October 16 , 2007October 16 , 2007
Korea Energy Management Corporation
New & Renewable Energy Center
ContentsContentsStatus of NRE
NRE Policies
Status of NRE
Instability of energy market * Continuous High oil price expected* Continuous High oil price expected
Exhaustion of fossil fuel
* Oil production peak expected in 2020 * Oil production peak expected in 2020
(IEA)(IEA)
Obligation to reduction of GHG emission
* 10* 10thth Ranked in the World (2003) Ranked in the World (2003)
New &Renewable
Energy
New &Renewable
Energy
Need to Change Energy
Paradigm
Why Renewables ?Why Renewables ?
New Growth Engine
Brief HistoryBrief History
Made legal basis for NRE Technology Development •Promulgation of the Promotion Act for NRE Development19871987
Started NRE Deployment•Amendment; Act for NRE Development, Utilization & Deployment19971997
Obligation to the Public Office, Certification, FIT etc•Amendment of the Promotion Act for NRE Development, Utilization & Deployment
20022002
10-Year Nat’l Basic Plan For NRE Technology
Development and Deployment• Target : 3% by 2006, 5% by 2011
20032003
Standardization, RESCO etcAmendment of the Promotion Act for NRE Development, Utilization & Deployment20042004
Category by the ActCategory by the Act
11 kinds of New & Renewable Energy
Money InvestedMoney Invested
Budget Increased by 222% from 2004 to 2007
Unit : M US$
- Local Energy Development
Total
R & D
Deployment Subsidy
- General Subsidy
- Solar Roof System
- Renewable Energy Complex
Loan for Business
Feed-in tariff
2004 2005 2006 2007
73.2
66.9
94.0
92.3
124.5
137.5
132.6
154.1
9.7
6.3
36.9
14.0
23.3
16.0
40.0
13.0
28.0
49.0
47.5
13.0
41.0
49.0
51.1
13.0
50.0 117.0 121.3 121.3
6.3 20.8 26.3 27.0
196.4 324.2 409.6 435.1
- Local Energy
< Nat’l R&D Budget (Government Only)*>
0
50
100
150
200
250
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
others
clean energy technology
NRE technology
energy efficiency &conservation
Bu
dg
et (
Bill
ion
Wo
n)
* Only 4% of USA
AchievementsAchievements
Very Low Compared to Leading Countries
Ratio of NRE to Total Energy Consumption is 2.26% in 2006
Source : Energy Balances of OECD Countries, IEA, 2006. (Korea is from 2005, other countries from 2004)
2.26%
13.6%
5.9
4.2
3.8 3.2
AchievementsAchievements
0.13.613.5MWPV
0.732.598.7 MW Wind
0.734.71,337,443 m2Solar
Thermal
3.7181.3LFG(30MW, 16kNm3/h), Bio-diesel(191Mt/y), etc Bio
18.8918.51,584 MWHydro
75.93,705.5Waste gas incinerators(6,317t/d), Municipal waste incinerators(11,310t/d), etcWaste
%Amount(1000toe)CapacityResource
Amount and percentage of supply by individual energy resources(2005)
Waste & Hydro power accounts for the most
1995 1997 1999 2000 2001 2002 2003 2004 2005
200
120
90
60
30
1
(1000 toe)
Bio energySolar thermal
Wind
Most of energy sources, such as bio, wind, and PV, continuously increase
- Wind power generation has increased sharply since 2003
Most of energy sources, such as bio, wind, and PV, continuously increase
- Wind power generation has increased sharply since 2003
Deployment TrendDeployment Trend
PV
NRE Power occupies 1.1% of total power generation - The amount of NRE Power generation largely has been affected by hydro power generation
NRE Power occupies 1.1% of total power generation - The amount of NRE Power generation largely has been affected by hydro power generation
1995 2001 2002 2005
Total Power Generation 184,660 285,223 306,474 364,639
NRE Power Generation 2,762 2,349 3,330 3,950
NRE ratio 1.5 0.8 1.1 1.1
- Commercial use 2,759 2,341 3,318 3,928
- Non Commercial use 2.6 8.0 11.8 21.2
(Unit: GWh)
NRE Power GenerationNRE Power Generation
Hydro(93.5%), Wind(3.2%) and LFG(3.3%) are playing major roles in NRE Power generationHydro(93.5%), Wind(3.2%) and LFG(3.3%) are playing major roles in NRE Power generation
150
120
90
60
30
10
0
(GWh)
1998 2002 2003 2005
Wind LFG PV
1.4
129.8
24.814.8 14
70.8
100.2
129.6
NRE Power GenerationNRE Power Generation
7.03.7
7.7
Sharp increase of Wind power is owing to Feed in Tariff (107.29 Won/kWh)
Commercial Wind Farm(’05): Gangwon(28MW), Hangwon(10MW), Hankyung(6MW), Youngduk(40MW)
Power trade amount: 103GWh(’05)
Demonstration and evaluation : 750kW, 1.5MW wind power system
Construction of off-shore wind farm in Jeju
85MW
19,459MWh
129,888MWh
13MW
110,429MWh
Status of Wind Power Status of Wind Power
(’02)
(’05)
98MW
Feed-in-Tariff largely affects investment to PV
677.38 Won/kWh over 30kW, 711.25 Won/kWh below 30kW
5 Commercial PV Plant(’05), Total capacity 1.4MW
Power exchange amount; 524MWh(’05)
Production capacity of PV industry(’05)
Module: 95MW, PV cell : 8MW
7,044MWh
14,399MWh
7,355MWh
Status of PV Status of PV
5.4MW
(’02)
8.1MW (’05)
13.5MW
NRE Policies in Korea
Deployment TargetDeployment Target
8.00.2-Geothermal
9.72.10.1Wind
2.50.40.1Photovoltaic
2.40.70.7Solar Thermal
7.88.33.0Bio
12.323.627.6Hydro
57.364.768.5Waste
201120062003Resources
Annual Target (%)
5% of Total Energy Consumption by 2011
52.52.1Goal
R&D
Demonstration
InternationalCollaboration
RD&D RD&D
Deployment
Solar Roof
F I T
Public Obligation
RPA
Loan
DeploymentDeploymentInfrastructure Infrastructure
Certification
Human Resources
Development
RESCO
NRE Policy SchemeNRE Policy Scheme
Achieve 70~90 % level of advanced countries’ by 2011
PV, Hydrogen/fuel cell in the 3rd rank in the world
Hydrogen/Fuel cell, PV, Wind receive major support Integration of the stages of development, demonstration, deployment
7 areas such as Solar thermal, biomass and waste energy focused on commercialization
Multilateral: APP, IPHE, IEA/CERT, APEC etc Bilateral: China, Germany, Japan, Mongolia etc
General R&D
Large Project
R&D
Int. Collaboration
R&D PoliciesR&D Policies
Research & Development
<Certification Process><Certification Process>
Request for evaluation
(Manufacturer,
Importer)
Test
(Testing Laboratory)
Request forCertification
(Manufacturer,
Importer )
Certification
(Certification
Body)
CB: New & Renewable Energy Center - Inspection for certification - Issuing certificate - Post management for certified facilities
To Increase the reliability of NRE facilities for consumers and guarantee
the quality of the products 17 items : Solar panel, PV inverter, small wind system etc
To Increase the reliability of NRE facilities for consumers and guarantee
the quality of the products 17 items : Solar panel, PV inverter, small wind system etc
Certification
Strengthening InfrastructureStrengthening Infrastructure
Core Technology Research Center
Short-term re-education program to industries with various research facilities in the centers
* Fuel cell, PV, Wind
Specialized Graduate School Provide Master and Doctoral students for industries * Fuel cell, PV
Best Laboratory In-depth research to solve bottlenecks of technologies required by industries * Fuel cell, PV, Wind, Solar thermal, Bio-energy, Coal gasification
Human Resources Development Program
Strengthening InfrastructureStrengthening Infrastructure
Solar Bio Wind Hydro Coal-gas
561 38 99 18 10
Fuel cell Waste Geo Hydrogen Total
21 25 180 10 969
* A company can register several area, Net No. of RESCO is 648
Registration system for the specialized company in NRE
Pre qualification for government program (ex. Solar roof program)
Solar energy(PV, thermal) occupies 57%
Registration system for the specialized company in NRE
Pre qualification for government program (ex. Solar roof program)
Solar energy(PV, thermal) occupies 57%
Renewable Energy Service Company
< Status of RESCO (‘06) >< Status of RESCO (‘06) >
Strengthening InfrastructureStrengthening Infrastructure
~’98 ‘99 ’00 ‘01 ’02 ‘03 ’04 ‘05 ‘06 Total
Bud. 5,109 700 700 735 1,20
02,07
54,69
623,30
028,00
066,51
5
<Statistics><Statistics> [Unit: M won, 1000won=1US$]
Create initial markets for new technologies and systems
Establish and activate the deployment infrastructure of commercialized technologies and equipments.
Exhibition Prog: 80%, General Prog: 60%(PV, Wind), 50%(Sol.T., Geo), 30%(Waste)
Subsidy Budget(41.0 Billion won) for FY07 increase 46% compared to FY06
Create initial markets for new technologies and systems
Establish and activate the deployment infrastructure of commercialized technologies and equipments.
Exhibition Prog: 80%, General Prog: 60%(PV, Wind), 50%(Sol.T., Geo), 30%(Waste)
Subsidy Budget(41.0 Billion won) for FY07 increase 46% compared to FY06
Subsidy
Deployment ProgramsDeployment Programs
<Status of Regional Deployment Program> <Status of Regional Deployment Program>(Unit: M won, 1000won=1US$)
Support various projects carried out by local governments to
improve the energy supply & demand condition
The subsidy for building the infrastructure : up to 100% The subsidy for installing NRE systems : up to 70%
Support various projects carried out by local governments to
improve the energy supply & demand condition
The subsidy for building the infrastructure : up to 100% The subsidy for installing NRE systems : up to 70%
Regional Deployment
Deployment ProgramsDeployment Programs
-5,000
10,00015,00020,00025,00030,00035,00040,00045,00050,000
96 97 98 99 00 01 02 03 04 05 06
TotalWindPV
Year Number of Solar Roof HousesTotal
Capacity(kW)
2004 310, Single family houses 771
2005 907, Single family houses 2,356
2006 5,968, Single and multi family houses 7,348
Deploy 100,000 PV systems in residential houses by 2012
to foster PV facility enterprises .
Produce solar cells with low price & high efficiency The subsidy portion for each solar roof is 60%
Deploy 100,000 PV systems in residential houses by 2012
to foster PV facility enterprises .
Produce solar cells with low price & high efficiency The subsidy portion for each solar roof is 60%
100,000 Solar Roofs
<Statistics> <Statistics>(Unit: M won, 1000won=1US$)
Deployment ProgramsDeployment Programs
Compensates for the difference between NRE power generation cost and fossil fuel power generation cost to promote NRE.
From October 2006, the standard price has been modified and newly added .
Compensates for the difference between NRE power generation cost and fossil fuel power generation cost to promote NRE.
From October 2006, the standard price has been modified and newly added .
Feed In Tariff
< Fixed Standard Prices of individual resource (won / KWh) >< Fixed Standard Prices of individual resource (won / KWh) >
SMP : ’05 average(61.6won/kwh) The price is applied for 15 years
Capacity limit of the FIT is 100MW for PV, 1,000MW for Wind, 50MW for fuel cell
Tidepower Waste
Landfillgas
Hydro WindPhotovol-t
aicResource
62.81~
90.50 SMP+5
68.07 (20MW ↑)
74.99 (20MW ↓)
72.80~
86.04107.29
711.25 (30kw ↓)
677.38 (30kw↑)
Fixed Price
Deployment Programs Deployment Programs
<Statistics ><Statistics >
Newly Built Public Offices, which exceeds 3,000 square meters are to be equipped with renewable energy facilities; The Costs of them should be more than 5 % of their total construction expenses.
Newly Built Public Offices, which exceeds 3,000 square meters are to be equipped with renewable energy facilities; The Costs of them should be more than 5 % of their total construction expenses.
Obligation to the Public Institution
(Unit: M won, 1000won=1US$)
Deployment ProgramsDeployment Programs
Year The No. of Installation
Plan
Construction expenses (A)
Investment for NRE systems Investment ratio
ofNRE
systems(B/A)
Solar Thermal
Photovoltaic Geothermal Total(B)
2004 30 213 1.4 4.9 10.4 16.6 7.8 %
2005 113 868 2.7 14.8 34.5 52 5.9 %
2006 129 1,285 2.3 24.8 40.7 67.8 5.3 %
Total 272 2,366 6.4 44.5 85.6 136.4 5.8 %
Agreement between the Government & Public Energy Companies
KEPCO and 6 Other Companies
Korea District Heating Corporation, Korea Water Resources
Corporation plan to invest 1,260 M$ to NRE
120 M$ was invested in 2006, 430 M$ will be invested in 2007
An Introduction to RPS
Agreement between the Government & Public Energy Companies
KEPCO and 6 Other Companies
Korea District Heating Corporation, Korea Water Resources
Corporation plan to invest 1,260 M$ to NRE
120 M$ was invested in 2006, 430 M$ will be invested in 2007
An Introduction to RPS
Renewable Portfolio Agreement
Deployment ProgramsDeployment Programs
PV Wind Hydro Fuel Cell Others
Capa.(kW) 30,377 184,550 29,630 3,500 100,000
<Expected Investment to Power Generation Facility>
Loan & Tax Incentives
The government provides The government provides long-term, low rate loanslong-term, low rate loans for the for the consumers or manufacturers of NRE systems which have been consumers or manufacturers of NRE systems which have been completely commercialized. completely commercialized.
Loans are provided for Loans are provided for up to 90 %up to 90 % of the total cost of the total cost ( (up to 80 % for large corporations, up to 50% for publicup to 80 % for large corporations, up to 50% for public institution institution))
Total loans(~ 2006) : 619 billion won Total loans(~ 2006) : 619 billion won
10 10 percent of total investment in installation of NRE systems of NRE systems can be deducted from the income tax or corporate can be deducted from the income tax or corporate income tax. income tax.
Deployment ProgramsDeployment Programs
Cooperation Suggestions
OVER VIEW• Hosted by : Ministry of Commerce, Industry and Energy (MOCIE) • Organized by : Korea Energy Management corporation(KEMCO)
• History : launched(1975), the 27th (2007)
• Special Feature - the only total trade exhibition in energy industry in Korea - the biggest energy exhibition in Korea - certified by UFI(The Global Association of the Exhibition Industry)
2007 Show Report• Period : Oct. 2 ~ Oct. 5, 2007
• Venue : Pacific Hall, Convention & Exhibition Center (COEX), Seoul, Korea
• Exhibition Size : 10,368m2, 192 companies, 585 booths
• Visiors : 25, 314
Parts &
ComponentsFuel & Heat Usin
g EquiomentElectrical Equpm
entNew&Renewable
EnergyPublic and R&D Total
Companies 26 14 24 75 53 192
Booths 56 46 61 278 144 585
Gyeonggi Province Invites you
Strong Industrial BasePyeongtaek Oseong Complex Why Gyeonggi Province
11,736 Knowledge Based Companies- Semiconductor: World #2,5 enterprises , Gyeonggi 82.6% national production- TFT Display : Korea- 39% World Market, Gyeonggi- 44% of national display companies - Automotive : Korea - 5.5% World MS(5th largest), Gyeonggi- 4 major producers- Mechatronics : Gyeonggi- National #1 (1,577 companies)
2
Abundant Talented Human Resources - 700 universities, graduate schools in metropolitan area, 250,000 grandaunts (43% of nation)- 89,000 science and technology grandaunts per annum(42% of nation) - 77,797 R&D Personnel (33% of nation)
Well developed Traffic infrastructure-2 international airports -2 international sea ports-9 national express ways -6 railroads and 1 super express road (KTX)
Gyeonggi Province
Renewable energy as priority strategic industry
on planning
Strong GovernmentSupport for FDI
Vast overseas market
5
North East AsiaNorth East Asia
1919 % of World Population1 billion
Gyeonggi ProvinceGyeonggi Province
2222 % of national population 10million
2121 % of national GRDP
4848 % of national population23million
Metropolitan AreaMetropolitan Area
4444 % of national GRDP
TaxDeduction
Employment Subsidy
• $3,000/person max
• National Tax upto 7 yrs• Local Tax 15yrs • Tariff & VAT 3yrs
Road map comparision Recommendable sitesPyeongtaek Oseong Complex Incentives package
11-1
Employee Training Subsidy
Little or Free rent
• Foreign Industrial Complex
• 1% of public land price or Free
16* Detailed information of each item is in appendix
* Local tax : Acquisition tax / registration tax/property tax
• $3,000/person max
Grant• Grant for infrastructure
support • Negotiable according to
quality and size of investment
Strong Industrial Base Korea’s semiconductor export volume : US$34 billion Korea takes 41% of world market share in Memory IC amounting US$48.2billion
Pyeongtaek Oseong Complex Silicon Valley of Korea
Gyeonggi$24billion
82.682.6%
44.244.2%
53.953.9%
Source : Korea Semiconductor Institute Association, Invest Korea 2006 Korea Statistical Office (2004)
Gyeonggi159
Gyeonggi
45,602Semiconductor
Semiconductorproduction volume
Number of semiconductorrelated companies
Employee numbersin Semiconductor industry
13