U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Montana Pipeline River Crossings Montana Pipeline River Crossings PHMSA PHMSA\Office of Pipeline Safety Office of Pipeline Safety PHMSA PHMSA\Office of Pipeline Safety Office of Pipeline Safety 8/17/2012 8/17/2012

Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Montana Pipeline River CrossingsMontana Pipeline River CrossingsPHMSAPHMSA\\Office of Pipeline SafetyOffice of Pipeline SafetyPHMSAPHMSA\\Office of Pipeline SafetyOffice of Pipeline Safety

8/17/20128/17/2012

Page 2: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

BackgroundBackground Water CrossingWater CrossingBackground Background -- Water Crossing Water Crossing Survey of MT Petroleum PipelinesSurvey of MT Petroleum Pipelines

• As a result of the July 2, 2011 crude oil spill into the Yellowstone River, ensure the integrity of petroleum pipelines at major water crossings that affect rivers in Montana.

• Collaborate with State of Montana to compile an inventory of petroleum pipelines at water crossings and determine if they are currently safe.

• Determine adequacy of pipeline operators’ patrolling methods and remedial actions at water crossings for future flooding events

• Enhance PHMSA inspection guidance to ensure operators are • Enhance PHMSA inspection guidance to ensure operators are meeting all aspects of regulations, particularly with respect to protecting their pipelines from water-related damage.

Page 3: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

PHMSA’s FocusPHMSA’s Focus

1. Petroleum pipelines (crude oil and refined products)

2. Major river crossings (greater than 100 feet)

3. Located in Montana and rivers flowing into Montana

4. Constructed with open-trench technology

5. Exposed or lack of depth-of-cover

6. River history & characteristics

7. Follow-up on mitigation measures recommended by Operators consultants

Page 4: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Information CollectedInformation Collected

• Depth of Cover Surveys

• MLV Alignment Sheets

• Worst Case Discharge

• Integrity Threats Reports/Studies

• Analysis Used for Remedial Actions (stream flow, depth-of-cover Remedial Actions taken in 2011

• Short-term Remedial Action Schedule • Short term Remedial Action Schedule

• Long-term Remedial Action Schedule

• Procedures to Monitor

• Shared GIS data with MT DEQ

Page 5: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

ExxonMobil UpdateExxonMobil UpdateHDD’ l t d Y ll t Ri R k C k Cl k’ F k • HDD’s completed: Yellowstone River; Rock Creek; Clark’s Fork of the Yellowstone

• Developed contingency plan to operate and monitor the p g y p pSilvertip Pipeline during flooding conditions, including enhanced patrolling and surveillance

• Completed In-Line-Inspection (ILI) to detect metal loss • Completed In Line Inspection (ILI) to detect metal loss and/or deformation and make necessary repairs

• ExxonMobil completed metallurgical investigation of Yellowstone River crossing failureYellowstone River crossing failure

• Closed Corrective Action Order (CAO) – August 8, 2012

• PHMSA is finalizing incident investigation• PHMSA is finalizing incident investigation

Page 6: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

ExxonMobil: Yellowstone River HDD P66: Clark Fork River HDD

ExxonMobil: Clarks Fork of the Yellowstone River HDD under test

P66: East Gallatin River HDD

Page 7: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Progress Since July 2011 ReleaseProgress Since July 2011 Release• Depth-of-Cover surveys and evaluations conducted for all

major crossings

• ExxonMobil:ExxonMobil:

– Yellowstone River (Laurel): HDD completed

– Rock Creek (Rockvale): HDD completed( ) p

– Clark’s Fork of the Yellowstone (Bridger): HDD completed

• CHS:

– Musselshell River (Shawmut): HDD completed

Page 8: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Progress Since July 2011 ReleaseProgress Since July 2011 ReleasePhilli 66 Pi li LLC• Phillips 66 Pipeline LLC:

– Coeur D’Alene River @ MP476 (#1 priority) – Kingston, ID: HDD nearing completiong p

– Clark Fork River @ MP319.1 (#2 priority) Yellowstone Pipe Line (just east of Missoula): HDD completed

ll ll– East Gallatin River @ MP148.3 Yellowstone Pipe Line (North of Manhattan): motor-operated valve installed

– Judith River 8” & 12”@ MP207 (Hobson): HDD nearing @ ( ) gcompletion

– East Gallatin River @ MP148 North of Manhattan: HDD nearing completionnearing completion

Page 9: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Progress Since July 2011 ReleaseProgress Since July 2011 ReleaseProgress Since July 2011 Release Progress Since July 2011 Release Cont.Cont.

• Phillips 66 Pipeline LLC (Cont.):

– Beauvais Creek: HDD completedp

– Belt Creek (Belt): added cover completed

– Coeur D’Alene River: Grout bags/temporary repairs ( d d l d ) l d(Campground Rd, Silver Bridge) completed

– Beaver Creek: MP 197.7 New trenched crossing (Refrigerator Canyon & Winston) completed( g y ) p

– Tongue River (WY): Grout bags/spring monitoring completed

Page 10: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Progress Since July 2011 ReleaseProgress Since July 2011 ReleaseProgress Since July 2011 Release Progress Since July 2011 Release Cont.Cont.

• KinderMorgan

– Clark Fork of Yellowstone River; Greybull River; Musselshell River: depth-of-cover surveysMusselshell River: depth of cover surveys

• Marathon (Wyoming)

– Shoshone River; Wind River; Big Horn River: depth-of-; ; g pcover surveys

• True (Bridger Pipeline)

– Poplar River/Missouri: Took out of service during flooding event due to valve inaccessibility (back in service)

– Yellowstone River and Poplar River: 2011 depth-of-cover surveys conducted and show adequate cover

Page 11: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

i ii iMontana River CrossingsMontana River CrossingsOperator Major River

CrossingsRemediation Not

Remediation to be

2013 and beyond Crossings

(open-cut, > 100 feet)

Not Necessary

to be Completed by 2012

beyond Remediation(Lower Priority)

ExxonMobil 4 1 3 N/A

CHS 3 1 1 1

Phillips 66 16 4 3* 9

Plains 0 0 N/A N/A

Marathon (Wyoming)

3 3 N/A N/A

Kinder Morgan 4 4 N/A N/A

ONEOK 1 (HVL) 1 N/A N/A

T e 2 2 N/A N/ATrue 2 2 N/A N/A

* Also 2 on Coeur d’ Alene, and 2 on Judith, 1 on Gallatin, 1 on Tongue all less than 100 feet wide, and slide area 76 miles southeast of Billings ,

Page 12: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

2012 PHMSA Focus Planned 2012 PHMSA Focus Planned Remediation MeasuresRemediation Measures

• Phillips 66 Pipeline LLC:• Phillips 66 Pipeline LLC:

– Yellowstone @ MP 2.2: RiverRock weir installation

• Delayed pending permit issues

– Coeur D’Alene River @ MP 456.6 (Silver Bridge): HDD

• Drilling expected to start in September

– Clark Fork River @ MP 264.7: HDD

• Drilling expected to start in September

– Big Horn River @ MP 44.5: HDD

• Delayed pending land use permit• Delayed pending land use permit

– Tongue River @ MP 88.3: HDD

• Drilling expected to start in September

i k i h d l d b di d 3– Lower risk crossings scheduled to be remediated over next 3 years (2013-2015)

Page 13: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Future Remediation'sFuture Remediation'sFuture Remediation'sFuture Remediation's2013 and Beyond 2013 and Beyond –– Lower PriorityLower Priority

• CHS:

– Tongue River: HDD in 3-5 years

• Phillips 66:

– Yellowstone River @ MP 1.3

– Missouri River @ MP 269.3

– Yellowstone River 8” & 10” delivery line

– Marias River 8” & 12” @ MP 353.2

– Musselshell @ MP 45.5

Cut Bank Creek @ MP 379 8 & MP 370– Cut Bank Creek @ MP 379.8 & MP 370

Page 14: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Continued FocusContinued FocusR i l FRegional Focus

• Inspect new construction and remediation activities of water crossingswater crossings

• Develop enforcement actions for operator’s not following submitted remedial action plans (None required to date)

• Ongoing information exchange with State, including the need for safety enhancements at water crossings and update to State-held GIS mapping system

• Use lessons learned to focus future inspections on Geotechnical/Hydrological Issues, Valve Effectiveness, and Leak Detection and Response. (Current Regulations p ( ghowever do not have explicit criteria)

Page 15: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Continued Focus Continued Focus

National Focus

• Issue a Notice of Proposed Rulemaking on GIS-based mapping detailing what level of information shall be provided.

• Complete the Congressionally mandated studies in the Complete the Congressionally mandated studies in the Pipeline Safety, Regulatory Certainty, and Job Creation of Act of 2011

Depth of cover at water crossing greater than 100 feet– Depth of cover at water crossing greater than 100 feet

– Valve Effectiveness Study

Page 16: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

PHMSA Safety StakeholderPHMSA Safety StakeholderPHMSA Safety Stakeholder PHMSA Safety Stakeholder Communication WebsiteCommunication Website

• PHMSA Safety Stakeholder Website:

– http://primis.phmsa.dot.gov/commhttp://primis.phmsa.dot.gov/comm

• Direct Link to National Pipeline Mapping System:

https://www npms phmsa dot gov/– https://www.npms.phmsa.dot.gov/

• Direct Link to Enforcement Cases:

– http://primis.phmsa.dot.gov/comm/reports/enforce/EnfHome.html?nocache=6563

Page 17: Office of Pipeline SafetyOffice of Pipeline Safety 8/17/2012bloximages.chicago2.vip.townnews.com/billingsgazette.com/content… · Pipeline and Hazardous Materials Safety Administration

U.S. Department of TransportationPipeline and Hazardous Materials Safety Administration

Q ti ?Q ti ?Questions?Questions?