Commissioner Marie Therese DominguezRegional Director Joseph T. Brown, PE
October 17, 2019
Thank you for coming to the New York State Department of Transportation Public Meeting for the Operational Improvements: LIE (I-495) at Crooked Hill Road (CR13).
NYSDOT representatives are here to help – please ask!Representantes del NYSDOT están aquí ayudar – ¡por favor pregunte!
Please sign in and take a brochure
October 17, 2019
Project Location & Limits
Project Location
Suffolk County
Nassau County
01 5 10 20mi
Legend
Secondary Study Area
Primary StudyArea
Proposed Construction Limits
2
October 17, 2019
Project Goals and Objectives• Provide direct access to Crooked Hill Road from the LIE.
• Provide access from Crooked Hill Road to the LIE.
• Create better traffic flow between Crooked Hill Road and the LIE Service Roads.
• Enhance overall traffic operations usingtransportation improvements to reduce congestion and delay.
Project Needs• Increased vehicular movements in the vicinity of Crooked Hill Road (CR 13) and a lack of routing options to access businesses and services from the Long Island Expressway(LIE/I-495).
• Lack of direct access from the LIE to Crooked Hill Road has resulted in congestion at the LIE Service Roads and Commack Road, Crooked Hill Road, and Wicks Road intersections.
3
October 17, 2019 4
Existing Aerial View
Legend
“ ” Ramp Name
October 17, 2019
Existing Conditions / No-Build AlternativeHighlights • Lack of direct access from eastbound and westbound
Long Island Expressway (I-495) to Crooked Hill Road (CR 13). Lack of direct access from Crooked Hill Road to eastbound Long Island Expressway.
• Limited routing options to access area shopping, local businesses, and the Suffolk County Community College Brentwood Campus.
• Congestion at the LIE South Service Road with Commack, Wicks, and Crooked Hill Roads intersections.
• Short acceleration lane, south of the Crooked Hill Road Bridge.
2
2
33 3
1
4
5
2
2
3
4
Ramp ‘Q’ Merge with SB Sagtikos State Parkway (Looking South)
Legend
“ ” Ramp NameExpress Drive South intersection with
Crooked Hill Road (Looking West)
1
5A
5B
2
3
4
October 17, 2019
1
3
2
4
4
5
7
Proposed Alternative
8
6
• Provides new eastbound off-ramp ‘BC’ from LIE Ramp ‘B’ to Crooked Hill Road.
• Provides new westbound off-ramp ‘QC’ from LIE Ramp ‘Q’ to Crooked Hill Road.
• Provides new on-ramp ‘CEB’ from Crooked Hill Road to eastbound LIE using underpasses at Ramp ‘Q’ and Ramp ‘B’.
• Reconfigures two loop ramps, Ramp ‘C’ and Ramp ‘D’.
• Improves the Ramp ‘Q’ merge length onto the southbound Sagtikos State Parkway.
• Reconfigures the SB Sagtikos State Parkway ramps.
• Reconfigures Crooked Hill Road and Ramp ‘QC’ intersection.
• Adds new signals on Crooked Hill Road at new exit ramps.
Highlights
6
1
2
4
5
7
8
LegendProposed Build
New Traffic Signal
“ ” Ramp Name
1
2
3
4
5
6
7
8
October 17, 2019 7
Aerial Visualization – Existing Conditions
Legend
“ ” Ramp Name
October 17, 2019
Aerial Visualization – Proposed Changes8
Legend
Proposed On-ramps Movement
Proposed Off-ramps Movement
“ ” Ramp Name
October 17, 2019
Aerial Visualization – Proposed Changes9
Legend
“ ” Ramp Name
October 17, 2019
Visualization 1 – LIE South Service Road to SB Sagtikos State Parkway & Crooked Hill Road
Existing
10
X
Existing and Proposed Conditions
(Location 1 – LIE South Service Road to Ramp 'B')Existing
Proposed
Proposed
1
A second exit lane would be added for direct access to Crooked Hill Road.
Legend
X Photo LocationX
October 17, 2019
Ramp from EB LIE South Service Road to SB Sagtikos State Parkway / Crooked Hill Road - Section A-A at Ramp 'B'
Proposed
A
A
To SB Sagtikos State Parkway To Crooked Hill Road
11
To SB Sagtikos State Parkway
Existing Ramp ‘B’
Proposed Ramp ‘B’
A second exit lane would be added for direct access to Crooked Hill Road.
Existing
October 17, 2019
Visualization 2 – LIE Ramps to SB Sagtikos State Parkway
Proposed
Proposed
N N
N
12
Existing
Existing Proposed Existing and Proposed Conditions
(Location 2 – Ramp 'B' and 'Q' Merge)
Proposed
Two New Bridges
2 22
Two new bridges would be built to accommodate a new ramp from Crooked Hill Road.
Legend
X Photo LocationX
October 17, 2019
LIE Ramps to SB Sagtikos State Parkway / Crooked Hill Road -Section B-B at Ramp 'C' and Ramp 'Q'
Existing
Proposed
B
B
SB Sagtikos to EB LIE
SB Sagtikos to EB LIE
To SB Sagtikos and Crooked Hill Road
To SB Sagtikos and Crooked Hill Road
13
Existing Ramp ‘C’
Proposed Ramp ‘C’
Proposed Ramp ‘Q’
Existing Ramp ‘Q’
ProposedTwo new bridges would be built to accommodate a new ramp from Crooked Hill Road.
October 17, 2019
Visualization 3 – Proposed Ramp from Crooked Hill Road to EB LIE South Service Road
14
Existing and Proposed Conditions
(Location 3 – Proposed Ramp CEB)
Existing Proposed
Proposed
3
A new ramp would give access from Crooked Hill Road to eastbound LIE via the South Service Road.
Legend
X Photo LocationX
October 17, 2019
Visualization 4 – Crooked Hill Road
ProposedNN
N N
15
Existing and Proposed Conditions
(Location 4 – At New Crooked Hill Road Intersection)
Proposed
Proposed Existing
Existing
444
A traffic signal would be installed at the new entrance/exit point for eastbound LIE.
Legend
X Photo LocationX
October 17, 2019
Visualization 5 – LIE Ramps to SB Sagtikos State Parkway and Crooked Hill Road
N
N N
16
Existing
Existing
Proposed
Proposed Existing and Proposed Conditions
(Location 5 – Sagtikos State Parkway at Ramp 'Q' Merge)
N
5 5
Ramps from eastbound and westbound LIE to southbound Sagtikos State Parkway and to Crooked Hill Road.
Legend
X Photo LocationX
October 17, 2019
LIE Ramps to SB Sagtikos State Parkway and Crooked Hill Road - Section C-C at Ramp 'Q'
ExistingC
C
To SB Sagtikos State Parkway To Crooked Hill Road
17
To SB Sagtikos State Parkway
Proposed
Existing Ramp ‘Q’
Proposed Ramp ‘Q’
Ramps from eastbound and westbound LIE to southbound Sagtikos State Parkway and to Crooked Hill Road.
October 17, 2019
Visualization 6 – Sagtikos State Parkway Southbound at Exit S2
Legend
X Photo LocationX
18
Existing
Existing
Proposed
Proposed
Existing and Proposed Conditions
(Location 6 - SB Sagtikos State Parkway ramps at Exit S2)
Ramps from eastbound and westbound LIE to southbound Sagtikos State Parkway and to Crooked Hill Road.
October 17, 2019
Sagtikos State Parkway Southbound at Exit S2 -Section D-D at SB Sagtikos State Parkway
D
D
19
Existing Sagtikos State Parkway
Proposed Sagtikos State Parkway
Existing
ProposedEastbound and westbound LIE to southbound Sagtikos State Parkway merge lanes and Exit S2.
Merge Lanes ToSB Sagtikos / Exit S2
Exit OnlyTo Exit S2
SB SagtikosState Parkway
SB SagtikosState Parkway
October 17, 2019
Existing Vehicle Routes from WB LIE to Crooked Hill Road 20
October 17, 2019
Proposed Vehicle Routes from WB LIE to Crooked Hill Road 21
October 17, 2019
Vehicle Diversions for WB LIE to Crooked Hill Road 22
Proposed Diversion Routes
1. Vehicles Diverted from Commack Road and LIE NSR Intersection
2. Vehicles Diverted from Commack Road and LIE SSR Intersection
3. Vehicles Diverted from Wicks Road and Vanderbilt Parkway Intersection
4. Vehicles Diverted from Wicks Road and LIE SSR Intersection
Vehicles will be given direct access to Crooked Hill Road, diverting them from local roads.
42
13
October 17, 2019
Existing Vehicle Routes from EB LIE to Crooked Hill Road 23
Vehicles currently must exit at Commack Road (Exit 52) for access to Crooked Hill Road.
52
October 17, 2019
Proposed Vehicle Routes from EB LIE to Crooked Hill Road 24
This project would build direct exit points for Crooked Hill Road from eastbound LIE to Exit 53.
53
October 17, 2019
Vehicle Diversions for EB LIE to Crooked Hill Road 25
Proposed Diversion Route
Vehicles Diverted from Commack Road and LIE SSR Intersection
Comparison of the current route and proposed route shows easier access.
October 17, 2019 26
Existing Vehicle Routes from Crooked Hill Road to EB LIE
There is currently no direct route onto eastbound LIE from Crooked Hill Road.
October 17, 2019
Proposed Vehicle Routes from Crooked Hill Road to EB LIE27
This project would build a new, easier and shorter route onto eastbound LIE.
October 17, 2019
Vehicle Diversions for Crooked Hill Road to EB LIE
4
28
2
1
Proposed Diversion Routes
1. Vehicles Diverted from Commack Road and LIE NSR Intersection
2. Vehicles Diverted from Commack Road and LIE SSR Intersection
3. No Change at Wicks Road and Vanderbilt Parkway Intersection
4. Vehicles Diverted from Wicks Road and LIE SSR Intersection
3
Comparison of the current route and proposed route shows easier access.
October 17, 2019
Project Benefits
• Improves mobility and access to and from the Crooked Hill Road corridor by providing:
o Direct access from the eastbound LIE to Crooked Hill Road.
o Direct access from the westbound LIE to Crooked Hill Road.
o Direct access from Crooked Hill Road to eastbound LIE.
• Improves traffic operations at the LIE Service Road intersections with Commack Road, Wicks Road, and Crooked Hill Road.
• Reduces the volume of trucks at the LIE South Service Road intersections with Commack Road, Wicks Road, and Crooked Hill Road.
• Improves drainage and lighting systems on the Sagtikos State Parkway within the project limits.
• Maintains historical landscape character of parkway.
• Upgrades curvature, superelevation, and merge length of proposed and reconstructed ramps.
October 17, 2019
“Drivers First” Initiatives During Construction
• Employ night work, when feasible.
• Institute Seasonal / Holiday limitations.
• Utilize lane width reductions and traffic shifts to keep travel lanes open.
• Minimize impacts by performing construction in stages.
• Limit lengths of work zones to minimize disruptions to motorists and the community.
• Maintain driveway access at all times.
• Utilize temporary work zone measures designed according to the "Manual on Uniform Traffic Control Devices” (MUTCD) and NYSDOT standards to maintain motorists’ safety.
October 17, 2019
1
2 3
5
6
4
• Provides new eastbound off-ramp ‘BC’ from LIE Ramp ‘B’ to Crooked Hill Road.
• Provides new westbound off-ramp ‘QC’ from LIE Ramp ‘Q’ to Crooked Hill Road.
• Improves the Ramp ‘Q’ merge length onto the southbound Sagtikos State Parkway.
• Reconfigures the SB Sagtikos State Parkway ramps.
• Reconfigures Crooked Hill Road and Ramp ‘QC’ intersection.
• Adds new signals on Crooked Hill Road at new exit ramps.
Highlights 1
2
4
5
7
4
8
6
Option WITHOUT Proposed Eastbound Connection to LIE
Under preliminary consideration pending Federal Highway Administration’s review.
LegendProposed Build
New Traffic Signal
“ ” Ramp Name
1
2
3
45
6
October 17, 2019
Tentative Schedule
Activity Date
Public Information Meeting October 17, 2019
Design Approval Early 2020
Construction Start Summer 2020
Construction Complete 2022
October 17, 2019
Your input is valuable to us!NYSDOT representatives are here to help – please ask!
Representantes del NYSDOT están aquí ayudar – ¡por favor pregunte!
Please complete a comment sheet provided to give us your input regarding NYSDOT’s Operational Improvements: LIE (I-495) Project at Crooked Hill Road.
October 17, 2019
Thank you for coming!For more information or comments contact:
Para mas información o comentarios contacte:NYSDOT Region 10
Crooked Hill Road Design Project Team250 Veterans Memorial Highway
Room 5A-15Hauppauge, New York 11788
(631) 952-6929
www.dot.ny.gov/CrookedHillRoad