THE REPUBLIC OF UGANDA OFFICE OF THE AUDITOR GENERAL ANNUAL REPORT OF THE AUDITOR GENERAL FOR THE YEAR ENDED 30 TH JUNE 2013 VOLUME 2 CENTRAL GOVERNMENT

OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

  • Upload
    voliem

  • View
    457

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

THE REPUBLIC OF UGANDA

OFFICE OF THE AUDITOR GENERAL

ANNUAL REPORT OF THE AUDITOR GENERAL FOR THE YEAR ENDED 30TH

JUNE 2013

VOLUME 2

CENTRAL GOVERNMENT

Page 2: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

ii

Page 3: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

iii

Table Of Contents

LIST OF ACRONYMS AND ABREVIATIONS................................................................................ viii

1.0 INTRODUCTION .................................................................................................................. 1

2.0 REPORT AND OPINION OF THE AUDITOR GENERAL ON THE GOVERNMENT OF

UGANDA CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEAR ENDED 30TH

JUNE, 2013 ........................................................................................................................ 14

ACCOUNTABILITY SECTOR ....................................................................................................... 34

3.0 TREASURY OPERATIONS ............................................................................................... 34

4.0 MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT .................... 37

5.0 DEPARTMENT OF ETHICS AND INTEGRITY ................................................................. 70

WORKS AND TRANSPORT SECTOR ......................................................................................... 73

6.0 MINISTRY OF WORKS AND TRANSPORT ..................................................................... 73

7.0 UGANDA NATIONAL ROADS AUTHORITY ..................................................................... 92

8.0 THE UGANDA ROAD FUND ........................................................................................... 150

JUSTICE LAW AND ORDER SECTOR ...................................................................................... 155

9.0 MINISTRY OF JUSTICE AND CONSTITUTIONAL AFFAIRS ........................................ 155

10.0 MINISTRY OF INTERNAL AFFAIRS ............................................................................... 198

11.0 UGANDA POLICE FORCE .............................................................................................. 204

12.0 UGANDA PRISONS SERVICES ..................................................................................... 214

13.0 JUDICIARY DEPARTMENT ............................................................................................ 225

14.0 JUDICIAL SERVICE COMMISSION ............................................................................... 233

15.0 UGANDA LAW REFORM COMMISSION ....................................................................... 237

16.0 UGANDA HUMAN RIGHTS COMMISSION .................................................................... 240

17.0 DEPARTMENT OF PUBLIC PROSECUTIONS .............................................................. 241

18.0 UGANDA REGISTRATION SERVICES BUREAU - OPERATIONS ............................... 247

19.0 UGANDA REGISTRATION SERVICES BUREAU – LIQUIDATION ACCOUNT............ 248

20.0 NATIONAL CITIZENSHIP AND IMMIGRATION CONTROL .......................................... 249

PUBLIC SECTOR MANAGEMENT.............................................................................................. 262

Page 4: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

iv

21.0 MINISTRY OF LOCAL GOVERNMENT .......................................................................... 262

22.0 OFFICE OF THE PRIME MINISTER ............................................................................... 317

23.0 MINISTRY OF PUBLIC SERVICE ................................................................................... 364

24.0 PUBLIC SERVICE COMMISSION .................................................................................. 372

25.0 LOCAL GOVERNMENT FINANCE COMMISSION ........................................................ 374

26.0 KAMPALA CAPITAL CITY AUTHORITY ......................................................................... 379

27.0 ELECTORAL COMMISSION ........................................................................................... 394

LEGISLATIVE SECTOR ............................................................................................................. 395

28.0 PARLIAMENTARY COMMISSION .................................................................................. 395

SECURITY SECTOR ................................................................................................................... 407

29.0 MINISTRY OF DEFENCE ................................................................................................ 407

30.0 OFFICE OF THE PRESIDENT ........................................................................................ 412

31.0 STATE HOUSE ................................................................................................................ 417

AGRICULTURE SECTOR ........................................................................................................... 418

32.0 MINISTRY OF AGRICULTURE, ANIMAL INDUSTRY AND FISHERIES ....................... 418

33.0 NATIONAL AGRICULTURAL RESEARCH ORGANISATION (NARO) .......................... 446

ENERGY SECTOR ...................................................................................................................... 469

34.0 MINISTRY OF ENERGY AND MINERAL DEVELOPMENT ........................................... 469

HEALTH SECTOR ....................................................................................................................... 478

35.0 MINISTRY OF HEALTH ................................................................................................... 478

36.0 UGANDA BLOOD TRANSFUSION SERVICES.............................................................. 484

37.0 UGANDA AIDS COMMISSION ....................................................................................... 484

38.0 HEALTH SERVICE COMMISSION ................................................................................. 486

39.0 BUTABIKA MENTAL REFERRAL HOSPITAL ................................................................ 488

40.0 UGANDA CANCER INSTITUTE ...................................................................................... 490

41.0 UGANDA HEART INSTITUTE ......................................................................................... 494

42.0 MULAGO REFERRAL HOSPITAL COMPLEX ............................................................... 496

Page 5: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

v

43.0 ARUA REGIONAL REFERRAL HOSPITAL .................................................................... 498

44.0 MBALE REGIONAL REFERRAL HOSPITAL .................................................................. 502

45.0 KABALE REGIONAL REFERRAL HOSPITAL ................................................................ 506

46.0 LIRA REGIONAL REFERRAL HOSPITAL ...................................................................... 510

47.0 GULU REGIONAL REFERRAL HOSPITAL .................................................................... 512

48.0 MBARARA REGIONAL REFERRAL HOSPITAL ............................................................ 517

49.0 FORT PORTAL REGIONAL REFERRAL HOSPITAL ..................................................... 521

50.0 JINJA REGIONAL REFERRAL HOSPITAL .................................................................... 524

51.0 SOROTI REGIONAL REFERRAL HOSPITAL ................................................................ 530

52.0 MASAKA REGIONAL REFERRAL HOSPITAL ............................................................... 532

53.0 MUBENDE REGIONAL REFERRAL HOSPITAL ............................................................ 534

54.0 MOROTO REGIONAL REFERRAL HOSPITAL .............................................................. 543

55.0 HOIMA REGIONAL REFERRAL HOSPITAL .................................................................. 546

56.0 CHINA-UGANDA FRIENDSHIP HOSPITAL NAGURU .................................................. 548

EDUCATION SECTOR ................................................................................................................ 553

57.0 MINISTRY OF EDUCATION AND SPORTS ................................................................... 553

58.0 EDUCATION SERVICE COMMISSON ........................................................................... 577

58.1 Fraudulent access to the Government payroll by personnel in Post Primary Institutions577

59.0 MAKERERE UNIVERSITY .............................................................................................. 579

60.0 MAKERERE UNIVERSITY BUSINESS SCHOOL .......................................................... 586

61.0 UGANDA MANAGEMENT INSTITUTE ........................................................................... 590

62.0 MBARARA UNIVERSITY OF SCIENCE AND TECHNOLOGY ...................................... 592

63.0 KYAMBOGO UNIVERSITY ............................................................................................. 595

64.0 BUSITEMA UNIVERSITY ................................................................................................ 603

65.0 GULU UNIVERSITY ........................................................................................................ 610

WATER AND ENVIRONMENT SECTOR .................................................................................... 617

66.0 MINISTRY OF WATER AND ENVIROMENT .................................................................. 617

Page 6: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

vi

67.0 MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES.......................................... 636

68.0 MINISTRY OF TOURISM WILDLIFE AND ANTIQUITIES .............................................. 639

LAND SECTOR ............................................................................................................................ 641

69.0 MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT ............................... 641

70.0 UGANDA LAND COMMISSION ...................................................................................... 644

INFORMATION AND COMMUNICATION SECTOR ................................................................... 647

71.0 MINISTRY OF INFORMATION AND COMMUNICATIONS TECHNOLOGY ................. 647

PUBLIC ADMINISTRATION SECTOR ........................................................................................ 649

72.0 MINISTRY OF FOREIGN AFFAIRS ................................................................................ 649

73.0 EAST AFRICAN COMMUNITY AFFAIRS ....................................................................... 651

MISSIONS .................................................................................................................................... 654

74.0 UGANDA EMBASSY, ABU DHABI .................................................................................. 654

75.0 UGANDA HIGH COMMISSION, ABUJA ......................................................................... 656

76.0 UGANDA, EMBASSY ADDIS ABABA ............................................................................. 661

77.0 ANKARA EMBASSY ........................................................................................................ 664

78.0 UGANDA, EMBASSY BEIJING ....................................................................................... 666

79.0 UGANDA EMBASSY, BERLIN ........................................................................................ 668

80.0 UGANDA EMBASSY BRUSSELS ................................................................................... 669

81.0 UGANDA HIGH COMMISSION, BUJUMBURA .............................................................. 673

82.0 UGANDA EMBASSY, CAIRO .......................................................................................... 674

83.0 UGANDA HIGH COMMISSION, CANBERRA ................................................................. 674

84.0 UGANDA EMBASSY, COPENHAGEN ........................................................................... 677

85.0 UGANDA HIGH COMMISSION, WASHINGTON ............................................................ 679

86.0 THE PERMANENT MISSION OF THE REPUBLIC OF UGANDA TO THE UNITED

NATIONS AND OTHER INTERNATIONAL ORGANIZATIONS IN GENEVA ................. 683

87.0 UGANDA CONSULATE, GUANGZHOU, CHINA............................................................ 690

88.0 UGANDA EMBASSY JUBA ............................................................................................. 692

Page 7: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

vii

89.0 UGANDA EMBASSY, KHARTOUM ................................................................................ 694

90.0 UGANDA HIGH COMMISSION, KIGALI ......................................................................... 695

91.0 UGANDA EMBASSY, KINSHASA ................................................................................... 698

92.0 UGANDA HIGH COMMISSION, LONDON ..................................................................... 700

93.0 UGANDA EMBASSY, MOSCOW .................................................................................... 705

94.0 UGANDA HIGH COMMISSION, NAIROBI ...................................................................... 708

95.0 UGANDA HIGH COMMISSION, NEW DELHI ................................................................. 710

96.0 UGANDA HIGH COMMISSION, OTTAWA ..................................................................... 717

97.0 UGANDA EMBASSY, PARIS .......................................................................................... 718

98.0 UGANDA HIGH COMMISSION, PRETORIA .................................................................. 725

99.0 UGANDA EMBASSY, ROME .......................................................................................... 727

100.0 UGANDA EMBASSY TOKYO ......................................................................................... 731

101.0 UGANDA EMBASSY, TRIPOLI ....................................................................................... 734

Page 8: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

viii

LIST OF ACRONYMS AND ABREVIATIONS

BFP Budget Framework Paper

CEMAS Computerized Education Management and Accounting System

FY Financial Year

ICT Information and Communications Technology

LANs Local Area Networks

NBI National Backbone Infrastructure

NTC National Teachers College

PIC Planning Investment Committee

WAN Wide Area Network

MoFPED Ministry of Finance, Planning and Economic Development

PFAA Public Finance and Accountability Act

NMS National Medical Stores

ESC Education Service Commission

MDAs Ministries, Departments and Agencies

MoES Ministry of Education and Sports

PAC Public Accounts Committee

DSCs District Service Commissions

HSC Health Service Commission

UGX Uganda Shillings

KYU Kyambogo University

NTR Non Tax Revenue

PPDA Public Procurement & Disposal of Assets

PAYE Pay As You Earn

OAG Office of the Auditor General

EAC East African Community

ESAAG East and Southern African Association of Accountant Generals

MEACA Ministry of East African Affairs

MICT Ministry of Information and Communications Technology

ICT Information Communication Technology

BOU Bank of Uganda

Page 9: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

ix

LC Letter of Credit

TAI Treasury Accounting Instruction

CHOGM Commonwealth Heads of Governments Meeting

ICGR International Conference for Great Lakes Region

MoFA Ministry of Foreign Affairs

JLOS Justice, Law and Order Sector

KCCA Kampala Capital City Authority

MoGLSD Ministry of Gender, Labour & Social Development

MOU Memorandum of Understanding

PFAR Public Finance and Accountability Regulation

PWD People With Disability

ULC Uganda Land Commission

USD United States Dollar

M&E/MIS Monitoring & Evaluation/Management Information System

CAO Chief Administrative Officer

CDC Center for Disease Control

CIID Criminal Intelligence and Investigations Department

DHO District Health Officer

EFT Electronic Funds Transfer

GoU Government of Uganda

HC Health Centre

IAS International Accounting Standards

IFMS Integrated Financial Management System

JCRC Joint Clinical Research Center

JMS Joint Medical stores

LCs Letters Of Credit

MKCCAP Mulago Kampala Capital City Authority Project

MoH Ministry of Health

NDA National Drug Authority

Page 10: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

x

NHIS National Health Insurance Scheme

NWSC National Water and Sewerage Corporation

PS Permanent Secretary

PS/ST Permanent Secretary/Secretary to the treasury

UNICEF United Nations International Children's Emergency Fund

URA Uganda Revenue Authority

MoLHUD Ministry of Lands, Housing and Urban Development

IAS International Accounting Standards

MFPED Ministry of Finance Planning And Economic Development

MTIC Ministry of Trade, Industry and Cooperatives

WRS Warehouse Receipt System

COMESA Common Market for Eastern & Southern Africa

ULC Uganda Land Commission

PSC Public Service Commission

MoTWA Ministry of Tourism Wildlife and Antiquities

MUBS Makerere University Business School

MUK Makerere University

FOC Faculty of Commerce

NCBS National College of Business Studies

FAR Fixed Asset Register

MUECCA (A) Makerere University Establishment of Constituent College Order Amended

COBAMS College of Business and Management Sciences

COVAB College of Veterinary Medicine and BioSecurity

CEDAT College of Engineering Design Art and Technology

CAES College of Agriculture and Environment Sciences

CONAS College of Natural Sciences

COCIS College of Computing and Information Sciences

Page 11: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

xi

CHS College of Health Sciences

CEES College of Education and External Studies

CHUSS College of Humanities and Social Sciences

ED Executive Director

HSC Health Service Commission

MNRH Mulago National Referral Hospital

PPS Private Patients Services

BTC Belgium Technical Cooperation

ITFC Institute of Tropical Forest Conservation

MUST Mbarara University of Science and Technology

PSU Pharmaceutical Society of Uganda

FIEFOC Farm Income Enhancement and Forest Conservation

MWE Water and Environment

UAC Uganda AIDS Commission

CUFH China Uganda Friendship Hospital

ART Anti-Retroviral Therapy

AIDS Acquired Immunodeficiency Syndrome

HIV Human Immunodeficiency Virus

UBTS Uganda Blood Transfusion Services

L.T.C ward Lymphoma Treatment Centre

OPD Out Patients Departments

S.T.C ward Solid Tumor Centre ward

UCI Uganda Cancer Institute

UNHRO Uganda National Health Research Organisation

UHI Uganda Heart Institute

Page 12: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

xii

Page 13: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

1

1.0 INTRODUCTION

I am required by Article 163(3) of the Constitution of the Republic of Uganda and

Section 13 and 19 of the National Audit Act 2008 to audit and report on the Public

Accounts of Uganda and of all public offices including the Courts, the Central and

Local Government Administrations, Universities and Public Institutions of like

nature and any Public Corporations or other bodies established by an Act of

Parliament.

Under Article 163 (4) of the Constitution, I am also required to submit to

Parliament by 31st March annually a Report of the Accounts audited by me for the

year immediately preceding. I am therefore, issuing this report in accordance with

the above provisions.

This is Volume two of my Annual Report to Parliament and it covers financial

audits carried out on Central Government Ministries, Departments, Agencies,

Universities and Uganda Missions abroad.

In this introduction, I give an overview of the financial audit work carried out,

status of completion of the audits, summary of the audit opinions issued on the

financial statements of the entities audited and a summary of the key audit

findings arising from the audit.

Section 2 presents my findings and audit opinion on Government of Uganda

Consolidated Financial Statements including major observations.

Section 3 contains the detailed audit findings on each entity audited.

1.1 STATUS OF COMPLETION OF AUDITS

1.1.1 Financial Audits

A total of 103 entities comprising of Ministries, Agencies, Commissions,

Departments, Uganda Missions abroad, Public Universities, Referral Hospitals and

Page 14: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

2

the Consolidated Government of Uganda Financial Statements, were audited

during the year ended 30th June 2013. Accordingly, separate audit reports were

issued for each of them.

Out of the 103 entities audited, 60 entities had unqualified opinions, 39 had

qualified opinions and 4 had disclaimed opinions. The basis used to arrive at the

audit opinion is described in the separate reports issued on individual entities. The

table below summarises the types of audit opinions issued on each of the entities

audited:-

Table showing type of opinion for each of the audited entities

UNQUALIFIED OPINION

QUALIFIED OPINION

1 INSPECTORATE OF GOVERNMENT 1 ETHICS & INTEGRITY

2 NARO 2 MINISTRY OF FINANCE (MOFPED

3 MINISTRY OF AGRICULTURE ANIMAL INDUSTRY & FISHERIES

3 MINISTRY OF DEFENCE

4 OFFICE OF THE PRESIDENT 4 UNRA

5 STATE HOUSE 5 OFFICE OF THE PRIME MINISTER

6 UGANDA ROAD FUND 6 KAMPALA CAPITAL CITY AUTHORITY

7 MINISTRY OF WORKS AND TRANSPORT

7 GOU CONSOLIDATED FINANCIAL STATEMENTS

8 PUBLIC SERVICE COMMISSION 8 TREASURY OPERATIONS

9 HOIMA REGIONAL REFERRAL HOSPITAL

9 MINISTRY OF LOCAL GOVERNMENT

10 JINJA REGIONAL REFERRAL HOSPITAL 10 LOCAL GOVERNMENT FINANCE COMMISSION

11 KABALE REFERRAL HOSPITAL 11 PARLIAMENTARY COMMISSION

12 LIRA REFERRAL HOSPITAL 12 MINISTRY OF INTERNAL AFFAIRS

13 MOROTO REGIONAL HOSPITAL 13 JUDICIARY DEPARTMENT

14 JUDICIAL SERVICE COMMISSION 14 LAW REFORM COMMISSION

15 UGANDA HUMAN RIGHTS COMMISSION

15 DPP

16 UGANDA POLICE 16 NATIONAL CITIZENSHIP AND IMMIGRATION

17 UGANDA PRISONS 17 BUSITEMA UNIVERSITY

18 UGANDA REGISTRATION SERVICES BUREAU

18 KYAMBOGO UNIVERSITY

19 BUTABIKA MENTAL REFERRAL HOSPITAL 19 MINISTRY OF EAST AFRICAN COMMUNITY AFFAIRS

20 EDUCATION SERVICE COMMISSION 20 MINISTRY OF HEALTH

Page 15: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

3

Table showing type of opinion for each of the audited entities

UNQUALIFIED OPINION

QUALIFIED OPINION

21 HEALTH SERVICE COMMISSION 21 MINISTRY OF LANDS, HOUSING AND URBAN DEVELOPMENT

22 MINISTRY OF INFORMATION AND COMMUNICATIONS TECHNOLOGY

22 MULAGO NATIONAL REFERRAL HOSPITAL

23 MINISTRY OF EDUCATION AND SPORTS 23 MINISTRY OF WATER AND ENVIRONMENT

24 MINISTRY OF FOREIGN AFFAIRS 24 UGANDA HEART INSTITUTE

25 MINISTRY OF GENDER, LABOUR AND SOCIAL DEVELOPMENT

25 UGANDA LAND COMMISSION

26 MINISTRY OF TOURISM WILDLIFE AND ANTIQUITIES

26 UGANDA EMBASSY, COPENHAGEN

27 MAKERERE UNIVERSITY BUSINESS SCHOOL 27 UGANDA EMBASSY, JUBA

28 MAKERERE UNIVERSITY 28 THE UGANDA EMBASSY IN PARIS

29 MBARARA UNIVERSITY OF SCIENCE AND TECHNOLOGY

29 UGANDA EMBASSY, ROME

30 UGANDA AIDS COMMISSION 30 UGANDA HIGH COMMISSION - TRIPOLI

31 UGANDA BLOOD TRANSFUSION SERVICES 31 SOROTI REFERRAL HOSPITAL

32 UGANDA CANCER INSTITUTE 32 ARUA REFERRAL HOSPITAL

33 UGANDA MANAGEMENT INSTITUTE (UMI 33 FORT PORTAL REFERRAL REGIONAL HOSPITAL

34 LAKE VICTORIA ENVIRONMENTAL MANAGEMENT PROJECT PHASE II

34 GULU REGIONAL REFERRAL HOSPITAL

35 UGANDA EMBASSY, ABU DHABI 35 MASAKA REGIONAL REFERRAL HOSPITAL

36 UGANDA HIGH COMMISSION - ABUJA 36 MBALE REGIONAL HOSPITAL

37 UGANDA EMBASSY - ADDIS ABABA 37 MBARARA REFERRAL HOSPITAL

38 UGANDA EMBASSY, ANKARA 38 MINISTRY OF PUBLIC SERVICE

39 UGANDA EMBASSY, BEIJING 39 MINISTRY OF ENERGY AND MINERAL DEVELOPEMENT

40 UGANDAN EMBASSY-BERLIN DISCLAIMER

41 UGANDA EMBASSY, BRUSSELS 1 MINISTRY JUSTICE & CONST. AFFAIRS

42 UGANDA HIGH COMMISSION - BUJUMBURA

2 NEW DELHI MISSION

43 UGANDA EMBASSY, CAIRO 3 MUBENDE REGIONAL REFERRAL HOSPITAL

44 UGANDA HIGH COMMISSION, CANBERRA 4 NYABYEYA FORESTRY COLLEGE

45 UGANDA HIGH COMMISSION, DAR ES SALAAM

46 THE PERMANENT MISSION OF UGANDA TO THE UNITED NATIONS AND OTHER INTERNATIONAL ORGANIZATIONS IN GENEVA

Page 16: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

4

Table showing type of opinion for each of the audited entities

UNQUALIFIED OPINION

QUALIFIED OPINION

47 UGANDA CONSULATE, GUANGZHOU

48 UGANDA EMBASSY, KHARTOUM

49 UGANDA HIGH COMMISSION, KIGALI

50 UGANDA EMBASSY, KINSHASA

51 UGANDA EMBASSY, MOSCOW

52 UGANDA HIGH COMMISSION - NAIROBI

53 UGANDA HIGH COMMISSION, OTTAWA

54 UGANDA HIGH COMMISSION, PRETORIA

55 UGANDA EMBASSY - TEHRAN

56 TOKYO MISSION

57 UGANA EMBASSY WASHINGTON

58 UGANDA PERMANENT MISSION TO THE UN, NEW YORK

59 UGANDA HIGH COMMISSION, LONDON

60 ELECTORAL COMMISSION

The table and graphs below provide a breakdown of the types of opinions issued:-

Types of Opinions issued since 2010 by numbers and percentage:-

Types of

Opinions

Year ending 30th June

2010 % 2011 % 2012 % 2013 %

Unqualified 40 39.6 61 59.22 47 45 60 58

Qualified 58 57.43 41 39.81 51 48 39 38

Disclaimer 3 2.97 1 0.97 7 7 4 4

Adverse 0 0 0 0 1 1 0 0

Page 17: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

5

Figure showing the types of opinions issued for 2012/2013:-

58%

38%

4%

Types of Audit Opinions Issued (2013)

UNQUALIFIED 60

QUALIFIED 39

DISCLAIMER 4

Figure showing Trends of Types of Opinions Issued since 2009/2010:-

0

10

20

30

40

50

60

70

2009/2010 2010/2011 2011/2012 2012/2013

Pe

rce

nta

ge

Trends of Opinions Issued Since 2009/2010

UNQUALIFIED

QUALIFIED

DISCLAIMER

ADVERSE

Page 18: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

6

Figure showing comparision of types of opinions issued since 2010:-

0

10

20

30

40

50

60

70

2009/2010 2010/2011 2011/2012 2012/2013

Pe

rce

nta

ge

Comparison of Types of Opinions Issued Since 2010

UNQUALIFIED

QUALIFIED

DISCLAIMER

ADVERSE

1.1.2 Special Audits

During the period under review, I undertook the following twelve (12) special

audits and the status is as below:-

Special Audits Status

1 Peace Recovery and Development Plan (PRDP) Activities Completed

2 The GIZ/GTZ Funded PRPD Activities Completed

3 Mbarara University of Science & Technology IT Systems Audit Completed

4 Individual reports to CIID Completed

5 Construction of Fish Landing Centres under MAIIF Completed

Special Audits still ongoing

6 Government Payroll Validation Ongoing

7 Bujagali Plant Cost Verification Ongoing

8 Kyambogo University Forensic Audit Ongoing

9 National Theatre Forensic Audit Ongoing

10 National Housing & Construction Corporation Ongoing

11 Verification of Terminal Benefits for Kilembe Mines Ongoing

12 Other individual Reports to CIID Ongoing

The reports for the above special audits have been issued separately.

Page 19: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

7

1.2 KEY AUDIT FINDINGS

A. CENTRAL GOVERNMENT AUDITS

The Constitution of the Republic of Uganda 1995 (as amended) requires

the Public Service Commission (PSC) to consist of a chairperson, Vice

chairperson and seven members appointed by the president. However, it

was noted that all the nine (9) commission member’s contracts had

expired and the commission activities were at a standstill. Without a

constituted commission, recruitments, promotions and handling of

disciplinary cases under Government entities could not take place. This

has greatly affected service delivery in the MDA's. There is need to

urgently put the commission in place.

The Parliamentary Accounts Committee recommended that UNRA

harmonizes with OAG the variation of price (VOP) position on all contracts

where anomalies had been noted. By the time of writing this report (31st

March 2014), this exercise was underway and the VOP position for two

contracts had been ascertained by the two parties. The joint verification

exercise established that a total of Shs.33,207,607,133 had been certified

as excess in respect of these two contracts.

Despite adopting the commitment control system, the total value of

domestic arrears payable have continued to increase over the years as

shown in the table below:-

Table 1: domestic arrears for the last three years

Details Amounts (UGX)

2010/2011 2011/2012 2012/2013

Domestic arrears 473,654,629,150 763,186,161,377 1,127,241,181,530

The current status shows a steady increase in the domestic arrears

figures, clearly indicating that the current approaches to address the

problem are not working. The debt figure may become unmanageable as

it appears to be spiralling out of control.

Page 20: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

8

A total of UGX.32,353,289,676 and Euros.2,474.05 was paid to various

contractors for works that had not been executed. Of this amount, UGX

1,289,505,648 was for works not executed whereas UGX 31, 063,784,028

was for costs that should have been avoided if proper contract

management procedures had been followed.

In my previous year audit report, I observed that a number of accounting

officers were paying various irregular allowances such as: consolidated

allowances, weekend allowances and monthly allowances to cater for

extra income for staff. During the year under review, several MDAs

continued with this practice and paid periodic consolidated allowances to

staff with no proper justification as these were not activity based,

rendering such a practice irregular. The Ministry of Public Service

indicated that it was currently discussing options to motivate public

officers given that government had failed to implement the pay policy of

2006 due to financial constraints. I advised the Accounting Officer to

ensure that this matter is comprehensively addressed since it is affecting

the whole service. It is important that the Ministry of Public Service

(MOPS) and Ministry of Finance Planning and Economic Development

(MoFPED) explore options and propose to government a viable course of

action to address the pay issue and stop the payment of consolidated

allowances outside the provisions of the Standing Orders.

Expenditures from various entities totalling to UGX.97,896,448,777 were

charged on items which do not reflect the nature of the expenditure. Such

a practice impacts on the credibility of the financial statements, since the

figures reported therein do not reflect true amounts expended on the

affected expenditure items. I however, noted an improvement where by

the previous year’s mischarges amounted to UGX.256,976,089,113. There

is still need for accounting officers to enforce strict adherence to the

provisions regarding reallocation of funds.

A number of accounting officers advanced a total sum of

UGX.16,284,144,090 to their staff, through their individual personal

accounts. I noted a reduction of 76% as compared to the previous year

amount of UGX.67,085,008,004. Although there has been an improvement

Page 21: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

9

in absolute terms, I advised the accounting officers to avoid the practice

as it is contrary to regulations, highly risky and exposes government

funds to loss since accounting officers have no control over individual’s

bank accounts.

A total of UGX.65,862,390,381 advanced to staff to carry out activities in

various entities remained un-accounted for by the time of audit contrary

to the Public Finance and Accounting Regulations. Delays in accounting

for funds may encourage falsification of documents.

During the year under review, a total of UGX.49,816,466,501 was repaid

to various development partners as a refund for their misappropriated

funds that happened in the Office of the Prime Minister during the last

previous year. It was noted that although government obtained a

supplementary appropriation for the refund in question, there is need to

ensure that the appropriate organs of government follow up this matter in

order to eventually recover the funds from the responsible officials.

Review of the Loan portfolio revealed that as a result of low levels of loan

disbursements, these loans were attracting high commitment fees which

could have been avoided. This is because, the more money that remains

undisbursed, the more commitment fees that accrues from such a loan.

Accordingly, commitment fees paid during the year 2012/2013 have

increased by 40% from UGX.9.023 billion in 2011/2012 to UGX.12.7

billion in 2012/2013.

It was observed that the judiciary has key vacant positions that are likely

to affect the provision of judicial services. These vacant positions noted

include that of the Chief Justice and head of Court of appeal, 8 Justices of

Court of appeal, 4 Justices of the Supreme Court and 8 High Court Judges.

There is an urgent need to have the vacancies filled.

In August 2010, the Ministry of Public Service (MoPS) engaged a

consultant to conduct a comprehensive review and restructuring of

Government Ministries, Departments and Agencies (MDAs), aimed at

addressing structural redundancies, inconsistencies, weaknesses,

duplications and performance gaps in key service delivery sectors of

Government. However, two and a half years later in April 2013, the

Page 22: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

10

Ministry of Finance Planning and Economic Development informed MoPS

that the recommendations of this exercise could not be implemented as a

result of budget constraints. Accordingly, the Ministry and other MDAs

were unable to implement the recommendations of the review and

restructuring exercise and this has impacted on their ability to perform

efficiently and effectively.

During the year under review, a number of MDAs did not remit taxes

amounting to UGX.28,306,339,889 contrary to the requirements of the

Income Tax Act. This un-paid tax included UGX.26,890,278,456 relating to

WHT deductions from payments to suppliers UGX.116,155,137 PAYE and

VAT UGX.1,135,189,149. The failure to deduct and remit taxes directly

impacts on collections by the Uganda Revenue Authority.

Tax refunds totalling UGX.49,056,655,413 are due on behalf of Ministry of

Finance Planning and Economic Development. The refunds arise from tax

incentives to various entities; however, the ministry lacks documented

criteria in selecting and approving the tax incentive beneficiaries. There is

need to streamline this process by providing clear guidance to avoid

haphazard selection of beneficiaries.

A total of UGX.231,426,034,484 was spent by various government

Ministries, Departments and Agencies on repairs and maintenance of

motor vehicles without technical pre and post inspections to determine

the extent of the defects on the vehicle and thus the repairs required. This

was attributed to lack of proper guidelines on how this activity was to be

carried out. Lack of technical pre-repair and post repairs

inspections/certificate of completion exposes the entities to risks of loss

of funds through over invoicing, payment for no work done and recycling

of old parts by the garages. During discussions with the accounting officer

of MOWT, I advised that the ministry expedites the review currently being

undertaken regarding the motor vehicle repairs and maintenance

guidelines to enable Accounting Officers comply with the requirement.

Uganda Road Fund Act required management to collect road user charges.

However, Uganda Revenue Authority is collecting this revenue on their

behalf and remitting the funds to the UCF. Due to this conflict, the

Page 23: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

11

management of URF has failed to operationalise the provision of the Act

which hampered the activities of other entities.

In support to the Agriculture Sector value chain (Textile sub-sector),

Government has been paying import taxes on raw materials. It was noted

that two companies instead imported semi/finished textiles (Bed sheet

material, Bales polyester and viscose rayon staple fiber, cartons polyester

viscose, texturized yarn and polyester bed sheet material etc.). A total of

paid UGX.642,902,785 as taxes for these imports. This is against the

purpose for which the incentive was established.

Uganda Good Governance (UGOGO) under judiciary planned to

spend UGX.4,018,000,000 to undertake various activities during the year.

The records regarding the receipts of expenditure and details of activities

undertaken were not accessed. Discussions with management revealed

that the Accounting Officer does not have control over the project and

despite the intervention of the PS/ST, the project management remains

outside the set recommended government structures. There is need to

have the operations of this project streamlined to enable proper

government operation and scrutiny.

I observed that only 28 out of the 230 prisons found country wide had

water borne toilets. The prisoners continue to use the bucket system as a

toilet facility. This system is not only unhygienic but also humanly

degrading. The accounting officer indicated that in order to address the

issue, Uganda Prisons Service requires UGX.2.64 billion to improve the

living conditions of the prison community. Government should consider

providing resources for this activity.

The arrears figure for court awards and compensations rose by 200%

from UGX.82b in the year 2011/12 to UGX.164bn in the year under audit.

This raises the question of the extent to which government is making

efforts to minimize court awards and compensations. Discussions with the

accounting officer attributed this to laxity on the part of the concerned

entities to provide the necessary information for the cases. He further

stated that it was important for government to decentralize the payments

of court awards and compensations to the entities where the causation of

Page 24: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

12

the award/compensation is. This would enable linkage of payment/loss

directly with the cause of the loss and would resultantly enhance

accountability.

It was observed that a number of Government contracts/projects for a

total of UGX.99,768,530,540, Us$.8,688,122.11 and Euros.940,720 that

had been ongoing or were started during the financial year lagged behind

schedule or demonstrated signs of failure. It was noted that a number of

these contracts/projects had exceeded their completion dates while

others had been abandoned. There appeared to be inadequate supervision

by the responsible entities and laxity in enforcing contract terms. This

could have resulted into losses to Government and failure to achieve the

objectives for which such contracts/projects were entered into.

Government owns land through a number of Government entities. These

entities are however facing challenges of protecting this land from illegal

claimants/encroachers. The challenges include lack of titles and the

inability to physically secure the properties due to inadequate resources.

The most affected institutions are NARO, LDC, Prisons, Gulu University,

and NAGRIC among others. Firm action to protect and secure government

land needs to be undertaken.

I observed that a number of Government assets that are not in use or

require repair have remained in stores or garages idle. This leads to

further loss and in certain instances theft of parts of these items. There is

need to adhere to the recommendations of Board of Surveys in order to

dispose off the uneconomical assets.

There has been continued deterioration of Government

properties/Buildings due to inadequate maintenance. The most affected

are the police, prisons, Judiciary, NARO, UBC, Health and Missions abroad,

which have structures that require major overhauls or maintenance. The

Accounting officers attributed this to inadequate allocation of capital

development fund to address the matter. There is need for Government to

deliberately address infrastructure needs of Government agencies.

UGX.294,721,969,000 was spent under Uganda Global Fund to fight Aids,

Tuberculosis and Malaria Project –Malaria Round 10 component. The

Page 25: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

13

amount was meant for medicines and Pharmaceutical products and

equipment and for procurement supply and chain management. Records

on the utilization of the funds were not availed for audit.

Parliament appropriated a total of UGX.10.769 trillion for MDAs during the

year under review. However, a total of UGX.8.246 trillion was actually

released leading to a shortfall of UGX.2.523 trillion (23% of the budget).

A total of 66 government entities were affected.

I noted that there were several inter project borrowings and these

borrowings involved donor funded projects while others were

Government of Uganda projects. For Instance in UNRA and MOLG the

borrowings amounted to UGX.189,122,590,242 and UGX.916,601,532

respectively. Although in most cases funds would be refunded, this

practice could lead to delays in implementation of Government projects.

Page 26: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

14

2.0 REPORT AND OPINION OF THE AUDITOR GENERAL ON

THE GOVERNMENT OF UGANDA CONSOLIDATED

FINANCIAL STATEMENTS FOR THE YEAR ENDED 30TH

JUNE, 2013

THE RT. HON. SPEAKER OF PARLIAMENT

I have audited the GoU Consolidated financial statements for the year ended 30th June,

2013, as set out on pages 10 to 76. These financial statements comprise of the Statement

of Financial Position as at 30th June 2013, Statement of Financial Performance, Statement

of Changes in Equity, Cash flow Statement together with other accompanying statements,

notes and accounting policies.

Management Responsibility for the Financial Statements

Under Article 164 of the Constitution of the Republic of Uganda, 1995 (as amended) and

Section 8 of the Public Finance and Accountability Act, 2003, the Accounting Officers are

accountable to Parliament for the funds and resources of the Votes/Entities under their

control. The Accountant General is also responsible for the preparation and fair

presentation of Consolidated Financial Statements in accordance with the requirements of

the Public Finance and Accountability Act 2003, and the modified cash basis of

accounting, and for such internal controls as management determines is necessary to

enable the preparation of financial statements that are free from material misstatement

whether due to fraud or error.

Auditor’s Responsibility

My responsibility as required by Article 163(3) of the Constitution of the Republic of

Uganda, 1995 (as amended) and Sections 13 and 19 of the National Audit Act, 2008, is to

audit and express an opinion on these statements based on my audit. I conducted the

audit in accordance with International Standards on Auditing. Those standards require

Page 27: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

15

that I comply with the ethical requirements and plan and perform the audit to obtain

reasonable assurance whether the financial statements are free from material

misstatement.

An audit involves performing audit procedures to obtain evidence about the amounts and

disclosures in the financial statements as well as evidence supporting compliance with

relevant laws and regulations. The procedures selected depend on the Auditor‘s judgment

including the assessment of risks of material misstatement of financial statements

whether due to fraud or error. In making those risk assessments, the Auditor considers

internal controls relevant to the entity‘s preparation and fair presentation of financial

statements in order to design audit procedures that are appropriate in the circumstances

but not for purposes of expressing an opinion on the effectiveness of the entity‘s internal

controls. An audit also includes evaluating the appropriateness of accounting policies used

and the reasonableness of accounting estimates made by management as well as

evaluating the overall presentation of the financial statements.

Except as discussed below, I believe that the audit evidence I have obtained is sufficient

and appropriate to provide a basis for my qualified opinion.

Part ―A‖ of this report sets out my qualified opinion on the financial statements. Part ―B‖

which forms an integral part of this report presents in detail all the significant audit

findings made during the audit which have been brought to the attention of management

and will form part of my Annual Report to Parliament.

PART “A”

Basis for Qualified Opinion

Mischarge of Expenditure – UGX.97,896,448,777

Expenditures from various entities totaling to UGX.97,896,448,777 were charged on items

which do not reflect the nature of the expenditure. Such a practice impacts on the

credibility of the financial statements, since the figures reported therein do not reflect true

amounts expended on the affected expenditure items.

Page 28: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

16

Unaccounted for Advances - UGX.65,862,390,381

A total of UGX.65,862,390,381 advanced to staff to carry out activities in various entities

remained un-accounted for by the time of audit contrary to the Public Finance and

Accounting Regulations. Delays in accounting for funds may encourage falsification of

documents.

Unspent Balances Returned by Local Authorities

A total of UGX.34,476,655,956 returned to Treasury as unspent balances from local

authorities was wrongly classified as Non Tax revenue.

Promissory Notes – UGX.10,108,612,787

Included under Note 21(1), Treasury Bills and Bonds is a figure of UGX.10,108,612,787 in

respect of promissory notes. I was not provided with documentation to support existence

of this liability.

Unreported Cash Balances – UGX.254,729,519,172

A total of UGX.254,729,519,172 relating to 21 bank accounts was not included in the

schedule for cash and bank balances, thereby understating the cash balance in the

financial statements by the same magnitude.

Qualified Opinion

In my opinion, except for the effects of the matters pointed out in the basis for qualified

opinion paragraph;

The financial statements together with the notes thereon fairly present in all material

respects the consolidated financial position of Government of Uganda as at 30th June,

2013 and its financial performance and cash flows for the year then ended, and

comply in all material respects with the Public Finance and Accountability Act, 2003

and the modified cash basis of accounting described under note 2 (a).

The expenditure and receipts have been applied in all material respects for the

intended purpose.

Page 29: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

17

Other Matters

Without qualifying my opinion further, your attention is drawn to the following additional

matters:-

Underfunding of MDAs

Parliament appropriated a total of UGX.10.769 trillion for MDAs during the year under

review. However, a total of UGX.8.246 trillion was actually released leading to a shortfall

of UGX.2.523 trillion (23% of the budget). The shortfalls affected the full implementation

of planned activities by MDAs.

Classified Expenditure

Included in the expenditure for goods and services consumed is UGX.335,408,394,623

which relates to classified expenditure, as explained under note 7 to the financial

statements. In compliance with Regulation 12 of the Public Finance and Accountability

(classified Expenditure) Regulations, 2003, this expenditure was audited separately and a

separate audit report will be issued.

Refund of Misappropriated Funds to donors – UGX.49,816,466,501

During the year under review, a total of UGX.49,816,466,501 was paid to various

development partners as refund for misappropriated funds that happened in the Office of

the Prime Minister. It was noted that although government obtained a supplementary

appropriation for the refund in question, there is need to ensure that the appropriate

organs of government follow up this matter in order to eventually recover the funds from

the responsible officials.

John F.S. Muwanga

AUDITOR GENERAL

KAMPALA

27th March, 2014

Page 30: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

18

PART "B"

DETAILED REPORT OF THE AUDITOR GENERAL

This Section outlines the detailed audit findings, management responses and my

recommendations in respect thereof.

2.1 INTRODUCTION

In accordance with Article 163(3), of the Constitution of the Republic of Uganda I

am required to audit and report on the public accounts of Uganda that is to say,

all public offices including the courts, the central and the local government

administrations, universities and public institutions of the like nature and any

public corporation or other bodies or organizations established by an Act of

Parliament. I carried out the audit of the Government of Uganda Consolidated

Financial Statements to enable me report to Parliament.

2.2 BACKGROUND INFORMATION

Under Article 164 of the Constitution of the Republic of Uganda and Section 8 of

the Public Finance and Accountability Act, 2003, the Accounting Officers are

accountable to Parliament for the funds and resources of the Votes/Entities under

their control. The Accountant General is appointed as the Accounting Officer and

Receiver of Revenue for the Consolidated Fund. He is responsible for establishing

and maintaining a system of Internal Controls designed to provide reasonable

assurance that the transactions recorded are within the authority and properly

record the use of all public funds by the Government of the Republic of Uganda.

Accordingly, the Accountant General is responsible for the preparation and fair

presentation of Consolidated Financial Statements in accordance with the

requirements of the Public Finance and Accountability Act, 2003, and the modified

cash basis of accounting.

2.3 OBJECTIVES FOR PREPARATION OF CONSOLIDATED FINANCIAL

STATEMENTS

The overall objective for preparation of Statutory Central Government

Consolidated Financial Statements is to indicate the extent to which Government

Page 31: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

19

has adhered to the budget objective through compliance to the Appropriation Act

and Statutory provisions. The statements provide a record of the Government‘s

financial performance over the financial year under review.

2.4 AUDIT SCOPE

The audit was carried out in accordance with International Standards on Auditing

and accordingly included a review of the accounting records and agreed

procedures as was considered necessary. In conducting my reviews, special

attention was paid to establish whether:-

a. The consolidated financial statements have been prepared in accordance

with consistently applied Accounting Policies and fairly present the

revenues and expenditures of government for the period and of the

consolidated financial position of the Consolidated Fund as at the end of

the period.

b. All funds were utilized with due attention to economy and efficiency and

only for the purposes for which the funds were provided.

c. A sound internal control structure is in place and internal controls were

consistently applied throughout the period.

d. Management was in compliance with the Government of Uganda financial

regulations.

e. All necessary supporting documents, records and accounts have been kept

in respect of all activities, and are in agreement with the consolidated

financial statements presented.

2.5 FINDINGS

2.5.1 Mischarge of Expenditure – UGX.97,896,448,777

The Government Chart of Accounts defines the nature of expenditure for each

item code. The intention is to facilitate better and consistent classification of

financial transactions and also track budget performance per item in line with

parliamentary appropriation. Audit noted that during the year under review, a

number of entites charged a total of UGX.97,896,448,777 on items which do not

reflect the nature of the expenditure.

Page 32: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

20

A summary of the mischarged expenditure per entity is shown in the table below:-

ENTITY

Amount mischarged

(UGX)

1 National Environmental Management Authority 190,157,114

2 Ministry of Information Communication Technology 232,267,708

3 Ministry Of Lands Housing And Urban Development 2,013,594,374

4 Ministry Of Tourism, Wild Life And Heritage 249,642,817

5 Ministry Of Water And Environment 9,438,526,861

6 Uganda Land Commission 274,007,650

7 Uganda Tourism Board 435,791,355

8 Ministry Of Public Service 2,245,336,970

9 Ministry Of Energy 9,200,543,112

10 Ministry Of Health 13,431,161,682

11 Ministry Of East African Affairs 631,272,089

12 Ethics & Integrity 753,056,165

13 Ministry of Finance (MOFPED 1,506,161,379

14 Inspectorate of Government 3,589,303,382

15 Uganda National Bureau of Statistics (UBOS) 231,015,454

16 Ministry of Agriculture Animal Industry & Fisheries 293,224,592

17 Dairy Development Authority 709,967,100

18 ATAAS (Grant) EU, WB and DANIDA 195,700,610

19 UNRA 2,480,827,360

20 Ministry of Works & Transport 118,176,248

21 Office Of The Prime minister 27,629,053,148

22 Ministry Of Local Government 4,178,737,274

23 Local Government Finance Commission 244,029,386

24 Parliamentary commission 4,132,998,534

25 Northern Uganda Social Action Fund 19,059,510

26 Ministry Justice & Const. Affairs 1,356,763,496

27 Ministry of Internal Affairs 4,132,998,534

28 Judiciary Department 4,701,073,327

29 Judicial Service Commission 284,300,282

30 Law Reform Commission 373,406,461

31 DPP 692,574,586

32 Uganda Police 563,783,138

33 Uganda Prisons 717,151,659

34 National Citizenship and Immigration 650,785,420

Total 97,896,448,777

The practice impacts on the credibility of the financial statements, since the

figures reported therein do not reflect the true amounts expended on the

Page 33: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

21

respective items. It further undermines the intentions of the appropriating

authority.

2.5.2 Unaccounted for Advances – UGX.65,862,390,381

During the year under review, several Ministries, Departments and Agencies

(MDAs) had a total of UGX.65,862,390,381 that remained unaccounted for

contrary to financial regulations that require all expenditure to be accounted for by

the year end. These expenditures were in form of advances to individuals and

departments and expenditure lacking adequate supporting documents. I was not

able to obtain reasonable assurance that the funds were applied to the intended

activities. The entities concerned included the following:-

Entity Amount outstanding

(UGX)

BUSITEMA 9,744,000

Ministry Of East African Community Affairs 758,031,287

Ministry Of Energy And Mineral Development 459,491,843

Ministry Of Health 13,052,912,535

Ministry Of Public Service 558,566,020

Ministry Of Water And Environment 506,022,340

Ethics & Integrity 96,000,000

National Planning Authority 29,754,500

Uganda Investment Authority 283,467,282

Uganda National Bureau of Statistics (UBOS) 93,814,114

Uganda National Council of Science and Technology 6,000,000

Uganda Privatization & Utility Sector Reform /

Privatization Unit (Divesture)

13,900,000

Uganda Panel Survey Project 1,500,000

Support to Firm Data Generation (SFDG)-BIS 9,117,142

Dairy Development Authority 434,615,989

National Animal Generic Resource Centre and Data 8,496,000

Page 34: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

22

Entity Amount outstanding

(UGX)

Bank (NAGRIC)

Office of the President 7,155,000

Luwero Industries 30,891,769

Uganda Road Fund 12,415,977,407

Ministry of Works & Transport 304,731,200

Office Of The Prime minister 2,838,631,501

Ministry Of Local Government 2,186,587,558

Local Government Finance Commission 7,105,600

Parliamentary commission 717,605,650

Northern Uganda Social Action Fund 30,642,929,605

Law Reform Commission 107,180,981

Strengthening Evidence Based Decision Making II-

UBOS

255,489,148

Avian Influenza Preparedness Project 26,671,910

TOTAL 65,862,390,381

Delays in accounting for expenditures are caused by laxity by Accounting Officers

to enforce timely accountability and weaknesses in controls in regard to advances.

This may lead to falsification of accountability documents and loss of government

funds.

The Accounting Officers have been advised to enforce strict controls as provided

for in the public Finance and Accounting regulations, including enforcing the

requirements of not advancing additional funds before accounting for the previous

advances and eventual recovery on failure to account.

2.5.3 Differences in Cash and Bank Balances - UGX.254,729,519,172

A total of 21 bank accounts with a total cash balance of UGX.254,729,519,172

were not included in the schedule for cash and bank balances of the consolidated

Page 35: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

23

financial statements. This implies that the cash balance in the financial statements

is understated by the same magnitude.

Some of the omitted accounts ought to have been closed and the balances

transferred to the consolidated fund, while others should have their balances

regularly transferred to the consolidated fund.

2.5.4 Unsupported Promissory Notes - UGX.10,108,612,787

Included under Note 21(1), Treasury Bills and Bonds is a figure of

UGX.10,108,612,787 in respect of promissory notes. However, I was not provided

with documentation to support existence of this liability, though management

explained that the funds are owed to Bank of Uganda. Review of Bank of Uganda

financial statements revealed that the bank did not disclose any receivable from

Government in form of promissory notes. Under the circumstances, Treasury is

recognizing a liability whose existence is doubtful.

Management explained that this amount originated from Bank of Uganda many

years back but the bank subsequently wrote it off as a result of having no

supporting documentation. Management promised to derecognize the liability after

consultations with the bank.

2.6 Re-capitalization of BoU

In a letter to the Governor Bank of Uganda (referenced MEP84/137/01 dated 10th

May, 2013), the Minister of State for Finance, Planning and Economic

Development (Privatization) authorized Bank of Uganda to issue interest earning

debt instruments amounting to UGX.410 billion for re-capitalizing the bank.

Section 14-4 of the Bank of Uganda Act allows Government to furnish the Bank of

Uganda with securities to make good of any impairment. I noted from the financial

statements of Bank of Uganda that during the year ended 30th June 2013, the

bank recognized a receivable from government of UGX.140 billion in respect of

letters of comfort that were made to various commercial banks for loans extended

to M/S Haba Group of Companies. Bank of Uganda however made a provision for

impairment losses for the entire amount of UGX.140 billion, implying that recovery

Page 36: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

24

was highly unlikely. The effect of the write off is that the bank‘s capital was

impaired to the magnitude of the impairment losses.

The recapitalization of the Bank therefore, is partly influenced by the above

impairment losses. No evidence was presented to me to confirm that the bank had

exhausted all available means to recover the funds. In addition, no information

was provided to explain the basis of the extent of recapitalization.

In response, management explained that although the recapitalization was done in

compliance with the law, government would continue to push for the recovery of

the money from Haba group of companies. I have advised that information to

support the extent of recapitalization should be provided and that management

also needs to push for recovery of the funds advanced to Haba Group of

Companies.

2.7 Underfunding of MDAs

Parliament appropriated a total of UGX.10.769 trillion for MDAs during the year

under review. However, a total of UGX.8.246 trillion was actually released leading

to a shortfall of UGX.2.523 trillion (23% of the budget). The key MDAs affected

included the following:-

Entity Approved Budget (Shs)

Actual Releases (Shs)

Under Funding (UGX)

%age of shortfall

Ministry of Energy and

Minerals

1,275,471,299,400 128,046,465,607 1,147,424,833,793 90

Uganda National Roads Authority

1,577,690,331,078 840,760,027,310 736,930,303,768 47

Uganda Heart Institute 5,049,683,764 2,641,202,052 2,408,481,712 48

Ministry of Agriculture, Animal Industry and

Fisheries

85,193,613,248 59,362,107,195 25,831,506,053 30

Office of the Prime Minister

98,861,028,772 77,973,474,055 20,887,554,717 21

Ministry of Justice and

Constitutional Affairs

52,034,141,174 36,868,184,164 15,165,957,010 29

Ministry of Finance, Planning and Economic

215,370,128,888 160,117,882,737 55,252,246,151 26

Ministry of Local

Government

70,063,866,699 57,250,084,238 12,813,782,461 18

Page 37: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

25

Entity Approved

Budget (Shs)

Actual

Releases (Shs)

Under

Funding (UGX)

%age of

shortfall

Ministry of Health 63,996,436,682 52,493,621,441 11,502,815,241 18

Ministry of Works & Transport

104,741,368,124 75,384,591,639 29,356,776,485 28

Ministry of Water &

Environment

160,724,031,928 111,322,634,336 49,401,397,592 31

Ministry of Communication & ICT

20,225,476,812 13,985,958,421 6,239,518,391 31

Electoral Commission 66,470,283,145 59,668,080,128 6,802,203,017 10

Uganda Industrial Research Institute

13,839,732,839 11,543,195,681 2,296,537,158 17

Busitema University 14,206,909,656 12,824,836,836 1,382,072,820 10

Uganda Road Fund 280,283,996,052 237,184,885,805 43,099,110,247 15

National Citizenship &

Imm Ctrl

62,403,706,890 47,485,167,010 14,918,539,880 24

KCCA 100,071,685,633 88,160,309,889 11,911,375,744 12

Mbarara University 14,772,457,297 13,319,099,418 1,453,357,879 10

National Agricultural

Research Org

51,455,612,347 34,304,918,634 17,150,693,713 33

Uganda Bureau of Statistics

30,160,888,707 25,590,324,419 4,570,564,288 15

National Environment

Mgt Auth.

5,799,827,494 4,681,353,889 1,118,473,605 19

National Agricultural Advisory Service

53,909,554,551 43,712,450,630 10,197,103,921 19

Public Procurement &

Disposal of Assets

6,981,405,510 5,951,686,973 1,029,718,537 15

Uganda National Bureau of Standards

11,210,133,142 9,839,522,292 1,370,610,850 12

The shortfalls affected the full implementation of planned activities by MDAs.

2.8 Accounting for Net Domestic Financing

The approved revenue and expenditure estimates for 2012/2013 provided for a

fiscal framework under which the budget deficit of UGX.988.6 billion would be

financed by way of net domestic financing. This was further broken down into,

UGX.763.6 billion to be realized through bank financing and UGX.225 billion

through non-bank financing. However, the financial statements put the net

domestic financing at UGX.1,472 billion creating an unapproved variance of

UGX.483 billion. This implies that the Treasury borrowed from the domestic

market way beyond what was approved.

Page 38: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

26

In addition, a report from the Macroeconomics department of Ministry of Finance

quoted the net domestic financing for the year as UGX.717 billion. No schedule

was provided to reconcile the two figures.

The Macro Economics Department, Accountant General and Bank of Uganda need

to jointly reconcile the amounts for domestic borrowing.

2.9 Contingencies Fund

Section 10 (1), (2) and (3) of the Public Finance and Accountability Act 2003,

states that ―there shall be a contingencies fund for national emergencies into

which shall be paid all sums appropriated by Parliament for the purposes of the

fund. The Minister may, if he or she is satisfied that an urgent need has arisen for

expenditure which could not have been foreseen, and which cannot be postponed

to the detriment of public interest, authorize by a warrant under his or her hand,

addressed to the Accountant General, advances from the fund for purposes of

meeting such expenditure. Where such advance is made, a supplementary

estimate for the purpose of replacing what was advanced shall be laid before

Parliament at its next sitting‖.

I reviewed the Contingencies Fund account and observed that the opening and

closing balance had been static at UGX.976,950 during the financial year

2012/2013. I also noted that prior to this, the fund had a balance of

UGX.235,000,000 which was advanced to the Office of the Prime Minister in

response to a disaster years back. Under the law, a supplementary budget should

have been presented to Parliament for approval and money should have been

released and paid back to the contingency fund. In the circumstance, the fund has

for long been depleted exposing the country to a risk of failure to fund emergency

disasters as required under the Act.

Management explained that Government could not operationalize the

Contingencies fund due to the absence of regulations to guide its implementation.

They further indicated that the issue will be addressed upon the enactment of the

new Finance Bill. I await this action.

Page 39: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

27

2.10 Domestic Arrears

Audit reviewed the status of domestic arrears as at 30th June, 2013 and noted the

following matters:-

a. In a letter dated 27th January 2014, to Accounting Officers of Central

Government Ministries, the PS/ST stated that the verified domestic arrears

as at 30th June 2013 was UGX.604,903,600,743. However, the reported

figure in the consolidated financial statements is UGX.1,127,241,181,530

resulting into an unexplained difference of UGX522,337,580,787..

b. Since the expiry of the debt strategy three (3) years ago, Treasury does not

have an approved debt strategy to guide its operations.

c. Despite adopting the commitment control system, the total value of

domestic arrears payable has continued to increase over the years to an

astounding UGX.1.13 trillion. This is illustrated in the table and graph

below:-

Table 1: domestic arrears for the last three years

Details Amounts (UGX)

2010/2011 2011/2012 2012/2013

Domestic

arrears

473,654,629,150 763,186,161,377 1,127,241,181,530

Graph showing the domestic arrears trend

Page 40: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

28

The current status shows a steady increase in the domestic arrears figures, clearly

indicating that the current approaches to address the problem are not working.

The debt figure may become unmanageable as it appears to be spiralling out of

control.

In response, management stated that the Commitment Control System cannot

control certain types of expenditures such as the contractual obligations of rent,

wage and contributions to International organizations. This is further complicated

by the budget credibility issues whereby certain Accounting Officers may not

budget adequately for some of the known expenditures. Sometimes even when

they budget adequately, in cases where budgets are cut to finance supplementary

budgets, arrears can be created. I have advised that Treasury needs to come up

with a detailed strategy on how it intends to address the problem of the increasing

domestic arrears.

2.11 Disclosure of Escrow Accounts

The Government of Uganda maintains a number of Escrow accounts in the Central

Bank and various commercial banks where funds are held for guarantee purposes.

Any draw-downs from these accounts are contingent on the failure by a

government agency to undertake its obligation. Best practice would require

government to have an accounting policy that would provide for the accounting

treatment and disclosure requirements for all Escrow accounts. Some of the active

Escrow accounts included the following:-

Table 2: Escrow Accounts

Account Tittle Name of the Bank

Bujagali liquidity facility Bank of Uganda

Agriculture Credit Guarantee scheme Bank of Uganda

Umeme Escrow Citi Bank

Eskom Escrow Stanbic Bank

Bujagali line Escrow Bank of Uganda

Bujagali resettlement Escrow Bank of Uganda

Page 41: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

29

Mbarara- Tororo line Escrow Bank of Uganda

UETCL Mbarara – Nkenda and Tororo-Lira transmission

line

Bank of Uganda

Kampala Institutional and infrastructure Development

Project

Bank of Uganda

It was however noted that Treasury does not have an appropriate accounting

policy relating to the operations and recording of the Escrow account activities. In

addition, there is no comprehensive list of Escrow accounts that is maintained and

that the consolidated financial statements do not disclose the annual movements

of the escrow accounts in question. Under the circumstances, I was unable to

establish the number of Escrow accounts held at the year-end as well as the

movements on the accounts in question.

In response, Management noted the audit observation and promised to follow up

the matter accordingly. I await the outcome of this management commitment.

2.12 Accounting for Development Finance Schemes

The Government of Uganda secured funds for development finance schemes

managed by Bank of Uganda. Review of the management and reporting of

Development Finance Schemes revealed that there was no formal policy regarding

the management and reporting of funds under the Development Finance Schemes.

Accordingly, the operations of the schemes in question are not properly monitored

and reported upon.

In their response, management explained that the current government policy on

Development finance schemes is to transfer all credit schemes implemented by

BoU to UDBL. Some transfers have since been made and for those that are yet to

be moved, government awaits full reconciliation to be undertaken by BoU before

transfers to UDBL can be sanctioned. I await the outcome of this management

commitment.

2.13 Accounting for Proceeds from Oil Fund Investments

Page 42: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

30

Review of the Bank of Uganda financial statements for the year under review

revealed that the bank had invested part of the Oil Tax Fund in short term money

market deposits. According to the bank, only Us$.171 million was invested during

the year which yielded interest of Us$.246,344 equivalent to UGX.640,060,834.

The note further states that the oil fund is ring fenced for future development

expenditure.

However, I was not provided with the investment instructions by PS/ST

authorizing the bank to invest part of the fund and giving directions on utilization

of interest earned. Under the circumstances, there is a risk that the bank may

undertake unauthorized investments which are not in tandem with the underlying

laws applicable to utilization of oil revenues.

Management explained that in the absence of Investment guidelines, Bank of

Uganda invests GoU deposits in short-term but secure portfolios which are rolled

over. However, Government was in the process of developing guidelines

regarding investment of oil revenues. I have advised that this process be

expedited so as to have the guidelines in place before the oil revenues fully start

flowing in.

2.14 Non-Performing Loans

Review of the Loan portfolio revealed three (3) loans which have never disbursed

since signing. There is no indication of any steps taken to either start

disbursement or terminate the loans in question. The table below indicates the

details of the affected loans:-

Table 3: non-performing loans

Effective

Date

Loan Name Creditor Amount Current

Status

31/10/201

1

Construction and

Equipping of Technical institute in Nakaseke

District.

Arab Bank For

Economic Development in

Africa(BADEA)

Us$.

5,000,000

No

disbursements so far

9/11/2011 Agricultural Technology and Agribusiness

Advisory Services Project

International Fund For Agricultural

Development

SDR. 9,300,000

No disbursements

so far

Page 43: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

31

Effective

Date

Loan Name Creditor Amount Current

Status

3/9/2003 Financing part of costs of

community vocational training polytechnics

project

Islamic

Development Bank

ID.

2,015,000

No

disbursements so far

In addition, I noted a number of loans with low levels of disbursements yet their

deadline for final disbursement is nearing. The table below shows the details:-

Table 4: loans with low levels of disbursements

Deadline For Disbursement

Loan Name

Amount Disbursed (UGX)

Amount Outstanding (UGX)

% Commitment Fees FY

2012/13

31/12/13 Electricity Transport (Mbarara-Nkenda)

33,102,654,516 172,139,936,840 19 1,026,760,846

31/12/14 Post Primary Educ. Training IV

70,204,148,570 133,055,923,196 35 859,377,584

31/12/14

Kampala sanitation program

33,091,956,371

100,310,380,098

33 544,456,571

136,398,759,457 405,506,240,134 541,904,999,591

As a result of low levels of disbursements, these loans were attracting high

commitment fees which could have been avoided. This is because, the more

money that remains undisbursed, the more commitment fees that accrues from

such a loan. Accordingly, commitment fees paid during the year 2012/2013 have

increased by 40% from UGX.9.023 billion in 2011/2012 to UGX.12.7 billion in

2012/2013. This was not consistent with the 16% increase of the total foreign

debt from UGX.8.023 trillion to UGX.9,373 trillion over the same period.

In addition, the above analysis may imply that one of the major drivers for

commitment fees is low absorption levels. Failure to implement the above projects

as scheduled, affects the attainment of the intended project objectives.

Management explained that the major cause for non-performance arises out of

procurement related challenges and that Government currently holds regular

reviews with development partners and project implementers so that any

Page 44: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

32

bottlenecks to the implementation process are identified and addressed early

enough. I however noted that projects have continued to perform poorly in spite

of the stated remedial measures. Government is advised to explore ways of

expediting project implementation processes so as to improve on their absorption

capacities.

2.15 Accounting for Investments in Shares

The government of Uganda has invested in a number of companies and corporate

entities. According to the accounting policy, government recognizes its portion of

the net worth in the consolidated financial statements of companies in which it has

shares. A sum of UGX.1,672,235,933,637 is reported as the total net worth of

domestic investments as at 30th June 2013, up from UGX.341,856,667,295

reported in the previous year. I reviewed the accompanying schedule and noted

that the reported net worth for all the entities was not properly supported as there

was no evidence provided to confirm this position. Under the circumstances, I

cannot confirm whether the balance for domestic investments is properly stated.

In their response, management explained that they were unable to obtain audited

accounts for all the investments for the period under review and that some of

these Investments have a different accounting period from that of government.

They further stated that the Public Finance Bill has a provision that will compel all

government entities to align their financial years to the government fiscal year. I

have advised management to always ensure that they adhere to the accounting

policies adopted or else consider changing such policies or disclosing such

instances of departure from the policy.

2.16 Refund to Development Partners – UGX.49,816,466,501

Following the financial impropriety in the Office of the Prime Minister which also

included funds contributed by donors, a number of development partners

demanded for refunds by Government of Uganda of the amounts that had been

contributed and misappropriated. Accordingly, Government of Uganda sought and

obtained approval from Parliament of a supplementary expenditure. Subsequently,

a total of UGX.49,816,466,501 was refunded to Development Partners during the

Page 45: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

33

year under review. Government committed to have these funds recovered from

individuals found culpable.

However, I have not been availed with the current status in regard to recovery of

misappropriated funds from the culpable individuals. I have advised management

to ensure that the appropriate organs of government follow up this matter in order

to eventually recover the funds from the responsible officials.

Page 46: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

34

ACCOUNTABILITY SECTOR

3.0 TREASURY OPERATIONS

3.1 Accounting for Investments in Shares

The government of Uganda has invested in a number of companies and corporate

entities. According to the accounting policy, government recognizes its portion of

the net worth in the consolidated financial statements of companies in which it has

shares. A sum of UGX.1,672,235,933,637 is reported as the total net worth of

domestic investments as at 30th June 2013, up from UGX.341,856,667,295

reported in the previous year. I reviewed the accompanying schedule and noted

that the reported net worth for all the entities was not properly supported as there

was no evidence provided to confirm this position. Under the circumstances, I

cannot confirm whether the balance for domestic investments is properly stated.

In their response, management explained that they were unable to obtain audited

accounts for all the investments for the period under review and that some of

these Investments have a different accounting period from that of government.

They further stated that the Public Finance Bill has a provision that will compel all

government entities to align their financial years to the government fiscal year. I

have advised management to always ensure that they adhere to the accounting

policies adopted or else consider changing such policies or disclosing such

instances of departure from the policy.

3.2 Non-Performing Loans

Review of the Loan portfolio revealed three (3) loans which have never disbursed

since signing. There is no indication of any steps taken to either start

disbursement or terminate the loans in question. The table below indicates the

details of the affected loans:-

Page 47: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

35

Table 1: non-performing loans

Effective

Date

Loan Name Creditor Amount Current

Status

31/10/2011 Construction and

Equipping of Technical institute in Nakaseke

District.

Arab Bank For

Economic Development in

Africa(BADEA)

Us$.

5,000,000

No

disbursements so far

9/11/2011 Agricultural Technology and Agribusiness

Advisory Services Project

International Fund For Agricultural

Development

SDR. 9,300,000

No disbursements

so far

3/9/2003 Financing part of costs

of community vocational training

polytechnics project

Islamic Development

Bank

ID.

2,015,000

No

disbursements so far

In addition, I noted a number of loans with low levels of disbursements yet their

deadline for final disbursement is nearing. Table 2 below shows the details:-

Table 2: Loans with low levels of disbursements

Deadline For Disbursement

Loan Name

Amount Disbursed (UGX)

Amount Outstanding (UGX)

Commitment Fees FY 2012/13

31/12/13 Electricity Transport (Mbarara-Nkenda)

33,102,654,516 172,139,936,840 1,026,760,846

31/12/14 Post Primary Educ.

Training IV

70,204,148,570 133,055,923,196 859,377,584

31/12/14

Kampala sanitation program

33,091,956,371

100,310,380,098

544,456,571

136,398,759,457 405,506,240,134 541,904,999,591

As a result of low levels of disbursements, these loans attract high commitment

fees which could have been avoided. This is because, commitment fees are

charged on undisbursed loan amounts. Accordingly, commitment fees paid during

the year 2012/2013 have increased by 40% from UGX.9.023 billion in 2011/2012

to UGX.12.7 billion in 2012/2013. This was not consistent with the 16% increase

Page 48: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

36

of the total foreign debt from UGX.8.023 trillion to UGX.9.373 trillion over the

same period.

The above analysis may imply that one of the major drivers for commitment fees

is low absorption levels. Failure to implement the above projects as scheduled,

affects the attainment of the intended project objectives.

Management explained that the major cause for non-performance arises out of

procurement related challenges and that Government currently holds regular

reviews with development partners and project implementers so that any

bottlenecks to the implementation process are identified and addressed early

enough. I however noted that projects have continued to perform poorly in spite

of the stated remedial measures. Government is advised to explore ways of

expediting project implementation processes so as to improve on their absorption

capacities.

3.3 Refund to Development Partners

Following the financial impropriety in the Office of the Prime Minister which also

included funds contributed by donors, a number of development partners

demanded for refunds by Government of Uganda of the amounts that had been

contributed and misappropriated. Accordingly, Government of Uganda sought and

obtained approval from Parliament for supplementary expenditure. Subsequently,

a total of UGX.45.50 billion was refunded to Development Partners during the year

under review. Government is committed to recover these funds from individuals

found culpable.

However, I have not been availed with the current status in regard to recovery of

misappropriated funds from the culpable individuals. I have advised management

to ensure that the appropriate organs of government follow up this matter in order

to eventually recover the funds from the responsible officials.

Page 49: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

37

4.0 MINISTRY OF FINANCE, PLANNING AND ECONOMIC

DEVELOPMENT

4.1 Mischarge of expenditure

The Government Chart of Accounts defines the nature of expenditures for each

item code. The intention is to facilitate better the classification of financial

transactions and also track budget performance per item. It was noted that a sum

of Shs.1,506,161,379 was charged on items which do not reflect the nature of the

expenditure. Mischarge of expenditure impacts on the credibility of the financial

statements since the figures reported therein do not reflect true amounts

expended on the respective items.

Management explained that IFMS items were not linking properly with the output

budgets. For example, what appears to be mischarged expenditure is office

imprest which is not tied to particular chart of accounts but rather a combination

of related items in accordance with TAIs.

I advised management to liaise with Accountant General and resolve the de-

linkage.

4.2 Un-supported Gross Tax payments-Shs.1,468,868,156

A sum of Shs.10,431,635,839 was spent from the Gross Tax account during the

year, out of which Shs.1,468,868,156 was un-supported. The import documents

and URA tax assessments against which the payments from the gross tax account

were based were not availed. In the circumstances, I was unable to confirm that

the gross tax payments were eligible.

I advised management to always ensure that payments from the gross tax

account are properly supported, otherwise funds are recoverable.

4.3 Gross Tax Payments for Non-Qualifying Items – Shs.642,902,785

Page 50: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

38

Government in support to the Agriculture Sector value chain (Textile sub-sector),

has been paying import taxes on raw materials for the manufacture of textiles.

The Ministry paid Shs.642,902,785 as taxes for these imports. This is against the

purpose for which the incentive was established. Importation of already ginned

cotton (yarn), bed sheets materials and other fibre, will not benefit the local

cotton farmers as had been intended.

It was noted that the beneficiary companies instead imported semi/finished

textiles (Bed sheet material, Bales polyester and viscose rayon staple fiber, cartons

polyester viscose, texturised yarn and polyester bed sheet material etc.).

The Accounting Officer explained that the list for qualifying items in the textile

sector is provided by URA and is the basis for payments on behalf of the textile

sector. The companies imported fabric for further transformation into finished

products which is consistent with the authority granted by the Minister. Evidence

to the effect was not provided.

I advised management to restrict tax payments to only raw materials as was

intended by Government policy for the textile sub-sector and also initiate recovery

measures for all payments made in respect of finished products (bed sheet

materials).

4.4 Amounts due to URA not disclosed in MoFPED Financial statements

Receivables of Shs.2,017,372,495 were disclosed in the URA financial statements

as due from the Ministry. This payable was not disclosed in the Ministry financial

statements. The nature and amounts of the liabilities are indicated the table

below:

Beneficiary

Tax

head Period

Amount Due

from MoFPED

Ministry of Finance, Planning

& Economic Development

Excise

Duty 2007/2008

7,185,936

Ministry of Finance/BPAFS

Outstanding VAT 2006 - 2009

1,886,054,911

Page 51: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

39

Ministry of Finance a/c

Lantech (Africa) Ltd VAT

01/2006 -

12/2011

124,131,648

TOTAL

2,017,372,495

The Ministry‘s liabilities are therefore understated. This may mislead the users of

the financial statements.

Management responded that they are in consultation with URA on the matter

before arriving at the decision to adjust the financial statements.

The outcome is awaited.

4.5 Unlicensed Gaming and Pool Betting Businesses

A review of the tax payer register/payment schedule of URA for the period

2012/13 revealed that a number of companies were registered and are

subsequently remitting taxes to URA. It is the responsibility of Ministry of Finance

to issue licenses to betting companies. However, it was noted that 24 companies

did not have operating licenses in the period in which they transacted business.

There is a likelihood that over Shs.24 million was lost in uncollected license fees.

Management explained that these companies did not qualify under the Gaming

and Pool Betting Act and are operating illegally. URA has been notified of this

illegality and the lottery board has began closing down offices until they comply.

I advised management to continue to liaise with URA to ensure that all operating

businesses in the sector are registered.

4.6 Inadequate budgeting and management of gross tax account

During the period under review the Ministry budgeted for Shs.26bn out of which

Shs.15 bn was received as gross tax amount available to settle import related

taxes. Out of the total release, management paid for taxes of only

Shs.10,431,635,839. This reflects inadequate budgeting. It also locks up scarce

resources which would have been applied elsewhere.

Page 52: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

40

Also noted was the gross tax balances of Shs.4,568,364,161 transferred to the

UCF, despite having outstanding tax obligations with URA of Shs.3,657,635,260

arising from import related taxes.

I advised management to budget properly for gross tax and obediently meet its

tax obligations on time to enable URA also achieve its objectives.

4.7 Un-clear criteria for selecting and recommending firms for tax incentives

and lack of information in that regard

It was noted that there was no guidance given in the criteria to be used in the

selection and recommending firms for tax incentives by the tax policy desk in the

Ministry. Further, there is lack of clear and readily available information to the

public/players in the economy regarding specific sectors of the economy which

have been earmarked to benefit from tax waivers.

For instance, the Hotel industry, Steel manufacturing and textile among others

have been benefiting from tax incentives without any documented criteria in place

which is open to all players in such sector to enable equal opportunities to access

the tax incentives. This creates un-fair competition in the market. It‘s worth noting

that the beneficiaries of the tax incentive (e.g. BIDCO) charge similar oil prices as

non-beneficiaries (e.g. Mukwano) without consideration of any returns in benefits

to the economy as would have been expected.

Lack of a documented criteria and method used in selecting and approving the tax

incentives beneficiaries poses the risk of handpicking without following a uniform

selection check list of conditions to be fulfilled.

Management explained that a criterion has been developed for the textile sector

and the criteria for the other sectors have been drafted pending approval.

I urged management to expedite the approval process and have the criteria in

place.

Page 53: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

41

4.8 Lack of repair post inspection reports

S.816 of the TAIs requires that, a motor vehicle should be inspected by the

mechanical supervisor before and after repair and a certificate of completion or

inspection report should be prepared by the mechanical supervisor confirming that

the vehicle has been repaired, all spares installed and in a good mechanical

condition. However, during the financial year, a sum of Shs.889,964,805 was

spent on repair and servicing of various vehicles but there were no certificates of

completion/inspection reports prepared for the serviced vehicles. I could not

therefore confirm the authenticity of the payments in absence of certificates or

inspection reports.

Management explained that the vehicles were being repaired by the suppliers as

part of policy to use genuine parts and maintain the cars in good mechanical

conditions.

I advised management to liaise with Ministry of Works and Transport and have the

vehicles inspected prior and post repairs.

4.9 Capitalization of institutions

During the period under review Parliament appropriated Shs.25,079,000,000 for

capitalization of EADB, UDB, IDB and PTA. Examination of the activity revealed the

following;

The EADB board of directors and governing council made a decision on 15th

March, 2012 that each member state pays an amount of USD 4.5 Million each

year towards capital subscription. At the time of audit, USD4,119,822 was still

outstanding. Failure to make timely contributions is likely to affect the

attainment of the intended aims/objectives.

Uganda being a member state was supposed to make annual capital

contribution of USD 1,632,024. However, only USD 930,000 was paid leaving a

balance of USD 8,050,872 as at 30th June 2013.

It was also noted that arrears continue to attract interest at a rate of 8% per

annum and by 30th June 2013 this had accumulated to USD 820,752. Failure to

remit contribution may affect the attainment of intended objectives.

Page 54: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

42

Management explained that Government has outstanding obligations with PTA

Bank caused by insufficient budget provisions.

I advised management to seek for sufficient budget appropriations and endeavor

to pay all above the outstanding obligation.

4.10 Budget Performance

According to the annual budget performance report for 2012/13 for the Ministry,

Shs.225.05 billion was budgeted, Shs.207.04 billion was released and Shs.207.01

billion was actually spent. The table below shows an analysis of the releases

against the actual expenditure and budget.

Vote Approved

budget

Released Spent %budget

/spent

%

release/

spent

1401: Macroeconomic Policy

and Management

75.75 40.56 40.55 53.5% 100%

1402:Budget Preparation,

Execution and Monitoring

11.73 10.29 10.49 89.4% 101.9%

1403: Public Financial

Management

44.66 51.89 51.91 116.2% 100.0%

1404: Development Policy

Research and Monitoring

28.08 31.78 31.78 113.2% 100.0%

1406: Investment and Private

Sector Promotion

21.53 30.57 30.57 142.0% 100%

1408: Microfinance 24.97 19.74 19.73 79% 100%

1449: Policy, Planning and

Support Services

18.34 22.22 21.98 119.9% 99.0%

Total for vote 225.05 207.04 207.01 92% 100%

In 4 instances, funds released and spent was above the approved budget. See

table above. From the annual budget performance report, a number of activities

were budgeted for but activities were not fully performed.

Management explained that the variance between approved budget and

expenditure was due to supplementary for FINMAP due to suspension of donor

Page 55: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

43

funding for data centre enhancement, reallocations for IFMS upgrade,

International Conference on Inter-Governmental Committee of Experts, funding

Scientists and outstanding taxes.

I advised management to always seek authority for reallocations.

4.11 IRISH AID SUPPORT TO GENDER & EQUITY BUDGETING (EDUCATION

SECTOR AND KARAMOJA SUB-REGION)

(a) General Standards of Accounting and Internal Control Systems

A review was carried out on the project‘s financial management system. It was

noted that management had instituted adequate controls to manage project

resources except for the following matter;

(i) Lack of critical information on payment vouchers

It was noted that all payment vouchers did not contain signatures of the payees

as evidence of receipt of the money paid. There is a risk that irregular transactions

could go undetected and payments could go to un-intended persons.

Management explained that payees did not acknowledge receipt of funds as funds

were disbursed directly to their accounts.

I advised management to ensure that all payees should acknowledge receipt of

funds to ensure payments are made to the intended beneficiaries.

(b) Compliance with Financing Agreement and GoU Financial

Regulations

It was noted that management had complied in all material respects with the

financing agreement and GoU financial regulations except for the following matter;

(i) Non remittance of Local Service Tax (LST)

It was noted that Local Service Tax (LST) was not remitted at all during the year.

Non-compliance could attract penalties based on the existing regulation.

Management explained that the Local Service Tax was not paid during the year,

but promised to follow the law in the next financial year 2012/13. I advised

Page 56: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

44

management to always adhere to pensions of the LST to avoid unnecessary costs

associated with non-compliance.

4.12 FINANCIAL MANAGEMENT AND ACCOUNTABILITY PROGRAMME

(FINMAP)

(a) Compliance with programme financing agreement and government

financial regulations

The Programme complied with the covenants with Programme agreement and

Government Financial Regulations except for the following matters;

(i) Statutory Deductions

Withholding tax deducted from suppliers of goods and services and paid during

the year under review was not remitted to the relevant authority on timely basis

i.e. by the 15th day of the following month. Also noted was that all PAYE & NSSF

returns were filled late. Non compliance with the provisions of the Income Tax Act

and NSSF Act may lead to heavy penalties and interest being imposed on the

programme.

Management explained that late remittance was attributed to lack of sufficient

funds and funding constraints experienced during the year 2012/13. They further

explained that it was an oversight not to withhold tax from the two companies but

a request would be made for IFMS to update the system and have the WHT

deducted automatically.

I advised management to comply with all the provisions of the tax laws in order to

avoid associated penalties and interest.

Page 57: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

45

(ii) Expenditure re-allocation

I noted a number of expenditure re-allocations done by project management

without prior approval from the development partners. Expenditure re-allocation

renders the budgetary control ineffective. Examples include the following:

Date Voucher

No

Description Amount

(Shs)

Classified as

2/4/13 5970 Tuition at the

International Law

Institute.

9,629,916 Allowances for

activity

facilitation

15/2/13 5453 Tuition at the

International London.

13,301,569 Allowances for

activity

facilitation

28/11/12 4654 Motor Vehicle servicing 2,752,300 Information and Communication

Management explained that due to insufficient budgetary provisions during the

year, there were budget over-runs on some expenditure items yet related

activities were still on-going.

I advised management to seek authority to reallocate prior to spending.

(b) General Standard of Accounting and Internal Control

A review was carried out on the programme system of financial management and

the following weaknesses were noted;

(i) Staff advances

I noted cases where salary advances were made to project staff in excess of Shs.1

million and recovered over a period exceeding three months. Such advances could

be construed as interest free loans in accordance with the Income Tax Act Cap

340 (Section 7 of the 5th Schedule). This would give rise to a taxable benefit on

which PAYE should have been accounted for on a monthly basis.

I advised management that payment of salary advances in excess of Shs.1 million

should be handled in accordance with the Income Tax Act.

Page 58: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

46

(ii) Payment vouchers

It was noted that a number of payment vouchers and their support documents

were not stamped ―PAID‖ or cancelled after payment to deter reuse. No other

indicative mark was put on these vouchers to indicate that they have been paid.

There is a risk that the supporting documents could be paid again resulting into

double payments.

I advised management to ensure that all payment vouchers and the supporting

documents are stamped or marked ―PAID‖ after payment.

(iii) Project Stores

A surprise visit to the project store revealed that for all the sampled items

subjected to a spot physical count, the bin card balances differed from the

physical counts. Besides, reconciliation for the variances was not provided. There

was no proper store‘s ledger and the bin cards used in place of the stores ledger

were incomplete.

It was further noted that all accounting records in the store were not reviewed by

an independent person and therefore the project risks errors going unnoticed.

Management explained that they have instituted controls to ensure confirmation of

delivery by the internal audit unit and that all dispatches to users were duly

authorized and recorded in the issues register. I advised that store bin cards are

regularly updated and any variances between the physical count and the bin card

balance reconciled to minimize errors in the store.

(iv) Field Visits

During a visit to the IFMS sites and the local government sites – tier 2 IFMIS roll

out, the following observations were noted;

Page 59: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

47

Site visited Issue noted Risk/Implications Responses

In house Training

Facility (ITF)

The server

room is not secure since the door lock

is faulty and as such the door is left

open for most of

the time.

It was also

noted that the ITF had no store and as

such, there are a

number of equipments and

many empty boxes which are kept in

the server room.

There was no

visitors‘ book to

record all people accessing the

server room and

the purpose for their visit.

There are

two keys to the server room door,

one kept by the

responsible official at ITF and the

other by the Principal Systems

Officer (PSO) who

sits at the ministry. We were told that

the PSO accesses the server room as

and when, even without the

knowledge of the

ITF officials. The reason for doing it

like this could not be ascertained.

Inadequate

security measures pose the risk of loss

through theft, damage,

deterioration,

financial loss coupled with

inevitable replacement costs

and more importantly

tampering with the

data.

This can be a

potential risk in case of a fire outbreak.

This makes it

hard to track those

who visit the server room and be able to

fix responsibility in case of a problem.

This subjects the

server room to un authorized access.

Management explained that measures were underway to replace the digital lock. Management explained that the ITF has fire proof filing cabinets for storage purposes Management explained that the Visitors book wais in place, it could have been an omission of not providing visitors‘ book to the Auditors. The PSO is the technical officer in-charge of the server room and is obliged to go in as and when necessary.

Diary

Development

There was no

visitors‘ book to

This could

make it hard to track

Server Rooms are under the

Page 60: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

48

Authority record all people

accessing the

server room and the purpose for

their visit.

The server

room was also used

as the store.

The server

supplied by FINMAP and the UPS are

not in use, instead

they are using their computer server.

those who visit the

server room and be

able to fix responsibility in case

of a problem.

There can be a

potential risk in case of a fire outbreak.

I could not

ascertain if there was

value for money realized.

supervision of the Accounting Officers of the votes as stipulated in the Memorandum of Understanding guiding IFMS implementation. This has been brought to the attention of the Accountant General for follow up.

Uganda Cotton

Development Authority

The server

room is also used

as the store.

There is no

visitors‘ book to

record all people

accessing the server room and

the purpose for their visit.

This can be a

potential risk in case

of a fire outbreak.

This makes it

hard to track those

who visit the server

room and be able to fix responsibility in

case of a problem.

Server Rooms are under the supervision of the Accounting Officers of the votes as stipulated in the Memorandum of Understanding guiding IFMS implementation. This has been brought to the attention of the Accountant General for follow up

Uganda Registry

Services Bureau

The server

room is also used as the store.

There was no

visitors‘ book to

record all people accessing the

server room and

the purpose for their visit.

This can be a

potential risk in case of a fire outbreak.

This makes it

hard to track those

who visit the server room and be able to

fix responsibility in

case of a problem.

Server Rooms are under the supervision of the Accounting Officers of the votes as stipulated in the Memorandum of Understanding guiding IFMS implementation. This has been brought to the attention of the Accountant General for follow up

IFMS Disaster

Recovery Site

The installed

equipment not

engraved.

Equipments

not engraved can

easily be taken or

used for private

(i) It is the practice to engrave all equipment. This omission will be

Page 61: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

49

Some

equipment still in

boxes and not installed.

The

old/decommissione

d equipment not

well arranged.

No asset

register of the equipment at site

facility

business.

Benefit to

which the equipment were purchased not

maximally utilized.

Lack of control

over the assets since no register is

maintained

addressed however this is often delayed to allow for installation and testing of some equipment. (ii) Delayed installation of the equipment arose from unforeseen delay in the upgrade of the Oracle application. This meant some of the equipment could not be deployed hence the continued storage in boxes. (iii) However, with the successful upgrade in October 2013, deployment and installation will now be undertaken. (iv) The issue of decommissioned equipment will be taken up with the PDU. An Asset Register will be established at the DRS

I advised management to address the inadequacies noted during the inspection.

4.13 STRENGTHENING EVIDENCE BASED DECISION MAKING – FINANCE

COMPONENT 2013

(a) Compliance with the key Covenants of DFID Funding Agreement

and GOU Financial Regulation

It was noted that the management had in all material respects complied with the

covenants contained in the Memorandum of Understanding and Government of

Uganda financial regulations except for the following matter;

Page 62: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

50

(i) Tax of Shs.9,251,795 paid from SEBDEM II Project Fund

It was noted that Shs.9,251,795 was paid from project funds to cater for taxes as

shown below;

Date Invoice No Product or Services Amount VAT paid

5/10/12 897 Maintenance 428,300 77,094

18/10/12 3678 Stationary 124,800 22,464

1/10/12 1569 Printing PPA report 34,102,000 6,138,360

4/10/12 950 Repair 298,516 68,313

20/9/12 17988 Conference facilities 12,350,000 2,223,000

24/9/12 0129 Batteries 222,000 39,960

7/8/12 AD318597 Field work supervisors 1,665,254 299,746

31/8/12 0120 Stationary 1,498,000 269,640

17/9/12 0123 Training material 710,000 127,800

9,251,795

Use of project funds to pay taxes contravenes section 7 of the Memorandum of

Understanding (MoU) which prohibits the use of project funds to pay taxes levied

on goods or services imposed directly or indirectly by Government.

I have advised management to claim reimbursement of Shs.9,251,795 from

MOFPED.

4.14 SECOND PRIVATE SECTOR COMPETITIVENESS PROJECT (PSCP II)

(a) Compliance with the Credit Agreement and Government financial

regulations

It was noted that the management had in all material respects complied with the

covenants contained in the credit agreement and government of Uganda financial

regulations except for the following matter;

(i) Non Deduction of Withholding tax

The Income Tax Act requires withholding tax agents to make monthly withholding

tax returns and submit details of their suppliers from whom tax has been withheld

Page 63: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

51

and remitted to URA. However, it was also noted that withholding tax amounting

to Shs.128,722,558 was not deducted from payments to suppliers:

I was not availed any documentation exempting the suppliers from withholding

tax. The practice is contrary to the law and could lead to penalties. I advised

management to comply with the requirements of the Income Tax Act.

(b) General Standards of Accounting and Internal Control

It was noted that management had instituted adequate controls to manage

project resources except in the following matters;

(i) Discrepancy between quarterly reports and financial statements

It was observed that total expenditure in quarterly financial statements submitted

to the bank was not in agreement with total expenditure included in the annual

financial statements. There was a discrepancy of Shs.8,241,678,840 as shown in

the table below;

FINANCIAL STATEMENTS IUFR DIFFERENCE

Description UShs. USD UShs. USD UShs. USD

1(a) Works for Part A.1

103,756,881 44,807 103,756,881 44,807 0 0

1(b) Works for Part C.1 (a)&(d)

2,631,043,666 1,012,727 2,631,043,666 1,008,306 0 0

2(b) Goods for Parts B.3 B.4&C

23,045,510,186 8,918,709 15,518,158,912 6,008,306 7,527,351,274 2,910,403

3(b) Consult Serv B3, B4

2,447,600,438 929,469 3,676,959,665 1,390,705 -1,229,359,227 -461,236

4 Training 176,027,368 67,729 176,027,368 67,729 0 0

7 Instit’al Grants A.2(a)&A.2C

129,745,697 51,846 129,745,697 51,846 0 0

8 operating costs

715064,989 274,756 708,316,159 272,091 6,748,830 2,665

TOTAL IDA 29,248,749,225 11,300,044 22,944,008,348 8,848,211 6,304,740,877 2,451,833

GoU counterpart funding

2,862,453,506 1,104,131 925,515,543 355,116 1,936,937,963 749,015

GRAND TOTAL

32,111,202,731 12,404,175 23,869,523,891 9,203,327 8,241,678,840 3,200,848

Page 64: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

52

The disagreement between two implies quarterly financial statements were not

accurately prepared.

Although management explained that the variances were mainly caused by the

difference in the reporting dates and errors during preparation of these

statements, I noted that one of the causes of the discrepancies was that

management did not prepare the last quarter interim report contrary to the World

Bank requirements. I advised management to ensure timely reporting and

reconciliation of the quarterly reports and financial statements.

(i) Payments to Wrong supplier

It was noted that a payment meant for Charles Koojo was credited to Peter

Kasyoka‘s account because the bank account quoted on the payment instruction

was for Mr. Peter Kasyoka. At the time of audit, US $ 15,980 had been recovered

from Peter Kasyoka on 7th June, 2013. The unrecovered balance of US $ 15,111

was included in receivables in the financial statements.

Management explained that there was an error and that the project had been

following up and was hopeful that all the money would be refunded before the

end of the year.

I informed management that the unrecovered balance is an ineligible expenditure

under the financing agreement and therefore should be recovered and refunded to

the project bank account.

(ii) Mis-procurement

Management contracted a company to undertake Government Land Inventory at a

cost of US $ 1,889,828 including taxes. Accordingly, US $ 882,200 was paid as

advance for the activity. However, it was determined by the World Bank that the

contract had been irregularly awarded and therefore considered ineligible for

which Government was required to refund the advance payment to the bank.

Further, it was noted that the contractor was unable to complete execution of the

activity. I find this advance doubtful as the payment guarantee expired.

Page 65: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

53

Although management explained that the value of work executed under the

advance amounted to US $ 460,257 and that only US $ 427,943 is recoverable, I

consider the amounts loss to government in absence of recovery. I advised

management to consult with the Solicitor General for guidance on the matter.

(iii) Outstanding project liabilities

The project closed on 28th February 2013 with nil cash balances. However, it was

noted that it had unsettled liabilities amounting to Shs.2,053,917,000. It was not

clear how these project liabilities were to be settled given that the project had

exhausted all funding available in the financing agreement.

Management explained that it had written to Ministry of Finance, Planning and

Economic Development to avail funding to settle the commitments entered under

the PSCP II, which is in line with the subsidiary agreement. I advised management

to follow up the matter with the concerned authorities to ensure funds are availed

to settle the outstanding obligations.

(iv) Land Information System (LIS)

The implementation of the National Land Information System was reviewed and

the following were noted;

(i) Some zones (Masaka and Wakiso) were experiencing problems in carrying

out subdivisions on some parcels of land.

(ii) The Wakiso district land office did not have enough equipment including

scanners, printers and computers to handle the volume of work that was

available. Because of the volume of scanning being done at the moment,

the scanners are sometimes overwhelmed and malfunction.

(iii) Transaction processing was not timely. Processing a land transfer takes up

to five months in some instances.

Management explained that the failure to undertake land sub divisions was due to

a delay in vectorising and geo-referencing the cadastal sheets owing to the nature

of how data was captured on these sheets at varying scales e.g insets.

Page 66: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

54

Management also indicated that measures were being developed to deal with the

weaknesses noted above. I await the outcome of the measures to address the

anomalies identified.

4.15 SIDA SUPPORT TO COMPETITIVENESS INVESTMENT CLIMATE

STRATEGY (CICS) PROJECT

(a) Compliance with the SIDA/GOU Financing Agreement Provisions

and GOU Financial Regulations

It was noted that management had in all material respects complied with the

covenants contained in the financing agreement and Government of Uganda

financial regulations except for the following matters;

(i) Human Resource Issues

Un approved staff titles

According to the project organogram, a provision was made for 10 staff whose

titles are indicated below;

Title No. of positions

National Coordinator. 1

Personal Assistant. 1

Senior Competitive Analyst 1

Competitive Analysts (Different Specialization) 4

Accounts & Administrative Officer 1

Assistant Competitive Analyst-IT 1

Driver/Office Assistant 1

Contrary to the above approved structure, the project had an additional three

Research Assistants earning a total monthly salary of Shs.4,575,470.

Management explained that the project from time to time hires temporary staff to

carry out duties which can not ordinarily be done by only permanent staff and that

Page 67: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

55

their stay is reviewed on an annual basis depending on their performance and

need.

I advised management to adhere to the original set project employment structure

or seek approvals for any new recruitments.

(ii) Non-remittance of Un-utilized project funds

Article 4 section 5 of the agreement signed between Sweden and GoU for support

to the competitiveness investment climate strategy secretariat requires that funds

transferred to Uganda and not utilized by 30th June, 2013 shall be repaid to

Sweden within three months of that date. However, it was noted that as at 30th

June, 2013, the project had a cash balance of Shs.47,010,645. At the time of

audit, a period of more than four months, these funds had not been remitted to

Sweden.

I advised management to adhere to the project financing agreement by returning

the un-utilized funds to the donors.

(iii) Procurement of hire of reality TV production services

On 26th November 2012, the project national coordinator in his communication to

the Swedish Embassy requested for no objection to use direct procurement while

procuring services of hiring of reality TV production. This was to be undertaken

through the use of the Ministry‘s prequalified firms that previously supplied similar

goods and services to the Ministry. The Embassy responded with a no objection

but indicated that it was a one off and not the rule. On 11th January 2013, the

project management signed a contract agreement with Explode 360 for a contract

price of Shs.48,050,000 for the hire of reality TV production service.

The following anomalies were noted:

Hiring of TV production services had been estimated at Shs.45,000,000 as

opposed to Shs.48,050,000 which was eventually contracted. The no objection

for the extra Shs.3,050,000 was not provided.

Page 68: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

56

The request for no objection indicated that the project was to use direct

procurement using the Ministry‘s pre-qualified firms however, this procurement

was not approved by the contracts committee as recommended by PPDA

regulations (Sec.119 (2)).

The contractor was paid the full amount without deducting the 6% WHT

worth Shs.2,883,000 from the supplier.

I urged management to adhere to the requirements of the PPDA regulations and

the Income Tax Act.

(iv) Overspent items

It was established that actual expenditure on three items was beyond the

budgeted amounts by Shs.52,747,730 as indicated in the table below:

Details Budget Actual Spent Over

Expenditure

Strengthening CICS staff Capacity 26,000,000 27,098,623 1,098,623

The 6th National Competitiveness Forum 75,000,000 75,716,568 716,568

CICS II Communication & Outreach

strategy

130,153,461 181,086,000 50,932,539

231,153,461 283,901,191 52,747,730

I was not provided with the authority to spend beyond budget.

I advised management to always ensure that expenditure is in accordance with

the budget or seek authority for reallocations where necessary.

(b) General Standard of Accounting and Internal Control

A review of the following areas was carried out:-

Accounting system and policies.

Book keeping.

Management and control of both bank and cash accounts.

Purchases and payments.

Page 69: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

57

Fixed assets management.

It was noted that management‘s control structure environment, accounting system

and policies and control procedures were generally adequate to ensure prudent

use of, and accountability in the project.

4.16 AGRICULTURAL CREDIT FACILITY PROJECT

(a) Inadequate monitoring and supervision of the scheme by the

Administrator

The Bank of Uganda internal quarterly report for the period ended 30th June,

2013 highlighted the following delinquent accounts but there was no evidence that

the Administrator had reviewed and taken action on these cases. Details in table

below:

S/NO

PFI

Project/ Beneficiary

Amount (Ushs)

1

DFCU

Bunya SACCO

18,251,164

2

DFCU

Kahunga Investments

702,223,587

3

Stanbic Bank

Mr. & Mrs. Byensi

105,919,095

4

Post Bank

Herdoh Ltd

41,666,667

TOTAL

868,060,513

Inadequate monitoring and supervision increases the risk of loss of scheme funds

arising from delinquent accounts.

Management explained that it would not monitor or evaluate the use of funds as

this was not consistent with BoU mandate to provide prudential regulation of the

financial system. Consequently, monitoring and supervision is done through the

quarterly reports submitted by the Participating Financial Institutions (PFIs).

Page 70: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

58

I advised management that an independent body should be set up to carry out

monitoring and supervision of the scheme operations to avoid any eventual losses.

(b) Non-compliant use of ACF funds

It is a requirement under clause 2.1 (vi) of the Memorandum of Understanding

that the primary security for the credit facility should be the machinery and

equipment financed. However, it was noted that one of the beneficiaries – Sugar

and Allied Industries – the eligible beneficiary diverted a loan facility worth

Shs.424,000,000 to another company – Steel Rolling Mills Ltd, which then

purchased the machinery and equipment. The loan facility of Shs.424,000,000 is

therefore not secured since the purchased machinery and equipment is not owned

by the eligible beneficiary.

The BoU management explained that all loan disbursements from BOU are made

directly to the PFIs and not to loan beneficiaries after obtaining proof or

confirmation of disbursements from the PFI that eventually pass on the funds to

the loan beneficiaries. In this particular case, Bank of Baroda submitted

information to the extent that the project was eligible and upon receipt of proof of

disbursement to the borrower by the bank, the refinance was made.

I advised management to put in place mechanisms that ensures that only

applicants eligible as stipulated under the Memorandum of Understanding receive

and utilise loan facilities.

(c) Non participation of Micro Finance deposit taking institutions (

MDIs)

The Memorandum of Understanding signed on 13th October, 2009, provides for

the Micro Finance Deposit taking Institutions (MDIs) to take part in the Scheme.

However under the current Project portfolio, there is no evidence that MDIs are

involved in the scheme. The MDIs that were signatories to the MOU included the

following:

• Finca Uganda

• Pride Micro Finance Limited

Page 71: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

59

• Uganda Finance Trust

Information obtained from interviews conducted with some of the licensed MDIs

revealed that the interest rate of 12% charged on loans under the scheme is on

the high side compared to the rate of 6% that the MDIs normally charge their

customers.

There is a risk that the project scope is limited and may not achieve its intended

objective of supporting and modernizing agriculture and its involved stake holders.

Management of BoU explained that although the MDIs are accredited to

participate, actual participation is upon their discretion. I advised that the

Government reviews the interest rate so as to encourage licensed Micro Finance

Deposit taking Institutions to participate in the Scheme.

(d) Lack of detailed report’s review and feed back by management of

MoFPED

It was noted that there was no evidence of a detailed review and feedback by the

management of Ministry of Finance, Planning and Economic Development

(MoFPED) on periodic reports. There could be a missed opportunity to realize the

benefits arising from the quarterly reporting process.

I advised management to take necessary follow-up so that the project reports are

periodically reviewed and officially responded to.

(e) Delays in the implementation of decisions.

A review of correspondences between the parties in the MoU indicated that

whereas the Minister of Finance, in a letter dated 28th August, 2012 agreed to

increase the interest rate chargeable by the participating financial institutions from

10% to 12%, implementation of the decision by the Fund‗s administrator and the

signing of the new addendum took place seven months later (March, 2013).

Page 72: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

60

Delays in implementation of the agreed upon decisions may adversely affect the

overall performance of the Project.

Management of BoU explained that the delay was attributed to consultations with

different stakeholders. This process took time for the PFIS to complete. I urged

the fund administrator to always ensure prompt implementation of the decisions

made with regards to critical issues.

(f) ACF Program Implementation Status -Field work

I carried out field work inspection and noted that some beneficiaries were partially

or not complying with the loan provisions.

Detailed Beneficiary

Description

ACF Total Loan

Amount Shs.

Audit Finding

Project name: Sesaco Limied

Proprietor : Nsubuga

Charles & Nsubuga Juliet Location: Kampala-

Kyengera

15,210,000 Compliance Status: Non-compliant.

Audit Issue: The beneficially

refused to cooperate by denying Auditors accessibility to his project.

Project name: Fence-

Construction Proprietor : Eseza

Kyasimire & Irumba

Location: Kiruhura – Kazo

40,000,000 Compliance Status: poor

Audit Issue: Non-compliant with the Mou.

The money was diverted and used

to set up a Veterinary drug shop in breach of the terms of the MoU.

Clause 2.1 (iv) of the MoU provides that the scheme shall not be used

for financing working capital for

trading in agriculture commodities. And clause 2.1 (vi) states that the

primary security for the credit facilities shall be machinery and

equipment financed. Accordingly,

this loan facility of Shs.40,000,000 is not secured.

Project name: Rainbow

Ind’s Ltd Proprietor : Panjwani

Ahmed & Ameer Ali Jasani

Location: Mukono

715,468,750 Compliance Status: Non-

compliant Audit Issue: The beneficiary

refused to cooperate by denying Auditors accessibility to his project.

Project name: Maina Speedy

2,785,068,024 Compliance Status: fair Audit Issue: From observation,

Page 73: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

61

Proprietor : Tom

Mugenga & Sarah

Mugenga Location: Kisoro

the equipment and the constructed

infrastructures on site did not

match the loan taken.

4.17 RURAL FINANCIAL SERVICES PROJECT

(a) Technical Oversight by the Programme Steering Committee

The IFAD loan agreement required that a programme steering committee be

formed to provide the program with technical expertise and therefore be

responsible for approving annual work plans and budgets, review semi-annual

reports and suggest ways to implement and improve the programme operations.

The loan agreement further required that this committee meets at least three

times during the year and on an adhoc basis as and when necessary. It was

however noted that there were no meetings held by the steering committee thus

no technical expertise was provided during programme implementation.

The programme administration unit may not achieve the set objectives and targets

in the absence of technical oversight that is supposed to be provided by the

steering committee.

I advised management to ensure that the management of the project is in

accordance with the loan agreement.

(b) Employee code of conduct

It was noted that as much as employees are inducted at the point of recruitment

in the expected practices of the organization, there is no follow up training or

communication from management intended to remind employees of what is

expected of them as per the guidelines set in the programme‘s code of ethics. In

the absence of refresher trainings and regular communications from management

about the code of ethics, employees may act contrary to the policies and

procedures and thus expose the programme to actions of unethical behaviour.

Management responded that there were delays in conducting refresher training

but will always ensure the delivery of trainings on time.

Page 74: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

62

I advised management to continually conduct refresher trainings for all employees

on a regular basis so as to maintain a culture of honesty and ethical behaviour

among the employees.

(c) Staff appraisals for PAU staff

I noted that the program did not carry out any staff appraisals for employees

during the year and therefore could not tell with certainty the extent to which

each employee has achieved their goals or contributed to the achievement of the

overall goals and objectives of the program. In the absence of performance

appraisals, management may not be able to identify training gaps and

improvement areas for employees.

Management responded that appraisals for the staff of RFSP are normally done by

the Human Resource Department of the Ministry of Finance. It was further stated

that the said staff appraisals have since been conducted, and the appraisals are

now updated.

I have urged Management to ensure that all staffs are appraised on a timely basis.

(d) Inadequate controls over fuel usage

It was noted that whilst fuel is a major expense of the project, management does

not have sufficient controls in place to monitor the reasonableness of fuel usage

especially by programme vehicles. No analysis is done in terms of the fuel usage

per kilometer vis a vis the specific trips done by the vehicle. The laxity in

monitoring may result into misuse of organizational vehicles to carryout personal

activities which may lead to unnecessarily high fuel expenses.

Management noted the audit findings and explained that PAU will put up measures

to mitigate the risk, which will always be reviewed periodically.

The action is awaited.

(e) Inadequate review of system exchange rates.

Page 75: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

63

During my review of exchange rates, I was not able to obtain any evidence that

the exchange rates input into the system were reviewed by a more senior person

to ascertain their accuracy. This may result into misstatements if wrong exchange

rates are input into the system.

I advised management to put in place a process that ensures that all exchange

rates entered into the pastel accounting system are reviewed by a more senior

person to avoid misstatements.

(f) Dormancy of Board committees

It was observed that whilst the SACCOs boards have formed committees charged

with particular responsibilities such as the supervisory committee and the credit

committee, there was no evidence of this activity being implemented in some of

the SACCOs visited. There were no minutes of any such meetings held by these

committees. It was further noted that some loans were approved by the SACCO

manager instead of the credit committee which further confirms that the

committee did not participate in the approval process.

Failure of these committees to discharge their duties may result in a lack of

segregation of duties as management staff take on an oversight role on top of

their day to day roles.

Management explained that RFSP will work with FEWs and MTIC to educate

SACCOs to comply through continuous mentoring.

The action is awaited.

(g) Deficiencies in SACCO loan registers

A review of the loans register at the Bukigayi SACCO in Bududa revealed the

following exceptions:

• The register was insufficiently detailed as it only showed the loan amounts

disbursed to each recipient and the tenor of the loan but no information on

amounts repaid to date and hence the outstanding balances. Management was

Page 76: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

64

therefore not in a position to reconcile its outstanding loan portfolio as

declared by the SACCO manager in Min 4/08/012 of our meeting.

• It was also noted that there were several inconsistencies in attempting to

reconcile the loan register to the approved loan application forms examples of

which are summarized below;

Name of recipient Details on application form Details in loan register

Bilah Wanzababa Ushs 70,000 for 1 month Ushs 100,000 for 4 months

Nataka Milton Ushs 200,000 for 1 month Ushs 200,000 for 4 months

Naboko Kadija Ushs 50,000 for 2 months at 6% per

month No record seen

• Generally, poor record keeping practices were noted characterized by poor

filing of loan records. Tracing a disbursement right from origination (loan

application form) to signing of a contract and eventual disbursement proved

futile.

Failure the properly track loans disbursed reduces chances of recoveries and may

result in financial loss to the SACCO. This in turn affects its ability to continue

operating.

Management responded that the programme will undertake continuous education

and mentoring to address the audit concerns.

The above actions are awaited.

(h) Insufficient staffing

It was noted that some SACCOs did not have adequate staffing to ably perform

the tasks of accepting deposits and advancing micro loans from and to the

members respectively since they operate as village banks. This was especially the

case for SACCOs such as Butonde and Kubumbu that have only two staff; a

manager and a cashier either of whom acts as a loans officer from time to time.

Page 77: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

65

There were also SACCOs like Bungokho Fukirisa that did not have a security

guard.

The inadequacy of the staff numbers mean that certain activities are neglected

thereby hindering the growth of the SACCO such as mobilization of members and

loan recoveries.

Management explained that staffing decisions are normally SACCO specific

responsibilities but RFSP through its implementing agencies will continue

encouraging SACCOs to adopt best practices that are suited to their individually

unique environments.

I advised management together with implementation agencies to sensitize the

SACCOs on the benefits of having adequate staffing and its link to growth and

sustainability.

4.18 CREDIT REFERENCE BUREAU DISPOSITION FUND – BOU

(a) General Standards of Accounting and Internal Control Systems

A review was carried out on the project‘s financial management system. It was

noted that management had instituted adequate controls to manage project

resources except for the following matters;

i) Bank reconciliation statements

It was noted that bank reconciliation statements for both special accounts; that is,

the dollar and Shilling accounts are not prepared on a monthly basis. There is

therefore a risk of errors and frauds going unnoticed on the project‘s bank

accounts.

Management explained that the reconciliation of the KfW CRB Special accounts is

done periodically when accounting for utilized funds. KfW replenishes funds based

on funds spent as required in the Separate Agreement signed between KfW,

MOFPED & BOU. Nevertheless, BOU would henceforth prepare monthly bank

reconciliation statements for both special accounts.

Page 78: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

66

I advised management to ensure that bank reconciliation statements were

prepared and reviewed by a senior independent person who should evidence this

by a signature.

Page 79: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

67

ii) Payment vouchers

It was noted that although some of the supporting documents to the payments

made during the year were stamped ―PAID‖/‖EXECUTED‖, the invoices and

receipts from Compuscan and claim letters from the participating institutions were

not and yet these are some of the major requirements for the claims to be

reimbursed. Unless this is done, the project risks these support documents being

used for double payment and there may be contention at the time of

reimbursement.

Management assured us that the accounts department would ensure that all

supporting documents to the payments made are stamped ―PAID/EXECUTED‖.

I advised management to ensure that all the accompanying support documents to

payments should be cancelled or stamped ―PAID‖/‖EXECUTED‖ to deter reuse.

4.19 PRIVATISATION AND UTILITY SECTOR REFORM PROJECT OPERATIONS

ACCOUNTS

(a) Human Resource Management

i) Vacant posts

It was noted that the entity had 48 approved posts out of which 36 (75%) were

filled and 12 (25%) were vacant. Some of the vacant positions included the one

of Chief Accountant (Head of Finance). Inadequate level of staff affects service

delivery.

The Accounting Officer explained that the Ministry halted recruitment in order to

undertake consultations on the restructuring and or, realignment of PU to manage

PPP initiatives. The PPP Bill which has since been forwarded to Parliament.

Page 80: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

68

I advised management to liaise with the responsible authorities to ensure that the

vacant posts especially the key ones are filled.

ii) Lack of internal audit department

Best practice requires an organization to have an internal audit unit to assess and

recommend on the organization internal controls. However it was noted that the

entity does not have this unit. The risk is that checks and balances with the

organization systems were not effectively carried out.

Management explained that they are consulting with MoFPED on how to resolve

the matter.

I urge the administration to consider establishing an internal audit department in

the organization.

iii) Failure to conduct staff appraisals

Sections 10 to 18 (A –m) of The Uganda Public Service Standing Orders, January

2010 requires the staff to be apprised annually. Contrary to the above sections of

the Uganda Public Service Standing Orders, a review of staff files revealed that the

staffs of the entity were not appraised during the calendar year 2012. Failure

to undertake staff performance appraisals hinders measurement of performance of

staff and the related decisions on promotions and dismissal.

Management explained that appraisals were not conducted due to staff continuity

uncertainties.

I advised management to ensure that staffs are periodically appraised.

(b) Doubtful fuel consumption

Section 40(1) of the PU guidelines requires that all PUSRP staff shall be entitled to

the use of pool vehicles only while on PUSRP work wherefore the requisition of

vehicle shall be authenticated by the relevant head of department and shall clearly

state the purpose of the journey, destination and duration of the journey. Contrary

Page 81: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

69

to this, Shs.16,031,025 was consumed at various shell service stations across the

country without the users showing the purposes, destinations and duration of the

journey and without producing activity reports to justify the consumption of the

fuel. There is a risk that the fuel was used for private purposes.

I advised management to follow guidelines as and when fuel requisitions have

been entered. Fuel consumed should be accounted for or recovery measures be

instituted.

(c) Lack of approved annual training program

Section 15 (4) (a) of the PU staff guidelines requires that management shall

prepare an annual training program which shall be submitted to the Permanent

Secretary/Secretary to the Treasury (PS/ST) for approval and that all subsequent

changes shall be subject to further approval from the PS/ST in accordance with

the project implementation manual. Furthermore, Section 15 (5) (a) requires that

at the beginning of each calendar year, the administrative officer in collaboration

with the project director/heads of departments, shall be responsible for designing

and preparing an integrated annual training program as per training guidelines in

place based on the training and development needs for the PUSRP and its

contracted staff as identified in the annual staff evaluation confidential reports.

Contrary to the above sections Shs.71,242,291 was spent on training in Public

Private Partnership of PU staff without an approved annual training program.

There was no prior annual training program prepared by management and

submitted to PS/ST. There is a risk that the training undertaken was not beneficial

to the entity and the individual staff.

It was explained that expedited interim PPP training was undertaken on an adhoc

basis mainly to prepare for the transformation of PU into a PPP agency.

I advised management to undertake training needs assessment to enable proper

training plans to be prepared and accordingly seek approval from the authorities

as required by the guidelines.

Page 82: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

70

(d) Repairs not supported by pre and post inspection repair reports

Payments worth Shs.34,960,341 for motor vehicle repairs were not supported by

pre inspection and post repair inspection reports. In absence of the inspection

assessment reports it was difficult to confirm whether the vehicles required the

necessary repairs and that the repair works were duly undertaken.

I advised management to ensure that all vehicles due for repair are subjected to

pre and post repair inspections.

5.0 DEPARTMENT OF ETHICS AND INTEGRITY

5.1 Mischarged Expenditure-Shs.753,056,165

The Parliament of Uganda appropriates funds in accordance with the needs of the

country and this appropriation is implemented through the budget in which funds

are tagged to particular activities and outputs using account codes and MTEF

codes. A review of the Directorate‘s expenditures revealed that the entity charged

wrong expenditure codes to a tune of Shs.753,056,165. Such a practice is contrary

to the intentions of the appropriating authority and leads to incorrect financial

reporting.

The Accounting Officer attributed this to inadequate budget on some codes and

yet work had to proceed. Management also attributed the problem to the

delinkage between IFMS and output budgeting.

I advised management to desist from such a practice and always request for

reallocations or virements, as provided for under the TAI. I also advised

management to contact the Accountant General to resolve the delinkage.

5.2 Funding gap-Shs.281,287,468

According to the statement of appropriation account based on services voted by

Parliament, the Directorate had budgeted to receive transfers from treasury worth

Shs.4,228,503,691 but only Shs.3,947,216,222 was received, creating a funding

gap of Shs.281,287,468. The shortfall directly affected the procurement of

Video cameras, still cameras, soft wares, boxes of CDS, wireless routers,

network switches and voice recorders to facilitate investigations

Page 83: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

71

Conclusion of the National ethical value policy for ethical direction and

management

L.C bill to guide operations and management of Local Councils and

Printing of corruption bill to disseminate to various stake holders which were

planned but were never procured as per the procurement plan.

The Accounting Officer explained that the PS/ST had been requested to provide

explanation for the funding gap but no response had been received.

I advised management to continue liaising with Treasury for purposes of ensuring

the appropriated resources are released.

5.3 Human Resource Issues

(a) Vacant positions

A review of the Directorate approved structure/establishment indicated that

whereas 54 posts were approved, only 43 had been filled by the year-end leaving

11 vacant posts unfilled. The most affected departments were the information

centre and the legal department as indicated in the table below.

Post Tile Approved Filled Vacant Salary

Legal Department

Commissioner Legal Services 1 0 1 UIE

Legal Officer 2 0 2 U4

Information Center

Principal Information Scientist 1 0 1 U2

Communications Officer 1 0 1 U3

Information Scientist 3 2 1 U4

Lack of such essential staff may negatively impact on the entity's service delivery.

The Accounting Officer explained that the delay in recruitments was caused by

lack of the Public Service Commission in place.

Page 84: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

72

I advised management to liaise with the responsible authorities and ensure that

the key vacant posts are urgently filled.

(b) Irregular payment of allowances

Monthly top up allowances amounting to Shs.247,786,000 were paid to entity staff

on a monthly basis. These payments are irregular because they are not supported

by any administrative circular or standing order instruction from the ministry of

public service. In addition, PAYE deductions were not effected.

The Accounting Officer explained that the payments were to minimally meet the

daily cost incurred by staff such as lunch, transport, telephone and overtime.

I urged management to seek authority from Public Service before such payments

are made.

5.4 Un-accounted for fuel funds deposited with Standard Chartered Bank

Shs.96,000,000 was deposited with Standard Chartered Bank through advantage

card system to cater for official fuel and motor vehicle servicing as per details in

the table below:

Invoice Description /Purpose Amount Supplier

R 0101/8

Fuel Advance for the 1st

qtr 21,000,000

Advantage Card

Disburse

R 054/11

Operational fuel

expenses for DEI 20,000,000

Advantage Card

Disburse

R 171/11

Operational fuel

expenses for DEI 10,000,000

Advantage Card

Disburse

R 025/02

Fuel Advance for Jan.

2013 45,000,000

Advantage Card

Disburse

96,000,000

The following were observed:

Copies of fuel orders to the supplier and supporting fuel consumptions

statements from the bank were not availed for audit verifications.

Beneficiaries staffs, breakdown of the entitled amount, purpose and vehicles

that consumed fuel were not availed too.

Page 85: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

73

I could not confirm that the fuel was served to only entity vehicles and used for

official purposes.

I advised management to trace the fuel accountabilities for future use or recovery

measures be instituted.

WORKS AND TRANSPORT SECTOR

6.0 MINISTRY OF WORKS AND TRANSPORT

6.1 Advances to Individual Personal Accounts - Non Compliance with

Treasury Accounting Instructions – Shs.1,247,860,600

Sections 227, 228 and 229 of the Treasury Accounting Instructions (TAIs),

provides that all payments should be made by the Accounting Officer directly to

the beneficiaries. Where this is not convenient, an imprest holder should be

appointed by the Accounting Officer with the approval of the Accountant General.

On the contrary, Shs.1,247,860,600 was advanced to Ministry staff through their

personal bank accounts during the year to undertake direct procurements and

other activities of the Ministry. I explained to management that such a practice of

depositing huge funds on personal accounts exposes Government funds to risk of

loss since the Ministry does not have any control over such funds deposited on

personal accounts.

In response, management explained that this has since stopped following the

PS/ST‘s communication to the Accounting Officer.

I urged management to continue adhering to the instructions.

6.2 Losses reported

Shs.932,773,100 was reported as losses at the end of the previous year. The

amount comprised of Shs.571,007,200 in cash losses and Shs.361,765,900 in

stores. The cash losses remained outstanding even at the end of the current year.

Page 86: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

74

In response, management explained that the case is before courts of law. I await

the outcome of the court process.

6.3 Mischarge of Expenditure – Shs.118,176,248

The Parliament of Uganda appropriates funds in accordance with the needs of the

country and this appropriation is implemented through the budget in which funds

are tagged to particular activities and outputs using account and MTEF codes. A

review of the Ministry‘s expenditures revealed that wrong expenditure codes to a

tune of Shs.118,176,248 were wrongly charged on budget lines to fund activities

that were not meant to be paid from the affected budget lines. This practice

undermines the importance of the budgeting process as well as the intentions of

the appropriating authority and leads to incorrect financial reporting.

Management was advised to request for reallocations before such payments are

incurred as provided under the TAI.

6.4 In adequately Supported Expenditure- Shs.304,731,200

Funds amounting to Shs.304,731,200 were subvented to Ntungamo District Local

Government for emergency repairs of Ahakabale bridge and rehabilitation of some

roads. However, by the time of this report, the accountabilities for the funds had

not been received. In the circumstances, I was unable to confirm whether the

funds were utilized for the intended purpose.

In response, management explained that the accountabilities had not been

submitted to the Ministry despite several reminders to the Accounting Officer of

the District. I advised management to ensure the funds are accounted for.

6.5 Budget Performance

a) Underperformance

Out of the total approved budget of Shs.104,741,368,124 for the year,

Shs.75,384,591,639 was released translating into 71.9%, leaving a total of

Shs.29,356,776,485 (28%) un released.

Page 87: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

75

The entity had a total operating revenue of Shs.76,692,469,139 including NTR of

Shs.1,307,877,500. As at 30th June, 2013 funds to the tune of Shs.5,456,807,327

including Gross tax balance of Shs.2,790,628,441 remained un utilized translating

into underperformance. Despite the availability of the above funds, I noted that a

number of key activities were not undertaken as highlighted below:

Procurement of land for the vehicle master testing center and the heavy

vehicle inspection lane.

Procurement of the drilling rig under Development and strengthening Quality

Management and

Renovations of upcountry laboratories.

In response, management explained that this happened due to procurement

related challenges. As a measure, management indicated it has developed a

monitoring and evaluation framework for monitoring sector performance.

I await the outcome of management‘s commitment.

6.6 Culverts loaned to UNRA

During the mid-year rainy season of 2012, most of the bridges in Karamoja region

were washed away and this necessitated emergency repairs. A decision was made

that UNRA carries out emergency repairs of the Bridges on Force Account basis. It

was observed the type of culverts that were technically required for the works

were only available in the Ministry stores and therefore the Ministry loaned UNRA

the culverts to carry out the works.

Verification of stores ledgers revealed that culverts worth Shs.316,000,000 which

were loaned to UNRA way back in 2012 had not been returned as detailed below:

Size Quantity

Issued

Date Station destined for Remarks

2100MM 66 M 31/8/2012 UNRA Karamoja Region

2500MM 88 M 31/8/2012 UNRA KARAMOJA

1500MM 110M 31/8/2012 UNRA KARAMOJA

1500MM 36 M 7/9/2012 EXEC. Director UNRA (Awoja Bridge)

2100MM 16M 24/4/2013 NYANSOZI-IBOROOGA However the

Page 88: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

76

RD, F.Portal (Road under

Kabarole District Local

Government

requisition from the

station Engineer Fort

Portal to the regional manager (West)

quotes 600mm diameter and not

2100m. Despite the issue of

16m culverts, it was

noted that a payment was made on

D449/4/13 ON EFT 2512888 of UGX.

77,663,000 being a full

payment inclusive of the culverts.

Management explained that UNRA is in the process of procuring the culverts and

delivery is expected in May 2014.

I advised management to follow up the matter and ensure full recovery of the

culverts.

6.7 Procurement of ferries and construction of landing sites

Office of the Prime Minister (OPM) released a sum of Shs.8,600,000,000 in

financial year 2011/2012 to Ministry of Works for procuring two (2) ferries and

construction of two(2) landing sites at Lakes Bisina and Kyoga. By end of the year

(30th June 2012), one (1) ferry had been procured and delivered to the Chief

Mechanical Engineer, MoW. A balance of Shs.5,245,466,352 remained unspent on

the account. No evidence was provided on how the funds were utilized during the

year. I was unable to confirm the utilization of the funds.

Management explained that one ferry was procured for Lake Bisina. Management

further explained that the procurement of the second ferry and contractors to

construct the landing sites was unfortunately mired by the procurement processes.

The process also affected the procurement of the consultant for the construction

supervision and as a result, there was low absorption of funds.

I advise management to implement activities as planned.

Page 89: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

77

6.8 Payments not Acknowledged by URA – Shs.296,696,703

It was noted that the Ministry withheld PAYE from the employees and WHT from

suppliers/contractors totalling to Shs.296,696,703 however, there was no evidence

to prove remittance. In the circumstances, I was unable to confirm whether the

funds reached the intended beneficiary.

I advised management to always comply with the tax law.

6.9 Lack of Technical Support and Guidance on Repair of Vehicles to Various

Ministries

Treasury Accounting Instructions section 816 requires a Government entity to

maintain an operating records/register for each vehicle to record its history,

performance, servicing, overheads and repairs among other things, in sufficient

details for periodic assessments to be made of its performance compared to its

cost of up keep.

During the year, various Ministries, Departments and Agencies (MDAs) paid out

funds to service providers and staff in respect of repairs and servicing of vehicles.

A review of the transactions revealed the following anomalies:

The MDAs did not have a policy on fleet management to provide guidance to

the Transport officer.

There were no internal mechanisms in place for a competent Engineer to carry

out internal assessments of vehicles that are due for repairs.

Repair needs were based on the assessments done by the respective drivers

which should not have been the case.

In very few instances, pre and post vehicle inspections were done by a

seconded engineer to confirm that repairs are done as specified in the repair

orders; instead it was the senior driver who confirmed the repairs done.

No maintenance charts were used to show the history of the repaired and

serviced vehicles.

The Ministry of Works provided limited technical support to the MDAs.

No guidelines been developed to provide guidance/standards for the repairs.

Page 90: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

78

It was also noted that at the Ministry of Works as an entity there was lack of

motor vehicle documented procedures and operating records and inadequate

guidance on repairs and servicing of vehicles. As a result, Shs.475,167,710 spent

by the Chief Mechanical Engineer was not supported with pre and post inspection

certificates for the serviced vehicles. Lack of segregation of duties in the process

of purchase of spares and repair of motor vehicles was also noted. I could

therefore not confirm the authenticity of the expenditure on the repairs and

servicing in absence of certificates or inspection reports.

I explained to management that in the absence of a proper motor vehicle system,

I was unable to verify the authenticity of repairs done. Funds may be lost through

recycling vehicles for similar repairs.

Management explained that the Ministry in conjunction with the Ministry of Public

Service is reviewing the entire motor vehicle repair and maintenance guidelines

that will ensure proper control of the repair and maintenance of the Government

fleet. I advised management to expedite the review process and have the

guidelines in place.

I advised management to expedite the process and have the policy guidelines in

place. This should be able to guide the users on the extent to which the MDA

attached engineers should be verified.

a) Lack of Segregation of duties

Lack of segregation of duties in the process of purchase of spares and repair of

motor vehicles.

In response, management explained that the Ministry is reviewing the entire

process of vehicle service/repair and developing guidelines that will ensure proper

control of Government fleet maintenance/repair activities.

I await the outcome of management commitment.

Page 91: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

79

6.10 Inspections

I carried out inspections to a number of institutions that support the entity and the

following were noted;

a) MT. Elgon Labour Based Training Centre (MELTEC)

Mt. Elgon Labour Based Training Centre was inspected and below are the findings:

i) Failure to Implement the Business plan

A local company entered into an agreement with the Centre for the consultation

and preparation of a four year business plan (2012-15) and the company was paid

Shs.49,995,000 for the consultancy. I noted that the Business Plan was completed

and handed over to the centre but the MOWT has never approved the plan. I

explained to management that operating without a business plan indicates that

the centre is operating without defined strategic objectives which could

demotivate interested funders/donors to the centre. At the time of reporting, the

plan was remaining with two (2) years for implementation. Delay in approving

this plan could be the likely cause of waste of government funds.

Management explained that the consultant submitted the Business plan which was

presented to the technical team for final review before approval by the Ministry‘s

Top management.

I await the outcome of management commitment.

ii) Unpaid Fees – Shs.26,000,000

It was noted that some of the Districts and Companies‘ engineers sent for training

had not cleared all the school dues by the time of this report (March 2014) totaling

to Shs.26,000,000. Some of them trained way back in 2009. The chances of

recovery appear to be remote.

In response, management explained that concerted efforts were made to recover

the monies, via reminders clearly reiterating the stand that training certificates are

Page 92: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

80

only issued to those fully paid up. Management indicated they will continue

pursuing the matter until all outstanding dues are recovered.

I await for the outcome of the management commitment.

iii) Obsolete Stock

It was noted that the station has obsolete stock in form of accumulated scrap.

This included; old vehicles and equipment in form of used spare parts which are

overdue for boarding off. This consumes space that would otherwise be used for

other useful stock (new/useful equipment) causing unnecessary congestion in the

store. Besides, the prolonged storage leads to further deterioration of old

equipment which denies the entity economic benefits that would accrue from an

early disposal. I further noted that ownership of some of the old vehicles that

were handed over to the Ministry by DANIDA had not been transferred to the

Ministry of Works though the centre was in possession of the Log books. I

explained to management that the Ministry could face challenges when it comes to

boarding off these assets.

In response management explained that a comprehensive list of items

recommended for boarding off had been prepared ready for the disposal process.

I await the outcome.

b) Gulu Regional Mechanical Workshop

i) Lack of land title for the office block

It was noted that the Ministry was carrying out the renovation and remodeling of

the office buildings as evidenced by the pictures below:

Page 93: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

81

However during the review, I noted the following anomalies;

The regional workshop offices are shared between Gulu Regional Mechanical

Workshop and Uganda National Roads Authority- Gulu Station and there is no

demarcation of land or buildings between the two entities;

None of the two entities has a land title to the land where the offices are

located. I could not establish whether the land in question is for Ministry of

Works and Transport or Uganda National Roads Authority or Gulu District.

I explained to management that renovation and remodeling of the office buildings

without land titles pose a risk of loss of funds in the event that ownership is

contested.

In response, management stated that the Office of the President (OP) took note of

the problem under the auspices of the Steering Committee of Inspection Agencies

spearheading the exercise to survey and title all Government Land.

I advised management to follow up the matter with OP and have the proper

demarcation of land to enable the process of acquisition of titles.

c) East African Civil Aviation Academy

i) Lack of a Stand by Generator at the Academy

It was noted that during the financial year 2011/2012 the Ministry supported the

Academy by rehabilitating the buildings and installing a Simulator. The Simulator is

used to train Pilot students before carrying out actual flight lessons. However

during the review, I noted that there was frequent power disruption that may

affect the performance of the machine and this may be costly to the Academy if

the machine is damaged because of power disruptions. I explained to

management that lack of a stand by generator results into the Academy going into

black out which may lead to damaging the expensive equipment.

Management acknowledged the challenge and indicated that a stand by generator

for the Academy has been budgeted for in the FY 2014/2015.The outcome of the

above action is awaited.

Page 94: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

82

ii) Maintenance of a Fixed Assets Register

In the previous audit report of the financial year 2011/12, it was noted that the six

recently acquired Airplanes, operated and maintained by the Academy were not

properly posted in the Fixed Assets Register. These were: 5X – KYO, 5X – SRI, 5X

– VIC, 5X – ELG, 5X – RWE, 5X – CEA all of Model Cessna 1725 acquired during

2010. The following were noted:

No acquisition cost was attached to each aero planes acquired.

The accumulated depreciation and depreciation rates were not provided for.

The Assets Register did not show the maintenance costs of the assets since

acquisition.

I explained to management that failure to consider the above could lead to

challenges in estimating the life span of the aircrafts.

I advised management to liaise with the Accountant General for guidance on

preparation of a fixed asset register.

d) Bugembe Mechanical Workshop

i) Obsolete stock

It was noted that the workshop had obsolete stock which was overdue for

boarding off. Inspection of the stores revealed that most of the stock was scrap

and not operational as indicated in the schedule below:

ITEM (Obsolete Stock) Serial Number STATUS

1 MTS Cargo Truck UG 045OW Scrap

2 Pick UP UG 0778W Scrap

3 KMTSU – Motor Grader UG 0782W Scrap

4 Isuzu Pick Up UG 0810W, UG0812W,

UG0814

All Scrap

7 Trax-Cavator UG 0823W Scrap

8 Mercy Fugerson Tractor UG 0830W Scrap

9 Mercy Fugerson Trailer UG O831W Scrap

10 MTS –Crane Truck UG 0833W Not operational

11 MTS- Dump Truck UG0880 W Not operational

12 Isuzu Station wagon UG 0907W Not operational

13 MTS- Station Wagon UG 0927W Not operational

14 Komatsu Motor Grader UG0303 W Scrap

Page 95: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

83

15 Shibaura .Wheel Tractor UG0304W Not operational

16 Low loader Nissan Diesel UW1321 Not operational

17 Yamaa 175 Motor Cycle ( 9 of them) UG 0981W, UG 0982W, UG

0983W, UG0984 W, UG

0992W, UG 0994W, UG

0996W, UR0353, UG1000W

Scrap

26 Monitor and key Board AP64005 Not Operational

28 Printer P14PA Not Operational

29 Type Writer -Electric Not Operational

30 Printer 102567 Not Operational

31 Monitor 63TT130154253 Not Operational

32 Key Board 6531331 Not Operational

33 CPU 55-0162152 Not Operational

34 Monitor 1751402 Not Operational

35 Stabilizer AM63FAM Not Operational

36 Stabilizer SVR-600ND Not Operational

37 Pager Telephone 2pcs Not Operational

38 Micrographics 3601 Not Operational

39 Printer XA1425888 Not Operational

40 UPS PLUS 650 Not Operational

41 Printer XAL2424624 Not Operational

42 Switch Board with 3 receivers SW/BPX2/2B MICI Not Operational

43 Assorted Tyres 168 Used

I explained to management that the old stock occupies the storage space that

would otherwise be occupied by the useful/new stock posing challenges to the

mechanical workshop staff in execution of their duties. Besides; the more the old

stock is kept, the more obsolete it becomes and hence loss of economic benefits

to the Ministry that would accrue from early disposal.

Management explained that the list of items to be boarded off has already been

compiled, awaiting constitution and advice of the board of survey.

I await the outcome of management‘s commitment.

Page 96: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

84

ii) Unfilled Posts

It was noted that some posts including stores clerk, senior mechanic, driver and

security guard were vacant. I explained to management that the vacant posts

create a vacuum in the daily operations of the mechanical workshop that could

result into poor performance, hence non-fulfilment of the workshop objectives.

In response management explained that the Ministry has initiated a recruitment

process to fill the vacant posts.

I await the outcome of management‘s commitment.

(i) Human Resource Matters

(i) Vacant posts

Following the creation of the Uganda National Roads Authority in 2008, a number

of employees transferred their services from the Ministry of Works and Transport

to the new organization. This led to the restructuring exercise in the MOWT by

Public Service Commission where in its 2009 report it recommended that the

established posts be reduced from 718 to 582. A review of the

establishment/Staff List for the period ended June 2013 indicated that 198

approved established posts were still vacant at the time. I noted that some of the

vacant posts relate to critical areas in the operations of the Ministry, hence leaving

them vacant is likely to affect the general performance of the Ministry.

The vacant posts were submitted to Public Service Commission and so far thirty

seven (37) posts have been filled. In addition, the Ministry of Public Service has

cleared sixty six (66) vacant posts awaiting constitution of the Commission.

The continued existence of vacant posts at senior levels is due to the fact that the

Ministry has experienced challenges in attracting suitable candidates for technical

posts such as engineers and surveyors at the level of Director, Commissioner,

Assistant Commissioner and Principal Officer level.

Page 97: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

85

I advised management to take up the matter with appropriate authorities to

ensure the vacant posts are filled.

(ii) Over establishment

I noted an over establishment of 106 posts in the entity. While the restructuring

report indicated a maximum of 582 posts, the staff list had 688 posts.

I informed management that the Ministry is likely to pay for services of redundant

personnel.

Management explained that the over establishment was a result of inclusion of

staff of the East African Civil Aviation Academy - Soroti.

I advised management to harmonize the staffing position in line with the

Restructuring Report.

e) Engineering Audits

A sample of four civil projects was selected for technical /engineering audit. The

projects selected included:

(i) Upgrading works on Kakungulu Roads-Phase II from km 0+000 - 1+400

(1.4km) and km 2+400 to 3+300 (0.9km)- Total Length 2.3km

(ii) Construction of Agule Ferry Landing Site in Kumi District

(iii) Construction of Okokor Bridge in Kumi District

(iv) Construction of Nyagak Bridge in Zombo District

Below is the summary of key findings arising from the Engineering Audit:

6.11 Irregular payments (UGX 418 ,234,691)

It was noted that in some cases, payments made for quantities in the BoQs were

in excess of the approved quantities and for works not yet executed. A total of

Shs.418,234,691 was paid in respect of these anomalies as explained below;

Page 98: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

86

a) Excess payment (Shs.371,423,580)

For Nyagak Bridge, the contractor was advanced Shs.495,231,440 instead of the

guaranteed Shs.123,807,860 hence an excess payment of Shs.371,423,580. This

created a risk of losing the money to the contractor who had done no work and

only guaranteed a lower amount. This amounted to pre-financing the contractor

contrary to the contract conditions.

b) Over payments (UShs.43,100,000)

An overpayment of Shs.43,100,000 was made to the contractor for Okokor Bridge

However, there was no evidence to show that efforts had been made to recover

the amounts as works had been abandoned by the contractor.

c) Payment for excess quantities (Shs.3,711,111)

It was observed that some items in the BoQs for Agule Ferry Landing site were

overpaid with the biggest items being for the passenger shed.

The Accounting Officer should ensure that the irregular amounts paid are

recovered from the parties responsible.

6.12 Abandoned works

During the inspection of Okokor bridge site, it was observed that the works had

stalled following the abandonment of works by the contractor; access to the actual

construction site was not possible since the diversion had cut off the bridge site

from Kumi side. In addition, the Embankments at the diversion had begun giving

way posing a risk to the pedestrians. The Ministry had since repossessed the site

without terminating the contract.

The Accounting Officer explained that the Ministry was preparing final accounts in

order to have the works repackaged.

It is recommended that the Ministry considers termination of the contract in

accordance with the contract provisions and safety risks on the abandoned site

rectified.

Page 99: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

87

6.13 Quality of works

Generally, the overall quality of the works on the projects audited varied from

good to poor. Despite the acceptable quality of concrete at Nyagak Bridge, it was

hard to differentiate the free end of the bridge from the fixed end of the bridge.

The alignment of the weep holes on the abutments and the deck drainage pipes

were not done according to the drawings. For Okokor Bridge the Embankments at

the diversion had begun giving way and there were cracks in the diversion

embankment beginning to manifest.

The Ministry should put in place sound quality control mechanisms, to ensure that

the defects relating to Okokor and Nyagak Bridges are rectified. For Nyagak

Bridge, the Ministry should carry out an as-built design of the constructed facility.

In addition contractors who persistently perform substandard work should be

penalized in accordance with the contract provisions and also reported to PPDA for

appropriate action.

6.14 Supervision and Contract Management

There were weaknesses noted in supervision of some aspects of the projects that

were reviewed.

For Okokor Bridge, whereas there were correspondences pertaining to

repossession of site by the Ministry, actual take over was not demonstrated.

For Nyagak Bridge, some aspects of the civil works were not in accordance

with the approved design drawings and there was also lack of quality

assurance in the reporting. For example, notably guard rails were reported as

handrails.

For Agule Ferry Landing Site, the contract periods for both the contractor and

consultant had long expired without formal extensions yet the works were on-

going and still being supervised by the same consultant.

The Accounting Officer should ensure that projects are supervised properly and

contract management effectively carried out; termination of Okokor Bridge

contract should be considered and safety risks addressed; cost implications of

Page 100: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

88

revised designs for Agule Ferry Landing site should be comprehensively studied to

avoid a scenario of failure to complete works due to insufficient funds.

6.15 Summary of Key Findings per Project

The key findings for each of the projects audited are presented in the table below

Road Project/

Contractor

Amount

Key findings

Construction of Agule Ferry

Landing site in Kumi District

at

UGX 1,653,530,183

Consultancy is shorter than the works contract The Terms of Reference of the consultant do not cover the defects

liability period. Works still on-going, despite expiry of the contract completion date

without formal extension of the contract and consultancy periods.

A significant component of the works being implemented is different from what was designed.

Payment had been made for lime stabilised base material yet the works were still at sub-base level.

Construction of Okokor

Bridge in Kumi

District

Abandoned and Inaccessible bridge construction site, The embankments at the diversion were beginning to give way posing

a safety risk to the pedestrians. In addition, it was difficult for the

locals to cross the diversion while carrying heavy loads In the Auditor general‘s reports, it was reported that the contractor

had been overpaid by UGX 43,100,000. There is no evidence that efforts to recover this money have been made yet the works were

abandoned by the contractor.

Whereas there were correspondences pertaining to repossession of site, actual take over was not demonstrated.

Upgrading of

Kakungulu Estate Roads-

Phase 2 UGX 1,659,975,900

Localised edge failures, loose chippings on access roads, localised

excess bitumen and unsealed edges. There is a possibility of traction problems along some sections of the road.

A section of silted drain and a few cracked culverts

Construction

of Nyagak Bridge in

Nyapea Sub-

county, Zombo Disrict.

UGX 619,039,300

Noncompliance with procurement regulations i.e. PP Form not used,

gaps in evaluation and absence of key documentation on procurement file,

The contractor was advanced UGX 495,231,440 instead of the guaranteed UGX 123,807,860 hence an excess payment of UGX

371,423,580. This created a risk of losing the money to the contractor who had done no work and only guaranteed a lower amount.

The beam depth from the bottom of the deck (down stand) was

realised to have a lower depth of 260mm compared to the required 500mm. The deck was also found to be thicker than the required

depth of 250mm i.e. 750mm. This increase in deck depth implies an increase in dead weight which might have not been catered for in the

design.

Page 101: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

89

6.16 EAST AFRICA TRADE AND TRANSPORT FACILITATION PROJECT

(EATTFP)

(a) Compliance with the Financing Agreement and Government of

Uganda Provisions

A review was carried out on the project compliance with the credit agreement

provisions and GoU financial regulations and it was noted that the project

complied in all material respects with the provisions in the agreement and applied

GoU regulations except in the following matter;

i) Unreleased Project funds

During the year under review, Government of Uganda was expected to contribute

counterpart funding amounting to Shs.2,160,000,000. However, only

Shs.1,549,516,666 was received leading to a shortfall of Shs.610,483,334 (28%). I

explained to management that the shortfall in funding could affect implementation

of planned activities that translates into failure to achieve the project objectives.

In his response, the Accounting Officer attributed that the shortfall to budget cuts

by the Ministry of Finance, Planning and Economic Development (MoFPED) during

the year. The Accounting Officer also indicated that a letter had been written to

MoFPED requesting for additional funding to the project during FY 2013/14 so that

implementation of project activities is not impeded.

I advised management to closely follow up on the matter to ensure the required

resources are provided.

(b) Project implementation

i) Budget Performance

It was noted that out of the total budget of Shs.15,206,457,000, only

Shs.2,801,416,177 was spent translating into 82% underperformance during the

year. Further, actual expenditure amounted to only Shs.2,801,416,177 against

receipts of Shs.4,757,394,295. I explained to management that failure to execute

activities as per the set targets could lead to failure to achieve the project

objectives within the stipulated project period.

Page 102: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

90

In his response, the Accounting officer explained that underperformance was

attributed to delayed procurements for the construction of One Stop Border Post

(OSBP) facilities at Malaba, Busia, Katuna and Mutukula border posts which

constitutes over 60% of the total credit amount. The civil works contracts for the

construction of OSBP facilities were awarded at the beginning of FY 2013/14 and

civil works are on-going which is believed will boost project budget performance

(both GOU and IDA) to over 90% during the period 2013/14.

I advised management to ensure implementation of the outstanding activities is

carried out within the remaining project time to avoid project extension costs.

ii) Inspection of Inland Container Depot –Mukono construction

works

The contract for construction works of the Railway Inland Container Depot (ICD)

at Mukono was awarded to M/S China Jiangi Corporation for International

Economic and Technical Cooperation at a contract sum of USD 8,688,112.11.

Contract commencement date was December 10th 2012, for a period of one year.

Inspection of works in October 2013 revealed the following:

a. Delayed construction activities

It was noted that 80% of the construction period had elapsed yet physical work in

progress was estimated at only 30.22%. The expected date of completion had

been set for 10th December 2013. There was a delay in implementation of this

activity.

In his response, the Accounting Officer attributed the slow progress on the

following:

i) Delay by the contractor to submit an acceptable bank guarantee which was a

pre-condition for contract effectiveness that resulted into late commencement

of civil works in April 2013;

ii) The original contract that suffered an arithmetic error and excluded provisional

sums and contingency that led to loss of time during the process of amending

the initial contract to include provisional sums and contingency;

Page 103: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

91

iii) The contractor having received an interim order from the Chief Magistrate‘s

Court of Mukono stopping the demolition of the existing ware houses allegedly

owned by Mukono District Council that resulted into partial possession of the

site by the contractor which affected his program of work; and

iv) The poor weather that could not favour the construction especially during the

months of March, April and October 2013, which affected the program of work.

The Accounting Officer further clarified that the contractor applied for a time

extension of 6 months (up to 10th June 2014) to enable completion of the works.

The outcome from the above action is awaited.

b. Land wrangles between URC and Mukono MDA

It was observed that the structures (old warehouses) on site that were supposed

to be demolished in order for the contractor to fully take over the site were not

demolished. This did not occur due to the reported land wrangles between Uganda

Railways Corporation (URC) and Mukono District Administration (MDA). I explained

to management that this was a limitation to the contractor‘s work and a setback to

project completion.

The Accounting Officer explained that the contractor had commenced on

demolition of the existing warehouses to pave way for construction of verification

shed for loose cargo but demolition was halted by MDA claiming ownership of the

structures. In the meantime, the legal teams of URC and MDA are working

together for an amicable solution to resolve the matter.

The outcome of management commitment is awaited.

Page 104: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

92

7.0 UGANDA NATIONAL ROADS AUTHORITY

7.1 Valuation of Fixed Assets – Shs.7,656,068,462,696

It was noted that the fixed assets disclosures as reflected in the financial

statements was based on the Uganda Road Agency study of 2012 which did not

reflect the fair position of the assets contrary to the requirements of IAS 16 that

requires property, plant and equipment to be re-valued with sufficient regularity.

Accordingly the assets were not fairly stated.

In response, management acknowledged the concern and explained that UNRA

took over the fixed Assets from the Ministry of Works and Transport included the

Assets in the Fixed Assets Register based on the historical values that were

reported in the Handover Report. However, a procurement of an Independent

consultant to verify and revalue these Assets has started and adjustments to the

Fixed Assets Register will be done when the Consultancy Report is concluded.

I have advised management expedite the revaluation exercise and have the issue

resolved.

7.2 Foreign Exchange Losses Shs.36,791,744,898

It was observed that the Authority incurred foreign exchange losses equivalent to

Shs.36,791,744,898 due to foreign exchange translations and currency

adjustments as at the end of the financial year contrary to sect.2 of the UNRA Act

2006 which requires management to conduct UNRA Affairs in a businesslike nature

and cost effective manner and in accordance with modern management practices.

I noted that UNRA does not seem to have tried to hedge against the risks of

foreign exchange transactions.

In response, management explained that although they would have liked to set up

a Treasury function and hedge against exchange movements in compliance with

the Act, this practice has been discouraged by the Ministry of Finance in a way

that it contravenes the Public Finance and Accountability Act 2003. They further

Page 105: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

93

indicated that with the current position of Treasury Single Account, there is no

provision for Hedging.

I advised management to work towards minimizing exchange losses through

application of best practices.

7.3 Non-performing contract for the supply of Ground engaging tools

A letter of credit (LC) was opened in favor of a local company towards the delivery

of ground engaging tools at a contract price of USD 177,713.00, out of which a

contract sum of US $ 124,399.10was paid leaving an outstanding balance of US $

53,313.90. Irrespective of the payment, supplies worth $ 102,644 were delivered.

It was observed that one of the three containers was reported lost at Mombasa

port hence delaying the delivery of the remaining quantities worth USD 75,070.00

as indicated in the schedule below:

Item Contract

quantity

Deliveries

made

Undelivered

items

Value of delivery

Cutting edge

5D -9558

1,200 pieces 810 pieces 390 $102,462

Bolt 3F -5108 17,160 pieces 120 pieces 17,040 $115

Nut 4K – 0367 17,160 pieces 120 pieces 17,040 $67

Total Total $102,644

Interview with management indicated that the supplier filed a case against Kenya

Revenue Authority and it was ruled in the suppliers favour. However as at 30th

June 2013, the supplier had not yet delivered. There is a risk that the supplier may

not deliver as expected.

In response, management explained that UNRA has initiated the process of

terminating the contract and ensuring that recovery of the funds (30%) under an

existing LC from Stanbic Bank is done. Management further indicated it would be

in position to recover the unsettled advance though they would not be able to

collect the amounts for Liquidated damages.

I await the results of Management effort.

Page 106: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

94

7.4 Outstanding payables – Shs.431,953,293,985

a) Outstanding Commitments for year – Shs.184,415,152,158

As at 30th June 2013, a total of Shs.431,953,293,985 was reported by the

Authority, as outstanding in payables, representing an increment of 74%

(Shs.184,415,152,158) from the payables figure of Shs.247,538,141,827 reported

as at 30th June 2012.

I noted there was a gradual rise in outstanding commitments. Last year‘s

increment was 67% as compared with the current position of 74%.The

outstanding commitments alone contribute to 29% of the total income received

during the year. I explained to management that this unpleasant situation is a

threat to the budget of the Authority if not checked early enough. Besides, there is

a risk that the accumulation of outstanding commitments could result into higher

costs in terms of interest and litigation by suppliers and contractors.

In response, management expressed fear that the outstanding commitments could

become unmanageable and stated that the increase in the debt situation every

financial year was mainly due to the budgeting process and funds are allocated to

UNRA based on provisions in the Medium term Expenditure Framework (MTEF)

irrespective of UNRA activities on the ground. Often the funds required to pursue

UNRA‘s Road Development and Maintenance programme exceed the funds

allocated in the Budget. These activities are ongoing and contractors continue

working and generate certificates every month yet the funds to pay off these

Interim Certificates are inadequate. Furthermore; the procurement process for

both Road Development and Maintenance contracts always take unnecessarily too

long about a year and yet during the implementation period prices for material

inputs are often above those that were included in the contractor‘s bid leading to

escalation of construction costs through variation of price.

I advised management to develop a strategy of settling the outstanding

commitments before they become unmanageable.

Page 107: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

95

b) Outstanding Taxes/NSSF unremitted –Shs.964,495,554

It was noted that Shs.964,495,554remained outstanding as at 30th June 2013in

unremitted statutory obligations (NSSF and PAYE) contrary to the provisions of the

Income Tax Act and the NSSF Act as indicated below:

Category of Statutory

obligation

Amount in

sHS.

Managment

PAYE 471,539,839 PAYE was deducted by Ministry of

Public Service (MoPS) but not

remitted to URA. It was explained that UNRA‘s payroll at the time was

managed by the Ministry of Public Service (MoPS). Through the Straight

through Process System (STP) and despite reminders to the MoPS, this

obligation has not been cleared.

5% NSSF not deducted from

salaries by Public Service

238,135,254 The amounts in question referred to

overpayments to UNRA staff as a

result of non-deduction of 5% NSSF. UNRA‘s payroll during the year was

managed by MoPS through the IPPS. Since the payroll has since reverted

to UNRA, it undertakes to make the

necessary recoveries from the affected staff and remit it to NSSF.

5% NSSF deducted by Public Service but not remitted to NSSF

254,820,461 The mentioned amounts relate to February, March and April 2013.

Deductions were not made on some

staff by the MoPS and UNRA on numerous occasions notified MoPS of

the continued anomaly but there has not been any response. With the new

arrangement of the UNRA managing

its payroll, the necessary recoveries would be made from the concerned

staff. Total outstanding as at 30th June 2013

964,495,554

I explained to management that there is a possibility that the authority could

attract penalties for failure to remit taxes and NSSF deductions on time.

I advised management to endeavour to remit statutory deductions in time and

within the provisions of the law to avoid penalties.

Page 108: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

96

c) Receivables outstanding Shs.4,324,360,299

During the review, it was noted that receivables worth Shs.4,324,360,299 had not

been received by the Authority and were therefore still outstanding as summarized

below:

Description of the nature of the Receivable Amount

Shs.(Receivables)

Outstanding letters of Credit that have performed 3,686,481,596

Cash compensation funds still with the Consultant 102,736,943

staff advances deducted from staff salaries by Public Service 13,037,501

Funds still held in ABC Capital Bank 173,701,010

Staff advances outstanding 348,403,249

Total 4,324,360,299

I noted that some of the staff who had not accounted for previous balances had

continued to receive upfront advances. At the time of reporting (February 2014)

there was no indication of any plan to recover the funds in the near future. I

explained to management that there is a risk that the activities for which these

advances were received may not have been carried out and this could affect

implementation of planned activities.

In response, management explained that it is standard practice at UNRA that

when a member of staff is advanced funds and fails to provide accountability

these funds are then deducted from the Individual staff salary. However, UNRA

experienced challenges during this period because the payroll was being managed

by the Ministry of Public Service. As a result; it was not possible to deduct funds

from staff salaries in a timely manner.

In regard to the receivable from ABC Capital Bank, a reminder to Bank of Uganda

to help in the recovery of Shs.173,701,010 was sent and that police completed its

investigations and the file is now with the Director of Public Prosecution to initiate

court proceedings on the culprits.

Page 109: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

97

I advised management to expedite the recovery process and have all the

receivables recovered.

7.5 Mischarge of Expenditure –Shs.2,480,827,360

Parliament appropriates funds in accordance with the needs of the country and

this appropriation is implemented through the budget in which funds are tagged to

particular activities and outputs using account codes and MTEF codes. During the

review, it was observed that expenditures totalling to Shs.2,480,827,360 were

wrongly charged on budget lines to fund activities that were not meant to be paid

from the affected budget lines. This practice renders the budgeting process

redundant and is not in line with the intentions of the appropriating authority. The

expenditure balances in the financial statements could be misrepresented.

In response, management acknowledged the matter and explained that in future

UNRA will ensure that funds are spent on the expenditure lines as stated in the

budget allocation. Management further indicated that requests for reallocations

where necessary will always be sought on a quarterly basis in situations where the

activities on the ground are no longer in line with budgetary provisions.

I await the outcome of management‘s commitment.

7.6 Budget Performance

a) Uncompleted planned activities

During the year under review, UNRA planned to undertake a number of activities.

A review of the reported performance revealed that some key planned activities

were not fully executed despite having received adequate funding as detailed

below:

Page 110: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

98

Planned Activities 2012/13

Expected Outputs 2012/13

Actual outputs 2012/13

Deviation Management Response

Paved Roads - Mechanized Maintenance (1,611 Km)

Approved: Shs.8.250 BN. Released: Shs.6.187 BN

Actual Expenditure UGX 6.200 BN 1,500 Km completed

111 Km not worked on.

Contractors were procured for mechanized maintenance but at higher rates than those estimated at the time of budgeting. However, works are on-going with several contracts at different levels of execution. Contractors faced several challenges like scarcity of equipment for hire, delayed mobilization, personnel challenges and delayed submission of advance

guarantees.

Unpaved Roads - Mechanized Maintenance (11,370 Km)

Approved: UGX 85.328 BN. Released: UGX 59.070 BN

Actual Expenditure UGX 59.103 BN.10,362 Km completed

1,008 Km not worked upon

Contractors were procured for mechanized maintenance but at higher rates than those estimated at the time of budgeting. At the time of audit, works were on-going with several contracts at different levels of execution. Contractors faced several challenges like scarcity of equipment for hire, delayed mobilization, personnel challenges and delayed submission of advance guarantees.

Unpaved Roads –

Re-gravelling (855 Km)

Approved:

UGX 22.000 BN. Released: UGX 15.375 BN

Actual

Expenditure UGX 15.320 BN. 502 Km completed

353 Km not

worked upon

Contractors were procured for

mechanized maintenance but at higher rates than those estimated at the time of budgeting. At the time of the audit, works were on-going with several contracts at different levels of execution.

Output 025104 : UNRA Support Services on Project 0298 Accident black spots on Jinja - Kampala

To conduct Workshops for taxi and bus drivers and to Procure the consultant to prepare road safety strategy and action plan

No road safety activity was implemented during the quarter

Activity not implemented

Road safety has been streamlined and is being implemented.

Page 111: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

99

Planned Activities 2012/13

Expected Outputs 2012/13

Actual outputs 2012/13

Deviation Management Response

Output :715104: Acquisition of land by Government on Project 0957 : Design the New Nile Bridge at Jinja. Budget: Shs.500m

To procure 1 hectare of land.

There was no land acquired

Set Target not met

The one hectare of land was not acquired because it was an additional land take arising out of the construction work by the contractors and also access roads for affected persons. Since the contractor had not yet been procured, the acquisition was not carried out. However it has so far been valued and upon approval of the report by the Chief Government Valuer, compensation will be paid and the acquisition concluded.

Output : 715104

Acquisition of Land by Government on Project 0955 Upgrade Nyakahita-Ibanda-Fort Portal (208km)

10 hectares

of land including properties to be acquired.

3.87 Hectares

of land and properties there in were acquired.

Set Target not

met

Supplementary reports were

prepared by the three Consultants on the project to cater for extra land. So far the project affected persons have been paid and the land acquired.

Output: 715104 Acquisition of Land by Government on Project 1180 : Kampala Entebbe Express Highway Budget GOU 85bn Donor 151.797bn

200 hectares and properties to be procured.

50.47 Hectares of land and properties therein were acquired out of the annual target of 200 hectares. Actual Releases

Gou 100bn Donor 186.122

The cumulative progress since the project start was 7.1% against releases of 117.6 % by Gou and over 100% by donor.

No explanation of the deviation was given by management.

Upgrading Gulu –Atiak road (74km)

Approved Budget GOU 1BN Donor 36

Released GOU 1.35bn Donor 26.13Bn Cumulative progress 18.08%

The project commenced in February 2012 and by June 2013, the cumulative progress since the project start was 18.08%. against releases of 135% from GOU and 72.6% from the Donors

One key issue was the need to clear Land mines along the road project which took longer because it had to be undertaken by UPDF. Initially, there was lack of effective site control on part of the Contractor. With keen monitoring, the Contractor has improved performance which stood at 57.3% against planned on 58.14%. There are still challenges with acquisition of site for the Gulu Town Road and Atiak Trading centre which UNRA is trying to resolve. The supplementary valuation report for these areas have been approved by CGV and payment should commence soon.

Page 112: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

100

Planned Activities 2012/13

Expected Outputs 2012/13

Actual outputs 2012/13

Deviation Management Response

(VI)Upgrading Vurra – Arua-Oraba road (92kms)

Approved Budget Gou 5 bn Donor 39.558 bn

Released Gou 7.712bn Donor 34.9 bn

The project commenced in January 2012. The cumulative progress was 36.03%. against a release of 154.3% GOU and 88.2% Donor

The evaluation of causes of delay is not completed but is anticipated to be due to; 1 delayed NEMA approval of Quarry/crusher site at Lokoze, 2 Contractor‘s own inherent management weakness; 3 Delayed acquisition of land in some sections. A supplementary valuation has been prepared for outstanding issues and awaits approval of the CGV.

Upgrading Ishaka- Kagamba road (35.4kms)

Approved Gou 22bn

Actual released Gou 25.5

The amount spent was 115.9% against a current

cumulative progress since project start of 20.09%.

The Design review commenced in December 2011, whereas the civil Works commenced in

February 2012. The current progress, at 100% of the time is 31%. The delay is attributed to a combination of factors as follows: -Unforeseen heavy/continuous rains in the project location, -Increase in the earthwork quantities as a result of the design review, -Additional land requirements/acquisition at the high hill cut sections (Km 13 – Km 14 & Km 21 – Km 24), This has subsequently been valued and paid and site availed. -Escalation of the utility service lines relocations, -High turnover of the key Contractor‘s site staff, -Inadequate equipment mobilization/utilization -Inadequate planning of the Contractor‘s activities

Rehabilitating Jinja – Kamuli road (60kms)

Budget Gou 20bn

Actual Released Gou 20.445% which was 102% of the budgeted funds. 30% of the works were completed.

This project commenced in August 2011 and by June 2013, 42.91% of road works had been completed. Works are expected to be completed by June 2014.

No explanation of the deviation was given by management.

I advised management toenforce monitoring of its operations to ensure that set

targets are achieved.

Page 113: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

101

b) Under funding of Maintenance Program –Shs.43,104,110,247

Uganda Road Fund finances maintenance of roads through disbursement of funds

to UNRA on a quarterly basis so that implementation is done. During the financial

year under review, UNRA planned to spend Shs.181,875,000,000 under the

maintenance program however, only Shs.138,770,889,753 was released to the

Authority leaving a balance of Shs.43,104,110,247 (24%) unreleased. I noted that

the current position is unpleasant in light of the heavy capital injected in the

construction of roads. If adequate maintenance of the roads is not carried out,

there is a risk that all the capital injected will go to waste. Lack of adequate

funding affected implementation of some of the maintenance activities.

UNRA expressed concern over the received inadequate funds for the capital

investment for Road maintenance from the Uganda Road Fund during the year

and added it would continue engaging the Ministry of Finance and the URF to

provide sufficient funding for UNRA Road Maintenance activities.

I advised management to continue following up the matter with the appropriate

Authorities to ensure all budgeted road maintenance funds are released and on

time.

c) Supplementary Expenditure Review –Shs.155,000,000,000

Towards the end of the financial year, the Accounting officer requested for a

supplementary of Shs.309bn out of which Shs.155bn was released. This was on

top of the original GOU Development budget of Shs.669bnfor the financial year

under review. UNRA‘s annual Development budget was to be exhausted in the

third quarter and management made a cash flow projection of Shs.309bn billion

for quota 4 hence requesting for a supplementary budget of Shs.200bn.This

request was for settlement of bills for a list of Projects mainly from the Transport

corridor project (code 1056). In June 2013, the Authority received a

supplementary appropriation for the development budget of Shs.175bn to cater

for the mentioned projects.

I noted that out of the above warrants, cash limits issued were only Shs.155 billion

as indicated below:

Page 114: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

102

Date of Receipt of Release Amount (Shs.)

13/06/2013 154,000,000,000

25/06/2013 1,000,000,000

Total 155,000,000,000

The cash limits were for various roads and bridges including; upgrading Moyo-

Afoji (Phase-1 Bridges), Improvement of Ferry Services (KIS Project), upgrading

Kampala-Gayaza-Zirobwe , upgrading of Fort Portal –Bundibugyo-Lamia and

various others.

From the review of the expenditure transactions and interim payment certificates

in respect of the funds, the following were noted:

d) Payment of Prolongation Costs Shs.1,617,803,400

Analysis of expenditure and claims raised by Contractors showed that UNRA paid

Shs.1,617,803,400 to Energo Projekt being compensation for time extension on

Kampala-Gayaza-Zirobwe Road. I regarded this expenditure nugatory as it could

have been avoided. This situation was caused by inadequate planning because of

the incomplete designs at the time of signing the contract which led to the

extension of the contract duration resulting into a claim for prolongation costs.

Prolongation costs are a waste of Government resources which accelerates the

costs of road construction.

In response, management explained that prolongation costs arose due to

extension of time granted on the contract mainly to allow the Contractor handle

the necessary additional scope on the project to accommodate unforeseen road

frontage and other developments that had occurred since completion of the

Kampala-Gayaza-Zirobwe design in 2002 and project commencement in 2008. The

scope included changing the Kalerwe section connecting the Kampala Northern

Bypass (KNBP) to Kampala City from the designed single carriageway standard to

dual carriageway standard so as to accommodate traffic to/from KNBP and others.

Page 115: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

103

I advised management that before contracts are entered into with the contractors,

designs should have been agreed on and approved to avoid unnecessary delays

that cause wasteful expenditure.

e) Expenditure incurred beyond what was applied for

The entity paid Shs.23,210,098,824 more than what was requested on two of its

projects as indicated in the table below;

Project Actual

expenditure

Requested

Amount

Difference

Kampala-Gayaza-Zirobwe 3,185,751,990 2,000,000,000 1,231,033,460

Upgrade Hoima-Kaiso -

Tonya

41,879,065,364 20,000,000,000 21,979,065,364

Total 23,210,098,824

I explained to management that this amount was paid without authority which

was irregular and is contrary to the financial regulations. The practice suffocates

other planned activities.

In response, management explained that UNRA required Shs.308.98 billion to

meet its commitments to 30th June 2013 but the MoFPED was only able to avail

50% of the funds required, so it was difficult to match the payments to the

accounting warrants because there was a significant glaring gap in financing. The

projects were at critical stages of implementation and urgently required funds.

I advise management to adhere to the budgeting guidelines and payment

principles.

f) Unapplied for Expenditure – Shs.11,578,596,573

I noted that payment to one of the Construction company worth

Shs.11,578,596,573 for Transport Corridor Nsangi- Kamengo had not been

applied for in the approved supplementary. The expenditure was therefore not

authorized.

Page 116: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

104

In response, management acknowledged the mentioned funds were paid to the

Company because the contractor was implementing works on the Northern

Corridor which is a key and sensitive component of the National Road Network.

UNRA owed the company a lot of money and this company had threatened to stop

working if they did not receive additional payment from Government, thus

management thought it was prudent to make this additional payment to the

Contractor to avoid the contractor stopping work on a key section of the National

Road Network.

I advised management to always adhere to financial regulations.

g) Interest on delayed payments – Shs.38,735,973

It was noted that a payment of Shs.38,735,973 in interest was made to a

construction company due to delayed payment on one of its certificates of

Shs.1,512,388,615. I explained to management that this resulted into diversion of

funds that were meant for other projects.

Management explained that the interest was a result of a delay in payments to the

contractors due to delayed release of funds and under funding of the Road

Development and Maintenance programme. Management further clarified that this

payment was made to avoid paying any further interest (Interest on interest)

which would be deemed to be nugatory expenditure.

I advised management to plan and avoid such payments in advance.

h) Unreleased supplementary Funds – Shs.20bn

It was noted that out of the supplementary appropriation of Shs.175bn only

Shs.155bn was released leaving Shs.20bn unreleased. Failure to release all the

funds to the Authority affects planned road construction projects.

Management explained that they had contacted Ministry of Finance on the matter.

I await the outcome of management actions.

Page 117: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

105

7.7 Governance issues

a) Lack of a Board of Directors

Section 8 (1) of the UNRA Act 2006 states that the Authority shall have a Board of

Directors, which shall be the governing body of the Authority to oversee the

operations of UNRA. However during the review, I noted that the Authority was

operating without a Board for almost 1 year which created gaps in policy

formulation. I explained to management that absence of a Board poses a high

risk in implementation of the strategic plan towards fulfilment of the Authority‘s

mandate. Absence of the Board meant that there was no audit and risk

management committees that are extremely key to the operations of UNRA.

In response, management explained that at the beginning of the financial year,

there was a board which was dissolved on the 1st of November 2012 and a new

one was inaugurated in February 2014.

I advise that the relevant committee are constituted and audit reports reviewed

for further action.

The new development was noted.

b) Lack of an Approved Strategic Plan

It was noted that the Authority did not have a strategic plan to guide management

in the operations and implementation of its activities. This means the Authority

operated without medium and long term plans to facilitate the management and

operations of the Authority. Lack of a strategic plan implies that implementation of

activities aimed at achieving the entity‘s mission and long term objectives may not

be properly guided. Besides, the performance measurement criteria could be

questionable.

In response, management explained that a draft Strategic Plan had been prepared

and was awaiting approval by the Board in April 2014 prior to the formal launching

of the plan.

Page 118: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

106

I advised management to expedite the process and have the plan approved.

7.8 Staffing - Vacant posts (126 Vacancies)

A review of the staffing position of the Authority revealed that out of the 1109

approved positions, only 963 positions were filled leaving 126 positions unfilled. I

noted that the most affected directorates include; Directorate of operations and

procurement which are key in execution of UNRA‘S mandate. Considering the

magnitude of the works meant to be carried out at the Authority, shortfalls in

capacity are likely and the implementation of the activities is affected.

In response, management explained that the recruitment process for the vacant

staff positions was substantially concluded. However, the engagement of the staff

was delayed due to fixed wage bill challenges.

I advised management to conclude up the matter and have the posts substantially

filled.

7.9 Fuel Payments

During the review, it was established that UNRA had an arrangement with Shell

(U) Ltd and Total (U) Ltd where the two fuel companies supplied fuel in advance

to the twenty two (22) UNRA Fuel Stations using advantage cards. The fuel

Companies would issue fuel consumption statements and fuel invoices which

UNRA would use as a basis of payment for fuel consumed during the period. A

review of the fuel transactions revealed the following:

a) Fuel drawings in excess of fuel capacities

It was noted that there were fuel drawings in huge amounts from a fuel company

around Kampala. Fuel drawings were in hundreds of litres at a time and I noted

that vehicles owned by UNRA and run by the stations have a capacity of not more

than one hundred litres. Drawing two hundred (200) litres and above creates

suspicion that cash could have been drawn instead of fuel.

Page 119: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

107

Management explained that there are some cases where this is necessary

especially when operations are to take place in hard to reach areas. In the

circumstances, stations pack fuel in containers after filling the vehicle tanks.

I advised management to strengthen controls over use of fuel to minimize on the

risks of misuse of Government funds.

b) Funds over paid to a fuel company

It was noted that fuel consumed as per the fuel consumption statements and the

fuel prices indicated could not match with the amount billed and paid by UNRA. As

a result, it was noted that Shs.102,500,004was overpaid to one of the fuel

company.

Management explained that at the time of audit, UNRA had started a reconciliation

exercise with the fuel company and that the two parties agreed that any over

payments would be offset from the outstanding invoices that were not settled

since September 2013.

I advised management to recover the funds and remit the funds to the

consolidated fund.

7.10 Avoidable Interest Payments to Contractors –Shs.525,488,501

Section 5 (43) (1) of the General Conditions of Contract between UNRA and

Contractors provides for payment of interest if UNRA delays to pay a particular

approved contract certificate. It was established that management delayed to pay

some approved certificates resulting into uncalled for payments in form of interest

worth Shs.525,488,501 to the contracted companies. These payments were made

from the Maintenance Account and Stanbic Head Office Account as indicated

below.

Voucher

Number

Date Payee Amount (Shs.) Remarks

AB211090 22/11/2012 Construction Co 31,552,837 Payment of Interest to CCC as a

result of delayed payment by UNRA on Cert 1(Euro 9,363.46@3,366.58)

Mbarara-Kikagati Road

Page 120: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

108

Voucher

Number

Date Payee Amount (Shs.) Remarks

AB211089 22/11/2012 Construction Co. 43,084,168 Payment of Interest to CCC as a result of delayed payment by UNRA

oncert.1($16,261.92@2,6949.39) Mbarara –Kikagati road

AB211088 22/11/2012 Construction Co. 41,480,183 Payment of Interest to CCC as a result of delayed payment by UNRA

on Cert 1 (Local currency) Mbarara-

Kikagati Road.

AB209063 18/09/2012 Construction Co. 39,744,342 Payment of Interest to CCC as a

result of delayed payment by UNRA

on Kitgum – Orom road

AB 209004 3/9/2012 Construction Co. 24,689,437 Payment of Interest to JB United

Civil Engineering as a result of delayed payment by UNRA on

Palabek-Padibe road

AS208042 31/07/2012 Construction Co. 103,530,050 Payment of Interest to SBI as a result of delayed payment of IPC

42-45 on Kabale-Kisoro -Bunagana

Road. US Dollar component - $ 41,002

AS208043 31/07/2012 Construction Co. 241,407,484 Payment of Interest to SBI as a result of delayed payment of IPC

42-45 on Kabale- Kisoro -Bunagana

Road. Shs. component.

Total 525,488,501

I explained to management that this translates into loss of Government funds that

would have been used to implement other road maintenance activities or

undertake new projects. The expenditure was therefore nugatory as it could have

been avoided with proper planning.

In response, management explained that UNRA engages contractors on Road

development and maintenance jobs and the contractual arrangements provide for

Interest on delayed payments. The Road development and Maintenance

programme are underfunded and sometimes funds are not released in time which

leads to claims from contractors for interest on delayed payments.

I advised management to always plan ahead to avoid such delays which lead to

wasteful expenditure.

Page 121: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

109

7.11 Delayed completion of maintenance of National Roads Contracts

Specific conditions of the contracts signed between UNRA and contractors specify

the duration of the contracts which should be observed by both parties to ensure

efficient and effective management of the works contracted. However during the

review, I noted that works on gravel roads spread over three years yet

management had not taken any action to invoke the contract agreement

provisions for their termination in accordance with PPDA Regulations. Refer to the

details below.

Voucher

No

Amount paid Details of the

payment

Project Name Contract

Amount

Duratio

n of the Contract

AB207136 dated 31/7/12

322,265,098 Supervison of mtnce works IPC 2 & date of Contract 30/11/2010

Consultancy services for supervision of maintenance of 202Km of selected National Roads Package 16(UNRA/SERVICES/2009-10/00002/01/13

929,960,000 Twelve(12 ) Months after signing the Contract

AB207126 Dated

31/7/12

103,639,925 Urgent repairs Cert 2

And date of contract 21/3/2011

Isunga -Bugwara -Kikwaya &

Kyenzige- Rugashari -Mabaale.UNRA/RMM/10/11/098 OR UNRA/RMM/10/11/066

Five (5) Months

after signing the Contract

Total 425,905,023

I explained to management that delays in contract implementation leads to

increased project costs associated with management, monitoring and

supervision which could have been avoided if a project is completed in time.

In response, management explained that when contract implementation delays

UNRA charges liquidated damages and in some instances as a last resort; the

Authority has terminated some of the contracts.

Page 122: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

110

I advised management to review implementation of all delayed projects with a

view of taking decisive action against delayed works by contractors.

7.12 Expenditure on Training –Shs.450,236,188

Expenditure totaling toShs.450,236,188 was paid from UNRA Stanbic bank

Account for staff training. Examination of the expenditure revealed the following:

a) Lack of an approved Training and Career Development Policy

UNRA Human Resource Management Manual (HRMM) requires UNRA to have an

approved training and career development policy. In addition Chapter 5 (a)

stipulates that the goals and objectives of the training and career development will

involve ensuring that employees have knowledge, skills and attitude needed to

perform the current job effectively. However during the review, it was noted that

UNRA lacked an approved training and career development policy that provides a

framework for managing the Authority training.

During the year; I noted that the Authority spent over Shs.2.4bn without an

approved training policy. It was further noted that the present system involves

individual staff sourcing for training programs from the internet without the

involvement of the Human Resource Department. I explained to management that

this kind of system was unfair to staff who may not have had the initiative and

time of searching for training programs through the internet. Besides, there is a

risk that the selected programs may not be beneficial to the Authority resulting

into non achievement of the Authority goals.

In response, management explained that the Training Policy was formulated by

the Human Resource Department and circulated to the different Directorates for

consideration and comments. It was indicated that training courses are sourced in

line with training needs of individual directorates and training programmes.

However, due to the absence of the Board of Directors for more than a year, the

policy has not been finalized for approval. Despite this fact, training in UNRA has

been guided by the Draft Training Policy. Management indicated that the

recommendation would be adopted as soon as possible.

Page 123: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

111

I await management‘s commitment towards this effort.

b) Lack of an active training Committee

Chapter 5 of the HRMM requires that a training committee be established for the

purpose of administering the training policy and ensuring that guidelines are

followed and enforced. The Training Committee is required to have a responsibility

of maintaining equity in training and regularly reviewing the rules and regulations

governing training and career development. During the year it was noted that the

entity operated without an active training committee to oversee the training policy

and guidelines. I explained to management that there is a possibility that equity in

training was not properly observed.

In response, management explained that the training Committee was actually

established and is comprised of representatives from all the Directorates.

However, due to understaffing in the entire organization, the Committee members

have been very busy and the Committee has not been active resulting into delays

in accomplishing its activities. Management indicated that the activities of the

Committee would resume with immediate effect.

I await the outcome of the management commitment.

c) Lack of an Annual Training Plan/Program

Chapter 5 of the Human Resource Management Manual (HRMM) requires that

arising from the Training Needs Assessment and the Performance Management

Exercise, the Human Resource Manager will prepare an annual Training Plan. This

will be reviewed by the Training Committee which will prioritize all the training and

agree on the training and career development activities to be carried out in the

coming year. The Committee is also required to cost all the training and prepare a

schedule that forms the Annual Training Plan/Program.

I noted that the Authority lacked an approved training program. The Training

Needs Assessment and the Performance Management Exercise was therefore not

being done as desired. I explained to management that there is a risk that large

Page 124: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

112

sums of funds utilized on training may not be addressing the needs assessment

and performance management needs.

In response, management explained that training Needs Assessment was

conducted by each Directorate and the respective training requirements submitted

by Directorates to the HR Department for implementation. Unfortunately, the

consolidated plan was still being finalized for approval.

I advised management to adhere to the existing regulations and have the

consolidated plan finalized.

7.13 Land and Property Compensation

a) Compensations on Entebbe Express Highway – transfer of titles

The compensation program to all affected people within the corridor of the new

Entebbe – Kampala Express Highway was administered by a Consultant Mott

MacDonald on behalf of UNRA. The compensation process required to carry out

an evaluation of all the property and land with a compensation Report. The

claimant was then required to fill a Claimants‘ Form, (Forms A,B and C). Copies of

relevant documents were to be verified by the Consultant, LC 1 Chairperson,

District lands officials and other stakeholders. A review of the compensation

exercise carried out on the highway revealed that some beneficiaries are still

holding on the land titles. Although the Transfer Forms were dully attached, they

were not filled and therefore not signed by the Purchaser (UNRA) posing a threat

of a third party falsely claiming ownership of the same land. Details are in the

schedule below:

Mailo land claims without Transfer Forms

NAME AMOUNT VALUATION REF. NO.

VILLAGE Transfer Form

Other Remarks

Compesator 279,596,249 KEEW01-188A KINAAWA No Form No Transfer Form filled

Compesator 45,760,000 KEEW01-397 BANDWE Not filled Transfer Form not filled and not signed by Purchaser (UNRA)

Compesator 11,856,000 KEEW01-398 BANDWE Not filled Transfer Form not filled and not signed by Purchaser (UNRA)

Page 125: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

113

Compesator 11,024,000 KEEW01-228B BANDWE Not filled Transfer Form not filled and not signed by Purchaser (UNRA)

Compesator 1,622,400 KEEW01-264B BANDWE Not filled Transfer Form not filled and not signed by Purchaser (UNRA)

Compesator 686,400 KEEW01-219 BANDWE Not filled Transfer Form not filled and not signed by Purchaser (UNRA)

TOTAL 350,545,049

I advised management to ensure that transfer forms are signed to minimize the

risks of losing land that has been compensated.

b) Valuation of land

It was noted that UNRA does not have its own valuer/surveyor to make an input in

the whole process or advise the entity on certain valuation matters. Management

depends only on the figures calculated by the consultant and the expert advice of

the Chief Government valuer is only given and considered. I explained to

management that there is a risk that UNRA cannot easily support or reject any

position provided by the private consultant which serves as the basis of the Chief

Government valuer‘s (CGV) considered opinion. There is a risk that UNRA could be

over or undervaluing land.

In the circumstances, I could not satisfy myself that these land compensation

payments were worth what was paid and/or supposed to be paid.

Management explained that the entity uses its Internal Auditor who performs

some audit checks especially before payments are made.

I advised management to review the current compensation system and ensure

UNRA has a technical person who contributes/checks what the consultant does in

the compensation assignments.

Page 126: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

114

c) Land compensation funds transferred to Kampala station

Shs.73,491,633,132

Maintenance of National roads is financed by URF that releases Funds to UNRA on

a quarterly basis. Implementation of the maintenance function is carried out by

UNRA through UNRA Stations. UNRA through execution of its mandate

compensates land owners that are affected by road construction and the Road

reserves. I noted that during the year, UNRA Headquarter transferred

Shs.73,491,633,132 to UNRA Kampala Stanbic Account being compensation funds

for Land Property Owners that were effected during the construction of various

roads. From the review, the following anomalies were noted:

a) End of Financial Year closing procedures

It was noted that at the end of the financial year, end of year closing procedures

destabilize the compensation exercise. I noted that the process of Land

Compensation is a continuous exercise that should not be disrupted by the end of

year closing procedures.

b) Co-mingling of compensation funds

The objective of opening up UNRA Kampala Station was for management and

implementation of maintenance activities for which funds are released on a

quarterly basis. It was however noted that compensation funds released to

Kampala station were mixed up with the station funds for road maintenance yet it

also holds NTR receipts. Comingling of funds creates reconciliation problems, and

can also result into diversion of funds hence affecting the planned activities for

which the account was established.

c) Mandate to pay compensations

UNRA Kampala does not have the mandate to pay compensations which is more of

a central function. I noted that Payment of Compensation Funds is a responsibility

of UNRA Headquarter and not UNRA Kampala Station. Besides, this is not under

the jurisdiction of the Station Engineer. I explained to management that the

compensation role stifles the engineer‘s role.

Page 127: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

115

In response, management explained that UNRA has requested the Accountant

General to open up a bank account in a commercial bank specifically for Land and

Property Compensation but no positive response from the office of the Accountant

General has been received yet. If this account is opened, the commingling of

funds for Land and property compensation with funds for Road maintenance will

cease and UNRA Headquarters will take full responsibility.

I have advised management to continue following up the matter with the

Accountant General to ensure that it is given the consideration it deserves.

7.14 Procurement

a) Consultancy Services for review of the UNRA organization and

setup

Contract for the Consultancy Services for review of the UNRA organization and

setup was entered into on the 29th May 2013 at a contract sum of

Shs.201,906,000 between M/s Ernst and Young (the Contractor) and the entity.

Review of the procurement process revealed the following:-

b) Lack of a contract implementation plan

PPDA regulations, section 258 (3) states that upon receipt of a contract, a contract

manager shall prepare a contract implementation plan, using PP Form 60 in the

Ninth Schedule, and forward a copy to the procurement and disposal unit for

monitoring purposes. Contrary to the above, UNRA signed the contract on 29th

May 2013 and appointed a team to manage the contract but the contract

management team appointed did not prepare a contract implementation plan. I

explained to management that this implied that the monitoring and evaluation of

the contract may not have been adequately carried out as stipulated in the PPDA

Regulation 258 (5).

I advised management to abide by the procurement regulations.

c) Delayed procurement process (18 Months)

The objective of this procurement was to undertake a self-assessment process to

evaluate where UNRA was, and where it needed to go. The view was that, whilst

Page 128: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

116

good progress had been made, a change point had been reached and initiatives

were required to support further change in the culture and direction of the

organization. This was to be done within a short time because there was limited

time to expiry of staff contracts (June 2012) and the need to renew staff contracts

by March 2012.

I noted that the procurement process took too long beyond the initial time it was

intended to take thus not achieving one of its objectives of using the report for the

organization review to renew staff contracts by March 2012. The PP form 20 was

initiated on 12/12/2011 and the contract was signed on 29th May 2013. This

implies that several staff contracts were renewed without the report. There was

therefore no value for money in this contract.

Management indicated that it was establishing a procurement tracking and

monitoring system to control delays.

I await the outcome of management‘s commitment.

d) Application of an inappropriate method of procurement

Contract for workers‘ compensation policy for UNRA employees was signed

between UNRA and an Insurance Company on the 1st of November 2010for a

period of two years. Two payments were effected in the financial year 2012/13.

Further Shs.246,322,915 from Treasury General Account.

All the payments were made based on the original compensation policy

no.010/110/1/001619/2009.Contrary Reg106 (4) of the PPDA Regulations 2003,

which requires open bidding to be used if the estimated value of the services

exceeds Shs.50,000,000 or US$ 25,000 whichever is greater; I noted that in this

case, director procurement method was used instead of open bidding as

required.

Management was aware that the procurement process was lengthy but seemed to

have waited for the contract to expire instead of planning to procure the services

early enough. Further review revealed the following:

Page 129: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

117

Only one bidder was invited and the solicitation document was only issued to

one company.

The approval of the procurement method was reportedly done by the

Contracts Committee but no evidence was availed for review.

The initial requirement for the service originated from the nonuser department

who initiated the procurement process i.e the legal department instead of the

Human Resource department.

The procurement was not in the approved Procurement plan for the financial

year 2012/13.

There was no contract manager and no contract management file was in

place. There was no evidence of appointment of a contract manager to

monitor implementation of the contract/service.

There were a number of claims to the tune of Shs.55,000,000that were earlier

not settled by the service provider translating into poor performance.

In the justification for extension, it is clear that the specifications/terms of

reference were tailored to suit the Insurance company nominated.

I explained to management that failure to observe PPDA regulations and

guidelines denies the Authority benefits of value for money through competition.

Management explained that direct procurement method was used on the grounds

of contract extension (2003 PPDA Reg. 112 for continuation with the existing

provider) as the new procurement for selection of a provider was not finalized.

The contract was urgently required to be in place to cover UNRA staff as per

statutory requirement. Further, management explained that in regard to the

claims to the tune of Shs.55,000,000, action would be taken to enhance contract

management.

I advised management to always follow PPDA regulations in all future

procurements.

Page 130: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

118

e) Supply and delivery of Heavy Road Maintenance Equipment Lot1

(Motor Graders)

Contract for the supply of eight (8) Motor graders was signed between UNRA and

the supplier on 28/06/2013 and the specific conditions to the contract provided for

completion period within five months after contract signing. By the time of this

report, the contracted company had not delivered the eight motor graders

registering a delay of 6 months. I explained to management that failure to adhere

to the major conditions of the contract may lead to the entity failing to repair

national roads in time. Besides, there was no evidence that Management had

charged liquidated damages as provided for in the specific conditions of the

contract.

Management explained that shipping of the eight (8) graders delayed the delivery

however the provider will be charged liquidated damages (as per clause GCC 27.1

of the General Conditions of Contract) at the time of making payments for the

supplies.

I advised management to ensure compliance with the stipulated conditions of the

contract.

7.15 Lack of Operators for New Road Equipment

I noted that road equipment worth Shs.10bn was procured during the year under

review. These included graders, bull dozers, excavators, and rollers among others.

However, no recruitment of plant operators had taken place and a few who are on

the ground seem to require further training due to the technological advancement

in the manufacture of these road equipment. The equipment has not been put to

use.

Management explained that UNRA has initiated the process of restructuring that

shall result into identification of the critical staffing levels and wage requirements

that can enable UNRA manage its operations.

I await the outcome of the above management commitment.

Page 131: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

119

7.16 Ferry Operations

It was noted that funds to the tune of Shs.7,536,489,901 were paid to Kalangala

Infrastructure Services (the company) for Bukakata ferry of which

Shs.1,975,020,975 was covering the period August to December 2012 and

Shs.5,567,468,926 was advance support payments covering the calendar year

2013.A review of the records availed and interview with Management in reference

to the ferry revealed the following:

(i) Breach of terms on monitoring and verification

Review of the conditions of the contract showed that UNRA was in breach of the

conditions in the agreement, Amendment No.1 to the implementation agreement

between GOU and Kalangala Infrastructure Services Ltd dated Nov. 2011 Schedule

1, that pertained to monitoring and evaluation of the contract.

There were no metering or recording devices installed on the ferry yet.

There was no confirmation of the information provided by the company in

relation to the claim for payments of support payments.

The audit noted that there were no independent reports made and this led to

loss of audit trail.

In response, management explained that UNRA has recommended installation of a

GPS tracking technology on the ferry to allow for real time and more independent

monitoring. This technology is affordable. An independent monitor was also

identified.

I await management implementation on the above matter.

(ii) Other irregularities noted include:

Advance payments to Kalangala Infrastructure Services (KIS)

I noted that the ferry support payments were being paid in advance but it is not

stated how the advances were secured. Under normal circumstances, advance

payments must be supported with an advance guarantee from the beneficiary.

Page 132: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

120

In response, management explained that UNRA noted the concern and

communicated the anomaly to MOFPED in January 2013 and that no response has

been provided by MOFPED to date.

(iii) Staff requirements for Procured Ferries

A review of the operations of the ferries revealed that there was staff shortage at

all the eight of the nine ferries operating. The affected ferries included: Kiyindi,

Laropi, Masindi Port, Mbulamuti, Nakiwogo, Wanseko, Obongi and Lwampanga.

Interview with management revealed that the minimum number of required staff

would be:

On each Ferry

Ferry master 1

Ferry mechanics 2

Ferry operators 4

Ferry deckhands 2

Ferry workshop

Mechanical supervisor 1

Mechanics 3

Welders 2

Electricians 1

However, I noted that there was a shortfall on each of the operating ferries except

Bukakata. Details of the shortfalls identified are indicated in the table below:

Ferry

master

Ferry

mechanics

Ferry

operators

Ferry

deckhands

Kiyindi 3

Laropi 3

Masindi Port 2

Mbulamuti 1 3 2

Nakiwogo 3 1

Wanseko 2

Page 133: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

121

Obongi 1 2 4 2

Lwampanga 1 2 4 2

Total

shortfall

2 5 22 9

In addition, I noted that the ferry workshops lack welders and electricians who are

key in the maintenance and major repairs of the ferries hence maintenance and

repairs might not be done satisfactorily. Interview with management indicated that

staffs get fatigued due to longer hours on duty without enough rest and some

work more than six days a week. I explained to management that in such

circumstances, the chances of accidents occurring are high.

I response, management responded that it was the desire of UNRA to recruit

additional staff in all its business areas but this has been hampered by the limited

wage budget provided by Government. It was indicated that Ministry of Finance,

has consistently indicated unavailability of additional resources to increase the

wages bill. The entity is however undergoing restructuring and it is hoped that

after this exercise, a comprehensive staff requirement, aligned position

requirements and a well justified wages requirement will be pre-determined. At

this point the entity will be in position to engage Government and have the audit

issue resolved.

I advised management to expedite the exercise and recruit additional staff for

smooth operations of the ferries and ferry workshop.

7.17 Inspection of UNRA Stations

I carried out an inspection of 13 out of the 22 UNRA stations. These included

Kampala, Mpigi, Luwero, Gulu, Kitgum, Jinja, Hoima, Mbarara, Soroti, Moroto,

Kotido, Mbale and Kasese and below is a summary of the findings:

Page 134: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

122

a) Un-released funds to the stations – Shs.15,383,130,019 and

unimplemented road maintenance activities

Analysis of budget performance for year based on the approved budget estimates

and the actual funds released to the 22 Stations revealed that out of

Shs.57,376,958,816 budgeted for under maintenance program only

Shs.41,993,828,797 was disbursed to the stations leaving a balance of

Shs.15,383,130,019 undisbursed. Management of the inspected stations indicated

that this was a challenge that affected implementation of maintenance program

resulting into a number of activities not fully undertaken. Non-release of funds led

to creation of liabilities. Non-release of funds affected the state of some roads as

indicated below:

Mpigi-Kanoni Road; The road was inspected and some sections have started developing potholes and in other areas water was running along the road surface creating a channel as shown in the picture below:

Road from Gulu to Aswa; Some parts of the road are in a bad state as seen from the picture below. There is need for opening of the road banks for water to flow off the road.

In response, management explained that there was a budget cut from the URF in

the last quarter of the financial year 2012/2013 amounting to Shs.43,809,282,976

significantly affecting UNRA‘S cash flows for the fourth quarter and in turn

affecting the delivery of the station.

Page 135: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

123

I advised management to dialogue with URF and MoFPED for timely and full

release of budgeted funds.

b) Dilapidated Station Road Equipment

During inspection, it was observed that a number of road equipment were old and

in dire need of repair. The main stations affected by this challenge included Gulu,

Jinja, Soroti as evidenced in a few sampled pictures below:

Old Road Equipment at Gulu station

At Jinja station, the equipment and machinery that was old and in a bad state

included the following:

Reg. No. Type Year Make Remarks

UG.0105W Crane Truck 1987 Mitsubishi Poor. Broken down. Requires new crane assembly

UG.1199W Pick-up Single cabin

2001 Nissan S/cabin Broken down Due for disposal, uneconomical to repair

UG.1086W Pick-up Double cabin L200 2WD

2000 Mitsubishi D/cabin

Broken down Requires engine repairs

UG.1268W Pick-up Double cabin

2003 Mitsubishi D/cabin

Broken down. Requires engine overhaul

UG.0965W Motor Grader GD521A

2000 Komatsu

Broken down Requires repairs to leakages. Replacement of Starter motor Replacement of alternator

CDP 0244 Pedestrian Roller 2003 Dynapac

Broken down Requires renewal of hydraulic pump assembly and hydraulic hose pipes.

CDP 0123 Roller single drum

2000 Bomag Broken down.

UG.0102W Tipper model FM515

1986 Mitsubishi

Grounded Uneconomical to repair.

UN.REG. Diesel generator Honda Grounded

Page 136: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

124

UG.1011W M/cycle CT 200 2000 Honda Grounded

WBR/002 Pedestrian roller 2010 Weber Nonoperational due to lack of service parts

UG.1010W M/cycle CT 200 2000 Honda Grounded

UG.1071W M/cycle 2006 Honda Broken down.

UG.1040W M/cycle 2001 Suzuki Grounded

3003109 Plate compactor 2011 Hatx Nonoperational due to lack of service parts

UG.1145W Grader Fiat-Hitachi Non Operational Requires repair of fuel system Requires new tyres

At Soroti Station, the old equipment and machinery included:

EQUIPMENT MECHANICAL STATUS

UG-1171W Toyota Hillux Pickup Poor Moving Condition

UG 1309W Ford Ranger Broken Down

UAB-051z Nissan Single Cabin Broken Down

UG-0357W Mitsubishi Tipper Grounded

UG-0358W Mitsubishi Tipper Poor moving condition

UG -0427-0427w Cat wheel loader

Need engine overhaul and replacement of body

parts

Phoenix bitumen boiler Grounded

CDP AIR COMPRESSOR SCRAP

UG0025 YAMAHA WATER PUMP SCRAP

UG-1007W HONDA MOTORCYCLE SCRAP

UG-1042W SUZUKI MOTORCYCLE SCRAP

UG-1013W HONDA MOTOR CYCLE SCRAP

UG-0891W NISSAN D/CAB PICK UP SCRAP

UG-0897W NISSAN D/CABIN SCRAP

Management of the stations visited explained that the releases do not provide for

buying and replacing new equipment as this remains a responsibility of UNRA

Head Office. They explained that the machines and equipments were always

breaking down causing the stations to hire privately owned road equipment. The

privately owned equipment that is commonly hired include motor graders, bull

dozers, crane trucks and Water Bowser to carry out road maintenance work. The

Page 137: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

125

inspected stations spentShs.1,866,606,385 on hiring privately owned equipment

as summarized below:

Station Amount (Shs.)

Kampala 26,000,000

Soroti 87,656,000

Mbarara 42,995,859

Gulu 157,749,640

Jinja 89,335,000

Kasese 4,826,886

Mbale 48,087,500

Kotido 408,939,500

Moroto 101,864,400

Kitgum 540,353,600

Mpigi 358,798,000

Total 1,866,606,385

The problem of old equipment becomes so acute during the rainy season when

most roads become impassable and need urgent repair and opening up which the

old equipment cannot handle. It was also noted that hiring of privately owned

equipment is expensive and negatively affects maintenance of the old equipment.

Management explained that the entity has compiled a list of this equipment and

will soon constitute a board of survey to dispose the obsolete and un-economical.

It was indicated that procurements for 71 earthmoving equipment and 88 trucks

are in progress to replace the old equipment. One of the new excavators has been

allocated to Mbale.

I advised management to expedite the disposal process and save government of

the costs related.

c) Other Equipment Related Challenges

It was noted that some stations have operational vehicles and equipment that

require spares of standard specifications which are not readily available upcountry

and in the country for example the ISUZU DMAX D/CAB PICKUPS Parts. This

affects the maintenance program. I further observed that some stations like Mbale

Page 138: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

126

lacked specialized equipment to handle the terrain like excavators which in many

instances affects timely interventions. This station has insufficient supervision

vehicles to cover the operational areas.

I advised management to always procure equipments on condition that the

supplier offers after sales support services.

d) Fuel consumption

Drawing of huge amounts of fuel through one transaction -

A review of the fuel transaction statements revealed that there were fuel drawings

in huge amounts some time in excess of 5,000 litres. These appeared unusual.

Station Quantity Amount (Ug.sh)

Gulu 19,138 64,530,000

Jinja Station 15,993 51,907,350

Kitgum 20,354 67,590,500

Luwero station 46,503.72 161,540,508

UNRA MPIGI 6,750 22,450,000

Total 108,739 368,018,358

I noted that these drawings seem to have been intended to remove the money

from the cards and deposit it with various fuel stations which would then be

utilised using other control mechanisms such as fuel coupons and ledgers at the

various fuel stations.

I explained to management that there is a possibility that fuel could have been

misused and/or diverted for unofficial business.

I advised management to put in place adequate controls to regulate fuel

consumption and ensure fuel is not misused.

Page 139: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

127

e) Fuel paid by UNRA Head Office but not recorded in Station fuel

ledgers

It was established that UNRA had an arrangement with two (2) petrol

stations to supply fuel in advance to UNRA Stations using advantage cards. The

two fuel companies would issue fuel consumption statements and fuel invoices to

UNRA head office which documents would be used as a basis of payment for fuel

consumed during the period. A review of the fuel transaction statements which

were used as a basis of payments by UNRA Head office and the fuel ledgers for

the Stations revealed that some fuel bills paid by UNRA head office were not

recorded in the Stations fuel ledgers as indicated below:

There is a risk that fuel may not have been consumed and therefore wasted.

Management explained that in order not to cripple operations due to delayed

payments, invoices were being settled and verification done later by Regional

Accountants. This was basically because the supplier would issue only one invoice

combining consumption of all the UNRA Stations and therefore all the 22 Stations

STATION AMOUNT

1 MBARARA 33,323,032

2 HOIMA 35,789,500

3 KAMPALA STATION 29,150,000

4 GULU 82,052,500

5 KITGUM 45,071,400

6 MPIGI 41,350,000

7 LUWERO 51,461,000

8 MBALE 94,935,170

9 SOROTI 83,167,200

10 KOTIDO 106,920,000

11 MOROTO 42,458,000

TOTAL 645,677,802

Page 140: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

128

would ideally have had to verify their consumption before that specific invoice is

paid.

The system has however changed and at the moment each station is receiving its

own invoices and all of them (fuel invoices) are being verified by the Station

Engineers first, and the Regional Managers, the Director of Operations, before any

payments are recommended for settlement. In addition, reconciliations with the

supplier for the past period are now being done. I advised management to put in

place adequate systems for processing of such fuel transactions.

f) Understaffing

A review of staffing at the stations inspected showed a number of unfilled posts in

the approved structure. These included among others the road overseers, road

inspectors, plant operators and a procurement officer. I explained to management

that staffing gaps have a negative effect on the general performance of the

Authority. Furthermore, I noted that in most stations the executive assistants were

handling PDU work which should have been done by an independent procurement

staff with the knowledge and skills in procurement. It was noted that Mbale

Station‘s organizational structure appeared inadequate with only 2 mechanics. The

station lacked specialized personnel like welders and electricians which affects the

station‘s operations.

In response, management explained that most Directorates are still understaffed

due to limited wage provision. Lobbying for more funds is ongoing. Further more,

the entity is undertaking an organizational review which will come up with the

ideal staffing levels to be used to justify the request for additional funds for

wages. During the organizational review, it is expected that the positions of

qualified procurement staff will be provided for each one of the stations.

I advised management to urgently review the stations‘ structures and staffing

positions to ensure they are appropriately staffed for improved performance.

g) Road Reserve Markings

Page 141: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

129

The UNRA Act 2006, requires the entity to maintain all national roads and this

forms part of the main objectives for the creation of the authority. During

implementation of its functions UNRA is obliged to carry out road reserve markings

in the area of its jurisdiction. However, it was noted that most of the road

networks under some stations like Mbarara station were not marked.

Encroachment on the road reserves makes the work under force account and

Labor based Contracts difficult and affects effective road maintenance. I explained

to management that failure to mark the road reserves could lead to unnecessary

claims by encroachers.

Management explained that Road Reserve Marker posts have been executed on

some of the road network for example; Kampala Northern Bypass, Mbarara-

Ibanda, Mityana-Mubende-Kyenjojo-Fort Portal, Kawempe-Luwero-Kafu, Gayaza-

Kalagi and others. Six (6) contracts are on-going while others are under

procurement. The Program of road reserve marker posts shall be gradually rolled

to the entire network.

I advised management to mark all road reserves to avoid issues of encroachment.

h) Obsolete Stock at Stations

During inspection, it was noted that all the stations had obsolete stock in form of

accumulated scrap, old vehicles, old equipment overdue for boarding off and so

many used spare parts. Given the storage facility which is limited, the mechanical

staffs have a challenge of storing the new/useful equipment. I explained to

management that Limited storage availability may lead to loss of new items since

they are all mixed up with scrap.

In response, management explained that the old stock have now been separated

from the new stock. List of items from stations are being compiled for submission

to PDU to initiate the disposal process.

I advised management to plan to dispose of the unwanted stock so as to provide

enough space for the newly acquired items.

i) Status of structures/buildings

Page 142: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

130

I noted that most of the stations structures were in poor state. In Mbale station

the roof of the main office block is seriously leaking and in a sorry state which

requires immediate/urgent repairs. The Buildings are dilapidated and not safe for

working conditions. Ownership the buildings could not be ascertained as there was

no land title:

At Moroto station; the stores were located in structures which are overdue for

maintenance and is mainly occupied by obsolete items which are due for

disposal.

At Soroti station, the roof of the mechanical offices and service yards were

leaking and in a sorry state that requires urgent repairs. The mechanical

workshop was dilapidated and poorly equipped and needed refurbishment.

In Kasese; the only structure utilized as a mechanical section has been

operating without a roof for a period of 3 years. It was further observed that

the mechanical staffs do not have the mandatory tools required in the

mechanical section. The station uses a lot of money to hire equipments yet

such funds could have been utilized on other road maintenance activities.

In response, management explained that at the time of audit, procurement for the

refurbishment of nine stations and 5 regional offices was underway. At the

moment, four contracts have been signed.

I advised management to expedite the procurement process and have the stations

renovated. Similarly, mechanical tools should be provided to the mechanical staff.

j) Delays in Supply of Road Materials

UNRA Headquarters took up the responsibility of purchasing and supplying road

material especially Bitumen to UNRA Stations. During inspection, it was noted that

there were delays of distribution of road material to the stations and this affected

the planned works. The bitumen supplied was at times too little to accomplish a

given task at the road sites.

Untimely distribution of road materials may lead to delays in completion of

specified road maintenance tasks or substandard work.

Page 143: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

131

Management explained that sometimes delays in the procurement of road

maintenance materials occur due to procurement challenges. These materials are

however always received and utilized by the stations on the network. Quantities of

materials procured at a time are usually limited by the available resources.

I advised management to aim at making timely and sufficient quantity supplies

with a view of avoiding shoddy and delayed completion of works.

k) Uncompleted Routine Mechanized Maintenance projects

A review of the routine mechanized maintenance projects at Jinja station showed

that most of the projects had stalled as indicated below:

i. Nawandala - Nambale - Namalemba - Bugobi – Kisiro .

ii. Kaitabawala - Lubanyi - Kisozi - Busota, Mbulamuti railway access, Kamuli

railway access

iii. Kaliro - Namwiwa, Bulumba - Buyonjo - Wataka - Saaka, Kaliro Railway access

and Namaganda Access road

Despite the failure by the contractors to perform, management had not considered

the provisions of the contracts. I explained to management that the objectives of

the above projects have not been achieved in addition to loss of resources.

In response, management explained that UNRA has initiated the process of

concluding these contracts but it should be noted that this process is long

involving re-measurement of works so far done, use of the Contracts Committee

and forwarding the decision to the contractor. Quite often this process is stopped

by the contractors through court injunctions. UNRA also considers the financial

implication of the actions, its effects on the road network in the interim, the

required intervention in the interim, and the length of the procurement process to

secure another contractor.

I advised management to consider termination of the contracts invoking clause

59.2 sub section (a) of the General conditions of contract.

7.18 Failure to Dispose Old Equipment

Page 144: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

132

It is good practice that assets that are no longer of economic value to the

organization be disposed of, and the profits or losses that accrue from such sales

subsequently disclosed in the financial statements. Inspection of the stations and

stores of the Authority revealed that a number of items including Road equipment,

Motor vehicles (33 old vehicles at Kyambogo), Old tyres at various places including

UNRA Head quarter -Lourdel road did not seem to be of any further use. Below is

a sample of picture items/equipment/vehicles due for disposal taken from various

stations:

Vehicles parked/grounded at Kyambogo

Pictures taken at Soroti Station.

Page 145: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

133

Tractor UG 0364W due for boarding off Nissan D/Cabin Pickup UG 0897W due for

boarding off.

Nissan D/cabin Pick- up UG 0891 W recommended due for boarding off

Tipper FUSO due for boarding off.

A CPD air Compressor ready for

boarding off

Yamaha water pump Generator ready for

boarding off

Motor cycle UG 1013W ready for

boarding off

Motor cycles UG 1007W and UG 1042W

ready for boarding off.

GULU Station

Page 146: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

134

These items occupy space that would otherwise be occupied by more valuable

stocks. Besides; the items are likely to deteriorate further, leading to loss of any

possible value that could be recovered from their sale.

In response, management explained that many stations have old equipment.

UNRA has compiled a list of this equipment and will soon constitute a board of

survey to dispose the obsolete and un-economical.

I advised management to repair these items if possible to make use of them or

dispose them urgently to avoid continued loss of benefits that would accrue from

the disposal.

7.19 Poor Management of Overloaded Trucks Plying the Ugandan Roads

UNRA is mandated to weigh suspected overloaded trucks plying the Ugandan

roads and in order to achieve this, several weigh bridges including Busia, Bisitema,

Jinja, Likaya, Luwero, Mbale, Mbarara and Mubende were setup along the major

roads susceptible to damage due to overloaded trucks. In a communication dated

6th December, 2013 to URA, the Minister of State for Works raised concern

regarding (25) pulling trucks which had overstayed parked at URA yard at Cyanika

border for fear of being reprimanded in Rwanda because they were overloaded.

It was noted that these trucks had already crossed several weigh bridges along

their way to Cyanika from Kenya and Kampala without any penalties or

reprimands from UNRA as would have been expected. This position is supported

by the Minister‘s revelation in the above communication that over 90% of the

trucks parked at Cyanika had 100% excess weight despite passing several Uganda

weigh bridges un-detected.

Page 147: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

135

There is a risk that several other overloaded trucks have been plying Ugandan

roads without any reprimands or penalties and fines being imposed. In the

circumstances, I could not therefore establish the purpose for which the weigh

bridges were installed.

Management explained that the entity has hired a consultant to develop an axle

management strategy including reviewing the management of axle load control

and make recommendations on the necessary changes to the legislation to make

enforcement of axle load control more effective.

I advised management to expedite the consultancy and have all vehicles weighed

to avoid road destruction.

7.20 Inter-Project Borrowings

During the year under review, a total of Shs.189,122,590,242 was borrowed from

various projects while Shs.188,283,626,047 was lent out (or refunded). The table

below shows the opening balances of borrowed and refunded funds during the

period and amounts that remained un-refunded by the end of the financial year:

Project name

Opening balance (Shs)

Amount lent to other Projects (Shs)

Amount borrowed from other Projects during the year / refunds (Shs)

Closing balance (Shs)

Kabale - Kisoro

24,898,556,522 13,354,508,215 49,203,115,057 (10,950,050,320)

TSDP 1,821,997,500 20,509,194,388 22,436,154,638 (157,272,127)

Maintenance (6,365,728,078) 26,781,613,388 14,359,263,942 6,056,621,368

HoimaKaiso Tonya

(7,836,006,681) 8,190,403,332 20,580,833,262 (20,226,436,610)

Kla-Ebb Expressway

3,168,905,322 15,979,285,957 40,377,457,980 (21,229,266,683)

Mbarara-Kikagati

(18,824,164,254) 12,645,940,955 4,800,269,038 (10,978,492,337)

Fort Portal-Bundibugyo

(2,747,254,898) 0 40,436,441 (2,787,691,339)

Transport Corridor

8,608,307,581 90,281,691,682 36,426,370,299 62,463,628,964

Nyakaita-Kazo-Kamwenge

(3,860,205,842) 540,988,130 898,689,585 (4,217,907,297)

Totals 188,283,626,047 189,122,590,242

Page 148: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

136

I explained to management that the practice exposes the Projects to the risks of

loss and dispute in case the borrowing Project does not repay or in case the

Development partners do not approve the borrowing.

Management explained that a bold step to ensure that inter Project borrowings are

minimized has been taken. This however shall affect the speed at which projects

are implemented and lead into payment of interests for delayed settlement of

Interim Payment Certificates.

I advised management to ensure that the funds disbursed for Project activities are

specifically used for the intended activities and not co-mingled with other Projects‘

funds. In situations where borrowing or lending is needed, prior approval by the

Board should be sought.

7.21 Fraudulent Fuel Transactions

It was established that over Shs.1.1 billion was wrongfully paid to a fuel company

as a result of wrongful acts by some individuals during the period 1st July 2012 to

31st April 2013. From the review, the following anomalies as highlighted by

internal audit were noted:

The fuel company was supplying excess fuel and lubricants to UNRA stations

as compared to the quantities and amounts ordered for by UNRA through the

Director Finance and Administration for each station.

In the period from 1st July 2012 to 30th April 2013, the fuel company over

invoiced UNRA Shs.1,416,937,242 for fuel and lubricants which UNRA stations

did not download from fuel stations. This figure was made up of the excess

fuel in bullet one above.

Out of Shs.1,416,937,242 over invoiced to UNRA, the fuel company had

already been paid Shs.1,142,115,230 for the period from 1st July 2012 to 28th

February 2013. These payments excluded Masaka and Gulu where the auditors

did not get access to information in time.

Most of the disputed fuel and lubricants by UNRA stations appearing on the

monthly statements of accounts was downloaded outside the operational areas

of the respective stations.

Page 149: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

137

Some of the over invoiced fuel was for fuel stations that had not dealt with any

of the UNRA stations.

In most cases the excess fuel and lubricants were downloaded just before

stations made their first transaction using the fuel card. At all the stations,

ordered for fuel allotted and lubricants were not tampered with.

Some of the withdrawals were so abnormal to the extent that the same fuel

card was used to make downloads at the same time or span of 5 times on the

same day from different fuel stations which were 400 km apart from each

other.

It was noted that the fuel company interchanged code numbers for dome fuel

stations to cover up the fraud. example; one of the branches had two code

numbers, 239 and 238 that were used interchangeably.

I noted that under the circumstances, UNRA incurred a financial loss of over Shs.1

billion under fraudulent transactions.

In response, management explained that this was an issue of over invoicing by

the fuel company which was initially found out during the routine process of

verification and confirming the correctness of the invoices submitted to UNRA for

payment. Based on this initial finding, preliminary communication was made to the

fuel company over the same subject culminating into a full process of

reconciliation of all fuel supplies by the fuel company. This process of

reconciliation was later reinforced by the Internal Audit Report referred to above.

Management indicated that once concluded, they will be able to establish the

amount that is not supported and action shall then be taken. In order to ensure

action, UNRA is withholding payment of invoices to this company amounting to

over 3.5 billion pending the conclusion of the investigation.

I advised management to institute deeper investigations into the matter.

7.22 Engineering Audits

A sample of seven road contracts was selected for the audit constituting a total

sum of Shs.501,503,491,123 and Euro 61,187,335. Below is the summary of key

findings arising from the Engineering Audit:

Page 150: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

138

a) Irregular and nugatory payments (Shs.27,374,522,509 and

€2,474.05)

A total of Shs.27,374,522,509and Euro.2,474.05 was paid to the various

contractors for works that had not been executed (Shs.1,289,505,648

&€2,474.05), and for costs that should have been avoided (Shs.26,085,016,861) if

proper contract management procedures had been followed. The summary of the

irregular and nugatory payments is shown in the table below.

Contract / Contractor/Amount

Payment in Shillings

Unexecuted works1

Nugatory2 Totals

Staged Reconstruction of Mbale

– Soroti Road – Lot E (103Km) by M/s Dott Services at

Shs.108,124,833,428

1,228,816,248

26,085,016,861

27,313,833,109

Reconstruction of Priority sections on the Kampala-

Mbarara Road: Package C:

Nsangi – Kamengo, Lukaya- Masaka and Katonga Bridge by

M/s Reynolds Construction Company (Nigeria) Ltd at Euro

61,187,334.90

€ 2,474.05

€ 2,474.05

Periodic Maintenance of Lumbugu – Lwamagwa -

Lyantonde Road (50Km) by M/s

Abubaker Technical Services & General Supplies Ltd at

Ushs.1,916,903,400

58,833,000

58,833,000

Term maintenance of 29 No selected National roads –Lot 6:

Iganga-Mayuge road (20km), Mayuge- Musita road (14km),

Mayuge- Nankoma Road (23km)

and Mayuge- Bugadde- Bwondha roads (39.8km) by M/s

Tegeka Enterprises Ltd at Shs.2,878,302,000

1,856,400

1,856,400

1Works that have been certified and paid yet they have not been executed by the contractors

(Shs.1,289,505,648 and €2,474.05). 2 Works paid but would have been avoided (Shs.26,085,016,861).

Page 151: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

139

The nugatory expenditure (Shs.26,085,016,861) relates to additional costs arising

from the revision of rates as a result of delays in execution of the contract caused

by delayed provision of design documents to the contractor.

The Accounting Officer has indicated that some of the above payments were

under verification while the nugatory payments were unavoidable given the

circumstances surrounding Mbale-Soroti Road.

The Accounting Officer should ensure recovery of all monies irregularly paid to

contractors and take responsibility for the nugatory expenditures.

b) Variation of Price (VoP) had been certified in excess and /or

Overpaid by Shs.33,207,607,133

Like in the previous three audit reports, payments for price adjustment or revision

of price has continued to be of concern and UNRA has not resolved this matter

fully. The Parliamentary Public Accounts Committee recommended that UNRA

harmonises with the OAG the VoP position on all the contracts where anomalies

had been noted. By the time of this report (31st march 2014), this exercise was

underway and the VoP position for two contracts had been ascertained and agreed

by the two parties. The joint verification exercise established that a total of

Shs33,207,607,133 had been certified in excess in respect of VoP on the two

contracts for Kazo – Kamwenge road and Fort Portal –Bundibuyo –Lamia road as

indicated in the table below.

Project IPC Vop certified and/

or paid by UNRA, Shs

VoP certified in

excess, Shs

Kazo – Kamwenge

road

As of IPC No.30 32,652,903,974 4,260,642,802

Fort Portal –

Bundibugyo –Lamia road

As of IPC No.41 74,998,204,698 28,946,964,331

Total 33,207,607,133

A joint calculation for Kampala- Mbarara Road: Package C and other contracts will

be concluded and reported in due course.

Page 152: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

140

The amounts ascertained to have been certified in excess or overpaid should be

recovered from the contractors. The Accounting Officer should also ensure that in

future VoP clauses are made clearer to both parties prior to contract signing.

The Accounting Officer has indicated that further payments for VoP on Kazo-

Kamwenge and Fort Portal – Bundibugyo –Lamia roads have been withheld

pending the results of the joint verification exercise.

c) Poor Implementation and Monitoring of Social Safeguards on

Projects

It was observed that for a number of projects audited, road safety issues were still

not being strictly enforced yet Safety Officers continued to be paid. It was also

observed that a number of regulatory and informative signs on roads were being

vandalised or maliciously damaged. For example on Fort Portal – Bundibugyo

road such road signs were burnt. Other road furniture like reflectors were being

stolen.

Important aspects to curb the environment like restoration of borrow pits for

gravel and fill material was not considered in the bills of quantities for some

contracts e.g. Periodic Maintenance of Lumbugu – Lyantode.

It have recommended that the Accounting Officer takes due care the social

safeguards deserve and enforce them on all projects. All future project designs

and bills of quantities should incorporate such measures to prevent, minimize and

mitigate potential adverse environmental and social effects of projects.

d) Supervision and Contracts Management

There has been significant improvement compared to previous audits in regard to

certification and payment for works. However, there are still cases like Mbale-

Soroti road where irregularities have been cited. Most of the projects are

supervised by hired Consultants and a handful projects are still being manned by

in-house technical staff at the stations.

Page 153: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

141

The Accounting Officer explained the new Consultant is carrying out their services

very well.

I have expressed to the Accounting Officer the need for UNRA to exercise more

control over project supervisors to ensure quality works are delivered and funds

are not misused through payments for un-executed quantities of work since these

triangulate to illegal advances to contractors. Contractors, Supervising

Consultants and UNRA Project Managers who do not deliver should be penalised in

accordance with the regulations.

7.23 Summary of Key Findings per Project:

The key findings for each of the projects audited are presented in the table below:

Road Name/ Contract Amount

Key Findings

Staged Reconstruction of Mbale – Soroti Road – Lot

E (103Km) by M/s Dott Services at

Shs.108,124,833,428

Poor record keeping evidenced by absence of key documents like variation order in contract management and PDU files limiting the scope of audit.

Contractor‘s financial inability to handle the project

which is evidenced by inherent slow progress, continuous requests to wave contract clauses like

payment of materials on site and minimum amount of IPC.

Non recovery of advance payment from the

contractor upon achieving 30% of the cumulative value of works in so doing frustrating other projects where

contractors have not been paid for work done.

Nugatory expenditures of Shs.24,415,692,861 due

to delayed provision of design documents to the

contractor which resulted in higher rates for executing the works

Overpayment of Shs 899,780,748 for works done

within the original contract period which should not have been affected by the revised rates.

Overpayment of Shs 58,275,000 for scarification

and re-compacting repeatedly paid in IPC 7 and 8

Overpayment of Shs 82,500,000 respectively for

road bed preparation on the existing carriageway where scarification and re-compacting existing layer has been

done. The items cannot be executed in the same place.

Overpayment of Shs 22,687,500 in IPC 6 and 8 for

repeated section of scarification and re-compacting

existing layers

Overpayment of Shs 165,573,000 paid both

scarification and re-compacting and common

Page 154: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

142

excavation to spoil on the same location

Uncharged Shs 165,000,000 for the Contractors

inability to update work programme

Contentious commencement date which resulted in

nugatory expenditures of Shs 737,824,000 for time related charges paid in maintaining the consultant on

site while the contractor was not working waiting for

the entire set of designs

Slow progress of works which was 52% at the end

of November 2013 against 80% lapsed time. The delay is equivalent to Shs 690,000,000 as time related

charges and Shs 241,500,000 for under utilisation of

the consultant supervising staff

Delays in decision making by UNRA including

Variation Order No.1 due to increased scope of work, Change of size of stones for second seal, Change of

chip spreader and size of stone chippings, Change from

pre-coated chippings to wet fix, Use of precast concrete slabs for lined drains instead of grouted stone pitching

Approval of uneconomic design which GIBB had

valued at Shs 60,881,988,914 with a design life of 2-3

years as opposed to the alternative design option

valued at Shs67,765,458,914 with a design life of 5-7 years.

Inadequate dust control on the road works causing health

complications to human beings, destruction of crops and

other surrounding vegetation, and also affecting the safety of road users by minimizing visibility

Upgrading of Kazo –

Kamwege road to Bitumen Standard

(75Km) by M/s M/s China Railway Seventh Group

Corporation Ltd (CRGS)

at Ushs.167,458,031,180

Analysis of the works contract indicated that the

form of agreement did not include the contract amount.

There was also a contradiction on the sources of indices in the contractor‘s appendix to bid whose clarification

was not seen. Quantities of some work items increased by huge

amounts for example excavation in swamps or wetlands

by 344%; the designs were prepared by qualified

consultants who did not predict such quantities. The Engineer is empowered to fix rates when quantities

vary significantly but this was not done and no Variation orders in this regard were seen.

Minor transverse cracks were observed on

pedestrian walkway at Ch.92+195.

There was notable siltation in access and cross

culverts. Some sections of lined drains were silted and

vegetation growing in the channel.

All stone pitched side drains terminate at points

susceptible to scouring. In some sections of stone pitched drains e.g. at Ch.

138+595, the bonding joints are oversize as compared

to the stone size. Warning signs for approaching traffic at work sites

were inadequate which can lead to fatal accidents.

Page 155: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

143

There was inadequate protective gear for workers

especially at the stone quarry and sections where stone

lining of drains was underway at the time of audit. The soffit of the roof slab for the waiting shelter at

Ch.92+195 had inadequate reinforcement cover.

Aggregates used for CRR at CH.100+400 Rhs did

not meet the grading requirements for the fine type.

Aggregates of 10mm for the 2nd seal did not meet

the requirement specifications for grading and flakiness index.

Use of provisional base indices provided at the

bidding stage in the calculation of VoP. The provisional base indices should have been updated and confirmed

at since the commencement of the contract. This has

implications in the computation of VoP. Up to certificate No.30 of October 2013 VoP had

been been certified in excess and/ or overpaid by

Shs4,260,642,802.

Upgrading of Fort Portal – Bundibugyo – Lamia

road (103Km) by M/s Chongqing International

Construction Corporation

at Shs.217,842,539,325

This project was audited as a follow-up case and

most of the issues observed in the previous report have been attended to other than the Variation of Price. The

joint verification exercise has established the VoP certified in excess at Shs28,946,964,331 as of

certificate 41. This amount is recoverable..

The financial progress is not clearly evaluated by

the Consultant; IPC No.40 revealed Shs.220,313,803,470 was due to the contractor yet the

revised contract sum is 217,842,539,325 causing a deficit of Shs.2,471,264,100 and more certificates are

expected.

Surface defects were observed at Ch.0+390 which were reportedly a result of turning vehicles loaded with

steel bars scratching the road surface.

Landslides in the mountainous section continue to

be a threat to the road surface. Concrete culverts were being used to control traffic

at work sites without forward warning signs to

approaching traffic. This poses a danger of accidents to road users

A number of sections on the road have structures

and houses that affect critical visibility along bends.

Some road furniture was being destroyed by communities living along the road. The road signs

were being burnt. Some delineators were found broken and steel bars

exposed.

Some reflectors on guardrails were missing and

reportedly stolen.

Reconstruction of Priority sections on the Kampala-

Mbarara Road: Package

C: Nsangi – Kamengo, Lukaya- Masaka and

Katonga Bridge by M/s

Inadequate justification for direct procurement

method. Delayed payments to contractor which will attract

interest on delayed payments.

Overpayment of Euro 693,481.42 in Variation of

Price. The VoP is yet to be verified through a joint

Page 156: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

144

Reynolds Construction

Company (Nigeria) Ltd at

Euro 61,187,334.90

recalculation with UNRA.

The Shoulder embankment at Ch.116+200 and a

few other localised areas had developed gullies Cracks were observed in the mortar joints of the

stone pitching.

The drop manholes at several locations were silted.

Laboratory tests revealed that seven (7) out of the

eight (8) samples for AC and DBM had low results for

indirect tensile strength. Overpayments of Euro2474.05 for unexecuted

quantities of works.

The project manager did not revise the rates for

items whose quantities had increased by more than 25% as required by the contract conditions.

Periodic Maintenance of

Lumbugu – Lwamagwa - Lyantonde Road (50Km)

by M/s Abubaker

Technical Services & General Supplies Ltd at

Ushs.1,916,903,400

The special conditions did not specify the Project

Manager as required. It was indicated that it will be

communicated to the contractor in writing. Letter communicating this information was not seen.

The minimum value of interim payment certificates

was not spelled out which affects the contractor‘s

targets and could have led to delayed completion of works.

The Special conditions of contract clause GCC 57.1

provides a requirement for Environmental Compliance Certificate yet the bills of quantities did not provide for

restoration of fill and gravel borrow pits as it is

expected. There was lack of routine maintenance by the

station leading to overgrowth vegetation in drains,

shoulders and the culverts were silted. Rutting was observed on some sections.

Gravel used as wearing course between Ch.

37+000 to Ch. 41+000 was of coarse type comprising

of oversize particles which exceed the nominal size specified. Invert levels along the outlet channel/drain

for a number of culverts could not allow free flow of

water and caused stagnation. It was explained that people do not allow such drains beyond the 30m road

reserve. The side drain at Ch.12+676 under-scoured on

both sides for approximately 100m.

One piece of culvert ring had cracked at Ch.30+750

Lhs.

Traffic warning signs especially for sharp bends

were missing for example for approaches to a bend between Ch.31+000 to Ch.32+000.

A DCP check at Ch.7+900 revealed a poorly

compacted top layer which is susceptible to wearing off fast.

An overpayment of Shs.58,833,000 was made in

respect of gravel as a result of paying for a wider width of the road than was executed.

Maintenance and

Reconstruction of

The performance bond was addressed to MoWT

Page 157: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

145

Kamwenge – Dura –

Rwimi Road (60km) by

M/s Marvel Contractors and Road Maintenance

Ltd at Shs.3,282,881,790

when the contracting authority was UNRA. It is not

clear how this is being managed by UNRA to guarantee

performance by the contractor. The performance security expired on 21st

December 2013; while the defects or snags raised by

the Station Engineer had not yet been rectified at the time of audit on 20th January 2014.

Another contractor instituted by Hima Cement was

found working on the same road hence overlapping works when M/s Marvel had not been discharged. This

makes it difficult to differentiate between the works of

the two contractors. The Works were tendered out when designs were

incomplete which delayed commencement and also led

to additional costs as the road had further deteriorated. The gravel used contains more coarse aggregates of

nominal diameter greater than that specified. However,

the material test results in the progress report indicate that it met the specification which implies that the

results could have been forged.

Term maintenance of 29 No selected National

roads –Lot 6: Iganga-Mayuge road (20km),

Mayuge- Musita road

(14km), Mayuge- Nankoma Road (23km)

and Mayuge- Bugadde- Bwondha roads (39.8km)

by M/s Tegeka Enterprises Ltd at

Shs.2,878,302,000

Delayed completion of works by the contractor

for a total of 74 days i.e. 20 days in the 1st Cycle and 54 days in the 2nd Cycle respectively

The provisions within cycles did not fully address

the necessary works on the road e.g. removal of boulders and provision of fill materials in

embankments and low spots were not provided for.

Mayuge- Musita road section observations

Stone pitching works worth Shs.8,568,000 were

destroyed by Mayuge Sugar company. Inadequate camber observed at Ch.2+500,

5+100 and 12+700

Shoulder erosion was observed at ch.12+000

LHS Water ponding was observed ialong the side

drain at 13+200 RHS within Mayuge Town.

The locals had blocked the side drain between

ch.9+600- 9+800 to hold water for brick making.

Mayuge – Bwondha Road section observations

Loss of camber on the road surface on some

sections e.g. from Ch. 0+800 – 1+100 and

ch.11+700.

The side drain at Ch.5+200 LHS and 5+200 was blocked to create accesses to the adjacent premises.

The road width at some sections e.g. 9+600 and

26+700 was narrowed due to the presence of rock

outcrops. ; Cracks were observed on the bottom of cross

culvert at Ch.6+000 and Ch.26+000.

Inadequate culvert pipe cover at Ch.23+700 and

Page 158: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

146

34+100, the pipe cover was 210mm and 250mm

respectively instead of 500mm specified.

Iganga- Mayuge road section observations

Water ponding was observed along the side drain

in some sections e.g.Ch.1+200 LHS for about 200m Overpayment of Shs.1,856,400for stone pitched

drains on Iganga – Mayuge road

7.24 TRANSPORT SECTOR DEVELOPMENT PROJECT

(a) Compliance with the Financing Agreement & GoU Financial

Regulations

It was observed that management had complied in all material aspects with the

financing agreement and GoU financial regulations except for the following

matters;

i) Inter-project borrowings

The project had an outstanding balance of Shs.1,828,815,000 lent out to other

projects at the close of the previous year, which was recognized as a receivable at

the start of the current financial year. During the financial year under review, the

project lent additional Shs.20,509,194,387 to other projects bringing the total

amount let out to Shs.22,338,009,387. The project also borrowed

Shs.22,495,281,514 from other projects resulting into a net payable of

Shs.157,272,127 as at 30th June, 2013.

Such movement of funds could affect the implementation of project activities.

Management explained that Government of Uganda (GoU) funds that had been

allocated to the Transport Corridor, another GoU Project, were utilized to pay for

Land and Property Compensation on the Vurra-Arua-Koboko-Oraba road corridor.

This was done as a temporary intervention to avoid possible undue delays and

disruption of civil works on the road corridor, which was at a critical stage of

implementation. Management further explained that the cause of the borrowing

was occasioned by the delays in release of GoU funds for the road. However, all

inter project borrowings referred to above have been fully settled in the financial

year 2013/14.

Page 159: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

147

Management was advised to ensure that sufficient resources are obtained for the

project to enable proper implementation of project activities. Prior approval should

be sought before any borrowing or lending is undertaken.

ii) Taxes to the Government

Withholding tax was properly computed on all the payments to the Project service

providers and the payment vouchers indicate payment of the taxes due. However,

it was noted that Project management did not obtain copies of the withholding tax

certificates from Uganda Revenue Authority to confirm remittance and receipt.

Details are indicated in the table below.

Date Payee/particulars US$

30/10/2012 15% WHT from payment 111,162

18/2/2013 15% WHT from payment

70,673.9

Management responded that at the time of audit, WHT had not been

acknowledged by URA. URA delayed in issuing the TCC‘s because the service

provider is a foreign company. Management promised to avail the receipts for

audit once they are secured from the URA.

I advised project Management to obtain the certificates to enable proper

accountability.

iii) Procurement

I noted that the contract awarded to a company worth USD 27,500 did not have a

procurement file containing necessary documentation to indicate which

procurement procedures were followed. I was therefore unable to ascertain that

the procurement complied with the PPDA regulations.

Although Management responded that the company was recommended by World

Bank to assist in the training of some critical staff in Contract Law and

Page 160: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

148

Management and had issued a No Objection letter to the Ministry for this training,

I was not provided this information.

I advised that procurements should be done in accordance with PPDA regulations.

7.25 ROAD SECTOR SUPPORT PROJECT I (RSSP I) - KABALE-

KISORO/BUNAGANA-KYANIKA ROAD

i) General Standards of Accounting and Internal Control

A review carried out on the General Standards of Accounting and internal control

system and the following shortcoming noted;

Observations from road tour

On 29th September 2012, the contractor finalized the road construction and

handed over the road to UNRA. During the period of 30th September 2012 to 30th

September, 2013, the project was under the defects liability period.

During a tour of the road with the UNRA western region station engineer on 25th

October 2013, I observed that following;

At Km 34 + 900, one lane of the road developed a crack of about 4 inches

deep which was attributed to the nearby swamp.

At Km 37+700 to 900, one side of the road slid causing cracks at the sector.

At Km 66+700 the culvert on the left hand side of the road was cut off by

water running from the hill across the road.

Delayed repairs from the contractor may lead to accidents which in turn would

negatively impact on UNRA‘s public reputation.

Management explained that the cracks at Km 34 and Km 37+900 were located in

a section whose defects liability period ended in 2011, while the culvert at Km

66+700 was damaged due to heavy rains which occurred in September 2013.

They further explained that the contract for the repair works had been approved

and works were scheduled to commence soon. Meanwhile the culvert would be

repaired as soon as the contractor commenced laying asphalt in the last 22 Km

which were originally completed with double surface dressing.

Page 161: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

149

I advised management to ensure that all defects are rectified by the contractor as

agreed.

7.26 ROAD SECTOR SUPPORT PROJECT II (RSSP II - FORT PORTAL –

BUNDIBUGYO-LAMIA ROAD PROJECT

(a) Compliance with the Financing Agreement and GoU Financial

Regulations

A review was carried out on the project compliance with the credit agreement

provisions and GoU financial regulations and it was noted that the project

complied in all material respects with the provisions in the agreement and applied

GoU regulations except in the following matters:

(b) Non Compliance with Income Tax Act Cap 340

It was noted that Shs.21,890,429,190 in respect of withholding tax was not

deducted and remitted to URA contrary to Section 119 of the Income Tax Act.

The practice could attract penalties in accordance with the Act.

In response, Management explained that according to the laws governing Works

Contracts, Contractors on development projects are paid on a reimbursement

basis. The BOQ includes bill items most of which are fixed by the employer with an

allowance for a pre-determined profit usually not exceeding 10%. Given this

scenario, issues relating to tax payment are directly handled by Uganda Revenue

Authority (URA) and the contractor. Management further added that because

these are large tax payers, most development contractors are exempt from

withholding Tax.

I informed management that in absence of exemption certificates the provisions of

the act should be applied.

(c) Land and Property Compensation

Article V Section 5.01 of the loan agreement stated that prior to the

Commencement of construction works, all project-affected persons in the sections

Page 162: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

150

of Lot1 and Lot2 should have been fully and adequately compensated in

accordance with the Resettlement Action Plan (RAP).

I noted that this Project is about 98% complete and 100% of the earthworks

done. However, an estimated 17% of the land and property owners were not

compensated prior to commencement of the construction work.

Management responded that this activity was affected by the beneficiaries who

could not be traced at the time of the compensation exercise before the

commencement of construction works. Some had already shifted to new locations

and other beneficiaries up to now have not yet resolved family disputes regarding

ownership, some lacked letters of administration and powers of Attorney,

recognising them as legitimate owners/administrators of the properties/estates.

I advised UNRA Management to follow up the compensation programme to avoid

unnecessary costs associated with litigation.

(d) Inter-Project transfers

At the start of the year under review, the project had borrowings amounting to

Shs.10,557,355,156 and receivables totaling Shs.9,976,813,707 from other

projects. During the year, the project borrowed additional Shs.19,401,143,149

from other Projects and also transferred Shs.4,956,492,685 to other projects

creating an overall payable position of Shs.14,444,650,464 at the end of the

financial year.

Although management responded that they obtained internal authorization for the

transfers, the inter project borrowings affect implementation arrangement of the

project.

I advised management to minimize the inter project transfers as these could

disrupt the implementation of project activities.

8.0 THE UGANDA ROAD FUND

8.1 Failure to Implement the Uganda Road Fund Act

Page 163: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

151

I noted that the Fund does not operate as envisioned and may not effectively

finance the maintenance of the public roads due to failure to observe the

applicable laws as indicated below:

(a) Implementation of the Road Fund Act – Collection of Road User

Charges

According to Section 21 of the Uganda Road Fund Act, Uganda Road Fund is

required to collect road user charges. However, it is Uganda Revenue Authority

(URA) that collects road user charges. Due to this conflict in the two laws,

Management of Uganda Road Fund has failed to operationalize the provision in the

Road Fund Act which may hamper the activities of the entity.

Management explained that action has been taken by seeking advice of the

Solicitor General (SG). In the meantime, a cabinet memo has been drafted with

regard to the matter and awaits action by the Minister of Finance, Planning and

Economic Development.

I have advised management to liaise with the various stakeholders in a bid to

harmonize the various laws impacting on the operations of the Fund.

(b) Lack of Regulations operationalizing the Fund Act

Following the enactment of the URF Act, 2008 it was incumbent upon

Management and the Board to ensure regulations are developed that would guide

the secretariat in application of the same Act and the operations of the Fund.

However, I noted that for the past 4 years of the Fund‘s existence, it has been

operating without regulations contrary to Section 49 (1) of the Act.

In their response, management explained that regulations have been drafted and

are scheduled to be considered at the 41st Board meeting expected to take place

early 2014 and thereafter forward them for gazetting by the Minister of Finance,

Planning and Economic Development.

The outcome of the above management commitment is awaited.

8.2 Funds Released to Designated Agencies

Page 164: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

152

Contrary to the URF Accounting Policies and procedures Manual that requires that

within two weeks after the end of each quarter, designated agencies are required

to submit accountability statements in respect of the monies of the Fund released

to them in the quarter; Shs.12,415,977,407 worth of releases to delegated

Agencies had not been accounted for by the Agencies by way of statements of

expenditure at the time of reporting. The Accountability statement is supposed to

show the amount spent for each activity. I explained to management that there is

a risk that the funds could have been diverted for unauthorized activities.

In response, the Accounting Officer explained that he has always faced challenges

of obtaining statements of expenditure in time from the Agencies but was

following up the matter.

I have advised the Accounting Officer to institute measures with a view of

ensuring that the funds are accounted for.

8.3 Lack of a Risk Monitoring Guide (RMG)

It is best practice that Management periodically assesses the risks the entity faces

from both external and internal sources and take appropriate action to manage

the identified risks. This is possible with the existence of the RMG. However, it was

noted that there is no RMG in place. I explained to management that a RMG

facilitates effective risk assessment and aids managers to take prompt and

appropriate action to mitigate them. Besides, it directs resources where they are

needed most.

In response, the accounting officer explained that the RMG is being drafted and is

expected to be ready by February 2014. An expert was hired to carry out the

assignment. The outcome is a waited.

8.4 Lack of an approved Staff Training Policy (STP)

Good Human Resource practices require an organization to put in place a Staff

Training Policy (STP) to guide Management with detailed guidelines in the

development of its human resource personnel for effective service delivery. During

the review, it was noted that management does not have an approved STP in

Page 165: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

153

place to guide in effective training of its staff. In the absence of a training policy,

there is a risk that irrelevant training courses could be undertaken that may not

add value to the entity leading to wasteful expenditure and or misuse of the

training budget.

In their response, management explained that the training policy is before the

Board for approval.

I advised management to follow up the matter and have the policy approved.

8.5 Failure to Dispose Old equipment

It is good practice that assets that are no longer of economic value to the

organization be disposed off and the profits or losses that accrue from such sales

subsequently disclosed in the financial statements. Inspection of the stores of the

Fund revealed that a number of items including ICT equipment, photocopier, Air

conditioners, office chairs and tyres were in store yet they did not seem to be of

any further use to URF. These items occupy space that would otherwise be

occupied by more valuable stocks. Besides, they are likely to deteriorate further;

leading to loss of any possible value that could be recovered from their sale.

In their response, management indicated that based on the recommendations of

the board of survey, the process to dispose the equipment shall commence soon

and conclude in early 2015.

I advised Management to expedite the process to avoid continued loss of benefits

that would accrue from the disposal.

8.6 Irregular use of Fund vehicle

It was noted that the Chairman of the Board uses a Fund vehicle that was

allocated to him for temporary usage in the Monitoring and Evaluation (M & E) of

the maintenance program in May 2011 until the monitoring unit was set up.

However, the Chairman has continued using the vehicle even after the unit was

set up. The board members‘ entitlements did not provide for this kind of benefit. I

explained to management that making allocations of benefits beyond the

Page 166: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

154

approved entitlements is irregular. Besides, there is a risk that decisions are not

done with adequate independent objectivity, which is contrary to Corporate

Governance principles.

In their response, management explained that the vehicle was released for

temporary usage for monitoring and evaluation of KCCA and UNRA network

because at that time the M&E department was not fully set up. Management

further explained that they are yet to seek authority for the use of the vehicle

from MoFPED. However, at the time of reporting, the authority had not been

availed.

I advised management that in absence of authority the vehicle should be returned

and associated costs be recovered accordingly.

8.7 Fund Budget Performance – failure to implement planned activities

It was noted that management did not achieve some of its set targets for the year

as indicated below:

Output definition Annual Target

Actual Out Put

Audit Remarks

Develop the 5 year strategic plan and business plan FY 2012/13

1No. 5 year strategic plan

Nil Not realized.

Acquire road condition data across the entire network

Compile an inventory of road condition data by Q3

Nil Not realized.

Physical and Financial Performance reports of DAs

4No. Nil Not realized

URF Internal Monitoring Reports

2No. 1 report produced.

Did not deliver as expected.

I explained to management that failure to implement the planned programs

affects the fulfillment of the objectives of the Fund.

I advised Management to implement activities appropriated by Parliament as

planned.

Page 167: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

155

JUSTICE LAW AND ORDER SECTOR

9.0 MINISTRY OF JUSTICE AND CONSTITUTIONAL AFFAIRS

9.1 Court Awards and Compensations

One of the responsibilities of the MoJCA is to represent government in any claims

made against it and to settle compensation and court awards arising from such

claims. By the end of the financial year government was indebted to a tune of

Shs.164bn as reflected in the financial statements. An examination of documents

relating to the amount revealed the following;

i) Accumulation of arrears

The arrears figure rose by 200% from Shs.82b in the year 2011/12 to Shs.164bn

in the year under audit. This raises the question of the extent to which

government is making effort to minimize court awards and compensations. During

discussions the Accounting Officer explained that it was important for government

to decentralize the payments of court awards and compensations to the entities

where the causation of the award/compensation is. This would enable linkage of

payment/loss directly with the cause of the loss. The benefit of this would be two

fold; 1) The causer of the loss would (if culpable) be held liable; and 2) The entity

involved would have direct interest in the case and would therefore strive to have

the case expeditiously and effectively concluded. This action in his opinion would

reduce on the rapid accumulation of the arrears.

I concurred with him and informed him that I would bring the matter of

decentralization of payment of court awards to the attention of Parliament.

ii) Payment of arrears

From the commentary on the financial statements by the Ministry Accounting

Officer, as at 30th June, 2013, the Ministry of Finance Planning and Economic

Development (MoFPED) has been releasing minimal sums of money to settle this

item of Statutory Court Awards, as per the approved budget. For the financial year

2012/2013 only Shs.4.3 billion was approved and released by MoFPED for the

Page 168: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

156

item. The delays in settling claims only worsen the situation and leads to

accumulating unmanageable amounts.

Management explained that they have continued to engage MoFPED and other

stake holders to ensure that reasonable provision for the Court awards and

Compensation is availed to the Ministry. They explained that they continue to do

this through the Parliamentary committees and letters to MOFPED requesting for

supplementary funding and an increase of the MTEF.

iii) Documentation

I was not provided with documentation in respect of the claims, court awards and

ledgers to support the figure. As a consequence, I was unable to verify the

correctness of the figure of court awards and compensations.

I advised Management to provide documentation to support the amount of court

awards and compensations in the financial statements.

9.2 Other Operating expenses (recurrent)

The Statement of Financial Performance for the year ended 30th June 2013

reported miscellaneous expenses (recurrent) of Shs.88, 545,581,549. However,

total transfers received from the Treasury were only Shs.36,868,184,164 and

there was no evidence of the supplementary budget extended to MoJCA.

Furthermore, the details and accountability documents for the miscellaneous other

expenses were not provided. As such I was unable to confirm the amounts

reflected as miscellaneous revenue.

Management responded that Shs.88,545,581,549 billion in question relates to

the liabilities for the financial years 2012/13, which included;

Shs.87,621,581,679 court wards, human rights tribunals awards,

compensations, rent, and contribution to international organizations, as well as

Shs.923,999,870 expended on utility and other operational expenses. However, I

was unable to confirm the amounts as there was no documentation to the effect.

Page 169: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

157

I advised management to ensure that proper accounting records are posted and

maintained to support accounting transactions.

9.3 Rent Payments (Produced Assets Private Entities)

It was noted that the Budget for Rent (produced assets to private entities) was

Shs.2,403,815,000. However, the actual expenditure as revealed by the

transactions on payment vouchers totalled to Shs.3,477,321,924. This caused over

expenditure on rent Shs.1,073,506,924.

I find it irregular to spend above the budget allocation without authority and/or

previous year disclosure as domestic arrears.

9.4 Absence of Strategic Plan

A strategic plan provides an organization with purpose and direction. It is an

important tool in steering an organization towards its Vision, Mission and the

overall Mandate. Annual activities undertaken by any organization should be

derived from the strategic plan. However, it was noted that the Ministry lacked an

approved Strategic Plan for the period 2012/13-2016/17. A draft plan had been

prepared but had not yet been approved a year into the period into which it was

supposed to be operational. Absence of an approved strategic plan as an overall

guide to planning and priority setting, could lead to sub optimal choices.

Management reaffirmed the existence of a draft. This is awaiting the input of the

Political leadership.

I advised Management to expedite the approval of the strategic investment plan.

9.5 Non-divestiture of Centre for Alternative Dispute Resolution (CADRE)

The Arbitration and Conciliation Act, 2000 (Cap.4) is an amendment of the laws

relating to Domestic Arbitration, International Commercial Arbitration,

Enforcement of Foreign arbitral awards and to define the law relating to

conciliation. The Act establishes the Centre for Arbitration and Dispute Resolution

(CADRE).

Page 170: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

158

The rationale for establishing CADRE was to promote arbitration and alternative

dispute resolution to decongest the Commercial Court and create a conducive

business environment for promotion of business and attract investments.

CADRE is one of the agencies which was recommended for divestiture into

autonomous status, however, it has not been operationalized since 2000 when

comprehensive restructuring was done. Operationalizing CADRE would imply a

critical part of Government of Uganda‘s strategy for improved case flow into

traditional courts, and reducing greatly commercial cases reaching the court.

However, the provisions of the Arbitration and Conciliation Act relating to

establishment and operations of Centre for Alternative Dispute Resolution are not

being implemented. As a result, the objectives for legal framework provisions for

CADRE to promote arbitration and decongest the Commercial courts are not being

realized.

Management explained that between 2009 and 2011 the Ministry together with

the JLOS sector secretariat and Ministry of Public Service finalized the

institutional arrangement in accordance with the Arbitration and

Reconciliation Act Cap 4. The draft was approved in the same year by the

governing council of CADRE. The Ministry submitted the Organizational

Structure for CADRE to Ministry of Public Service for approval. Since then

several reminders have been made to Ministry of Public Service coupled

with discussions convened by Parliament to resolve the establishment of

CADRE but to date nothing has been done.

I advised MoJCA to divest and restructure CADRE and Government to provide seed

money as capital investment for CADRE to firmly establish itself. Special provisions

for Arbitration and Conciliation Act relating to establishment and operationalizing

CADRE should be implemented in order to achieve the objective of the Act.

9.6 Inadequate Records Management

It was observed that the records management system is inadequate because the

Ministry‘s case management filling system is still a manual one. MoJCA works with

case and advice request files that require tracing, quick movement and action

Page 171: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

159

which is not possible in the manual system. As the Directorates and Departments

have pending cases for a long time, tracing these documentation from manual

records can be cumbersome and subject to abuse.

Management responded that the Ministry in the past had challenges in the

management of records. However the Ministry has started an Electronic

Document and Records Management Systems (EDRMS) programme which will

help in the streamlining of information management , that is; processing,

storing accessing and retrieving. Management further explained that at the

moment they have procured Laserfiche ® one of the World‘s leading systems in

the electronic records management industry. Additional server hardware and

database software have also been procured to provide a platform for

storage.

I advised Management to computerize records so as to improve information flow

and protection.

9.7 Outdated Organizational Structure

During the review of the Ministry of Justice and Constitutional Affairs

Organizational structure, it was established that the Organization Structure in use

was last approved in the restructuring in the year 2000. Since that time the

Ministry has grown both in number of staff and scope of work. For instance, the

post of the Minister of Justice and Constitutional Affairs was created and Regional

Offices opened in the four regions of Arua, Gulu, Mbarara and Mbale. There are

also plans to create more regional offices at Masaka, Fort portal and Moroto.

Whereas the opening of Regional Offices was a welcome initiative as this enables

most legal issues pertinent to the public to be handled at regional level and

decongest functions at the Ministry headquarters particularly at lower levels, their

absence on the formal organizational structure of the Ministry causes legal and

administrative challenges in their operations.

Management explained that the Ministry‘s structure was reviewed by Adam Smith

Consultants and they submitted the final report of the proposed structure to the

Page 172: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

160

Ministry of Public Service for consideration. Management is awaiting a response

from Ministry of Public Service.

I advised Management to follow up approval of the revised structure with the

Ministry of Public Service.

9.8 Staffing gaps

Section 15(9) of the standing Orders, 2010 mandates the Ministry of Public Service

to determine the structure, terms and conditions of service in Government entities.

Furthermore, good strategic planning requires an entity to carry out human

resource planning to ensure that an adequate number of qualified staff is in place

to carry out the operational activities of an entity so as to enable her achieve

strategic objectives.

According to the staff establishment, the approved number of positions is 340 and

only 273 positions were filled by the time of audit, while 67 positions remained

vacant, which is 19.7% of the workforce of the Ministry. The unfilled positions

impact negatively on the achievement of the Ministry‘s objectives and planned

activity outputs.

Management explained that vital positions of Solicitor General, Director Legal

Advisory Services, Director Civil Litigation, Commissioner Civil Litigation

(Institutions), Commissioner Legal Advisory Services (Local Government) and

Secretary Law Council in the Ministry have all been filled except for the position of

Administrator General and Commissioner Legislative Drafting (Local Government)

which were externally advertised by PSC and one person applied for the post of

Administrator General while the post of Commissioner Legal Drafting (Local

Government) did not attract any candidate due to the need for specialized training

in Legal Drafting. Management is waiting for the Commission to conclude with the

recruitment process.

I advised Management to expedite the process of filling all the vacant posts.

9.9 Unfilled positions of Administrator General and Deputy Administrator

General

Page 173: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

161

The Administrator General‘s Act, 1933 (Cap.157) governs the establishment,

powers and functions of the Administrator General. The Administrator General‘s

Act establishes the office of the Administrator General. It also provides for the

appointment of the Administrator General, the Deputy Administrator General and

Assistant Administrator General, subject to the law relating to the appointment of

persons onto the Public Service.

It was noted that, the Ministry under department of Administrator General,

provides only for the Administrator General – one post which is not filled. There is

no provision for the Deputy Administrator General. The current situation in the

office of Administrator General is that, the department is headed by two Principal

State Attorneys. This is contrary to the Administrator General‘s Act, 1933 (Cap.

157) and The Succession Act, 1906 (Cap.162).

Management explained that the Office of the Administrator General is a

department under the Ministry of Justice and Constitutional Affairs whose

organizational structure is approved by the Ministry of Public Service. The

office does not recruit its own staff, the recruitment is done by Public

Service Commission and the deployment is done by the Ministry of Justice and

Constitutional Affairs.

I advised Management to ensure that the Administrator General‘s Office is run in

accordance with the provisions of the Administrator General‘s Act, 1933 (Cap.

157).

9.10 Staffing gaps in the Law Council

Part II of the Advocates Act prescribes the establishment and functions of the Law

Council. To effect independent execution of the above functions, Ministry of

Justice and Constitutional Affairs, at the restructuring exercise of 2000

recommended divesture of the Law Council to a semi-autonomous status, which

recommendation was meant to divest the Law Council to allow independence of

professional conduct with less due influence from any organ of Government with

direct control.

Page 174: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

162

However, the Council by the time of audit (January 2014) had not been divested

and continues to operate under full support of Ministry of Justice with huge

staffing gaps. The Law Council was operating with only a Secretary and an office

attendant. This situation has greatly affected the work of the Council as there are

many pending cases that are yet to be handled by the Council.

Management in their response explained that the only approved posts are; of

Secretary, Law Council and Office Attendant which are substantively filled. The

remaining posts are filled by officers drawn from other Directorates/Departments.

This concern will be addressed after the approval of the proposed structure.

I advised Management to address the staffing gaps of the Law Council in

accordance with section 2 of the Advocates Act (Cap. 267) and the Advocates

(Amendment) Act, 2002.

9.11 Lack of Quality Assurance Unit

It is best practice now that entities should have a functional unit for Quality

Assurance that provides function of diligence and adherence to procedures.

However, it was noted that Ministry did not have an established function of Quality

Assurance. As a result of this, Ministry of Justice and Constitutional Affairs has

continued to experience problems of ensuring due process, diligence and

adherence to procedures in dispensation of justice especially in the provision of

legal support and advisory services on contracts and civil litigation that involve

compensations.

Management responded that the post is reflected in the proposed structure of the

Ministry. I advised Management to expedite the approval of the new proposed

structure.

9.12 Lack of Estates Manager

With the support of JLOS SWAP project at the sector, Ministry of Justice and

Constitutional Affairs is undertaking major structural developments throughout the

sector in form of JLOS house and Mini-JLOS houses in every region in the country.

These establishments at the Headquarters and regions need to be maintained.

Page 175: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

163

Maintenance of Government infrastructure is often neglected and/or left to non -

technical care takers who are not able to assess technical requirements in case of

any repairs. It has been observed the function and position of estates

management is not yet established in the Ministry.

Management stated that the post of Estates Officer is reflected in the Ministry‘s

proposed structure which is yet to be approved by Ministry of Public Service. I

await the outcome of the proposed structure.

9.13 Mischarge of Expenditure

A review of payments revealed that there were mischarges under various codes of

Shs.1,356,763,496 during the year under review without authority. In the

absence of mechanism to monitor movement of funds from one code to another,

the principal of proper accountability spelt out in the TAI is violated and gives

avenue for the diversion of funds from the rightful activities. The mischarges also

lead to misrepresentation in the financial statements.

Management explained that due to lack of money on relevant activity items,

management was compelled to charge areas where there was money to meet

urgent travel abroad, travel inland and other urgent operational requirements to

mention a few.

I advised Management to streamline the budgeting process to ensure that

sufficient funds are allocated to each account. Authority should be sought before

any reallocations are made.

9.14 Motor Vehicle Repairs

The Ministry spent total sum of Shs.225,873,321 for repairs of motor vehicles.

Examination of records revealed that, there was no technical assessment done to

the motor vehicles before and after repair contrary to Section 816 of TAI.

Management explained that failure to carry out technical assessment before and

after repairs was an oversight which was highly regrettable. Management further

explained that the cost and frequency of repairs of the Ministry Vehicles is

Page 176: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

164

precipitated by a fleet of aged vehicles due to lack of capital budget to

replace the old ones, and the many official journeys that the lawyers

make to courts of law upcountry in defence of government.

I advised Management to ensure that motor vehicle for repairs should be assessed

by a Government engineer before and after the repairs to ensure quality and

proper accountability.

9.15 Unacknowledged remittances of Withholding Taxes/PAYE to Uganda

Revenue Authority

Shs. 980,240,917 was withheld from payments to staff as Pay As You Earn (PAYE)

and to Suppliers and Service providers as 6% Withholding Taxes. However,

neither acknowledgement receipts nor tax certificates from URA were availed to

confirm that URA received the remittances and that tax certificates were issued.

Failure to issue tax certificates makes it difficult for the suppliers to determine

their tax obligation when filing their returns to URA. Further, in absence of the

acknowledgement receipts; it becomes difficult to confirm the remittances.

Management explained that at the time of Audit, the URA computer system could

not process the certificates.

I advised Management to comply with tax laws and ensure that all remittances are

supported by acknowledgement receipts from the tax authority.

9.16 Budget Analysis

(a) Lack of Budget Provision for Capital Development

Budgeting is a process of planning for estimates of funds to be used to execute

the activities in an entity for both Recurrent and Capital in nature. It was noted

that there was no provision for Capital Development for the entity in the year‘s

budget. Due to non-provision of Capital Development budget, the Ministry cannot

meet its Capital needs especially to procure assets classified under class 3 assets

whose expenditure Codes were provided with zero funds provision, which include

the following among others:

Page 177: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

165

Code No. Asset

312101 Non-Residential Buildings

312102 Residential Buildings

312105 Taxes on Buildings and Structures

312201 Transport Equipment

312202 Machinery and Equipment

312203 Furniture and Fixtures

312204 Taxes on Machinery, Furniture and Vehicles

It was noted that what appeared to be approved under Development is Donor

support which passes through MoJCA as conduit towards implementation of

activities in the JLOS Project at the JLOS Institutions. Due to this MoJCA is forced

to use recurrent budget funds to meet some of its capital development

expenditure, for instance; MoJCA spent Shs.133,801,000 to procure Telesaver

Land lines.

Management in their response agreed with the observation.

I advised that MoJCA, Parliament and MoFPED should plan for a Comprehensive

Budget that provides for both Recurrent and Capital Development funds every

year for the smooth running of the Ministry.

(b) Inadequate provision for Recurrent Budget

Records availed during the audit revealed that the approved revised budget for

MoJCA for the year ended 30th June, 2013 was Shs.21,783,000,000 (Recurrent –

Shs.21,783,000,000 and Development – UGX.0), out of which only

Shs.16,787,000,000 was actual release which is 77%. This left the un-released

budget funds of Shs.4,996,000,000, which was 23% of the approved budget.

Failure to release all funds approved hampers smooth implementation of planned

activities of the Ministry and also undermines the Parliamentary Authority under

Appropriation Act 2010.

Page 178: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

166

Management in their response agreed with the observation.

I advised management to liaise with Parliament and MOFPED to harmonize the

budget planning process and approve a realistic budget that reflects the actual

needs of the Ministry.

9.17 Budget Performance

During the year under review, MoJCA planned to undertake a number of activities.

A review of the reported performance by the Ministry revealed that some Key

planned activities were not fully achieved despite funding approved for the

purpose. The details of expected output, actual output and deviations are below;

OUTPUT

NO. /

BUDGET

DESCRIPTION PLANNED ACTIVTIES EXPECTED OUTPUT ACTUAL OUTPUT DEVIATION

120101

0.659bn.

Bills, Acts,

Statutory

Instruments,

Ordinances, and

Bye-laws

-Bills to be drafted and

published.

-Acts to be Published

-Statutory Instruments

(SIs)

-Ordinances

-Bye-laws

-Legal Notices

-19 Bills

-22 Acts

61 SIs

6

3

16

-7 Bills

-14 Acts

-42 (SIs)

-3Ordince

-0Byelaws

-13 Legal Notices

-12 Bills not

achieved by 63%

-8 Acts not achieved

by 36%

-19 SIs

-3 Ordinance

-3Byelaws

3 L/Notices

120103

0.883bn.

Civil suits

defended in

Court

-Effective representation of

Government in Court.

-64 Civil Suits handled - -

-Effective supervision of

State Attorneys to defend

Government in Court.

-114 Constitution

Petitions

-319 UHR Tribunals

-10 EAJC References

-2 Local Arbitrations 7

1 Civil matter

- -

-Effective negotiation of

out of Court settlement

-0 NIL NIL

120301

0.150bn.

Estates

Registration and

Inspection

New Files for clients to be

opened

4,000 Files 3,058 Files 944 files

Estates to be wound- up 200 Estates 200 Estates filed -

120303

0.150bn.

Estates

Administration

Land transfers 400 Land transfers 383 Land transfers 17 land transfers

Certificates of no objection

to be issued

2,200 Certificates 2,198 Certificates 2 certificates

120401

0.144bn.

Conclusion of

disciplinary Cases

Hold Disciplinary

Committee meetings and

conclude cases

150 cases in 60

sittings

72 cases in 36

sittings

78 cases

Carrying out research and Carried out research NIL Not done

Page 179: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

167

Consultations and Consultations

120501

1.826bn.

Ministry of Justice

and

Constitutional

Affairs (JLOS)

-Develop Legislative

Quality Assurance

Standards for MoJCA

service

QA Standards

developed

NIL Not done

-Set a Legal Audit and

Inspectorate Department

Legal Audit and

Inspectorate Dept.

set out

NIL Not done

-Gov‘t Liability Mitigation

Policy

Liability Mitigation

Policy formulated

NIL Not done

-Claimant Award and

Compensation Policy

Claimant Award and

Compensation Policy

formulated

NIL Not done

120552

1.680bn.

Ministry of Internal

Affairs (JLOS)

-Improve Border Control Border Control

improved

NIL Not done

-Alternative Sentencing

promoted

Promoted Alternative

Sentencing

NIL Not done

-Enhanced Forensic

Analysis

Forensic Analysis

enhanced

NIL Not done

-Resettlement of returnees Returnees resettled NIL Not done

-Capacity to regulate NGOs Capacity to regulate

NGOs enhanced

NIL Not done

-Publication of Law

Reports

Law Reports Published 3,000 copies

published

Published

120555

2.391bn.

Judiciary (JLOS) -Cases to be disposed off 119126 cases Total of cases

disposed off was

54,800

64,326 cases

-Construction of Aibanda

CM & Lugazi/Mayuge G1.

Aibanda CM and

Lugazi/Mayuge GI

Constructed

NIL Not done

-Transcription and Court

recording equipment in

Courts

In 13 Courts In 4 Courts 9 courts

-Inspections conducted 130 inspections NIL Not done

-Complaints to be handled 900 Complaints NIL Not done

-Increased rationalized

physical presence

Increased physical

presence

NIL Not done

-Quick wins Case Backlog Case backlog reduced NIL Not done

-Community Policing Done NIL Not done

-Improved welfare Improved welfare NIL Not done

-Increased production &

productivity

Increased production

and productivity

NIL Not done

-Effective offender

integration and

rehabilitation programs

Effective offender

integration

NIL Not done

120558

0.680bn.

Judicial Service

Commission

(JLOS)

-Radio talk shows in

regional centres around

the country will be held

36 Radio talk shows 36 Radio talk shows -

-Judicial Officers recruited Judicial Officers

recruited

NIL Not done

-Strong Public Complaints

System

Strong Public

complaints System

established

NIL

Not done

-Staff will be trained in

short term courses

8 staff members NIL Not done

120559 Directorate of -Prosecution programme 142,250 cases Prosecuted 1,283 27,245 cases

Page 180: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

168

1.908bn. Public

Prosecution DPP

(JLOS)

plans to have cases

prosecuted

cases in 41 High

courts, 113,722 in

MC

-Nation Wide and adhoc

inspections carried out

4 Nationwide and 100

Adhoc

NIL Not done

-Rationalized physical

presence

Physical Presence NIL Not done

-Train Prosecutors 100 NIL Not done

-Hold one Professional

Retreat

1 NIL Not done

120560

2.237bn.

Other JLOS

Funded Services

-Computerization of

Business registration of

BDR

Business registration

of BDR computerized

NIL Not done

-Tax Appeal Tribunals Tax Appeal Tribunal

supported

NIL Not done

-Local Council Courts Local Council Courts

supported

NIL Not done

-Uganda Law Society Uganda Law Society

supported

NIL Not done

120601

4.347bn.

Court Awards and

Compensations

paid

-Effect payments of Court

Award claimants

Court Award claimants

payments effected

2.19bn paid 2.157bn. not paid

Management explained that the performance varied from the expected output for

the following reasons:-

(a) Expected output is projected against Government‘s Legislation Programme

and Ministry of Justice and Constitutional Affairs bench marks. Further,

planned activities are demand driven; fewer requests from MDAs

automatically result in fewer outputs in terms of drafted legislation.

(b) Delayed payments to Government Printer (UPPC)

Whereas MOJCA drafts legislation for all MDAs, it is the responsibility of each

MDA promoting legislation to meet publication and printing costs. MoJCA has

no control in ensuring timely payment to UPPC by MDAs without which,

legislation cannot be published.

(c) Delayed response by client MDAs to requests for further instructions and

clarification by FPC and the need to consult other departments in the

processing of the legislation also impacts on output achieved.

I advised management to ensure adequate planning by liaising with all

stakeholders involved.

Page 181: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

169

9.18 JLOS, LAW AND ORDER SECTOR SECRETARIAT

(a) Budget performance

During the year, the Justice, Law and Order Sector (JLOS) Secretariat received a

total of Shs.39,494,465,988 to facilitate operations of the various JLOS

components. At the beginning of the year, the Secretariate also had unspent

balance totaling Shs.25,167,063,002 bringing the total available funds for

spending to a tune of Shs.64,661,528,990 for the year.

Shs.44,975,848,043 was subsequently spent during the year by the various

components leaving a balance of Shs.19,685,677,947 unspent. An analysis of

utilization of the funds revealed low funds absorption capacity. The table below

shows the opening and closing balances as well as expenditures by various

entities:-

Ministry/

Department

Opening

balance (Shs)

Adjustment of

opening

balance (Shs)

Amount

Received (Shs)

Total funding

Available (Shs)

Amount Spent

(Shs)

Closing Balance (Shs)

Uganda Law

Society

136,695 357,130,450 357,267,145 357,267,145 124,550

Uganda Law

Reform

Commission

93,923 1,583,624,800 1,583,718,723 1,566,228,319 17,490,404

Local

Government

45,929,584 255,054,000 300,983,584 229,986,219 70,997,365

Law

Development

Centre

103,092,050 1,480,034,000 1,583,126,050 1,579,200,578 3,925,472

Tax Appeals

tribunal

80,187,505 413,825,000 494,012,505 405,284,799 88,727,706

DPP 386,282,831 2,601,456,808 2,987,739,639 2,973,620,531 14,119,108

URSB 868,134,437 874,410,000 1,742,544,437 1,094,108,056 648,436,381

Ministry of

Internal

Affairs

356,191,508 2,842,597,000 3,198,788,508 2,836,520,498 362,268,010

Uganda

Police Force

1,238,857,408 258,560,092 3,481,215,500 4,978,633,000 3,236,172,000 1,742,461,000

Uganda

Prisons

Service

926,310,405 4,897,596,000 5,823,906,405 4,096,777,747 1,727,128,658

Page 182: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

170

Judicial

Service

Commission

16,772 705,288,000 705,304,772 705,301,618 3,154

Min. of

Gender,

Labor and

Social Dev’t

732,721,279 382,150,000 1,114,871,279 548,124,566 566,746,713

Judiciary 1,121,429,913 344,442 4,464,645,500 5,586,419,855 4,609,405,000 977,014,855

MOJCA 0 1,690,900,000 1,690,900,000 1,681,064,681 9,835,319

Administrator

General –

Public

Trustee

236,304,247 408,630,000 644,934,247 523,712,452 121,221,795

Uganda

Human

Rights

Commission

142,563,757 687,384,000 829,947,757 759,525,000 70,422,757

National

Citizenship

and

Immigration

979,000,000 1,136,000,000 2,115,000,000 484,452,756 1,630,547,244

Secretariat

(IFMS)

0 2,549,879,000 2,549,879,000 2,516,781,493 33,097,507

Secretariat

(Donor)

0 17,352,174,283 1,440,108,444 18,792,282,727 12,387,196,497 6,405,083,230

MoJCA (CBL) 0 338,731,871 1,786,865,000 2,125,596,871 1,920,295,282 205,301,589

JLOS House

Account

0 4,990,725,130 4,990,725,130 0 4,990,725,130

Taxes on

Machinery

464,822,806 464,822,806 464,822,806 0

Total

7,217,252,314

17,949,810,688 39,494,465,988 64,661,528,990 44,975,848,043 19,685,677,947

Failure to utilize the available funds implies that planned activities were partially or

not implemented. This may lead to failure by the management to attain the

programme objectives.

Management responded that Shs.17,475,066,791 out of the Shs.19,685,677,947

was committed to various ongoing construction projects in the sector by the close

of the year. The commitments included preparation of detailed designs and

construction supervision of the JLOS house, ongoing constructions under PRDP,

constructions of Justice centres, Prisons, Police stations, courts and remand

homes.

Page 183: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

171

I advised Management to properly supervise the ongoing works with a view of

concluding them in the agreed time.

(b) Shortfall in the Budget Releases

A comparison of the approved JLOS budget and work plan for the 2012/13 with

funds released for the financial year revealed shortfalls in funding. Funds for the

fourth quarter for a number of JLOS implementers were not released at all. The

table below shows funding shortfalls for some institutions:

No Institution Budget (Shs) Releases (Shs) Shortfall (Shs)

1 Directorate of Public

Prosecutions

2,628,000,000 2,264,618,500 363,381,500

2 Judicial Service Commission

820,607,000 705,282,000 115,325,000

3 Ministry of Local

Government

330,040,000 255,054,000 74,986,000

4 Uganda Human Rights Commission

851,000,000 687,384,000 163,616,000

Total 4,629,647,000 3,912,338,500 717,308,500

This impacts negatively on the implementation of planned activities under

Programme.

Management responded that the Sector will continue to liaise with JLOS and

Ministry of Finance, planning and Economic Development to ensure adequate

funding in future for implementation of planned activities.

Management was advised to liaise with the Ministry of Finance, Planning and

Economic Development to ensure adequate funding for implementation of planned

activities.

(c) Lack of Computerized Project Management and Information

System – (PMIS)

According to the Work Plan for the year, one of the priorities in SIP III was to

strengthen records and information management. PMIS was intended to offer

computer support to project management procedures and the Centre. It was

however, noted that the PMIS had not been put in place. Records and information

management is being run manually. Lack of a computerized information system

Page 184: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

172

negatively affects management of Programme information in all vital aspects such

as; scope, programme organization, quality, cost, time and activity scheduling.

The Accounting Officer explained that the sector had in place an elaborate but

manual project management system and efforts are underway to computerize the

whole system. While the development and deployment of a Geographical

Information System (GIS) had been completed, computerizing the budgeting and

accounting as well as Monitoring and Evaluation (M & E) functionalities is

underway.

I advised the Accounting Officer to expedite the computerization process to allow

management executes project programmes successfully.

(d) Expiry of grant period

Shs.415,042,600 was transferred to the Embassy of Ireland to supply 400

mountain bikes to be used by the Uganda Police Force (UPF) for community

policing and 14 bikes for training. In the MoU, it was agreed that GoU refund to

Irish Aid within one month of completion of the financial year any part of the grant

which had not been spent unless a joint written agreement regarding its suitable

use had been made between Irish Aid and GOU. It was noted that by the time

JLOS Secretariat effected the above transfer/payment, the terms of the grant had

long expired and there was no proof of renewed joint written agreement availed

for audit review.

Management did not adhere to the agreement terms. The continued application of

the grant is in contravention of agreement terms and may attract penalties.

In their response, Management regretted the delay to request for extension of the

MOU. They further indicated that the sector has been in negotiations with the Irish

Aid and has since requested for a no cost extension to the project.

Management was advised to ensure that funding agreement terms are always

complied with.

(e) Double Payment to a Contractor

Page 185: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

173

A local construction firm was contracted to construct Kisoro Police Station at a cost

of Shs.680,827,739. According to interim certificate number one worth

Shs.156,252,389, this certificate had been approved for payment in January 2013

and payment effected on the 19th March 2013 which payment was reversed by the

bank on 21st March 2013, reason being ―invalid account details‖.

On the 27th March 2013 the contractor notified the employer of the change of the

bank and account details to which payment would be effected. The employer

notified the bank accordingly and on the 28th March 2013, the bank effected the

payment of Shs.156,252,389 to the contractor. However, on the 8/4/2013, the

employer raised another payment to replace the dishonoured payment on

payment of interim certificate number one and another payment and subsequently

a sum of Shs.156,252,389 was effected on the 17th April 2013. The interim

certificate number one was therefore paid twice.

Management explained that this was an error that was advertently caused by BoU.

Management further explained that they had agreed with the contractor to recover

the questioned amount from the final and last certificate.

I await the outcome of Management efforts.

9.19 MINISTRY OF JUSTICE AND CONSTITUTIONAL AFFAIRS (MOJCA)

i) Implementation of project activities

During the year, a total of Shs.1,690,900,000 was available for approved JLOS

activities under the MOJCA. Records availed indicate that Shs.1,681,064,681 was

utilized leaving a balance of only Shs.9,835,319 unutilized at the end of the

financial year. Although 99% of the releases was spent, some activities that had

earlier been planned were not implemented during the year. See the table

below;

Specific

Activities

Target

/Inputs

(units)

Proposed

cost

Released Expenditure Remarks on Actual outputs

Page 186: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

174

1.1.1.4

Undertake a

study and

develop a

Government

Liability

mitigation policy

and plan

Consultancy

fees

80,000,000 80,000,000 80,000,000 The expected output was not

undertaken by a consultant.

Instead the entity just set up a

task force to coordinate

development of the policy;

developed concept paper and

Terms of reference for

Technical advisor.

1.1.4.1 Review

and harmonize

constitutional

and other Court

rulings with the

existing

legislation

Consultant,

data collection,

analysis and

reporting and

dissemination

30,000,000 30,000,000 30,000,000 No out puts reported therefore

nothing was disseminated.

1.3.5.5

Sensitization

workshops for

legal

practitioners and

other

stakeholders on

legal practice in

central region

Workshop 30,000,000 30,000,000 30,000,000 No output reported. Therefore

no knowledge imparted.

Management responded that the funds for the above activities were used to pay

contractors constructing Mbale regional offices after seeking authority from the

sector following inadequate releases of funds in the last quarter of the financial

year.

Management was advised to carry out adequate planning and ensure that the

activities are implemented in accordance with the work plan.

ii) Non-remittance of donor funds

The Ministry on behalf of the Justice Law and Order Sector signed a Memorandum

of Understanding (MOU) with the Irish Embassy for the assessment of the

implementation of a witness protection policy on 6th December 2011.

Page 187: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

175

Section 16.1 of the MOU stipulated that any funds that remained unutilized at the

end of the project were to be refunded within 3 months of completion of the

project failure of which interest at European Central Bank rate would be charged

on the outstanding moneys not refunded from the date of completion. According

to the MOUs, the Irish Aid granted Uganda a total of €65,235 (€40,000 as per the

first MOU and an addendum of €25,235).

It was noted that a sum of Shs.153,535,455 was spent from the grant; translating

into implying that €15,021 remained unutilized. The balance was not remitted

back to the Irish Embassy account. Failure to refund unutilized funds was in

contravention of the terms of the MOU.

Management explained that the sector awaits final audit by Irish Aid before any

further action can be taken on the unutilized balances. I advised Management to

follow up the audit and ensure that balances are remitted to avoid any charges on

unremitted balances.

iii) Incomplete Works at Judicial Studies Institute (JSI)

The work plan for the period 2011/2012 had a provision for construction of

classrooms for the JSI at a cost of Shs.400,000,000 under the GoU budget and

Euro 50,000 was expected from Netherlands Organization for International

Cooperation in higher Education (NUFFIC). The balance of construction costs

were to be met by JLOS sector. A contract for Shs.852,109,288 was signed with a

local company on 21st May 2012. According to the contract, the activity was to

take eight months from the date of signing of the contract.

Field inspections carried out in October 2013, revealed that the period of

completion expired in January 2013 and work had stalled. The status of

construction is shown in the photos below:

Page 188: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

176

Stalled construction works at the Judicial Studies Institute in Nakawa, Kampala

Management explained that funding from JLOS was on a phased approach and as

a result interfered with the progress of work. I advised that in future, works

should be carried out in accordance with the work plan.

9.20 DIRECTORATE OF CITIZENSHIP AND IMMIGRATION CONTROL (DCIC)

i) Non implementation of planned activities

During the year, a total of Shs.2,136,930,000 was available for JLOS activities

under the DCIC (Shs.979,000,000 brought forward from the previous year and

Shs.1,157,930,000 released in the year under review). Records availed indicate

that only Shs.484,452,756 was utilized leaving a balance of Shs.1,630,547,244

unutilized implying that only 22.7% of the funds was utilized. The following

planned and funded activities were not implemented at all:

Planned activity Amount

released

(Shs)

Amount

spent

(Shs)

Remarks

Construct immigration border station at

Kizinga

200,000,000 0 No work done

Completion of the chain of Justice 390,000,000 0 No work done

Software installation, carry out staff

training, procure solar system, scanners,

computers

100,000,000 0 No work done

Procure consultant, procure software,

scan, digitize physical files, implement a

computerized workflow

300,000,000 0 No work done

Develop and translate a citizen

verification manual.

40,000,000 0 No work done

Page 189: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

177

Develop and print operating procedures

manual

50,000,000 0 No work done

Pilot decentralized passport processing

and issuance (Mbarara, Mbale and Gulu)

300,000,000 0 No work done

Reduction of illegal stay 50,000,000 0 No work done

Enhanced inspections and investigations

of aliens’ immigration and facilities

75,000,000 0 No work done

Ethics code put in place, complaints

system established

40,000,000 0 No work done

The slow implementation of the planned activities has a negative effect on the

achievement of objectives of the project.

Management responded that the delay was caused by long procurement process

in land acquisition and unresolved border disputes. These challenges have since

been addressed and the activities are at various levels of implementation.

Management was advised to ensure that activities are implemented in accordance

with the approved work plans.

ii) Construction of border posts

During field inspections in October 2012, it was noted that construction of border

posts had progressed in only three sites (Bunagana, Atiak and Goli) out of the four

planned. Construction of Cyanika was still pending. Inspection of the sites

revealed that the progress of work was still slow:

(a) Bunagana Border Post

A construction company was contracted to construct the border post of Bunagana

at a contract price of Shs.188,845,241. The following were noted;

The construction was almost complete but no counter had been provided as

specified in the BOQs and no provision was made for construction of an

outside pit larine.

Much as laying of conduits for electrical wiring had been done, power had

not been connected to the building. Sockets, switches and electrical wiring

had not been installed.

Page 190: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

178

The billboard stand indicating the client, contractor, supervisor as specified in

the BOQ had not been installed despite the construction having started.

(b) Goli Border Post

A construction company was contracted to construct the border post of Goli at a

contract price of Shs.195,197,400. The following were noted;

Construction was still at wall plate level.

The contactor abandoned the site since June 2012 and it had turned bushy.

The contract period was for 6 calendar months, however, this contract had

expired in February 2012 yet less than 50% of the work had been done.

Although the contract was extended, no extra work had been done by the

new contractor at the time of inspection.

Site clearing was not done at the back of the building leaving excavated

materials on site.

No bill boards or sign post had been fixed yet funds had been paid.

The structural designs provided for internal toilets but there was no piped

water and no provision was made for construction of a pit larine.

(c) Atiak Border Post

A construction company was contracted to construct the border post of Atiak at a

contract price of Shs.93,124,504. The structure did not meet the required

specifications. The rooms and the total constructed area were smaller than

planned. The contractor was required to rectify the defects instead no further

works were undertaken and the site was abandoned. The building is as below:

It was further revealed that the Directorate does not own the land on which this

post was being constructed.

Page 191: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

179

(d) Cyanika

A construction company was contracted to construct the border post of Cyanika at

a contract price of Shs.390,000,000. No work had started despite the funds

having been released.

Management acknowledged the observations and regretted the state of works in

various sites at the time of audit. Management explained that they had initiated

supervision trips by the technical team and internal audit department, and a

special task force was constituted to address the issues and advise the Accounting

Officer.

I advised Management to urgently compel the contractors to rectify and complete

the works. I also advised that a follow up on the land title for one of the border

posts be done.

iii) Poor state of Immigration offices up country

An inspection of some of the immigration offices upcountry revealed that the

stations were in a poor state. The following were observed at Bibia,

Ngoromoromo and Madi Pei stations:

a) Bibia

The office in Bibia is located within the market area together with the URA offices.

The building was constructed to house shops but has now been turned into

offices. The station has two rooms;

i) The front room for the reception and immigration officers on duty. Here

officers issue visas and stamp passports from behind the counter that

separates them from the customers

ii) The second room serves as the store for all the stationery and items not

required in the front office including used and unused stationery. It is also

used as the kitchen, dining room and office for the in-charge of the station.

b) Ngoromoromo and Madi Pei border posts

Page 192: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

180

The immigration posts are located on the borders with South Sudan in the district

of Kitgum. The posts have only one staff each who collects money, writes the cash

book and transports the money on a motor cycle to the bank in Kitgum once a

week, which is about two kilometres away from each of these posts. The offices

are mud grass thatched huts with no doors or any security. The photo of the

Ngoromoromo station is shown below:

The grass thatched hut housing Ngoromoromo border post

On a daily basis, staff retire with the office equipments home. They live in uni-

pots provided by the police in their barracks located near the border posts.

Management responded that at the time of establishing the Bibia Immigration

offices, there was limited office space available for rent. However, land has been

identified and a one stop border center is yet to be constructed by Trade Mark

East Africa. Delays were due to border point disputes between the Government of

Uganda and South Sudan.

I await the results of Management efforts.

9.21 DIRECTORATE OF PUBLIC PROSECUTIONS (DPP)

i) Budget performance

During the year under review, a sum of Shs.2,628,000,000 was approved for

implementation of DPP project activities, however, only Shs.2,264,618,500 was

received leading to a budget shortfall of Shs.363,381,500. Project's performance

revealed that some planned activities had not been undertaken, while others

remained incomplete. Details are in the table below:

Page 193: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

181

Planned Key

Activity

Approved

Budget

Actual

amount

Released

Expected Output Actual output Remarks

2.1.3.5 Open

and resource 8

new DPP

stations

160,000,000 157,117,623

8 new DPP stations

opened and

resourced

Only 4 offices were

opened in

Lyantonde,

Nakifuma, Mitooma

and Nakapiripirit,

and furnished. 5

computer

workstations, 10

laptops procured.

Under absorption

(43%)

2.1.3.6 Carry

out major

renovation of 3

DPP buildings in

Kasese, Nebbi &

Arua

300,000,000

289,371,233

Major renovation of

3 DPP buildings in

Kasese, Nebbi &

Arua.

Kasese office

renovation is at

completion hence

Lira and Arua offices

not yet renovated.

Delayed

Completion

(absorption

capacity of only

3%)

2.1.3.7 Procure

and install solar

equipment in 5

stations.

150,000,000

144,955,840

Solar equipment in 5

stations supplied and

installed.

Installation of solar

in Amolator, Moyo

and Adjumani offices

is complete.

Installation in Abim

and Kaberamaido

offices was in

progress.

Installation not

done due to

incomplete

construction of offices

though the

contractor had been

fully paid and equipment

procured.

2.1.3.9

Construct Guard

house and

toilets on 6

existing DPP

offices

180,000,000

158,198,514

Guard house and

toilets on 6 existing

DPP offices

constructed

50% construction

done.

Delayed works

Slow activity implementation was exhibited in some construction works.

Construction especially of DPP offices and staff quarters at Kalangala was far

behind schedule. The slow implementation of the planned activities is an

indication of inadequate coordination between those responsible and the

implementers.

Management attributed the slow implementation of planned activities especially

construction works to acquisition and ownership of land, procurement related

Page 194: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

182

hitches, contract management related issues and delayed release of funds.

However, the Directorate continues to explore remedial actions such as carrying

out consultations with stakeholders to overcome the emerging challenges that

may affect the implementation of planned activities.

Management was advised to ensure that activities are undertaken as planned.

9.22 JUDICIARY

i) Budget performance

Shs.5,355,000,000 was budgeted to cater for JLOS activities under Judiciary.

During the year, a total of Shs.5,586,419,855 was available for spending

(Shs.1,121,774,355 brought forward from the previous year and

Shs.4,464,645,500 released in the year under review). Records availed indicated

that only Shs.4,609,405,000 was utilized leaving a balance of Shs.977,014,855

unutilized at the end of the financial year. As a result a number of activities were

not implemented as planned despite the release of funds on the planned activities.

Details are below:

Specific Activities

Approved Budget (Shs)

Cumulative Release (Shs)

Cumulative Expenditure (Shs)

Balance released but not spent (Shs)

Remarks

2.1.3.19 Rehabilitation of 2 Chief Magistrate Courts across the country (Kasese and Jinja)

200,000,000 - - Not implemented

2.3.1.1 Acquire Court Recording Equipment for Appellate Courts

80,000,000 80,000,000 - 80,000,000 Not Achieved yet full budget released

2.3.1.2 Acquire Court Recording Equipment for Civil division for 4 Judges

80,000,000 80,000,000 - 80,000,000 Not Achieved yet full budget released

2.3.1.3 Roll out land courts to 10 C.M Courts

180,000 ,000 180,000,000 35,567,000 144,433,000 Not Achieved yet full budget released

Page 195: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

183

2.3.1.4 Acquire Court Recording Equipment for Family division for 3 Judges

160,000,000 160,000,000 - 160,000,000 Not Achieved yet full budget released

2.3.1.5 Provide office furniture for 10 Magistrate Courts.

100,000,000 100,000,000 41,152,000 58,848,000 No other courts were provided furniture apart from Kalangala but which had its own budget. Not achieved

2.3.5.15High Court- Commercial Justice

160,000,000 130,000,000 130,000,000 0 No report given

2.3.5.20 Case backlog in in the CM Courts (civil, land, family and criminal)

300,000,000 200,000,000 200,000,000 0 No report given

2.3.5.25 Procurement of Station wagon vehicles for Chief Magistrates to be appointed

160,000 ,000 75,000,000 - 75,000,000 Not achieved

2.3.7.1 Provide for facilitation of witnesses in criminal matters and cases involving children (family division) at all Court levels

240,000 ,000 134,000,000 134,000,000 0 Activity not done

Non-implementation of planned activities within the stipulated time does not only

lead to spill over of activities to the next planning periods but may also lead to

non-achievement of the desired outputs due to the rise of prices of the inputs,

subsequently hampering fulfilment of Project objectives.

Management explained that the released funds were committed on procurement

of equipment but the process had not been concluded.

I advised Management to carry out adequate planning to ensure that activities are

implemented in accordance with the work plan.

ii) Inequitable distribution of session funds

Page 196: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

184

I noted inequitable distribution of session funds for the backlog cases in the High

courts and other lower courts in the period under review. For example; Gulu,

Masindi and Kabale High courts for unknown reasons did not receive any backlog

funds in the period. Shs.341,670,000 transferred to Chief magistrate courts in the

period under review was allocated to only to 17 Chief magistrate courts out of the

46 spread across the country.

Grade 1 and 11 Courts did not receive any funds although Shs.120,000,000 had

been budgeted and Shs.65,000,000 reported to have been transferred.

Management responded that the available funds were not sufficient to cover all

the courts which called for prioritization where consideration was given to those

courts with large number of cases and availability of Judicial Officers to handle

them.

I advised that management develops a criteria on distribution of session funds and

how they intend to cover non benefiting courts.

iii) Payments for State Briefs

It was noted that there were no proper system and standard rates for the

payment of state briefs to advocates. Detailed information such as the name of

the advocate or the Law firm being represented, and the persons accused of

capital offences was not captured. In many instances, the cases were not

mentioned besides the rates paid differed from one advocate to another. In the

absence of a system and standard rates of pay, state briefs to advocates may not

be appropriately justified.

Management explained that advocates are paid on the basis of number of cases

being handled, number of times one appears in court and the number of witnesses

involved in the case and that some cases are peculiar and hence payment cannot

be standardized for all advocates.

I advised management to develop guidelines for payment of state briefs.

Page 197: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

185

9.23 UGANDA PRISONS SERVICE (UPS)

i) Budget performance

Shs.5,823,906,405 was available for approved JLOS activities under the UPS

(Shs.926,310,405 brought forward from the previous year and Shs.4,897,596,000

released in the year under review). Records availed indicate that only

Shs.4,096,777,747 was utilized leaving a balance of Shs.1,727,128,658 unspent at

the end of the financial year. Because of this, planned and funded activities were

partially or not implemented at all. See below;

Planned activity Amount released (Shs)

Amount spent (Shs)

Remarks

Construction of Nebbi Prison 1,359,194,005 435,088,247 Work had just started

Recruitment of 700 Prisons warders/wardresses

500,000,000 93,039,800 Recruitment not done.

Construction of 20 water borne toilets

400,000,000 0 No work done

Construction of Lamwo Prison 250,000,000 0 No work done

The slow implementation of the planned activities negatively affects the

achievement of Project objectives. I advised management to implement activities

in accordance with the work plans.

ii) Construction of New Nebbi Prison

On 27th April 2012, a contract for construction of Nebbi Prison was signed between

Uganda Prisons Service (UPS) and a construction company for a contract sum of

Shs.1,359,194,005. The works involved construction of a prison ward,

administration block, VIP latrines and three staff houses. The construction was to

be completed in 12 months commencing on 5th September 2012. However, field

inspections in September 2013 revealed that the work was far behind schedule

despite the entity paying a sum of Shs.435,088,247 to-date. The photos of the

prison ward and administration block are shown below:

Page 198: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

186

Excavation of prison ward was still ongoing

The Administration block at window level

It was observed that the construction of the staff houses could not proceed

because of discrepancies in drawings and bills of quantities. The delayed

execution of the works negatively affected the implementation of Project activities.

Management responded that commencement was greatly delayed by heavy rains

that made the road impassable to the site necessitating extension up to end of

April 2014. I advised Management to follow up the project to completion

within the extended period.

iii) Recruitment of Prison warders

It was observed that the department budgeted for the recruitment and training of

700 staff at the rank of warders/wardresses at Shs.500,000,000. However, only

Shs.390,000,000 was released and only 300 former Local Administration Prisons

Services (LAPS) were trained at a cost of Shs.93,039,800. This meant that

recruitment and training of new staff did not take place as planned.

Management explained that the request for authority to recruit the 700 staff was

declined by Ministry of Finance and Public Service. The authority to re-allocate the

funds to train former LAP staff in basic Prisons was sought and granted.

Page 199: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

187

Management was advised to liaise with the responsible Ministries to recruit staff to

improve staffing levels in prisons.

iv) Lamwo prison

UPS budgeted and received a sum of Shs.250 million to build a prison in Lamwo

district. It was however noted that by the time of audit, no work had been done

and no contract had been signed

Management explained that the signing of the contract was delayed because the

District Local Government (DLG) was not able to open the access road to the site.

Management was advised to follow up the project to its completion.

9.24 UGANDA POLICE FORCE (UPF)

i) Budget Performance

During the year, Shs.3,481,215,500 was released to the Police Force while

Shs.1,497,417,500 unspent from the previous year was brought forward, bringing

the total of available funds for spending to Shs.4,978,633,000. Shs.3,236,172,000

was utilized leaving a balance of Shs.1,742,461,000 unutilized at the end of the

financial year. By not utilizing all the funds available some activities were partially

or not implemented at all. Details are in the table below:

Specific Activities

Approved Budget

Cumulative Releases

Cumulative Expenditure

Remarks

Equipment for the Veterinary

Clinic

30,000,000 30,000,000 - Activity not executed

Printing of 2,000 quarterly

reports

32,000,000 32,000,000 - Reports to be made after a trial run of the system

Model Police station Kajjansi

507,000,000 507,000,000 506,000,000 Request for re allocation to Luwero was

submitted to the JLOS and accepted. An LC top

up on the contractor

made.

Procure 2 Patrol Vehicles

83,424,000 83,424,000 - Not done

Procure 16

M/Cycles for

70,000,000 70,000,000 - Contract awarded to

Honda awaiting

Page 200: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

188

CFPU clearance from Solicitor

General

The delay or failure to implement planned activities denied beneficiaries of the

intended services and hinders the achievement of programme objectives.

I advised Management to ensure that activities are implemented in accordance

with the approved plans.

ii) JLOS Quick Win Case Backlog Reduction Programme

One of the major Challenges in Administration of effective delivery of Justice in

Uganda has been persistent increase in case back log due to inadequate

resources, poor investigation and delays by criminal justice actors such as Criminal

Investigation Directorate (CID). A number of police stations were inspected to

ascertain the level of investigations. It was noted despite the effort, case backlogs

have accumulated as depicted in three police stations visited in northern Uganda:

No Police Station Total number of cases in year (Old and new)

Successfully investigated by end of year

Cases carried forward at end of 2012/2013

1 Arua 119 29 90

2 Maracha 60 10 50

3 Gulu 80 38 42

Total 259 77 182

I also noted that most suspects spend more time in the police cells than the

required 48 hours and some were released on bond due to inadequate funding

and lack of enough information.

In their explanation, management indicated that much as the complainants, the

investigators, the Government and the Development Partners (JLOS) want speedy

investigations and trials, the funds extended to the up-county stations are not

sufficient to expeditiously and adequately handle the cases as would be required.

Page 201: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

189

Management further explained that a request for more funding has been made to

the Ministry of Finance, Planning and Economic Development.

I advised that the Police budget should be enhanced to ensure provision of

adequate funds to the Police stations for investigations so as to clear the

increasing backlog of reported cases yet to be investigated.

iii) Field inspections – Construction of Mukono Police Station

A contract was awarded to a construction company for completion of Mukono

Police station at Shs.295,567,173. A total of Shs.64,183,457 has been paid so far

(on certificate 1). The construction ought to have been completed and the building

handed over within 6 months. However, it was noted that construction was still

underway by the time of the audit inspection in September 2013. It was further

noted that the mahogany veneer doors were of poor quality. The doors do not

measure up to 7ft as prescribed by the bills of quantities. Photos are shown

below:

Doors provided not according to specfications

The windows were supposed to be of casement comprising of 3mm thick steel

plate bottom panel 150mm high and glazed top panels of 600mm high. It was

noted that the panels were weak and some were bent meaning that they do not

measure to the prescribed thickness. A picture of one of the windows is below:

Page 202: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

190

Windows not according to standard

The team also observed uncovered septic tanks. The pictures below refer:

Open septic tank Flooring and screeding already in poor shape

According to the report of the supervising engineer, it is evident that the external

and internal plastering was complete and certified yet the work appears below

standard as shown in the pictures. The site inspection also revealed that no

activity was ongoing meaning the works had been abandoned.

The open septic tank can endanger the lives of the people who operate around

the site. The delay in contract performance increase administration costs and also

delays the achievement of the objectives of the project.

Management explained that the site was handed over to the Contractor in March

2013 with a six month completion period and that instructions were issued to the

contractor to remedy the defective doors and windows.

I await the outcome of management action.

Page 203: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

191

9.25 LAW DEVELOPMENT CENTRE (LDC)

i) Construction of a Perimeter wall fence

A contract to construct a perimeter wall fence and upper part of LDC premises was

awarded to Home Builders Ltd at a cost of Shs.195,000,000. An inspection of the

work done by the contractor revealed that construction works were incomplete.

According to the BOQ, the contractor was to apply undercoat and three finishing

coats of oil base paint in approved colors to all framings and vertical members of

grill panel. However this had not been done and the contactor seemed to have

abandoned the work as no work was ongoing. It was also noted that some parts

of the copings on the perimeter wall were not properly done and have since

cracked exhibiting substandard works.

Part of unpainted framings cracked coping on the perimeter wall

Delayed completion of the construction works and shoddy work exhibited are a

result of poor supervision and contract management.

Management responded that the contractor is to put right all the defects before

the retention fee is paid. Management had arranged to have a meeting with

contractor on the matter.

Management was advised to ensure that defects on the perimeter wall are

rectified by the contractor.

ii) Construction of Auditorium - Lack of a Contract Manager

Page 204: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

192

A contract for construction works for the auditorium was awarded to a

construction company at a contract sum of Shs.3,971,880,902. Regulation 259(1)

of the PPDA Regulations 2003 requires the user department to nominate an

existing member of staff with appropriate skills and experience, or who is

supervised by a member of staff with appropriate skills and experience as a

contract manager.

Contrary to the regulations, no Contract manager was appointed to supervise and

ensure that the provider performs the contract in accordance with terms and

conditions specified in the contract. Absence of a contract manager in a contract

of such a magnitude undermines the procurement regulations and poses a risk of

departure from the terms and conditions of the contract and eventual poor

workmanship.

Management explained that at the beginning of the construction works the project

manager was retrenched. Management indicated that appointment of another

manager is in the process.

I await management action on the matter.

iii) Delayed completion of construction works

It was further observed that construction works for the auditorium started on

30/5/2012 and the completion date was agreed to be 11/6/2013. However,

inspection revealed that construction is still on-going implying that the contract

exceeded its completion date.

By the time of inspection on 30th October, 2013 only two certificates worth

Shs.2,770,753,602 had been paid for the construction of the Project, leaving a

balance of Shs.1,201,127,300. Work was still in progress as indicated in the

photos below:

Page 205: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

193

Ongoing works on the auditorium

Delays to complete construction works may result into failure to achieve the

objectives for which the contract was entered, hence affecting the performance of

the entity.

Management explained that the delayed completion of construction works was due

to failure by Ministry of Finance to release all funds allocated for the project in the

1st year of the project.

I advised Management to liaise with the Ministry and ensure all funds are released

as anticipated.

9.26 MINISTRY OF GENDER, LABOUR AND SOCIAL DEVELOPMENT (MOGLSD)

(a) Delayed transfer of Property ownership

In the Financial year 2011/12, the Ministry signed a contract to purchase a

building on Martyrs way in Ntinda at USD.1,100,000 to house various councils that

are under its supervision and indeed staff are already utilizing the premises. It was

however noted that the ownership had not been transferred to the Ministry as

prescribed in the terms of purchase rendering the authenticity of the expenditure

Page 206: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

194

uncertain. Additionally, the certificate of occupancy indicating suitability of the

premises for habitation was not availed for audit verification.

I have advised the Accounting officer to ensure that the ownership of the building

is transferred into the names of the Ministry and an occupancy certificate be

obtained from Kampala Capital City Authority.

(b) Lack of records for Ministry land and property

The Ministry indicated that it owns various pieces of land across the country. It

was however noted that a comprehensive data base of all the Ministry land and

property was lacking.

An audit inspection of the property in a sample of districts revealed the following

matters;

Lack of ownership documents

Claim of ownership of the land and properties by Districts and Individuals

Occupation of the land by squatters involved in sand mining and bricklaying

Dilapidated buildings

The Accounting Officer acknowledged that the Ministry did not have land titles for

all the institutional land, with the exception of Kampiringisa National Rehabilitation

Centre, Naguru Remand Home and Lweza Rehabilitation Centre. He further stated

that a taskforce had been constituted to trace and document all the Ministry land

and property for titling. I await the outcome of this exercise.

(c) Inspection of Rehabilitation Centres and Remand Homes

Physical inspection of a sample of rehabilitation centers, remand homes and

sheltered workshops across the country revealed the following matters;

Centre Audit observation

a. Mpumudde

Rehabilitation

Centre

Out of establishment of 19 staff, only 6 were filled resulting into

13 vacancies

One computer for training 50 children

Inspection report by the Ministry Works and Transport (Entebbe),

referenced as; Bld52/141/01 of 23/1/2012 indicated that the

buildings needed urgent repairs to protect the lives of the children

Page 207: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

195

b. Ruti Vocational

Rehabilitation

Centre

Had only 4 staff out of an establishment of 7

Building was dilapidated and lacks a land title

c. Kireka

Rehabilitation

Centre

Out of establishment of 19 posts only 7 were filled

The carpentry and metal work shop has been without power for

two years.

Juvenile boys lack toilets

d. Fort portal

Remand Home

Out of establishment of 17 posts, only 7 are filled.

Supplies reportedly are made late because of centralized

purchasing

Children share beds without blankets and mattresses are worn out

Sewerage system is appalling and regularly breaks down.

e. Arua Juvenile

Remand Home

Relatively new structures

But manholes were found open and there were no pit latrines as

stop-gap measure in case of water shortage.

f. Gulu Remand

Home

Lacks a nurse and a cook.

g. Mbale Remand

Home

Out of 19 positions in the establishment only 4 are filled

Due to lack of transport facilities, children are held on remand for

more than 6 months before appearing in court.

The roofs leak

h. Naguru Remand

Home

Out of the 4.4 acres of land occupied by the remand home, only 2

acres is fenced while 2.4 acres had been encroached upon by

Uganda City Terminal Car Depot.

Buildings are dilapidated and some have asbestos roofs

19 approved staff positions, only 6 were filled

i. Jinja Sheltered

Workshop

Workshop has dilapidated buildings

Chain link and poles were reportedly stolen by artisans

Compound was bushy

j. Mbale Sheltered

Workshop

The machinery is non-functional and the structures are

dilapidated

It also lacks a land title

Establishment of 13 positions only 8 are filled

The above weaknesses render the rehabilitation centres, remand homes and

sheltered workshops unsuitable for reforming juveniles.

The Accounting Officer explained that submissions had been made to the Ministry

of Public Service to address staffing gaps. He further stated that renovation of the

Page 208: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

196

Institutes for youth and children is ongoing after which rehabilitation centers will

be renovated.

I have advised management to liaise with the relevant ministries and departments

to address the staffing, infrastructural, financial and social needs of the children as

mandated by the regulations.

(d) Budget performance

During the year, a total of Shs.1,114,871,279 was available for approved JLOS

activities under the MoLGSD (Shs.732,721,279 brought forward from the previous

year and Shs.382,150,000 released in the year under review). Records availed

indicate that only Shs.548,124,566 was utilized leaving a balance of

Shs.566,746,713 unutilized at the end of the financial year implying that only

49.2% of the funds was utilized. The unspent balances affected the

implementation of the following project activities.

i. Construction of Kabale Remand Home Phase I and Arua Remand Home

Phase III.

ii. Payment of retention fee for Arua Remand Home Construction Work Phase II

Office block and staff quarters.

iii. Consultancy and supervision services for Arua and Kabale Phase II and I

respectively

Management was advised to carry out adequate planning to requisition for only

those funds that can be put to use during the financial year. Funds should be

released to the entity based on realistic plan and budgets.

9.27 JUDICIAL SERVICE COMMISSION (JSC)

(a) Contract for development and performance of drama skit

A budget of Shs.39,000,000 was included in the Commission JLOS work plan for

the financial year split into development and production of a drama skit on

domestic violence Shs.15,000,000 and staging performance of four drama skits

Shs.24,000,000. The consultancy contract was awarded to M/s Afri-Talent (U)

signed by Abbey Mukiibi, the Company Director and JSC.

Page 209: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

197

Inspection and enquiries carried out in the listed districts where

performance/drama shows should have been carried out i.e. Kalangala, Katakwi,

Sheema, Lamwo revealed that no such shows were performed in those districts.

Furthermore, there were no performance reports presented for verification. The

drama skit show was not staged as was required by the statement of

requirements. Despite that fact that no performances were made, allowances were

noted to have been paid to Commissioners during the purported drama

presentations in the mentioned districts. Non-implementation of planned activities

undermines the Programme objectives.

Management explained that the Drama Skit Performance was not carried out in all

the districts except Kalangala because the officer leading the presentation was

assigned extra works on illegal land evictions.

Management was advised to ensure that the activity is implemented to its

conclusion.

(b) Utilization of Information, Education and Communication (IEC)

materials

Over the past years, the Commission has procured various printed Information,

Education and Communication (IEC) materials in form of brochures, charts and

citizens‘ handbooks in various languages including English, Luganda, Runyankole,

Luo, Ateso and Ngakarimojong. The printed materials are properly recorded in the

stores ledger and the responsible officers requisition and receive copies for

dissemination to the public. However, review of the stores by Internal Audit

revealed the following:

The materials issued out of the Commission stores to the public were not

properly accounted for. Other than the quantities reflected in the stores

ledger, details of names of benefiting members from the public at any given

Agency, Sub-County, District or location were not available at the stores for

review as accountability. It was therefore difficult to trace whether these

Page 210: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

198

materials reached the intended beneficiaries. The intended objectives may not

have been achieved.

Absence of a well laid down programme for distribution of educational

materials throughout the country was also noted. The distribution is currently

done in an adhoc manner depending on where the Commission staff are

proceeding for official activities and they carry any materials for distribution

without following any systematic programme. This is a disadvantage to some

hard to reach places that are not regularly visited by the Commission.

I advised Management to come up with a comprehensive programme for the

distribution of IEC materials covering the entire country. This will ease tracking

and enable a systematic approach to the distribution and monitoring of these

activities.

10.0 MINISTRY OF INTERNAL AFFAIRS

10.1 Mischarge of expenditure

The Parliament of Uganda appropriates funds in accordance with the needs of the

country and this appropriation is implemented through the budget in which funds

are tagged to particular activities and outputs using account and MTEF codes.

Review of the Ministry‘s expenditures revealed that the Ministry charged wrong

expenditure codes to a tune of Shs.834,282,494. This practice undermines the

budgeting process and it is contrary to the intentions of the appropriating

authority. The practice also leads to incorrect financial reporting.

In response, Management explained that the mischarges arose as a result of

having insufficient funds on the relevant item codes whereas the payments were

critical and un-avoidable.

I advised management to streamline the budget process to ensure that sufficient

funds are allocated to each account. Authority should be sought for any

reallocations undertaken.

10.2 Payables

Page 211: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

199

A review of the Statement of Financial Position revealed payables of Shs.

1,708,629,810 that remained outstanding as at 30th June 2013. Accumulation of

domestic arrears is in contravention of the commitment control system. There is a

risk of loss of reputation and litigation by creditors.

I advised Management to clear the outstanding commitments as a first call on the

budget as guided by Accountant General. I also advised Management to liaise with

the relevant Government authorities for adequate funding.

10.3 Advances to Individual Personal Accounts - Non Compliance with

Treasury Accounting Instructions

Sections 227, 228 and 229 of the Treasury Accounting Instructions (TAIs),

provides for all payments to be made by the Accounting Officer directly to the

beneficiaries. Where this is not convenient, an imprest holder should be appointed

by the Accounting Officer with the approval of the Accountant General.

On the contrary however, Shs.285,191,112 was advanced to Ministry staff through

their personal bank accounts to undertake direct procurements and other activities

of the Ministry. Such a practice of depositing huge funds on personal accounts

exposes Government funds to risk of loss, since the Ministry does not have any

control over such funds deposited on personal accounts.

Management explained that advances to individual personal accounts are treated

as administrative advances and are usually of emergency nature. These are later

on accounted for and retired. I advised Management to ensure strict adherence

with the requirements under the Treasury Accounting Instructions.

10.4 Motor vehicle repairs and servicing

During the year, a total of Shs.66,247,623 was paid to various service providers in

respect of repairs and servicing of vehicles. It was however noted that the entity

has no policy on fleet management to provide guidance to the Transport officer.

For instance, there is no internal mechanism in place for a competent Engineer to

carry out internal assessments of vehicles that are due for repairs. Repair needs

Page 212: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

200

have mainly been based on the assessment done by the respective drivers.

Further still no post vehicle inspections are done by an engineer to confirm that

repairs are done as specified in the repair orders, instead it is the drivers that

confirm the repairs were done. In absence of an appropriate system and other

records like motor vehicle maintenance charts, I was unable to verify that the

repairs were undertaken accordingly.

Management in their response explained that the Ministry structure does not have

mechanical engineers and in most cases they depend on engineers from the

Ministry of Works and Transport (MoWT). However, MoWT staff are not readily

available and yet the repairs and servicing are usually an emergency.

I advised management to liaise with MoWT to ensure that proper pre and post

inspection is made on all vehicles taken to garages by a competent engineer.

10.5 Lack of storage of space

It was noted that Management lacks an established storage for items of the

Ministry before they are disposed of. Furniture and cars litter the compound with

no immediate plans of disposing them off some of which appear to be in good

condition. The photo below refers:

The Ministry property is likely to depreciate rapidly.

Management explained that the Ministry lacks ample office and other space to

house the items. I advised Management to expeditiously plan for the disposal of

the items to salvage some value.

Page 213: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

201

10.6 Utilities

(a) Water

The Ministry headquarters has one water meter number 12-042724 located at Old

Port bell Road gate. Outstanding water bills at the end of financial year 2012/2013

amounted to Shs.55,163,695 as per Statement of Account dated 4th July 2013,

from National Water and Sewerage Cooperation. Deposits amounting to

Shs.21,683,266 paid during the financial year were not reflected on the Ministry‘s

Water Statement of Account.

There is a risk of double payments for water bills and creation of unnecessary

domestic arrears since some of the deposits are not indicated on the Ministry‘s

Account.

There is a need for management to send payment advice forms to National Water

as soon as payments are made and also to make a follow up to ensure that the

Ministry Account is credited.

(b) Electricity

The Ministry has one electricity meter number U211392 located on the main block.

Deposits made to UMEME during the financial year amounted to shillings

70,136,184 and they were all reflected on the Ministry Account. However at the

closure of the financial year, the outstanding bill amounted to Shs.29,059,977.

Management in their response stated that this is a result of low budget provisions.

The Ministry made several requests to the Treasury on increased funding for the

utilities, however no positive response was received.

I advised management to come up with appropriate budget provisions for utilities

and continue pursuing MOFPED.

10.7 Stalled Government Laboratory Projects

Construction of Gulu Regional Laboratory which started in February 2008 and

expected to be completed in July 2008 at the original cost of Shs.436,445,468

stalled, while construction of Mbarara regional Laboratory at original contract price

Page 214: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

202

of Shs.454,015,728 is ongoing but behind schedule. Delays in construction of the

Regional Laboratories may lead to increase in backlog of cases since analysis of

various samples to be used for testifying in court is equally delayed.

Management in their response explained that initially the contractors experienced

a lot of challenges on the ground and consequently work stalled. However,

management has now appointed project managers for each of these projects,

intensified inspections and work is almost complete.

I advised management to expedite the arrangements under way for revival of the

stalled project in Gulu. I also advised that the Project management team of

Mbarara should be more vigilant to ensure that the project is not delayed any

further.

10.8 Monitoring of NGOs

The department of NGO Board has consistently registered new Non-Governmental

Organizations (NGOs) without monitoring whether those registered earlier are still

operational. As a result, the department has un updated database of NGOs.

Management indicated that a monitoring tool was developed and was to be shared

with the District NGO Monitoring Committees, and that it was to publish in the

media all registered NGOs and issue a directive for them to update their

information on an agreed timetable, which were not done.

Management responded that this was due to limited resources (human and

financial), and the Ministry was unable to monitor all NGOs across the country.

They further indicated that they recently secured some funding from USAID and

they developed a database together with a monitoring tool that will help them

improve on NGO monitoring.

I advised the Ministry to regularly update the NGO database.

10.9 Budget performance

Public Finance and Accountability Regulations, 2003, section 2.10 (b) entrusts the

accounting officer with ensuring that all controls such as those contained in the

Page 215: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

203

approved estimates and warrants are strictly observed. Budget estimates are

based on outputs to be achieved for the financial year and during implementation,

effort is required to be made to achieve the agreed objectives or targets of the

entity within the availed resources.

Review of the budget performance for the year 2012/2013 revealed that some

targets were not achieved despite release of funds for the various programmes.

Details are below:

Activity Cumulative Release

(Shs)

Cumulative expenditure

(Shs)

Unutilized funds

(Shs)

Absorption capacity

Support for EDM system for NGO Board

100,000,000

1,965,000 99,803,500

2%

Partitioning of Office space

of NGO Board

50,000,000 1,965,000 49,803,50

0

4%

Continue piloting DNA

crime data bank to improve

forensic intelligence

50,000,000 - 50,000,00

0

0%

Improve office and

Laboratory health and

safety

50,000,000 - 50,000,00

0

0%

Cybercrime and anti-

corruption investigation

70,000,000 - 70,000,00

0

0%

NCSP Offenders Monitoring – 10 Motor cycles for

community service in Districts.

75,000,000 12,923,000 62,077,000

17%

Procurement of a station

wagon to transport marking team and marking machines

120,000,00

0

- 120,000,0

00

0%

Establishment of inquiry

and information desk and Train staff in customer care.

10,000,000 10,000,00

0

0%

This may have been due to inadequate supervision and as a result service delivery

is hampered and the appropriating authority‘s objectives are not met.

Management explained that by the time the audit was carried out, funds had just

been received and implementation of activities was just commencing.

I advised Management to carry out adequate supervision of the projects being

undertaken to ensure timely completion.

Page 216: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

204

11.0 UGANDA POLICE FORCE

11.1 Payables

A review of the Statement of Financial Position revealed outstanding payables of

Shs.48,477,669,348. The position as at 30th June 2012 stood at

Shs.38,457,244,017, implying that there was an increase in domestic arrears by

Shs.10,020,425,331 (26.1%) compared to last year. It is evident that

management has continued to incur arrears without establishing sufficient

mechanisms to monitor and control them. Included in the total outstanding

payables is huge rental arrears amounting to Shs.6,754,083,700. Some of the

arrears relate to the period since 2008. There is a risk of eviction of Police

personnel from the rented premises.

Management explained that the increase in the figure of payables was a result of

the unpaid salaries of June 2013 totalling to Shs.12,020,425,331, which were later

paid in August 2013.

I explained to management that the arrears position is still high and could easily

lead to nugatory expenditure arising from costly litigations.

I advised Management to clear the outstanding commitments as a first call on the

budget as guided by Accountant General. I also advised Management to liaise with

the relevant Government authorities for adequate funding.

11.2 Mischarge of Expenditure

A review of the entity expenditures revealed that wrong expenditure codes were

charged to a tune of Shs.563,783,138 without authority contrary to chapter IV

section 156 of the TAIs. This practice does not only distort the intentions of

appropriating authority but also results into misreporting of the financial

statements.

Page 217: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

205

Management explained that the Police budget is underfunded and as such it

cannot support the level of services that are required to fulfil its mandate. It was

therefore inevitable that certain items were used to fund critical activities resulting

into mischarges.

I advised management to ensure that accounting regulations are strictly adhered

to.

11.3 Absence of Approved Strategic Plan

A strategic plan provides an organization with purpose and direction. It is an

important tool in steering an organization towards its Vision, Mission and the

overall Mandate. Annual activities undertaken by any organization should be

derived from the strategic plan. However, it was noted that the Uganda Police

Force (UPF) did not have an approved corporate plan during the year that spells

out the long and medium term plans. Absence of a strategic plan has a direct

effect on the achievement of the organizational mission and objectives and

therefore performance of planned activities.

Management explained that a draft strategic plan 2012/13 to 2016/17 was

presented, discussed and approved with amendments in the extra Ordinary Police

Council in November, 2013. The final plan is expected to be ready by end of this

FY 2013/14.

I advised Management that this plan has been in draft form for very long and

should be finalized to provide direction to the Force.

11.4 Lack of an IT strategic plan

International Standard on Auditing requires that the Auditor considers whether the

entity has responded adequately to the risk arising from using Information

Technology (IT) by establishing effective general IT controls and applications, the

main objective being to establish the effectiveness and integrity of information and

ICT Policy.

Page 218: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

206

UPF has heavily invested in the Information and Communication Technology (ICT)

function. It was however noted that the Force has not developed an IT strategic

plan. The increasing reliance on information technology for the delivery of

services makes it necessary to ensure that these systems are developed, operated,

used and maintained in a safe and secure fashion. Without an approved

IT/information security policy and IT strategic plan, there is a risk of making

investments that are not well aligned with other business processes and besides

investments in IT may not be properly guided leading to waste of resources.

Management explained that they have a draft IT policy that is awaiting the

completion of the strategic plan, so as to align the IT plan to the main Strategic

plan.

I advised management to finalize this policy so as to give guidance and direction.

11.5 Failure to dispose off uneconomic fleet

It was noted that the entity has a fleet of 1,057 motor vehicles. Out of this fleet,

318 motor vehicles are either grounded, under repair or uneconomical, leaving

only 735 vehicles in a running condition, implying 30% of the motor vehicles are

grounded. Failure by Management to dispose off the vehicle will lead to further

deterioration and loss in value.

Management explained that the contract for boarding off 174 vehicles has been

signed, 13 vehicles are accident cases beyond repair that will be included on the

list of those for board off, 24 vehicles are grounded but still economical and

pending repairs, and 41 vehicles are under repair.

I advised management to ensure that the uneconomical fleet is boarded off to

avoid any eventual risks.

11.6 Staffing gaps

The approved structure of Uganda Police Force has an establishment of 65,461

staff (uniformed) of which only 41,242 posts have been filled representing a gap

of 24,219. The staffing levels are not adequate to handle the current Police

Page 219: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

207

challenges emerging daily in the country. The most affected rank was that of

sergeants. Equally affected are the civilian staff, whose approved work force stood

at 927 of which 317 had been filled representing only 34%, of the work force. It

was also noted that the international law puts the police strength in relation to

population to 1:500, however the Uganda Police Force is at 1:767. Lack of ample

staff coupled with the work over load impacts negatively on service delivery and

achievement of Police Force objectives.

Management explained that there has been a ban on staff recruitment. The

staffing gaps were also attributed to lack of resources to effect adequate

recruitment.

I advised UPF to liaise with the relevant GoU bodies to ensure that resources are

provided for recruitment of adequate manpower.

11.7 Un-surveyed Police land

(a) Land Ownership

There is a lot of un-surveyed Police land which needs formalization and securing of

land titles. Out of 563 police stations, 105 had land titles while 456 did not have

titles. It was difficult to establish exactly how much of this land was surveyed.

Although a budget of Shs.120 million had been provided for the financial year

2112/2013, for this activity, very little was done. The Police Force stands to loose

some of its land to encroachers.

Management claimed that UPF has 613 pieces of land scattered in 86 Districts of

which 78 pieces have been surveyed representing 13% of their land.

I advised Management to follow up with relevant stakeholders to ensure that land

is surveyed and secured.

(b) Kawempe Police Station land title

The office has expressed concern on the issue of the untitled Police land at

Kawempe Police Post. It was indicated that the Family of Kakungulu signed

transfer forms for the said land on and a few days later the file disappeared. A

Page 220: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

208

follow up on the issue revealed that the agreement for this land was signed

between UPF and Kakungulu Family, duly witnessed by the Chairman Uganda

Land Board (ULB) for purchase of land valued at Shs.645, 000,000. The land was

duly paid for by the Uganda Police Force in full and a copy of the agreement and

title was handed over to Uganda Land Board by the Kakungulu family. This title

has since disappeared at the Uganda Land Board Offices. To date, UPF has not

secured the title to its land. In the absence of a title, management of UPF risks

losing this valuable asset.

Management explained that they have taken steps to ensure that the title is

recovered by informing Uganda Land Commission (ULC) to act on the matter.

However the Commission has not responded.

I advised that management should continue seeking audience with management

of ULC to ensure the title is recovered.

11.8 Budget Performance

A review of the budget performance for the year 2012/2013 revealed that some

planned activities and targets were partially or not achieved at all. Unimplemented

activities hamper service delivery, and the appropriating authority‘s objectives may

not be met. Details are indicated in the table below:

Activities Details Budget Achieved Out put Remarks

Output 1256 Police Services

Prompt response to violent crime

Investigate and conclude 59,543 criminal cases

33,659 Cases investigated

25,886 not investigated

Output 125603 Counter Terrorism

Improve public awareness on terrorism. -Increased capacity to identify and

respond to terrorism threats/Incidents

To ensure a proportion of 60% public are aware of signs of terrorism

40% proportion of public are aware of signs of terrorism.

20% are not aware. Also unclear is the methodology used to determine the proportion of the

public that are aware of terror threats.

Output 125605

Minimise incidents of cattle rustling and theft in Karamoja region and neighbouring communities.

To settle and recover 4,368 cases of rustled cattle reported.

353 cattle recovered

4,015 cases not settled.

Page 221: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

209

Output 125610 Police Administration and Support Services

-Enhanced Information sharing and investigation. -Enhanced participation in UN peace keeping operations. -Enhanced cooperation with partner states on transnational/crime.

210 of international criminals to be repatriated.

169 International criminals repatriated.

41 not repatriated.

Output 1256 Police services

Recruit and train 2000 PPCs and 500 cadets.

2,500 PPCs and Cadets recruited

NIL No recruitment was done.

Output 1256 Police services

Start Implementation of PPP. Construction of 5 barracks using Hydra form.

PPP implementation Complete construction of 5 barracks using Hydra form.

-PPP Program not implemented. Constructed 3 out of 5 Police stations Namely (Tororo, Butaleja and Kibuku).

-PPP Program not implemented apart from forming the Negotiation team. 2 Police stations not yet done

Output 125677

Contractual obligation on Public Order Management bill fulfilled.

Contractual Obligation on Public order Management bill fulfilled.

Partly paid contractual obligation on Public Order Management equipment.

Partly handled.

Output 125609 Police, Command,

Control and Planning.

Strategic Policing finalized.

Strategic Policing finalized.

Process on going. Not finalized.

Management in its response argued that the entity was under funded and as a

result some of the activities budgeted were not implemented.

I advised management to liaise with relevant authorities and ensure that the

planned activities are implemented.

11.9 Inspections

(a) Masindi Police – Backlog cases

One of the Objectives of JLOS is to enhance access to justice for all particularly for

the poor and the marginalized. Continued accumulation of backlog cases therefore

does not reflect the achievement of the objective of the program.

Page 222: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

210

During Inspection of Masindi Police station, it was noted that only Shs.830,000

was advanced to an officer in charge of criminal investigation to investigate 6,000

cases for the calendar years 2012 and 2013. With the limited resources available,

the officer managed to investigate 779 cases successfully. 1,729 cases were put

on hold due to want of evidence and 437 cases remained un-investigated in 2012.

In 2013, 3,055 case were reported of which 556 were investigated, 921 cases put

away due to want of evidence and 1,578 cases remained un-investigated.

Management explained that in addition to limited funding, office activities were

hampered by delays in receiving reports from Government Analytical Laboratory

and finger Prints expert, lack of cooperation from those who report cases

preferring to settle case out of court, manpower problems and lack of adequate

transportation facilities.

I advised management to liaise with the relevant authorities and address the

critical issues raised above.

(b) Soroti Police station – case backlog

Soroti police was equally facing similar problems as Masindi station. It was noted

that 275 cases were brought forward from the previous year, while 2,990 cases

registered in the 2012/2013, bringing the total number of cases for disposal during

the year to 3,265. Only 288 cases were concluded in court, 1,088 were settled out

of court, 849 cases had been taken to court while 1,040 were still under inquiry.

The concluded court cases, those settled out of court and those taken to court

totalled to 2225 (68%)of available cases, which in my view has been considered

low. Details are in the table below:

Month No. of cases b/f 2011/12

No. cases registered

Total no. of cases

Cases out of court

Cases concluded in court

Cases taken to court

Cases still under inquiry c/f 2013/2014

July 2012

28 156 184 49 38 69 28

Aug 2012 20 184 204 78 18 58 50

Sep 2012 20 184 204 86 16 42 60

Oct 2012 25 263 288 90 23 73 102

Nov 21 264 285 110 24 78 73

Page 223: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

211

2012

Dec 2012 15 206 221 84 11 76 50

Jan 2013 19 262 281 117 21 66 77

Feb 2013 16 261 277 97 34 83 63

Mar 2013 29 248 277 100 32 74 71

April 2013

21 307 328 114 35 80 99

May 2013

27 309 336 64 17 73 182

June 2013

34 346 380 99 19 77 185

Total 275 2,990 3265 1,088 288 849 1040

The slow disposal of cases denies justice to the complainants and suspects. The

slow progress was attributed to slow investigation processes by Police.

I advised management to ensure that cases registered and under inquiry are

investigated expeditiously to minimize delays in delivery of justice.

(c) Soroti Police - State of the cells

It was noted that the doors to the cells at the station had rusted, making it easy

for the suspect to break and escape jeopardizing investigations. The cells were

untidy. It was also noted that the state of the toilets was pathetic with no flush

water facilities. See photographs below:

Pathetic state of toilets

Page 224: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

212

Management blamed the bad state of affairs on lack of funding. A provision has

been made for infrastructural development in the subsequent year.

I advised management to make arrangements to have the cells renovated and the

doors fixed to improve the living condition of the suspects.

(d) Gulu Police Station

During inspection, it was established that initially the cells were meant to

accommodate only20 suspects but the officer in charge revealed that sometimes

the number goes up to 70. The cells are now dilapidated because of congestions

and lack of maintenance. There were no toilet facilities in the cells, suspects use

buckets to answer nature‘s call at night, and during the day they help themselves

at a nearby pit latrine near the cells.

The Photo below shows the state of cells:

Male cell at Gulu Police Station

Absence of ample space coupled with the deplorable condition of cells could lead

to suffocation and escape of prisoners.

Management explained that the budget for maintenance is highly inadequate

given the vast stock of Police infrastructure. Consequently routine maintenance is

impossible. However, minor interventions are carried out from time to time.

Page 225: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

213

I advised management to liaise with the relevant Government agencies to allow

renovations and construction of new structures.

(e) Nebbi Police station – inadequate facilities

It was established that initially the cells were meant to accommodate only 30

suspects but the officer in charge revealed that sometimes the number can go to

over 40. There were no toilet facilities in the cells, at night offenders use buckets

to answer nature‘s call, while during the day they help themselves at a nearby pit

latrine near the cells. The cells also lacked ventilation and lighting systems for the

Juvenile, women and Adult male cells. Absence of ample space coupled with the

deplorable condition of cells could lead to suffocation and escape of prisoners.

Management explained that budget constraints hamper renovation of the existing

facilities and construction of new facilities.

I advised management to liaise with the relevant Government agencies for funding

of the Police to enable renovations and construction of new structures.

(f) Arua Police station - Revenue collection

Section 83, 84 and 85 of the Treasury Accounting Instructions (TAIs) 2003 Part 1

Finance requires that funds collected be immediately banked on the collection

account and a banking slip issued to act as accountability. During inspection it was

noted that apart from the Express Penalty scheme and Traffic Accident and Sketch

Plan, Arua Police Station collected other revenues to the tune of Shs.33,045,400.

This revenue was from Police guard services, Police reports and licensing of fire

arms.

It was noted that the account lacked bank statements to confirm receipt and

banking of revenue, as only bank advice forms were kept. The account was not

reconciled as well, contrary to TAI requirements. In the absence of bank

statements, I was unable to confirm that the funds were all promptly banked.

Page 226: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

214

I advised management to ensure that bank reconciliations are timely done so that

the collections are properly correlated to banking.

12.0 UGANDA PRISONS SERVICES

12.1 Payables

A review of the Statement of Financial Position revealed outstanding payables of

Shs.18,028,999,698. Payables worth Shs.13,062,521,489 were disclosed in the

statement of financial position as at 30th June 2012, implying that there has been

an increase in domestic arrears by Shs.4,966,478,209 (38%) from the closing

position of the previous year. It is evident that management has continued to

incur arrears without establishing sufficient mechanisms to monitor and control

them. There is a risk of loss of reputation and litigation by creditors.

Management explained that the increase in payables was as a result of electricity

and water consumed during the year and not paid because of insufficient funding

for the utilities.

I advised Management to clear the outstanding commitments as a first call on the

budget as guided by Accountant General. I also advised Management to liaise with

the relevant Government authorities for adequate funding.

12.2 Mischarge of expenditure items

A review of the entity expenditures revealed that Shs.717,151,659 was charged on

wrong expenditure. There was no authority for the reallocation. This practice does

not only distort the intentions of appropriating authority but also results into

incorrect reporting in the financial statements.

Management explained that some of the outputs like construction and renovation

had no related budgets such as allowances spent on the implementation of the

projects and as such funds had to be reallocated from other expenditure codes.

The anomaly is regrettable and this will be addressed in the next budgeting

process.

Page 227: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

215

I advised management to utilize the budget as appropriated and also ensure that

adequate funds are allocated for each account code and MTEF.

12.3 Under collection of non tax revenue (NTR)

The entity budgeted to collect Shs.7,030,000,000 in non-tax revenue during the

financial year. However, only Shs.5,203,969,214 was collected leading to a

shortfall of Shs.1,826,030,786 (26%).

Management in their explanation indicated that most of their NTR comes from

farm productions, however, the output was affected by erratic weather conditions

over season 2013A as indicated in the table below.

Acreage Target Actual

output

Variance

Season

2013A

2,168 3,722,400 1,525,000 2,194,400

Season

2013B

2,168 3,240,000 2,697,000 543,000

6,962,400 4,222,000 2,740,400

I advised management to liaise with relevant authorities and have the necessary

farm inputs secured.

12.4 Lack of IT Strategic Plan

UPS has heavily invested in the Information and Communication Technology (ICT)

function. It was however noted that the there is no IT Strategic Plan. The

increasing reliance on information technology for the delivery of services makes it

necessary to ensure that these systems are developed, operated, used and

maintained in a safe and secure fashion. Without an approved IT/information

security policy and IT strategic plan, there is a risk of making investments in IT

that are not well aligned with other business processes and objectives of the UPS;

investments in IT may not be properly guided leading to waste of resources.

Page 228: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

216

Management in their reply acknowledged lack of an IT strategic plan, however

they have conducted a system study as the 1st step towards computerization of

entity operations and several recommendations have been made in terms of hard

ware, software, user requirements and operating environment. It is upon this

development that a Strategic Plan will be developed.

I advised management to speed up the completion of this study and ensure that

the IT Plan is accordingly developed.

12.5 Lack of Recruitment Policies and Procedures

Section 5 of the Public Service Act, Cap 277 delegates the Authority to appoint,

confirm, engage for further service, retire and promote serving custodial officers

below the rank of Assistant Superintendent of Prison. It was however noted that

management has not put in place recruitment policies and procedures to handle

the regional recruitment of prison cadres. The exercise is carried out only when

need arises. Absences of recruitment procedures at a cadre level could lead to the

exercise being marred by irregularities.

Management responded that they are currently using the Public Service Policies

and Guidelines on recruitment. Arising out of the Prisons Act, it is prudent upon

UPS to develop its own policy on recruitment to address UPS‘ specific concerns.

Management further indicated that they are yet to develop the recruitment policy.

I advised management to develop their own guide lines and seek approvals before

they are adopted.

12.6 Inadequate Staff (Warders)

The Final Report on the review and restructuring of the Uganda Prisons Service

done in August, 2006 identified that Uganda Prisons Service was grossly

understaffed in terms of custodial Officers, rehabilitation and reform staff. Under

the current Prisons Standing Instruction, there is supposed to be one custodial

Officer for every three inmates. In Practice however, the ideal ratio is far from

being attained with an average of one Custodial Officer to every 6 inmates. It

was further noted that there were no replacements of staff after retirement or

Page 229: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

217

death of Prison staff. There was also no motivation of staff in hard to reach areas.

This undermines the efficient and effective provision of custodial services to the

prisoners. Inadequate staff (warders) make custodial officers vulnerable to risk of

attack or injury from inmates.

Management attributed this to the ban on recruitment and this has affected their

ability to perform. However, additional wage has been provided to cater for

recruitment of 30 Cadet Assistant Superintendent of Prisons (CASP), 50 Cadet

Principal Officers and 920 warders/wardresses in the financial year 2014/15.

I advised management to dialogue with the relevant Government agencies to

enable recruitment of the necessary staff.

12.7 Staff not taking annual leave

According to the Public Service Standing Orders, every staff is entitled to annual

leave. From a sample of twenty personal files, I observed that 11 out of 20 staff

did not take their annual leave. Many had accumulated leave in lieu without

approval. This is likely to cause fatigue and subsequent poor performance.

In response, Management explained that given the current level of understaffing

of 44% with staff prisoner ratio of 1:7, against ideal ratio of 1:3, weak physical

infrastructure and changing profiles of criminals, it may not be possible for every

staff to take annual leave within a year.

I advised management to lobby for increased funding to allow recruitment of the

necessary staff. This will partially solve the leave gaps.

12.8 Provision of Prison facilities and infrastructure

(a) Infrastructure

Humane custody of offenders covers provision of basic amenities such as

medication, food and accommodation. The infrastructure of the Prison Service has

not expanded even with the increase in number of prisoners‘ population. The

service is still operating from the infrastructures that were set up in the 1960's and

1970's.This has resulted in congestion of the prisons. The review of the Strategic

Page 230: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

218

Investment Plan as at June 2012 puts the number of prisoners at 33,682 with

occupancy percentage of 231%. The big number cannot only encourage escape

but also poor hygiene, diseases and rampant strikes in prisons as the

prisoners continue scampering for the little resources. In the absence of adequate

structures, the safety, hygiene and general welfare of both the prisoners and

prisons personnel is at stake.

Management explained that they are doing their best within the financial

limitations especially through the JLOS project. With this project in place, through

construction and renovation, occupancy has increased by 65% in 10 Prisons.

There are ongoing constructions/renovations in 8 Prisons and the entity has

planned over a medium term to cater for 20,000 prisoners. Other than the

constructions, UPS has embarked on community service, reactivation of judicial

parole, reviewing of sentences and strengthening rehabilitation services in order to

reduce on the congestion.

(b) Use of the bucket system

Shs.120,000,000 was provided by the entity to construct water borne toilets with a

view of reducing the use of a bucket system. The funds released were inadequate

to address the problem. In almost all prisons visited, the bucket system was still

in use. It was observed that the use of this system is unhygienic and humanly

degrading. Although management indicated that the system is being phased out,

only 28 prisons out of 230 had been provided with water borne toilets.

Management explained that they had planned to construct water borne toilets in

all prisons. However adequate resources were not provided.

I advised management to continue lobbying for additional resources to improve

the well being of the prison community.

12.9 Absence of Regional and District Committee

Section 16 and 17 of Uganda Prisons Act, 2006 empowers the Prisons service to

enact the Regional and District Prisons Committees. The role of these Committees

is to provide advisory role to Prisons Council and Regional Prisons Committees

Page 231: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

219

respectively. It was noted that management has not instituted these committees

as required. This was attributed to lack of resources to maintain these

Committees. In the absence of the various Committees, Prisons activities may

not be handled in an organized and efficient way to allow proper decision making.

Management explained that they do not have the committees in place due to lack

of funds to support the committees. They further explained that they are currently

using the visiting Justices to inspect prisons and attend to complaints. However, a

presentation was made to the Prisons Council for the formation of the two

Committees. A resolution is being awaited after the approval by the Prisons

Authority.

I advised management to implement this requirement for better service delivery.

12.10 Duty Free Shop

(a) Returned cement

One of the objectives of creating the Duty free Shop was to help staff access

building materials at lower prices. However, a visit to the stores at Luzira

indicated that cement worth Shs.8,908,488 (382 bags) was returned to the stores

from up country due to lack of buyers. Details are in the table below:

Dates

Brought

back

Receipt

Voucher No

No of Bags

Brought back

Value in

(Shs.)

Stations that Brought

Back

7/6/2013 2084 53 1,237,444 Back from Masindi Duty free shop

28/1/201

3

5355 171 3,992,508 Back from Ndorwa Duty

free shop

21/1/2013

4573 150 3,502,200 Back from Jinja Duty free shop

1/6/2013 3607 8 176,336 Back from mid-Eastern

(Soroti)

Total 382 8,908,488

This could have been caused by procuring excess materials beyond the staff

demand for the period or the items.

Management in their response explained that the cement was transferred back

from the said regional stores to the central store in Luzira however the returned

Page 232: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

220

cement was sold with the exception of 25 bags which got damaged and needed

re-bagging.

I advised management to ensure procured materials are in line with assessed

demand.

(b) Items sold at higher prices than market prices

The objective of creating the duty Free shops was to avail materials at subsidized

prices in various stores both at headquarters and upcountry for beneficiaries

(staff). Currently UPS has fourteen (14) stores including headquarter and up

country stores. It was noted that some stores had prices of items greater than

the market prices. Details of these are given below:

ITEM/SUPPLIER QTY PRICE MARKET PRICE

SAVING MARGIN

STORE LOCATION

ORDER STATUS

IRON SHEETS FROM ROOFINGS GROUP

Super Eco preprinted G30 B/Red

1 38,600 37,000 -1,600 Luzira, S/Eastern, Jinja and Mbale stores

New

Corrugated Preprinted G30 B/Red and Super Eco pre-painted G30 Blue

1 38,600 37,000 -1,600 Luzira ,Gulu New

Corrugated Pre-painted G30 Blue

1 38,600 37,000 -1,600 Luzira New

RIDGES FROM ROOFINGS GROUP

New

12MM X12M 1 27,100 27,000 -100 KER Luzira New 16MMX12M 1 48,300 47,000 -1,300 KER Luzira New

This defeats the objective for which the scheme was established.

Management in their response explained that the Committee of the Duty Free

Shop is reviewing the prices to ensure staff get value for money.

I await the outcome of the technical committee reviews.

12.11 Budget Performance

Page 233: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

221

A review of the budget performance for the year 2012/2013 revealed that some

targets were not achieved as planned. Details are as per table below:

Planned activities 2012/13 Status of output at end of 2012/13

Enhance safety and security for prisoners, staff and the Public.

Reduce staff to prisoner

ratio from 1:6.

Reduce congestion levels

from 217% to 212% by

constructing and

renovating more prisoners’

wards and case backlog

reduction programmes.

Custodial staff to prisoners‘ ratio has worsened from

1:6 to 1: 6.7.

Congestion level increased from 231% to 251%

because of increase in the number of prisoners. This

was due to 14% increase in prisoners population

from 32,967 in FY 2011/2012 to 37,458 in FY

2012/13 Staff attrition of 215 and no recruitment as

the request to recruit in 2012/13 was turned down

by the Ministry of Public Service.

Contribute to access to Justice

Reduce length of stay on

remand from 14 to 12

months (Sector target)

Reduce the remand

population from 52% to

50% of total prisoners’

population (Sector target)

Length of stay on remand for capital offenders did

not improve but was maintained.

Remand to convicts ratio also increased from 52%

to 55.4%

Rehabilitation and reintegration of offenders

1,000 prisoners integrated

into communities

Conducting rehabilitative

guidance and counseling

for 1,500 inmates and

routine counseling of all

inmates

Instead of industrial and agricultural skills, 1,500

inmates undergoing formal education training; 302

inmates sat for UNEB Exams (PLE -118 (101 Passed)

UCE – 46 (31 passed) UACE -38 (29 Passed with a

minimum of 2 principal passes) others certificates

50. Diploma , 50)

Support on integration into communities and

rehabilitative counselling and guidance not provided.

Prisons Management

A daily average of 532

inmates produced to 211

courts country wide

Survey 10 prisons land

(Ragem, Adjuman, Olia,

Moyo, Lukaya, Mubuku,

Ibuga, Kamuge , Bulaula

and Kamuli prisons land)

Boundaries for 4 prisons

land opened ( Luzira ,

Only 231 inmates produced in courts on average.

Survey not done.

Page 234: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

222

Amita, Arua and Gulu

Plant 300 acres with

various trees species.

Only 37 acres planted with fruits (Oranges 17,

Mangoes 18, and Pineapples 2).

Constructions and Rehabilitations of prisons

Renovate Gulu prisons ( 7

Prisoners wards and an

administration block)

Shs.565m

Reconstruct a

rehabilitation centre at

Namalu prisons – UGX 360

m

Renovate and expand

Mbarara prison

(administration block, sick

bay, 1 prisoners ward of

accommodation capacity

70 prisoners, perimeter

fence ; construct 20

housing units and renovate

5 staff houses –

Shs.1.751bn.

Completion of the twin-

ward at Ruimi prisons –

UGX 300m

Renovations works ongoing at Gulu prison. Not

completed.

Reconstruction of Namalu Rehabilitation centre

ongoing, not completed.

Construction of low cost staff houses at Mbarara still

on going

A twin-ward at Ruimi farm prison at final finishes.

Unimplemented activities negatively affect service delivery, and the appropriating

authority‘s objectives are not met.

Management explained that capital development activities were hampered due to

insufficient funding.

I advised management to lobby for capital development and have the activities

performed as planned.

12.12 Field Inspections

(a) Soroti Prison – inadequate uniforms

Page 235: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

223

During audit inspection, it was noted that some prisoners were dressed in torn

uniforms. Records available indicated that Soroti prison received only 375 pairs of

uniforms on 16/05/2012 and yet the lock up number was 621, leaving almost half

of the prisoners without uniforms. The picture below refers:

Prisoner with torn uniform

The inadequate clothing undermines the status of Uganda prisons.

Management in their response indicated that they had a budget for at least 2

uniforms per prisoner at an estimated cost of Shs.1.423 billion, however only

about 0.756 billion was provided and as a result not all prisoners were catered for.

I advised management to bring this to the attention of the relevant authorities to

ensure that prisoners have the required clothing.

(b) Soroti Prison - inadequate beddings

According to records at Soroti prison, it was noted that the prisoners‘ beddings are

in shambles, the prison last received 400 blankets five years ago (21/08/2009).

Most of the prisoners who cannot afford to buy their own blankets sleep on the

ragged blankets or on the cold floor. The pictures below refers:

Page 236: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

224

Tattered prison blankets

The inadequate prisoners‘ welfare may undermine the image and status of Uganda

Prisons.

Management in its response stated that they planned to provide 2 blankets per

prisoner to a daily average of 35,565 prisoners, this would require

Shs.2,133,900,000. However GoU provided in the budget only Shs.300,000,000,

as a result UPS was un able to provide blankets for the inmates.

I advised management to bring this matter to the attention of the relevant

authorities to ensure that prisoners have sufficient beddings.

(c) Soroti Prison - Drinking water containers and hygiene

It was noted that the prison did not have proper equipment for storing drinking

water. Water was being kept in open containers. Refer to pictures shown below:

Storage of drinking water for prisoners

Page 237: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

225

This poses a health risk to the prisoners.

Management should acquire proper and closed hygienic containers for keeping

drinking water for the prisoners.

(d) Isingiro Prison - Living condition of staff and inmates

The following were observed at Isingiro prison:

Health center II that provides health services to the prison is 12 kms away,

posing a risk of escape of prisoners while being escorted for medical services.

The prison has no electricity.

No water source is available at the prison, and the nearest well is 6 kms away

The courts are in Kigagate and Rugaga sub-counties, which are very far from

the prison, (about 50km away).

Most of the time the relatives are the ones who transport the prisoners posing

a risk of escape.

The office has no furniture and office equipment.

Beddings like blankets were last received in 2011 and they were 30 in number,

yet the population now is about 180.

The living condition of the staff and inmates are generally poor. The living

condition affects staff morale, and negatively affects the image and status of

Uganda Prisons.

Management in its response explained that construction and improvement of

Isingiro Prison is planned for this FY2013/14. The procurement process is at the

contract awarding stage.

I advised management to speed up implementation of this contract to improve the

lives of the inmates.

13.0 JUDICIARY DEPARTMENT

13.1 Mischarge of Expenditure

Page 238: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

226

A review of payments revealed that wrong expenditure codes were charged to a

tune of Shs.4,701,073,327 without authority contrary to S.156 of the TAIs. This

practice undermines the intensions of appointing authority and also leads to

incorrect financial reporting.

The Accounting Officer explained that the mischarge of expenditure was brought

about mainly by gross underfunding of the institutional activities and spending

pressures that emerge after receiving releases when re-allocation cannot be

effected.

I advised the Accounting Officer to streamline the budget process to ensure that

sufficient funds are allocated to each account. Authority should be sought before

any reallocations are made.

13.2 Payables

A review of the Statement of Financial Position revealed outstanding payables of

Shs.6,615,748,840. This amount comprised of trade creditors of

Shs.2,539,771,946 and security deposits of Shs.4,075,976,894. The trade

creditors‘ position as at 30th June 2012 stood at Shs.1,745,647,214 implying that

there was an increase in domestic arrears (trade creditors) by Shs.794,124,732

(45.5%) compared to last year. It is evident that management has continued to

incur arrears without establishing sufficient mechanisms to monitor and control

them.

I advised Management to clear the outstanding commitments as a first call on the

budget as guided by Accountant General. I also advised Management to liaise with

the relevant Government authorities for adequate funding.

13.3 Staffing Gaps

A review of the staff establishment revealed that 297 posts remained vacant

during the year. This included the post of Chief Justice (filled with Acting

Capacity), Deputy Chief Justice and head of Court of appeal, 8 Justices of Court of

Page 239: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

227

appeal, 4 Justices of the Supreme Court and 8 High court Judges. The post of

Chief registrar has been filled with staff in acting capacity for some time now.

Lack of staff in vital positions of the organization affects the performance and

overall achievement of organization‘s goals and objectives.

Management explained that staffing gaps are being filled with time. The positions

of Chief Justice and the Deputy Chief Justice have been communicated to the

Appointing Authority. Vacancies in the Supreme Court, Court of Appeal and the

High Court, the current position is that Justices of the Supreme Court have

increased from 4 to 8, in the Court of Appeal they have increased from 5 to 11

and the Judges of the High Court are 56 as per the current structure. For the

other cadre of staff, management has continuously liaised with the Ministry of

Finance, Planning and Economic Development and Ministry of Public Service to

approve and provide for the numbers required.

I advised Management to continue liaising with the relevant stakeholders and

expedite the process of filling of the vacant posts.

13.4 Staff in unapproved positions

I identified cases of over staffing for some staff categories. It was observed that

335 staff were recruited above the establishment contrary to the recruitment

policy and procedures. The excess workforce created an unapproved increase in

the wage bill.

The Accounting Officer explained that the Judiciary was last restructured in 1998

and since then, there have been structural adjustments due to continuous and

increased demands for Judicial Services. As a result therefore, there are certain

structures that became a necessity but were not in the structure of the Judiciary.

However, the Judiciary is currently under restructuring and all this will be

addressed.

I advised management to expedite the revision of the structure and have it

approved by the responsible organs of Government.

Page 240: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

228

13.5 Narrow Structure of the Court of Appeal

The Court of Appeal has jurisdiction to hear appeals from the High Courts. These

appeals come from court rulings of the High Court circuits and the High

Court divisions -including the Civil division, the Criminal division, the Commercial

division, the Anti-corruption division, the Land division and others. A narrow

structure of the court of appeal was noted in as far as the handling of cases from

the High Courts is concerned. The eight divisions of the High Court and the High

Court circuits all feed into the un-divisionalized Court of Appeal. This does not

allow smooth flow of cases.

The Accounting Officer explained that the nature of operation of the Court of

Appeal is through quorum/ panels to execute their duties. Therefore because of

the lack of enough Justices, divisionalising the Court of Appeal may not be easily

affordable.

I indicated to the Accounting Officer that there is need to broaden the structure of

the Court of Appeal to match with the High Court structure. This may go along in

solving the case backlog in the court.

13.6 Uganda Good Governance(UGOGO)

(a) Lack of records for the Project

UGOGO is one of the projects under Judiciary. The Project planned to spend

Shs.4,018,000,000 to undertake several activities in the year under review. Outline

of the activities that were planned for the Project is below:

Planned Activity Budgeted Cost UGX

Capacity building to Judiciary staff 2,000,000,000

Purchase of office and ICT equipment 1,100,000,000

Purchase of office and residential furniture and

fittings

118,000,000

Construction and rehabilitation of Judicial courts 800,000,000

Total 4,018,000,000

Page 241: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

229

The performance of this Project has not been reported on as no details were

availed for audit review. I could not establish how much was received and

subsequently spent. The cash book, expenditure vouchers, bank statement

together with the bank reconciliation statements were not provided even after

several communications from OAG and intervention by SJ and PS/ST. Some of the

planned activities such as construction and rehabilitation of Judicial Courts are a

responsibility of JLOS project. I could not rule out duplication. Failure to provide

Project records for audit is contravention of the National Audit Act, the Project

Financing Agreement and the Government of Uganda Financial Regulations.

Management explained that the Judiciary Accounting Officer does not have control

over the books of accounts of this project. This state of affairs was brought to the

attention of the Permanent Secretary/Secretary to Treasury who has initiated

negotiations between Ministry of Finance Planning and Economic Development

and the Danish Government to streamline the project operations.

I await the outcome of the negotiation.

(b) Control of Uganda Good Governance (UGOGO)Project

It was further noted that the UGOGO Project profile in the Judiciary Ministerial

Policy Statement indicated that the Secretary to the Judiciary would be the

responsible officer for the project. However, interaction with the Secretary to the

Judiciary, who is also the Accounting Officer revealed that the responsibility for the

project is with the Chief Registrar who is not a designated accounting officer,

which responsibility was embedded in the Memorandum of understanding between

the Danish Government and Government of Uganda. I found this irregular.

Although the PS/ST had provided guidance in regard to the management and

control of the project, his advice was not adhered to.

Management explained that the matter is being handled by the Permanent

Secretary/Secretary to Treasury who has initiated negotiations between Ministry of

Finance Planning and Economic Development and the Danish Government to

streamline the project operations.

Page 242: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

230

I advised that the control of the project should be urgently streamlined.

13.7 Payments to Personal Individual Accounts

The Treasury Accounting Instructions, Sections 227, 228 and 229 state that all

payments should be made by the Accounting officer directly to the beneficiaries.

Where this is not convenient, an imprest holder should be appointed by the

Accounting Officer with the approval of the Accountant General.

It was noted that a sum of Shs.588,533,829 was transferred to personal accounts

of staff to undertake Department activities without following the regulations. Such

a practice of depositing huge funds on personal accounts exposes Government

funds to risk of loss, since the Ministry does not have any control over such funds

deposited on personal accounts.

The Accounting Officer explained that advances were made to personal individual

accounts to undertake departmental activities especially routine inspections. In

order to comply with the circulars from the Ministry of Finance, Planning and

Economic Development restricted cash withdrawals were made.

I advised that Management strictly adheres with the requirements under the

Treasury Accounting Instructions.

13.8 Rental Expenditure

The Judiciary budgeted to spend Shs.7,855,956,325 on rent for the various courts

in the year under review of which only Shs.6,188,930,812 was released to the

entity creating a short fall of Shs.1,667,025,513. It was noted that the arrears for

rent at the end of the financial year stood at Shs.1,923,979,955. Some of the

arrears relate to the financial year 2011/12. Rental expenses in Judiciary are too

high. Due to delayed settlement of rental obligations, there is a risk of the

Judiciary facing penalties and litigation resulting into nugatory expenditure.

The Accounting Officer explained that rental expenses are too high because of the

increasing demand for judicial services coupled with lack of own premises. This

Page 243: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

231

leaves the Judiciary with no alternative but to rent premises throughout the

country. Out of the 122 Courts that operate throughout the country, 79 courts

operate in rented premises. Appeals to Government to build courts have not

yielded much, but with the support of development partners the Judiciary is

currently constructing 13 courts and the JLOS house will house the Appellate

courts.

I advised the Accounting officer to settle the rent obligation to avoid negative

reputation and the potential litigation costs. The Judiciary should also continue

lobbying for funds to construct its own premises country wide.

13.9 Motor Vehicles due for boarding off

It was noted that out of a fleet of 235 vehicles, 57 vehicles were due for boarding

off. However, the entity has not been able to board off the vehicles. Holding on

to old vehicles does not only lead to increased repair costs but also reduces the

salvage value of these vehicles.

The Accounting Officer responded that the listed motor vehicles have become

uneconomical and are supposed to be boarded off. The motor vehicles for board

off have been identified and the disposal process has commenced.

I advised the Accounting Officer to expedite the process.

13.10 Gross tax

The Department budgeted for Shs.1.6bn as gross tax; Shs.668million was released

to cater for gross tax expenditure. However, only Shs.200 million was spent on

this item resulting into un-utilized amount of Shs.468 million. These funds were

subsequently returned to the consolidated fund.

Allocating funds for activities whose likelihood of occurrence is remote provides

avenues for diversions as well as large budgetary slacks which provide for future

unfair budgetary variations. There is a risk that these funds can easily be

converted into resource and later spent by the entity inappropriately.

Page 244: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

232

The Accounting Officer responded that the Judiciary did not get all the

development funds during the year under review. Out of the total approved

budget of Shs.3.695bn, only Shs.2.45bn was released. This affected the

performance of this area since the entity did not get the proportion of Gross tax

on unreleased development funds.

I advised the Accounting Officer to always ensure that reasonable budgetary

estimates are made.

13.11 Budget Performance

The Judiciary department approved budget for the year under review stood at

Shs.59,150,639,609, comprising of Recurrent Shs.55,455,168,261 and

development Shs.3,695,471,348. A total of Shs.57,667,444,976 was released.

Table below shows the budget:

Despite release of 97.5% of the budget, under performance was noted on a

number of planned activities for the year. Details are shown in the table below:

Output Planned Budget and Output

Actual Expenditure and Performance

Variance- performance

Remarks

Disposal of appeals in the supreme court

No. of cases

Cost 000’s No. of cases Cost 000’s

Criminal appeals 53 5,399,000 3 5,688,000 50 Under performed 94%

Civil appeals 28 9 19 Under performed 68%

Disposal of appeals and Constitutional Matters in the court of appeal

Criminal appeals 277 5,686,000 77 5,556,000 200 Under performed 72%

Civil appeals 150 128 22 Under performed 15%

Disposal of appeals and suits in the High Court

Criminal suits 3,094 1,893 2,568 Under performed

Family suits 3,056 2,345 711 Under performed

Anti-corruption suits

388 360 28 Remarkable performance noted

Civil and Criminal appeals

3,070 502 2,568

Construction and Rehabilitation of Judicial Courts

Construction of Ibanda Chief Magistrate Court;

1 1,696,000 0 242,000 1 No performance noted

Construction of Lugazi/Mayuge G1 Court

1 0 1 No performance noted

Capacity 130 inspections 632 cases No capacity

Page 245: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

233

building of staff in the Judiciary

resulting to over 900 complaints handled to completion

inspected conclusively out of 682 complaints registered

building activity was reported to have taken place.

Purchase of office and ICT Equipment, including software

Provide Transcription and Court recording equipment to 4 Chief magistrate courts

4 410,924 Court recording equipment to 4 Chief magistrate courts not procured.

The under-performance does not only escalate the case backlogs but also leads to

double funding as funded planned activities are rolled over to subsequent periods.

Management explained that the targets especially on cases under the Supreme

Court, Court of Appeal and High Court were not achieved because of lack of

adequate judges.

I advised Management to follow up recruitment of adequate personnel to enable

the Judiciary achieve its mandate.

14.0 JUDICIAL SERVICE COMMISSION

14.1 Staffing Gaps

A review of the Commission‘s organizational structure revealed that out of the

available 73 posts, only 57 were filled leaving 16 positions vacant. The vacant

posts include key posts of: a Registrar (PRI); a Deputy Registrar (PRI); two

Principal Legal Officers; two legal clerks; and one Senior Policy Analyst.

Lack of staff in vital positions of the organization affects the performance and

overall achievement of organization‘s goals and objectives.

The Accounting Officer explained that despite numerous advertisements being

run, it has failed to attract appropriately experienced legal professionals into the

Commission. The inability to attract the required human resource is attributable to

a number of key factors among which are the un-favourable pay package for legal

professionals at the Commission vis a vis those in other Government agencies, and

the hanging structure which has no vacancies for fresh graduates.

Page 246: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

234

I advised the Accounting Officer to liaise with Ministry of Public Service and

Ministry of Finance, Planning and Economic Development to improve the staffing

structure and the rates of pay, with a view of ensuring that the Commission can

attract and retain suitable staff.

14.2 Case backlogs

It was noted that the Commission has been slow in handling cases brought

against judicial officers. During the year under review the Commission had

accumulated case backlogs to a tune of 788. While 697 cases were brought

forward from the previous year, 215 were registered during the year, bringing the

total number of cases to 912, of which only 124 cases were concluded. This

impairs the timely administration of justice.

Management attributed the case backlogs to a number of factors including;

Delay in reconstituting the Commission for fourteen months from December

2010 to February 2012.

The composition of the Commission where the Chairperson is the only full time

member, and the rest are part time which undermines their ability to address

day-to-day demands connected to the Commission‘s mandate;

The quorum of the Commission, which is six out of nine members negatively

impacts on operations, and;

The absence of technical staff to conduct case investigations and prepare

reports for the Disciplinary Committee.

The Accounting Officer was advised to review the mode of operation of the

Commission and address the accumulating backlogs.

14.3 The Autonomous status of Judiciary Service Commission

Section 14(4) of the Judicial Service Act 1997, requires it to be a self-accounting

institution and further to deal directly with the Ministry responsible for Finance on

matters relating to its finances.

Contrary, the Judicial Service Commission reports to Parliament through the

Ministry of Justice and Constitutional Affairs. This impairs its

Page 247: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

235

independence/autonomous status and the ability to acquire sufficient resources

to run the Commission.

The Accounting Officer explained that the proposal to amend the Constitution

which was accepted by Government in the Constitution (Amendment) (No. 3) Bill,

2005 is on course.

I recommended that the Commission be given opportunity to operate

autonomously for effective delivery the mandate.

14.4 Mischarged expenditure

The Parliament of Uganda appropriates funds annually in accordance with the

needs of each MDA. This appropriation is implemented through the budget in

which funds are tagged to particular activities and outputs using account and

MTEF codes.

A review of the Commission expenditure revealed that the entity charged wrong

expenditure codes to a tune of Shs.284,300,282. The practice undermines the

budgeting process and the intentions of the appropriating authority as funds are

not utilized for the intended purposes. The practice also leads to financial

misreporting.

I advised Management to streamline the budgeting process and ensure that funds

are allocated to budget lines in accordance with priorities. Any reallocations

should be undertaken in accordance with the regulations.

14.5 Poor Office Accommodation

Public health regulations in Uganda require that there should be a favourable

environment for human beings to live or work in. A conducive working

environment does not only motivate staff towards efficiency but also guarantees

safety of staff and office assets.

During the inspection of the building, it was noted that some offices like: the

registry; accounts section; IT and office superintendent‘s offices are in a

Page 248: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

236

condemned state and inhabitable. The rooms are leaking and hence affecting

some of the entity‘s important documents. The ventilation is poor with inadequate

lighting system. Photos below refer:

Part of the spoilt roof. Documents spoiled by leaking water. Furniture getting spoilt by the rain water

It was further noted that there is no provision to have the building rehabilitated

and/or maintained.

The Accounting Officer responded that he had contacted Office of the President to

address the issue, who referred him to Ministry of Finance, Planning and Economic

Development for additional resources in FY 2014/15 with a view of sourcing for

office space. However, no response had been received yet.

I advised Management to continue dialoguing with MOFPED on the matter.

14.6 Implementation of planned activities

It was noted that the entity did not implement all activities as planned. The

table below refers.

Planned Key Activity Expected Output

Actual output Variance

Facilitating disciplinary Committee meetings.

24 disciplinary Committee meetings facilitated.

22 disciplinary Committee meetings facilitated

2 meetings (8%) not undertaken.

Court 24 inspection 19 inspection trips 5(20.8%) trips

Page 249: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

237

inspections/collecting complaints

trips undertaken undertaken not undertaken.

Conducting Investigations

24 Investigations conducted.

17 Investigations conducted.

7(29%) investigations not undertaken.

Management explained that the Committee could not hold all the Disciplinary

Committee as planned because the members who comprise the Disciplinary

Committee are also part of the members of the Commission; which Commission

was heavily involved in the recruitment of Judicial Officers at various levels.

Management also explained that inadequate personnel affected the investigations

and inspection trips of the Commission.

Management was advised to liaise with relevant stakeholders to address the

problem of inadequate personnel.

15.0 UGANDA LAW REFORM COMMISSION

15.1 Mischarge of Expenditure

The Parliament of Uganda appropriates funds in accordance with the needs of the

country and this appropriation is implemented through the budget in which funds

are tagged to particular activities and outputs using account codes and MTEF

codes. A review of the Commission payments revealed that there were

mischarges under various codes worth Shs.373,406,461 (20% of actual

appropriation). This practice undermines the importance of budgeting and could

lead to misleading reporting.

Management explained that this arose because the vote item for allowances was

not adequately funded and therefore allowances had to be paid from other vote

items

I advised Management to stop the practice and always request for reallocations or

virements as provided for under TAI.

Page 250: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

238

15.2 Unaccounted for fuel deposits

It was observed that the Commission spent Shs.107,180,981 on fuel but the

monthly fuel reconciliations were not maintained contrary to Standing Orders

Section F-1. In absence of the fuel reconciliation statements, I was unable to

ascertain the genuineness of the fuel usage.

Management was advised to put in place a fuel register and carry out monthly

reconciliations.

15.3 Payables

The Commission had outstanding payables amounting to Shs.489,478,968 broken

down into: trade creditors Shs.314,507,781; sundry creditors Shs.172,391,288;

and Withholding tax payable Shs.2,579,899. The outstanding arrears are

attributed to non-compliance with the requirement of Commitment Control

System. Accumulation of creditors may lead to unnecessary cost in form of

litigation.

Management was advised to settle the outstanding obligations to avoid the

associated costs in form of litigation.

15.4 Outdated organogram

It was noted that the Organization Structure used by the Commission was last

reviewed in 1990. Since that time, the Commission has grown both in number of

staff, and mandate. For instance research is a major activity in the process of law

reform but this is not reflected in the existing organizational structure. As a

consequence, in certain instances the Commission has gone ahead to recruit staff

beyond the approved structure. I find this irregular.

Management agreed with the observation and explained that the ongoing

restructuring exercise is expected to address this issue.

I advised Management to ensure that the organization structure of the

Commission is reviewed in line with the current developments.

Page 251: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

239

15.5 Unimplemented planned activities

It was noted that the entity did not implement all activities that were planned for.

The table below refers:

Planned Key Activity

Expected Output Actual output Variance

Legal Reform

Research under taken to reform the following;

National Citizen and Immigration Control,

Registration of Titles Act, the Employment Act,

Legislation of the

Government analytical Lab(GAL), Law to

regulate the construction Industry

Field consultations on reform of the Civil

Procedure regime were finalized. Writing of the

study report on GAL is ongoing. Working

group meetings held,

consultative meetings held with Ministry of

Lands and report writing on going for

the Registration of

Titles Act; Draft transitional Justice

policy finalised. Report writing for the Market

Act is in advanced stages

Reform of Registration of Titles Act the

Employment Act, Legislation of the

Government analytical Lab(GAL), Law to

regulate the

construction Industry not achieved / finalized,

the research and report writing still on going.

Revision of

Laws

Major revision; revision

of the Principal Laws,

revision of the cumulative supplement

as at 2011, revision of Laws affected by court

decisions and distribution

of Commissions Publications.

Four volumes of the

principal laws 2000

were revised. Revision laws passed between

2001-2012 completed. Draft of cumulative

supplement updated as

at March 2013

Distribution of the

Commission Publications

not effectively done.

Publication

and Translation

of Laws

Translation of the

Constitution into Runyakitara.

Ngakarimojong, and Ateso; Translation of the

simplified Local

government Act into Luganda, Publication of

the Land Act, publication of the study reports

Review of the

Constitution in Luganda concluded.

Procurement process for printing index

ongoing.

Major planned out put

of translation of Constitution into

Kunyakitara and Ateso not achieved.

Publication of Land Act

remained un-attained.

Unimplemented planned activities affect the achievement of entity objectives.

Realistic and achievable targets should be made and priority given to activities not

achieved in the previous year.

Page 252: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

240

16.0 UGANDA HUMAN RIGHTS COMMISSION

16.1 Motor vehicle repair without certification

Section 816 of the Treasury Accounting Instructions requires an entity to inspect

its vehicles to determine the extent of repair works needed for its vehicles before

placing orders for the repairs. The repaired vehicles should also be inspected to

confirm that the repairs were done as specified in the LPOs.

During the year, a total of Shs.98,395,100 was paid to a service provider in

respect of repairs and servicing of Commission vehicles. However, contrary to the

TAI no pre and post inspections were undertaken to assess the need and

subsequent confirmation of repairs. In absence of such checks, it becomes difficult

to establish the genuineness of the repairs undertaken.

Management explained that the Commission could not recruit an Engineer because

of the inadequate wage provision.

I advised management to liaise with the Ministry of Works and Transport to obtain

the necessary technical expertise whenever required.

16.2 NSSF Remittances- Contribution from Annual Gratuity

Shs.82,771,153 in respect of NSSF contribution was not deducted from staff

gratuity payments contrary to Section 11 (i) of the National Social Security Fund

Act, 1985. Non remittance of statutory deductions could lead to imposition of

fines and penalties on the Commission.

Management explained that the Commission sought legal opinion from the

Solicitor General over this matter. However, at the time of the report no response

had been received.

I advised Management to recover and remit the NSSF contribution as required.

16.3 Budget Performance

Page 253: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

241

A review of the Commission‘s performance for the year revealed that some

activities were not undertaken despite the release and utilization of the funds.

Details are below:

Planned key activity Expected output

Construction of regional offices by

procuring land and one building.

Land and building procured

Produce 110,000 IEC materials. 110,000 IEC materials, produced

Produce 24,000 copies of

publications.

24,000 copies of publications

produced

Train 54 District Human Rights

desks

54 District Human Rights desks

trained

4 bills reviewed. 4 bills reviewed.

100 detention facilities inspected. 100 detention facilities inspected.

Management was advised to undertake activities in accordance with the

workplans.

17.0 DEPARTMENT OF PUBLIC PROSECUTIONS

17.1 Mischarge of Expenditure

Parliament of Uganda appropriates funds annually in accordance with the needs of

each MDA. This appropriation is implemented through the budget in which funds

are tagged to particular activities and outputs using account and MTEF codes. A

review of the Directorate payments revealed that there were mischarges under

various codes worth Shs.692,574,586 during the year under review. These

payments were made without requisite authority. The practice undermines the

budgeting process and the intentions of the appropriating authority. The practice

also leads to incorrect financial reporting.

Management explained that there were a number of complex cases that required

co-opting of a wide range of experts which was not anticipated during the

budgeting process. The budget re-allocation process as it is provided for in the

Budget Act is not that flexible yet speed of investigation is critical for a conviction

in the Courts.

Page 254: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

242

I advised Management to streamline the budgeting process and ensure that funds

are allocated to budget lines in accordance with priorities. Any reallocations

should be undertaken in accordance with the regulations.

17.2 Unsettled Domestic Arrears-Accrued Rent

It was noted that the Directorate continued to commit Government even when

there were no funds available. A review of the statement of outstanding

commitments revealed a sharp increase in outstanding domestic arrears from

Shs.465,000,000 at close of the previous year to Shs.929,816,160 by the end of

the year under review. The practice is contrary to established commitment control

system.

Management explained that the build-up of unsettled rent during FY 2011/12 and

FY 2012/13 was occasioned by the increase of the rental fees by the Landlord

upon the renewal of the Tenancy Agreement. Attempts by the Directorate to

obtain a supplementary budget during the financial year 2012/13 to settle the

arrears were not successful. However, adequate provisions in the following

financial year to settle the outstanding have been made.

I advised Management to prioritise these commitments in the subsequent year.

17.3 Absence of Approved Strategic Plan

A strategic plan provides an organization with purpose and direction. It is an

important tool in steering an organization towards its Vision, Mission and the

overall Mandate. Annual activities undertaken by any organization should be

derived from the strategic plan. However, it was noted that the Directorate‘s

Second Strategic Investment Plan (2007/08 - 2011/12) expired. The third Strategic

Investment Plan (2012/13 - 2016/17) had been initiated but was still in the draft

form yet to be approved.

Management explained that the delay in the approval process was due to the need

for wide consultations with stakeholders. After the consultations, the process has

Page 255: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

243

progressed and the plan will be approved by Top Management early February

2014.

I advised Management to expedite the approval process.

17.4 Staffing gaps

It was noted that the Directorate has 80 vacant posts. These include key positions

of; Senior Principal State Attorney; Principal State Attorneys; Senior State

Attorneys; State Attorneys; and Secretaries.

I informed management that inadequate staffing affects the timely implementation

of the Directorate‘s activities.

Management explained that the Ministry of Public Service cleared the recruitment

of State Attorneys and a submission was made to Public Service Commission. The

process has however stalled due to lack of members of the Commission.

I await the results of management action.

17.5 Repairs and Maintenance of Motor Vehicles

Shs.236,042,886 was paid to various service providers in respect of repairs and

servicing of vehicles. However, it was noted that there were no pre and post

vehicle inspections done on repairs, instead it was the Directorate driver that

confirmed the repairs.

There is a risk that repairs may not be undertaken at all leading to loss of

government funds.

Although management explained that pre-/post repair assesment from the CME-

MoWT, for major repairs were done, I advised Management to ensure that the

repairs should be undertaken in line with the regulations.

17.6 Advances to Individual staff Accounts

Page 256: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

244

Sections 227, 228 and 229 of the Treasury Accounting Instructions (TAI) require

that all payments should be made by the Accounting Officer directly to the

beneficiaries. Where this is not convenient an imprest holder should be appointed

by the Accounting Officer with approval of the Accountant General.

Contrary to the requirements, a total of Shs.71,832,900 was deposited on the

personal bank accounts of the Directorate staff to execute official activities instead

of effecting payments to the beneficiaries. This practice is irregular and exposes

the Directorate‘s funds to a risk of loss since the Directorate has no control over

such funds deposited on personal accounts.

Management was advised to strengthen the internal controls over advances to

individual personal accounts and ensure compliance with the regulations.

17.7 Budget Performance

A review of the planned activities against the actual performance revealed that

some of the activities were partially undertaken, some of which below 50% mark.

Planned key activity Expected output Actual output Variance

01 Headquarters

Recruitment of staff. 72 Staff recruitment

initiated, inducted and

deployed.

1 position of Senior

Economist filled.

71 (98.6%) under

performance.

Field verification of

Administration matters

107 field offices visited for

verification of

administration matters

72 field offices visited 35 (32.7%) under

performance.

Training of

Administration staff and

drivers

5 administration staff

trained in management

skills

2 Staff trained in

management skills

3 (60%) under

performance

12 drivers trained on basic

mechanics and defensive

driving courses

7 drivers trained on

basic mechanics and

defensive driving

courses.

7 (41.6%) under

performance

Field offices established 8 Field offices established 4 Field offices

established

4 (50%) under

performance.

02 Prosecution

142,250 Investigations

of criminal cases

Investigations of criminal

cases guided in an average

of 120 days

Investigations of

criminal cases guided

in an average of 98

days

22 saved (18%)

time saved.

Prosecutions- led Case

files pending decision to

Prosecutions- led Case files

pending decision to

Prosecutions- led

Case files pending

extra 7 days used

(19%) under

Page 257: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

245

prosecute or not

perused.

prosecute or not perused in

an average of 3o days (1

month)

decision to prosecute

or not perused in an

average of 37 days(1

month)

performance.

Case files for

sanctioning perused

Case files for sanctioning

perused in an average of 2

days

Case files for

sanctioning perused

in an average of 2

days

100% performance.

Police Case files

pending decision to

prosecute or not

perused.

Police Case files pending

decision to prosecute or

not perused in an average

of 30 days.

Police Case files

pending decision to

prosecute or not were

perused within an

average of 5 days.

25 days saved

(89%) time saved /

over performance

03 Inspections and Quality Assurance.

All public complaints

against staff

performance and

conduct addressed.

100% public complaints

against staff performance

and conduct addressed.

82% public

complaints against

staff performance

and conduct

addressed.

17% under

performance

Public complaints

against criminal justice

processed.

95% Public complaints

against criminal justice

processed.

78% Public

complaints against

criminal justice

processed.

17% under

performance

04 Internal Affairs &Field Operations

Performance planning,

staff mentoring and

performance

assessment done

4 field office performance

planning staff mentoring

and performance

assessment visits carried

out.

2 visits carried out. 2 (50%) under

performance

06 Internal Audit

Field inspections 4 Inspection and

verification reports

produced.

2 Inspection and

verification reports

produced.

2 (50%) under

performance

Verification of payroll. 12 payroll staff verification

Reports on produced

9 payroll staff

verification Reports

on produced

3 (25%) under

performance

staff trained 1 staff trained in risk based

auditing, fraud & security

management matters.

NONE 100% under

performance

Management explained that the inadequacies were attributed to lack of capacity

and inadequate resources to undertake the activities.

I advised human resource management to liaise with the MoPS and MoFPED to

address the bottlenecks.

17.8 Field Inspections

Page 258: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

246

Field inspections were carried out at various DPP branch offices. The inspections

focussed on the assets of the branch offices, human resource and also followed

the imprest received by the branches. The following were the findings;

Good internal control system for assets requires that all non- current assets be

clearly labelled/engraved with agreed identification marks according to

classification and a serial number given to each of these assets. It was

however observed that some assets at the branch offices were not engraved.

It was noted that the assets register at all the branch offices only indicates the

particulars of the assets and quantity, leaving out other details like; date of

acquisition condition, location among others. Failure to disclose details relating

to the fixed assets poses risk of poor control over the station‘s assets and

eventual failure to track the assets.

In order to ensure efficiently and effectiveness, staff should be provided with

adequate office equipment to enable them carry out their official duties. It was

however noted that inspite the big volume of secretarial work done at Njeru

RSA, Busia RSA, Bugiri RSA offices, the office lacks essential assets such as a

computer, printer and photocopier. It should be noted that DPP‘s office deals

with confidential information that should not be exposed to the public. Typing

and photocopying official documents outside office impair the confidentiality

and security of office information.

Though payments are vouched and submitted to DPP headquarters, the

stations do not maintain an imprest cashbook contrary to Section 28 of the

Accounting Instructions.

It was noted that Njeru RSA, Bugiri RSA, Iganga RSA stations lack secretaries

to do the secretarial work. Inadequate human resource, affects the timely

implementation of the station activities. This may adversely impact on

the Directorate in the achievement of its objectives.

I have informed management to consult the MoPS and MoFPED to address the

anomalies noted in the branch offices.

Page 259: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

247

18.0 UGANDA REGISTRATION SERVICES BUREAU -

OPERATIONS

18.1 Rental arrears

The Bureau has outstanding rental arrears for FYs 2011/12 and 2012/13

amounting to USD 911,810. It was further noted that no provisions were made in

the budget to settle these arrears in the financial year. There is a risk of eviction

of the Bureau from the rented premises.

Management explained that the total rental arrears could not be accommodated in

the MTEF for FY 2013/14. Management further explained that they have written

to the Ministry of Finance, Planning and Economic Development requesting that

with effect from FY 2014/15, the MTEF for URSB be increased to address existing

funding gaps in the non-wage budget and the non-existent capital development

budget.

I advised Management to continue dialogue with the relevant authorities to ensure

that the rental arrears are settled.

18.2 Lack of a Capital Development Budget

During the financial year, the Bureau was not allocated any development budget.

Consequently, the Bureau has not made any development interventions, a

situation which could stifle its strategic focus.

Management explained that the lack of a capital development budget has for the

last three years constrained the Bureau‘s capacity to roll out its strategic plans.

Management further explained that they have written to the Ministry of Finance,

Planning and Economic Development requesting the MTEF for URSB to be

increased in order to address the lack of a capital development budget and other

funding gaps.

I await the results of management efforts.

Page 260: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

248

18.3 Disposals of assets

A Board of Survey was commissioned and a report produced. In the report it was

recommended that specific assets to be disposed off. However, no asset has been

disposed off yet. This could lead to further deterioration of asset value. The table

below refers.

Management in their explanation recognized and regretted the delayed disposal of

the assets and indicated that the disposal process has been initiated. They further

explained that a Board of Survey has been constituted to aid the assessment of

the assets to be disposed.

I advised management to expedite the disposal process.

19.0 UGANDA REGISTRATION SERVICES BUREAU –

LIQUIDATION ACCOUNT

19.1 Receivables

Shs.8,183,970,354 was reported as receivables outstanding as at 30th June 2013.

During the previous year, the same amount was reported as outstanding implying

that there has been no movement in the receivables. The delayed collection of the

receivables may result into bad debts.

Management responded that the biggest debtors are Government entities, with

whom they have engaged in meetings and even involved Ministry of Finance,

Item QUANTITY

Car UG 0130J Station wagon white in color 01

Funs 06

Tables 03

Monitors 27

Carpets 06

Chairs 22

Page 261: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

249

Planning and Economic Development to amicably find a solution to this long

outstanding matter. However, the efforts have not yet yielded results.

Management was advised to continue engaging the relevant stakeholders on the

collection of the outstanding receivables.

19.2 Irregular Lending out of Funds from the Liquidation Account

In my report for the financial year ended 30th June 2012, I reported that the

Ministry of Justice and Constitutional Affairs had irregularly borrowed money from

this account worth Shs.3,353,802,640. I noted that the funds had not been

refunded by the end of the financial year under review. There is a risk that

liquidation funds may be lost under the circumstances.

In their response, Management explained that the Ministry of Justice and

Constitutional Affairs borrowed the funds from the companies in Liquidation .This

was during the years of 2004, 2005 and 2006 and the funds were to pay for rent

for the office of the Registrar General which at the time was a department in the

Ministry of Justice and Constitutional Affairs. Under the Self Accounting Status

which came into effect in FY 2010/11 URSB does not and will not engage in

irregular lending of funds.

I advised Management to follow up with the Ministry of Justice and Constitutional

Affairs to ensure recovery of the liquidation account funds.

20.0 NATIONAL CITIZENSHIP AND IMMIGRATION CONTROL

20.1 Non-Tax revenue

A review of the Statement of Financial Performance revealed that

Shs.7,119,954,223 was collected as non-tax revenue (NTR). However,

documentation in respect of the NTR collected such as receipts, banking in slips

and revenue registers were not availed to enable a comprehensive review of the

revenue collected.

Page 262: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

250

Management responded that these funds are collected directly at border stations

and deposited on the collection accounts. A Standing Order was given to the

Accountant General to transfer the funds to the Consolidated Fund, and the

transfers are done weekly. Management further explained that there is currently a

probe committee which was set up by the Hon. Minister of Internal Affairs to look

at all the areas of the Directorate‘s operations and the documents in relation to

NTR were subsequently forwarded to them.

Management promised to avail the documents when they are returned.

20.2 Security Bond Deposit Account

A review of the financial statements revealed that Shs.13,595,330,081 was

reported as a balance on the security deposit accounts as at 30th June 2013. The

account had a balance of Shs.7,999,358,750 by as at 30th June 2012, implying

that there were deposits of Shs.5,595,971,331 from various immigrants during the

year. However, the documentation in respect of the security deposit account such

as receipts, banking in slips, bank statements, ledgers and the database of the

individual depositors was not readily availed to enable a comprehensive review of

the transactions.

Management explained that this account receives funds deposited as security bond

for foreign workers. Management indicated that documents in relation to

transactions on this account were submitted to the probe committee and await

completion of the committee‘s work to be able to submit them for audit

verification.

I advised management to submit the documents for audit verification at the end of

the probe.

20.3 Payables

A review of the Statement of Financial Position as at 30th June, 2013 revealed

outstanding payables of Shs.79,452,765,142. The position of payables was

Shs.61,006,008,707 in the statement of financial position as at 30th June 2012,

implying that there was an increase in domestic arrears by Shs.18,446,756,435

Page 263: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

251

(30%) from the closing position of the previous year. It is evident that

management has continued to incur arrears without establishing sufficient

mechanisms to monitor and control them. There is a risk of loss of reputation and

litigation by creditors.

Management in their response agreed to the increase in payables which they

attributed to inadequate releases from the Treasury, and interest on the Mulbuer

contract amounting to Shs.12,997,280,863.

I advised Management to clear the outstanding commitments as a first call on the

budget as guided by Accountant General. I also advised Management to liaise with

the relevant Government authorities for adequate funding.

20.4 Implementation of the National ID Project

In March 2010, the Ministry of Internal Affairs entered into an agreement with Ms

Mulbauer, to develop the National Security Information System at a cost of

€64,231,371.49. The contract provided for supply and installation of equipment,

supply of blank cards, staff training and system maintenance, among others.

Following the establishment of the Directorate, management of this contract was

then transferred from the Ministry (mainstream) to the Directorate. Review of the

progress of implementation of the Project revealed matter below:

(i) Unimplemented activities

A number of activities that were planned to be implemented under the ID Project

during the year under review were not achieved. A total of Shs.25,115,610,000

was budgeted for under the project for the current year, out of which

Shs.19,135,522,406 was released. Shs.2,571,442,721 was utilized during the year

out of the released amount, leaving a balance of Shs.16,564,079,685 unspent.

The actual expenditure was 13.4% of the actual releases and 10.2% of the

budgeted amount. Details are shown below:

Code Planned Activity Budget Amount (UGX)

Releases (UGX) Expenditure (UGX)

Variance (UGX)

121176 Purchase of office and ICT equipment including software

4,000,000,000 2,903,324,176 2,036,958,889 866,365,287

121175 Purchase of motor 900,000,000 725,000,000 5,162,292 719,837,708

Page 264: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

252

vehicles and other transport equipment

121172 Government buildings and administrative infrastructure

13,660,000,000 10,578,353,024 - 10,578,353,024

121161 Identity cards issued (2 million National ID cards personalized

6,555,610,000 4,928,845,206 529,321,540 4,399,523,666

Total 25,115,610,000 19,135,522,406 2,571,442,721 16,564,079,685

Because of the slow implementation of Project activities, there is a risk that the

intended activities of the Project may not be achieved.

Management responded that ever since the inception of the Project in 2010, there

has been a number of challenges faced. Maulbeur delivered most of the

equipment but Government of Uganda did not adequately meet her part of the

obligation under the agreement. Under the contract GOU was supposed to provide

operational funds and also set up personalization centre where the equipment was

to be installed. Management further explained that Government has now taken

steps in fulfilling her part of the contract, funds have been secured,

personalization centre set up at Kololo airstrip and mass enrolment is soon

commencing.

I await the progress on the implementation of the National ID project.

(ii) Mischarge of expenditure items

The Parliament of Uganda appropriates funds in accordance with the needs of the

country and this appropriation is implemented through the budget in which funds

are tagged to particular activities and outputs using account codes and MTEF

codes. Review of the Directorate‘s expenditures revealed that management

charged wrong expenditure account codes to a tune of Shs.650,785,420. The

expenditure did not meet the definition of what these account codes are required

to be charged with. The bulk of the funds were diverted to pay allowances.

The practice renders the budgeting process redundant, undermines the intentions

of the appropriating authority and leads to misleading reporting.

Page 265: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

253

I advised management to always ensure that proper budgeting process is done

and adequate funds are allocated for each account code and MTEF.

20.5 Incompletely Vouched Expenditure

Treasury Accounting Instructions, 2003 part 1, Chapter 1V section 199 requires

procuring entities to issue Local Purchase Orders (LPOs) before a cost is incurred.

Contrary to the legislation, Shs.662,447,643 was paid to Pan Afrique Forwarders

vide EFT 2532373 for clearing services, without an LPO. It was further noted that

the contract Agreement signed between the clearing Agent and the Directorate

was not availed for audit. I was unable to confirm the genuineness of the

payment.

Management in its response explained that at the time of receiving the equipment

for the ID project in March 2010, there was need for clearing services. Pan Afrique

was contracted by vote 009 (MIA) which was then still managing the project.

When the project was transferred to vote 120 (DCIC) in the FY 2010/11, they

were not availed with any formal agreement but the liability was transferred to the

Vote. Pan Afrique through their lawyers had served Government with a notice of

intention to sue for the payments. Management sought guidance from the Solicitor

General and he did advise that the obligation be cleared without going to court.

I requested that Management follows up the documentation to enable audit

verification.

20.6 Nugatory Expenditure

Shs.186,824,001 was paid to URA vide EFT number 2545421 as interest expense

on VAT due to Pan Afrique forwarders due to delayed lodging of returns or

payment of VAT to URA. This payment is considered nugatory since NCIC was not

obliged to file account and pay VAT on behalf of Pan Afrique Forwarders.

Management in their response stated that Pan Afrique forwarders had provided

clearing services to the Directorate but payment was delayed due to insufficient

funds. URA on the other hand continued to charge interest on VAT that had not

Page 266: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

254

been paid by the service provider. Subsequently, the clearing agent transferred

this liability to the Directorate.

I advised management to ensure that they do not get into unplanned expenditure

in the future without ensuring that they have enough funds to settle the bills.

20.7 Absence of Approved Strategic Plan

A strategic plan provides an organization with purpose and direction. It is an

important tool in steering an organization towards its Vision, Mission and the

overall Mandate. Annual activities undertaken by any organization should be

derived from the strategic plan. It was noted that the entity does not have a

corporate plan that spells out the long and medium term plans. Absence of an

approved strategic plan affects the overall guide to planning and priority setting.

The achievement of the organizational mission and objectives are likely to be

negatively affected.

Management in their response indicated that they have started the process of

making one and a consultant was in place.

I advised management to ensure that a strategic plan is urgently put in place.

20.8 Lack of an IT strategic plan and Policy

It was noted that the entity has heavily invested in the Information and

Communication Technology (ICT) function, however, there was no IT strategic

plan. The increasing reliance on information technology for the delivery of

services makes it necessary to ensure that these systems are developed, operated,

used and maintained in a safe and secure fashion. Without an approved

IT/information security policy and IT strategic plan, there is a risk of making

investments in IT that are not well aligned with other business processes.

Management in their response explained that their IT plan is being developed

together with the strategic Plan.

Page 267: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

255

I advised management to ensure they have an approved IT strategic plan or policy

is in place to guide them in their operations.

20.9 Business continuity and Back up of data

The Directorate has a room referred to as strong room in which all activities of

processing Passports and data capturing are done. The server in which this data is

collected and stored is also in the strong room, the backup is also done in the

strong room. Once in a month data is backed up and allegedly stored off site. The

room has no fire extinguisher and the whole Ministry has no known fire-fighting

equipment. In case anything wrong happened to the strong room all data would

be lost. There is no contingency plan for business continuity.

Management in their responses claimed that the process of formulating the

strategic investment plan which covers IT master plan is ongoing. However, they

have backed up all the processes and the storage is outside the strong room.

I advised management to find an offsite location to be used for backup and should

automatically back up as and when they input the data.

20.10 Inadequate structure

The Directorate has an approved structure however the structure does not have

certain key functions. It relies on the support of the Ministry of Internal affairs for

some very critical and important services. For example, DNCIC does not have

personnel and administration positions in its staffing structure; such as

undersecretary and personnel officers. There is a risk that the Directorate

performance in terms of human resources management and general

administration may be stifled.

Management in their response indicated that the Ministry of Public Service carried

out a study and made recommendations on the new structure, however this has

not been completed. I await the outcome of the MoPs restructuring efforts.

20.11 Vacant posts

Page 268: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

256

The approved organization structure for the Directorate of Citizenship and

Immigration control has a total staff establishment of 367 personnel. However,

out of the 367 only 337 posts are filled while 30 posts still remain vacant. The

most vital vacant posts include; i) Commissioner/Immigration Control ii) the

Principal procurement officer ,iii) the Internal Auditor and iv) the Principal Stores

Assistant. This state of affairs is likely to affect service delivery at the directorate.

Management explained that Government had put a ban on recruitments and this is

making it difficult to fill the vacant posts.

I advised the Directorate to liaise with Ministry of Public Service to ensure that

these important posts are filled.

20.12 Lack of Disciplinary Committee

A review of the minutes of Top Management revealed that there are a number of

cases of staff misconduct, and an indication of some action taken by management.

However, the Directorate does not have a Disciplinary Committee to handle

disciplinary cases in detail and make appropriate recommendations to conclusion.

Management in their response said that they utilised the services of the Ministry of

Internal Affairs Disciplinary committee chaired by the Undersecretary MIA when

the need arises.

I advised management to consider constituting their own Disciplinary Committee

with properly laid down procedures/terms of references to handle discipline

matters.

20.13 Inadequate controls at immigration offices

Chapter 63 of the Immigration Act, section 21 (1b) states that any person whether

within or in Uganda, who knowingly makes any false declaration, return or

statement for the purpose of obtaining or assisting another person to obtain any

permit, certificate or pass under this act commits an offence. It was noted during

the review of the legal and inspection report that although, the Directorate has a

system – Personal Information Security Comparison Evaluation System (PISCES)

Page 269: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

257

that facilitates documentation at the boarder points and Headquarters, it is only

used at particular border posts, that is; Entebbe, Busia, Malaba, Katuna and

Mutukula implying other areas remain unchecked and porous. This has enabled

processing of entry documents to illegal immigrants without apprehending the

perpetuators to check the vice.

Management acknowledged these problems but cited lack of funds as the major

bottleneck.

Management was advised to solicit for funding to procure the system and have it

installed in various immigration centers to ensure persons are screened as they

enter into the country. The system should be able to connect all the immigration

points with headquarters to be able to fully monitor immigrants.

20.14 Lack of detention facilities (holding facilities)

Under the Immigration Act section 17 3, ―A person against whom a deportation

order has been made may, if the Minister so directs, while awaiting deportation

and while being conveyed to the place of departure, be kept in custody, and while

so shall be deemed to be in lawful custody. ‖The Ministry of Internal Affairs does

not have a safe place to keep people awaiting deportation especially those who

have been caught off guard and are not prepared. This may cause issues in

respect of the rights of deportees.

Management in their response indicated that they have been having financial

constraints although they needed the facility to perform their duties effectively.

I advised Management to ensure that the place for safe custody is secured to

ensure that such people are kept safe until they are ready to leave.

20.15 Reconciliation of Passport requisitioning and issuing

The storage of passports is handled by different entities and often the process has

gaps, as witnessed between Bank of Uganda and the strong room. There is no

record taken on the number of passports that arrive at the Ministry of Internal

Affairs (MOIA) from Bank of Uganda (BOU) stores. Lack of a register at the

Page 270: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

258

Ministry means that the passports brought in from BoU may not reach the Ministry

in full numbers. Besides, those picked and taken to Ministry of Finance may also

not be equal to those picked from BoU.

Management in their response claimed to have a designated person to follow the

collection and dispatch of Passports.

I advised that the Directorate should develop a proper recording system of

passports to ensure that there is an audit trail in the collecting and dispatch of

these passports to avoid possible loss.

20.16 Losses of passports in the passport office

The Directorate has a Department of Investigations and Legal Advisory Services.

This department is responsible for investigating, reporting of any possible losses

and providing legal advice to the Accounting Officer. However, this department

did not carry out investigations on the alleged loss of passports and no report was

issued. According to the financial statements page 19, passports worth

Shs.48,400,000 were lost during the year while passports worth Shs.58,480,000

were damaged.

Management promised to provide a report on these figures, however at the time

of writing this report nothing had been provided.

Internal investigations should be done and a report with recommendation made

and acted upon.

20.17 Budget Performance

Public Finance and Accountability Regulations, 2003, section 2.10 (b) entrusts the

accounting officer with ensuring that all controls such as those contained in the

approved estimates and warrants are strictly observed. Budget estimates are

based on outputs to be achieved for the financial year and during implementation,

effort is required to be made to achieve the agreed objectives or targets of the

entity within the availed resources.

Page 271: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

259

A review of the budget performance of the entity for the year 2012/2013 revealed

that some targets were not achieved despite release of funds for the various

program. Details are as per table below:

PLANNED ACTIVITIES 2012/13 ACHIEVED OUTPUT 2012/13 Audit Comments

Facilitate and regulate

entry, Exit and stay of

Immigrants in the country

through Issuance of at least

80% of all applications

received for Work permits,

Residence Permits,

Dependant passes, Students

passes and Visas.

Issued 412 East African passports,

103 CTDs and 4,674 Certificate of

Identity.

7,975 work permits issued to

foreigners in employment in the

country compared to 8,602 permits

issued last year.

The planned activities are not

measurable. I was unable to

ascertain the targets and

whether they were achieved.

Expand PISCES Software to

4 more borders

Not done Note done

Spearhead implementation

of interconnectivity

between and among borders

with the headquarters.

Not done Note done

Construct three border

posts. i.e. Murumumba in

Kabale district , Madi Opei in

Lamwo district , and

Cyanika Model Border posts

Completed and commissioned

Bunagana and Suam River border

posts. Meanwhile Amudat , Goli and

Lia border posts are 80% complete

(roofed and being plastered)

None of the planned activities

were done during the period

under review, they are

reporting on work carried

forward

Process and issue of at least

90% of all received

applications for passports

conventional travel

documents, Certificate of

identity and temporary

movement permits.

Issued 70,164 passports

compared to last FY ‗s 66,787

reflecting a slight growth of 5%

growth.

The process of issuing

passports and other

documents is still hit by

several bottlenecks ie 1. low

man power in passport office

compared to the tasks

2. Lack of proper statistical

collections to be able to tell

how many applications were

received.

Decentralize immigration

service’s delivery, install

passport issuance system

in Mbale and Mbarara to

decongest the Immigration

Headquarters.

Decentralize immigration service‘s

delivery –install passport issuance

system in Mbale and Mbarara to

decongest the Immigration

Headquarters.

None of this was done during

the period under review. Still

functioning at very low

capacity due to staff levels

Procure Personalization

Centre and install necessary

Procurement for civil works on

UPPC building to establish the main

Not much done in this area by

the end of the financial year.

Page 272: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

260

equipment for processing

National Identity Cards

Personalization Centre in Entebbe is

at bid evaluation stage. It is

expected that by early July 2013,

the contract will be awarded and

reconstruction start.

Carry out citizenship

verification; personalize

Identity cards for 2 million

citizens already captured in

first phase of the National

Identity Card Project.

Personalized 30,120 National

Identity Cards at the current UPPC

Entebbe interim Personalization

centre.

The planned activity was not

achieved.

Renovate personalization

Centre and install necessary

equipment.

-

Not done during the period

under review

Finalize the development of

the National Migration

Policy; develop regulations

and guidelines for improved

immigration service

delivery.

2nd draft of the National Migration

Policy prepared, pending further

stakeholder consultation.

Procurement of a consultant to

develop the DCIC Information

Communication Technology Master

Plan is at evaluation stage.

Not completed.

Develop and implement the

Directorate’s 5 years

Strategic Plan

-

Not done

This may have been due to management‘s inadequate supervision and as a result

service delivery is hampered and the appropriating authority‘s objectives are not

met.

Management explained that the manpower gaps led to failure to implement some

of the planned activities. They also indicated that some of the activities were still

ongoing as their implementation spanned over two financial years.

I advised management to carry out realistic planning and budgeting, and also

ensure adequate supervision of activities being undertaken.

20.18 Issuing of National passports and East African Passports

Ugandan passports are issued out at the Headquarters of National Citizenship and

Immigration Control, Pretoria, London and Washington. However all these centers

are not interlinked or connected to the main server at the headquarters.

Therefore management cannot regularly access and monitor passports issued at

Page 273: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

261

the different centres. Reconciliation by the headquarters was difficult in the

circumstance.

Management explained that the output has always remained as one of the

unfunded priorities in the Directorate.

I advised management to continue lobbying for funds to implement the activity.

20.19 Inspections

An audit inspection of border posts was carried out and the following were noted:

Border post Observations

Kamwezi

Border post

The Border post has very little revenue activity. On average, the

station collects UGX.50,000 a month out of selling temporary

movement permits. These funds are banked once or twice a month. The officer has to travel to Mbarara or Kabale to bank

since there is no bank in a close range. There are no student pass documents even when some students

pass, enter and exit from the station. He normally refers them to

Mbarara or Kabale.

DCIC does not have enough facilities at the entry point of Kamwezi.

The station is housed in a UNI PORT of URA. The officer rents a house about a kilometre away from the post making life very

difficult for him. The Border post is entitled to 1,000,000 per quarter; however it

was noted that the officer only received once in the last quarter of

the financial year. Running the station became very difficult.

Paidha border post

During the inspection only one staff was on site and most of the

records had been locked up by the in charge who was away and therefore we could not inspect the records and the books because

the officer had taken with him the keys storing the accounting

documents. There was no structure for a border post

Kikagati

Border Post

The border post was manned by an office attendant since the in-

charge had left the station. Accounting documents could not be

verified to be able to review performance of this station.

Ishasha River

Border Post

At the time of inspection the office attendant was present and he

was the one handling passengers as the rest of the staff had

travelled to Kampala. There were no records/books of accounts as the in charge had lacked them in the drawers although he had left

the unused visa stickers with him.

The above weaknesses hamper delivery of immigration services, negatively

affecting the objectives of the Directorate.

Page 274: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

262

Management explained that they have had limitations in terms of staff and

financial resources. They further indicated that action is being taken to address the

concerns. I await the results of management action.

PUBLIC SECTOR MANAGEMENT

21.0 MINISTRY OF LOCAL GOVERNMENT

21.1 Mischarge of Expenditure – Shs.4,178,737,274

The Parliament of Uganda appropriates funds in accordance with the needs of the

country and this appropriation is implemented through the budget in which funds

are tagged to particular activities and outputs using account codes and MTEF

codes. A review of the Ministry‘s expenditures revealed that the entity charged

wrong expenditure codes to a tune of Shs.4,178,737,274. Such a practice is

contrary to the intentions of the appropriating authority and leads to misleading

reporting.

Management in response acknowledged the anomaly and explained that they have

since improved the budgeting process to take into account spending priorities with

the output budgeting tool as rolled out by Ministry of Finance Planning and

Economic Development. Management further stated that a request for an increase

in the Ministry‘s MTEF ceiling to cater for the increasing scope of operation of new

Local Governments has been made.

I advised management to streamline the budget process to ensure that sufficient

funds are allocated to each account. Authority should be sought for any

reallocations.

21.2 Advances to Individual Personal Accounts

(a) Non Compliance with Treasury Accounting Instructions

Sections 227, 228 and 229 of the Treasury Accounting Instructions (TAIs), states

that all payments should be made by the Accounting Officer directly to the

beneficiaries. Where this is not convenient, an imprest holder should be appointed

Page 275: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

263

by the Accounting Officer with the approval of the Accountant General.

Shs.1,840,727,530 was advanced to Ministry staff through their personal bank

accounts to undertake direct procurements and other activities of the Ministry.

Such a practice of depositing huge funds on personal accounts exposes

Government funds to risk of loss, since the Ministry does not have any control

over such funds deposited on personal accounts.

Management explained that advances were mainly related to activities and

workshops undertaken upcountry jointly with staff from other Ministries and Local

Governments and as such, their entitlements were advanced to the team leaders

within the Ministry.

I advised management to ensure adherence with the requirements under the

Treasury Accounting Instructions.

(b) Advances to personal accounts not accounted for

A review of advances to personal accounts was carried out and the following

issues were noted:

i. Personal advances to the tune of Shs.67,700,200 were not accounted for by the

respective officials.

ii. Accountability of Shs.96,313,500 was doubted due to inadequacies in the

accountability.

iii. Photocopies of some accountability were availed without certification, making

the accountability doubtful.

iv. Payment sheets were in some cases blank and not signed by the beneficiaries

as such I was unable to confirm the payments.

The above flaws rendered the accountabilities in question doubtful. In this regard,

I was unable to confirm whether the amount involved was applied to the intended

purposes.

I advised management to ensure that funds are accounted for or recovery

measures should be initiated.

21.3 Unaccounted for Cash Withdrawals

Page 276: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

264

A sum of Shs.376,248,891 was withdrawn in cash of which Shs.72,000,000 relates

to imprest while Shs.304,248,891 relates to other activity cash withdrawals. It was

noted that Shs.77,896,691 was unaccounted for at the time of audit

(Shs.19,137,500 and Shs.58,759,191 for imprest and other cash withdrawals

respectively) while Shs.15,160,000 was accounted for but the accountabilities

were inconsistent and therefore considered doubtful.

In absence of the relevant accountabilities, I was not able to confirm whether the

funds were put to the intended purposes.

I advised management to ensure that all funds are accounted for within the

statutory period or recovery measures be enforced.

21.4 Payments for Hotel Services

During the year under review, Shs.647,265,371 was spent on workshops and

conference services in four (4) hotels. Scrutiny of the transactions revealed that

expenditure worth Shs.636,362,171 for retreats and workshops lacked attendance

lists. In absence of these lists, I was not able to confirm whether activities did take

place. I could also not confirm the numbers of the billed participants.

Further Shs.57,199,993 paid to Hotel Africana and Hotel paradise lacked

expenditure vouchers and the relevant documentation to support the payments;

consequently I could not certify that the funds were genuinely spent on the

intended purposes.

I advised management to ensure that all funds are accounted for within the

statutory period or recovery measures be enforced.

21.5 Project Refunds

(a) Irregular borrowing from Project Accounts

Contrary to section 42 (c) of the TAIs the Ministry borrowed a sum of

Shs.916,601,532 from eight (8) project Accounts to fund Ministry‘s activities. At

the time of the report, the borrowings had not been refunded. Details are as

below:

Page 277: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

265

Project Amount (Shs.)

District Development Programme III 52,924,028

District Livelihoods Support Programme 56,751,967

District Transport Revolving Fund 328,688,331

Energy For Rural Transformation(ERT II) 62,074,970

Local Government Management and Service Delivery Programme

198,483,739

Local Government Sector Investment Plan 26,810,000

Strengthening Monitoring Capacities in Uganda Public Sector

61,080,000

Uganda Good Governance Programme 129,788,497

Total 916,601,532

The borrowings affected the planned and timely implementation of Project

activities.

Management explained that the borrowing was due to inadequate funding.

I advised management to ensure strict adherence to the Commitment Control

guidelines and avoid borrowing from the project Accounts.

(b) Unaccounted for borrowings

Examination of payments relating to the borrowing revealed that Shs.70,931,400

advanced in form of fuel and allowances to staff to carry out various activities

remained unaccounted for by the time of audit contrary to section 120 of the TAIs.

There is a weakness in enforcing timely accountability from the staff. In absence

of the relevant accountabilities, I was not able to confirm whether the funds were

put to the intended purposes for which they were borrowed. Unaccounted for

funds are prone to misuse.

I advised management to ensure that all funds are accounted for within the

statutory period or recovery measures considered on the concerned officers.

21.6 Improperly vouched air tickets expenditure

A sum of Shs.33,578,776 was spent on air tickets for staff travelling abroad.

However the funds were not properly accounted for as they lacked supporting

Page 278: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

266

documents contrary to section 120 and 181 of the Treasury Accounting

Instructions. The highlights of the findings are as below:

Accountabilities in form of ticket folios or e-ticket print-outs were not availed

for authentication of payments.

Boarding passes and passport copies were not availed to confirm exit and

return dates.

No back to office reports were on file to justify the travels undertaken.

In absence of the relevant accountabilities, I was not able to confirm whether the

funds were put to the intended purposes for which they were requisitioned.

I advised management to ensure that all funds are accounted for within the

statutory period or consider recovery measures.

21.7 Irregular Inter-Account Transfer

The Ministry operates Bank Account no.000110088000018 ―Local Government

Sector Investment Plan‖ with Bank of Uganda. It was noted that the Project closed

some years back but the entity did not close the account. Audit review of the bank

account revealed the following:

a) A transfer of Shs.5,211,930,182 was made from the Treasury General Account

in the last week of the financial year 2011/2012 (29th June 2012). No authority

from Treasury for the transfer to the off-budget account was availed for

review. This transfer could have been made to circumvent the controls which

require unspent balances to be returned to Treasury at the close of the

financial year.

b) The amount was spent from the off budget project account in 2012/2013

financial year without appropriation authority of Parliament and approved work

plans.

c) The above transfer was utilised from this account as detailed below:

Expense category Amount (Shs)

Cash 178,180,000

Personal advances to individuals 355,348,860

Page 279: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

267

Ministry of works and Transport 1,268,658,000

Fuel 143,984,867

Clearing and Forwarding Ltd 994,545,548

URA tax 60,994,939

Shipping Services 2,079,686,300

Tours and Travel Company 82,741,725

Tours and Travel Company 28,304,100

Others 81,059,040

Total 5,273,503,379

A review of the expenditure relating to the above transfer revealed the following:

Shs.188,058,700 out of Shs.355,348,860 deposited on individual personal

accounts was not accounted for. No cash book and advance ledger was

maintained for this account.

According to the MoU signed between the MoLG and Ministry of Works and

Transport (MoWT), MoWT was meant to utilize the remitted funds

(Shs.1,268,658,000) in strict compliance to the terms in the MoU and to

submit accountabilities supported by bank statements and original copies of

related documents within one month of completion of assignment. However

this has not been done ten (10) months after expiry of the MoU.

I was not provided with the policy cover by the contracted cleaning company

implying that charges of Shs.262,920,000 were irregular. Without evidence of

insurance cover certificates and receipts, I could not rule out inflated

payment to the firm.

There was no bank guarantee executed by the cleaning company Ltd for

Shs.108,541,812 though Management stated that it had been returned. I

could therefore not certify its execution. No evidence of confirmation of the

guarantee was availed and consequently no confirmation was on file from

any insurance firm to the Ministry regarding the guarantee.

d) Another transfer of Shs.6,681,216,846 from a cancelled LC account was also

made to this project account. Shs. 6,694,225,263 was transferred to 52 districts

Page 280: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

268

for the procurement of bicycles. Management records indicated that 29,767

bicycles were procured and distributed to beneficiaries by the 52 districts.

e) Outstanding balance of Shs.852,593,754 at the end of the financial year was not

reflected in the financial statements (balance sheet) of the Ministry as at 30th

June 2013 and yet these are Ministry funds from the TGA. The funds were

instead disclosed in the schedule of project balances hence understating the

cash and cash equivalent.

Management in response stated that the Account will be closed and

accountabilities from Ministry of Works will be obtained and presented for

verification. Management further stated that they had written to the provider to

furnish a copy of the security and the insurance cover.

I will await the outcome of the efforts.

21.8 Payment for Protocol and Presidential Pledges

During the year a total of Shs.84,000,000, was paid to the Ministry of Foreign

Affairs (Shs.59,000,000) and State House ( Shs.25,000,000) to facilitate protocol

activities and hosting of the State banquet. However, the supporting documents to

justify the transfers were lacking and neither were accountability documents for

the expenditure provided for audit review. There is a risk of duplication by the

Ministry for activities that are budgeted and financed by other line Ministries.

Management explained that the funds were for supporting the sub committees for

hosting of the Commonwealth Local Government conference and hosting of the

state banquet.

I advised management to provide accountability or initiate recovery measures.

21.9 Diversion of GOU Counterpart Funding

Shs.597,998,795 (exclusive of gross tax) was released to the Ministry as

Government Counterpart funding for four projects during the year under review.

Scrutiny of expenditure documents revealed that a total of Shs.143,102,809 was

diverted to fund non-project related activities. There is no evidence that the

Page 281: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

269

Accounting Officer sought for approval by way of a reallocation or virements

warrant, as required under the Public Finance and Accountability Regulations

2003. Summary of diversion of counterpart funding is as below;

Project code Release amount (Shs) Diversion (Shs)

CAIIP I 1068 157,057,145 6,154,298

CAIIP II 1087 149,675,561 19,034,800

DLSP 1066 231,250,577 77,422,200

CAIIP III 1236 60,015,512 40,491,511

TOTAL 597,998,795 143,102,809

Such a practice undermines the intentions of the appropriating Authority, results

into under performance on the part of the project and leads to misstatement of

financial statements. Management in response stated that the omission had been

noted and that refunds will be effected.

I await the outcome of the efforts.

21.10 Transfers to Districts

The Ministry transferred Shs.697,452,087 to various districts to meet several

activities including; medical treatment, IFMS tier 2 recurrent costs, physical

development plan implementation and road openings. Audit review of the

payments revealed the following:

(a) Treatment abroad

Public Service Standing Orders 2010 Medical Attention, section (M-f) 4(b) requires

that night allowance should not be paid to patients except where an officer is

required to convalesce in the country under specialist supervision. The maximum

claim is limited to 21 days exclusive of hospital days which are charged on the

hospital account. It is also provided that in case of any excess requirement, the

officer may claim from the responsible Permanent Secretary and any authority

thereon will be limited to half of the officer‘s night allowance.

Page 282: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

270

Shs.120,872,000 was remitted to a Municipal Council for treatment of a mayor in

India for a kidney transplant where he was to spend 38 days with the kidney

donor and attendant. The referral was properly authorised by the medical board.

Included in Shs.120,872,000 was US $ 17,900 to cater for hospital costs during

observation, operation and after operation while in India for the 38 days.

However, contrary to the standing orders the ministry of health recommended

payment of per-diem for 38 days to the mayor and subsequently US $ 13,680

(Shs.35,636,400) was paid for all the days he spent in the Indian hospital. The

officer was therefore not entitled to any per-diem. I consider this a loss of

government funds.

Management explained that the Ministry did not have a budget line for treatment

of political leaders however authority was provided by PS/ST to spend from the

Ministry budget.

I advised management to always refer to the standing orders before such

payments are affected.

(b) Support to Town Councils

The Decentralization policy provides an anchor for advancement of Governments

overall political and social –economic agenda. It promotes popular participation

and empowers local people to make decisions on issues that affect their lives and

this is done by Government support through funding the decentralized services.

This funding is through unconditional grants, conditional grants and equalization

grants which are budgeted for and released directly to Local Governments.

Contrary to the above Government funding frame work, it was noted that the

Ministry transferred Shs.60,000,000 to 5 Town Councils to open and grade urban

roads. Several issues were noted as below;

i. Local Government‘s road funding interventions are budgeted and released by

Uganda Road Fund as conditional grants after approval of work plans and

IPFs are provided and passed by the Councils in their budgets for

implementation. The Ministry documentation stated that funding had been

Page 283: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

271

secured for these transfers however I was not availed with the source. This

pointed to a diversion of Ministry funds.

ii. There were no approved work plans and supplementary budgets by the

Councils provided for review to confirm absorption of funds. This is an

indicator of haphazard planning and absorption of the funds is doubtful given

that even conditional funds are many times returned at year end despite

being planned for.

iii. The criterion used by the Ministry in allocating the secured funds to the

chosen Town Councils was not availed.

iv. No accountability was availed by the districts upon utilization of the funds by

the time of the report.

Ministry allocation of funds to Local Governments without set criteria of allocation,

approved work plans by designated agencies and Councils may affect programme

implementation.

I advised management to provide sufficient supervision to the town councils so as

to ensure adequate absorption of funds transferred to them. I further advised

them to provide accountability for the funds spent.

21.11 Non-deduction of Withholding Tax from Local Suppliers

It was noted that withholding tax to the tune of Shs.26,606,383 was not deducted

from some payments for onward remittance to URA contrary to the regulations.

Summary of payments are in table below;

Item Amount (Shs) WHT tax due

Stationery and computer

supplies

347,761,191

36334,761,191

,761,191,761,19

1258,338,784

18,501,211 Silver springs 26,626,699 1, 353,900

Kembabazi catering centre

Ltd

49,200,000 2, 952,000

Vehicle hire 135,086,201

8,105,172

Total 210,912,900 26,606,383

The Ministry may incur losses due to fines and penalties imposed by URA for non-

deduction and non-remittance of tax.

Page 284: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

272

I advised the Accounting Officer to adhere to the requirements under the Income

Tax Act. The concerned suppliers should be traced and tax recovered.

21.12 Wasteful Expenditure- Parking fees for Grounded Vehicles

It was noted that Shs.35,607,680 was paid to a company as parking fees for 16

Ministry motor vehicles parked in the basement of Uganda House for more than a

year. However an inspection of the parked vehicles in the basement revealed that

these vehicles were grounded. Management‘s failure to adhere to the TAIs chapter

7, paragraph 705 led to wastage of funds.

Among the vehicles were 4 Mitshubishi Pajeros (2 White and 2 Grey), One Blue

Nissan Hard body, three Nissan Patrols grey in colour and one Toyota Land cruiser

white with the inscription ―UN‖ whose number plates had been removed. Five of

the grounded motor vehicles were not recorded in the Motor Vehicle register

namely UG 2214R Mitshubishi Pajero, UG 1090 R Nissan Hard body, UG 3012 R

Mitshubishi Pajero UG 1221 R and UG 2213 R both Nissans Hard body. Sample

photos are below:

This Vehicle Mistubishi is abandoned in the Uganda House basement parking without registration number plate. This puts the asset at risk of vandalism.

Mitsubishi Pajero vehicle that is not recorded in the Motor vehicle register

Page 285: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

273

Nissan hard body vehicle that is not recorded in the Motor vehicle register

The Ministry is losing money spent on parking space for motor vehicles that are no

longer of economic benefit to the Ministry and should have been boarded off.

Risks of vandalism are likely to reduce the disposal value at the time of disposal.

Management explained that the vehicles were in the process of being boarded off.

I await the outcome of the boarding off process by management.

21.13 Staff Welfare-Irregular Allowances

It was noted that Shs.624,920,000 was paid to Ministry staff as automatic monthly

allowances. I observed that this allowance paid in form of night subsistence was

paid irregularly because it was not supported with any administrative

circulars/standing order instructions from Ministry of Public Service. Further, no

taxes were deducted in form of PAYE.

Such payments affect the Ministry‘s cash flows hence affecting performance and

implementation of planned activities.

Management explained that the allowances were paid as a way of motivating the

ministry staff to enhance productivity.

I advised management to liaise with the Ministry of Public Service to have the

allowance regularised.

21.14 Budget Performance

A Review of the budget performance for the year revealed that some targets were

not achieved despite release of funds to the various vote functions. Details are in

table below;

Page 286: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

274

Vote/Programme

Item description Quantity Amount Budgeted in billions

Released amount in billions

Quantity Remarks

Vote 11 Vote function 1323 Project 1089e LGSIP Support to urban development

To provide a single point of reference for mobilizing resources for implementation of decentralization policy within the context of the MTEF

-Urban planning and development regulated, fund transfers to 20 urban councils effected

0.25 0.30 -None No activity undertaken.

Vote function

1324 Programme 11: Urban Inspection Department

To undertake systematic

verification of adherence to established legal and policy frameworks, regulations, guidelines, procedures and rules to ensure efficiency and effectiveness in the operations of urban LGs

-To carry out routine and periodic inspection

in 176 urban councils -Carryout VFM audit on capital investment in 22 Municipal councils -Human resource capacity in 14 urban councils -Provide support to 8 municipalities to improve public financial management systems

0.763 0.532 -Routine and periodic

inspection of 111 districts

-No VFM audits on

capiatal investment. -No human resource capacity in 14 urban councils

Project 1089d LGSIP

Support to policy, planning and support

To provide a single point of reference for mobilization

resources for implementation of the decentralization policy within the context of the MTEF.

-JICA interventions enhanced and FAO phase out strategy

followed up in Northern -Global and Common Wealth Forum -Planning, budgeting and M&E function in 70 districts and 22 MC‘s strengthened -Monitoring and evaluation of 70 districts and 22 MC‘s to link their development plan to the NDP -ICT support to LG‘s in data management and LOGICs in 111 districts and 22 MCs -Provide ordinary coordination meeting, and support supervision on exists strategy for FAO in 7 supported districts.

0.733 1.015 -Global LG common wealth forum

hosted -JICA interventions enhanced and FAO phase out strategy followed. -Planning, budgeting and M&E function in 70 districts and 22 MCs provided.

-No ICT support to LG‘s was

undertaken.

Vote function 1321

Enhance the capacity of MoLG and its partners to

-Decentralized planning supported and monitored in 80 high

0.4 0.287 -None No activity undertaken.

Page 287: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

275

Project 1069 Participatory development project

coordinate the promotion and facilitation of participatory development management at all levels

and lower local governments in Northern Uganda -Provision of technical guidance and capacity building to 80LG

Project 1073 LG Management and Service Delivery Programme

To enhance the capacity of local Government so that they are able to plan and manage human and financial resources for effective and sustainable service delivery

-CDD initiatives monitored and supervised in 111 LGs -Implementation of LED projects supported in 21 LGs -LGMSD training, monitoring and support supervision undertaken in 111 LGs. -LG civil works for IFMS installation undertaken in 22 districts

12.24 0.553 -None -No CDD initiatives monitored.—No implementation of LED projects. -No LGMSD training caried out.

Service delivery is hampered and the appropriating authority‘s objectives are not

met.

Management in response stated that due to inadequate funding, they prioritized

the expenditures.

I advised management to liaise with the appropriate authority and ensure that all

activities are undertaken as planned.

21.15 Audit Committee

Regulation 29 and 30 of the Public Finance and Accountability Regulations 2003

and section 8 of the Public Finance and Accountability Act 2003 requires the

Minister in charge of Finance to establish and appoint Audit Committees whose

functions are advisory to the Accounting Officer.

During the year ended 30th June 2013 the Ministry of Local government had an

Audit Committee composed of five members. However, the committee did not

carry out its functions relating to approval of annual audit workplans, discussion of

audit reports, and review of the Ministry‘s financial statements:

I informed management to bring the matter to the attention of the committee.

Page 288: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

276

21.16 COMMUNITY AGRICULTURAL INFRASTRUCTURE IMPROVEMENT

PROGRAMME – PROJECT 1 (CAIIP 1)

It was noted that management had complied in all material aspects of the

financing and GoU financial regulations except for the matters below;

(a) Un-remitted Pay-As-You-Earn (PAYE)

It was observed that a total of Shs.147,392,099 was deducted and withheld as

PAYE from salaries of Programme staff as required by the regulations, however,

these funds were not remitted to URA. Non remittance of deductions is a violation

of the tax law which may lead to penalties.

Management explained that PAYE was not remitted due to limited counterpart

funding from Government. I advised management to liaise with MoFPED and

ensure that the statutory deductions are promptly remitted to the rightful

authorities as required by the law to avoid unnecessary fines and penalties.

(b) Failure to deduct 6%Withholding tax (WHT) from Service

providers

It was observed that Management did not withhold tax amounting to

Shs.2,469,004,410 on payments for services provided on non-exempt companies

contrary to the requirements of the tax laws under Section 120(1). Non-deduction

of withholding tax may result in to penalties and fines being imposed on the

Programme by the tax body.

Management explained that the ADB loan agreement prohibits the use of the loan

funds for the payment of taxes relating to the goods and services required for the

execution of the Project.

I explained to management that this is income that should have been subjected to

tax and advised management to liaise with the MoFPED to ensure that tax is

withheld from the service providers and remitted to the tax body as required by

the Income Tax Act.

(c) General Standards of Accounting and Internal Controls

Page 289: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

277

Spending project funds at source

A review of the Ministry of Local Government expenditure revealed that GoU

contribution amounting to Shs. 2,657,057,145 was released by Ministry of Finance,

Planning and Economic Development (MOFPED) to the project through the

Ministry of Local Government Treasury General Account where funds were spent

on behalf of the Project which was contrary to the Project‘s operations manual.

Spending Project funds by the Ministry does not only deny Project Management

control over the funds but also poses a risk of diverting the funds to activities

outside the Project.

I advised management to ensure that Project funds are transferred from the line

Ministry to the Project Account for proper monitoring and control.

(d) Field Inspections

Field inspections were undertaken with a view of establishing among others,

Physical progress of civil works on district feeder roads and community access

roads; construction of rural markets and agro processing shelters. The extent of

supervision and monitoring by the respective District Local Governments were

considered. The following matters were observed during inspections:-

Rehabilitation of Community and Access Roads (CARs)

i. Lack of routine maintenance of roads by the Districts

Most of the roads in the Districts under CAIIP 1 (Batch A and B) Project were

completed. However, the districts are not maintaining these roads and as a result

some roads have narrowed due to lack of maintenance. The roads had become

bushy with drainages. Specifically during inspection of Masaka, Mbale, Tororo,

Butaleja and Rakai districts, I noted that the carriage width of some roads had

reduced to 2.5m from the 4.5m standard meter set for the murrum roads. It was

also noted that in some instances, there was poor workmanship exhibited by

contractors. Refer to the pictures and explanations below:

MBALE DISTRICT

Busiu Subcounty

Page 290: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

278

Rehabilitation of Watakakhuna-Bukaya-Nanaaloko, Buwalasi-Namwalye Bridge Contractor; Khabusi Building Contractors Contract price ; Shs 892,493,059 Amount Paid; shs.804,320,825 Percentage paid; 90% The bridge was constructed, however maintenance of the road is needed as part of the road was being washed away by rain.

TORORO DISTRICT

Rehabilitation of Siwa Lwala Nimwanga Pobwok 17.7km Road in Nabuyonga Sub County Contractor; WAFW Consult Ltd Contract price; Shs 524,132,806 Amount paid; Shs; 273,125,000 Percentage paid 52% Poor workmanship, stones were left on the road sides and very little murrum appeared to have been used to construct the road. The headwalls are at the same level as the road and there was no offshoot to enable water to flow properly.

BUTALEJA DISTRICT

Mazimasa Sub-county

Page 291: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

279

Rehabilitation of Mpologoma- Nabiganda-Bugalo, Kanghalaba- Hisala- Kamenya Contractor;BMK Contractors Contract price ;457,424,900 Amount paid ; Ug shs 425,424,725 Percentage paid: 93% Findings: Narrowing of the road as a result of lack of routine maintenance.

RAKAI DISTRICT

1. Kabingo-Nsimbo-Kyabalemera-Ddwaniro & Lumbugu-Nsozibiri Road 12.3km

Good surface However the head walls at the junction are broken.

Kachanga- Sagala Road 8.2km

Drainage channel blocked by silt and Garbage

Uncompleted drainage channel

Page 292: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

280

The respective District Engineers explained that the districts do not get enough

funds to maintain the roads. They further explained that Uganda Road Fund is

planning to fund maintenance of Community Access Roads in sub-counties in the

coming year.

I advised management to liaise with the relevant stakeholders and urgently secure

funds for routine maintenance of rehabilitated roads.

21.17 Agro processing facilities

a) Delayed commissioning of Agro processing Facilities

A number of agro processing facilities in Mbale district were completed but had

not yet been commissioned. For example, a maize mill at Kimwanga market in the

pictures below were not commissioned. Some of the facilities had already

developed cracks before becoming operational most likely due to poor

workmanship. See the photos below:

Maize mill installed but not operating Rice huller fitted but not operational

Poor workmanship; cracks on the floors and on the verandah was evident.

At the moment therefore, the community is not benefiting from the facilities

despite availability.

Page 293: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

281

Management explained that follow up with the Sub Counties and District

management will be made to ensure that all the mentioned impediments.

I await the outcome of management‘s efforts.

b) Lack of capacity by a contractor

During the previous year, it was noted that in Tororo District a construction

company was awarded a contract with a contract sum of Shs.227,594,063 to

construct agro processing facilities in all the three sub counties of Nagongera (2

rice hullers); Merikit (2 rice hullers) and Nabuyoga (1 maize mill and 2 rice hullers)

all to be completed at the same time. At the time of audit, only 25% of the

contracted sum had been paid. It was revealed that the contractor lacked

capacity to execute the contracted works in accordance with the contract period

as the projects are still incomplete to date.

Tororo District Local Government wrote to Ministry of Local Government in August

2013 recommending for termination and blacklisting of the contractor for failure to

complete the works. The Ministry responded requesting the district to take over

the abandoned sites from the contractor as the Ministry formalized the termination

process. However at the time of inspection, the District had not yet taken over

the site and the termination process had not been concluded. The construction

sites are shown in pictures below:

a) Rice hullers in Nabuyoga sub county

A bushy site of the abandoned incomplete rice mills; the iron sheets used do not comply

with the specification of ‗‘gauge 28‘‘.

Page 294: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

282

b) Incomplete rice hullers in Nagongera Sub county

Abandoned construction sites for rice hullers in Nagongera Sub County

Management of the project promised to follow up the matter and ensure that the

Projects activities fully are implemented.

I advised management to follow up the matter and ensure that the works are

completed.

c) Non-Operational markets

It was noted that some markets that had been completed in Mbale District were

not operational. For instance Busiu Sub County market was complete but not

operational and yet some lockers had already been removed from the stalls. The

District Engineer explained that these markets were handed over to the Sub

County and therefore it was the responsibility of the Sub-county management to

allocate the stalls to the vendors. The community is not benefiting from the

Project infrastructure as was intended.

Completed but un-operational Busiu market

Page 295: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

283

Management of the project attributed the non-operational markets to poor

location, lack of enforcement of the Market Act, political interference, reluctance

by vendors to pay market dues and inadequate commodities to sell during off-

season, however, these issues were being addressed.

I await the outcome of management action.

21.18 Status of Project Implementation

i. Project performance under rural infrastructure improvement

component

According to the project five year implementation plan and quarterly progress

reports, the Project had not achieved the following targets despite the fact that its

closure date was set for 30th September 2013:

Activity Targets Progress as at 30th June 2013

Rehabilitation of Community

Access Roads

4,680km 3868.2km completed and handed

over.

343.5km ongoing physical

progress 80%

Rehabilitation/Construction of

Markets

78 Markets 74 Markets completed and handed

over

Four markets not completed.

Supply and installation of

Agro-processing Facilities

123 Assorted

APFs

106 of 123 assorted agro

processing facilities have been

installed. 17 facilities pending.

Unless there is an extension of the closure date, Management will not be able to

achieve targets in the loan agreements.

In their written response, management envisaged that these activities will be

complete by the project closure date and if deemed necessary the closure will be

extended to allow proper management of the completion activities. I advised

management to ensure that uncompleted project activities are completed within

Page 296: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

284

the Project time frame to avoid any additional costs associated with project

extension.

21.19 COMMUNITY AGRICULTURAL INFRASTRUCTURE IMPROVEMENT

PROGRAMME – PROJECT I1 (CAIIP I1)

(a) Compliance with financing agreement and Government of Uganda

financial regulations

i) Budget Performance-Low Absorption Capacity

The approved Project expenditure estimates for the financial year amounted to

Shs.80,197,862,398. However, only Shs.30,133,948,428 was spent during the

year, reflecting an absorption capacity of only 37.6%. Low absorption capacity

denies the beneficiary communities services which were meant to improve their

livelihood. There is also a risk that Management may not meet project objectives

within the programme period.

Management attributed the delays to the slow procurement process and as such

implementation of activities was rolled over to the financial year 2013/14.

Management further explained that the loan is 78% committed and the overall

planned activities will be implemented within the project period.

I advised management to ensure closer monitoring of implementations of

contracts to ensure that the activities are concluded within the programme

timelines.

ii) Shortfalls in Counterpart funding

According to the Provisions of the Loan Agreement, GOU is required to fully

commit and contribute funds towards the implementation of Programme activities.

Shs.200,000,000 was accordingly budgeted as GOU counterpart funding, however

only Shs.149,675,561 was released for Project activities resulting into a shortfall of

Shs.50,324,439. Failure to provide counterpart funding as budgeted for is in

violation of the Project Financing Agreement. Besides, underfunding hinders the

smooth implementation of the planned Project activities.

Page 297: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

285

Management explained that this matter was addressed to the Ministry of Finance,

Planning and Economic Development by the line Ministry with a view of ensuring

that sufficient releases are made in the financial year 2013/14 and subsequent

years. I await the outcome of management‘s efforts.

iii) Failure to deduct 6%Withholding tax (WHT) from Service

providers

It was observed that Management did not withhold tax amounting to

Shs.1,455,131,824 on payments for services provided contrary to the

requirements of the Income Tax Act under S.120(1). Non-deduction of withholding

tax may result in to penalties and fines being imposed on the Programme by the

tax body.

Management explained that the ADB loan agreement prohibits the use of the loan

funds for the payment of taxes relating to the goods and services required for the

execution of the Project.

I explained to management that this is income that should have been subjected to

tax and advised management to liaise with MoFPED to ensure that tax is withheld

from eligible service providers and remitted to the tax body as required by the

Income Tax Act.

(b) General Standards of Accounting and internal control

i) Spending at source

A review of the Ministry of Local Government development expenditure revealed

that GoU contribution amounting to Shs 149,675,561 was released by Ministry of

Finance, Planning and Economic Development to the Project through the Ministry

of Local Government Treasury General Account where funds were spent on behalf

of the Project. This was contrary to the Project‘s operations manual. Spending

Project funds by the Ministry does not only deny Project Management control over

the funds but also poses a risk of diverting the funds to non-project activities.

Indeed Shs.19,034,800 counterpart funding was diverted to cater for Ministry

activities.

Page 298: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

286

Management explained that the GOU funds under CAIIP II are now controlled and

managed on the Government IFMS system. The Project was given the

responsibilities of committing funds on the system by the Accountant General.

I advised management to ensure adequate controls to avoid possible diversions.

In the meantime diverted funds should be refunded to the Programme.

(c) Field Inspections

An inspection was carried out in September 2013 and the following issues relating

to the implementation of the Project were noted;

i) Abandonment of Community access road works under Batch A

It was noted that some road works had not been completed in time while other

sites had been abandoned. During inspections in Lira district, it was observed that

Ageni Lela-Te Cwao road in Aloi Sub County in Aleptong District constructed by a

construction company had been abandoned after undertaking works of 3.2kms out

of the contracted 17.2kms. This road had been contracted at a sum of

Shs.335,692,169 out of which Shs.127,602,100 had been paid to the contractor.

Refer to the picture 1 below:

Incomplete works - 1 Ageni Lela-Te Cwao road in Aloi S/ County in Aleptong

There is a risk that extra administrative costs will be incurred as a consequence of

delayed implementation.

Page 299: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

287

Management explained that they had contacted the District Contracts Committee

who explained that the contract had been extended to allow the contractor to

complete the works and promised that no extra costs will be incurred.

I advised management to regularly monitor activities in the districts to ensure

quality and timely completion of the road works. Such monitoring would identify

early enough areas of concern that require attention.

21.20 Delayed completion of projects

a) Delayed completion of Community access roads under Batch B

According to the contract documents for community access roads under batch B,

all road works ought to have been completed and handed over by December

2010. However, inspections carried out in beneficiary districts revealed that some

of these roads had not been completed. The completion was below 50% as

indicated in the table below;

District Sub County Contract sum

(Shs)

Amount paid

(Shs)

Outstanding

(Shs)

%age of

completion

Soroti PINGIRE S/C

489,870,150

126,402,250 356,815,150 26%

KUMI ATUTUR S/C

484,593,900 150,475,250 326,198,900 31%

AMURIA KAPELEBYONG

S/C

638,641,500

246,392,000

379,281,500

39%

The delay in contract performance increases administration costs. It also denies

the community access to good roads which are meant to improve people‘s

livelihoods.

Management explained that the contracts had delayed due to factors beyond the

contractors control such as weather patterns, limited availability of gravel material

and the difficult terrain in some districts. Cognizant of the above challenges, a lot

of effort had been put in place to ensure that contracts are completed albeit late.

Page 300: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

288

I advised management to step up the monitoring of these roads with a view of

ensuring quality and timely completion of road works. Management should also

consider invoking the penalty clauses within the contract agreements for delayed

completion of works.

b) Delayed completion of Agro Processing Facilities

It was noted that many Projects were at varying stages of completion in

Kaberamaido, Soroti and Kumi districts despite the fact that contracts completion

was due on 30th September 2013. While some projects were at roofing stage,

others were at slab and foundation levels as evidenced below:

Kaberamaido district

Incomplete structure of the grain mill A grain mill still at foundation level in

in Otuboi sub county Kaberamaido Sub county

Incomplete grain mill at Ochero Sub County

Soroti district

Page 301: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

289

Foundation of a maize mill in Arapai Sub county Foundation of Maize Mill in Kateta subcounty

Incomplete maize mill in Atiira Sub County

Kumi District

Incomplete structure for maize mill at Mukongoro Subcounty

Milk cooler and generator house completed in Kobwin, Kumi district but machinery not yet

installed.

Page 302: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

290

Milk cooler and generator house completed in Ongino, Kumi district but machinery not yet

installed.

The delay in completion denies the community the intended benefits of the

Project.

Management stated that the delay was mainly due to escalation of prices of major

building materials at the time of contract execution which led to reduced

enthusiasm of the contractors to complete the works as the projects were not

profitable, but measures had been put in place to ensure that works are

completed by February 2014.

I advised management to consider invoking the penalty clauses within the contract

agreements on the delayed completion and also ensure monitoring and

supervision of these projects is properly undertaken.

21.21 Lack of bill boards

Under Item one of Bill of Quantities, bill boards are provided for and costed to

enable identification of the Community Access Road projects. The bill boards

clearly specify the Ministry, the project, the community access road, Sub County,

District and contract number of the contractor for proper identification.

During inspections it was noted that some of the contracted road works

undertaken lacked bill boards yet the cost of Billboards was provided for in the

BOQs. Refer to the table below for roads without billboards:

District Sub County Road Name

DOKOLO Agwata Agwata Atidi-Kachung

Awerowot PS-Alyecjuk PS

Dokolo Alwitmac- Cr. Asalim

Igar-Awialem PS

Kangai Chwagere-Barayom-Amodo

Acungapenyi-Batta Ebwol

LIRA Adwari Adwari TC - Ober

Okwongo TC - Okume PS

Aloi Aloi corner-Orum border

Page 303: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

291

Amach Corner Abic-Atanga

Acan pii-Owo-Abongorwot

In absence of the billboards, I could not clearly confirm whether the Community

Access roads inspected were for CAIIP-2 Batch B, as there are several road works

projects in the Districts.

Management responded that it had communicated to all beneficiary districts to

ensure that bill boards are installed. I advised management to ensure that the bill

boards are expeditiously installed for easier identification of road works performed

by the Project.

21.22 Failure to re-grade the road

Before graveling there is need to carry out grading of the road. It was observed

that a contractor of Aromi-Anyangoga road in Amolotar District took long before

spreading the murram resulting into growth of grass which required to be re-

graded before graveling is done. However, the contractor decided to gravel before

re-grading the road. Refer to photograph below:

Aromi-Anyangoga Road in Amolotar District

Management noted the concern and promised to communicate to the relevant

Amolatar District Local Government officials to ensure that the scenario does not

recur in future. I advised management to take stringent administrative measures

on the contractor and the district officials involved.

21.23 Environmental degradation

Page 304: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

292

Best practice requires that measures to mitigate environment damage are put in

place before and after construction work is undertaken. It was however observed

that most barrow pits used to excavate gravel for road works were not restored.

Refer to pictures below:

Ocaapa-Orupe P/s-Mukalu Rd, Kateta Sub County in Serere District

The un-restored excavated grounds are a danger to the community as these

provide places for breeding mosquitoes.

Management explained that the borrow pits had been restored, however selected

pits were maintained for mining of construction materials for other roads as well

as correcting defects during the defects liability period.

I advised management to continue restoring areas excavated during construction

of roads in order to control environmental degradation.

21.24 Non-rehabilitation of Onyakedi-Ayac-Banya-Dokolo Boarder Road, Lira

Dsitrict

One of the Project activities inspected in the prior year 2011/2012 was a 21.8 km

Onyakedi-Ayac-Banya-Dokolo boarder road under Lot 74 in Lira district, Amac sub

County; where under-scope of work was noted in Adip swamp and about 100m of

road works had sunk in the swamp thus hindering community‘s access to a nearby

market. It was noted that Management had not made any interventions to repair

the road since 2011/2012. The pictures below refer.

Page 305: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

293

As per last year‘s report 2011-12 Recent inspection view of 2012-13

Failure to rehabilitate the road hinders farmers‘ access to markets thus limiting

income generating opportunities.

Management explained that funds had now been secured to extend the road to

connect to a market at Bata Sub-county in Dokolo district and the works have

already been advertised and the procurement process is ongoing.

I await the results of the implementation.

21.25 Non-adherence to Road Specifications

Shs.457,680,300 was paid to Grant Engineering Ltd to construct three roads

totaling to 13.5kms in Amolatar district. According to the specifications in the

contract agreement for the construction of Aromi-Anyangoga Road at Aromi

Swamp, the carriage length was specified as 4.5 Kms with the overall road width

of 6 meters. It was however noted that the road width had varying measures

ranging from 3 meters to 4 meters at certain points. A section of the road is

shown below:

Page 306: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

294

Aromi-Anyangoga Road measuring only 3m wide in Amolatar at Aromi Swamp

Non-adherence to road width specifications is a breach of contract and also denies

communities access to good roads.

I advised management to properly execute works according to the specified road

width of 6 metres.

21.26 Closure/blockage of roads

Best practice requires that traffic must be managed and the roads remain

accessible despite the on-going works. This involves the creation of diversions or

working on half of the road while the other half is being used. During the audit

inspection it was noted that several roads were closed and had been inaccessible

for over three months. In one instance the community took initiative to spread the

murram themselves in order to access the nearest market. Refer to pictures below

for blocked roads:

Acan pii-Owo-Abongorwot road in Amach Corner Nyeni road in Lira District

Page 307: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

295

Aloi corner-Orum border Road in Aloi -Lira District

Okidi TC Sambwa Road in Soroti District Alwitmac- Cr. Asalim in Dokolo District

Management explained that they are yet to contact and give guidance to the

Project Managers and the community in planning and implementing such works to

ensure that deviations and alternative access are provided.

I advised management to put in place guidelines to avoid significant disruptions in

the affected areas.

21.27 Lack of routine maintenance of roads by the Districts

During audit field inspections in Kaberamaido and Soroti districts, it was noted that

most of the roads were not maintained. In many instances, head walls were

broken, drainages were blocked and grass had narrowed the road width. Refer to

the pictures below:

Okapel-Aperkira road in Kaberamaido Achuna-Angaro-Abeko TC-Aputi Soroti

Page 308: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

296

Due to non-maintenance, the roads may not last for the expected life span.

Management explained that they will closely liaise with Uganda Road Fund and

beneficiary districts to ensure rehabilitated roads are maintained. Management

further stated that rehabilitation of community roads will be conditioned on proper

maintenance of the completed roads.

I await the outcome of the efforts being made.

21.28 Inadequate workmanship

Section vii sub section 1.23.1 of the general conditions of the Project civil works

contracts specifies that the contractor shall construct and install the works in

accordance with specifications and drawings.

During inspection of the rehabilitation of 15kms of Lwala Amukurat-Ousia Rd,

contracted to Ficah Enterprises (U) at a contract price of Shs.442,448,843, it was

noted that work was inadequately done as there were no headwalls at the culvert

ends, the drainage was blocked, offshoots were not in good condition, a thin layer

of murrum was spread and poor quality of culverts was used many of which were

found broken. Refer to the pictures below:

Headwalls and passage of water Thin layer of murrum of Achuna-Angaro-

Page 309: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

297

Lwala Amukurat-Ousia Rd - the small culverts used were not well placed and no headwalls

Culvert broken on Chwagere-Barayom-Amodo Rd in Dokolo District

Due to poor workmanship, the roads may not last for the expected period thus

denying the community access the intended benefits of the Project.

Management responded that the contractor had partially de-mobilized due to

adverse weather conditions and at the time the road was being used hence

exposing the culverts to direct axel loading resulting into the damages.

I advised management to replace all broken culverts and complete construction of

the road.

21.29 Status of project implementation

21.30 Project performance under Rural Infrastructure Improvement

Component

According to the Project five year implementation plan and progressive reports

accessed from management, the project had not achieved the following targets

despite the fact that the project closure date was set for 30th July 2014:

Activity Targets Progress as at 30th June 2013

Rehabilitation of

Community Access

Roads

4,365kms 1454.1km Batch A CARs completed

and handed over leaving 362km

under construction.

Page 310: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

298

1198.2km of Batch B community

access Roads were still on going at

physical progress of 40%.

Recurrent maintenance 8,515kms of community

access roads and 439

kms of district roads;

There was no routine maintenance

carried out in districts due to lack of

funds.

Supply and installation

of Agro-processing

Facilities

97 Assorted APFs Contracts for 77 shelters for

assorted agro processing facilities

(36 maize mills, 14 rice hullers, 37

multipurpose Grain Mills and 5 milk

coolers) were signed; however,

supplies and equipment that were

expected by September 2013 had

not been installed.

Delay in project implementation leads to unnecessary extra administrative costs in

form of monitoring and supervision.

Management explained that rehabilitation of the remaining batch of community

roads will commence soon. Contracts for supply of agro processing equipment

were awarded and the equipments will be delivered soon.

I await management‘s implementation of activities.

21.31 COMMUNITY AGRICULTURAL INFRASTRUCTURE IMPROVEMENT

PROGRAMME – PROJECT I1 (CAIIP III)

(a) Status of Project implementation

Delayed implementation of works

The Project was expected to commence in 2011 and run for 5 years, however,

operations began 9 months late in April 2012. According to the annual work plan

the activities below should have been undertaken and completed by the end of the

year under review, however, by the time of reporting, the works were still

ongoing. See table below for progress.

Page 311: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

299

Progress of works so far

Activities for

the year

Targets for the

year

Amount (Shs) Progress

during the year

Rehabilitation of

Batch A Community

Access Roads

40% of the total

road works of

10,645,944,000 Works have

not taken off. Procurements

process still on going

Provision for

Procurement of Consultant to

carry out a baseline study

a study report 150,000,000 Contract was

awarded and the work is in

progress

Provision for

Procurement of consultant to

carry out a post-

harvest losses baseline study

a study report 150,000,000 Contract was

awarded and the work is in

progress

Hire and

remuneration of PFT staff for

Mbarara regional office

1 M&E Officer, 1

CDO,1 Infrastructure

Engineer

379,320,000 Not yet done

TOTAL 11,478,264,000

During inspection of beneficiary districts, it was observed that although some

operational funds had been received to cater for agro based activities, training and

construction of community access roads among others. These activities had not

yet commenced due to delays in the procurement process.

Delay in implementation of works denies beneficiaries the intended benefits of the

Project.

Management attributed the delay to the elaborate evaluation process for the

procurement of contractors. Management indicated that the procurement of

consultancies were complete and the studies were in advanced stages of

completion.

I advised management to expedite the planned Project activities in order to meet

Project objectives within the agreed time frame.

(b) General Standards of Accounting and Internal Controls

Page 312: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

300

No reportable internal control weaknesses were observed during the period under

review.

21.32 MARKETS AND AGRICULTURAL TRADE IMPROVEMENT PROJECT 1

(MATIP 1)

(a) Non-Performing Loan from Arab Bank for Economic Development

in Africa (BADEA) - US$ 10,000,000

Two funding agreements were signed between the GoU as Borrower and two

banks; African Development Bank (ADB/F - UA 38 Million) and the Arab Bank for

Economic Development in Africa (BADEA - USD 10Million). The following were

noted on the performance of the loans;

Only the ADB/F loan is performing. This was evidenced through the first tranch

disbursement in 2011. The last disbursement is due on 30th September 2015.

BADEA loan agreement was signed on 16th July 2009 to necessitate the

acquisition of land and construction of five markets at Kasubi, Busega,

Kansanga (Kampala City), Kimaka (Jinja District) and Nyendo (Masaka

District). The loan was declared effective on 21st January 2010 and last

disbursement expected on 30th March 2013. The agreement indicated that the

borrower shall pay interest at the rate of one per cent (1%) per annum on the

principal amount of the loan withdrawn and outstanding from time to time. It

was observed that no disbursements have been made since then, despite the

fact that the consultants were procured and were paid to draw up architectural

designs and supervise the construction of the five markets. The commitment

fees and interest that have accrued on this loan account since its effective date

has been estimated at US$400,000. This is a likely loss to Government. In

addition, delays in accessing funds have an effect on service delivery to

communities.

The period for the construction of the above five markets has since elapsed.

The agreed disbursement date of 30th March 2013 has passed yet no

construction works had started.

Page 313: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

301

Management responded that the designs for the 2 (two) markets of Nyendo and

Busega were submitted to BADEA for approval and the Project is expected to

receive funds upon approval of the designs.

I advised management to follow up on the remaining three (3) markets and also

ensure that funds are requisitioned early to avoid commitment fees from accruing.

(b) Un-remitted statutory deductions

Shs.22, 486,512 was deducted and withheld from staff salaries in respect of Pay

As you Earn (PAYE). However, the funds were not remitted to Uganda Revenue

Authority (URA). Non remittance of statutory deductions is a violation of the law

which may lead to penalties. There is also a risk that the retained deductions could

be diverted.

Management explained that PAYE was not remitted due to insufficient Government

counterpart funding. I advised management to liaise with the Ministry of Finance,

Planning and Economic Development to address the matter.

(c) Failure to deduct 6% Withholding tax (WHT) from civil works

consultants

It was observed that Management did not withhold tax amounting to

Shs.35,892,180 and USD.86,996 on payments made for civil works and

consultancies to eligible service providers. Non-deduction of withholding tax is a

violation of the Income Tax Act which may result into penalties and fines being

imposed on the Project by the tax body.

Management explained that the ADB loan agreement prohibits the use of the loan

funds for the payment of taxes relating to the goods and services required for the

execution of the Project

I explained to management that this is income that should have been subjected to

tax and advised them to liaise with Ministry of Finance, Planning and Economic

Page 314: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

302

Development to ensure that tax is withheld from the service providers and

remitted to the tax body as required by the Income Tax Act.

(d) Outstanding VAT on certified works and consultancy

The contract agreements signed between the Ministry and the contractors for

works and consultancy for the construction of markets quoted the prices inclusive

of Value Added Tax (VAT). It was however observed that payments to

consultancy firms were exclusive of VAT. This amounted to Shs.157,014,922 and

USD.264,623. It was also noted that there was an outstanding balance of VAT

amounting to Shs.1,135,189,149 due to contractors.

Management explained that VAT was not paid to a number of service providers

due to insufficient Government counterpart funding.

I advised management to liaise with MoFPED and ensure that GOU abides with the

terms and conditions of the loan agreements to avoid costs that may arise in case

of litigation.

(e) General standards of accounting and internal control

No reportable internal control weaknesses were observed during the period under

review.

(f) Field inspections

Field inspections were undertaken with a view of establishing among others,

physical progress of civil works on markets and the quality of works. By the time

of inspection, Wandegeya, Mbale and Fort Portal markets were substantially

completed, however, the construction of Lira, Gulu, Hoima and Jinja markets were

behind schedule. The following matters were observed during inspections:-

i) Lira Central Market

The contract for the construction of this market was awarded at a contract price of

Shs.26,515,762,350. By the time of inspection, works were ongoing; but behind

schedule. The site engineer indicated that works would be completed in June

Page 315: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

303

2014, eight months after the agreed completion date of 30th October 2013. Photos

of the inspection are shown below:

LIRA CENTRAL MARKET REMARKS

Construction is ongoing at the third floor which is at roofing level. According to the contractor the works will be completed by June 2014 eight (8) months after the agreed completion date of 30thOctober 2013.

Stalls under construction

Rear view of the Lira Market

Management explained that the contractor had requested for an extension based

on delays in payment of VAT by GOU, design modification during construction,

long haulage distances for local materials and the bad weather conditions.

I advised management to closely follow up the construction with a view of

completing the market as agreed in the extension contract.

ii) Jinja Central Market

Page 316: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

304

The construction works for this market were awarded at a contract price of

Shs.28,679,485,336. It was established that the works were also behind schedule.

The photos on the audit inspection are shown below:

JINJA CENTRAL MARKET REMARKS

Construction is ongoing. Poles were being erected for slabbing of the second level. The contractor requested for an extension of 6months from October 2013 ending March 2014. But it appears the works will not be completed within the time frame.

Slabbing of the middle level was ongoing.

Construction of the stalls area at the time of inspection.

Management explained that works progress was about 75% against a time

progress of 98% meaning that the works were behind schedule. This was

attributed to delayed payments of VAT, variation of the foundation to reduce on

the backfill, creating extra storage for bulk goods and additional drainage works to

cater for the increased storm water from the built area of the market.

I advised management to closely follow up the progress and ensure that works are

completed as agreed in the extension contract.

Page 317: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

305

iii) Gulu Main Market

The construction of this market was awarded at a contract sum of

Shs.15,057,709,217. By the time of audit inspection, the works were ongoing, but

behind schedule. Photos of the site during the inspection are shown below:

GULU MAIN MARKET REMARKS

Construction of the lower level of the Gulu Market. The contractor requested for a 6 months extension period but it appears that works may not be completed within the time frame.

Construction is ongoing at second level.

Management explained that the contractor was granted extension due to revised

scope of works, delays in VAT payment by GOU, modification in designs including

relocation of sewage and water supply lines, long haulage distances for local

materials through bad roads, suspension of work due to concerns by the local

community resulting into political interference in the construction of the market

and the inclement whether conditions.

I advised management to follow up the progress of the contract and ensure that

works are completed as agreed in the extension contract.

iv) Hoima Central Market

The construction of this market was awarded to Amugoli General Enterprises Ltd

at a contract sum of Shs.13,717,782,223. By the time of audit inspection, the

Page 318: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

306

works were ongoing but behind schedule. Photos taken during field inspection are

shown below:

HOIMA CENTRAL MARKET REMARKS

Construction had progressed but the contractor had requested for an extension of completion date for another three months which had not yet been granted. The Supervising company stated that 93% of civil works have been completed.

This is the appearance of the market from the outside.

Management explained that a time extension of 3 months was granted after

analyzing the causes of delay which included delays in the payment of VAT to the

contractor by GOU, initial investigations of the materials and corresponding design

mixes, modifications in designs and introduction of extra works.

Management was advised to step up monitoring and supervision to ensure timely

completion as agreed in the extension contract.

(g) Status of project implementation

i) Project performance as per logical framework

According to the Project five year implementation plan and physical progress

reports accessed from management, the Project had not achieved the following

targets despite the fact that the project closure is done on 30th September 2015:

Component Target Progress to date

Page 319: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

307

Market

Infrastructure

Development

• Complete design of

Kitgum market

under AfDB Loan

• Complete designs

for Lot 01 (Nyendo and Busega

markets in Masaka

Municipality and Kampala Capital

City Authority) under the BADEA

Loan

• Initiate the

procurement process for lot 01

contractors for Busega and

Nyendo Markets

• Completion of the designs for Kitgum

market under AfDB Loan is still pending

due to the identification of alternative suitable land by the Municipality.

• The detailed structural designs for Busega

and Nyendo markets were completed and submitted to BADEA for approval, but

approval and commencement are still

pending. The markets are to be financed using the BADEA loan.

• The process awaits the approval of detailed designs by the funders (BADEA)

Market

Management and Trade

Enhancement

• Initiate advance

action activities for the relocation of

vendors back to the redeveloped

markets and the eventual

management of the

markets upon completion.

Relocated 14,825 vendors in the seven

markets to temporary relocation sites to

pave way for construction.

Preliminary process of relocating vendors

back to the markets commenced. Draft vendors‘ facility allocation letters

produced and shared with the relevant seven (7) urban councils for their input.

Relocation of vendors was expected to

commence early August 2013. Relocate started only in Wandegeya but met

resistance from vendors due to purportedly high charge out rates for

market spaces.

Programme Management

and

Coordination

• Undertake supervision and

monitoring

Supervision of the seven market

construction sites was undertaken by consultants with technical support from

the Programme Facilitation Team

particularly in matters relating to adherence to key contractual provisions.

Regular site meetings were carried out for

each site on a monthly basis to review progress and address any

issues/challenges that may arise during

implementation.

• Hold progress review workshop

The review workshop was not held. It was rescheduled for the first quarter of the

year 2013/2014.

• Hold an IPC

meeting

One IPC meeting was held in June 2013

and the key output was the approval of

the Annual Work Plan and Budget for the

Page 320: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

308

FY. 2013/2014.

Delays in Project implementation lead to extra administrative costs in form of

monitoring and supervision.

Management in response stated the Project was set for closure in line with the

project closure date and that two out of seven markets were completed and

commissioned. Management further stated that the remaining five markets were

95% complete and commissioning is expected by February 2014.

I advised management to ensure that incomplete project activities are undertaken

within the Project time frame to avoid additional costs.

21.33 DISTRICT LIVELIHOODS SUPPORT PROGRAMME (DLSP) – MINISTRY OF

LOCAL GOVERNMENT (MOLG)

(a) Low absorption capacity

The approved budget for the financial year 2012/2013 was Shs.29,273,931,317.

While Shs.20,354,291,615 was released, only Shs.17,640,275,579 was spent

representing an absorption capacity of only 60%. It is worth noting that the

Project is in the sixth year of the seven–year implementation period.

Low absorption capacity denies the community services meant to uplift their

livelihoods. Furthermore Project objectives may not be achieved within the

stipulated time frame leading to extra administrative costs.

Management attributed the low absorption capacity to delays in the procurement

process and lack of Engineers to supervise works. They further explained that

internal mechanisms had been put in place to ensure that activities are done on

time.

I await the outcome of management‘s effort.

Page 321: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

309

(b) Non-incorporation of the GOU counterpart funding into the

Consolidated Annual budget of DLSP

According to the Project Financial Guideline 1.32, all budgets are required to be

associated with codes which identify the funding source, budget categories,

budget components, sub components, and activities as indicated in the budget

plan chart and analysis. However a review of the Annual work plan and budget for

the programme revealed that GOU counterpart funding budget and work plan was

not incorporated in the project consolidated work plan and budget.

Failure to incorporate the GOU funds budget estimates in the Project consolidated

work plan and budget may result into the entity spending funds on unplanned and

duplicate activities.

Management stated that the annual work plan and budget will be updated to

incorporate GOU funds.

I wait management‘s action on this matter.

(c) Project performance as per logical framework

According to the Project seven year implementation plan and progressive reports

accessed from management, the project had not achieved the following targets

despite the fact that the project closure date was set for 15th December, 2014.

Activity Targets Progress as at 30th June 2013

Community infrastructure

Community

Access

roads

(CARs)

Construction of 2,400

Kms of community

access roads.

Training 300 road user

The first batch CARs of 313.5 Kms

were completed and in use.

570 Kms under the second batch of

CARs had been completed while

construction of 77.1 Kms were still in

progress.

Contracts for the third batch of CARs

totaling to 488.1 Kms were submitted

to the Solicitor General for clearance,

not yet implemented

Procurement of contractors for the

fourth batch totaling to 765 Kms is in

progress (37% complete)

171 road user committees had been

Page 322: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

310

committees

trained (constituting only 57%)

Community Development

Train and facilitate

1,872 community

volunteers (household

mentors and FAL

instructors)

Enroll 46,800 FAL

learners

Train 15,600 farmers

in group organization

and leadership skills.

Achieved: 572 FAL instructors

facilitated.

Achieved: 660 household mentors

trained and facilitated (66%)

13,028 of FAL learners enrolled (28%)

10,240 FAL learners tested (22%)

680 farmer groups identified and

Strengthened

15,640 Individual farmers have been

targeted for capacity building however

no training has commenced (0%)

Agriculture Development and Land Tenure

Support 624 groups

with Enterprise grants

Establish 312 on farm

demonstration.

Support 17,280 poor

households with food

security grants

Sensitize 25,000

people in land tenure

rights

Train 39 area land

committees.

Enterprise development grants valued

at an average of US Dollars 5,000 per

grant were provided to 680 farmer

groups and producer associations

(109%).

236 on farm demonstration were

established. (76%)

Food security grants were given to

18,172 poor household at an average

of US dollars 120 per household.

(105%)

25,000 people sensitized on land

tenure rights. (100%)

39 area land committees trained.

(100%).

District and Sub-County Execution

Page 323: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

311

Refurbishment of 13

sub-county

headquarters

Refurbishment of 5

district headquarters.

One sub-county headquarters per

programme district refurbished.

(100%)

2 district headquarters Refurbished

(40%).

Delays in project implementation may lead to unnecessary extra administrative

costs in form of monitoring and supervision.

Management explained that internal mechanisms had been put in place to ensure

that activities are done in time.

I await the outcome of management‘s effort to implement activities within the

project time frame.

(d) General standards of accounting and internal control

i) Spending at source

A review of the Ministry of Local Government development expenditure revealed

that GoU contribution amounting to Shs.331,250,577 was released to the Project

through the Ministry Treasury General Account (TGA) where funds were spent on

behalf of the Project contrary to the Project‘s operations manual.

Spending Project funds by the Ministry does not only deny Project management

control over the funds but also poses a risk of diverting the funds to activities

outside the project components.

I advised management to institute measures to ensure that project funds are

transferred to the project accounts for proper monitoring and control.

ii) Lack of a Vehicles Maintenance Register

It was noted that the Project does not maintain a vehicle movement register to

record all repairs done on vehicles and spares used contrary to the Treasury

Accounting Instructions. In absence of the records, periodic assessment of

vehicles performance compared with their cost of maintenance cannot be done. In

Page 324: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

312

addition, financial resources may be lost through recycling of repairs on the same

vehicles.

I advised management to put in place operating records for each vehicle as

required by TAI in order to monitor the frequency of repairs, maintenance costs

and spares used.

iii) Unutilized ''TOMPRO' Accounting Software

''TOMPRO'' Accounting Software was procured and installed at the districts and at

the Project Coordination Unit (PCU) in Kampala. The Accounting software was

intended to harmonize the financial, monitoring and reporting for the project

team. The software has modules for system parameters; financial accounting,

reports analysis, budget control, fixed assets management, credit management,

procurement management and disbursement reports. However, it was noted

during the audit that the accounting software had not been put to use at the PCU

and the districts.

I advised management to expedite the process of its implementation to ensure

that the software is utilized for the intended purpose.

(e) Audit Field Inspections

Field inspection to assess progress on implementation of DLSP activities was

undertaken and the findings are noted below. Further, a technical audit was also

undertaken with a view to assessing the quality of works and related progress.

The findings of the technical audit will be issued in a separate report expected to

be out by 31st January, 2014.

i) Lack of routine road maintenance by the Districts

It was noted that most of the roads were not maintained. Drainages were

found blocked and over growing grass had narrowed the road width of

some roads. Refer to the pictures of the sampled roads below:

Page 325: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

313

Blocked Drainage on Rwenziramire-Kyamugenyi-Kyangamoyo Road in Masindi district

Over grown grass on Businge-Nyancwamba-Nyabitusi-Rukoko Rd in Kamwenge District

Due to lack of routine maintenance, the roads may not last for the expected life

span.

Management explained that there was a delay in putting road gangs in place

however the Ministry had procured and distributed road equipments which will be

used to maintain the roads. I advised management to liaise with the relevant

stakeholders and ensure routine maintenance of rehabilitated roads.

ii) Non adherence to specifications

It was observed that the works on Byerima-Kaiha-Maiha and Rwenzimire-

Kyamugenyi-Kyangamoyo roads in Masindi was not done according to the

specifications in the contract. Inadequate workmanship was exhibited in backfill

around the headwalls posing a risk of rain water washing away murram thereby

exposing culverts and making the roads narrow. Furthermore the culverts used

could not contain the large volume of rain water leading to silting. Refer to photos

below:

Pictures of blocked culverts

Page 326: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

314

Byerima-Kaiha-Maiha road in Masindi

district

The area near the headwalls is not

well compacted as evidenced by the

washing away of the murram.

Blocked drainage on Rwenzimire-

Kyamugenyi-Kyangamoyo Road in

Masindi district

Kyangamoyo-Kaikuku-Ntoma road in

Masindi district.

The headwall is almost submerged in

the water as the road was not raised.

Non-adherence to road width specifications is a breach of contract and also denies

communities access to good roads.

Management in response stated that the omissions were brought to the

contractor‘s attention for rectification. I advised management to ensure that the

defects are rectified by the contractor before final payment of retention monies.

iii) Abandoned Works in Bulisa district

Terms and conditions of Project civil works contracts stipulate that the contractors

should complete the work and correct any defect within 6 months from the

contract completion date.

A review of one of the contracts indicated that a total of 45.3kms of five (5)

community access roads was to be rehabilitated in Bulisa district under batch 2 at

a total cost of Shs.1,464,068,499. However at the time of inspection, it was noted

that all the roads had been abandoned by the contractors after having completed

Page 327: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

315

only 4.2km, less than 10% of the entire road length. Shs.344,252,546 had been

paid for the certified works while performance securities in form of bank

guarantees provided by the contractors had expired before the execution of the

works and therefore could not be enforced except for one bank performance

security/guarantee amounting to Shs.55,937,860.

Management explained that the re-tendering process for the roads at an estimated

cost of Shs.1,626,565,500 (a cost which is higher than the original contract cost of

Shs.1,464,068,499) had begun. The roads status as per project management

contract monitoring ledger was as follows:

ROAD NAME Length Length Completed

Contractor Contract Price Payments To date

% Physical Progress as per contract monitoring ledger

Wanseko-Murchson Falls Park

17.5 0 Patrov International

559,378,600 118,952,493 35%

Kisiabi-Kijangi-Uribo-Nyamitete

12.7 0 Tesla Eng. & Supplies Ltd.

344,707,400 63,477,611 45%

Booma-Walukuba-Kamagongoro-Sonsio

10.9 0 JubEnterp Ltd 319,982,499 161,822,442 15%

Tangala-Kampala-Bubwe

4.2 4.2 JubEnterp Ltd 240,000,000 0 15%

Booma-Walukuba

10.9 0

45.3 4.2 1,464,068,499 344,252,546

Management further stated that the relevant clauses of the contract were invoked

and all recoveries made. However the recoveries made were not availed for

verification.

I advised management to ensue that there is close monitoring of the roads to

address contract execution gaps. Furthermore, due diligence should be done

during the evaluation and award of contracts by carrying out post qualification of

bidders to confirm the ability of the contractors to execute the contracts.

iv) Delayed completion of works

Page 328: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

316

Best practice requires that traffic must be managed to make roads accessible to

users despite on-going works by creating diversions or working on half of the road

while the other half is being used. During inspection of the rehabilitation of Otwal

Railway Ojwi Road (12km) in Oyam district, it was noted that the dumped murram

had not been spread making the road inaccessible and the work had also stalled.

Photos of the road works are shown below:

OYAM DISTRICT

Rehabilitation of Otwal Railway

Ojwii Road(12km)

Delayed works and blocked road

Due to the delays, communities are denied access to good roads meant to uplift

their livelihood. Project objectives may not be achieved under the circumstances.

I advised management to prioritize contract management in order to ensure

proper and timely implementation of works in accordance with the contract

agreements.

v) Poor procurement record keeping

During inspection in Masindi district, it was noted that the district did not maintain

a procurement file for the procurement of Heifers and Oxen worth Shs.44,

294,000 carried out during the year. In absence of documentation on the

Page 329: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

317

procurement of the animals, I was unable to ascertain whether the procurement

was done in a transparent manner.

Management should ensure that all procurement documents are properly

maintained as required by the PPDA regulations.

22.0 OFFICE OF THE PRIME MINISTER

22.1 Mischarge of Expenditure

The Parliament of Uganda appropriates funds in accordance with the needs of the

country and this appropriation is implemented through the budget in which funds

are tagged to particular activities and outputs using account codes and MTEF

codes. A review of the Office of the Prime Minister‘s expenditures revealed that

the entity charged wrong expenditure codes to a tune of Shs.27, 629,053,148.

This constituted 37% of total expenditure for the Office of the Prime Minister. This

practice undermines the importance of the budgeting process as well as the

intentions of the appropriating authority and leads to misleading reporting.

Management explained that the diversions were due to insufficient budget

allocations and severe cuts in consumptive areas. In addition, the Ministry of

Finance Planning and Economic Development (MoFPED) had imposed restrictions

as regards to allocations on some of these items despite being commonly used

consumptive items.

I advised management to ensure that they follow set procedures in cases where

reallocations are to be made.

22.2 Advances to Individual Personal Accounts

22.2.1 Non Compliance with Treasury Accounting Instructions

Sections 227, 228 and 229 of the Treasury Accounting Instructions (TAIs), states

that all payments should be made by the Accounting Officer directly to the

beneficiaries. Where this is not convenient, an imprest holder should be appointed

by the Accounting Officer with the approval of the Accountant General. Shs.9.29

Page 330: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

318

billion was advanced to Ministry staff through their personal bank accounts to

undertake direct procurements and other activities.

Such a practice of depositing huge funds on personal accounts exposes

Government funds to risk of loss, since the entity does not have any control over

such funds deposited on personal accounts.

Management explained that most of the activities undertaken by office are field

based and involve working with other stake holders in the Districts who are not

usually known at the time the requisitions for funds are made necessitating it to

advance funds to individuals to execute field based activities given the fact that it

is not practical to seek authority to withdraw cash from Permanent

Secretary/Secretary to Treasury (PS/ST) for all these activities.

I advised management to ensure strict adherence with the requirements of the

Treasury Accounting Instructions.

22.2.2 Advances to personal accounts not accounted for

a) Unpresented accountabilities

Accountability documents were filed separately from filled vouchers and were not

cross-referenced to either invoice numbers or EFT numbers. From the sample

selected it was thus difficult to relate particular accountabilities to payment

vouchers. As a result, accountability worth Shs. 417,639,932 could not be traced

and therefore remained outstanding.

b) Doubtful expenditure

A review of accountabilities presented revealed that a sum of Shs.55,869,932 was

doubted because of overpaid per-diems, uncertified photocopies and field reports

filed before activities were undertaken. I was therefore unable to confirm whether

the amount involved was applied for the intended purpose.

Management explained that the inconsistencies in the filling system were a result

of poor record management and that the gap had been addressed.

Page 331: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

319

I advised management to undertake an extensive review of the expenditure and

where misuse is observed, recovery measures be instituted accordingly.

22.3 Cash Withdrawals

22.3.1 Unaccounted for Cash Withdrawals

Section 226 of the TAI‘s requires cashiers to keep records of payments made by

them in Cash Books and to stamp all the vouchers with a ―PAID‖ stamp and file

such vouchers immediately a payment has been made. In addition, Section 181

requires all vouchers to contain full particulars of each service or goods and be

accompanied by such supporting documents as may be required so as to enable

them to be checked without reference to any other documents.

It was noted that out of the Shs.3,755,374,923 withdrawn in cash by the OPM

during the period, Shs.613,325,500 was unaccounted for. Further, review of the

payments and requisitions revealed several anomalies as outlined below:

Allowances: Funds were spent on allowances without the claimants

acknowledging receipt of funds. In the circumstances I could not confirm the

beneficiaries.

Tonner and Stationery: Funds were spent in cash as micro-procurements yet

the office had pre-qualified suppliers for the items. Management should have

placed orders with the providers and payments processed through direct

payments from the system.

Motor Vehicle Repairs: Funds were spent in cash contrary to regulations which

require service providers to be paid by EFT.

In absence of the relevant accountabilities, I was unable to confirm whether the

funds were put to the intended purpose for which they were requisitioned for.

There is a risk of misappropriation of the funds.

Management explained that cash payments for procurable items were mainly

drawn for items which were required in the field, so it was impractical to procure

them from Kampala. The motor vehicle payments were for emergency repairs

carried out on vehicles of entitled officers especially in absence of relief vehicles.

Page 332: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

320

I advised management to ensure that all funds are accounted for within the

statutory period.

22.4 Doubtful purchase delivery and issuance of stationery items

It was noted that stationery supplies worth Shs.701,721,893 were contracted out

to various suppliers, however delivery of the stationery items was not recorded in

the stores ledgers to acknowledge receipt. Furthermore there were no authorized

requisitions and issue vouchers to indicate usage as required by stores regulations.

It was also noted that heads of departments were ordering and purportedly

receiving stationery items without first delivering them to stores which was

contrary to stores procedures. I was unable to confirm the genuineness of the

stationery purchases. There is a risk that stationery items were not bought or

delivered.

Management explained that the documents relating to the supplies were taken by

CIID for scrutiny.

I advised management to ensure that procedures regarding receipt and issuance

of stores are followed. In the meantime the funds should be accounted for or

recovery measures be instituted.

22.5 Payments from a Forex Account

OPM spent a total of Shs.2,464,533,982 from the forex account being transfers to

international organizations, payments to international suppliers and travel abroad.

A review of the transactions paid out of this revealed the following:

22.5.1 Unsupported travel abroad

Shs.137,707,383was paid out for purposes of facilitating officers to travel to

various destinations outside Uganda. However the travels were not adequately

supported by accountability documents. Specifically the following were not

provided:

Page 333: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

321

Copies of the passport pages bearing exit and entry immigration stamps of the

countries where the officers purportedly travelled to were not provided for

verification.

Air tickets showing flight itinerary, boarding passes, visa receipts, and

electronic receipts were not presented.

Back to office reports or briefs to justify the travels were also not presented.

In the absence of the stated documents, the number of per diem days claimed,

number of staff who undertook travels and expenditure incurred could not be

confirmed rendering the expenditure doubtful.

I advised management to ensure that all funds are accounted for within the

statutory period. Otherwise recovery measures should be enforced in event of

non-accountability.

22.5.2 Non-deduction of Withholding Tax

Shs.992,570,770 was paid to two foreign based companies for the supply of Hydra

foam brick making machines and running an advert in the Queen and Common

Wealth 2012 magazine. It was noted that Shs.148,885,615 was not deducted as

15% withholding tax contrary to section 121 of the Income Tax Act.

Failure to deduct withholding tax is a violation of the requirements of the Income

Tax Act and culminates into loss of Government revenue. It also exposes OPM to a

risk of penalties and fines from the Tax Authority.

Management explained that the failure to deduct taxes was an oversight and that

taxes due from M/s Hydra Foam International will be recovered from subsequent

payments since the company still had a running contract with the office. I await

recovery and remittance of taxes to URA.

22.6 Payments for hotel services

Workshops and retreat expenses incurred in hotels are accounted for by provision

of pro-forma invoices, invoices, attendance lists of participants and receipts from

the service providers. During the year, Shs.228,311,993 was spent on workshops

Page 334: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

322

and conference services in 5 (five) hotels in Kampala and Jinja. Scrutiny of the

transactions revealed that a sum of Shs.162,889,129 lacked attendance lists.

Without the lists, I was unable to confirm whether activities were indeed

undertaken. Included in the above amount is Shs.43,678,130 paid to one of the

hotels where uncertified photocopied accountabilities were presented. I could not

place reliance on them.

The Office could have lost funds due to the anomalies as this could be an indicator

that services were not rendered.

I advised management to ensure that all funds are accounted for within the

statutory period. Recovery measures should be enforced in event of non-

accountability.

22.7 Irregular Inter-Account transfer

The entity operates bank account no.000030088000013 ―National policy on

disaster management‖ with Bank of Uganda which was opened in 2009 for

formulation of a National disaster management policy. This account was reviewed

last financial year and found to have several anomalies which are currently under

investigations.

For the year under review a sum of Shs.3,306,100,000 was transferred from the

Treasury General Account in the last week of the previous financial year

2011/2012 (29th June 2012) to the account. This transfer circumvented the

controls which require unspent balances to be returned to treasury at the close of

the financial year. The expenditures incurred from the account could not be

related to formulation of a disaster policy because the policy had already been

formulated and drafted.

Shs.3,319,953,508 was utilised from the off budget project account in 2012/2013

financial year without appropriation authority by Parliament and approved work

plans as detailed below:

Expense category Amount (Shs.)

Cash 439,262,664

Page 335: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

323

Personal advances to individuals 366,085,000

Farm engineering 123,192,000

Fuel 50,300,000

Food supplies 1,401,120,000

others 939,993,844

Total 3,319,953,508

A review of the activities on the account revealed the following:

There were no accountabilities for the advances made to individual officers‘

personal accounts.

There were no accountabilities for the cash withdrawals made by the cashier.

I was unable to confirm whether the funds were used on genuine Ministry

activities.

Management explained that the expenditures incurred on the account were in

reference to the disaster that occurred in Bududa and other related disasters soon

thereafter. Management further stated that the account could not be closed

because it was still under investigation by CIID and PAC.

I advised management to cease operations on the account pending finalisation of

the investigation. Recovery measures should be enforced for the unaccounted for

funds.

22.8 Refunds to Donors

The entity paid funds to a tune of Shs.4,314,211,646 to three Donor project

accounts as refunds erroneously charged in the previous financial year. The

following was noted;

(i) Loss: This loss was occasioned from the fraud discovered in the previous

financial year and efforts to recover the funds must be hastened.

(ii) Wrong charge: These funds were not included in the appropriation act

and neither were virements/ reallocation warrants nor supplementary

Page 336: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

324

funding requisitioned and approved for the expenditure. The accounting

officer charged ―other grants‖, ―transport equipment‖ and ―general supply

of goods and services‖ when refunding to DFID (NIMES), UK/Uganda post

conflict development programme, and GIZ respectively causing financial

mis-reporting and affecting service provision under the item codes. Details

are in the table below:

EFT NO. PAYMENT DATE

SUPPLIER DESCRIPTION AMOUNT (Shs.)

2424529 8/3/2012 DFID Support to National Integrated monitoring and Evaluation Strategy (NIMES)

Refund of funds erroneously charged on NIMES

2,397,716,250

2424530 8/3/2012 UK/Uganda Post Conflict Development Program Grant

Refund of funds erroneously charged on UK/Uganda Post Conflict Dev‘t Prog

1,512,115,748

2722238 30/5/2013 OPM transfers Repayment of Unaccounted funds and VAT for the Germany funded projects.

404,379,648

4,314,211,646

This practice undermines the importance of the budgeting process. It also

suffocates approved programmes which hampers service delivery. Furthermore,

the practice leads to misreporting.

Management explained that efforts to secure supplementary funding to cover the

obligations were not honoured and instead MoFPED advised OPM to re-prioritise

within their budget.

I advised management to adhere to the financial regulations by applying for

supplementary provisions where unforeseen circumstances arise.

22.9 Non-deduction of withholding tax

Page 337: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

325

It was noted that the entity failed to withhold taxes to a tune of Shs.161,821,594

during the year under review from several companies supplying goods and

services at the prescribed 6% rate contrary to section 121 of the Income Tax Act.

The oversight exposes OPM to a risk of penalties and fines and culminates into

loss of Government revenue.

Management explained that the failure to deduct taxes was due to non-activation

of the IFMS in built system that automatically deducts the taxes. Management

further stated that the recoveries will be enforced as most of the firms have

running contracts with OPM.

I await the recovery of taxes from the affected suppliers.

22.10 Payments for domestic arrears

Shs.2,363,144,295 was paid to several companies for settlement of arrears

incurred in the previous financial years. I could not ascertain whether the

payments were genuine given that no disclosure had been made in the previous

financial year‘s accounts memorandum statement. Besides no evidence was

available to confirm delivery for instance; goods were not taken on charge and

there was no record of issues out of the store. Travel abroad expenditure was not

supported in any way. There was no budget and therefore no release to settle the

obligation.

Under the circumstances, it was noted that the payments for settlement of

domestic arrears were not appropriately charged in accordance with the chart of

accounts provisions. In essence, funds for planned activities appropriated by

Parliament were diverted to settle domestic arrears.

Management explained that in the budget execution circular for the financial year

2012/13 dated 3rd July 2012, the PS/ST directed Accounting Officers to prioritize

outstanding contractual obligations from the previous years and have them make

the first call on the budgeted resources. Expenditures were accordingly made from

the relevant items using resources for the financial year 2012/13.

Page 338: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

326

I advised management to adhere to the commitment control system and ensure

that domestic arrears are appropriately disclosed in the financial statements,

verified, budgeted for and paid in line with TAIs.

22.11 Farm Engineering Industries Ltd

A contract was signed between OPM and the company in 2012. The company was

to provide ploughing services for Northern Uganda and Karamoja region for a

period of 18 months effective February 2012. In the contract, OPM had the

responsibility of identifying the districts where the ploughing should be done,

allocate the acreage to be ploughed per district, hire the service provider (Farm

Engineering) and settle the bills. The districts had the responsibility of identifying

the beneficiaries of the ploughing, supervising the ploughing through the district

production officers and certifying the works done.

During negotiations with the contractors, it was agreed that a 30% surcharge

would apply to all virgin land and contractual rates would apply to non-virgin land.

Further, it was noted that all land had to be ploughed two times, that is; first and

second ploughing at different rates and also be harrowed twice at different rates

according to the contract provisions. Review of payments and inspections revealed

the following:

(i) Surcharge on ploughing and harrowing non-virgin land

All payments made to the firm during the year totalling to Shs.8,534,645,970 were

surcharged, implying that all land was virgin land. Without identifying virgin land

in advance, the contractor was presented with the opportunity to declare all land

virgin. Further, confirmation of works undertaken by the parish chiefs, sub-county

chiefs, agricultural officers and Chief Administrative Officers (CAOs) did not specify

whether cultivated land was virgin or not. Under the circumstances, surcharge of

Shs.2,537,737,070 could not be independently confirmed.

It was noted during inspection that all the districts land especially individual land

was not virgin. This was confirmed by the CAO‘s, sub-county chiefs, district

production officers and some individual farmers on being interviewed who stated

Page 339: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

327

that this was land they used to plough before the tractor hire project came into

existence. Therefore payments made to the firm during the year as surcharges for

some virgin land was ineligible.

(ii) Ploughing once

It was further observed that with the exception of Namalu prison, all other land

was ploughed and harrowed only once. Also noted was that some areas such as

Orupa sub-county in Moroto district and Lotome sub-county in Napak district, land

was ploughed only once and no harrowing was done. There were thus

overpayments to the contractor as a result of this anomaly.

(iii) Gap in contract Negotiation

It was noted that the negotiation team did not give OPM value by specifying how

to charge 30% given the inconsistence by the firm in billing. In one of the

payment, the firm charged 30% on only ploughings (I and II) whereas in all the

other subsequent payments it charged 30% on all the ploughings (I and II) and

harrowings (I and II). Audit is of the view that the basis for the surcharge should

have been clearly stated in the contract.

(iv) Lack of central database and land utilisation mechanism

It was noted that OPM does not keep a central database of ploughed land

specifying total acreage ploughed to-date, acreage ploughed per district, acreage

ploughed per sub-county and beneficiaries. Without this database OPM may end

up ploughing more acreage in a sub-county than actual farm land acreage

implying re-ploughing of the same land. Further, there are no mechanisms in place

by the districts/sub-counties to ensure that ploughed land is fully utilised.

During inspection it was noted that most of the land in Napak, Kaabong and

Moroto districts was ploughed late in the months of June-August after the rain

season had passed. This was confirmed through reports from the district

production officers and interviews held with individual farmers, CAO‘s and sub-

county chiefs. As a result there was no planting and this undermined achievement

of project objectives.

Page 340: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

328

I advised management to review the contract and implementing modalities.

Management should also maintain a central data base capturing the status of land

ploughed.

22.12 Nugatory expenditure on clearing and handling charges

The Ministry imported three containers of fortified (ATIMIT) food as relief aid to

malnourished children which was a donation from Jesus Christ of the later day

saints. The items arrived on 22/12/2012 and OPM had a seven day grace period to

clear the consignment without incurring rental charges for the three containers

and storage charges from the clearing firm.

It was noted that the entity failed to utilize the grace period despite availability of

funds on the Gross payment tax account to expeditiously clear the items and held

onto the containers for 72 extra days which led to wasteful expenditure of

Shs.28,052,860 (US $ 8,640 in rental charges and Shs.5,070,460 in storage

charges).This expenditure could have been avoided had Management taken the

initiative to clear the goods immediately on receipt of the bill of lading.

Management explained that the delay to clear the goods was occasioned by lack

of a MOU between the entity that imported the goods and OPM so as to clear the

taxes from the gross tax account.

I advised management to always ensure that proper planning of transportation

and receipt of donations is done once acceptance of a donation is made. This

would enable clearance of imported items expeditiously to avoid losses.

22.13 Staff allowances

The Office of the Prime Minister paid quarterly allowances to staff during the year

under review to a tune of Shs.1,395,641,502. Review of the allowance payments

revealed the following:

Irregular consolidated allowances

It was noted that Shs.1,172,325,000 was paid to staff as quarterly consolidated

allowance in form of night subsistence days. I observed that this consolidated

Page 341: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

329

allowance was paid irregularly because it was not supported with any

administrative circulars/standing order instructions approving it from Ministry of

Public Service.

Management in their response explained that this was due to management‘s

desire to motivate Ministry staff. However the practice had hence forth stopped

and only allowances provided for in the standing orders are now paid.

I await management‘s adherence to the regulations.

22.14 Luwero-Rwenzori Development Programme (LRDP)

Luwero- Rwenzori Development Programme is a five year comprehensive

development programme for Luwero Triangle and Rwenzori regions that were

affected by the National Resistance Movement (NRM) Liberation struggle of 1981-

1986 and Allied Democratic Forces (ADF) insurgency of 1996-2003.

The main objective of the programme is to improve household income of the

people and improve social mobilization for development and peace building

through two ways;

(i) Transfers of funds to organized groups through community SACCOs on a

basis of 50% loan and 50% grant.

(ii) Transfer of funds to districts for infrastructure development in selected

sectors.

Chapter Two, 2.2 (Planning and Funds Management) of the third LRDP Operations

Manual, requires MoFPED to directly disburse funds to the Chief Administrative

Officers for the 60% support through the districts. A review of the Programme

transactions revealed the following:

Whereas OPM was to advise MoFPED on the allocation to each Local

Government by availing a disbursement schedule and thereafter disburse

funds to Chief Administrative Officers (60%), this was not done but instead

funds were rather sent to OPM and later sent to the districts.

Shs.4,121,665,102 was remitted to districts by OPM during the year instead of

Shs.4,240,944,550, causing a shortfall of Shs.119,279,448.

Page 342: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

330

16 (sixteen) micro support projects were supposed to have been appraised

before being given funds worth Shs.273,000,000. It was however noted that

only 4 (four) micro support projects were appraised before receiving

Shs.57,000,000. The twelve (12) projects were funded with Shs.216,000,000

without being appraised.

The Ministry did not have an up to date status report on the performance of

the grants to community SACCOs and thus I was unable to adequately review

the programme to ascertain its efficiency and effectiveness at the grassroots.

There is a risk that the 50% loan funds disbursed to community groups are not

being paid back as per guidelines.

Management explained that effective 2014/2015 Ministry of Finance Planning and

Economic Development will be advised to remit funds directly to the Districts

basing on the lists submitted by OPM. Regarding the issue of project appraisals,

additional staff had been recruited to further strengthen the monitoring and

evaluation of the programme and in addition, an assessment of the programme is

going to be undertaken to assess its viability.

I await management‘s progress in undertaking the above measures.

22.15 Kasiimo Project

The Office of the Prime Minister through the department of Luwero Affairs was

charged with the mandate of paying gratuity to non-combatant War (civil)

veterans. To expedite the process, the Ministry transferred funds to Centenary

Bank equivalent to moneys due to the veterans verified by a committee. The Bank

would then pay individual veterans by crediting bank accounts opened with them.

During the year, Shs.5,139,500,000 was transferred to the bank. I carried out a

review and reconciliation of the verified lists with the amounts transferred to the

bank and noted the following:

i. As stated in my previous years audit report, neither the Committee nor the

Office of the Prime Minister has a full data base of the combatants who have

been paid and those who are pending five (5) years after the onset of the

Page 343: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

331

scheme. Under the circumstances, cases of duplication and inclusion of non-

entitled beneficiaries could not be ruled out.

ii. While Government had earmarked Shs.30 billion to be released over a period

of three consecutive years for 30,000 civilian veterans, it is now estimated

that the beneficiaries are 60,000 and an extra Shs.60 billion is the estimate

by OPM required to pay off the veterans.

iii. Whereas civilians are paid varying amounts ranging from 1.5 million, 5 million

and 10 million, the verification policy of veteran leaders in a sub-county or

operation zone recommending veterans to be paid should have included area

elected leaders, elders and NRA/UPDF veterans who operated in the areas for

better transparency. Furthermore, whereas management sends a copy of the

approved veterans to be paid back to the district, it was noted that these lists

are not circulated and pinned at the sub-county levels for people to ascertain

genuineness of payees.

I advised management to ensure that the Committee comes up with a detailed

database of the civilian veterans paid and those pending payment. Furthermore,

all data for payments so far made on the various disbursement schedules in soft

copies should be availed for audit verification given that partial payments have

been made in different financial years in order to reconcile payments made to

individuals and rule out double or overpayments.

22.16 Gross Tax

(a) Budgeting

The Ministry budgeted for a total of Shs.20,913,653,190 for gross tax but only

Shs. 2,100,000,000 was released by Treasury. Although Shs.2,100,000,000 was

released, actual expenditure was only Shs.1,724,325,729 reflecting about 10% of

the budget and 82% of the actual release. Allocating funds for activities whose

likelihood of occurrence is remote provides avenues for diversions as well as large

budgetary slacks which provide for future unfair budgetary variations.

Management explained that Memoranda of Understanding (MoU) have been made

with a number of organizations to pay non-resource based taxes on behalf of

Page 344: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

332

them although at times it may not be possible to accurately determine how much

tax will be required as the tax demands from these organizations are not easily

predictable. Management further explained that an NGO Committee that will

assess all NGOs that are partnering with OPM had been instituted to review the

MoU with all entities with a view of streamlining the planning process.

I await the outcome of the committee.

(b) Tax payments by the Ministry

The Office of the Prime Minister entered into several Memoranda of Understanding

(MOUs) with Non-Governmental Organizations (NGOs) and provided for tax

settlement on their behalf within the MoU‘s for goods acquired by them. As such,

the Ministry had to meet several tax obligations on behalf of the NGOs arising out

of the agreements made. As a result of these obligations the Ministry paid a total

of Shs.665,244,817 on behalf of these organizations. A review of the MOUs

revealed the following:

Article 7 in the MOU‘s signed regarding taxes and duties was open ended as it

did not limit the type of imports, that is; vehicle capacities, luxurious goods

and others.

Upon paying, the Ministry has no control in regard to the final destination of

the goods and there is a risk that such goods may end up in the open market.

Without procurement work plans of the NGOs, OPM risks incurring domestic

arrears on NGO imports since it has no control over their imports.

This practice may undermine the tax planning efforts and ultimately lead to loss of

Government funds.

Management explained that, the instituted NGO committee will review all existing

MOUs with all partnering NGOs with a view of streamlining the planning process

and also develop guidelines and standard MOUs.

I await the outcome of the committee.

(c) Payments for NGOs without MOU

Page 345: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

333

It was noted that the Office paid taxes to the tune of Shs.95,214,821 on behalf of

five (5) NGOs without any MOUs in place. In one instance Medicines San Frontiers,

the MOU was with Ministry of health. The basis for the payments was not availed

rendering them irregular. Duplication could not be ruled out.

Management explained that the NGO Committee will be advised adequately to

take note of the observation. I await the outcome.

22.17 Vacant posts in the establishment

It was noted that 29 posts had not yet been filled as per the approved

establishment. Service delivery is hampered by the delays in filling the vacancies

especially at senior management level.

Management explained that they had sought clearance from the Ministry of Public

Service and made submissions to the Public Service Commission for filling 18

positions.

I advised management to liaise follow-up the matter with the relevant authorities

and have all staffing gaps filled.

22.18 Audit committee performance

Section 8 of the Public Finance and Accountability Act 2003 and Regulation 29 and

30 of the Public Finance and Accountability Regulations 2003 require the Minister

in charge of Finance to establish and appoint Audit Committees whose functions

are advisory to the Accounting Officer.

During the year ended 30th June 2013 the Office of the Prime Minister had an

Audit Committee composed of five members. However, the committee did not

carry out its functions relating to the following:

The Committee did not review and approve the annual and operational plans

of the Internal Audit.

The Committee did not periodically review and report on the overall quality of

the Internal Audit services at OPM.

Page 346: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

334

The Committee did not review the adequacy of the Internal Audit function, its

adherence to professional standards, independence, standing, scope,

resources and reporting arrangements.

It did not consider objectives and scope of any additional work undertaken by

internal auditors to ensure that there was no conflict of interest and

compromise.

The committee did not discuss with the accounting officer the internal audit

findings and recommendations and review or monitor their implementation.

There was concern from the internal audit about under facilitation/funding but

the Committee did not represent this concern to the Accounting Officer, the

Accountant General and the Secretary to the Treasury or the Minister.

The Committee also failed to review the OPM financial statements prepared by

the Accounting Officer to ensure adequate disclosure and fair presentation.

In view of the above observed weaknesses, the Ministry was exposed to several

risks including misstatement of financial statements.

Management explained that during the year under review, the entity was

undergoing various investigations which led to the non-compliance.

I advised management to draw the attention of the Audit Committee to its

statutory responsibility so that OPM can improve its financial management and

accountability.

22.19 Budget performance

Budget performance for the year under review revealed that some targets were

partially or not achieved despite release of funds to the vote functions. Service

delivery is hampered and the authority‘s objectives are not met under the

circumstances. Details are shown below:

Vote function

output

Item description Quantity Amount

(shs)

budgeted

in billions

Amount

released

(shs) in

billions

Quantity Remarks

130302-

programme 06

Payment of

gratuity and

- 4850 war

civilians paid

7.898 7.740 -2619 civilian

veterans paid

-2231 veterans not

paid

Page 347: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

335

Luwero-

rwenzori

triangle

coordination of

war debt claimants

- 4000 iron

sheets

- 4000 bags of

cement

-2000 bags of

cement

-2000 iron sheets

-2000 iron sheets not

bought

-2000 bags of cement

not bought

130372-

project 022

support to

LRDP

Government

buildings and

administrative

infrastructure

-Construction of

Semuto town

council offices

-Construction of

kabarole youth

skills training

centre

-Regional office

constructed

-Completion of

Nalutuntu health

centre

1.242 1.041

-Nalutuntu health

center finised

- Kabarole youth

skills centre kick

started.

-Semuto TC

constructed

-No regional office

constructed

130279 –

project 0922

Acquisition of

other capital

assets

-Construction of

national store for

relief food

2.022 0.521 No construction -No works were

undertaken.

130275 –

project 1235

Purchase of motor

vehicles and other

transport

equipment

-One trailer

- Two 12 tonne

trucks

- Three pick-ups

1.100 0.866

-Two trucks

bought

-No pick-ups and

trailer bought

130377-

project 0932

Purchase of

specialized

machinery and

equipment

-Hydra foam

machines (35)

- Tractors(10)

5.521

1.328

-8 hydra foam

machines

-2 tractors

Under funded due to

budget cuts of

3,127,000,000

and re-allocation of

1,065,576,168.

.

Management explained that due to emerging needs of the vote which would have

necessitated provision of additional resources by MoFPED, decisions were taken to

vary some targets in the work plans to prioritize new developments.

I advised management to ensure adequate planning and supervision of the

projects being undertaken.

22.20 Field Inspections

(a) Construction of VIP Pit latrines, Kitchen and Storage facilities at Lorengedwat Hydra Form Modern Village

Page 348: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

336

The Office of the Prime Minister embarked on the construction of Modern Hydra

Form Village houses, VIP Pit latrines, Kitchen and Storage facilities at Naweet

Village, Lorengedwat sub-county in Nakapiripirit District at a cost of

Shs.157,616,651. The Ministry was during the financial year 2012/2013

undertaking the construction of Kitchens(10) and Pit latrines (4) for the Modern

Village as per detailed costs below:

Item Category Amount (Shs) Units Total Amount (Shs)

1 Kitchen and Store

9,945,100 10 99,452,000

2 Pit latrines 8,913,761 4 35,655,046

Sub total 135,106,046

3 Add 10% Monitoring &

Supervision

13,510,605

4 Food 4,000,000

5 Transportation Cost

5,000,000

Grand Total 157,616,651

The payments were advanced to the following persons:

Voucher No. Payee Amounts (Shs)

610/Aug/2012 Mutebi John Henry 79,000,000

/Aug/2012 Segujja Denis 78,616,651

Total 157,616,651

Field inspections of the construction site revealed the following:

(i) Inappropriate Location of the modern village houses

It was noted that the Highway from Moroto to Nakapiripirit passes through the

middle of the modern village and several structures are sited in the road reserve

and too close to the Highway. The structures face a risk of demolition by the Road

Authority. Further, there is a high risk of road accidents to the occupants of the

Modern Village especially children which may lead to abandonment of the village

given the culture of the inhabitants.

(ii) Non-completion of works

It was noted that though all budgeted funds were released to the officers to carry

out the constructions, the works were incomplete as detailed below:

Page 349: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

337

Out of the four (4) toilets to be built only three were built and completed. The

fourth one was left at slab level.

Two kitchen houses lacked both internal and external doors despite provision

of the quantities in the estimates.

One kitchen was roofed without fixing ridges and therefore poses a risk of

collapse as a result of leaking during rainy season.

Page 350: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

338

The photographs below refer:

An incomplete toilet left at slab level despite full funding in Lorengedwat

Kitchen built without doors in lorengedwat Modern village

Kitchen House roofed without ridges

Page 351: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

339

(iii) Non-adherence to Bills of Quantities

Bills of quantities (BOQ) are a document detailing activities to be undertaken with

costed amounts and give the material breakdown in terms of item, unit quantity

rate/cost and the total amount involved. In construction of toilets the following

activities were to be carried out and were costed; excavations of the pit, concrete

slabing of the floor, erecting of the wall, plastering, roofing and finishing. The

following were noted on inspection:

Whereas there was a provision for toilet ring beams, no beams were provided

but rather, wood was laid across the wall.

The structures were not fully plastered as costed in the B.O.Qs and overall

budget.

The toilets were budgeted to be roofed using maroon colored iron sheets

gauge 26 however white iron sheets of gauge 32 were used.

It should also be noted that up to now none of the toilets is in use, eight

months after the completion of the works.

Some of the accountabilities appeared doubtful as the officer purchased 40

tape measures,20 drums, 30 spirit levels, 20 squares, 35 iron bars to construct

4 toilets.

No closing wall was put in some of the toilets built.

The photo below refers:

Page 352: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

340

Toilets without a ring beam above, not plastered and roofed with iron sheets gauge 32, in

lorengedwat modern village

The un-plastered toilets with a short wall to cover the front in Lorengedwat modern village

Inadequate works and inappropriate location of structures lead to loss of funds as

buildings may collapse or be moved by the road authority without compensation.

Further, unfinished works hamper achievement of project objectives.

I advised management to ensure that structures are well sited and all scoped

works in BOQ‘s are undertaken. I also advised management to ensure that the

identified defects are rectified.

Page 353: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

341

22.21 NORTHERN UGANDA SOCIAL ACTION FUND (NUSAF 2)

(a) Compliance with the Memorandum of Understanding and GOU

Regulations

i) Outstanding subproject accountabilities

It was noted that funds amounting to Shs.30,489,256,242 remained unaccounted

for as noted in the table below;

Age of

disbursement

Amount disbursed

(Shs)

Amount accounted

for (Shs)

% Accounted

for

Amount

outstanding

(Shs)

%

Outstanding

Above 12 Months 48,447,669,892 47,965,000,555 99.0% 482,669,337 1.0%

6-12 Months 64,157,173,639 48,867,362,540 76.2% 15,289,811,099 23.8%

Sub-Total (≥

6Mths)

112,604,843,531 96,832,363,095 86.0% 15,772,480,436 14.0%

0-6 Months 15,790,831,371 1,074,055,565 6.8% 14,716,775,806 93.2%

Overall Status 128,395,674,902 97,906,418,660 76.3% 30,489,256,242 23.7%

The delay in accountability is likely to affect Project implementation as

beneficiaries are required to account up to 80% before further disbursements are

made. There is a risk that project objectives may not be achieved within the

stipulated Project timelines.

Management responded that the project had undertaken a Rapid Result Initiative

(RRI) with districts and communities which will likely improve on the submission of

the accountabilities.

I await the outcome of management efforts.

ii) Low absorption capacity

The Annual work plan and budget for the project activities was

Shs.165,129,926,383. During the year, a total of Shs.103,698,075,513 was

available for expenditure by the Project (receipts during the year totalled to

Shs.63,195,040,052 and balance brought forward from previous year of

Shs.40,503,035,461). However, only Shs.53,134,155,258 was utilized during the

year representing an absorption capacity of only 32% of its budget. Considering

Page 354: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

342

that the project is in its forth year of the five year implementation, project

activities may not be implemented within the stipulated time.

I advised management to expedite the implementation of the activities within the

stipulated time to avoid costs associated with project extensions.

iii) Discrepancy between approved budget estimates by project

funders and the estimates approved by Parliament

According to the financial records the approved estimates by Parliament for the

year under review were Shs.50,946,941,000 while the approved budget by the

World Bank amounted to Shs.165,129,926,383 creating a variance of

Shs.114,182,985,383.

Management in response stated that the discrepancy was a result of the project

implementation designs that allow continuous commitment of subproject funds

where by the funds can be released anytime depending on the implementation

rate by the contractors.

I advised management to harmonise project annual estimates with that approved

estimates by Parliament. This will also facilitate performance measurement.

iv) Failure to align annual work plan and budget to the chart of

accounts

Public Finance and Accountability Regulation 6 (2) (a) and (b) requires

expenditure to be limited to the provision in each item shown in the estimates of

expenditure. The Government Chart of Accounts defines the nature of

expenditures for each item code. The intention is to facilitate better and consistent

classification of financial transactions and also track budget performance per item.

A review of the project annual work plan and budget revealed that expenditure

was not aligned to expenditure codes in the chart of accounts. Failure to align

expenditure with the chart of accounts creates mischarges which will result in to

non-implementation of project activities as per the agreed work plan. The

expenditure reported may not represent the actual charges to the relevant

expenditure codes. Under the circumstances, verification of the correctness of

Page 355: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

343

expenditure as categorized and reflected in the financial statements becomes

difficult.

I advised management to align the programme budget with the chart of accounts

for easy budget monitoring.

(b) General Standard of Accounting and Internal Controls

A review was carried out of the project system of financial management and the

following matters were observed;

i) Mischarges

It was noted that a sum of Shs.19,059,510 was charged on an item which was not

in line with the nature of the expenditure. Details are below:

VOUCHER No AMOUNT (Shs) PURPOSE ACCOUNT

CHARGED

CORRECT

CHARGE

R113/13/051 19,059,510 NSSF Employer

contribution

Contract staff

salaries

NSSF Expense

A/c

I consider this a diversion. The practice hinders the proper implementation of

approved budgets and work plans and also undermines the objectives of the

project.

Management promised to strengthen the internal checks and ensure that such

actions do not re-occur. I advised management to seek authority for reallocations

in accordance with the regulations.

ii) Unaccounted for funds

Shs.153,673,363 advanced to staff to execute project activities lacked necessary

supporting documents such as Goods Received Notes, activity reports, field

programmes and receipts. In absence of the requisite supporting documentation,

I was unable able to confirm the authenticity of the expenditure.

I advised management to account for funds or take the necessary steps to recover

these funds from the staff involved.

Page 356: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

344

(c) Training expenditure

i) Ineligible expenditure on a Learning Trip to Malawi

I noted that a total sum of USD 7,186 was spent on purchase of air tickets and

perdiem for two non-project staff to attend a 7-day experimental learning trip in

Malawi. Such practice may result into under performance on the part of the

Project as funds are diverted to cater for unplanned activities. The practice is also

irregular.

Management responded that training sessions undertaken were for capacity

enhancement determined and approved by OPM management.

I explained to management that they should have sought for a no objection from

World Bank before effecting the payment. Management should consider having

the money refunded to the project account.

ii) Lack of training needs assessment

Paragraph 2.2.9 (h)(i) of the NUSAF Administrative Hand book requires

management to be responsible for designing and preparing an integrated Annual

Training Programme based on the training and development needs of the Project

and its employees.

It was however noted that management did not carry out a training needs

assessment during the year under review. Without proper training needs

assessment, performance gaps of Project staff may not be identified and bridged.

I advised management to regularly carry out a training needs assessment of staff

in order to raise the technical and professional level of competence and status of

Project employees.

iii) Irregular Expenditure on a Team building retreat

Paragraph 2.2.8 (c) of the NUSAF Administrative Handbook states that the daily

travel allowances paid to an employee of NUSAF2/OPM shall be the same as that

paid to an employee of an equivalent rank in the Public Service. A review of

Page 357: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

345

expenditure of Shs38,189,500 incurred on a Technical Support Team (TST)

building retreat held at Ankrah Foundation –Mukono revealed the following:

Cash refunds in lieu of fuel were made to 15 participants at a uniform rate of

Shs.100,000 each instead of using fuel consumed or travel allowances basis.

Management did not provide an explanation as to why the established system

of using smart fuel cards was ignored.

Although the 3 day workshop was paid full board, out of pocket was paid at a

rate of Shs.50,000 per day for each of the 51 participants for 3 days which

totaled to Shs.7,650,000. According to Circular Standing Instructions, out of

pocket is computed as 20% of one‘s night allowance per day. Based on this,

only Shs.2,750,000 should have been paid. This resulted into an over

payment of Shs.4, 900,000 which is recoverable.

The retreat had been planned to take place in the financial year 2011-2012.

This means that it was not in the annual work plan and budget for the year

under review.

I advised management is to ensure that Project funds are spent on only activities

approved in the Project work plan and budget and in accordance with the manual.

(d) General Implementation of Workplan and Activity Component

Audit inspection of subprojects was carried out to assess the progress of

implementation. The following issues were observed:

i) Delayed/under remittance of operational funds

Paragraph 2.2(iii) of the NUSAF2 operations manual states that each District will

be provided with operation funds of at least 5% of the total subproject

disbursements. The District Operation funds are required to be shared between

the District Local Government and her Sub-counties/Municipality Divisions in the

ratio of 35% to 65%. Such funds are to be used to finance fuel costs, motor

vehicle maintenance, stationeries, work related allowances, telephone bills,

approved NUSAF 2 workshops and training.

Page 358: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

346

During the year, a total of Shs.44,480,214,725 was released to districts

(subproject funds – Shs.42,764,670,255 and operational funds-

Shs.1,715,544,470). However it was noted that operational funds were sometimes

remitted late to beneficiary districts. It was also established that a sum of

Shs.1,715,544,470 was released to the districts as operational funds instead of

Shs.2,138,233,512 resulting into under-remittance of Shs.422,689,042. This was

in contravention of the operation manual.

The delayed remittance and under remittance is likely to negatively affect activities

at the districts.

I advised management to release operational funds in time and in agreed ratios to

enable timely implementation of activities.

ii) Incomplete works

Incomplete works were observed in a number of districts. Details of inspected

projects are in the photographs below:

PROJECT PHOTOGRAPH REMARKS

BULIISA DISTRICT

Incomplete structure of Bulisa Primary school staff houses. The contractor was not found on site yet work was not complete. The engineer explained that he stopped the contractors to proceed because the sub-project had not received funds from OPM. The surrounding bush indicates that there has been no construction for a long time

Page 359: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

347

KABERAMAIDO DISTRICT

Ekinu Cell Community road (1.3km) in Kaberamaido Town Council handed over but not completed. There was little murrum on the road due to poor workmanship.

AMURIA DISTRICT

Amugu Health Center OPD in Asamuk Sub County is at roofing level. However works had been abandoned because funds for completion had not been released.

Aeket P/S Teachers house in Obalanga Sub County. Works were found incomplete.

KUMI DISTRICT

Incomplete Teachers‘ house at Mukongoro Township P/S

MBALE DISTRICT

Busiu Health Center Staff House. The works are incomplete.

The verandah was low and there were signs of poor workmanship which is likely to be due to limited supervision.

Page 360: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

348

TORORO DISTRICT

Incomplete construction of Teachers Quarters at Aputir P/S

BUTALEJA DISTRICT

Incomplete Napologoma Heath Center III Staff House. The building was at roofing level, not plastered, no ceiling/ shutters,

Nabagali South Community Road The road construction was still ongoing yet it completion date was 21/06/2013. The road was under construction and gravelling of some parts of the road had not yet done.

Delayed completion of the projects denies the beneficiary community of the

intended services.

Management explained that at the time of inspection, the communities were in the

process of preparing accountabilities for 1st tranche of funds and were yet to

submit requests for 2nd tranche of funds to enable completion of the works.

I advised management to expedite the release of funds and ensure that the

construction works are followed up to completion.

Page 361: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

349

iii) Non-adherence to bills of quantities - Kobulubulu Health centre

III construction

This contract was awarded to a local contractor. According to the bills of

quantities, the contractor was to use 12mm iron bars for the ring beam. It was

however observed that during erection of the staff house, the contractor used a

combination of 10mm and 12mm iron bars instead of the specified 12mm bars.

Part of the structure was still at window level as shown below:

The use of the wrong specifications can have a negative impact on the overall

strength of the walls and life of the structure as a whole due to under-gauge.

Management explained that a follow up will be made with the district to obtain a

verification report on the deviation of the recommended materials and

consequently follow up the contractor.

I await the outcome of management efforts.

iv) Lack of Routine road maintenance

Inspection of rehabilitated roads revealed that most of the roads were not

maintained. Head walls were broken and grass had narrowed the road width of

some of the inspected roads. Refer to the pictures below:

Page 362: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

350

Rehabilitated Ayago road

0.5km in Tororo district. Shs.40,538,209

Overgrowing grass narrowing

the road. Broken head walls.

Due to non-maintenance, the roads may not last for the expected life span.

Management responded that the districts had been requested to put in place long

term arrangements for operation and maintenance of roads.

I await the outcome of management‘s efforts.

v) Lack of training of Community Project Management Committees

(CPMC) in Karamoja region

The Operational Manual guideline 2.1.3 Delivery Benchmarks provides for CPMC

training as one of the benchmark to help in assessing the performance of each Local

Government in terms of management of the subproject cycle with a view to

providing technical supervision and capacity enhancement support to improve

performance at the various levels of Project implementation.

It was observed that the sub projects took off prior to training of the CPMCs. Non-

training of CPMCs may lead to poor project implementation.

I advised management to train CPCMs for compliance with the guidelines while

implementing the project activities.

vi) Lack of individual project accounts at district level in Karamoja

region

During the inspections, it was noted that all the districts in Karamoja region had

not opened bank accounts for the identified subprojects contrary to the project

manual guidelines. Advance payments to contractors were made directly from the

District Subprojects Fund in Moroto and Abim districts. Lack of subprojects

accounts may lead to the diversion of funds by the District as CPMCs have no

control over them.

Page 363: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

351

Management explained that guidance on flow of funds and disbursement

arrangements had been given to the districts and a follow up on this will be done

accordingly.

I await the outcome of management‘s efforts.

vii) Lack of supervision of sub projects

The operational manual guideline 2.1.2(f) provides that supervision, monitoring

and evaluation of subprojects is to be undertaken at the community, district and

national levels. At the district level, overall technical supervision, monitoring and

evaluation is a responsibility of the Chief Administrative Officer. He/she is

supported by the district technical team including the sub-county staff. The Sub-

county Chief on the other hand is responsible for monitoring and supervision of

Project activities in his/her sub-county with the support of the sub-county

technical team.

On the contrary however, it was observed that a number of subprojects were not

adequately supervised in Moroto, Amolatar, Soroti and Amuru/ Nwoya districts

there by leading to poor quality works. Refer to the photos below:

Amolotar District

Lack of back fill on the toilet in Aguludia P/S

Amuru District

Page 364: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

352

Otwee Health Centre II Staff house roofed with gauge 28 iron sheets instead of gauge 26.

Soroti District

Awasi- Obyarai Community Road 1.6km, Soroti district Shs64,215,412 According to the specifications in the contract agreement, the contractor had to construct 8 head walls. It was however noted that only 5 head walls were installed, insufficient murram had been applied in the swampy area besides the road was not compacted.

Due to inadequate supervision of works, the targeted beneficiaries may not obtain

the intended service delivery.

Management responded that the defects on the works at the time of inspection

had been brought to the attention of the respective contractors and remedial

action was yet to be undertaken. Management further stated that supervision and

monitoring will be intensified through a network of engineering assistants

stationed in each district.

I await the outcome of management‘s efforts.

viii) Lack of sign posts at the project sites

Page 365: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

353

Bills of Quantities provide for sign posts for identification of sub projects

undertaken by NUSAF2 in the area in which the project is located. The bill boards

should clearly specify the Ministry, the Project, the subproject name, Sub County,

District and contractor. It was however observed that all sub-projects in Karamoja

region and in some areas of Acholi and Lango regions inspected lacked sign posts

for identification except in Dokolo District.

In absence of sign posts, I was unable to confirm whether all projects inspected

were actually genuine NUSAF projects as there were similar projects being

implemented by different Non-Governmental organizations (NGOs).

Management explained that the sign posts had been fabricated and awaiting

transportation to the project sites.

I await the outcome of management‘s efforts.

ix) Delayed execution of works in Karamoja region

According to the contract agreements for NUSAF construction works, the contract

period for all works is a maximum of 6 months. It was however observed during

inspections that most of the contracts had stalled and could not be completed

within the specified period. This was attributed to delayed payments of certificates

by the districts. It was also attributed to lack of training by Community Project

Management Committees (CPMCs) responsible for managing the contracts. For

details of the stalled projects, refer to the photos below:

Lopei Health Centre 2 OPD Napak District at slab level

Page 366: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

354

Tapac Staff House Heath Centre Moroto District at slab level

Arembwara Staff house in Abim District at slab level

Awach Staff house in Abim District at slab level

Delays in project implementation may result into unnecessary extra costs in form

of administration, monitoring and supervision, as well as escalation of material

costs.

Management responded that there were challenges experienced in engaging

contractors for the Community Infrastructure Rehabilitation (CIR) in Karamoja

which are currently being managed together with the district.

I advised management to ensure that project activities are performed within the

project time frame.

x) Omission of toilet facilities in Out Patients Departments (OPDs) in

designs in Napak district

One of the community health activities implemented by NUSAF2 is the

construction of OPDs at the various health centres. A review of the OPD health

Page 367: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

355

center designs for Lopei HCII, Murulinga HCII and goleriet HC II OPDs in Napak

district revealed that there was no provision for toilets or VIP latrines contrary to

the Health Sector strategic and Investment Plan (HSSIP) plan that promotes good

health, disease prevention and community health initiative.

Absence of toilets in the OPD centres is a health hazard which may lead to

patients contracting diseases that could have been avoided.

Management explained that a needs assessment will be conducted to update the

infrastructural investment plans for all health centres implemented. For any

subsequent designs, provision for toilets/latrines will be included.

I advised management to urgently reassess and also re-design the OPDs with a

view of providing toilets in line with the HSSIP plan.

xi) Improper location of an incinerator at Lotome Health Centre in

Napak district

The IDA financing agreement Schedule 2 section D ―Environmental and Social

Safeguards‖ requires management to run the Project in accordance with the

environmental, social and resettlement guidelines, rules and procedures defined in

the Environmental and Social Management Framework, Pest Management Plans,

and the Resettlement Policy Framework.

Incineration is a waste treatment process that involves the combustion of organic

substances contained in waste materials. Hundreds of toxic chemicals are

released into the atmosphere when the waste is burned in the incinerator. It was

noted during inspection that a Staff House was being constructed near the

incinerator at Lotome Health Centre in Napak district. Refer to the photos

below:

Page 368: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

356

Location of Incinerator near the Kitchen and the Main house

This is likely to pose a health risk to the occupants of the staff house.

Management responded that it will engage the district to appropriately either

relocate the household or the incinerator for convenient use by the health facility.

I await the outcome of management efforts.

xii) Delayed implementation of Livelihood Investment Support in

Karamoja region

One of the components of NUSAF2 is Livelihood Investment Support (LIS) whose

major objective is to improve access to income earning among the target

households under the Household Income Support Program and Public Works

Program.

In Karamoja region, the component is supposed to be implemented through the

consultants who are recruited using the World Bank guidelines of ―Selection and

Employment of Consultants‖. It was noted that implementation of the programme

had not commenced due to delays in the recruitment of consultants yet the

Programme is in its final year of implementation (ending August 2014). The

delayed implementation of the project component, denies the community the

benefits which would accrue from the Programme.

Management explained that there were delays in modifying the project

implementation modality for Karamoja however, these are yet to be overcome.

Page 369: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

357

I advised management to continue in conjunction with other stakeholders to

explore ways of overcoming the challenges.

xiii) Livelihood Support projects in other regions

An inspection of some of the beneficiary communities in northern and eastern

regions was done to assess the progress of projects being undertaken. Findings

are detailed in the pictures below:

PHOTOGRAPHS ON INSPECTION REMARKS

TORORO DISTRICT

Water Village Community Restaurant

The group has insufficient space to carry out their catering services. There is need for subproject supervision through meeting beneficiaries to discuss the challenges and opportunities facing the business.

BUTALEJA DISTRICT

Maize mill at Humutu Sub County

The community is benefiting from this maize mill. However, the structure is made of mud and wattle which cannot sustain the mill for a long period of time. Management should construct a formal structure for the sub project.

MASINDI DISTRICT

Page 370: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

358

Kiramagi A piggery project

The group received 30 pigs which were distributed to 15 members with each beneficiary getting 2 pigs. One beneficiary lost 13 pigs due to Swine fever. This photo shows an empty Sty.

Mubende Community Piggery project

The group received 33 pigs for 10 members. However, all the pigs died of swine fever.

The sub projects are facing a number of challenges that have remained

unattended to, which would be addressed if there was adequate follow up and

support supervision.

Management explained that the above matters were addressed at a consultative

workshop held for all PRDP districts and that policy related action points were

raised with the responsible Ministries of Agriculture, Animal Industries and

Fisheries and Local Government.

I await the outcome of management‘s efforts.

(e) Status of Sub Project Implementation

i) Project performance per annual work plan and Budget 2012/13

The Project Management planned for implementation of various activities during

the year. A review of the annual work plan vis-à-vis actual implementation and

outputs for the year revealed that a number of activities had been partially

implemented or not implemented at all. The table below refers:

Page 371: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

359

Activities for the

year

Targets for the

year

Amount (Shs) Progress during

the year

Orientation of

NGOS contracted to support LIS

Implementation in

Karamoja region

27 NGOs (5 staff

per NGO)

30,938,000 Only two NGOs were

trained

Hire of consultancy services

1 consultant to train District

trainers in Business and

Entrepreneurship skills

177,370,000 Not Implemented due to budget constraints.

Subproject review

and funding

Funding of

approved

subprojects; a) New sub

projects 2000 – HISP

600 _ CIR 260 _ PWP

144,361,190,22

4

The project financed

1646 new sub

projects for Shs 43,290,784,432 (30%

of the budget) New sub projects;

723-HISP 911-CIR

12 –PWP

Conducting tracer study for youth

beneficiaries under HISP livelihood

skills development

Trace study report on 80 subprojects

100,000,000 Not Implemented

Administering community

scorecard

Community service scorecard 140m

CIR, HISP and PWP

subprojects

144,962,933 Not implemented

Conducting NUSAF2

institutional assessment

NUSAF2 Institutional

assessment reports

100,000,000 Not implemented

Conducting study

on Environmental safeguards

Environmental

safeguards report on NUSAF2

150,000,000 Not implemented.

However the project recruited an

environmental

specialist in May 2013 to carry out

environmental and social assessments.

Study on social

safeguards

NUSAF2 social

safeguards reports

100,000,000 Not implemented.

However the project recruited an

environmental

specialist in May 2013 to carry out

environmental and social assessments.

Conduct a study on Report produced 100,000,000 Not implemented due

Page 372: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

360

cost effectiveness

of CIR component

on effectiveness of

CIR

to budget constraints.

Training of EPRA facilitators in

Karamoja region

125 EPRA facilitators trained.

7 supervisors trained

90,000,000 Only 54 facilitators trained in October

2012.

Training of sub

county and divisional focal

persons (CDOs)

546 focal persons

trained on data collection,

reporting, record keeping and

procurement

modalities.

150,000,000 Not Implemented due

to budget constraints

Delay in implementation of planned activities denies beneficiaries the intended

benefits of the Project. Besides, Project objectives may not be achieved due to the

delays.

Management responded that the project experienced delays, particularly in the

lengthy procurement processes that affected and slowed down subproject

implementation. In order to expedite implementation of planned activities, some

actions were undertaken including the recruitment of an environmental specialist

to carry out environmental and social safeguards, training EPRA facilitators and

reviewing of work plan and budget in line with the available funding.

I await the management implementation efforts.

(f) Project performance as per logical framework

According to the Project five year implementation plan and progressive reports

reviewed from management, the Project had not achieved the following targets

despite the fact that its closure date was set for 24th August 2014: In all of the

sub components, the percentage of actual funding against 5 year target was

below 60% as indicated in the table below;

Component / Sub component

5- Year target for number of subprojects

5-Year target funds to sub projects (Shs)

Actual funding (Shs)

Number of sub projects financed

% of sub projects financed against 5-year target

% of actual funding against 5-year target

Community Infrastructure Rehabilitation

1,915 57,450,000 29,528,624 1,826 73% 51%

Page 373: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

361

(CIR)

Household Income Support Programme (HISP)

7,236 36,180,000 19,823,634 4,807 80% 55%

Public works programme (PWP)

891 17,820,000 1,255,297 96 42% 7%

TOTAL 10,042 111,450,000 50,607,554 6,729 77% 45%

Unless there is an extension of the closure date, Management may not be able to

achieve targets in the loan agreement.

Management responded that the project will not commit any more funds for

implementation of new Community Infrastructure Rehabilitation (CIR) and Public

Works Programmes (PWP).

I advised management to ensure that planned sub project activities are

implemented within the project time frame in order to achieve project objectives.

22.22 STRENGTHENING EVIDENCE BASED DECISION MAKING – OPM

COMPONENT

(a) Compliance with the Key Covenants of DFID Funding Agreement

and GOU Financial Regulation

It was noted that the management had in all material respects complied with the

covenants contained in the credit agreement and government of Uganda financial

regulations except for the following matters;

i) Intermingling of funds

A grant of $30,000 equivalent to UShs.74,016,900 was disbursed to the OPM from

Global Development Network and International Institute for Impact Evaluation for

research, production and use of evidence from rigorous Impact Evaluation for

policy decisions that improves social and economic development programmes in

low and mid income countries. The funds were received on the same bank

account with that of DFID at Bank of Uganda. This contravenes the Memorandum

Page 374: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

362

of Understanding between the development partners and could lead to use of

project funds for non project activities.

Management explained that there was an urgent need to perform the activity and

they found it practical to transfer the funds to this account. They further

explained that funds were accounted for separately and this was not the practice

but rather a one off occurrence.

I advised management to open independent bank accounts in future for each

project to avoid the risks posed by intermingling of donor funds.

ii) Value Added Tax paid out of DFID funds

VAT of Shs.17,344,800 was paid to a company for printing the Government Annual

Review report for 2011/2012. The Memorandum of Understanding Paragraph 7

prohibits use of DFID funds to meet the cost of any other taxes or duties or taxes,

fees or similar charges imposed directly or indirectly by the Government of Uganda

Management explained that the error was caused due to operational challenges.

However, a refund of the said money was being processed.

I advised management to consider refunding the money applied to activities

outside the recommendations of the Memorandum of Understanding to ensure

total compliance with its provisions. I also advised management to seek a ―no

objection‖ in future from DFID for such activities.

(b) General Standard of Accounting and Internal Control

A review was carried out of the project system of financial management and it was

noted that management had instituted adequate controls to manage project

resources.

(c) Outstanding refunds to be made by OPM to DFID Bank account

A reconciliation of the funds of OPM was undertaken with a view to establishing

any outstanding refunds to DFID. It was noted that Shs.143,813,801 was still due

to DFID as indicated in the table below;

Page 375: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

363

Details Amount in UShs.

Total unaccounted for funds as at 30th June 2012 report 2,521,732,972

Add: Illegible expenditure (PRDP) as at 30th June 2012 report 48,945,278

VAT as at 30th June 2011 report 77,523,723

VAT as at 30th June 2013 report 17,344,800

Sub total 2,665,546,773

Payments:

Refund on 6/08/2012 (2,397,716,250)

Refund on 12/09/2013 (124,016,722)

Net refund to be made to DFID account – 30th June 2013 143,813,801

I have advised management to consider refunding all the outstanding amounts

due.

22.23 AVIAN AND HUMAN INFLUENZA PREPARADENESS PROJECT

(a) Compliance with Financing Agreement and Government of

Uganda Financial Regulations

It was noted that management complied in all material aspects of the financing

agreement and GoU financial regulations except for the matters below;

i) Ministry of Agriculture, Animal Industry and Fisheries (MAIIF)

Advance from Ministry of Health

Under the project design, MoH receives funds from the World Bank for the

communication component. Part of these funds is sent to MAAIF and OPM for the

implementation of the communication component of the project. The audit noted

that out of the funds received from MoH, MAAIF had not spent a total of US $

96,311 and these funds remained on the account.

Management of MoH explained that they had not yet been availed with the

management comments from MAAIF and promised to follow up the matter.

I advised management to ensure that MAIIF expedites the implementation of the

communication activities as per the project work plan and accordingly account for

Page 376: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

364

these advances from MoH. In cases where the planned activities could not, the

funds should be refunded to MoH.

Boarding passes

It was noted that there were some instances where boarding passes were not

attached on accountabilities for travel. Journeys for funds amounting to

Shs.26,671,910 were not supported with boarding passes. In the absence of

boarding passes, it would be difficult to confirm actual travel of the officials.

Management explained that they had not yet been availed with the management

comments from MAAIF and promised to follow up. I advised management to

always attached boarding passes on all accountabilities for air travel. In cases

where the officials were not project staff, scanned copies could be obtained

through the e-mail for as far as possible.

23.0 MINISTRY OF PUBLIC SERVICE

23.1 Mischarges of Expenditure – UGX.2,245,336,970

The Government Chart of Accounts defines the nature of expenditure for each

item code. The intention is to facilitate better and consistent classification of

financial transactions and also track budget performance per item in line with

parliamentary appropriation. Audit noted that during the year under review, a sum

of UGX.2,245,336,970 was charged on items which do not reflect the nature of the

expenditure. Such a practice impacts on the credibility of the financial statements,

since the figures reported therein do not reflect true amounts expended on the

respective items. It further undermines the intentions of the appropriating

authority.

In her response, the Accounting Officer regretted the anomaly and promised not

to repeat it in future. I advised Management to avoid such a practice and always

seek for reallocations when such a need arises, in accordance with the

requirements under the Treasury Accounting Instructions (TAI).

23.2 Fuel Expenditure Incompletely Accounted for – UGX.332,879,120

Page 377: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

365

During the year under review, the Ministry expended a total of UGX.332,879,120

on fuel to staff by issuing them with fuel cards through Standard Chartered Bank.

However, the transaction statements detailing the withdrawals were not availed to

support the expenditure. Under the circumstances, there is a risk that the funds in

question were not put to proper use.

Although the Accounting Officer explained that the statements in question were

available, these were not availed to me by the time of compiling this report. I have

advised management to ensure that all fuel deposits are always properly

supported with detailed fuel withdrawal statements as well as receipts issued by

the fuel stations. In addition, management is requested to follow up this matter

with a view of ensuring full accountability.

23.3 Unaccounted for Imprest Withdrawals – UGX.142,000,000

Treasury Accounting Instructions (TAI) provide for retirement of all imprests by

the close of the financial year, failure of which recovery measures should be

instituted against the concerned officers‘ emoluments. During the year under

review, it was however noted that a total of Shs.142,000,000 withdrawn by the

Ministry‘s cashier as cash imprest remained un accounted for, as there were no

documents availed, detailing how the amount was utilized. Under the

circumstances, I could not establish whether the amount in question was utilized

for legitimate purposes. Further noted was that the amount was not reflected as

an outstanding advance in the financial statements for the year under review. This

implies that the statements are misstated in this regard.

In her response, the Accounting Officer acknowledged the anomaly and indicated

that she had written to the concerned former ministry staff to avail accountability

for the amounts in question.

I advised the Accounting Officer to always ensure that all imprest funds are

promptly accounted for. In the meantime, the accountability for the funds in

question should be followed up and necessary adjustments made to the accounts

to reflect the outstanding amount.

Page 378: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

366

23.4 Doubtful Refunds to Personal Accounts – UGX.83,668,700

During the year under review, a total of UGX.83,668,700 was deposited onto two

Ministry official‘s personal bank accounts, purportedly being ―refund of borrowed

funds‖. However, there was no documentation availed to show that the two staff

had indeed lent funds to the ministry, rendering the transactions questionable.

The Accounting Officer explained that the funds in question were deposited onto

the two Ministry officials‘ personal bank accounts as refunds for borrowed funds

from available cash meant for other activities which had not been carried out yet.

However, I was not availed any documentary proof to support this explanation.

I advised the Accounting Officer to stop the practice of paying operational funds

into personal bank accounts. In the meantime, the amount in question remains

outstanding and should accordingly be followed up.

23.5 Advances to Staff - UGX.443,467,585

a. Noncompliance with Treasury Accounting Instructions (TAI)

Sections 227 to 229 of the Treasury Accounting Instructions (TAIs) require that

the accounting officer should effect payments directly to the beneficiaries, or

where this is not possible, an imprest holder approved by the Accountant General

to provide cash for disbursements which cannot conveniently be paid directly by

an Accounting Officer.

Contrary to the above, a total of UGX.443,467,585 was advanced to ministry staff

through their personal bank accounts to undertake direct procurements and other

activities of the Ministry. Such a practice is irregular and exposes government

funds to a risk of loss through misuse. Besides the ministry does not have any

control over such funds deposited on personal accounts.

In their response, management explained that the advances in question were

mainly to cater for the Ministry‘s monthly Imprest, office welfare, Newspapers and

other minor office requirements as well as to pay for workshop expenses where

direct payments to participants would prove to be difficult.

Page 379: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

367

I advised management to stop such a practice and ensure full adherence to the

requirements under the TAI.

b. Advances not Accounted for – Shs.112,924,845

A review of the ministry accounting records revealed that out of shs.443,467,585

deposited on personal bank accounts, advances amounting to shs.112,924,845

remained unaccounted for at the yearend. Under the circumstances, I was unable

to confirm whether the amount involved was applied to the intended purposes.

Further noted was that the unaccounted for advances were also not reported in

the financial statements and that the ministry did not maintain an advances ledger

to record and monitor the retirement of these advances. Under the circumstances,

the ministry‘s financial statements are misstated to this extent. Besides failure to

maintain an advances ledger can lead to failure to track such advances as well as

misuse.

Although the Accounting Officer explained that the accountabilities in question

were available, these were not availed to me by the time of compiling this report.

I advised management to ensure that the advances in question are accounted for

and appropriate adjustments made to the accounts to reflect them accordingly. In

addition, an advances ledger should be opened up accordingly.

23.6 Comprehensive Review and Restructuring of MDAs

In August 2010, the Ministry of Public Service (MoPS) contracted a consultancy

firm to conduct a comprehensive review and restructuring of Government

Ministries, Departments and Agencies (MDAs) as one of the major components of

the Public Service Reform Programme. The major objectives of this exercise were

to address the need to increase accessibility of public services, popularize ICT and

other technological advances, the changing priorities and programmes in

Government among others.

The recommendations of the comprehensive review exercise of MDAs were

presented in a draft Cabinet Memorandum which was forwarded to the Ministry of

Finance, Planning and Economic Development (MOFPED) in July, 2011, requesting

Page 380: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

368

for a Certificate of Financial Implication. However, MOFPED informed the Ministry

of Public Service in April 2013, that as a result of budget constraints, government

was unable to issue the certificate of financial implications amounting to

UGX.116.598 billion at the time.

As a result of the above shortcoming, the Ministry and other MDAs were unable to

implement the recommendations of the review and restructuring exercise which

aimed at addressing structural redundancies, inconsistencies, weaknesses,

duplications and performance gaps in key service delivery sectors of Government.

Additionally, the resources invested by government in the said consultancy appear

to have been wasted given that some of the recommendations may have been

overtaken by events as a result of the time that has lapsed.

I advised the Accounting Officer to liaise with the responsible authorities and

review this matter so as to address the urgent structural deficiencies across

government MDAs, which continue to impact on their service delivery capacity.

23.7 Payment of Quarterly Night allowances - UGX.569,505,009

According to the Public Service Standing Orders, night allowance is payable to an

officer necessarily absent from their duty station and is claimed only for the actual

nights spent away from the usual station. The Ministry however paid a sum of

shs.569,505,009 to its officers as night allowance with no proper justification, as it

was paid on a quarterly basis and not activity based, rendering it irregular.

The Accounting Officer acknowledged the anomaly and explained that this has

been the practice across the service. In the meantime the Ministry of Public

Service was currently discussing options to motivate public officers given that

government had failed to implement the pay policy of 2006 due to financial

constraints.

I advised the Accounting Officer to ensure that this matter is comprehensively

addressed since it is affecting the whole service. It is important that the Ministry of

Public Service (MOPS) and Ministry of Finance Planning and Economic

Development (MoFPED) explore options and propose to government a viable

Page 381: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

369

course of action to address the pay issue and stop the payment of consolidated

allowances outside the provisions of the Standing Orders.

23.8 Lack of Motor Vehicle Fleet Management Policy

The Ministry has a fleet of vehicles some of which are attached to entitled staff of

the Ministry, while others are in a pool for use by other un-entitled staff. It was

however noted that the Ministry has no documented motor vehicle fleet

management policy to guide all staff in the usage of motor vehicles. Under the

circumstances, there is a risk of misuse of the Ministry vehicles which in turn can

lead to avoidable maintenance costs.

In her response, the Accounting Officer stated that the Ministry is guided by the

provisions of the Government Standing Orders as well as the provisions of

Establishment Notice No.1 of 2003 on Standardization of Vehicles for Ministries,

other Entitled Officers and Projects.

I advised the Accounting Officer to ensure that given the ministry‘s mandate over

the entire public service, there is an urgent need to compile and put into

operation, a fleet management policy to strengthen the controls, care and

management of government vehicles.

23.9 Vacant Staffing Posts

A review of the staff records of the Ministry revealed that although 293 posts had

been approved following the restructuring of the Ministry, only 233 (79.5%) had

been filled at the time of audit, leaving 58 posts (19.7%) vacant. Some of the

vacant posts such as Assistant Commissioner Monitoring and Evaluation, Assistant

commissioner Information Education and the Principal Internal Auditor are

fundamental in the operations and achievement of the strategic objectives of the

Ministry. Failure to have all the posts filled impacts negatively on the ministry‘s

capacity to deliver its mandate.

In response management stated that the major recommendations from the

comprehensive review and restructuring of MDAs which aimed at addressing the

question of redundancies in the ministry‘s structure were submitted to Cabinet as

Page 382: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

370

part of the main report and Cabinet approval is contingent upon issuance of

Certificate of Financial Implication from the Ministry of Finance Planning and

Economic Development.

I advised the Accounting officer to liaise with the responsible authorities so as to

have process in question expedited.

23.10 Unspent Balances due to the Consolidated Fund – UGX.552,239,100

The Public Finance and Accountability Act (PFAA), 2003, requires that any unspent

funds from the Consolidated Fund as at the end of the financial year, should be

returned to the Consolidated Fund Account. It was however noted that a total of

UGX.552,239,100 that was meant for the Integrated Payroll and Pension System

(IPPS) but had not been expended by 30th June 2013, was not returned as

required by the above Regulation. The funds were instead transferred to the PSRP

project account number 000050088000013 in Bank of Uganda. There was no

evidence that authority from the Permanent Secretary/Secretary to Treasury

(PS/ST) to retain and transfer the funds was obtained by the Ministry prior to the

transfer. I explained to the Accounting Officer that such action was irregular as it

was meant to circumvent the regulations in force.

In their response, Management acknowledged the anomaly and stated that they

had written to the Accountant General seeking permission to effect the transfer

but no written response was obtained.

I advised the Accounting Officer to always ensure strict adherence with the

regulation and only retain such funds upon obtaining written authority from the

PS/ST, as per the requirements under the Act.

23.11 Payment of Pension Beyond the Pensionable Periods -

UGX.6,153,642,948

According to section 18 of the Pensions Act, every pension or other allowance

granted under the Act, should cease upon the death of the person to whom it is

granted. For the avoidance of doubt, it is declared that a pension granted under

this section be payable for a period not exceeding in aggregate fifteen years from

Page 383: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

371

the date of retirement of the deceased pensioner. Pursuant to the above

therefore, all pensioners must furnish the Ministry of Public service with annual life

certificates after the expiry of their 15 year pensionable periods as proof that they

are still alive. However the following matters were noted:-

a. Contrary to the above requirements, out of the 1,647 sampled pension

files, a total of 995 pensioners had attained the maximum pensionable

period of 15 years but were still on the ministry‘s payroll and earning

monthly pension, yet they had not submitted life certificates as proof that

they were still alive. Under the circumstances, a total of

UGX.6,153,642,948 paid as monthly pension to this category of pensioners

during the year under review, could not be justified in the absence of life

certificates.

b. Noted also was the apparent laxity in filing of the available certificates as

several life certificates were found unfiled to their relevant pensioners files.

c. There is no mechanism within the ministry aimed at tracking pensioners to

ensure that they do not exceed their lawful pensionable periods as

provided for under the Act. This exposes the ministry to a risk of paying

pension to ineligible pensioners.

In her response, the Accounting Officer attributed the anomaly to laxity on the

part of the responsible officers in filing Life Certificates on the individual

pensioners‘ files.

I advised the Ministry to institute a mechanism to track pensioners so that they do

not get paid beyond the lawful pensionable periods. In addition, the Ministry

should enforce the requirement for pensioners specifically those that have attained

the maximum pensionable period of fifteen years to avail life certificates or else

have them deleted from the pension payroll.

23.12 Pension Payments to Group Associations - UGX.1,472,195,209

A total of UGX.1,472,195,209 was paid to various pension groups as both gratuity

and monthly pension. It was however noted that these groups did not furnish the

Ministry with accountability records/evidence of acknowledgements to show that

Page 384: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

372

the funds reached the bonafide beneficiaries. Further noted was that there is no

evidence that the ministry has a mechanism to track the pensioners under these

groups to ascertain whether they were still alive and eligible for pension as there

were no life certificates on file for the beneficiaries under these groups. Most of

these files were last updated in 2001. I explained to the Accounting Officer that

absence of any monitoring measures exposes the ministry to a risk of payment of

non-existent/ineligible pensioners and thus occasioning loss to government.

In response, the Accounting Officer acknowledged the anomaly and indicated that

the Ministry had since written to the various groups to furnish the Ministry with

accountability of acknowledgement of funds and life certificates by 15th of April

2014.

I advised the Accounting Officer to update all data in respect of group pensioners

and consider having their payments effected directly to the individual beneficiary

bank accounts and not through group accounts.

24.0 PUBLIC SERVICE COMMISSION

24.1 Lack of fully constituted commission

Chapter 10, 165(2) of the Constitution of the Republic of Uganda 1995 (amended)

requires the Public Service Commission to consist of a Chairperson, Vice

Chairperson and seven members appointed by the President. However, it was

noted that all the nine (9) Commission members‘ contracts had expired and the

Commission activities were at a standstill.

In absence of a constituted Commission, service delivery is hampered due to lack

of authority for recruitment, promotions and handling of disciplinary cases.

Management explained that the matter of the PSC board is before the appointing

authority.

I advised management to follow-up on the matter with the authorities.

24.2 Staffing Gaps

Page 385: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

373

Good strategic planning and management requires an entity to carry out human

resource planning to ensure that an adequate number of qualified staff is in place

to carryout the operational activities of an entity so as to enable her achieve

strategic objectives.

A review of the Commission‘s organizational structure revealed that out of the

available 82 posts, 76 posts is filled leaving 6 positions vacant.

Lack of filled staff affects the performance and overall achievement of

organization‘s goals and objectives.

Management was advised to liaise with MoPS with a view of ensuring that the

vacant posts are filled.

24.3 Outstanding domestic arrears

It was noted that Shs.75,623,796 (payables) due to various suppliers remained

outstanding for the third year running since 2009/2010 financial year. The

Commission risks litigation from the suppliers which may lead to losses in form of

damages and interest awards by court.

The Accounting Officer explained that the payable relate to UMEME bills that have

not been cleared in a long time however he is pursuing the matter with MoFPED to

have bills cleared.

I await management effort to clear the outstanding obligations.

24.4 Payments for vehicle repairs

Shs.85,239,800 was paid to various pre-qualified garages for repairs and servicing

of vehicles for the Commission for the financial year 2012/13 based on requests by

drivers without vehicle repair assessments done by a competent mechanical

engineer prior to commitment of vehicles to garages for repairs. Further, no

competent mechanical engineer from the Commission was at hand to inspect and

certify repairs undertaken by the garages. The practice is contrary to section 816

of the TAI. There is a risk that the garages may take advantage during

assessment of repair needs and consequently inflate/falsify repair costs.

Page 386: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

374

The Accounting Officer explained that the Commission does not have a Post of an

Engineer in the staff structure to carry out the pre- and post inspection of

vehicles. However, he had consulted with Ministry of Works and Transport who

had promised to come up with the Government vehicles operational guidelines.

I advised management to contact MoWT to ensure that all vehicle repairs are

assessed and certified as required by TAIs.

24.5 Absence of IT strategic plan

The Commission has an IT resource centre responsible for maintaining data of the

Public Service Commission. However the Commission does not have a strategic IT

plan that ensures adequate security and protection over computers and of data

held on computers or information systems operated by the Commission. In the

absence of the IT strategic plan, there is a risk of loss given the considerable

investments in terms of computers, accessories and data security.

Management explained that the Commission has an E-recruitment System in place

but was awaiting for the harmonization of Integrated Personnel and Payroll

System (IPPS) and IFMS to the National IT Strategic Plan to have a final written IT

plan.

I advised management to come up with an IT policy that will guide in the use of

IT.

25.0 LOCAL GOVERNMENT FINANCE COMMISSION

25.1 Mischarge of expenditure

A review of the Commission‘s expenditures revealed that the entity charged wrong

expenditure codes to a tune of Shs.244,029,386 without authority. This practice

undermines the importance of the budgeting process and leads to misleading

reporting.

Page 387: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

375

Management in their response acknowledged the mischarges and promised to

abide by the accounting regulations in future. I advised the Accounting Officer to

streamline the budget process to ensure that sufficient funds are allocated to each

account. Authority should be sought for any reallocations.

25.2 Outstanding commitments

It was noted that Shs.17,525,048 (payables) due to URA in taxes remained

outstanding for the second year running and no effort has been undertaken to

have it cleared. The Commission risks fines and penalties from the tax body for

the unremitted taxes.

Management attributed this to non-allocation of funds for domestic arrears in the

appropriation despite several requests for the item inclusion. Management further

explained that they will continue submitting requests to MoFPED to settle the

outstanding dues.

I await the outcome of management efforts.

25.3 Outstanding recoverables

Receivables amounting to Shs.52,575,241 were not received at the close of the

financial year. Shs.49,138,063 relate to the period 2011/12. There is risk that

funds may not be collected.

Management explained that efforts will be made to recover the funds. I advised

management to enforce recovery measures or seek authority from the Ministry of

Finance to have the amounts written off.

25.4 Advances to individual personal accounts

Sections 227, 228 and 229 of the Treasury Accounting Instructions (TAIs), require

that all payments should be made by the Accounting Officer directly to the

beneficiaries. Where this is not convenient, an imprest holder is required to be

appointed by the Accounting Officer with the approval of the Accountant General.

However, it was noted that Shs.429,767,447 was advanced to Commission staff

Page 388: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

376

through their personal bank accounts to undertake direct procurements and other

activities of the Commission.

Such a practice of depositing huge funds on personal accounts exposes

Government funds to risk of loss, since the commission does not have any control

over such funds deposited on individual personal accounts.

Although management explained that the most of the Commission activities are

field based, I advised management to ensure strict adherence with the

requirements of the Treasury Accounting Instructions.

25.5 Unaccounted for funds

Shs.7,105,600 was paid to third parties and Commission officials for

implementation of Commission activities but these funds remained unaccounted

for at the time of audit. Basic documents like requisitions, acknowledgement of

receipt, receipts for purchases made and pro-forma or invoices from service

providers were lacking. In absence of the relevant accountabilities, I was not able

to confirm whether the funds were put to the intended purposes for which they

were requisitioned.

I advised management to ensure that all funds are accounted for within the

statutory period. In the absence of accountability documents recovery measures

should be enforced.

25.6 Doubtful payments on spares and repairs

Shs.54,735,389 was paid to two pre-qualified garages for repairs of Commission

vehicles for the financial year 2012/13. A review of the transactions revealed the

following:

There were no vehicle repair assessments done by a competent mechanical

engineer prior to commitment of vehicles to garages for repair. The garages

Page 389: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

377

could thus take advantage in assessing repair needs and consequently inflate

repair costs.

No competent mechanical engineer from the Commission was at hand to

inspect and certify repairs undertaken by the garages. Without this crucial

check I could not ascertain genuineness of the repairs.

The spare items replaced (used spare parts) were not returned to stores for

independent verification by audit.

In absence of checks, the genuineness of the repairs could not be ascertained.

Management explained that due to lack of funds to hire experts, they could not

implement the above section of the TAIs.

I advised management to liaise with Ministry of Works and Transport to obtain the

technical expertise whenever required.

25.7 Budget performance

Public Finance and Accountability regulations, 2003 section 2.10(b) entrusts the

accounting officer with ensuring that controls such as those contained in the

approved estimates and warrants are strictly observed. Budget estimates are

based on outputs to be achieved for the financial year and during implementation

effort should be made to achieve the agreed objectives or targets of the entity

within the availed resources.

Review of the budget performance for the year under review revealed that some

targets were not achieved despite government releasing funds for the various vote

functions. See table below. The authority‘s objectives may not have been met.

Vote function output

Item description

Quantity Budget amount (shs in billions)

Amount released (shs in billions)

Quantity Remarks

135303 Enhancement of LG revenue mobilisation

4 Local revenue enhancement coordination committee

0.573 0.561 3 LRECC meeting held

2 regional workshops

Significant under-performance especially with regional

Page 390: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

378

and generation

meetings 8 regional

workshops conducted

Technical support for property rates collection in 60 LG‘s

Tax education awareness created in 40 LG‘s

held 42 LG‘s

provided with property rates technical support

34 LG‘s availed with tax education awareness campaigns

workshops despite 98% funding

135304 Equitable distribution of grants to LG‘s

6 meetings of the Local Government budget committee

Grant allocation formulae reviewed to incorporate cross-cutting issues

1.419 1.419 1 meeting of the LG budget committee held

Only Draft

concept note developed

Significant under-performance despite 100% release.

135305 Institutional capacity enhancement and maintenance

8 finance and administration meetings

4 budget committee meetings

Resource center enhancement

Development of communication strategy

Conduct field visits to identify issues affecting financing of education and social development sectors

1.197 1.176 No finance and administration meeting reported

3 budget committee meetings held

No communicatio

n strategy developed

No field visits on education and social development

135375 Support LGFC purchase of one station wagon, spares and tyres

0.149 0.083 No station wagon bought

No station wagon bought

Management explained that after submission of the OBT the Technical Committee

revised the targets to fit the available budget. Besides in some vote functions,

funds received were inadequate.

I advised management to undertake planned activities as approved.

Page 391: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

379

26.0 KAMPALA CAPITAL CITY AUTHORITY

26.1 Receivables

A review of receivables under notes 4 and R2 and Non-tax revenue in the financial

statement revealed the following:

(i) Irregular provisions for doubtful debts

Reconciliation of receivables revealed a 100% provision of Shs. 3,827,633,557 on

certain revenue sources, especially markets on grounds that the entity does not

anticipate to collect this revenue. Some of the owners of the business and back

ground information on the debts could not be traced. Furthermore a 30%

provision on outstanding receivables as at 30th June 2013 of Shs.25,107,436,851

was made. However these provisions were not supported by narrative disclosures

to confirm that the debt may not be recoverable. Besides, the approval of the

provisions by council was not availed.

(ii) Lack of Ledgers

Out of Shs.21,032,546,909 Accrued revenue, Shs.20,883,562,609 consisting of

property rates, ground rent, Local Hotel tax, Local service tax and Advertisement

could not be confirmed as ledgers for property rates, ground rent and

advertisements were incomplete while no ledgers were maintained for local hotel

tax and local service tax. In the circumstances the accuracy of the figures could

not be confirmed. I was also unable to confirm that properties, hotels and eligible

tax payers were included in the KCCA database.

Management explained that it was not practical to maintain ledgers for local hotel

tax and local service tax as collectable amounts were unpredictable.

I advised management to demonstrate efforts undertaken to collect debtors and

to ensure that debtors‘ ledgers are regularly updated.

26.2 Payables

Page 392: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

380

Shs. 9,256,053,723 was stated as payables in the statement of financial position

for the year under review. A review of payables in the financial statements

revealed the following:

(i) Trade Payables amounting to Shs. 2,069,433,927 have remained unpaid for

over 2years. Management issued a public notice on KCCA outstanding

creditors through one of the local new papers in September 2013. However

the suppliers‘ claims in response to the public notice could not be verified by

management.

(ii) Pension liabilities amounting to Shs.211,898,151 were not supported by a

schedule of pensioners.

(iii) Shs.875,886,294 was stated as Trade creditors for the financial 2011/12.

However a review of a sample of Shs.369,750,124 owed to creditors under

this category revealed that Shs.313,466,408 was not supported by invoices.

(iv) Shs.4,983,276,692 was stated as additional trade creditors for the year under

review. However a sample of Shs. 2,898,498,561 under this category revealed

Shs.2,515,067,977 could not supported by invoices from suppliers.

Under the circumstances, I was unable to confirm the existence and accuracy of

the payables amount stated in the financial statements.

Management explained that most of these payables relate to the former KCC, the

new management of KCCA has taken steps of certifying the payables by inviting

the creditors to substantiate their claims through the local media however this

process has not yielded results. Many of the claimants in (i) above presented

doubtful claims.

Although management stated that payables‘ ledgers, schedules and supporting

accountabilities were available, by the time of writing this report the mentioned

documents had not been availed.

Page 393: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

381

I have advised management to take the necessary steps with a view of writing off

the doubtful, unsupported and un presented claims.

Management is further advised to ensure that up to date supplier control ledgers

supported by accountability documents such as invoices, LPOs, certificates of

completion and delivery notes are maintained for future reference.

26.3 Deferred Income

A total of Shs.9,676,075,500 was stated to have been received in the financial

year 2009/10 by KCC as land premium for various KCC properties leased out for

49 years. This amount was apportioned and accrued at a rate of Shs.197,470,918

per annum over the lease period. However Lease agreements for the properties

stated in Note 14 were not availed. I was therefore unable to ascertain the lease

periods and the correct amount of income accruing to the Authority.

I advised management to avail lease agreements to confirm the lease period and

deferred income outstanding.

26.4 Shortfall in Government Grant

The Authority estimated to receive Shs.100,071,685,633 as grants from the

Central Government. However, only Shs. 88,160,309,889 was released creating a

short fall of Shs.11,911,375,744. Management attributed this to a general budget

cut imposed on all Government Ministries and Agencies during the year under

review. Failure by Government to release all budgeted funds to the Authority

stalled implementation of some programs thereby denying services to the

beneficiary communities.

Management explained the Authority suffered budget cuts during the year which

affected the implementation of originally planned programmes in the city like

roads, school facilitation Grant, Community Driven Development (CDD) and

NAADS.

Page 394: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

382

I advised management to continually engage the Ministry of Finance, Planning and

Economic Development to ensure that budgeted funds are released.

26.5 Non-tax Revenue collection shortfalls

The Authority‘s estimate for Non-tax revenue (NTR) collection was

Shs.75,690,000,000. During the year, actual NTR collected amounted to

Shs.55,679,919,377 creating a shortfall of Shs.20,010,080,623 (26%). Shortfalls in

budgeted NTR collections affect implementation of planned activities of the

Authority.

Management attributed the shortfall to failure to revalue properties, lack of legal

instruments to enable collection of taxes, inaccurate and outdated property rates

and ground rent databases, and failure to renew leases as the KCCA Land Board

was not functioning during the year under review. Management further explained

that the projections had been pegged on the assumption that all the necessary

supporting legislations and rates would have been revised within the year and that

several revenue enhancement strategies would have been adopted and others

proposed.

I advised management to put in place appropriate mechanisms to improve

revenue collections.

26.6 Nugatory expenditure arising out of court cases

A review of quarterly reports from the legal department revealed that the entity

incurred expenditure worth Shs.1,124,880,150 in form of court settlements which

arose from management‘s laxity in the conduct of operations for example breach

of contract agreements and enforcement activities. This expenditure is rendered

nugatory since it would have been avoided. There is a risk that amount incurred in

settling Court claims, could affect service delivery as planned activities may not be

funded.

Management explained these were court awards which arose from breach of

contract and enforcement activities that happened in 2005 and 2007 respectively.

Page 395: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

383

I advised management to be diligent in executing its mandate to avoid wasteful

expenditure arising from litigation.

26.7 Advances

a) Advances to Personal accounts – Non compliance with Treasury

Accounting Instructions

Sections 227, 228 and 229 of the Treasury Accounting Instructions (TAIs),

provides that all payments should be made by the Accounting Officer directly to

the beneficiaries. Where this is not convenient, an imprest holder should be

appointed by the Accounting Officer with the approval of the Accountant General.

It was noted that Shs.190,824,516 was advanced to Authority staff through their

personal bank accounts to undertake direct procurements and other activities such

as civil works, parties, collection of street children and games of the Authority.

Such a practice of depositing funds on personal accounts exposes Authority funds

to a risk of loss, since the Authority does not have any control over such funds

deposited on personal accounts.

Management in response acknowledged the anomaly and explained that imprest

holders had been nominated and names forwarded to the Accountant General for

approval.

I await the appointment of imprest holders.

b) Unaccounted for advances

Treasury Accounting Instructions Section 217 requires Advances not accounted for

within 60 days from date of payment to be deducted from the monthly salary of

the debtor. Instructions also require that no further advances are made to

anybody with unsettled advance.

A review of advances to officials of the Authority was carried out and it was noted

that accountabilities for funds amounting to Shs.97,124,523 were not available for

Page 396: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

384

verification. These advances have remained outstanding for over six months after

the close of the financial year. In absence of the relevant accountabilities, I was

not able to confirm whether the funds were utilized on planned activities.

The funds are recoverable in the absence of accountabilities.

26.8 Non co funding of NAADS activities

Section 7.7 of the Revised NAADS Guidelines 2007 requires the Authority to

contribute a matching fund amounting to 5% of its NAADs annual budget for

implementing NAADs activities. A review of the quarterly reports revealed that the

entity received Shs.701,451,221 for NAADs activities. However, the entity did not

provide NAADS (5%) co-funding amounting to Shs.35,072,561 as required by the

guidelines. Failure to comply with the NAADS guidelines might lead to withdraw of

the grant by the funders thereby denying the community the benefits of the

Project meant to uplift their livelihoods.

Management explained that a contribution of Shs.232,213,800 towards NAADS

activities in form of salaries for NAADS coordinators was made.

I advised management to co-fund as required by the programme guidelines.

26.9 Absence of an approved Human Resource Manual

Although the Authority formulated the Human Resource manual, it is not yet

operational. In absence of approved Human Resource policies, procedures and

Manuals, it becomes difficult for the authority staff to be guided.

Management explained that a draft Human resource management manual was in

place and was awaiting Ministerial approval.

I advised management to ensure that the Human Resource Manual is approved

and disseminated to staff as a tool to help them contribute to the achievement of

the corporate goals and objectives.

26.10 Organizational structure - Staffing gaps

Page 397: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

385

The Authority has an approved organization structure of 1,332 posts of which only

359 have been filled representing only 27% of the required workforce. Lack of

adequate staff coupled with the workload on the existing few staff may impact on

service delivery and achievement of the targeted output/results. The Authority

appears to have few staff to achieve the desired performance.

Management explained that the relevant authorities for recruiting staff provided

the requisite support in terms of conducting interviews but actual appointment has

been hindered by budget constraints.

I advised management to liaise with the relevant Government organs for the

required funding.

26.11 Absence of Public Accounts Committee

Section 58 of the Kampala Capital City Authority (KCCA) Act, 2010 stipulates that

there shall be established for the Capital City, a Public Accounts Committee (PAC)

consisting of a Chairperson and four other members appointed by the Lord Mayor

and with the approval of the Minister. This committee is responsible for examining

the reports of the Auditor General, Chief Internal Auditor and any reports of

Commission of Inquiry and submits its reports to the Authority and to the Minister

and the Minister lays the report before Parliament.

Contrary to the requirement, it was noted that the Capital City Public Accounts

Committee has never been instituted. Absence of Authority Public Accounts

Committee implies that the corporate governance structures are inadequate and

the recommendations of Internal Audit department, Auditor General and other

investigation agencies may not be reviewed and implemented as required.

Management explained that the matter was before the Honourable Minister

responsible for Kampala Capital City.

I advised management to liaise with the minister responsible so as to have a

Public accounts committee in place.

Page 398: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

386

26.12 Absence of a Metropolitan Physical Planning Authority

Section 21 of the Kampala Capital City Act, 2010 states that there shall be a body

to be known as the Metropolitan Physical Planning Authority. The Metropolitan

Authority shall consist of a Chairperson and four other persons all of whom shall

be appointed by the Minister with the approval of Cabinet, being persons qualified

and experienced in physical planning, civil engineering, architecture, environment,

public health or survey. The functions of the Metropolitan Physical Planning

Authority include developing of the physical plan for the city, planning for

transportation and infrastructural development, approving Capital City, Municipal

and Town structural plans and overall overseeing and monitoring the execution of

the Metropolitan Authority Development Plan.

Contrary to the provision, it was noted that Metropolitan Physical Planning

Authority was not instituted. Absence of the Metropolitan Physical Planning

Authority affects the quality and location of infrastructure in the city as

inconsistencies between individual physical plans with the metropolitan plan may

not be addressed. This is likely to have negative effects in the future plans of the

Authority.

Management explained that the matter was before the honourable minister

responsible for Kampala Capital City.

I advised management to liaise with the Minister responsible so as to have the

Metropolitan Physical Planning Authority in place.

26.13 Absence of a Metropolitan Police

Section 26 of the Kampala Capital City Act, 2011 states that there shall be a

Metropolitan Police Force for the Capital City. The Metropolitan Police Force shall

comprise persons appointed under the police Act and trained by the Uganda Police

Force. It was however noted that there is no such Police in place. Failure to

institute the metropolitan police, hamper‘s the Authority‘s efforts to effectively

maintain law and order in the capital city.

Page 399: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

387

Management explained that there was a Memorandum of Understanding (MOU)

between KCCA and Uganda Police Force prepared and approved by the Solicitor

General to regulate the interim relationship.

I await the outcome of the MOU arrangements.

26.14 Absence of Standing Committees

Section 6 of the Kampala Capital City Act, 2010 states that the Authority shall

appoint Standing Committees not exceeding the number of Directorates of the

Authority and other committees necessary for the efficient discharge of its

functions which include overseeing the performance of directorates, receiving and

approving directorate work plans, reviewing bills for ordinance and scrutinizing and

recommending to the Authority budget proposals of the Authority‘s directorates.

Contrary to the requirement, it was noted that the Standing Committees of the

Authority were not instituted. In the absence of Standing Committees, the

performance of directorates may not be sufficiently monitored, which might affect

service delivery in the Authority.

Management explained that the appointment of standing committees was a

function of the political organ, which has not been functional. Management further

explained that the Minister responsible for the Authority in exercise of his powers

under section 79 of the KCCA Act directed constitution of working groups to fill this

gap.

I advised management to engage the political arm of the Authority to ensure that

standing committees are constituted so as to have directorates effectively

monitored.

26.15 Unapproved Strategic plan

The strategic plan is an important tool in steering any organization towards its

vision, mission and its overall mandate. Annual activities undertaken by any

organization should be derived from the strategic plan. Management developed a

strategic plan, however this plan has not been approved yet. Delays in

Page 400: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

388

implementing the strategic plan may adversely impact on the Authority in the

achievement of its objectives.

Management explained that all relevant stakeholders shall be engaged so as to

have the strategic plan approved before the end of the financial year 2013/14.

I await the outcome of management‘s efforts to have the strategic plan in place.

26.16 Unsigned Authority Minutes

The Fourth Schedule 3 (2) of the Kampala Capital City Act, 2010 states that the

minutes recorded shall be submitted to the Authority for confirmation at its next

meeting following that to which the minutes relate and when so confirmed, shall

be signed by the Lord Mayor and at least one councilor in the presence of the

members present at the latter meeting.

Contrary to the requirement, all the minutes submitted for review for the financial

year 2012/2013 were not signed. The resolutions of the governing body may not

be binding as a result they may not be relied upon by management to support

policy decisions.

Management confirmed that minutes of the Authority meetings have not been

approved to date.

I advised management to liaise with the Political organ of the Authority to ensure

that minutes of the Authority are confirmed and signed so that the resolutions of

the governing body are binding.

26.17 Engineering Audits

A sample of seven roads constructed under KCCA was selected for engineering

audit. The projects selected included:

(c) Reconstruction of Paved Roads in Rubaga 1- Consisting of Kabakanjagala,

Kalinda and Ssekabaka Kintu Roads

(d) Periodic maintenance of Hanlon and Nsambya Roads

(e) Reconstruction of New Taxi Park

Page 401: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

389

(f) Design and build for Rehabilitation and Strengthening of Paved City Roads-

Consisting of Buganda Road, Nakasero Road, Nakasero Hill Road, Lumumba

Avenue, Lourdel Road, Queen‘s Way, Wandegeya Road, Biashara Road ,

Mulondo Road and Wandegeya Parking Yard.

(g) Reconstruction of Mutungo-Bina Road

(h) Upgrading of Gravel Roads to Bitumen Standards Phase 2 (Kimera Road -

1km, Kansanga - Lukuuli Road -1.3km, Salaama-Munyonyo -0.9km)

(i) Construction of Lubigi- Channel

Below is the summary of key findings arising from the Engineering Audit:

(a) Unrecovered advance payment - Shs 234,782,000

Following the termination of the contractor on the Upgrading of gravel roads to

Bitumen standards for Kimera, Soweto and Salaama roads, funds amounting

Shs.234,782,000 are still unrecovered from the contractor despite cashing the

advance payment guarantee and further advance payment recoveries during

execution. The matter is still in court.

The Accounting Officer should ensure that all the advance payment is recovered

from the contractor.

(b) Quality of works

Generally, the overall quality of the works on the projects audited was good.

However, on some roads, defects were identified which need correction. For

example, on Kimera road, alligator cracks were observed at Ch 0+449; and access

culverts on some roads such as Kabakanjagala will need to be replaced.

It is recommended that KCCA follows up the matter with the contractor to ensure

that defects are rectified.

(c) Supervision and Contract Management

The following were noted on supervision and contract management:

Supervision was approached in two ways namely: In-house supervision and

supervision by consultants. Where In-house supervision was used, only one

technical staff was attached to the project thereby providing all the skills

Page 402: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

390

services required including project management, materials control,

measurement control and reporting. This contrasts with projects supervised by

consultants where each of the roles was played by different personnel. This

was regardless of the scope of the projects. This could have negative impacts

on the quality of project execution especially when the staff is absent or

assigned other duties.

KCCA should boost the capacity of the in-house personnel to provide the full

range of skills required for effective supervision.

Whereas the contract for Lubigi channel was awarded to Spencon Services

(Nairobi, Kenya), the contract was signed and implemented by Spencon

Services (Uganda). This has capacity, legal and cost implications.

KCCA should look into the legal implications of this undertaking.

―As-built‖ drawings for substantially completed projects, for example, Lubigi

Channel, have not yet been submitted as required by the Contract.

KCCA should ensure that the as-built drawings are submitted. The amounts

required as per contract should be retained until the submissions are done.

(d) Summary of Key Findings per Project

The key findings for each of the project audited are presented in the table below:

Road Project / Contractor / Amount

Key findings

Construction of Kalinda, Kabakanjagala, Ssekabaka Kintu Roads in Lubaga Division/ Stirling Civil Engineering Ltd/ Shs 5,066,589,951

Kabakanjagala Road Some of the culverts are cracked, have reinforcement

exposed, joints not filled with mortar at installation and other culverts deforming eg at Chainage 0+326.

Kalinda Road Some of the U-Drains were failing. Some sections of the stone-pitched drains were heavily

silted while mortar joints were failing in other sections. There was little/no mortar in some culvert joints and

there was a cracked culvert line (7m) at Chainage 0+060.

Some access culverts lacked end structures. Man-holes have been left open Ssekabaka Kintu Road Heavy siltation of side and U-drains, cracked, silted eg

0+920LHS Poorly aligned access culverts especially on major

Page 403: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

391

junctions eg at Ch 0+145, 0+550, 0+100.

Drainage Improvement Works on Lubigi Channel/ M/s Spencon Services (Nairobi, Kenya) Ltd/ Shs 20,588,947,361

The Contract was awarded to Spencon Services of Nairobi, Kenya yet all transactions are with Spencon Services Uganda Ltd without a sub-contract agreement on file. This has legal, cost implications.

As-built drawings not yet submitted despite substantial completion as required by the special conditions of contract. UGX 90,000,000 should be retained for this item as required.

The Contractor raised a claim for compensation against five Addenda which were issued without costs.

Design and build contract for rehabilitation of Paved City Roads –Buganda Road (2.12km), Nakasero road (1.56km), Lumumba Avenue (0.55km), Lourdel road (0.44km), Biashara road (0.29km), Mulondo road (0.32km), Nakasero Hill road (0.35km), Queens lane (0.28km),

Wandegeya parking yard (1,750m2)/ M/s Energo Projekt – Niskogradnja A.D./ Shs 22,385,944,834

Most of the drainage manholes are uncovered and silted

Construction of New Taxi Park / M/S STIRLING CIVIL ENGINEERING / Shs5,940,287,986

Various defects in the new toilet such as - Leaking roof, sagging and cracked ceiling, malfunctioning hand wash basins in toilets, leaking piping systems.

Overpayments of Shs3,818,871.60

Page 404: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

392

Rehabilitation of Kimera, Soweto and

Salaam Roads/ Stirling Civil Eng Ltd/ Kimera Road – Shs 3,510,322,135 and Soweto Road – Shs 4,089,061,594

An advance of Shs1,212,375,464 was paid to the initial contractor but by the time of termination Shs156,229,799 had been recovered. More funds were recovered by way of cashing the advance payment guarantee of USD 317,066.87 (equivalent to Shs 754,543,054). This makes a total recovery of Shs 910,772,853 leaving a balance of Shs 301,602,611 as unrecovered funds

Kimera Road: There were alligator cracks at Chainage 0+449 on the

asphalt surface The drains are silted and choked with debris. The workers did not have enough PPE especially gloves

and helmets. The site was untidy with a lot of debris and waste material dumped on the road, which affects traffic flow and narrows the road.

There was no evidence of sensitization about HIV/AIDS

Soweto Road Measurement sheets for paid items of Asphalt concrete

and crushed stone base were not included in the certificate reviewed. The basis of quantities certified therefore needs clarification.

Salaama Road No major works were going on at time of audit.

26.18 KAMPALA INSTITUTIONAL AND INFRASTRUCTURE DEVELOPMENT

PROJECT (KIIDP)

(a) Compliance with Financing Agreement and GOU Financial

Regulations

It was noted that project management had complied with the credit agreement

provisions and GoU financial regulations except for the matter noted below;

i) Compliance with Financing Agreement and GOU Financial

Regulations

It was noted that project management had complied with the credit agreement

provisions and GoU financial regulations except for the matters noted below;

RAP Compensations

It was observed that there were still unpaid beneficiaries in the approved RAP

report of the Chief Government Valuer amounting to Shs.4,306,076,966 yet the

funds provided for compensations were fully utilized.

Page 405: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

393

There is a risk of KCCA being sued by the affected persons whose compensation

has not been paid.

Management explained that Geomaps (U) Ltd, the consultants that facilitated the

compensation exercise had been re-engaged to assist KCCA to open boundaries

particularly along Lubigi Channel and thereafter establish the affected people that

had already been compensated and those that had not. The findings will be used

by management to take further action.

I await for the outcome of management action.

Outstanding Remittances to URA

It was observed that Shs.585,467,717 recovered in the months of November,

2012, January, February, April and May, 2013 as withholding tax and VAT from

contractors‘ bills was not remitted to URA by 30th June, 2013.

There is a risk of being penalized for non compliance with the tax laws.

Management explained that the delayed tax remittances were due to

disbursement challenges the project encountered. I advised management to

ensure that withholding tax and VAT are settled without undue delay to avoid

unnecessary costs in form of penalties.

ii) General Standards of Accounting and Internal Control Systems

A review was carried out of the project system of financial management and it was

noted that management had instituted adequate controls to manage project

resources.

iii) Status of Project Implementation

A review and inspection of project activities was undertaken and the following was

noted;

Construction Works

Page 406: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

394

It was noted that contracts for construction of the Mpererwe landfill extension and

upgrading of gravel road to Bitumen standards – Phase 2 Roads were terminated.

There is a risk that these works may not be completed at the project closure.

Management explained that a new contractor (M/s Stirling (U) Ltd) was procured

to complete Kimera and Soweto roads. They further explained that the contractor

had mobilized and was already on site starting with the drainage works. They also

explained that another contractor had been procured to complete the extension

works at Kiteezi landfill.

I advised management to expedite the works to ensure that the works are

completed by the project closure date of 31st December 2013.

27.0 ELECTORAL COMMISSION

27.1 Election Petition Costs

The EC incurred election petition costs of UGX.148,678,000stemming from

malpractices perpetrated by presiding officers and failure to properly demarcate

electoral boundaries in some constituencies. These costs could have been avoided

if the EC had demonstrated due diligence. Management explained that the

concerned presiding officers had been blacklisted while re-demarcation of affected

constituencies had also been undertaken.

I have advised the management of EC to always adhere to the electoral laws so as

to avoid or minimize electoral litigations.

27.2 Status of EC Offices in districts

Inspection of selected EC district offices revealed inadequate storage facilities

resulting into damage of some of the election materials. The condition is made

worse by failure by the headquarters to return the metallic ballot boxes from the

district offices to the main ware house in Kampala. Inspection also revealed

instances of inadequate offices in some districts, as showed in table below;

Page 407: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

395

District Facility Status at Inspection

Kumi Office Building Dilapidated Infested with termites which have destroyed

some records.

Tororo -do- poor structural state.

No place of convenience as the latrine had collapsed.

No fence to secure the premises from intruders.

Manholes had no covers and thus endangering lives.

Kyenjojo -do- Office had leaking roof which posed high risk to the EC records.

Gulu -do- The office is housed in an old and dilapidated structure.

Management in its response acknowledged the anomalies but explained that

retrieval of metallic ballot boxes will be done in 2015 when they are to be returned

to Kampala for refurbishing. The Accounting Officer further stated that the

Commission plans to build regional offices/stores over a period of 5 years, but is

currently being constrained by the meagre capital development funding. For the

time being, the Accounting Officer said that the search is on for better office

buildings.

I advised the Accounting Officer to ensure suitable terms are included in the

contracts with the Landlords and enforced accordingly to ensure conducive

working environment for staff. In the long term, EC should liaise with the

responsible ministries and stakeholders for funding towards building offices.

LEGISLATIVE SECTOR

28.0 PARLIAMENTARY COMMISSION

28.1 Mischarge of Expenditure

The Parliament of Uganda appropriates funds in accordance with the needs of the

country and this appropriation is implemented through the budget in which funds

Page 408: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

396

are tagged to particular activities and outputs using account codes and MTEF

codes. However, a review of the Commission‘s expenditures revealed that the

entity operates budgets under programs not at item level. An analysis using

government expenditure codes revealed a charge to a tune of Shs.4,132,998,534

on wrong codes. This practice undermines the importance of the budgeting

process and does not conform to proper accounting and financial reporting

practices.

Management explained that the Recurrent Budget of the Parliamentary

Commission is a Statutory Vote and the breakdown of the budget into items is

done for administrative purposes. Management further explained that the actual

expenditure is based on the priority activities where items with funds are charged

accordingly.

I was not satisfied with the explanation and advised the Accounting Officer to

streamline the budgeting process to ensure that funds are budgeted under line

items with sufficient funds and spent within the planned budgets. Proper financial

management practices including budgeting, virement and reallocations need to be

laid down in a financial manual to guide implementation of the budget and

operations.

28.2 Advances to personal accounts not accounted for

A review of advances to personal accounts was carried out and the following

issues were noted:

a) Doubtful expenditure

Shs.420,235,400 was advanced to an individual officer to carry out various

departmental activities however, a review of the accountabilities revealed the

following;

Payments to the tune of Shs.212,836,200 had no supporting accountability

documents and thus audit could not justify the payments.

Accountability of Shs.181,932,533 was questioned due to inconsistencies in the

submitted accountability, and non-compliance with the law as outlined below;

Page 409: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

397

Signatures and allowances of officials claimed to have participated in the

activities were in some instances forged as some individuals who were

interviewed from the Commission denied ever participating in the activities and

signing for the allowances.

Air time consumption was doubtful as in over ten times the official could

consume air time worth Shs.1,650,000 in a period of 5-10 days for an activity.

Stationery receipts attached appeared forged, for example the officer carrying

out an activity in Sironko attached a receipt worth Shs.4,650,000 from ―Jaira

ICT Centre‖ a stationery shop in Kaberemaido district which is over 100km

from Sironko. Upon calling the number attached the individual denied having

any branch in Sironko.

In many instances the officer paid for the activity report production 10 days

before carrying out the activity. This casts doubt on how the official could have

pre-determined the magnitude of the report. It should be noted that in all

cases no reports were availed despite payment for their production.

In many instances the official hired vehicles for field activities in a range of 10-

16million for 8-12 days yet the officials who were to use these vehicles denied

participating in the activity. This rendered the payments doubtful.

It should be noted that most of the telephone numbers attached to the

receipts were either not existing or incomplete. I could not therefore confirm

the existence of these companies hired to offer the services.

All the payments for stationery and vehicle hire had no withholding tax

deductions retained which poses a risk of fines and penalties to the entity.

The above flaws rendered the accountabilities in question doubtful. In this regard,

I was unable to confirm whether the amount involved was applied to the intended

purpose.

The issue is under investigation and I await the outcome.

b) Unaccounted for funds.

Shs.270,015,000 advanced to other individual‘s personal accounts for

implementation of commission activities remained unaccounted for at the time of

audit.

Page 410: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

398

In absence of relevant accountabilities, I was not able to confirm whether the

funds were put to the intended purposes for which they were requisitioned. There

is a risk of misappropriation of the funds.

Management should ensure that all funds are accounted for within the statutory

period or recoveries are instituted against the concerned officers.

28.3 Absence of Corporate Strategic Plan

It was noted that the Commission‘s strategic plan expired at the end of the year

(2010/11). The Commission operated without one for the second year running. In

absence of such a plan there is lack of strategic guide in achieving the

Commission‘s objectives.

Management explained that the strategic plan was presented to the Parliamentary

Commission at a joint retreat with the Board of management and discussed but

the approval was deferred until consideration by a joint meeting of Chairpersons of

Committees of Parliament and the Parliamentary Commission.

I advised management to expedite the approval of a new strategic plan.

28.4 Internal Audit

A review of the internal audit function of Parliamentary Commission revealed that

the Internal Audit department did not carry out its statutory role of reviewing and

appraising the soundness and application of accounting, financial and operational

controls as no quarterly reports were produced as required by the regulations.

Further, the Parliamentary Commission had only one Internal auditor who also

acts as head of internal audit and yet the structure provides for three staff. This

has created a big workload which cannot be handled by one officer.

Management explained that the new structure arising out of the restructuring

exercise increased the establishment to four (4) staff which have all been

externally advertised.

I await the outcome of the recruitment exercise.

Page 411: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

399

28.5 Audit Committee

Regulations 29 and 30 of the Public Finance and Accountability regulations, 2003

and section 8 of the Public Finance and Accountability Act, 2003 require the

Minister in charge of Finance to establish and appoint Audit Committees whose

functions are advisory to the Accounting Officer. However during the year ended

30th June 2013 the Parliamentary Commission had no Audit Committee appointed.

Management explained that a request was made to the Parliamentary Commission

to set up an Audit Committee which was subsequently approved and the

composition duly agreed upon. However ever since this decision was made, the

Committee has not been constituted.

I advised management to draw the attention of the parliamentary commission

regarding the outstanding matter.

28.6 Travel Abroad

The Commission spent a total of Shs.15,438,493,854 in relation to per diem,

transit, tuition, visa fees, and registration payments for travel abroad. Review of

the related payments revealed the following:

Unsupported travel abroad

Shs.142,364,450 was paid to various Commission officials for purposes of

facilitating officers to travel to various destinations outside Uganda. However the

travels were not adequately supported by accountability documents. Specifically

the following were not provided:

Copies of the passport pages bearing exit and entry immigration stamps of the

countries where the officers travelled to.

Air tickets showing flight itinerary, boarding passes, visa receipts, and

electronic receipts were not availed.

There were no back to office reports and/or briefs to support the expenditure.

In the absence of the documentation, the number of per diem days claimed,

number of staff undertaking travels and expenditure incurred could not be

confirmed.

Page 412: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

400

I advised management to ensure that accountability for travel abroad is sought or

recovery measures are enforced.

28.7 Payment to Uganda Police Operations

Classified expenditure is budgeted for and appropriated by Parliament under the

entitled Government MDA‘s. Regulations governing classified expenditure do not

categorise parliamentary commission as a classified entity. However, it was

observed that Shs. 340,000,000 was transferred to Police Force account and

treated as a classified expenditure. This was done against the regulations.

The accounting officer explained that after an analysis of the security situation of

Parliament, the inspector General of Police advised that security equipment be

purchased for Parliament and funds were accordingly transferred to Uganda police

force for the classified procurement. The equipment was accordingly procured and

delivered to Parliament.

I advised management to adhere to the financial regulations.

28.8 Motor Vehicle repair payments without certification

It was noted that a sum of Shs.521,506,358 was paid to fifteen pre-qualified

garages for repairs and servicing of the Commission vehicles for the financial year

2012/13. However it was noted that there were no vehicle repair assessments

done by a competent mechanical engineer assigned by Ministry of Works and

Transport or from the Commission prior to commitment of vehicles to garages for

repair. Further post repair inspections were also not undertaken.

There is a risk that the garages may take advantage in assessing repair needs and

consequently inflate/falsify repair costs.

Management explained that the repair assessments were not done by a competent

engineer because the officer allocated to the Commission was not available.

I advised management to liaise with the responsible Ministry and have the due

process followed.

Page 413: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

401

28.9 Payment of VAT on Non-tax Invoices

It was noted that six (6) firms did not present VAT invoices when claiming

payments from the Commission contrary to the VAT statute and as such VAT

amounting to Shs.6,687,867 paid by the Commission may not be accounted for to

the Tax Authority. Failure by the Commission to comply with the VAT Act may lead

to loss of Government revenue.

I advised management to follow up the matter with the suppliers to ensure

compliance and in future not to honour any VAT payment to contractors without

tax invoices.

28.10 Unaccounted for Advances

It was noted that funds advanced to staff during the year amounting to

Shs.120,530,000 were not accounted for by the time of audit. The anomalies

noted included:-

Lack of activity reports for all the official activities undertaken.

Lack of receipts for the consumables such as fuel and stationery or any other

appropriate supporting documents were availed for verification as required by

financial regulations.

Payments for the services rendered to the Commission lacked requisition

minutes, Local purchase orders, invoices and supervisor certification.

Lack of acknowledgement of payments by beneficiaries to confirm receipt of

funds.

In absence of the relevant accountabilities, I was unable to confirm whether the

funds were put to the intended purposes.

I advised management to ensure that all funds are accounted for within the

statutory period. Recovery measures should be considered in absence of

accountabilities.

28.11 Budget performance

Page 414: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

402

Review of the budget performance for the year 2012/2013 revealed that some

targets were not achieved despite release of funds for the various programmes.

Details are as below:

Programme Item description

Quantity Amount Budgeted (billions)

Released amount (billions)

Quantity Remarks

Programme 02 members of Parliament

To make laws for promoting the rule of law, protection of human rights and socio-economic development.

-Hold 600 standing committee meetings -150 oversight committee field visits

153.5 158.5 -539 sessional and standing committee meetings held -72 oversight field visits

50% underperfomance on oversight commiittee field visits.

Programme 03 Office of the Speaker

To provide administrative support to Rt. Hon. Speaker in the most efficient and timely manner

-180 upcountry trips to government -Speaker to offer donations to 60 charitable causes and fundraising functions -30 trips out of the country

1.433 1.433 -Undertook 208 upcountry trips to officiate at/ attend government -The speaker offered support/donations to 32 local organizations. -22 trips were undertaken by the speaker abroad.

-Few charitable causes undertaken due to increase in amount per donation i.e. from Shs. 500,000 to Shs.1,000,000. -Fewer trips undertaken due to higher number of staff and MP‘s on speakers delegations

Programme 07 Department of clerks 1551 05 Parliament Support Services

Provide technical advice to parliament and committees, ensuring minutes of proceedings are recorded.

-Coordinate 150 oversight field visits with committees -Coordinate 119 plenary sittings -Coordinate 1070 committee meetings

1.241 1.241 -72 committee oversight field visits -106 plenary sittings -539 committee meetings held -55 public hearings -57 reports produced for debate in plenay

inadequate perfomance on commiittee meetings

Programme 09 Department of Library and Research

To provide efficient and effective library and research services to members and staff of parliament.

-1000 text books procured

0.091 0.091 -787 new text books procured

Fewer books purchased despite full release of funds. This was attributed to increase in book prices and utilisation of some funds for subscription to online resources.

Programme 14 Planning and development Coordination Office

Coordinated the updating of the PSIDP and liaises with committees, for a and other departments

-Conduct over 24 oversight field visits -Organize 2 parliamentary outreaches

0.426 0.426 -Thirteen (13) committee oversight visits facilitated -One (1) exposure visit to benchmark best practices

Only half of the outputs were achieved. This was attributed to unforeseen changes in the Parliamentary Calendar i.e. the passing of the

Page 415: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

403

national budget and other bills took longer than expected and yet they take priority over all other Parliamentary activities. This delay reduced the time left for committee oversight visits, Parliamentary Outreaches and benchmarking trips.

This may have hampered the Commissions objectives.

I advised management to ensure adequate planning and coordination is

appropriately done so that all deliverables are achieved as planned and in a timely

manner.

28.12 PARLIAMENTARY PENSIONS SCHEME

(a) GENERAL STANDARD OF ACCOUNTING AND INTERNAL CONTROL

A review was carried out on the pension scheme‘s system of internal controls and

financial management and the following matters were noted;

i) Lack of Financial, Accounting and Administrative Manuals

I noted that during the year, the scheme did not have Finance, Accounting and

Administrative manuals to guide its employees on how to conduct their operational

activities. Lack of procedural manuals implies that employees work without

standard operating procedures and in the event of misconduct, the scheme has no

written down procedures, guidelines and standards against which to hold them

accountable.

Management explained that during the year, they carried out the process of

developing and documenting the Financial and Administrative Manuals. These are

yet to be approved by the Board. I advised Management to expedite the process

of approval with a view of strengthening internal controls and improving

performance.

Page 416: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

404

ii) Variances between members on monthly lists submitted for the

sponsor’s (Government) 30% contribution and those submitted

for the 15% deductions from the employees’ monthly salaries.

During the year under review, I noted differences between the number of

members reflected on the 30% schedules and those reflected on the 15%

schedules. Ideally, these numbers should be the same. The details are reflected

in the table below;

Month

Numbers as per the

30% deduction

schedules.

Numbers as per the

15% deduction

schedules.

Difference in

numbers

Staff MPs Staff MPs Staff MPs

Jul-12 288 381 289 381 -1 -

Aug-12 288 378 289 379 -1 -1

Sep-12 303 380 288 380 15 -

Dec-12 288 383 289 383 -1 -

Jan-13 287 382 288 382 -1 -

Feb-13 286 382 287 382 -1 -

Mar-13 289 382 287 382 2 -

Variances in numbers result into under or over-remittances of the contributions to

the scheme by the sponsor. This could result in acts of impropriety which can

lead to financial loss to the Scheme.

Management explained that the variance was attributed to errors from the

Sponsor‘s payroll and promised to reconcile the schedules and take corrective

measures accordingly. I advised management to undertake regular reconciliations

to enable early detection of these variances.

iii) Variance between the expected contributions (both from the

members and the sponsor) and the actual remittances received by

the Scheme.

The scheme management accrued, on a monthly basis, the expected

contributions. However, for the year audited, it was noted that actual contributions

received from the sponsor were less than what was expected by Shs.24,440,218.

The scheme was denied the opportunity to receive full contributions and to

promptly invest the expected income, resulting into loss of income.

Page 417: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

405

Management explained that the variations were as a result of errors in source

documents received from the Sponsor, but had established a reconciliation

mechanism to identify the cases and bring them to the attention of the Sponsor

for correction. I await the outcome of management efforts.

iv) Untaxed Staff Allowances

I noted that PPS staff were paid medical allowances for the months of September,

October and November 2012 which were not subjected to tax. The staff members

were also paid mileage and subsistence allowances on a monthly basis and these

were also not subjected to tax. Exclusion of such payments from the tax bracket

is non-compliance to provisions of the law and can lead to heavy tax penalties.

Management responded that the payments for medical, lunch, mileage and

subsistence were considered as reimbursable expenses. Management further

indicated that they will in future ensure that all payments are taxed in accordance

with the provisions of the Income Tax Act.

I advised Management to ensure that all payments made to the PPS staff are

made through the payroll, grossed up and taxed in accordance with the provisions

of the ITA to avoid possible penalties from the tax authority.

Page 418: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

406

v) Lack of copies of birth certificates on members’ files

A review of the members‘ benefits and members‘ files revealed that there were no

copies of birth certificates on members‘ files reviewed. A birth certificate is one of

the key documents that should be included on each member‘s file. The date of

birth is vital in the calculation and computation of member benefits. Without birth

certificates, the correctness of benefits computed and paid is doubted.

The Management responded that they have had challenges on obtaining birth

certificates from some members, but had put in place a member specifically to

follow up initiative to ensure that all Members provide the relevant documents.

I advised management to speed up the initiative to avoid eventual errors.

(b) Delays in the implementation of the Management Information

System

In a bid to improve its information management system, the Scheme procured

from M/s Systech Africa (U) Ltd a pension administration computer package in July

15, 2010, at a cost of Shs.184,269,140. Besides administering the pension funds,

the system; according to the procurement contract is supposed to offer

Investment Management, Accounting and Financial Management and Human

Resource Management Systems. According to the General Conditions of the

Contract (GCC) 20.1, this service should have been performed to completion by

end of June, 2011.

At the time of the audit (October 2013), three years from the time of the

commencement of the contract, the system was not fully operational. Additional

modules, such as; Investment Management, Accounting and Financial

Management, and Human Resource Management Systems were not functioning.

To-date the Scheme had paid Shs.138,201,855 with a balance of Shs.46,067,285

yet to be paid. If management does not internally build capacity when the supplier

contract is still running, the scheme might not fully enjoy the intended benefits

and value for money may not be achieved.

Page 419: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

407

Management explained that the contractor had installed and customized the

agreed upon additional modules, although they were not yet fully operational.

Management further explained that the delay had been mainly due to capacity

gaps on its side.

I advised Management to ensure that;

The key personnel (Fund Accountant and Data Manager) are trained to

develop their skills in the application of the system.

Standard reports are customized to be directly generated by the system.

SECURITY SECTOR

29.0 MINISTRY OF DEFENCE

29.1 Outstanding Commitments

According to the financial statements, the Ministry incurred outstanding

commitments amounting to Shs.35,969,615,635. This practice is contrary to the

commitment control system which requires the Accounting Officer to commit the

Ministry to the extent of funds available. Further, included in the amount is

Shs.20,393,463,394 in respect of UMEME which was not properly supported and

reconciled. As such I was unable to confirm the figure reflected as outstanding

commitment.

I advised the Accounting Officer to ensure that commitments are minimized and

also reconcile the amounts outstanding.

29.2 Un-reconciled domestic arrears paid to Utility companies

A total of Shs.9,642,859,478 was paid to cater for outstanding utility arrears and

bills consumed during the year. However, by the time of writing this report, a

reconciled position in regard to the arrears was not availed. The amount brought

forward, consumed during the year and payable could not be established. I have

Page 420: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

408

raised this issue in my report to Parliament before but no action has been taken.

Details of payments are in table below;

Company Amount paid

UMEME 7,266,863,598

National Water and Sewerage Corporation 2,375,995,880

Total 9,642,859,478

Management explained that the Ministry was undertaking a comprehensive

reconciliation exercise with NWSC and UMEME aimed at determining the arrears

position and the exercise was expected to be completed mid April 2014.

I advised management to finalize the exercise to enable establishment of the

Ministry‘s utility arrears position.

29.3 Diversion of funds from the Defence Forces Fund

UPDF Act required the Ministry to open a Defence Forces Fund. This account

accumulates any savings to cater for the welfare of the armed forces under UPDF.

It was noted that out of Shs.1,470,886,674 expended from this account, a sum of

Shs.1,300,000,000 was spent to settle taxes for items of Defence Forces Shop (U)

Ltd. Payment of taxes from this account was outside the purpose for which the

Fund was established. The items of Defence Forces Shop are tax free and

therefore the basis for using funds meant for welfare to settle taxes was not

explained.

I advised management to consult Ministry of Finance regarding the payment of

taxes for Defence Forces shop.

29.4 Unlawful allocation of Land at Upper Mbuya

Sometime back in 2006, Uganda Land Commission unlawfully allocated 4.8

hectares of Ministry of Defence land at upper Mbuya to private individuals who

were issued with land titles, a position the Ministry contested. The Ministry

stopped the private individuals from undertaking any developments on the land.

Page 421: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

409

The matter was referred to police for further investigation however a report is yet

to be produced.

Management explained that the IGP‘s report on the investigation is still awaited.

I urged management to make a follow up on this matter.

29.5 Irregularities in procurements

Various procurements undertaken by the Ministry during the year were reviewed

and the particulars and findings are summarized in the table below:

Issue/Supplier Particulars Findings

Un completed works at 2nd

Division headquarters

Tender for Sewage

rehabilitation and repair works

of the water system at 2nd

division headquarters Mbarara

in the financial year 2009/2010

and was paid Shs.574,777,740.

Works are still pending

The commander‘s office

had not yet been

connected to sewage line.

The sewage lagoons had

not been fenced off with

chain links.

Pipes carrying waste from

respective houses end up

pouring waste to the

bushes as the pipes are

not connected to the

lagoon.

The entire sewage system

was not working as some

pipes had not yet been

replaced.

Leaking ceilings at Kabamba

(UMAK) - M/S Cementers ―U‖

Ltd

To construct Kabamba Military

Academy at a cost of Shs.25bn

to be carried out in 2 Phases.

1st phase was to construct the

main building, 8 classrooms,

dormitories, and external

works. By the close of financial

year 2011/12,

Shs.12,091,391,589 had been

paid to the contractor for the

constructions under phase 1.

Some areas of the roof

were however found

leaking damaging of the

ceiling boards, some of

which appear rotten and

are about to collapse.

The contractor poorly

fixed the roof nails in the

iron sheet valleys instead

of fixing them on

corrugations and although

bondex was applied on

the leaking roof, the

problem has persisted.

Page 422: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

410

Procurement of UPDF Army

Band instruments

Supply of UPDF band

instruments at a contract price

of USD.589,893.66

(Shs.1,474,734,150).

Bids were accepted on

30/04/2013, four months

after the first delivery of

06/10/212.

The contract agreement

was signed on

10/05/2013, seven

months after delivery.

The procurement and

project management file

was not availed for audit.

Management attributed

non adherence of the

PPDA regulations to

urgency due the Golden

Jubilee celebrations.

Delivery of some items in

January, 2013 (three

months after the

celebrations) was not

justifiable.

Irregular procurement of

furniture

Paid Shs.314,373,800 for supply

of assorted furniture to UMAK-

Kabamba.

7 tables and 100 chairs

delivered, however 2

tables and 8 chairs had

broken down before they

were put to use.

Management of UMAK

had refused to use the

supplied furniture sighting

inferior quality.

M/s Cleave and Company

Limited

Supply of assorted clothing

items for Special Forces Group-

(Shs.907,459,750)

Not availed the

procurement file

Emergency supply of tyres

Procurement of tyres worth

Shs.1,190,630,000

Premised on an

instruction by a senior

officer of the Ministry

quoting an authority of a

previous year

Lacked PP Form 20 which

initiates the procurement

process

Assorted tyres delivered

by 20/08/2012 were

worth Shs.951,280,000

leaving tyres worth

Shs.239,350,004 not

delivered.

Procurement was not

subjected to competition

Purchase of motor Toyota Land Cruiser Prados of Total amount incurred

Page 423: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

411

vehicles for the

Defence Attaches

3000cc diesel engines at a cost

of USD 60,000 each for the

Defence Attachés‘ of Rwanda,

Burundi, Russia and China.

was Shs.684,196,484

inclusive of USD.13,000

for furniture of the China

Attaché‘.

Similar request was made

for the Defence Attaché of

Sudan for the same type

of vehicle at a cost of

USD.38, 000 and not

USD.60, 000 as it was in

the previous case. This

implies that the previous

vehicles were inflated by

USD.22,000.

Vehicles procured were

specified as ―Toyota Land

cruiser Prado‖. This

contravenes Sec.265 of

the PPDA regulations.

The engine capacity of

the vehicles procured of

3,000 cc was 500 cc

higher than the official

capacity of 2,500 meant

for Military Attaches.

Funds were transferred to

individual personal

accounts and not the

Embassy accounts which

is against financial

regulations

Evidence of purchase and

ownership of the vehicles

could not be confirmed.

Management is urged to ensure that all procurements are undertaken in

accordance with the PPDA law and its regulations. The inefficiencies in supplies

and constructions should be made good by the suppliers or recoveries effected.

29.6 Telecom Masts on Defence land

Telecommunication and Radio Companies erected their Masts on Ministry of

Defence land at Kabamba, Kaweweta and National Leadership Institute (NALI) in

Kyankwanzi, however lease agreements between the Ministry and companies were

not provided for verification. There is likelihood that revenue from the masts could

have been utilized at source since it was not disclosed in the Ministry financial

statements. This is not in line with the TAIs that govern NTR.

Page 424: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

412

Management stated that the process of formalizing of Masts on MOD/UPDF land is

still ongoing.

I urged management to expedite the process.

29.7 Nugatory expenditure on clearing of contracted goods

Shs.16,745,842 was spent on clearing of goods supplied under various contracts

Documents supporting the payments indicated that goods were to be delivered by

the supplier to Delivery At Place (DAP). Under such agreements, unless it is clearly

stated otherwise in the bid document and in the specific conditions of the contract,

the seller bears responsibility and risks delivering the goods to the named place

and is required to clear the goods. The Ministry instead paid on behalf of the

supplier.

Supplier Items Clearing

Amount (Shs.)

Point of entry DAP

M/s. Alps Int‘l Ground Sheets 6,189,690 Malaba Magamaga

M/s. Alps Int‘l Military Foot wear 5,342,126 Entebbe airport Magamaga

M/s. Alps Int‘l Military Foot wear 5,560,026 Entebbe airport Magamaga

Total 16,745,842

The Ministry promised to recover the payment. The action is awaited.

30.0 OFFICE OF THE PRESIDENT

30.1 Outstanding commitments

Office of the President had arrears of Shs.20,025,531,752 at the beginning of

financial year 2012/2013 of which Shs.12,735,806,000 was paid leaving a balance

of Shs.7,289,725,752. The balance comprised of Shs.4,289,000,754 as employee

costs and Shs.3,000,414,998 for goods and services.

Page 425: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

413

The Accounting Officer explained that outstanding commitments were a result of

insufficient funding of the Security Agencies and that the resultant arrears have

been brought to the attention of Parliament and the Ministry of Finance.

I advised management to follow up the requests made to ensure that resources

are availed to settle all the outstanding arrears.

30.2 Direct Procurement of theatrical performances – Shs.708,000,000

A contract was signed on 23/11/2012 between a company and the Office of the

President for the provision of theatrical performances at the Independence Golden

Jubilee Celebrations at a contract price of Shs.807, 000,000. Contrary to Sec.80 of

the PPDA Act the direct method of procurement was used instead of the open

bidding method, and no waiver was obtained from the PPDA as provided for in

Sec.79(3) of the Act and Sec. 330. Besides, the procurement was made before

signing a contract. Whereas the procurement was concluded on 09/10/2012, the

contract was signed 44 days after receiving the services.

Management explained that the use of the direct method of procurement was

occasioned by the late release of funds for the celebrations which translated to

late commencement of the procurement process. Further, delays in approval of

the contract by the Solicitor General led to late conclusion of the contract.

I explained to management that such a practice was irregular and exposes the

Office to a risk of unfair prices, since there is no competition in the procurement

process. I advised that procurement procedures should always be adhered to.

30.3 Contracts performed before signing contract agreements

Contrary to Section 76(3) of the PPDA Act 2003 that provides for an award to be

confirmed in writing by a written contract signed by both the provider and the

procuring and disposing entity, it was noted that the Office undertook various

procurements amounting to Shs.3,306,561,149 before written contracts binding

the Office and service providers were signed. I explained to management that the

Page 426: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

414

performances of such contracts were illegal and a risk of loss of funds in case the

service providers failed to perform their obligations.

I advised management to ensure that contracts are always signed before the

procurements are performed.

30.4 Doubtful accountability of PAF fuel refund-Shs.4,549,000

A payment of Shs.7,155,000 was made as a refund of PAF funds from February to

June, 2013. The accountability for fuel worth Shs.4,540,000 presented for audit

from a petroleum company indicated that only one vehicle No. UG 1970C drew

fuel from the station. However, all the receipt serial numbers more or less

chronologically followed one another and the dates on them were not matching

the serial numbers rendering the accountability doubtful.

The Accounting Officer is advised to investigate the transaction with a view to

establishing whether fuel funds were expended for the intended purposes.

30.5 Irregular payment for training abroad

A government officer was paid Shs.12,970,400 to cater for a trip to Korea for

training of foreign leaders from 21st- 30th Nov 2012. According to the invitation

letter, all expenses for travels and the entire stay in Korea would be fully covered.

The amount paid to the officer is recoverable.

The Accounting Officer responded that recovery of the funds was going to be

effected.

The action of the Accounting Officer is awaited.

30.6 Lack of technical pre-motor vehicle repairs assessment reports

Shs.343,590,383 was spent on repairs and maintenance of the entity motor

vehicles without technical pre-inspection reports to determine the extent of the

defects on the vehicle and thus the repairs required. Lack of technical pre-repair

inspection reports exposes the Office to risks of loss of funds through over

invoicing by the garages.

Page 427: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

415

In response, the Accounting Officer explained that motor vehicle repairs

requisitions and quotations were analyzed by the transport officer who lacked the

technical capacity however the matter will be pursued with Ministry of Works and

Transport.

Management action is awaited.

30.7 Lack of land titles for RDCs offices

Seven Resident District Commissioner‘s (RDCs) offices located at Lamwo, Otuke,

Kamuli, Amuru, Abim, Buvuma and Buhweju Districts were constructed at a cost of

Shs.4,116,137,221. However, the Office has not secured land titles on which the

offices were constructed. I informed management about the irregularity and the

risk of losing funds on capital projects with no evidence of ownership.

The Accounting Officer explained that the processing of the land title for Buhweju

district is being handled by ULC while the rest are in process of being surveyed.

Management is urged to expedite the process.

30.8 Budget performance

A review of the budget performance for the year 2012/13 revealed that some

targets were not achieved despite release of funds for the various functions and

related activities. Whereas some of the activities were not broken down into

measurable indicators, others were. Details in the table below;

Page 428: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

416

Function Planned output Performance

Indicators/Audit Remarks

Achievements

160101;

Monitoring the performance of

government policies,

programmes and

projects

Implementation and

performance of government project/programs monitored

in sampled Districts under

PAF,

SACCOs

NAADS,

Education

Roads

Health

The activities were

not broken down into measurable outputs,

e.g. how many districts under PAF,

how many SACCOs,

etc. This made the audit of budget

performance difficult.

160102;

Economic policy implementation

Inspections conducted to

track progress on implementation of 3

government investment projects

Markets under MATIP

project, Youth Job Stimulus

Project

Development of Mines

The activities were

not broken down into measurable outputs,

e.g. how many markets under MATIP

were inspected, etc.

This made the audit of budget performance

difficult.

160103;

Monitoring implementation of

Manifesto Commitments

Reports from Ministries

analysed and monitoring visits conducted in districts.

Intend to produce 04 quarterly reports and 01

annual report.

Manifesto documentary up

dated

The activities were

not broken down into measurable outputs,

e.g. how many Ministries monitored

and analysed, etc. This made the audit of

budget performance

difficult.

160104;

Economic

research and information

Research conducted on the

effectiveness of 2 existing

policies for 2 key sectors of Infrastructure

Road Maintenance plan &

Road expenditure Program and

Micro/SMES-Operational

framework of SACCOs

01 Research report

on infrastructure

01 Research report

on SACCOS

00

01

160201;

Cabinet meetings

supported

72 number of Agenda and

Minutes of cabinet

meeting issued

12 number of Agenda and

Minutes of PSs meetings issues.

250 Draft Cabinet

Submissions reviewed for adequacy

72 Agendas and

minutes expected

12 Agendas and

minutes expected

250 Draft Cabinet

Submissions expected to be

reviewed

50

11

166

Page 429: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

417

4,800 Extracts of Cabinet

Decisions issued to

Ministers and PSs

04 Cabinet Committee

meetings facilitated

01 PSs Annual Retreat

organized

4,800 Extracts of

Cabinet Decisions to

be issued to Ministers and PSs

04 Cabinet

Committee meetings to be facilitated

01 PSs Annual

Retreat to be

organized

4,680

01

00

160203;

Capacity for policy formation

strengthened

Comprehensive Long Term

Policy Capacity Development Plan of Public Service

Developed

01 01

160352; Population

mobilization

Sensitization and awareness campaign programmes

conducted in all districts. Government programmes

monitored.

National Patriotism

Secretariat offices staffed and equipped.

Patriotism clubs

coordinated country wide

The activities were not broken down into

measurable outputs, e.g. how many

patriotism clubs coordinated

countrywide, etc. This

made the audit of budget performance

difficult.

31.0 STATE HOUSE

31.1 Unrealistic Budget for State House

State House approved budget for the year was Shs.63.2bn which was later

adjusted through supplementary funding of Shs.140.2bn bringing the revised

approved budget to Shs.203.5bn. These supplementary funds were 221% of the

original budget implying that the original budget was not realistic in view of State

House operations. Further, it was noted that over the years that State House has

continued to receive supplementary budgets annually exceeding its original

budgets. This impairs the credibility of the budget.

The Accounting Officer explained that they endeavor to present a more realistic

budget but have to work within the ceiling set by the Ministry of Finance, Planning

& Economic Development. I advised management to continue liaising with the

Ministry of Finance to ensure that the ceiling set reflects the operations of the

entity.

Page 430: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

418

AGRICULTURE SECTOR

32.0 MINISTRY OF AGRICULTURE, ANIMAL INDUSTRY AND

FISHERIES

32.1 Mischarge of expenditure-Shs.293,224,592

Parliament appropriates funds in accordance with the needs of the country and

this appropriation is implemented through the budget in which funds are tagged to

particular activities and outputs using account codes and MTEF codes. During the

year, expenditures totalling to Shs.293,224,592 were wrongly charged on budget

lines to fund activities that were not meant to be paid from the affected budget

lines. This practice renders the budgeting process redundant and is not in line with

the intentions of the appropriating authority. The practice leads to

misrepresentation of expenditure reported in the financial statements.

Management explained that this was linked to restrictive distribution of funds to

the various item lines on the Chart of Accounts during the budgeting process.

I advised management to consult the Accountant General to streamline the budget

process and ensure authority is always thought before any reallocations are made.

32.2 Budget Performance

It was noted that some key planned activities were not fully executed despite

receiving the funding. As at 30th June, 2013 funds worth Shs.20,707,058,483

remained un utilized iincluding the gross tax balance of Shs.118,152,255. The

under absorption capacity of 35% translated into underperformance for the year.

Service delivery was therefore hamphered. The ministry objective may not have

been met as anticipated.Details in the table below:

Page 431: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

419

Planned Activities Expected Outputs Actual outputs Deviation Management Response

Output 010103 Crop production technology promotion; Up to 1.76bn was provided under project 1194

Purchase of 20 tractors for distribution as grants to farmer groups engaged in the production of strategic commodities under the DSIP i.e fruit farmers, maize producers, beans producers,

None 20 Tractors not distributed.

The Solicitor General cleared the contract on 30th May 2013 and the contract was signed on 7th June 2013 hence not possible to procure the tractors before the end of the Financial Year.

Output 010106 Increased value addition in the sector. 1.44bn was provided

under project 0104 Budget 0.343bn

Inspection of 20,000 metric tons of cocoa for quality.

A total of 19,430 metric tons of cocoa beans were inspected. Spent:

Shs.0.290bn (84.6%)

570 metric tons not inspected.

It is true that 570 MTs (2.85%) was not inspected. Since 20,000MTs was a projection.

Output 010102 Improved access for water for livestock Budget .110bn Spent .080bn (73%)

Construct 50 valley tanks in the cattle corridor districts with equipment from the Japanese Government.

Sites identified for construction of valley tanks. 1st consignment of Japanese heavy earth moving equipment received. Reported that construction started in Nakasongola, Lwengo and Namalele however progress not reported.

No valley tank yet constructed.

The Tsunam in Japan affected the manufacturing of the equipment and the expected date of delivery delayed. The Government of Japan handed over the equipment to GOU on 27th May 2013 thus preparatory activities delayed and the actual deployment of equipment to the 1st districts (Lwengo, Luwero and Nakasongola was in July 2013.

Output 010204 Promotion of sustainable fisheries. Budget 2.9bn Spent 2.4bn (83%)

Increased fish production from 500,000 MT to 620,000MT from both captures and cultures Establish 4000 aquaculture sites

Production was 507,639MT that is below projection. 800 aquaculture enterprises (20%)

Short fall of 112,361 fish production registered. 3,200 aquaculture sites not established (80%) underperformance.

Fish production was 507,639 MT (407,639 metric tons from capture fisheries and 100,000 from aquaculture) which is 81.8% performance. The short fall of 112,361 is attributed to environmental factors. The underperformance

related to limited PPP arrangements in the aquaculture sector to cover areas of fish seed, feed and management.

Output 010205 Vector and disease control measures

Procure: 250,000 doses of FMD, 100,000 doses of CBPP,

116,000 doses procured.

374,000 doses not procured. Though 90.8%

Explanation of the deviation not given.

Page 432: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

420

I advised management to enforce monitoring of its operations to ensure that set

targets are always achieved.

Budget 4.780bn Spent 4.338bn (90.8%)

120,000 doses of rabies vaccine, 20,000 doses of ECF vaccine.

of funds were spent.

Output 010252 Animal breeding and Genetic development. Budget 2.5bn Spent 2.5bn (100%)

83,000 litres of liquid nitrogen produced,72,000 dozens of semen produced. 15,000 breeding produced and sold

14,277 litres of liquid nitrogen produced, 28,650 doses of semen produced and distributed for breeding. 6,694 breeding cattle produced and sold.

68,923 litres of liquid nitrogen not produced, 43,350 doses of semen not produced.8,306 breeding cattle not produced.

Explanation of the deviation not given.

Output 010280 Livestock Infrastructure

Construction. Budgeted .600bn Spent 0.142bn (23.6%)

Rehabilitation of offices and fencing of Animal holding grounds at

boarder posts of Katuna, Malaba, Busia and Mpondwe.

No work was done.

Although 23.6% of the funds was spent, no

activity took place.

A feasibility study was undertaken to know the exact sites, installations

and current functional status of the 4 Ports and their animal holding grounds that are gazetted as per the instrument. The survey was conducted using funding from the supervision spending item Output 010280 and was accounted for. The procurement process was completed. SG gave clearance on 18th June 2013 just at the closure of the Financial Year. Survey results and procurement achievements are to be applied in 2013/14.

Output 10105 Food Nutrition and Security Budget 0.733bn Spent 0.661bn (90%)

Amendments to the Food and Nutrition bill submitted to OPM, stake holder consultations, 200 local government staff trained, 20 Districts assessed

120 Local government staff trained. 18 Districts assessed

130 Local government staff not trained. 2 Districts not assessed.

The budget estimate for the activities was Shs. 0.733bn. However, Shs.0.661bn was released.

Page 433: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

421

32.3 Procurement Issues

(a) Lack of contract implementation plan-Shs.281,128,146

Sect. 258(3) of the PPDA Act states that upon receipt of the contract, a contract

manager shall prepare a contract implementation plan, using PP Form 60 in the 9th

Schedule, and forward a copy to the procurement and disposal unit for monitoring

purposes. However, it was noted that contracts of value

Shs.281,128,146 lacked contract implementation plans. In the circumstances, I

was therefore unable to establish whether the monitoring of implementation of the

contracts in question was done in accordance with the PPDA regulations.

Management explained that lack of contract implementation plans during the year

was due to inadequate capacity which has so far been addressed. I advised

management to always ensure that a contract implementation plan is prepared for

every contract.

(b) Un executed procurements-Shs.2,525,352,083

Procurements worth Shs.2,525,352,083 were not undertaken at all. PDU did not

have in place a monitoring system to track the procurement implementation

process and as a result, the Ministry returned un utilized funds worth

Shs.6,546,986,464 to the consolidated fund. This is not in line with the intentions

for which the activities were planned and funds released.

Management explained that all the stated procurements were processed up to

some level but not concluded. Details in table below:

Procurement Ref Details Amount (UGX) Management Response

00092/22/10/1 Feasibility Studies on irrigation potential in Kween and Butambala Districts.

250,000,000 The contract was signed in May 2013 and by the end of the FYR the provider had completed the Inception report and the signed agreement is in place as cleared by the SG.

00082/5/10/012 Supply of tractors and implements for demonstration and kick start mechanized

500,000,000 By the end of the FYR, the contract was signed but delivery not yet effected.

Page 434: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

422

Agriculture labour saving technologies

00102/19/11/12 Feasibility studies on environmental area social impact on Kiige Citrus irrigation scheme

500,000,000 The procurement was delayed due to the lengthy funder‘s procedures and reviews carried out but procurement currently with an evaluation report pending funder‘s review.

00103/19/11/12 Complimentary design for rehabilitation of Olweny irrigation scheme

250,000,000 There was a change in the funding arrangement from AFD to GOU bridging finance (FIEFOC) which led to the transfer of this procurement to Ministry of Water.

00106/13/12/12 Procurement of services to design and install animal quarantine facilities at ports of entry

250,000,000 Procurement was processed and SG clearance was received but contract could not be signed due to closure of Financial Year.

134/18/1/13 Cadastral survey installation of pellars /beacons in Kasese resettled land

320,000,000 Procurement was processed and SG clearance was received. This has been budgeted for this FYR 13/2014 and it is being implemented.

189/3/4/13 Consultancy services for development of MAAIF livestock identification and traceability.

277,452,083 The procurement was cancelled due to failed response.

196/11/4/13 Supply of Motor Cycles , backup laptops for FMD disaster preparedness at TZ boarders

177,900,000 The procurement was processed up to clearance by SG but contract could not be signed due to closure of Financial Year. Currently a tracking system has been put in place to address delaying initiation.

Total 2,525,352,083

I advised management put in place a mechanism to ensure that all the planned

procurements are carried out in the planned period.

(c) Direct Procurement of 44 Cross Alpine Goats for PPR Vaccine Research Project-Arising from PPDA reviews.

It was noted that the entity engaged a local company to supply 44 pure cross

Alpine goats for PPR vaccine research project at a price of Shs.15,312,000 through

a direct procurement method. A review of the PPDA report revealed the following

anomalies:

The procurement was direct but no clear justification was found on file.

Page 435: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

423

There was no evidence to prove that this supply was budgeted for by the

Ministry and duly included in the procurement plan.

The provider was not on the entity‘s list of pre-qualified suppliers.

The evaluation criteria on technical issues were evaluated without evidence of

proof that the requirements were fulfilled hence a sign of subjectivity.

No evidence of supply was found on file.

Management explained that the experiment was time bound since it had to be

undertaken in a very short time frame to address an epidemic of goat and sheep –

Peste des petites ruminants (PPR). Direct procurement was used in order to

address an emergency due to wide spread of PPR outbreak.

I advised management to ensure that proper procurement methods are applied in

accordance with the regulations.

32.4 Grounded motor vehicles

A review of the list of motor vehicles availed by management revealed that up to

52 motor vehicles were currently grounded and parked in various premises of the

Ministry as well as several garages. I noted that some vehicles were taken to

garages either due to accidents, engine knocks and other mechanical breakdowns

without carrying out pre-repair assessments and on several occasions; the vehicles

were even taken to the garages without LPOs. A visit to 8 garages where some of

the grounded vehicles had been parked on average 2 years revealed that in some

cases where the vehicles were delivered to garages after accidents, there were no

accident reports. It was observed that most of the vehicles appeared to have been

vandalized and continue to deteriorate due to long stay in these garages and there

is a possibility that some could get stolen in those garages.

32.5 Expired chemicals

A review of the entity stores and the system of issuing of chemicals during the

year revealed the following anomalies:

Page 436: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

424

a) It was observed that 3000ltrs of Cypermetherin 5% Sicorin EC worth

Shs.54,000,000 was received in the stores on 22nd December, 2012 expired in

September 2013. During the entire financial year; 170ltrs

worth Shs.3,060,000 was issued and by the time of audit (Nov.2013) there was a

balance of 2830ltrs worth Shs.50,940,000 that had expired but were still being

issued as indicated in the table below.

Date of

Issue

Issue Vr Receipient(District) Qty Value

11/11/2003 369 Kasese 300 5,400,000

14/11/2013 234 Kween 200 3,600,000

15/11/2013 235 Masindi 200 3,600,000

19/11/2013 236 Soroti 100 1,800,000

19/11/2013 239 Bukedea 200 3,600,000

20/11/2013 223 Bukwo 200 3,600,000

22/11/2013 224 Kapchorwa 250 4,500,000

25/11/2013 225 Serere 200 3,600,000

Total 29,700,000

b) It was further noted that 9700ltrs of Lithoate worth Shs.139,360,000 was

received in the store as per the schedule below:

Date Quantity

28th Jun-2011 1000ltrs

18th Jun -2012 3000ltrs

6thApri-2012 1500ltrs

22nd Jun-2012 2000ltrs

30th Jun -2012 2200ltrs

During the financial year, only 975litres worth Shs.20,280,000 were issued and a

balance of 5725 litres worth Shs.119,080,000 had expired yet they were still being

issued indicated in the table below.

Page 437: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

425

Expired stock of Lithoate issued.

Date of

Issue

Issue Vr Recipient Quantity(ltrs) Value (Rate

20,800)

11/11/2013 369 Kasese 509 10,587,200

14/11/2013 234 Kween 250 5,200,000

15/11/2013 235 Masindi 400 8,320,000

19/11/2013 239 Bukedea 350 7,280,000

20/11/2013 223 Bukwo 250 5,200,000

22/11/2013 224 Kapchorwa 300 6,240,000

Total 42,827,000

The procurement of the chemicals appears not to have been based on demand,

which could have led to wastage of funds in expired chemicals. It is likely that the

costs will rise duet to destruction costs that involves unquantifiable and hidden

environmental costs on the crops, animals and human health.

Management explained that the chemicals in question were still potent and

effective despite expiry. They further explained that the formulation of an

agricultural chemical does not completely collapse at the end of the period

indicated as the expiry date. The expiry date indicates when the potency of the

chemical just starts to decline and that the decline is slow and gradual such that

the chemical remains potent and effective for a period of time, even up to two (2)

years indicating that all the chemicals were still 100% potent.

I advised management to plan effectively and avoid instances of expired drugs.

32.6 Unutilised science equipment

It was noted that the Ministry procured Scientific Equipment from M/S Labx

Scientific Systems worth Shs.189,549,919 which was delivered to Namalere

Diagnostic Laboratory way back in 2012. From the review, I noted the following

anomalies:

Page 438: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

426

The equipment was delivered on 7th November, 2012 but received in stores

after one year (12th November, 2013).

The procurement file was not availed for audit.

A verification carried out in December, 2013 at Namalere Diagnostic

Laboratory established that the equipment has not been installed yet.

32.7 Unutilised science equipment

It was noted that the Ministry procured Scientific Equipment from M/S Labx

Scientific Systems worth Shs.189,549,919 which was delivered to Namalere

Diagnostic Laboratory way back in the year 2012. From the review, I noted the

following anomalies:

The equipment was delivered on 7th November, 2012 but received in stores

after one year on 12th November, 2013.

The procurement file was not availed for audit.

A verification carried out in December, 2013 at Namalere Diagnostic

Laboratory established that the equipment has not been installed yet.

It was also reported that the laboratory lacked power and water for a period of

two years. I explained to management that there appears to have been poor

planning and un-coordinated approach in undertaking the procurement of the

science equipment leading to a likely financial loss. There is a risk that the

equipment is likely to go obsolete.

In response, management explained that the equipment is used for pesticide

formulation and residue analysis as part of assurance of safety of food to the

consumer and the potency of pesticides. Installation and test-running of the high

performance chromatography equipment was part of the contract and that the

equipment is very sensitive such that it has to be installed once on the specific

location where it will always be used. Management further indicated that at the

time of Audit, a heavy storm caused damage to the electric system and so the

laboratory lacked power to test run the equipment and hence the installation of

the equipment was stayed.

Page 439: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

427

I advised management to ensure reconnection of power and water to the

laboratory to enable utilization of the equipment.

32.8 Poor state of stores

As part of the audit, inspection of MAAIF Wandegeya stores was carried out on the

2nd December, 2013 and the following anomalies noted:

Cap 1 Para 112 of the TAI 2003 and part 11 of the Standing orders on Public

Stores management requires every Government store to be fitted with fire

appliances and equipment for protection and that such must be inspected at

least every 6 months. This was not done.

The asbestos roof and metallic wall sheets are worn out and the roof

was leaking due to rusting/peeling.

Due to lack of storage racks and holders; arrangement of items was so

disorganized and as a result; several materials such as publications, old

furniture, computers, old tyres and expired chemicals were mixed up and

littered in the stores.

Combustible/inflammable items such as chemicals were mixed up with items

like stationery, old furniture and old tyres posing a high risk of fire outbreak.

Most of the storage rooms were littered with dead stock some of which were

dumped in the stores most especially the Plan for Modernization of Agriculture

(PMA) Secretariat that dumped stock piles of printed materials such as books,

brochures, banners, old computers, old furniture and others without any

supporting documents.

Management explained that they undertook to install the facilities and to carry out

phased renovation of the stores. The phased renovation shall include installation

of vital facilities while obsolete and unserviceable materials will be boarded off.

Furthermore, inadequacy of stores infrastructure was attributed to inadequate

funding under maintenance-civil.

I advised management to improve on stores management and ensure expired

chemicals are stored separately from the rest of the stocks.

Page 440: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

428

32.9 Non Tax Revenue performance

(a) Decline in Nontax Revenue performance

It was noted that NTR performance for the year declined by close to 53% (shs

558,622,892) from previous financial year‘s Shs.1,061,579,332 to Shs.502,956,440

for the current year under review.

In response management explained that NTR in fisheries is majorly collected from

fisheries licensing, regulation and enforcement activities. In FY 2011/12 funds

were allocated for fisheries licensing and policing activities however in FY 2012/13

there was no budgetary allocation for these activities hence a decline in NTR

Collection.

I have advised management to enforce collection measures to avoid loss of NTR.

(b) Un disclosed NTR projections

The Ministry collects revenue from various sources however during the review, it

was noted that the information was not disclosed/presented in the statistical data

for NTR projections such as:

a) The schedule of revenue collection centres.

b) List of revenue collectors‘ authorization as per PFA Reg. 45 (1).

c) The Ministry realizes most NTR from issue of various licenses under fisheries

and Rule No 24 (1) of the Fishing rule Statutory Instruments 33 of 2010 states

that the Chief Fisheries Officer or an authorized licensing officer publishes a list

of all licenses and permits issued under these rules in each year, including the

names and addresses of all licensees. This was not done.

d) The Chief Fisheries Officer or an authorized licensing officer shall publish an

updated list of licenses and permits by 31st day of July each year. The Fishing

Rules were reviewed and I noted that out of 679 landing sites enumerated in

the schedule, only 13 (1.9%) indicated the numbers of boats. The total

number of boats recorded in the 13 landing sites was 614 but the number of

boats in all landing sites was not disclosed. The 614 boats currently stated as

revenue licensing base represent only 2% of the potential revenue.

Page 441: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

429

The Ministry seems to lack capacity to monitor and enforce compliance in the

various lakes where NTR is collected. As a result, the revenue may have been

under estimated by over 98% since licensing is partially based on the number of

boats/fishing vessels.

In their response, management acknowledged that all licenses and permits issued

under Rule No. 21 (1) of the fishing rules Statutory Instrument (SI) 33 of 2010

was not published and indicated it was mainly due to the fact that there is a new

licensing strategy and the database was being organised and updated. It was

indicated that the exact number of boats for the revenue base by landing sites

during the year was not known but improvements have been put in place and the

current data capture system is able to capture the number of boats at landing sites

hence list of boats per landing site will be updated. The ministry further indicated

it has expanded its structure and hence capacity and an Agricultural Police is being

established to enhance capacity to monitor and enforce compliance.

I await the outcome of the above commitment.

32.10 Valley dams

(a) Payments on valley dams construction-Shs.1,537,446,872

The Ministry contracted a construction company to construct valley dams in the

districts of Isingiro, Lyantonde, Rakai, Mubende and Kiboga at a cost of

US$.8,094,704.56 and the work was completed in 2009. During the year under

review; I noted that Shs.1,537,446,872 was paid for the construction/rehabilitation

of valley dams namely; Rwenjuba in Isingiro district, Mukulu in Lyatonde district,

and Kibanda dam in Rakai district. In the previous year‘s report, I pointed out that

the Ministry had paid interest on the delayed payment of Shs. 2,159,517,353. In

the current year, I noted that the amount paid for the year was not broken down

to indicate the payments in relation to the principal and interest respectively. In

the circumstances, I could not establish how the amounts paid were determined

and how much remained outstanding. There is a risk that Government could lose

funds if the Ministry does not reconcile the above position to avoid the endless

claims by the contractor.

Page 442: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

430

Management explained the issue of endless claims would not arise as the

outstanding amount of this account was now zero. During verification, this position

could not be confirmed as all the supporting documentation was not availed in

time.

I advised management to ensure the above position is reconciled.

32.11 Inspection of the valley dams

As part of audit, inspection of a sample of valley dams was carried out at the

following sites: Rwenjumba Dam-Isingiro district, Mukukulu dam – Lyantonde

district, Kibanda Valley dam - Rakai district and Kasejere Valley dam-Kyankwanzi

district. The following were noted.

It was observed that the papyrus grass had grown in the middle of the dam at

Rwenjumba dam-Isingiro district which contributes to the reduction of water in

the dam. The gate that was originally installed to control movement of both

cattle keepers and animals was no longer in place and as a result two (2) cows

were reported to have drowned in the dam.

The dam at Mukukulu dam – Lyantonde district was being used as a fishing

ground as evidenced by the fishing nets and the traps found in the dam and all

water taps for troughs and those for the dams to the troughs had been stolen.

The location of the dam at Kibanda Valley dam - Rakai district was originally a

swamp and the contractor just removed the grass and fenced it off. The whole

dam is covered by papyrus grass and a big section was not fenced hence

making it easy for people and their animals to enter freely.

The water in the dam at Kasejere Valley dam-Kyankwanzi district had dried up;

it could rightly be observed that the dam‘s source of water was poorly

identified hence persistent low water levels.

All the dams had many inlets and outlets around and as a result, animals were

found grazing within the dams instead of drinking from the troughs that were

constructed outside the dams.

Page 443: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

431

It was further noted that the pipes leading to the troughs broke down causing

water to divert from the troughs hence reducing the volume of the flow to the

troughs.

It was observed that boreholes constructed on the dams to provide water to

people had broken down and the toilets that were constructed were found to

be out of use due to poor maintenance and grass had over grown all around.

In response, management explained that during project implementation, it was a

requirement for the user committee to form user associations and elect a user

committee to manage the dams which in effect is not a direct responsibility of the

ministry. These committees were trained by the project to ensure that once the

dams are handed over, they are properly maintained.

From the explanations given by management I noted that this is not a primary

responsibility of MAAIF but a sustainability issue as the dams are owned by the

communities. I noted with concern that there was a management challenge on

sustainability of these dams since there is no clear strategy in place on how to

make the valley dams serve their purpose. If these valley dams are not well

maintained, it will have been a serious loss to Government that put in a significant

amount of resources.

I have advised management to liaise with appropriate authorities to allow

sustainability of the valley dams if the intended objectives are to be achieved.

32.12 Bukalasa Agricultural College

(a) Vacant posts

It was noted that the College had 53 vacant posts and these relate to critical areas

in the operations of the college. Vacant posts hinder the smooth running of the

operations of the college.

Management explained that the ministry sought clearance to fill the vacancies and

that the ministry of Public Service has granted clearance for 11 critical posts which

include: the Principal, Senior Lecturer (2), Lecturer (4), Bursar Librarian, Medical

Page 444: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

432

Assistant/Registered nurse and Assistant Registrar. The other staff will be cleared

on a phased approach pending availability of funds.

(b) Outstanding balances in school fees-Shs.122,591,000

The Universities and Other Tertiary Institutions Act, 2001 gives all public

Universities, Colleges and any other institutions under the Act to devise alternative

sources of generating revenue to supplement the subventions/grants from

Treasury. As at the time of reporting (February 2014), a total of shs.122,591,000

was still outstanding in fees. I explained to management that this affects

implementation of the college activities.

Management explained that measures to ensure recovery of outstanding fees have

been institutes including denying students‘ meal cards and access to examination.

I urged management to collect the pending fees.

(c) Un formalized staff appointments

A review of employee personal records especially those on contract revealed that a

number of staff were recruited on contract arrangement but their appointment had

not been formalized/regularized for a number of years by the Council as required

by the Act.

I explained to management that failure to formalize the appointments result into

remuneration of staff that are not known to the college (ghost workers) or

employment of unqualified staff that would affect the performance of the college.

Management explained that the governing council considered the matter of

formalising staff and recommended interviews subject to complete performance

appraisal reports.

Management‘s action is awaited on this matter.

Page 445: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

433

(d) Un approved supplementary admission list

The Universities and Other Tertiary Institutions Act, 2001 gives the College powers

to admit private students on private programs through the Admissions Committee

appointed and approved by the council. However, it was noted that despite the

council approving the original admission list, the head admissions board who is

also the Academic Registrar went ahead to include a supplementary list that was

not approved by the Council as required by the Act.

I further noted that even the original Government list was supplemented by

another list not approved by the Ministry of Education. I explained to management

that none approval of supplementary admissions is not only against the law but

could lead to irregular admissions of students.

In response, management explained that the college academic board approved

the admissions in accordance with the universities and other tertiary institutions

ACT sec 82 and as per the Board meeting held on 26th July 2012. I advised

management to always admit students following the law.

32.13 Fisheries Training Institute – Entebbe

(a) Non formalization of staff appointments

A review of employee personal records revealed that a number of staffs were

recruited on contract arrangement but their appointment has not been

formalized/regularized for a number of years by management. I explained to

management that failure to formalize and appoint staff officially may lead to

paying of ghost workers. This may also lead to employment of unqualified staff

once the jobs are not competed for.

In response, management explained that the MoPS has cleared 5 critical posts and

MAAIF will be submitting their names to PSC for regularization of the

appointments.

Page 446: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

434

I await the outcome of the above action.

(b) Un funded capital development budget-Shs.1,380,000,000

It was noted that the institute had a capital development budget of

Shs.1,380,000,000 for the year which was never funded. As a result, the institute

had many capital development projects which were not implemented during the

year as indicated below:

Unimplemented activities hamper service delivery and the appropriating authority

objectives may not be met.

No. Item Qty. Total

1 Students training/Outboard engines

(15 HP, Yamaha)

02 (10,000,000=)

@)

20,000,000=

2 Swimming pool for training students 01 350,000,000=

4 Double cabin pick-up (official) 01 80,000,000=

5 VIP Latrines for students (5 stances) 01 10,000,000=

7 Equipping wet laboratory Lump sum 300,000,000=

8 Renovating the processing Lab and

Installation of the new machinery

and the cold rooms

01 200,000,000=

9 Fish cages and accessories 04 15,000,000=

10 Incinerator 5,000,000=

11 V.I.P. Latrines 02 25,000,000=

12 Plumbing and Water Pump for (AQ) 50,000,000=

13 Hatchery Construction. 45,000,000=

14 Institute bus 01 280,000,000

Total 1,380,000,000

I advised management to take up the matter with the Ministry and appropriate

authorities for immediate attention.

Page 447: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

435

Management explained that the budget estimates on an annuals basis, both

recurrent and capital expenditures are made in order to achieve long term and

short-term institute goals though the budget for the year was not approved.

I advised management to take up the matter with the Ministry and appropriate

authorities for immediate attention.

(c) Vacant posts

During the year under review; it was noted that the Institute had 18 vacant posts

including the Deputy Principal, Secretary, Bursar, Assistant Bursar, lecturers and

other support staff. Some of the vacant posts relate to critical areas in the

operations of the institute like the Bursar and the Deputy Principal thus leaving

them vacant affects the operations of the institute.

Management explained that MAAIF took up the matter with MoPS which has

approved filling of 5 critical posts which including: 1 Senior Lecturer, 4 Lecturers

and 1 Bursar.

I advised management to pursue the matter further and have all the positions

filled.

32.14 Institute land issues

(a) Land encroachment-rocky peninsular

It was noted that the Institute has been using a rocky piece of land of

approximately 2 acres located behind the boy‘s hostel. The land has been used by

the school as students‘ observation point for navigation, training in cage farming,

and a breeding ground for fish since 1968. During the review; I noted that the

land is being claimed by M/s Masindi Hotels who recently acquired a title and plans

are under way to have a hotel constructed there. It was noted that this will not

only deny the school authorities to train students but it will also obstruct students

reading environment.

Page 448: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

436

Management explained that the matter had been taken up with the appropriate

authorities at Wakiso District Land Board, Entebbe Municipal Council, Ministry of

Lands and Uganda Land Commission.

The outcome is awaited

(b) Untitled land – Donation from Entebbe Municipal Council

It was noted that the Institute was allocated a wet land of approximately 5 acres

by Entebbe Municipal Council near the old Airport on Buku Road for aquaculture

fish farming in 2005. However, the land has no title which exposes it to

encroachment by private developers and makes it difficult for the institute to use it

for the purposes originally intended for.

Management explained that the matter is being followed up with Wakiso Land

Board.

I urged management to ensure that the efforts to acquire the land title are

continued.

32.15 Abandoned facility at Namalere

The facility has approximately 90 rooms for office and laboratory usage and well

stocked with new first class furniture. Physical inspection of the

Phytosanitory Laboratory at Namalere revealed the following anomalies:

There was a lot of unauthorized tilling of land at the facility by unknown

people.

The perimeter fence was damaged on the northern side which makes the place

susceptible to vandalism.

It was noted that some of the new items like furniture, freezers and

microscopes were not engraved which makes them vulnerable to theft.

I noted that the facility is given little support as evidenced by lack of basic supplies

like the basic apparatus for cleaning such as basins and brushes. Similarly the

compound caretaker was only using hand slashers for a compound of about 3

Page 449: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

437

acres hence the over grown lawns. There is a risk that the facility will continue

deteriorating due to neglect and hence no value for money will be realized from

such an investment. The act of neglect could lead to wasteful expenditure on this

investment.

Management explained that the facility is being used and efforts will be taken to

fence the facility and engrave the assets.

The management action is awaited.

32.16 CONSTRUCTION OF FISH LANDING CENTERS UNDER THE FISHERIES

DEVELOPMENT PROJECT-MINSTRY OF AGRICULTURE – SPECIAL AUDIT

A total of Four Fish landing centres namely Lwampanga, Butiaba, Bukungu and

Kiyindi under the Fisheries Development Project were selected for the audit. The

construction works were originally contracted to M/s Dembe – Liberty JV under Lot

1 who were terminated and the works completed by M/s Spencon Services Ltd

through an addendum to their main contract for construction of other landing sites

under Lot 2. The works were funded by the African Development Bank. The key

audit findings arising from documentation review, field inspection, quality tests

and measurement for works executed are summarised below.

I. Lack of Procurement Documents

Procurement documents for the works and consultancy contracts were not availed

for audit. It was therefore not possible to conclude as to whether the

procurement processes were conducted in accordance with the Public

Procurement and Disposal of Public Assets Act.

Management explained that PPDA guidelines were followed in the procurement of

the contract and the solicitation documents were duly approved by the Contracts

Committee, but the procurement documents were subsequently picked from PDU

by CID for investigations following the termination of the contractor for forging a

performance guarantee.

Page 450: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

438

The Accounting Officer should in future undertake proper due diligence on

contractors before they are engaged to avoid instances of non compliance with

procurement process; it is further recommended that this contractor be forwarded

to PPDA for Action.

II. Financial loss of Shs.2,060,686,142 due to Laxity in the

Procurement and Contract Management

It was observed that the works audited were originally contracted to Dembe -

Liberty Joint Venture on 11th December 2007. However two years after the

guarantees were submitted in the month of September 2009; it was discovered

that Dembe – Liberty Joint Venture had submitted forged advance payment and

performance guarantees; consequently the contract was terminated.

The Bank guarantee submitted by Dembe –Liberty JV was forged at the time its

validity was due to expire, and the contractor was requested to have it extended

but failed.

On 5th July 2010 Spencon services were procured to complete the works through

an addendum to the contract. However, an additional Shs.2,060,686,142 was

incurred because the rates of Spencon were higher than the rates of the original

contractor. In addition some works were eliminated to accommodate the

additional cost implying that some design objectives were not achieved. This cost

could have been avoided if due diligence was ensured at the time the bid

securities were submitted.

I advised that due diligence be carried out on future procurements by the Ministry

to assess the competence, capacity and credibility of the Contractor prior to

contract award.

III. Un-charged liquidated damages (Shs 383, 623,809) and Delayed

completion of works

The addendum made to the contract to bring in M/s Spencon Services Ltd was to

have executed the works within 5 months ending on 4th December 2010; However

even with multiple extensions of time the latest being 15th June 2013, none of the

Page 451: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

439

project facilities had been handed over to the Ministry because of delays in

completing works; this delay should have attracted liquidated damages of

Shs.383,623,809 under the addendum.

It is recommended that the Ministry should adhere to contract conditions for such

works and the uncharged associated liquidated damages on the contracts be

recovered from the contractors since there was no further extension of the

contract beyond June 2013.

Management explained that Dembe-Liberty and Spencon Services requested for

extensions that were granted, by the Project Manager and this is the reason

liquidated damages were not charged on the contracts. I have however explained

to the Accounting Officer that the extensions granted by the project Manager

(Consultant) were undertaken without the approval of the Ministry. The project

manager granted extensions of time to both contractors in the absence of which

liquidated damages worth Shs.1,641,437,730 would have been charged.

It is recommended that time extensions be properly controlled and minimized as

they have cost implications for the Ministry. Project Managers should not grant

time extensions without the approval of the Ministry.

IV. Irregular Payment of Shs.2,265,064,334 (14%)

The contract amount for the original works under Spencon Services Ltd was

Shs16,190,909,620 exclusive of VAT, however the total amount paid to Spencon

Services Ltd was Shs18,455,973,954. It could not be ascertained why an extra

payment of Shs.2,265,064,334 had to be made as the necessary supporting

documentation and details of the excess payments were not availed for audit.

The excess amount paid of Shs.2,265,064,334 represents an increment of 14% of

the contract amount. The client should be responsible for approvals of costs that

significantly increase the project costs.

Proper justification should be provided for the excess amount paid. It is further

recommended that the client (Ministry) be responsible for approvals of costs that

Page 452: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

440

significantly increase the project costs. The project manager should seek the

client‘s approval before instructing the contractor to do works that exceed the

contract amount.

V. Amounts Unrecovered on termination of Dembe-Liberty Contract

According to clause 60.1 of the Contract agreement regarding payments upon

termination; the Project Manager is required to value all the completed work and

make recoveries for all advance payments made and apply punitive costs at a rate

of 20% of the value of the remaining works.

On 30th September 2009, the Ministry terminated the works contract with Dembe

– Liberty JV. In this regard the amount payable by the contractor to the employer

was ascertained to be Shs 1,100,659,769 exclusive of VAT which was reduced by

Shs 726,936,006 in respect of VAT due to the contractor on previous certificates.

No proof of recovery of the balance of Shs. 373,723,763 was seen. The Ministry

did not avail evidence of the reconciled tax position of the Contractor. Hence it

was difficult to confirm that the VAT of shs 726,936,006 was the actual amount

due to the contractor. Moreover, if this VAT was paid to the contractor by URA

through the Ministry of Finance, then the Contractor ought to have paid the

Ministry the total Shs.1,100,659,769.

Management explained that the Ministry instituted recovery proceedings upon

termination of Dembe-Liberty JV contract but the contractor made counter claims

and sued the Ministry. The matter is now before the courts of law.

The Accounting officer should pursue the matter with the Solicitor General and

ensure that all recoveries due from the contractor are made.

VI. Cracks in concrete structures , use of timber for kerbs and general

quality of works

Site inspection revealed that there were hairline cracks in some concrete bays on

the landing sites indicating poor control of the curing process; also observed was

the use of timber as kerbs which were cracking and some of the timber poorly

jointed. Use of timber is not appropriate given that it is in contact with water.

Page 453: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

441

Overall the quality of works was generally good although some concrete panels

were found not meeting the strength requirements as per tests conducted.

Management explained that the Observed hairline cracks in some concrete bays

were noted by the Project Manager and communicated to the contractor for

rectification by way of snag lists during the defect liability period.

It is advised that the cracks be repaired and weak concrete panels redone before

discharging the contractor and the use of timber for kerbing be reviewed.

VII. Payment of Shs.76,332,134 for unexecuted works

Measurements were taken by the audit team in the presence of the contractor,

Ministry and Consultant‘s representatives and an amount totalling Shs.76,332,134

was ascertained to have been paid for unexecuted works.

The Accounting officer should ensure that these amounts are recovered from the

contractor.

VIII. Weaknesses in Supervision and Project Management

It was noted that the project supervisors took almost two years from 11th

December 2007 to September 2009 to discover that the advance payment and

performance guarantees expired. It took the Ministry another ten months to

conclude the addendum on 5th July 2010.

The contract with Spencon expired on 15th January 2009 and had no time

extension granted prior to signing the addendum on 5th July 2010 (1 year and 6

months after the expiry of original contract). This implies that the Ministry had no

contract with M/S Spencon services Ltd to warrant an addendum. To date i.e.

seven years after the contracts commenced, and four years after signing the

addendum, none of the project facilities have been handed over to government

and no action has been taken on either the Consultant or the contractor. At the

time of field inspection on 6th and 8th January 2014, the sites were virtually

abandoned.

Page 454: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

442

There was no evidence indicating that the Project Coordinator or Manager at the

Ministry was overseeing the project implementation and receiving progress reports

from the Contractor and Supervising consultant as required by the PPDA

regulations on Contract management.

Had the project manager followed progress on the project implementation; delays

and abandoned works would have been detected in time and corrective measures

instituted earlier enough; this is an indication of weaknesses in project supervision

and management.

The Accounting Officer should ensure that there is adequate capacity to supervise

and manage such contracts since the project was being implemented at ten

different landing sites variously located.

Summary of Key Findings per Sub-project

The detailed findings for each of the sub-projects in the audited project are

presented in the table below:

Sn Sub-project Key findings

1 Kiyindi Fish landing site in Mukono district

Multiple hair line cracks were seen on the floor screed for the fish handling bay and the water pump house

Overpayment of Shs 42,604,184.

2 Bukungu fish landing site in Buyende formerly part of Bukungu District

The ice shed structure constructed by Dembe – Liberty JV was abandoned,

Cracking of cement screed on the fish handling bay and the outlet drainage channel

Cracking and poor jointing of the timber kerb

Overpayment of Shs 1,013,599.

3 Lwampanga Fish landing Site in Nakasongola district

Incomplete and abandoned security/tally structure at ring beam level constructed by Dembe – Liberty JV,

Cracked Floor Surfaces Overpayment of Shs 18,115,307

Page 455: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

443

32.17 VEGETABLE OIL DEVELOPMENT PROJECT

(a) Compliance with financing agreement provisions and GOU

financial regulations

A review was carried out on the project compliance with the loan agreement

provisions and GoU financial regulations and it was noted that the project

complied in all material respects with the provisions in the agreement and applied

GoU regulations except in the following matters:

i) Project Financial Performance

During the year, the project planned expenditure was Shs.24,678,704,410 (GOU:

Shs.2,623,500,000; IFAD: Shs.21,759,405,744 and Farmers‘ funds

Shs.295,798,666) but only Shs.14,756,633,901 in respect of GOU:

Shs.2,621,174,997 IFAD: Shs.11,839,660,238 and Farmers‘ funds:

Shs.295,798,666 was spent translating into only 60% of the annual budget

performance. Procurements and activities for the year under review that were not

undertaken include;

Construction of fertilizer store and farmer‘s hall,

Cadastral survey and road mapping of 90km and the road design for 65km and

other small roads,

Procurements for contractors for construction of 65 kms of connection roads,

Procurement of vehicles (13 double cabin pick-ups),

Conducting consultancies and procurement of seeds for demonstration among

others to facilitate smooth implementation of the project.

Implementation of the planned procurements is critical to the success of the

project, and failure to do so affects the implementation of project activities.

Management explained that the roads constructions and other civil works like

construction of the fertilizer store were deferred, awaiting recruitment of a project

engineer. Procurements related to Buvuma activities (Road design, road

constructions, procurement of a Mini bus and Generators) were also deferred,

Page 456: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

444

awaiting start of activities by the private sector partner, a condition in the loan

agreement while activities by the private sector await availability of the 6,500

hectares of land required for the nucleus estate. Road mapping of 90 kms was

also postponed until studies for the ferry service between Bugala Island and the

outlying islands of Bunyama and Bubembe are completed.

I advised management to ensure that the required resources are brought on

board to enable implementation of project activities.

ii) Recovery of Loans to KOPGT Farmers

Shs.29.5 bn was disbursed to KOPGT farmers under Phase I and 2. Phase I of the

project commenced in May 1998 and was supposed to close in 2008 but was

extended to June 2012. Phase 2 of the project has just commenced. However,

Shs.1.97bn only has been recovered from the farmers as loan repayment todate.

The balance of Shs.27.53bn is yet to be recovered representing only 93.32%. I

find the recovery rate slow.

I urged the Accounting Officer to put in extra effort and ensure that the

outstanding loan is fully recovered before the end of phase 2 (2018).

iii) Land for Oil Palm Growing

According to the agreement signed between OPUL and GoU, it was agreed that

6,500ha of land be acquired and cleared of any encumbrance and be handed over

for consolidation and expansion of oil palm growing/development. However at the

time of reporting, only 2,404ha had been cleared of all encumbrances but not yet

handed over to OPUL. The balance of 4,096ha had not been secured despite the

fact that funds to the tune of Shs.3,007,197,822 were available and held on the

‗Land funds account‘ managed by the entity. The delay to handover the land could

affect the fulfilment of the project objectives.

Management explained that the delay in acquisition and handing over land to

OPUL was hampered by the following;

some of the land titles that were still held in the names of deceased making

the process of updating the land documents lengthy,

Page 457: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

445

some of the land that was still occupied by tenants making the process of

negotiations between land lords and tenants is time consuming,

the process of valuation that has been found lengthy and involving vigorous

discussions with the parties involved and cases of land conflicts in terms of

ownership some of which are before courts of law.

Management further explained that caution has been exercised to ensure that the

land paid for has no issues of conflict in terms of ownership to avoid loss to

Government.

I advised management to ensure that the land related issues are handled in a

timely manner so that project activities can be implemented.

iv) Inspection of Kalangala Oil Palm Growers Trust (KOPGT)

operations

KOPGT is one of the implementing agencies of VODP. The Trust is responsible for

representation of the interest of the palm oil farmer, carrying out periodic

reconciliation of growers accounts with Oil Palm Uganda Limited (OPUL),

transportation of fresh fruit bunches from farmers plantations to the mill and

facilitation of credit for the purchase of inputs such as fertilizers and seedlings by

the farmers among other activities.

As part of audit of the project, inspection of the oil palm component of the project

was carried out whose scope included review of the structure and trust operations

and status of implementation of activities for the year. The following was

observed:

v) Lack of a land title

In 2006, the registered farmers agreed to buy a plot of land on which the KOPGT

secretariat was to be constructed. The farmers contributed Shs.50,000 each and

collected a total of Shs.24,000,000 that was used to buy land in Kalangala Town

Council way back in 2007. However, it was noted that although the transfer forms

were dully signed, management has not yet acquired the land title. There is a risk

of encroachment of land in absence of land titles.

Page 458: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

446

Management explained that KOPGT management has engaged a surveyor to

pursue the land titling process with the Masaka Land Registry to completion. This

is expected to be ready by March, 2014.

The outcome from the above action is awaited.

(b) General standard of accounting and internal control

A review of the following areas was carried out:-

Accounting system and policies.

Book keeping.

Management and control of both bank and cash accounts.

Purchases and payments.

Fixed assets management.

It was noted that management‘s control structure environment, accounting system

and policies and control procedures were generally adequate to ensure prudent

use of, and accountability of the project funds.

33.0 NATIONAL AGRICULTURAL RESEARCH ORGANISATION

(NARO)

33.1 Assets Management

a) Land Issues

It was noted that NARO does not have title deeds as evidence of ownership for

most of its Research Institutions located country wide. The institutes land were

encroached on mainly for settlement, crop growing, and other commercial

activities like brick making. Details taken from a sample of Institutes inspected

follow below:

Institute Observation

National Forestry Resource Research Institute (NAFORRI).

Untitled Land The institute has approximately 425 hectares of land but with no evidence of legal ownership as there was

Page 459: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

447

no land title.

Coffee Research Center(COREC) -KITUZA

Untitled Land The institute has approximately two acres of land but with no evidence of legal ownership as there was no land title. It was noted that the land title available is in the names of the Uganda Land Board instead of NARO.

Other ZARDI‘s; MBAZARDI, ABIZARDI, KAZARDI, BUZARDI

Lack of land Titles and land encroachment. It was noted that there was no proof of land ownership for Mbazardi, ABIZARDI, KAZARDI, BUZARDI and Kakumiro land. The Institutes‘ land has been encroached on for settlement, crop growing, commercial activities and these encroachers were allegedly illegally selling the land to other individuals. Titles for the mentioned institutes‘ land have not been secured as earlier recommended.

BUZARDI

Land at Kakumiro The land at Kakumiro is held in trust by the land commission and was allocated for exclusive use of Agricultural Research. It was noted that this land has been encroached on affecting productivity of the institute as the encroachers were reported to have destroyed high quality experiments and research structures. Other challenges faced on this land included; Land commission parceling out pieces of land within the research institute and allocating it to private developers regardless of the investments made by NARO. The Host districts issuing subsistent land titles which are recognized by the land commission.

National Fisheries Resources Research Institute

(NaFIRRI)

Land for construction of a pier It was observed that the Institute operates from a pier that belongs to Rift Valley Railways. Further, there was no memorandum of understanding between the two Institutions. There is a risk that the RVR (Rift Valley Railways) could hike charges anytime and or stop offering the services to the Institute which could interrupt operations. I advised management to have a contract with RVR and consider acquiring its own land.

Irregular Allocation of NAFIRRI Institute land to private developers: a) It was noted that land located between Lwasumu road and Mutekanga and Waka road

Page 460: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

448

measuring 5 acres that had been initially planned for construction of 43 units for staff was allocated to private developers by the Uganda Land Commission. Another piece of land adjacent to the existing staff quarters was reportedly under threat from unknown persons as efforts by NaFIRRI to acquire the title had not yielded any results. b) Land situated at plots 89 Magwa Crescent and 21 Acacia Road where NaFIRRI had already started to develop (foundation and columns up) was allegedly allocated to a company as shown in the picture below:

It was further noted that developments north of this land were also constructed on land belonging to NaFIRRI. c) I noted that Plots No 76 to 82 on Magwa Crescent are not yet developed and there is a risk that these plots may be irregularly taken any time as Plots No.76, 78 and 80 were already leased out to unknown developers by Uganda Land Commission despite the fact that the same plots had been designated for the exclusive use of NARO. d) Plot 8A on Lubogo road is partially developed with a small structure; however NARO does not possess its title. e) Staff quarters located on plots 6-8 Circular Rd that was planned to have 4 houses has 3 houses already constructed. However, the audit noted that plot 8 is empty and vulnerable to land grabbers since management has not secured the titles to these plots ever since 2007 when they were surveyed.

Page 461: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

449

f) NaFIRRI was allocated 19 acres of land along Jinja –Iganga highway situated between Kakira Community Technical Institute and Kakira Sugar Plantations stretching up to the lake shores. While the institute was in the process of acquiring the title for this land, the same land was being cultivated by unknown persons.

National Livestock Resources Research Institute NaLIRRI

Irregular use ofNaLIRRI’s property (Plot 48 Osukuru Road)

Records available showed that sometime back in 2008 the Honorable MP for West Budama South requested to be allowed a temporary stay in one of the NaLIRRI houses in Senior Quarters in Tororo town plot 48 Osukuru road. It was noted the MP was given permission and entered the house in January 2009 having paid rent of 3,000,000 at the rate of 250,000/= per month. On the 18th of January 2011 the Director NaLIRRI advised the MP that management took a decision that non staff should vacate the Institute‘s houses to give priority to staff and thus the MP was requested to vacate the house. Records further showed that the Legal Counsel for NARO wrote to the same MP on the 12th October, 2011 still addressing the same issue of his refusal to vacate the Institute‘s house despite several reminders. As at 30th June, 2013, the MP was still occupying the Institutes house under unclear terms as there was no tenancy agreement availed for review. Besides, there was no evidence that he ever paid rent since Jan.2010 to Dec.2013 indicating that he owes the Institute Shs.10.5M in rent for the period Jan 2010 – June 2013. The circumstances under which the MP continued to stay in the house were not clear since management advised him to vacate the house. I have advised management to take up the matter with authority to ensure the Institute does not lose this asset and besides, recovery measures should be instituted to ensure the outstanding rent is cleared.

BUGINYANYA (BUGIZARDI)

Encroachment on the Institute’s land.

It was noted that land measuring approximately 270 acres has triplicate title deeds in different individual names and the land was under threat of encroachment. There is a risk of losing this land since there seems to be conflict in ownership that is likely

Page 462: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

450

to affect the various activities of the Institute.

National Semi-Arid Resources Research Institute(NASARRI) SERERE.

Land Grabbing by Local community Some encroachment was reported on the Institute‘s land situated at Serere by the local community. In Kumi Town Council; un known persons had started putting up permanent structures, in Kuju located in Amuria Trial Verification Centre (TVC). The local community was reported irregularly taking possession of the land and this is similar to what is happening in Nakabango TVC in Jinja.

Nabuin zonal Agricultural Research Development Institute (NABUZARDI)

Un-Surveyed land/Lack of a title deed It was noted that all the land occupied by the Institute estimated to be 1,300 acres has never been surveyed and hence no title deed to the same land. It was further noted that some land estimated at 100 acres were allocated to the Prime Minister‘s office for resettling Karamoja street children, however; there was no evidence to show that appropriate procedures for land allocation was followed and no evidence that Uganda Land Commission was involved in the land allocation. Besides; no memorandum of understanding between the two entities was seen clearly defining the terms of the land allocation. I explained to management that there is a risk that the Institute could lose its prime land since the allocation criteria was not clear/known. I advised management to ensure that proper procedures are always followed in land allocations.

Ngetta Zonal Agricultural Research Development Institute Nge ZARDI.

Land

Ngetta Institute has land measuring approx. 540 acres. It was noted that the eastern side of the land that was formerly used for animal rearing has been encroached on. It was further noted that the District Agricultural Officer Kitgum has been staying in one of the houses for a period of over 5 years without paying any rent. Rent income in default is estimated to be Sh.7M and this has remained outstanding despite frequent demands from the Institute. I have advised management to consider instituting litigation measures to ensure recovery of the outstanding rent and securing the property.

I explained to management that lack of land titles by the institutes might

continuously affect the operations of the Organization and besides, there is a risk

that the organization could lose this land to un-scrupulous persons. Moreover; the

Page 463: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

451

disruption on the land constrains productivity, and interrupts experimentation,

technology testing and multiplications objectives of the institute. In response,

management explained that NARO was doing its best to address the land issues

though the process was taking long.

I advised management to ensure that all issues on land are resolved urgently and

where applicable land tittles are obtained to avoid unnecessary costs which could

include legal costs.

b) Failure to dispose of old equipment

It is good practice that assets that are no longer of economic value to the

organization be disposed of and the profits or losses that accrue from such sales

subsequently disclosed in the financial statements. This is normally aided by the

Board of survey recommendations. Inspection of various Institutes of the

Organization showed some weaknesses as indicated below:

Institute Observation

1. National Forestry

Resources Research

Institute, NaFIRRI, COFFEE REEARCH

CENTER (COREC)-KITUZA

At these Institutes, old items (scrap) including old computers;

printers and furniture were still kept in stores and others like

old vehicles (3 with no number plates) and motorcycles were scattered in the compounds of these institutes.

3. Other ZARDI‘s;

MBAZARDI, ABIZARDI, KAZARDI, BUZARDI

Inspection carried out during the month of October 2013,

showed that there were assets at the institutes of Mbazardi, KaZardi, Buzardi, and ABIZARDI that were recommended for

boarding off in the previous year‘s board of survey report but

management had not taken action. These included motor vehicles and other scrap.

4. NaFIRRI, NaLIRRI and

NaCRRI

It was noted that most of the grounded motor vehicles were

overdue for boarding off. See a sample of some pictures below:

Page 464: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

452

5. NgeZARDI Transport Equipment and Tractors

It was noted that most of the motor vehicles and tractors at

NgeZARDI are grounded due to inadequate maintenance. The audit noted that most of the motor vehicles and walking

tractors of the Institute have been grounded for long without repairs. Refer to the pictures below:

I explained to management that these assets continue to lose value as time

passes leading to reduction in the benefits of early disposal. Furthermore; the

items occupy space that would otherwise be occupied by more valuable stocks.

In their response, management explained that NARO was doing its best to address

the asset management issues though the exercise of boarding off the old assets

had taken long.

The outcome is awaited.

Page 465: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

453

33.2 Domestic arrears

Review of the financial statements showed that during the year, the Organisation

incurred new outstanding commitments totalling to Shs.57,793,017 that related to

international organisations and UMEME in addition to outstanding commitments

from previous years of Shs.885,734,692. This is contrary to the commitment

control system. I explained to management that there is a risk that the continued

discontinued payment of the arrears may result into non provision of services by

the service providers.

In response, management explained that the Organisation did not get quarter four

(4) release as planned which affected fulfillment of its obligations. I advised

management to ensure that these arrears are prioritized in the subsequent

financial year as guided by the Accountant General.

33.3 Budget Performance

a) Shortfalls in Government funding

Analysis of budgeted income of the Organization of Shs.51,455,612,347 (excluding

NTR) for the year showed that only Shs.34,304,918,634 was released leading to a

shortfall of Shs.17,150,693,713 (33% of the budget). I noted that Government‘s

failure to release the expected funding resulted into non-implementation of various

activities. Listed below is a sample of unimplemented activities taken from Abi

ZARDI and Buginyanya ZARDI.

Un implemented activities under Abi ZARDI

Buginyanya ZARDI Un implemented Activities.

Multiplication of the newly introduced

16 improved lines of sorghum for

evaluation and adoption in the region Survey reports on cereal production

constraints in west Nile

Setting up experiments to determine

effects of soil management practices in improvement of tolerance to bean

fly and maintenance of trials

Conduct experiments for cereal and

legume crops on station and adapt them on farm

Generating100 independent rootstock

plantlets Determine soil amendment options for

apples trees at Buginyanya station

2-One goat unit housing 20 bucks

renovated to control breeding 0.7ha of Chlorisgayana pasture

established for seed multiplication at

Bulegeni station

Procurement and establishment of wheat

multiplication gardens

Page 466: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

454

Collect germ-plasm for trials;

Establish trials both on station and

on farm; Collect data from trials Setting up trial on boundary planting

on station

Testing cassava processing

technologies and Forage multiplication of 2 sites.

Farmer training in pasture agronomic

principles and 80 farmers on fertiliser

use and management Farmer training, animal identification

and initiation of AI breeding services

Setting up trials on different feeding

strategies for goats Training of farmer groups and

individual farmers

Enhancing farmers‘ capacity in

production of live feed for catfish

On site manual sexing of brood stock

and breeding by farmers adapted

Application of 3 fungicide treatments to

selected plots on farms in Bushika,

Bududa District Best soil nutrient amendment options

identified for promotion

Disease surveillance and monitoring on

station and in the zone Generating baseline information on SWC

practices in project sites

Training sessions for famers in

appropriate livestock management

techniques

I explained to management that failure to implement the planned activities may

lead to the organisation‘s failure to achieve the intended objectives. In response

management explained that attempts have been made to follow up the matter

with Ministry of Finance, Planning and Economic Development (MOFPED) but with

no tangible results. I have advised management to continue pursuing the matter

with the MOFPED to ensure the budgeted funds are always secured.

33.4 Inspection of the NARO Institutes

Inspection of the Institutes revealed the following issues:

Institute Observation

Coffee Research Center (COREC) – Kituza

Lack of laboratory space and equipment

It was noted that COREC institute did not have enough space for its laboratory and equipment. The equipment is

currently housed in the main administration block directly opposite the Directors office. This equipment included the

incubator, Water distiller, Autoclave whose operations

within the office block could be unhealthy to human life. Besides, the equipment was too old and needs

replacement. Interview with management showed there was need for the purchase of new ones like Polymerase

Chain reaction machine, 80 C Freezers, and insect rearing unit, for meaningful research to be carried out. I explained

Page 467: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

455

to management that the above state could affect research

work. In response, management indicated this was a new

Institute that would be included in the civil works of the

project funded by World bank. Management‘s commitment is awaited on the matter.

NaFIRRI

Health Challenges

It was noted that NaFIRRI was generally faced with a

challenge of water pollution coming from water hyacinth, heavy metals such as phosphorus and too much

nitrogenous nutrients. I explained to management that there is a risk that this could affect the research

operations of the Institute in the near future. In response management explained that Pollution was a lake wide

phenomenon and that efforts were being made to engage

NEMA on the matter. The outcome of management efforts is a waited.

Staffing

It was noted that the staffing position of the Institute is

not sufficient for its operations. While the core mandate of the Institute is research; it was noted that the current

number of scientists of 22 staff is inadequate. I explained to management that Research work and all the associated

innovations tend to move at a rather slow pace and cannot meet the ever growing socio economic needs of

the stake holders if the adequate number of scientists is

not in place.

Although management indicated that it has been a long wish and plan to enroll at least 15 scientists every year for

the next 5 years; it was noted that this position has not

changed and that it has always been curtailed by the Government‘s ceiling on recruitment. Management further

explained that the current MTEF cannot allow attainment of desired staff numbers and that engaging MOFPED

would continue. I advised management to take up the

matter with appropriate authorities so as to have the matter resolved.

Operations of the Research Marine Vessels

Status of the Marine Vessels;

NaFIRRI has 3 Research Marine Vessels two of which were reported quite old, with the oldest MV RVIBIS of model

1967, and as a result it consumes excessive fuel. It was

noted that these marine vessels have not been insured contrary to the required Marine vessels operational

standards. In response, management explained that the process of procurement for the insurance of the vessels

had started and ongoing.I advised management to speed up the process of insurance and consider refurbishing the

marine vessels for continued benefits.

Insufficient funding for operations of the vessels.

It was noted that the two Vessels have two fuel tanks each with capacity of 4000 litres that would ordinarily

consume 4000 litres per trip. The vessels are planned to

make at least 2 research trips in a quarter that would

Page 468: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

456

amount to 12 trips in a year, however due to the reported

financial constraints, the Institute could only afford 4 trips. As a result, management failed to undertake eight (8)

research trips during the year.In response, management

explained that budget restriction is responsible for the reduction in the number of trips but indicated that

additional financing is being sought. I have advised management to adequately provide for the operations of

the vessels in order to be able to carry out all planned research activities.

Road Transport Facilities

It was noted that the Institute is faced with shortage of

worthy transport facilities. Originally; NaFIRRI had 14 project donated motor vehicles however, it was noted that

the majority of these vehicles were grounded except four

(4) of them. I explained to management that there is a risk that the Institute may not deliver as expected.

In response, management explained that NARO secured some resources to improve transport facilities including

two (2) new vehicles and four (4) motor cycles have been procured. Management further indicated that two (2)

pickups are anticipated under ATAAS project funding. I

await the outcome of management‘s commitment.

NaLIRRI

Collapsing Residential

Quarters at NaLIRRI

It was noted that most of the buildings especially staff

quarters of National Livestock Resources Research Institute (NaLIRRI) are in a very bad state with the

exception of the main administration block. A number of the buildings seemed to have been abandoned and were

reported occupied by unknown people as the premises of

the Institute were not fenced. Below are pictures of some of the dilapidated structures:

I explained to management that occupation of abandoned buildings by unknown people pause a security threat to

the Institute. Besides, there is currently shortage of accommodation of staff. Management acknowledged the

challenge and indicated this would be worked on when

funds are available.I have advised management to carry

Page 469: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

457

out the necessary renovations urgently so as to address

the challenges.

Buginyanya (BUGIZARDI)

Lack of Adequate

Infrastructure (Buildings)

It was noted that the Institute does not have sufficient

infrastructure more especially buildings for office accommodation, stores, laboratories and residential

quarters. The audit noted that the available space within

the administration office block was shared sometimes among 4-5 staff and the same space is being used as

laboratories and storage for samples; a situation that makes the work environment untenable. Furthermore, it

was noted that the administration block just like other staff quarters is still roofed with asbestos whose usage

was long banned by the World Health Organization. The

residential quarters were found to be in a poor state and overdue for renovation. See the picture below:

I explained to management that since the core activity for the Institute is research; lack of laboratory facilities

impacts negatively on its performance. In response, management explained they are in the process of repairs

and that funding is about to start coming in.I advised management to address the above challenges to avoid

further deterioration of the available structures and ensure

the asbestos roof is changed.

Transport facilities at the

Institute

The Institute was reported to have a fleet of seven (7)

Motor Vehicles. However; 3 were grounded due to lack of

routine maintenance yet the Institute is located on the slopes of Mount Elgon with such a difficult terrain that

would require strong road motor vehicles as well as sufficient maintenance funds. I explained to management

that limited mobility constrains research activities.

Management indicated that the above challenges would soon be resolved as they expect project funding where

refurbishment of old structures would be done. I have advised management to review the budget support to the

Institute so as to improve on the current operational challenges including vehicle maintenance.

Page 470: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

458

Poor internet services

The internet service at the institute was reported to be

very un reliable, a situation that affects research since the Institute is situated in a quite remote area and relies on

internet for both communication and information source. I

advised management to consider having a better service provider and or subscribe for a broader band width for the

Institute if resources can allow.

NASARRI

Dilapidated Housing Structures at

Inspection of National Semi-Arid Resources Research Institute (NASARRI) - SERERE showed that most of the

buildings were old and some dilapidated in need of urgent renovations. Some roof tiles were collapsing while some

houses still had asbestos roofing despite its condemnation by the World Health Organization. Refer to the pictures

below:

It was further noted that the Screen House in which

controlled experiments are carried out is dilapidated and can no longer serve the purpose due to the broken

glasses at the top and the sides which allows in unwanted heat, moisture and light. It was noted that

experiments can no longer be performed in the dilapidated structure since the experiments were meant to be carried

out in a controlled environment. Interview with

management of the institute indicated that research activity is currently carried out at below capacity. I advised

management to plan for the renovation of the structures urgently to avoid further deterioration.

NABUIN Institute

(NABUZARDI

Lack of Office

Infrastructure

It was noted that NaBUZARDI operates from a rented

property in Moroto town since its own premises were

destroyed during the war period as shown below:

Page 471: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

459

The audit noted that the office accommodation in the

rented property was not sufficient for the existing staff numbers. Besides, the furniture available (10 desks) is not

sufficient for the 32 staff which makes the working

environment not conducive. It was further noted that the rented property does not have a store for samples

collected from the field and reliable internet. Besides, the Institute lacked staff accommodation facilities and

laboratories and as a result operational costs were high

due to commuting costs to the fields which were noted to be 30km away from the current office location. The usual

routine activities such as the lab tests/analysis have to be taken to Kampala and this too is costly and time

consuming. I advised management to make rehabilitation of the Institute a priority if it is to serve the purpose for

which it was set up.

Transport

It was noted that the Institute has a fleet of about 5 Motor Vehicles and by the time of inspection; only one

was found working. It was explained that the frequency of

motor vehicle breakdown was high due to the poor state of the roads. I explained to management that there is a

risk that planned activities may not be carried out as planned due to lack of transport.I advised management to

plan to avail appropriate vehicles for the Institute operations and if possible increase funding on vehicle

maintenance.

Security at the Farm

It was noted that the station is currently guarded by few UPDF Officers; however the permanency of these officers

could not be guaranteed. Because of its remoteness,

security is at risk to both staff and property. I advised management to liaise with appropriate authorities for

assistance so as to have a permanent police post at Nabuin ZARDI station to provide security to both staff and

property.

Page 472: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

460

Ngetta

Lack of Laboratory and

Screen House

It was noted that the Institute did not have a Laboratory

and Screen House that are quite vital for research activities and this has led to an increase in research costs

as almost all tests and analysis is done in Kampala and

other distant locations.I advised management to plan and construct labs and screen houses in the near future for

enhanced efficiency in research.

33.5 EAST AFRICA AGRICULTURAL PRODUCTIVITY PROGRAM (EAAPP)

a. Compliance with financing agreement provisions and GOU

financial regulations

A review was carried out on the project compliance with the credit agreement

provisions and GoU financial regulations and it was noted that the project

complied in all material respects with the provisions in the agreement and applied

GoU regulations except in the following matter:

i. Over Expenditure US $ 6,013.98

The project management incurred an over expenditure of US $ 6,013.98 on

goods, consultants‘ services and operating costs for parts C.3 and D.1 of the

project without authority.

The Accounting Officer explained that following the mid-term evaluation of the

project, changes were made in regard to the components of the project and this

had an effect on the budget items.

I advised the Accounting Officer to Adhere to the budget provision or seek the

necessary authority to reallocate.

b. General standard of accounting and internal control

A review was carried out on the project system of financial management and the

following matter was observed:

i. Irregular procurement at Ngetta Zonal Institute

Page 473: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

461

The Institute procured 204 bags of cassava cuttings from MS Otuke Private Sector

Enterprises Ltd at a cost of Shs.9,588,000. However, I noted that the procurement

was undertaken without following PPDA requirements as there was no

procurement file, PP form 20 and no evidence of involvement of Contracts

Committee.

The Accounting Officer explained that the procurement was handled by the

Procurement Officer who has since been transferred from the project and the file

could not be traced but promised to avail the file for audit as soon as the file is

located.

The action of the Accounting Officer is awaited.

c. Status of project implementation

A review of the status of project implementation revealed the following matters;

i. Un-utilized project balances-US $ 5,264,333.93

It was noted that US $ 5,264,333.93 (49%) remained unspent out of the available

funds of US $ 10,772,800.76. Failure to implement the planned activities affects

the achievement of the project objectives.

The Accounting Officer explained that funds could not be fully spent and therefore

some activities could not be undertaken on time due to shortage of staff and

postponement of some uncritical activities. The funds were however carried

forward and incorporated in the project work-plan and budget for 2013-14 and are

currently being implemented.

I advised the Accounting Officer to put in place measures that will ensure that the

project activities are implemented in accordance with the project timelines.

Page 474: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

462

d. Delayed Works Procurements

i. Delayed Supply and Installation of a Liquid Nitrogen Plant

It was noted that there was a delay in the supply of the liquid nitrogen plant by an

international firm which was contracted at a cost of Euros 940,720. The contract

was entered into in Oct 2011 with completion period of 50 weeks (by March

2012), however, at the time of reporting, supply and installation of the plant had

not been made.

It was further noted that an advance payment was executed almost one and half

years after the signing of the contract and a Letter of Credit opened in favour of

the Contractor effected on 11th July, 2013, almost 20 months from the signing of

the contract.

The Accounting Officer explained that a Contract Management team was

constituted to support the Contract Manager to monitor the Supplier in regard to

the delivery of the Plant and Construction of the Plant House. The Plant was

airlifted and was expected at the end of December, 2013.

I urged the Accounting Officer to ensure that the contract is fully executed plant

installed as agreed.

ii. Delayed supply of Embryo Freezing Machine and Equipment

An international firm was contracted to supply Embryo Freezing Machine and

Equipment on the 5th October, 2012 with the contract expected to be executed at

least not later than 5th January, 2013 (60 days from the contract date as per the

GCC 33). However, I noted that the contractor had neither executed the above

contract within the prescribed period nor notified the Procuring and Disposing

Entity (PDE) requesting for an extension. Further, no liquidated damages for the

delays encountered have been executed.

Further, the agreement provides for termination of the contract in whole or in part

if the provider fails to deliver any or all the supplies within the period specified in

Page 475: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

463

the contract or within any extension thereof granted by the PDE. This clause was

not invoked despite the failure by the provider to deliver as required.

The failure to observe the conditions of the contract may cause financial loss to

Government.

I advised management to compel the contractor to comply with the contractual

obligations.

e. Lack of approved workplans

It was noted that funds amounting to Shs.402,359,850 released to Ministry of

Agriculture, Animal Industry and Fisheries (MAAIF) were not utilized due to lack of

an approved work-plan and budget for crop (seeds) for the year. The basis upon

which the funds were released to the Ministry could not be established. Non

utilization of project funds is a set back to the fulfillment of the project objectives

and besides the project funds could easily be diverted to other non-project

activities.

The Accounting Officer explained that since the funds were not utilized, and were

still held on the Ministry project account. A refund to NAROSEL will be done once

reconciliations are complete.

I advised the Accounting Officer to liaise with management of MAAIF to ensure

that the funds are utilized or refunded.

33.6 AGRICULTURAL TECHNOLOGY AND AGRIBUSINESS ADVISORY

SERVICES

(a) Compliance with financing agreement provisions and GOU

financial regulations

A review was carried out on the project compliance with the credit agreement

provisions and GoU financial regulations and it was noted that the project

complied in all material respects with the provisions in the agreement and

applicable GoU regulations except in the following matters:

Page 476: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

464

i) Un-released funds-Shs.26,760,151,091

It was noted that the project management budgeted for Shs.51,455,740,347 as

funding from Government of Uganda but only Shs.34,304,918,634 was released.

In addition, the expected funding from IDA for year was Shs.30,000,000,000 but

only Shs.20,390,670,622 was released. This resulted into an overall shortfall of

Shs.26,760,151,091. Failure to achieve the expected funding implies that the

project may not achieve its objectives in the project planned period.

The Accounting officer explained that the big chunk of unreleased funds worth

Shs.17,308,000,000 relate to non-resource taxes meant to clear the NARO

imports. However, due to the prolonged procurement process, the goods were

not procured on time and funds differed to next year.

I advised management to take up this matter with appropriate authorities to

ensure that all planned funding is released to the project to enable execution of all

planned activities. Further, the Accounting Officer was advised to ensure early

planning to avoid delays in implementation of project activities.

(b) General standard of accounting and internal control

A review was carried out of the project system of financial management and the

following matter was observed;

i) Mischarge of Expenditure-Shs.195,700,610

It was noted that Shs.195,700,610 was spent on various project activities but

charged on wrong expenditure codes contrary to the project requirements. The

affected items were mainly allowances for field activities charged to goods and

services. The practice resulted into misreported expenditure balances in the

financial statements and a diversion of project funds from the intended activities.

I advised management to ensure that activities are implemented in accordance

with the workplans and in case of any reallocations, these should be done in

accordance with the regulations.

Page 477: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

465

(c) Status of project implementation

A review of the status of project implementation revealed the following;

i) Unspent Project balance-Shs.15,371,475,463

Shs.15,371,475,463 remained unspent at the year end and yet activities for these

funds were budgeted for. There is a risk that the project intended objectives may

not have been fulfilled by the project which could lead to extra administrative cost

in case of project extension.

The Accounting Officer explained that the high project balances were attributed to

unavailability of scientists that are on training for their PHD programmes and this

had an effect on the workforce to implement the planned activities. Management

further explained that World Bank had approved appointment of short term

consultants and a process of recruiting them is ongoing.

I advised the Accounting Officer to expedite the process of recruitment so that

project implementation is not impeded further.

ii) Failure to implement planned project activities at NARO Research

Centres

a) Kazardi, Mbazardi, Rwebizardi, and Abizardi

It was observed that some project activities totaling to Shs.1,093,009,000 at

Kazardi, Mbazardi, Rwebizardi and Abizardi were not implemented as planned

during the year. Summary of the activities not undertaken is below:

1. Programme015101

Generation of Agricultural technologies.

ABIZARDI

Activity Description Target output and remarks. Amount budgeted (Shs.)

Development and

commercialization of cassava

varieties resistant to cassava brown streak virus and cassava

Mosaic disease in west Nile

i. 5 Cassava landraces resistant

/tolerant to CBSD and CMD identified

to be used as parents in the new crossing block not completed.

ii. 4 cassava adaptive trials were not

10,300,000

Page 478: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

466

region. established in Maracha, moyo, Arua and Nebbi Districts.

2. Improvement and adaption of

selected cereal crop varieties with end-user preferred trials.

4 screening trials for each crop

commodity were not established in Arua, maracha, Koboko and Moyo

Districts.

10,000,000

3. Participatory evaluation of

improved groundnuts and beans technologies.

i. Integrated package for soil fertility

management, weed control and plant spacing for beans and ground nuts

were not developed. ii. 6 bean fly IPM packages (earthing

up, seed dressing, high and low plant

densities fertilizer application and combination) were not evaluated and

recommended for dissemination.

11,000,000

KAZARDI

1. Development and promotion of population B3C1 and B3C2-

based potato varieties for

resistance to bacterial wilt, late blight and with consumer

acceptable qualities.

i. Two B3C2-based potato clones resistance to late blight and accepted

by the farmers were not selected.

ii. On-station evaluation of crosses (progenies) of B3C2 potato genotypes

for resistance to late blight and consumer acceptability was not done.

17,140,000

13,840,000

2. Development and promotion

of population B3C1 and B3C2-

based potato varieties for resistance to bacterial wilt, late

blight and with consumer acceptable qualities

i. Evaluating field and screen house

response of population B3C2 potato

genotypes for bacterial wilt tolerance was not done.

222,570,000

3. Optimization of laboratory and

field protocols for production of

high quality seed potato.

i. A media formulation that supports

in-vitro propagation of new and farmer

preferred potato varieties were not established.

13,110,000

4. Production of foundation seed

potato for experiments and

uptake pathways.

i. 24 tones of prebasic seed were not

generated by June 2013

32,344,000

Conservation and Promotion of selected goat breeds for meat

and dairy production in SWHAEZ

DNA sequences were not generated on existing goat breeds in the zone for

use in molecular characterization of the breeds.

28,950,000

RwebiZARDI

1. Rehabilitation and maintenance of tea research

facilities for scientific evaluations.

High yielding and quality tea planting materials were not developed

18,000,000

2. Evaluation of tea clones for pest and disease resistance

characteristics.

Tea clones tolerant to Xylaria disease selected for the Western highland

agro-ecological zone no data produced.

ii. There was no Selection of high yielding tea clones in Western highland

agro-ecological zone done.

32,100,000

20,855,000

3. Evaluation of chemical composition of Ugandan tea.

80 tea clones were not evaluated for biochemical profiles by end of June

88,000,000

Page 479: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

467

2013

2. Programme 015102. Research extension interface

promoted and strengthened.

ABIZARDI

Developing Technologies that

improve soil fertility and soil Nutrient management in West

Nile Agro Ecological zone.

The 7 INM trials were not established

for both Maize and groundnuts in Arua, Nebbi, Zombo, Adjumani and maracha

districts.

10,800,000

Development and adaption of

Agro-forestry technologies for

improved livelihood in West Nile.

The 3 protocols for grafting tamarind

and shea were not designed.

6,73,000

Development of technologies

that enhance aquaculture Production and marketing in the

West Nile zone.

4 fish cages were not established in

Nebbi and Adjumani districts.

11,000,000

Improvement of Goat health management in north west Agro-

ecological zone

4 Demonstrations were not set up with fodder in Zombo and Moyo districts

5,000,000

KAZARDI

1. Development and promotion

of population B3C1 and B3C2-based potato varieties for

resistance to bacterial wilt, late blight and with consumer

acceptable qualities

Four potato varieties (Nakpot 1&5,

Kachpot 1&2) popularised in the zone were not presented

20,000,000

Conservation and Promotion of selected goat breeds for meat

and dairy production in SWHAEZ Under

3 genetic breed levels of meat goat breeds popularized in 4 districts of the

zone were not ascertained

12,000,000

3.Programme 015104

Agricultural research

capacity strengthened

ABIZARDI

Development of technologies that enhance acquaculture

production and marketing

3 fish tanks were not established at the station.

Fish Hatchery at the station not done.

7,000,000

100,000,000

KAZARDI

1. Optimization of laboratory and field protocols for production of

high quality seed potato at KAZARDI.

Construction of a new screen house for maintaining potato germplasm for

breeding activities at the institute was not done.

24,000,000

2. Management of Research &

Development activities at KAZARDI

Construction of new stores at

Kachwekano was not done.

60,000,000

Page 480: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

468

BUZARDI

Construction of new office building with provision of conference facilities

at the institute. This was not done.

195,000,000

Rehabilitation of water works at the institute.

60,000,000

Animal infrastructure facilities to be constructed to create animal study at

the institute. Not done.

40,000,000

Rehabilitation of other existing facilities at the institute. Not done.

30,000,000

Total 1,093,009,000

b) MUZARDI

Project activities estimated at Shs.456,078,000 were in the project work plan for

the year 2012/13, however at the time of reporting, these had not been

implemented. Details are in the table below:

Project/Item Activity not undertaken Amount provided

(Shs.)

04 Agricultural

research capacity strengthened

Carry out administrative operations

such as maintaining information equipments, payments of subscription

fees, rentals and records. -Renovation of laboratory.

20,000,000

Zonal resource centre equipment --purchase of electronic services.

-- purchase of 4 laptops and 2 desktops

13,000,000 14,700,000

Renovation of resource centre 36,797,000

Government Buildings

and administrative

infrastructure

--workshop and Lab. equipment,

Constructing the work workshop and

procuring equipment. --constructing the new laboratory.

130,000,000

78,967,000

Transport equipment. Purchase of vehicle (pickup). 83,240,000

Purchase of ICT

equipments and

software.

7 desktops , 4 laptops computers ,2

printers,15 UPS and 1 fax machine

31,524,000

Procuring of office and residential furniture

and fittings.

3 office tables 1 office table and 1 office chair for the

director. 3 office chairs , 3 bookshelves,

5visitor‘s chairs for HR

3 desk organisers and 3 executive open racket file

11,350,000

Page 481: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

469

Laboratory furniture and furnishing for the lab.

13,000,000

18 tables and 150 chairs for the

Conference centre.

23,500,000

Total 456,078,000

a) NARL – Kawanda

Funds to the tune of Shs.1,220,000,000 remained unutilized yet the activities had

been included in the project work-plan for the year. Refer to the table below:

Planned Activities Budgeted Amounts (Shs.)

1 Rehabilitation of office buildings at NARL 150,000,000

Rehabilitation of laboratory building 150,000,000

2 Construction of screen houses 270,000,000

3 Rehabilitation of existing residential buildings 200,000,000

4 Rehabilitation of water works 180,000,000

5 Rehabilitation of sewage works 90,000,000

6 Electricity connections and rehabilitation 130,000,000

7 Construction of cold rooms 50,000,000

Total 1,220,000,000

The Accounting Officer explained that the activities that were not implemented

were due to the fact that the procurement process was delayed but they are now

at evaluation and contract awarding stage.

I urged the Accounting Officer to ensure that the procurement process is

expedited so as to enhance improved implementation of the project activities.

ENERGY SECTOR

34.0 MINISTRY OF ENERGY AND MINERAL DEVELOPMENT

34.1 Mischarge of Expenditure – UGX.9,200,543,112

The Government Chart of Accounts defines the nature of expenditure for each

item code. The intention is to facilitate better and consistent classification of

Page 482: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

470

financial transactions and also track budget performance per item in line with

parliamentary appropriation. Audit noted that during the year under review, a sum

of UGX.9,200,543,112 was charged on items which do not reflect the nature of the

expenditure. For example expenditure item 211103 which according to the chart of

accounts should only be charged with staff allowances was actually charged with

fuel, stationery and tuition among others. The practice impacts on the credibility of

the financial statements, since the figures reported therein do not reflect true

amounts expended on the respective items. It further undermines the intentions of

the appropriating authority.

In his response, the Accounting officer attributed this to the desire to achieve

outputs that leads management to make decisions to utilize resources allocated to

slow moving activities and programmes. I advised Management to avoid such a

practice in future and always seek for reallocations when such a need arises, in

accordance with the requirements under the Treasury Accounting Instructions

(TAI).

34.2 Unsupported Foreign Currency Withdrawals – UGX.375,280,270

A total of UGX.375,280,270 was withdrawn in cash to undertake several activities.

However, I could not confirm whether the funds were expended for the intended

purposes as I was not availed the supporting documentation in form of requisitions

from the officers, withdraw vouchers, evidence of travel and payment receipts to

support the withdraws.

Although the Accounting Officer explained that the documents in question were

available, these were however not availed to me by the time of compiling this

report.

I advised the Accounting Officer to always ensure that all expenditures are

accompanied with the related supporting documentation and that the funds in

question are followed up with a view of ensuring that accountability is provided.

Page 483: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

471

34.3 Unsupported Expenditure from the Energy Fund Account–

UGX.418,663,378

In my last year‘s report to parliament, I highlighted the irregular use of the

Support to Energy Fund account in Bank of Uganda and advised the Ministry to

have this account closed; the account was eventually closed. However, prior to its

closure, the Ministry had transferred a total of UGX.679,385,200 from the Treasury

General Account (TGA) to this account during the year under review. I reviewed

the transactions that transpired off this account and noted that a total of

UGX.418,663,378 expended from this account was not properly supported. Under

the circumstances, I could not confirm that the expenditures in question were for

genuine purposes.

I advised the Accounting Officer to always ensure that all expenditures are

accompanied with the related supporting documentation. In addition the funds in

question should be followed up with a view of obtaining accountability.

34.4 Hydro Power Development Unit Program Account

The Ministry operates the Hydro Power Development Unit Program account in

Bank of Uganda. A review of the operations on the account revealed the

following:-

a. Transfer of Funds to this Account – UGX.4,444,077,360

During the year under review, a sum of UGX.4,444,077,360 was transferred from

the Treasury General Account to this account. At the time of transfer, these funds

were directly expensed on the respective expenditure line items although by the

close of the year, a significant amount remained as unspent cash. The expenditure

was not reversed to reflect the unspent cash balance. I explained to the

Accounting Officer, that such a practice is irregular and increases the risk of

probable misuse of funds.

Page 484: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

472

In his response, the Accounting Officer explained that the account in question is

meant to handle the operational activities of the Ministry in regard to the ongoing

hydro power projects, including Karuma and Isimba. I advised the Accounting

Officer to ensure that proper budgeting is done for the programmes mentioned

and funds are properly allocated within the budget. In expending such funds, the

recommended Government systems (i.e. IFMS) should be utilized. In addition, the

Accounting Officer was advised to close the account and transfer all unspent

balances to the consolidated fund.

b. Unsupported Payments out of the Hydro Power Development

Account – UGX.460,725,234

A review of the expenditures out of this account revealed that a total of

UGX.460,725,234 expended from this account was not properly supported. Under

the circumstances, I could not confirm that the expenditures in question were

genuine.

Although the Accounting Officer explained that the accountabilities in question

were available, these were not availed to me for verification by the time of

compiling this report. I advised the Accounting Officer to always ensure that all

expenditures are accompanied with the related supporting documentation. In

addition the funds in question should be followed up with a view of obtaining

accountability.

34.5 Budget Performance

As provided for in the National Development Plan and the policy statement, the

ministry is focusing on the implementation of four (4) flag bearer projects

namely:-

i) Development of Karuma Hydropower project

ii) Development of the Oil refinery

iii) Promotion of investment in the Sukuru phosphates and

iv) Development of Iron and Steel Industry.

It was noted that the Ministry was appropriated a total of UGX.1,275 billion under

both the development and recurrent budgets. However, only a total of UGX.128

Page 485: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

473

billion was actually released, representing an overall budget outturn of 10% as

shown in the table below:-

Budget Revised Budget

(UGX)

Releases (UGX) %

Release

Unreleased funds

(UGX)

%

Unreleased

Recurrent 7,170,699,399 6,338,426,581 88.4 832,272,818 11.6

Dev. 1,268,300,600,001 121,708,039,026 9.6 1,146,592,560,975 90.4

Totals 1,275,471,299,400 128,046,465,607 10.0 1,147,424,833,793 90.0

A review of the ministry projects further indicated that four out of nineteen (19)

Projects received zero funding; notable among them was Karuma hydro power

project which did not receive any release yet it was the biggest project the

ministry intended to implement. Whereas some projects received more than 50

percent funding, audit was not provided with physical performance reports in

order to verify activities on the ground. I explained to the Accounting Officer that

such disparities in funding for the projects usually lead to failure to fully implement

such projects within the planned periods.

In his response, the Accounting officer explained that UGX.1,268 billion was the

development budget provision of which UGX.1,056 billion was for Karuma

Hydropower dam, Bujagali Interconnection, Karuma Interconnection and Mputa

Interconnection projects, which did not take off due to delays in the procurement

processes.

I have advised the Accounting Officer to always ensure that all planned activities

are implemented as intended so as to ensure the attainment of the set targets and

objectives.

34.6 Noncompliance with the Commitment Control System

It was noted that the Ministry‘s outstanding commitments as at 30th June 2013,

stood at UGX.34,260,009,595, up from UGX.2,582,707,955 as at the beginning of

the financial year under review. This implies that the ministry has continued to

over commit government and enter into contracts even without the necessary cash

resources to settle such commitments, contrary to the requirements under the

commitment control system. I explained to the Accounting Officer that failure to

Page 486: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

474

pay outstanding creditors can lead to unnecessary legal costs as well as loss of

supplier goodwill.

In his response, the Accounting Officer attributed this anomaly mostly to the

thermal power subsidies as well as contributions to International Organizations, for

which there were inadequate releases to meet the required payments.

Management is advised to always adhere to the commitment control system of

government and avoid committing government beyond the availed resources.

34.7 Cash Withdrawals from the TGA not Accounted for – UGX.345,105,433

It is a requirement under section 173 of the TAI that all Payments wherever

possible, must be made by means of direct bank transfer or crossed cheques, only

to the persons named in the vouchers or their accredited agents. It was however

noted that during the year under review, cash withdrawals amounting to

UGX.345,105,433 were made off the TGA and this remained unaccounted for at

the time of audit, six (6) months after the close of the year. I explained to the

Accounting Officer that such a practice not only contradicts the requirements

under the TAI but also exposes such funds to a risk of loss through abuse.

I have advised the Accounting Officer to always ensure that in the event that such

withdrawals are made, these should always be promptly accounted for. In the

meantime, the unaccounted for funds should be followed up with a view of

ensuring accountability.

34.8 Oil Refinery Development Program Account

a. Unaccounted for Cash Withdrawals – UGX.114,386,410

A total of UGX.114,386,410 drawn in cash from this Account remained

unaccounted for by the time of audit, as I was not availed with the necessary

supporting documentation. Under such circumstances, I was unable to establish

the purpose to which the funds were applied.

I advised the Accounting Officer to ensure that all expenditures are always

properly supported with the relevant documentation as required by the

Page 487: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

475

government financial regulations. In the meantime, accountability for the above

funds should either be provided or recovery measures initiated accordingly.

b. Payments for Transaction Advisory Services

A consultant was engaged to provide transaction advisory services for the

development of a refinery in Uganda at a (time based) total contract price ceiling

of Us$.3,227,777. According to the agreement signed on 31/01/2013, the contract

was to be financed partly using a portion of the grant from the Norwegian Ministry

of foreign Affairs up to the tune of Norwegian Kroner (NOK) 15,300,000

(equivalent to Us$.2,500,000). A review of the payments to the consultant

revealed that a total of UGX.2,181,032,490 (Us$.838,859.20) had been paid by the

Ministry during the year; this exceeded the Government of Uganda‘s planned

contribution by Us$.100,000. There was no evidence that appropriate budgetary

reallocations were made to support this additional expenditure.

In his response, the Accounting Officer attributed this to the Donor freeze the

country was experiencing at the time yet the Consultant had requested to be paid.

However, the Norwegian Government had reopened financing to this project and

agreed to meet its part of the contribution less any moneys paid by GoU during

the freeze.

I advised management to always ensure that such eventualities are treated in

accordance with the provisions in the financial regulations particularly relating to

reallocation of funds.

34.9 Transfer of Funds for Masaka - Kawanda RAP – UGX.7,800,000,000

The Ministry transferred a total of UGX.7,800,000,000 to the Energy Investment

Fund for activities relating to Masaka-Kawanda T-Line Resettlement Action Plan

(RAP) implementation. However, it was noted that this amount was not utilised by

the year end and was also not returned to the Consolidated Funds Account as is

required under the financial regulations. Under the circumstances, the above funds

are exposed to a risk of diversion.

Page 488: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

476

In response, management explained that the amount remained unutilised because

of delays in the procurement process for the Kawanda – Masaka Transmission

Resettlement Action Plan; however, the RAP implementation consultant is now on

board and that the funds in question will be utilised for this purpose.

I advised the Accounting Officer to always follow lawful procedures embedded in

the financial regulations to handle such occurrences.

34.10 Payment for Acquisition of Office Space for Bujagali Implementation

Unit Offices – UGX.1,200,000,000

Bujagali Hydro power project was started in 2007 and is now complete. The

project is currently being run by a private investor under the power purchasing

agreement with UETCL. The ministry disbursed a total of UGX.1,200,000,000 to

UETCL for purchase of Bujagali Implementation Unit Offices, at Plot 32A, Amberly

Road, Kimaka. However, no documentation was provided to support the transfer.

It was not clear as to how this amount was determined, in the absence of any

form of agreement with UETCL or the land lord. Audit further established that the

said amount has remained redundant on this account nine (9) months after the

transfer. This balance was neither reflected in the Ministry nor UETCL accounts.

There is a risk that over time, the said funds could be misused.

In his response, the Accounting Officer explained that the funds in question were

transfered for procurement of land to accomodate the Bujagali Implementation

Unit Offices. However, this process has delayed due to ownership wangles over

the land in question.

I advised the Accounting Officer to ensure that the amount in question is properly

reflected in the ministry accounts as unspent balances and transferred back to the

consolidated fund to avoid possible misuse.

34.11 Absence of a Central Store to Record all Procurements

In my last year‘s report to Parliament, I noted that the Ministry had no central

store function, with most procurements being delivered directly to user

departments. During the year under review, the Ministry had still not put in place a

Page 489: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

477

properly functioning central store and accordingly, sundry items procured during

the year worth UGX.1,114,338,237, were not delivered, recorded and issued

through the stores, contrary to the provisions under the Treasury Accounting

Instructions (TAI). Such a practice complicates the audit trail in the absence of any

record to evidence delivery and utilization of such items.

In his response, the Accounting Officer attributed this matter to the challenges the

ministry experiences as a result of location of the two major departments at

Entebbe and other regional offices as well as inadequate stores personnel;

however, the recent deployment of more stores cadres is expected to address this

problem.

I advised the Accounting Officer to institute a sound stores management system

to track all receipts of goods, their storage, requisitions as well as regular stock

taking to confirm stock balances.

34.12 Failure to Deduct Withholding Tax

Contrary to the provisions of the Income Tax Act with regard to withholding tax,

the ministry made payments totaling to UGX.1,488,767,224 to various suppliers

without deducting and remitting the requisite withholding tax worth

UGX.89,326,034 to Uganda Revenue Authority (URA). This omission exposes the

Ministry to a risk of imposition of penalties and fines from the tax body as per the

provisions of the Income Tax Act.

In response, management attributed this matter to a system lapse which affected

the automatic deduction of WHT deductions. Although the Accounting Officer

explained that e-Tax payments had been processed for the amounts in question, I

was not availed evidence of actual payment of the tax in question.

I advised the Accounting to always adhere to the tax law while making payments.

34.13 Expenditure for Fumigation Services - Shs.31,683,000

The Ministry engaged a contractor to undertake fumigation services of Amber

House at a contract sum of Shs.31,683,000. However, audit review revealed there

Page 490: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

478

was no evidence that the contract was awarded competitively in line with PPDA

regulations. In addition although the Ministry occupies about 30% of Amber

House, with the rest of the building occupied by other tenants, the ministry paid

the entire bill; there was no evidence that efforts were made to have other tenants

contribute to the total bill. This was therefore wasteful.

The Accounting Officer explained that the ministry offices were invaded by rodents

that damaged its computer network system and IFMS; this necessitated urgent

fumigation of the entire building to prevent further damage to the networks.

HEALTH SECTOR

35.0 MINISTRY OF HEALTH

35.1 Mischarge of Expenditure

Out of the total Ministry, expenditure of UGX.53,730,701,618 a sum of

UGX.13,431,161,682 (25%) was charged on expenditure codes other than those

under which it was appropriated. The practice portrays a breakdown of controls in

the budget implementation process and implies that the financial statements are

misrepresented to the extent of the mischarge.

Management attributed the anomaly to underfunding of some items in the budget.

I advised management to streamline the budgeting process and ensure that

payments are correctly charged on the item codes to enable proper

implementation of the Ministry‘s programmes.

35.2 Funds not accounted for

Funds totalling to UGX.13,052,912,535 were paid out for various activities but

remained un-accounted for by the time of writing this report. In the absence of

the necessary accountabilities, I could not confirm whether the funds had been

put to the intended use. The following table summarizes the funds not accounted

for on activity basis.

Page 491: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

479

Particulars Amount (UGX)

Programme funds in the Ministry 331,058,034

Transfers to Emergency Account 837,284,048

Nodding disease syndrome payments not accounted for 799,614,000

Unaccounted for funds for Ebola Epidemic 698,080,620

Unaccounted for funds for Recruitment of Health Workers 2,456,839,000

Funds for Retention of medical officers at Health Centre IVs 1,944,000,000

Unsupported salaries payments to Intern Doctors 5,148,465,980

Expenditure without supporting records 837,570,853

Total 13,052,912,535

Delayed accountabilities may lead to falsification of documents and the practice is

also contrary to paragraphs 217 of the Treasury Accountability Instructions.

I advised the Accounting Officer to ensure that funds are fully accounted for and

to provide for mechanisms of ensuring timely accountability for such payments in

future.

35.3 Unverifiable Salaries for bonded staff

A sum of UGX.559,444,355 was purported to have been paid to the Ministry

bonded workers deployed in various districts hospitals and health facilities.

However there were no personnel records for the respective staff to confirm the

existence of such employees. There is a risk that some of these employees may

not be existing.

I advised management to ensure that the personnel records for the affected staff

are kept and maintained at the Ministry headquarters.

35.4 Accumulation of Payables

According to the Statement of Financial Position, The Ministry had payables of

UGX.8,541,022,766, up from UGX.2,588,020,748 the previous year. Of this

amount, UGX.3,091,460,197 is owed to UMEME and NWSC while

UGX.3,771,617,043 is owed to National Medical Stores. The accumulation payables

is contrary to the government commitment policy on domestic arrears. Under this

policy, Accounting Officers are not allowed to commit government without

confirming availability of funds.

Page 492: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

480

The Accounting Officer stated that the PS/ST had guided that domestic arrears

should carry first call on the next budget. This would curtail the implementation of

activities in the next budget year.

I advised the Accounting Officer to always adhere to the commitment control

policy to avoid uncontrolled accumulation of domestic arrears.

35.5 Liabilities recognized as contingent liabilities

The Ministry recognized contingent liabilities of UGX.6,748,728,628 relating to

funds owed to NDA, NMS and JCRC, down from UGX.11,765,341,884 reported in

the previous year. The balances related to suppliers who had delivered services

and therefore the resultant expenditure could not result into contingent liabilities

(i.e. the obligating events of companies providing services occurred).

The current treatment of the liabilities understated the domestic arrears position

of the ministry resulting into misrepresentation of the financial statements.

Management stated that they had taken note of the matter and were to review

the issues and make corrective adjustments. I was not provided with evidence of

any adjustments made.

35.6 Diversion of Funds

During the year, the Ministry made various refunds to Uganda Sanitation Fund,

CDC and UNICEF of UGX.22,980,000, UGX.111,252,5000 and UGX.839,441,954

respectively. The refunds were charged on the National Disease control

Programme and Mulago Kampala Capital City Authority Project (MKCCAP). I was

not provided with evidence that the borrowed funds had been used to fund

activities under this programme and project. There were no ledgers maintained to

keep track of the borrowed and refunded amounts.

Management explained that the borrowing had been necessitated by the pressure

of epidemics and emergencies that occurred in the health sector.

Page 493: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

481

I advised the Accounting Officer to avoid the practice of mixing up the project and

programme funds through ―borrowing‖ and ―refunding‖ which are not properly

documented.

35.7 Outstanding Letters of Credit

Five Letters of Credit (LCs) with balance of UGX.1,023,907,010 were reported in

the financial statements under Receivables, which had not changed from the

balance reported in the previous financial year. This implies that the LCs did not

perform. However, a list of outstanding LCs availed to me showed that

UGX.918,687,512 was outstanding as at 30th June 2013 as shown in the table

below. The variance of UGX.105,038,498 could not be explained. The financial

statements are likely to be misrepresented with regard to the outstanding letters

of credit (receivables).

Name of Supplier

Date When

opened

LC No Bank

Contract Sum

Balance Amount

(UGX)

Period extension

from 5th Feb 2013

Ace Consult

Ltd

11/3/2009 MH/3414/1

1

BO

U

564,761,358 30,644,238 6 Months

Armpass Technical

13/06/2008 MH/3414/02

BOU

535,251,768 104,961,228 -do-

Coronation Developers

25/07/2008 MH/3414/01

BOU

483,409,110 132,885,543 -do-

Excel

Construction

20/07/2009 MH/3514/0

2

BO

U

2,177,607,183 370,771,266 -do-

Spencon Services

16/03/2010 MH/3514/06

BOU

1,183,558,928 279,425,237 -do-

Total 918,868,512

My recommendation to management was to restate the balance on receivables not

implemented.

35.8 Revenue Performance

The Ministry budgeted to receive UGX.63,996,436,682 for implementation of the

planned activities for 2012/13 financial year. However only UGX.52,493,621,441

(82%) was received resulting into a shortfall of UGX.11,502,815,241 (18%).

Page 494: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

482

Shortfalls in budgeted funds affect the implementation of planned activities and

consequently the achievement of the Ministry‘s objectives.

Management explained that the Ministry and the sector generally was

underfunded and therefore making initiation of critical activities difficult.

I advised the Accounting officer to continue liaising with the Ministry of Finance,

Planning and Economic Development to ensure that funds in the approved budget

are released for implementation of all planned activities.

35.9 Delayed implementation of the National Health Insurance Scheme

The National Health Insurance Scheme (NHIS) project commenced in 2007, with

intentions to facilitate the provision of accessible, affordable, acceptable and

quality healthcare services to all the beneficiaries of the scheme. UGX.706,000,000

was allocated in financial year under review towards the scheme. The MoH activity

work plan showed NHIS Act as one of the major planned outputs financial year

2012/2013. However it was noted that this output was not achieved.

Management explained that they were in the process of requesting for a certificate

of financial implication from the MoFPED and thereafter have the bill tabled to

Parliament.

I advised management to expedite the process and ensure that the bill is tabled to

Parliament for enactment.

35.10 Redundant Printing Unit

In 2007, the Ministry‘s printing unit was demobilized from Entebbe to Kampala

after the shifting of the Ministry operations earlier. It was noted that

the equipment has not been installed since then. The seven (7) staff who were

supposed to operate and run the unit have also been idle while drawing salaries

for the last six (6) years.

The redundancy of the machines could lead to their obsolescence and yet they

could have reduced the cost of printing of documents such as magazines,

Page 495: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

483

newsletters, posters, brochures and leaflets on which more than UGX 100million

was incurred during the financial year.

The Accounting Officer explained that the printing unit equipment was secured at

Mulago Hospital stores and that the Ministry had undertaken a procurement to

have it reinstalled.

I await the outcome of this undertaking by management.

35.11 Inadequate Fleet Management System

It was observed that the Ministry had a fleet of 293 Motor Vehicles at

headquarters. A review of the status and condition of the vehicles revealed the

following matters:-

There were motor vehicles which were in poor condition necessitating frequent

repairs and maintenance. For example, forty six (46) motor vehicles had been

grounded and required to be boarded off. Management explained that because

of the Government ban on procurement of new vehicles, the Ministry had

continued to the old fleet of vehicles they had. They stated that a disposal

process of 80 motor vehicles had commenced.

The Ministry lost one (1) motor vehicle but had never reported the matter to

the Permanent Secretary/Secretary to the Treasury, contrary to paragraph 390

of Treasury Accounting Instructions. Management explained that investigations

had been instituted to have the matter resolved.

Motor vehicle registration numberUG1688M was taken by an officer who retired

but the circumstances under which this happened remained unclear.

Management explained that they had contacted the officer several times and

wrote to him officially but did not return the vehicle. They also stated that

processing of his retirement benefits had been halted and the police was asked

to impound the vehicle.

I await the outcomes of management‘s actions.

Page 496: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

484

36.0 UGANDA BLOOD TRANSFUSION SERVICES

36.1 Proposed Store Construction

Stemming from the inadequate space and the nature of the Blood Bank‘s

operations, the Blood Bank contracted a local firm at a cost of UGX.42,350,000 to

design and come up with drawings for a store that is to be constructed at the

Blood Bank Headquarters. It was however, noted that funds have not yet been

secured to commence the construction works.

The Accounting Officer stated that the Ministry of Finance, Planning & Economic

Development has been approached through the Sector Wide Budgeting Group for

the Health Sector to source for funding for the civil works to commence in

2014/15 financial year. I await the outcome of management‘s action.

36.2 Funds not accounted for

Out of a total of UGX.117,102,521 advanced to staff for official activities

UGX.107,778,521 was accounted for leaving a balance of UGX.9,324,000

outstanding . Delayed accountability may result into falsification of documents.

I advised the Accounting Officer to always ensure that advance payments are

accounted for in a timely manner in accordance with Treasury Accounting

instructions.

37.0 UGANDA AIDS COMMISSION

37.1 Budget Performance

Out of the total appropriated budget of UGX.5,507,195,000 for the year under

review, the Commission realized UGX.5,261,961,073 (95%), thereby registering a

shortfall of UGX.245,233,927. Revenue shortfalls undermine implementation of

planned activities.

Page 497: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

485

I have advised management to continue liaising with the Ministry of Finance

Planning and Economic Development to ensure that all appropriated funds are

released to enable full implementation of planned activities.

37.2 Non remittance of PAYE and NSSF

Review of employee costs in the statement of financial performance and cash flow

statement revealed a variance of UGX.25,548,455.

Management attributed the variance to deduction of PAYE and NSSF contributions

by Ministry of Public Service (MOPS) amounting to UGX.20,623,341 and failure to

release UGX.4,900,114 of the approved budget by the Ministry of Finance Planning

and Economic Development(MOFPED).

I advised management to follow up with MOPS and MOFPED to ensure that the

statutory deductions are dully remitted to the responsible agencies and

appropriated funds are fully released respectively.

37.3 Non Disposal of Grounded Vehicles and Unused Items

Regulation 295(5) of the PPDA, 2003 requires a Procuring and Disposing Entity

(PDE) to identify assets for disposal on a periodic basis. A review of the

Commission‗s fixed assets‘ register revealed a number of grounded vehicles and

motor cycles which had not been disposed of. There is risk of further loss in value

of the affected assets.

In his response, the Accounting Officer explained that the disposal process had

been initiated.

I advised management to expedite the process of disposal so as to avoid further

loss in the value of the assets.

Page 498: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

486

38.0 HEALTH SERVICE COMMISSION

38.1 Lack of IT personnel

A review of the Commission‘s operations revealed that the Commission did not

have an IT expert to operate and professionally manage the available computers

(27 desktops) and E-recruitment software in place. There is a risk of

mismanagement of the IT resources.

The Accounting Officer explained that the Commission staff

establishment/structure initially did not provide for an IT person but the Ministry

of Public Service had granted the Commission permission to create the post of

Systems Administrator.

I await the outcome of management action.

38.2 Management of old Motor Vehicles

(a) Wasteful parking charges

The Commission‘s motor vehicle registration number UG 0383B (Suzuki Vitara)

was involved in an accident in early 2010, towed and parked in Workers House

basement. Audit noted that the Commission incurs monthly parking fees of

UGX.120,000 or over UGX.5,760,000 for the more than four years the vehicle has

been parked. It was noted that vehicle risks being vandalized besides the

accumulating of costs.

In his explanation, the Accounting Officer stated that the vehicle had been

recommended for boarding off and a disposal process that was carried out in

2012/2013, failed to attract any buyer. Another disposal process had been initiated

to have the motor vehicle disposed of.

I advised the Accounting Officer to expedite this process for which I await the

outcome.

Page 499: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

487

(b) Abandoned Motor Vehicles

Two motor vehicles of the Commission were abandoned and grounded at private

garages for more than 3 years, where they had been taken for repairs; UG 0351B

grounded at Africa Motors since August 2010 and UG 0382B grounded at Cooper

Motors garage since early 2011.

The failure to repair the vehicles and have them returned to the Commission

exposes them to a risk of being vandalized and effects of weather.

Accounting Officer explained that the Commission was not able to raise funds

required for the repairs of the vehicles, which had been estimated at about

UGX.65 million. The Commission was liaising with the Chief Mechanical Engineer

on the process of disposing them off. I await the outcome of this undertaking by

management.

38.3 Budget performance

Review of the approved budget estimates and the financial statements for the

year revealed that out of the total budget of UGX.3,865,673,394, the Commission

received only UGX.3,555,264,221 (91.9%), resulting in a shortfall of

UGX.310,409,173. A shortfall in funding affects implementation of the

Commission‘s planned activities.

I advised management to liaise with Ministry of Finance, Planning and Economic

Development and other relevant stakeholders for improved funding.

38.4 Non-submission of quarterly reports by District Service Commissions

Section 26 (2) of the Health Service Commission Act, 2001, requires District

Service Commissions (DSCs) to submit quarterly performance reports to the

Health Service Commission; these reports help the HSC to keep abreast with the

businesses conducted by the DSCs in executing their mandate in relation to the

mandate of HSC. Most districts submitted one or two quarterly performance

reports for the financial year under review.

Page 500: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

488

Failure to submit quarterly reports by DSCs is irregular and implies that the HSC

cannot have consolidated information regarding the number of health staff

recruited, promoted and confirmed in service for proper planning.

I advised the Accounting Officer to always ensure that DSCs submit to the HSC

quarterly reports as required and should consider assigning the role of follow up to

an officer.

39.0 BUTABIKA MENTAL REFERRAL HOSPITAL

39.1 Shortfall in supplies ordered

In the year under review, the hospital received drugs valued at UGX.582,053,641

as compared to the value of orders made of UGX.798,952,318, resulting into a

deficit of drugs valued at UGX.216,898,677.

Management attributed this to the specialized nature of the services offered by the

hospital, whereby NMS initially experienced challenges in supplying the medicines.

I have advised the Accounting Officer to plan properly for the specialized

medicines and have the requirements fully met by NMS, since this is the only

referral hospital for the kind of services offered.

39.2 Poor mechanical condition of the Hospital Ambulances

It was noted that two of the hospital‘s ambulances were in poor mechanical

condition, while the third one had been recommended for disposal. Lack of

properly functioning Ambulances hampers service delivery in the hospital.

Maintaining the old Ambulances is also costly.

Management explained that the hospital had budgeted for procurement of a new

Ambulance during the FY 2013/13 and the process was in advanced stages. I have

advised the Accounting Officer to ensure that the process of procuring a new

Ambulance is expedited and to have the old one disposed off to avoid further

deterioration in value.

Page 501: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

489

39.3 Encroachment on Hospital Land

The Hospital was issued with a freehold Land Title on 22nd May 2008 for the pieces

of land covering 76.795 hectares (189.763 acres). An audit inspection of this land

revealed that several encroachers had occupied Plots 89-90 and had erected semi-

permanent structures, without authority of the Hospital Board of Management. It

was noted that management of the hospital had not taken any measures to stop

this encroachment and is likely to face difficulties in evicting these encroachers in

future.

Management explained that all the hospital land had been re-surveyed and the

encroachers had been served with eviction notices. In addition materials for

fencing off the affected land had been procured.

I advised the Accounting Officer to expedite the process of fencing off the affected

land and have the encroachers evicted.

39.4 Status of hospital equipment

Most of the equipment used in the hospital was in good condition but only needed

regular servicing, which is hampered by lack of local technicians. For example, the

hospital X-Ray equipment is always repaired by experts sourced from Nairobi. This

makes the repairs expensive and may require standby equipment.

Management explained that the nature of the x-ray equipment is specialized and

unique and cannot be repaired by local bio-medical engineers hence necessitating

outsourcing within the region. I have advised the Accounting Officer to enter into

a service level agreement with the service provider so that the servicing period

and intervals are properly planned.

Page 502: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

490

40.0 UGANDA CANCER INSTITUTE

40.1 Staffing Gaps

Out of the 78 approved positions at the institute, only 52 positions representing

67% of the established structure had been filled leaving 26 posts vacant. Key

positions including Medical Officers of Special Grade, Senior Consultants,

Consultants, Nursing Officers, Senior Hospital Administrator, Senior Principal

Nursing Officers, Senior Procurement Officer, Procurement Officer and medical

officers were among the unfilled.

This matter has not been given the attention it deserves as reported in my

previous audit report for the year ended 30th June, 2012. Such staffing gaps lead

to work overload on the existing staff and limit the ability of the Institute to

effectively deliver its mandate.

I advised management to liaise with the relevant stakeholders and have the

staffing gaps filled.

40.2 Procurement & expenditure

(a) Irregular Procurement of Consultancy

An individual was awarded a consultancy to develop an operational manual for

UCI, at a cost of UGX.9,975,000. Subsequently, UGX.5,000,000 was paid vide

expenditure voucher No. R35/10/12.

However, it was noted that the consultant was handpicked. It was further

observed that, no contract was signed for this procurement. In addition, no

performance reports were presented for audit and neither was there a waiver from

PPDA to allow UCI to procure the services using Direct Procurement Method.

Management explained that an individual with previous experience in the

preparation of the manual was required.

Page 503: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

491

I have advised the Accounting Officer that solicitation of proposals from at least

three experts would have provided the necessary competition in the exercise.

Meanwhile, management should obtain and avail all the missing documentation.

(b) Unplanned Procurement

PPDA regulation 96 (1) of 2003, stipulates that a user department shall prepare a

multi-annual, rolling work plan for procurement based on the approved budget,

which shall be submitted to the procurement and disposal unit to facilitate orderly

execution of annual procurement activities.

Contrary to the Regulations, UGX.9,159,322 was spent on procuring furniture yet

it was not included in the entity‘s procurement plan. Further more, the entity used

the Direct Procurement Method without the Contract Committee‘s approval.

The practice undermines the principles of transparency, fairness and competitive

pricing for the items. I have advised management to always ensure that all

procurements and disposals are conducted in accordance with procurement

principles enshrined in the PPDA Act and Regulations.

(c) Violation of the Procurement Regulations

Included in the purchases out of imprest was an amount totalling to

UGX.7,383,000 which was released in respect of two procurements;

i) Purchase of curtains for the clinicians‘ consultation room in the OPD section at

UGX.4,083,000,

ii) Making twenty pieces of wooden pallets for use in the stores and kitchen at

UGX.3,300,000, however, the following observations were noted:

Suppliers were sourced directly for each of the procurements without observing the

procurement thresholds contrary to PPDA Regulation 106 (1) which stipulates that

a procuring and disposing entity shall use the procurement methods specifies in

Part VI of the Act of all procurements.

I have explained to the Accounting Officer that the procurement thresholds would dictate

in such circumstances that the procuring and disposing unit requests for

Page 504: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

492

quotations from at least 3 suppliers in order to create a competitive exercise which

eventually brings about fairness and transparency.

I have advised management to always adhere to the PPDA Regulations in all its

procurement undertakings in order to achieve value for money.

(d) Irregular allowances

Section E of the Public Service Standing Orders, 2010 provides for the different

kinds of allowances that public officers are entitled to and a copy of the allowances

Circular No. 4 2008, clearly indicates revised standard rates of allowances

accessible to all public servants.

A review of the institute‘s imprest revealed that an amount of UGX.40,170,000

was paid in respect of irregular allowances to different employees of the entity.

The irregularity constituted two forms:

i. Paying higher allowance rates than what is stipulated in the Public Service

Regulations,

ii. Allowances not traceable to the Public Service Standing Orders, 2010 were

paid to institute employees for activities considered routine in nature.

I further advised management to liaise with Ministry of Public Service on

regularizing the allowances paid.

40.3 Inspections

(a) Congestion in wards

A physical inspection of the institute premises and wards revealed congestion that

is attributed to the high number of patients and attendants, that exceed the

originally planned capacity. There is a risk of increase in cross-infections due to

contamination.

Analysis of the planned capacity and the current number of admissions at the

institute revealed the following gaps;

Page 505: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

493

Name of

ward

Category Planned

Capacity

Current

Capacity

L.T.C Children ward 32 53

S.T.C Adult ward 24 38

Private General 9 15

The Accounting Officer explained that the Institute has constructed a six (6) level

ward that will be put to use after installing equipment to ease congestion.

I have advised the Accounting Officer to liaise with relevant stakeholders and have

the building equipped to ease on the congestion.

(b) Expired drugs

An inspection conducted in the institute‘s drug store revealed that an assortment

of drugs worth UGX.898,848,322 had expired. Expired drugs represent a loss to

the public and further loss may be incurred in the process of their destruction.

Management explained that due to the long procurement process, the drugs were

delivered when their usability period was short. I have advised management to

liaise with the key stakeholders and streamline procurement for essential drugs.

(c) Rampant Drug stock outs

It was observed that the institute experiences frequent drug stock outs. The

Accounting Officer explained that supply of some essential drugs takes a period as

long as seven months due to the complexity of the drugs and the nature of

patients medical needs. This affects service delivery in that patients are not able

to get treatment in time

I have advised management to ensure procurement plans are submitted promptly

to NMS and re-order levels for essential drugs are established for ease of placing

orders.

Page 506: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

494

40.4 Non-reconciliation of drug supplies with NMS

It was noted that Uganda Cancer Institute did not make regular reconciliations

with NMS regarding drug supplies .For the year under review, while NMS indicated

that drugs worth UGX.651,723,362 had been delivered, UCI disputed this assertion

stating that no invoices were received. Management attributed the anomaly to the

failure by NMS to provide monthly statements in respect of drugs and medical

supplies.

I advised management to obtain monthly statements from NMS for reconciliation

purposes. In addition invoices and delivery notes should be obtained on every

delivery.

41.0 UGANDA HEART INSTITUTE

41.1 Doubtful Expenditure

Funds totalling UGX.85,228,265 advanced to various individuals and organizations

to execute activities of the institute lacked relevant supporting accountability

documents contrary to the requirements of the Treasury Accounting Instructions.

In the absence of these documents, I was unable to confirm whether the funds

were spent on the intended activities.

I advised the Accounting Officer to ensure that advance payments are always

accounted for in accordance with the Treasury Accounting Instructions (2003).

41.2 Utilisation of NTR without authority

The Institute planned to collect UGX,2,033,000,000 in NTR and realised

UGX.2,700,538,488. Details show that part of the excess collections, was spent

without appropriate authority in form of a supplementary budget required under

Sections 16 and 17 of the Public Finance and Accountability Act (PFAA), 2003.

This practice is irregular.

Page 507: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

495

I advised the Accounting Officer to ensure that the legal provisions regarding

supplementary funding are always adhered to.

41.3 Shortfall in transfers from MoFPED

A review of the financial statements revealed that out of the revised budget of

UGX.3,759,683,764, the Institute received only UGX.2,641,202,052 from Ministry

of Finance Planning and Economic Development (MoFPED), creating a short fall in

funding of UGX.1,118,481,172 thus curtailing the implementation of planned

activities.

I advised the Accounting Officer to always liaise with MoFPED to ensure that

appropriated funds are released to the Institute to enable implementation of the

planned activities.

41.4 Drug Management Issues

Expiry of Drugs

Audit noted that the Institute had a number of expired drugs which needed to be

destroyed. It was also noted that NMS delivered Dobutamine (used in Intensive

Care Unit and Theatre) with only three months remaining of its shelf life (Aug-Nov

2012). The drugs with short shelf life pose a risk to the lives of patients and the

medical staff, and ought not to have been accepted by the Institute.

I advised management to ensure that drug deliveries are checked and verified to

ensure that those with a short shelf life are rejected. I further advised them to

liaise with the NMS and National Drug Authority and have the expired drugs

properly disposed of.

41.5 Staffing Gaps

Out of the 192 approved staffing positions in the Institute, only 68 (35%)

positions were filled. The key positions critical to service delivery in the Institute

for example Director, Deputy Director, Senior Medical Officers of Special Grade,

Senior Consultants, Consultants, Senior Internal Auditor, and Medical Officers were

Page 508: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

496

among those not filled. This matter was reported in my previous audit report for

the year ended 30th June 2012 but no action was taken. Such staffing gaps lead

to work overload on the existing staff and may affect the level and quality of

service delivery.

The Accounting Officer explained that the Institute liaised with relevant authorities

and consequently ten (10) positions had been approved to be filled in the 2013/14

financial year.

I await the feedback on this management action. Meanwhile, management should

fast track turning the Institute into a semi-autonomous entity to be able to recruit,

remunerate and retain its own staff and consultants.

I advised management to implement the audit recommendations so as to ensure

enhanced accountability and better stewardship of the resources availed to the

Institute.

42.0 MULAGO REFERRAL HOSPITAL COMPLEX

42.1 Misclassification of expenditure

UGX.213,000,000 paid to various institutions , departments and individuals for

carrying out research activities , running medical camps and contribution to

professional bodies was wrongly charged on the item of transfers to other

organizations instead of the respective expenditure codes, thereby misstating the

financial statements. It was further noted that the funds lacked accountability.

Though management stated that the accountability was available, the relevant

documents were not submitted for verification.

I advised management to always charge expenditure in accordance with the

appropriation Act. Meanwhile the funds should be accounted for or recovered

accordingly.

Page 509: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

497

42.2 Payment of Value Added Tax on Exempt Supplies

A sum of UGX.62,375,000 was paid to a local firm in respect of supply of CT Scan

Films for the Radiology Department. Out of this payment however, UGX.9,514,830

was in relation to the 18% Value Added Tax (VAT) paid in contravention of

Section 79 of the VAT Act 1996, which exempts the supply of dental, medical and

veterinary equipment from VAT.

Further review also revealed that this payment was irregularly effected on a non

Tax Invoice.Management explained that action had been taken by writing to the

firm demanding for refund and response was awaited.

I await the outcome of the management‘s action.

42.3 Outstanding Domestic Arrears

The Payables of UGX.1,704,626,602 reported in the financial statements

comprise electricity bills that have been outstanding since financial year ended

30th June 2010. There is risk of cessation of services and higher costs arising

from possible litigation.

Management attributed the long standing arrears to lack of funding for the item.

I advised management to ensure that the outstanding bills are budgeted for and

settled.

42.4 Revenue Performance

Out of the Hospital budget of UGX.44,315,643,000 , onlyUGX.42,625,168,502 was

realized resulting into a shortfall of UGX.1,690,474,498.Given the nature of

services offered by the hospital, inadequate funding greatly affects the level and

quality of medical services.

I advised management to identify and adequately address the causes of under

collection of Non Tax Revenue and to liaise with Ministry of Finance, Planning and

Page 510: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

498

Economic Development to ensure that all appropriated funds are released to the

Hospital.

42.5 Advance payments through employees’ bank accounts

During the year under review, the Hospital made advance payments amounting to

UGX.292,656,588 to individuals through their personal bank accounts contrary to

sections 227 and 228 of the Treasury Accounting Instructions, 2003. Though the

funds were eventually accounted for the practice is vulnerable to abuse and could

easily lead to loss of public funds.

I advised the management to ensure that funds are paid directly to the intended

beneficiaries and service providers to eliminate the risk of loss of funds.

42.6 Staffing Gaps

Out of the 2,091 approved positions in the staff structure of the hospital, only

1,860 (89%) positions had been filled leaving 231 vacancies (11%). Audit noted

that the department of Radio therapy, Nuclear Medicine, Planning, Community

Health, Anaesthesia, Paediatrics and Child Health were greatly affected. This also

affects the level and quality of service delivery.

The Accounting Officer explained that the matter had been taken up by the the

Health Service Commision and most of the remaining vacancies had been declared

for filling.

I await for the outcome of this undertaking by management and the Health

Service Commission.

REGIONAL REFERRAL HOSPITALS

43.0 ARUA REGIONAL REFERRAL HOSPITAL

43.1 Unaccounted for funds

Paragraphs 214(a) and 215(a) of the Treasury Accounting Instructions, 2003

require that advances are accounted for without delay.

Page 511: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

499

During the year under review, it was noted that a total of UGX.132,

061,690 advanced to various staff for various activities remained unaccounted for

by the year end. Furthermore, UGX 102,158,138 paid to various suppliers of

goods and services had no supporting documents. As a result, it was not possible

to confirm that a sum of UGX.234,219,828 spent was properly utilized.

I advised the Accounting Officer to ensure that funds are accounted for.

43.2 Utilization of Non-Tax Revenue (NTR) without authority

Paragraph 94 of Treasury Accounting Instructions (TAI), 2003 does not allow NTR

to be utilised at source unless authorised by the Accountant General. However,

total of UGX 76,960,600 as collection from the private wing and proceeds from

sale of assets was spent at source without authority. Out of the total collections of

UGX.76,960,600, UGX. 51,626,000 was later banked and the balance of

UGX.25,334,600 remained unaccounted for. It was further noted that NTR was

collected by a driver who was not so appointed puts the funds at risk of

misappropriation.

The Accounting Officer claimed that authority to collect and utilize revenue at

source was obtained from the Secretary to the Treasury and attributed use of a

driver to understaffing in the accounts department. However, the authority to use

the funds at source was not availed.

I advised the Accounting Officer to avail the authority to utilize the funds at

source, ensure that the funds are accounted for and a cashier appointed to handle

the collection of NTR.

43.3 Unauthorized reallocations UGX.79,722,845

Contrary to Paragraph 152 of TAI, 2003, Management incurred expenditure over

and above the approved estimates amounting to UGX.79,722,845 on five

expenditure items without seeking the relevant authority.

Page 512: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

500

The Accounting Officer claimed that these items were spent in accordance with

the approved budget. However, this could not be verified without the approved

reallocation warrants.

I advised the Accounting Officer to desist from incurring over expenditure without

seeking the approval in accordance with the law.

43.4 Unspent balances UGX.867,000,000

Section 19(1) of the Public Finance & Accountability Act (PFAA), 2003 requires that

at the close of the financial year, unspent balances are repaid to the consolidated

fund. At the close of the year, the hospital retained funds totaling to

UGX.867,000,000 without authority. Having such funds by the end of the year

might imply poor absorption capacity.

The Accounting Officer explained that these funds were for the renovation of the

maternity ward and construction of a lagoon which was halted as a result of a

court case.

I advised the Accounting Officer that in the circumstance, authority to retain would

have been sought from the secretary of the treasury to retain the unspent

balances.

43.5 Advance payment to a service provider

Regulation 252(1) of PPDA Regulations, 2003 requires advance payments to be

guaranteed by appropriate security.

The hospital paid an advance of UGX.80,635,638 to the Contractor for the

construction of a 2 bed-roomed flat without appropriate security which was

irregular.

The Accounting Officer claimed that the advance payment had a bank guarantee.

However, there was no evidence that the bank guarantee was provided.

Page 513: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

501

I advised the Accounting Officer to follow the regulations and ensure that the

advance is fully recovered.

43.6 Absence of salary record cards/establishment registers & mandatory

examination of monthly payrolls:

Paragraph 264 of the Treasury Accounting Instructions, 2003 (TAI) requires that

salary record cards to be maintained. Salary cards show the gross amounts, total

allowances/deductions and net pay for each month. Further, Paragraph 265

requires examination of the monthly pay roll and preparation of pay change

reports for submission to the Ministry of Public Service for action. However,

Management did not maintain salary record cards for each staff and there was no

evidence that monthly payrolls were examined and change reports prepared and

submitted to the Ministry of Public Service. There is therefore a risk that wrong

salaries are paid.

I advised the Accounting Officer to ensure that the salary record

cards/establishment registers are maintained and mandatory examination of the

monthly payrolls is undertaken.

43.7 Contracts awarded without sufficient funds

Regulation 105 (1) of PPDA regulation, 2003 states that an entity shall not initiate

any procurement proceeding or activities for which funds are neither available nor

adequate. However, management entered into a contract to construct one block

of two units of flats at UGX.1,001,744,280 when only UGX.450,000,000 was

provided for in the approved budget. Similarly, another contract for rehabilitation

of the perimeter fence at a contract amount of UGX.529,350,382 was also

awarded when it was not in the approved estimates.

This undermines the process of procurement planning and budgeting.

The Accounting Officer attributed this to the budget cuts in the year and that

funding was to be provided for in the following years since the project span is

three years.

Page 514: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

502

I advised the Accounting Officer to commit Government on contracts only when

sufficient funds are available in the budget.

43.8 Supply of Medical Equipment – UGX.355, 386,150

A total of UGX.355, 386,150 was spent on procurement of medical equipment

from two service providers. However, the budget allocation for the medical

equipment was UGX.120,000,000. The source of the excess funds of

UGX.235,386,150 was not disclosed. Furthermore, out of the above amount,

procurement records were available for UGX.89,235,000 and the balance of

UGX.266,151,150 was not supported by procurement records.

I advised the Accounting Officer to explain the excess expenditure on the

equipment and avail procurement records for the balance of UGX.266,151,150.

44.0 MBALE REGIONAL REFERRAL HOSPITAL

44.1 Unauthorized Expenditure

According to Treasury Accounting Instruction 152, expenditure not provided for in

the approved estimates of the current financial year may not be incurred without

the authority of a supplementary warrant, virement or contingencies fund advance

warrant.

A sum of UGX.499, 486,625 was paid in excess of the approved budget without a

supplementary warrant as shown in appendix 1.

The accounting officer explained that they had a salary short fall of UGX.

430,000,000 which compelled the hospital to request the Permanent Secretary and

Secretary to Treasury PS/ST for the extra funding.

I advised the accounting officer to seek for the parliamentary approval of the

excess expenditure.

Page 515: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

503

44.2 Nugatory Expenditure of UGX.143, 564,177

A local construction firm was contracted to construct staff accommodation. It was

however noted that the hospital delayed payments in contravention of the contract

agreement resulting into accumulated interest of UGX 143,564,177.

This expenditure is nugatory and could have been avoided.

The Accounting Officer attributed the interest to inadequate releases.

I advised the Accounting Officer to ensure that commitments are made only when

funds are available in accordance with the regulations.

44.3 Unaccounted for Funds

Para 120 and 181 of Treasury Accounting Instructions (TAIs) 2003 require that all

payment vouchers must be properly supported with appropriate documents or sub

vouchers before they are passed for payment. This is further amplified by section

181 of the same instructions which provide that all vouchers will contain full

particulars of each service or goods and will be accompanied by such supporting

documents as may be required so as to enable them be checked without reference

to any other documents.

During the year under review UGX 88,318,200 in respect of incompletely vouched

expenditure (UGX 64,904,100) and unsupported administrative advances to

council staff (UGX 23,414,100) remained outstanding contrary to these

regulations.

I recommended that the Accounting officer enforces the accountability regulations

as stipulated by the Treasury Accounting Instructions

44.4 Doubtful Tax Remittances

Section 123 of the Income Tax Act, 1997, requires the a withholding agent to pay

URA any tax that has or should have been withheld within fifteen days after the

Page 516: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

504

end of the month in which the payment subject to withholding tax was made and

regulation 5.6.6 (2) of the LGFAM, 2007 requires PAYE which has been deducted

on salaries and allowances to be remitted to URA.

It was however noted that a sum of UGX.21, 548,079 deducted from contractors

and suppliers in respect of 6% withholding tax lacked the official URA receipts.

There is a risk that the funds were not received by URA and this exposes the

District to the risk of penalties and fines by URA.

I urged the Accounting Officer to follow up the matter and ensure that the funds are

accounted for and also recovery be made for taxes not deducted in accordance with

the Income Tax Act.

44.5 Outstanding Commitments

Section 200 of Treasury Accounting Instructions Part I Finance, provides that all

purchases of goods or services will be subject to the commitment control system

procedures that will be issued by the Accountant General from time to time.

By the end of the financial year, the entity had accumulated outstanding

commitments amounted to UGX.396, 014, 984.

The outstanding commitments can lead to fines litigation costs.

I advised the Accounting officers to adhere to the commitment control system.

44.6 Vacant Positions

A review of the approved structure revealed that the hospital has an establishment

of 429 staff in various positions. The records however indicate that 35 positions

including the senior positions of Senior Consultant Pediatric, Consultant Orthopedic

Surgeon, Consultant Surgeon, Consultant Ophthalmologist, Consultant Physician

and a number of Medical Officers Special Grade are vacant, a situation which has

persisted for the last three years.

Page 517: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

505

Understaffing and failure to have all necessary positions filled leads to work over

load of staff and undermines delivery of health services.

The Accounting Officer explained that management has constantly used a variety

of approaches including periodic submissions to the ministry of health and public

service. He also indicated that a recruitment plan and the staffing structure and

status has been included in the Output Budgeting Tool to guide the Ministry of

finance provide funds for the extra staff required.

I urged the Accounting Officer to continue engaging the relevant government

agencies with a view of having all vacant posts filled.

44.7 Irregular Payment of Salaries

A review of employee‘s records revealed that there is lapse in updating the payroll

records. From a sample of records on the payrolls for a six months period, it was

established that a total of UGX.19, 144,938 was paid to 4 employees after they

had reached the mandatory retirement age.

The continued existence of ineligible staff on the payroll is attributed to internal

control weaknesses in both human resource and finance departments.

The Accounting Officer attributed the anomaly to absence of a human resource

officer during the period. He also indicated that the response by Ministry of Public

Service in effecting pay changes was rather slow.

I advised the accounting officer to make a follow up of the matter to ensure

money irregularly paid is recovered. Management was also advised to ensure that

human resource records are regularly updated to avoid loss.

44.8 Inspection Report

Audit inspection was carried out at the hospital and a number of salient issues

including; unutilized equipment, poor storage, poor disposal of expired drugs and

some defective projects were noted.

Page 518: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

506

44.9 Expired Drugs

Some expired drugs were found kept outside at the stores veranda for

approximately one year. It was established that a company in the names of

Green label had earlier been contracted to collect expired drugs on a regular basis

but had not collected since February. Records indicate that the last collection was

on 20/02/2013.

The Accounting Officer revealed that the mandate to dispose expire drugs did not

lie with the hospital but with National Medical Stores.

I advised the Accounting Officer to continuously liaise with the National Medical

Stores to minimize expiry of drugs and to make a follow up with NMS to collect

and dispose of the expired drugs.

45.0 KABALE REGIONAL REFERRAL HOSPITAL

45.1 Audit of Payroll

a) Un effected payroll deletion

A sum of UGX.45,226,480 was irregularly paid due to the failure of the Ministry of

Public Service to delete staff from payroll as per the exception reports that were

raised by the Referral Hospital as well as failure of the Hospital management to

clean up the payroll. This was loss of public funds that would have been used to

deliver service on other programs to the public.

I advised management to recover the funds from the beneficiaries.

b) Vacant Posts

Section 15 (a) of the standing orders 2010 mandates the Ministry of Public Service

to determine the structure, terms and conditions of service of staff in government

service. In line with this requirement, the Ministry approved the staff structure of

the hospital to comprise of 350 positions. Out of this approved Staff

Page 519: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

507

establishment, only 234 posts were filled leaving staff shortage of 116 positions

(33%) unfilled. Staff shortages adversely affect service delivery.

I advised Management to liaise with the relevant stakeholders in the health and

finance ministry to ensure that vacant positions are filled as soon as practicable.

45.2 Internal Control Weaknesses

(a) Lack of segregation of duties

Treasury Accounting Instructions require Accounting Officers to be responsible for

the financial controls of their entities. Key amongst them is the segregation of

duties. Audit established that the cashier who receives cash, is also responsible for

banking it and maintaining all books of account relating to revenue including the

cash books, revenue register and preparation of bank reconciliations. This practice

compromises the internal control environment in the Finance department.

Management attributed the situation to the challenge of under staffing faced by

the hospital.

I advised Management to address the matter so as to strengthen the internal

controls.

(b) Weaknesses in contract management

Regulation 119 (2) & (3) of PPDA of 2006 requires the User departments to

nominate a member of staff with appropriate skills and experience to be Contract

Supervisor on any contract entered into by the entity and is directly responsible for

supervising the contract.

It was noted that management did not nominate contract supervisors in all the

contracts executed worth UGX185,689,400. Furthermore, the PDU of the hospital

did not carry out contract management and evaluation on projects executed.

I advised management to comply with the PPDA Regulations.

Page 520: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

508

(c) Commitment control system

A review of financial statements of the hospital revealed that a sum of UGX.

32,460,825 was outstanding in lieu of several services and supplies to the hospital

as at the end of the year contrary to the commitment control system. This

exposes the hospital to the risk of litigation which could lead to eventual loss of

public funds.

I advised management to liaise with the Ministries of Finance and Health to ensure

that these arrears are cleared at the earliest to avoid potential penalties and fines

for late payment.

45.3 Budget Performance

Treasury Accounting Instructions require budget estimates to be based on

objectives to be achieved for the financial year and during implementation, effort

to be made to achieve the agreed objectives or targets as per the programmes of

the hospital. It was noted that hospital had an approved budget of

UGX.4,036,404,000 but only realized UGX.3,900,457,419 creating shortfall of

UGX.135,946,581 ( 3.4%).

Failure to realize budgeted funds impacts negatively on the implementation of

planned activities of the hospital.

I advised the Accounting Officer to always liaise with the responsible authorities to

ensure that all budgeted funds are received and that any budget cuts are properly

planned to avoid disruption of key activities of the Hospital.

45.4 Ineffective hospital board

According to the Referral Hospital Guidelines (2003) issued by the Ministry of

Health, it is a requirement that there should be a hospital Board to provide

strategic guidance to the Referral Hospital through execution of the functions as

stipulated therein. Audit established that there were no committees of the board

Page 521: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

509

for finance, planning, disciplinary, audit and welfare. The effectiveness of the

Board is therefore affected.

I advised the Accounting Officer to ensure that hospital board executes its

mandate as stipulated in the hospital boards manual.

45.5 Audit Inspections

(a) Construction of Private wing

The Hospital awarded a contractor to construct a private wing at the hospital at a

cost of UGX.2,657,035,984 in May 2009 with the estimated date completion date

being April 2010. The project was delayed for more than 3 years. At the time of

Audit in January, 2014 the contract had expired but work was on going. The

delay to complete the project may lead to extra administrative costs.

Management explained that efforts were being made to expedite completion of

the project and the main contractor had subcontracted some of the works.

I advised the accounting officer to expedite the completion of the project or seek

contract extension.

45.6 Hospital facilities

a) Non-functional and idle medical equipment

Audit inspections revealed that a number of medical equipment for all the Units of

the hospital inspected were found to be obsolete, non-functional and inadequate

for effective service delivery some of the equipment‘s were; ultra sound -scan

machine and the con lab machine.

b) Un safe disposal of medical waste and refuse

It was noted that the waste was dumped in an open pit and burnt. The hospital

also dumped the other waste in the same pit.

Page 522: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

510

c) Congested patient wards

Inspections of accommodation facilities revealed that a number of wards were too

congested. The surgical and maternity wards were observed as extreme cases

with some patients sleeping on the floor and with bed spacing hardly a metre

apart.

d) Un serviced fire extinguishers

Inspections revealed that some of the fire fighting equipment did have a service

history while others were expired/empty rendering them useless which puts the

hospital at risk of fire.

I advised the Hospital administration to ensure the above anomalies are

addressed.

46.0 LIRA REGIONAL REFERRAL HOSPITAL

46.1 Staffing Gaps

Section 15 (a) of the standing orders 2010 which mandates the Ministry of Public

Service to determine the structure, terms and conditions of service of staff.

In line with requirement the Ministry approved the structure of the Hospital of 347

posts. However, only 260 were filled leaving 87 positions vacant.

The Accounting Officer explained that the Ministry of Public Service has cleared

the filling of up to 23 vacant positions on replacement basis and management was

awaiting action of the Health Service commission.

Under staffing poses a challenge to service delivery and as it may lead to

overworking of the few available staff leading to stress, demotivation and poor

performance.

I advised the Accounting Officer to pursue the matter further with the relevant

authorities and have all the vacant positions filled.

Page 523: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

511

46.2 Congestion in the wards

Previous audit reports to Parliament, mentioned congestion in the Hospital.

However, An inspection of the hospital wards revealed that congestion still exists.

For instance, it was noted that the children and Male surgical wards were over

crowded to the extent that some patients in the Male surgical ward are attended

to from the corridor. Furthermore, the Children‘s ward which has a capacity of 33

had 46 admissions which exceeded the designed capacity. The hospital also lacks

adequate space in the maternity ward. Below, is a presentation of the situation in

the male surgical ward.

The old sanitary facilities do not match the ever increasing number of patients.

The Accounting Officer attributed it to the non-functioning of lower level health

facilities, and population growth.

I advised the Accounting Officer to liaise with the Ministry of Health and other key

stakeholders to address the matter.

46.3 Dilapited OPD structure and insufficient facilities in the unit

In my previous year report to parliament , I mentioned the appalling state of the

OPD structure and insufficient facilities in this unit. However, a visit to the same

facility revealed that no corrective measures have since been made. It was noted

that there is an ever increasing number of patients in this facility. It was further

Page 524: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

512

noted that the roof was leaking and the floors are cracked while the sanitation is

deplorable.

The Accounting officer explained that the OPD department is the oldest structure

in the hospital, built in 1922 and has since been condemned, adding that there is

an urgent need for a new out patient department.

Pictorial view of the OPD structure

Outpatients waiting for service in dilapidated OPD1

Dilapidated outlook of OPD building 1

I advised the Accounting officer to bring the matter to the attention of the mother-

ministry for necessary action.

47.0 GULU REGIONAL REFERRAL HOSPITAL

47.1 Domestic arrears paid

The cash flow statement revealed that UGX.420,082,124 was paid to settle

domestic arrears. However, expenditure vouchers together with other supporting

documents were not availed for audit. Accordingly, I could not confirm their

genuineness.

The Accounting Officer explained that the arrears accumulated over the previous

financial years mainly from water bills.

I advised the Accounting Officer to ensure that documentation in support of the

expenditures is provided for audit.

Page 525: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

513

47.2 Net advances recovered UGX 41,229,994

Advance recoveries presented in the cash flow statement of UGX 41,229,994 could

not be verified in absence of advance ledgers and a schedule and evidence of

recovery.

I advised the Accounting Officer to render the necessary supporting documents in

respect recovery.

47.3 Lack of data on property plant and Equipment

Management reported purchase of property plant and equipment (PPE) at

UGX 1,999,942,521 in the cash flow statement (investing activities). However,

there was no detailed schedule of the items accompanying the financial

statements; neither were procurement and contract management files provided

for audit. This may have been a result of laxity by the procurement and disposal

unit to maintain proper procurement records.

The Accounting Officer stated that the hospital did not have a resident

procurement officer and as such most of the information relating to procurement

could not readily be available.

I advised the Accounting Officer to provide proper documentation of property,

plant and equipment.

47.4 Unaccounted For Funds (UGX 13,156,486)

Paragraph 120 of the Treasury Accounting Instructions (TAI) Part 1 requires that

funds be properly accounted for with appropriate documents. However, a total of

UGX.13,156,486 paid to staff to undertake official activities remained unaccounted

for at the close of the year. As a result, it was not possible to ascertain whether

the funds were put to the purpose for which they were intended.

I advised the Accounting Officer to ensure accountability or recovery.

Page 526: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

514

47.5 Staff Shortages

Section 15 (a) of the standing orders 2010 mandates the Ministry of Public Service

to determine the structure, terms and conditions of service. Accordingly the

Ministry of Public Service approved a staff establishment of 426, of which 291

posts were filled (68%), leaving 188 posts vacant under staffing impacts

negatively on service delivery.

The Accounting Officer explained that the vacant post had been cleared by the

Ministry of public service for recruitment. By the time of writing the report,

however, recruitment exercise had not yet started.

I await the outcome of management action.

47.6 Nugatory Expenditure for Civil Suits UGX. 168,794,700

A review of records revealed that the Hospital had incurred legal costs of

UGX168,794,700 in respect of court cases and general damages for breach of

contract, and non payment of creditors. These costs could have been avoided had

management adhered to the commitment control system and contract terms.

Accordingly the expenditure is nugatory.

I advised the accounting officer to observe the commitment control system and

compliance to contract terms to avoid such situations in future.

47.7 Unremitted Withholding Tax (UGX. 65,201,024)

Section 124 (1) of the Income Tax Act 1997, provides for deduction of Withholding

tax and remitting to Uganda revenue authority. However, there was no evidence

that the 6% withholding tax totaling UGX. 65,201,024 deducted from payments to

various contractors was remitted to Uganda Revenue Authority (URA). Unremitted

taxes attract fines and penalties.

The Accounting Officer explained that they had obtained all the receipts, but did

not provide the documents for verification.

Page 527: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

515

The Accounting Officer was advised to obtain acknowledgement receipt as proof

or remittance of the tax.

47.8 Payment Of Hotel Bills (UGX 38,070,000)

During the financial year, UGX 38,070,000 was paid out in favour of hotel bills.

However, the expenditure was not supported by invoices or demand notes.

Management explained that UGX 7,050,000 was incurred in respect of new staff

reporting on duty while the balance related to arrears of hotel bills accumulated

over the years.

I advised the Accounting Officer to present the supporting document otherwise

the expenditure is suspected.

47.9 Accumulation of Expired Drugs (Status of Store)

Audit inspection revealed expired drugs and sundries that had accumulated over a

long time and needed to be disposed off. Besides, the store is in bad condition as

the roof was on the verge of collapsing.

Finally some drugs were on the floor instead of being put on pallets risking

deterioration. The Accounting Officer explained the expiry of the drugs arose

partly from a donation of drugs worth 500 million received in January some of

which was slow moving and nearing expiry.

I advised the Accounting Officer to ensure disposal of the expired drugs, and

proper storage of drugs.

Section of the roof almost giving way

Page 528: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

516

47.10 Status of Incinerator

The Hospital has only one functional incinerator used for combustion of organic

substances contained in waste materials. However, the following matters were

noted during inspections.

The existing incinerator in use is small, old and obsolete. As a result it

cannot be efficiently used for the high levels of waste at the hospital as

evidently demonstrated by the quantity of waste items to be disposed of.

The position of the incinerator may easily lead to adverse human health

effects. It was observed that the incinerator spews smoke directly into one of

the adjacent administrative buildings. See pictorial below:

Size of incinerator appears to be too small to

handle the high waste levels

Position of incinerator -less than 10meters away

from the administrative building

The Hospital Director stated that the hospital had just repaired an old incinerator

donated in 1998, but decried the high fuel consumption by the machine. I advised

management to reposition the incinerator or consider using cyclonic incinerators

which burn waste/refuse with neither smoke nor smell as well as make

consultations with the relevant authorities on the way forward.

47.11 Construction of Radiology Unit

A firm was awarded a contract to construct a new X-Ray department at a cost of

UGX €242,963.53 (about UGX 923,261,414) funded by Italian government. The

construction work started on 16th March, 2013 and was expected to take 12

months. An audit inspection noted that €20,000(UGX 76,000,000) had been

advanced to the contractor.

Page 529: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

517

However, the following matters were noted:-

Contract records relating to the project were not availed as management

explained that project was being handled by entirely the Italian corporation.

The contractor abandoned the site in November 2013 (approximately 3

months to the scheduled completion time).

It was also noted that the monitoring of the project was poor.

I advised the Accounting Officer to engage the development partner to avail

copies of the contract records.

48.0 MBARARA REGIONAL REFERRAL HOSPITAL

48.1 Cash and cash equivalent

From the review of financial statements, it was noted that cash and cash

equivalent on the cash flow statement of UGX.437,497,658 differed from what was

stated in the statement of financial position of UGX.695,522,177 rendering the

reported cash and cash equivalent doubtful. I could not confirm the accuracy of

financial statements.

48.2 Non Tax Revenue UGX.207,269,950

During the year, the hospital purportedly collected UGX.207,269,950 as Non Tax

Revenue (NTR). However, no revenue ledgers were maintained for the revenue

collected, no cash book for the NTR collections from July 2012 to February 2013

was presented for audit.

In the absence of revenue registers, I could not confirm the completeness of the

reported NTR revenue reported in the financial statements.

Page 530: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

518

48.3 Assets Management

a) Lack of Fixed Assets Register

Treasury Accounting Instruction 804 requires that a fixed Assets register be

maintained to show the location of plant, property and equipment of the Hospital.

This register will also show the articles in the custody of each officer. All officers in

charge of plant and tools are required to keep inventories recording each article,

its date of receipt, and the reference to the respective Plant and Tools Ledger. It

was noted that the entity did not maintain a fixed assets register contrary to the

regulation.

The Accounting Officer explained that a register tool provided by Accountant

Generals Office that captures all details is under implementation but the officer

responsible had been transferred.

The Accounting Officer was advised to maintain a fixed assets register to record all

hospital property including plant and equipment.

b) Non Engraving of assets

Best practice requires that entity assets are engraved for ease of identification.

However, during verification, it was noted that most of the assets are not

engraved. This makes it difficult to identify the items in case of loss.

Management explained that engraving is a continuous process that is done

whenever additional assets are procured and the exercise is ongoing.

The Accounting Officer was advised to establish the fixed assets register and to

engrave all the assets.

48.4 Board of Survey report

Board of Survey is mandated to verify the cash balances and security

arrangements at the main cash office, all sub-offices and other entity

establishments holding cash or items of value, as well as inspect and verify all

Page 531: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

519

goods on charge and belonging to the entity. The board of survey report

highlighted that the Private Patients‘ Account Cash book was not reviewed and

Government release account cash book balance was reported as not reconciling

with the bank balance. As such, I could not confirm cash balances at the end of

the year.

I advised the Hospital Administrator to ensure compliance with the regulations.

48.5 Disposal of assets

Regulation 295 (5) of the PPDA, 2003 requires a procuring and disposing entity

through the board of survey to identify assets to be disposed of on a periodic

basis. The board of survey report recommended a number of grounded vehicles

and un-used items due for boarding off. The failure to timely dispose grounded

vehicles and old items results in further deterioration.

Management explained that the exercise delayed due to inadequate manpower in

the PDU to initiate the disposal process. The old ambulance will be repaired since

it is in running condition.

I advised the Accounting Officer to ensure the obsolete assets are timely disposed

off in accordance with the laid down procedures and the PPDA regulations to avoid

further deterioration in their value.

48.6 Storage space

Inspection of Stores revealed that, the stores where medicine and other related

health supplies were kept did not have adequate space. Some of the drugs were

packed along the corridors. The 8 rooms purportedly used as stores were too

small and lacked the required standards for storage of medicine and other health

supplies.

Poor storage facilities hinder physical check, retrieval and reconciliation of drugs.

It may also lead to losses through theft and pilferage. There was apparent

Page 532: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

520

overload of drugs and sundries on shelves which causes damage to drugs and

may break shelves.

I advised the Accounting Officer to provide enough space so that all store items

are accommodated in a well arranged manner.

48.7 Lack of Vote control Registers

Paragraph 412 and paragraph 415 of the Treasury Accounting Instructions

mandates an accounting officer to maintain a Vote Control register, electronically

or manually and to watch not only the progress of expenditure incurred and

committed but also the progress of collection of revenue for which they are

accountable. A review of a sample of vote control registers revealed that progress

of commitments was not watched/ monitored and as a result some votes were

overspent.

The Accounting Officer was advised to closely watch the progress of expenditure

commitments and guard against over expenditure.

48.8 Inspections

(a) Dilapidated building

Hospital Buildings were found to be very dilapidated due to lack of regular repair

and maintenance, rendering the structure weak and dangerous for human

habitation as shown below.

Management acknowledged the shortcomings and explained that the matter is

being addressed under the District master plan; the structures are designated for

Page 533: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

521

demolition and replaced with new ones. Management should ensure that the

structures are renovated for better services.

I advised the Accounting Officer to source for funding to improve on the Hospital

buildings.

49.0 FORT PORTAL REGIONAL REFERRAL HOSPITAL

49.1 Entity Financing

Fort Portal Regional Referral Hospital was financed by grants (Conditional and

Unconditional) from Central Government, donations and locally generated

revenues from taxes, fees, licenses and charges. During the year, the entity

received grants totaling to UGX.4,636,498,347 from Central Government, UGX

74,466,164 from other government units and UGX 164,543,299 from locally

generated revenues. The total revenue of UGX4,875,507,810constituting 111% of

its approved budget estimates of UGX 4,401,870,858. Out of the funds received

UGX.4,451,864,904 (91%) was spent on service delivery and administration costs.

49.2 Detailed Audit Findings

This section outlines the detailed audit findings, management responses and my

recommendations in respect thereof.

49.3 Unauthorised Excess Expenditure: UGX 266,042,151

A review of the approved budget against actual expenditure on various item codes

revealed several expenditures in excess of the budget provision with no virement

or authority to reallocate contrary to enabling laws as detailed below.

ITEM BUDGET ACTUAL AMOUNT Excess Expenditure

Allowances 94,864,000 222,275,536 127,411,536

Welfare & Entertainment 69,853,000 94,055,430 24,202,430

Property Expenses 39,801,000 40,084,940 283,940

Electricity 53,774,000 88,457,872 34,683,872

General Supply of Goods 90,059,000 145,960,633 55,901,633

Page 534: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

522

Travel Inland 89,236,000 99,773,800 10,537,800

Fuel, Lubricants & Oils 90,418,000 99,902,000 9,484,000

Mtce of Mach.& Equip 45,304,000 48,840,940 3,536,940

TOTAL 266,042,151

There was no authority in form of approved reallocation or virement warrants

obtained to incur the over expenditure.

The Accounting Officer explained that the excess expenditure arose because of

more income from the private wing.

I advised the Accounting Officer to spend in accordance with approved budgets

and to seek approval for excess expenditure as required by the PFAA 2003.

49.4 Missing Records: UGX 172,632,541

Regulation 90 and 91 of the PPDA Regulations of 2003, requires an entity to

ensure that all records in respect of procurement are filed on the respective

procurement files. Records for procurements amounting to UGX 172,632,541

were not availed for audit. Absence of procurement is an indication procurements

which are potentially fraudulent.

The Accounting Officer explained that the previous Procurement officer had not

handed over the keys that would enable them access the documents.

I advised the Accounting Officer to ensure that the documents are availed for

review.

49.5 Understaffing

Public Service Standing Orders Chapter (A-a) paragraph 15(a) requires the

Permanent Secretary Ministry of Public Service to determine the terms and

conditions of Service and the structures of the public service in consultation with

the secretary to the treasury.

Page 535: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

523

It was noted that out of the establishment of 420 posts, only 312(74%) were

filled leaving 108(26%) posts vacant as shown below.

SECTOR APPROVED FILLED VACANT %GE

VACANT

Doctors 41 17 24 59%

Nurses Division 152 114 38 25%

Paramedics 88 66 22 25%

Administration 32 18 14 44%

Support Staff 107 97 10 9%

Total 420 312 108 26%

Management responded that it was difficult to attract and retain health workers

due to lack of accommodation and poor remuneration.

I advised him to liaise with the Ministry of Public Service and Finance to design

strategies of attracting and retaining staff at the hospital.

49.6 Incomplete Fixed Asset Register

TAI 2003 Part 11 Public Stores Para 804-806 requires a Fixed Asset Register to be

maintained showing the asset code, description, serial number, date of acquisition,

value, condition and location.

It was noted that although the Fixed Asset Register for the Referral Hospital exist

details such location, condition, date of purchase, valuation of some assets were

not shown in the register.

In the absence of full details about the assets in the fixed assets register, the

verification of the items becomes difficult. In addition, it was noted that some

items had not been recorded in the register.

The Accounting Officer stated that management had taken interest in the assets

register and instituted the inventory committee to have the register updated.

Page 536: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

524

I urged the Accounting Officer to ensure that the asset register is updated for

proper management and monitoring of assets.

49.7 Service Delivery

(a) Disposal of Expired Drugs

Analysis of the Hospital drug store data revealed that there were expired drugs

which had not been destroyed

The Accounting Officer explained that expired drugs are confined in a secure place

different from the other drug stores and that professional pharmacists were in

place to ensure that there is no linkage to the main system.

I advised the Accounting Officer to liaise with other stakeholders like NMS and

NDA to ensure that expired drugs are promptly disposed off.

50.0 JINJA REGIONAL REFERRAL HOSPITAL

50.1 Lack of land titles

It was noted that the hospital did not have land titles for six pieces of its land. The

hospital land is exposed to risk of encroachment. The Hospital Director in his

response stated that some plots of land are in dispute and are in courts of law

while others, have their titles being pursued by relevant authorities. I advised the

Accounting Officer to ensure that the land titles for the hospital are secured.

50.2 Unaccounted for Funds

Paragraph 217 of the Treasury Accounting instructions 2003, requires that

advances not accounted for within 60 days from date of payment should be

deducted from the monthly salary of the debtor and new advance should not be

given to anybody with unsettled advances.

Page 537: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

525

On the contrary, a sum of UGX.10, 374,924 advanced to an officer to undertake

official activities remained unaccounted for contrary to the provisions under the

Public Finance and Accountability Regulations and the Treasury Accounting

Instructions. In the absence of proper accountability, I was unable to confirm that

the funds were utilized for the intended purpose.

I advised the Accounting Officer to ensure that the funds are accounted for or else

recovery from the recipient be effected.

50.3 Establishment and Staffing

(a) Staffing Gap

Out of the approved establishment of 575 posts, 327 posts had been filled,

representing 57% of the establishment, leaving a staffing gap of 248 posts which

are not filled. Staffing gaps negatively affect the service delivery. The Hospital

Director attributed the gaps to inadequate wage bill and a ban on recruitment by

the Ministry of Public.

I advised him to liaise with the Health service commission and Ministry of Public

service so that the staffing gap is minimized.

(b) Over Establishment

There were over establishment of Twenty eight (28) staff; of whom the hospital

had spent UGX.311,441,586 on salary costs. This expenditure is irregular.

I advised the Hospital Director to evaluate the need for those staff and ensure that

the structure is reviewed to accommodate them.

(c) Non Established Posts filled

A review of the approved/established structure revealed that there were some

posts which were not on the establishment but have been filled without authority.

Page 538: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

526

As a result a sum of UGX.47, 847,324 was irregularly spent on the staffs who

occupy the non established posts. The details are in the table below;-

Post Approved Filled Salary per Month Amount (UGX.)

annual

Medical Laboratory

Technician

0 3 657,143 23,657,148

Medical Record Assistant

0 1 406,237 4,874,844

Auditor 0 1 952,468 11,429,616

Senior enrolled Nurse 0 1 657,143 7,885,716

6 47,847,324

The expenditure is irregular. The Hospital Director indicated that submissions were

made to MOPS to regularize the appointments or transfer those whose posts do

not exist on the structure.

I advised him to ensure that follow up is made so that the issue is addressed.

50.4 Drugs and other items

(a) Under Delivery of Drugs and Other Items

The hospital receives drugs and other items under the credit line of the Ministry of

Health. It was however noted that the hospital budget under the credit line was

UGX1, 353,693,181 out of which drugs worth UGX.1, 326,222,793 were delivered

leaving a balance of UGX.27, 470,388.

The Hospital Director admitted the shortfall of drugs deliveries and explained that

the funds were carried forward to the FY 2013/2014.

I advised the Accounting Officer to ensure that National Medical Stores (NMS)

makes good the shortfall.

(b) Expired Drugs

It was noted that there were expired drugs to be returned to National Medical

Store/Joint Medical store for further destruction. The failure to dispose of the

drugs poses a danger to the community.

Page 539: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

527

I advised the Accounting Officer to follow up the matter and ensure that the drugs

are destroyed.

(c) Non- functioning of Equipment’s

During the year under review the hospital paid UGX.75, 200,000 as part payment

for the equipment worth UGX.579,688,000 supplied in November/December,

2011.

However, audit inspections revealed that they were either non-functional or had

broken down.

An interview with responsible users of this equipment revealed that most of the

equipments delivered had problems which have never been addressed.

The Accounting Officer explained that UGX.23,000,000 had been withheld because

of these defects pending suppliers to train users.

I advised the Accounting Officer to ensure that the equipment is repaired and put

to proper use.

50.5 Inspection of Hospital

(a) Accounting for drugs

Samples of drugs for the month of March were verified and the following

observations were made;-

There were cases of stock variances between quantities of drugs issued to

the pharmacy and those acknowledged. The amount involved was

UGX.3,617,500. Details as follows;-

Items Issued to the

Pharmacy as per

the issue

vouchers

(tablets)

Acknowledged

receipts in the

stock cards

(tablets)

Variance

(tablets)

Cost

per tin

(UGX)

Amount

(UGX)

Erythromycin 22,000 12,000 10,000 70,600 706,000

Page 540: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

528

Amoxicillin tab 140,000 70,000 70,000 35,000 2,450,000

Ceftriaxone 27,000 0 27,000 1,000 27,000

Metronidazole 66,000 20,000 46,000 4,500 207,000

Ciprofloxacin 35,000 0 35,000 6,500 227,500

290,000 102,000 188,000 3,617,500

About 64.8% of the drugs issued to the pharmacy from the store were not

acknowledged and their stock cards were missing in the pharmacy store

and some had partially filled stock cards.

Others like amoxicillin and ciprofloxacin had stock cards which were filled

partially. Lack of filled stock cards creates difficulties in monitoring drug

movements within the pharmacy and other wards which increases the risk

of drug thefts.

It was noted that the Dispensing Section had no formal requisitions to the

pharmacy section for the drugs to be issued to the patients.

Ministry of health guidelines require all units to fill in a drug dispensing log,

however; during inspection it was noted that the drug dispensing log for

the month of March 2013 was not available and therefore, there was no

accountability for drugs dispensed to patients.

The Accounting Officer accepted the anomalies and attributed them to staffing

gaps in pharmacy and stores. He promised to address the issue of staffing gaps.

I advised him to follow up the matter and ensure appropriate recruitment.

(b) Stores condition

It was noted that the drug store was congested, and some of the drug shelves

were too dirty to be used for storing medicines. It was observed that drugs are

placed on the floor and not on pallets as recommended. This exposes drugs to

deterioration.

Page 541: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

529

Furthermore, the fire extinguishers in the store expired six years ago and have

never been serviced. There is a risk of loss of drugs in case of a fire outbreak. The

accounting officer promised to address the issues raised.

I advised the Accounting Officer to ensure that store conditions are improved.

(c) Inspections of the wards

An inspection was carried out in the wards to assess their functionality and the

following issues noted:

There are no delivery beds at the labour ward

The Theatre bed/ Operating table does not rotate

The Anaethesiatic machine has not been serviced since it was acquired in

2008.

The Auto claves were not working.

The children‘s ward was congested.

Shower rooms were in poor state

Houses for the nurses were in poor state.

I advised the accounting officer to engage stakeholders to address these

anomalies.

(d) ICT Security and Maintenance Policy

Review of the IT general and application controls revealed that the hospital has

not formulated an IT policy and there was no evidence of any effective measures

that had been taken to create awareness regarding IT security amongst staff

despite having 25 desk top computers, 4 laptops, some printers and scanners.

Accordingly, misuse of computer equipment, loss of vital data and information and

theft could not be ruled out.

The Accounting Officer reported that the hospital has engaged a consultant to

formulate the IT security and maintenance policy.

Page 542: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

530

Management was advised to follow up and ensure IT security and maintenance

policy is in place.

51.0 SOROTI REGIONAL REFERRAL HOSPITAL

51.1 Grants from Development Partners.

A grant totaling to UGX 148,467,529 from development partners (Expanded

Immunization Programme under World Health Organization) was not reflected in

the hospital financial statements and as result statement of financial performance,

cash flow statement and statements of appropriation accounts and as result were

misstated.

The Accounting Officer promised to adjust the accounts to reflect funding from the

development partners which was not done. The financial statements are

therefore, misstated to that extent.

I advised the Accounting Officer to adjust the accounts accordingly which was

never done.

51.2 Un-Accounted for Funds

Section 215 (a) of TAI Part 1 requires advances to be accounted for without delay.

UGX. 22,993,660 paid to several staff to undertake official activities remained

unaccounted for at the close of the financial year.

There was laxity on the part of the management to enforce controls regarding

accountability and also lack of records to monitor those advances.

In absence of accountability, it was difficult to ascertain whether all the funds

were utilised for intended purposes.

I advised the Accounting Officer to ensure that accountability documents are

obtained from the responsible offices or funds be recovered from them.

Page 543: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

531

51.3 Staffing Shortage of the Medical Staff

Section 15 (a) of the standing orders 2010 mandates the Ministry of Public Service

in consultation with the secretary to the treasury to determine the structure,

terms and conditions of service of local government staff.

It was noted that the hospital was under staffed with only 265 positions filled

against the approved structure of 331 posts leaving a gap of 66 posts (19.6%)

vacant which includes Key positions of Specialists (52%) not filled. Lack of

sufficient staffing in key positions affects effective and efficient service delivery to

the public and deprives patients of specialized attention.

Management explained that staff shortage is attributed to retirement, death and

transfers and that the hospital is trying to ensure that the vacant positions are

filled, despite a ban on recruitment.

I advised the Accounting Officer to liaise with the line Ministry to ensure that

critical positions are filled as per the approved structure.

51.4 Payables

Section 198, Part I of the TAI, 2003, requires all purchases of goods or services to

be subject to the commitment control system procedures. A review of the financial

statements revealed that the hospital paid UGX 20,000,000 of the outstanding

payables of UGX 462,368,144 (as per note 26 to accounts) brought forward from

2011/12 financial year leaving a balance of 442,368,144. The delay to settle

domestic arrears may attract interest and fines.

The failure to settle outstanding commitments was attributed to budget cuts by

Ministry of Finance.

I advised the Accounting Officer to ensure that all government commitments are

based on availability of funds as required by the commitment control system.

Page 544: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

532

52.0 MASAKA REGIONAL REFERRAL HOSPITAL

52.1 Over payment on construction of retaining wall

The hospital entered into contract with a firm to construct a retaining wall,

landscaping and paving of parking yard for the new staff hostel at a contract sum

of UGX.385,162,280. Analysis of payments to the contractor revealed that

UGX.478,534,870 was paid to the contractor leading to excess payment of

UGX.93,372,590.

There was no evidence in support of the over payment that was made to the firm.

I advised the Accounting Officer to explain the over payment, failure to which

recovery of the over payments should be made.

52.2 Excess Expenditure

The Hospital budgeted for UGX.2,560,090,000 for salary, electricity and water.

However, the actual expenditure for the year was UGX.2,627,104,722 leading to

an excess expenditure of UGX.67,012,727. This expenditure lacks the required

authorization from parliament

Item Ledgers/Budget Financial statement Variance

Staff salary 2,409,092,000 2,437,239,913 28,147,913

Electricity 52,500,000 94,953,101 42,453,101

Water 64,500,000 94,911,713 30,411,713

Total 2,560,092,000 2,627,104,727 67,012,727

The Accounting Officer stated that management requested for a supplementary to

cover a salary shortfall of UGX.28,239,913, however, to their surprise the hospital

received UGX.65,939,927 from the MOFPED and the balance of UGX.37,792,014

remained with the Bank of Uganda.

I advised the Accounting Officer to liaise with MOFPED and Bank of Uganda to

reconcile the balance and have the funds accounted for and ensure Parliamentary

approval for the excess expenditure.

Page 545: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

533

52.3 Payables

A review of outstanding commitments schedule reveals that the entity had

payables amounting to UGX.141,846,386 in form of goods and services consumed

by the close of the financial year. It is not clear how management intends to

settle them. In any case accumulation of payables is contrary to government

system of commitment control (CCS).

I advised the Accounting Officer to liaise with the mother ministry and have the

bills cleared and ensure that CCS is observed.

52.4 Procurement irregularity on remodeling Neonatal Unit

Management entered into contract with a firm in May 2013 to remodel the

Neonatal unit at a contract sum of UGX.15,133,000. A review of the procurement

documentation revealed that the record of issue of solicitation document, record of

receipt of bids and record of bid opening were not certified by the procurement

and disposal unit (PDU) due to inadequacies of the PDU.

The Accounting Officer explained that there were generally weaknesses in the PDU

which were being addressed in liaison with the Accountant General.

I urged the Accounting Officer to liaise with the Accountant General to have the

PDU officer replaced in order to address the weaknesses of the procurement unit.

52.5 Expired Drugs

It was observed that drugs worth UGX.31,826,000 had expired. These drugs had

been delivered by National Medical Stores (NMS) to the hospital through the push

system. Expired drugs are a loss of funds. The Accounting Officer explained that

some drugs had expired from the store the bulk of which were under global fund

and Integrated Management of Acute Malnutrition delivered under the push

system.

Page 546: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

534

I advised the Accounting Officer to inform NMS of the expired drugs for necessary action.

53.0 MUBENDE REGIONAL REFERRAL HOSPITAL

53.1 Financial Statements

(a) Accounting records

The Hospital did not avail cash books, abstracts, subsidiary ledgers, journals, vote

books payment vouchers, revenue registers, asset registers, contract registers

General Ledgers. Consequently, I could not ascertain whether the financial

statements are a true reflection of the transactions of the hospital during the year

of review.

(b) Outstanding commitments

UGX.92,029,568 owed to contractors remained out standing at the closure of the

year but it was not disclosed in the schedule of outstanding commitments.

(c) Lack of Budget Approval and Performance Reports

The hospital budget lacked board approval as there were no minutes availed for

audit.

I advised the Accounting Officer to avail evidence of board approval and

performance reports for audit review.

(d) Journalizing payroll

The district paid out salaries totaling UGX.1,170,000,000 to staff for the financial

year 12/13 through the straight through process under the hospital vote but did

not journalize the expenditure yet they had budgeted for the expenditure. The

expenditure is therefore misstated in the financial statements.

Page 547: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

535

(e) Unsupported figures of fixed assets acquired

A review of the statement of stores and other assets (physical assets) acquired

during the ended 30th June 2013 revealed non-residential assets of

UGX.119,584,000 and UGX.219,167,000 which were not supported with assets

schedules rendering verification difficult.

In all the cases above I advised the Accounting Officer to take corrective action to

address the anomalies.

53.2 Imprest holder not officially appointed by the Accounting Officer

Section 227 of the Treasury Accounting Instruction Part 1 Finance requires the

imprest Holders to be appointed by Accounting Officers with the Approval of the

Accountant General. It was observed that the hospital draws UGX.18,000,000

annually as imprest. However the imprest holder has never been appointed

officially by the Accounting Officer neither was there an approval by the

Accountant General.

The Accounting officer should ensure that imprest holders are formally appointed.

53.3 Non implementation of the investment plan

In the financial year 2010/2011 the hospital entered into contract with a firm to

carry out consultancy services to develop 30 year master plan for the hospital at a

contract sum of UGX.149,840,000.

Although the entity received the investment plan it has never implemented it.

Besides, investment strategic plan does not state the goals, strategies,

objectives and activities to be carried out and has no linkage with National

Development Plan (NDP).

The Accounting Officer was advised to ensure implementation of the plan and

address the above gaps.

Page 548: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

536

53.4 Over expenditure on capital development procurements

The hospital had a capital development procurement budget of UGX.500,000,000

of which UGX.338,750,000 was released. This amount was for the construction of

VIP Emptible latrines, supply of assorted furniture, supply of assorted equipment,

construction of a parking yard, supply of patients monitor, supply and installation

of metallic shelves and two computer sets. A review of the expenditure vouchers

revealed that the entity spent UGX.375,351,376 exceeding the actual release by

UGX.36,601,376. There was no evidence of authorization of the excess

expenditure nor the source of funding.

I advised the Accounting Officer to provide authority for the over expenditure and

evidence of source of additional funding.

53.5 Procurement Irregularities

(a) Construction of a Parking Yard

The entity entered into contract with a firm to construct a parking yard at a

contract sum of UGX.102,705,750. The contract started 15 days after signing the

letter of bid acceptance in June 2013 and it was rolled over to financial year 2013-

2014. By the time of Audit the company had received UGX.38,617,362 as advance

payment leaving a balance of UGX.64,088,388 outstanding. A review of the

procurement file revealed the following:

Two companies were issued with the bid document however, evidence of receipt

of the bid documents was not availed for audit.

An inspection carried out in November, 2013 revealed that the Gate and the

security house were not yet completed. The pavers were broken implying poor

quality materials and workmanship. Pictures below refer.

Page 549: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

537

Unfinished gate unfinished security guard house at foundation level

I advised the Hospital Administrator to ensure completion of the project.

(b) Supply and installation of metallic shelves

The referral hospital entered into contract with a firm for supply and

installation of metallic shelves at a contract sum of UGX.28,208,626.

Payment of UGX.17,957,760 had been made to the company leaving a

balance of UGX.10,250,866. It was noted that the procurement

requisition Form 20 was not approved by the authorizing officer.

There was a contradiction on the date and time of bid opening, as the

record of bid opening indicates date and time of bid document on

22/01/2013, at 10.30 am while the date and time in the request for

quotation document is 18th/01/13.

I advised the Hospital Administrator to explain the above anomalies.

(c) Construction of emptible VIP 6 stance latrine

The referral hospital entered into contract with a firm for construction of emptible

VIP 6 stance latrine at a contract sum of UGX. 39,331,000. The contract started on

3rd February, 2013 and it was supposed to end on 3rd April using restricted

bidding method. Payments made at the time of audit totaled to UGX.33,688,520

leaving a balance of UGX.5,642,480 outstanding. Inspection carried out in

November 2013 revealed that the emptible toilets were completed and were

already in use.

Page 550: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

538

However, a review of the procurement file revealed the following:

Requisition for requirement was not approved by the authorizing officer.

The request for quotation was purportedly issued to the five firms, however

there was no evidence that the companies received /picked the solicitation

document.

Emptible pit latrine

I advised the Hospital Administrator to explain the above anomalies.

(d) Supply and installation of 10,000 ltrs 2 water tanks

The referral hospital entered into contract with a contractor for Supply and

installation of 10,000 ltrs 2 water tanks at a contract sum of UGX. 17,540,000. The

contract started on 3rd February, 2013 and it was supposed to end on 3rd April

2013. By the time of audit the company had been paid UGX.17,961,520 more by

UGX.421,520 implying even the retention money had been paid before the defect

liability period. An inspection carried out revealed that the tanks were supplied and

installed.

A review of the procurement file revealed the following:

Invitation to bid was purportedly issued to three companies that is: H eki

however, there was no evidence of receipt of the invitation documents by all

these companies.

A record of issue indicates only two companies.

A record of receipt and bid opening revealed that only one company received

and returned the bid document which was evaluated as the best bidder.

Page 551: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

539

Both tanks were supplied and are already in use

(e) Consultancy service for development of Bill of Quantities &

drawings for latrine, parking yard & walk way construction

The Referral Regional Hospital entered into contract with a company at a

contract sum of UGX. 9,800,000 to carry out Consultancy service for

development of BOQs & drawing s for latrine, parking yard and walk way

construction. By the time of audit the entity had received UGX.9,212,000

leaving a balance of UGX.588,000 un paid.

A review of the procurement file revealed that four companies were approved to

be invited for solicitation documents however, only two companies did

acknowledge receipt and only one company returned the bid document whose

opening was not witnessed by representative of the contracts committee. Time of

bid opening was not indicated.

I advised the Accounting Officer to address the above anomalies.

(f) Supply of assorted medical equipment

The Referral Hospital entered into contract with a firm under contract number

MDH/SPLS/12-13/00058/0009 to supply assorted medical equipment‘s at a

contract sum of UGX. 62,225,000. The contract was supposed to start in March

and end on April 2013. By the time of audit the supplier had been paid

UGX.58,416,300 leaving a balance of UGX.3,808,700.

Page 552: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

540

A review of the procurement file revealed the following:

Three companies were issued with invitation to bid document.

The record of receipt of bid document and record of bid opening revealed that

two other companies were included in the receipt of bid document and

yet there was no evidence that those companies were invited to bid.

Date and time of bid opening was not indicated on the record of receipt and

opening of the bid documents.

Record of bid opening was not witnessed by any representative of the

contracts committee.

It was noted that the contract did not have the required technical knowledge

on the equipment. Besides, the contract manager did not prepare progress

reports.

Inspection carried out in November revealed that some of the purchased

equipment‘s were damaged, broken and some had started rusting. Examples of

the damaged equipment were the patient's trolleys at accident & emergency,

maternity and OPD, Theater wheel chairs which lacked wheels as they had fallen

off and the equipment were over loose.

The instrument trolley‘s stainless coating had started peeling off, the trolleys,

wheel chairs had one peddle as the other may be broken or all peddles

broken,

Patients bed screens in wards 1,2,3,4, the medical children's wards, maternity

wards and surgical wards had all the wheels of the trolleys had all fallen off

making it difficult to move patients around the ward.

Other trolley frames are broken at the hinges point which makes it difficult to

maneuver with patients. Pictures below all refer.

Broken patients screens broken hinges

Page 553: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

541

The Accounting Officer was advised to explain the above anomalies with a view of

effecting recovery from the supply for the damaged equipment.

(g) Purchase and use of drugs from National Medical Stores

A review of National Medical Stores drug supply revealed that the entity had a

budget of UGX.988,000,000 for drugs to be supplied by National Medical stores

out of which UGX. 615,794,302.59 worth of drug deliveries were made by National

Medical Stores to the Hospital during the period under review leaving a balance of

UGX.273,856,275 unutilized. The following observations were made:-

There was no evidence of reconciliation between drug and medical supplies

orders and receipts.

There was no reconciliation between the invoice received and the actual

amounts debited on the account of the Referral Hospital.

In the absence of reconciliations between the Hospital records and the National

Medical Stores it is difficult to ascertain the actual value of receipts and balances

owing to the Hospital by National Medical Stores.

I advised the Accounting Officer to reconcile the credit line at National Medical

Stores with the value of actual drugs received in order to ascertain the balances

owing by National Medical Stores.

53.6 Internal Controls

(a) Lack of internal audit unit

It is a requirement to institute an internal control department to mitigate on the

risks however it was noted that for the year under review the entity did not have

internal audit department. As a result, management is not able to mitigate risk

and fraud in the organization.

I advised the Accounting Officer to urgently put in place an internal audit section

to enhance the internal control.

Page 554: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

542

(b) Lack of segregation of duties in the Accounting System

In order to achieve the objectives of internal controls the function of authorization

of transactions, execution of transactions and custody of assets, this should be

segregated. Officials charged with the duty of examining and checking accounting

transactions should not themselves be engaged in the processing any of these

transactions. However, it was noted that most of the accounting work was being

done by the cashier, that is; initiates, payment prepares payment vouchers, post

the cashbook, writes cheques, draws money from the bank, effects payment and

prepares financial statements.

This could lead to errors, intentional or otherwise occurring and remaining

undetected since the work of one person is not checked by another person.

I advised the Accounting Officer to enforce segregation of accounting duties in

Hospital.

(c) Risk management policy

The responsibility of maintaining a risk management system and an effective

internal controls system lies with the Hospital Administration and the Board.

However, the management has not established and documented a risk

management system for the Hospital. In the absence of a risk management

system the hospital operations are exposed to risk.

The Accounting Officer should develop a documented risk management system

that would assist in mitigating risks.

53.7 Lack of an IT policy

It was observed that investments in terms of computers had been acquired to

improve operations. However, there are no IT policies to regulate their use.

Besides, there was no IT specialist. As a consequence there was no effective

Page 555: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

543

general and application controls in existence that would ensure proper logical and

physical access and security over data.

I advised the Accounting Office to liaise with the Ministry of Information

Communication Technology (ICT) to formulate IT policies, to guide in

management of IT resources, and also liaise with the Ministry of Public Service

with a view of recruiting an IT staff.

53.8 Staffing

It was noted that the hospital has operated without a substantive Executive

Director, Senior Accountant and Human Resource Manager for the whole financial

year. These are critical positions that should be filled.

I advised the Accounting Officer to liaise with the relevant authorities to ensure

that the posts are substantively filled.

54.0 MOROTO REGIONAL REFERRAL HOSPITAL

54.1 Un Accounted for Funds

Section 215 (a & b) of Treasury accounting instructions requires advances to be

accounted for without delay. UGX.3,273,000 advanced to various staff members

for various activities remained unaccounted for at the time of audit.

This was due to the laxity of Accounting Officer to enforce the regulation

regarding accountbaility. It was therefore difficult to ascertain whether all the

funds were utilised for intended purposes.

I advised the Accounting Officer to ensure that accountability documents are

obtained from the responsible offices or funds be recovered from them.

Page 556: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

544

54.2 Human Resource

(a) Staffing Gaps Section 15 (a) of the standing orders 2010 mandates the Ministry of Public Service

in consultation with the secretary to the treasury to determine the structure,

terms and conditions of service of local government staff. A review of the staffing

position of the hospital revealed that out of the recommended establishment of

393 employees, only 173 (44%) posts were filled, leaving a gap of 220 (56%).

In addition, the hospital does not have consultants and a medical officer special

grade. Lack of key medical personnel adversely affect service delivery.

Management explained that retention of staff in the region was difficult due to the

challenge of lack of accommodation, inaccessible roads, non payment of hardship

allowance, a high cost of living and a harsh environment.

I advised the Accounting Officer to to liaise with the line Ministries of Health and

Public Service to ensure that the critical positions are filled and to meet some of

the challenges.

54.3 Asset Management

(a) Un Boarded off Assets

Section 295(1) of the PPDA Regulations states that the accounting officer shall

ensure that the assets of a procuring and disposing entity are reviewed on an

annual basis, to identify those which are obsolete and subject to disposal. It was

however, noted that hospital assets recommended by the board of survey for

boarding off had not been boarded off.

Delayed disposal of these assets causes further deterioration.

I advised the Accounting Officer to ensure that the above assets are disposed off

in accordance with PPDA Regulations.

Page 557: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

545

(b) Hospital facilities

Idle Mobile Work Shop

Uganda Health Systems Strengthening project donated a workshop equipment to

work as the regional mobile medical workshop. However, the van is not utilised

due to lack of a technical operator. Failure to use of the facility may result in

deterioration of the equipment.

Management acknowledged the observation and explained that the Ministry of

Health was requested to procure a technician to manage the workshop.

I await management action of the matter.

Lack of a Mortuary

The hospital lacks a mortuary and it keeps human remains dilapidated municipality

house without a cooling system.

Management acknowledged the short coming and explained that a new mortuary

with modern facilities will soon be built using funds under the UHSSP (World Bank)

project.

I advised the Accounting Officer to liaise with other stakeholders to expedite the

process of procuring a contractor to build the mortuary.

54.4 Lack of internal audit department

Section3 (d) of the PFA Act, 2003 requires that the Accountant- General to ensure

that there is an internal audit function in each Government Ministry, department,

fund and agency. It was, however, noted that MRRH does not have a functional

internal audit department. The function is carried out by staff from Soroti Regional

Referral Hospital. The absence of an internal audit unit weakens internal controls

at the hospital.

Page 558: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

546

Management explained that there is no internal audit department in the hospital.

However efforts have been made to liaise with Accountant General to post an

Internal Auditor.

I advised the Accounting Officer to laise with Ministry of Finance, Planning and

Economic Development and Accountant General‘s Office to establish the internal

audit unit.

55.0 HOIMA REGIONAL REFERRAL HOSPITAL

55.1 Funds un accounted for: UGX 13,166,000

Paragraph 217 of Part 1 of the Treasury Accounting Instructions (TAI) 2003

requires advances to be accounted for within 60 days and there after deductions

to be made from the monthly salary of the debtor and no new advance to be

given before accounting for the previous advance.

A sum of UGX 13,166,000 remained un-accounted for at the time of audit contrary

to the Accounting Instructions.

This could be attributed to laxity of management to enforce the accountability

procedures.

Delays in submission of accountability may lead to falsification of documents.

I advised the Accounting Officer to ensure that the funds are accounted for or

else, recoveries be made from the concerned staff.

55.2 Staffing Shortages

Out of 349 posts in the approved structure, only 205 (60%) were filled; leaving a

staffing gap of 144 (40%).

This affects service delivery to the community.

Page 559: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

547

The Accounting Officer admitted the shortcoming and explained that given the

workload and catchment area for the hospital, there is need for the Central

Government to ensure that key critical staff are recruited to enable the hospital to

deliver on its mandate.

I advised the Accounting Officer to liaise with relevant authorities to have the

challenge addressed.

55.3 Supply of drugs from NMS: UGX 884,030,372

A review of Orders to the National Medical Stores (NMS) revealed under supply of

drugs as shown below:-

Invoice &

order No.

Delivery No. Order Amount

(UGX)

Invoice

Amount (UGX)

Variance

Amount

(UGX)

0158231 120824 -002 418,894,060 206,348,942 212,545,118

0173305 121017 -005 385,856,600 210,558,660 175,297,940

0202830 12O219 -010 317,757,820 120,168,473 197,589,347

0215967 130410 -004 250,176,340 118,760,411 131,415,929

0229681 130606 -007 250,545,260 83,363,222 167,182,038

1,623,230,080 739,199,708 884,030,372

The failure to supply adequate drugs impacts on well being of the community.

I advised the Accounting Officer to liaise with the National Medical Stores to

ensure that the issue of under supply of drugs is addressed.

55.4 Service delivery

(a) Un Disposed Expired Drugs

The physical inspection revealed expired drugs which had not been disposed off.

It was further noted that drugs supplied were not tailored to the Local Purchase

Orders raised leading to supply of unwanted drugs which end up not being used

instead dumped in stores.

Page 560: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

548

Un-disposed off expired drugs can end up on market.

The Accounting Officer explained that management will liaise with the NMS to

have these drugs disposed off in Nakasongola.

I await management action on this matter.

(b) Congestion in the wards

Physical inspection revealed congestion in Obstetrics & Gynecology, Pediatric and

Surgical wards with some patients sleeping under beds and others in the corridors

as shown in the photos below:

The Accounting Officer admitted the shortcoming and stated that it is beyond

management control.

I advised the Accounting Officer to lobby for support from relevant authorities to

address the matter.

56.0 CHINA-UGANDA FRIENDSHIP HOSPITAL NAGURU

56.1 Fuel Expenditure not accounted for

During the period under review, management did not maintain vehicle movement

logbooks and yet the hospital spent UGX.82,883,199 on the item out of which

UGX.43,339,667 remained unaccounted for. In the absence of vehicle movement

logbooks and relevant activity reports, fuel consumption statements and fuel

Page 561: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

549

receipts, it was not possible to ascertain whether fuel consumed was used for the

hospital official duties.

I have advised the Accounting Officer that as a matter of procedure vehicle

movement logbooks and relevant activity reports, fuel consumption statements

and fuel receipts should always be prepared and filed as part of the accountability.

56.2 Excess Expenditure on the consumption of Capital Development

Note 4 to the financial statements indicated that UGX.254,391,667, was received

as transfer from the Treasury for capital development during the financial year.

However, the statement of appropriation reported UGX.271,250,000 as

consumption of property plant and equipment resulting into an excess

expenditure of UGX.16,858,333 which was not authorized. The source of the

additional funds could not be established in the absence of virements and/or

reallocation warrants.

The Accounting Officer stated that this was a systems anomaly which would be

rectified in liaison with Treasury. I await evidence of action taken.

56.3 Revenue performance

Out of the appropriation of UGX.2,662,268,504 for the year under review only

UGX.2,436,039,559 was received resulting into a shortfall of UGX.226,228,945

(8%). Under funding of a new hospital of this nature may deny services to the

population.

I advised management to always liaise with the MoFPED to ensure that all

appropriated funds are released to the Hospital to enable full implementation of

the planned activities.

Page 562: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

550

56.4 Governance issues

(a) Lack of Strategic Plan

During the course of the audit, it was observed that China-Uganda Friendship

Hospital lacks a strategic plan hence implementation of activities aimed at

achieving the Hospital mission and long term objectives may not be properly

guided.

The Accounting officer explained that a consultant had been contracted to develop

the plan in the financial year 2013/14.I have advised the hospital management to

expedite the process of formulating and developing a strategic plan for the

hospital.

(b) Lack of Hospital Management Board

According to the Ministry of Health National Hospital Act 2006, Part 111, Sec.5

Paragraph 3, all hospitals ought to have hospital management boards. The board

is required to provide strategic guidance to the hospital management team.

However it was observed that the Hospital lacks a board.

I advised management to liaise with relevant stakeholders to constitute the

hospital management board in accordance with the law.

56.5 Lack of Board of Survey Report

Regulation 84(1) of the PFA Regulations empowers the Accountant General to

appoint a Board of Survey for each vote to survey cash, bank balances and stores

held by the Accounting Officer at the end of the financial year. The Board of

Survey report supports the balances in the financial statements and indicates the

status of various assets thereby guiding disposal plans. It was however, noted that

the survey was not carried out for the year under review.

The Accounting Officer explained that the Board of Survey team was awaited from

Ministry of Finance, Planning and Economic Development (MoFPED).I have advised

the Accounting officer to follow up the matter with MoFPED.

Page 563: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

551

56.6 Lack of waste management plan

By the nature of its operations and location the hospital requires a waste

management plan to be able guide safe disposal of waste in order to mitigate

environmental and health hazards. It was however noted that this was not in

place.

The Accounting Officer explained that preparation of the plan is under way and

procurement of an environmentally friendly medical waste treatment machine is

on-going. I have advised management to expedite the processes.

56.7 Lack of staff houses and space for expansion

Physical inspection indicated that the Hospital lacks staff quarters and land for

expansion. In addition office space and space for the private wing are inadequate.

Lack of accommodation for critical staff may impair medical interventions in

emergency cases.

The Accounting Officer explained that a process of acquisition of land and

construction of staff accommodation was ongoing in Kyanja, Kampala

(approximately 8km from the Hospital).

I advised the Accounting officer to work with relevant stakeholders to expedite the

process of land acquisition and subsequent construction.

56.8 Non Functional Medical equipment

The inspection revealed that some essential equipment such as Auto Chemistry

Analyzer Machine and Safety Light Machine, which were among the initially

installed equipment, were not functioning well. It was noted that some of the

equipment can only be sourced from China.

The Accounting Officer explained that management is already liaising with the

Economic and Commercial Counsellor at the Chinese Embassy to facilitate

Page 564: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

552

replacement and repairs of the equipment. I have advised management to put in

place a long term plan for maintenance and replacement of the equipment.

56.9 Staff Shortages

The Hospital has a total of 181 vacant positions in the medical and administrative

ranks, indicating 52.2% vacancy rate. Significantly there is no single consultant in

the hospital out of the 12 approved posts, and only one Senior Consultant out of

the provision of four (4). This adversely affected service delivery.

Management explained that a request had been made to the Ministry of Health

and the Health Service Commissions to fill the vacant positions. I have advised

management to follow up the recruitment so as to fill the vacant positions.

56.10 Fixed Assets Management

(a) Failure to value and engrave assets

The Assets donated to the Hospital such as the buildings and equipment had not

been valued. In addition physical inspections revealed that assets such as tables,

fridge and some laboratory equipment had not been engraved for ease of

identification. There is a risk of loss of equipment without possibility of being

traced.

It was also noted that despite owning a range of assets, the function of managing

assets had not been formally assigned to any officer. Poor asset management may

lead to loss of hospital assets and poor maintenance.

The Accounting Officer explained that engraving of all newly acquired equipment

was on-going.

I advised management to ensure valuation of hospital properties, engraving of

assets and assignment of the asset management function to a dedicated staff.

Page 565: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

553

(b) Failure to maintain Fixed Assets Register

It was noted that the Hospital does not maintain a Fixed Assets Register (FAR)

contrary to Regulation 101 of Public Finance and Accountability Act regulations,

2003. All fixed assets donated and those procured during the year were not

recorded in the register.

Lack of a fixed assets register is a critical internal control weakness that exposes

the hospital‗s assets to a risk of loss without notice. Management was advised to

maintain a proper register which should be up-dated regularly.

(c) Inadequate Operating Theatre

The hospital has got only one operating theatre to handle all the operations

including emergencies. The second theatre which would have been used as the

operating theatre under emergency unit was noted to be non-functional during the

hospital inspection on February 6, 2014. Absence of adequate operating theatres

may lead to loss of lives.

I advised management to liaise with the line Ministry and the other relevant

stakeholders to ensure that the facility is adequately equipped.

EDUCATION SECTOR

57.0 MINISTRY OF EDUCATION AND SPORTS

57.1 Inadequately Supported Expenditure

Treasury Accounting Instructions 181 require payment vouchers to contain full

particulars of services or goods, and be accompanied by such supporting

documents as may be required to enable them to be checked without reference to

any other documents. Contrary to this requirement, it was noted that rental and

internet service payments totalling UGX.371,862,292 lacked supporting documents

Page 566: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

554

such as tenancy agreements, invoices and acknowledgement receipts rendering

the authenticity of the expenditure doubtful. The table below refers;

DESCRIPTION_PURPOSE AMOUNT REMARKS

Payment for outstanding Rent

Arrears 120,022,891

No tenancy agreement, payment

receipts and invoice

Project office rent & parking for

January to March 2013 64,820,222

No Tenancy agreement, invoice

and payment receipts

Payment for rent for PES & Statistics

Dept. 46,210,778

No Tenancy agreement, invoice

and payment receipts

DIRECT DEBIT FOR RENT 70,808,401 No Tenancy agreement ,invoice

and payment receipts

Sub total 301,862,292

Settling of overdue payments for

internet email data services 70,000,000 No Invoice and receipts

Sub total 70,000,000

Grand total 371,862,292

.

Though management indicated that the documents were available, they were not

submitted for review. I have advised management to trace and submit the

documents for verification.

57.2 Domestic Arrears

The domestic arrears figure of UGX.27,526,613,527 included VAT;

UGX.25,535,059,360 WHT; UGX.8,834,120, Electricity bills; UGX.1,513,523,108,

and water bills; UGX.94,493,893.

Failure to settle the tax and utility obligations may result into penalties and

cessation of services to the institutions respectively.

In response management explained that;

the VAT arrears were incurred before the introduction of VAT exemptions

on provision of education services in respect of donor funded contracts.

the electricity and water bills relate to BTVET institutions, and they

accumulated at the time when the Ministry was not responsible for their

Page 567: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

555

settlement, the individual invoices issued had been retained by the respective

institutions and remained outstanding because MOFPED had not provided

funding.

I advised management to liaise with the respective stakeholders and set aside

funds for settlement of the arrears.

57.3 Unspent Balances

The Ministry returned unspent funds amounting to UGX.2,414,095,426 to the

consolidated fund despite having outstanding payables of UGX. 21.5 billion.

In response, management explained that the unspent balances resulted from late

release of funds from MOFPED. I have advised management to always liaise with

MOFPED to ensure timely release of funds.

57.4 Revenue Performance

Out of the budgeted revenue of UGX.412,501,988,999 the Ministry realized only

UGX.352,768,758,178 (85.5%) resulting into a shortfall of UGX.59,733,230,821

(14.5%). It was noted that, the development and donor components suffered the

biggest shortfall . Budget shortfalls affect implementation of planned activities

negatively. The table below refers;

BUDGET ANALYSIS REPORT FOR FY 2012/13

Approved Budget

2012/13

supplementary Revised Budget

A

Actual Releases

B

Variance/ Shortfall

C=(B-A)

%

Rec 149,513,158,039 13,326,000,000 162,839,158,039 162,653,077,872 (187,080,167) 0.11%

Dev 54,350,999,960 - 54,350,999,960 40,862,027,002 (13,488,972,958) 24.82

%

Sub Tot 203,864,157,999 13,326,000,000 217,190,157,999 203,515,104,874 (13,675,053,125) 6.30%

Donor 195,311,831,000 0 195,311,831,000 149,253,653,304 (46,058,177,696) 30.8

399,175,988,999 13,326,000,000 412,501,988,999 352,768,758,178 (59,733,230,821) 14.48

Page 568: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

556

In response, management explained that the Development Budget was affected

by the 4th Quarter freeze across all Government where only 13% of the budget

was released.

I have advised management to continue liaising with MOFPED and relevant

stakeholders to ensure appropriated revenue is realized to meet the Ministry

objectives.

57.5 Procurement anomalies

(a) Unapproved Procurement Method

Regulation 94, (1) (a) of the Public Procurement and Disposal of Public Assets

(PPDA) Act, 2003 stipulates that a Contracts Committee or a holder of delegated

authority shall approve the choice of procurement method prior to commencement

of the procurement process. However, UGX.57,550,000 was paid to a company

through the Direct Procurement Method for supply of sports uniforms without the

Contract Committee‘s approval. The possibility of inflation of prices could not be

ruled out.

Management stated that funds were released late in the 4th quarter and the

detailed procurement process could not fit into the prescribed dates for the sports

opening ceremony that was held in Bujumbura, Burundi.

Management is advised that since the sports calendar is known in advance,

procurement of sports uniforms should always be planned and undertaken in a

timely manner.

(b) Doubtful Contracts Award

Regulation 90 (g, h & i) of Public Procurement and Disposal of Public Assets

(PPDA) Act, 2003 requires procurement records to be maintained by a

procurement and disposal unit. However, records for UGX.35,656,779 incurred on

procurement of newspaper advertising space were not availed for review

Page 569: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

557

rendering the authenticity of the expenditure doubtful. Though management

indicated that the documents were available, they were not submitted on request.

I have advised management to trace and submit the documents for verification. In

the alternative the funds are recoverable from concerned officers.

(c) Lack of Solicitor General’s approval

UGX.73,868,000 incurred on procurement of hotel services for a workshop was not

supported with the Solicitor General‘s approval contrary to procurement guidelines

which require that all procurements above UGX.50,000,000 shall be approved by

Solicitor General. It was also noted that payments were made before expiry of the

display period for the best evaluated bidder.

In response, management explained that there was a delay by the office of the

Solicitor General to provide the clearance and yet invitations had already been

made. I have advised management to always ensure that the PPDA Regulations

are complied with at all times.

57.6 Lack of Land Titles for Government Schools

It was observed that the majority of Government owned schools lack land titles.

This exposes the Government to land conflicts and legal costs. A case in point was

the loss of UGX.960,882,013 to a private firm in respect of compensation of

property belonging to Aboke Girls Secondary School.

Management indicated that out of 183 Government Schools, land titles for 30

schools had been obtained and arrangements were underway to acquire titles for

the remaining 153 schools. I have advised management to expedite acquisition of

the land titles to enable protection of government investments.

Page 570: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

558

57.7 Staffing matters

(a) Staffing gaps

A review of the approved staff establishment revealed that out of the 456 posts

only 345 (75.6 %) were filled leaving 111 (24.4%) vacancies. Understaffing

affects the level and quality of service delivery at the Ministry.

Management explained that vacancies continuously arise from high levels of

attrition through retirement, death and abscondment. In addition, Government

imposed a temporary ban on recruitment in July 2012 thereby stagnating the

process of filling the vacancies. In spite of this development, the Ministry

submitted a recruitment plan and requested for clearance to fill vacant posts from

Ministry of Public Service though no response was received.

I have advised management to continue liaising with the Ministry of Public Service

to prioritize filling of key positions.

(b) Failure to Appraise Staff Performance

Section A-m paragraph 14 (a) & (c) of the Public Service Standing Orders 2010

require performance appraisal to be conducted on 30th June of every financial year

for confirmed staff and every 3 months with effect from the date of assumption of

duty for staff on probation. A review of staff personal records revealed that 24

confirmed staff had not been appraised for more than one year.

Failure to appraise staff hinders motivation of good performers and identification

of weaknesses for corrective action.

Management stated that a review exercise would be undertaken to identify non-

compliant staff and carry out the appraisal. I have advised management to

comply with the Public Service Standing Orders accordingly.

Page 571: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

559

57.8 Output performance

Review of the output performance of the Ministry revealed some significant

shortfalls as follows;

(a) Support to war affected children in Northern Uganda

Whereas the Ministry planned to enroll and support 700 pupils in the war affected

region at a cost of UGX.356,262,000, only UGX.291,698,507 was released resulting

in a variance of UGX.64,563,493. Failure to release the necessary funds may

compromise the quality of services offered to the pupils.

In response, management explained that despite the shortage of the funds, all the

pupils were assisted using the available resources. I have advised management

to liaise with all the relevant stakeholders to ensure adequate funding is provided

to support the war affected children.

(b) Classroom construction and rehabilitation in Primary schools

The Ministry planned to Construct 25 new classrooms, renovate 42 old classrooms

provide 644 desks , construct 142 stances of latrines and 2 blocks of teachers‘

houses in 22 schools at a cost of UGX.16.198 billion. However, only UGX.1.038

billion was released for the activities resulting into a funding gap of 15.890 billion

and this negatively impacted on the programme. As an example some emergency

construction of Primary Schools was not undertaken.

In response, management attributed the shortfall majorly to suspension of funding

by the development partners. I have advised management to engage all the

stakeholders and develop appropriate strategies for mobilizing funds to improve

infrastructure in the schools.

Page 572: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

560

57.9 SUPPORT TO POST-PRIMARY EDUCATION AND TRAINING EXPANSION

AND IMPROVEMENT (ADB EDUCATION IV)PROJECT

(a) Delayed Procurement of consultancy services

Review of the procurement of consultancy services regarding school facilities

maintenance manual revealed that the process has been delayed as outlined in the

table below:

No Activity Progress reported by

management

Remarks

1. Consultancy services to develop

school facilities maintenance

manual

i) Outstanding but Procurement is underway;

ii) Response from all the short listed firms was

received concerning the

renewal of validity of their Expression of Interest (EoI);

iii) Consultations with the Ministry‘s Construction

Management Unit (CMU)

were finalized; and iv) The Request for

Proposals (RFP) is being developed.

There is need to expedite the

procurement process given that

only six months

remain to completion period

of the project.

Delayed initiation and completion of the procurement process may result into

failure to implement the project timely.

Management in response undertook to implement the activities in the remaining

twelve- months period as follows:

Activity Period

(i) Submit the RFP to the Bank for approval. 10-Jan-14

(ii) Issue RFP to shortlisted consultants 24-Jan-14

(iii) Submission of Proposals by consultants 28-Feb-14

(iv) Bid Evaluation and Award of Contracts 31-Mar-14

(v) Preparation of the maintenance manual 30-Jun-14

(vi) Training of school managers August 2014 Holidays

Page 573: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

561

I have advised management to undertake adequate and timely procurement

planning.

(b) The Aide Memoire

Review of the AIDE MEMOIRE revealed that works in various schools were behind

schedule. In some cases contracts had been terminated and subsequently

litigation was underway. Court cases are likely to further delay completion of the

works. The table below refers;

DISTRICT SCHOOL WORKS DONE STATUS

Kalisizo Kalisizo TC SSS Construction of a new seed

secondary school

60% complete but the contract has

been terminated

Management should consider

re-tendering the works as soon as

possible.

Mpigi Bulamu SSS Expansion of an existing seed

secondary school

60% complete but the contract has

been terminated

Management should consider

re-tendering the

works as soon as possible

Kamwenge Kamwenge SSS Expansion of an existing seed

secondary school

0% complete but contract has been

terminated.

Contractor put an injunction and the

matter is before Solicitor General

for his advise.

Management should follow up

the matter with

the Solicitor General for

advise.

Kyejonjo Bufunjo SSS Construction of a new seed

secondary school

0% complete but contract has been

terminated.

Contractor put an injunction and the

matter is before Solicitor General

for his advise.

Management should follow up

the matter with

the Solicitor General for

advice.

Rubirizi Katungulu SSS Construction of a new seed

secondary school

0% complete but contract has been

terminated. Contractor put an

injunction and the

matter is before Solicitor General

for his advise.

Management should follow up

the matter with the Solicitor

General for

advice.

Busia Lumino High

School

Centres of

excellence (CE)

Expansion and rehabilitation

60 % complete.

Contractor is 6

weeks behind schedule

Management

should enhance

monitoring and supervision

Page 574: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

562

Tororo Tororo Girls

School

Centres of

excellence (CE) Expansion and

rehabilitation

70 % complete.

Contractor is 4 weeks behind

schedule

Management

should enhance monitoring and

supervision

St. Peters College Tororo

Centres of excellence (CE)

Expansion and rehabilitation

70 % complete. Contractor is 4

weeks behind schedule

Management should enhance

monitoring and supervision

Mbale Mbale SSS Centres of

excellence (CE) Expansion and

rehabilitation

70 % complete.

Contractor is 4 weeks behind

schedule

Management

should enhance monitoring and

supervision and

also note the issues in the

inspection report

Nabumali High

School

Centres of

excellence (CE)

Expansion and rehabilitation

70 % complete.

Contractor is 4

weeks behind schedule

Management

should enhance

monitoring and supervision and

also note the issues in the

inspection report

Zombo St. Aloysius Nyapea

Centres of excellence (CE)

Expansion and rehabilitation

75 % complete. Contractor is 3

weeks behind schedule

Management should enhance

monitoring and supervision and

also note the

issues in the inspection report

Ibanda Kyezimbire

SSS

Centres of

excellence (CE) Expansion and

rehabilitation

60 % complete.

Contractor is six weeks behind

schedule

Management

should enhance monitoring and

supervision and also note the

issues in the

inspection report

Mbarara Mary Hill High

School

Centres of

excellence (CE) Expansion and

rehabilitation

66 % complete.

Contractor is six weeks behind

schedule

Management

should enhance monitoring and

supervision and

also note the issues in the

inspection report

Mbarara High School

Centres of excellence (CE)

Expansion and rehabilitation

60 % complete. Contractor is 3

weeks behind schedule

Management should enhance

monitoring and supervision and

also note the issues in the

inspection report

Bushenyi Bweranyangi Girls School

Centres of excellence (CE)

Expansion and

rehabilitation

75% complete. Contractor is 3

weeks behind

schedule

Management should enhance

monitoring and

supervision and

Page 575: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

563

also note the

issues in the inspection report

Ntungamo Muntuyera High

School

Centres of

excellence (CE) Expansion and

rehabilitation

75% complete.

Contractor is 3 weeks behind

schedule

Management

should enhance monitoring and

supervision and also note the

issues in the

inspection report

Kabale Kabala SSS Centres of

excellence (CE)

Expansion and rehabilitation

70% complete.

Contractor is four

weeks behind schedule

Management

should enhance

monitoring and supervision

Masaka Masaka SSS Centres of excellence (CE)

Expansion and

rehabilitation

80% complete. Contractor is four

weeks behind

schedule

Management should enhance

monitoring and

supervision

Masindi Kitara SS Centres of

excellence (CE)

Expansion and rehabilitation

Sites were handed

over for

commencement of civil works

between 16th -19th September

2013

Management

should enhance

monitoring and supervision

Kabarole Kyebambe SS Centres of excellence (CE)

Expansion and rehabilitation

Management should enhance

monitoring and supervision

St. Leo‘s

college Kyegobe

Centres of

excellence (CE) Expansion and

rehabilitation

Management

should enhance monitoring and

supervision and

also note the issues in the

inspection report

Kasese Kasese SSS Centres of

excellence (CE)

Expansion and rehabilitation

Management

should enhance

monitoring and supervision and

also note the issues in the

inspection report

Ibanda Ibanda SSS Centres of excellence (CE)

Expansion and rehabilitation

Management should enhance

monitoring and supervision and

also note the

issues in the inspection report

Iganga Iganga SS Centres of

excellence (CE) Expansion and

Management

should enhance monitoring and

Page 576: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

564

rehabilitation supervision and

also note the issues in the

inspection report

Mityana Mityana SS Centres of excellence (CE)

Expansion and rehabilitation

Management should enhance

monitoring and supervision

Management attributed the delayed implementation to the need to vary the scope

of work at most of the schools. Whereas the needs assessment was carried out in

2008, actual implementation was three years later in 2011-2012. It was also

explained that, liquidated damages and other sanctions have been imposed on

defaulting companies. The performance and advance payment guarantees

crystalized and US$558,600.62 deposited on the project special account have been

activated. Outstanding works have been budgeted for in the 2014-15 financial

year.

I have advised management to ensure regular supervision of the project among

other interventions and also subject delayed works to liquidated damages where

applicable.

(c) GoU Budget performance

The government of Uganda counterpart funding for the project was determined as

UA; 5,780,000(US$ 8,901,200). However, only UA 3,005,600 (US$ 4,628,624) was

availed implying a shortfall of UA. 2,744, 400 (US$4,226,376). The inadequate

disbursement of GOU funding which is expected to meet 10% of the project costs

may result in failure to achieve the planned objectives. In addition it was noted

that quarterly releases of counterpart funding do not match the contractors‘

requests for interim payments, thereby resulting into arrears of payments.

Management in response explained that the Ministry had programmed adequate

resources in Financial Years 2013/14 and 2014/2015 to meet this shortfall to

enable the Project achieve its planned objectives without causing arrears of

payments.

Page 577: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

565

I advised management to ensure that counterpart funding is obtained in a timely

manner to fund project costs as prescribed in the agreement.

(d) Inspection of Project Activities

As part of the audit process during the year, a field inspection exercise was

undertaken to assess the extent of project implementation. The following findings

were noted;

Non-functional Bore holes

Boreholes installed at Mella and Atutur Seed Secondary Schools for provision of

water were observed as non-functional. This matter was also reported in minute

8.0 of the Site meeting held on 18thSeptember 2013. The anomaly was attributed

to the low depth of 55 Meters contrary to the prescribed depth of 85Metres.

Management explained that the anomalies had been brought to the attention of

the contractor and rectification works were underway.

I await the outcome of management‘s intervention in this regard.

Improper School structures

Inspections at Bugunzu, Busaba and Atutur senior secondary schools revealed

various anomalies as indicated below;

School Particulars Remarks

1 Busaba SS Cracks in the Multipurpose hall Rectification works required

urgently.

2 Bugunzu SS roof leakages in some rooms of

the staff house

Rectification works required

urgently.

3 Atutur SS roof leakages in the Head

teacher‘s house.

Rectification works required

urgently.

Whereas the Head teachers indicated that they had communicated the defects to

the contractors within the defects liability period, no action had been taken at the

time of physical inspection.

Page 578: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

566

Management is advised to liaise with the Ministry of Education and Sports to

ensure rectification of defects is undertaken timely.

Specific inspection findings in selected schools:

Additional findings regarding specific schools are listed in the matrix below;

School Observation Remarks Response by management

1 Dr. Obote SS Log book for

the tractor UG 2563 E

supplied to Dr. Obote SS was missing.

Ownership of the tractor was not

confirmed.

MoES has custody of original Registration Log Book and copies to be sent to schools.

2 St Joseph‘s

College Layibi, Metu SS in

Moyo, St Joseph‘s

College

Ombachi, Mvara SS in

Arua, Purongo Seed SS

Fencing of the

sites was not done

Management

should ensure that the

construction guidelines

regarding fencing

of the site are adhered to by the

contractors.

Instructions have been issued to contractors to ensure that the sites are hoarded off.

3 Sacred Heart

Girls Schools

The contractor was

using the facilities of the school contrary to

the project guidelines.

Management

should ensure that the

construction agreement is

complied with at

all times.

There is a Memorandum of understanding between the school and the contractor spelling out the terms for the use

of school facilities. The school is to be compensated for use of their facilities.

4 St Joseph‘s

College Layibi,

The condemned bricks

were still on site at the time of the inspection.

Management

should ensure that the

condemned bricks are not put to use

again.

These have been removed

5 Purongo Seed SS,

The consultant advised removal of condemned

Y 16mm iron bars that were used at column

bases as they did not

conform to Bills of quantities.

Consultant advice should be

adhered to.

This has been enforced and adhered to.

6 Bukanga Seed

School

Staff House

roof was leaking

Lights in the

Library Block not

working,

Defects should

rectified before

the end of the defects liability

period.

These schools are still under the defects liability period stipulated in the contracts. These defects have been highlighted to the contractors by the

Page 579: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

567

the Rail on the

Multipurpose

/Classroom block was not firm

the shutter of

the Toilet was displaced

Project Managers as a List of Snags to be completed before the end of the defects liability period. Retention will not be paid until defects are rectified.

7 Busaba Seed SS

The Verandah

and walls of the Multipurpose

/Classroom block have cracked.

The Staff

Houses were leaking.

Cracks in the

toilet wall.

Management should ensure

that the defects are rectified

before the end of the defects

liability period

These schools are still under the defects liability period stipulated in the contracts. These defects have been highlighted to the contractors by the Project Managers as a List of Snags to be completed before the end of the defects

liability period. Retention will not be paid until defects are rectified.

8 Bubandi and

Kyezimbire SS

Cracks in the

constructed staff

houses noted. Low thickness

of Verandahs in

Bubandi and Kyezimbire SS

Management

should ensure that the defects

are rectified before the end of

the defects

liability period

These schools are still under construction. These defects have been highlighted to the contractors by the Project Managers and are to be rectified before they are issued a Certificate of Practical Completion.

9 Nabumali High

School

The Gauge of

the iron sheets

was doubted by project

management. The iron

sheets were still

on site

Management

should ensure that construction

agreement is complied with at

all times.

The poor quality roofing

iron sheets have been removed from site and the contractor has supplied iron sheets of the recommended gauge.

I have advised management to implement the various recommendations outlined

above.

Page 580: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

568

57.10 UNIVERSAL POST PRIMARY EDUCATION AND TRAINING PROJECT

(a) Weaknesses in Project Implementation

Review of the World Bank inspection report on UPPET revealed the following

weaknesses in the project implementation:

a) There was lack of participatory budgeting where by work plans were

formulated by MoES without input from Beneficiary Schools and this resulted into

underestimation of construction costs.

Management explained that the project was technical in nature based on designs

to which the School Management Committees (SMCs) were unable to contribute

and attributed the increase in estimates to varying terrain of the various Schools

which was not considered during the design stage. I have advised management to

always consider the different terrains in the country while making designs for such

projects.

b) The Accounting System of MoES is based on IFMS which does not directly

generate project reports required by management and Cooperating Partners

without manual intervention with the Excel Spread sheet. Schools operate manual

accounting systems which are prone to human error.

Management explained that due to limited access to internet facilities, it was not

possible to integrate the schools to the reporting system of the Ministry which also

required installation of the system (IFMS) at school level. I have advised

management to explore the possibility of implementing a simple system that that

has minimal human interventions or where such interventions can be logged and

tracked.

c) Internal Control Weaknesses were noted in the financial management

function leading to;

Lack of segregation of duties.

Absence of dedicated financial management personnel at MoES contrary to

what was specified in the agreement.

Page 581: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

569

Bursar is the only staff performing all the accounting functions at each

beneficiary school.

Management explained that the weaknesses at the Project Implementation Unit

were addressed by recruitment of additional staff in the Accounts Unit. However at

school level, it was a policy matter and there were compensating controls of using

the various school committees to check on the Bursars‘ actions.

d) The flow of funds from the Ministry was affected by time lags between the

signing of works contracts and transfer of funds leading to delays in

commencement of construction works in some schools. Consequently,

BoQs were affected by increases in prices due to inflation

abandonment of sites by contractors;

Requests for variations that took a long time to approve;

Management explained that the accountability thresholds originally required in

order to disburse more money to the schools bank account have since been

reduced allowing schools to account in smaller amounts leading to replenishment

of the bank accounts in time. This also addressed the delays in submission of

Accountability Returns by the schools which could not attain the 75% threshold

specified in the Guidelines as quickly as expected.

e) There were cases of non-performance of some contractors resulting into

termination thereby leaving many facilities incomplete. A total of

Shs.1,469,350,070 that was paid in respect of terminated contracts was

considered to be ineligible expenditure. Reconciliation sheets availed by

management indicated that Shs.1,224,110,977 had been accounted for by the

schools leaving shs.245,239,093 outstanding. Other recovery measures such as

legal suits had been put in place. I have advised the management to ensure that

the outstanding amount is fully recovered

f) There was failure by the Ministry to take action against terminated

contractors by either not charging liquidated damages or collecting the

Page 582: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

570

Performance Bonds/Guarantees from the issuers. It was noted that most Bonds

and Guarantees had expired prior to termination of the contracts.

Management explained that a number of factors contributed to the failures of the

contractors which could not be solely attributed to them. For example late release

of funds, delays in processing requests for time extensions and unrecorded time

extensions by SMCs.

g) Accumulated Retention monies withheld in compliance with the contract

agreements were not found in some schools pooled bank accounts and no

explanation was given as to how the funds were utilized. Only Shs.6,761,437 out

of Shs.35,547,210 was on the school bank accounts. Management explained that

measures were put in place to release 90% of the money to the schools‘ accounts

and retain the 10% till fulfilment of the prescribed conditions.

I in general, advised management to put in place appropriate measures that

address the causes of the weaknesses and anomalies outlined.

(b) Review of the quarterly reports

A review of the project quarterly reports for the quarter ending 30th June 2013 in

line with the respective ledgers revealed the following:

Accountability status

Out of the sum of Shs.191,879,800,461 advanced to schools for UPPET activities

under phase 1 and phase 2, Shs.141,656,243,555 was either accounted for or

refunded leaving an outstanding balance of Shs.50,223,556,906 as indicated in the

table below;

Status of Accountability

Advanced (Shs)

Accounted (Shs)

Refunded (Shs)

Outstanding Balance (Shs)

Phase 1 54,493,733,142 40,954,602,871 2,375,903,452 11,163,226,819

Phase 2 137,386,067,319 98,068,104,343 257,632,889 39,060,330,087

Total 191,879,800,461 139,022,707,214

2,633,536,341

50,223,556,906

Page 583: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

571

Further analysis of the advances ledgers for individual schools for phase 1

revealed that by October 2013, Shs.11,281,487,361 had been outstanding for

more than 18 months contrary to the construction guidelines which require

submission of accountabilities as and when the contractors‘ certificates are settled.

Failure to account for the funds in a timely manner may be an indication that the

contractors are not performing in accordance with the contract completion terms

of 4 months, which could result in sanctions from the funding agency.

Management explained that the status of outstanding accountabilities continued to

change as more accountabilities were being submitted by the schools.

I advised the Accounting Officer to follow up the long outstanding accountabilities

and ensure that the respective schools comply with the accountability

requirements.

Refund of project funds

Shs.119,141,585 purportedly refunded by Abdalla Anyuru memorial school to the

ministry for non-compliance with project guidelines could not be traced to the

project bank statement. In addition Shs.40,511,350 recoverable from Kihihi high

school for unauthorised contract variation was not refunded to the ministry.

Although management indicated that the funds were received on the project

account, there was no evidence to this effect. I have advised management to

ensure that the outstanding refunds are effected in accordance with the project

guidelines and accounted for.

c. General Standards of accounting and internal control

A review of the general standards of accounting was undertaken with regard to

the following areas;

Accounting system and policies.

Book keeping.

Page 584: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

572

Management and control of both bank and cash accounts.

Purchases and payments.

Fixed assets management.

It was observed that management‘s control structure and environment, accounting

system and policies and control procedures were generally adequate to ensure

prudent use of and accountability for all project funds except for the following

matters:

Taxes not supported with remittance advice forms

A sum of Shs.156,537,007 purportedly remitted to Uganda Revenue Authority as

withholding tax was not supported with remittance advice forms. Non remittance

of the taxes may attract penalties against the project.

Whereas management explained that the tax remittance advice notes were in

place, they were not availed to the audit team for verification.

I advised management to ensure that tax remittances are supported by

remittance advice forms.

i) Withholding Taxes not remitted to URA

Contrary to the Income Tax Act CAP 340, a sum of Shs.23,317,996 which was

withheld from various contractors was not remitted to Uganda Revenue Authority.

Non-compliance with the tax law may attract penalties. Meanwhile at Mackay

College, Nateete, the Interim Payment Certificate No. 4 of Shs.46,074,087 was

paid without deducting the mandatory withholding tax.

No explanation was given by management regarding the omission. I have advised

the Accounting Officer to ensure that taxes due to URA are remitted in accordance

with the Income tax law.

d) Review of the Aide memoire

Review of the Aide memoire regarding activities for the period revealed that a

number of flaws were identified in 22 schools for which actions to be taken were

Page 585: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

573

agreed upon between the team and the ministry officials. However, it was noted at

the time of audit that management had implemented the agreed actions in 10

schools, while those in 12 schools were still outstanding as shown in the table

below. I was not provided with proper explanations for the non-implementation of

the agreed actions in the twelve schools and this could lead to;

non-achievement of the intended project objectives

Cancelation of funding by the bank.

Substandard structures being handed over by the contractors.

I advised management to ensure that the actions are implemented as agreed in

the Aide Memoire. I have also advised that the supervising consultants should

engage experienced Clerks to visit the sites more frequently.

Agreed actions in 12 schools that were still outstanding at the time of

audit

School Findings Agreed action

Bukedi SS Site abandoned and no contract staff onsite

Contractor to resume works or effect termination if no further deployment

Kiyeyi High School

No works on the structure due to layout issues

Layout plan discussed on site and proposal for implementation made

Kololo High School

Site abandoned at upper slab level and terminated by school

MOES to follow up TSF computation of final accounts and revised BOQ for retendering and include BOQ and details of staff house in the scope of works.

St. Joseph Kakindo

Manholes for lightening arrestor not built, beam support to verandah wrongly fixed, finish to ramps poorly done and final coat of paint not applied

MOES to ensure corrections done before expiry of DLP

Kakungube Secondary School

Site handed over Quality of finish poor TSF attendance poor Snag list not generated

TSF to generate snag list Re- works to poorly finished surfaces required at

contractors cost MOES ensures all works done before expiry of DLP

Kasenyi Secondary

School

Works behind schedule Contractor has under

deployed VIP latrine construction not started due to location challenges Roofing delayed for no technical reason

TSF to request for revised work plan TSF to ensure contractor deploys manpower to

meet the targets Tracking by schedule of works required for school

supervision TSF ensures roofing should start to avoid delays in

completion.

St. Mugaga Secondary School

Works heavily under certified Lab poorly finished, crooked sink supports, poor quality cabinet shutters, poor

MOES to investigate why works are under certified TSF to generate snag list and ensure quality re -

works MOES ensures contractor is paid for work done

Page 586: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

574

surface finish TSF attendance very poor

and accountability by school is effected.

Agweng Secondary School

Structures at 100% completion Surface finish to internal walls poorly done Lightening arresters not installed Contract extended due to delayed release of funds by MOES

TSF to approve all surface finish before painting

Town College School

Internal wall surfaces poorly finished No furniture supplied Contract overrun by 2 years Contract expired on 11th July 2012

TSF advised to compute final accounts for termination to be effected

Agwata Secondary School

Works handed over Certification was valued and 50% retention was released before 100% works completion Worktops fixed not to specification provided; tiles used as opposed to terrazzo worktops Lab taps not installed Locks to steel doors not fixed Furniture supply not completed

TSF over certified works before they were

completed and paid including 50% retention release. TSF should bear cost of completion of works should the contractor abandon pending works and furniture supply

MOES to follow up

St. John Bosco Secondary School

Truss assembly not as per roof detail required but is structurally sound Poor brick used on VIP

latrine construction. No bituminous paint applied before fixing of slab to VIP. Internal surface finish poor and not to spec. Hoop iron used of poor quality Facia boards used warping and of poor quality Contractor on and off the site

Present to COW invoices for materials and revised work plan in 3 days

COW to ensure poor bricks removed before casting of slab

Contractor to replace all facia boards with quality boards.

Hoop iron to be replaced by proper quality iron. All poorly finished surfaces to be hacked and

redone at contractors cost and poly filler applied to the rough ones.

Kitgum High School

Contract expired Floors cracked Truss assembly poorly done

TSF advised to monitor repairs as discussed on site TSF to instruct contractor to re-screed floor with

good sand. To avoid procurement delays, school advised to

renew contract upon receipt of revised work plan by the contractor

e) Field Inspections

Field inspections were undertaken to assess the extent of project implementation

and ascertain whether the implementation guidelines were being followed. The

Page 587: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

575

major findings as well as the responses from management are summarised in the

table below. I have advised management to enhance monitoring and supervision

of the projects and to also take appropriate action where necessary.

School Audit Observations MOES Management Response

L.Mburo SS Two-seater furniture delivered

instead of three- seaters.

Small gauge door shutters.

Head teacher interdicted due

to mismanagement.

In Phase one schools, there was a

discrepancy between the BOQs and

drawings. The furniture at Lake Mburo

S.S was paid for at BOQ rate of two-

seater desks.

Noted and the Technical supervising

firms will be penalized by deducting

from their remuneration.

The Head Teacher was interdicted for

diversion of money and the case was

forwarded to CID for further action

Kibingo Girls

SS

Furniture not engraved and

found lying on the verandah

Accepted the anomaly and pledged to

rectify.

Rwamanyon

yi SS

Shs.153,622,395 not refunded

to the ministry.

Civil works on-going and work had

reached 60% completion.

Kakira high

school

Cracks in the walls of the

Ground floor noticed.

No response by management

Buhkooli

College

Site minutes indicated that

contractor‘s representative

never attended meetings.

No response by management

Nyondo S.S Floor had cracks. No response by management

Ivukula S.S Certificate no.3 overpaid by

Shs.15,627,719.

Withholding tax on certificate

no.3 of Shs.9,463,208 not

paid.

Site minutes for September

2013 not filed.

No response by management

Busembatia

S.S

Ceiling altered from concrete

to boards without approval.

No response by management

Bukonte S.S Funds frozen due to change

in name of account.

Contractor demanding

shs.17m for completed works

No response by management

St. Paul‘s

Rushoka

Poor quality benches were

delivered by contractor.

No response by management

Page 588: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

576

f) Non- delivery of furniture.

It was also observed that in a number of schools, furniture had not been delivered

by the respective contractors,

School Audit comments

Kapeka SS Furniture was not yet delivered at the time of inspection.

Nampunge SS Project was partially complete but furniture not yet delivered.

Nyakayojo Furniture was not yet delivered at the time of inspection.

Rukoni SS, 150 benches had not yet been delivered.

delivered furniture was not engraved

Nyondo SS Contractor did not supply the Furniture but was paid an

advance of Shs.36,000,000 without authority.

Another Company was contracted to supply the Furniture at

an additional cost of Shs.51,071,500.

Ivukula SS Furniture was not yet delivered at the time of inspection.

Nawansega SS 20 desks for students and the teachers‘ tables were not

delivered.

Laboratory had been completed and 124 stools delivered, but

the tables were missing.

No explanations were provided by management for the non-delivery of furniture at

the various schools and for the other anomalies. I have advised the Accounting

Officer to ensure that the furniture is delivered to schools in accordance with the

contract terms and that the other irregularities are addressed.

g) Contracts executed without performance security

In the following schools, the works contracts were being executed by the

contractors without valid performance guarantees contrary to Reg. 232 of the

PPDA Regulations, 2003.

School Remarks

Nampunge SS, Performance security expired on 18/10/2013

St Kizito Katikamu Kisuule, Performance security was not on file.

Lake Mburo SS, The performance bond expired on 15/02/2013.

Page 589: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

577

The practice is irregular and leaves the clients without fall-back position in the

event of default or abandonment of works by the contractors. There was no

explanation by management for the continued execution of works without valid

performance guarantees in the above schools. I have accordingly advised

management to strengthen the internal project management and supervision and

to also ensure that contractors renew performance bonds.

58.0 EDUCATION SERVICE COMMISSON

58.1 Fraudulent access to the Government payroll by personnel in Post

Primary Institutions

The Commission undertook a validation exercise for teaching and non-teaching

personnel on the Government payroll in Government aided Post Primary

Institutions in the Eastern, North Eastern and Central Regions, produced a report

in November 2013 which identified 372 personnel with different categories of

anomalies indicating fraudulent actions as detailed in the table below:-

S/N Category No of staff Commission Recommendation

1. Fraudulent access to payroll

201 A complete list of those who

fraudulently accessed the payroll be submitted to the MOES and MOPS for

deletion.

Culprits be blacklisted and records

frozen to deny them re-entry. Formal communication be made to

affected teachers stopping them from

continuing on the payroll.

2. Staff sharing

registration numbers

39 Agreed that lists of officers sharing

registration numbers be submitted to

the MOES to enable correction of the

anomaly. MOES should avail the owner of the

numbers and whether the other people

were genuinely registered or not and their registration numbers

3. Staff in care taking

positions

46 Follow due process for handling cases

of confirming in appointment

4. Staff with disciplinary

cases

9 MOES should be informed so that

actions are taken on the cases.

MOES pledged to handle disciplinary

cases more expeditiously in accordance with the regulations in place.

Page 590: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

578

5. Staff declared

unknown by head teachers on whose

payroll they

appeared

7 They should be identified and be

submitted to the ministry for deletion.

6. Staff holding more

than one probationary

appointments

5 A list be complied for MOES to initiate

disciplinary procedures against the

culprits. Follow due process while handling

disciplinary cases.

7. Staff earning salary

not commensurate to their substantive

appointments

23 The list be sent to MOES for

investigation and taking of the

necessary action.

8. Staff without the minimum entry

requirements

5 Those without minimum requirements

but had been appointed by the authorized bodies should have their

appointments regularized and thereafter retired.

MOES should identify officers in such

category who may be in other areas

not covered by the validation exercise.

9. Staff appointed on

trial

37 Submit for appointment on permanent

and pensionable basis those who had

acquired the requisite qualifications.

Submit for renewal/extension of the

trial period those whose services are required.

Terminate the services of those

appointed on trial if their services are no longer required.

ESC to submit a list of those appointed

on trial to MOES to enable it take Final position on the matter and finding a

lasting solution to matters pertaining to

Non-Formal Education Instructions (NFE).

TOTAL 372

Although management explained that the recommendations in the report were to

be implemented expeditiously, at the time of writing this report, the Ministry of

Education and Sports had not responded to the issues raised and therefore the

status of implementation could not be established.

I have advised the Commission management to follow up with the Ministry, have

the anomalies investigated and appropriate action taken.

Page 591: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

579

58.2 Lack of a Strategic Plan

It is best practice for Government Agencies to undertake long term strategic

planning to be able to achieve their objectives through measurable and clear

outputs. It was noted that Education Service Commission was operating without a

strategic plan, despite its huge responsibility of recruiting teachers in the country.

Management explained that the process of formulating the Commission’s Strategic

Plan was in progress and expected it to be in place by end of 2014/15 financial

year.

I advised management to have the formulation process expedited.

59.0 MAKERERE UNIVERSITY

59.1 Un-authorized over Expenditure

Analysis of the budget estimates and the actual expenditure of the University for

the financial year under review revealed that three budget lines were overspent by

UGX.8,552,403,721 without authorization contrary to the requirements of the

Public Finance and Accountability Act, 2003 as well as the Universities and Other

Tertiary Institutions Act, 2001. Unauthorized excess expenditure undermines the

intentions of the appropriating authority. The table below refers;

Expenditure Item Budget

(Shs)

Actual

(Shs)

Excess

Expenditure (Shs)

Employee costs 101,276,703,122 102,939,251,875 1,662,548,753

Goods and services consumed

35,291,581,052 39,450,463,038 4,158,881,986

Other operating expenses

15,439,198,699 18,170,171,681 2,730,972,982

Total 152,007,482,873 160,559,886,594 8,552,403,721

Management explained that, whereas Government approved 30% enhancement of

staff salaries for scientists, the funding and the corresponding NSSF contribution

were not provided thereby necessitating reallocation of funds from other items. In

Page 592: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

580

addition, introduction of internship for Government sponsored students by the

university also necessitated extra expenditure.

I have advised the Accounting Officer to always seek for the necessary approvals

from the University Council and the Secretary to the Treasury before virement of

funds.

59.2 Revenue Performance

Out of the budgeted revenue of UGX.184,486,065,396, the University realized

UGX. 180,082,040,267 resulting into a shortfall of UGX.4.404,125,129. Further

analysis indicated that the Development Budget under performed by

UGX.8,243,137,562 while the donor component and non-tax revenue exceeded

the budgets by UGX. 2,503,478,887 and UGX.1,335,603,546 respectively.

Failure to fund the capital budget adequately impacted on the planned

infrastructure improvements at the University and as a result the lecture rooms

remain congested.

Management indicated that various stakeholders have been approached to support

the university in funding the capital budget.

I advised the Accounting Officer to continue liaising with Ministry of Finance,

Planning and Economic Development (MoFPED) and other stakeholders to mobilize

resources for improvement of infrastructure and other needs of the University.

59.3 Advances to Employees’ Personal Accounts

Sections 227, 228 and 229 of The Treasury Accounting Instructions (TAIs) 2003

part 1, require that all payments should be made by the Accounting Officer directly

to the beneficiaries. Where this is not convenient, an Imprest holder should be

appointed by the Accounting Officer with the approval of the Accountant General

to handle the Imprest and account at least once a month. However, a total of

UGX.113, 682,246 was paid to the personal bank accounts of College staff for

executing official activities contrary to the above provisions. Though the funds

Page 593: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

581

were eventually accounted for, the practice exposes the funds to the risk of

diversion and misappropriation. Besides purchase of consumables by individuals

may result into uncompetitive pricing as the benefits of economies of scale are

lost.

In response, management explained that the payments were made to individuals

in cases where the materials were so specialized that they could not be kept for a

long time because they were perishable in nature.

I advised management to comply with the provisions of the Treasury Accounting

Instructions for the safety of public funds and efficiency in procurement.

59.4 Funds Not Accounted For

(a) Unsupported expenditure

Chapter IV, Paragraph 181 of the Treasury Accounting Instructions Part I -

Finance requires all vouchers to contain full particulars of each service or goods

and to be accompanied with such supporting documents as may be required to

enable checking without reference to any other documents.

On the contrary, UGX.288,304,678 paid for various activities such as field

attachments, student supervision, field practical‘s and teaching allowances lacked

relevant supporting documents including; students lists, time-tables, approved

claim forms and acknowledgement receipts from suppliers. Insufficient

documentation may result into misappropriation of funds.

I advised management to provide the necessary documentation to support these

payments or institute measures to recover the funds.

(b) Outstanding Advances

A sum of UGX.129,488,560 advanced to various staff for official activities remained

outstanding contrary to the Treasury Accounting Instructions 2003, paragraph 217

which require accountabilities to be submitted within 60 days from the date of

payment. Delayed accountability may result into falsification of documents.

Page 594: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

582

I advised management to submit the accountability or recover the funds from the

concerned staff.

(c) Irregular Hire of space for Lectures

The Colleges of Education and External Studies (CEES) together with the College

of Business and Management (COBAMS) hired lecture space from secondary

schools and private conference halls at UGX.37,662,020 and UGX.49,080,000

respectively.

However, the payments were not supported with formal agreements and/or

negotiation minutes indicating rates, duration and facilities to be utilized. In the

circumstances the authenticity of the expenditure is doubtful.

Management explained that efforts were being made to ensure that space hire is

formalized.

I advised management to ensure that formal agreements are made and

implemented to safeguard the University from the risk of exorbitant charges and

abrupt alterations. Meanwhile, management should investigate the authenticity

and fairness of the expenditure.

59.5 Review of Financial Statements of Commercial Units

(a) Maize Mill Payables

The maize mill owed suppliers UGX.239, 755,654 as at 30th June 2013. Delayed

settlement of obligations may attract litigation costs and affect business

relationships adversely.

Although management indicated that UGX.164,151,829 had been paid leaving a

balance of UGX. 75,603,825, no evidence was availed to support this position. I

have advised management to put in place necessary measures to ensure creditors

are settled in a timely manner.

Page 595: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

583

(b) Makerere University Guest House Creditors

The financial statements of the Guest House reported payables of UGX.248,

541,753 at the end of the financial year under review. During audit examination, it

was noted that UGX.104,015,232 had been settled leaving a balance of

UGX.146,817,181 of which statutory deductions included; N.S.S.F

(UGX.13,263,313), P.A.Y.E (UGX.40,405,188), VAT (UGX.22,478,168).

Management indicated that efforts were being made to settle outstanding debts.

I advised management to prioritize settlement of statutory deductions in

accordance with the relevant laws and regulations to avoid penalties and fines.

(c) Makerere University maize mill Debtors Management

The statement of financial position indicated receivables of UGX.220, 510,730

which represented an increment of UGX.59,816,780 (37.2%) over the previous

year. Receivables indicate idle assets which hinder availability of working capital

for the commercial operations. An increment in the item also implies weaknesses

in debt management.

Although Management indicated that debts totalling UGX.170, 986,100 had been

recovered, no evidence was provided to this effect.

I advised management to follow-up the matter and have the funds fully recovered.

59.6 Operations of Makerere University Printery

(a) Shortage in Revenue Collection

Out of the budgeted revenue of UGX.1,375,000,000 at the University Printery

UGX.1,215,400,391 was realized resulting into shortfall of UGX.159,599,609

(11.6%). As a result various planned procurements such as; computer software,

laminating machine and double cabin pick-up were not made.

I advised management to ensure that revenues are improved for full

implementation of planned activities.

Page 596: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

584

(b) Trade Creditors

Review of the financial statements revealed that the printery owes various service

providers a sum of UGX.124,300,363. Long outstanding debts may attract litigation

and loss of goodwill. I have advised management to settle its debts promptly.

(c) Trade Debtors

At the close of the year, the printery was owed UGX.746,278,744 by its customers.

It was further noted that, the entity lacks a credit policy and had not prepared an

aging list of the debtors. Long standing debts represent idle assets which constrain

working capital of an enterprise and may become uncollectable.

Management indicated that a debt collector had been appointed to follow up the

outstanding debts.

I await the outcome of management action.

(d) Misclassification of expenditure at University Guest House

Review of the Guest house accounts revealed that imprest transactions worth

UGX.128,966,354 at the University Guest house were not entered into the imprest

cashbook thereby exposing the expenditure to risk of misclassification .

In response, management explained that following placement of an agency notice

on he Guest House Bank Account by URA due to VAT arrears, only cash

transactions were undertaken during September to December 2012 and these

were inadvertently omitted from the imprest cashbook.

I have advised management that the transactions should be recorded in the

imprest cashbook to enable proper classification of expenditure.

59.7 GOVERNANCE ISSUES

(a) Non-submission of Semi-Annual Reports

Section 8 of the Colleges statute requires every College to submit to the University

council performance reports at least every six months. In addition Section 16 (1),

provides that a Principal of the College shall implement University policies and

Page 597: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

585

enforce applicable regulations at the College. However, for the year under review,

all colleges failed to submit performance reports to the University Council. Non

submission of the reports undermines the Council‘s ability to monitor, regulate and

supervise the management and performance of the colleges.

In response, management pledged to ensure submission of reports by the College

Principals with effect from the next accounting year. I have advised management

to ensure that reports are submitted by Colleges to the University Council in

accordance with the statute.

(b) Improper Assets management

An examination of the assets management practices at the College of Natural

Sciences revealed the following anomalies;

Non engravement of assets,

Obsolete items unnecessarily occupying space,

Assets not recorded in the assets register for example Dell laptop

purchased on 25/09/2012 at UGX.1,856,500.

The above weaknesses expose the University property to risk of loss without trace.

In response, management explained that the process of engravement of assets

and disposal of obsolete items had started. I await the outcome of management

action.

59.8 Tax Matters

(a) Non-payment of P.A.Y.E Tax

Section 116 of the Income Tax Act, requires the employer to pay to the

Commissioner any tax that has been withheld or that should have been withheld

under this part within fifteen days after the end of the month in which the

payment subject to P.A.Y.E was made. However, P.A.Y.E of UGX.51,125,340

deducted from employees and purportedly remitted to URA lacked

acknowledgement receipts rendering the authenticity of the expenditure doubtful.

In the circumstances the entity is exposed to the risk of penalties.

Page 598: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

586

I advised the Accounting Officer to obtain and submit the acknowledgement

receipts for future use.

(b) Unremitted Withholding Tax

Section 123 (1) of the Income Tax Act, requires that a withholding agent shall pay

to the Commissioner any tax that has been withheld or that should have been

withheld under this part within fifteen days after the end of the month in which

the payment subject to WHT was made by the agent. However, withholding tax of

UGX.6,506,809 deducted from various suppliers was not remitted to the tax body

contrary to the law.

I advised management to submit the acknowledgement receipts for verification.

60.0 MAKERERE UNIVERSITY BUSINESS SCHOOL

60.1 Outstanding Debtors

Included in the receivables of UGX.2,407,291,668 is a sum of UGX.1,725,731,787

in respect of outstanding tuition fees debtors. Delayed collection of tuition fees

and recovery of debts constrains management in implementing planned activities

and could also result into loss of revenue to the school.

I advised management to institute and implement an appropriate tuition fees

collection and debt management policy to reduce on the amount of debtors.

60.2 Inconsistence in the number of staff on the payroll

Review of the staff list and monthly payrolls revealed that every month there was

a variance in the number of staff paid as compared to the staff list as highlighted

in the table below:

COMPARISON OF THE ESTABLISHED STAFF LIST AGAINST PAY ROLL

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

Jan-13

Feb-13

Mar-13

Apr-13

May-13

Jun-13

P/Rolls Govt/Payroll and Non/Govt

Total 745 750 754 758 761 763 763 766 778 772 793 819

Page 599: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

587

I informed management that inconsistencies between the payroll and the staff list

could result in loss of funds through payment of non-existing employees.

Management attributed the inconsistence in the number of staff on the payroll and

staff list to fluctuations in numbers of part-time academic and administrative staff

who were not remunerated on the payroll. They added that the School usually

prepared a separate payroll for part-time staff based on the number of hours

worked and these payments were not made through the Ministry of Public Service.

I advised management to always reconcile the staff list with the payroll to avoid

the risk of making payments to non-existing employees.

60.3 Inadequate Staffing

The University Establishment was filled to the levels of 57.6%, 83.5%, and 89.3%

for Academic Staff, Administrative Staff, and Support Staff respectively. It was

noted that the academic staff levels were lowest of all categories despite the core

activity of the school being teaching. The tables below gives a summary of

staffing levels in the different categories;

A) Academic Staff Establishment

Position Establishment Filled as at June, 2013 Vacant as at June, 2013

No. % No. %

Sub-total 552 318 57.6 234 42.4

B) Administrative Staff Establishment

Position Establishment Filled as at June, 2013 Vacant as at June, 2013

Sub-total 200 167 83.5 33 16.5

Master file Academic and Non -academic

Total 753 759 762 764 766 760 766 780 780 799 812 827

Variance(P/Roll less Master file) -8 -9 -8 -6 -5 3 -3 -14 -2 -27 -19 -8

Page 600: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

588

C) Support Staff Establishment

Position Establishment Filled as at June, 2013 Vacant as at June, 2013

Sub-total 400 357 89.3 43 10.7

Management attributed the understaffing levels to inadequate Government

subvention towards the MUBS wage bill and indicated that despite earlier

promises, the school was yet to receive additional funding for more staff.

I advised the Accounting Officer to follow up the matter with the relevant

authorities to increase funding for more staff especially in the teaching category.

60.4 Incomplete Fixed Assets Register

MUBS Fixed Assets and Management policy states that Assets of the school shall

be accounted for in accordance with the Generally Accepted Accounting Practices,

issue notes and guidance from the Accountant General‘s Office and IFRSs.

Accounting procedures with respect to fixed assets are required to take cognisance of

the following; Existence of a proper record of the asset in terms of description,

physical location, and valuation of the fixed assets.

However, review of the FAR revealed that it was not properly maintained. For

example land and buildings were not reflected in the register and not all the furniture

acquired during the year was recorded. An incomplete FAR may lead to

understatement of the net worth of the school and loss of assets without trace.

Management explained that the revaluation and recording in the FAR of land and

buildings could not be done because the School had not attained ownership of the

land. They stated that the 1st land title was received in December 2013 and a

revaluation request was to be presented in the next Council meeting.

I advised management to expedite the process and update the FAR accordingly.

Page 601: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

589

60.5 Irregular medical expenditure

According to the MUBS Human Resource Manual, medical attention for members

of staff and their families is provided by the Council on special terms under the

schemes set out in Appendix D/1 and D/2. The manual defines family as spouse

and children up to 4 in number under the age of 18 years who should be

registered with the Human Resource office using appropriate documents namely;

Marriage and Birth Certificates.

However, management paid a sum of UGX.84,900,000 for the medical treatment

of patients who were neither members of staff nor registered family members.

Review of Council minutes and other documents on the matter revealed that no

authority was sought from Council. The payment vouchers were also not availed

for audit as they were reported to have been taken by Inspector General of

Government.

In response, management explained that the expenditure was part of the school‘s

corporate social responsibility.

I advised management to develop a clear policy on corporate social responsibility

and have it approved by the University Council to be able to streamline such

expenditure. A specific budget should also be provided for the item.

60.6 Exam Malpractices

According to the Minute 4.1 (b) of the 1st Continued Special meeting held on 4th

December 2012, the Principal raised the issue of the School experiencing a

challenge of students cheating in exams and was in the process of acquiring CCTV

cameras to help curb the vice. It was further noted that, UGX.305,976,601 was

incurred on invigilation costs during the year but no evidence of procurement of

the CCTV cameras was submitted, implying that the challenge had not been

addressed. Examination cheating could lead to reputational risk which impacts on

the image of the University and employability of it‘s products.

Page 602: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

590

Management explained that the School was in the process of procuring CCTV

cameras, but was constrained by availability of funds.

I advised them to prioritise the activity.

60.7 Physical state of Library building

The inspection of the University library carried out on 9th December, 2013 revealed

the following weaknesses;

Cracks had developed on the Ground Floor and the walls on Second Floor

despite previous correction of defects by the Contractor.

Users of the facility stated that there were three spots that leaked whenever it

rained.

The defective works were attributed to inadequate supervision by the consultants,

during the construction period. Management explained that the defects were

brought to the attention of the architects and the contractor for corrective action.

The retention money due to the contractor had not been paid as a result. I have

advised management to ensure that the defects are fixed to avoid rapid

deterioration of the building.

61.0 UGANDA MANAGEMENT INSTITUTE

61.1 Un-Secured Contract

Ms. Techno Three Uganda Ltd was awarded a contract for rehabilitation of a

hostel at a sum of UGX.2,379,402,546. Whereas the completion date was October

2013, inspections carried out in December, 2013 revealed that the works were

incomplete. Besides the performance security and advance payment guarantee

had expired on 29/9/2012 and 5/1/13 respectively thereby exposing the Institute

to risk of loss of funds.

Management indicated that a letter had been written to the contractor asking for

renewal of the performance security and advance payment guarantee.

Page 603: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

591

I advised management to enhance project supervision to ensure completion of the

works, and have the guarantees and securities renewed without further delay.

61.2 Under absorption of funds by the Research function

Whereas the Institute allocated UGX.82,781,414 to research activities, only

UGX.10,436,740 was actually utilized leaving a balance of UGX.72,344,674.

Under absorption of funds implies that some of the activities were not

implemented as planned. Similarly, the goal of strengthening long distance

learning was not properly supported in the absence of a substantive Head of

Department and adequate staffing. Management stated that a process of

addressing the identified gaps was underway.

I advised management that since this is an academic institution, research activities

should be prioritized.

61.3 Domestic Arrears

The Institute liabilities stood at UGX.2,630,191,183 at the end of the financial

year. Included in the liabilities, were sundry creditors and committed creditors

whose details were not clearly explained. Committed creditors had accumulated

from UGX. 1,001,459,828 (F/Y 2011/12) to UGX.1,625,353,691 (F/Y 2012/13).

The table below refers;

ITEM AMOUNT(UGX.)

Overdraft 521,118,246

Trade Creditors 483,539,246

Committed Creditors 1,625,533,691

Total 2,630,191,183

I explained to the Accounting Officer that accumulation of liabilities exposes the

entity to risk of litigation.

Page 604: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

592

61.4 Irregular expenditure

A sum of UGX.28,348,000 was paid to two Municipal Councils to facilitate Council

Meetings with regard to acquisition of land by the Institute. This expenditure is

considered irregular as the Councils are required to consider matters of land

application as part of their routine duties. The table below refers:

Irregular expenditure

ENTITY AMOUNT (UGX) CHEQ NO.

Mbarara municipality 12,448,000 CHQ No. 800871

Mbale municipality 15,900,000 CHQ No. 800870

Total 28,348,000

Management stated that the Governing Council of the Institute had approved

facilitation of the special sittings of the respective District Councils to fast track the

allocation of land. However, there was no evidence of acquisition of the said land.

I advised management to follow up the matter and acquire the land. Meanwhile

evidence of approval of the expenditure by the council is awaited.

62.0 MBARARA UNIVERSITY OF SCIENCE AND TECHNOLOGY

62.1 Outstanding Law Suit

In June 2004 the Public University Councils were directed to use part of the

internally generated revenues to enhance the salaries of the Non-Academic Staff

and if possible, to enhance further the salaries of Academic Staff.

It was however noted that the MUST Council did not implement the directive and

in July 2011, the Non-Teaching Staff of the University sued the University Council

for non-payment of their salary arrears amounting to UGX.4,442,293,176. In June

2012, the Solicitor General advised management to settle the case out of Court.

Page 605: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

593

The eventual settlement of the subsequent obligation may significantly affect the

operations of the University. Besides, the contingent liability was not disclosed by

way of note to the accounts.

I advised management to take up the matter with the relevant authorities and

have the matter settled. In case this matter is not resolved, the liability should be

disclosed in the 2013/2014 financial statements by way of a note to the accounts.

62.2 Unauthorized Over expenditure

Contrary to Section 17 of the Public Finance and Accountability Act, 2003, a sum

of UGX.722,472,773 was incurred well above the budgeted expenditure on two

items without the relevant authority. The table below refers;

Expenditure item Budget

(UGX)

Actual

(UGX)

Over

(UGX)

Research, Consultancy

and publications 290,000,000 1,007,172,741 717,172,741

Students welfare 735,000,000 740,300,032 5,300,032

Total 1,025,000,000 1,747,472,773 722,472,773

Management attributed the over expenditure on research to off-budget funds that

were channelled through the University Forex Collection Account.

I advised Management to always budget properly and avoid overspending by

obtaining appropriate authority to adjust the budgets where expenditure is

expected to exceed the budget.

62.3 Payables

Payables increased from UGX.1,093,144,611 to UGX.1,458,614,156 indicating an

increment of UGX.365,469,545 during the financial year.

The accumulation of domestic arrears contravenes the Government Policy on

commitment control and may attract litigation from long outstanding creditors.

The NSSF obligations could attract fines and penalties.

Page 606: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

594

Management explained that Payables relating to MUST staff would be settled the

following financial. It was further explained that requests had been made to

MoFPED to provide funds to settle NSSF remittances.

I advised management to follow the Government policy on commitments control

and ensure timely settlement of outstanding payables.

62.4 Management of receivables

During the year, receivables increased from UGX.489,658,300 to UGX.521,185,307

indicating an increase of UGX.31,527,007. A review of the supporting schedule

revealed that the debts were owed by sponsors of private students such as Baylor,

BTC and Compassion International. Although Management explained that there

was a policy on fees payments, there appeared to be laxity on its enforcement as

there were students who sat exams without settling the tuition fees.

I advised management to institute mechanisms of enforcing collection of tuition

fees from all privately sponsored students.

62.5 Staffing Gaps

A review of the approved university staff establishment revealed that out of the

2490 posts approved, only 494 (19.8 %) were filled leaving 1996 (80.2%) vacant

as summarized in the table below;

Department Establishment Filled Vacant

CENTRAL ADMINISTRATION 736 170 566

ACADEMIC 1312 178 1134

DEVELOPMENT STUDIES 86 36 50

INSTITUTE OF COMPUTER SCIENCE 104 50 54

FACAULTY OF SCIENCE 205 57 148

ITFC-BWINDI 47 3 44

Grand Total 2490 494 1996

Inadequate staffing undermines achievement of strategic objectives and affects

the level and quality of service delivery at the university. There was no evidence

Page 607: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

595

that the University Council and Management were taking any steps to fill the

vacant positions.

Management explained that Government was yet to avail funds to the University

for uplifting the staff structure.

I advised management together with the University Council to liaise with MoFPED

to provide funding for recruitment of more staff in order to be able to achieve the

mandate of the University.

63.0 KYAMBOGO UNIVERSITY

63.1 Funds not accounted for

a) Fuel Expenses

Paragraph 181 of The Treasury Accounting Instructions, 2003 and Regulation

63(4) of the Public Finance and Accountability Regulations, 2003 require all

vouchers to contain full particulars of each service or goods and accompanying

supporting documents. However, a sum of UGX.621,438,192 incurred on fuel was

not supported with motor vehicle movement log books, consumption statements

and deposit receipts rendering the expenditure doubtful.

According to management, the log books, consumption statements and deposit

slips were available. However on verification, the logbooks were incomplete with

columns for total mileage covered, fuel consumed, departure and arrival time and

the signature of the authorizing officer not filled out.

I advised management to update the motor-vehicle records to assist in decision

making.

b) Unvouched expenditure

According to Regulation 60(1) of the Pubic Finance and Accountability

Regulations 2003, all disbursements of public monies shall be properly vouched on

payment vouchers prescribed by the Accountant General. It was however noted

Page 608: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

596

that payment vouchers for UGX.483,015,712 were missing rendering the

authenticity of the expenditure doubtful.

Whereas management indicated that the payment vouchers and other supporting

documents were available, there was no documentary proof to this effect.

I advised management to enforce accountability of funds at the University.

c) Nugatory expenditure

The management of Kyambogo University paid UGX.210,263,100 to lecturers as

an allowance for marking coursework assignments. This expenditure was

considered nugatory as the activities are deemed to constitute part of the officers‘

normal schedule of duties as stipulated in the terms and conditions of

employment.

Management in response indicated that the policy was approved by the University

Council in order to create fairness on marking load where some staff had as fewer

scripts as 20 in some programs while others had as many as 800 scripts to mark.

However on verification, there was no documentary proof of policy approval by the

University Council.

I advised management to desist from such practices.

d) Outstanding Advances

UGX.208,002,108 advanced to various staff for official activities lacked relevant

supporting documents contrary to Treasury Accounting instructions, paragraph

181 and Section 63(4) the Public Finance and Accountability Act. Unsupported

expenditure may result into misappropriation of funds. I explained to management

that delayed accountability may result into falsification of documents and

possible loss of funds. Whereas management in response indicated that the

accountability documents were available, there was no proof to this effect.

I advised management to ensure that funds are properly accounted for.

Page 609: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

597

e) Doubtful expenditure

A sum of UGX.35,860,604 incurred on various activities lacked relevant supporting

documents rendering the expenditure doubtful.

Whereas management indicated that the expenditure was genuine, there was no

proof to this effect.

I have advised management to recover the funds and ensure proper and timely

accountabilities in future.

f) Payments to retired staff

UGX.5,566,756 was paid to retired staff due to failure to delete their names from

the payroll, contrary to Human Resource regulations, thereby exposing the

university to risk of loss of funds.

In response, management explained that they submitted payroll exception reports

on time to the Ministry of Finance, Planning and Economic Development to

facilitate the deletion of the said staff that left the University. However, MOFPED

delayed to delete the names and instead deleted them in the subsequent month.

Management undertook to deduct the said monies from the former employees‘

gratuity.

I await management‘s commitment in this regard.

g) Doubtful Remittance of PAYE

A sum of UGX.914,901,957purportedly remitted to URA as Pay-as-you-earn (PAYE)

was not supported with acknowledgement receipts rendering the expenditure

doubtful.

Whereas management indicated that some acknowledgement receipts were

available for verification, I could not confirm receipt of the funds by the Tax

Authority.

Page 610: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

598

I advised management to always follow-up payments to URA and obtain receipts

thereof.

h) Over Payment of NSSF Contribution

According to section 11(1) of the NSSF Act, every contributing employer shall, for

every month during which he or she pays wages to an eligible employee, pay to

the fund, within fifteen days a standard contribution of 10 percent calculated on

the total wages paid during that month to that employee. On the contrary, it was

noted that 20% of total wages was paid as the standard contribution for the

month of August 2012 to NSSF resulting into an overpayment of UGX.18,860,499.

In their response, management explained that the overpayment of

UGX18,860,499 was in error and that recovery would be effected from the next

NSSF contribution.

I await management‘s action in this regard.

63.2 Procurement Anomalies

(a) Breach of Contract

M/S Global Oracle was awarded a contract for road works on Kulubya road at a

sum of UGX.498,410,000. Review of the contract performance revealed that the

contractor abandoned works after receiving UGX.182,459,398 (37% of the

contract sum). Also noted was that the performance security had expired

rendering recovery of the funds difficult.

In their response, management acknowledged the above state of affairs and

indicated that arrangements were underway to terminate the contract and ensure

that the works are completed.

I have advised Management to seek legal advice to ensure enforcement of the

contract.

Page 611: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

599

(b) Uncompetitive Procurements

A sum of UGX.473,179,098 was incurred on micro procurement of repetitive goods

and services during the year. There was a risk of uncompetitive pricing of goods

and services that would be addressed through framework contracts.

In their response, management acknowledged the observation indicating that

most micro procurements were procured from pre-qualified suppliers. However on

verification, the suppliers‘ names were missing from the pre-qualification list.

I advised management to ensure that procurements are conducted in a manner to

maximize competition and achieve value for money.

(c) Doubtful Contract Awards

Regulation 90 (g, h & i) of the Public procurement and Disposal of Public Assets

Act,2003 require a Procurement and Disposal Unit to maintain procurement

records such as; Award Minutes, Contracts Committee decisions, Letter of Bid

Acceptance and Negotiation Minutes. However, payments to various suppliers

amounting to UGX.446,226,772 were effected without the above documents

thereby rendering the validity of the expenditure doubtful.

In response, although management indicated that the payments were procured

with authority of the Contracts Committee with most of the procurements under

Framework Contracts, there was no documentary proof to this effect.

(d) Irregular Procurements

Regulation 94(1)(a) of the public procurement and Disposal of public assets

stipulates that a contracts committee or a holder of delegated authority shall

approve the choice of a procurement method prior to commencement of the

procurement process. However, UGX.51,517,966 was paid to university staff and

other un-prequalified firms for purposes of purchasing various items directly. I

explained to management that the practice undermined the purpose of pre-

qualifying firms.

Page 612: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

600

In their response, management acknowledged that some payments were paid to

staff to purchase various goods and services of emergence nature. Those procured

directly by the staff on road construction were unique and uncommon items such

as tar, sand and other materials that were not normally used.

I advised management to ensure that future purchases are made from pre-

qualified suppliers.

(e) Miscellaneous Procurement Anomalies

During the year under audit, some weaknesses were noted in the procurement

and disposal unit. They include among others:

Poor filing of records

Late submission of procurement requisitions

Failure to sign off issues of bids and bid receipts by responsible persons.

Some contract agreements have no effective dates.

I explained to management that these weaknesses hinder tracking of documents

and may result into inefficiencies in procurement and thus the need for proper

record keeping by the management.

In response, management attributed the weaknesses in records management to

understaffing and inadequate records space.

I advised management to take up the matter with the University Council.

63.3 Staff Accommodation

Contrary to the University Policy, 30% of staff occupied University houses without

signing tenancy agreements. Enforcement of recovery procedures may not be

possible in the circumstances.

Whereas management indicated that the University had about 90 staff paying for

the University houses and that rent was deducted from the staff salaries on a

monthly basis, the issue of unsigned tenancy agreements remained unresolved.

Page 613: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

601

I advised management to streamline the system and have all occupants sign

agreements for easy monitoring of rentals.

63.4 Rentals from other assets

Out of 36 businesses operating in the University, 28 (representing 77%) did not

have any tenancy agreements contrary to the University Policy. In the

circumstances, the revenue amounting to UGX 240,259,518 reported as ‗other

property income‘ (Note 7_Non-Tax Revenue) could have been understated.

In their response, management explained that an adhoc technical committee

which was appointed, produced a report which identifies all weaknesses in the

collection of revenue in the small business entities in the University and the

committee had already been directed to implement the report by contracting all

premises where business entities are expected to operate through a procurement

process.

I await the outcome of management‘s intervention in this regard.

56.1 Teaching Process

a. Irregular Issuance of certificates to students

The university policy on examinations stipulates that students shall be issued with

certificates of performance before sitting for examinations, as a method of

confirming that students fulfill all academic and non-academic requirements.

However, it was noted that all the nine (9) departments did not issue certificates

of performance.

In their response, management attributed the anomaly to inadequate Human

Resources and high student numbers in the University. According to management,

the process of establishing the Quality Assurance Department to manage all

quality assurance issues was on-going.

I await the outcome of management action in this regard.

Page 614: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

602

b. Maintenance of students attendance register

The university policy requires that each department/Faculty maintains a student

attendance register to confirm attendance as a fulfillment of the minimum

requirement of the university before examinations are sat at the end of each

semester. However out of nine (9) departments, only four (4) departments (44%)

maintained student‘s registers. I explained to management that students may not

be fulfilling requirements for sitting for examinations.

In their response, management acknowledged that some Faculties and Academic

departments had not maintained the registers.

I advised management to always maintain students registers as a control

measure.

c. Accreditation of courses

According to the University and Other Tertiary Institutions Act 2001, all the

programmes taught at the university should be accredited by the National Council

for Higher Education. However out of 91 programmes offered only 21 (23%) are

accredited while the rest are still in the process of accreditation. I explained to

management that there is a risk of students offering programmes that are not

recognized in the job market.

In their response, management indicated that efforts had been made to submit all

the University academic programs to the National Council for Higher Education

(NCHE) and a temporary accreditation had been granted.

I advised management to enforce its stated policies to enhance the quality of its

academic programmes and accreditation of the programmes be followed up

urgently.

Page 615: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

603

64.0 BUSITEMA UNIVERSITY

64.1 Misrepresentation of Gratuity Arrears

A Council resolution referenced as minute 9/UC/20/2012 changed the University

staff engagement terms from contractual to permanent basis resulting into total

payable gratuity of UGX.3,718,173,901 out of which only UGX.496,876,521 was

settled during the year leaving a balance of UGX.3,221,297,380.

This liability was however not reported in the Statement of Financial Position but

was rather disclosed by way of a memorandum statement. The financial position

is understated in this regard.

Although management indicated that they had a payment plan for the outstanding

arrears, the liability position in the financial statements remains understated.

I advised management to have the liability recognized properly in the financial

statements.

64.2 Non-alignment of the Budget with the Strategic Plan

The University strategic plan for the period 2008/09-2013/14 indicated a funding

requirement of UGX.43,199,883,000 for the financial year 2012/2013 while the

approved budget provided for only UGX.15,756,779,000 resulting into a funding

gap of UGX.27,443,104,000. It was also noted that the budgeted activities were

not properly aligned to the plan. The non alignment combined with the gross

underfunding implies that the strategic objectives may not be achieved. It was

also noted that the strategic plan did not identify the potential sources of funding

to enable funds mobilization.

Management stated that the budget was aligned to the strategic plan but the

variances in amounts of funds were due to limitation of funding.

I have advised management to ensure annual plans are properly aligned to the

strategic plan and to enhance mobilization of the necessary funds.

Page 616: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

604

64.3 Non implementation of planned activities

A comparison of the University‘s budget and Ministerial Policy Statement for the

year with outputs achieved revealed that the following planned activities and

acquisitions were not attained yet these activities impact directly on the quality of

Education achieved;

Farm structure construction;

Modern Library construction;

Machinery for the workshop; and

Assorted furniture (Chairs and tables).

Management attributed the shortfalls in the performance to inadequate funding.

I advised the Accounting Officer to enhance liaison with the MoFPED to attain

necessary funding and to prioritize key activities.

64.4 Advances not accounted for

TAI 215 (a and b) of the Treasury Accounting Instructions require all advances to

be accounted for without delay and immediately after the expense has been

incurred. On the contrary, UGX.9,744,000 that was advanced to one University

staff to facilitate a committee meeting was not accounted for. Delayed

accountability may result into falsification of accountability documents.

I advised management to ensure that advances are always fully accounted for in a

timely manner.

64.5 Management of ICT and Information Systems

A review of the University Strategic plan revealed that the University had planned

to develop an ICT policy by June 2010 in order to provide a framework for ICT

operations. However, the following matters were noted:

Page 617: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

605

Lack of ICT Policy and IT Steering Committee

There was no ICT Policy in place at the time of audit and the University lacked an

ICT Steering Committee to guide the related investments. This could result into

inefficient and uncoordinated ICT operations.

The Accounting Officer explained that efforts were being made to form the

Steering Committee and that there was a draft ICT Policy pending approval by the

Planning Investment Committee.

ICT Infrastructure and their security

Various planned infrastructural activities had not been implemented. For

instance LANs, WAN and intranet as well as connection to the National

Infrastructure Backbone had not been done. Management in response

attributed the inadequacy to limited funds.

Contrary to Regulation 74 of the PFAR regarding control of access to data

and computer systems, a number of security lapses were noted for example;

unrestricted access to the computer server room and existence of some un

engraved ICT equipment. As a consequence, there were some losses of ICT

equipment (Computers). Also noted was absence of fire control equipment

in the computer/server room thereby exposing the entity to risk loss.

Management explained that access to the server room was restricted to only two

staff with the keys. Biometric Access control was being planned for in the year

2014/15.

Staffing and Administration

Whereas the ICT staffing establishment provides for twenty two (22) staff, the

Unit had only 4 staff and was not represented at key University decision making

organs thereby limiting its effectiveness. Management explained that the wage

ceiling could not allow for more recruitment and as such any increment received

would cater for the teaching staff.

Page 618: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

606

Lack of integration of software

The University installed 2 Information Systems namely; Pastel Systems for

financial management and Academic Information System for academics. However

the two systems lack integration. They are also not linked to other units such as

Library service management, student management and inventory management. In

the circumstances the University is unable to take advantage of related databases

which would aid efficient and prompt decision making.

Management explained that CEMAS would soon be implemented in public

Universities and this would address the issue of system integration.

I have advised management to ensure that;

The ICT Policy is approved and ICT Steering Committee established,

All the University units are connected to the ICT platform through LANS, WANS

and intranet to enhance communication at the University,

ICT staffing levels are improved especially at senior level,

Proper physical controls are initiated to the ICT infrastructure,

IT software is properly integrated to reduce on the cost of maintaining

different systems,

Proper communication channels are established through LANS and WANS.

64.6 Contracts Committee decision making

Regulations 51(2) to (4) of the PPDA Regulation, 2003 require the Contracts

Committee to either approve or reject (with reasons in writing) the

recommendations of an evaluation committee and to refer back the matter to the

Procurement Unit. However, it was noted that the Contracts Committee made

decisions without referring the matters back to the Procurement Unit in two cases

namely; contract for construction of the lecture blocks at Nagongera campus by

Peak Planets and supply of computers by CAL Ltd.

Management in their response acknowledged the anomaly and indicated that the

relevant provisions of the procurement law will be followed henceforth.

Page 619: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

607

I advised management to always comply with the regulatory framework governing

procurements in public institutions.

64.7 Procedural flaws in hand-over of projects

Review of activities relating to the completion and takeover of University

construction projects revealed that the procedures followed were contrary to

provisions of the PPDA Act and General Conditions for Contracts as shown below;

Sites taken over without key witnesses such as management representative

and users;

Non issuance of key documents such as; statement of Final Account issued by

contractors and defects liability completion certificate issued by supervisors,

certificate of occupancy issued by district/town health departments; and

Absence of minutes for inspection meetings.

Failure to undertake appropriate procedures in project completion and takeover

may result into taking over of works that are defective.

Management acknowledged the anomaly and indicated that procedures had since

been put in place to ensure that sites are handed over in the presence of a

member of management as a witness and certificates of final completion are

handed over to contractors.

I advised the Accounting Officer to ensure that proper procedures are always

followed when contracted works are being handed over to management.

64.8 Formulation of University Procurement Plan

Section 58 of the PPDA Act 2003, and Regulation 60 of the PPDA Regulations

2003, require that all user departments shall prepare and submit to PDU their

procurement work plans, to form basis for formulation of the master procurement

plan of the entity based on the approved budget.

It was noted that there was limited integration into the master procurement plan

and alignment to the budget with regard to the procurement of stationery, ICT,

medical supplies, insurance, maintenance civil, telecommunications, machinery

Page 620: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

608

and books/periodicals. There is a risk of unbudgeted procurements and missing

out on the benefits of bulk procurements.

I advised management to always ensure that the Master Procurement Plan is

comprehensive and aligned with the University budget.

64.9 Non-competitive Procurements

Section 94 (a) of the PPDA Act 2003, requires approval of the choice of a

procurement or disposal method by the Contracts Committee. On the contrary

goods, building and clearing materials worth UGX.19,398,006 were procured

through Direct Procurement method without approval of the method by the

Contracts Committee. Use of non competitive procurement methods without

requisite approvals is vulnerable to influence peddling, substandard goods or

services being provided at exorbitant prices.

Although management asserted that the suppler for building materials was

solicited through Request for Quotation (RFQ) and that a framework contract for

cleaning materials was in place, there was no documentary evidence to support

this assertion.

I advised management to ensure that procurement methods are approved before

procurement processes are commenced.

64.10 Significant variances between Estimated and Contract prices

PPDA Regulation 104 (2) requires that in estimating the value of procurements

and confirming the availability of funds, the estimate should be realistic and based

on current information and technical assessment. Comparison of the estimates

with actual contract prices however revealed significant variances which were not

properly explained. The variances are shown in the table below;

Provider/subject Estimate (UGX

million)

Contract value (UGX

million)

Variance in

(UGX Millions)

Percentage variance

Construction of bathroom 26.9 39 12.1 45%

Page 621: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

609

at Namasagali

Supervision of Master plan by TECO

8.5 27.5 19 224%

Renovation of Arapai library by Mukakamu

14 26 12 86%

Supply of training materials by Goodwill

29.6 32.3 2.7 9.1%

Significant variances may be a result of unrealistic technical estimates and/or

overpricing on the part of contractors and could have adverse effect on the budget

performance.

The Accounting Officer acknowledged that the reserve price for the works was

under quoted and attributed the variation to unfavourable changes in prices of

goods and services at the time of project implementation.

I advised management to ensure realistic estimation of costs and proper

procurement of service providers to ensure resources are economically utilized.

64.11 Inspection Report

Inspection of the infrastructure at the Arapai Campus revealed the following state

of affairs:

Dilapidated infrastructure including roads, lecture rooms and residential

houses;

Inadequate lecture rooms, dormitories, furniture and fittings;

Some houses are still roofed with asbestos sheets which is a health hazard to

occupants;

Lack of a proper green house; and

Insufficient number of animals kept for student practical lessons, non-

operational dairy farm.

The current poor state of infrastructure if not improved is likely to impact

negatively on the image and general performance of the University.

Management explained that an assessment of renovations needs had been done

and the results partially included in the BFP for the FY 2014/15. Management

Page 622: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

610

further explained that they were in advanced stages of preparing a business plan

to improve the facilities at the campus.

I advised management to follow up the matter and address the infrastructure

needs of the University.

65.0 GULU UNIVERSITY

65.1 Doubtful Payment for Extra Load Allowance - UGX.728,758,584

During the year under review, the University spent a total of UGX.728,758,584

purportedly for the extra lecture time/work done. This majorly applied to weekend

assignments and evening lessons. However, the basis of computation of these

payments, including information relating to the total number of hours lectured

above the standard hours by each lecturer, rates and evidence of occurrence were

not availed to support the payments. Further noted was that there is no evidence

of close monitoring/supervision of teaching staff, who may opt to appear outside

working hours for purposes of earning this type of allowance irregularly. Under the

circumstances, the authenticity of the payments made cannot be established.

In response, management agreed that the policy guiding teaching extra load lacks

control and shall strengthen the monitoring and control measures to address this

shortfall.

I advised management to expedite this action so as to curtail any possible misuse

of this facility. Besides, given that the cost involved in paying for the extra load is

sufficient to have other staff recruited locally and be paid, the University could also

consider revisiting the staffing numbers to ensure that adequate staff are

engaged.

65.2 Understaffing at the University

The University‘s current staff strength is only 414 personnel out of the approved

900 staffing positions. Among the units that are seriously affected is the Human

Resource (HR) department; according to the approved structure, the HR

department is supposed to be headed by a director, assisted by a deputy director

Page 623: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

611

and senior human resource officer plus the Human resource officers and

assistants. However, the department that is charged with managing over 400

employees is being headed by a personnel officer and assisted by an assistant

personnel officer. This grossly affects their effectiveness.

Other key vacant positions include; Quality Assurance Officer, Deputy University

Secretary, Senior Assistant Secretary, Estates Manager, Senior Medical Officer,

Chief Internal Auditor, Principal Internal Auditor, Senior Procurement Officer,

Principal Personal Secretaries (2) and Senior Security Officer among others.

I explained to the Accounting Officer that such insufficient staffing levels ultimately

imply that the existing staff are overworked, which in turn reduces their motivation

and hence their productivity. This ultimately reduces the level of service delivery

by the University.

In their response, the Accounting Officer explained that the University has made

several submissions for recruitment to the Ministries of Finance and that of Public

Service over the last three years but all have not been honoured. I have advised

management to follow up the requests made to ensure that all key positions are

filled to avoid operational inefficiencies.

65.3 Absence of Titles to University Land

During the audit, it was noted that the University owns various parcels of land

with no land titles as shown in the table below:-

Table 1: List of land parcels owned by the University

Land name Location Size (acre

)

Status Remarks

National Forestry

Authority land

Gulu

Municipality

69.2 Faculty of medicine

buildings

To be swapped with

Latoro land

Gulu University Main Campus

Gulu Municipality

22.2 Office, lecture blocks, laboratories & library

Offered by Gulu District

Latoro land Nwoya

District

606 Vacant, portion

earmarked for swapping with NFA

To be swapped with

National forestry Authority land

Gulu Constituent

College, Lira

Lira district 621 Offices, lecture

blocks & library

Offered by Lira

District

Page 624: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

612

I explained to management that under such circumstances, the University land is

exposed to a risk of encroachment.

In response, management explained that the process of acquiring titles for all

University land had been initiated.

I advised the Accounting Officer to expedite such action so as to fully secure the

University‘s ownership status of the land in question.

65.4 Revenue from Income Generating Units

The University has a number of Income Generating Units (IGUs) comprising of the

Public Café, the Guest House and the University Printery. An inquiry into the

management of the IGUs in question revealed that, there are no operational

guidelines put in place by management for monitoring their activities. Further

noted was that there was no provision in the budget for the income and

expenditures from these units during the year. Under the circumstances, there is a

risk of misuse of such revenue.

In his response, the Accounting Officer explained that the university has started

the process of developing policy guidelines relating to the operations of all the

income generating units and that a team of senior staff had been setup to monitor

the operations of the IGUs, as an interim measure.

I advised management to expedite the process of setting up the operational

guidelines so as to strengthen revenue monitoring and accountability by all IGUs.

65.5 Revenue Shortfall - UGX.1,089.166,998

It was noted that during the year under review, out of a total budget of

UGX.25,915,853,186 the University managed to collect a total of

UGX.24,826,686,188 (about 96% of the budget) thereby making a revenue

shortfall of UGX.1,089,166,998. Failure to collect all the budgeted revenues

negatively affects the university‘s capacity to implement all the planned activities.

In his response, the Accounting Officer committed to strengthen the University‘s

revenue collection efforts so as to fully collect all the budgeted revenue in future.

Page 625: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

613

I await the outcome of this management commitment.

65.6 IT Policy, Usage and Development

A review of the Information Technology (IT) operations revealed limited usage of

Information Technology in the business processes of the University. The IT

operations are largely under resourced; the systems analyst and other IT staff are

operating without a defined budget for the unit. The only server belongs to the

Library department and the IT officer in charge of the Server is answerable to the

Librarian and not the head of the IT Unit. The server room is at the same time

used as a workshop to repair broken down computers. There is no service plan for

the server except repairs when it has broken down. In addition, there is no fire

extinguisher in the server room, no restricted access to the room and no record

taken of personnel who access this room. These are weaknesses that expose the

University to a risk of unauthorized access and loss of stored data. In addition, the

University risks losing the benefits of ICT application in its operations like revenue

recording and monitoring, as well as admissions and examinations management.

In response management stated that a new directorate for ICT has been approved

by Council and that the University was in the process of recruiting the required

personnel to start off its operations.

I advised management to ensure that the new directorate is fully supported so as

to quickly embrace its potential in effectively handling the University‘s business

processes and therefore the achievement of its strategic objectives.

65.7 Grounded Vehicles and other spares

Regulation 295(1) of PPDA requires an Accounting Officer to carry out review of

assets on annual basis for the purpose of identifying those which are obsolete and

those which should be subjected to disposal. A physical inspection of the

University vehicles and spares revealed a number of grounded vehicles and plants

that have not been boarded off for a long time. Many old motor vehicle tyres and

spare parts are also available for disposal.

Page 626: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

614

I explained to the Accounting Officer that under the circumstances, the is a risk of

further deterioration in value as a result of the continued failure to have the items

disposed.

In his response, the Accounting Officer explained that the processes of boarding

off these assets had been kick started.

I advised management to speed up the disposal processes to avoid further loss in

value and also free the available storage space.

65.8 Internal Audit Effectiveness

A review of the Internal Audit operations revealed that the unit is understaffed. By

the time of audit, it was being headed by a Senior Internal Auditor, in absence of a

substantive Chief Internal Auditor and Principal Internal Auditor. This significantly

affects its capacity to deliver its mandate, given the size and nature of operations

of the University. As a result of the above, it was noted that the quarterly Internal

Audit reports to Council for the entire financial year were not produced on time

and hence limiting its usefulness.

Absence of an effective internal audit unit exposes the University to a risk of

financial losses and various operational irregularities across the various

departments within the University, since there is no internal mechanism for timely

evaluation of the effectiveness of the other internal controls.

In response, the Accounting Officer explained that the University was to take all

the necessary efforts aimed at strengthening the Internal Audit department in the

near future.

I advised that the department‘s key positions be urgently filled and that adequate

staff numbers are engaged in order to enhance its capacity to fully deliver its

mandate.

Page 627: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

615

65.9 Anomalies in the Procurement Processes

a. Lack of an Approved Procurement Plan

Contrary to section 96(1) of the PPDA regulations, 2003 that provides for the user

department to prepare a multi-annual rolling work plan for procurement based on

the approved budget, a review of the procurement records revealed that the

University again failed to prepare a consolidated work plan for Council approval,

despite my previous audit recommendation. The continued failure by the

University to adhere to the procurement law is not only irregular but also denies

the University of an opportunity to properly plan for all its procurements and also

benefit from consolidated bulk procurements as opposed to disintegrated

purchases by individual departments.

In his response, the Accounting Officer attributed this matter to delays by user

departments in submission of their departmental plans and indicated that efforts

have been made to compile the consolidated procurement plan for the 2013/2014

financial year.

I advised the Accounting Officer to ensure that the University always compiles a

consolidated Procurement Plan in accordance with the procurement law.

b. Poor Estimation of Procurements on PP Form 20

Contrary to regulation 227 of the PPDA that requires the Accounting Officer to

commit the total cost of the contract prior to its placement, there was poor

estimation of the total costs on PP Form 20 for the following procurements:-

Contract Purpose Amount on PP Form 20 (UGX)

Amount on award (UGX)

(Gu/works/1112/00031/10/01

Construction of School of Midwifery block in Lira

695,000,000 1,114,136,353

Gu/works/1213/00031/07/01)

Tiling and Painting the Main Library

52,000,000 89,616,870

It was noted that the values recommended for award were above the estimated

values on PP Form 20, yet there is no other commitment that was approved by the

Page 628: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

616

Accounting Officer before the eventual award. This has contributed to increase in

payables as there is always an inadequate budget to pay off the suppliers.

In response management regretted the anomaly and indicated that this was to be

addressed in any future procurement.

I advised management to always ensure that no contract awards are made before

confirmation of additional funding in circumstances where the quotations are

higher than the budgeted amounts.

c. Split Procurements - UGX.64,989,000

Contrary to section 108 of the PPDA regulations that provides for micro-

procurements to be undertaken where the estimated value of the procurements is

below UGX.2,000,000, it was noted that management of Gulu University

Constituent College - Lira, broke down procurements amounting to

UGX.64,989,000 to disguise them as micro-procurements apparently to avoid

going through the laid down procurement procedures. This was done through

drawing cash and sourcing the items from wherever management deemed fit. This

was attributed to lack of a procurement plan as well as failure to undertake proper

supervision of the line departments by the Main campus.

I explained to management that such a practice exposes the University to a risk of

unfair prices, since there is no transparency in the procurement processes

undertaken.

In response the Accounting Officer regretted the above anomaly and committed to

have the constituent college adhere to the procurement law while undertaking any

future procurements.

I advised that management needs to ensure that a consolidated procurement plan

is always compiled and that the constituent college is instructed to adhere to the

procurement law while undertaking all procurements, which should regularly be

subjected to supervision and monitoring, by the main campus.

Page 629: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

617

d. Procurement from Non Prequalified Service Provider

The University paid a total of UGX.31,406,800 to M/S National Insurance

Corporation (NIC) for comprehensive Insurance of the University Vehicles.

However, this company was not on the list of the prequalified service providers.

There was no evidence that the service providers who were prequalified during the

year under review had been requested to also submit quotations for the services

in question.

I explained to management that such a practice is not only irregular but also

unfair to the firms that showed interest in doing business with the University but

are not given an opportunity to compete.

In his response, the Accounting Officer explained that from the inception of the

University, NIC was used as a service provider and this continued up to the year

under review; however, going forward the error made was to be rectified whereby

management will make use of the prequalified firms to provide the services in

question.

I advised that management should always adhere to the provisions under the

procurement law and only engage firms that are on its prequalified list.

WATER AND ENVIRONMENT SECTOR

66.0 MINISTRY OF WATER AND ENVIROMENT

66.1 Mischarge of Expenditure

A total of UGX.9,438,526,861 was charged wrongly on expenditure codes other

than those under which it was appropriated. The practice portrays a breakdown of

controls in the budget implementation process and implies that the financial

statements are misrepresented to the extent of the mischarge.

Page 630: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

618

The Accounting Officer attributed the anomaly to budget cuts in certain areas

termed as ‗consumptive items‘ which results into charging expenditure on items

which have funds.

I advised management to streamline the budgeting process and to subsequently

ensure that payments are correctly charged on the item codes to enable proper

implementation of the Ministry‘s programmes.

66.2 Funds not accounted for

a) Expenditure on workshops and field work

Out of a sum of UGX.650,853,714 incurred on workshops and field travels

UGX.398,694,714 was accounted for leaving UGX.252,159,000 outstanding.

Among the missing accountability documents were attendance lists, field reports

and vehicle movement log books. Delayed accountability may result into

falsification of documents.

I advised management to submit the relevant documents for verification.

Otherwise the funds are recoverable from the concerned officers.

b) Unsupported Utility bills

Section 120 of the Treasury Accounting Instructions (TAI), 2003 requires payment

vouchers to be properly supported with appropriate documents before being

passed for payment. On the contrary UGX.194,469,517 paid to various companies

for utility services lacked acknowledgement receipts and reconciliation statements

rendering their authenticity doubtful. Whereas management indicated that the

documents were available they were not submitted for verification. The table

below refers;

Table indicating unsupported Utility bills

S/No Entity Amount (UGX.)

1. Uganda Telecom Ltd 94,747,981

2. Umeme Ltd 74,567,507

3. National Water and Sewerage Corp. 25,154,029

Total 194,469,517

Page 631: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

619

I advised management to obtain acknowledgement receipts and prepare

reconciliation statements for future use.

c) Irregularities in payment of Consultancy Fees

UGX.59,393,823 paid to various consultants for carrying out feasibility studies,

policy formulation, project design and supervision were not supported with

invoices and completion certificates. In some cases withholding taxes were not

charged on the payments contrary to the Income Tax Act. In the circumstances,

the authenticity of the payments is doubtful.

Management indicated that the specific cases would be investigated and corrective

action taken. I await evidence of action taken.

66.3 Nugatory expenditure

a) Delayed payments to contractors

The Ministry paid interest charges of UGX.203,158,615 to three local contractors

as a result of delayed settlement of approved work certificates. Management

attributed delayed payments to cash flow constraints and extensive verification

processes for the claims. Management further indicated that the Ministry had since

addressed internal bottlenecks to expedite the payment process of certificates

without compromising the internal controls.

I advised the Accounting Officer to ensure that in future, realistic payment terms

are included in the contract agreements and verification processes are

streamlined.

b) Under performance of Letters of Credit

The Ministry disclosed in the statement of financial position receivables of

UGX.7,464,502,592 relating to three Letters of Credit that had not performed at

the end of the financial year. The underperformance of Letters of Credit resulted

into payment of UGX.52,240,811 as bank charges and commissions by the

ministry.

Page 632: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

620

Management attributed the costs to various extensions and amendments of the

Letters of Credit. The interest charges and commissions are considered nugatory

expenditure as they could have been avoided had the provisions of the contracts

been complied with.

I advised management to ensure that procurements using Letters of Credit are

properly planned and executed in future.

66.4 Procurement of Goods and Services

a) Procurements not reflected in the Procurement Plan

PPDA Regulations, 2003 particularly Regulation 96 require a user department to

prepare a procurement plan for ease of organizing, forecasting and scheduling of

procurement activities for the financial year. It was however, noted that goods and

services worth UGX.579,975,000 were procured without being provided for in the

approved procurement plan. Whereas, management indicated that all

procurements had been planned for, examination of the approved plan revealed

that procurements in the schedule below were missing.

Schedule indicating unplanned procurements

S.no Subject of procurement Reference no. Amount

(UGX.)

1. Supply of one Rigid

Inflatable

MWE/SPLS/11-

12/01419/1

245,600,000

2. Construction supervision of

Ntwetwe Town water

supply

MWE/SRVCS/13/01434 334,375,000

Total 579,975,000

b) Micro procurements

During the year under review, UGX.161,601,702 was advanced to various staff of

the Ministry through their individual bank accounts to carry out micro

procurements, however, some procurements were split to ensure that the

purchases did not exceed the threshold of UGX.2,000,000. Most of the

Page 633: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

621

procurements were for stationery which was neither delivered to stores nor

verified by internal Audit.

The practice however denied the Ministry the economies of scale associated with

bulk purchases. Management indicated that it would stop the practice effective

2013/2014 financial year.

I advised the Accounting Officer to always comply with regulations.

c) Dormant Accounts

The MWE maintained fourteen dormant accounts comprising eight (8) local

currency accounts and six (6) foreign currency accounts, with a total bank balance

of UGX.214,648,582 and USD.144,266.86 respectively as at 30th June 2013.

Dormant accounts are prone to abuse and ought to be closed.

Management indicated that it had written to the Accountant General to have the

dormant accounts closed.

I advised management to follow up the matter with the Accountant General and

ensure that all the dormant accounts are closed.

d) Failure to transfer FIEFOC project counterpart funds

Audit noted that the MWE received GoU counterpart funding of

UGX.17,161,052,576 for FIEFOC project but transferred only UGX.15,738,742,900,

and thus retaining UGX.1,422,309,696. This undermines the intentions of the

appropriating authority and may delay the implementation of planned activities

and ultimately the attainment of the project objectives.

Management stated that the funds were used to meet the Ministry‘s cross-cutting

expenses while some of the funds were utilized on the project activities.

I advised management that since the project has separate accounts, it is

important that all the counterpart funds are transferred to the project and spent as

appropriated.

Page 634: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

622

e) Domestic Arrears

The MWE reported domestic arrears of UGX. 8,104,031,863 at year end. These

had accumulated over the years and may attract additional costs in form of

litigation and associated interest charges. Management attributed the

accumulation to failure by the Ministry of Finance, Planning and economic

Development (MoFPED) to release necessary funds for their settlement.

I advised management to continue liaising with MoFPED to ensure that resources

are set aside to settle these outstanding commitments.

f) Gross Tax budgeting and payment

Out of the Gross Tax allocation of UGX.12,200,623,324, the MWE utilized only

UGX.2,093,000,000 (17%) indicating low level of procurement of goods and

services. The practice may also imply unrealistic budgeting for Gross Tax.

Management indicated that the low absorption of the Gross tax provision was due

to lengthy procurement procedures.

I advised management to ensure realistic budgeting for Gross Tax and proper

procurement planning that would ensure efficient attainment of project objectives.

g) Irregular payment of VAT

Review of Value Added Tax (VAT) payments revealed that the Ministry paid VAT of

UGX.26,492,919 to various contractors who were VAT exempt. Management

indicated that it was in the process of recovering the money from the contractors.

I await evidence of recovery.

I advised management to always prepare and adhere to the approved

procurement plan and in the event of need for amendment, prescribed procedures

should be followed.

h) Under Staffing

Out of the 418 approved staffing positions in the Ministry, only 203 had been filled

leaving 215 vacancies. The unfilled posts included senior positions such Assistant

Page 635: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

623

Commissioners, Principal Water officers, Principal Hydrologists, Principal Water

Analysts amongst others. It was further noted that some posts were filled over

and above the approved numbers, such as Senior Wetland Officer, Senior

Sociologist, Senior Engineer and senior assistant engineering officer. In addition it

was observed that the MWE maintained 189 staff on contract basis in various

projects using support from development partners, and this may not be a

sustainable approach.

I advised the Accounting Officer to liaise with the relevant stakeholders for the

review of the organization structure and fill the vacant posts appropriately.

66.5 FARM INCOME ENHANCEMENT & FOREST CONSERVATION PROJECT

a) Outstanding Project Liabilities

A review of the contract ledgers, certificates and financial statements revealed

that the project had a liability of UGX.1,270,000,000 owed to a local construction

firm. It was however noted that the project officially closed on 31st December

2012, on the side of the Development Partners, leaving the liability to be settled

using the GoU counterpart funding through the Ministry of Water and Environment

(MWE). The settlement of this liability is bound to affect the funding of MWE‘s

activities and may also result into extra costs in form of interest due to delayed

payments.

Project management explained that outstanding obligations were to be settled

with GoU funding.

I advised them to provide a roadmap on how the outstanding obligations will

eventually be settled to avoid incurring of huge amounts of interest and possible

litigation.

b) Under absorption of funds

Out of the funds received by the project amounting to UGX.59,513,636,421 only

UGX.58,514,778,849 was spent leaving a balance of UGX.998,857,512 which was

still lying idle on the various bank accounts at year end. This implies that planned

Page 636: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

624

activities were not implemented according to the work plans. The funds on the

account had also not been returned to the financiers.

Under-utilization of the funds was attributed to splitting of districts during the

project implementation period, which resulted into inadequate staff in the newly

created districts to implement the project activities. Management further explained

that unutilized balances were to be returned to the development partners after

undertaking final reconciliation.

I advised the Accounting Officer to always plan properly and utilize all the

disbursed funds on the project activities and to have the unspent funds returned

to the Development Partners.

c) Funds not accounted for

It was noted that a total of UGX. 62,048,000 spent on fuel on the various project

activities remained unaccounted for at the time of audit. The payment vouchers

availed for review lacked evidence of official fuel usage in form of vehicle

movement log books, fuel receipts and associated work plans to which their usage

could be linked.

Furthermore, contrary to Chapter 1V Section 217 of the Treasury Accounting

Instructions 2003, which requires public officers to account for funds advanced to

them within a period of 60 days, audit noted that UGX.4,000,000 advanced to staff

had not been accounted for. Accordingly, I could not ascertain whether the funds

were used for the intended purpose.

I advised management to ensure that advances to staff are always accounted for

in a timely manner.

d) Project Accounts at Districts

The project opened special accounts with 71 Districts for purposes of remitting

money to fund the project activities at the respective Districts. In January 2013,

the Permanent Secretary (PS) requested the Accounting Officer of the Districts to

close the bank accounts, submit bank statements, documents regarding closure,

any outstanding accountabilities for advances, project asset registers and District

Page 637: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

625

physical project outputs. It was however, noted that only 6 districts had complied

implying that the MWE is constrained in the preparation of the final project

reports.

Management explained that they had written reminders to submit asset registers

and to close special bank accounts.

I advised management to follow up with the Accounting Officers of the districts to

ensure that the closure procedures are expedited and report thereof finalised.

66.6 JOINT PARTNERSHIP FUND

a) Low absorption of project funds

The JPF had total of Euros 19,191,793 to spend on donor account during the year

under review but only Euros 10,573,129 was transferred to operations accounts

leaving a balance of Euros 8,618,664 (45%) on the account. As a result, some of

the key project component activities were either partly or not implemented. The

failure to absorb all the available funds does not only affect service delivery but

may also impact negatively on future donor funding. Table below refers.

Title Target Actual (%) Variance

Code Output and activities

Performance indicators (a) (b) (b/a*100)

8122 Mobilization, design and documentation of the RGCs/STs water supplies (including supervision)

No. of STs/RGCs whose Designs have been approved

19 5 26.3

813 Applications for construction received

No. of STs/RGCs that have submitted applications for construction

10 1 10

8142 Procurement of contractors

No. of STs/RGCs whose contractors have been procured

11 5 45.5

8143 Construction of water facilities by the contractors

No. of STs/RGCs under construction to completion

9 8 88.9

8144 Construction of Public Ecosan facilities by the contractors

No. of Public Ecosan facilities under construction

3 2 66.7

08151 Developing the Operational & Maintenance

No. of STs/RGCs whose Operational Manual has been developed

2 1 50.

Page 638: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

626

manual

510 Fully functional water supply schemes in 75 RGCs/STs

No. of RGCs/STs with functional water supply schemes

3 0 0

512 Designs completed No. of RGCs/STs with completed designs

5 0 0

513 Applications for construction received

No. of RGCs that have submitted in their applications for construction

6 1 16.67

514 Construction Completed

No. of completed schemes 5 1 20.00

515 Fully functional schemes

No. of schemes in operation 3 1 33.33

520 Sanitation coverage in 75 RGCs/STs

No. of Eco-san units constructed

32 0 0

05213 Construction of household Ecosan toilets

No. of Eco-san units constructed at household level

32 0 0

05215 Training communities on sanitation

No. of community trainings 32 4 12.50

Management explained that most of the funds were received late and could not be

absorbed within the financial year because of the lengthy procurement procedures

involved.

I advised management to improve on the funds absorption in the subsequent

periods so as to be able to attain the intended objectives.

b) Supply of Laboratory Equipment

PPDA Reg.237 Para 1(b), requires a procuring entity to use frame work contracts

to reduce procurement costs and lead times for items that are used repeatedly.

Audit however noted that a call off order for Benefit Worldwide Ltd to supply

laboratory equipment worth Euros 66,880.92 (UGX.226,290,138) was made on

16th April 2011 but deliveries were made on 27th August and 19thOctober 2012.

The delay of 16 to 18 months contradicts the purpose for which a frame work

contract was signed with the supplier. Delayed deliveries greatly affect service

delivery.

Management indicated that the delivery period of 16-18 months is a record

improvement from the previous 36-48 months because the supplier had to obtain

Page 639: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

627

equipment from companies and manufacturers in Europe and United States of

America. Management further indicated that some of the chemicals and equipment

had restricted transport regulations which further lengthened the delivery period.

I advised management to always specify the delivery periods and the penalties for

late deliveries in the call off orders sent out to the suppliers.

66.7 Inadequately supported payments for consultancy fees

a) Provision of strategic environmental and social assessment

COWI Uganda Ltd was contracted to carry out consultancy on strategic

environment and social assessment at a contract sum of Euros 869,888 for a

period of 2 years and later the contract was extended for another 4 months at a

cost of Euros 127,359.

During the year under review the contractor was paid UGX.414,897,459

(equivalent to Euros 122,045.06) but audit noted the following irregularities in the

payments made;

Clause 24.1 of the General Conditions of the contract required the consultant

to provide details of working and travelling hours used in the computation of

the number of days worked and for the reimbursable funds to be supported by

invoices from the third party. It was however, noted that the consultant was

paid without availing management with any of the above required information.

Contract ledgers and invoice registers were not maintained by the fund

accountant and this made it difficult to maintain audit trail of the payments.

For example certificate No. 12, which was paid on 25/02/2013, was used to

clear invoices No. 5273671 and No. 5284035 that were submitted on 24th May

2011 and 11th Oct 2011 respectively. Without a contract ledger and an invoice

register, there is a risk of recycling invoices.

COWI submitted a demand notice from Prof. B.E. Marshall for editing a report

and was paid USD.13,750 (Vat Inclusive) for 20 days at a rate of USD.575 but

the time sheets were not attached to show time worked and the activities done

contrary to clause 24.1 of the general conditions of the contract. In the

Page 640: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

628

absence of the above, I could not ascertain if the consultant was paid what

was rightfully due.

b) Assessment of water use and demand in the Lake Albert Basin

M/s WSS Services was paid UGX.199,146,240 for consultancy services on water

use and demand in the Lake Albert basin however; audit noted that contrary to

clause 24.1 of the general contract agreement, reimbursables of UGX.65,968,000

was paid to the contractor without the supporting evidence of working and

travelling hours. Furthermore audit noted that the contract period was for 8

months but the firm delayed by more than 2 months.

Although management in its response indicated that the details of working and

travelling hours used to compute the number of days worked and invoices for

reimbursable funds were available however, during the audit verification

management failed to provide.

I advised management to investigate these payments with an aim of recovering

inadequately supported amounts.

c) Travel Abroad

Management paid USD.7,320 to a member of staff to cater for air ticket, per diem

and seminar fees on 9th May 2013 vide voucher number 12-0892 for attending

executive secretary seminar in Nairobi conducted from 13th to 24th May 2013. Audit

however noted that although all the facilitation and necessary approval for travel

were obtained in time, the officer travelled 3 days late (16th May 2013), implying

that the per diem of USD.1,080 paid for those days should have been refunded.

Management indicated that the officer regretted the anomaly and was willing to

refund the money.

I advised management to expedite the recovery process of the funds from the

concerned officer.

Page 641: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

629

d) Supply of Motor Vehicles Lot 1- Toyota Uganda

Toyota (U) Ltd was contracted to supply four double cabin pickups to the Urban

Water Department at a cost of USD.159,476 however, audit noted that contrary to

PPDA regulation 249 (2), which requires an advance payment to be secured with

an appropriate security, M/s. TOYOTA U Ltd was paid USD.31,895.2 as a deposit

payment without any security. There was a risk of losing the advance payment to

the contractor in case of failure to perform.

In response management indicated that in future the Ministry will adhere to the

procurement regulations.

I advised management to refrain from advancing funds to suppliers of goods and

service without obtaining appropriate security.

e) Supply and Installations of Water Pumps in Small Towns

Sumadhura Technologies Ltd was contracted to supply and install water pumps in

small towns at contract sum of USD.224,000. Audit however noted that the call-off

order No.1 of USD.82,500 was made on 15th July 2011 and No.3 of USD. 67,907

on 11th Nov 2011, however the deliveries for both were made in April 2012,

implying a delay to supply. Further review revealed that:

The contract price was for supply and installation of pumps however, on 5th

Mar 2012, the Ministry wrote to the supplier amending the contract to include

an additional cost of USD.35,000 for the installation of the pumps under call-

off order No.3. Audit noted that the additional cost was not approved by the

contracts committee.

Delivery notes, job installation reports and engineer‘s certificate of completion

were not attached to the examined payment vouchers.

It is possible that the contract was executed without following the agreed upon

terms leading to the loss of government funds.

Page 642: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

630

I advised management to investigate the circumstances through which the

contract was amended, to include installation cost; an item which was provided for

in the initial contract.

66.8 Water and sanitation development facility-north

Inspection of Construction Works

a. Water supply Systems at Omugo Sub-County

Construction works for Omugo Water Supply Systems were contracted out to M/s

Sumadhura Technologies Ltd at a cost of UGX.2.2 billion. Construction works

started on 15th Jan 2013 and were expected to be completed by 15th Jan 2014.

However by the time of inspection (6th Dec 2013), which was one month to the

expiry of the contract period, there were still a lot of unfinished works as indicated

below;

A second tank at Drimveni had not been completed.

The construction works for water Office Block were at the finishing level, while

the 2 stance flush toilet and 2 bathrooms were still under construction.

At the water source of Aliodra Village - Angazi parish, clearing of debris,

replacement of the fence, construction of Guard House and Ecosan Toilet had

not been completed.

b. Inspection of Paidha Water Supply System in Zombo district

Construction works for Paidha Water Supply System started on 15th Jan 2013 and

was supposed to be completed by 15th Jan 2014. Audit inspection of this project

noted the following;

Painting, wiring, and fitting of doors for the office block had not been done.

The water tank had not been installed.

Construction works for the water source near Ayoda River had stalled.

Construction works for the Ecosan Toilet at Paidha Primary School had not

been completed.

The delayed completion of construction works, which was caused by late

disbursement of funds, does not only affect service delivery but may also result in

litigations.

Page 643: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

631

I advised management to hasten the implementation of the water supply system

for the good of the populace.

66.9 JOINT WATER SANITATION SECTOR PROGRAMME SUPPORT (JWSSPS)-

AfDB FUNDED COMPONENT

a) Unreconciled Bank Balance

The bank balance on the Joint partnership fund component Account at Bank of

Uganda was reported in the financial statements as Shs.347,785,267 while the

reconciliation statement indicated a negative balance of Shs.187,499,762 implying

a variance of Shs.535,285,029 which was not explained. Unreconciled balances

imply improper bookkeeping and may result into misappropriation of funds.

I advised management to explain the variance and to ensure the reconciliation of

the balances.

b) Low absorption of Funds

Shs.26,652,627,247was disbursed by ADB to the JPF account to fund activities of

the Rural Water Supply and Sanitation (RWSS), Sector Programme Support (SPS),

and Water and the Sanitation Development Facility-Central (WSDF-Central). A

review of the operations of the three projects however revealed that

Shs.1,268,892,945 was transferred to the operations account and

Shs.7,994,780,000 to the WSDF-Central donor account, leaving a balance of

Shs.17,388,954,302. The delays in implementation may constrain the attainment

of programme objectives.

Management in its response attributed the above to the delay by GoU to meet the

conditions for effectiveness of the Program which led to delays in procurements

and in implementing of planned activities.

I advised management to ensure timely and comprehensive planning and

implementation of activities.

Page 644: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

632

66.10 JOINT WATER AND SANITATION SECTOR PROGRAMME SUPPORT

(JWSSPS)- WATER AND SANITATION WATER DEVELOPMENT FACILIY

EAST

a) Delayed remittance of funds

The project received 99% of the budgeted funds for the financial year 2012/13

whose remittance and receipt were inconsistent in the 1st and the 4th quarters

resulting in slow progress of works. At the year end, the outstanding obligations

for certified works amounted Shs.2,608,054,723. These obligations may attract

ligations with related costs and interest.

Similarly, there were outstanding tax obligations due to Uganda Revenue Authority

of shs.282,526,820 in form of PAYE and WHT which are likely to attract fines and

penalties.

Management attributed the delays in settling the obligations to untimely release of

funds by the development partners. For Withholding Tax, management explained

that the amounts were withheld in error because the contractors were exempted

from withholding tax.

I advised management to regularly engage the funding Partners so as to remove

funding bottlenecks that cause delays in remittance of funds.

b) Laxity in the monitoring and evaluation of activities

Monitoring and Evaluation Performance plan for the year requires production of

quarterly Monitoring & Evaluation reports, but only two incomplete monitoring

reports, were prepared in the 1st and 3rd quarters. Without regular Monitoring &

Evaluation reports, independent assessment of activity progress, implementation

weaknesses and limitations may not be promptly identified for action.

I advised management to ensure that M&E activities are undertaken as planned

and complete reports prepared thereafter.

Page 645: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

633

c) Staffing Gaps

The facility‘s key positions of Administrator and Senior Environment and Sanitation

Officer were vacant and no evidence that action was being taken to fill the

vacancies. The delay to recruit key project personnel affects performance of

specific project activities and achievement of project objectives. For example,

activities such as community sensitization on hygiene and sanitation in usage of

public and Ecosan toilets were not implemented as planned.

Management explained that the process of filling the positions was on-going. I

have advised the project to expedite the process of filling the vacant positions so

as to solve the existing operational challenges.

d) Revised employment contracts

A review of the harmonized project salary structure and comparison with the

documentation in the staff files revealed that the individual staff files lacked

revised employment contracts. Absence of revised contracts could be an indication

that staff files were not updated to reflect changes in employment terms.

Management explained that the process of revising the affected employees‘

contracts in accordance with the general communication had been initiated and

thereafter all staff files were to be updated to reflect the new employment status.

I advised management to expedite the process and to ensure that staff files are

regularly updated with changes in employment terms.

e) Inadequate reviews of processed accounting Information

At the time of the audit, the branch expenditure cashbook differed from the

Kampala HQ branch ledger by shs.29,762,798. This was as a result of double

posting of expenditure in the Accounting software system and the omission of

some transactions. It was noted that although corrections were later made, branch

financial data processed at Kampala Head office is not adequately reviewed to

identify such errors and this could lead to incorrect information being used for

Page 646: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

634

decision making. There is also a risk that such errors could be used to perpetuate

some malpractices.

Management explained that due to persistent poor network link between the

Facility and the Ministry server, data capture into the Navision system was done at

the Ministry headquarters, which resulted in differences between the manual

cashbook and the Navision records. However, efforts to improve the connectivity

were ongoing and a solution to the problem had been agreed with the service

provider and its implementation was being awaited.

I advised management to ensure that the branch accounting data processed by

the accountant is timely and adequately reviewed for accuracy to avoid producing

misleading financial information.

66.11 WATER SUPPLY AND SANITATION DEVELOPMENT FACILITY-CENTRAL

a) Invalid Bank Guarantee

The contractor for the Bweyale Town Water Supply and Sanitation System was

paid Shs.845,451,558 as an advance payment against a bank guarantee

No.328020033898. Further scrutiny revealed that the bank guarantee related to

contract number MWE/WRKS/11-12/01453/3 of 30th October 2012 while the actual

contract number was MWE/WRKS/11-12/0145/3 of 7th March 2013. Payment

against an invalid bank guarantee exposes the facility to risk of losing funds in

case of failure by the contractor to honor its obligation. Management in its

response regretted the typographic errors but affirmed that the contractor

performed the obligation.

I advised management to always validate documents from third parties before

committing funds.

b) Unaccounted for Funds

Out of shs.233,404,520 advanced to contractors for materials, Shs.145,000,000

was accounted for leaving a balance of Shs.88,404,520 contrary to ADB

guidelines. Delayed accountability may result into falsification of documents.

Page 647: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

635

I advised management to ensure that all funds are timely accounted for.

c) Failure to Maintain Accounting Records

The WSDF-C facility did not maintain a manual vote control register, general

ledger and subsidiary ledgers as required by Para E.1.7 of the WSDF operations

manual, 2009. The interrogation of the NAVISION accounting system also revealed

that the records were not maintained electronically. In the circumstances it was

difficult to confirm some of the account balances like advances, NSSF, PAYE and

withholding tax deductions and remittances.

I advised management to maintain the primary books of accounts as required by

the operations manual.

66.12 LAKE VICTORIA ENVIRONMENT MANAGEMENT PROJECT II

a) Memoranda of Understanding with Implementing Agencies

A review of the contents of the Memoranda of Understanding (MoUs) signed with

the ministries revealed that the deliverables expected were lacking, contrary to

the LVEMP II Financing agreement, schedule 2. This makes it difficult to assess

the performance of ministries and whether the money is being used for activities

geared towards attaining the agreed upon deliverables.

Management in its response stated that it will review all the MoUs to incorporate

deliverables by implementing agencies.

Management effort in the matter is awaited.

b) Beneficiary Contributions

It was noted that the project beneficiaries were not contributing the required 20%

of the total project cost in cash or in-kind, as stated in Section 1(d) sub-section

3(a) (i) of the LVEMP II Financing Agreement. This may result in scaling down the

implementation of the project activities. Management stated that it will seek to

ensure that the beneficiaries contribute towards the implementation of the

subproject as stipulated in the agreement.

I await results of management‘s efforts.

Page 648: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

636

67.0 MINISTRY OF TRADE, INDUSTRY AND COOPERATIVES

a) COMESA Summit advances not accounted for

Paragraph 215 (a) of Part I of the TAI, 2003 requires advances to be accounted

for without delay and in any case not later than sixty days. However

UGX.84,795,999 advanced to several sub-committee members to execute the

COMESA summit activities in November 2012 and June 2013 lacked accountability

rendering the authenticity of the expenditure doubtful.

I advised management to avail the necessary documentation for future use or

effect recoveries from the concerned persons.

a) Funds not accounted for by Uganda Commodities Exchange

The ministry disbursed a sum of UGX. 76,456,000 to Uganda Commodities

Exchange (UCE)for purposes of meeting expenses with regard to regulating the

Warehouse Receipt System (WRS) in accordance with the WRS Act. However,

contrary to financial regulations, the funds lacked relevant accountability. In

addition performance reports were not submitted to the ministry to enable

verification as required by WRS regulations.

Management stated that the accountability documents could not be availed as

they were locked up by the Landlord over rent arrears.

I advised management that the agency should be adequately funded to carry out

the prescribed functions. Meanwhile, arrangements should be made to avail the

documents for verification.

b) Incompletely Vouched Expenditure

Paragraph 120 of Part I of the TAI, 2003 requires all payment vouchers to be

properly supported with appropriate documents or sub-vouchers before they are

passed for payment. However, it was noted that expenditure amounting to

UGX.54,112,956 incurred on workshops, meetings, field work and stationery

lacked the necessary supporting documents such as; attendance lists, activity

Page 649: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

637

reports and acknowledgement receipts rendering the authenticity of the

expenditure doubtful.

I advised management to submit the relevant accountability for verification or

recover the funds from the concerned staff.

c) Un-acknowledged Tax Remittances

A sum of UGX.25, 030,360 reportedly remitted to URA as withholding tax lacked

acknowledgement receipts rendering the expenditure doubtful. Non remittance of

the tax may attract penalties as prescribed in the Income tax Act,1997(as

amended).

In response, management stated that a process of obtaining a password from URA

to enable printing acknowledgement receipts off the URA‘s website has been

initiated.

I await the outcome of management‘s action.

d) Budget performance

Out of the budgeted revenue of UGX.33,595,668,604 only UGX.32,706,145,330

was realized resulting into a shortfall of UGX.889,523,274. Failure to release all the

budgeted funds constrains management in the implementation of planned

activities.

In response, management explained that despite writing to the MOFPED for

additional funding the request was not addressed.

Management was advised to liaise with the relevant stakeholders to obtain more

funding.

e) Untitled Ministry Land

The Ministry indicated that it owns four plots of land with in Kampala, valued at

UGX. 300,000,000. However, in the absence of proof of ownership in form of land

titles, there is risk of encroachment and/or fraudulent transfer of the land.

Page 650: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

638

Management explained that Uganda Land Commission had been requested to

expedite the transfer of the land into the ministry‘s name. Meanwhile, a caveat

was also placed on the land.

I advised the Accounting officer to follow up the matter and have the land title

processed without further delay.

f) Staffing Gaps

Out of the 183 approved staffing positions only 130 positions (71%) were filled

leaving 53 vacancies.

The Accounting Officer attributed the staffing gap to the inadequate wage bill

allocated to the Ministry. He further stated that MoFPED had agreed to an

increment of the Ministry‘s wage bill for the financial year 2014/15 and that is

when recruitment will be effected.

I await the outcome of management‘s action.

g) Lack of Asset Disposal Plan

Section 295(1) of PPDA regulations, 2003 requires an Accounting Officer to review

the assets of the procuring and the Disposing Entity on an annual basis to identify

obsolete assets due for disposal. It was noted that the Ministry lacked a disposal

plan and yet it had assets like vehicles and motorcycles identified for disposal.

The table below refers;

Reg No Make/type Office attached to

UG 0312T MIT PAJERO Grounded at Uganda museum

UG 0308T TOYOTA COROLLA Grounded at Uganda museum

UG 0068T MIT D/CABIN UCE – Grounded

UG 0313T MOTORCYCLE Registry (old needs boarding off).

In response, management indicated that obsolete items would be disposed of in

April 2014.

Page 651: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

639

I advised management to periodically review the Ministry‘s assets and put in place

a disposal plan for assets that are no longer required for use.

68.0 MINISTRY OF TOURISM WILDLIFE AND ANTIQUITIES

(a) Mischarge of Expenditure

Paragraph 405 (a) of the Treasury Accounting Instructions 2003 specifies that all

government transactions shall be recorded in the books of account in accordance

with the Government of Uganda chart of Accounts as prescribed by the Accountant

General. In addition, Accounting Officers shall ensure that all financial transactions

are properly coded.

It was however noted that out of the total Ministry expenditure of

UGX.10,521,481,141 a sum of UGX.981,208,806 (16.1%) was charged on codes

other than those under which it was appropriated leading to mischarge of

expenditure on these accounts as summarized in the table below:-

Item Code Total Spent Correct Charge Mischarge

Amount

211102 24,000,000 0 24,000,000

213001 6,816,000 2,220,000 4,596,000

213002 19,461,640 11,500,000 7,961,640

213003 4,999,800 0 4,999,800

221001 38,239,613 0 38,239,613

221002 149,011,691 145,280,691 3,731,000

221003 311,879,708 191,594,582 120,285,126

221006 105,989,421 0 105,989,421

221007 110,732,152 76,325,966 34,406,186

221008 43,347,717 26,019,346 17,328,371

221011 186,422,444 133,604,073 52,818,371

221012 15,066,999 0 15,066,999

222001 80,428,388 69,809,329 10,619,059

222003 20,000,000 0 20,000,000

223004 61,986,796 4,986,610 57,000,186

223901 1,532,111,610 1,419,621,946 112,489,664

225001 250,175,444 156,700,000 93,475,444

227001 202,473,767 200,473,676 2,000,091

227002 229,405,491 194,148,183 35,257,308

Page 652: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

640

227003 46,741,096 0 46,741,096

228001 69,999,559 54,855,559 15,144,000

228002 139,758,184 100,265,811 39,492,373

228003 26,884,568 0 26,884,568

231002 222,333,133 221,333,333 999,000

231004 444,761,447 436,000,000 8,761,447

231005 29,999,444 16,596,000 13,403,000

263322 8,717,799 0 8,717,799

321422 60,800,000 0 60,800,000

5,654,092,442 4,672,883,636 981,208,806

The practice portrays a breakdown in budgetary controls and leads to

misrepresentation of the financial statements.

Management attributed the anomaly to underfunding of some items in the budget.

I advised the Accounting Officer to always liaise with MOFPED and ensure

adequate funds are allocated to the budget items.

(b) Advances paid into personal Bank Accounts of Ministry officers

Sections 227, 228 and 229 of the Treasury Accounting Instructions (TAIs) 2003,

state that all payments should be made by the Accounting Officer directly to the

beneficiaries. Where this is not convenient an Imprest holder shall be appointed by

the Accounting Officer with the approval of the Accountant General. It also

requires that the Imprest funds must be accounted for promptly.

It was noted that UGX.1,275,725,185 was advanced to various Ministry staff

through their personal bank accounts to implement a number of activities.

Although the funds were eventually accounted for, the practice is prone to abuse

and could easily lead to loss of public funds.

Management explained that these were funds deposited on personal accounts for

field work activities to take care of local expenses such as transport refund,

refreshments and allowances for local participants given that cash withdrawals

were limited to UGX.20,000,000 per month.

Page 653: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

641

I advised the Accounting Officer to adhere to the financial guidelines regarding

management of advances given the high risks involved.

(c) Vacant Posts

A review of the staff list of the Ministry revealed that out of 301 approved posts,

171 posts had been filled leaving 130 vacant. A number of vacant posts relate to

implementation of the mission critical activities in the fulfilment of the Ministry‘s

Constitutional mandate. The posts include the following;

Director Tourism, Wildlife & Antiquities

Assistant Commissioner Quality Assurance

Assistant Commissioner Planning and Partnership

Assistant Commissioner Licensing & Monitoring

Assistant Commissioner Sites and Monuments

Principal Conservator

Principals of the two Training Institutes.

In response management indicated that clearance had been sought from the

Ministry of Public Service to fill the first three positions on the list and that the rest

of the positions could not been filled due to the recruitment freeze.

I advised the Accounting Officer to continue engaging the Ministry of Public

service and other relevant stakeholders to have vacant posts filled.

LAND SECTOR

69.0 MINISTRY OF LANDS, HOUSING AND URBAN

DEVELOPMENT

a) Mischarge of Expenditure

Expenditure of UGX.2,013,594,374 in respect of various activities was charged

wrongly to item codes meant for different activities resulting in misstatement of

amounts expended on the affected codes. This implies that the financial

statements are misrepresented with regard to the mischarged amounts. The

Page 654: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

642

practice renders the budgeting process redundant, and it is also contrary to the

intentions of the appropriating authority.

Management attributed the mischarges to mix up of narrations on the payment

vouchers which were not carefully scrutinized due to shortage of staff in accounts

section. He further stated that he is liaising with the Accountant General to obtain

the necessary staff to address the issues.

I await outcome of the action.

b) Payments without supporting documents

Paragraph 120 of Part I of TAI, 2003 requires all payments to be properly

supported with appropriate documents before they are passed for payment.

However, the Ministry expended UGX.43,895,000 through the Intergrated

Financial Management System ( IFMS) without filing supporting documents. Such

expenditure is potentially fraudulent. I was not able to ascertain whether the funds

were used for the intended purpose.

I advised management to ensure that all payments are properly vouched and

supported with appropriate documents.

c) Outstanding Commitments

The Ministry had outstanding payables of UGX.8,286,694,065 at year end of which

UGX.8,158,337,542 was for the years dating to financial year 1999/2000. The

delayed payment of domestic arrears could result into higher costs by way of

interest and litigation.

Management explained that the accumulated domestic arrears had been

reconciled and the position frozen by the MoFPED but funds had not yet been

released for the purpose.

I advised management to liaise with Ministry of Finance, Planning and Economic

development to ensure that resources are set aside to settle these long

outstanding commitments before it becomes a national problem.

Page 655: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

643

d) Budget Performance

Review of the approved budget and the financial statements for the year revealed

that out of the total budget of UGX.14,507,839,600, the Ministry received

UGX.13,260,322,137 (91.4%), resulting in a shortfall of UGX.1,247,517,463. The

failure to realize all the budgeted funds hindered full implementation of the

Ministry planned activities, for example the dissemination of Land Act,

operationalization of the urban development forum and the stakeholders‘ meetings

on tenants‘ bills were only partly implemented.

Management explained that the Ministry‘s budget was affected by the budget cuts

which they did not have control over.

I advised management to liaise with Ministry of Finance, Planning and Economic

Development and other relevant stakeholders for improved funding to have all

planned activities implemented.

e) Staffing Gaps

It was noted that out of the 839 approved staffing positions for the Ministry, only

329 (39.2%) positions had been filled. In particular, the department of Surveys

was greatly affected yet it plays a very important role in the management of land

affairs. It was also noted that a number of staff have been in acting capacities for

periods longer than the six (6) months contrary to provisions of the Public Service

Standing Orders. This practice is irregular and demoralizes staff.

Management explained that most of the staffing gaps were a result of inadequate

wage budget provisions and delays in the recruitment process by the responsible

entity. The Public Service Commission is not in place.

I advised management to continue engaging with the concerned agencies to

ensure that the vacant posts are filled and staff in acting positions are regularized.

f) Status of buildings at the Department of Surveys and Mapping in

Entebbe

An audit inspection was carried out at the Department of Surveys and Mapping in

Entebbe and it was noted that;

Page 656: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

644

The buildings are dilapidated and have old wooden doors without burglar

proofing, yet the department houses highly valuable survey and mapping data,

records and equipment.

The department did not have access to intranet making it difficult to

communicate to the mother Ministry in Kampala.

There is a great risk of losing the data and the equipment kept at the department.

Management stated that the buildings at Survey and Mapping Department

Entebbe were in a dilapidated state because of lack of adequate funding for

maintenance.

I advised management to plan for renovation of the structures at the department

in order to secure the survey data and equipment at the department.

70.0 UGANDA LAND COMMISSION

a) Mischarge of Expenditure

Expenditure of UGX.274,007,650 in respect of various activities was charged

wrongly to item codes meant for different activities resulting in misstatement of

amounts expended on the affected item codes. This implies that the financial

statements are misrepresented with regard to the mischarged amounts. The

practice renders the budgeting process redundant, and it is also contrary to the

intentions of the appropriating authority.

Management attributed the mischarge to non-availability of funds on some items

and yet activities had to be implemented.

I have advised the Accounting Officer to ensure that payments are correctly

charged on the item codes to enable proper implementation of the Commission‘s

programs.

b) Outstanding Property Rates

The Commission had accumulated property rates commitments at year end of

UGX.5,316,175,868. This was an increase of UGX.2,473,315,251 from the figure of

UGX.2,842,860,617, reported in the previous year. There was no provision to pay

Page 657: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

645

off these arrears in the budget of 2013/2014,hence there is a likelihood of the

obligation increasing further.

Management explained that the property rate arrears were verified by internal

audit and awaited availability of funds by the Ministry of Finance, Planning and

Economic Development (MoFPED) to pay the debts.

I advised management to make provisions in the Commission‘s subsequent

budgets and have the creditors settled.

c) Failure to maintain an inventory of Land

ULC is mandated to acquire and manage government land and keep custody of all

documents relating to land. It was however noted that the Commission lacked a

comprehensive inventory of Government land and this may result into

encroachment and/or loss.

Management attributed this to lack of sufficient funds, personnel, and information

management systems to keep such an inventory but stated that they were

planning to make a budget provision in the FY 2014/15.

I advised management to liaise with key stakeholders in the sector to ensure that

this activity is undertaken.

d) Delayed approval of the Organizational Structure

The Ministry of Public Service approved a temporary establishment for ULC in

2006 to enable it start operations pending consultations and approval of its main

organizational Structure. Since then the main Organizational Structure has never

been approved by Public Service.

Consequently, out of necessity the Commission recruited officers on contract but

the positions were not in the temporary establishment. These officers included

Economist, Transport Officer and Systems Administrator.

Page 658: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

646

Management explained that under staffing was a challenge in the Commission and

this had been communicated to the Ministry of Public Service (MoPS) but no

response had been obtained.

I advised management to follow up with the MoPS so that a proper Organizational

Structure is put in place to enable the Commission operate optimally.

e) Revenue Performance

Review of the approved budget estimates and the financial statements for the

year revealed that out of the total budget of UGX.11,664,589,000 a sum of

UGX.11,451,370,266 (98%) was released resulting into a deficit of UGX.

213,218,734. Non realization of all appropriated revenues leads to non-

implementation of planned activities.

Further analysis revealed that despite receiving 98% of the budgeted funds, the

commission processed only 28 land titles out the planned 50 titles and did not

register the 1,750 planned bonafide occupants. This implies that management

diverted funds meant for these outputs to fund other activities without obtaining

necessary approvals.

I advised management to always liaise with the MoFPED for improved funding and

seek necessary approval for any re-allocations.

f) Procurement Anomalies

Uganda Land Commission paid UGX.59,704,050 to a local firm for supply of

surveying equipment, however audit noted that the equipment was not entered in

the Assets Register on delivery and has remained idle in the stores. There is a risk

of this equipment being misappropriated or becoming obsolete before utilization.

I advised the management to ensure that the equipment is registered in the stores

ledger and to put it to the intended use.

g) Fixed Asset Marking /Engraving

Regulation 101 of the PFAR, 2003 requires all fixed assets to be appropriately

marked or engraved to ensure that they are easily identifiable as Government

Page 659: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

647

assets. It was noted that some assets had not been engraved as required. The

failure to have the assets engraved exposes them to risk of loss through theft or

misappropriation.

Management explained that the only items that were not engraved were those

procured in FY 2012/2013 but indicated that they were in the process of procuring

a firm to undertake the exercise.

I advised management to expedite the process to safeguard the assets of the

Commission.

INFORMATION AND COMMUNICATION SECTOR

71.0 MINISTRY OF INFORMATION AND COMMUNICATIONS

TECHNOLOGY

a) Budget performance

Out of the revenue budget of UGX.20,225,476,812 the Ministry realized only UGX.

13,985,958,421 resulting into a shortfall of UGX. 6,239,518,391. As a result key

planned activities such as the National ICT Backbone were not implemented. I

informed management that delayed implementation of ICT Infrastructure impairs

improvement of government business process and hinders country

competitiveness.

In response management stated that not all funds budgeted were released by the

Ministry of Finance Planning and Economic Development (MoFPED). Further,

management indicated that they had since engaged the MoFPED to ensure

funding of ICT infrastructure programs are adequately catered for in the budget.

I advised management that there is need for closer liaison between the Ministries

of ICT and MoFPED to prioritize funding of key infrastructure that support business

processes.

Page 660: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

648

b) Mischarge of Expenditure

Review of the Ministry‘s expenditures revealed that a total of UGX 232,267,708

was charged on budget lines other than those under which funds were

appropriated.

The practice undermines the intentions of the appropriating authority and implies

that the financial statements were misrepresented to the extent of the mischarge.

Management explained that the mischarge was necessitated by limited cash

ceilings on some critical items of the Ministry

I advised management to always ensure adequate liaison with MoFPED so as to

allocate sufficient funds to critical items.

c) Domestic arrears

Comparison of the payables balances for 2011/12 and 2012/13 revealed that the

Ministry has continued to report domestic arrears at UGX.900,856,821 without

any movement thereof. Long outstanding payables may expose the Ministry to

the risk of litigation.

The Accounting officer explained that funds were not released for the item during

the year despite requests to the Ministry of Finance, Planning and Economic

Development (MoFPED).

I advised management to continue liaising with MoFPED to prioritize settlement

of domestic arrears.

d) Nugatory expenditure

The ministry incurred costs of UGX.16,538,890 following cancellation of an

irrevocable letter of credit on purchase of a vehicle. This expenditure is

considered nugatory since it would have been avoided had proper procurement

planning been undertaken.

Page 661: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

649

Management explained that the cancellation was necessitated by the objection of

the supplier, who indicated that the vehicle was already in the country and there

was no need of importation.

I advised management to always ensure proper procurement planning to avoid

unnecessary costs.

e) Funds not accounted for

Contrary to TAI 217 which requires accountability for official advances within sixty

days, it was noted that a sum of UGX. 43,979,000 paid to various staff to carry out

official activities remained outstanding. In the circumstances, it was not possible to

confirm that the money was used for the intended purposes.

I urged the Accounting Officer to submit the relevant documents for verification.

In the alternative the funds are recoverable.

PUBLIC ADMINISTRATION SECTOR

72.0 MINISTRY OF FOREIGN AFFAIRS

a) Unplanned procurement

During the year under review the Ministry incurred UGX.1,200,000,000 on

procurement of conference and accommodation facilities for the International

Conference for Great Lakes Region (ICGLR) summit without including the activity

in the procurement plan for the year contrary to the procurement regulations. It

was further noted that the Ministry contravened PPDA Regulation 105 (1-3) which

requires a procuring and disposing entity to confirm availability of funds before

initiation of any procurement proceedings. Management attributed the anomaly to

the short notice of the summit arising from issues of emergency nature.

I explained to management that since they were aware that the country was

chairing the ICGLR summit, the procurement plan and budget should have

included this activity.

Page 662: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

650

I advised management to follow prescribed procedures whenever such

procurements are anticipated.

b) Procurements not Approved by the Solicitor General

All procurements of UGX.50 million and above are required to be approved by the

Solicitor General in accordance with procurement Regulations. It was however,

noted that the procurements worth UGX.945,742,695 were not approved by the

Solicitor General thereby exposing the Ministry to unfavorable contract clauses that

could lead to loss of public funds. Table 2 below refers;

Table 2:

In response, the Accounting Officer explained that the time frame for the summit

was too short to enable following all the required procedures under PPDA.

I advised Management to always ensure that prescribed approvals are obtained as

required by the PPDA Act to protect the entity from possible losses.

c) Un-realized Receivable

The Ministry reported in its Statement of Financial Position, receivables of

UGX.3,343,140,729 that arose from an advance made to the proprietor of Imperial

Royal Hotel for the completion of the hotel for use during CHOGM event in 2007.

The hotel was not able to host/accommodate CHOGM officials and as such, the

proprietor was tasked to pay back the money to the Ministry.

Procurement Ref

Number Contractor Contract Details

Contract

Sum (UGX)

MOFA/SRVS/12-

13/000189 Munyonyo Resort

Venue, conference facilities

and accommodation for ICGLR

summit

109,929,732

MOFA/SRVS/12-

13/00048 Munyonyo Resort

Venue, conference facilities

and accommodations for

ICGLR summit

670,326,500

MOFA/SRVCS/11-

12/00153 Munyonyo Resort

Conference facilities for 7-8th

October summit 165,486,463

TOTAL 945,742,695

Page 663: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

651

Management explained that the matter was in court.

I await the outcome of management action.

d) Failure to Withhold Tax

Section 119 (1) & (2) of the Income Tax Act requires all Government institutions

to withhold tax at the rate of 6% on payments for supplies of goods and services

exceeding one million shillings and to remit it to Uganda Revenue Authority.

Contrary to this requirement, MoFA did not withhold UGX.9,388,821 from the

payments to a supplier of stationery. Failure to withhold and remit the tax may

attract penalties from the tax body.

Management explained that deduction of the tax is a system automated function

which was not activated at the time of setting up the supplier on the IFMS and

that the supplier had been requested to declare the tax to Uganda Revenue

Authority (URA).

I advised management to follow up the matter with URA since the Income Tax Act

considers the Ministry the withholding agent responsible for remitting the tax.

73.0 EAST AFRICAN COMMUNITY AFFAIRS

a) Mischarged Expenditure

Treasury Accounting Instructions require that transactions should be recorded in

the books of account using the Government of Uganda Chart of Accounts as

prescribed by the Accountant General. The detailed explanations for each account

prescribe what expenditures should be charged on the account.

However, expenditure of UGX.631,272,089 was charged on expenditure codes

other than those under which it was appropriated as summarised in the table

below:-

Page 664: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

652

Account Account Description Amount mischarged

213001 Medical expenses (To employees) 6,888,000

221001 Advertising and Public Relations 244,106,159

221003 Staff Training 26,518,175

221008 Computer supplies and IT services 19,027,060

221009 Welfare and Entertainment 153,869,378

221011 Printing, Stationery, Photocopying and Binding 38,546,351

221012 Small Office Equipment 41,022,668

222002 Postage and Courier 21,515,890

227002 Travel abroad 8,657,500

227004 Fuel, Lubricants and Oils 26,126,800

228001 Maintenance – Civil 7,855,940

228002 Maintenance - Vehicles 25,008,168

228003 Maintenance – Machinery, Equipment & Furniture 12,130,000

631,272,089

The practice is a sign of a breakdown in controls over the budget implementation

process and implies that the financial statements are misrepresented to the extent

of the mischarge.

Management explained that these were preliminary expenses related to the main

item codes.

I advised the Accounting Officer to streamline the budgeting process so that

available funds are properly allocated to the planned activities.

b) Expenditure on Foreign exchange Account

The Ministry spent UGX 15,212,588,098 out of its foreign exchange account of

which UGX 12,500,392,970 was transferred to the EAC Secretariat and the balance

of UGX.2,712,195,128 was spent on other activities. The details on the bank

statement show that UGX.758,031,287was drawn in cash during the financial year.

I was not availed with accountability documents relating to this cash withdrawal

Page 665: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

653

for examination. It was therefore not possible to satisfy myself that this cash was

properly utilized.

I advised management to ensure that records relating to this expenditure are

properly kept and maintained for proper accountability.

c) Expenditure on Travel Abroad

Review of the records relating to travel abroad for various activities revealed the

following matters;

Inappropriate representation to conferences

There were officers being nominated to travel and attend conferences but by their

designations were not appropriate to attend these conferences. There is a risk that

as a country, Uganda may not be benefitting from such representation at high

level conferences because they are attended by staff who are not coming back to

implement what they learn. Besides, supporting accountability documents for

these trips such as back to office reports were not made.

Retrospective requests for Clearance

There were cases of staff who travelled without clearance from the Prime Minister

but later requested for retrospective ones. This was contrary to a letter referenced

ADM/125/128/01 of 19th December 2012 stopping the retrospective clearances,

with exception of those who were forced to stay abroad after being cleared. The

ministry risks incurring travel expenditure on staff whose clearances could be

rejected.

Travel abroad without the clearance of the Prime Minister

It was noted that the travels abroad whose expenditure amounted to UGX

318,396,600 were not supported with clearance by the Prime Minister for trips

abroad.

The Accounting Officer explained that this was caused by the short notices at

which some of the travel requests were made.

I advised the management to always plan properly for the travels so that the

appropriate clearances are sought in time.

Page 666: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

654

MISSIONS

74.0 UGANDA EMBASSY, ABU DHABI

74.1 Lack of Mission Charter

It was observed that the Embassy is operating without an approved Charter.

Whereas H.E the Ambassador submitted proposals on the Charter including its

objectives, activities and the cost implications of the proposals, these have not

been acted upon by the Ministry of Foreign Affairs. Ideally, the Ministry would

formulate a foreign policy through which missions would contribute to its

achievement by way of implementation of well defined and coordinated charters.

In the absence of approved Mission Charters, there is a risk implementing

uncoordinated activities at missions that may not achieve the objectives of the

foreign policy.

Management explained that the Embassy operates and files performance reports

based on the draft charter submitted to Ministry of Foreign Affairs in March 2011.

They further indicated that in the Ambassadors‘ Conference of January 2014, a

summarized version of the Mission Charter was agreed upon.

I advised management to follow up with Ministry and finalise the Charter to enable

achievement of Government objectives in the foreign policy.

74.2 Unimplemented activity – Uganda Consulate in Dubai

The Embassy is responsible for representing Uganda‘s interests in the seven

United Arab Emirates including Abu Dhabi, Dubai, Sharjah, Ras Al Khaimah,

Fujairah, Ajman and Umm Al Quwain. To enhance representation in Dubai, which

is the business centre of UAE, the Embassy planned to open up a consulate in the

Emirates in the 2012/2013 financial year, set up offices and procure a vehicle for

the consulate. It was however, noted that the Mission did not implement this

activity reportedly due to lack of funding.

Page 667: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

655

I advised management to continue pursuing the establishment of the consulate

with the Ministries of Foreign Affairs and Finance, Planning and Economic

Development for enhanced representation in the Emirates.

74.3 Accommodation of Foreign Service Officer (FSO) V

As reported in my previous year report, the Foreign Service Officer, Grade V was

still accommodated within the Chancery due to inadequate funds. The officer has

been living in these circumstances for three years now. There is a need to ensure

that staff of the Mission are provided with appropriate accommodation depicting

their status.

Management explained that the Embassy budgets for the optimal officers‘

accommodation but the funds are usually not provided in the approved

appropriated budget. They further explained that an appeal had been made to the

responsible Ministries of Foreign Affairs and Finance, Planning and Economic

Development to avail an optimal budget for the chancery and the officers‘

accommodation.

I await the results of Management action in this regard.

74.4 Security at the Chancery

It was noted that the Chancery did not have a Security Guard and Security

Surveillance systems like CCTV cameras though the facilities had been provided for

in the 2012/2013 work plan. The Chancery premises are pictured below:

Abu Dhabi Mission chancery premises

Page 668: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

656

There is a risk of burglary and vandalism of the Chancery premises, and

subsequent loss of Government property due lack of security.

Management responded that they had obtained authority from Abu Dhabi

Municipality to erect a shelter for the Guard, however, there was no funding for

the activity.

I advised management to ensure that the premises are secured as planned.

74.5 Staffing at the Embassy

The Embassy is graded as 1+3+9 Head of Mission, three home based staff and

nine local staff in accordance with the approved staffing structure. However, it was

observed that the Embassy had not yet recruited an Administrative Attaché and a

Translator, absence of whom the Embassy may not implement all its planned

activities.

Management attributed the shortfall in staffing levels to inadequate funds to cater

for wages.

I have advised Management to liaise with the Ministries of Foreign Affairs and

Finance, Planning and Economic Development to provide for the sufficient funds

for wages.

75.0 UGANDA HIGH COMMISSION, ABUJA

75.1 Review of draft financial statements

a) Statement of Financial Performance

Included in the Statement of Financial Performance were transfers to treasury

totaling to UGX.203,605,255 at the year end. However, this did not include

UGX.235,847,496 cash and cash equivalents which were due to Treasury. I was

therefore unable to confirm that transfers to treasury were fairly stated.

Page 669: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

657

In addition, it was also noted that receivables of UGX.31,057,291 disclosed in note

21 lacked a supporting schedule. In the absence of the schedule, I was not in

position to determine whether the balance reported is fairly stated.

I advised the accounting officer in future to always make necessary adjustments

to the financial statements and always provide a schedule for receivables as an

attachment to the financial statements.

b) Statement of Stores and Other assets

The following issues were observed during the audit of the statement of stores

and other assets;

Included among other assets acquired during the year, are non-residential

buildings erroneously posted with UGX.204,366,703 when actually there was

no expenditure incurred in acquiring non-residential buildings during the year.

On the other hand, residential buildings item was posted with UGX.90,114,974

although this item was not budgeted for in the first place.

Transport equipment acquired during the year was US$.35,759.50, an

equivalent of UGX.90,277,718. This was however omitted from the Statement

of Stores and Other Assets acquired during the year.

I advised management to always make necessary adjustments to the Financial

Statements and as well as strengthening the budgetary processes.

c) Non-Tax Revenue

The Mission collects Non-Tax Revenue from passport and visa entry fees.

However, the inventory for passport and Visa entry books was not availed for

verification. The records such as Revenue Counterfoil Register, used counter foils,

record of receipt and issue of passports which are vital for accounting for revenue

collected, banked and transferred to treasury were not availed. In the

circumstances I could not verify the accuracy of shs.154,172,262 reflected as

actual revenue collected under NTR during the year.

I advised management to avail all necessary supporting documents for

verification.

Page 670: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

658

d) Transfers to Treasury

Revenue reflected as remitted to the consolidated fund of Ugx.124,650,624 was

not supported with remittance schedules and acknowledgement receipts. In the

circumstances I was unable to verify whether the transfers were fairly stated in

the Financial Statements.

I advised the Accounting Officer to always follow up acknowledgement.

75.2 Non-Submission of Accounting Documents

The High Commission in Abuja, Nigeria opened and operated bank accounts Nos.

05280040000027, 02680131002197, 3000003033, 3001200145, 3000003026,

02680131002197 and 1015388990 as follows:

A/C Title

A/C Number Balance at

June 30th

2013(USD)

Balance at

June 30th

2013(NGN)

Revenue (US $) 3000003033 11,074.11

Uganda House Project. (US

$).

3001200145 21,178.67

3000003026 51,565.91

Social Security (NGN). 1015388990 760,318.71

05280040000027

02680131002197

Uganda House Project.(NGN) 1014577249

However the returns for Accounts 3000003033, 3001200145, 1015388990,

1014577249 and 3000003026 such as receipts, payment vouchers, cash

sheets/cash books and revenue returns for all the months under review were not

availed for verification. Bank reconciliations statements for all the accounts were

also not presented for audit.

I advised management to always submit the relevant returns for each of the

accounts for review.

Page 671: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

659

75.3 Improper procurements

a) Fuel

It was noted that during the year a sum of Nigerian Naira (NN) 162,600 was used

for the purchase of fuel. However a test check revealed that fuel worth NN

101,000 was purchased from ungazetted markets. I brought to management‘s

attention that they risk consumption of contaminated fuel. The table below refers;

S/N VOUCHER NO. AMOUNT PAID (NN)

1. PV-389/08/12 5,000

2. PV-391/08/12 6,000

3. PV-392/08/12 11,000

4. PV-402/08/12 4,000

5. PV-446/09/12 8,000

6. PV-444/09/12 11,000

7. PV-429/09/12 11,000

8. PV-428/09/12 8,000

9. PV-416/09/12 6,000

10. PV-672/10/12 6,000

11. PV-394/10/12 6,000

12. PV-393/10/12 3,000

13. PV-487/10/12 8,000

14. PV-484/10/12 8,000

TOTAL 101,000

I advised management to desist from such practice in future.

b) Purchase of a Mini-Bus

A minibus was purchased by the High Commission at a cost of NN.5,650,0000

approximately US$.35,759.50 from one Kojo Motors. However the following

anomalies were observed;

i. The customs papers for import of new vehicles were not attached for

verification. Other documents showing specifications, mileage at purchase,

seating capacity, engine and chassis numbers were also not provided for audit.

ii. The assets register page indicating recording of the asset was not submitted

for review.

I advised management to avail all the relevant documents indicated above for

review.

Page 672: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

660

75.4 Payment of Allowances to Policemen

During the year under review, Nigerian naira 560,000 approximately US$.3,544.30

was paid to some policemen in cash as allowances for security services. However

there were discrepancies in the signatures of the recipients making it difficult to

rely on them.

Besides, it is not clear whether diplomatic facilities require separate security

arrangements. I have advised management to explain the anomalies.

75.5 50th Independence Anniversary Celebrations

A total of NN.1,536,100, approximately US$.10,000 was purportedly used for the

Independence celebrations as follows;

VOUCHER NO. PAYEE AMOUNT (NN)

PV-452/09/12 Chelsea Hotel 800,000

PV-502/10/12 Chelsea Hotel 612,500

PV-503/10/12 Mugisha 104,000

PV-469/03/12 Mugisha 19,600

TOTAL 1,536,100

However the following matters were noted;

i) The above expenditure was not budgeted for and therefore it was not funded

for the year under review.

ii) The expenditure also did not follow the public procurement and disposal of

assets procedures and regulations.

iii) There was no proper accountability of the above in terms of attendance list

and the invitation of the 250 guests who should have attended.

I advised management to avail the necessary accountability for verification and

also to ensure that in future, important celebrations should be budgeted for.

Page 673: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

661

75.6 Capital Development Funds

One of the key planned activities for Abuja Mission was to acquire, develop and

manage properties abroad. A budget was therefore set for Non-residential

buildings of NN.300,000,000, (US$.120,813.31) and for transport equipment of

NN.150,000,000 (US$.60,406.65).

However the following expenditure incurred from the capital development fund

was not budgeted for and this resulted into diversion of funds without authority.

Item Amount (US$)

Renovation of Residence 20,800

Construction of a Bore hole 5,949.37

Purchase of Generators, furniture & music system 8,515.69

35,265.06

In addition, I was also unable to verify the balance of US$.14,063.44 an

equivalent of UGX.36,554,958.96 because of lack documentary evidence.

I have asked management to always seek relevant authority for reallocation or

virement of funds.

76.0 UGANDA, EMBASSY ADDIS ABABA

76.1 Inadequacy of payment processing controls

Good public management practices require enhancement of checks and balances

inform of segregating of duties to minimize the possibility of making errors. Audit

however noted that most of the Embassy payments were initiated, approved, and

paid without involving the heads of units and sections. Furthermore scrutiny

revealed that payment vouchers were not signed by the beneficiaries. There is a

risk that public funds may be misused in the absence of adequate internal

controls.

Page 674: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

662

In response the Accounting Officer indicated that in future, steps will be made to

ensure that transactions are processed by more than one officer.

I advised the Accounting Officer to enhance the internal controls in the transaction

processing system by involving section and unit heads at the Embassy.

76.2 Embassy planned out puts and actual expenditures

The output based budgeting system requires funds to be linked to the

output/deliverables in the work plans and presented in ―Performance Form: A‖, to

facilitate measuring of performance against planned outputs.

Audit noted that the Embassy expenditures such as employee costs, rent, water,

electricity and insurance amounted to UGX.347,000,000, however this was not

itemized in relation to the planned outputs and performance indicators.

It was further noted that the performance report of the mission did not link actual

expenditures incurred to the objectives, except in general terms. In the absence of

this, I was unable to assess the mission‘s performance.

Management in its response indicated that future work plans shall contain details

of planned resource allocation per planned output.

I advised the Embassy management to prepare work plans that link activities to

the cost of execution to ease performance evaluation.

76.3 Lack of Embassy Website

Modern information technology is critical for proper functioning of the Embassy in

order to maintain a well-populated and periodically updated Website. It was

however noted that the Embassy did not have a website and can be attributed to

the fact that Embassy management has not accorded setting up of the website the

attention it deserves. In the absence of a website the Embassy operations are

effected given the fact that it‘s accredited to serve two countries.

Page 675: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

663

In its response the Embassy management regretted the omission and indicated

that an officer had already started assembling materials for the website.

I advised the Accounting Officer to expedite the process.

76.4 Embassy rental costs

Good practice require Foreign Missions to acquire own property in the country of

accreditation to reduce on rental costs. Audit noted that the Ethiopian Government

in 2004 offered land to the Embassy for the construction of its permanent home

but no efforts have been put in place to formalize the offer and utilization of land.

The physical inspection of the allocated land revealed that it had been encroached

on.

Management indicated that they are planning to make a budget allocation in F/Y

2014/15 for acquiring the allocated piece of land offered by the Ethiopian

Government and after plans for developing it will be undertaken.

I advised the Accounting Officer to liaise with stakeholders and ensure that

appropriate measures are undertaken in acquiring and developing embassy land.

76.5 Furniture status of Chancery and Official residence

Government, in accordance with section H-e (10) provides furniture to Foreign

Service officers however, inspection of the chancery and the official residence

revealed that 85% of the furniture had outlived their usefulness. Furthermore

audit noted that furniture was not engraved and not comprehensively captured in

the assets register. Absence of such in asset register and distinctive identification

makes it difficult to manage the assets during their useful life.

Management explained that the Ministry of Foreign Affairs has not developed a

replacement policy for furniture and other assets in Missions.

I advised the Accounting Officer to liaise with the Ministry of Foreign Affairs on

formulation of a policy or guidelines for replacement of furniture and other assets.

Page 676: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

664

77.0 ANKARA EMBASSY

77.1 Performance Report

The Accounting Officer under Regulation 14 of the Public Finance Accountability

Regulations (PFAR 2003) is required to carry out a regular review of the Embassy

operations and establish whether the operations are being carried out as planned.

The 3rd and 4th quarter or performance reports were not presented for verification.

The Accounting Officer acknowledged the shortcoming and undertook to prepare

and present both the financial and performance reports in accordance with the

regulations.

It was therefore difficult to establish whether the Embassy activities had been

implemented as planned.

I advised management to ensure that performance reviews and reports are

regularly concluded and presented for verification.

77.2 Assets Management

Regulation 14 (c) of the PFAR 2003 requires the Accounting Officer to ensure that

property and resources are properly managed and safeguarded. It was observed

that the Mission had not established a detailed Fixed Assets Register for purposes

of recording the items owed by the Embassy. In absence of a detailed fixed assets

register, the verification of the assets owned by the Embassy could not be done.

The Accounting officer acknowledged the shortcoming and explained that the

Embassy inventory list of assets was computer based but will in future establish a

book register to show full details about the assets.

I advised management to ensure that a detailed Fixed Assets Register is kept and

properly maintained.

Page 677: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

665

77.3 Engraving of the Assets

It was also noted that the assets owned by the Embassy had not been engraved

with the Embassy identification marks. It therefore becomes difficult to identify

the items in case of loss.

Management attributed this to lack of the necessary funding but indicated that

plans were underway to have all the assets engraved by the end of the financial

year 2013/14.

I advised the Accounting Officer to ensure that the process is followed through

and concluded.

77.4 Procurements

77.4.1 Procurement Plans

Regulation 96 of the PPDA Regulations, 2003 requires that entities shall prepare

annual procurement plans based on the approved budgets and work plans in

accordance with PPDA Regulations and submit them to the Authority before the

end of the first quarter of the financial year. It was noted that there was no

procurement plan submitted to PPDA, contrary to the Regulations.

The Accounting Officer acknowledged the shortcoming and attributed it to staffing

challenges, but promised to endeavour to ensure compliance in this regard with

effect from the financial year 2014/15.

I advised management to ensure that procurement plans are prepared and

submitted to the Authority in accordance with the regulations and guidelines.

77.4.2 Quarterly Reports on Procurement and Disposal

Section 3.1 of the PPDA guidelines 2007 requires that the entity submits quarterly

reports on procurement and disposal to the Authority by the 15th day of each

month using PP Forms 200 and 202 on micro procurements and, DPA Form 201 on

Page 678: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

666

disposals, copied to the Permanent Secretary, Ministry of Foreign Affairs. However,

no such a report was presented for audit verification.

The Accounting Officer undertook to ensure that quarterly reports on procurement

and disposal are prepared and submitted to PPDA and the Ministry of Foreign

Affairs in accordance with the PPDA Regulations.

I advised management to ensure that in future quarterly reports on Procurement

and Disposal are prepared and submitted to the Authority and the Ministry of

Foreign Affairs.

78.0 UGANDA, EMBASSY BEIJING

78.1 Payables balance

Included in the payables balance of UGX.433,160,894 is a sum of

UGX.426,244,607 comprising of overdue rent and heating costs for the diplomatic

compound and staff apartments. The embassy is exposed to a fine of 2% on daily

basis for delayed settlement of rent and a risk of cessation of services.

Management attributed the accumulation of payables to underfunding of the items

and stated that the embassy would seek supplementary funding for the payables.

I advised the Accounting officer to liaise with the Ministry responsible for finance

to ensure prioritization of funding for the items.

78.2 Lack of procurement plan and un approved contracts committee

Contrary to the PPDA Act, 2003 section 58 the entity did not prepare a

procurement and disposal plan. In addition the members of the contracts

committee were not approved by the Secretary to Treasury thereby contravening

section 27 of the Act. In the circumstances there is risk of uncoordinated and

irregular procurement activities. Management stated that a draft plan had been

prepared and regretted that final review and approval was not followed up. In

addition the request to the Secretary for Treasury for approval of contracts

committee members was not responded to.

Page 679: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

667

Management was advised to always ensure timely preparation of the procurement

and disposal plan, and approval of members of contracts committee before

commencement of the activities.

78.3 Non-responsiveness to offer of purchase of property

Review of official correspondences revealed that the Embassy was given an offer

to purchase the diplomatic compound measuring; Built floor of 1,496.4 square

meters and land area of 5,026.5 square meters in November 2006 at a cost of

approximately US $7.8 million. It was however noted that despite previous

expression of interest, no further efforts have been made to acquire the property

despite high rental charges that are projected to increase. There is also possibility

of withdrawal of the offer by the host government.

I advised management to follow up the matter with the Ministry of Foreign affairs

and other relevant stakeholders to acquire property so as to minimize future rental

charges.

78.4 Failure to appraise local staff

Appraisal of staff is a requirement under government standing orders and good

human resource management practices. This enables motivation of staff over good

performance and identification of performance gaps for corrective action.

It was however noted that eight local staff comprising; the accountant, visa clerk,

two drivers, translator, cook, gardener and maid were not appraised.

Management stated that this was an oversight and appropriate appraisal forms for

staff had been secured for the purpose.

I await evidence of appraisal.

Page 680: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

668

79.0 UGANDA EMBASSY, BERLIN

79.1 Unauthorized Over expenditure

A review of financial statements revealed that the Embassy incurred

UGX.370,619,951 in excess of the approved budget of UGX. 798,328,000.

However, there was no documentary proof to the effect that the necessary

approval in the form of virements/reallocation warrants was granted contrary to

section 17 of the Public Finance and Accountability Act, 2003. Under the

circumstances, the expenditure is not a proper charge to government funds.

Management in response acknowledged the anomaly but indicated that the

necessary approvals for the Financial Year 13/14 had been received.

I advised management to always ensure that approval is obtained prior to

spending.

79.2 Absence of an Approved Mission Charter

A Mission Charter outlines the strategic objectives of an Embassy/Mission

established and how a given Mission should be run in the prevailing economic and

political environment.

However, it was noted that the Mission did not have an approved Charter in place.

In absence of the charter, I was unable to assess the performance of the mission

against its planned activities.

Management in response indicated that the Ambassador made a follow-up of this

matter during their Conference in December 2013. According to management, the

authorities undertook to send a signed copy to the Mission. I have advised

management to ensure that the proposed Charter is approved by the relevant

authority.

Page 681: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

669

79.3 Staff Appraisals

It is a requirement under Chapter (A-m), para 14(a) of the Uganda Public

Standing Orders 2010 for a staff performance appraisal report form to be

completed for each confirmed officer and those on contract terms in Ministries and

a copy submitted to the Responsible Permanent Secretary by 30th of June of every

financial year. However, no such record was in place at the time of inspection of

the Mission.

In the absence of an objective assessment of an Officer‘s appraisal, it is difficult to

recognize their performance and reward them accordingly. In addition,

performance gaps may not be easily identifiable for appropriate action.

Management in response undertook to comply henceforth. I await the outcome of

management‘s commitment in this regard.

79.4 Inventory of Official Residence

Chapter (H-e)(4) of the Uganda Public Standing Orders 2010 requires the Head of

Mission to assign, in writing, an officer who should be responsible for the official

residence. The assigned officer should compile an inventory of the contents of the

official residence and undertake maintenance of the residence. However, no such

inventory was in place at the time of inspection. In the circumstances, it is difficult

to assess the furnishing and maintenance needs of the Residence.

Management in response indicated that the Third Secretary was appointed to take

charge of the Official Residence and that the Officer was in the process of drawing

up the inventory accordingly.

I await the outcome of management‘s action in this regard.

80.0 UGANDA EMBASSY BRUSSELS

80.1 Budgeting and inadequate funding

Page 682: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

670

The Ugandan Embassy in Brussels is a multilateral station which covers Belgium,

the Netherlands, Luxemburg as well as the European Union and international court

of Justice (ICJ). For the financial year 2012/13, UGX.2.751Bn (compared to

UGX.2.964Bn for 2011/12) was released to implement planned activities of the

Embassy in the above areas of representation.

It was noted that due to fixed MTEF budget ceilings, there were always

expenditure pressures on the available funds. The situation was further worsened

by continued loss in value of the UGX against the Euro. Some activities such as

travel abroad had to be suspended due to budgetary constraints. There is a risk

that the embassy will fail to meet its obligations in the implementation of its

mission charter.

Management explained that they were liaising with the relevant stakeholders to

have the budget of the embassy increased.

I await the outcome of this engagement.

80.2 NTR reconciliation

Following my previous recommendations to management to strengthen controls

over Non Tax Revenue collection and management, audit noted that action was

taken in this regard. However, there were still challenges regarding daily

reconciliations.

It was noted that transfers to the bank through the agent using ATOS system

were in lump sum amounts (batches), which made it difficult to reconcile the

individual entries to the lump sum (batch) transfers to the bank.

Management explained that the ATOS system had been linked to the consular

Documents related to NTR collection and the accounting system so that the entries

could be traced to the relevant bank transfer.

I advised management to ensure that the reconciliations are done at the close of

business daily to allow immediate follow-ups to avoid backlogs.

80.3 Use of PPDA guidelines

Page 683: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

671

The PPDA issued guidelines for missions, PPDA Guideline 1/2007 to simplify the

procurement procedures and guide Missions and Embassies in conducting

procurements and disposals. The guidelines were occasioned by the different

staffing levels of these entities and unique circumstances under which they

operate.

It was noted that the Embassy in Brussels had not accessed these simplified

guidelines which was impacting on how the procurement activities were being

undertaken at the Embassy.

Management stated that, they had obtained the simplified guidelines but indicated

that they continued to face hurdles in their implementation because of the unique

nature of the procurement environment and conditions in Belgium.

I advised management to bring this to the attention of PPDA Authority so that

proper guidance is given.

80.4 Staff matters

a) Understaffing

It was noted that the Embassy was understaffed especially in the category of

support staff, posts which are required to be filled with Local staff. The area

greatly affected was the front desk office which must be attended to at all times

when the Embassy is open to business but was being manned by officers (home

based) who had other duties to perform. Combining the responsibility with others

implies that the officers could be underperforming in their other responsibilities.

Management explained that they had undertaken to recruit staff to fill the vacant

posts at the embassy beginning with the receptionist. I await the outcome of this

undertaking.

b) Lack of performance plans at the start of the appraisal period

Management of staff performance requires the appraisees to agree with the

supervisors on the outputs for the appraisal period. The agreed outputs together

Page 684: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

672

with the activities constitute staff performance plans on the basis of which staff

should be appraised at the end of the appraisal period. However, the staff of the

Embassy did not have performance plans agreed with their supervisors at the

beginning of the period. As a result, there were cases of appraisees not agreeing

with the performance appraisal results at the end of the financial year. Lack of

performance plans with clear outputs limits the objectives of performance

appraisals at the end of the period.

Management explained that they had initiated discussions on the staff

performance plans for both home and locally based staff.

I await the outcome of these discussions initiated by management.

80.5 Status of the Government properties

a) State of Disrepair of the Chancery

An audit inspection of the chancery revealed that the building has not had major

renovations of recent and as a result, it was in a state of disrepair requiring

substantial provision of money to have it renovated. There was complete lack of

routine and periodic maintenance activities required because of the weather

conditions. The structure continued to deteriorate with water leakages from the

roof destroying the walls and ceiling, the basement floors were in a sorry state and

inhabitable, some walls in the building had developed mold which is considered to

be toxic, while most of the walls and ceiling had developed major cracks putting

the lives of the users at great risk.

b) Official residence

An audit inspection of the Official Residence revealed that some limited

renovations had been undertaken mainly on the heating system. There were

notable defects on the building with motor peeling off the walls on the outside,

unpainted walls, water leakages through the roof and ceiling affecting the walls.

The heating system, though improved, still had old heaters, non-functioning water

and plumbing systems in the bath rooms, broken wooden window frames among

others.

Page 685: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

673

There is a risk that the two facilities may deteriorate further if no major

renovations are undertaken.

c) Redevelopment of plot of land formerly occupied by official

residence

Following the demolition of the former official residence at 35 Clos DesLauriers

Woluwe St Pierre because of non-maintenance and then its eventual collapse, the

asset (plot) was stripped of its immunity and granted the same to the current

building occupied by the Ambassador. As a result of this, the City Authorities have

asked the Embassy to redevelop the plot within a given time frame. There is a

great risk that if the construction is not done within the time frame given, the plot

which is located in a very prime area will be given to other developers.

Management explained that an assessment of the status of the buildings had been

undertaken and recommendations made by the property management team from

Ministry of Foreign Affairs. A provision was made in the 2013/14 budget of

UGX.1.18bn to start the renovation works. The team had also taken up the matter

of the plot with a view of soliciting for funding to develop it.

I await the outcome of management undertaking regarding the renovations and

redevelopment of the plot.

I have also advised them to liaise with MOFA & MOFPED and set up a minimum

fund to cater for routine and periodic maintenance requirements of the buildings.

81.0 UGANDA HIGH COMMISSION, BUJUMBURA

a) Un-Budgeted NTR

It was observed that the High Commission collected NTR of UGX.12,372,151 from

Administrative Fees and Licenses and VAT refunds without prior budgeting for the

funds. Besides, no revision of the budget was evidenced.

Management in response indicated that they will liaise with relevant authorizes in

the budgeting process to include the Missions NTR projections in the upcoming

budget.

Page 686: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

674

I advised management to ensure that in future, all incomes are budgeted for and

reported accordingly.

82.0 UGANDA EMBASSY, CAIRO

82.1 Review of Financial Statements

a) Statement of Outstanding Commitments

A total of UGX.158,679,788 was reflected in the accounts as commitments

outstanding. Out of this UGX.106,669,233 and UGX.51,562,039 were for Social

Benefits and Goods and Services respectively. However, the balances were not

supported with schedules and/or notes to the accounts.

Management said that these payables had been outstanding for the past several

financial years and efforts by the Mission to have them paid off had failed due to

lack of funds from the treasury.

I advised management to plan for the settlement of the debt to avoid possible

litigation costs in future which would be nugatory.

b) Statement of Disposal of Physical Assets

Proceeds from sale of boarded off furniture and fittings to staff amounting to EGP

1820 were not reflected in the cash flow statement as is required.

Management said that these proceeds were recorded under item 145003

(Miscellaneous receipts) and hence reflected in the cash flow statement.

I advised management to always make sure that necessary adjustments and

disclosures in the financial statements made.

83.0 UGANDA HIGH COMMISSION, CANBERRA

a) Unnecessary interest charges

Page 687: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

675

The High Commission entered into an agreement with Mercedes-Benz Canberra in

February 2013 to purchase a new official vehicle for the High Commissioner at a

sum of AUS$28,559.20. UGX.100,000,000 was provided in the Mission budget and

UGX.99,999,469 released for the purpose, the Mission opted to acquire the vehicle

on hire purchase, attracting interest charges of AUS$5,076.32 bringing the total

contract price to AUS$33,635.52 which was to be paid by monthly instalments of

UAS$934.32 for 36 months up to February 2016. The additional cost could have

been avoided if outright purchase method was used.

Management explained that because of insufficient funding, the funds that were

provided for the vehicle were used for other pressing and urgent needs of the

Mission. They further explained that they had sought authority from Ministry of

Foreign Affairs to be allowed to reallocate funds from other items to pay off this

debt.

I note that management‘s explanations are indicative of improper budget

execution.

b) Expired Tenancy Agreement

The Mission signed a contract with a local Landlord in January 2005 for rent of the

building housing the Chancery at 7 Dunoon Street, Block 1, Section 6, O‘Malley

Division for two years beginning from 2nd January 2005, at rental amount of

AUS$3,476 per month.

It was noted that the Tenancy Agreement expired on 2nd January 2007 but was

not renewed. The Mission is not protected in case any legal challenges arise with

the Landlord.

Management explained that the Tenancy Agreement was last reviewed in

December 2009 and increased the monthly rent to AUD$3,823.81. However, due

to inadequate funding, the Mission was reluctant to discuss renewal of the

agreement out of fear that the landlord would definitely increase the monthly rent.

I advised management to ensure that they are legally protected amidst the

financial challenges.

Page 688: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

676

c) Underfunding of the Mission

The Mission is responsible for representing Uganda‘s interests in Australia, New

Zealand as well as Papua New Guinea with regard to promoting bilateral and

multilateral relations, trade and investment, tourism and, diplomatic, protocol and

consular services.

It was however noted that the Mission is not adequately funded to carry out its

mandate. For example for the 2012/2013 financial year was UGX. 1,703,180,000,

was budgeted for but only UGX.1,470,117,897 was released by Ministry of

Finance, Planning and Economic Development. The underfunding affects

implementation of Mission activities.

Management was advised to continue in dialogue with the responsible Ministries of

Foreign Affairs and Finance, Planning and Economic Development for increased

funding.

d) Obsolete Equipment

It was noted that desk top computers in use by the Accounts Clerk, the

Accounting Officer and the High Commissioner were old and not functioning

properly. This hampers the work flow and activities of the affected staff.

The Accounting Officer explained that procurement of new equipment had been

budgeted for under the development budget but were not funded. The

underfunding had also affected other areas like medical care and up keep for

Mission staff which had to be pushed to the 2014/2015 financial year budget.

I advised management to liaise with Ministries of Foreign Affairs and Finance,

Planning and Economic Development to review and increase the funding to the

Mission.

e) Inadequate Security at the Chancery

The building housing the chancery is located on 7 Dunoon Street, O‘Malley ACT

2606, Canberra, an uptown suburb, with a low population density. It was noted

that the building was neither fitted with security surveillance systems like CCTV

Page 689: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

677

cameras nor monitored by a security guard. The chancery premises are pictured

below:

View of chancery premises from Road

Chancery premises at close range

There is a risk of burglary and vandalism of the chancery premises, and

subsequent loss of Government property due lack of security guards.

Management explained that a provision to cater for guard services had been

included in the 2014/2015 financial year budget and they were liaising closely with

Ministry of Foreign Affairs regarding the matter. I await the outcome of this

engagement.

84.0 UGANDA EMBASSY, COPENHAGEN

a) Non Tax Revenue not Accounted

Examination of the Non Tax Revenue (NTR) returns revealed that during the

period 1st July 2012 to June 2013, a total of UGX.187,905,114 was collected as

NTR. However, review of transfers to the Uganda Consolidated Fund(UCF)

Page 690: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

678

indicated that only UGX.151,051,637 was remitted leaving a balance of

UGX.30,853,477 unremitted.

There is risk that the NTR may have been utilized at source.

I advised the Accounting Officer to remit the outstanding funds to UCF in

accordance with financial regulations.

b) Imprest Management

The Treasury Accounting Instructions 28 & 233 require imprest holders to keep

separate cashbooks for purposes of recording petty cash transactions. In addition,

sections 29 & 230 require preparation of payment vouchers for all petty cash

transactions.

It was observed that petty cash withdrawals amounting to DKr. 126,000.00 were

made without corresponding petty cashbook entries to capture the income. It was

also not clear as to how the drawings were expensed because there were no

accountability documents attached to support the payments.

It was further observed that the Accounting Officer is also an imprest holder. This

undermines the internal controls regarding segregation of this function.

I advised the Accounting Officer to institute a proper imprest management system,

including the use of imprest cashbook and payment vouchers for accountability

purposes.

c) Irregular Payment of Travel Allowance

According to Section (E-b) 2 of the Public Service Standing Orders, 2010, night

allowance is payable when the Foreign Service Officer abroad officer is travelling

on official duties away from the duty station in the country to which his or her

Mission is accredited and having to spend nights away from his or her residence. A

review of expenditure however revealed that some Embassy Officials were paid

Dkr.64.661,11 subsistence allowance for carrying out special duties instead of

being paid honoraria. This payment is irregular.

Page 691: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

679

I advised the Accounting Officer to recover the irregularly paid allowances.

d) Initiation of Procurement

PPDA Regulation 104 (1) 2003 requires that procurement requisitions should be

documented using PP Form 20. Contrary to this requirement, it was noted that all

the procurements during the year under review totaling Dkr.454.084,75 were not

requisitioned on PP Form 20. The failure to comply with the stipulated procedures

of initiating procurement may lead to abuse of the procurement process.

I advised the Accounting Officer to always comply with the PPDA procedures in

initiating procurements.

e) Wasteful Expenditure

Review of expenditure for the year under audit revealed that the Mission paid DKK

2,496.43 to a company in India for printing business cards. It is not clear why the

Mission preferred to import printed cards other than sourcing them from a

domestic supplier which would have been cheaper.

I did not get any response from the Accounting Officer for this decision.

Management is advised to manage public funds more prudently.

f) Lease of Photocopier

It was noted that management of the Embassy undertook lease payments worth

Dkr 95.890,54 for photocopying services. However, there were no details attached

to the payments to show how the service was procured. Besides there was no

signed agreement for the services offered. In the circumstance, I could not

establish the basis for the determination of the quarterly payments made and

whether value for money was obtained from the procurement process.

I advised Management to always document any transaction that involves public

funds for accountability purposes.

85.0 UGANDA HIGH COMMISSION, WASHINGTON

Page 692: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

680

85.1 Staffing at the Mission

According to the approved structure of the mission, the mission is graded as

1+3+9 implying Head of mission(1), home based staff(3) and local staff(9).

However it was observed that the mission has six (6) home based staff as opposed

to the approved three (3).

The current staffing position implied that the mission was overstaffed and could

not access adequate resources to manage the existing staff.

Management explained that whereas management at the Mission had jurisdiction

over the numbers of locally recruited staff, it had no say as to how many home

based staff were posted by Authorities in Kampala.

They further explained that they had written a couple of letters to both Ministry of

Finance, Planning and Economic Development and Foreign Affairs, hoping they

would review the structure. Up till now, the structure has not been reviewed.

I advised management to liaise with the Ministry of Foreign Affairs and that of

Finance, Planning and Economic Development to review the structure so that

corresponding resources are provided.

85.2 Board of Survey Report

It is required under the Public Finance and Accountability Regulation Number 85

that the Accountant General appoints a Board of Survey to undertake stock of the

missions assets and also identify those that may require disposal. However, it was

noted that the activity was not undertaken.

There was non compliance which could lead to inappropriate use of assets.

Management explained that a Board of Survey was actually instituted at the end of

financial year 2012/13. The only problem was that at the time of audit inspection,

the report could not be located due to the laying off of the Accounts Assistant,

who did not make a proper handover. However, they have since located the

Survey Report from the lockers and it is available for verification.

Page 693: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

681

I advised management to ensure that a copy is availed for verification.

85.3 Un remitted Non Tax Revenue

It was observed that during the financial year ended 30th June 2012, the mission

had un remitted non tax revenue of Shs.211,796,984 constituting 16% of the NTR

collected. For the financial under review the mission collected Shs.1,355,723,400

and only Shs.1,143,926,416 was remitted. The practice is irregular and contrary to

the regulations which require that all NTR should be remitted to the consolidated

fund.

Management explained that the unremitted NTR was borrowed by the Mission to

meet some of the obligatory expenditures like rent, utilities, medical insurance and

staff salaries, which had not been paid due to insufficient releases from Treasury.

However, the funds were later refunded.

I advised the Accounting Officer to comply with the regulations and ensure that

the NTR is remitted regularly as provided in the regulations.

85.4 Production of Passports at the Mission

The mission procured a passport production machine over 15 years ago. However,

over the years the machine had been experiencing frequent breakdowns.

Management explained that the passport printing machine was procured 15 years

ago and had finally broken down. They further explained that they had written

several letters to the Ministries of Foreign Affairs and Finance, Planning and

Economic Development informing them about the problem and requesting for

funds to procure a replacement. No action had been taken by the relevant

authority at the Headquarters.

I advised management to continue liaising with the Ministry of Internal Affairs,

Directorate of Immigration and the Ministry of Finance, Planning and Economic

Development to secure resources in order to enable replacement of the existing

old machine.

Page 694: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

682

85.5 Appraisal of staff

Under the Terms and Conditions of Service, staff can be reappointed or contracts

renewed based on satisfactory performance in the previous contracts. However, it

was noted that appraisals were not undertaken to assess the performance of these

staff to enable decisions on renewal of contracts or otherwise. There is a risk of

non performing staff being reappointed.

Management explained that they had developed a staff appraisal instrument,

which is being used to appraise locally recruited staff and intend to revise the

contract period to one year beginning with next financial year (2014/15).

I await the outcome of management efforts.

85.6 Procurements at the Mission

Procurement Plan and reporting

According to the PPDA guidelines on procurements in missions, all missions are

expected to prepare procurement plans based on PPDA regulation 96 and submit

them to the Authority before end of the 1st quarter of the financial year. However,

it was noted that no procurement plans were prepared despite the entity

undertaking procurements during the year under review. The practice is irregular

and could lead to penalties.

Management explained that due to some internal weaknesses coupled with

wrangles at the Mission, it was very difficult to come up with an appropriate

procurement plan. However, with a change in leadership at the Mission, a

mechanism was being put in place to ensure that PPDA guidelines are strictly

adhered to. PPDA Committees have been formed and procurement plans which

are in consonance with work plans are being prepared so as to comply with PPDA

regulations.

I await the outcome of the management efforts.

85.7 Management of Fixed Assets

Page 695: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

683

The mission owned a number of assets including the Chancery, official residence

and office and home items. However a proper fixed assets register with all the

necessary details such as cost, location and current condition of assets were not

included for all items. Instead a list of items was only provided. In addition a

number of items were not engraved to provide easy identification incase of loss.

Management explained that they already have a proper fixed assets register.

However, they were looking for an engraving company to the do the engravings.

I advised management to institute a fixed assets register in accordance with the

TAI.

86.0 THE PERMANENT MISSION OF THE REPUBLIC OF

UGANDA TO THE UNITED NATIONS AND OTHER

INTERNATIONAL ORGANIZATIONS IN GENEVA

a) MISSION CHARTER

Uganda Embassies now use the Mission Charter as a tool that defines and

provides the strategic direction of the Embassies. At the time of inspection in

November 2013, the previous charter that had been put in place in 2006 had

expired and a new charter had been formulated and approved by the management

of the Mission. However the charter had not been approved by Ministry of Foreign

Affairs.

Without an approved charter, the mission may produce work plans that are not in

line with the long term strategies of the Ministry resulting into failure by the

ministry to achieve its strategic objectives.

Management explained that the Ministry of Foreign Affairs had requested the

mission to revise the charter before its approval and were planning to meet to

consider the revisions.

Page 696: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

684

Management should expedite the process of operationalisation of the charter by

having it formerly approved by the Ministry of Foreign Affairs, aligning it with the

annual operational plan of the Mission clearly defining the annual outputs, planned

activities and the performance indicators to be used to monitor performance.

There will also be need for an effective performance management system to

monitor the performance of the charter.

b) Mission Structure

Absence of approved structure

A review of the approved structure for the mission revealed that one staff position

of third secretary had not yet been filled. In the interaction with the management

of the mission, it was indicated that the structure and staffing positions of the

mission were not adequate to effectively handle the huge work load of the

Mission. Uganda Embassy, Geneva handles both bilateral and multilateral relations.

In addition to bilateral relations between Uganda and Switzerland, the Embassy is

also responsible for representation of Uganda to the United Nations and various

other key international organizations in Geneva which include; World Trade

Organization (WTO), World Intellectual Property Organization (WIPO), World

Metrological Organization (WMO), United Nations High Commission for Refugees

(UNCHR), Office of the High Commission for Refugees (OHCHR), World Health

Organization (WHO) Global Alliance for Vaccines and Immunization (GAVI), United

Nations Environment Programme (UNEP), Global Fund, United Nations Conference

on Disarmament and International organization for Migrations among others.

These organizations operate on permanent basis (full time) and hence require the

country‘s full time representation.

However due to inadequate staffing, the Embassy was not able to participate in

the work of a number of these international organizations. Where there was

participation, it would not be effective given that staff had to attend to the

demands of other organizations assigned to them.

This also impacted on the effectiveness of the Embassy to handle the bilateral

relations between Uganda and Switzerland.

Page 697: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

685

There is need for the Ministry to fill the existing vacancy and further undertake a

review of the mission structure and staffing requirements to address this

challenge. In addition, the Ministry should pursue the request made by the mission

to the Ministries of Health, Gender, Labor and Social Development to post Health

and Labor attaché‘s to the Embassy to support the Embassy staff in the work

undertaken by the related international organizations.

86.1 Human Resource Management

At the time of the inspection, the mission was employing seven locally recruited

staff who included the Accounts Assistant, Office attendant, Representative Driver,

Utility car Driver, Office attendant, Cleaner, House keeper (Ambassador‘s

residence) and House keeper – Deputy permanent representative residence. It

was observed that the mission did not have an approved structure for local staff

and there were no documented recruitment procedures for local staff. Without

documented procedures, recruitment may be undertaken arbitrarily based on

individual preference or convenience rather than by necessity.

Management should come up with an approved structure and recruitment

procedures for local staff to provide guidance on staff recruitment.

The Accounting Officer explained that they had come up with a draft structure

which was to be presented to management for approval.

86.2 Budgeting

It was observed that the budgeting was undertaken through a participatory and

consultative process involving all staff and the finance committee. The key

challenge facing the Embassy was the unfunded priorities that heavily impact on

the mission operations. Some of the key unfunded priorities included:

a. Relocation of the Chancery to a new location

The Embassy is currently located in a residential area that is not suitable for office

accommodation. Its location makes accessibility difficult for not only staff but also

other people seeking for services. The mission has been advised by the Authorities

Page 698: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

686

to relocate to a more suitable location where all other Diplomatic offices are

located.

b. Procurement of office furniture

The existing office furniture was acquired in 2006 and now requires replacement.

c. Replacement of Heavy Duty Printer /Photocopies

The heavy duty in printer was due for replacement. The manufacturer had

indicated to the mission that from December 2013, there would be no further

technical support for that range of equipment.

d. Replacement of vehicles

All the three mission vehicles bought in 2006 -2007 require immediate

replacement. Due to old age, the cost of maintenance is high.

86.3 Non Tax Revenue

(a) NTR Utilized at Source

Examination of the Non Tax Revenue (NTR) returns revealed that during the

period 1st July 2012 to June 2013 a total of UGX.122,473,893 was collected in

revenue out of which shs.35,080,585 was banked and remitted to the UCF leaving

a balance of shs.87,393,308 due to the consolidated fund at the end of the

financial year.

A total of CHF 50,411 (shs.87.3 million) had been borrowed without authority to

fund mission operations and repaid back.

Borrowing of NTR without authority should be discouraged as it delays remittance

of NTR to the Treasury and may also result into extra budgetary expenditure.

(b) Visa Booklets not Accounted for

A total of 20 visa booklets bearing serial numbers SU 709001-710,000 issued to an

officer who had since been recalled to Headquarters were found missing hence

exposing the mission to the risk of fraud.

Page 699: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

687

In a recent inspection undertaken by the Ministry of Foreign Affairs, the Mission

was advised to bring the matter to the attention of the officer responsible. At the

time of the audit inspection, there was no record on file regarding the explanation

of the officer.

Management should seek for an official explanation of the officer and take

appropriate action.

86.4 Expenditure

86.4.3 Delayed return of Accounting Officer

An officer was posted to the Mission in February 2008 and subsequently appointed

Accounting officer in June 2011. The instrument of appointment as Accounting

Officer related to financial year 1st July 2011 to 30th June 2012.

On 30th April 2012, his tour of duty ended following his recall to Headquarters. For

unexplained reasons, the officer overstayed at the Mission up to September 2012.

Consequently, the officer continued to handle Mission finances without a valid

appointment letter as Accounting Officer after the expiry of his instrument of

appointment on 30th June 2012.

It was also observed that the officer paid himself allowances (CHF 3897) for

September 2012 inspite of instructions from the Permanent secretary, Ministry of

Foreign Affairs stopping payment of his allowances and expenses by 31st August

2012.

Management should seek for the recovery of the irregular payment from the

officer.

a) Excess Expenditure

The financial statements (Statement of Appropriation) for year ended 30th June

2013 showed that the mission incurred excess expenditure totaling

shs.90,434,033.

Page 700: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

688

b) Loss on Poundage

During the financial under review, the mission incurred loss on poundage

amounting to Shs.56million. However, it was observed that only shs.2million had

been provided in the budget to make good the loss on poundage.

This loss is significant given the resource envelope available to the mission and

impacts heavily on the mission operations if not reimbursed.

To avoid budget distortions, Treasury should provide realistic projections of

amounts reimbursable for loss on poundage. Provisions based on losses incurred

the previous year may provide more realistic projections.

c) Utilized cash Balances

The mission had utilized cash balances of shs.595,810,911 by the end of the year

which were not returned to the consolidated fund as required by regulations. The

Accounting Officer attributed the balances to the delayed release of funds for the

fourth quarter by Treasury. He explained that following the release of the cash

limits for the last quarter of the financial year, they committed the funds on the

system with the hope that the cash release would be received immediately.

However the amounts were credited on the embassy account in July and

payments made thereafter.

The late release of funds to missions delays implementation of planned activities

and may lead to challenges of funds absorption inspite of the funding needs for

the Embassy. Treasury should put in place mechanisms to ensure that funding for

missions is released early to allow proper planning and implementation of

activities.

d) Navision computerized accounting system

During the audit inspection, a high level review was undertaken of the Navision

computerized accounting system used by the Embassy for budgeting, payment

processing, accounting and reporting. The major objective of the review was to

Page 701: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

689

assess the adequacy of general and application controls of the system and assess

the extent to which the system can be relied upon to produce accurate and

reliable financial statements for the mission. The following matters were observed.

e) Functionality of the software

The software has various modules that have the capability to handle financial

management, fixed assets, inventory management and human resource

management. The module in use was the financial management module being

utilized for budgeting, payment processing, accounting and financial reporting.

On the basis of the procedures undertaken, it was observed that management was

to a very large extent utilizing the software for the purposes intended in

accordance with the guidelines prescribed by Treasury.

However, Treasury should work towards deploying other modules (HRM and

inventory Manual) to benefit from the full functionality of the software.

f) Lack of system Integration with the banking application

Currently the financial management module is not fully integrated with the

banking application. It was observed that with the system set up, it is possible to

use the e-banking application to effect payments without using the Navision

computerized accounting system. The set up can allow actual payment in the bank

to be undertaken before payment vouchers are raised and approved by the

Accounting Office, a practice that is inconsistent with financial Regulations and

Treasury Accounting Instructions.

g) Password management

There were no formal procedures for charge of passwords. The Accounting Officer

in an interview explained that if there is a need for change of user responsibility

on the system, all he does is to call the Navision centre at Treasury (Kampala) to

effect the changes. The lack of documented procedures for change of

responsibility or passwords poses a risk of unauthorized access to the system.

Page 702: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

690

Treasury should come up with procedures and standard templates to be used for

requests for change of responsibility and passwords.

It was also observed that the system set up did not prompt users to regularly

change passwords. In addition the password structure was numeric instead of

alpha numeric. This poses a risk of unauthorized access to the system.

h) Stores

No Board of survey for stores was undertaken during the year contrary to

Treasury Accounting Instructions which provide that Boards of Surveys

should be undertaken annually at the end year. By not undertaking a Board of

survey, the mission was exposed to the risk of loss of assets without easy

detection. It also deprived management, of the relevant information needed to

properly plan for replacement of assets.

Management should ensure that Boards of surveys are regularly undertaken in

accordance with the requirements of the Treasury Accounting Instructions.

i) Court cases

An officer (Miss Irene Kalibbala) who formerly worked at the mission as a support

staff had sued the mission for unfair dismissal and harassment and was

demanding a total of CHF 240,000 .The case was before the Courts of Law in

Switzerland was due for hearing in a few months. The Head of mission indicated

that the case had been taken over by the Ministry of Justice for further

management. It was however observed that in spite of the impending hearing and

possible determination of the case, there was minimal consultation going on

between the Mission, Ministry of Foreign Affairs and the Attorney General. This

minimal level of consultation between the key players exposed the mission to the

risk of loss of the case and the attendant court costs.

Management was advised to follow up the matter with the Attorney General.

87.0 UGANDA CONSULATE, GUANGZHOU, CHINA

Page 703: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

691

a) Non-responsiveness to Land offer

The Chinese government offered interested governments including Uganda, land

to construct consular premises at an estimated cost of US$ 1,500,000 for an

acreage of 2500 square meters. Out of 17 plots demarcated for the purpose only 1

remains available. It was also noted that the consulate incurred US$ 267,228 on

rent for the year 2012 and this is projected to increase at a rate of 6-8% annually.

The consulate had been given notice of eviction in the previous year for delayed

rent payment. In the circumstances acquisition of the land and subsequent

construction of premises would eliminate rental charges and save foreign

exchange. However at the time of audit inspection, there was no evidence of

expression of interest by the government thereby exposing the land offer to risk of

forfeiture.

I advised the Accounting officer to follow up the offer with the Ministry of Foreign

affairs and other relevant stakeholders.

b) Lack of mission Charter

The consulate lacks a mission charter that would spell out its key objectives,

outputs, performance and annual targets. In the circumstances it is difficult to

assess the performance of the consulate or individual officers. The Accounting

officer indicated that despite requests to the ministry for the mission charter no

response had been obtained.

I advised management to make further follow up with the ministry on the matter.

c) Failure to appraise local staff

Appraisal of staff is a requirement under government standing orders and good

human resource management practices. This enables motivation of staff over good

performance and identification of performance gaps for corrective action. It was

however noted that six local staff comprising; the accountant, two drivers,

translator, visa clerk/receptionist and cleaner were not appraised.

Page 704: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

692

Management stated that this was an oversight and appropriate appraisal forms for

staff had been secured for the purpose.

I await evidence of appraisal.

88.0 UGANDA EMBASSY JUBA

a) Un-supported cash in transit UGX.198, 556,110

Review of financial statements revealed that the embassy disclosed UGX.198,

556,110 as cash in transit under note 20 however; there were no supporting

documents to confirm its accuracy and remittance. As a result I was unable to

confirm the concurrency of the transaction.

I advised the accounting officer to always document and file returns for all the

remittances made at the embassy.

b) Failure to transfer of non-tax revenue of UGX 695,328,767

Section 9 of Public Finance and Accountability Act requires that all revenues or

other moneys raised or received for the purpose of the Government, be paid into

and form part of the Consolidated Fund. However, review of the statement of

financial performance on page 6 and cash flow statements on page 8 and 9

revealed that the embassy collected NTR of UGX 695,328,767 but according to

note 18 this money was not reflected in the financial statements as having been

transferred to the consolidated fund.

It is therefore possible that this money was spent at source and was not been

accounted for contrary to the established regulations.

I advised management to always remit all the NTR to the consolidated fund or

seek permission from an appropriate authority when there is need to spend NTR

collections at source.

c) Unspent balance of cash UGX2,065,939,399

Page 705: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

693

Section 19 of public finance and accountability Act 2003 requires the accounting

officer to return the balance of any moneys withdrawn from the Consolidated Fund

at the end of the financial year. The embassy disclosed under note 20 page 36

that a total of UGX 2,065,939,399 remained on its bank account but there was no

evidence that this money was transferred to the consolidate fund. Further analysis

revealed that cash balance were 100.7% of the total operating expenses during

the year under review, implying that this was relatively substantial sum to be held

by the embassy at the financial year end.

I advised the accounting officer to remit the bank balances to the consolidated

fund.

d) Transport Expenses

The embassy has a fleet of two cars, but analysis of expenditure on their

maintenance fuel, lubricants and oil revealed that a substantial sum of UGX

149,379,383 was spent on then during the financial year under review.

Management explained that the vehicles were procured in 2006 and have of

recent been breaking down.

I advised the accounting officer to make budget allocation for the procurement of

new vehicles in the next budget.

e) Rent Expenditure

In the financial year under audit, the mission spent a total of UGX.761,248,948 on

payment of rent, constituting 58% of goods and services consumed in the year.

The accounting officer attributed the substantial funds paid in rent to the high

demand for house in Juba due to many international organizations in the country.

I advised Accounting Officer to liaise with other stakeholders for a long term

solution of constructing a permanent residence for the consulate.

f) Purchase of Land

Regulation 100 of Public Finance and Accountability Regulations requires a register

to be kept for all assets of Governmentt and make them identifiable. Audit noted

Page 706: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

694

that under note 10, the mission purchased land worth UGX.46,462,660 during the

year under audit but neither the assets register nor purchase documents were

availed for audit verification. In the absence of these vital documents I was unable

to confirm ownership, existence and authority of purchase.

I advised management to always prepare and avail all necessary documents

during the audit that important to confirm ownership and existence of assets.

g) Lack of Missions Charter

The ministry of foreign affairs requires every embassy to have an approved

charter spelling out the goals, objectives, activities and the cost implication of the

proposals however, it was noted that Juba embassy operated without one.

In the absence of approved mission charter, there is a risk that the embassy is

implementing uncoordinated activities that may not achieve the objectives of the

foreign policy.

I advised the accounting officer to liaise with the ministry and ensure that the

charter is prepared to enable achievement of government objectives in the foreign

policy.

89.0 UGANDA EMBASSY, KHARTOUM

89.1 Review of draft financial statements

a) Non-Tax Revenue

The Non Tax Revenue (NTR) of UGX.131,614,597 collected was not supported

with revenue receipts rendering the collection uncertain. Out of NTR of UGX

131,614,597 only UGX 119,554,197 was purportedly remitted to treasury, leaving

UGX 12,060,400 not accounted for. The remittance was not supported with the

Treasury receipts.

I advised management to always avail the acknowledgement receipts for

verification.

Page 707: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

695

b) Foreign Exchange Losses

UGX.54,498,671 was reported in the accounts as foreign exchange losses incurred

during the period. However, this assertion was not adequately supported with

relevant journal vouchers and conversion rates.

I advised the Accounting Officer to always provide supporting documentation for

the occurrence and measurement of the exchange losses.

c) Refund of Medical Expenses

Section M- Medical Attention part (M-a) subsection 14 of the Public Service

Standing Orders 2010 requires Foreign Service Officers, his/her spouse and up to

4 children while serving on a mission abroad to be covered by full Medical

Insurance. Contrary to this a sum of SDG.6,235 was paid to staff as refund for

medical bills. There was no evidence that embassy staff were registered with a

medical insurance scheme as required by the Foreign Service standing orders.

I advised management to ensure that in future, the Embassy staffs get registered

with medical insurance scheme in accordance with Foreign Service Standing

Orders.

90.0 UGANDA HIGH COMMISSION, KIGALI

a) Unauthorized Over Expenditure

A review of financial statements revealed that the Embassy incurred a sum of UGX

516,640,239 in excess of the approved budget of UGX 2,643,120,000. However,

there was no documentary proof to the effect that the necessary approval in the

form of virements/reallocation warrants was granted contrary to section 17 of the

Public Finance and Accountability Act, 2003. Under the circumstances, the

expenditure is not a proper charge on government funds.

Management in response attributed the over expenditure on non-residential

buildings and transport equipment to funds retained as at 30th June 2012 for the

Page 708: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

696

construction of Chancery and procurement of Representation Car. However, the

team undertook to ensure approval is secured prior to spending.

b) Open-ended Mission Charter

A Mission Charter outlines the strategic objectives of an Embassy/Mission

established and how a given Mission should be run in the prevailing economic and

political environment.

However, it was noted that the existing Charter which was approved by the Hon.

Minister of Foreign Affairs on 23rd January 2006 had no implementation time-

frame. In view of the dynamic political and economic environment within which

the Embassy operates, the objectives may no longer be appropriate and realistic.

Management in response stated that following the Ambassadors‘ Conference for all

Heads of Missions, the Ministry of Foreign Affairs undertook to conclude the

formulation of comprehensive Charters by end of April 2014.

I await the outcome of the Ministry‘s commitment in this regard.

c) Staffing Matters

Staff Appraisals

It is a requirement under Chapter (A-m), para 14(a) of the Uganda Public

Standing Orders 2010 for a staff performance appraisal report form to be

completed for each confirmed officer and those on contract terms in Ministries and

a copy submitted to the Responsible PermanentSecretary by 30th of June of every

financial year. However, no such record was in place at the time of inspection of

the Embassy.

In the absence of an objective assessment of an Officer‘s appraisal, it is difficult to

recognize their performance and reward them accordingly. In addition,

performance gaps may not be easily identifiable for appropriate action.

Management in reponse acknowledged the anomaly and indicated that the

appraisals were now being conducted accordingly.

Page 709: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

697

I await the outcome of management‘s commitment in this regard.

d) Special Provision of Overtime for Drivers

According to Section E-c, Para 37 of the Uganda Government Standing Orders,

overtime, means any period of work on weekends, public holidays or in excess of7

¾ hours on any day, from Monday to Friday. Para 39 states that overtime which

invariably no driver can avoid has been consolidated for drivers so that such

drivers shall get a consolidated overtime payment calculated as 30%of their

monthly basic salary.

In addition, Section 6 of the Embassy Drivers‘ appointment letters indicates that a

driver may be called upon for official duty on Saturdays, Sundays and Public

Holidays.

However, it was noted that the 30% was not paid to the drivers during the year

under review. In the circumstances, the welfare of the officers is compromised

which may affect their productivity.

Management in response undertook to comply with the standing orders. I have

advised management to always make a provision in the Embassy Annual budget

to cater for the drivers‘ overtime.

e) Treasury Management

The Embassy opened a USD Project Development Account No.5005347-04-50

(Bank 4) for purposes of managing transactions related to the construction of the

Chancellery. However, it was noted that development releases were first deposited

on the USD operational A/c No.5005347-02-56 (Bank 2) before being transferred

to the Development A/c. In the circumstances, there is a risk of diversion of the

development funds.

Management in response indicated that a fresh permission was being sought

through the Ministry of Finance to add another account for receipt of the funds in

question.

Page 710: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

698

I advised management to ensure that all development releases are credited

directly on the designated A/c.

f) Irregular Power Refunds

According to the Uganda Government Standing Orders, Sec H-e Para 9,

responsibility of the cost of lighting and water lies with every public officer(other

than Head of Mission) at the Embassy. On the contrary, a sum of Rwandese

Francs 2,240,000 was paid to Embassy Staff to cater for power costs at their

residences. In the circumstances, implementation of priority activities is

compromised.

Management in response indicated that the 80% refund to staff was supported by

section (H-e) 10 of the Standing Orders 2010.

I advised management to seek guidance from the Ministry of Foreign Affairs in this

regard.

g) Inventory of Official Residence

Chapter (H-e)(4) of the Uganda Public Standing Orders 2010 requires the Head of

Mission to assign, in writing, an officer who should be responsiblefor the official

residence. The assigned officer should compile an inventory of the contents of the

official residence and undertake maintenance of the residence.

However, no officer had been formally assigned this responsibity at the time of

inspection. In the circumstances, it is difficult to assess the furnishing and

maintenance needs of the Residence.

Management in response acknowledged the anomaly and indicated that the Head

of Chancery had been duly assigned to undertake the assignment.

91.0 UGANDA EMBASSY, KINSHASA

a) Review of draft financial statements

Page 711: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

699

The following matters were observed during a review of the draft financial

statements;

b) Non Tax Revenue

The financial statement for the period ended 30th March, 2013 indicated Non-Tax

Revenue of UGX.26,695,914. It was however not possible to validate totals to

ledger balances because revenue ledgers were not availed. The Accounting officer

explained that all NTRs were transferred to the Consolidated Fund (CF) and

receipts were given. However, evidence to this effect was not availed. In

circumstance I could not confirm transfer of funds to the CF.

I have advised management to always provide supporting documentation in

relation to NTRs for verification.

c) Payables

Included in the Financial Statements is an amount of UGX. 130,999,921= that was

committed to pay the sundry creditors. However particulars of the payables were

not disclosed in a schedule rendering their authenticity doubtful.

Management in their explanation attributed the amount in question to outstanding

terminal payments due to former locally recruited staff.

I advised management to always provide schedules in relation to payables for

verification.

d) Cash at Hand

Included in the financial statements is an amount of UGX.80,931,523 representing

cash and bank balances. These balances were however not supported by

certificates of bank balances rendering their accuracy doubtful. While as

management in their response indicated that all certificates of bank balances had

been submitted for verification. The said certificates were still outstanding. In their

absence I could not confirm cash at hand.

Page 712: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

700

I advised management to always provide certificates of bank balances in order to

confirm funds at bank and at hand.

e) Employee Costs

The financial statements indicated UGX.130,999,921 as unpaid employee costs for

the last ten months.

The Accounting Officer explained that the money relates to the outstanding

terminal benefits due to the former locally recruited staffs of the mission from

1975 to 1997 when the Mission was forceful closed down after severance of

diplomatic relations.

I advised the Accounting Officer to ensure that the matter is followed with the

ministry of Finance and appropriate bodies so as to settle the arrears.

f) Revision of Foreign Service Allowances

The PAC made recommendations for the upward revision of the Foreign Service

allowances after ascertaining the circumstances in which the staffs therein live in

their respect missions abroad. However, there was no evidence that this

recommendation of PAC was implemented.

I have advised management to follow the issue with the relevant authorities so

that the leaving conditions of the staffs are improved.

92.0 UGANDA HIGH COMMISSION, LONDON

92.1 Budgeting and inadequate funding

It was noted that due to fixed MTEF budget ceilings, there were huge pressures

on the available funds. Activities such as Independence cerebrations, movement of

incoming and outgoing officers, renovations and an extra officer, other state

agencies‘ programmes etc., did not have adequate provisions in the Mission‘s

budget. It was also noted that the budget continues to be affected by loss of

poundage due to weakening value of the UGX.

Page 713: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

701

For example, although the absolute amounts in UGX increased slightly over the

past five financial years, the corresponding amounts in Pounds had reduced as

shown in the graphs below

UGX amounts since 2008/09 Equivalent amount in pounds.

The Mission was failing to implement planned activities using the released funds

and management frequently requested for authority from the Secretary to

Treasury to utilise Non Tax Revenue at source as a stopgap measure.

Management explained that the MTEF Budget ceilings had stayed fixed for the last

five years yet costs of utility bills and Rent for Officers had substantially increased.

The Mission had been hugely affected by Loss in Poundage.

I advised the Mission management to continue liaising with other stakeholders and

have the budget increased to meet the requirements of the Mission.

92.2 Opening of new bank accounts in a local Bank

The Mission operated four bank accounts in the HSBC bank in London until June,

2013 when the bank forced the Mission management to close these bank

accounts. This was after the bank had indicated that they would no longer provide

the Mission with any banking services. Consequently, management opened

corresponding bank accounts in a small bank, Habib Allied International Bank Plc,

(HBL). The following matters were observed with regard to the operations of the

bank accounts

Page 714: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

702

There was no risk assessment of the banks operations and reputation which

could lead to loss of the Mission‗s funds in case of unforeseen events

happening.

The bank‘s location is a distance away from the Mission. This was because the

other banks in the vicinity of the Mission could not accept to provide the

nature of services required by the Mission. The distance increases the risk of

carrying many to and from the bank.

Management explained that the Mission was still banking with Habib Allied

International Bank plc, as the process of liaising with Bank of Uganda to engage

Barclays Bank for reconsideration was going on.

I advised the Accounting Officer to continue engaging the Ministry of Foreign

Affairs to explore opening accounts in other nearby banks whose operational risks

may be lower.

92.3 Use of a permanent evaluation committee

It was noted that the Mission‘s management appointed a permanent Evaluation

Committee that evaluated bids for all procurements undertaken. The permanent

nature of the Committee does not allow appointment of members in accordance

with the specific requirement of each procurement.

Management explained that the use of permanent evaluation committee in the

evaluation of Mission‘s procurements was mainly due to the small number of

Home Based Officers available at the Mission.

I advised management of the Mission to appoint members of the evaluation

committee for every procurement and not to be permanently chaired by one

member.

92.4 Staff matters

a) Staff performance plans

Management of staff performance requires setting of performance plans by the

staff and agreeing with the supervisors on the outputs for the period. These

Page 715: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

703

agreed outputs together with the activities to achieve them constitute staff

performance plans on the basis of which staff should be appraised at the end of

the appraisal period. It was however, observed that the locally recruited staff did

not have performance plans agreed with their supervisors at the beginning of the

period.

Furthermore, the same staff had their contracts renewed without appraisals being

undertaken in respect of the previous period of their contracts.

This practice does not allow objective appraisals that should be informed by the

staff performance and achievements of the agreed outputs.

Although management explained that the Staff had been issued with the

Performance Plans, these were not availed for verification.

b) Staff Gratuity

The local staff on contracts are entitled to gratuity in accordance with the labour

laws of the UK. Due to budget constraints, the Mission management decided to

integrate the gratuity entitlements in the monthly salaries. However, it was noted

that apart from the amendment in the employment terms to state that the

monthly salaries were inclusive of entitled gratuity, there were no increments on

the salaries to reflect this change.

In a related development, a former employee (Accountant) at the Mission from

2003 to 2009 had submitted a claim for payment of gratuity amounting to

GBP.22,576. There was no formal response to the claimant and no efforts were

being made to have the amount settled.

There is a risk that the Mission may be faced with regarding the gratuity payments

for both current and former employees.

Management explained that they were still investigating the non-payment of

gratuity to the former Accountant and also finding ways of how to reduce the risk

of such developments by putting all requirements/terms and Conditions on paper.

Page 716: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

704

I advised the Accounting Officer to review the current arrangement on gratuity for

the current staff and consider the claim of the former employee to avoid future

ligations.

92.5 Asset Register

It was noted that the Assets register maintained by the Mission was incomplete

and not updated with the assets acquired during the year. The assets used at the

Ambassador‘s residence were all not recorded in the register. As a result, the

assets that were used by the former Ambassador could not be tracked and

accounted for before the current one occupied the house.

There is a risk that the Mission could have lost its assets because they were not

recorded to ease their tracking.

The Accounting Officer explained that the Mission had adopted the audit

recommendations and started the process of recording into the Assets Register all

Assets being held both at the Official Residence and Chancery.

I advised management to maintain and have the register updated with assets

acquired and disposed of. Asset counts should be undertaken whenever an Officer

using them is leaving the Mission to avoid loss of more assets.

92.6 Renovation works

a) The Chancery

A contract for renovation of the Chancery Building at a total of GBP 39,982 was

signed between the Mission and a firm, Virtual Group, to which GBP.20,642.50

was paid during the financial year. Although quality works were undertaken on

some parts of the building, other areas of the building remained in a poor state

and substantial amounts of money are still required to work on them.

There is a risk that if additional funds are not availed to undertake these

renovations, the renovated areas will again be affected.

b) Official Residence

Page 717: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

705

GBP 69,500 was paid to NY Contractors for renovation works at the official

residence of the Ambassador. An audit inspection of the residence showed that

although some substantive works were executed, the building still required

substantial amounts to put it in a maintainable state. The flat roof had stagnant

water on it leading to uncontrolled leakages; plumbing system was old and

required overhaul while the furniture and fittings required to be replaced.

The poor conditions of the buildings was attributed to lack of mandatory routine

and periodic maintenance works necessitated by effects of weather on buildings in

the Temperate zones. The amount spent could not have a big impact because

there had been no maintenance works for a long time.

Management explained that the Official Residence was to undergo major

renovations and repairs that are mandatory requirements by the council on Listed

Buildings.

I advised the Accounting Officer to ensure that adequate funds are included in the

subsequent budget to undertake the planned renovations and routine maintenance

works.

93.0 UGANDA EMBASSY, MOSCOW

a) Late submission of quarterly financial returns

Audit found out that contrary to the requirements of Section 417 of Treasury

Accounting Instructions (TAI) 2003; the mission submitted financial returns for

January to June 2013 four months after the required date. Late submission of

financial returns affect timely evaluation and reporting on the embassy by other

government agencies. Management attributed this failure to the high costs

involved in sending documents by courier from Moscow to Uganda.

I advised the Accounting Officer to electronically submit a summary report

quarterly and supporting documents can be delivered physically half yearly.

Page 718: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

706

b) Periodic Procurement reports

Paragraph 3 of the mission‘s procurement guidelines requires the procuring entity

to submit quarterly procurement reports to the Public Procurement and Disposal

Authority (PPDA). However, audit noted that the mission made procurements

worth UGX 19,460,417 but the quarterly reports were not submitted to PPDA as

required.

Failure to submit procurement quarterly report may not only lead to the

Accounting Officer being penalized but also undermines PPDA‘s ability to promptly

and accurately provide procurement information to the users.

I advised the mission management to comply with procurement guidelines by

promptly submitting quarterly reports to PPDA.

c) Embassy planned out puts and actual expenditures

The output based budgeting system requires funds to be linked to the

output/deliverables in the work plans and presented in ―Performance Form: A‖, to

facilitate measuring of performance against planned outputs.

Audit, however, audit noted that the mission did not analyze actual expenditures

to reflect the cost incurred towards achieving specific mission objectives.

Furthermore the performance report of the mission, does not link actual

expenditures incurred to the objective except in general terms. Evaluation of the

mission‘s performance became difficult in the absence of this vital information.

In response management indicated commitment of ensuring future work plans

contain details of planned resource allocated per planned output.

I advised Embassy management to prepare work plans that link activities to the

cost of execution to ease performance evaluation.

d) Embassy website

It is a best practice that the embassy maintains a well-populated and periodically

updated Website. Audit however, established that the official mission website was

Page 719: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

707

not functioning effectively and appeared hatched into. Additionally audit found out

that there was another website in the names of Ugandan Embassy hosted by

entity unknown to the mission providing unauthenticated information. Inefficient

and un-updated website effects the operations of the embassy.

Management in its response indicated that the service provider for updating the

embassy website had been secured and that it undertakes to update the website

on a regular basis.

I advised the Accounting Officer expedite the process of updating the website.

e) Language challenges of the Mission

Good practice requires that Foreign Service officers are prepared prior to posting

to the intended foreign stations. This entails providing them with basics regarding

the foreign country of posting in order to effectively operate in executing public

duty for the benefit of government. It was however, established that none of the

four home based staff serving in Moscow mission can adequately transact business

in Russian. This scenario is a result of inadequate prior staff posting planning by

the Ministry of Foreign Affairs. This has exposed the mission to lack of control on

confidential matters on mission operations. It has further increased the magnitude

of translation of information into Russian by a single non-Ugandan

secretary/receptionist who is apparently also over worked without additional pay.

Management indicated that the mission had been constrained by the budget

ceilings to train embassy staff in local language. I have advised the accounting

officer to administratively handle staff training needs and to consider an

appropriate remuneration for the secretary/receptionist.

f) Non-compliance with host Labour Laws.

The Foreign Service standing orders chapter 3(6) requires that the terms and

condition of service of locally recruited staff at a mission should generally follow

the national labour laws and practices for comparable personnel in the country of

accreditation as spelt out by the national laws.

Page 720: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

708

However, review of employee‘s costs indicated that the mission is not remitting

taxes and social security contributions in respect of the locally recruited staff. This

situation contravenes the Russian Federal law No. 115-FZ of July 25, 2002. The

Russian Ministry of Foreign Affairs has already written twice bringing this matter to

the attention of the Embassy for compliance.

The Embassy risks being dragged into diplomatic exchanges over non-compliance

with Russian Federation law. In its response management indicated that it has

already held meetings with the Russian Ministry of Foreign and guidance was

obtained and the Embassy undertakes to regularize local staff employment.

I advised management to ensure that the employment contracts for locally

recruited staff comply with the requirement of the National laws relating to

taxation and social contributions.

g) Furniture status of Chancery and official residence

Government, in accordance with section H-e (10) provides furniture to Foreign

Service officers however, Inspection of the chancery and the official residence

revealed that 75% of the furniture had outlived their usefulness. Furthermore

audit noted that furniture was not engraved and not comprehensively captured in

the assets register. Absence of such in asset register and distinctive identification

makes it difficult to manage the assets during their useful life.

Management explained that the Ministry of Foreign Affairs has not developed a

replacement policy for furniture and other assets in Missions.

I advised the accounting officer to liaise with the Ministry of Foreign Affairs on

formulation of a policy or guidelines for replacement of furniture and other assets.

94.0 UGANDA HIGH COMMISSION, NAIROBI

a) Excess Expenditure

The High Commission incurred expenditure of UGX.106,055,285 over and above

the approved estimates on various expenditure items without obtaining authority

Page 721: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

709

from the Permanent Secretary/Secretary to Treasury contrary to the financial

regulations. Expenditure in this respect was rendered irregular. Table below

refers.

Management in response attributed this anomaly to MoFPED releasing less than

the budgeted funds to the High Commission.

Based on the management response, it implies that excess expenditure was

incurred out of the NTR which should have been transferred to the consolidated

fund account.

I advised management to always follow prescribed procedures before incurring

excess expenditure.

b) Outstanding Commitments

A review of the financial statements revealed that the High Commission had

payables of UGX.23,627,965. Of this figure, UGX.689,182 accrued in the year

under review. The accumulation of domestic arrears poses a huge burden to

Government and may also lead to litigation.

The Accounting Officer in response stated that the High Commission had liaised

with the Ministry of Finance to pay the domestic arrears.

I await the outcome from the management‘s actions.

c) Refund of Medical Expenses

Expenditure Item Final Budget Actual

Expenditure

Variance

Employee Costs 1,139,999,255 1,170,219,028 30,219,773

Goods and services

consumed

810,637,833 883,803,048 73,165,215

Consumption of Property,

Plant & Equipment

153,999,750 156,670,047 2,670,297

Total 106,055,285

Page 722: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

710

Section M-Medical Attention part (M-a) subsection 14 of the Public Service

Standing Orders 2010 requires Foreign Service Officers, their spouses and up to 4

children while serving in a Mission abroad to be covered by full medical insurance.

Contrary to this, KShs.712,868 was spent on medical bills from various health

facilities and refund to staff for costs on medical treatment. The High Commission

had not instituted a medical insurance scheme, as envisaged by the Standing

Orders and no assurance was given as to the authenticity of the medical bills.

In response the Accounting Officer indicated that the High Commission was in the

process of selecting a medical insurance company to provide the service.

I await the outcome of the action taken by the Accounting Officer.

d) Clearance of Local Mission Staff by MoFA

Section A-C (8) of the Public Service Standing Orders, require all Missions to seek

clearance and approval from the Permanent Secretary, Ministry of Foreign Affairs

(MoFA) before appointing non Ugandans as employees of Missions. It was noted

that the Mission has 13 local staff that were paid monthly gross salary totalling to

KShs.408,930, however there was no evidence of MoFA having cleared these staff.

In the absence of such clearance, the staffs are considered illegally recruited.

In response, the Accounting Officer indicated that the High Commission had

written to the Permanent Secretary of MoFA requesting for authority to regularise

the employment of the local Staff.

I advised management to hasten the regularization of the appointment of local

staff, in accordance with the Standing Orders.

95.0 UGANDA HIGH COMMISSION, NEW DELHI

a) Review of financial statements

A review of the financial statements reviewed several audit observations namely:

The statement of losses of public monies and stores (page 19) reported

UGX.1,211,606 that was incurred on lost immigration permits. The amount

related to the F/Y 2011/12 (UGX.728,323), and F/Y 2012/13 (UGX.473,283).

Page 723: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

711

However, there was no explanation to the causes nor was the matter

investigated.

The statement of financial performance revealed transfer from the treasury

UGX.1,678,001,914 and NTR UGX.149,891,269. However, I was not able to

verify the amounts for lack of general receipts.

The statement of financial performance also revealed foreign exchange losses

UGX.11,405,848. Again, I was not able to verify the amount because no

supporting document was availed to indicate the computation of the losses.

The statement of financial position reported cash and cash equivalents of

UGX.416,692,443. The cash books, certificates of bank balance, bank debit

advice notes and Board of Survey report were not presented for audit.

Accordingly, the amount and the supporting Note 20 to the financial statement

could not be verified. Similarly payables reported at UGX.119,550,361 lacked

supporting documents.

The cash flow statement reported domestic arrears paid of

UGX.86,306,031,and deposits received of UGX.26,216,871. However, the

respective ledgers and supporting payment vouchers and acknowledgement

receipts were not presented for verification.

The statement of appropriation revealed that the budget on transfers received

from the treasury were revised from UGX.1,678,000,000 to

UGX.2,069,386,260. There was therefore, a budget revision of

UGX.391,384,346. However, the PS/ST authority was not availed.

Statement of arrears of revenue reported an accumulated amount of

UGX.149,891,269 at the year. However, supporting ledger was not availed

rendering it difficult for the amount to be verified.

The notes to the financial statements on pages 31, 35, 39 indicated supporting

schedules which were not attached.

I advised the Accounting officer to provide the necessary explanations and

documentation for verification.

b) Incomplete preparation of Monthly Returns

Page 724: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

712

The monthly returns examined at the Mission on a test check basis were

incomplete. The following were lacking:

Cash books

Bank reconciliation statements

Abstracts

Counterfoil returns

Expenditure summaries

Balanced NTR revenue returns

Trial balance etc

I have advised the Accounting Officer to submit the complete set of monthly

returns for audit.

c) Segregation of duties

A review of the expenditure revealed minimal segregation of duties. The

requisitioning for procurements, selection of the supplier, authorization of

purchase orders, approving of payments were all done by the Accounting Officer.

On the other hand, invoice processing, ledger posting, preparation of purchase

invoices and payment vouchers were all done by the Accountant. Therefore,

processing of payments was a responsibility of only two people. This poses a risk

in the expenditure process for lack of adequate segregation of duties.

For example most of the expenditure relating to the operations of the Chancery

namely; the payroll for local staff, repair and maintenance of building and motor

vehicles, procurement of goods, etc, were not endorsed by the Head of the

Chancery who would render the necessary counter check to confirm genuineness

of expenditure.

It was explained that, only two people were given responsibility rights on the

Navision system, the software installed for financial management.

Page 725: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

713

I advised the Accounting Officer to liaise with the Accountant General to review

the system with a view of enhancing responsibility rights to include the Head of

Chancery.

d) Non submission of returns to Ministry of Foreign Affairs

It was observed that the Mission did not submit monthly returns to the Ministry of

Foreign Affairs as required by Regulations. This is a matter that has been raised

repeatedly in the previous audit reports.

It was explained by the Accounting officer that the system of submission was not

very clear.

I advised the Accounting Officer to liaise with the Ministry for guidance on the

existing submission arrangements and ensure compliance.

e) Foreign Service Allowance

Apparent Overpayment

In three cases the Foreign Service allowance being paid was inconsistent with the

officers‘ entitlements according to their grading and Mission classification. This

resulted into an overpayment of US$1,698.57 per month.

I advised the Accounting Officer to explain the apparent overpayment.

f) Review of Foreign Service Allowance

It was noted that the Foreign Service Allowance (FSA) paid to the home based

staff to cater for their cost of living has never been reviewed by the Ministry of

Foreign Affairs and Public Service for a long time. The FSA has now been eroded

by the expensive market prices in the economy. As a result, management

explained that it is becoming increasingly difficult for the staff to live an affordable

life. This impacts on their morale and hence productivity.

In view of the high price index in India, I advised management to engage the

relevant authorities for the possibility of reviewing the FSA .

Page 726: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

714

g) Payment for Repair of Chancery

A sum of Rs.151,470 was paid to a firm in respect of repair and maintenance of air

conditioners at the Chancery. However, as reported in Paragraph 3.2.1 the bills

were not endorsed by the Head of Chancery.

During discussions, the Accounting Officer further explained that according to the

Tenancy Agreement such repair and maintenance were considered major and

were a responsibility of the landlord. Accordingly, a claim had been for recovery.

However documentary evidence of the claim was not presented for verification.

I advised the Accounting officer to follow up the claim and ensure recovery. In

future, such bills should be independently checked by the responsible officer

before they are approved by the Accounting Officer for payment.

h) Renting of Property

It was observed that the Mission does not own any property. Accordingly, the

Chancery, the official residence and other residences for staff are rented at an

annual cost of Rs.15,033,600 equivalent to US$820,008 (2,141,040,888). This cost

would be saved in the long run if an attempt to acquire own property through the

budget process is made.

During discussions with Head of Mission, she stated that indeed the matter has

been raised in their annual retreats of Heads of Missions.

I urged the Head of Mission to follow up the matter and engage the Ministry of

Foreign Affairs and Ministry of Finance, Planning and Economic Development and

other stakeholders for the necessary consideration.

95.1 Review of Procurements

a) Lack of a Contract Committee and a Procurement and Disposal

Unit

An interview with the Accounting officer revealed that there is a Contracts

Committee chaired by the Head of Chancery. However, it had not been formally

Page 727: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

715

appointed by the PS/ST Contrary to the Public Procurement and Disposal of Public

Assets (PPDA) Regulations. Besides the Contracts Committee lacks the requisite

training and sensitization.

It was also discovered during the inspection that there was no PDU. In fact, it

was the Chairperson who was again carrying out the roles of the PDU.

I informed the Accounting Officer that according to the number of available staff

(6) she was able to constitute a fully-fledged contracts committee as well as the

PDU in accordance with the existing PPDA guidelines issued for mission.

It was recommended that the Accounting Officer ensures that the contracts

committee is formally appointed and PDU established.

b) Procurements and disposals undertaken during the year

The statement of revenue collected and the statement of stores acquired during

year reported disposals of assets of UGX.23,347,294 and a motor vehicle

acquired at UGX.138,804,641. However the procurement file lacked any record

relating to the disposal and procurement process respectively. Accordingly I could

not confirm whether the required procedures were complied with and value for

money obtained.

c) Goods and services consumed

The statement of appropriation of account reported a sum of UGX.1,023,353,893

incurred on goods and services. However evidence to confirm that proper

procurement procedures were complied with were lacking as the procurement file

availed did not contain evidence of initiation, bidding, evaluation, contract

management etc. of the procurements in question. Besides value for money could

not be confirmed

I advised the Accounting Officer that Procurements procedures should be complied

with and documented.

d) Outstanding medical bills

Page 728: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

716

It was noted that, there are outstanding medical bills of Rs.1,471,386

(US$27,850.93) in respect of Indra prasha Medical Corporation Limited (Apollo

Hospital) incurred on two patients referred by the Mission. In both cases,

clearance from the mother organizations and medical board authority as required

under the Standing Orders were not availed for audit. Although the Accounting

Officer has reminded the mother organizations of the pending bills, no response

has been obtained. Failure to settle the debt may depict negatively on the image

of the Mission and may attract litigation.

I advised the Accounting Officer to continue following up the matter with her

counterparts and ensure settlement. Meanwhile referring cases for medical

treatment should be upon relevant clearances within the existing standing orders.

e) Training

It was noted during discussions with the Head of Mission that there was need of

training of staff to enable them meet their mandate with necessary efficiency.

Such training would include exposure to procurement, financial and accounting

regulations, human resource management, the Navision software installed for

financial management, and negotiation skills among others.

However, it was noted that the Accountant General had scheduled the training for

the computerized financial management system for Accounting Officers of Missions

due to take place in January 2014.

I advised management to engage the Ministry of Foreign Affairs and that of

Finance Planning and Economic Development and other stakeholders to secure the

necessary budget provisions for training.

f) Mission Charter and performance reports

Although the Mission prepared performance reports according to the required

budget performance format, they did not show actual out puts realized during the

year. It was therefore, not possible to assess performance against the targets for

which UGX.2,069,386,260 was allocated in the revised budget estimates.

Page 729: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

717

Besides, the Mission charter was not availed for audit. During discussions with the

Accounting Officer, she explained that there was other guidance from the Ministry

of Foreign Affairs that was used to prepare the targeted outputs for the year.

However, these guidelines were also not provided for verification.

In the circumstances, it was not possible to establish value for money spent.

I advised the Accounting Officer to avail the Mission Charter, the guidance

mentioned above and the performance report that includes actual output realized.

g) Review of the inventory

A review of the inventory of the Chancery and the residences revealed old

furniture and other stores that require replacement. During discussions the Head

of Mission and the Accounting Officer explained that Capital Development funds to

enable replacement of the items were minimal.

I urged management to lobby for the necessary funding through the budget

process to ensure that the old stores, furniture, and equipment are replaced.

96.0 UGANDA HIGH COMMISSION, OTTAWA

a) Fixed Assets Register

In my previous report, I stated that the mission did not have a comprehensive

assets register to record its fixed assets. During inspection of the mission for the

year under review, it was noted that the mission had not yet established a fixed

assets register despite the management‘s commitment to put one in place.

Absence of a comprehensive fixed assets register exposes the mission‘s assets to a

risk of loss without detection.

The Accounting officer indicated that the Mission had established the Register and

also secured a provider of the engraving services to engrave all the Mission assets

that will be incorporated in a comprehensive fixed Assets Register.

Page 730: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

718

I advised the Accounting officer to ensure that the register is kept and properly

maintained.

b) Official Residence

In my previous year report, I also indicated that the official residence required

renovation and improved security measures. However, no renovation works had

been undertaken at the official residence by the time of audit inspection.

According to the Accounting officer, the Mission had prioritized the issue of

security and was to continue liaising with the Ministry of Finance, Planning and

Economic Development to secure the required funds for the renovation works.

I advised management to continue liaising with the authorities to have the

residence renovated.

97.0 UGANDA EMBASSY, PARIS

a) Charter

The mission had a charter issued in 2007 which expired in 2012. At the time of

audit inspection in November 2013, a new charter dated March 2011 had been

developed and the draft had been submitted to the Ministry of Foreign Affairs for

approval.

It was observed that a year had elapsed without the Ministry of Foreign Affairs

giving final approval of the Mission charter.

Without an approved charter, the mission may undertake activities which may not

be properly aligned with strategic objectives of the Ministry. It may also be difficult

for the Ministry to monitor and evaluate the performance of the mission.

Management should immediately follow up the matter with the Ministry of Foreign

Affairs.

97.1 Human Resource management

Page 731: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

719

a) Organization Structure

The approved structure for the mission was not presented during the audit.

However management in an interview indicated that the mission is categorized as

a 1+2 structure. At the time of inspection, the structure had been filled with Head

of Mission, Counselor, 1st Secretary and 3rd Secretary in addition to various other

local staff.

Management also indicated that the 1+2 structure was not adequate for the

existing workload for the mission which also involves coordinating the work

relating to an international organization, UNESCO to which Uganda is a member.

Management should undertake comprehensive review of its staffing structure and

liaise with the Ministry of Foreign Affairs and Public Service for appropriate action.

The current approved structure should be traced and properly filed at the mission.

b) Locally Recruited Staff

At the time of audit inspection, the mission had eight locally recruited staff

comprising of Drivers, Cooks and Office Assistants.

Their contracts had been renewed and were running from 1st August 2013 to 30th

August 2014. Conditions of Service spelling out their terms of employment were in

place and these constituted an integral part of their employment contracts.

However the following matters were observed;

The mission did not have documented recruitment procedures for local staff.

In absence of such procedures, recruitments may be undertaken arbitrarily

and not in the best interest of the mission.

There was no approved organization structure for local staff posing a risk of

inefficient utilization of staff resources.

There was no evidence on file that appointments of local staff had been

approved by the Ministry of Foreign Affairs.

Page 732: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

720

There was no evidence on file that the performance of local staff was being

appraised. In absence of an appraisal system for local staff, staff may not be

properly directed to the achievement of their outputs and gaps in their

performance may not be identified and addressed.

Management was advised to put in place recruitment procedures for local staff in

order to make the process more transparent and effective. A staff evaluation

should also be undertaken and a proper structure put in place in order to guide

the mission in the recruitment of staff. There is also need to put in place an

appraisal system for local staff.

97.2 Financial management

a) Budgeted Expenditure (Excess expenditure)

A review of the financial records (Statement of Appropriation) revealed that during

the financial year (2011/12), out of an approved budget of shs.2,907,599,812,the

mission registered total actual expenditure of shs.3,319,058,854 resulting into

excess expenditure of shs.411,459,042. The excess expenditure was incurred

without parliamentary approval contrary to the Public Finance and Accountability

Act, 2003.

Management should ensure that expenditure is incurred in accordance with the

approved budget and where additional expenditure is necessitated, budget

variations should be sought in accordance with the regulations.

The excess expenditure should also be regularized in accordance with the Public

Finance and Accountability Act 2003.

b) Unfunded Priorities

Management expressed the need for additional funding of the mission to cater for

various unfunded priorities. The review of the budget indicated that some key

activities budgeted in the past had not been funded despite their critical

importance to the operations of the mission, key among these priorities were;

Page 733: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

721

Activity

Renovation of the Chancery Building (civil works, painting, electrical, drainage,

heating and lighting )

Procurement of Representation car

Replacement of utility vehicles

Furnishing of official residence and the Chancery

Security installation at the Chancery

Failure to finance these activities impacts on the smooth implementation of the

mission activities.

The Mission should be facilitated to finance the unfunded priorities in order to

make the mission more effective in its operations.

Revenue

Review of the revenue revealed that during the financial year 2010/2013, the

mission registered collections of shs.303,400,824 out of which only

shs.233,604,667 was remitted to the consolidated fund (UCF) leaving

shs69,996,157 due to the UCF.

The unremitted amount was utilized at source to fund mission operations without

relevant authority contrary to financial regulations. It was also observed that the

revenues collected and remitted to the UCF were not disclosed in the

memorandum statement of arrears of revenue as required by the treasury

reporting guidelines.

Utilization of revenue without authority should be discouraged as it leads to extra

budgetary expenditure.

All non tax revenue should always be banked intact and remitted to the UCF.

Rented Properties

Page 734: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

722

A review of the rental contract records for staff revealed that, the mission had not

yet recovered the security deposit amounting to (euro) 5,500 in respect of the

residence that had been vacated by the former head of mission It was also

observed that security deposits on rented properties had not been disclosed in the

financial statements for the year ended 30th June 2013 hence under stating the

assets (receivables).

Management should pursue the recovery of the security deposit henceforth. All

rental security deposits should also be determined and recorded in the financial

records.

Expenditure (Internal Control System)

The following matters were observed as a result of the review of controls over the

payment system.

The embassy uses the Navision accounting software for budgeting, payment

processing and accounting. It was observed that the system is not fully

integrated with the E Banking application used for payments by the bank. With

the current set up, it is possible for payments to be effected through the bank

without going through the Navision accounting software.

Payment vouchers generated by the system during the payment process were

not being approved (signed) by the Accounting Officer. This can result into

unauthorized payments leading to loss of funds.

Payment vouchers were not filed sequentially rendering audit verification

difficult.

The design of the payment vouchers did not provide for a space for payee. It

was difficult to get the payee details from the payment voucher and the

system cash book.

Supporting documentation for the payments made were being filed separately

from the payment vouches.

Treasury should work towards full integration of the Navision software with the e

banking application.

Page 735: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

723

All payment vouchers generated by the system should be approved by the

Accountant and Accounting Officer.

A proper voucher filing system should be put in place for ease of identification of

vouchers and their supporting documentation.

Chancery Building

The Uganda Government owns the Chancery building situated at 13th Avenue

Raymond Poinarre‘ in the 16th Arrondissement of Paris. It is a storied building

comprising of four flours and a basement. The property was acquired in 1993.

The following matters were observed;

(a) Refurbishment of the Building

Although the building is in a very prime location and is considered to be

structurally sound, it looks dilapidated due to lack of regular maintenance. The

upper most floor of the building is an un-partitioned hall which has not been in use

for a very long time because of the poor state it is in. The electrical, drainage,

heating and cooling systems for the whole building require replacement. There is

also need to furnish the building.

Through previous interventions, the mission was able install a new lift. However a

lot still needs to be done to make the building more appealing.

(b) Rental of space to the Tanzania Embassy

The Embassy of the Republic of Uganda, Paris entered into a lease agreement

with the Embassy of the Republic of Tanzania for the rental of office space at the

2nd and 3rd floors of the Chancery building each measuring 127 sqm2.

The lease was to run from 21st October 2004 to 20th October 2007 at a monthly

rental of €6,152 and €600 to cater for water. A review of the lease performance

revealed the following matters;

Page 736: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

724

It was observed that the lease agreement expired in 2007 and had not been

renewed by the time of audit inspection (November 2013).

The rental payable was in arrears to the tune of €50,082. Efforts by the

mission to have the arrears settled have proved futile. As a result of failure by

the Tanzania Embassy to clear the arrears, the Uganda Embassy was meeting

the costs of maintenance, ground rent and management fees, costs which

should have been met from the rental proceeds from the Tanzania Embassy. A

total of €6,499 was spent by the Embassy in this during the year.

To manage the property, the Embassy contracted Loick Founder as the

property manager for a period of 3 years running from 25th September 2000 to

25th September 2003. The contract provided for tacit annual renewal of the

contract for a maximum of ten times implying that the contract was to expire

on 25th September 2013. It was however observed that at the time audit

inspection, the mission had not yet initiated arrangements for the renewal of

the management contract.

Management should continue to pursue the recovery of the outstanding arrears of

rent from the Tanzania Embassy. There is also need for Management to

undertake arrangements for the renewal of the rental agreement and the property

management contract.

(c) Vehicles

The mission has two vehicles, the representation vehicle, Mercedes Benz 350

bought in 2005 and the Utility vehicle, Peugeot Model 807 bought in 2003 when

the Embassy was reopened. The two vehicles are due for replacement as their

maintenance costs are too to three times their current value. They often

breakdown while carrying delegates and causing embarrassments to the Mission.

At the time of inspection, the embassy had obtained quotations of €103,000 and

€23,000 (without taxes) for the new representation car and utility vehicle

respectively.

The mission should be facilitated to replace the two vehicles.

Page 737: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

725

(d) Procurement

There was no contract, committee in place at the time of the inspection. In

absence a contracts committee, procurements were being handled in a manner

not prescribed by the PPDA Act and Regulations.

In absence of a contracts committee, the mission may fail to achieve value for

money from the procurement it undertakes from time to time.

Management should put in place Procurement and Disposal Unit and a Contracts

Committee in accordance with the Procurement guidelines for missions.

98.0 UGANDA HIGH COMMISSION, PRETORIA

a) Absence of Mission Charter

The high commission lacks a mission charter that would spell out its key

objectives, outputs, performance and annual targets. In the circumstances it is

difficult to assess the performance of the mission or individual officers.

Management explained that the issue had been raised during the bi-annual

conference for the Ambassadors that took place in January 2014.

I advised management to follow up the issue with the Ministry Foreign affairs.

b) Unexpended balance 2012/13

A review of the financial statements revealed that there was un-spent balance on

the dollar account equivalent to UGX.578,496,143 which was not returned to the

consolidated fund, in contravention of Section 19(1) of the Public Finance and

Accountability Act, 2003.

Management acknowledged the anomaly and stated that the funds were for

capital development works and consultancy for the renovation of the official

residence of which the procurement process was still ongoing by the end of the

financial year. A letter to the Permanent Secretary and Secretary to Treasury

requesting for permission to retain the funds had not been responded to.

Page 738: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

726

I advised the Accounting Officer to always return un-spent balances or seek

authority before retaining funds.

c) Over Expenditure

A review of the financial statements revealed that the Mission spent

UGX.128,373,275 over and above the budgeted amount, which contravened

Paragraphs 152 of the Treasury Accounting Instructions (TAIs), 2004. There was

no evidence that the Mission obtained a Supplementary Budget Warrant to allow

the expenditure stand in the Financial Statements.

Management attributed the anomaly to the unforeseen activities such as the recall

of the High Commissioner to Kampala, whose travel (including the family), haulage

and freight costs had to be met by the Mission. Additionally, the Mission had to

remunerate a financial attaché who had not been budgeted for.

I advised management to ensure that the Mission‘s expenditure does not exceed

the amounts approved in the budget without seeking supplementary funding.

d) Management of Fixed Asset

Lack of Fixed Assets Register

The Mission did not maintain a comprehensive fixed assets register but rather a

list of assets was kept without details like dates of acquisition, repairs, additions

and the valuations thereof. This is contrary to Paragraph 400 of the TAIs, 2014.

Lack of these details makes it difficult to track the existence of assets.

Assets not Engraved

The Mission‘s assets had not been engraved contrary to Regulation 101 of the

PFAR, 2003, thus exposing them to risk of loss through theft or misappropriation.

Management acknowledged the omission but attributed it to budgetary

constraints.

Page 739: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

727

I advised the Accounting Officer to ensure that the activity is planned and

budgeted for in the subsequent financial years. A comprehensive assets register

should also be maintained.

e) Follow up of prior year audit recommendations

A review of the status of implementation of prior year‘s audit recommendations

revealed that some had not been implemented, as detailed in the following table.

This is indicative of management‘s attitude towards the relevance of the audit

function.

Finding Status of Implementation

Excess Expenditure - UGX

234,391,868 Not Addressed

Foreign Exchange Losses

Addressed

Revenue Collections Utilized at Source

without Authority.

Addressed

Un-spent Balance not Returned to the

Uganda Consolidated Fund (UCF) –

UGX 249,115,161

Not addressed.

Misstatement of the Statement of

Arrears of Revenue

Addressed

I advised management to implement the audit recommendations so as to ensure

enhanced accountability and better stewardship of resources appropriated to the

Mission.

99.0 UGANDA EMBASSY, ROME

a) Lack of accountability for the Agriculture Subvention Funds

The Embassy has additional responsibility of being a Permanent Mission to the UN

Agricultural Agencies of FAO, WFP and IFAD for which it operates an account No.

090050 with BNL Bank in Rome, under the supervision of the Agricultural attaché.

During the year,UGX.387,000,000 was disbursed to the account.

Page 740: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

728

However review of the operations of the account revealed the following

anomalies;

The Accounting Officer and the Accountant are not signatories to the

subvention account thereby complicating the accounting responsibilities.

The expenditure records for the funds were not availed for examination. It was

not possible to ascertain whether the funds were utilized for the intended

purposes.

The expenditure resulting from the operations of the Account were not

reported in the financial statements of the Embassy, implying that the

performance regarding the Embassy is understated.

The Accounting officer indicated that he is not privy to the activities of the

subvention.

I advised management to seek guidance from the Accountant General, Ministry of

Foreign Affairs and other relevant stakeholders to have the issues resolved.

b) Mission Accreditation

It was noted that the Embassy had presented letters of accreditation to Italy, FAO,

WFP and IFAD, but was yet to present to the countries of Malta, Greece, Cyprus

and Serbia & Montenegro, which had already accepted Uganda. The countries of

Macedonia, Croatia, Slovenia, Albania and Bosnia & Herzegovina were yet to

accept Uganda‘s accreditation. In the circumstances the Embassy‘s ability to

execute its mandate of representing Uganda is affected adversely. The delay to

present letters of accreditation was attributed to inadequate resources on the

travel vote.

I advised management to enhance engagement with MoFPED and MOFA so as to

obtain funds for the purpose.

c) Employment Contracts for Non-Diplomatic Staff

A review of top management minutes revealed that the non-diplomatic staff did

not have employment contracts with the Embassy as a result of disagreement on

exclusion of past period of employment with the Embassy. The staff feared that

Page 741: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

729

the exclusion was likely to affect their terminal benefits. Lack of contracts may

lead to litigation and loss of funds in future.

I advised the Embassy management to amicably resolve the matter raised by the

affected staff and have contracts finalized.

d) Lack of Insurance of Embassy vehicle

Interviews with staff revealed that an Embassy vehicle number CD060EC which

was involved in an accident on 11th December 2012, with another car, registration

number EM594HD lacked insurance cover. There is risk of loss of funds arising

from the legal suit instituted by the affected party. The Accounting officer

indicated that the vehicle belonged to the office of the Agricultural attaché whose

operations are not under his supervision.

I advised management to ensure all vehicles of the Embassy are insured

accordingly. Meanwhile the concerned officer should be held responsible.

e) Rent expenditure

Review of the commentary to financial statements indicated that the embassy

incurs more than UGX. 496,800,000 on rent of premises for the chancery annually.

Physical inspection revealed that the space was still inadequate and Embassy

records were packed in boxes and piled in corridors.

Management explained that proposals have been made to the responsible

ministries for acquisition of property estimated at UGX. 10 Billion. In the meantime

the embassy was in the process of renting new office premises.

I advised management to continue engaging with the responsible ministries to

acquire property so as to minimize rental expenditure.

f) Management of Fixed Asset

Lack of Fixed Asset Register:

The Embassy did not maintain a comprehensive fixed asset register showing

details of the assets and their valuations but only a list of the assets was

maintained contrary to paragraph 400(h) of the Treasury Accounting Instructions

(TAI). Lack of these details makes it difficult to track the existence of the assets.

Page 742: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

730

Management acknowledged the anomaly and undertook to put in place a proper

Asset Register in 2014.

Assets not engraved:

The Mission assets had not been marked/engraved as required by section 101 of

the PFAR, 2003 and this exposes them to risk of loss through theft or

misappropriation. Management stated that they were going to procure equipment

for engraving in 2014.

I advised the Accounting Officer to ensure that a comprehensive fixed asset

register is maintained and have the assets engraved to avoid possible loss without

trace.

g) Follow up of Prior Year’s Audit Observations

A review of the status of implementation of prior year‘s audit recommendations

revealed that some had not been implemented, as detailed in the following table.

This may be indicative of management‘s attitude towards the relevance of the

audit function.

Finding Status of Implementation

Collection & Accounting for Non Tax

Revenue

Not Addressed

Board of Survey Addressed

Recruitment of Non Ugandans as Local

Staff

Addressed

Review of Personnel Files & Staff

Contracts

1) The appointment letters are varied and

open ended.

2) Poor filing of documents in some

personal files

3) Incomplete files

Audit could not ascertain due to absence of

the Deputy Ambassador/Head of Chancery

from the duty station, and yet the files had

been locked in her office.

Staff Performance Appraisals Not addressed

Court Cases from Local Staff Not Addressed

Page 743: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

731

Recruitment of Accounts Staff Addressed

Staff Entitlements Not Addressed

Engraving of Fixed Assets Not Addressed

Letters of Accreditation Not addressed

Non-compliance with The PPDA,

Regulations

Not Addressed.

Capital Budget Addressed

Subvention Funding from MAIIF Not Addressed

I have advised management to implement the audit recommendations so as to

ensure enhanced accountability and better stewardship of the funds disbursed to

the Embassy.

100.0 UGANDA EMBASSY TOKYO

a) Over expenditure on the vote

A review of financial statements revealed an over expenditure in the statement

of appropriation of UGX 33,869,667.It appears no authority was sought from the

treasury occasioning the over expenditure.

I advised the Accounting Officer to consult the treasury and obtain the necessary

authority.

b) Staffing

The staff at the mission is small and as such categorized as 1+2. This means the

Head of mission and two other home based staff. It was observed that the mission

area of jurisdiction is big as it is accredited to Japan, South Korea, the Philippines

and Brunei Darussalam.

However, for this number of staff the mission is charged in its charter to:

Page 744: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

732

To convince Japan, South Korea, Brunei Darussalam and Philippines to

increase ODA and grant funding for vital projects in Uganda.

To solicit for technical assistance in fields such as Education, Health,

Agriculture

To solicit for markets for Uganda products in order to increase trade between

Uganda and Japan, South Korea, Brunei Darussalam and the Philippines.

To attract and promote investment from Japan, South Korea, Brunei

Darussalam and Philippines

To promote Uganda as number one tourist destination in the missions areas of

accreditation

To initiate development ventures from mission‘s area of accreditation

To protect and assist where possible Ugandans living in the area of

accreditation

A review of the annual plan and performance for the year under review revealed

that it could only cover Japan leaving out the other areas of accreditation.

During discussion, the Head of Mission attributed the under coverage of scope to

the inadequate structure and staffing. She further explained that the Mission has a

lot of economic and development potential that Uganda could take advantage of if

staffing could be stepped up and the requisite funding enhanced. She argued that

the mission structure should be reviewed and at least reinstated to its former

status of 1+3 status.

I urged the Head of Mission and the Accounting Officer to follow up the matter

with the Ministry of Foreign Affairs, Ministry of Finance planning and economic

development and Ministry of Public service for redress. An appropriate structure

and staffing together with the requisite funds will strengthen the performance of

the mission and reasonably cover its of scope.

c) Renting of property

It was observed that the mission does not own any property. Accordingly the

chancery, the official residence and other residences for staff are rented at an

Page 745: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

733

annual cost of ¥27,450,000 equivalent to US $ 274,500(shs.741,150,000). This

cost would be saved in the long run if an attempt to acquire own property through

the budget process is made.

In fact the Head of Mission affirmed that acquiring of own property was cost

effective. She revealed that the matter could be initiated by engaging the two

governments so that land for construction could be obtained through negotiations

on a reciprocity basis.

I urged the Head of Mission and the Accounting officer to follow up the matter

and ensure that the mission acquires its own premises to save on rent.

d) Review of the board of survey report on stores

The above review revealed several store items that were very old and the board

recommended replacement. This includes a 1997 vehicle, Toyota Crown

registration number GAI-12616. Such old stocks consume space and are

uneconomical to keep. Regarding the vehicle management revealed that it cannot

be allowed on the road as it is considered unworthy by the authorities.

During discussion the Head of Mission and the Accounting Officer explained that

the mission cannot replace the old stores due to inadequate capital development

funds. Besides their disposal would not attract any saleable value in the local

market, instead a cost would be incurred on them.

I advised management to lobby for the necessary funding through the budget

process to ensure that the disposal of assets and eventual.

e) Representation Car

In 2005 the Mission acquired a representation car, Toyota model 2005 registration

number GAI -12601. The vehicle is eight years now. Although it appeared to be in

good condition, management revealed that the vehicle was too old and considered

road unworthy under the traffic regulation of Japan. The mission may therefore

suffer embarrassment as a result if not replaced.

Page 746: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

734

Management should similarly lobby for the requisite funds through the budget

process and have the representation car replaced to save the mission any possible

embarrassment.

f) Foreign Service Allowance

It was noted that the Foreign Service allowance (FSA) paid to the home based

staff to cater for their cost of living has never been reviewed by the ministry of

foreign affairs and public service for a long time. The FSA has now been eroded by

the expensive market prices in the economy. As a result management explained

that it is becoming increasingly difficult for the staff to live an affordable life. This

impacts on their morale and hence productivity.

In view of the high price index in Japan I advised management to engage the

relevant authorities for the possibility of reviewing the FSA .

g) Training

It was noted that staff generally needed training and sensitization on the financial

and accounting regulations to enable them appreciate the role of the Accounting

Officer and their responsibility under the regulations. Similarly it was also noted

the Accountant specifically needed formal training on the Navision accounting

software. The training will enable her use some of the functions, for example,

bank reconciliation, that are currently dormant.

In a written response, the Accounting Officer stated that the training on Navision

soft ware was scheduled for May 2014. However this left the other training un

planned for the moment.

I advised the Accounting officer to follow up the matter with the Accountant

General and other authorities to ensure that all training as identified is undertaken.

The necessary budgetary funding need to be sought.

101.0 UGANDA EMBASSY, TRIPOLI

a) Unsupported rent payments

Page 747: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

735

A total of Euros 57,600 was paid in respect of rent for the Chancery official

residence and officer‘s accommodation. There were, however, no tenancy

agreements provided for the premises being rented to enable me confirm their

authenticity. I could also not ascertain whether the rates used were arrived at

competitively through proper market surveys, comparative bids and proper

evaluation.

I advised management to avail the tenancy agreements and a documented

procedure for identifying and valuation of properties.

b) Review of Financial Statements

Unsupported Non-Tax Revenue(NTR)

The NTR collection of UGX.12,934,981 was not supported with revenue returns

documents such as visa receipts rendering the completeness of the revenue

uncertain.

Non acknowledgement of NTR

The purported remittance of NTR in the sum of UGX.4,892,582 to the consolidated

fund lacked acknowledgement.

Non-remittance of NTR

A Sum of UGX.8,042,399 collected as NTR was not remitted to the consolidated

fund contrary to financial regulations. There is a risk that the funds were spent at

source.

Cash and cash equivalents

Included in the cash and cash equivalents balance of UGX.312,867,261 is a sum of

UGX.57,920,901, being cash at hand. However the cash balance was not

supported with the board of survey report rendering its accuracy and

completeness doubtful.

Foreign Exchange Losses

UGX.32,198,407, was reported under operating expenses in the Statement of

Financial Performance as Foreign Exchange Losses. However the basis of

measurement of the loss was not provided for audit verification.

Page 748: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

736

Trade Creditors

Included in the Financial Statement under Statement of Financial Position is an

amount of UGX.238,000,000 as trade creditors. However, a schedule indicating the

details of the creditors was lacking.

Statement of Cash Flows

Review of the Statement of Financial Performance (Based on classification of

expenditure), indicated the transfers from treasury as UGX.1,283,000,000. The

corresponding figure as per the Statement of Cash Flows is UGX.1,521,000,000

resulting into a difference of UGX.238,000,000 which was not explained. It was

also noted that the difference is equivalent to the amount of trade creditors and

may have been inserted into the cash flow statement as a balancing figure.

I advised management to ensure all the necessary explanations, adjustments and

disclosures are made and submitted for future use.

c) Un authorized excess expenditure

The provisions of Public Finance and Accountability Act and Regulations

(Regulation 39 & 40) together with the Treasury Accounting Instructions require

that Accounting Officers to adhere to the budgetary allocation per vote or obtain

prior permission before an over expenditure is incurred. On the contrary,

expenditure of UGX.238,929,314 was incurred on various budget items in excess

of budget provisions without necessary authorization. The practice undermines

budgetary controls.

I advised management to always follow prescribed procedures before incurring

excess expenditure. In the meantime, an explanation is awaited.

d) Medical Treatment of Mission Staff

Chapter 3 Section F-a of the Uganda Public Service Standing Orders, 2010 requires

Foreign Service Officers together with their spouses and children to be registered

with a doctor and dentist to provide them with medical treatment and the Mission

deals directly with those service providers. However, the Mission paid out

Page 749: OFFICE OF THE AUDITOR GENERAL · office of the auditor general ... 69.0 ministry of lands, housing and urban development ... 76.0 uganda, embassy addis ababa

737

individual bills and also made refunds to officers amounting to Euros 2,454 for

their treatment without any prescription from qualified personnel.

Such adhoc medical payments not only prove costly in the long run but may also

be dangerous to officers‘ health. Medical costs would have been probably lower if

the Mission had subscribed to the national health insurance scheme as required by

the Standing Orders.

I have advised management of the Mission to ensure that the requirements of the

Standing Orders are complied with. Meanwhile an explanation for the anomaly is

awaited.