ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR | JERRY WRAY, ODOT DIRECTOR | ROXANNE KANE, DISTRICT DEPUTY DIRECTOR SERVING BELMONT, CARROLL, COLUMBIANA, HARRISON, HOLMES, JEFFERSON & TUSCARAWAS COUNTIES

ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

JOHN R. KASICH, OHIO GOVERNOR | JERRY WRAY, ODOT DIRECTOR | ROXANNE KANE, DISTRICT DEPUTY DIRECTOR

SERVING BELMONT, CARROLL, COLUMBIANA, HARRISON, HOLMES, JEFFERSON & TUSCARAWAS COUNTIES

Page 2: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15
Page 3: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

CONSTRUCTION PROGRAM HIGHLIGHTS 1

101 Total Projects worth more than $180M

26 Pavement Projects

19 Bridge / Culvert Projects

7 Safety Improvements

34 Slide Repairs

Page 4: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

BELMONT COUNTY 2

Belmont County Projects

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

80599 IR 70 14.24 Major Reconstruction 3/1/16 4/1/16 7/31/18 $19,520,051.33

101508 SR 331 2.22 Slide Repair 6/22/17 9/7/17 6/30/18 $313,243.50

89314 CR 29-Commons Mall Crossing

New Construction 12/1/16 3/1/17 10/31/18 $10,328,829.65

100971 SR 800 8.28 Slide Repair 8/10/17 10/23/17 7/31/18 $442,555

103643 SR 647 0.72/0.91/1.02 Slide Repair 6/22/17 9/5/17 6/30/18 $478,276.50

22778 IR 470 6.54 Bridge Repair 9/7/17 2/1/18 10/15/19 $3,219,805.07

97842 CR 4 23.52 (not mapped) TR 291 0.01 (not mapped)

OBPP Bridge Replacements 4/21/16 3/15/18 8/31/18 $987,000

102336 SR 149 24.44-30.85 Preservation, Preventive

Maintenance Microsurfacing 10/19/17 5/1/18 9/30/18 $488,993.04

106359 US 250 7.86 Slide Repair 4/5/18 6/1/18 7/15/18 $60,489

103395 SR 647 6.63 Slide Repair 1/11/18 4/1/18 5/31/18 $110,000

103404 US 250 8.03 Slide Repair 1/11/18 5/1/18 6/30/18 $332,000

87352 IR 70 12.61-13.73 IR 70 14.75-15.72

Minor Rehab – Pavement 2/1/18 5/1/18 10/31/18 $1,030,636.19

103499 SR 9 9.35 Slide Repair 6/1/18 8/1/18 10/31/18 $351,630

106148 US 250 9.18 Slide Repair 5/1/18 7/1/18 8/31/18 $86,040

106109 SR 147 25.40 Slide Repair 3/22/18 5/1/18 7/31/18 $375,452

101497 SR 149 5.34 Slide Repair 4/5/18 6/1/18 9/30/18 $180,819

106108 SR 9 11.24 Slide Repair 3/22/18 6/1/18 9/30/18 $235,000

105324 SR 7 19.75 Bridge Repair 7/1/18 9/1/18 11/31/18 $1,000,000

99955 US 40 20.50 & 26.77 Traffic Signals 4/19/18 5/1/18 4/30/19 $342,134.67

Page 5: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

BELMONT COUNTY 3

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

102639 Barnesville Outpost (not mapped)

Buildings - Mix Shed 3/8/18 5/15/18 9/30/18 $541,569

103641 SR 9 7.00 Slide Repair 1/11/18 6/1/18 8/31/18 $335,000

99453 SR 9 11.79 Slide Repair 4/5/18 6/1/18 8/31/18 $264,638.50

99455 SR 147 22.93 Slide Repair 5/17/18 6/1/18 8/31/18 $355,500

103629 US 250 7.620 Slide Repair 7/2/18 9/1/18 10/31/18 $147,044.87

103630 US 250 7.40 Slide Repair 7/2/18 9/1/18 11/30/18 $289,968.18

102475

SR 149 30.85-32.69 SR 331 0.00-2.20 SR 331 5.29-5.85 SR 331 9.95-14.16 HAS SR 331 0.00-3.05

Resurfacing, Two-Lane 8/9/18 9/1/18 11/30/18 $2,850,000

101117 US 40 20.80 Slide Repair 3/2/17 4/15/18 7/31/18 $692,351.15

Local Project

103722 VAR PM Phase 3 (not mapped)

Pavement Marking 2/1/18 5/1/18 10/1/18 $152,927

28 Total Projects worth more than $45M

Page 6: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

BELMONT COUNTY 4

BELMONT COUNTY

Page 7: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

CARROLL COUNTY 5

Carroll County Projects

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

99945 SR 171 1.92 SR 542 9.29

Culvert Replacements 2/1/18 3/15/18 7/31/18 $346,749.33

102340 SR 542 5.48-15.65 Preservation, Preventive Maintenance Chip Seal

11/16/17 5/1/18 10/15/18 $547,940.50

100976 SR 39 0.77 Slide Repair 11/16/17 5/1/18 6/30/18 $127,492

91837 SR 164 7.27-13.71 SR 164 13.77-17.90 JEF SR 164 0.00-0.94

Resurfacing, Two-Lane 1/25/18 5/1/18 10/31/18 $2,367,228.93

102338 SR 9 14.61-21.82 SR 171 0.00-10.62

Preservation, Preventive Maintenance Microsurfacing

3/8/18 5/1/18 10/15/18 $1,140,000

100591 SR 39 0.00-6.53 SR 39 15.24-23.41

Resurfacing, Two-Lane 4/19/18 5/31/18 9/30/18 $1,773,200

100602 SR 43 16.15-22.32 Preservation, Preventive

Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251

102482 SR 183 0.00-1.15 SR 542 15.61-15.78 TUS SR 183 0.00-2.06

Resurfacing, Two-Lane 6/21/18 8/1/18 10/31/18 $534,000

8 Total Projects worth more than $7M

Page 8: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

CARROLL COUNTY 6

CARROLL COUNTY

Page 9: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

COLUMBIANA COUNTY 7

Columbiana County Projects

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

102809 US 30 8.86 Traffic Signals 5/25/17 4/1/18 5/31/18 $134,998.25

22854 SR 14 7.58 Bridge Replacement 3/30/17 3/15/18 6/15/18 $1,572,817.66

80117 SR 7 5.95 Bridge Repair 10/5/17 11/20/17 9/30/18 $985,399.77

101480 SR 7 4.35 Slide Repair 11/16/17 3/1/18 10/31/18 $2,380,019.58

98313 SR 7 26.62 Spot Safety 1/25/18 4/1/18 10/31/18 $2,403,135.95

102342 US 62 10.83-12.71 SR 165 0.00-2.75

Resurfacing, Two-Lane 10/5/17 5/1/18 10/31/18 $666,789.98

97622 SR 170 1.72-11.36 Resurfacing, Two-Lane 9/21/17 5/1/18 10/31/18 $1,317,391.07

102371 SR 11 11.14-15.99 Preservation, Preventive

Maintenance Microsurfacing 10/19/17 5/1/18 9/30/18 $1,282,675.65

100676 SR 172 8.97-16.09 Preservation, Preventive

Maintenance Microsurfacing 2/1/18 5/1/18 9/30/18 $509,000

17779 SR 45 23.70 Intersection 2/15/18 5/1/18 10/31/18 $1,108,690.85

101481 US 30 16.98 Slide Repair 3/1/18 5/1/18 12/1/18 $883,124.80

97972 US 30 30.04 Bridge Repair 1/11/18 6/1/18 9/30/18 $472,350

101526 SR 170 2.40 Slide Repair 8/1/18 10/1/18 6/30/19 $167,259.70

99955 SR 14 17.50 BEL US 40 20.50 & 26.77

Traffic Signals 4/19/18 5/1/18 4/30/19 $342,134.67

Page 10: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

COLUMBIANA COUNTY 8

Local Projects

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

103851 Fairfield Avenue Enhancements: Add Sidewalks 1/25/18 4/15/18 9/15/18 $289,279.65

84763 CR 421 0.74 Bridge Repair 2/7/18 4/18/18 9/12/18 $456,691.00

16 Total Projects worth nearly $15M

Page 11: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

COLUMBIANA COUNTY 9

COLUMBIANA COUNTY

Page 12: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

HARRISON COUNTY 10

Harrison County Projects

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

91603 SR 799 3.90 & 4.52 Bridge Replacements 8/11/16 1/17/17 5/31/18 $2,478,646.90

102285 Scio Outpost (not mapped)

Salt Storage Facility 2/17/17 4/25/17 5/31/18 $1,034,965.25

101534 SR 799-4.15 Slide Repair 6/8/17 1/18/18 5/15/18 $166,941

100590

US 250 19.99-22.03 SR 9 1.31-6.49 SR 332 0.00-1.77 SR 519 6.21-6.78

Resurfacing, Two-Lane 11/30/17 5/1/18 10/31/18 $2,028,630.85

102117 SR 800 3.67 Slide Repair 5/17/18 7/1/18 9/30/18 $405,955

101527 SR 9 21.27 Slide Repair 6/1/18 8/1/18 11/1/18 $276,592.23

102475

SR 331 0.00-3.05 BEL SR 149 30.85-32.69 BEL SR 331 0.00-2.20 BEL SR 331 5.29-5.85 BEL SR 331 9.95-14.16

Resurfacing, Two-Lane 8/9/18 9/1/18 11/30/18 $2,850,000

7 Total Projects worth more than $9M

Page 13: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

HARRISON COUNTY 11

HARRISON COUNTY

Page 14: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

HOLMES COUNTY 12

Holmes County Projects

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

101528 SR 60 2.56 Slide Repair 6/22/17 4/2/18 7/31/18 $310,307.03

99947 SR 557 2.53 SR 643 0.41 & 3.56

Culvert Replacements 1/11/18 2/20/18 8/15/18 $406,912

102398

SR 39 5.72-6.76 SR 39 11.45-17.11 SR 60 0.00-4.22 SR 83 9.02-10.27

Resurfacing, Two-Lane 10/5/17 5/1/18 10/31/18 $2,019,217.35

99942 SR 241 11.59 Culvert Replacement 2/1/18 6/1/18 8/31/18 $238,300.00

98181 US 62 14.93 SR 39 4.26

Culvert Replacements 5/17/18 7/1/18 9/30/18 $274,554

Local Projects

104513 County Trail Repairs (not mapped)

Enhancements: Bikeways 4/1/18 6/1/18 10/1/18 $262,000

104049 VAR PM Phase 2 (not mapped)

Pavement Markings 7/25/18 9/5/18 11/14/18 $140,000

7 Total Projects worth nearly $4M

Page 15: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

HOLMES COUNTY 13

HOLMES COUNTY

Page 16: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

JEFFERSON COUNTY 14

Jefferson County Projects

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

97847 CR 10 2.62 (not mapped) OBPP Bridge Replacement 4/21/16 11/14/17 10/15/18 $995,600

94058 SR 7 4.80 Slope Repair 7/10/14 4/1/15 5/31/18 $15,974,744.65

93192 SR 7 10.0 Slope Repair 2/5/15 4/20/15 6/30/18 $29,978,283.40

81314 SR 7 17.29 Intersection Improvements 10/22/15 6/13/16 11/30/18 $9,931,409.14

101457 SR 151 12.10 Slide Repair 3/1/18 5/1/18 7/31/18 $410,000

101458 SR 151 12.26 Slide Repair 3/1/18 5/1/18 7/31/18 $175,000

99960 SR 213 0.00 Traffic Signals 10/19/17 1/15/18 10/31/18 $388,863.50

94177 SR 7 19.79 Bridge Replacement 8/24/17 4/1/18 10/31/18 $1,928,000

106776 US 22 5.90 Bridge Repair 5/1/18 6/1/18 10/31/18 $343,000

102368 SR 152 14.53-21.96 Preservation, Preventive

Maintenance Microsurfacing 11/2/17 5/1/18 9/30/18 $635,442.40

100647 SR 152 0.22-5.26 SR 152 6.45-13.87 SR 213 14.90-18.61

Preservation, Preventive Maintenance Chip Seal

12/14/17 5/1/18 8/31/18 $1,279,884.01

106114 SR 7 7.36 Slide Repair 2/15/18 5/1/18 6/30/18 $122,000

95564 SR 7 0.20-4.76 Resurfacing – Four-Lane 2/15/18 5/1/18 10/31/18 $2,166,447.98

100619 SR 7 - Various Locations (not mapped)

Bridge Maintenance 5/3/18 6/11/18 9/30/18 $475,538

91837 SR 164 0.00-0.94 CAR SR 164 7.27-13.71 CAR SR 164 13.77-17.90

Resurfacing, Two-Lane 1/25/18 5/1/18 10/31/18 $2,367,228.93

79353 Wellsburg Bridge WVDOT’s New Ohio River Bridge 7/26/16 4/1/18 6/1/21 $34,363,591*

(over 10 years)

Page 17: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

JEFFERSON COUNTY 15

Local Projects

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

86475 CR 75A 0.02 Bridge Replacement 6/29/17 10/9/17 6/1/18 $747,463

102993 CR 17 3.88 Bridge Replacement 5/16/18 7/11/18 12/12/18 $818,181.82

18 Total Projects worth more than $68M *(does not include $34.3M a year over 10 Year Period for New Ohio River Bridge)

Page 18: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

JEFFERSON COUNTY 16

JEFFER

SO

N C

OU

NT

Y

Page 19: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

TUSCARAWAS COUNTY 17

Tuscarawas County Projects

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

96790 SR 416 4.61-9.85 Preservation, Preventive

Maintenance Microsurfacing 3/2/17 5/1/18 5/31/18 $648,841.17

87320 SR 212 1.07-5.11 SR 212 9.49-18.23

Resurfacing, Two-Lane 6/8/17 9/18/17 6/15/18 $2,505,901.28

91567 SR 93 3.33 Bridge Replacement 8/24/17 6/4/18 9/30/18 $398,819.20

91599 IR 77 19.80 Bridge Deck Replacement 1/25/18 3/31/18 10/31/18 $2,932,250.30

98742 IR 77 3.78 Bridge Deck Replacement 1/11/18 4/1/18 7/31/19 $5,301,393

101482 US 36 16.80 Slide Repair 4/1/18 6/1/18 9/30/18 $2,996,631.24

101727 SR 416 3.81-4.57 Enhancements: Add Sidewalks 3/22/18 4/15/18 8/31/18 $478,141.68

95540 SR 39 0.71-2.94 SR 39 7.27-10.24 SR 211 0.00-0.07

Resurfacing, Two-Lane 9/21/17 5/1/18 10/31/18 $1,796,208.40

102367 SR 416 12.98-14.98 Resurfacing, Two-Lane 11/2/17 5/1/18 10/31/18 $374,548.42

87198 US 250 17.37-21.42 Resurfacing, Four-Lane 11/16/17 5/1/18 9/30/18 $2,553,245.50

98266 SR 416 9.85-12.67 Resurfacing, Two-Lane 2/15/18 5/1/18 10/31/18 $1,066,569.82

99976 SR 39 12.64 Safety, Turn Lane Addition 4/5/18 5/1/18 4/30/19 $1,429,799.22

106231 SR 800 25.10 Slide Repair 7/31/18 8/15/18 9/30/18 $196,900

101461 SR 416 8.93 Slide Repair 4/5/18 6/1/18 8/31/18 $200,774.97

100630 US 36 3.85-17.49 Resurfacing, Two-Lane 5/3/18 6/15/18 10/31/18 $2,281,000

105022 SR 259 0.55 (not mapped) District 11 Headquarters 6/21/18 8/1/18 10/31/18 $607,892

102482 CAR SR 183 0.00-1.15 CAR SR 542 15.61-15.78 SR 183 0.00-2.06

Resurfacing, Two-Lane 6/21/18 8/1/18 10/31/18 $534,000

101531 SR 800 25.65 Slide Repair 7/2/18 8/15/18 10/31/19 $252,365.56

Page 20: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

TUSCARAWAS COUNTY 18

Ref. PID Number

Route & Section Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

96610 US 36 17.24 Bridge Deck Replacement 8/23/18 9/3/18 10/31/19 $1,925,000

Local Projects

104013 VAR GR Phase 4 (not mapped)

Guardrail Upgrade/Replacement 2/7/18 5/1/18 9/1/18 $282,160

107181 VAR PM Phase 3 (not mapped)

Pavement Marking 7/11/18 8/29/18 11/9/18 $150,000

21 Total Projects worth nearly $29M

Page 21: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

TUSCARAWAS COUNTY 19

Resurfacing

Reactive/Preventive Maintenance

Bridge/Culvert

Continued Construction from 2013

New Construction in 2014

Sale in 2014; Construction in 2015

TU

SC

AR

AW

AS C

OU

NT

Y

Page 22: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

ODOT DISTRICT 11 2018 CONSTRUCTION PROGRAM

DISTRICT MAINTENANCE PROJECTS 20

District Maintenance Projects (Not Mapped)

Ref. PID Number

Project Name Work Type

Sale Date

Estimated Start Date

Estimated End Date

Estimated Investment

96877 D11-LG-FY2018 Lighting Maintenance 6/8/17 8/1/17 8/1/18 $364,150

96873 D11-PM-FY2018(A) Pavement Marking 9/21/17 4/1/18 11/15/18 $293,938.15

96874 D11-PM-FY2018(B) Pavement Marking 11/2/17 4/1/18 5/15/19 $1,467,240.85

96875 D11-RPM-FY2018 Pavement Marking 2/1/18 5/1/18 5/15/19 $167,722

100579 D11 CS FY2018 Crack Seal 1/25/18 4/15/18 10/31/18 $286,359.64

99601 D11-HS-FY2018(B) Herbicidal Spraying 2/1/18 5/1/18 9/30/18 $88,629

99600 D11-HS-FY2018(A) Herbicidal Spraying 2/15/18 5/1/18 9/30/18 $155,960

106347 D11-SP-FY2018(C) Spot Paving 4/19/18 6/1/18 9/30/18 $500,000

98502 D11-GR-FY2018 Guardrail Reconstruction/Repair 4/19/18 7/1/18 4/1/19 $1,350,000

97461 D11-PM-FY2019(B) Pavement Marking 6/21/18 8/1/18 10/31/19 $1,567,698.76

97463 D11-LG-FY2019 Lighting Maintenance 6/21/18 8/1/18 7/31/19 $350,000

102595 D11-SIGN-FY2018 Signs 6/7/18 7/1/18 12/31/18 $500,000

98115 D11-SP-FY2019(A) Reactive Maintenance 6/21/18 8/1/18 10/31/18 $1,000,000

13

2?

Total Projects worth more than $8M

Page 23: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15
Page 24: ODOT DISTRICT 11 › districts › D11 › Documents...100602 SR 43 16.15-22.32 Preservation, Preventive Maintenance Microsurfacing 7/12/18 8/1/18 9/30/18 $517,251 102482 SR 183 0.00-1.15

To provide easy conveyance of people

and goods from place to place, we will:

Take care of what we have;

Make our system work better;

Improve safety;

Enhance capacity

A long-term, reliable, professional and

highly productive organization

O U R M I S S I O N

O U R V I S I O N

For more information, contact:

District 11 Deputy Director Roxanne Kane, P.E., at (330) 308-3950,

District 11 Construction Engineer Todd Moore, P.E. at (330) 308-3952, or

District 11 Office of Communications at (330) 308-7817.

Like us on Facebook: facebook.com/ODOTEasternOhio

Follow us on Twitter: twitter.com/ODOT_EasternOH

Statewide Traffic Information: www.Ohgo.com

For general information, call (330) 339-6633 or visit District 11’s Web site at: www.Transportation.Ohio.Gov/Dist11