Preemption and CompetitionAnnual Plan Items Affected

• 2013 AP Item 2(a) Develop version 2 business practice standards to better coordinate the use of the transmission system among neighboring transmission providers. Request R050004 was expanded to include the Order No. 890 (Docket Nos.RM05-17-000 and RM02-25-000), (Order No. 890-A (Docket Nos. RM05-17-001, 002 and RM05-25-001, 002), and Order No. 890-B (Docket Nos. RM05-17-03 and RM05-25-03) “Preventing Undue Discrimination and Preference in Transmission Services”– (i) Group 4: Pre-Emption; Request No. R05019• (1) Pre-Emption• (2) Request No. R05019

• 2013 AP Item 5(c) Add language to WEQ-001-4 Online Negotiation and Confirmation process to clarify Table 4-3 (R09003)

Page 3: OASIS Subcommittee Status

Preemption and Competition • Working on all phases of Preemption and Competition– Short-Term Firm Preemption and Competition– Non-Firm Preemption and Competition– Long-Term Preemption

• Resolving issues – ROFR Treatment– Priorities – Redirects– Reservation Deadlines– Conditionalities– Simultaneous Requests

Page 4: OASIS Subcommittee Status

Preemption and CompetitionTask Assignments

• Non Firm (Completed 11/13)• Tiers 1&3 (Completed 11/13)• OASIS Notification (Completed 11/13)• Tagging Adjustment/Notification (Completed 11/13)• Resales/Redirects (Scheduled for Completion 3/14)• Long Term (Scheduled for Completion 3/14)• Timing/Flowchart (Scheduled for Completion 4/14)• Preemption Recommendation (Scheduled for Completion

6/14)

Page 5: OASIS Subcommittee Status

Preemption and Competition Goals

• Make revisions to Business Practice Standards– WEQ-000– WEQ-001– WEQ-002– WEQ-003– WEQ-013

• Finish issues and requirements 1Q 2014• Out for informal comments 2Q 2014• Out for formal comments 2Q 2014

Page 6: OASIS Subcommittee Status

1. Preemption and Competition (3 APIs)

2. Posting of additional information on OASIS regarding firm transmission curtailments

3. Allow for posting of 3rd party offers of planning redispatch services

4. Eliminate Masking of TSR tag source and sink when request status is final state

5. Eliminate disparity of posting “sensitive” information. Include procedures of user certification that allows access to this class of information

6. Enhance TSR result posting to allow showing (1) limiting transmission elements and (2) generation dispatch options that would allow acceptance of TSR

OASIS Workload

Page 7: OASIS Subcommittee Status

7. Requirements for OASIS to use data in the EIR

8. Add AFC and TFC values to the “System_Attribute” data element in the Data Dictionary

9. Correct WEQ 013-2.6.7.2 – Resale off OASIS

10. Create new OASIS mechanism that allows for merger of like reservations without use of the resale mechanism

11. Posting of additional information when service is denied (refused or declined) when associated with SAMTS for customers serving NITS load

12. Develop standards to support the Transmission Provider right to reassess the availability of conditional firm

13. Not assigned yet: Coordinate with NERC on NERC Project 2012-05 ATC Revisions

14. Provisional item: Rights to transmission service on an original path when redirect is conditional - Entergy Order

OASIS Workload (cont.)

Page 8: OASIS Subcommittee Status

OASIS WorkloadUrgency Level

(low=5)Effort Level

(low=5)Easy to

CompletePriority

Level2014 AP

ItemDescription 2014 AP Due

DateRequest number

2 1 No 1 2(a)(i)(1) Pre-emption 2nd Q, 2014 R05019 (2005)

2 1 No 1 2(a)(i)(2) Request No. R05019 2nd Q, 2014 R05019 (2005)

2 1 No 1

Add language to WEQ-001-4 Online Negotiation and Confirmation process to clarify Table 4-3 (R09003)

2nd Q, 2014 R09003 (2009)

4 3 No 2

2(a)(ii)(1) Paragraphs 1627 of Order 890 – Posting of additional information on OASIS regarding firm transmission curtailments

TBD (follows AP 1(a))

Order 890 (2007)

3 3 No 2

2(a)(ii)(2) Redispatch Cost Posting to allow for posting of third party offers of planning redispatch services

TBD (follows AP 1(a))

Order 890 (2007)

3 2 No 5

3(a)(i)(1) Eliminate Masking of TSR tag source and sink when requested status is denied, withdrawn refused, displaced, invalid, declined, annulled or retracted

TBD R05026 (2005)

3 2 No 5

3(a)(i)(2) Initiate standard that eliminates the disparity of posting “sensitive” information. This standard should also include procedures of user certification that allows access to this class of information.

TBD R05026 (2005)

3 3 No 5

3(a)(i)(3) Enhance the TSR result postings to allow showing of (i) limiting transmission elements and (ii) available generation dispatch options that would allow acceptance of reservation request

TBD R05026 (2005)

Page 9: OASIS Subcommittee Status

OASIS WorkloadUrgency Level

(low=5)Effort Level

(low=5)Easy to

CompletePriority

Level2014 AP

ItemDescription 2014 AP Due

DateRequest number

5 3 No low3(c) Requirements for OASIS to use data in the Electric

Industry Registry (R12001)TBD R12001 (2012)

5 5 Yes 3

5(a) Consistent with ¶51 of FERC Order No. 890-A, add AFC and TFC values to the “System_Attribute” data element of the NAESB Standard WEQ-003: OASIS S&CP Data Dictionaries. (R08011)

TBD R08011 (2008)

4 3 No 55(b) Correct WEQ 013-2.6.7.2. – Resale off OASIS

(R08027)TBD R08027 (2008)

3 1 No 5

5(d) Create a new OASIS mechanism that allows for the merger of like reservations without the use of the resale mechanism (R09015)

TBD R09015 (2009)

?? ?? ?? ??

5(e) Improve transparency to allow customers to determine whether they have been treated in a non-discriminatory manner by posting of additional information on OASIS when service is denied (i.e. refused or declined) by customer(s) using new SAMTS process across multiple transmission systems to serve their NITS load on multiple systems. (R12006)

TBD R12006 (2012)

Page 10: OASIS Subcommittee Status

OASIS WorkloadUrgency Level

(low=5)Effort Level

(low=5)Easy to

CompletePriority

Level2014 AP

ItemDescription 2014 AP Due

DateRequest number

5 5 Yes 4

6(a) Develop standards to support the Transmission Provider right to reassess the availability of conditional firm (See ¶ 72[1])

TBD Order 676E (2009)

?? ?? ?? ??

1(h) Coordinate with NERC on NERC Project 2012-05 ATC Revisions - Order 729. The NERC project may impact the WEQ-001 Open Access Same-Time Information Systems (OASIS) Standards, WEQ-002 OASIS Standards and Communication Protocol (S&CP), WEQ-003 Open Access Same-Time Information Systems (OASIS) Data Dictionary, and WEQ-013 OASIS Implementation Guide.

TBD Not yet assigned

?? ?? ?? ??

Provisional 3(e)

Develop and/or modify existing standards as needed in response to FERC Final Order in Docket No. RM05-5-022 concerning rights to transmission service on an original path when the redirect is conditional.

N/A Awaiting FERC order

Page 11: OASIS Subcommittee Status

OASIS Calendar

• February 19-20 Phoenix, AZ (Salt River Project) FTF• February 27 Conference• March 11-13 Portland, OR (BPA) FTF• March 27 Conference• April 15-17 Little Rock, AR (SPP) FTF• May 1 Conference• May 13-15 Seattle, WA (Seattle City Light) FTF• May 30 Conference• June 17-19 Carmel, IN (MISO) FTF