ODOT- PIT and CSL Overview

Embed Size (px)

Citation preview

  • 7/25/2019 ODOT- PIT and CSL Overview

    1/24

    GRLGRLDynamic Testing Methods for

    Evaluation of Integrity andCapacity for Drilled Shafts

    Dynamic Testing Methods for

    Evaluation of Integrity andCapacity for Drilled Shafts

    CSL

    CSL

    PDAPDAPDA PITPITPIT

  • 7/25/2019 ODOT- PIT and CSL Overview

    2/24

    GRLGRLDeep Foundation Solutions:

    Driven Piles

    Steel, Concrete, Timber

    Drilled Shafts Wet or Dry, Cased or Uncased

    Augercast Piles

    Each pile type has differentinspection needs

    Deep Foundation Solutions:Deep Foundation Solutions:

    Driven PilesDriven Piles

    Steel, Concrete, Timber Steel, Concrete, Timber

    Drilled ShaftsDrilled Shafts Wet or Dry, Cased orWet or Dry, Cased or UncasedUncased

    AugercastAugercast PilesPiles

    Each pile type has differentEach pile type has differentinspection needsinspection needs

  • 7/25/2019 ODOT- PIT and CSL Overview

    3/24

    GRLGRL

    Planned inspection

    Included in project specifications

    Planned costs - normal pay item

    Unplanned inspection

    in response to something gone wrong

    Unplanned costs - who pays?

    Delays project, extra claims

    Planned inspectionPlanned inspection

    Included in project specificationsIncluded in project specifications

    Planned costsPlanned costs -- normal pay itemnormal pay item

    Unplanned inspectionUnplanned inspection

    in response to something gone wrongin response to something gone wrong

    Unplanned costsUnplanned costs -- who pays?who pays?

    Delays project, extra claimsDelays project, extra claims

    ( Preferred )( Preferred )( Preferred )

  • 7/25/2019 ODOT- PIT and CSL Overview

    4/24

    GRLGRL

    Low Strain Integrity MethodsLow Strain Integrity MethodsLow Strain Integrity Methods

    PILE INTEGRITY TESTING (PIT) Measure Pile Top Motion, Reflections from Defects For concrete piles, concrete filled pipes, drilled

    shafts, augercast piles, and sometimes timber piles.

    CROSS-HOLE SONIC LOGGING (CSL) Determines Concrete Quality Between Tubes in Shaft For drilled shafts and larger augercast piles

    PILE INTEGRITY TESTING (PIT)PILE INTEGRITY TESTING (PIT) Measure Pile Top Motion, Reflections from DefectsMeasure Pile Top Motion, Reflections from Defects For concrete piles, concrete filled pipes, drilledFor concrete piles, concrete filled pipes, drilled

    shafts,shafts, augercastaugercast piles, and sometimes timber piles.piles, and sometimes timber piles.

    CROSSCROSS --HOLE SONIC LOGGING (CSL)HOLE SONIC LOGGING (CSL) Determines Concrete Quality Between Tubes in ShaftDetermines Concrete Quality Between Tubes in Shaft For drilled shafts and largerFor drilled shafts and larger augercastaugercast pilespiles

  • 7/25/2019 ODOT- PIT and CSL Overview

    5/24

    GRLGRLPile Integrity Testing...

    looks for major defects

    Pile Integrity Testing...

    looks for

    major defectsSmall hammerimpact device Accelerometer

    measures response

    (defect)

    ASTM D5882ASTM D5882

  • 7/25/2019 ODOT- PIT and CSL Overview

    6/24

    GRLGRL

    Local Defect: small medium large

    Local Bulge: small medium large

    PIT - Basic InterpretationsPITPIT -- Basic InterpretationsBasic Interpretations

  • 7/25/2019 ODOT- PIT and CSL Overview

    7/24

    GRLGRLNormal test

    (pile top free)

    800 mm drilled shafts800 mm drilled shafts

    L = 25 m (L/D = 31)L = 25 m (L/D = 31)

    Good PileGood Pile

    Bad PileBad Pile

  • 7/25/2019 ODOT- PIT and CSL Overview

    8/24

    GRLGRL

    14 inch14 inch augercastaugercast pile with 15 foot rebars.pile with 15 foot rebars.

    Failed static load testFailed static load test often prompts testing.often prompts testing.

    Defect in this test pile shaft caused failed testDefect in this test pile shaft caused failed test(rather than soil failure)(rather than soil failure)

    GRL#994034

    Test Pile

    DefectDefect

  • 7/25/2019 ODOT- PIT and CSL Overview

    9/24

    GRLGRLPIT detected bored pile defect at 4.1 m depth;PIT detected bored pile defect at 4.1 m depth;confirmed by coreconfirmed by core

  • 7/25/2019 ODOT- PIT and CSL Overview

    10/24

    GRLGRL

    Good pile with local bulgeat about 25 ft and clear toe

    Bulge- / + cycle

    Bad pile with major defect atabout 3.5 ft and no clear toe

    Neck+ / - cycleBad pile excavatedto reveal neck

  • 7/25/2019 ODOT- PIT and CSL Overview

    11/24

    GRLGRLClassifications(4 categories proposed by GRL)

    Classifications(4 categories proposed by GRL)

    AA -- Good PileGood PileClear toe response, no obvious defect; sound shaftClear toe response, no obvious defect; sound shaft

    BB -- Bad PileBad PileClear identification of serious defect;Clear identification of serious defect; no toe signalno toe signal

    needs contingency tests or corrective measuresneeds contingency tests or corrective measures CC -- Possible DefectPossible Defect

    rere --test, other tests, reduce capacity or replacetest, other tests, reduce capacity or replace

    DD -- Inconclusive dataInconclusive data(poor pile top quality,(poor pile top quality,

    or no reflections due to strong soil)or no reflections due to strong soil) fix pile top & refix pile top & re --test; might givetest; might give infoinfo for upper pile shaftfor upper pile shaft

    which is reason to accept pile.which is reason to accept pile.

  • 7/25/2019 ODOT- PIT and CSL Overview

    12/24

    GRLGRL

    Compare with other observationsCompare with other observations

    ReRe --test with PIT (trim pile top to solid concrete)test with PIT (trim pile top to solid concrete) Excavate if near topExcavate if near top

    Request pile coreRequest pile core Request a PDA test or a static testRequest a PDA test or a static test Replace pile (or repair)Replace pile (or repair) Other?Other?

    Have a planHave a plan what to do if find a defectwhat to do if find a defect

    What to do if find a problem ?What to do if find a problem ?

  • 7/25/2019 ODOT- PIT and CSL Overview

    13/24

    GRLGRL

    Some studies suggest a 30 L/DSome studies suggest a 30 L/D limit.limit.Actually this is only a rule of thumb andActually this is only a rule of thumb anduseable length depends on:useable length depends on:

    soil strength,soil strength, pile uniformity,pile uniformity,

    actual diameter and length,actual diameter and length, and equipment noise and resolution.and equipment noise and resolution.

    We often see much farther We often see much farther

    PIT LimitationsPIT Limitations

    Highly nonHighly non --uniform piles difficult to interpretuniform piles difficult to interpret Cracks or mechanical joints block wavesCracks or mechanical joints block waves

    Small defects (or of short length) hard to findSmall defects (or of short length) hard to find Gradual changes hard to findGradual changes hard to find

  • 7/25/2019 ODOT- PIT and CSL Overview

    14/24

    GRLGRLPIT ConclusionsPIT ConclusionsPIT Conclusions

    PIT finds major defects,

    low cost so can test every pile Inclusion of inspection requirements in

    job specifications is suggested PIT can sometimes test piles in structure

    Guideline of use till 30 L/D is not a limit.

    Cracks or gaps limit transmission of wave

    No information about capacity

    PIT findsPIT finds major defectsmajor defects ,,

    low cost so can test every pilelow cost so can test every pile Inclusion of inspection requirements inInclusion of inspection requirements in

    job specifications is suggested job specifications is suggested PIT can sometimes test piles in structurePIT can sometimes test piles in structure

    Guideline of use till 30 L/D is not a limit.Guideline of use till 30 L/D is not a limit.

    Cracks or gaps limit transmission of waveCracks or gaps limit transmission of wave

    No information about capacityNo information about capacity

  • 7/25/2019 ODOT- PIT and CSL Overview

    15/24

    GRLGRL

    Stress Waves, emittedStress Waves, emittedin one tube are receivedin one tube are received

    in another one if concretein another one if concrete

    quality is satisfactoryquality is satisfactory

    ReceiveReceiveTransmit Transmit

    Cross Hole Sonic Logging

    ASTM D6760

    Cross Hole Sonic LoggingCross Hole Sonic Logging

    ASTM D6760ASTM D6760

  • 7/25/2019 ODOT- PIT and CSL Overview

    16/24

    GRLGRL

    Cross Hole Sonic Logging

  • 7/25/2019 ODOT- PIT and CSL Overview

    17/24

    GRLGRL

    SignalSignal

    (wave speed) = ( tube distance ) / (arrival time )(wave speed) = ( tube distance ) / (arrival time )

    Arrival

    Energy

    Cross Hole Sonic Logging

    Arrival

    Arrival

  • 7/25/2019 ODOT- PIT and CSL Overview

    18/24

    GRLGRL

    DefectDefect

    DefectDefect

    DefectDefect

    How do we spot defects?How do we spot defects?Low energyLow energyLate arrivalsLate arrivals

    Cross Hole Sonic Logging

  • 7/25/2019 ODOT- PIT and CSL Overview

    19/24

    GRLGRL48 shaft with soft toe condition48 shaft with soft toe condition

  • 7/25/2019 ODOT- PIT and CSL Overview

    20/24

    GRLGRLShaft with tremie defect

  • 7/25/2019 ODOT- PIT and CSL Overview

    21/24

    GRLGRL

    insensitive to surrounding soil or pile lengthinsensitive to surrounding soil or pile length

    finds multiple defects, depth and quadrantfinds multiple defects, depth and quadrant

    finds soft bottoms if tubes go to bottomfinds soft bottoms if tubes go to bottom inspires careful construction by contractor inspires careful construction by contractor

    CSL Testing AdvantagesCSL Testing Advantages

  • 7/25/2019 ODOT- PIT and CSL Overview

    22/24

    GRLGRL

    must plan and install access tubesmust plan and install access tubes tubes preferably less than 2 meters aparttubes preferably less than 2 meters apart

    evaluates concrete only between tube pairsevaluates concrete only between tube pairs

    defects undetected when outside cagedefects undetected when outside cage

    CSL Testing LimitationsCSL Testing Limitations

  • 7/25/2019 ODOT- PIT and CSL Overview

    23/24

    GRLGRLCSL ConclusionsCSL ConclusionsCSL Conclusions Can find multiple defects and their quadrant;

    not sensitive to pile length or soil

    CSL finds defects between (steel) access tubes;consider defect remedy in advance

    CSL access tubes in every shaft inspireshigh quality installation for every shaft

    (even if do not test every shaft)

    Allows low cost testing access if problems occurduring installation

    Waterfall, FAT and energy complimentinterpretation of results

    Can find multiple defects and their quadrant;Can find multiple defects and their quadrant;not sensitive to pile length or soil not sensitive to pile length or soil

    CSL finds defects between (steel) access tubes;CSL finds defects between (steel) access tubes;consider defect remedy in advanceconsider defect remedy in advance

    CSL access tubesCSL access tubes in every shaft in every shaft inspiresinspireshigh quality installation for every shafthigh quality installation for every shaft

    (even if do not test every shaft)(even if do not test every shaft)

    Allows low cost testing access if problems occur Allows low cost testing access if problems occurduring installationduring installation

    Waterfall, FAT and energy complimentWaterfall, FAT and energy complimentinterpretation of resultsinterpretation of results

  • 7/25/2019 ODOT- PIT and CSL Overview

    24/24

    GRLGRL

    The ndhe nd