8
1 HL DESIGN GROUP - PROJECT LEADER / DESIGNER DASH LINE INDICATES BEAM LINE ABOVE 30th FLOOR PLAN sc 1:75 The project involves renovation work at new office (31st floor) & addition of a spiral staircase to connect new office to existing one at 30th floor. The location of the new staircase is studied carefully to create comfortable circulation space around it without sacrificing the existing workstations. The biggest challenge is to minimize the impact of the new staircase to existing building structures, A.C. ducts & sprinkler pipes. BLUE DASH LINE INDICATES EXISTING FURNITURE TO BE DEMOLISED RED DASH LINE INDICATES NEW FURNITURE NEW HOTDESK NEW SPIRAL STEEL STAIRCASE TO ENGR’S DETAIL R=167mm (24r) EXISTING BUILT-IN WORKSTATION HL DESIGN GROUP OFFICE EXTENSION RECTIFICATION OF A.C. DUCTS & SPRNKLER PIPE TO MAKE WAY FOR NEW STAIRACE NEW SPIRAL STAIRCASE IN PLACE CONSTRUCTION CONNECTING PEOPLE

NUS portfolio work (part 1)

Embed Size (px)

Citation preview

1HL DESIGN GROUP - PROJECT LEADER / DESIGNER

DASH LINE INDICATES BEAM LINE ABOVE

30th FLOOR PLANsc 1:75

The project involves renovation work at new office (31st floor) & addition of a spiral staircase to connect new office to existing one at 30th floor. The location of the new staircase is studied carefully to create comfortable circulation space around it without sacrificing the existing workstations. The biggest challenge is to minimize the impact of the new staircase to existing building structures, A.C. ducts & sprinkler pipes.

BLUE DASH LINE INDICATES EXISTING

FURNITURE TO BE DEMOLISED

RED DASH LINE INDICATES NEW

FURNITURE

NEW HOTDESKNEW SPIRAL STEEL STAIRCASE TO

ENGR’S DETAILR=167mm (24r)

EXISTING BUILT-INWORKSTATION

HL DESIGN GROUP OFFICE EXTENSION

RECTIFICATION OF A.C. DUCTS & SPRNKLER PIPE TO MAKE WAY FOR NEW STAIRACE

NEW SPIRAL STAIRCASE IN PLACE

CONSTRUCTION

CONNECTING PEOPLE

2HL DESIGN GROUP - PROJECT LEADER / DESIGNER HL DESIGN GROUP OFFICE EXTENSION

The renovation work at 31st floor office requires coordination with the contractors, office administra-tor & office tower management as renovation works can only be done after working hours. Besides that, a Bill of Quantity (BQ) is drafted to ensure new office design fits the given budget.

31st FLOOR FURNITURE PLANsc 1:100

RECTIFICATION OF A.C. DUCTS & PAINTING WORK INSTALLING PLASTER CEILING PLASTER CEILING TOUCH-UP INSTALLING LINEAR LIGHTS

NEW SPIRAL STEEL STAIRCASE TO

ENGR’S DETAILR=167mm (24r)

RED DASH LINE INDICATES NEW FURNITURE TO BE

ADDED IN FUTURE

CUTTINGTABLE

PRINTER

DISCUSSIONTABLE

RETRACTA

BLESLID

E

2600mm HIGHCURTAIN

AHU ROOM

ENTERTAINMENTAREA

PANTRY

MATERIAL LIBRARY

3HL DESIGN GROUP OFFICE EXTENSIONHL DESIGN GROUP - PROJECT LEADER / DESIGNER

50 x 8mm THK MS PLATE RAILING

50 x 8mm THK MS PLATE BANISTER

EXISTING RC COLUMN

EXISTING RC SLAB TO BE FINISHED WITH 4mm THK

VINYL FLOORING

100 x 75mm RHS CONNECTING TO CHS

TO EXISTING RC BEAM TO ENGR’S DETAIL

9.5mm THK PLASTER CEILING

TO ARCH’S DETAIL

31st FLOOR LEVEL

30th FLOOR LEVEL

200mm Ø CHS FIXED TO EXISTING

30TH FLOOR RC SLAB TO ENGR’S

DETAIL

50 x 8mm THK MS PLATE RAILING

50 x 8mm THK MS PLATE BANISTER

MS TREAD WITH CARPET INSET TO

ARCH’S DETAIL

SPIRAL STAIRCASE ELEVATION

4HL DESIGN GROUP OFFICE EXTENSIONHL DESIGN GROUP - PROJECT LEADER / DESIGNER

50 x 8mm THK MS PLATE BANISTER

TO BE FULLY WELDED ON MS TREAD

MS TREAD WITH CARPET INSET TO

ARCH’S DETAIL

SPIRAL STAIRCASE PLAN ON 31ST FLOOR

SC 1:25 TREAD DETAIL

SC 1:5

DASH LINE INDICATES50 x 8mm THK

MS PLATE RAILING

DASH LINE INDICATES OVER-LAPPING

MS TREAD BELOW

200mm Ø CHS FIXED TO EXISTING

30TH FLOOR RC SLAB TO ENGR’S

DETAIL

200mm Ø CHS FIXED TO EXISTING

30TH FLOOR RC SLAB TO ENGR’S

DETAIL

8mm THK CARPET INSET TO ARCH’S

SELECTION

6mm THK FOLDED MS PLATE

TO BE FULLY WELDED TO CHS

TREAD ABOVE

6mm THK MS PLATETO BE FULLY WELDED TO FOLDED MS PLATE & CHS

CARPET INSET READY TO BE INSTALLED ON STEEL TREAD

5HL DESIGN GROUP - PROJECT LEADER / DESIGNER MENARA HAW PAR REFURBISHMENT & LANDSCAPE DESIGN

The site is located at Menara Haw Par, Jalan Sultan Ismail, Kuala Lumpur, with numerous office workers and tourists coming from nearby monorail station. The site is developed into landscaped area to create transitional space before entering the main office building (Menara Haw Par) and act as noise buffer from the road. The shaded open area would become the interaction or event space for the office workers. Cratoxylum Cochinchinense trees are planted along the existing walkway to reinforce the ‘path’, while reflecting pool is placed in front of the main office building to become the focal point upon arrival. In addition, plants with thin-long leaves are selected to further enhance the ‘linearlity’ of the overall landscape design.

ZOYSIA GRASSPANDANUS PYGMAEUSCAESALPINIA FERREA ACALYPHA SIAMENSIS ACALYPHA WILKESIANACRATOXYLUM COCHINCHINENSE

N

TO M

ENA

RA H

AW

PA

R LO

BBY

EN

TRA

NCE

TO SHANGRI-LA HOTEL

FROM BKT. NANAS MONORAIL STATION

REFLECTING POOL

EVENTSPACE

PUBLIC PLAZA TERRACEDSLOPE

EVENTSPACE

CONNECTING LINES

CONTRACT DOCUMENTATION

PRESERVED EXISTINGMATURE TREE

FRO

M A

CRO

SS T

HE

ROA

DS

6HL DESIGN GROUP - PROJECT LEADER / DESIGNER MENARA HAW PAR REFURBISHMENT & LANDSCAPE DESIGNCONTRACT DOCUMENTATION

The sculptural walls define circulation within the landscaped area. The gradual increase in height of the sculptural wals adds rhythmic and dramatic effect to the space. The height of the walls is kept below 1.2m to improve safety by allowing optimum eye-sight throughout the space.

600 x 300 x 15mm THKCOMPRESSED

SANDSTONE WITH MULTIPLE GROOVE

FINISH

VOID

SCULPTURAL WALL ELEVATIONsc 1:75

SCULPTURAL WALL DETAILsc 1:25

120mm THK RC WALL TO ENGR’S DETAIL

6mm THK WELDED MS PLATE FRAME WITH POWDER COAT FINISH

20 x 30mm THK STAINLESS STEEL ANGLE WITH

RECESSED LED STRIP

PANDANUS PYGMAEUSSHRUB

20 x 30mm THK STAINLESS STEEL ANGLE WITH RECESSED LED STRIP

150mm THK RC FOOTING TO ENGR’S DETAIL

CAESALPINIA FERREA

VIEW OF LANDSCAPE FROM JALAN SULTAIN ISMAIL (RENDERING BY REDZUAN)

+34.45

+34.00

+34.00

EXISTING SITE CONDITION

SCULPTURAL WALL

7HL DESIGN GROUP - PROJECT LEADER / DESIGNER MENARA HAW PAR REFURBISHMENT & LANDSCAPE DESIGN

LOBBY FLOOR PLANsc 1:150

BLUE DAHS LINE INDICATES EXISTING

BRICK WALL TO BE DEMOLISHED

FIRELIFT

LIFT

LIFT

LIFT

LIFT

LIFT

LIFT

EXISTINGFIRE

STAIRCASE

EXISTINGFIRE

CONTROL-ROOM

LOBBY

EXISTING RESTAURANT

NEW CAFE

T=300mm, R=150mm (3r)NEW RC STEPS TO

ENGR’S DETAIL

EXISTING DRIVEWAY TO BE DEMOLISHED

AND LEVELED TO FFL+34.00

RED LINE INDICATES NEW 100mm THK BRICK WALL

WITH SELECTED FINISH ON BOTH SIDES TO ARCH’S SELECTION

CONCIERGE COUNTER TO

ARCH’S DETAIL

EXISTING STEPS TO BE DEMOLISHED AND

LEVELED TO FFL +34.00 TO ENGR’S DETAIL

EXISTING TC COLUMN

EXISTINGRAMP

LIFTLOBBY

VIEW OF NEW CAFE FROM LANDSCAPE (RENDERING BY AZWAN)

EXISTING VIEW OF MAIN APPROACH

NEW CAFE (RENDERING BY AZWAN)

N

The lobby refurbishment work includes the relocation of entry point, addition of new cafe and replacement of interior materials. The lobby interior is remeas-ured to draw as-built drawing as the original blueprint of the building is lost.

A

B

8HL DESIGN GROUP - PROJECT LEADER / DESIGNER MENARA HAW PAR REFURBISHMENT & LANDSCAPE DESIGN

NEW LOBBY ENTRANCE (RENDERING BY AZWAN) EXISTING LIFT LOBBYNEW LIFT LOBBY (RENDERING BY AZWAN)

SECTION A-Asc 1:150

SECTION B-Bsc 1:150

NEW SUSPENDED GLASS CANOPY WITH STEEL STRUCTURE

TO ENGR’S DETAIL

1200 x 600 x 20mm THKCOMPRESSED SANDSTONE WITH

HONED FINISH & MULTIPLE GROOVE PROFILE (COLOR SF108)

+34.00

+36.60

+36.80

COLOR COATED GLASS(RAL 8007)

1200 x 600 x 20mm THKCOMPRESSED SANDSTONE

WITH HONED FINISH (COLOR SF108)

2400mm LONG PENDANT LINEAR

WITH ACRYLIC HOUSING

950 x 2800 x 12mm THK TEMPERED GLASS PANEL

TO MANUF’S DETAIL

+36.60

+36.80

EXISTING CABINET DOORS TO BE CLADDED

WITH COLOR COATED GLASS

(WHITE)

9.5mm THK ‘BORAL UNISPAN’ PLASTER CEILING BOARD TO BE FIXED ON 610mm SPAN CEILING

MEMBERS

2400mm LONG PENDANT LINEAR

WITH ACRYLIC HOUSING

95 x 45mm THK RECLAIMED TIMBER BATTEN TO BE BOLTED

TO 80 x 60 x 5mm THK MS C-CHANNEL AND SUSPENDED

FROM EXISTING RC SLAB

LED STRIP

CEILING DETAILsc 1:40