28
Certification Process

OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

Certification Process

Page 2: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: PROJECT TEAM

Project Leader: to be assignedDeputy: to be assigned

Customer

Project Coordination:C

ertif

icat

ion

Bod

y

Administration/Inbox

Loads / Safety System / ElectricRotor BladesMachinery

Tower / Foundation and

GeotechnicalManufacturing

Evaluation

Experts in charge Experts in charge Experts in chargeExperts in charge Experts in charge

Monitoring guidelinerelated

issues andrelease ofcertificates

Monitoring timeline ofassigned

experts andproject

Primary contact for the customer, taskand timeline distribution with

department leader, regular projectupdate to customer

Sending of documentation, communication with project

leader

Manging documenation, Invoices, sending reports andcertificates

Assessment ofdocumentation, issue of

certification report

Department Leader: assigns and

monitors work to/oftheir experts

For technial issues, theexperts contacts the

customer directly

Page 3: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: ADMINSTRATIVE

• Final Evaluation (Reports, Statements, Type/ComponentCertificates)

• Invoice

• Delivery of Documentation• Assessment/Evaluation (Checklists, phone conferenc, E-Mail)

• Project Leader Assignment• Offer• Purchase Order / OrderPre-contract

Execution

Closing

1

2

3

Page 4: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: ADMINSTRATIVE

Pre-contract

1

Cus

tom

er

DE

WI O

CC

Adm

inistration

Project Leader

Information/Offer Request

Offer

Purchase order

Support

Support, Information

Page 5: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: ADMINSTRATIVE

Execution

2

DEWI OCC Administration

(Inbox/Document Manager)

Documents

DEWI-OCC Experts

Project Coordination

Feecback, Checklists

Cus

tom

er

Project Leader

- Documentation list- Project sheet- Communication

through conferencesand Emails

Agreed time line fordocumentation and

assessment

Phone conferences, E-mails

Page 6: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: ADMINSTRATIVE

Cus

tom

erProject Leader

DEWI OCC Administration

(Inbox/Document Manager)Certification Reports, Statements,

Certificates

Certification Reports, Statements, Certificates (drafts)

InvoiceClosing

3

Page 7: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

Design Evaluation

ManufacturingEvaluation

TypeTesting

Type CharacteristicMeasurements

(optional)

Page 8: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

1. Load Assumptions

2. Safety System and Manuals

3. Rotor Blade

4. Machinery

5. Tower

6. Electrical System

7. Foundation

Design Evaluation

Page 9: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

Design Evaluation

Safety Systems

Assessment:Safety Systems / Manuals

LoadsLoad Assumptions

Assessment:Rotor Blades

Assessment: Machinery / Structural Components

Assessment: Tower

Assessment: Foundation(optional)

Assessment: Electrical System

Certification Report -2Safety Systems / Manuals

Certification Report -3 Rotor Blades

Certification Report -4Machinery / StructuralComponents

Certification Report -5 Tower

Certification Report -7 Foundation (optional)

Certification Report -6 Electrical System

Design EvaluationConformity Statement

Certification Report -2Safety Systems

Certification Report -1Load Assumptions

Page 10: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

ManufacturingEvaluation

1. Nacelle and Hub

2. Rotor Blade

3. Tower

4. Gearbox

5. …

Page 11: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

Manufacturing Evaluation (ME)

ME Nacelle and Hub

ME Rotor Blade

ME Tower

ME Gearbox

ME Generator (optional)

ME …

Manufacturing EvaluationConformity Statement

Certification Report -10a ME Nacelle and Hub

Certification Report -10b ME Rotor Blade

Certification Report -10cME Tower

Certification Report -10eME Gearbox

Certification Report -10fME Generator (optional)

Certification Report -10x ME …

Page 12: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

TypeTesting

1. Type Measurementsi. Safety and Function Testsii. Mechanical Loadiii. Power Performanceiv. Noisev. Power Quality

2. Testsi. Gearbox Field Testii. Rotor Blade Full Scale Test

3. Validation of Simulation Model4. Power Quality Tests (optional)5. Acoustic Noise Measurements

(optional)

Type CharacteristicsMeasurements

(optional)

Page 13: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

Blade andGearbox Tests

Safety andFunction Test

incl. Inspection

EnvironmentalTesting

(optional)

ElectromagneticalCompatibility

Testing(optional)

Oth

er T

ests

Type Characteristic

Measurem

entsPower

Performance Measurements

LoadMeasurements(and Comparison)

Power QualityTests

(optional)

Acoustic NoiseMeasurements

(optional)

Type TestingConformity Statement

Page 14: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

Type Testing

Safety and Function Test

Power Performance Measurements

Load Measurements

Blade Tests

Comissioning

Other Tests

Conformity Statement Type Testing

Evaluation Report -25Type Testing

Type CharacteristicMeasurements

(optional)

Power Quality Tests(optional)

Acoustic Noise Measurements(optional)

Page 15: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

Conformity Statement Design Evaluation

Conformity Statement Manufacturing Evaluation

Conformity Statement Type Testing

Type CertificateFinal Evaluation Report -12

Page 16: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION PROCESS: TECHNICAL

Final CertificationReport -12

Type Certificate

Site survey(network andground)

Foundation

Installation supervision

Periodic Inspection(optional)

Site SpecificCertificate

PeriodicSurveillance

Annual ConformityStatement

Design Evaluation

Safety Systems

Assessment:Safety Systems / Manuals

LoadsLoad Assumptions

Assessment:Rotor Blades

Assessment: Machinery / Structural Components

Assessment: Tower

Assessment: Foundation(optional)

Assessment: ElectricalSystem

Certification Report -2Safety Systems / Manuals

Certification Report -3 Rotor Blades

Certification Report -4Machinery / StructuralComponents

Certification Report -5 Tower

Certification Report -7 Foundation (optional)

Certification Report -6 Electrical System

Design EvaluationConformity Statement

Certification Report -2Safety Systems

Certification Report -1Load Assumptions

Manufacturing Evaluation (ME)

ME Nacelle and Hub

ME Rotor Blade

ME Tower

ME Gearbox

ME Generator (optional)

ME …

Manufacturing EvaluationConformity Statement

Certification Report -10a ME Nacelle and Hub

Certification Report -10b ME Rotor Blade

Certification Report -10cME Tower

Certification Report -10eME Gearbox

Certification Report -10fME Generator (optional)

Certification Report -10x ME …

Type Testing

Safety and Function Test

Power Performance Measurements

Load Measurements

Blade Tests

Comissioning

Other Tests

ConformityStatement Type

Testing

Evaluation Report -25Type Testing

Type CharacteristicMeasurements(optional)

Power Quality Tests(optional)

Acoustic Noise Measurements(optional)

Page 17: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMES

Type Certification

Onshore IEC WT01

IEC 61400-22

GL 2003/2004

GL 2010

DIBt 2004

OffshoreGL 2005

GL 2012

Project Certification

Onshore IEC WT01

IEC 61400-22

GL 2003/2004

GL 2010

DEWI OCC 37-OP-S0852

Offshore• BSH Standards

• DNV-OS-J101, 2007/2009

• DEWI OCC 37-OP-S0852

Page 18: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

GL

• Type Certificate- STC DA- STC IPE- STC PT

• Project CertificateIEC

• Type Certification- Design- ME- TT

• Project Certificate

Page 19: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMES: GL

Type Certification(GL 2003/2004 and/or GL 2010)

A-Type Certificate

Source: GL 2010, Guideline for the Certification of Wind Turbines, Fig. 1.2.1 Elements of the Type Certificate, Chapter 1, page 4.

Final Assessment(Final Assessment Report)

STC of A-DA STC of PTSTC of IPE & Quality Assessment

Page 20: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMES: GL

Type Certification(GL 2003/2004 and/or GL 2010)STC for the A-Design Assessment (DA)

Assessment: Loads & Safety Concept

- Static Rotor Blade Test- Gearbox Test- Generator Test- Electrical Components- Commissioning

Evaluation of the design, documentation and manuals

STC for the A-DA

Issue of certification reportfor the Load Assumptions

Issue of certification reports fora) Safety Systems and Manualsb) Rotor Bladesc) Machinery Componentsd) Towere) Electrical System

(Foundation)

Page 21: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMES: GLType Certification(GL 2003/2004 and/or GL 2010)STC for the Implementation of design related requirements for production and erection (IPE)

IPE for Rotor Blade

STC for the IPE

IPE for Nacelle IPE for Tower (IPE for Gearbox)(…)

Source: GL2010, Guideline for the Certification of Wind Turbines, 1.2.2.5 Implementation of the design-related requirements in Production and Erection (IPE), Chapter 1, page 7-9.

Page 22: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMES: GLType Certification(GL 2003/2004 and/or GL 2010)STC for the Prototype Testing (PT)

Evaluation of documentation of prototype testing (e.g. load measurement, power curve)

Simulation Model Real turbine

STC for the PT

„comparison of“

Comparison of the measurement results with the assumption for design (validation of load simulation)

Comparison of the measurement results with the assumption for design (validation of load simulation)

Summarizing report

Source: GL 2010, Guideline for the Certification of Wind Turbines, 1.2.2.7 Protoype Testing, Chapter 1, page 10.

Page 23: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMES: GLProject Certification(GL 2003/2004 and/or GL 2010)

Assessment of siteDesign conditions

Site specificdesign assessment

Examination offoundation

Surveillance duringtransportation Commissioning

Type Certificate

ProjectCertificate

Periodicmonitoring Source: GL2010, Guideline for the Certification of Wind Turbines, Fig.

1.2.3 Elements of the Project Certificate, Chapter 1, page 11.

Surveillanceduring production

Final Assessment

Page 24: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMES: IECType Certification(IEC WT 01 or IEC 61400-22)

Design Basis Evaluation

DesignEvaluation

ManufacturingEvaluation

Type Testing

FinalEvaluation

Foundationmanufacturingevaluation

Foundation basisevaluation

Type characteristicsmeasurement

Optional Module

TypeCertificate

Source: IEC 61400-22, Wind turbines – Part 22: Conformity testing anc certification, Fig. 1 Modules ot type certification, page 19.

Design Basis Conformity Statement

Design EvaluationConformity Statement

ManufacturingConformity Statement

Type TestConformity Statement

Final EvaluationReport

Page 25: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMES: IECProject Certification(IEC WT 01 or IEC 61400-22)

Site ConditionsAssessment

Design basisevaluation

SupportStructureDesignEvaluation

SupportStructureManuf.Surveillance

Transportation& Install.Surveillance

CommissioningSurveillance

FinalEvaluation

ProjectCertificate

Wind TurbineType

Certificate

Wind Turbine/RNADesign Evaluation

Wind Turbine/RNAManuf. Surveillance

Other InstallationDesign Evaluation

Other InstallationManuf. Surveillance

Optional Module

Project CharacteristicsMeasurements

Integrated LoadAnalysis

RNARotor Nacelle Assembly

Page 26: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMES: IECProject CertificationDEWI-OCC 37-OP-S0852

Site ConditionsAssessment

Design basisevaluation

Integrated LoadAnalysis

Support StructureDesign Evaluation

Wind Turbine/RNADesign Evaluation

Project specificManufacturing Evaluation

Transportation& Install.Surveillance

CommissioningSurveillance

Certification ReportSite Assessment

Certification ReportDesign Assessment

Other InstallationsDesign Evaluation

Certification ReportDesign Assessment

Certification ReportManufacturing

Evaluation

Certification ReportTransportation &

Install. Surveillance

Certification ReportCommissioning

Surveillance

ProjectCertificate

Operation andMaintenance Surveillance

Page 27: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

CERTIFICATION SCHEMESProject Certification (BSH)

Environmental Conditions andDesign Basis

Development1st Release

Integrated LoadAnalysis

Basic Design andImplementation Planning

2nd Release

Wind TurbineDesign Evaluation

TowerDesign Evaluation

SubstructureDesign Evaluation

Implementation (3rd Release)Production, Transportation, Installation, Commissioning

Substructure/Foundation

M1

Start: QX/20XX

Manufacturing Surveillance

Transportationand Installation Commissioning

Tower

Manufacturing Surveillance

Transportationand Installation Commissioning

Wind Turbine Components

Manufacturing Surveillance

Transportationand Installation Commissioning

M2 M3

Design Basic QX/20XX

Basic Design QX/20XX

Design Evaluation QX/20XX

M4 M5 M6 M7

Project Certificate20XX

ManufacturingTransportation

Commissioning

Final Evaluation

OTS TopsightDesign Evaluation

OTS Topsight

Manufacturing Surveillance

Transportationand Installation Commissioning

3.10 Final Evaluation Report

3.11Project Certificate

Statement of Conformity 1st BSH release(Design Basis)

Test Reports and Statement of Conformity for the Basic Design for WTG, Tower, Foundation,OTS

Statement of Conformity Detailed Design for WTG, Tower, Foundation, OTS

3.3 Statement of conformity and test reports Manufacturing Survey

3.7 Statement of conformity and test reports Transport and Installation Survey

3.9 Statement of conformity and test reports Commissioning survey

Page 28: OCC Certification Presentation - ULCertification Report -2 Safety Systems / Manuals Certification Report -3 Rotor Blades Certification Report -4 ... • DNV-OS-J101, 2007/2009

Introduction of DEWI-OCCA Global Certification Provider serving the Wind Energy Industry