    Attached is an updated briefing for today's conference call

    Thanks

    From:Sent: Tuesday, September 30, 2008 2:57 PMRequired:

    FLOSSMAN, LOREN W;

    Optional:

    Subject: Updated: Weekly meeting with IBWCWhen: Thursday, October 02, 2008 1:00 PM-2:00 PM.Where: 1 (800) 238-0210, Passcode #342193

    Access number: 1 (800) 238-0210

    Passcode #342193

    (b) (6)

    (b) (6)

    (b) (6)

    (b) (6)

    (b) (6)

    (b) (6)

    (b) (6)

    (b) (6)

    (b) (6)

  • 7/31/2019 Oct 2 2008 Mtg CBP IBWC -Likely to Drop O-1 O-2 0-3 -

    2/8

    F r Of cia e On yFor Official Use Only

    SBI Tactical Infrastructure ProgramIBWC Issues

    October 2nd, 2008

    009226

  • 7/31/2019 Oct 2 2008 Mtg CBP IBWC -Likely to Drop O-1 O-2 0-3 -

    3/8

    2

    Major Issues

    Fence in Floodplain

    Fence on Levees

    Hidalgo County

    Miscellaneous Items

    009227

  • 7/31/2019 Oct 2 2008 Mtg CBP IBWC -Likely to Drop O-1 O-2 0-3 -

    4/8

    3

    Fence in Floodplain

    Segments O-1 (3.8 miles), O-2 (8.8 miles) & O-3 (1.9 miles)

    DHS likely to drop fence segments from PF225

    Segment M-2A (0.75 miles)

    Baker modeled the retaining wall proposed for M-2A (in the flood plain) andconcluded it will not impact the floodplain

    IBWC approved the construction of M-2A in the floodplain on 22 Aug

    No Issues letter drafted and forwarded to Commissioner for signature.

    Segment L-1 (0.20 miles)

    009228

    (b) (7)(E)

  • 7/31/2019 Oct 2 2008 Mtg CBP IBWC -Likely to Drop O-1 O-2 0-3 -

    5/8

    4

    Fence in Floodplain

    Segment O-21 (0.53 miles)

    CBP would now like IBWC to design and construct levee wall similar to Hidalgo

    using CBP funds

    Segment CV-1A CBP to install permanent fencing along canal, outside of the spillway and weir

    footprints for the dam. CBP still desires to locate temporary barriers across the

    weir until such time de-silting has been accomplished. USIBWC requires letter from

    CBP Commissioner prior to placement of temporary barriers.

    Draft letter forwarded to DHS??

    009229

  • 7/31/2019 Oct 2 2008 Mtg CBP IBWC -Likely to Drop O-1 O-2 0-3 -

    6/8

    5

    Fence on/near Levee

    Segments L-1A and L-1B (6 miles)

    Projects have been removed from PF225

    CBP would now like IBWC to design and construct a levee wall within these segments

    CBP preparing written request

    Segment K-1B (0.7 miles) Project has been canceled

    Segment K-2C

    Current alignment has been determined to not be constructible; now looking at installing at the north toe of thelevee (i.e. our original proposed location)

    Segment O-21

    Segment O-21 currently the only segment in which CBP believes sections of fence may need to encroach on

    the 15 ft desired buffer north of the levee The contract documents for all RGV segments in which fence is proposed north of the levee:

    The minimum 15 ft buffer

    Contractor to stake out fence alignment prior to construction

    IBWC review/approval of staked-out alignment prior to construction

    Station 35+00 to Station 40+00 USIBWC concurs with location closer than 15 ft from toe. Contractor must stake out area priorto construction and obtain USIBWC review/no issues.

    Station 220+00 to Station 224+00 USIBWC will coordinate with owner of unauthorized structures to have them removed. DHSto maintain 15 ft offset.

    Station 236+00 to Station 259+00 USIBWC concurs with less than 15 ft offset at station 236, if required to avoid tower.USIBWC currently surveying our right-of-way between stations 236 & 259 to determine if existing fencing is within right-of-wayand 15 ft offset could be obtained within our right-of-way (OPEN ITEM).

    Station 369+37.50 to Station 397+77.50 Nye Plantation segment; CBP terminated this work for FY 2008. No further actionrequired.

    USIBWC understands that all other fence segments will provide a 15 ft offset from toe of levee. USIBWC will provide CBP withletter regarding our decision on abovementioned segments.

    009230

  • 7/31/2019 Oct 2 2008 Mtg CBP IBWC -Likely to Drop O-1 O-2 0-3 -

    7/8

    6

    Hidalgo County

    SBI has decided to provide Hidalgo County additional funding to complete

    segments O-4A, O-4C, O-6A, O-6B/C, O-8 and O-9 Phase II

    SBI evaluating the feasibility of constructing pedestrian fence on either side

    of the HCWD#1 pump station (O-4B)SBI owes IBWC:

    Draft letter from CBP on coordination efforts with property owners potentially

    directly impacted by the levee wall project is being routed for Mr. Giddens

    signature

    009231

  • 7/31/2019 Oct 2 2008 Mtg CBP IBWC -Likely to Drop O-1 O-2 0-3 -

    8/8

    7

    Miscellaneous Items

    Tracking of IBWC Design Approvals

    On-going; both CBP/Corps & IBWC tracking status

    Segment K-1A (1.1 mile)

    CBP moving forward with design assuming floating fence (PV-3) in TXDOT

    right of way

    Proposed alignment/draft RFP submitted to IBWC

    Need to discuss IBWC requested gate

    Laredo Cane Control Project CBP submitted letter to IBWC on June 22nd describing the proposed project

    US IBWC has informed MX IBWC of proposed pilot project (1.7 miles)

    Cane removal activities scheduled to begin on October 1st

    009232