Oakland Fifth Avenue and Forbes Avenue Pedestrian Safety and Mobility Hometown Streets Project. Strada LLC. Project Evaluation Table. Project Evaluation Table. Concrete versus Asphalt Intersection. Strada LLC. Overall Site Plan. Strada LLC. Fifth Avenue Intersections. Strada LLC. - PowerPoint PPT Presentation
Citation preview
Oakland Fifth Avenue and Forbes Avenue Pedestrian Safety and Mobility Hometown Streets Project
Strada LLC
TrafficCalming Mobility Safety Amenities Project Elements: Cost Implication
0-162 2 3 1 <= Weights
4 2 6 2 14 Curb Extensions Fifth: +$58,000 / Forbes: +$120,0004 4 6 1 15 Crosswalk Demarcations r $360,000 Concrete > Asphalt
(Pavement, Markings, LED Inserts) LED: + $17,000 per installation on 5th
4 4 6 0 14 Ped Countdown Signal/Advance + $52,0004 4 6 0 14 New Crosswalks (Thackery and McKee) --4 0 6 1 11 Bus lane Demarcation + $14,0000 0 6 2 8 Fifth Ave Railing Not in Construction Scope4 0 0 2 6 Street Trees +$38,0000 0 3 2 5 Bollards +$750 per installation0 2 3 1 6 New Sidewalk/ADA ramps/Curbs --0 2 3 1 6 Pedestrian Signage Not in Construction Scope0 0 0 2 2 New Signal/Sign poles (Forbes) +$75,0000 0 0 2 2 Street Lighting (Forbes) + $400,0002 0 0 1 3 Landscaping (Desoto) --
2 - significant benefit, 1- some benefit, 0 - min/no benefit
Project ObjectivesTotal Score
Pedestrian
Fifth/Forbes Pedestrian Safety and Mobility Hometown Streets ProjectEvaluation of Alternative Project Elements
Project Evaluation Table
Project Evaluation Table
TrafficCalming Mobility Safety Amenities Project Elements: Cost Implication
0-162 2 3 1 <= Weights
4 2 6 2 14 Curb Extensions Fifth: +$58,000 / Forbes: +$120,0004 4 6 1 15 Crosswalk Demarcations r $360,000 Concrete > Asphalt
(Pavement, Markings, LED Inserts) LED: + $17,000 per installation on 5th
4 4 6 0 14 Ped Countdown Signal/Advance + $52,0004 4 6 0 14 New Crosswalks (Thackery and McKee) --4 0 6 1 11 Bus lane Demarcation + $14,0000 0 6 2 8 Fifth Ave Railing Not in Construction Scope4 0 0 2 6 Street Trees +$38,0000 0 3 2 5 Bollards +$750 per installation0 2 3 1 6 New Sidewalk/ADA ramps/Curbs --0 2 3 1 6 Pedestrian Signage Not in Construction Scope0 0 0 2 2 New Signal/Sign poles (Forbes) +$75,0000 0 0 2 2 Street Lighting (Forbes) + $400,0002 0 0 1 3 Landscaping (Desoto) --
2 - significant benefit, 1- some benefit, 0 - min/no benefit
Project ObjectivesTotal Score
Pedestrian
Fifth/Forbes Pedestrian Safety and Mobility Hometown Streets ProjectEvaluation of Alternative Project Elements