7
US Army Corps of Engineers BUILDING STRONG ® NWW 2015 Lock Maintenance Update Rick Werner, P.E. Chief, Operations Division Walla Walla District May 27, 2015 Columbia-Snake River Navigation System Spring Stakeholder Meeting

NWW 2015 Lock Maintenance Update - Northwestern … 2015 Lock Maintenance Update . Rick Werner, P.E. Chief, ... Adjustment of tainter gate cable tension, skew, and timing Inspected

  • Upload
    trinhtu

  • View
    222

  • Download
    5

Embed Size (px)

Citation preview

Page 1: NWW 2015 Lock Maintenance Update - Northwestern … 2015 Lock Maintenance Update . Rick Werner, P.E. Chief, ... Adjustment of tainter gate cable tension, skew, and timing Inspected

US Army Corps of Engineers BUILDING STRONG®

US Army Corps of Engineers BUILDING STRONG®

NWW 2015 Lock Maintenance Update

Rick Werner, P.E. Chief, Operations Division Walla Walla District

May 27, 2015 Columbia-Snake River Navigation System Spring Stakeholder Meeting

Page 2: NWW 2015 Lock Maintenance Update - Northwestern … 2015 Lock Maintenance Update . Rick Werner, P.E. Chief, ... Adjustment of tainter gate cable tension, skew, and timing Inspected

BUILDING STRONG®

Lower Granite Downstream gate sill repairs Replaced farval auto grease

line Inspected and repaired US

tainter gate trunnion bearing pin keeper

Adjustment of tainter gate cable tension, skew, and timing

Inspected and repaired miter gate anode

US tainter gate gearboxes Minor crack repair on both fill

valves.

Page 3: NWW 2015 Lock Maintenance Update - Northwestern … 2015 Lock Maintenance Update . Rick Werner, P.E. Chief, ... Adjustment of tainter gate cable tension, skew, and timing Inspected

BUILDING STRONG®

Little Goose Replaced upstream gate cables Replaced downstream miter

gate hydraulic power units (HPUs)

Page 4: NWW 2015 Lock Maintenance Update - Northwestern … 2015 Lock Maintenance Update . Rick Werner, P.E. Chief, ... Adjustment of tainter gate cable tension, skew, and timing Inspected

BUILDING STRONG®

Lower Monumental Tainter Valve 4 repairs

ongoing LSP2 Transformer:

► Failed Test ► Contract is out for bid, NLT

20JUN ► Redesign of switchgear is

underway ► Currently using rental transformer

Completed wire rope inspection and lubrication

Cleaned and spot painted corrosion areas of concern

Page 5: NWW 2015 Lock Maintenance Update - Northwestern … 2015 Lock Maintenance Update . Rick Werner, P.E. Chief, ... Adjustment of tainter gate cable tension, skew, and timing Inspected

BUILDING STRONG®

Ice Harbor Replaced upstream gate

open gear sets and cables Replaced upstream gate

side seals Downstream gate climbing

inspection Replaced LSP switchgear

motor starters with new models.

Page 6: NWW 2015 Lock Maintenance Update - Northwestern … 2015 Lock Maintenance Update . Rick Werner, P.E. Chief, ... Adjustment of tainter gate cable tension, skew, and timing Inspected

BUILDING STRONG®

McNary

Drain valve repairs Dam Safety Periodic

Inspection Downstream miter gate

crack repair