ADDENDUM 1 To: All prospective bidders and suppliers on Project SU-5-983(059)059 scheduled for the November 17,
2017 bid opening. Please incorporate the following revisions into the plans for the referenced project: Plan Revisions: Remove and Replace Sheets 1-1, 8-1, 10-1, 11-1, 30-2, 30-3, 30-4, 30-5, 30-6, 110-1, 110-2, 110-6, 110-8, 110-10, 110-11, 200-9 thru 39 Section 1 – Cover Sheet
Sheet 1-1: Revised Traffic Data and Design ESAL’s. Section 8 - Quantities
Sheet 8-1: Revised “Common Excavation-Waste”, “Water”, “Aggregate Base Course CL 5”, and “Reset Sign Panel” quantities. Added “Reset Sign Support” item.
Section 10 – Basis of Estimate
Sheet 10-1: Revised “Aggregate Base Course CL 5” quantity to reflect revised asphalt pavement section. Revised “Water” quantity to reflect revised “Aggregate Base Course CL 5” quantity.
Section 11 – Quantity Summary
Sheet 11-1: Revised earthwork quantities to reflect revised asphalt pavement section. Section 30 – Typical Sections
Sheets 30-2 thru 30-6: Revised minimum existing aggregate base depth for concrete pavement section from 5.5-inches to 4-inches. Revised proposed “Aggregate Base Course CL 5” depth for asphalt pavement sections from 8-inches to 10-inches.
Section 110 - Signing
Sheets 110-1 thru 110-2: Added “Reset Sign” and “Reset Sign Support” at Sta 74+75 RT.
Sheets 110-6, 8, 10, 11: Added existing and proposed signs for east truck route. Section 200 – Cross Sections
Sheet 200-9 thru 200-39: Revised proposed “Aggregate Base Course CL 5” depth for asphalt pavement sections from 8-inches to 10-inches.
Andrew Schrank /s/ Andrew Schrank, PE
Enclosures
SpecNo.
Amount
Description UnitApprox.Quantity
Unit Price
$$$$$ 000 $$$$$ 00
PROPOSAL FORMNorth Dakota Department of Transportation
032Page 5 of 12
11/6/2017
JobNovember 17, 2017BID OPENING:
CodeNo.
Bidder must type or neatly print unit prices in numerals, make extensions for each item, and total. Do not carry unit prices further than three (3) decimal places.
ItemNo.
Project: SU-5-983(059)059 (PCN-21723)
Rev: BID ITEMS
CONTRACT BOND 1.001 103 0100 L SUM
REMOVAL OF TREES & BRUSH 1.002 201 0352 L SUM
REMOVAL OF TREES 10IN 2.003 201 0370 EA
REMOVAL OF PAVEMENT 5,266.004 202 0136 TON
REMOVAL OF PIPE ALL TYPES AND SIZES 2,003.005 202 0174 LF
COMMON EXCAVATION-TYPE A 26.006 203 0101 CY
COMMON EXCAVATION-WASTE 5,110.007 203 0113 CY
WATER 171.008 216 0100 M GAL
SUBGRADE PREPARATION-TYPE A-12IN 30026.009 230 0165 STA
SEEDING CLASS I 300.010 251 0100 ACRE
HYDRAULIC MULCH 300.011 253 0201 ACRE
FIBER ROLLS 6IN 1,332.012 261 0106 LF
REMOVE FIBER ROLLS 6IN 1,332.013 261 0107 LF
WEIGHTED FIBER ROLLS 144.014 261 0200 LF
REMOVE WEIGHTED FIBER ROLLS 144.015 261 0201 LF
AGGREGATE BASE COURSE CL 5 7,752.016 302 0120 TON
SpecNo.
Amount
Description UnitApprox.Quantity
Unit Price
$$$$$ 000 $$$$$ 00
PROPOSAL FORMNorth Dakota Department of Transportation
032Page 8 of 12
11/6/2017
JobNovember 17, 2017BID OPENING:
CodeNo.
Bidder must type or neatly print unit prices in numerals, make extensions for each item, and total. Do not carry unit prices further than three (3) decimal places.
ItemNo.
Project: SU-5-983(059)059 (PCN-21723)
Rev: BID ITEMS
WATER LINE CONNECTION 6IN 3.049 724 0975 EA
WATER LINE CONNECTION 6IN TO 8IN 7.050 724 0976 EA
WATER LINE CONNECTION 8IN 3.051 724 0980 EA
BORE & PUSH 8IN WATERMAIN 100.052 724 1208 LF
CURB & GUTTER 1,171.053 748 0100 LF
VALLEY GUTTER 72IN 30.054 748 1030 SY
SIDEWALK CONCRETE 951.055 750 0100 SY
DRIVEWAY CONCRETE 16.056 750 1000 SY
DETECTABLE WARNING PANELS 216.057 750 2115 SF
FLAT SHEET FOR SIGNS-TYPE XI REFL SHEETING 100262.058 754 0110 SF
STEEL GALV POSTS-TELESCOPING PERFORATED TUBE 600582.059 754 0206 LF
RESET SIGN PANEL 3.060 754 0592 EA
RESET SIGN SUPPORT 1.061 754 0593 EA
DYNAMIC SPEED DISPLAY SIGN 2.062 754 8010 EA
PREFORMED PATTERNED PVMT MK-MESSAGE(GROOVED) 208.063 762 0122 SF
SHORT TERM 4IN LINE-TYPE NR 380.064 762 0430 LF
SpecNo.
Amount
Description UnitApprox.Quantity
Unit Price
$$$$$ 000 $$$$$ 00
PROPOSAL FORMNorth Dakota Department of Transportation
032Page 9 of 12
11/6/2017
JobNovember 17, 2017BID OPENING:
CodeNo.
Bidder must type or neatly print unit prices in numerals, make extensions for each item, and total. Do not carry unit prices further than three (3) decimal places.
ItemNo.
Project: SU-5-983(059)059 (PCN-21723)
Rev: BID ITEMS
SHORT TERM 8IN LINE-TYPE NR 363.065 762 0434 LF
SHORT TERM 24IN LINE-TYPE NR 13.066 762 0436 LF
SHORT TERM MESSAGE-TYPE NR 48.067 762 0442 SF
PREFORMED PATTERNED PVMT MK 4IN LINE-GROOVED 12,045.068 762 1305 LF
PREFORMED PATTERNED PVMT MK 6IN LINE-GROOVED 954.069 762 1307 LF
PREFORMED PATTERNED PVMT MK 8IN LINE-GROOVED 885.070 762 1309 LF
PREFORMED PATTERNED PVMT MK 12IN LINE-GROOVED 85.071 762 1315 LF
PREFORMED PATTERNED PVMT MK 24IN LINE-GROOVED 627.072 762 1325 LF
CONCRETE FOUNDATION-HIGHWAY LIGHTING 20.073 770 0020 EA
PULL BOX 2.074 770 0100 EA
2IN DIAMETER RIGID CONDUIT 3,215.075 770 0330 LF
UNDERGROUND CONDUCTOR NO4-TYPE RHW 6,766.076 770 0504 LF
UNDERGROUND CONDUCTOR NO6-TYPE RHW 3,383.077 770 0505 LF
FEED POINT-TYPE II-PAD MOUNTED 1.078 770 0735 EA
LT STD 8FT MA 32FT POLE BREAKAWAY 20.079 770 1718 EA
LED LUMINAIRE 20.080 770 4210 EA
SpecNo.
Amount
Description UnitApprox.Quantity
Unit Price
$$$$$ 000 $$$$$ 00
PROPOSAL FORMNorth Dakota Department of Transportation
032Page 10 of 12
11/6/2017
JobNovember 17, 2017BID OPENING:
CodeNo.
Bidder must type or neatly print unit prices in numerals, make extensions for each item, and total. Do not carry unit prices further than three (3) decimal places.
ItemNo.
Project: SU-5-983(059)059 (PCN-21723)
Rev: BID ITEMS
REMOVE LIGHT STANDARD 2.081 770 4560 EA
REMOVE CONCRETE FOUNDATION 2.082 770 4582 EA
STONE MULCH 332.083 970 0070 SF
TEMPORARY ACCESS 1.084 990 0230 L SUM
TOTAL SUM BID
DESIGN DATA - EAST OF MAIN AVE
Traffic Average Daily
Current 2018 Pass: 3386 Trucks: 235 Total: 3621
Forecast 2038 Pass: 5032 Trucks: 349 Total: 5381
Clear Zone Distance: 14' Design Speed: 35 mph
Minimum Sight Dist. for Stopping: 250' Bridges: N/A
Pavement Design Life 20 (years)
Design Accumulated One-Way Flexible ESALs: 599,120
Clear Zone Distance: 14' Design Speed: 35 mph
Minimum Sight Dist. for Stopping: 250' Bridges: N/A
Pavement Design Life 30 (years)
Design Accumulated One-Way Rigid ESALs: 1,263,513
DESIGN DATA - WEST OF MAIN AVE
Traffic Average Daily
Current 2018 Pass: 2576 Trucks: 194 Total: 2769
Forecast 2038 Pass: 3827 Trucks: 288 Total: 4115
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
STATE PROJECT NO.
ND
SHEETNO.
SECTIONNO.PCN
SU-5-983(059)059 1 1
10-23-179814
Andrew Schrank
21723
GOVERNING SPECIFICATIONS
2014 Standard Specifications for Road and Bridge Construction adopted by theNorth Dakota Department of Transportation and the Supplemental Specificationseffective on the date the project is advertised.
JOB #32CITY OF DICKINSON, STARK COUNTY
NORTH DAKOTANDDOT PROJECT NO. SU-5-983(059)059
8TH STREET S RECONSTRUCTION2ND AVE SW TO 6TH AVE SE
Grading, Aggregate Base Course, Hot Mix Asphalt, PCC Pavement,Curb & Gutter, Sidewalks, Driveway, Valley Gutter, Signing,
Pavement Marking, Lighting, & Water Main
STATE COUNTY MAP
I hereby certify that the attached plans were prepared byme or under my direct supervision and that I am a dulyregistered professional engineer under the laws of thestate of ND.
APPROVED DATE 10-23-17
Andrew Schrank /S/Andrew Schrank, PE-9814Highlands Engineering & Surveying, PLLC
CITY OF DICKINSON REVIEW
Craig Kubas /S/ Date: 10-23-17Craig Kubas, City EngineerCity of Dickinson, ND
DESIGNERS: HIGHLANDS ENGINEERING
Andrew Schrank, PE
KC Homiston, PE/LS
Andrew Albrecht, EIT
PROJECT NUMBER \ DESCRIPTION NET MILES GROSS MILESSU-5-983(059)059 0.632 0.648
DICKINSON
N
BEGIN PROJECTSTA 42+30.3 END PROJECT
STA 76+53.3
CITY MAP1"=1 mile
DESIGNERS: PRAIRIE ENGINEERING
Jeremy Butman, PE
EXCEPTIONSTA 49+57.7 to STA 50+43.3
103 0100 CONTRACT BOND LSUM 0.83 0.17 1
201 0352 REMOVAL OF TREES & BRUSH LSUM 1 1
201 0370 REMOVAL OF TREES 10IN EA 2 2
202 0136 REMOVAL OF PAVEMENT TON 5,266 5,266
202 0174 REMOVAL OF PIPE ALL TYPES AND SIZES LF 2,003 2,003
203 0101 COMMON EXCAVATION-TYPE A CY 26 26
203 0113 COMMON EXCAVATION-WASTE CY 5,110 5,110
216 0100 WATER MGAL 171 171
230 0165 SUBGRADE PREPARATION-TYPE A-12IN STA 26.3 26.3
251 0100 SEEDING CLASS I ACRE 0.30 0.30
253 0201 HYDRAULIC MULCH ACRE 0.30 0.30
261 0106 FIBER ROLLS 6IN LF 1,332 1,332
261 0107 REMOVE FIBER ROLLS 6IN LF 1,332 1,332
261 0200 WEIGHTED FIBER ROLLS LF 144 144
261 0201 REMOVAL WEIGHTED FIBER ROLL LF 144 144
302 0120 AGGREGATE BASE COURSE CL 5 TON 7,752 7,752
302 0407 RESHAPE AGGREGATE BASE COURSE STA 7.2 7.2
401 0050 TACK COAT GAL 714 714
401 0060 PRIME COAT GAL 5,000 5,000
430 0040 SUPERPAVE FAA 40 TON 3,174 3,174
430 1000 CORED SAMPLE EA 17 17
430 5828 PG 58-28 ASPHALT CEMENT TON 190 190
550 0300 8IN NON-REINF CONCRETE PVMT CL AE-DOWELED SY 3,884 3,884
702 0100 MOBILIZATION LSUM 0.83 0.17 1
704 0100 FLAGGING MHR 800 800
704 1000 TRAFFIC CONTROL SIGNS UNIT 3,181 3,181
704 1052 TYPE III BARRICADE EA 69 69
704 1054 SIDEWALK BARRICADE EA 28 28
704 1060 DELINEATOR DRUMS EA 161 161
704 1067 TUBULAR MARKERS EA 166 166
704 1080 STACKABLE VERTICAL PANELS EA 158 158
704 1500 OBLITERATION OF PAVEMENT MARKING SF 595 595
706 0550 BITUMINOUS LABORATORY EA 1 1
706 0600 CONTRACTOR'S LABORATORY EA 1 1
708 1540 INLET PROTECTION-SPECIAL EA 7 7
708 1541 REMOVE INLET PROTECTION-SPECIAL EA 7 7
722 6140 ADJUST GATE VALVE BOX EA 27 27
722 6200 ADJUST MANHOLE EA 8 8
724 0210 FITTINGS-DUCTILE IRON LBS 1,440 1,440
724 0270 REMOVE GATE VALVE & BOX EA 14 14
724 0300 GATE VALVE & BOX 6IN EA 8 8
724 0310 GATE VALVE & BOX 8IN EA 15 15
724 0411 6IN HYDRANT EA 5 5
724 0430 REMOVE HYDRANT EA 5 5
724 0805 PLUG 6IN WATERMAIN EA 2 2
724 0810 WATERMAIN 6IN PVC LF 110 110
724 0830 WATERMAIN 8IN PVC LF 1,899 1,899
724 0955 WATER SERVICE CONNECTION 1IN EA 3 3
724 0975 WATER LINE CONNECTION 6IN EA 3 3
724 0976 WATER LINE CONNECTION 6IN TO 8IN EA 7 7
724 0980 WATER LINE CONNECTION 8IN EA 3 3
724 1208 BORE & PUSH 8IN WATERMAIN LF 100 100
748 0100 CURB & GUTTER LF 1,171 1,171
748 1030 VALLEY GUTTER 72IN SY 30 30
750 0100 SIDEWALK CONCRETE SY 951 951
750 1000 DRIVEWAY CONCRETE SY 16 16
750 2115 DETECTABLE WARNING PANELS SF 216 216
754 0110 FLAT SHEET FOR SIGNS-TYPE XI REFL SHEETING SF 262.1 262.1
754 0206 STEEL GALV POSTS-TELESCOPING PERFORATED TUBE LF 582.6 582.6
754 0592 RESET SIGN PANEL EA 3 3
754 0593 RESET SIGN SUPPORT EA 1 1
754 8010 DYNAMIC SPEED DISPLAY SIGN EA 2 2
762 0122 PREFORMED PATTERNED PVMT MK-MESSAGE(GROOVED) SF 208 208
762 0430 SHORT TERM 4IN LINE-TYPE NR LF 380 380
762 0434 SHORT TERM 8IN LINE-TYPE NR LF 363 363
762 0436 SHORT TERM 24IN LINE-TYPE NR LF 13 13
762 0442 SHORT TERM MESSAGE-TYPE NR SF 48 48
762 1305 PREFORMED PATTERNED PVMT MK 4IN LINE-GROOVED LF 12,045 12,045
762 1307 PREFORMED PATTERNED PVMT MK 6IN LINE-GROOVED LF 954 954
762 1309 PREFORMED PATTERNED PVMT MK 8IN LINE-GROOVED LF 885 885
762 1315 PREFORMED PATTERNED PVMT MK 12IN LINE-GROOVED LF 85 85
762 1325 PREFORMED PATTERNED PVMT MK 24IN LINE-GROOVED LF 627 627
770 0020 CONCRETE FOUNDATION-HIGHWAY LIGHTING EA 20 20
770 0100 PULL BOX EA 2 2
770 0330 2IN DIAMETER RIGID CONDUIT LF 3,215 3,215
770 0504 UNDERGROUND CONDUCTOR N04-TYPE RHW LF 6,766 6,766
770 0505 UNDERGROUND CONDUCTOR N06-TYPE RHW LF 3,383 3,383
770 0735 FEED POINT-TYPE II-PAD MOUNTED EA 1 1
770 1718 LT STD 8FT MA 32 FT POLE BREAKAWAY EA 20 20
770 4210 LED LUMINAIRE EA 20 20
770 4560 REMOVE LIGHT STANDARD EA 2 2
770 4582 REMOVE CONCRETE FOUNDATION EA 2 2
970 0070 STONE MULCH SF 332 332
990 0230 TEMPORARY ACCESS LSUM 1 1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
FED. AID CITY TOTALSPEC. CODE ITEM DESCRIPTION UNITS QTY. QTY. QTY.
FED. AID CITY TOTALSPEC. CODE ITEM DESCRIPTION UNITS QTY. QTY. QTY.
QUANTITIES
SU-5-983(059)059 8 1
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
BASIS OF ESTIMATE
SU-5-983(059)059 10 1
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
BASIS OF ESTIMATE
WATER:25 MGal/Mile of Dust Paliative = (0.63 Miles) x (25 MGal/Mile) = 16 MGal20 Gal/Ton for Aggregates = (7,752 Ton) x (20 Gal/Ton) ÷ (1000 MGal/Gal) = 155 MGal
HOT MIX ASPHALT RECONSTRUCTION AREA QUANTITIES EAST OF MAIN AVENUE
Sta 50+43 to 76+53
A B C = A x B / 36
TotalSpec Code Material UnitSurface Area
(SY)Depth
(IN)Volume
(CY)
302 0120 Aggregate Base Course CL 5 @ 1.875 Ton/CY Ton 14,287 10 3,969 7,441
401 0050 Tack Coat @ 0.05 Gal/SY (1 application) Gal 14,287 --- --- 714
401 0060 Prime Coat @ 0.25 Gal/SY Gal 14,287 --- --- 5,000
430 0040 Superpave FAA 40 @ 2 Ton/CY Ton 14,287 4 1,587 3,174
430 5828 PG 58-28 Asphalt Cemet @ 6.0% Ton --- --- --- 190
HBP CORED SAMPLES
A B C D
Specification Section Distance (ft) ÷ 2000 Lanes LiftsSublots
(A x B x C)Quantity(D x 2)
Quantity(1 per mile) Unit
430.04 I.2.b(1), "General" 1 4 2 8 16 --- EA
430.04 I.2.b(2), "Pavement Thickness Determination Cores" --- --- --- --- --- 1 EA
Total 16 1 EA
AGGREGATE BASE COURSE CL 5 @ 1.875 TON/CY FOR CURB & GUTTER, VALLEY GUTTER, SIDEWALK CONCRETE, AND DRIVEWAY CONCRETE
A B C = A x B / 3 D = 1.875 * C
Item Aggregate Base will be Beneath UnitDepth(FT)
End Area(SY)
Surface Area(SY)
Linear Feet(LF)
Volume(CY) Subtotal
Curb & Gutter - When Abutting New Sidewalk or Unpaved Areas * Ton --- 0.17 --- 622 35 65
Curb & Gutter - When Abutting Existing Sidewalk Ton --- 0.11 --- 549 20 38
Valley Gutter Ton 0.50 --- 30 --- 5 9
Sidewalk & Driveway Concrete Ton 0.33 --- 967 --- 106 199
Total 311* Includes aggregate base beneath and 1-foot behind curb & gutter.
REMOVAL OF PAVEMENT
A B 2 x (A x B / 27)
Material to be Removed UnitDepth(FT)
End Area(SF)
Area(SF)
Linear Feet(LF) Subtotal
Mainline Bituminous & Concrete Surfacing @ 2 Ton/CY Ton 0.42 --- 164,300 --- 5,112
Other Bituminous Surfacing @ 2 Ton/CY Ton 0.42 --- 824 --- 26
Sidewalk Concrete @ 2 Ton/CY Ton 0.33 --- 1574 --- 38
Driveway Concrete @ 2 Ton/CY Ton 0.50 --- 145 --- 5
Curb and Gutter @ 2 Ton/CY Ton --- 1.3 --- 887 85
Total 5,266
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
DATA TABLESEarthwork Summary
SU-5-983(059)059 11 1
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
EARTHWORK SUMMARY
Top of Existing Pavement toProposed Subgrade Volume
within Roadway (CY)
Pavement RemovalArea within
Roadway (SF)
Pavement RemovalVolume within Roadway
@ 5" Depth (CY)
CommonExcavation within
Roadway (CY)
Common Excavationfor Sidewalk, Driveway,
and Curb & GutterReconstruction Areas
(CY)
CommonExcavation for
Sidewalk in NewLocations (CY)
EmbankmentRequired for
Sidewalk in NewLocations (CY)
PAY ITEM
Common Excavation -Type A (CY)
PAY ITEM
Common Excavation -Waste (CY)
A B C = 5 * B / 324 D = A - C E (See Table Below) F G H = G I = D + E + F - H
2nd Ave SW toMain Avenue 1,173 34,947 539 634 --- 0 0 0 ---
Main Avenue to6th Ave SE 6,306 129,353 1,996 4,310 --- 116 26 26 ---
Total Project 7,479 164,300 2,535 4,944 76 116 26 26 5,110
NOTE: Quantity shown for embankment has been increased by 30% to account for shrinkage.
COMMON EXCAVATION FOR SIDEWALK, DRIVEWAYS, AND CURB & GUTTER RECONSTRUCTION AREAS
A B A x B / 3
Item Earthwork is to be Performed Under UnitDepth(FT)
End Area(SY)
Area(SY)
Linear Feet(LF) Subtotal
Curb & Gutter - When Abutting New Sidewalk or Unpaved Areas * CY --- 0.17 --- 622 35
Curb & Gutter - When Abutting Existing Sidewalk CY --- 0.11 --- 549 20
Sidewalk Reconstruction CY 0.33 --- 174 --- 19
Driveway Reconstruction CY 0.33 --- 16 --- 2
Total = E 76* Includes aggregate base beneath and 1-foot behind curb & gutter.
TYPICAL PROPOSED ROADWAY SECTION
STA. 43+50 TO 44+75
1
2 2
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
TYPICAL SECTIONSProposed
SU-5-983(059)059 30 2
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
STA. B.O.P. TO 43+50STA. 44+75 TO 45+50STA. 50+43 TO 51+50STA. 52+25 TO 52+50STA. 54+00 TO 54+75
STA. 59+00 TO 62+25STA. 63+00 TO 65+00STA. 66+75 TO 67+50STA. 75+25 TO E.O.P.
TRANSITION AREAS: THE FOLLOWING AREAS ARE TRANSITION AREAS BETWEEN THE TYPICAL SECTIONS SHOWN.SEE CROSS-SECTION SHEETS FOR DETAILS AT THE FOLLOWING TRANSITION AREAS.
1
2
TYPICAL PROPOSED ROADWAY SECTION
STA. 45+50 TO 49+58
1
2 2
TYPICAL PROPOSED ROADWAY SECTION
STA. 51+50 TO 52+25
1 1
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
TYPICAL SECTIONSProposed
SU-5-983(059)059 30 3
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
1
2
1
TYPICAL PROPOSED ROADWAY SECTION
STA. 52+50 TO 54+00
1 1
TYPICAL PROPOSED ROADWAY SECTION
STA. 54+75 TO 59+00
11
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
TYPICAL SECTIONSProposed
SU-5-983(059)059 30 4
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
1
1
TYPICAL PROPOSED ROADWAY SECTION
STA. 62+25 TO 63+00
1 1
TYPICAL PROPOSED ROADWAY SECTION
STA. 65+00 TO 66+75
11
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
TYPICAL SECTIONSProposed
SU-5-983(059)059 30 5
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
1
1
TYPICAL PROPOSED ROADWAY SECTION
STA. 67+50 TO 75+25
1 1
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
TYPICAL SECTIONSProposed
SU-5-983(059)059 30 6
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
1
No.Sta/RP
Flat Sheet
1st 2ndSize Comments
Sign Support LengthFor SignsXIIVSignSFSF LFLF
MaxPostLenLF
AnchorEA
ResetSign
EA
ResetSign
SupportEA
4thLF
3rdLFNo.
Assembly Panel Break-AwayEA
1st 2ndSleeve Length
LFLF4thLF
3rdLF Size Size
Sleeve AnchorSupport AnchorLF
SU-5-983(059)059
PROJECT NO.
N.D.
STATE SHEETNO.Revised 10/23/17 SECTION
NO.
1110
34+25 Rt 10.4 2.5 x 2.5 10 ga 12.9 19.020 13 x 3 7 ga436+00 Rt 10.2 2.25 x 2.25 12 ga 10.6 17.510 2.5 x 2.5 12 ga437+80 Lt 10.2 2.25 x 2.25 12 ga 10.6 17.510 2.5 x 2.5 12 ga443+84 Lt Mount on Light Standard3.0846+25 Rt 9.2 2 x 2 12 ga 14.6 13.08 2.25 x 2.25 12 ga446+40 Lt 8.7 2 x 2 12 ga 25.5 11.57 2.25 x 2.25 12 ga447+30 Lt 10.2 2.25 x 2.25 12 ga 10.6 17.510 2.5 x 2.5 12 ga448+97 Lt Mount on Light Standard1.5749+01 Lt 9.7 2 x 2 12 ga 10.5 1 11 2.25 x 2.25 12 ga449+26 Rt 9.2 2.5 x 2.5 12 ga 11.3 18.034 3 x 3 7 ga449+52 Rt 9.7 2.5 x 2.5 12 ga 12.1 17.52 3 x 3 7 ga4
SA A49+70 Lt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4SA A50+30 Lt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4
50+43 Lt 9.7 2.5 x 2.5 12 ga 12.1 17.52 3 x 3 7 ga450+65 Rt 8.7 2 x 2 12 ga 25.5 11.57 2.25 x 2.25 12 ga450+74 Rt 9.2 2.5 x 2.5 12 ga 11.3 18.034 3 x 3 7 ga451+09 Lt 1 Mount on Light Standard371
SA A52+25 Rt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga453+25 Rt 8.7 2 x 2 12 ga 25.5 11.57 2.25 x 2.25 12 ga453+40 Lt 8.7 2 x 2 12 ga 25.5 11.57 2.25 x 2.25 12 ga4
SA A54+00 Rt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4SA A54+66 Lt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4
55+80 Rt 9.2 2 x 2 12 ga 14.6 13.08 2.25 x 2.25 12 ga456+14 Lt Mount on Light Standard3.08
SA A57+00 Lt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4SA B57+00 Rt 12.3 2.5 x 2.5 12 ga 15.3 17.5 12.4 2.25 x 2.25 12 ga 3 x 3 7 ga4
59+35 Lt 9.2 2 x 2 12 ga 14.6 13.08 2.25 x 2.25 12 ga461+64 Rt Mount on Light Standard3.0862+00 Lt 9.2 2 x 2 12 ga 14.6 13.08 2.25 x 2.25 12 ga4
SA A63+55 Rt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4SA A63+68 Lt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4
64+75 Rt 10.2 2.25 x 2.25 12 ga 10.6 17.510 2.5 x 2.5 12 ga4SA A66+07 Lt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4
66+18 Rt Mount on Light Standard3.08
Page 1 of 210/23/2017 10:34:52 AM
8th Street S Reconstruction
Sign SummaryPerforated Tube
Basis of EstimateSign Support Lengths
The sign support lengths have been calculatedusing the following vertical clearances:
Areas where parking and/or pedestrian movement will occur - 84"
No.Sta/RP
Flat Sheet
1st 2ndSize Comments
Sign Support LengthFor SignsXIIVSignSFSF LFLF
MaxPostLenLF
AnchorEA
ResetSign
EA
ResetSign
SupportEA
4thLF
3rdLFNo.
Assembly Panel Break-AwayEA
1st 2ndSleeve Length
LFLF4thLF
3rdLF Size Size
Sleeve AnchorSupport AnchorLF
SU-5-983(059)059
PROJECT NO.
N.D.
STATE SHEETNO.Revised 10/23/17 SECTION
NO.
2110
67+00 Lt 9.2 2 x 2 12 ga 14.6 13.08 2.25 x 2.25 12 ga4SA B69+55 Lt 12.3 2.5 x 2.5 12 ga 15.3 17.5 12.4 2.25 x 2.25 12 ga 3 x 3 7 ga4
70+25 Rt Mount on Light Standard3.0871+00 Lt 9.2 2 x 2 12 ga 14.6 13.08 2.25 x 2.25 12 ga473+20 Rt 8.7 2 x 2 12 ga 25.5 11.57 2.25 x 2.25 12 ga473+50 Lt 8.7 2 x 2 12 ga 25.5 11.57 2.25 x 2.25 12 ga4
SA A74+00 Rt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga474+75 Rt 2 x 2 12 ga 1 137375+32 Lt 9.8 2 x 2 12 ga 13.6 13.94 2.25 x 2.25 12 ga4
SA A75+55 Lt 11.3 2.5 x 2.5 12 ga 12.5 18.3 3 x 3 7 ga4SA A75+88 Rt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4SA A75+89 Lt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4SA A75+90 Lt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4
75+97 Lt 9.7 2 x 2 12 ga 10.5 15.21 2.25 x 2.25 12 ga4SA A78+00 Lt 11.3 2.5 x 2.5 12 ga 12.5 1 Use fluorescent yellow-green signs.8.3 3 x 3 7 ga4
Sub Total 164 3 1418.6Total Total0.0 262.1 3
Grand Total 1Total0.0 262.1 418.6 3164 3Total
Page 2 of 210/23/2017 10:34:54 AM
8th Street S Reconstruction
Sign SummaryPerforated Tube
Basis of EstimateSign Support Lengths
The sign support lengths have been calculatedusing the following vertical clearances:
Areas where parking and/or pedestrian movement will occur - 84"
OHE OHE OHE OHE OHE OHE OHE OHE OHE
OH
EO
HE
MA
IN A
VE
FRO
NTA
GE
RD
1ST
AV
E S
E
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
SIGNING
SU-5-983(059)059 110 6
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
SCALE: 1" = 40'
40'0
3RD
AV
E S
E
SO
UTH
VIE
W A
VE
ME
AD
OW
S D
R
4TH
AV
E S
E
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
SIGNING
SU-5-983(059)059 110 8
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
SCALE: 1" = 40'
40'0
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
SIGNING
SU-5-983(059)059 110 10
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
SCALE: 1" = 40'
40'0
6TH
AV
E S
E
6TH
AV
E S
E
This document wasoriginally issued and sealed
by
Registration NumberPE- , on
and the originaldocument is stored at the
City of Dickinson, NDCity Hall
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND
SIGNING
SU-5-983(059)059 110 11
2ND AVE SW TO 6TH AVE SE8TH STREET S RECONSTRUCTION
10-23-179814
Andrew Schrank
SCALE: 1" = 40'
40'0
70 50 30 10 10 30 50 706040200204060
50+50.00
2425
2430
2435
2425
2430
2435
11.5
2427
.01
28.0
2426
.69
11.5
2426
.84
22.9
2426
.59
0.3% -2.0%-1.2%-2.2%
50+75.00
2425
2430
2435
2425
2430
2435
11.5
2426
.70
22.0
2426
.54
11.5
2426
.45
22.9
2426
.24
0.9% -1.5%-1.3%-1.8%
51+00.00
2425
2430
2435
2425
2430
2435
11.5
2426
.50
22.0
2426
.42
11.5
2426
.03
22.9
2425
.74
1.7% -0.8%-2.4%-2.5%
51+25.00
2425
2430
2435
2425
2430
2435
11.5
2426
.39
22.1
2426
.29
11.5
2425
.83
22.8
2425
.51
2.4% -0.9%-2.5%-2.9%
CL TOP:2426.98
CL TOP:2426.60
CL TOP:2426.30
CL TOP:2426.12
60 40 20 0 20 40 6010305070 10 30 50 70
EAST FRONTAGE RD INTERSECTION
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 98TH STREET SE
70 50 30 10 10 30 50 706040200204060
51+50.00
2425
2430
2435
2425
2430
2435
11.5
2426
.28
22.1
2426
.17
11.5
2425
.73
22.8
2425
.42
2.4% -1.1%-2.4%-2.8%
51+75.00
2425
2430
2435
2425
2430
2435
11.5
2426
.18
22.1
2426
.04
11.5
2425
.62
22.8
2425
.34
2.4% -1.3%-2.4%-2.5%
52+00.00
2425
2430
2435
2425
2430
2435
11.5
2426
.07
22.1
2425
.91
11.5
2425
.52
22.8
2425
.24
2.4% -1.5%-2.4%-2.4%
CL TOP:2426.01
CL TOP:2425.90
CL TOP:2425.79
60 40 20 0 20 40 6010305070 10 30 50 70
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 108TH STREET SE
70 50 30 10 10 30 50 706040200204060
52+25.00
2425
2430
2435
2425
2430
2435
11.5
2425
.96
22.1
2425
.78
11.5
2425
.41
22.9
2425
.13
2.4% -1.7%-2.4%-2.5%
52+50.00
2425
2430
2435
2425
2430
2435
11.5
2425
.81
22.1
2425
.65
11.5
2425
.35
22.9
2425
.07
2.0% -1.5%-2.0%-2.4%
52+75.00
2420
2425
2430
2435
2420
2425
2430
2435
11.5
2425
.70
22.1
2425
.53
11.5
2425
.24
23.0
2424
.99
2.0% -1.7%-2.0%-2.2%
CL TOP:2425.69
CL TOP:2425.58
CL TOP:2425.47
60 40 20 0 20 40 6010305070 10 30 50 70
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 118TH STREET SE
70 50 30 10 10 30 50 706040200204060
53+00.00
2420
2425
2430
2435
2420
2425
2430
2435
11.5
2425
.60
22.1
2425
.38
11.5
2425
.14
22.9
2424
.76
2.0% -2.0%-2.0%-3.3%
53+25.00
2420
2425
2430
2435
2420
2425
2430
2435
11.5
2425
.49
22.1
2425
.24
11.5
2425
.03
23.0
2424
.60
2.0% -2.3%-2.0%-3.7%
53+50.00
2420
2425
2430
2435
2420
2425
2430
2435
11.5
2425
.38
22.2
2425
.10
11.5
2424
.92
23.0
2424
.55
2.0% -2.7%-2.0%-3.2%
CL TOP:2425.37
CL TOP:2425.26
CL TOP:2425.15
60 40 20 0 20 40 6010305070 10 30 50 70
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 128TH STREET SE
70 50 30 10 10 30 50 706040200204060
53+75.00
2420
2425
2430
2435
2420
2425
2430
2435
11.5
2425
.28
22.2
2424
.95
11.5
2424
.82
23.1
2424
.45
2.0% -3.1%-2.0%-3.2%
54+00.00
2420
2425
2430
2435
2420
2425
2430
2435
11.5
2425
.24
22.1
2424
.88
11.5
2424
.78
23.2
2424
.36
2.0% -3.5%-2.0%-3.6%
54+25.00
2420
2425
2430
2435
2420
2425
2430
2435
11.5
2425
.23
22.1
2424
.87
23.2
2424
.77
1.5% -3.4%-1.2%
CL TOP:2425.05
CL TOP:2425.01
CL TOP:2425.06
60 40 20 0 20 40 6010305070 10 30 50 70
1ST AVENUE SE INTERSECTION
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 138TH STREET SE
70 50 30 10 10 30 50 706040200204060
54+50.00
2420
2425
2430
2435
2420
2425
2430
2435
11.5
2425
.35
22.2
2425
.09
23.2
2424
.91
1.5% -2.4%-1.1%
54+75.00
2420
2425
2430
2435
2420
2425
2430
2435
11.5
2425
.55
11.5
2425
.21
22.2
2425
.22
23.0
2424
.72
1.5%-1.5% -3.2%-4.2%
55+00.00
2425
2430
2435
2425
2430
2435
11.5
2425
.83
11.5
2425
.49
22.2
2425
.50
23.0
2425
.17
1.5%-1.5% -3.1%-2.7%
CL TOP:2425.18
CL TOP:2425.38
CL TOP:2425.66
60 40 20 0 20 40 6010305070 10 30 50 70
1ST AVENUE SE INTERSECTION
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 148TH STREET SE
70 50 30 10 10 30 50 706040200204060
55+25.00
2425
2430
2435
2425
2430
2435
11.5
2426
.19
11.5
2425
.84
22.3
2425
.89
23.0
2425
.61
1.5%-1.5% -2.8%-2.0%
55+50.00
2425
2430
2435
2425
2430
2435
11.5
2426
.63
11.5
2426
.28
22.2
2426
.37
22.9
2426
.10
1.5%-1.5% -2.4%-1.6%
55+75.00
2425
2430
2435
2425
2430
2435
11.5
2427
.13
11.5
2426
.79
22.2
2426
.85
22.8
2426
.58
1.5%-1.5% -2.6%-1.8%
56+00.00
2425
2430
2435
2425
2430
2435
11.5
2427
.65
11.5
2427
.31
22.1
2427
.35
22.8
2427
.03
1.5%-1.5% -2.8%-2.5%
CL TOP:2426.02
CL TOP:2426.45
CL TOP:2426.96
CL TOP:2427.48
60 40 20 0 20 40 6010305070 10 30 50 70
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 158TH STREET SE
70 50 30 10 10 30 50 706040200204060
56+25.00
2425
2430
2435
2425
2430
2435
11.5
2428
.16
11.5
2427
.81
22.2
2427
.77
22.8
2427
.47
1.5%-1.5% -3.6%-3.0%
56+50.00
2425
2430
2435
2440
2425
2430
2435
2440
11.5
2428
.64
11.5
2428
.29
22.2
2428
.22
22.7
2427
.90
1.5%-1.5% -3.9%-3.6%
56+75.00
2425
2430
2435
2425
2430
2435
11.5
2429
.10
11.5
2428
.76
22.1
2428
.70
22.7
2428
.37
1.5%-1.5% -3.7%-3.5%
57+00.00
2425
2430
2435
2440
2425
2430
2435
2440
11.5
2429
.54
11.5
2429
.20
22.1
2429
.11
22.7
2428
.90
1.5%-1.5% -4.0%-2.7%
CL TOP:2427.98
CL TOP:2428.47
CL TOP:2428.93
CL TOP:2429.37
60 40 20 0 20 40 6010305070 10 30 50 70
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 168TH STREET SE
70 50 30 10 10 30 50 706040200204060
57+25.00
2425
2430
2435
2440
2425
2430
2435
2440
11.5
2429
.97
11.5
2429
.62
22.1
2429
.55
22.6
2429
.40
1.5%-1.5% -3.9%-2.0%
57+50.00
2425
2430
2435
2440
2425
2430
2435
2440
11.5
2430
.37
11.5
2430
.02
22.0
2429
.98
22.4
2429
.90
1.5%-1.5% -3.6%-1.1%
57+75.00
2430
2435
2440
2430
2435
2440
11.5
2430
.75
11.5
2430
.40
22.0
2430
.41
23.8
2430
.13
1.5%-1.5% -3.2%-2.2%
CL TOP:2429.79
CL TOP:2430.19
CL TOP:2430.58
60 40 20 0 20 40 6010305070 10 30 50 70
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 178TH STREET SE
70 50 30 10 10 30 50 706040200204060
58+00.00
2430
2435
2440
2430
2435
2440
11.5
2431
.11
11.5
2430
.76
22.1
2430
.81
24.8
2430
.34
1.5%-1.5% -2.8%-3.2%
58+25.00
2430
2435
2440
2430
2435
2440
11.5
2431
.45
11.5
2431
.10
22.2
2431
.21
23.3
2430
.66
1.5%-1.5% -2.3%-3.8%
58+50.00
2430
2435
2440
2430
2435
2440
11.5
2431
.77
11.5
2431
.42
22.2
2431
.54
22.4
2431
.02
1.5%-1.5% -2.1%-3.7%
58+75.00
2430
2435
2440
2430
2435
2440
11.5
2432
.07
11.5
2431
.73
22.1
2431
.86
22.3
2431
.36
1.5%-1.5% -2.0%-3.5%
CL TOP:2430.94
CL TOP:2431.28
CL TOP:2431.60
CL TOP:2431.90
60 40 20 0 20 40 6010305070 10 30 50 70
2ND AVENUE SE INTERSECTION
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 188TH STREET SE
70 50 30 10 10 30 50 706040200204060
59+00.00
2430
2435
2440
2430
2435
2440
11.5
2432
.37
11.5
2432
.03
22.1
2432
.17
22.2
2431
.75
1.5%-1.5% -1.9%-2.6%
59+25.00
2430
2435
2440
2430
2435
2440
11.5
2432
.64
22.1
2432
.43
11.5
2432
.46
22.2
2432
.26
0.7% -1.9%-0.8%-1.9%
59+50.00
2430
2435
2440
2430
2435
2440
11.5
2432
.90
22.2
2432
.69
11.5
2432
.90
22.2
2432
.75
-0.0% -1.9%-0.0%-1.5%
59+75.00
2430
2435
2440
2430
2435
2440
11.5
2433
.16
22.2
2432
.94
11.5
2433
.34
22.1
2433
.17
-0.8% -2.0%0.7%-1.6%
CL TOP:2432.20
CL TOP:2432.55
CL TOP:2432.90
CL TOP:2433.25
60 40 20 0 20 40 6010305070 10 30 50 70
29.1
2432
.40
29.1
2432
.40
1.0% -4:1
29.1
2432
.66
1.0%
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 198TH STREET SE
70 50 30 10 10 30 50 706040200204060
60+00.00
2430
2435
2440
2445
2430
2435
2440
2445
11.5
2433
.42
22.0
2433
.21
11.5
2433
.78
22.0
2433
.56
-1.6% -2.0%1.5%-2.1%
60+25.00
2430
2435
2440
2445
2430
2435
2440
2445
11.5
2433
.69
20.5
2433
.3311
.524
34.2
1
22.0
2433
.92
-2.3% -3.9%2.2%-2.8%
60+50.00
2430
2435
2440
2430
2435
2440
11.0
2433
.9811.5
2434
.65
22.0
2434
.41
20.3
2433
.47
-3.0%3.0%-2.3%-5.5%
CL TOP:2433.60
CL TOP:2433.96
CL TOP:2434.31
60 40 20 0 20 40 6010305070 10 30 50 70
3RD AVENUE SE INTERSECTION
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 208TH STREET SE
70 50 30 10 10 30 50 706040200204060
60+75.00
2430
2435
2440
2445
2430
2435
2440
2445
11.0
2434
.3311.5
2435
.00
22.0
2434
.90
22.1
2433
.77
-3.0%3.0%-1.0%-5.0%
61+00.00
2430
2435
2440
2445
2430
2435
2440
2445
11.5
2434
.67
22.1
2434
.2011
.524
35.2
7
22.0
2435
.03
-2.9% -4.5%2.3%-2.3%
61+25.00
2430
2435
2440
2445
2430
2435
2440
2445
11.5
2435
.04
22.1
2434
.6211
.524
35.5
5
22.0
2435
.30
-2.8% -4.0%1.5%-2.4%
CL TOP:2434.66
CL TOP:2435.01
CL TOP:2435.37
60 40 20 0 20 40 6010305070 10 30 50 70
3RD AVENUE SE INTERSECTION
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 218TH STREET SE
70 50 30 10 10 30 50 706040200204060
61+50.00
2430
2435
2440
2445
2430
2435
2440
2445
11.5
2435
.41
22.1
2435
.0411
.524
35.8
2
21.9
2435
.63
-2.7% -3.5%0.8%-1.8%
61+75.00
2435
2440
2445
2435
2440
2445
11.5
2435
.78
22.2
2435
.4611.5
2436
.09
21.9
2435
.94
-2.6% -3.1%0.0%-1.4%
62+00.00
2435
2440
2445
2435
2440
2445
11.5
2436
.15
22.2
2435
.87
11.5
2436
.36
22.0
2436
.20
-2.5% -2.6%-0.7%-1.5%
CL TOP:2435.73
CL TOP:2436.08
CL TOP:2436.44
60 40 20 0 20 40 6010305070 10 30 50 70
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 228TH STREET SE
70 50 30 10 10 30 50 706040200204060
62+25.00
2435
2440
2445
2435
2440
2445
22.2
2436
.28
22.0
2436
.48
-2.3%-1.4%
62+50.00
2435
2440
2445
2435
2440
2445
22.1
2436
.68
22.1
2436
.81
-1.9%-1.3%
62+75.00
2435
2440
2445
2435
2440
2445
22.1
2437
.01
22.0
2437
.05
-1.7%-1.5%
63+00.00
2435
2440
2445
2435
2440
2445
22.1
2437
.26
22.0
2437
.35
-1.8%-1.4%
CL TOP:2436.79
CL TOP:2437.10
CL TOP:2437.39
CL TOP:2437.65
60 40 20 0 20 40 6010305070 10 30 50 70
29.1
2437
.24
1.0% 4:1
1.0% 9.5%
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 238TH STREET SE
70 50 30 10 10 30 50 706040200204060
63+25.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2437
.65
22.2
2437
.39
11.5
2437
.74
22.3
2437
.66
-2.1% -2.4%-1.2%-0.8%
63+50.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2437
.84
22.2
2437
.51
11.5
2437
.99
22.6
2437
.82
-2.2% -3.0%-0.9%-1.5%
63+75.00
2435
2440
2445
2435
2440
2445
11.5
2438
.03
20.7
2437
.81
11.5
2438
.24
22.7
2438
.04
-2.2% -2.4%-0.3%-1.8%
CL TOP:2437.89
CL TOP:2438.09
CL TOP:2438.28
60 40 20 0 20 40 6010305070 10 30 50 70
4TH AVENUE SE INTERSECTION
29.2
2437
.62
1.0% 4:1
29.2
2437
.74
1.0% 4:1
29.6
2438
.56
29.6
2438
.56
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 248TH STREET SE
70 50 30 10 10 30 50 706040200204060
64+00.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2438
.22
20.9
2437
.96
11.5
2438
.49
22.7
2438
.33
-2.2% -2.8%0.2%-1.4%
64+25.00
2435
2440
2445
2435
2440
2445
11.5
2438
.41
21.7
2438
.21
11.5
2438
.74
22.7
2438
.59
-2.2% -2.0%0.7%-1.4%
64+50.00
2435
2440
2445
2435
2440
2445
11.5
2438
.60
21.9
2438
.39
11.5
2438
.99
22.7
2438
.81
-2.2% -2.0%1.2%-1.6%
64+75.00
2435
2440
2445
2435
2440
2445
11.5
2438
.79
22.0
2438
.5811.5
2439
.24
22.7
2439
.01
-2.2% -2.0%1.7%-2.0%
CL TOP:2438.47
CL TOP:2438.66
CL TOP:2438.85
CL TOP:2439.05
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2438
.84
29.7
2438
.84
1.0%-4:1
29.8
2439
.10
29.8
2439
.10
1.0%-4:1
29.7
2439
.34
29.7
2439
.34
1.0%-4:1
29.7
2439
.51
32.3
2438
.86
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 258TH STREET SE
70 50 30 10 10 30 50 706040200204060
65+00.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2438
.98
22.1
2438
.7111.5
2439
.49
22.8
2439
.20
-2.2% -2.6%2.2%-2.6%
65+25.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2439
.17
22.2
2438
.9511
.524
39.6
8
22.8
2439
.42
-2.2% -2.1%2.2%-2.3%
65+50.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2439
.37
22.1
2439
.1211
.524
39.8
7
22.7
2439
.66
-2.2% -2.3%2.2%-1.9%
CL TOP:2439.24
CL TOP:2439.43
CL TOP:2439.62
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2439
.59
32.1
2439
.01
1.0%-4:1
29.7
2439
.78
29.7
2439
.78
1.0%-4:1
29.7
2440
.05
29.7
2440
.05
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 268TH STREET SE
70 50 30 10 10 30 50 706040200204060
65+75.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2439
.56
22.1
2439
.2911
.524
40.0
6
22.7
2439
.86
-2.2% -2.5%2.2%-1.8%
66+00.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2439
.75
22.1
2439
.4611
.524
40.2
5
22.7
2440
.02
-2.2% -2.7%2.2%-2.1%
66+25.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2439
.93
22.1
2439
.6311
.524
40.4
3
22.7
2440
.19
-2.2% -2.8%2.2%-2.2%
CL TOP:2439.81
CL TOP:2440.00
CL TOP:2440.18
60 40 20 0 20 40 6010305070 10 30 50 70
29.8
2440
.28
29.8
2440
.28
1.0%-4:1
29.8
2440
.48
29.8
2440
.48
1.0%-4:1
29.8
2440
.66
29.8
2440
.66
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 278TH STREET SE
70 50 30 10 10 30 50 706040200204060
66+50.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2440
.11
22.1
2439
.8211
.524
40.6
1
22.7
2440
.36
-2.2% -2.7%2.2%-2.3%
66+75.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2440
.29
22.1
2440
.0111.5
2440
.79
22.8
2440
.50
-2.2% -2.6%2.2%-2.6%
67+00.00
2435
2440
2445
2450
2435
2440
2445
2450
11.5
2440
.49
22.1
2440
.2011
.524
40.9
5
22.8
2440
.64
-2.0% -2.7%2.0%-2.7%
CL TOP:2440.36
CL TOP:2440.54
CL TOP:2440.72
60 40 20 0 20 40 6010305070 10 30 50 70
29.8
2440
.83
29.8
2440
.83
1.0%-4:1
29.8
2440
.96
29.8
2440
.96
1.0%-4:1
29.8
2441
.08
33.1
2440
.25
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 288TH STREET SE
70 50 30 10 10 30 50 706040200204060
67+25.00
2440
2445
2450
2440
2445
2450
11.5
2440
.70
22.2
2440
.3911
.524
41.1
0
22.7
2440
.79
-1.7% -2.9%1.7%-2.8%
67+50.00
2440
2445
2450
2440
2445
2450
11.5
2440
.91
22.1
2440
.61
11.5
2441
.25
22.7
2440
.94
-1.5% -2.8%1.5%-2.8%
67+75.00
2440
2445
2450
2440
2445
2450
11.5
2441
.09
22.1
2440
.82
11.5
2441
.43
22.7
2441
.11
-1.5% -2.5%1.5%-2.9%
CL TOP:2440.90
CL TOP:2441.08
CL TOP:2441.26
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2441
.25
32.9
2440
.45
1.0%-4:1
29.7
2441
.42
29.7
2441
.42
1.0%-4:1
29.7
2441
.54
29.7
2441
.54
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 298TH STREET SE
70 50 30 10 10 30 50 706040200204060
68+00.00
2440
2445
2450
2440
2445
2450
11.5
2441
.27
22.1
2441
.04
11.5
2441
.61
22.7
2441
.28
-1.5% -2.2%1.5%-3.0%
68+25.00
2440
2445
2450
2440
2445
2450
11.5
2441
.45
22.1
2441
.25
11.5
2441
.79
22.7
2441
.44
-1.5% -1.8%1.5%-3.1%
68+50.00
2440
2445
2450
2440
2445
2450
11.5
2441
.63
22.1
2441
.43
11.5
2441
.97
22.8
2441
.60
-1.5% -1.8%1.5%-3.3%
68+75.00
2440
2445
2450
2440
2445
2450
11.5
2441
.81
22.2
2441
.60
11.5
2442
.15
22.8
2441
.76
-1.5% -2.0%1.5%-3.5%
CL TOP:2441.44
CL TOP:2441.62
CL TOP:2441.80
CL TOP:2441.98
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2441
.65
29.7
2441
.65
1.0%-4:1
29.7
2441
.73
29.7
2441
.73
1.0%-4:1
29.7
2441
.86
29.7
2441
.86
1.0%-4:1
29.7
2442
.15
29.7
2442
.15
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 308TH STREET SE
70 50 30 10 10 30 50 706040200204060
69+00.00
2440
2445
2450
2440
2445
2450
11.5
2441
.99
22.2
2441
.76
11.5
2442
.33
22.8
2441
.93
-1.5% -2.1%1.5%-3.6%
69+25.00
2440
2445
2450
2440
2445
2450
11.5
2442
.17
22.2
2441
.93
11.5
2442
.51
22.7
2442
.14
-1.5% -2.2%1.5%-3.3%
69+50.00
2440
2445
2450
2440
2445
2450
11.5
2442
.35
22.3
2442
.09
11.5
2442
.69
22.6
2442
.34
-1.5% -2.4%1.5%-3.1%
69+75.00
2440
2445
2450
2440
2445
2450
11.5
2442
.53
22.3
2442
.27
11.5
2442
.87
22.7
2442
.51
-1.5% -2.4%1.5%-3.2%
CL TOP:2442.16
CL TOP:2442.34
CL TOP:2442.52
CL TOP:2442.70
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2442
.41
29.7
2442
.41
1.0%-4:1
29.7
2442
.56
33.4
2441
.63
1.0%-4:1
29.7
2442
.74
33.8
2441
.72
1.0%-4:1
29.7
2442
.94
29.7
2442
.94
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 318TH STREET SE
70 50 30 10 10 30 50 706040200204060
70+00.00
2440
2445
2450
2440
2445
2450
11.5
2442
.71
22.3
2442
.46
11.5
2443
.05
22.7
2442
.70
-1.5% -2.3%1.5%-3.2%
70+25.00
2440
2445
2450
2440
2445
2450
11.5
2442
.89
22.3
2442
.65
11.5
2443
.23
22.7
2442
.90
-1.5% -2.2%1.5%-3.0%
70+50.00
2440
2445
2450
2440
2445
2450
11.5
2443
.07
22.3
2442
.83
11.5
2443
.41
22.7
2443
.10
-1.5% -2.2%1.5%-2.8%
70+75.00
2440
2445
2450
2440
2445
2450
11.5
2443
.25
22.3
2443
.02
11.5
2443
.59
22.7
2443
.31
-1.5% -2.1%1.5%-2.6%
CL TOP:2442.88
CL TOP:2443.06
CL TOP:2443.24
CL TOP:2443.42
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2443
.13
29.7
2443
.13
1.0%-4:1
29.8
2443
.33
29.8
2443
.33
1.0%-4:1
29.8
2443
.52
29.8
2443
.52
1.0%-4:1
29.7
2443
.72
33.1
2442
.87
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 328TH STREET SE
70 50 30 10 10 30 50 706040200204060
71+00.00
2440
2445
2450
2440
2445
2450
11.5
2443
.43
22.3
2443
.22
11.5
2443
.77
22.7
2443
.52
-1.5% -1.9%1.5%-2.3%
71+25.00
2440
2445
2450
2440
2445
2450
11.5
2443
.62
22.3
2443
.43
11.5
2443
.96
22.6
2443
.73
-1.5% -1.8%1.5%-2.1%
71+50.00
2440
2445
2450
2440
2445
2450
11.5
2443
.81
22.3
2443
.63
11.5
2444
.16
22.6
2443
.89
-1.5% -1.6%1.5%-2.4%
71+75.00
2440
2445
2450
2440
2445
2450
11.5
2444
.00
22.2
2443
.84
11.5
2444
.35
22.6
2444
.01
-1.5% -1.5%1.5%-3.0%
CL TOP:2443.60
CL TOP:2443.79
CL TOP:2443.98
CL TOP:2444.18
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2443
.92
32.4
2443
.24
1.0%-4:1
29.7
2444
.13
32.0
2443
.55
1.0%-4:1
29.7
2444
.27
29.7
2444
.27
1.0%-4:1
29.6
2444
.38
29.6
2444
.38
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 338TH STREET SE
70 50 30 10 10 30 50 706040200204060
72+00.00
2440
2445
2450
2440
2445
2450
11.5
2444
.20
22.2
2444
.02
11.5
2444
.54
22.6
2444
.17
-1.5% -1.6%1.5%-3.3%
72+25.00
2440
2445
2450
2455
2440
2445
2450
2455
11.5
2444
.39
22.2
2444
.20
11.5
2444
.73
22.6
2444
.35
-1.5% -1.8%1.5%-3.5%
72+50.00
2440
2445
2450
2455
2440
2445
2450
2455
11.5
2444
.58
22.2
2444
.38
11.5
2444
.93
22.6
2444
.56
-1.5% -1.9%1.5%-3.3%
CL TOP:2444.37
CL TOP:2444.56
CL TOP:2444.75
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2444
.56
29.7
2444
.56
1.0%-4:1
29.7
2444
.79
29.7
2444
.79
1.0%-4:1
29.7
2444
.97
31.2
2444
.59
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 348TH STREET SE
70 50 30 10 10 30 50 706040200204060
72+75.00
2440
2445
2450
2455
2440
2445
2450
2455
11.5
2444
.77
22.1
2444
.56
11.5
2445
.12
22.6
2444
.78
-1.5% -2.0%1.5%-3.1%
73+00.00
2440
2445
2450
2455
2440
2445
2450
2455
11.5
2444
.96
22.2
2444
.78
11.5
2445
.31
22.6
2444
.97
-1.5% -1.8%1.5%-3.0%
73+25.00
2440
2445
2450
2455
2440
2445
2450
2455
11.5
2445
.16
22.2
2444
.99
11.5
2445
.50
22.7
2445
.16
-1.5% -1.6%1.5%-3.0%
CL TOP:2444.94
CL TOP:2445.14
CL TOP:2445.33
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2445
.15
31.2
2444
.78
1.0%-4:1
29.7
2445
.40
29.7
2445
.40
1.0%-4:1
29.7
2445
.65
29.7
2445
.65
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 358TH STREET SE
70 50 30 10 10 30 50 706040200204060
73+50.00
2440
2445
2450
2455
2440
2445
2450
2455
11.5
2445
.35
22.3
2445
.20
11.5
2445
.69
22.7
2445
.37
-1.5% -1.4%1.5%-2.9%
73+75.00
2445
2450
2455
2445
2450
2455
11.5
2445
.54
22.3
2445
.41
11.5
2445
.89
22.7
2445
.58
-1.5% -1.3%1.5%-2.7%
74+00.00
2445
2450
2455
2445
2450
2455
11.5
2445
.73
22.3
2445
.55
11.5
2446
.08
22.7
2445
.84
-1.5% -1.7%1.5%-2.1%
CL TOP:2445.52
CL TOP:2445.71
CL TOP:2445.91
60 40 20 0 20 40 6010305070 10 30 50 70
29.7
2445
.84
31.3
2445
.45
1.0%-4:1
29.7
2446
.03
31.3
2445
.64
1.0%-4:1
29.7
2446
.28
30.9
2445
.97
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 368TH STREET SE
70 50 30 10 10 30 50 706040200204060
74+25.00
2445
2450
2455
2445
2450
2455
11.5
2445
.93
22.2
2445
.70
11.5
2446
.27
22.6
2446
.11
-1.5% -2.1%1.5%-1.4%
74+50.00
2445
2450
2455
2445
2450
2455
11.5
2446
.12
22.2
2445
.89
11.5
2446
.46
22.5
2446
.37
-1.5% -2.1%1.5%-0.9%
74+75.00
2445
2450
2455
2445
2450
2455
11.5
2446
.31
22.1
2446
.13
11.5
2446
.66
22.4
2446
.62
-1.5% -1.7%1.5%-0.3%
75+00.00
2445
2450
2455
2445
2450
2455
11.5
2446
.50
22.1
2446
.37
11.5
2446
.85
22.9
2446
.90
-1.5% -1.2%1.5%0.4%
CL TOP:2446.10
CL TOP:2446.29
CL TOP:2446.48
CL TOP:2446.68
60 40 20 0 20 40 6010305070 10 30 50 70
29.6
2446
.56
1.0%-4:1
29.5
2446
.83
1.0%-4:1
30.3
2446
.90
1.0%-4:1
30.9
2447
.28
1.0%-4:1
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 378TH STREET SE
75+25.00
2445
2450
2455
2445
2450
2455
11.5
2446
.70
22.2
2446
.60
11.5
2447
.04
23.0
2447
.24
-1.5% -0.9%1.5%1.7%
75+50.00
2445
2450
2455
2445
2450
2455
22.2
2446
.7123
.124
47.4
8
-1.8%1.6%
CL TOP:2446.87
CL TOP:2447.10
37.7
2447
.65
38.4
2447
.50
1.4%-4:1
70 50 30 10 10 30 50 706040200204060
60 40 20 0 20 40 6010305070 10 30 50 70
6TH AVENUE SE INTERSECTION
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 388TH STREET SE
70 50 30 10 10 302002040608090100
75+75.00
2445
2450
2455
2445
2450
2455
22.3
2446
.9123
.224
47.8
3
-2.4%1.6%
76+00.00
2445
2450
2455
2445
2450
2455
21.3
2447
.2023
.324
48.1
8
-3.3%1.1%
76+25.00
2445
2450
2455
2445
2450
2455
20.4
2447
.6123
.524
48.4
8
-4.3%-0.1%
76+50.00
2445
2450
2455
2445
2450
2455
21.4
2448
.14
23.6
2448
.65
-4.9%-2.3%
CL TOP:2447.45
CL TOP:2447.91
CL TOP:2448.50
CL TOP:2449.19
60 40 20 0 2010305070 10 308090100
6TH AVENUE SE INTERSECTION
6TH AVENUE SE INTERSECTION
6TH AVENUE SE INTERSECTION
6TH AVENUE SE INTERSECTION
PROJECT NO. SHEETNO.
SECTIONNO.STATE
ND SU-5-983(059)059 200 398TH STREET SE