I n Reply Refer To: FO-2-1 May 18, 1987
Shell Offshore Inc. Attention: Hr. G. D. Meglllfgan f. Post Office Box 60159 X New Orleans* Louisiana "0160 ;
m) Gentlemen: *
Reference 1s made t o your I n i t i a l Plan o f Exp lo ra t i on and En* ronmental Report received May 1 1 , 1987, amended May 13, 1987, f o r Leases OCS-G 7933, 7936, 7937, and 7943, Blocks 338, 382, 363, and 427, r e s p e c t i v e l y , M i s s i s s i p p i Canyon Are. This plan inc ludes the a c t i v i t i e s uroposed f o r Wel ls A and B 1n Block 338, Wel ls A and B 1n Block 382, W e l l * A through C 1n Block 383 and Well A 1n Block 427.
I n accordance w i t h 30 CFR 250.34, rev ised December 13, 1979,#and our l e t t e r dated January 29, 1979, t h i s plan i s hereby determined t o bt, 'complete and 1s now being considered f o r approva l .
ft
Your plan con t ro l number i s N-2697 and should be referenced .n your cocrjTUjnication and correspondence concerning t h i s p l an . «
S incere ly yours,
(Orlg. Sgd.) A. Donald G'uhr % i f
D. J . Bourgeois ^ ^ .Reg iona l Supervisor
F i e l d Operat ions
bcc: Lease OCS-G 7933 (OPS-3-2) (FILE ROOM) Lease OCS-G 7936 (OPS-3-2) (FILE ROOM) Lease OCS-G 7937 (OPS-3-2) (FILE ROOM) Lease OCS-G 7943 (OPS-3-2) (FILE ROOM)
(0PS-3-4 w /Pub l i c I n f o . Copy of the plan and ER (PUBLIC RECORDS)
ADGobert:dsl :5/13/87:poecom
Office* Program S^/teef
MAY 2 i >387
irtferffldtien * * * * *
. ._».,w-^.-—
Shell Of!* tore Inc. * SuDvam> ol S' O'i C o " M " i
One Shell Sauare P O Bo* 60159 New O r l e i f n l o u i f t n * 70160
OHsno'e East Proouction D i v m o n ^HtVf 12 ;OQ7
Regional Supervisor O f f i ce of Fielq Operations Minerals Management Service 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394
Dear S i r :
SUBJECT: PLAN Of EXPLORATION SITE SPECIFIC LOCATIONS SOI OCS-G 7933, MISSISSIPPI CANYON BLOCK 338 SOI OCS-G 7936, MISSISSIPPI CANYON BLOCK 382 SOI OCS-G 7937, MISSISSIPPI CANYON BLOCK 383 SOI OCS-G 7943, MISSISSIPPI CANYON BLOCK 427 UFFSHORF LOUISIANA. MISSISSIPPI
Shell Offshore Inc. (SOI) submitted an I n i t i a l Plan of Exploration (POE) for the captioned leases on May 11, 1987 and was assigned Plan Control No. N-2697. SOI herewith submits s i te specif ic locations for the subject plan. We request the attachments, which are marked "Conf ident ia l , 1 be exempted from disclosure under the Freedom of Information Act.
Should you require addit .onal information, please contact A. R. Pickett at (504)588-0198 or 588.6312.
Yours very t r u l y ,
ORIGINAL SIGNED T . G, D, MEGILLIGAN '
G. D. Megilligan
Div is ion Safety, Envirc > jiental and Administration Manager
ARP:LLL
Attachments cc: D i s t r i c t Supervisor > //attachments)
New Orleans D i s t r i c t Minerals Management .^ rv ice 1201 Elmwood Park Bou>'vard New Orleans, LA 7012V 2394
CNCN8713201
Shell Offshore Inc. * SotwKJ^fy o* Snail Cw Company
Ona Snail Squara • 0 Bo. 80159 Naw Ortaant Louoiar.a 70100
OTHhofe East Production D L I I cn
Regional Supervisor
HM 1 1 536 •
Of f ice of Field Operatione Minerals Management Service \ 2 n Elmwood Park Boulevard New Orleans. LA 70123-2394
^ear S i r :
SUBJECT: PLAH OF EXPLORATION SOI GCS-C 7933, MISSISSIPPI CANYON BLOCK 338 SOI OCS-G 7936, MISSISSIPPI CANYON BLOCK 382 SOI OCS-G 7937, MISSISSIPPI CANYON BLOCK 383 SOI OCS-G 7943, MISSISSIPPI CANYON BLOCK 427 OFFSHORE LOUISIANA, MISSISSIPPI
Shell Offshore Inc. (SOI) herewith submits for your approval an I n i t i a l Plan of Exploration (POE) for the captioned leases.
This Plan is submitted in accordance with 30 CFR 250.34, effective December 12, 1979, and subsequent guidelines. A search for Cultural Resources is not required for tht captioned leases.
This Plan consists of a series of attachments describing details of OUT intended operations. The attachments we desire to be exempted from disclosure under the Freedom of Information Act are marked "Confidential."
The d r i l l i n g r i g we propose to use, the D r i l l Ship Discoverer Seven Seas, has previously been approved for use in the Gulf of Mexico.
D r i l l i n g and other operations w i l l be conducted under the applicable provisions of OCS Orders and other regulations, including those regarding the avoidance of potential d r i l l i n g hazards. Safety and pollution prevention and control w i l l be prime considerations during a l l operations.
SOI i s submitting a Shallow Hazards Report for the subject leases under separate cover. D r i l l i n g may commence as early as June 12, 1987 i f the D r i l l Ship Discoverer Seven Seas is available.
LC8712423K 0004.0.0
Should you requi re a d d i t i o n a l i n f o r m a t i o n , please contact A. R. P i c k e t t at (504) 588-0198 or 588-6312.
Yours very t r u l y , ORIGINAL . i
G : D: M£GiL_!w.i -
C. D. M e g i l l i g a n
D i v l s i D n Safe ty , Environmental _ A d m i n i s t r a t i o n Manager
ARP:CCV
Attachments
cc : D i s t r i c t Supervisor (w/at tachmenls) New Orleans D i s t r i c t Minera l s Management Service 1201 Elmwood Park ~oulevard New Orleans, LA 70123-2394
LC8712423K 0005 .0 .0
INDEX OF ATTACHMENTS PLAN OF EXPLORATION
SOI ocs -c 7933, MISSISSIPPI CANYON BLOCK 338 SOI ocs -G 7936, MISSISSIPPI CANYON BLOCK 382 SOI ocs -G 7937, MISSISSIPPI CANYON BLOCK 383 SOI ocs -G 7943, MISSISSIPPI CANYON BLOCK 427
OFFSHORE LOUISIANA, MISSISSIPPI
ATTACHMENT NO. OF NO. DESCRIPTION COPIES
1 Index o f Attachments 11
2 D e s c r i p t i o n o f A c t i v i t i e s 5*
3 Schedule o f A c t i v i t i e s 11
4 P l a t , Surface Loca t ion o f Wells 11
5 P l a t , Proposed Bottom-hole Loca t ions and Depths 5*
6 Geologic S t r u c t u r e Map 5*
7 Cross S e c t i o n , E-W 5*
8 L i 6 t , D r i l l i n g Mud Components and A d d i t i v e s 11
9 Comments, S p i l l Prevent ion , C o n t r o l and 11 Countermeasure Plan
10 Comments, A i r Emissions Data 11
11 D e s c r i p t i o n , Onshore Support F a c i l i t y 11
12 Support Vesse l s , D e s c r i p t i o n , T r a v e l Frequency 1!
13 P l a t , T r a n s p o r t a t i o n Routes and Shore Base 11 D e s c r i p t i o n
14 C e r t i f i c a t e o f Consistency, Louis iana 11
15 C e r t i f i c a t e o f Consistency, M i s s i s s i p p i 11
16 S i t e - S p e c i f i c - Shallow Hazards Data 5*
17 Environmental Report 11
* C o n f i d e n t i a l
Attachment
LC8712423K 0007.0 .0
SCHEDULE OF ACTIVITIES PLAN OF EXPLORATION
so: ocs -c 7933, MISSISSIPPI CANYON BLOCK 338 SOI ocs -G 7936, MISSISSIPPI CANYON BLOCK 382 SOI ocs -G 7937 , MISSISSIPPI CANYON BLOCK 383 SOI ocs -G 7943, MISSISSIPPI CANYON BLOCK 427
OFFSHORE LOUISIANA, MISSISSIPPI
Exploratory d r i l l i n g may commence as early as June 12, 1987, provided the r i g Discoverer Seven Seas i s available. D r i l l i n g earh location is expected to require about 40 days, thus i f a l l wells are d r i l l e d , the entire program would require about 320 days.
LC8712423K 0009.0.0
Attachment 3
Y • 10.406.880
BLOCK 338 SOI
OCS-G 7933
o
Y ^ 10.391.040
uc ua ocs-Q n u . A234I FEL 4 24M FSLOf BLK XM BOS4 F t L l M J J r F N L O F B U l X »
UC 14? OCS-G ?»34 A io 371- rwv. t H I ' FML Of BLK jaa B ISST FEL & 15 f S i Of Bu t M I
UC M3 OCS-G 7W7 A A M i FEL 1 i . t * i FSL Of 3LK M l B a t 3 i FWV * 4 422" FSL Of B u t M3 C 4.7 i r f EL 4 J.MS f S l O F I W H )
uc tf; ocs-o rao A 7 U l > 1 MO Ff*. Of B l * 427
ATTACHMENT 4 SHELL OfFSHORE INC.
(A SUBSIDIARY OF SHELL OIL COMPANY)
PROPOSED WELL LOCATIONS PLAN OF EXPLORATION
SOI OCS-G 7933 BLX 338 SOi OCS-G 7937 BLK 343
SOI OCS-G 7936 BLK 382 SOI OCS-G 7943 BLK 427
MISSISSIPPI CANYON 338. 382.383.427 OFFSHORE L O U I S I A N A MISSISSIPPI
0 SOOO* l i
OA QB
BLOCK 382 SOI
OCS-G 7936
BLOCK 383 SOI
OCS-G 7937
B
L.
o
Y » 1C.375.20O
BLOCK 428 SOi
OCS-G 7942
BLOCK 427 SCH
OCS-G 7943
Y • 10 359 360
PRII.!.INC. MUD COMPONENTS AND APDITIVF.S PIAN OF Exnxmxriw
SOI OCS-C 7935, HT557S5TPPT CANYON BIOCK 33» §61 6CS-C 7936! MTSSTSSirn CANYoN Rl.oTK lfll ' SOT PCTTi 7937! MTSSTSSTPn C.PrKVTTrrrx^irs SET QCS-C TjgT HTS5TS5TTn CANYoN BI.OTTT77
OFTSnOBE 1.QIH5IANA. HTSSTSSTPPT
I . ITEMS USED ON A ROUTINE BASIS
IDF BARIOD M - I MILPARK DESCRIPTION
I D F BAR BARITE/BARIOD M - l BAR RARITE/MI LBAR BARITE (BARIUM SULFATE)
I D F WYOMING BENTONITE AQUAGEL M - I CEL MILGEL BENTONITE
I D F L I G N I T E CARBONOX TANNATHIN LICCO LIGNITE
I D r CLS Q-BROXIN RP-111 IWI CAL BLENDED LIGNOSULFONATE
CAUSTIC SODA CAUSTIC SODA CAUSTIC SODA CAUSTIC SODA SODTUM HYDROXIDE
ALUMINUM STEARATE ALUMINUM STF ARATF ALUMINUM STEARATE ALUMINUM STEARATE ALUMINUM STEARATE
LIME LIME LIMF LIME CALCIUM HYDROXIDE
I D F CAUSTICIZED CC-16 CAUSTTMC I.IGCON BLFNDFD LIGNITE/CAUSTIC
SOOA ASH SODA ASH SODA ASH SODA ASH SODIUM CARBONATE
SODIUM BICARBONATE BICARB BICARB BICARB BICARBONATE OF SODA
I D F HI-TEMP BARANEX RESTNEX I I CHEMTROl -X/FILTREX ELECTED POLYMER BLEND
I D F DRILLING DETERGENT CON DET. PP M.P. DETERGENT
IDF DEFOAM BARA-DEFOAM I PFFOAM-A W.O. PEFOAM/LD R PEFOAMTR (USUALLY AI-COHOL RASED)
I D F HYMJL AKTAFLOS DMS - NONIONIC MID SURFACTANT
I D F CMC CMC OR CELLEX CMC CMC SODlirM CARBOXY METHYL CELLULOSE
SALT SALT SALT SALT SPDIirM CHLORIDE
TDF STANCH IMPERMEX MY - LO- TFL M i l JTiARCH P R E C n > n N I 7 F P STARCH
I D F A P - 2 1 CYPAN OR WL-100 SP-101 CYPAN OR WI.-100 SODIUM POLYACRYLATE
TDFLO DEXTRID POLY SAL PERM-LOSE ORGANIC POLYMER
DRI STAC/TDF-FLR DRISPAC OR PAC POLY-PAC PRISPAC POLYANIONIC CEU.ULOSE
GYPSUM CYP CYP CYP CYP S I'M (FLASTER OF PARIS)
IDTEX HME/SUPERDRILL HME/SUPERDRIL HME/SUPERPPIL GILSONITE (TREATED) - NATURAL
HYDROCARBON
IDFREE BLACK MACIC SUPERMIX (SFT) PIPE-LAX W BLACK MACIC SUPERMIX (SFT) MUD CONCENTRATE FOR SPOTTING FLUI
IDLUBE TOF.Q TRIM LURE-106 LUBRISAL ORGANIC LUBRICANT
At t » c !
LC8712423K
ATTACHMF-rrr 8
IDF RAP, IOD M - I Ml I .PARK DESCRIPTION
MICA
TEF WALNUT HULLS
SODIUM CHROMATE
TFONITE SPONCE
ZINC CARBONATE
I D FLOC
SAPP
KCL
M F - 1
BEN-EX
MICA TEX
WALL-NUT
SODIUM CHROMATE
IRONITE
NO-SULF
E-Z MUD
SAPP
KCL
MF-1
BEN-EX
MICA (C OR F)
NIT PLUC (C, M, OR F)
SOP I IIM CHROMATE
IRONITE
SULF* X
POLY-PLUS
SAPP
KCL
MF-1
GELEX
MIL-MICA
MIL PLUC
SODIUM CHROMATE
IRONITE
MIL CARD
SEPARAN
SAPP
SHA I E TROL
KCL MF-1
RFN-FX
MICA-Fl-AKES
GROUND WALNUT OR OTHER NIH NULLS
SODIUM CHROMATE
SYNTHETIC IRON OXIDE, H ? S SCAVENGER
H.S SCAVENGER (ZINC CARBONATE)
P O L Y A C R V L A M I D E POLYMER
SODIUM ACID PYROPHOSPHATE
ORCANO/Al.UMINTM COMPOUND
POTASSII*M CHI.ORI DE ( POTASSIUM)
SELECTIVE nOCULANT
CLAY EXTENDER
I I . OIL BASE MUD ADDITIVES
INTERDRILL EMUL
INTERDRILL FL
INTERDRILL DEFLOC
INTERDRILL ESX
INTERDRILL VISTCNE
I D F QUICK LIME
VISTA ODC
INVERMUL
E-Z MTH.
DRII.TREAT
DURVTONE
GEL TONE
LIME
VISTA OOC
VERSAMHL
VFRSATHIN
VERSATROL
VFRSAGEL
LIME
VISTA ODC
CARBO-TEC L
CA»RO-MUL
CARBO-CEL
LIME
VISTA ODC
PRIMARY EMULSIFIER
SECONDARY EMU1.STF1FR
DTSPERSANT
HICH TEMP. STABILIZER, FILTRATE CONTROL
VERCOSIF1ER WE1CHT SUSPENDING AGENT
CALCIUM HYDROXIDE
I-OW TOXICITY MINERAL O I L (DIESEL
SUBSTITUTE)
I I I . METHOD OF DISPOSAL:
A l l water baae trud and imid a d d i t i v e s w i l l be d t a n r s e d o f ove rboard I n t o t h e C u l f <>f MVxlcO p r o v i d e d t h e a a t e r i a l t o be d1acharRed a e r t i t h * t o x i c i t y M u l t a p e c l f l e d l n the USKPA NPDES Gene ra l Permi t No. CMG7HXXXX. Any f l u i d c o n t a i n i n g f r e e o t 1 w t l l be t r a n s p o r t e d t o l a n d f o r d t a p o a a l . D ieae l w i l l n o t be uaed I n rmida t o be d l a r h a r R e d , e j i r e p f f o r " p o t f l n R I n n r r o r d n n r e w i t h the d l e u r l p i l l m o n i t o r i n g p r o g r a * .
ATT A (THT KT X (CONT'D*
I.C8712423K
SPILL PREVENTION. CONTROL AND COUNTERMEASURE PLAN PLAN OF EXPLORATION
SOI ocs -c 7933, MISSISSIPPI CAN": OS BLOCK 338 COI oc; -G 793b, MISSISSIPPI CANYON BLOCK 382 SOI ocs • w 7937. MISSISSIPPI CANYON BLOCK 383 SOI ocs -G 7943, MISSISSIPPI CANYON BLOCK 42?
OFFSHORE LOUISIANA, MISSISSIPPI
SOI's latest revisions to i t s " S p i l l Prevention, Control and Count erneASure Plan" were approved by the MMS on September 3, 1986. The d r i l l i n g plans proposed herewith w i l l rely primarily on the s p i l l equipment stored at the Clean Gulf Associates based i n Venice, Louisiana. Section I I I of the submitted plan l i s t s available equipment at these bases plus other bases from which additional equipment can be drawn. Sectior. I I l i s t s the preventive measures to be taken to minimize o i l s p i l l s and the reporting procedures to be followed in the event that one occurs. Section VI provides a detailed discussion of the clean-up procedures to be i n i t i a t e d , including a l i s t i n g of the personnel that make up the clean-up organization. The training of these personnel is summarized in Section X I I . Assuming two hours to load out equipment and a 12-knot cruising speed, a fast response unit can normally be on location Ja 7 hovrs.
LC8712423K 0010.0.0
Attachment 9
AIR EMISSIONS DATA PLAN OF EXPLORATION
SOI ocs - G 7936, MISSISSIPPI CANYON BLOCK 382 SOI ocs -c 7937 , MISSISSIPPI CANYON ELOCK 383 SOI ocs •c 7943, MISSISSIPPI CANYON BLOCK 427
OFFSHORE LOUISIANA, MISSISSIPPI
DRILLING PHASE
A Jynamically positioned d r i l l ship w i l l be used for this exploratory d r i l l i n g . The sources of a i r emissions for a typical d r i l l ship are the main diesel set (17,000 bp), an auxiliary diesel set of about 700 hp, aod an emergency diesel set of about 120 hp. The m»in diesel set is assumed to have a 50 percent load factor and the auxiliary and emergency sets are assumed to have a one percent load factor. This totals a daily horsepower usage of 204,000 hp-hr. or a t o t a l horsepower usage of 65,280,000 hp-hr over the course of tbe d r i l l i n g period. Based on the emission rates for o i l - f i r e d reciprocating engines (Table 4.4 of EPA's Report 450/3-77-026 ent i t l e d "Atmospheric Emissions from Offshore Oil and Gas Development and Production"), the following gaseous emissions would be generated during the 320 days d r i l l i n g a c t i v i t y .
EMISSIONS (TONS) Daily Yearly Total Project (320 days)
N O x 2.88 1,051 922
so2 0.19 69 bl
HC 0.10 36.5 32
CO 0.42 153 134
Particulates UNK UNK UNK
WATER TRANSPORTATION
The horsepower usage of the two vessels to be used i n conjunction with this operation are ?s follows:
176-Ft. Cargo Vessel
2,400 HP x .80 load f f c t o r 20_h_i^ x 14_trip8 x 1 Q 6 ? m o n t h s = 5 7 0 0 0 0 0 „ p . h r
t r i p month
Attar-hment 10
LC8712423K 0011.0.0
2
80-Ft. Standby Vessel
165 HP X .80 load factor x •< 212 days - 970,000 HP-hr.
1.000 HP X .80 lc*d factor X --—i. x 320 days - 260,000 HP-hr. day
TOTAL 6,930.000 HP-hr.
Based on Table 4.4, the gaseous emissions generated by water transportation are as follows:
EMISSIONS (TONS) Dal ly Year ly T o t a l P r o j e c t (320 days)
N0 x 0.31 112.4 98.5
S0 2 0.02 7.7 6.6
HC 0.01 3.7 3.3
CO 0.045 16.4 14.4
P a r t i c u l a t e s UNK UNK UNK
LC8712423K 0012.0.0
Attachment 10 (Continued)
EXEMPTION CALCINATION FOR DRILLING, ACTIVITIES
The proposed location i s 43 miles from the nearest shoreline. Therefore, the emission exemption (E) for the various pollutants i s as follows:
2/3
CO E - 3,400 (43) - 42,000 tons/year
N C x
S0 2 E - 33.3 (43) - 1,430 tons /yea r
HC
P a r t i c u l a t e s
Annual emissions from the d r i l l i n g opera t ions ( D r i l l i n g and Water T r a n s p o r t a t i o n ) are:
Tons
N0 x 1,163
S0 2 76.7
: 40.2
CO 169.4
P a r t i c u l a t e s UNK
The t o t a l emission f o r any one p o l l u t a n t does not exceed the exemption t o t a l s above; consequently, no f u r t h e r a i r q u a l i t y r ev iew i s requi red f o r the emiss ions from the opera t ions i n connection w i t h t h i s Plan.
LC8712423K 0013 .0 .0
Attachment 10 (Continued)
ONSHORE SUPPORT FACILITY PLAN OF EXPLORATION
SOI ocs -c 7933, MISSISSIPPI CANYON BLOCK 338 SOI ocs -G 7936, MISSISSIPPI CANYON BLOCK 382 SOI ocs -G 7937, MISSISSIPPI CANYON BLOCK 383 SOI ocs -G 7943, MISSISSIPPI CANYON BLOCK 427
OFFSHORE LOUISIANA, MISSISSIPPI
The onshore support base for this a c t i v i t y w i l l be SOI's existing Venice Tenninal. This f a c i l i t y is located on the Mississippi River near Venice, Louisiana, approximately 35 miles upriver from the Gulf of Mexico. The physical plant covers 14 acres and includes 1,000 linear feet of waterfront, 3,000 square feet of offi c e 6pace, 3,200 square feet of personnel quartering space and 7,200 square feet of covered warehouse area. One 45-ton crane and t«»o fork trucks are used for material handling operations. No expansion of the Venice Terminal w i i l be required fcr this a c t i v i t y . In addition to the above, tubular goods w i l l usually be shipped by land to Venice from one of the contract warehouses located in Morgan City. Louisiana, which w i l l also require no expansion. Also, while personnel transported by helicopter w i l l be picked up and returned to SOI's Venice Terminal, both Air Logistics and PHI operate bases at Venice for refueling and maintenance.
LC8712423K 0014.0.0
Attachment 11
- j i i —
SUPPORT VESSELS PLAN OF EXPLORATION
SOI OCS-G 7933, MISSISSIPPI CANYON BLOCK 338 SOI OCS-G 7936, MISSISSIPPI CANYON BLOCK 382 SOI OCS-G 7937, MISSISSIPPI CANYON BLOCK 383 SOI OCS-G 7943, MISSISSIPPI CANYON BLOCK 427
OFFSHORE LOUISIANA, MISSISSIPPI
ITEM SIZE OR MODEL USE TRIPS PER WEEK
3 or 4
N.A
18 to 20
i
1
Boat 176'± Cargo
Boat 80'-100* Standby
Helicopter Bell 206B, 217, 214, Crew Change and Misc. or 412
LC8712423K 0015.0.0
Attachment 12
j j [ ATTACHMENT 13 SHELL OFrSHORE INC.
(A SUBSIDIARY OF SHELL OIL COMPANY!
LEASE VICINITY & TRANSPORTATION ROUTES
PLAN OF EXPLORATION
SOI OCS-G 7933 BLK 33B SOI OCS-G 7936 BLK. 382 SOI OCS-G 7937 BLK 383 SOI OCS-G 7943 BLK 427
MISSISSIPPI CANYON 338.382.383.427 OFFSHORE LOUISIANA MISSISSIPPI
MILES 1 Q
1
COASTAL ZONE MANAGEMENT CONSISTENCY CERTIFICATION
PLAN OF EXPLORATION Type of Plan
MISSISSIPPI CANYON BLOCKS 338, 382, 383, AND 427 Areas and Blocks
SOI OCS-G 7933, 7936, 7937, AND 7943 Lease Numbers
The proposed a c t i v i t i e s described in d e t a i l In t h i s Plan comply with Louisiana's approved Coastal Resources Program and w i l l be conducted in a manner consistent with such programs.
Such findings are summarized on the f i n a l page of the attached Environmental Report (ER) .
A request is being made to the o f f i c i a l state journal, the State Times, published ir. Baton Rouge, for publication on May 29, 1987 of our notice of exploration plans.
SHELL OFFSHORE INC. (SOI) Operator
^ IKl G. D.^ /Beg i l i igan D i v i s i o n S a f e t y , Environmental
and A d m i n i s t r a t i o n Manager
Date
Attachment 14
LC8712423K 0016.0.0
_____
COASTAL ZONE MANAGEMENT CONSISTENCY CERTIFICATION
PLAN OF EXPLORATION Type of Plan
MISSISSIPPI CANYON BLOCKS 338, 382, 383, AND 427 Areas and Blocks
SOI OCS-G 7933, 7936, 7937, AND 7943 Lease Numbers
The proposed a c t i v i t i e s described in d e t a i l in th i s Plan comply with Mississippi's approved Coastal Managemen. Program and w i l l be conducted in a manner consistent with such programs.
Such findings are summarized on the f i n a l page of the attached Environmental Report (ER).
SHELL OFFSHORE INC. (SOI) Operator
_D_^ 21^. G. D. Megiiligan