ YD AWD $ 3.50000 $ 7,574.00 2 $ 3.45000 $ 7,465.80 3 $ 1.70000 $ 3,678.80 2 202E23500 WEARING COURSE REMOVED 1,000.000 SQ YD AWD $ 4.50000 $ 4,500.00 2 $ 6.83000 $ 6,830.00 3 $ 5.50000 $ 5,500.00 3 202E30000 WALK REMOVED 3,564.000 SQ FT AWD $ 2.50000 $ 8,910.00 2 $ 2.00000 $ 7,128.00 3 $ 2.00000 $ 7,128.00 4 202E32500 CURB & GUTTER REMOVED 924.000 LIN FT AWD $ 11.00000 $ 10,164.00 2 $ 9.00000 $ 8,316.00 3 $ 9.00000 $ 8,316.00 5 202E54101 RSD PVMT MRK RMVD/STRG, APP 50.000 EACH AWD $ 7.00000 $ 350.00 2 $ 9.43000 $ 471.50 3 $ 4.00000 $ 200.00 6 203E12000 EXCAVATION W/O EMBANKMENT 526.000 CU YD AWD $ 12.00000 $ 6,312.00 2 $ 11.64000 $ 6,122.64 3 $ 17.00000 $ 8,942.00 7 203E50000 SUBGRADE COMPACTION 2,164.000 SQ YD AWD $ 1.25000 $ 2,705.00 2 $ 0.61000 $ 1,320.04 3 $ 0.40000 $ 865.60 8 251E01000 PRTL DEPTH PVMT REPAIR 50.000 SQ YD AWD $ 10.00000 $ 500.00 2 $ 40.22000 $ 2,011.00 3 $ 35.00000 $ 1,750.00

PROJ. NO. 010053 PAGE NO. 59 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 9 253E02000 PAVEMENT REPAIR 50.000 CU YD AWD $ 110.00000 $ 5,500.00 2 $ 183.77000 $ 9,188.50 3 $ 135.00000 $ 6,750.00 10 254E01000 PAVEMENT PLANING, BITUMINOUS 52,943.000 SQ YD AWD $ 0.65000 $ 34,412.95 2 $ 0.93000 $ 49,236.99 3 $ 1.25000 $ 66,178.75 11 254E01600 PATCHING PLANED SURF 105.000 SQ YD AWD $ 10.00000 $ 1,050.00 2 $ 19.14000 $ 2,009.70 3 $ 6.50000 $ 682.50 12 301E46000 BITUMINOUS AGGREGATE BASE, PG64-22 421.000 CU YD AWD $ 60.00000 $ 25,260.00 2 $ 50.20000 $ 21,134.20 3 $ 50.00000 $ 21,050.00 13 304E20000 AGGREGATE BASE 361.000 CU YD AWD $ 26.00000 $ 9,386.00 2 $ 21.90000 $ 7,905.90 3 $ 22.00000 $ 7,942.00 14 407E10000 TACK COAT 8,642.000 GALLON AWD $ 0.80000 $ 6,913.60 2 $ 0.78000 $ 6,740.76 3 $ 0.65000 $ 5,617.30 15 407E14000 TACK COAT FOR INTERMEDIATE COURSE 1,945.000 GALLON AWD $ 0.80000 $ 1,556.00 2 $ 0.78000 $ 1,517.10 3 $ 0.65000 $ 1,264.25 16 408E10000 BITUMINOUS PRIME COAT 866.000 GALLON AWD $ 1.54000 $ 1,333.64 2 $ 1.47000 $ 1,273.02 3 $ 0.70000 $ 606.20

PROJ. NO. 010053 PAGE NO. 60 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 17 448E46020 ASPH CONC INTERMEDIATE, TYPE 1, PG64-22 840.000 CU YD AWD $ 66.00000 $ 55,440.00 2 $ 60.68000 $ 50,971.20 3 $ 76.00000 $ 63,840.00 18 448E46040 ASPH CONC INTERMEDIATE, TYPE 2, PG64-28 105.000 CU YD AWD $ 80.00000 $ 8,400.00 2 $ 66.76000 $ 7,009.80 3 $ 64.00000 $ 6,720.00 19 448E47021 ASPH CONC SURFACE, T1, PG64-22, APP 1,999.000 CU YD AWD $ 60.00000 $ 119,940.00 2 $ 60.13000 $ 120,199.87 3 $ 59.00000 $ 117,941.00 20 448E50001 ASPHALT CONCRETE SURFACE, TYPE 1H, APP 2,409.000 CU YD AWD $ 70.00000 $ 168,630.00 2 $ 65.43000 $ 157,620.87 3 $ 62.50000 $ 150,562.50 21 604E39501 MON BOX ADJ TO GRADE, APP 2.000 EACH AWD $ 125.00000 $ 250.00 2 $ 37.40000 $ 74.80 3 $ 250.00000 $ 500.00 22 608E54000 CURB RAMP, TYPE 2 3,564.000 SQ FT AWD $ 6.00000 $ 21,384.00 2 $ 6.40000 $ 22,809.60 3 $ 6.40000 $ 22,809.60 23 614E12460 WORK ZONE MARKING SIGN 27.000 EACH AWD $ 50.00000 $ 1,350.00 2 $ 45.02000 $ 1,215.54 3 $ 78.00000 $ 2,106.00 24 614E21400 TEMP CL, CL II 9.430 MILE AWD $ 100.00000 $ 943.00 2 $ 180.84000 $ 1,705.32 3 $ 125.00000 $ 1,178.75

PROJ. NO. 010053 PAGE NO. 61 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 25 617E10100 COMP AGGREGATE, TYPE A 486.000 CU YD AWD $ 25.00000 $ 12,150.00 2 $ 27.43000 $ 13,330.98 3 $ 22.50000 $ 10,935.00 26 621E00200 RAISED PAVEMENT MARKER, INSTALL ONLY 50.000 EACH AWD $ 40.00000 $ 2,000.00 2 $ 20.00000 $ 1,000.00 3 $ 39.50000 $ 1,975.00 27 642E00090 EDGE LINE 7.120 MILE AWD $ 250.00000 $ 1,780.00 2 $ 500.00000 $ 3,560.00 3 $ 250.00000 $ 1,780.00 28 642E00290 CENTER LINE 7.200 MILE AWD $ 170.00000 $ 1,224.00 2 $ 500.00000 $ 3,600.00 3 $ 170.00000 $ 1,224.00 29 642E00390 CHANNELIZING LINE 640.000 LIN FT AWD $ 0.50000 $ 320.00 2 $ 2.00000 $ 1,280.00 3 $ 0.50000 $ 320.00 30 642E00490 STOP LINE 560.000 LIN FT AWD $ 2.00000 $ 1,120.00 2 $ 2.00000 $ 1,120.00 3 $ 2.00000 $ 1,120.00 31 642E00590 CROSSWALK LINE 2,280.000 LIN FT AWD $ 1.75000 $ 3,990.00 2 $ 2.00000 $ 4,560.00 3 $ 1.75000 $ 3,990.00 32 642E00990 RR SYMBOL MARKING 4.000 EACH AWD $ 125.00000 $ 500.00 2 $ 500.00000 $ 2,000.00 3 $ 125.00000 $ 500.00

PROJ. NO. 010053 PAGE NO. 62 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 33 642E01090 SCHOOL SYMBOL MARKING, 72" 3.000 EACH AWD $ 125.00000 $ 375.00 2 $ 500.00000 $ 1,500.00 3 $ 125.00000 $ 375.00 34 642E01290 LANE ARROW 47.000 EACH AWD $ 50.00000 $ 2,350.00 2 $ 50.00000 $ 2,350.00 3 $ 50.00000 $ 2,350.00 35 642E01390 WORD ON PAVEMENT, 72" 14.000 EACH AWD $ 75.00000 $ 1,050.00 2 $ 250.00000 $ 3,500.00 3 $ 75.00000 $ 1,050.00

S.1 ITEMS OF WORK TOTALS AWD $ 529,623.19 2 $ 538,079.13 3 $ 537,748.25 36 100E00300 RAILROAD INSURANCE BOND LUMP SUM AWD $ 450.00000 $ 450.00 2 $ 523.24000 $ 523.24 3 $ 3,500.00000 $ 3,500.00 37 103E05000 CONTRACT PERFORMANCE BOND LUMP SUM AWD $ 3,259.00000 $ 3,259.00 2 $ 941.83000 $ 941.83 3 $ 2,500.00000 $ 2,500.00 38 614E11000 MAINTAINING TRAFFIC LUMP SUM AWD $ 25,000.00000 $ 25,000.00 2 $ 26,698.27000 $ 26,698.27 3 $ 12,000.00000 $ 12,000.00 39 624E10000 MOBILIZATION LUMP SUM AWD $ 10,000.00000 $ 10,000.00 2 $ 5,460.59000 $ 5,460.59 3 $ 20,000.00000 $ 20,000.00

S.2 INCIDENTALS TOTALS AWD $ 38,709.00 2 $ 33,623.93 3 $ 38,000.00

PROJ. NO. 010053 PAGE NO. 63 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION

TOTAL AMOUNT OF THE BID AWD $ 568,332.19 2 $ 571,703.06 3 $ 575,748.25

OFFICIAL BID TABULATION AWARDED PROJECT PROJECT NO. 013003 PID. 12761 TUS-77-3.94 TE21-G010(003) TYPE: FOUR LANE RESURFACING LETTING: 02/07/01 COMPLETION DATE: 07/31/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT AWARDED TO: SHELLY COMPANY AWARDED AMOUNT: $ 9,192,000.00 ENGINEERS ESTIMATE: $ 11,922,000.00 BIDDER 1 BIDDER 2 SHELLY COMPANY SHELLY & SANDS INC 80 PARK DR 3570 SOUTH RIVER RD THORNVILLE ,OH 43076 ZANESVILLE ,OH 43702-1585

PROJ. NO. 013003 PAGE NO. 65 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 1 202E99100 REMOVAL, MISC.: WEARING COURSE REMOVED LUMP SUM AWD $ 250,000.00000 $ 250,000.00 2 $ 553,400.00000 $ 553,400.00 2 606E99000 GUARDRAIL LUMP SUM AWD $ 250,000.00000 $ 250,000.00 2 $ 240,000.00000 $ 240,000.00 3 607E99000 FENCE LUMP SUM AWD $ 200,000.00000 $ 200,000.00 2 $ 170,900.00000 $ 170,900.00

S.1 ROADWAY TOTALS AWD $ 700,000.00 2 $ 964,300.00 4 659E99000 PERMANENT EROSION CONTROL LUMP SUM AWD $ 30,000.00000 $ 30,000.00 2 $ 74,300.00000 $ 74,300.00 5 877E99000 TEMPORARY EROSION CONTROL LUMP SUM AWD $ 50,000.00000 $ 50,000.00 2 $ 72,600.00000 $ 72,600.00

S.2 EROSION CONTROL TOTALS AWD $ 80,000.00 2 $ 146,900.00 6 603E99000 DRAINAGE LUMP SUM AWD $ 544,000.00000 $ 544,000.00 2 $ 682,600.00000 $ 682,600.00

S.3 DRAINAGE TOTALS AWD $ 544,000.00 2 $ 682,600.00 7 452E99000 PLAIN CONCRETE PAVEMENT AS PER CONC DOC LUMP SUM AWD $ 350,000.00000 $ 350,000.00 2 $ 293,800.00000 $ 293,800.00

PROJ. NO. 013003 PAGE NO. 66 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 8 690E20100 ASPH PVMT, AS PER CONCEPTUAL DOCUMENTS LUMP SUM AWD $ 450,000.00000 $ 450,000.00 2 $ 201,000.00000 $ 201,000.00 9 690E21000 MISC.: RUBBLIZE AND ROLL EXISTING REINFORCED CONCRETE PAVEMENT LUMP SUM AWD $ 350,000.00000 $ 350,000.00 2 $ 156,000.00000 $ 156,000.00 10 880E99050 ASPHALT PAVEMENT (7 YEAR WARRANTY) LUMP SUM AWD $ 2,950,000.00000 $ 2,950,000.00 2 $ 3,857,800.00000 $ 3,857,800.00

S.4 PAVEMENT TOTALS AWD $ 4,100,000.00 2 $ 4,508,600.00 11 625E99000 LIGHTING LUMP SUM AWD $ 520,000.00000 $ 520,000.00 2 $ 453,000.00000 $ 453,000.00

S.5 LIGHTING TOTALS AWD $ 520,000.00 2 $ 453,000.00 12 621E99000 SPECIAL - RAISED PAVEMENT MARKERS LUMP SUM AWD $ 15,000.00000 $ 15,000.00 2 $ 28,560.00000 $ 28,560.00 13 642E99000 PAVEMENT MARKING LUMP SUM AWD $ 10,000.00000 $ 10,000.00 2 $ 10,000.00000 $ 10,000.00 14 690E21000 MISC.: SIGN UPGRADING LUMP SUM AWD $ 250,000.00000 $ 250,000.00 2 $ 260,900.00000 $ 260,900.00

S.6 TRAFFIC CONTROL TOTALS AWD $ 275,000.00 2 $ 299,460.00

PROJ. NO. 013003 PAGE NO. 67 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 15 530E99010 SUBSTRUCTURE LUMP SUM AWD $ 100,000.00000 $ 100,000.00 2 $ 51,000.00000 $ 51,000.00 16 530E99020 SUPERSTRUCTURE LUMP SUM AWD $ 230,000.00000 $ 230,000.00 2 $ 461,300.00000 $ 461,300.00

S.7 STRUCTURES REPAIR TOTALS AWD $ 330,000.00 2 $ 512,300.00 17 530E99010 SUBSTRUCTURE LUMP SUM AWD $ 90,000.00000 $ 90,000.00 2 $ 42,100.00000 $ 42,100.00 18 530E99020 SUPERSTRUCTURE LUMP SUM AWD $ 230,000.00000 $ 230,000.00 2 $ 425,600.00000 $ 425,600.00

S.8 BRIDGE NO. TUS-77-0502 R TOTALS AWD $ 320,000.00 2 $ 467,700.00 19 603E99010 CULVERT REPAIR, AS PER CONCEPTUAL DOC LUMP SUM AWD $ 68,000.00000 $ 68,000.00 2 $ 129,800.00000 $ 129,800.00

S.9 BRIDGE NO. TUS-77-0510 TOTALS AWD $ 68,000.00 2 $ 129,800.00 20 530E99010 SUBSTRUCTURE LUMP SUM AWD $ 80,000.00000 $ 80,000.00 2 $ 15,800.00000 $ 15,800.00 21 530E99020 SUPERSTRUCTURE LUMP SUM AWD $ 210,000.00000 $ 210,000.00 2 $ 365,000.00000 $ 365,000.00

S.10 BRIDGE NO. TUS-77-0527 L TOTALS AWD $ 290,000.00 2 $ 380,800.00

PROJ. NO. 013003 PAGE NO. 68 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 22 530E99010 SUBSTRUCTURE LUMP SUM AWD $ 75,000.00000 $ 75,000.00 2 $ 20,000.00000 $ 20,000.00 23 530E99020 SUPERSTRUCTURE LUMP SUM AWD $ 290,000.00000 $ 290,000.00 2 $ 546,000.00000 $ 546,000.00

S.11 BRIDGE NO. TUS-77-0527 R TOTALS AWD $ 365,000.00 2 $ 566,000.00 24 107E99000 UTILITY COORDINATION LUMP SUM AWD $ 10,000.00000 $ 10,000.00 2 $ 6,824.00000 $ 6,824.00 25 690E20020 FIELD SURVEYS LUMP SUM AWD $ 45,000.00000 $ 45,000.00 2 $ 68,514.00000 $ 68,514.00 26 690E20200 SPECIAL - PRELIMINARY PLANS FOR DB LUMP SUM AWD $ 150,000.00000 $ 150,000.00 2 $ 300,236.00000 $ 300,236.00 27 690E20210 SPECIAL - FINAL PLANS FOR DB LUMP SUM AWD $ 225,000.00000 $ 225,000.00 2 $ 217,707.00000 $ 217,707.00 28 690E20220 CONST PLANS FOR DESIGN-BUILD LUMP SUM AWD $ 15,000.00000 $ 15,000.00 2 $ 127,967.00000 $ 127,967.00

S.12 ENGINEERING AND SURVEYING SERVICES TOTALS AWD $ 445,000.00 2 $ 721,248.00 29 100E99000 PREMIUM ON RR'S/LIABILITY & PROPERTY LUMP SUM AWD $ 10,000.00000 $ 10,000.00 2 $ 4,500.00000 $ 4,500.00

PROJ. NO. 013003 PAGE NO. 69 OFFICIAL BID TABULATION REF NO. ALT. ITEM QUANTITY BIDDER UNIT PRICE EXTENSION 30 100E99010 PROFESSIONAL LIABILITY INSURANCE LUMP SUM AWD $ 10,000.00000 $ 10,000.00 2 $ 24,400.00000 $ 24,400.00 31 103E99000 PREMIUM FOR PREFORMANCE/PAYMENT LUMP SUM AWD $ 50,000.00000 $ 50,000.00 2 $ 85,400.00000 $ 85,400.00 32 614E99000 MAINTAINING TRAFFIC LUMP SUM AWD $ 800,000.00000 $ 800,000.00 2 $ 1,115,400.00000 $ 1,115,400.00 33 623E99000 CONSTRUCTION LAYOUT STAKES LUMP SUM AWD $ 55,000.00000 $ 55,000.00 2 $ 72,900.00000 $ 72,900.00 34 624E99000 MOBILIZATION LUMP SUM AWD $ 200,000.00000 $ 200,000.00 2 $ 449,200.00000 $ 449,200.00 35 806E99000 SPECIAL - FIELD OFFICE , TYPE C LUMP SUM AWD $ 30,000.00000 $ 30,000.00 2 $ 27,500.00000 $ 27,500.00

S.13 INCIDENTALS TOTALS AWD $ 1,155,000.00 2 $ 1,779,300.00

TOTAL AMOUNT OF THE BID AWD $ 9,192,000.00 2 $ 11,612,008.00