67
October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Embed Size (px)

Citation preview

Page 1: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

October 4, 2005Stakeholder MeetingCalgary, AB

Incremental Impact on System Operations with Increased Wind Power PenetrationPhase 1 Report

Page 2: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Topics

• Introduction

• Wind Power Variability Study

• System Impact Study – Phase 1

• Conclusions

• Next Steps

Page 3: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Introduction

Page 4: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Why are we concerned about wind power?

STEAM TURBINE

Steam From BoilerHeadwater

ROTOR

Generator Bus

AVR

CT

AUTO

MANUAL

Steam To TurbineWater To Turbine

Speed Governor

Generator (Supply)System Load

Load

Non-dispatchable, varies and can be

reasonably forecasted

Supply

Primarily Dispatchable

Before wind and interconnections

Page 5: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Add interconnections

STEAM TURBINE

Steam From BoilerHeadwater

ROTOR

Generator Bus

AVR

CT

AUTO

MANUAL

Steam To TurbineWater To Turbine

Speed Governor

Generator (Supply)

System Load

Interconnections Import or Export

Interconnections have rules and timing for schedules

Page 6: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Add Wind

STEAM TURBINE

Steam From BoilerHeadwater

ROTOR

Generator Bus

AVR

CT

AUTO

MANUAL

Steam To TurbineWater To Turbine

Speed Governor

Non-Wind PowerGenerator (Supply)

System Load

Wind Power(Supply)

Interconnections Import or Export

Page 7: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Add the AESO

STEAM TURBINE

Steam From BoilerHeadwater

ROTOR

Generator Bus

AVR

CT

AUTOMANUAL

Steam To TurbineWater To Turbine

Speed Governor

Non-Wind PowerGenerator (Supply)

System Load

Wind Power(Supply)

Interconnections Import or Export

Keep the balance within prescribed bounds

Page 8: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Main Questions and Concerns

• How big is the variability?

• Variability causes uncertainty in real time operation

• What is the effect on system performance?

• Variability can effect system operation performance

Page 9: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Introduction - History

• 2003

• Increased interest in wind power development in Alberta

• Raised questions on adequate standards, planning considerations and operating considerations

• AESO engaged ABB to conduct study

• 2004

• ABB Report released in May

• Indicated concerns around wind power variability

• Concluded concerns can be managed via controls / monitoring, wind forecasting and market rules

• Many stakeholders had questions or concerns with assumptions on variability data used in the study and thus any conclusions on system impact

Page 10: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Introduction – History Continued

• 2004

• AESO released Technical Requirements for wind power facilities in November

• Operational requirements not finalised pending further understanding of wind variability in Alberta

• 2005

• Jan. - AESO initiated a variability study

• Aug. - AESO released the Wind Power Variability study to industry

• Sept. - Released draft of the system impact study

Page 11: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Consultation Process

• Sept. 23 Release draft phase study to stakeholders

• Sept. 27 Present to wind group

• Oct. 4 Industry wide stakeholder session

• Oct. 5-21 1-on-1 sessions with key stakeholders

• Oct. 21 Deadline for stakeholder comment on phase 1

• Nov. 1 Finalize phase 1 and launch phase 2 (sensitivity studies list)

• Dec. 1 Release draft phase 2 results

• Jan. 2006 Begin finalizing options for solutions

• Mar. 2006 Communicate recommendations externally

• May 2006 Recommendations finalized and implementation timeline developed

DOE Market Policy Implementation initiatives are coinciding with the technical process.

Page 12: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

The Wind Power Variability Study

Page 13: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Wind Power Variability Study

• Used actual time-stamped measured wind speed data at existing and potential wind power facilities in Alberta

• Models to convert wind speed to MW

• Models were validated to ensure accuracy

• One and 10-minute time series MW data provided to AESO for the system impact studies

Page 14: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Development Scenarios

• Alberta SW divided up into 6 development areas

• There are four development scenarios to be studied:

• Scenario A – Existing Generation (254 MW)

• Used to benchmark accuracy of the models developed for the variability study

• Scenario B – 895 MW

• Scenario C – 1445 MW

• Scenario D – 1994 MW Pincher Creek

Waterton

Fort Macleod/Magrath

TaberMedicine Hat

North

Page 15: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Accuracy of the Models to Simulate Wind Variability

• The simulated or predicted wind power from the study was compared to the actual wind power as measured at the AESO from SCADA data.

• The AESO and wind developers were satisfied with the accuracy of the models.

Nov 21-27, 2004

Blue-Measured

Red - Simulated

Page 16: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

AESO System Impact Study – Phase 1

Page 17: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Objectives

• Use wind power data that the wind industry can support as realistic from the variability study

• Examine variability statistics

• Examine the incremental effects of wind power penetration on system operation

• Scenario B to A, Scenario C to A, Scenario D to A

• Provide a more accurate assessment on operational impact: (CPS2, OTC, TRM)

• Provide strong analytical tools that can be used to lead to appropriate solutions (the second phase)

Page 18: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Variability Statistics

Page 19: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Statistical Analysis

• Event Based

• persistent behaviour

• General Statistics

• Variability and uncertainty relationships (>10 minutes)

• Standard deviation and correlation factor

• Studied between wind and combined system load (load - wind)

• Studied at 10, 20, 60, 120, 180 and 240 minutes

• Magnitude of Variability – short term (<20 minutes)

• 95% percentile

• Studied between wind and net demand (load + interchange - wind)

• Studied at 1-minute, intra 20-minute, 20-minute, and 60-minute

Statistical Methods

Page 20: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Findings from Statistical Analysis

• Wind power variability has a persistence or ramping effect

• On an annual basis, there is low correlation between system load variability and wind power variability

• Increasing wind power development increases operational uncertainty

• In the 20-minute and less time frame, wind power variability increases with wind power development, but not in proportion to the wind power development

Page 21: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Examples of Variability and Persistence

Stable MW Variable MW

Persistent MW

Page 22: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Event Based Statistical AnalysisScenario A (254 MW)

Period of Time the Change Took Place

Benchmark Scenario

Cha

nge

in M

W

Page 23: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Event Based Statistical AnalysisScenario C (1445 MW)

In this scenario, there are 20 events periods where a significant portion of wind power capacity is ramped over a 2-6 hour time period.

Page 24: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Event Based Statistical AnalysisComparison

C 1445 D 1995B 895A 254

Events in the light blue area would indicate ramping problems if these occurred during off-peak hours

Example Event

Page 25: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Correlation of Wind Power Variability and System Load Variability

Example where wind power changes and system load changes do correlate.

Example where wind power changes and system load changes do not correlate.

Example where wind power changes and system load changes have random correlation.

+ ∆Load+ ∆Wind

- ∆Load- ∆Wind

+ ∆Load- ∆Wind

- ∆Load+ ∆Wind

Page 26: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Study Indicates Low Correlation between Wind Power and System Load Correlate (1 Hour Period)

On an annual basis, there is low correlation between system load variability and wind variability. As wind penetration increases, system load variability becomes less dominant.

Page 27: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Operational Uncertainty

• The AESO provides a day ahead load forecast to our system controller

• The AESO system controller uses the forecast in conjunction with what occurred:

• The day before

• The same day a week earlier

• A similar day during the previous half-year

• The difference between the forecast and actual is the operational uncertainty experienced during the real time

Page 28: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Example Load Forecast

Data available on the AESO website

Converting this data to forecast error

Forecast Load

Actual LoadForecast

Error

Forecast Change In

Load

Actual Change in

Load

Forecast Error on

Change in Load

6,681.00 6,799.00 -1.7%

6,592.00 6,689.00 -1.5% (89.00) (110.00) 0.31%

6,548.00 6,701.00 -2.3% (44.00) 12.00 0.84%

6,537.00 6,669.00 -2.0% (11.00) (32.00) 0.31%

6,578.00 6,714.00 -2.0% 41.00 45.00 0.06%

6,735.00 6,843.00 -1.6% 157.00 129.00 0.42%

7,102.00 7,234.00 -1.8% 367.00 391.00 0.35%

7,549.00 7,684.00 -1.8% 447.00 450.00 0.04%

Page 29: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Uncertainty in Real-TimeWhat will the resource do 1 minute from now, 1 hour from now, 1 day from now and 1 yr from now

WindPower

Load

DispatchableGeneration

1Min

Later

1Hr

Later

1Day

Later

1Yr

Later

1%1.5% 5%

* 9 to 25%

100% 100%

0.5%

*Decreases with increased amount of wind penetration

+/- 5 MW as per AESO rules

Page 30: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Adding Wind to the Load Forecast

The perfect

load forecast

Forecast Change in LoadThe less

than perfect

load forecast

Page 31: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Adding Wind to the Load Forecast

Effect of wind power

variability to the load forecast

Page 32: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

What Does Variability Look Like Without Forecasting 1 Hour?

The aggregation of wind power plus system load results with increased operational uncertainty with increased wind power penetration.

Page 33: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

General Statistical Analysis 4 HourRelationship between combined system (load - wind) forecast error and system load forecast error (4 hour)

The aggregation of wind power plus system load results with increased operational uncertainty with increased wind power penetration.

Page 34: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

1 Minute and Intra- 20 Minute Results

Wind power variability increases, but not in proportion to wind power development. It is smaller at shorter time periods.

2.3x

2.6x

Page 35: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Inter- 20 Minute and Inter- 60 Minute Results

Wind power variability increases, but not in proportion to wind power development. It is smaller at shorter time periods.

2.4x 2.7x

Page 36: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

System Performance

Page 37: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Why is system performance important?

• Alberta is interconnected to the BC / Western US systems that form the Western Electricity Coordinating Council (WECC)

• Poor performance effects all members on the interconnected system

• The system is planned and operated on the basis that each control area meets operating criteria

• Violations are reported and appropriate actions initiated

Page 38: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

What are the operational measures?CPS2, TRM, OTC violation

CPS2 – Control performance standard

• measures ACE (area control error – supply/demand deviation) performance.

• NERC establishes a specific limit for CPS2 that the AESO must meet :

• The AESO is required to operate such that its average ACE for at least 90% of clock-ten-minute periods during a calendar month is within the NERC specified limit.

TRM – Transmission Reliability Margin

• capacity on the interconnection with B.C. that is not used for market based interchange schedules and is available to keep the interconnected network secure under system uncertainties.

• An Operational Transfer Capability (OTC) violation occurs when the power on the interchange is greater, for a period of more than 20 minutes, than the sum of Available Transmission Capacity (ATC) plus TRM. TRM is currently set at 65 MW.

• Available Transfer Capability (ATC) is maximum amount of transfer capacity that can be scheduled on the inter-tie. It is continually changing usually by the hour as per the current system conditions

Page 39: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

System Performance on the AB-BC Interconnection (CPS2)

Example of ACE and CPS2 Violations

-200

-100

0

100

200

Time (10 minutes per division)

MW

Area Control Error 10 Minute Average Ld

Illustrative Example showing twoCPS2 violations

Page 40: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

System Performance on the AB-BC Interconnection (OTC and TRM)

0 MW

Operating Transfer Capability Violations

TTCTRMATCMW

0 MW

OTC violation analysis examines events that exceed the hourly TTC

TRM analysis examines events to determine a TRM level that would have prevented the OTC violation

Page 41: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Time-Simulation Model

• Developed to:

• Simulate 2004 system operation with the four wind power scenarios

• Calculate system performance with wind power variability

• Conduct sensitivity studies for ‘what if” questions

• Uses generator ramp-rate limited modeling

• Uses 2004 actual historical data for;

• Internal Alberta load,

• BC and Saskatchewan interchange schedules,

• Regulation reserve range,

• Available transfer capability (ATC) limits

Page 42: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Time-Simulation ModelAssumptions

• Assumptions in the time-simulation model include

• The energy market based on observed historical data;

• 600 MW/hr on peak / 300MW/hr off peak ramp rate limit

• ramps in a linear fashion

• has a 5-minute delay representing system controller and plant operator dispatch response time

Page 43: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Time-Simulation ModelAssumptions cont.

• Assumptions in the time-simulation model include

• Regulating reserves market

• ramp rate limited to 10% per minute of regulating range provided as per AESO’s ancillary services technical requirements

• volume is set at the top of the hour as per the AESO’s current ancillary service market rules

• will target to be in the middle of its range based on observations of historical data

Page 44: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Time-Simulation ModelAssumptions cont.

• Assumptions in the time-simulation model include:

• Questionable data excluded from study results

• Any periods where system or wind power data quality was questionable were excluded from the analysis

• Wind power data was interpolated between two good data points when data quality was questionable

• Periods of supply or load contingencies were excluded from the analysis

Page 45: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Time-Simulation ModelAssumptions cont.

• The time-simulation studies do not:

• predict energy (MWhrs) production of wind power facilities

• consider transmission capability or development

• consider system variability as a result of contingencies internal or external to the AIES

• examine variability of dispatchable generators

• examine variability of individual wind power facilities

• examine volatility of the energy market merit order

Page 46: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Validation of the Time-Simulation AnalysisComparison of Actual and Simulated Generation in the

Energy Market with Existing Wind Power

6000

6500

7000

7500

8000

1 Hour Per Division (Oct 9)

MW

Simulated Generation in the Energy Market

Actual Generation in the Energy Market

Comparison of Actual ACE versus Simulated ACE for Existing Wind Power

-150

-100

-50

0

50

100

150

1 Hour Per Division (Oct 9)

MW

Actual Area Control Error (ACE)

Simulated Area Control Error (ACE)

The actual CPS2 versus simulated CPS2 for 2004

97.0%

97.5%

98.0%

98.5%

99.0%

99.5%

100.0%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Simulated

Actual

Page 47: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Findings from Time-Simulation Analysis

• The 254 MW scenario produced results similar in characteristic and behavior to the actual system performance measures in 2004

• There are no violations to the three reliability criteria at the 254 MW penetration level

• All three growth scenarios resulted in one or more performance violations

• Increased wind power variability reduced all three system performance measures

• There is an observable relationship between CPS2 performance and OTC violations or changes in TRM. Changing one effects the others

• Increased regulating reserves will improve system performance, but will neither totally eliminate OTC violations nor eliminate increases in TRM

Page 48: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Effects on System Performance with No Change in System Operation

TRM

-100

0

100

200

300

400

500

600

1 2 3 4 5 6 7 8 9 10 11 12

Month

Incr

ease

in

TR

M

A - Existing B - 850MW C -1500MW D -2100MW

CPS2 Performance

85%

90%

95%

100%

1 2 3 4 5 6 7 8 9 10 11 12

Month

CP

S2

D -2100MW C -1500MW B - 850MW A - ExistingEffect on CPS2

Incremental TRM to prevent OTC Violations

Number of OTC Violations with no change in TRM

Number of OTC Violations

0

5

10

15

1 2 3 4 5 6 7 8 9 10 11 12

Month

Nu

mb

er

C - 1500MW - OTC Number of Violation

C - 1500MW - OTC Number of Violation

D - 2100MW - OTC Number of Violation

Page 49: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Sensitivity Study on Effects on System Performance with Increased Regulating Reserves

Effects on TRM

-100

0

100

200

300

400

500

600

1 2 3 4 5 6 7 8 9 10 11 12

Month

MW

A - Existing B - 850MW C -1500MW D -2100MW

Effects on Number of OTC Violations

0

5

10

15

1 2 3 4 5 6 7 8 9 10 11 12

MonthN

um

ber

B - 850MW - OTC Number of Violation

C - 1500MW - OTC Number of Violation

D - 2100MW - OTC Number of Violation

Incremental TRM to prevent OTC Violations

Number of OTC Violations with no change in TRM

Page 50: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Results Time-Simulation AnalysisOTC Violations by the hour

Frequency of minute OTC violations at different hour endings

0

50

100

150

200

250

300

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hour Ending

Scenario BScenario C

Scenario D

OTC violations were more often off-peak when system ramp rate was low

Page 51: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Results Time- Simulation AnalysisSimulation Example – Scenario A

6600

6800

7000

7200

7400

7600

7800

8000

Jul28 2200 Jul28 2220 Jul28 2240 Jul28 2300 Jul28 2320 Jul28 2340 Jul29 0000 Jul29 0020 Jul29 0040 Jul29 0100 Jul29 0120 Jul29 0140 Jul29 0200 Jul29 0220 Jul29 0240 Jul29 0300

Time

MW

-400

-200

0

200

400

600

800

1000System simulation based on wind data of scenario [A - Existing], dataSet of [Version_1] for 2004/Jul

WindVariability-ScaleFactor: 1.00, RR-ScareFactor: 1.00, RR-Ramping: 10% \ 10% of range

simulated wind generation

simulated BC tie

Export ATC

load

simulated energy market

dispatch

scheduled BC tie

Export ATC plus current

TRM (65MW)

TRM requirement is within current

65MW

20 Minutes Per Division

200

MW

Per

Div

isio

n

200

MW

Per

Div

isio

nLOADSimulated

BC Tie

TTC

ATC

Scheduled

BC Tie

Scenario

Wind MW

Simulated

EnergyMarket

Page 52: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Results Time-Simulation AnalysisSimulation Example – Scenario B

6600

6800

7000

7200

7400

7600

7800

8000

Jul28 2200 Jul28 2220 Jul28 2240 Jul28 2300 Jul28 2320 Jul28 2340 Jul29 0000 Jul29 0020 Jul29 0040 Jul29 0100 Jul29 0120 Jul29 0140 Jul29 0200 Jul29 0220 Jul29 0240 Jul29 0300

Time

MW

-400

-200

0

200

400

600

800

1000System simulation based on wind data of scenario [B - 850MW], dataSet of [Version_1] for 2004/Jul

WindVariability-ScaleFactor: 1.00, RR-ScareFactor: 1.00, RR-Ramping: 10% \ 10% of range

TRM

requirem

ent

simulated wind generation

simulated BC tie

Export ATC

load

simulated energy market

dispatch

scheduled BC tie

20 minutes20 minutesExport ATC plus current

TRM (65MW)

227 MW

20 Minutes Per Division

200

MW

Per

Div

isio

n

200

MW

Per

Div

isio

n

Page 53: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Conclusions

Page 54: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Conclusions

• Increased wind power development will increase wind power variability, wind power persistence, and operational uncertainty

• Increased wind power variability reduced all three system performance measures

• 895 MW scenario has operational concerns

• Given the installed wind capacity in the province and the capacity of wind power at advanced stages of development mitigating measures will need to be developed

Page 55: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Conclusions continued…

• Further sensitivity studies are required in a phase 2 to assess the merit and effectiveness of various considerations including:

• Effectiveness of wind power forecasting

• Increasing the available ramp-rate in the energy market

• Increasing the ramp-rate requirement of regulating reserves

• Ramp-rate limiting on wind power facilities

• The impact of an increased load profile

• Others

Page 56: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Next Steps

Page 57: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Dealing With Variability

• Reduce the variability, live with the variability or a bit of both

• Reducing Variability converges on;

• predicting variability and have adequate ramp rate to mitigate it or

• preventing the variability

• Living with Variability converges on understanding its magnitude of variability you can withstand and leaving ‘enough room’ on the system for it.

Page 58: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Reducing Variability

• Predicting variability

• Forecasting or other prediction tools

• Operators can anticipate change and dispatch the system accordingly

• Ramp rate of non-wind power resources to reduce variability

• Ramp rate of wind power resources to prevent variability

Page 59: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Principle of Controlling VariabilityVariability

-1.5

-1

-0.5

0

0.5

1

1.5

Time

MW

Ramp rate of resources to counter Variability

-1.5

-1

-0.5

0

0.5

1

1.5

Time

MW

Net Result of Variability Combined With Ramp Rate Resources

-1.5

-1

-0.5

0

0.5

1

1.5

Time

MW

The originating variability which is left unchanged

Control other resources to counter the variability

Net result is reduced system variability

Page 60: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Principle of Preventing VariabilityVariability

-1.5

-1

-0.5

0

0.5

1

1.5

Time

MW

Preventing Variability

-1.5

-1

-0.5

0

0.5

1

1.5

0 20 40 60 80

Time

MW

Add Facility Controls

The original variability

Add facility controls to limit the variability

Net result is the original variability is reduced

Page 61: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Living With Variability

0 MW 0 MW0 MW 0 MW

Time

Total Transfer Capability- Export

Total Transfer Capability- Import

Avail. Transfer Capability- Export

Avail. Transfer Capability- Import

Transmission Reliability

Margin

Operating Transfer Capability Violations

Operating Transfer Capability Violations

Scheduling Limits

Page 62: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Goals - Next Steps

• Ensure that by year end there is sufficient information available to start looking at options that lead to solutions and recommendations during 2006

• To do this, by year end we need to:

• Finalize the Phase 1 report

• Conduct additional studies to answer ‘what if’ questions as identified during industry consultation

• Finalize Phase 2 report with results of the ‘what if’ questions

Page 63: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Next Steps – Sensitivity Studies

End zone 1 – What is the effect on CPS2 and TRM if Regulating Reserve volumes did not increase

End zone 2 – What is the effect on Regulating reserve volumes if we cannot forecast

Sensitivity – If we could forecast

Sensitivity – What is the effect on Regulating reserve ramp rate

Sensitivity – What is the effect on Regulating reserve volumes

The actual answer is within the end zones

Page 64: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Steps over the next few months

• Finalize the Phase 1 Report

• Any comments and questions greatly appreciated

• All comments submitted to the AESO are to written form

• All written comments will be posted to website

• Phase 1 report should stimulate “what if” questions

• AESO will conduct one-on-one sessions on Phase 1 report

• These sessions will lead to concerns or questions that could be answered in the Phase 2 report

• Issue Phase 2 report

Page 65: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

Stakeholder Involvement

• Provide written comments to the AESO on the Phase 1 report by Oct. 21

• Participate in the one-on-one sessions to discuss the report and what additional information would you like to see before we start looking at options

• Contact the AESO with any questions or concerns you have

Page 66: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

`

QUESTIONS?

Page 67: October 4, 2005 Stakeholder Meeting Calgary, AB Incremental Impact on System Operations with Increased Wind Power Penetration Phase 1 Report

CONTACTS

John Kehler – 403-539-2622

[email protected]

Darren McCrank – 403-539-2623

[email protected]