30
Nuclear Economics 2 nd Part Dr. E. E. Pilat MIT NSED CANES Center for Advanced Nuclear Energy Systems 22.251

Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

  • Upload
    phamdan

  • View
    213

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

NuclearEconomics2ndPart

Dr.E.E.Pilat

MITNSED

CANESCenterforAdvancedNuclearEnergySystems

22.251

Page 2: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

FuelCostRatevsBurnup

• Followingslidesshowfuelcostmillrateanditscomponentsvsburnup

• Unitcostsarelowbytoday’svalues

22.251

Page 3: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

22.251

1.5 year3.0 region

10 20 30 40 50 60 700

1

2

3

4

5

6

Discharge burnup GWD/MTU

Fuel

cos

t mill

s/K

WH

Base CaseTails: 0.30, U: $15, SWU: $75, FAB: $200/kg, Carry 0.10, DOE: 1.0 mills

Image by MIT OpenCourseWare.

Page 4: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

22.251

1.5 year3.0 region

10 20 30 40 50 60 700

1

2

3

4

5

6

Discharge burnup GWD/MTU

Fuel

cos

t mill

s/K

WH

Direct Only - No CarryingTails: 0.30, U: $15, SWU: $75, FAB: $200/kg, Carry 0.00, DOE: 1.0 mills

Image by MIT OpenCourseWare.

Page 5: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

22.251

1.5 year3.0 region

10 20 30 40 50 60 700

1

2

3

4

5

6

Discharge burnup GWD/MTU

Fuel

cos

t mill

s/K

WH

Direct U308 OnlyTails: 0.30, U: $15, SWU: $0, FAB: $0/kg, Carry 0.00, DOE: 0.0 mills

Image by MIT OpenCourseWare.

Page 6: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

22.251

1.5 year3.0 region

10 20 30 40 50 60 700

1

2

3

4

5

6

Discharge burnup GWD/MTU

Fuel

cos

t mill

s/K

WH

Total Depletion (U308+Conv+SWU+INT)Tails: 0.30, U: $15, SWU: $75, FAB: $0/kg, Carry 0.10, DOE: 0.0 mills

Image by MIT OpenCourseWare.

Page 7: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

22.251

3.0 region

10 20 30 40 50 60 700

1

2

3

4

5

6

Discharge burnup GWD/MTU

Fuel

cos

t mill

s/K

WH

Direct FABTails: 0.30, U: $0, SWU: $0, FAB: $200/kg, Carry 0.00, DOE: 0.0 mills

Image by MIT OpenCourseWare.

Page 8: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

22.251

1.5 year2.0 year

10 20 30 40 50 60 700

1

2

3

4

5

6

Discharge burnup GWD/MTU

Fuel

cos

t mill

s/K

WH

Tails: 0.30, U: $15, SWU: $75, FAB: $200/kg, Carry 0.10, DOE: 1.0 mills1.5 Year and 2.0 Year

Image by MIT OpenCourseWare.

Page 9: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

22.251

10 20 30 40 50 60 701

2

3

5

4

7

6

8

10

9

12

11

Discharge burnup GWD/MTU

Fuel

cos

t mill

s/K

WH

Tails: 0.30, U: $25, SWU: $100, FAB: $900/kg, Carry 0.10, DOE: 0.0 millsDisposal at $700/KGU (EUROPE)

1.5 year3.0 region

Image by MIT OpenCourseWare.

Page 10: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

2006FuelCostsbyPlant

22.251

Page 11: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

FuelContractsInclude

• Productpurchase

• Termsandconditions

• Options

22.251

Page 12: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

Terms&Conditions

• Durationofcontract– Calendartimeorreactorcycles

• Amountstobepurchased– Absoluteor%ofrequirements

• Notificationterms

• Deliveryterms– What,where,when,whatconditionit’sin

• Warranty

22.251

Page 13: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

Terms&Conditions2

• Paymentterms– Baseprice

– Escalationterms

– Paymentdates• Calendarorrelative

• Whohastitle,insurance

• Possibilityofsuspensionofwork

• Possibilityofcancellation

22.251

Page 14: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

Options

• Changeamount,deliverydate,enrichmentwithsomeleadtime

• Changefuelmechanicaldesign

• Changeburnablepoison

• Havefabvendorperformcoredesignwork

• Failedfueltesting

22.251

Page 15: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

TwoTypesofPricing

• Basepriceescalated– Escalationindexcanbeanything(gnpdeflator,SICindex,privatelypublishedindicesforanything)

• Marketbased– Somepercentagemoreorlessthanpublishedmarketpriceofthisproduct

• Bothkindscanincludefloorsandceilings

22.251

Page 16: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

PaymentstoUSHLWFundAverage~$280/kgU

22.251Source:NUREG1350Vol22

Page 17: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

HLWPaymentcont’d

22.251

Page 18: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

ThereisNoSingle“Price”forU

22.251

$70.00

$60.00

$50.00

$40.00

$30.00

$20.00

$10.00

$0.002007 2008

Average price for uranium purchased by owners and operators of U.S. civilian nuclear power reactors by pricing mechanisms and delivery year, 2007-2008

Dol

lars

per

pou

nd U

2O2

equi

vale

nt

Contract-specified (Fixed and base-escalated) pricing Spot-market pricing Other pricing

Image by MIT OpenCourseWare.

Page 19: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

UtilityBalanceSheet(NetNuclearFuel~$85million/plant)

22.251Source:EEI2008Financial

Consolidated Balance SheetU.S. Shareholder-Owned Electric Utilities

($ Millions) 12/31/2008 12/31/2007

PP&E in service, grossAccumulated depreciation

Net property in serviceConstruction work in progressNet nuclear fuelOther property

Net property & equipment

Cash & cash equivalentsAccounts receivable

Other current assetsTotal current assets

Total investmentsOther assets

Inventories

927,412320,294

868,929304,696

607,118 564,23358,9468,8021,085

675,951

19,39844,23226,86559,500

149,995

62,671216,558

47,4677,3362,465

621,502

14,15144,09123,49756,281

138,020

69,057200,180

1,028,7581,105,175Total Assets

Image by MIT OpenCourseWare.

Page 20: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

CapitalCost

UCC= Asbuiltunitcapitalcost($perKWe)

FCR= Fixedchargerate

L= Lifetimecapacityfactor

22.251

!

CC "100 FCR( ) UCC( )

8766L

Page 21: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

CapitalCost2

• Startwithan“overnight”costatprojectstart

• Asbuiltcostincludesescalationfromprojectstarttotimeofpaymentforcomponent

• Asbuiltcostincludesinterestduringconstruction(AFUDC)fromtimeofpaymenttostartofoperation

22.251

Page 22: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

CapitalCost3

• FCR~x/[1–(1+x)‐n]

• x~(1–t)brb+(1‐b)rs=costofmoney

• t=incometaxrate

• b=bondfraction

• rb=returnonbonds

• rs=returnonstock

• n=booklifeofplant

22.251

Page 23: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

CapitalCost4

• Easiertousespreadsheet

• Todayrs~10.5%

• Todayrbvariesfrom5to15%

22.251

Page 24: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

HowIsNukeIntegratedIntoGrid?

• Powercost=capital+production

• Production=O&M+Fuel

• Systemoperatorsdispatchplantsaccordingtocost

• Nukeshavehighcapitalcostssoliketorunathighcapacityfactor

22.251

Page 25: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

ProductionCostsFuelissmallfractionofnuclear

22.251Source:EEI2008FinancialReview

0

20

40

60

80

100

120

140

160

180

200

Cost of fuelNon-fuel O&M

Coa

lN

atur

al G

asN

ucle

ar Oil

Hyd

ro

Coa

lN

atur

al G

asN

ucle

ar Oil

Hyd

ro

Coa

lN

atur

al G

asN

ucle

ar Oil

Hyd

ro

Coa

lN

atur

al G

asN

ucle

ar Oil

Hyd

ro

Coa

lN

atur

al G

asN

ucle

ar Oil

Hyd

ro

Coa

lN

atur

al G

asN

ucle

ar Oil

Hyd

ro

2003 2004 2005 2006 2007 2008

Average Cost to Produce Electricity 2003-2008U.S. Electric Utility and Non-Utility

$/MWh

Image by MIT OpenCourseWare.

Page 26: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

“Load‐Duration”CurvesforNewEng.(50%oftime,load>16,000MW)

22.251Source:ISO‐NE2009Q1MarketRpt

24,000

22,000

20,000

18,000

16,000

14,000

12,000

10,000

8,0000% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Percent of Hours

Syst

em lo

ad (M

W)

New England Hourly Load Curves 2006-2009 Q1

2007

2008

2009

Image by MIT OpenCourseWare.

Page 27: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

“Price‐Duration”CurvesforNewEng.50%oftime,price>$40/MWhin2009

22.251

$275

$250

$225

$200

$175

$150

$125

$100

$75

$50

$25

$00% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Percent of Hours

$/M

WNew England Hourly RT System Price Duration Curves

2005-2009, Q1 Prices < $275

20072008

2009

Image by MIT OpenCourseWare.

Source: ISO-NE 2009Q1 Market Rpt

Page 28: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

LocalMarginalPricesinNewEng.

22.251

HQ HG

Date

Real-Time LMPs for Hub and External NodesSeptember 21-27, 2009

HQ VII

NB

NY - 1385

Hub

NY N-AC

NY-CSC

21 Se

p 09

22 Se

p 09

23 Se

p 09

24 Se

p 09

25 Se

p 09

26 Se

p 09

27 Se

p 09

$/M

Wh

$150

$100

$50

$0

Image by MIT OpenCourseWare.

Page 29: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

NewEnglandGridInfo

• NewEnglandloadflowsandmarginalcosts

DailyNewEnglandloads:http://www.cvx.com/java/NELoadGraph.htm

22.251

Page 30: Nuclear Economics 2nd Part - MIT OpenCourseWare ·  · 2017-12-29Cost UCC = As built unit capital cost ($per KWe) FCR ... 2003 2004 2005 2006 2007 2008 Average Cost to Produce Electricity

MIT OpenCourseWarehttp://ocw.mit.edu

22.251 Systems Analysis of the Nuclear Fuel CycleFall 2009

For information about citing these materials or our Terms of Use, visit: http://ocw.mit.edu/terms.