Upload
lykhanh
View
213
Download
0
Embed Size (px)
Citation preview
1
1
Page1
COMPANY PROFILE
OF
STAR COMPUTER SYSTEMS LIMITED (SCSL)
Version 0.0.1
A CMMI Level 3 Company
Version 0.0.1
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
2
Pa
ge
2
Confidentiality Statement: The information provided herein contains confidential and proprietary information owned by Star Computer Systems Limited, and is intended solely for the above named specific individual, for the stated purpose and is protected by law. Any disclosure, copying or distribution of this information beyond its evaluation for the stated purpose is strictly prohibited. If you are not the intended recipient, you are hereby notified that any disclosure, copying or distribution of this message or the taking of any action based on it, is strictly prohibited.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
3
Pa
ge
3
TABLE OF CONTENTS
ABOUT SCSL........................................................................................................................ 4
Vision ................................................................................................................................. 4
Certifications....................................................................................................................... 5
Mission ............................................................................................................................... 4
Most important strengths and core competencies ............................................................... 5
Track Records .................................................................................................................... 5
PRODUCTS & SERVICES .................................................................................................... 6
Products ............................................................................................................................. 6
Services ............................................................................................................................. 6
TECHNICAL EXPERTISE ..................................................................................................... 8
TOOLS WE USE ................................................................................................................... 9
ENGAGEMENT MODEL ....................................................................................................... 9
PROFESSIONAL CERTIFICATIONS .................................................................................. 11
LEGAL INFORMATION ....................................................................................................... 13
HR POLICY ......................................................................................................................... 15
CORPORATE SOCIAL RESPONSIBILITY (CSR) PROGRAM ........................................... 17
SUMMARY OF SERVICES RENDERED ............................................................................. 18
SCSL EXPERIENCES ......................................................................................................... 21
Software Development Experiences ................................................................................. 21
Training Experiences ........................................................................................................ 51
Management Training Experience .................................................................................... 59
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
4
Pa
ge
4
ABOUT SCSL
SCSL is one of the leading ICT solutions and services providers in Bangladesh having CMMi
level 3 appraisal and ISO 9001:2008 certification. Our Business Application Development
services help clients concentrate on evolving business and technology challenges by
defining, designing and building applications adapted to meet your business requirements.
SCSL implements best practices like BOOT, JV, Turnkey and SaaS model for its projects.
SCSL develops in windows, web and mobile platforms for better accessibility and user
friendliness of the user end. SCSL works with ERP, HRM, e-Commerce, e-Governance
Application, Web Portal development and implementation in an enterprise scale.
SCSL marks success for the strongest product line the "'ERP OPTIMA'" providing a stellar
Enterprise Planning Solution. Our consultancy services have provided solutions for Capacity
Development of Bangladesh and other Ministries of Government of Bangladesh.
We provide software development services both for the government and commercial sectors
to help increase productivity and reduce operating expenses. SCSL serves the Large and
Medium sized Enterprises of
Manufacturing
Textile & Garments
Construction/Projects/Engineering/Real Estate
Non-Profit (International organizations, NGOs, Donors),
National/Local Government
Retail
SCSL‟s capacity in Network Establishment is proven through establishment of the entire
network infrastructure Setup and Solution of Rural Development Academy (RDA) Bogura,
Bangladesh Academy for Rural Development (BARD) Comilla, and National Institute for
Local Government (NILG) Dhaka.
We have been able to make our marks of success already for our strongest product line the
„ERP OPTIMA™‟ providing the best Enterprise Planning Solution in the Country. Our
consultancy services have already taken challenges for Capacity Development of
Bangladesh and other different Ministries of Government of Bangladesh.
Vision
“Define your business and complete your requirement with our solutions on demand.”
Mission
“SCSL is a process and performance driven company who accentuates on metrics to
continual improvement. We empower your business with our creative, up to date & on
demand solutions”
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
5
Pa
ge
5
Most important strengths and core competencies
Quick understanding and documenting business requirements in a way that
facilitates solution design.
Choosing tools that solve today‟s problems and anticipate tomorrow‟s need.
Appropriate development processes with continual improvements.
Managing large, low cost, off-side and on-shore developments & implementations.
SCSL combines of functional, technological, engineering and process excellence resulting in
long standing customer relationships. Greater automation, agility and innovation are crucial
to deliver high quality products that are relevant and timely.
Track Records
We have helped our customers launching 200+ successful products/ projects globally,
through our superior program management and engineering.
Delivered 200+ projects spanning servers and tools, collaboration, operating systems, online services and cloud computing for the world's largest software vendor.
Achieved 40% reduction in price comparison inquiry, through performance benchmarking and optimization
Delivered 30+ releases on time, across platforms, technologies and engagement models.
Certifications
CMMI level 3: for
Software Department
ISO 9001:2008 for
HR, Purchase, Store, Training, Management Representative
(MR)
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
6
Pa
ge
6
PRODUCTS & SERVICES
Products
ERP Optima™
Accounts & Financial Management
Sales Management
Inventory Management
Purchase Management
Supply Chain Management
Commercial
Production Management
Human Resource Management (HRM)
Fixes Asset Management
Customer Relationship Management (CRM)
CMAS-Optima
ZWCADTM
Services
Custom Business Applications
SCSL develops in windows, web and mobile platforms for better accessibility and user
friendliness of the end user. SCSL works with ERP, HRM, e-Commerce, e-Governance
Application, Web Portal development and implementation in an enterprise scale.
Web Portals
SCSL is specialized in incorporating the best interactive options and latest technologies to
develop your website. With years of experience and dedicated pool of professionals on our
team, we develop scalable applications in a shorter time span. Our portfolio includes fully
functional and highly interactive applications that have become an asset to our clients and
have helped their business scale new heights.
Mobile Application
SCSL has the tools, processes and experience essential to develop mobile applications for
its business applications. From ready-to-run applications to the industry's most powerful
open mobility platform, our solutions let you define, design, build, integrate, deploy, and
manage amazing apps at each step of your mobile journey.
Whether you need a ready app to get to market fast, or a completely custom app built from
scratch designed just for your industry, we can help.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
7
Pa
ge
7
ICT Training
SCSL has a high degree of expertise and confidence that our trainings are standards-based,
reliable and will accelerate your growth. Below are the Training Courses and contents:
Training Courses Contents
Courses For All Engineers, Drafters And General Professionals
Computer Fundamental Basic Course, AutoCAD 2D, AutoCAD 3D
Course For Architecture Revit Architecture
Course For Project Planning & Management Professionals
Microsoft Project, MS Visio
Course For Interior Designers & 3d Modelers
3D Studio Max
Course For Graphic Designing Adobe Photoshop, Adobe Illustrator, Adobe Flash
Course For Network Engineering Advanced Network Technology, Computer Hardware Engineering, Cloud Computing Certification Course
Course For Web Application Development
HLML5, PHP, MySQL & HTML, ASP.NET, Joomla, OOP using PHP, Responsive Web Design with Codeigniter / CakePHP
Course For Web Software Development
C#.NET, SQL Server 2008, OOP using .NET
Course For Mobile Application Development
PhoneGap, Android Apps Development, iPhone Application Development
Course For Mid-Level Management Leadership, HR Policy, Basic Accounting, Basic Overview Training on QMS, Administrative & Skill Development Training
ICT Consultancy
SCSL has a dedicated and experienced team for providing professional IT Consultancy
services for the industry. Our IT Consultancy service includes provision Business Process
Analysis, System Design and Business Process Reengineering, IT Roadmap Preparation
and E Governance Consultancy.
Overseas Training management
We are proficient of implementing training, study tour, workshop, seminar leading to capacity
building for civil and government institutions, non-government organizations (NGO‟s) and
communities in Bangladesh, Vietnam, Malaysia, Indonesia, China, the Philippines, Korea,
Australia, New Zeeland, Canada etc.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
8
Pa
ge
8
TECHNICAL EXPERTISE
WEB MOBILE
Language
ASP.Net, C#.Net, XML, HTML/HTML5,
CSS/CSS3, PHP, JSP, JavaScript
Phonegap(SDK), JAVA,
HTML5, CSS3
Framework .Net, Cake PHP, codegniter, jQuery, AJAX,
Angular JS etc. jQuery, jQueryMobile
Database ORACLE,MS SQL Server, MYSQL, SQLlite,
Web SQL SQLlite, Web SQL
Platform
MS-Windows 9x/2000/2003/windows 7,
Linux
Android, IOS, Windows,
Blackberry
Server Apache Web Server, IIS, Tomcat
Development
Tools
Dream weaver, Nodepad2, Visual Studio ECLIPES, Xcode
Others
Design Pattern MVC, ORM
Content Management System Joomla, Drupal, Wordpress, OS commerce, X-Cart,
Zen-Cart, Magento-Commerce,
Project Management Tools MS Project Management 2007, MS Excel, Podio,
Mantis, TFS
Reporting Tools Crystal report, HTML
Version Control Visual SourceSafe, Sub version, TFS
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
9
Pa
ge
9
TOOLS WE USE
Microsoft Share Point
We are using SharePoint for developing .Net based software project, maintaining and
sharing documents. Also used for team update, work progress and notification.
Microsoft Project
We are using Microsoft Project for managing team and scheduling and distribution of tasks.
We also track tasks, schedule, effort and milestones through Microsoft Project.
ENGAGEMENT MODEL
Our teams are built around your technology requirements for offering specialized services
and solutions that meet the discrete needs of your business. Our assurance to our
customers defines how we do business, and our years of working experience across
industries reinforce the service assortment we offer.
The primary factors in SCSL‟s successful client relationships are respect, rapport, and
resonance. We become a part of team and share a passion for customers‟ business goals.
SCSL‟s client engagement models reflect our account relationship philosophy. Our flexible
models provide support exactly the way you need it.
The engagement models that we adopt are:
Project-Based Model/Fixed Price Project Model
SCSL team works with the clients closely to understand their requirements and define their
expected deliverable outcomes to determine a mutually agreed fixed price. This model is
suitable for projects that are specifically defined in terms of their requirements, schedules
and project path.
If the project is well-defined and the scope is clearly understood with a definite finishing date,
then the fixed bid project model is the appropriate one to select.
Hourly Engagement Model
This model is for projects with extensible development requirements that may vary upon the
project objective and deliverables. Client just has to pay for the hours invested in the project.
This model is suitable for projects with continuously evolving requirements, having possibility
of further expansion adding further work hours till the accomplishment of the project
objective.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
10
Pa
ge
1
0
Dedicated Resource Model
This Dedicated Resource engagement model is for clients looking to hire dedicated
manpower for their projects. It will give you total control on the resources that you hire for the
project. We will assign the most experienced and competent professionals, who will work on
the project as per your project requirement, following Project structure and procedure will be
decided by the client. If your project framework expands then you are free to increase the
team or change its composition.
BOOT (Build Operate Own Transfer) Model
In the BOOT model, the service provider finances the capital expenses necessary to start a
new service center or service delivery platform. In a pure BOOT, the service provider owns
and finances the infrastructure in addition to managing it for a fee.
Typically we use this model where we set up, optimize and run your required service delivery
option with the contractually pre-specified commitment of transferring the service or solution
to the client.
Turnkey Project Model
In Turnkey engagement model we take full responsibility for breakthrough deliveries within a
mutually agreed schedule. We work closely with clients from requirement collection to train
the client to support the application and then transfer ownership.
This model is best applicable when client turn derivative products over to us, or when they
need a full set of skills which are not readily available within their company at that time. Our
clients are assured with a well-defined and managed process of high quality results with
minimal impact to their other ongoing projects.
We understand that taking ownership of a project means "getting things done".
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
11
Pa
ge
1
1
PROFESSIONAL CERTIFICATIONS
Skills Inventory by Vendor
Certifications
CORE TECHNOLOGY CERTIFICATION
DETAILS
TOTAL NO.
PROFESSIONALS
Oracle OCP 1
MS MCSD 3
MS MCSE 3
MS MCPD 3
Linux RHCE 3
CentOS 5.6 3
Microsoft Windows Server 2003 MCSE 5
Microsoft Windows Server 2008 MCSE 5
Microsoft Exchange Server 2003 MCSA: Massaging 3
Microsoft Exchange Server 2010 MCSA: Massaging 3
Cisco CCNA 1
CORE TECHNOLOGY CERTIFICATION
DETAILS
TOTAL NO.
PROFESSIONALS
Oracle OCP 1
MS MCSD 3
MS MCSE 3
MS MCPD 3
Linux RHCE 3
Project Management Prof PMP 1
Microsoft Windows Server
2003/2008
MCSE 5
Microsoft Exchange Server
2003/2010
MCSA: Massaging 3
Cisco CCNA 1
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
12
Pa
ge
1
2
Particulars Description
Office Space 6600 Sq. Ft.
Office Vehicle 6
Conference Room 1
Training Room 4
Network Operations Centre (Noc) 1
Server (Branded) 3
Server (Clone) 3
High End Test Environment Server 2
Internet Connectivity (Fibre Optics, Wimax, Edge, Cdma 1000)
4 mbps (4096 kbps); connected with all workstations
Land Phone Line 2
Pabx Connection 20
Fax 1
Power Backup Facilities Generator, IPS Backup up to 2 hours
Security 24 Hours Security Guard
Air Condition 25
Projector 4
Workstation 80+
Laptop 12+
Wlan Whole Office
Scanner 2
Printer (High End Laser) 4
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
13
Pa
ge
1
3
LEGAL INFORMATION
Trade License Under the act of Dhaka City Corporation Ordinance , 1983
(Ord. XL of 1983), Section 69
Type of Organization Limited Company
Paid-Up Capital 25 Lac 50 Thousand
Authorized Capital 1 Crore
Trade License 0102069
Certificate of
Incorporation No. C-35901(201)/98
TIN 037-201-0373/C-80
VAT Registration No. 9121066453
Name of the Bankers Bank Asia & Mutual Trust Bank Ltd.
Certification CMMI level 3 and ISO 9001:2008 Certified
BASIS Membership
No. G-018
BCS Membership No. 105
DCCI Membership
No. 909 (Book No.079/Serial No. 07887)
Corporate Address 70, Green Road, Fattah Plaza (7th -9th Floor), Dhaka-1205
Tel (880) 2 9641006, 9665374
Email [email protected]
Web www.stargroup-bd.com
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
14
Pa
ge
1
4
Company Organ gram
Managing Director
Director (Admin & Finance)
Director (Technical)
Manager Accounts & Admin
Executive, Accountant and HR
Receptionist
office executive
Office Messenger
Head of Marketing & Business Development
ICT Consultancy
Head of Software Development
Head of Network Dept
Manager(Training)
Business Development Officer
Business Development Executive
Project Coordinator
System Analyst
Business Analyst
Business Process Specialist
Project Manager
System Analyst/Team Leader
Analyst Programmer
R&D Development Manager
Database Administrator
Sr. Software Engineer
Software Engineer
Creative/Graphic Designer
R&D Product Development Engineer
DB Programmer
Technical Writer
Tester
IT Support Engineer
R&D Test Engineer
Project Manager
System Admin
Network Admin
Asst. System Admin
Asst. Network Admin
Support Engineer
Technical Contact
Faculty (CAD )
Faculty [OCA (DBA)]
Faculty (ICDL )
Faculty(Programming )
Faculty (MCSE / MCSA )
Faculty(Networking)
Office Messenger
NOTATIONS
GRADE # A
GRADE # B
GRADE # C
GRADE # D
GRADE # E
GRADE # F
GRADE # G
GRADE # H
GRADE # H
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
15
Pa
ge
1
5
HR POLICY
We know that exceptional experiences begin with extraordinary people. We employ the leading experts, and technology innovators and proven integrators. We empower our employees to become a committed team, and a talented developer community to create experiences that matter.
It is, therefore, the mission of the company to offer our employees an entrepreneurial work environment in which excellence, team work, open communication, innovation, respect and personal growth are encouraged.
Equal opportunity practices
SCSL is committed to provide a working environment free from unlawful discrimination and to foster a company culture founded upon the fundamental dignity of all of its members. It does not discriminate against or permit harassment of employees or applicants for employment on the basis of race, color, gender (including gender identity and expression), religion, and national origin.
Recruitment
In general all administrative positions, including senior and executive level positions, must be posted through the Companies Career Page and different Job Portals and keep them posted for a month to the least.
Selection
As part of SCSL‟s commitment to equal employment opportunity and affirmative action, the company has an established Administrative Hiring Process for all applicants.
SCSL hires, develops and retains the best employee for every job. It takes steps to identify and encourage highly qualified applicants to apply for jobs and try to make the hiring process as clear and easy as possible for applicants and managers.
Training & Development
SCSL offers Induction Training, Administrative and Skill Development Training, training on different technology for our human resources regularly.
In addition SCSL arranges special training programs as per project need and technology demand. We also encourage our Staffs to participate on different workshops that SCSL thinks necessary and adds value to the company and most importantly bears all the expenses related to the workshop.
Performance Management/Review Management
SCSL has a review system which gets conducted yearly. Promotion and pay rise are offered in accordance with the result of the review.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
16
Pa
ge
1
6
Benefits
SCSL offers its employees market competitive wages, Festival bonus, Project bonus, Provident fund, Group-Insurance, Medical Benefits, House Rents, Travel Allowance, Daily Allowance, Telephone Allowance, Yearly Leave, Maternity & Paternity Leave, Marriage Leave, Entertainment including Birthday and Occasional Parties, Etc.
Freedom of association and collective bargaining
SCSL involves its entire stakes in the decision making process which relates the respective stakes. Administrative decisions are taken followed by a round table meeting of its employees. Scheduled meetings and instant meetings are called up before taking decisions that relates our employees.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
17
Pa
ge
1
7
CORPORATE SOCIAL RESPONSIBILITY (CSR) PROGRAM
Since founded, SCSL has been committed to various corporate social responsibility (CSR) programs and granting resources to carry them out.
Child education
As a responsible organization we offer early childhood education to poor and destitute children. They are given books and all the supporting materials to continue their study up to a certain stage.
Women empowerment
SCSL gives special attention to empowering local girls and women in order to improve their social condition and make them economically independent. Several training programs are arranged often including domestic food products, candle, paper envelopes, stitching, tailoring and embroidery, mushroom cultivation, incense sticks preparation, fishery, and facilitating them to start their own enterprises for income generation.
Senior citizen entertainment
Senior citizens are always of respect. They work hard to keep their body and mind active. Numerous activities and social events help them do just that. We offer many entertainment and recreations for that purpose including: outdoor activities, indoor games, art, reading, social gatherings etc.
Medical treatment
We often raise funds both internally and externally to support the treatment expenses of patients of insolvent families suffering from serious diseases.
Internship opportunity for students
Those just finished their Graduations or still pursuing their degree and require work experience as part of their courses, have incredible opportunity to work at SCSL. We offer three positions throughout the year for the Internship program in return of attractive remuneration whilst having the advantage and opportunity in the next recruitment process.
Natural Disaster
SCSL takes initiative to stand next to the victims of any Natural Disaster through financial contribution, collecting and distributing food and drinking water straight among the victims. During the winter season SCSL collects and distributes winter clothes, blankets to the poor of the society living in the street.
Environmental responsibility
Considering our environmental-responsibility we do most of our paper work based communications electronically. Before printing anything we always ask ourselves: "Do I need a hard copy?” Also we have two ways of separating any disposals and office waste, recyclable and non-recyclable.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
18
Pa
ge
1
8
SUMMARY OF SERVICES RENDERED
No. Assignment Name Name of Client
1. Customized ERP Software Development Service MEP Group
2. Development of dynamic
(http://greenpower.com.bd/)
Green Power Electrical &
Electronics
3. Joint-Venture Project For Development of ERP
Software Between Abdul Monem Ltd (AML) & Star
Computer System Limited (SCSL)
Abdul Monem Limited
4.
Customized ERP Software Development:
Accounting System, Corporate Payroll, Inventory
Management, PF Management, Production
Management & Management Information System
Rupantarita Prakritik Gas
Company Limited, (RPGCL)
Dhaka.
5. Development of ERP Software
International Trade Lines Ltd.
(ITL)
6. Development of Accounting Management System
and Payroll & Human Resource Management
System under ERP implementation
Mastex Sweater Industries
Limited
7. Development of Provident Fund Management
Software Save The Children
8.
Development of Human Resource Management
Software including Payroll, Time Attendance &
Leave Management for The Structural Engineers
Ltd.
The Structural Engineers Ltd.
9.
Development of Save The Children Human
Resource Information System (HRIS), first phase,
second phase, Annual maintenance and Migration of
all date of Save the Children International
Save The Children
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
19
Pa
ge
1
9
10. Customized Integrated Accounting & Financial
Management System Software. AMJ Corporation Limited
11. Integrated Accounting Management Information
System (IAMS) AMJ Corporation Limited
12. Development of Financial Management System of a
Company including Trade Tracking Record (FMS) &
Administrative Management System.
Kawasho Corporation
13. Customized Integrated Accounting Management
Information Systems (IAMIS), TAS. Telledger under
ERP implementation
Orion Group, Dhaka.
14. Integrated Solution of Time & Attendance (TAS) with
Payroll and 7 Proximity Readers Security Digitech
15. Integrated Time & Attendance (TAS) System
Solution, STAR TelLedger Software Solution,
Software Maintenance.
Bangladesh General Insurance
Company Ltd. (BGIC)
16. Accounting & Inventory Management System Khan Foundry Limited
17. Time Attendance System The Oriental Bank Limited
18. Development of Web based HRM Management
System Muslim Aid-UK, Bangladesh
19.
Development of Web Portal for Bangladesh
Academy for Rural Development (BARD), Rural
Development Academy (RDA) and National Institute
of Local Government (NILG).
Verulam Associates Bangladesh
Ltd.
20. Job Portal for Prothom-alojobs Prothom-alojob.com
21. Development of Child Labour Monitoring System
and Website for Child Labour for “Enhancing the
Capacity of the Child Labour Unit”
Ministry Of Labour &
Employment, Government Of The
People‟s Republic Of Bangladesh
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
20
Pa
ge
2
0
22. Development of web portal for Food Security for
Ultra Poor (FSUP) Programme, European Union
European Union, Food Security
for Ultra Poor (FSUP)
Programme
23.
Development of Online Registration, Admin login &
view the registered Students list, Integrate Payment
method and convert current website to our
framework for BIM.
Bangladesh Institute of
Management (BIM)
24.
Development of Webportal for ATN Radio, ATN Jobs
and IP TV for ATN Bangla, ATN News and Bijoy TV
by B-Core Limited, a sister concern of Star
Computer Systems Limited & ATN Bangla.
Bangladesh Institute of
Management (BIM)
25. Development of Customized Software for Online
Information for Youth Training.
Department of Youth
Development, Ministry of Youth &
Sports
26. Development of web based software for VSO
Capacity Building & Database Management System
Voluntary Services Overseas
(VSO)
27. Development of Web based Compliance
Management & Audit System
Bureau Veritas (Bangladesh)
Private Ltd
28. Development of dynamic website for Roadhouse
Restaurant http://roadhousebd.com/ Roadhouse Restaurant
29. Development of dynamic website for Star
Consultants & Engineering, Ltd. (SCEL)
http://scelbd.com/
Star Consultants & Engineering,
Ltd. (SCEL)
30. Software Development for Database Preparation &
Maintenance in Guchchhogram (CVRP) Project Guchhogram (CVRP) project, Ministry of Land,
30 Development of Union Parishad Management
Software and Union Parishad Information Database Bangladesh Academy for Rural Development, Kotbari, Comilla
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
21
Pa
ge
2
1
SCSL EXPERIENCES
Software Development Experiences
Assignment name: Development of dynamic website for Green Power Electrical & Electronics http://greenpower.com.bd/
Country: Bangladesh
Duration of assignment (months): 1.5 Months
Name of Client Roadhouse Restaurant
Total No of staff-Month of the assignment 2 man-month
Start Date November 2015
Completion Date January 2016
Name of Joint Venture/Associated Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture, Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved A F M Salah Uddin Sumon, Project Manager
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement, training etc.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of dynamic website for Roadhouse Restaurant http://roadhousebd.com/
Country: Bangladesh
Duration of assignment (months): 1.5 Months
Name of Client Roadhouse Restaurant
Total No of staff-Month of the assignment 2 man-month
Start Date November 2015
Completion Date Ongoing
Name of Joint Venture/Associated Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture, Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved A F M Salah Uddin Sumon, Project Manager
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement, training etc.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of dynamic website for Star Consultants & Engineering, Ltd. (SCEL) http://scelbd.com/
Country: Bangladesh
Duration of assignment (months): 1.5 Months
Name of Client
Star Consultants & Engineering Ltd.
Total No of staff-Month of the assignment
3 man-month
Start Date
June 2015
Completion Date
July 2015
Name of Joint Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by
joint venture, Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
A F M Salah Uddin Sumon, Project Manager
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training etc.
Firm‟s Name: Star Computer Systems Limited
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
22
Pa
ge
2
2
Assignment name: Software Development for Database Preparation & Maintenance in
Guchchhogram (CVRP) Project
Country:
Bangladesh
Duration of assignment (months):
2 Months
Name of Client
Guchhogram (CVRP) project
Ministry of Land, House# 3/A, Nilkhet,
Babupura, Dhaka -1205
Total No of staff-Month of the assignment
5 man-month
Start Date
July 2015
Completion Date
Ongoing
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint
venture, Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
A F M Salah Uddin Sumon, Project Manager
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training etc.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Union Parishad Management Software and Union
Parishad Information Database
Country:
Bangladesh
Duration of assignment (months):
2 Months
Name of Client
Bangladesh Academy for Rural Development
(BARD) Kotbari, Comilla
Total No of staff-Month of the assignment
3 man-month
Start Date
April 2015
Completion Date
March 2015
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint
venture, Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
A F M Salah Uddin Sumon, Project Manager
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training etc.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of website for MT Digital
Country:
Netherlands
Duration of assignment (months):
30 days
Name of Client
MT Digital
Meander 859, Amstelveen, The Netherlands
Total No of staff-Month of the assignment
1 man-month
Start Date
February 2015
Completion Date
March 2015
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint
venture, Associated Consultants: N/A
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
23
Pa
ge
2
3
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
A F M Salah Uddin Sumon, Project Manager
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training etc.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Customized ERP Development Services for MEP Group
Country:
Bangladesh
Location Within country: Dhaka and
surroundings
Duration of assignment (months):
8 month
Name of Client:
MEP Group
13th Floor, Estern Arzoo, Bijoynagar,
Dhaka-1000, Bangladesh
Total No of staff-Month of the assignment
24 man-month
Start Date
December 2014
Completion Date
Ongoing
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
A F M Salah Uddin Sumon, Project Manager
Detailed Narrative Description of Project:
Development of Enterprise Resource Planning (ERP) Software including Account & Finance and
Sales Management for The MEP Group.
Account & Finance
Sales
Detailed Description of Actual Services Provided by your Staff:
Total development of ERP Software for MEP Group
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement, training, maintenance and manage service through our technical human resources
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Provident Fund
Country:
Bangladesh
Location Within country: Dhaka and other
districts
Duration of assignment (months):
1 month
Annual Maintenance : Continue after warranty
period
Name of Client:
Save The Children (USA), Current Save
The Children (International)
House: 1A(2), Road: 91, Gulshan 2,
Dhaka 1212, Bangladesh
Phone: +880 2 8828081
Total No of staff-Month of the assignment
3 Man-Months
Start Date
January 2014
Completion Date
February 2014
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
24
Pa
ge
2
4
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mr. Shoikat Chowdhury, System Analyst
Detailed Narrative Description of Project:
1. PF Contribution
2. Interest Calculation
3. Loan Management
4. Investment
Detailed Description of Actual Services Provided by your Staff:
Total development of the PF System, Data Migration, Training, maintenance and manage service
through our technical human resources.
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, Training, Maintenance.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Web based Compliance Management & Audit System
Country:
Bangladesh
Duration of assignment (months):
23 working days
Name of Client
Bureau Veritas (Bangladesh) Private Ltd
Haque Chamber (Level-6),89/2, West
Panthopath, Dhaka-1205, Bangladesh
Total No of staff-Month of the assignment
3 man-month
Start Date
January 2014
Completion Date
February 2014 (Running As service now)
Name of Joint
Venture/Associated
Consultant, if any:
No of Staff-Months of key personnel staff provided by Joint Venture/Associated
Consultants:
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shajjad Hossain, Project Manager
Detailed Narrative Description of Project:
Basic Setup
Scheduling
Electrical
Civil
Fire Fighting
Structural
Corrective Action Plan Analysis Dashboard
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
training.
Firm‟s Name: Star Computer Systems Limited
Authorized Signature
Assignment name: Development of Software of Child Tracking System
Country:
Bangladesh
Duration of assignment (months):
45 days
Name of Client
Save the Children
House No. CWN (A) 35, Road No. 43,
Gulshan-2, Dhaka 1213, Bangladesh
Total No of staff-Month of the assignment
3 man-month
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
25
Pa
ge
2
5
Start Date
January 2013
Completion Date
May 2013
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shamsul Haque, Project Manager
Detailed Narrative Description of Project: Development of Software of Child Tracking System
The Overall Objective of the project is to strengthen the services of Local Government Institutions
(LGIs) in cooperation with Non State Actors (NSAs) to reduce unsafe rural-urban child migration and
to improve the situation of migrant children
Specific Objective 1: By 2013, reduced numbers of children migrate from rural to urban settings
through improved cooperation and provision of referral services from LGIs, communities and NSAs
in the project areas.
Specific Objective 2: By 2013, protection of migrant children has been improved in the project
areas through increased monitoring, reporting and service activities of LGIs and NSAs.
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training.
Firm‟s
Name:
Star Computer Systems Limited
Assignment name: Development of web portal for Green Delta Capital Limited – GDCL
Country:
Bangladesh
Duration of assignment (months):
30 Days
Name of Client
Green Delta Capital Limited – GDCL
Green Delta AIMS Tower
51-52 Mohakhali C/A, Dhaka 1212,
Bangladesh
Total No of staff-Month of the assignment
2 man-month
Start Date
December 2012
Completion Date
January 2013
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shajjad Hossain, System Analyst
Detailed Narrative Description of Project: Development of web portal for Green Delta Capital
Limited – GDCL
http://www.greendeltacapital.com/
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training.
Firm‟s
Name:
Star Computer Systems Limited
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
26
Pa
ge
2
6
Assignment name: Development of Library Management System (LMS) for Bangladesh Academy
for Rural Development (BARD) and Rural Development Academy (RDA) Working as National
Consultant by our Director Ms. Rezwana Khan.
Country:
Bangladesh
Bangladesh Academy for Rural
Development (BARD), Comilla
Rural Development Academy (RDA), Bogra
Duration of assignment (months):
120 days
Name of Client
Verulam Associates Bangladesh Ltd.
House 33 (Gr. Floor), Road 55, Gulshan 2
Dhaka-1217, Bangladesh
Project Name: Capacity Development for Local
Governments (Phase 1)
Funded By: Swiss agency for Development and
Cooperation (SDC)
Total No of staff-Month of the assignment
6 man-month
Start Date
January 2013
Completion Date
May 2013
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shamsul Haque, Project Manager
Detailed Narrative Description of Project: Development of Library Management System (LMS) for
Bangladesh Academy for Rural Development (BARD) and Rural Development Academy (RDA). Demo
software is uploaded on
http://bard.stargroup-bd.com/lms/
http://rda.stargroup-bd.com/lms/
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
training.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of web portal Debate for Verulam Associates Bangladesh Ltd.
Country:
Bangladesh
Duration of assignment (months):
30 Days
Name of Client
Debate for Democracy
Total No of staff-Month of the assignment
2 man-month
Start Date
March 2013
Completion Date
April 2013
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shajjad Hossain, System Analyst
Detailed Narrative Description of Project: Development of web portal for Verulam Associates
Bangladesh Ltd. http://www.scsl.stargroup-bd.com/verullam/home#
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training.
Firm‟s Name: Star Computer Systems Limited
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
27
Pa
ge
2
7
Assignment name: Development of web portal for Global Sourcing Bangladesh Ltd. ( GSBL)
Country:
Bangladesh
Duration of assignment (months):
30 Days
Name of Client
Global Sourcing Bangladesh Ltd (GSBL)
29/1 G, Toyenbee Circular Road, Dainik
Banglar More, Mothijheel Commercial Area,
Dhaka - 1000, Bangladesh
Total No of staff-Month of the assignment
2 man-month
Start Date
April 2013
Completion Date
May 2013
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shajjad Hossain, System Analyst
Detailed Narrative Description of Project: Development of web portal for Global Sourcing Bangladesh
Ltd www.gsblgroup.com
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of web portal Debate for Democracy
Country:
Bangladesh
Duration of assignment (months):
30 Days
Name of Client
Debate for Democracy
Total No of staff-Month of the assignment
2 man-month
Start Date
April 2013
Completion Date
May 2013
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shajjad Hossain, System Analyst
Detailed Narrative Description of Project: Development of web portal for Debate for Democracy.
http://scsl.stargroup-bd.com/debate/site/home?menuID=4
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Establishing Network Infrastructure for Bangladesh Academy for Rural
Development (BARD), Rural Development Academy (RDA) and National Institute of Local
Government (NILG).
Country:
Bangladesh
Bangladesh Academy for Rural
Development (BARD), Comilla
Rural Development Academy (RDA),
Bogra
Duration of assignment (months):
120 days
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
28
Pa
ge
2
8
National Institute of Local Government (NILG),
Dhaka
Name of Client
Verulam Associates Bangladesh Ltd.
House 33 (Gr. Floor), Road 55, Gulshan 2
Dhaka-1217, Bangladesh
Project Name: Capacity Development for Local
Governments (Phase 1)
Funded By: Swiss agency for Development and
Cooperation (SDC)
Total No of staff-Month of the assignment
15 man-month
Start Date
February 2012
Completion Date
June 2012
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shoyeb Kamal, System Admin
Detailed Narrative Description of Project: Establishing Network Infrastructure for Bangladesh Academy
for Rural Development (BARD), Rural Development Academy (RDA) and National Institute of Local
Government (NILG).
Phases 1:
Designing and Developing Network
Local Area Networking
o Established RACK 32U:
o Established Media Converter Chasis (12 to 14 slot rack mounted)
o Cabling
o Access Point (AP) configuration
o Established AP and Switch
System Testing
Phases 2:
Established Internet Connectivity
Established UpLink endpoint-to-endpoint
Core Router Configuration
Core Switch Configuration
Server Configuration
o Installation of Operating system (Windows Server 2008)
o Installation of Domain Server
o Configure File Server
o Configure Backup Server
o System Testing
Phases 3:
System Testing
Workshop
Description of actual services provided by your staff: Establishing Network Infrastructure and training
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Web Portal for Bangladesh Academy for Rural
Development (BARD), Rural Development Academy (RDA) and National Institute of Local
Government (NILG).
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
29
Pa
ge
2
9
Working as National Consultant by our Director Ms. Rezwana Khan
Country:
Bangladesh
Bangladesh Academy for Rural
Development (BARD), Comilla
Rural Development Academy (RDA), Bogra
National Institute of Local Government
(NILG), Dhaka
Duration of assignment (months):
120 days
Ongoing
Name of Client
Verulam Associates Bangladesh Ltd.
House 33 (Gr. Floor), Road 55, Gulshan 2
Dhaka-1217, Bangladesh
Project Name: Capacity Development for Local
Governments (Phase 1)
Funded By: Swiss agency for Development and
Cooperation (SDC)
Total No of staff-Month of the assignment
6 man-month
Start Date
March 2012
Completion Date
August 2012
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md.Shamsul Haque, Project Manager
Detailed Narrative Description of Project: Development of Dynamic Web Portal for Bangladesh
Academy for Rural Development (BARD), Rural Development Academy (RDA) and National Institute
of Local Government (NILG). Demo portal is uploaded on
http://www.rda.stargroup-bd.com/home
http://www.nilg.stargroup-bd.com/ , www.nilg.gov.bd
http://www.bard.stargroup-bd.com/
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Online Registration, Admin login & view the registered
Students list, Integrate Payment method and convert current website to our framework for BIM.
Country:
Bangladesh
Location Within country: All over Bangladesh
through online application
Duration of assignment (months):
30 days
Name of Client
Bangladesh Institute of Management (BIM)
4, Sobhanbag, Mirpur Road Dhaka-1207,
Bangladesh
Total No of staff-Month of the assignment
1 man-month
Start Date
October 2011
Completion Date
November 2011
Name of Joint
Venture/Associated Consultant,
if any: N/A
No of Staff-Months of key personnel staff provided by joint
venture, Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
30
Pa
ge
3
0
Md. Shajjad Hossain, Analyst Programmer
Detailed Narrative Description of Project: We have Development of Online Registration, Admin login &
view the registered Students list, Integrate Payment method and convert current website to our
framework for BIM.
Online Registration
Admin login and view the registered Students list
Create the Application form in Tab Order with style sheet
Create and Validation of every require field for evry form
Update BIM website to our own developed framework
Change Home page view
Display Notice information display in notice details page
Integrate Payment method (BKash) for payment receipt in Registration process.
Implement SMS based service by SYNESIS Ltd as our partner to use their short code.
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training etc.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Webportal for ATN Radio, ATN Jobs and IP TV for ATN
Bangla, ATN News and Bijoy TV by B-Core Limited, a sister concern of Star Computer Systems
Limited & ATN Bangla.
Country:
Bangladesh
Location Within country: All over Bangladesh
and world wide.
Duration of assignment (months):
Initial Development : 90 Days+ approximately
And continuous improvement and
enhancement.
Name of Client
Bangladesh Institute of Management (BIM)
4, Sobhanbag, Mirpur Road Dhaka-1207,
Bangladesh
Total No of staff-Month of the assignment
15 man-month
Start Date
September 2011
Completion Date
Devember 2011
Name of Joint
Venture/Associated
Consultant, if any: B-Core
Limited & ATN Bangla
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: 6 man-month
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shajjad Hossain, Analyst Programmer
Detailed Narrative Description of Project: We are doing the Development of Webportal for ATN Radio,
ATN Jobs and IP TV for ATN Bangla and Bijoy TV by B-Core Limited, a sister concern of Star
Computer Systems Limited & ATN Bangla.
ATN Radio: www.atnradio24.com . Already developed and implementing SMS and Mobile application
with our VAS partner SYNESIS Limited.
ATN Jobs: is under development (www.atnjobs.com ) which is a full job portal including services for
immigration, overseas studies, hostel, tutor findings services and so on.
IP TV for ATN Bangla (www.atnmusic.com ), ATN News and Bijoy TV: We have developed IP TV
for mentioned TV Channels already and will be launched after getting Goven\rnment consent.
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training, manage service through our technical human resources etc.
Firm‟s Name: Star Computer Systems Limited
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
31
Pa
ge
3
1
Assignment name: Joint-Venture Project For Development of ERP Software Between Abdul Monem
Ltd (AML) & Star Computer System Limited (SCSL)
Country:
Bangladesh
Duration of assignment (months):
18 Months
Ongoing
Name of Client
Abdul Monem Limited
Head Office at 111, BirUttam C. R. Dutta Road
(Sonargoan Road), Dhaka – 1205
Total No of staff-Month of the assignment
144 man-month
Start Date
January 2011
Completion Date
December 2012
Name of Joint
Venture/Associated
Consultant, if any: Abdul
Monem Limited
No of Staff-Months of key personnel staff provided by Joint
Venture/Associated Consultants: 54 man-month
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md.Shamsul Haque, Project Manager
Detailed Narrative Description of Project: The following 9 (Nine) modules will develop, implement and
deployed in a sequential order.
Accounts & Finance
Inventory Management
Purchase & Commercial
Production Management
Detailed Narrative Description of Project: The following 9 (Nine) modules will develop, implement and
deployed in a sequential order.
Sales Management
Human Resource Management
Fixed Asset Management
Fleet Management
CRM
Additional Modules after agreement
Tender Management
Maintenance
VAT Management
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
training.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Web based HRM Management System
Country:
Bangladesh
Duration of assignment (months):
18 Months
Now under maintenance
Name of Client
Muslim Aid-UK, Bangladesh
House 13, Road 27, Block – J, Banani, Dhaka
– 1213, Bangladesh
Total No of staff-Month of the assignment
144 man-month
Start Date
January 2011
Completion Date
December 2012
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
32
Pa
ge
3
2
Running As service now
Name of Joint
Venture/Associated
Consultant, if any:
Abdul Monem
Limited
No of Staff-Months of key personnel staff provided by Joint Venture/Associated
Consultants: 54 man-month
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shamsul Haque, Project Manager
Detailed Narrative Description of Project:
Human Resource Management
Recruitment management
Personnel Management
Consultant and Contractual Employee Management
Training management
Payroll Module
Archival management (media and communication)
Font desk
Time and attendance module
Leave module
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
training.
Firm‟s Name: Star Computer Systems Limited
Authorized Signature
Assignment name: Development of Customized Software for Online Information for Youth
Training.
Country:
Bangladesh
Location Within country: All over Bangladesh
through online application
Duration of assignment (months):
60 days
Name of Client
Department of Youth Development
Ministry of Youth & Sports
108 Motijheel C/A, Dhaka
Total No of staff-Month of the assignment
6 man-month
Start Date
May 2011
Completion Date
June 2011
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shajjad Hossain, Analyst Programmer
Detailed Narrative Description of Project: We have developed a full web based system for Youth
Development for their online training information, registration, management, Youth institute database
management etc.
1. Rb¨ Av‡e`bcÎAbjvB‡b `vwLjKiv (64wU †Rjvq wewfbœ †Uª‡W)
2. AbjvB‡bcÖwkÿYv_©x fwZ© cÖwµqvKiY
3. AbjvB‡b Z_¨ Av`vb-cÖ`vb
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
33
Pa
ge
3
3
4. ‡`iWvUv‡eBR ¯’vcb
5. hyeDbœqbAwa`߇iiKg©KZ©v-Kg©Pvix‡`iWvUv‡eBR •Zwi
6. hyeDbœqbAwa`߇ii ZvwjKvfz³ hyemsMV‡biWvUv‡eBR •Zwi
7. Ab¨vb¨ Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training etc.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Job Portal for Prothom-alojobs
Country:
Bangladesh
Location Within country: Dhaka and
surroundings.
Duration of assignment (months):
90 days
Name of Client
CA Bhaban (4th
)
100 KaziNazrul Islam Avenue, Dhaka
1215
Total No of staff-Month of the assignment
24 man-month
Start Date
October 2010
Completion Date
Continuing and will end January 2011
Name of Joint Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by
joint venture, Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shamsul Haque, Systems Analyst
Detailed Narrative Description of Project: Development of Job portal for Prothom-alojobs
Modules are
Registration
Job Search
Content Management System
Advertisement
Training Management
Event Calendar
Contact Form
Sending CV trough SMS for Job Seekers (Have done this through SYNESIS Limited as our VAS
partner)
Online Interactive Quiz Polls
Social Media Intigration
Virtual Job Fair Module
Newsletter
Discussion Forum
Feature Blog
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, training, maintenance and manage service through our technical human
resources etc.
Firm‟s Name: Star Computer Systems Limited
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
34
Pa
ge
3
4
Assignment name: Development of Child Labour Monitoring System and Website for Child
Labour for “Enhancing the Capacity of the Child Labour Unit of the Ministry of Labour and
Employment”
Working as National Consultant by our Director Ms. Rezwana Khan
Country:
Bangladesh
Location Within country: Dhaka and
surroundings.
Duration of assignment (months):
180 days
Name of Client
GOVERNMENT OF THE PEOPLE’S
REPUBLIC OF BANGLADESH
MINISTRY OF LABOUR & EMPLOYMENT
Total No of staff-Month of the assignment
6 man-month
Start Date
August 2010
Completion Date
Continuing and will end February 2010
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Rezwana Khan, Director
Detailed Narrative Description of Project: Development of Child Labour Monitoring System and
Website for Child Labour for “Enhancing the Capacity of the Child Labour Unit of the Ministry of
Labour and Employment”
A. Review existing Child Labour Monitoring Information System(CLMIS);
B. User-friendly computer software programmes are developed and installed for:
i. Child labour monitoring and
ii. Child labour intervention programmes/projects by different stakeholders;
C. Software programmes are uploaded into the MOLE / CLU‟s website which can be reported online
by concerned stakeholder;
D. Child labour baseline information and child labour intervention programmes/projects of the UIE-
financed DCC‟s zones are installed and tested;
E. Training manual is developed and designated child labour monitoring officers from MOLE /CLU are
trained to operate effectively and efficiently the CLM system;
F. A one day training workshop on CLIM system operation is organized for designated officers from
both key stakeholders); and
G. Website is developed.
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of consultancy services is to develop computerized/electronic
management information system for Privatization Commission with a view to enable this system
under e-governance and automation environment.
Working as National Consultant by our Director Ms. Rezwana Khan
Country:
Bangladesh
Location Within country: Dhaka and surroundings.
Duration of assignment (months):
75 days
Name of Client
Government of the People’s Republic of
Bangladesh
Privatization Commission
Prime Minister’s Office
Total No of staff-Month of the assignment
2.5 man-month
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
35
Pa
ge
3
5
Paribahan Pool Bhaban (8th-10th Floor)
Secretariate Link Road, Dhaka
Start Date
May 2009
Completion Date
July 2009
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Rezwana Khan, Director
Detailed Narrative Description of Project: Development of computerized/electronic management
information system for Privatization Commission
(i) Design and establish an appropriate Management Information System (MIS) to collect and analyze the
data for all SOEs.
(ii) Develop system for presentation through multi-media on privatization.
(iii) Render on-the-job training to the PC Officials on MIS.
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of web portal for Food Security for Ultra Poor (FSUP) Programme, European Union Working as Consultant by our Director Ms. Rezwana Khan
Country: Bangladesh Location Within country: Dhaka and surroundings.
Duration of assignment (months): 30 days
Name of Client Euopean Union Food Security for Ultra Poor (FSUP) Programme Road: 11, House: 539/A (2
nd Floor)
East DOHS, Baridhara, Dhaka 1212
Total No of staff-Month of the assignment 1 man-month
Start Date May 2010
Completion Date July 2010
Name of Joint Venture/Associated Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture, Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved Rezwana Khan, Director
Detailed Narrative Description of Project: Development of computerized/electronic management information system for Privatization Commission
o Design and establish an appropriate Management Information System (MIS) to collect and analyze the data for all SOEs.
o Develop system for presentation through multi-media on privatization. o Render on-the-job training to the PC Officials on MIS.
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement, manage service through our technical human resources.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Human Resource Management Software including Payroll, Time
Attendance & Leave Management for The Structural Engineers Ltd.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
36
Pa
ge
3
6
Country:
Bangladesh
Location Within country: Dhaka and
surroundings
Duration of assignment (months):
80 days
Name of Client:
The Structural Engineers Ltd.
SEL Centre, 29 West Panthapath, Dhaka 1205
Total No of staff-Month of the assignment
12 man-month
Start Date
June 2010
Completion Date
September 2010
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Md. Shamsul Haque, System Analyst
Detailed Narrative Description of Project:
Development of Human Resource Management Software including Payroll, Time Attendance &
Leave Management for The Structural Engineers Ltd.
Human Resource Management Module
Payroll Module
Time & Attendance Module
Leave Management Module
Detailed Description of Actual Services Provided by your Staff:
Total development of Human Resource Management Software for SEL
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
training, maintananace and manage service through our technical human resources
Firm‟s Name: Star Computer Systems Limited
Assignment name: Conducting need assessment for the Integrated Accounting Solutions for
University of Dhaka.
Country:
Bangladesh
Location Within country: Dhaka and
surroundings
Duration of assignment (months):
60 days
Name of Client:
Ahmad Ahmad And Associates
BCIC Bhaban (3rd
Floor), 30-31 Dilkusha
Commercial Area, Dhaka 1000
Total No of staff-Month of the assignment
2 man-month
Start Date
May 2010
Completion Date
July 2010
Name of Joint Venture/Associated Consultant,
if any: N/A
No of Staff-Months of key personnel staff
provided by joint venture, Associated Consultants:
N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mr, Zakir Al Mamun, ICT Business Analyst
Detailed Narrative Description of Project: Conducting need assessment for the Integrated
Accounting Solutions for University of Dhaka.
Star Computer Systems Limited (SCSL) is working for Ahmad Ahmad And Associates for their software
development work of Integrated Accounting Solutions for University of Dhaka. SCSL is conducting need
assessment part of the above project.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
37
Pa
ge
3
7
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of software for VSO Capacity Building & Database
Management System for Voluntary Services Overseas
Country:
Bangladesh
Location Within country: All over Bangladesh
and world wide by web application.
Duration of assignment (months):
45 days
Name of Client:
Voluntary Services Overseas (VSO)
2/7, Block C, Lalmatia
Dhaka-1207, Bangladesh
Total No of staff-Month of the assignment
4.5 man-month
Start Date
January 2010
Completion Date
March 2010
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mr.Shajjad Hossain, Analyst Programmer
Detailed Narrative Description of Project: Development of software for VSO Capacity Building &
Database Management System for Voluntary Services Overseas. It is a systemized software
and database information system for building capacity for VSO volunteers in many sectors. All
kinds of news, articles and pictures are included in the software.
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Need assessment for Software Development for Rural Electrification Board
Country:
Bangladesh
Location Within country: Dhaka and
surroundings
Duration of assignment (months):
60 days
Name of Client:
Rural Electrification Board (REB)
REB Bhaban, Khilkhet, Nikunja-2, Dhaka.
Total No of staff-Month of the assignment
8 man-month
Start Date
September 2009
Completion Date
January 2010
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Rezwana Khan, Director
Detailed Narrative Description of Project: Need assessment for Software Development for Rural
Electrification Board
Description of actual services provided by your staff: Analysis, design, tender document preparation
Firm‟s Name: Star Computer Systems Limited
Assignment name: Web Application development using PHP,MySQL, XT:Commerce, Flash etc.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
38
Pa
ge
3
8
http://rempel.blume-it.de/
Assignment Location
Germany
Duration of assignment (months):
30 days
Name of Client:
SUPCONS LIMITED, Germany
Total No of staff-Month of the assignment
3 man-month
Start Date
July 2009
Completion Date
July 2009
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mr.Shajjad Hossain, Sr. Web Developer
Detailed Narrative Description of Project: Web Application development using PHP,MySQL,
XT:Commerce, Flash etc.
http://rempel.blume-it.de/
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
online support for 24X7 by our human resource
Firm‟s Name: Star Computer Systems Limited
Assignment name: Web portal developmet of www.bdtender.com with ASP.Net and SQL Server
2005
Assignment Location
Within country: Dhaka and surroundings.
Duration of assignment (months):
30 days
Name of Client:
BDTENDER.COM
House # 116, Road # 5, Mohammadia Housing
Society
Mohammadpur, Dhaka-1207, Bangladesh.
Phone: 02-9123954, 02-9123059,
01556340338, 02-8123070
Contact person: Habibur Rahman
Email: [email protected]
Total No of staff-Month of the assignment
3 man-month
Start Date
August 2009
Completion Date
September 2009
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mr.MahfuzulHauque, Sr. Web Developer
Detailed Narrative Description of Project: Web portal developmet of www.bdtender.com with
ASP.Net and SQL Server 2005
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development/Support/Service of Web Application www.locumcalender.com ,
FIRST AND SECOND PHASE
Assignment Location : for UK Doctors Duration of assignment (months):
30 days
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
39
Pa
ge
3
9
Name of Client:
Intellegents2B Corporation
Florida, USA
Phone: +1 713 344 0435
Total No of staff-Month of the assignment
3 man-month
Start Date
August 2009
Completion Date
September 2009
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mohammad Shajjad Hossain,
Senior Programmer & Designer
Detailed Narrative Description of Project:
Web Application (portal) Development/Support/Service for www.locumcalender.com, provide schedule
services for group of professionals‟. Locum Calendar. This projects is for all the locum profession
baseed on USA, UK and Australia. To get an appointment by the Doctors a member of this sites send
a request to the Locum through email and also through there panel. At Locums panel, he notified by
the email or notification message board and approved there request.
Detailed Description of Actual Services Provided by your Staff:
Web Application/Portal Design & Development, Online Support/Service etc
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
online support for 24X7 by our human resource
Firm‟s Name: Star Computer Systems Limited
Assignment name: Design &Development/Support/Service of Web Application
http://www.cbtdevelopmentcorp.com/
Assignment Location : World Wide Web (www) Duration of assignment (months):
30 days
Name of Client:
Symbyo, USA
Total No of staff-Month of the assignment
3 man-month
Start Date
October 2009
Completion Date
November 2009
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mohammad Shajjad Hossain,
Senior Programmer & Designer
Detailed Narrative Description of Project:
Design & Development/Support/Service of Web Application http://www.cbtdevelopmentcorp.com/
Detailed Description of Actual Services Provided by your Staff:
Web Application/Portal Design & Development, Online Support/Service etc
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Save The Children Human Resource Information System
(HRIS), first phase, second phase, Annual maintenance and Migration of all date of Save the
Children International after their merging in 2011.
Country: Duration of assignment (months):
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
40
Pa
ge
4
0
Bangladesh
Location Within country: Dhaka and
other districts
First phase: 90 days.
Second phase: 30 days
Annual Maintenance : Continue after warranty
period
Migration of all date of Save the Children
International: 15 Days
Name of Client:
Save The Children (USA), Current Save The
Children (International)
House: 1A(2), Road: 91, Gulshan 2, Dhaka 1212,
Bangladesh
Phone: +880 2 8828081
Total No of staff-Month of the assignment
First phase: 12 man-month
Second phase: 2 man-month
Start Date
August 2008
Completion Date
December 2008
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mr.Mohsin Reza, System Analyst
Detailed Narrative Description of Project:
Save The Children Human Resource Information System (HRIS). Three modules, they are
1. Personal Information
2. Payroll Management
3. Time Management
4. Various kinds of reports as per client‟s requirements
5. Integrated Time attendance System
6. Contractual consultant
7. Area wise security
Other works done
Data Migration & Some features for remote area like overt time, leave etc
Training
Detailed Description of Actual Services Provided by your Staff:
Total development of the HRIS System, Data Migration, Training, maintenance and manage service
through our technical human resources.
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
Training, Maintanance.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Total web/online application for their multilevel marketing
system, including binary calculation, commission distribution, product, smart card balance
etc.
Country:
Bangladesh
Location Within country: Sylhet and
surroundings/districts
Web Portal so its online
Duration of assignment (months):
45 days
Name of Client:
Light Life (PVT) Ltd.
Eastern Plaza, 3rd
Floor
AmborKhana, Sylhet
Total No of staff-Month of the assignment
7.5 man-month
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
41
Pa
ge
4
1
Start Date
April 2009
Completion Date
June 2009
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mr. Mahfuzul Hauque, System Analyst
Detailed Narrative Description of Project: Development of Total web/online application for their
multilevel marketing system, including binary calculation, commission distribution, product,
smart card balance etc.
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Web Application development using PHP,MySQL, Joomla, Flash etc.
www.sondersignalfahrt.de
www.solarenergy-khulna.eu
http://intelligon.com/en
Assignment Location
Germany
Duration of assignment (months):
30 days
Name of Client:
SUPCONS LIMITED, Germany
Total No of staff-Month of the assignment
3 man-month
Start Date
May 2009
Completion Date
June 2009
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mr.Shajjad Hossain, Sr. Web Developer
Detailed Narrative Description of Project: Development of Web Application development using
PHP, MySQL, Joomla, Flash etc.
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
online support for 24X7 by our human resource.
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Integrated Health Management System and supply all source
code with documentation with ASP.Net, C#.Net, SQL Server, SQL Server CE for mobile
application, XML, AJAX etc
Assignment Location : USA
Duration of assignment (months):
90 days
Name of Client:
SAPMATRIX INC.
1200 Smith Street (Two Allen Center), Suite
1600, Houston, TX 77002, USA
Office: +1-713-353-3970
Total No of staff-Month of the assignment
15 man-month
Start Date
March 2009
Completion Date
June 2009
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
42
Pa
ge
4
2
Name of Senior Staff (Project Director/ Coordinator, Team Leader)
Ms. Rezwana Khan, COO.
Detailed Narrative Description of Project:
Development of Integrated Health Management System and supply all source code with
documentation with ASP.Net, C#.Net, SQL Server, SQL Server CE for mobile application, XML,
AJAX etc.
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
online support for 24X7 by our human resource
Firm‟s Name: Star Computer Systems Limited
Assignment name: Web Application Development & Design of www.ERPmatrix.com
Assignment Location : World wide web
(www)
Duration of assignment (months):
30 days
Name of Client:
ERPMATRIX INC.
1200 Smith Street (Two Allen Center),
Suite 1600,
Houston, TX 77002, USA
Office: +1-713-353-3970
Total No of staff-Month of the assignment
4 man-month
Start Date
March 2008
Completion Date
April 2008
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader)
Ms. Rezwana Khan, COO.
Detailed Narrative Description of Project:
Web Application (portal) Development for ERPMATRIX INC. Various kinds of functionalities added
in the application. This portal is for ERP professionals, where they can upload their resume and find
appropriate job for them. Basically the company is doing Human Resource Requirement for ERP
Professionals.
Detailed Description of Actual Services Provided by your Staff:
Web Application/Portal Development & Design, Online Support/Service, SEO etc
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement, online support for 24X7 by our human resource
Firm‟s Name: Star Computer Systems Limited
Assignment name: Web Application Development & Design of www.sapmatrix.com
Assignment Location : World wide web (www)
Duration of assignment (months):
30 days
Name of Client:
SAPMATRIX INC.
1200 Smith Street (Two Allen Center), Suite
1600, Houston, TX 77002, USA
Office: +1-713-353-3970
Total No of staff-Month of the assignment
4 man-month
Start Date
March 2008
Completion Date
April 2008
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
43
Pa
ge
4
3
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader)
Ms. Rezwana Khan, COO.
Detailed Narrative Description of Project:
Web Application (portal) Development for SAPMATRIX INC. Various kinds of functionalities added in
the application. This portal is for SAP professionals, where they can upload their resume and find
appropriate job for them. Basically the company is doing Human Resource Requirement for SAP
Professionals.
Detailed Description of Actual Services Provided by your Staff:
Web Application/Portal Development & Design, Online Support/Service, SEO etc
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
online support for 24X7 by our human resource
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development/Support/Service of Web Application www.supercandidate.com
Assignment Location : World wide web
(www)
Duration of assignment (months):
90 days
Name of Client:
Intellegents2B Corporation
Florida, USA
Phone: +1 713 344 0435
Total No of staff-Month of the assignment
9 man-month
Start Date
August 2007
Completion Date
November 2007
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Assignment name: Integrated Solution of Time & Attandance (TAS) with Payroll and 7 Proximity Readers
Assignment Location within country: Bangladesh, Dhaka
Duration of assignment (months): 90 days
Name of Client: Client: Security Digitech Level 1, Block B, Shop 44, Bashundhara City Shopping Mall, 13/Ka/1, Panthapath, Dhaka Tel: 9130321, 9131294, Ext: 201044 End User: Hannan Fashions Ltd. 1155, Siddique Road, Khailkur, Board Bazar, Gazipur 1704
Total No of staff-Month of the assignment 18 man-month
Start Date June 2007
Completion Date August 2007
Name of Joint Venture/Associated Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture, Associated Consultants: N/A
Detailed Narrative Description of Project: Integrated Solution of Time & Attandance (TAS) with Payroll and 7 Proximity Readers
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement, Access control system, networking, support
Firm‟s Name: Star Computer Systems Limited
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
44
Pa
ge
4
4
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Ms. Rezwana Khan, COO.
Detailed Narrative Description of Project:
Web Application (portal) Development/Support/Service for supercandidate.com. Various kinds of
functionalities added in the application for Training/educational/HRM/Employment purpose. This
portal is for students, professionals, consultants, employers etc
Detailed Description of Actual Services Provided by your Staff:
Web Application/Portal Development, Online Support/Service, SEO etc
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
online support for 24X7 by our human resource
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Accounting Management System and Payroll & Human
Resource Management System
Country:
Bangladesh
Location Within country: Dhaka and
surroundings
Duration of assignment (months):
80 days
Name of Client:
Mastex Sweater Industries Limited
Safura Tower, House:45, Road:7, Block:K,
Mirpur 12, Dhaka 1221
Total No of staff-Month of the assignment
12.5 man-month
Start Date
April 2007
Completion Date
July 2007
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Mr.Mohsin Reza, Analyst Programmer
Detailed Narrative Description of Project:
Development of Accounting Management System and Payroll & Human Resource
Management System for Mastex Sweater Industries Limited and manage service through our
technical human resources.
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name:
Integrated Solution of Time & Attendance (TAS) with Payroll and 7 Proximity Readers
Assignment Location
within country: Bangladesh, Dhaka
Duration of assignment (months):
90 days
Name of Client:
Client: Security Digitech
Level 1, Block B, Shop 44, Bashundhara City
Shopping Mall, 13/Ka/1, Panthapath, Dhaka
Tel: 9130321, 9131294, Ext: 201044
End User: Hannan Fashions Ltd.
1155, Siddique Road, Khailkur, Board Bazar,
Gazipur 1704
Total No of staff-Month of the assignment
18 man-month
Start Date Completion Date
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
45
Pa
ge
4
5
June 2007 August 2007
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Detailed Narrative Description of Project:
Integrated Solution of Time & Attendance (TAS) with Payroll and 7 Proximity Readers
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
Access control system, networking, support
Firm‟s Name: Star Computer Systems Limited
Assignment name:
Customized Integrated Accounting Management Information Systems (IAMIS), TAS. Telledger,
Server, Computer, UPS, Printer
Country:
Bangladesh
Location Within country: Dhaka and
surroundings
Duration of assignment (months):
90 days
Name of Client :
Orion Group, Dhaka.
Total No of staff-Month of the assignment
15 man-month
Start Date
October 2005
Completion Date
January 2006
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Detailed Narrative Description of Project:
Customized Integrated Accounting Management Information Systems (IAMIS)
Modules are
General Ledger Module
Finance Module
Loan Module
Audit Module
User Management Module
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement,
Hardware support
Firm‟s Name: Star Computer Systems Limited
Assignment name: Turnkey supply, installation, Testing and Commissioning of Computer
Hardware, Software and LAN for Domestic Gas Customers Ledger keeping including 3 years
system maintenance.
Country:
Bangladesh
Location Within country: Dhaka and
surroundings/districts
Duration of assignment (months):
180 (One hundred eighty) days and 3 Years
Maintenance.
Name of Client:
Titas Gas Transmission & Distribution
Co. Ltd.
Total No of staff-Month of the assignment
18 man-month for networking
48 for Software development
Others for data entry &maintanance
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
46
Pa
ge
4
6
Start Date
February 2006
Completion Date
September 2006
Maintenance till now
Name of Joint
Venture/Associated Consultant,
if any:
Technohaven Company Ltd.,
Dhaka.
No of Staff-Months of key personnel staff provided by joint
venture, Associated Consultants: 48 Man Month
Name of associated Consultants, if any:
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved and Functions Performed:
Ms. Rezwana Khan, COO.
Detailed Narrative Description of Project:
Turnkey supply, installation, Testing and Commissioning of Computer Hardware, Software and LAN for
Domestic Gas Customers Ledger keeping including 3 years system maintenance.
Hardware: Supply of Server, Workstations, Router, Printer, UPS, Scanner, Networking, etc.
Software: Design, Development, Deployment of Application software with LINUX and Oracle.
Training: To be arranged in house training for Titas Staff.
Detailed Description of Actual Services Provided by your Staff:
Hardware installation, Networking (LAN) of 14 branch Offices of Titas, Software development, Data
Entry, Training to the Titas staff.
Description of actual services provided by your staff: Turnkey supply, installation, Testing and
Commissioning of Computer Hardware, Software and LAN for Domestic Gas Customers Ledger
keeping including 3 years system maintenance with our own human resource.
Firm‟s Name: Star Computer Systems Limited
Assignment name:
Appointment as a Consultant to prepare IT Road Map for Palli Karma-Sahayak Foundation
(PKSF).
Assignment Location
within country: Bangladesh,Dhaka
Duration of assignment (months):
90 days
Name of Client:
Palli Karma Shayak Foundation
PksfBhaban, Plot: E-4/B, Agargaon
Administrative Area, Sher E Bangka Nagarm
Dhaka 1207
Total No of staff-Month of the assignment
12 man-month
Start Date
January 2006
Completion Date
March 2006
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved and Functions Performed:
Ms. Rezwana Khan, Director & COO.
Detailed Narrative Description of Project:
Consultancy Services from Star Computer Systems Limited (SCSL) for building IT Roadmap for
PalliKarma Shayak Foundation (PKSF), Agargaon, Dhaka, Bnagladesh. SCSL proposed modified
business procedures in line with having an integrated IT based information system. Then build IT Road
map for PKSF. Lastly SCSL did Comparative cost benefit analysis between proposed systems in IT
road map and existing systems.
Detailed Description of Actual Services Provided by your Staff:
Design and development of software of IT Road Map for PKSF.
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
47
Pa
ge
4
7
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name:
Accounting & Inventory Management System
Assignment Location
within country: Dhaka
Duration of assignment (months):
30 days
Name of Client:
Khan Foundry Limited
BISIK Shilpanagari, Rangpur
Total No of staff-Month of the assignment
3 man-month
Start Date
December 2006
Completion Date
January 2007
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Detailed Narrative Description of Project:
Development of Accounting & Inventory Management System. Modules are
General Ledger Module
Inventory Module
User Management Module
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name:
Time Attendance System
Assignment Location
within country: Dhaka
Duration of assignment (months):
30 days
Name of Client:
The Oriental Bank Limited
Total No of staff-Month of the assignment
2 man-month
Start Date
January 2005
Completion Date
February 2005
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved and Functions
Performed:
Detailed Narrative Description of Project:
Time Attendance System
Detailed Description of Actual Services Provided by your Staff: Analysis, design, development, Q/A,
Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Customized Integrated Accounting & Financial Management System
Software.
Country: JAPAN
Location Within country: Dhaka and
surroundings.
Duration of assignment (months):
90 days
Name of Client
AMJ Corporation Limited
Address:127-3, Yaku, Ibogawa-Cho, Ibo-Gun,
Total No of staff-Month of the assignment
18 man-month
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
48
Pa
ge
4
8
Japan
Start Date
July 2004
Completion Date
November 2004
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Aldrine Thomas Gaine, IT Manager
Detailed Narrative Description of Project: Development of Customized Integrated Accounting &
Financial Management System Software for AMJ, Japan
Modules are General Ledger Module, Import/Export Module, Production Planning Module,
Commercial Module, Payroll Module, MIS Module, Star Telledger Module, User Management
Module
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of ERP Software
Country:
Bangladesh
Location Within country: Dhaka and
surroundings
Duration of assignment (months):
180 days
Name of Client:
International Trade Lines Ltd. (ITL)
House: 25, Road: 18, Block: A, Banani,
Dhaka 1213, Bangladesh
Total No of staff-Month of the assignment
30 man-month
Start Date
July 2004
Completion Date
February 2005
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Aldrine Thomas Gaine, IT Manager
Detailed Narrative Description of Project: Development of ERP Software
Modules are General Ledger, Financial Management, Inventory, Production, Import/Export,
Commercial, User Management
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name:
Integrated Time & Attendance (TAS) System Solution, STAR TelLedger Software Solution,
Software Maintenance.
Assignment Location
within country: Dhaka
Duration of assignment (months):
90 days
Name of Client:
Bangladesh General Insurance
Company Ltd. (BGIC)
42, Dilkusha C/A. (3rd Floor), Dhaka.
Total No of staff-Month of the assignment
6 man-month
Start Date Completion Date
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
49
Pa
ge
4
9
April 2005 June 2005
Name of Joint Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by
joint venture, Associated Consultants: N/A
Detailed Narrative Description of Project:
Integrated Time & Attendance (TAS) System Solution, STAR TelLedger Software Solution,
Software Maintenance
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Integrated Accounting Management Information System (IAMS)
Country:
JAPAN
Location Within country: Dhaka and
surroundings.
Duration of assignment (months):
90 days
Name of Client
AMJ Corporation Limited
Address:127-3, Yaku, Ibogawa-Cho, Ibo-Gun,
Japan
Total No of staff-Month of the assignment
18 man-month
Start Date
May 2004
Completion Date
September 2004
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Aldrine Thomas Gaine, IT Manager
Detailed Narrative Description of Project: Development of Financial Management System of a
Company including Trade Tracking Record (FMS) for AMJ, Japan
Modules are
Accounting Management Module
Trade Tracking Module
User Management Module
System Module0
Description of actual services provided by your staff: Analysis, design, development, Q/A,
Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name: Development of Financial Management System of a Company including
Trade Tracking Record (FMS) & Administrative Management System.
Country:
JAPAN
Location Within country: Dhaka and
surroundings
Duration of assignment (months):
85 days
Name of Client:
Kawasho Corporation
7-1 Otemachi 2-Chome, Chiyoda-Ku, Tokyo
100-8070, Japan
Total No of staff-Month of the assignment
15 man-month
Start Date
July 2002
Completion Date
November 2002
Name of Joint
Venture/Associated
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
50
Pa
ge
5
0
Consultant, if any: N/A
Name of Senior Staff (Project Director/ Coordinator, Team Leader) involved
Aldrine Thomas Gaine, IT Manager
Detailed Narrative Description of Project: Development of Financial Management System of a
Company including Trade Tracking Record (FMS) & Administrative Management System for
KAWASHO, JAPAN
Modules are
Finance Management Module
Trade Tracking Module
Administrative Management Module
Description of actual services provided by your staff: Analysis, design, development, Q/A, Implement
Firm‟s Name: Star Computer Systems Limited
Assignment name:
Customized Software Development Accounting System, Corporate Payroll, Inventory
Management, PF Management, Production Management & Management Information System
Assignment Location
within country: Dhaka
Duration of assignment (months):
45 days
Name of Client
Rupantarita Prakritik Gas Company
Limited, (RPGCL) Dhaka.
Total No of staff-Month of the assignment
10.5 man-month
Start Date
June 2003
Completion Date
August 2003
Name of Joint
Venture/Associated
Consultant, if any: N/A
No of Staff-Months of key personnel staff provided by joint venture,
Associated Consultants: N/A
Detailed Narrative Description of Project: Customized Software Development for RPGCL.
Modules developed for the client’s are Accounting System, Corporate Payroll, Inventory
Management, PF Management, Production Management, Management Information System
(MIS)
Detailed Description of Actual Services Provided by your Staff: Analysis, design, development, Q/A,
Implement
Firm‟s Name: Star Computer Systems Limited
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
51
Pa
ge
5
1
Training Experiences
Assignment name:
Skill Enhancement Training
Program – IT/ITES
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 2 years
Name of Client:
Bangladesh Hiteck Park Authority (BHTPA)
BCC Bhaban, Agargaon, Sher-e-Bangla Nagar
Dhaka 1207 Bangladesh
Start Date: June 2014
(Month/Year)
Completion Date: Continuing
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Md. Hasnat Reza, S.M Faisal, Md. Shahadat Hossain, A. F. M Salah Uddin, Rowshan
Jamil
Detailed Narrative Description of Project: BHTPA intends to enhance the skills of candidates for
creating a readily employable workforce to be absorbed in the Information Technology (IT) or IT
Enabled Services (ITES) sector in order to increase employment and self-employment
opportunities for the youth of Bangladesh
Detailed Description of Actual Services Provided by your Staff: Md. Hasnat Reza (Manager), S.M
Faisal (technical Contact), Md. Shahadat Hossain (Faculty), A. F. M Salah Uddin (Faculty),
Rowshan Jamil (Faculty)
Assignment name:
Training on Customized Software & Online
Information for youth
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 1
Name of Client
Department of Youth Development
Ministry of Youth & Sports
108 Motijheel C/A, Dhaka
Start Date: Apr 2012
(Month/Year)
Completion Date: May 2012
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Md. Hasnat Reza, Shajjad Hossain, Prithu Ahmed.
Detailed Narrative Description of Project: We have developed a full web based system for Youth
Development for their online training information, registration, management, Youth institute
database management etc.
Detailed Description of Actual Services Provided by your Staff: Md. Hasnat Reza (Coordinator),
Shajjad Hossain (Instructor for software training), Prithu Ahmed (Instructor for software training)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 1 (each batch)
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
52
Pa
ge
5
2
As per project
Name of Client:
WAQF Administration
4, New Eskaton Road, Dhaka-1000
Providing Training every year from 2011 to 2013
with min 65 participants.
Start Date: Jan 2011
(Month/Year)
Completion Date: Mar 2013
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Md. Hasnat Reza, S.M Faisal,
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Md. Hasnat Reza (Manager), S.M
Faisal (Faculty)
Assignment name: 14 Days Refreshers
Training
Country: Bangladesh
Assignment Location within country:
Dhaka
Duration of assignment :
14 Days
Name of Client:
DG Health
Directorate General of Health Services
(DGHS)
Mohakhali, Dhaka
Tel: 8802 8816459 Fax: 8802 8813875
Email: [email protected]
Professional Staff provided by your Organization:
No of Staff: 16
No of Person-Months: 1
Start Date Completion Date
(12/2009) (01/2010)
Name of associated Consultants, if any: N/A No of Person-Months of Professional Staff
provided by associated Consultants:2
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Md. Hasnat Reza, Shajjad Hossain, Atiqul Islam
Detailed Narrative Description of Project: Training on Computer Fundamental
Detailed Description of Actual Services Provided by your Staff: Md. Hasnat Reza (Manager),
Shajjad Hossain (Faculty), Atiqul Islam (Faculty)
Assignment name: 14 Days Refreshers
Training
Country: Bangladesh
Assignment Location within country:
Dhaka
Duration of assignment :
14 Days
Name of Client:
DG Health
Directorate General of Health Services
(DGHS)
Mohakhali, Dhaka
Tel: 8802 8816459 Fax: 8802 8813875
Email: [email protected]
Professional Staff provided by your Organization:
No of Staff: 16
No of Person-Months: 1
Start Date Completion Date
(10/2011) (03/2013)
Name of associated Consultants, if any: N/A No of Person-Months of Professional Staff
provided by associated Consultants:2
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Md. Hasnat Reza, Shajjad Hossain, Atiqul Islam
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
53
Pa
ge
5
3
Detailed Narrative Description of Project: Training on Computer Fundamental
Detailed Description of Actual Services Provided by your Staff: Md. Hasnat Reza (Manager),
Shajjad Hossain (Faculty), Atiqul Islam (Faculty)
Assignment name:
Professional training for Interior Design
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 27
As per Batch. Each batch is for 4 month. We
have completed 8 batches
Name of Client:
EX-IN (Exterior Interior Pvt. Ltd.)
Road 11A, House 56,Dhanmondi, Dhaka
Start Date: May 2010
(Month/Year)
Completion Date: July 2012
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Md. Hasnat Reza, S.M Faisal,
Detailed Narrative Description of Project:
Professional training for Exterior & Interior Design with AutoCAD and 3DS Max
Detailed Description of Actual Services Provided by your Staff: Md. Hasnat Reza (Manager &
Faculty), S.M Faisal (technical Contact)
Assignment name: 14 Days Refreshers
Training
Country: Bangladesh
Assignment Location within country:
Dhaka
Duration of assignment :
7 Days (each batch)
Name of Client:
DG Family Planning
6 Kawran Bazar, Dhaka
Providing Training every year from 2009 to 2013
with min 65 participants.
Start Date: April 2009
(Month/Year)
Completion Date: June 2013
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Md. Hasnat Reza, Zakir Al Mamun, Atiqul Islam
Detailed Narrative Description of Project: Training on Computer Fundamental
Detailed Description of Actual Services Provided by your Staff: Md. Hasnat Reza (Manager), Zakir
Al Mamun (Faculty), Atiqul Islam (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months):
As per project
Name of Client:
Gas Transmission Co. Ltd. (GTCL)
Uttara Model Town, Dhaka
Start Date: Feb 2008
(Month/Year)
Completion Date: May 2008
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Shajjad Hossain, Mahfuzur Rahman, Atikul Islam
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator),
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
54
Pa
ge
5
4
Shajjad Hossain (Faculty), Mahfuzur Rahman (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months):
As per project
Name of Client:
Titas Gas Transmission & Distribution Co. Ltd.
Titas Bhaban, Kawran Bazar, Dhaka.
Start Date: Sep 2007
(Month/Year)
Completion Date: Dec 2007
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Shajjad Hossain, Mahfuzur Rahman, Atikul Islam
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator),
Shajjad Hossain (Faculty), Mahfuzur Rahman (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 3
Name of Client:
Mohila Polytechnic Institute.
Shara-Bangla-Nagor, Dhaka -1207
Start Date: Aug 2006
(Month/Year)
Completion Date: Oct 2006
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Abdur Razzak, Saiful Islam,
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator), Abdur
Razzak (Faculty), Saiful Islam (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 2
Name of Client:
Janata Bank
110, Motijheel C/A, Dhaka
Start Date: Apr 2006
(Month/Year)
Completion Date: May 2006
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Abdur Razzak, Burhan Uddin
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator), Abdur
Razzak (Faculty), Burhan Uddin (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months):
As per project
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
55
Pa
ge
5
5
Name of Client:
Dhaka Electric Supply Co. (DESCO)
Banani, Dhaka
Start Date: Oct 2005
(Month/Year)
Completion Date: Mar 2006
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Shajjad Hossain, Mahfuzur Rahman, Prithu Ahmed
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator),
Shajjad Hossain (Faculty), Mahfuzur Rahman (Faculty), Prithu Ahmed (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 3
Name of Client:
Bakhrabad Gas Systems Ltd.
Chapapur, P.O. Box No.97, Comilla, Bangladesh
Start Date: Nov 2005
(Month/Year)
Completion Date: Jan 2006
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Abdur Razzak, Saiful Islam,
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator), Abdur
Razzak (Faculty), Saiful Islam (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 3
Name of Client:
Bangladesh Petroleum Exploration & Production Company Ltd.
Shahjalal Tower (4th Floor), 80/A-B Siddeshwari Circular Road, Dhaka.
Start Date: Jan 2005
(Month/Year)
Completion Date: Mar 2005
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Abdur Razzak, Saiful Islam
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator), Abdur
Razzak (Faculty), Saiful Islam (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 4
Name of Client:
Rupantarita Prakritik Gas Company Ltd.
BSEC Bhaban, 102, Kazi Nazrul Islam Avenue, Dhaka.
Start Date: Jul 2005
(Month/Year)
Completion Date: Oct 2005
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Abdur Razzak, Saiful Islam
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
56
Pa
ge
5
6
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator), Abdur
Razzak (Faculty), Saiful Islam (Faculty)
Assignment name:
Professional training for IDB-
BISEW IT Scholarship Project
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): Continuous
As per round. Each round is for 10 months. We
have completed Round
5,6,7,8,9,10,11,12,13,14,15,16,17,18, 19, 20, 21, 22,
23, 24 (running), 25(start very soon)
Name of Client:
IDB-BISEW
IDB Bhaban, Sher-e-Bangla Nagar, Dhaka.
Start Date: Jan 2004
(Month/Year)
Completion Date: Continuous
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Md. Hasnat Reza, S.M Faisal, Symus Sadat, Iftekhar Alam
Detailed Narrative Description of Project:
Professional training for IDB-BISEW Scholarship Programme on Microsoft Certifications like
MCSE, MCAD, MCSD, ACAD etc
Detailed Description of Actual Services Provided by your Staff: Md. Hasnat Reza (Manager &
Faculty), S.M Faisal (technical Contact), A.K.M. Symus Sadat (Faculty), Iftekhar Alam (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months):
As per project
Name of Client:
Rural Electrification Board (REB)
REB Bhaban, Khilkhet, Nikunja-2, Dhaka.
Start Date: Oct 2004
(Month/Year)
Completion Date: Jan 2005
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Shajjad Hossain, Mahfuzur Rahman
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator),
Shajjad Hossain (Faculty), Mahfuzur Rahman (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months):
As per project
Name of Client:
Bangladesh Rifles (BDR)
BDR Head Quarter, Pilkhana, Dhaka.
Start Date: July 2004
(Month/Year)
Completion Date: Apr 2005
(Month/Year)
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
57
Pa
ge
5
7
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Shajjad Hossain, Mahfuzur Rahman, Prithu Ahmed
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator),
Shajjad Hossain (Faculty), Mahfuzur Rahman (Faculty), Prithu Ahmed (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months):
3 Months
Name of Client:
State Bank of India
Dilkusha C/A, Dhaka.
Start Date: Feb 2004
(Month/Year)
Completion Date: Apr 2004
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Shajjad Hossain, Mahfuzur Rahman,
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator),
Shajjad Hossain (Faculty), Mahfuzur Rahman (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months):
As per project
Name of Client:
Dhaka Electric Supply Authority (DESA)
1, Abdul Gani Road, Dhaka
Start Date: Sep 2003
(Month/Year)
Completion Date: Dec 2003
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Shajjad Hossain, Mahfuzur Rahman
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator),
Shajjad Hossain (Faculty), Mahfuzur Rahman (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 4
Name of Client:
Industrial Development Leasing Company of Bangladesh Ltd. (IDLC)
Hadi Mansion (6th Floor), 2, Dilkusha C/A, Dhaka.
Start Date: Mar 2003
(Month/Year)
Completion Date: Jun 2003
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Manjurul Islam, Burhan Uddin, Saiful Islam,
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Manjurul Islam (Coordinator), Burhan
Uddin (Faculty), Saiful Islam (Faculty)
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
58
Pa
ge
5
8
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months):
As per project
Name of Client:
Bangladesh Power Dev. Board (BPDB)
WAPDA Building, Motijheel C/A, Dhaka.
Start Date: Dec 2002
(Month/Year)
Completion Date: Mar 2003
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Zakir Al Mamun, Shajjad Hossain, Atiqul Islam
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Zakir Al Mamun (Coordinator),
Shajjad Hossain (Faculty), Atiqul Islam (Faculty)
Assignment name:
Corporate IT Training
Country:
Bangladesh
Assignment Location : Bangladesh Duration of assignment (months): 3
Name of Client:
Dacca Warehouse Ltd.
80, Gulshan Avenue, Dhaka -1212.
Start Date: Nov 2002
(Month/Year)
Completion Date: Jan 2003
(Month/Year)
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions
Performed: Manjurul Islam, Burhan Uddin, Saiful Islam,
Detailed Narrative Description of Project: Training to the High Officials and Staffs
Detailed Description of Actual Services Provided by your Staff: Manjurul Islam (Coordinator), Burhan
Uddin (Faculty), Saiful Islam (Faculty)
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
59
Pa
ge
5
9
Management Training Experience
Assignment Name: Natural Gas Access Improvement Project
Country: Bangladesh
Assignment Location within Country : Malaysia Duration of Assignment: 4 months
Professional Staff Provided by your Organization
No. of Staff: 01
No. of Person-Months: 6 months
Name of Client: Titas Gas Transmission & Distribution Company Limited
Start Date (Month/Year): 10/5/2015
Completion Date (Month/Year): 10/8/2015
Name of associated Firm(s), if any: Global Consulting Group
No. of Person-Months of Professional Staff Provided by Associated Firm(s): 4
Detailed Narrative Description of Project: This project aims to enable the participants to articulate their knowledge and understanding in concrete form as well as acquire additional skills to address the emerging challenges. The exposure visit compromised of four modules spanning over 11 days. Each module had a structured theoretical orientation by an expert resource person coupled with objective and practical on the job training.
Detailed Description of Actual Services Provided by your Staff
Pre-departure logistical arrangement viz: assistance with visa, purchase of air air-ticket Organize accommodation Co-ordination with Overseas Institutions Visits to places of educational and cultural interest Meet and greet at Destination city airport Transfer to hotel / Check in Payment of Per Diem Training Completion Report/ Welfare Guide
A CMMI Level 3 Company
COMPANY PROFILE <V.0.0.1> Copy: Controlled
60
Pa
ge
6
0
STAR COMPUTER SYSTEMS LIMITED (SCSL)
70, Green Road, Fattah Plaza (7th - 8th Floor), Dhaka 1205, Bangladesh
Tel: +880 2 9641006, 9665374 Email: [email protected]
Web: www.stargroup-bd.com