    Westlake Cycle

    Track Project

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    2/26

    Westlake Cycle Track Project

    Project OverviewWhat:

    Develop and Study

    Alternatives for a CycleTrack

    Where:

    Between S. Lake Union &

    Fremont Bridge

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    3/26

    Westlake Cycle Track Project

    What is a cycle track?

    Dedicated bicycle facility

    Physically separated from:

    Pedestrians

    Motor Vehicles

    More space than bike lanes

    Special consideration at street

    crossings

    Supports a broader range of bicyclists

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    4/26

    Westlake Cycle Track Project

    Alignment options

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    5/26

    Westlake Cycle Track Project

    Why a Cycle Track on Westlake Safety:All modes

    Connectivity: Multi-

    modal link to

    network

    Inclusiveness:Serve more users

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    6/26

    Westlake Cycle Track Project

    Project Benefits Enhanced parking lot safety

    Improved access and circulation

    Upgraded crossing Improvements

    Opportunities for linearplacemaking

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    7/26

    Westlake Cycle Track Project

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    8/26

    Westlake Cycle Track Project

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    9/26

    Westlake Cycle Track Project

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    10/26

    Westlake Cycle Track Project

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    11/26

    Westlake Cycle Track Project

    Planning History

    Bicycle Master Plan

    2007 2ndmost

    requested for safety

    2009 Bands of Green,

    Cheshiahud Lake

    Union Loop Master

    PlanBicycle Advisory Board

    top 15 projects

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    12/26

    Westlake Cycle Track Project

    Bicycle Rider Demographics

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    13/26

    Westlake Cycle Track Project

    Funding

    Estimated Cost: 3.6 million

    1.7 million PSRC Grant

    Local funds and bonds

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    14/26

    Westlake Cycle Track Project

    What does it take?

    Tool Box Options

    Pavement markings Lines, symbols, color

    Signs Warning and educational

    Physical separation Flex posts, planters, curbsCrossing Treatments Raised crosswalks, signs, signals

    Curb/Island Modifications Widened cut-through, bump-outs

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    15/26

    Westlake Cycle Track Project

    Corridor Overview

    150 right of way

    ~24,000 cars a day use Westlake Avenue

    ~1300 parking spaces (500 metered)

    ~75% of corridor for movement/storage of motor vehicles No dedicated space for bikes

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    16/26

    Westlake Cycle Track Project

    Data-driven Concept Design

    Turning movements and

    volume

    Parking lot traffic flow

    User behavior, conflicts Bike/ped counts

    Parking utilization for

    paid and unpaid stalls

    Weekday/weekend, dayand nighttime

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    17/26

    Westlake Cycle Track Project

    Turning movements

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    18/26

    Westlake Cycle Track Project

    Bike & Pedestrian Counts

    North parking lot

    near Diamond Marina

    Middle parking lotat Galer Street

    South parking lot,south of Highland Dr

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    19/26

    Westlake Cycle Track Project

    High volume of bicyclists + narrow shared use pathway

    Most choose to ride in the parking access lanes, few in roadway

    Many choices for bicyclists, less predictability in behavior

    Visibility and speed issues

    Ingress and egress issues at 14 driveways/street ends

    What we heard and observed:

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    20/26

    Westlake Cycle Track Project

    Parking Utilization City data (3 highest hours, 8am 3pm)

    2011 2012 2013

    52% 60% 76%

    2-3 Hour Parking Maximum 7 Hour Parking Maximum

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    21/26

    Westlake Cycle Track Project

    Parking UtilizationSeptember 2013 Spot Study

    Friday 9/13/2013 7am, noon, 6pm, midnight

    Saturday 9/14/13 noon, 6pm

    Friday 9/18/2013 7am, noon, 6pm

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    22/26

    Westlake Cycle Track Project

    Parking Utilization

    91%

    70%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Average peak hour parking

    occupancy

    Total Occupancy

    Free and Paid Parking Utilization

    free

    paid

    Average parking

    occupancy

    (3 observations)

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    23/26

    Westlake Cycle Track Project

    On-Street Parking OccupancyWestlake Avenue N - Weekday

    0%

    20%

    40%

    60%

    80%

    100%

    120%

    PercentofPa

    rkingOccupied

    Time Interval

    Total Occupied Parking by Hour Disabled Occupied Parking by Hour Target Parking Occupancy

    On-Street Parking OccupancyWestlake Avenue N - Weekday

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    24/26

    Westlake Cycle Track Project

    Design Guidelines

    Design Speed

    Sight Distance

    Separation methods Materials

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    25/26

    Westlake Cycle Track Project

    Westlake Cycle Track Features

    Two-way

    10 foot minimum width

    Special crossings treatments Pavement markings lines, symbols

    and green pavement

    Warning, education signs

  • 8/13/2019 October2013 WestlakeCycleTrack OpenHouse Presentation

    26/26

    Westlake Cycle Track Project

    Schedule & Next Steps