ÖBB - Foundation

Page 2: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 2

Up to 75 m

Contact WireCatenary Wire

Cantilever orBracket Arm

Page 3: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 3

Standard Types of MastsRectangular Concrete Mast Rectangular Steel Mast

Page 4: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 4

Concrete Pad Foundation

• Concrete Quantity: 1,2m³ to 12,8m³

• Quiver for Mast Footing • Fastening of Mast by

compacted split gravel

of Rectangular Concrete Mast

Split Gravel

Page 5: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 5

Development of Piling Technology

Page 6: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 6

Austropile

Contact Patch/Area

Cutting

Box-Section Frame consists of 4 steel plates with defined contact areas

Page 7: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 7

Piling Process

Cavity for mast remains

unfilled

NO EXCAVATION

Page 8: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 8

Advantages of Austropiles• Set-up of foundation in

one step• No excavation• Immediately loadable• Modular concept allows

delivery and installation on short notice

• Construction of foundation at inadmissible location

• Additional earth connection

Page 9: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 9

Piling Rig

Firstly operated at Rail Station Wörgl

in 1992

Page 10: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 10

Hydraulic Hammer

• Weight of hammer 1500kg

• Total Weight 2700kg

• Rate of Fall max 4,7m/s

• Blowenergy 16,5 kNm

• Blowrate 60-100/min.

Page 11: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 11

Advantages of Piling Rig• Operation underneath

existing lines and networks

• Unconstrained operation of subsidiary track

• Self-propelled (no locomotive)

Page 12: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 12

Advantages of Piling Rig

• Rail-Road Vehicle(minimized travel time)

• Hydraulic Hammer(simplified handling/ adjustable to ground conditions)

• Average Piling Time approx. 25 Minutes(at hardground conditions up to 1 hour)

Page 13: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 13

Work Flow

Page 14: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 14

Functional Range of Astropiles

• Mastfoundation of Catenary Systems

• Foundation of Sound Barrier Supports

• Foundation of Signal Masts

• Foundation of Floodlight Tower

Page 15: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 15

Mast Mounting Device

• Crane Momentum

75 mtons

• Dead Weight 120 tons

• Unconstrained operation of subsidiary track

• Existing Catenary System does not impede operation

Page 16: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 17

Client‘s Advantages • Optimized Use of Processing Time

• Execution without Locomotives

• Minimized Documentation of Client required ... hence beginning of construction works at short notice

• Optimized Economical Production Costs of Foundation

Page 17: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 18

Special Operation

Joint Operation of Foundation and Installation Gangs in the Area of Haag

Mission Possible

by using

EUROPTEN - Technology

Page 18: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 19

Special OperationRailstation Meidling

Foundation Works closed to Platforms

80 Foundation completed in 13

Workingdays under full Operation of

Railtraffic

Page 19: ÖBB - Foundation. Rammfundierung bei nder ÖBB2 Up to 75 m Contact Wire Catenary Wire Cantilever or Bracket Arm

Rammfundierung bei nder ÖBB 21

• For the further information please contact:

• Mr. Wolfgang Schlesinger

[email protected]

• Marko Marijanovic

[email protected]