OAK PARK STUDY SESSION #8 MAY 2016

CORRIDOR ROW EVALUATION SUSTAINABILITY

Page 2: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

Corridor ROW Evaluation

Page 3: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

3

Corridor Right of Way Evaluation

Process: – Blue Line Vision Study – Design, operations, & safety analysis – Coordination

GOAL: Determine optimal use of ROW

CTA CSX

Page 4: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

4

Corridor Right of Way Evaluation

No freight railroad ROW available – CSX Ongoing coordination – vertical clearance

– No raise in cross-road bridge elevations

CTA CSX CSX

Page 5: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

5

CTA Evaluation – Maintenance clearance – Platform capacity – Station safety

Corridor Right of Way Evaluation

Existing platforms

• Approx. 15 ft. • CTA Platforms • Roadway

Potential Existing CTA ROW Availability

Maintenance offset needed between I-290 and CTA

CTA 64 ft. ROW

28.7 ft. 13.8 ft.

13.5 ft.

13 ft.

I-290 Evaluation – No additional ROW – Up to 10 ft. of CTA ROW – Design & safety analysis

Page 6: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

6

Corridor Right of Way Evaluation Findings

– I-290 safety improved with/without additional ROW – Wider shoulders – 2x safety improvement – Lane widths – marginal safety difference – CTA Platforms – end loaded

Design flexibility ADA, safety, operational needs met with 5ft. to 7ft. platform widening

Recommendations – Use up to 10ft. CTA ROW for wider shoulders – Widen CTA Platforms 18’ to 21’ wide Subject to final design

Page 7: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

7

Next Steps

Continued CTA coordination Design Funding Schedules

Continue/complete CSX coordination

Page 8: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

Sustainability

Page 9: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

9

“Triple Bottom Line” – Considers 3 Principles

What is Sustainability?

Environmental

Social Economic

Page 10: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

10

Avoid, minimize, mitigate Stakeholder engagement Robust technical evaluation

– Environmental Impact Statement – Noise / air quality sensitivity analysis

Expanded Public Spaces – Shared use path & green space: 4 ac – Additional sidewalk width: 0.9 ac – Total expanded area: 4.9 ac

Environmental

Page 11: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

11

Maintain I-290 ROW Footprint Local Opportunities:

– LED Lighting – Native plantings – Solar panels – Permeable pavements – Self-cleaning concrete

Environmental

Solar panel/LED Lighting opportunity area

Shared use trail

Wider sidewalks & pedestrian plazas

Page 12: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

12

Regional travel improvements – 56% travel time savings in managed lane

Local travel improvements. – Peak period N-S delay reduced

Harlem Ave. 81% Austin Blvd. 49%

Flooding addressed – Mainline I-290 – CTA – CSX

Productivity: $2.7 Billion in travel time savings

Economic

Page 13: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

13

Livability – Support existing communities – Offer additional travel choices

Bike & pedestrian Carpool

– Improved access to jobs – Improved access to transit – Strengthen community

connections Walkability – Complete streets Safety improvements Aesthetics

Social

Pedestrian refuge islands

Page 14: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

14

Build upon Phase I process Continued coordination & communication Design refinements & details

– Fully develop aesthetics – Erosion control and storm water design – Cost estimate refinements

Sustainability - Phase II Context

Page 15: OAK PARK STUDY SESSION #8 · 5/9/2016  · CTA Evaluation – Maintenance clearance – Platform capacity – Station safety . Corridor Right of Way Evaluation . Existing platforms

15

– Reduce, re-use, recycle – Local coordination & communication – Construction specifications Equipment idling, dust control Materials sourcing Noise & vibration – monitor & minimize

– Construction jobs – Construction quality control – Reduce/minimize maintenance disruptions

Sustainability - Phase III Context