U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation
NRR OFFICE INSTRUCTION
Change Notice
Office Instruction No.: ADM-507
Office Instruction Title: “Grow Your Own” PRA Analyst Training Qualification
Program
Effective Date: November 5, 2012
Approved By: Christopher M. Regan
Date Approved: November 1, 2012
Primary Contact: Jeff A. Circle 301-415-1152 [email protected]
Responsible Organization: NRR/DRA
Summary of Changes: This is the initial issuance of ADM-507. The purpose of this OI is to prepare a comprehensive hands-on training qualification program for newly selected personnel to the “Grow Your Own” (GYO) Probabilistic Risk Assessment (PRA) analyst training qualification program. Training: None
ADAMS Accession No.:
ML12229A266
U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation
NRR OFFICE INSTRUCTION
Change Notice
Office Instruction No.: ADM-507
Office Instruction Title: “Grow Your Own” PRA Analyst Training Qualification
Program
Effective Date: November 5, 2012
Approved By: Christopher M. Regan
Date Approved: November 1, 2012
Primary Contact: Jeff A. Circle 301-415-1152 [email protected]
Responsible Organization: NRR/DRA
Summary of Changes: This is the initial issuance of ADM-507. The purpose of this OI is to prepare a comprehensive hands-on training qualification program for newly selected personnel to the “Grow Your Own” (GYO) Probabilistic Risk Assessment (PRA) analyst training qualification program. Training: None
ADAMS Accession No.:
ML12229A266
Obtain concurrences as necessary. To receive a copy of this document, indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
OFFICE BC:DRA/APOB D/DD:DRA NRR/PMDA/DD NAME S. Weerakkody
JCircle /f/ Joseph G. Giitter SLee /f/
CRegan
DATE 08/15/12 08/15/12 11/01/12
OFFICIAL RECORD COPY
NRR OFFICE INSTRUCTION ADM-507
“Grow Your Own” PRA Analyst Training Qualification Program
1. POLICY
It is the policy of the Office of Nuclear Reactor Regulation (NRR) that all employees have a training plan which facilitates gaining the knowledge and skills necessary to perform effectively in their jobs. This Office Instruction (OI) provides guidance for the creation of training plans for PRA analysts who join NRR under the “Grow Your Own PRA Analysts” program.
2. OBJECTIVES
The objective of the Office Instruction (OI) is to prepare a comprehensive hands-on training qualification program for newly selected personnel to the “Grow Your Own” (GYO) Probabilistic Risk Assessment (PRA) analyst training qualification program. Since candidates selected to the GYO PRA Analyst training qualification program are not required to have extensive PRA analyses experience, this program will require additional training beyond the existing Appendix M of ADM 504, “Qualification for Reliability and Risk Analysts”. This OI both defines knowledge standards to facilitate a trainee’s understanding of expectations to perform his or her job and outlines a comprehensive training program enabling that individual to meet those standards. Utilization of this OI provides guidance for an individual to obtain and transfer knowledge necessary to perform the technical duties assigned to a Reliability and Risk Analyst within NRR. This OI promotes consistency in the qualification process for staff members pursuing the analyst position. Successful completion of the training program results in issuance of analyst certification and, for grade level GG-13 candidates, a promotion to grade level GG-14 with the title of Reliability and Risk Analyst.
3. BACKGROUND
NRR values the contribution which all of its staff makes to support the NRC mission to protect public health, safety, and the environment. As an expression of that value, NRR emphasizes training for employees to foster their ability to execute this mission. Recruitment, development, and retention of Reliability and Risk Analyst staff has long been a challenge at NRC due to the limited national pool of expertise, lengthy training periods to develop staff, and extensive competition, both within and outside the NRC, for experienced analysts. To address this challenge, a multi office recruitment and training effort, with NRO, RES, and NMSS, has been started with NRR taking the lead in its pilot implementation. The goal is to “Grow Your Own” PRA analysts by providing candidates to the program with the necessary basic training and experience to become, after satisfactory completion of the required training, reliability and risk analysts.
NRR Office Instruction ADM-507 Page 2 of 9
4. BASIC REQUIREMENTS
4.1 Introduction:
The GYO PRA analyst training and qualification program is an advanced study leading to certification as a grade level GG-14 Reliability and Risk Analyst. This is a competitive program for selected candidates to be transferred and assigned to positions in a PRA technical branch (home branch). In addition to work assignments, individuals selected into this program must successfully complete the formal classroom training courses, learning projects, the individual study activities (ISAs), the on-the-job training activities (OJTs), and the required rotations prior to certification. Some of these activities can be exempted by the home branch chief based on the applicant's prior experience or training. Documentation of such exemptions must be provided by the home branch chief in writing, and should be maintained in the individual's personnel folder. This training program consists of two components, a core program and an Office specific program. The core training program is described in Enclosure 2 and is supplemented by the office-specific training in Appendix A of this Office Instruction for candidates working in NRR. In addition to periodic evaluation of completed training activities, the candidate must pass a PRA analyst qualification board upon satisfactory completion of all the required program elements. The purpose of the board is to verify that the qualifying individual has gained an acceptable level of knowledge and experience to be certified as a grade level GG-14 Reliability & Risk Analyst. It is desirable, but not mandatory, for individuals entering the program at grade level GG-13 (Series 0801, 0840, or 1301) to have commercial nuclear power plant system, inspection, or operation experience. Being selected to participate in the PRA analyst training and qualification program involves a requirement to complete the program and be qualified in approximately three years. During this period, the candidate will complete a combination of formal training and learning projects with specific on-the-job training (OJT) in development and application of various areas involving PRA techniques within the NRC. Some of these activities could include possible assignment of work on a full scope level three PRA or other areas of PRA specialty. The period of three years was selected to mature the candidate into a Reliability and Risk Analyst functioning at the GG-14 grade level. The position description of the candidates explicitly identifies the requirement of the candidates to complete PRA training. During the training period, achievements in the area acquiring PRA training skills will be a key component of the candidate’s performance rating. To that extent, the home branch chief will use feedback provided by the candidate’s technical mentor and/or the rotational branch chief during periodic evaluations. For GG-13 candidates who enter the program, failure to meet a Fully Successful (FS) rating in performance standards may result in removal from the program. Consequently, such candidates will not be promoted to GG-14 positions. After satisfactorily completing the training program by meeting all the requirements,
NRR Office Instruction ADM-507 Page 3 of 9
and with PRA analyst qualification board approval, the candidate will be promoted to grade level GG-14 in the candidate’s home branch. During the period of training the candidate will not be granted rotational assignments or lateral assignments outside of the qualification program without approval of division management (see Equivalency below).
4.2 Prerequisites:
1) It is desired but not mandatory that candidates have sufficient experience and training to ensure success in the qualification program. Having this experience will not burden the candidate with additional training outside the program and will allow successful and timely completion of PRA training. The individual should possess experience in one of the following example areas, or their equivalent: • Qualification as a basic reactor inspector and work as a site resident
inspector. • Completion of either PWR or BWR technology full series or equivalent
and technical experience in a nuclear power technical branch. • Significant experience gained by working in a technical systems,
design, or operations position at a nuclear utility licensee, vendor, or architectural/engineering firm.
2) This program is not a substitute for NRR’s Reactor Technical Reviewer
program. A candidate must complete the Reactor Technical Reviewer qualification board to be retained in the PRA analyst training and qualification program.
4.3 Rotational Assignments:
During the training qualification period, the candidate may be required to go on rotational assignments in branches outside of the home branch, division, or program office. These rotations will be tailored based on the candidate’s home branch areas of interest, and experience. For example, if a candidate enters the program after having significant reactor experience based on their prior employment at a region or a licensee, they will not be required to perform a rotation at a region. It is expected that the home branch chief will develop the rotation schedule with the rotation branch chief, and with appropriate management approval. Unless exempted, the candidate is expected to attend all assigned classroom training, even while on rotation. Also, a different set of goals, expectations and standards will be developed for the candidate while on rotation. It is encouraged but not mandatory for the rotational branch chief (or designee) to meet periodically with the home branch chief on candidate progress and on completion of the rotation.
NRR Office Instruction ADM-507 Page 4 of 9
4.4 Exemption and Equivalency Justification:
Program requirements, including the rotation, individual study activities, formal course work, and on-the-job training activities are assessed on a case-by-case basis. When approving an equivalency justification, careful consideration will be given to the length of time that has passed since the individual has previously completed the training or the experience gained from previous work history. Equivalencies will be approved and documented by the candidate’s home branch chief and division management. The GYO PRA analyst program is primarily intended to train approved GG-13 and GG-14 candidates. However, given class size and branch needs, elements of the program may be made available for non-GYO PRA branch staff members to participate in. The extent of participation will be at the discretion of the branch chief and will also rely on available resources. The following table provides an overview for the various types of new staff members and expectations.
Grade
Level
Status GYO Program
Requirement
Qualification
Board
Promotion
Guarantee
GG-13 GYO PRA analyst program candidate
Full completion of the program. Yes Guaranteed promotion to GG-14 upon successful completion of program.
GG-13 Non-GYO PRA analyst staff
Need to qualify to ADM-504, Appendix M. Optional participation in the program at the discretion of the branch chief.
No N/A
GG-14 GYO PRA analyst program candidate
Completion of program with accelerated equivalency justification based on the degree of partial PRA experience.
Yes N/A
GG-14 Non-GYO PRA analyst staff
Need to qualify to ADM-504, Appendix M. Optional participation in program at the discretion of the branch chief.
No N/A
4.5 Training Qualification Program Organization:
The basic training program parallels the requirements of the existing training qualification plans developed for Risk and Reliability Analysts as documented in NRR Office Instruction ADM-504, Appendix M, “Reliability and Risk Analyst”. It is expected that candidates in this GYO PRA Analyst program must fulfill all these existing requirements with additional specific rotation activities, a learning project,
NRR Office Instruction ADM-507 Page 5 of 9
and certain activities borrowed from the Senior Reactor Analyst (SRA) qualification plan of Inspection Manual Chapter IMC-1245, Appendix C9, “Senior Reactor Analyst Training Qualification Program”. Details of the training requirements are outlined in Appendix A of Enclosure 3 of this OI.
4.6 Review of Completed Training:
Upon completion of each individual training, study, or rotational assignment, the candidate will meet to discuss the results with the branch chief and associated technical mentor. Approval of each completed training activity will come from the branch chief. If the branch chief decides that the candidate has not satisfactorily completed the specific training activity, a remedial course of action may be developed for the candidate at the discretion of the branch chief. Examples of remedial action can include but, are not limited to, re-assignment of Independent Training Activities, additional classroom training, or additional work assignments.
4.7 Documentation:
Documentation of completed training is recorded on the Activity Sign-off Sheet. Equivalency justification for formal training courses, individual study activities, and on-the-job activities are recorded on the Equivalency Justification Form. Candidates are required to maintain records of specific tasks (e.g., completion of a Phase 3 analysis) performed that are required by the ISAs or OJTs. This documentation is required when the individual is preparing to go before the qualification board. Documentation will be incorporated in iLearn.
4.8 Reliability and Risk Analyst Certificate:
At the successful completion of the candidate’s board, the qualification board chairman will submit a memorandum to the Director of the home program office to notify senior management of the candidate’s accomplishment. A formal certificate will be prepared for the qualifying Reliability and Risk Analyst to be signed by the Director of the home program office. In addition, the Office of Chief Human Capital Officer (OCHCO) must be notified to make permanent the analyst’s promotion to GG-14.
4.9 Grievances:
Grievances in the program will be addressed pursuant to the Collective Bargaining Agreement between the U.S. Nuclear Regulatory Commission and the National Treasury Employees Union.
NRR Office Instruction ADM-507 Page 6 of 9
5. RESPONSIBILITIES AND AUTHORITIES
During the course of the training qualification program, the candidate will interface regularly with the assigned technical mentors, the branch chiefs of the home and rotational branches, and the home division management.
The Technical Mentor:
For each training module, a technical mentor, who is a subject matter expert in a particular relevant area (or multiple areas), will be assigned to work with the candidate. Assignment will be made by the branch chief, with approval of associated division management, and may span more than one training module. The responsibilities of the technical mentor are:
• Provide technical guidance to the candidate on completion of the training
module. • Assess progress made by the candidate and report this progress to the
associated branch chief. • Help prepare the candidate for any required qualification boards.
During the course of the program, a candidate may have several technical mentors.
The Home and Rotation Branch Chief:
The home branch chief is the candidate’s hiring branch chief and will serve as the candidate’s front-line administrative supervisor during and after the entire training qualification process. In addition to the administrative functions, the home branch chief will oversee the approval of the overall training qualification program for the candidate. When on rotation, the rotation branch chief will serve as a temporary technical supervisor. It is encouraged that rotational and home branch chiefs communicate regularly on the candidate’s progress. The branch chief will meet with the candidate upon completion of each training, study, or rotational activity in order to decide on approval of satisfactory completion of that activity. Feedback from the respective technical mentors, training personnel, and/or rotational branch chief will be considered. Upon completion of the program, the analyst will be assigned to the home branch.
NRR Office Instruction ADM-507 Page 7 of 9
The Home Division Management:
The home division management consists of the division director and deputy director(s). The home division management in consultation with the branch chief will organize the qualification boards for candidate, make training determinations on equivalency, address grievances in consultation with OCHCO, and approve certification of the candidate upon satisfactory completion of the program. The division director can delegate these functions separately to the deputy director, or other designee.
PRA Analyst Qualification Board:
The PRA Analyst qualification board will consist of a minimum of three members, two of which will be currently qualified and active Senior Level Advisors, GG-15 senior reliability and risk analysts, branch chiefs with PRA background, or SRAs. The role of the board is to certify that the candidate meets the minimum requirement of a reliability and risk analyst and has satisfied the expectations of this training qualification program. The board chairman will be an SES manager, appointed by the home division director (or designee), who is responsible to select board members. The home branch chief will schedule the board meeting. Whenever practical, the individual’s home branch chief is encouraged to observe the board proceedings. Once members have been selected, the candidate shall submit a package to the PRA analyst qualification board for review, consisting of documentation of completed work and approvals made during the training qualification program. The purpose of this review is to inform the board of the extent and depth of the analytical work the candidate has performed and to provide the board with the opportunity to explore the benefits gained from those activities. Upon review of the completed work, the board chairman may provide specific direction to the candidate of any additional actions which may be needed to prepare for the board appearance. This may include successful passing of a written exam. The candidate will meet with the board who will then ask questions on various aspects of the program. Upon completion, the board chairman will initiate a memorandum to the candidate’s home division management and HR informing them of the results. In the event a candidate is determined by the board to lack knowledge in a particular area(s), at the board chairman’s discretion, a remedial strategy can be used to address the area(s) of concern.
The Candidate:
The candidate is responsible for scheduling, maintaining records, and on-time completion of all training activities. It is the expectation that the candidate will work continually with the technical mentors and branch chiefs to ensure that required training activities are scheduled and satisfactorily completed. It is the responsibility of the candidate to communicate any encountered difficulty with management and to pursue resolution.
NRR Office Instruction ADM-507 Page 8 of 9
6. PERFORMANCE MEASURES
Expectations and Outcomes: The candidate shall complete the training qualification program in no longer than three years. Based on extenuating circumstances or need, the home branch chief will determine if additional time is warranted beyond the three year period for the candidate to be qualified. Upon completion of the program, the minimum goal is for the candidate to have the following basic competencies:
• Model specific detailed plant system behavior and operator actions in response to a series of initiating events based on review of engineering design documentation, drawings, procedures, and calculations.
• Collect, evaluate, and integrate operating data into risk model basic events. • Perform various statistical methods such as Bayesian analysis, common cause
failure, and uncertainty. • Perform human reliability analysis. • Perform quantification of detailed models using several techniques and to be
able to trace-back contributors to risk. • Modeling and understanding of the special requirements needed for all operating
modes and external events, e.g., shutdown, low power, fire, seismic, flooding, severe weather, and other hazards.
• Demonstrate understanding of severe accident phenomena and radionuclide release as they relate to PRA.
• Demonstrate proficiency in PRA software used by the NRC with understanding of licensee’s software and results.
• Evaluate risk-informed applications on how they relate to risk models. • Demonstrate a working knowledge of the various risk-informed initiatives that
have been undertaken at the NRC and in industry.
7. PRIMARY CONTACT
Jeff Circle 301-415-1152 [email protected]
8. RESPONSIBLE ORGANIZATION
NRR/DRA
9. EFFECTIVE DATE
November 5, 2012
NRR Office Instruction ADM-507 Page 9 of 9
10. REFERENCES
None.
Enclosures: 1. Change History 2. Core Qualification Program 3. Specific Qualification Programs and Training Requirements - Descriptions of Specific GYO PRA Analyst Activities 4. Forms
A. Activity sign-off sheets B. Equivalency Justification and Exemption
ENCLOSURE 1
Change History
NRR Office Instruction ADM-507
PRA Practitioner Development Program
ADM-507 Change History - Page 1 of 1
Date Description of Changes Method Used to
Announce &
Distribute
Training
11/01/12 This is the initial issuance of ADM-507. The purpose of this OI is to prepare a comprehensive hands-on training qualification program for newly selected personnel to the “Grow Your Own” (GYO) Probabilistic Risk Assessment (PRA) analyst training qualification program.
E-mail to NRR staff None
ENCLOSURE 2
Core Qualification Program
CORE QUALIFICATION PROGRAM
Program Schedule It is intended for the candidate to complete all the necessary course work and on-the-job training listed in the Core PRA Fundamentals Training Activities table below before moving on to the office-specific training. The candidate’s home branch chief may waive any of these required training based on candidates’ education and/or experience. Flexibility will be exercised based on availability of classroom training and rotational assignments. To demonstrate proficiency after completion of each training activity, the candidate shall formally meet with the branch chief and technical mentor. A written or oral exam will be given, at the discretion of the branch chief, to determine if the candidate has successfully completed the training activity in order to progress to the next level.
1 NRR Office Instruction ADM 504, “Qualification Program,” contains NRR staff qualification requirements. Appendix M (under development) of this Office Instruction ADM-504 provides qualification requirements for a Reliability and Risk Analyst who already possesses basic PRA skills. The subset of ISAs identified here are of a generic nature so that other offices - RES, NRO, NMSS - may choose to include them in their core requirements.
Core PRA Fundamentals Training Activities
Classroom Training
Number Description
P-101 Risk-Informed Regulation for Technical Staff (8 hrs) P-105 PRA Basis for Regulatory Applications (21 hrs) P-200 Modeling Techniques (24.5 hrs) P-102 Probability and Statistics (36 hrs)
Independent Study Activities Derived From
ADM-504, Appendix M1
ISA-1 Principles and Review of NRC Approaches to Risk-
Informed Regulation
ISA-3 Current Risk-informed Applications
ISA-15 Operating Experience Databases
ENCLOSURE 3
Specific Qualification Programs and Training Requirements Descriptions of Specific GYO PRA Analyst Activities
NRR Office Instruction ADM-507 Page 2 of 4
Program Schedule The program schedule for candidates in NRR is grouped according to areas of expertise and level. The candidate is expected to complete the PRA Fundamental Activities below as a prerequisite before continuing with the Modeling Experience Activities and the PRA-in-Regulation Activities. Candidates can complete Modeling Experience and PRA-in-Regulation in parallel. For these two groups, schedule and program flexibility will be exercised based on availability of classroom training and rotational assignments. To demonstrate proficiency after completion of each training activity, regardless of type, a written or oral exam will be given at the discretion of the technical mentor or home branch chief. The branch chief may waive requirements for any of these training requirements or rotations based on the candidate’s education or experience.
2 Inspection Manual Chapter IMC-1245, Appendix C9, “Senior Reactor Analyst Training and Qualification Program”, contains relevant training activities for the GYO PRA analyst program.
PRA Fundamental Activities
Number Description
Classroom Training
R-304(B and P) Full Series - Both BWR and PWR
Independent Study
Activities Derived From
ADM- 504, Appendix M
ISA-5 IPE /IPEEE study of submittals and of lessons learned
ISA-6 Overview of shutdown risk ISA-7 Large Early Release Frequency (LERF) ISA-8 Historical NRC Severe Accident Risk Evaluations
ISA-19 Climatology
ISA-10 Specialized Risk-informed Decision-Making
Process Independent
Study Activities
Derived From IMC-1245,
Appendix C92
ISA-SRA-5 How licensees use EPRI documents
NRR Office Instruction ADM-507 Page 3 of 4
Modeling Experience Activities
Number Description
GYO Program-specific Learning
Project LP-GYO-1 PRA Model Learning Project
Independent Study Activities Derived From
ADM- 504, Appendix M
ISA-2 PRA Quality Initiative
ISA-9 ASP analysis
Independent Study Activities Derived From
IMC-1245, Appendix C9
ISA-SRA-7 EOP procedure guidance
GYO Program-Specific
Independent Study Activities
ISA-GYO-5 Regulatory Framework for New Reactor PRA
Classroom Training
P-202 Advanced SAPHIRE P-204 External Events P-300 Accident Progression Analysis P-301 Accident Consequence Analysis
External - 1 EPRI/RES Fire PRA Training External - 2 EPRI/RES Seismic PRA
R-800 Perspectives on Reactor Safety P-501 Advanced risk assessment topics P-203 Human Reliability Analysis
P-201 SAPHIRE
GYO Program-Specific
Rotation/On-the-job Training
OJT-GYO-ROT-1 Rotation to RES on Level III analysis
OJT-GYO-ROT-2 Remote or on-site rotation to INL to assist in SPAR model
development.
OJT-GYO-ROT-3 Rotation to site resident inspector’s office to work with licensee
staff on PRA model development and use.
NRR Office Instruction ADM-507 Page 4 of 4
PRA-in-Regulation Activities
Number Description
Independent Study Activities From ADM- 504,
Appendix M
ISA-12 NOED technical guidance
ISA-13 Reactive inspection technical guidance
ISA-17 Maintenance Rule, 10 CFR 50.65
ISA-18 Reactor Oversight Process (ROP) and Significance
Determination Process (SDP) Basis
GYO Program-Specific
Independent Study Activities
ISA-GYO-1 NFPA-805 review
ISA-GYO-2 MSPI and NEI-99-02
ISA-GYO-3 SAMGs (RES video material)
ISA-GYO-4 SAMA
Classroom Training
P-111 PRA Technology and Regulatory Perspective
P-302 Risk Assessment in Event Evaluation
Internal NFPA-805 LAR training On-the-job
Training and Rotations Derived From ADM- 504,
Appendix M
OJT-2 Conduct a Phase 3 SDP
OJT-7 Perform a reactive inspection evaluation
OJT-3 Perform a NOED risk review
GYO Program-Specific On-the-Job Training and
Rotations
OJT-GYO-ROT-4 Regional office rotations to DRP
OJT-GYO-ROT-5 Rotations to NRR/DRA branches
OJT-GYO-ROT-6 Rotation to NRR/DIRS for Maintenance Rule and
MSPI OJT-GYO-1 Conduct a Phase 3 Shutdown Risk Assessment
OJT-GYO-2 Write a risk-informed SE
Description of Specific GYO PRA Analyst Activities
NRR Offi
TOPIC:
PURPOS
COMPET
AREA:
PREREQ
LEVEL
OF EFFO
ACTIVIT
EVALUA
CRITERI
ice Instructio
GYO Pr
SE:
TENCY
QUISITE:
ORT:
TY:
ATION
IA:
on ADM-507
Descriptio
rogram-
PRA MOD
To give a g
scope leve
MODELIN
Completio
activities.
6 months
This is a p
complete.
of the othe
completed
plans and
candidates
At the com
following a
• Applyin
• Develo
• Develo
proced
diagra
7
on of Specifi
LPspecific
DEL LEARN
group of ana
el 1 PRA ana
NG EXPERIE
on of all PRA
Modeling ex
part-time proj
It is expect
er training re
d. A comple
guides will b
s are expect
mpletion of th
areas of com
ng calculatio
opment of ev
op system fa
dures, e.g., e
ms, process
c GYO PRA
P-GYO-1c Learnin
NING PROJE
alyst candida
alysis using
ENCE
A Core Funda
xperience ac
ject for more
ted for candi
equirements
ete detailed
be used for
ted to use ex
his activity, t
mpetency:
on results to
vent trees fo
ault trees ba
electrical sch
s and instrum
A Analyst Act
ng Proje
ECT
ates experie
practical inf
amental and
ctivities are
e than one a
idates to sta
and rotation
description w
completion o
xisting NRC
the candidat
establish sy
or a specific
sed on licen
hematics, on
mentation dia
Page
tivities
ect Activ
ence in cond
formation fro
d PRA Funda
a co-requisit
analyst cand
art on this pro
ns have bee
with a separ
of this activit
software fo
es should de
ystem succe
plant.
nsee design
ne-line diagr
agrams, ope
1 of 26
vity 1
ducting a full
om licensees
amental
te.
idate to
oject after m
n satisfactor
rate set of le
ty. The
r models.
emonstrate
ess criteria.
documents
rams, flow
erating
s.
most
rily
esson
the
and
NRR Offi
TASKS:
ice Instructioon ADM-507
Descriptio
proced
• Evalua
fault tr
• Studyi
probab
• Perform
• Using
All candida
modules o
• Metho
• The or
• Potent
• Techn
• Discus
• Insight
• Overal
This pres
branches
from other
7
on of Specifi
dures, etc.
ation of data
ree basic eve
ng licensee
bilities.
mance of co
licensee info
ates shall co
of this learnin
ds used in th
rganization o
tial obstacles
ical details o
ssion of deta
ts gained fro
ll insights of
entation will
and division
r program of
c GYO PRA
and perform
ent probabili
training doc
ommon caus
ormation to d
ollaborate to
ng project. I
he preparati
of the learnin
s encountere
of how the a
ails of results
om the result
performing
be attended
s in NRR wi
ffices.
A Analyst Act
mance of Ba
ities.
cuments to d
se failure ana
develop reco
prepare a p
Items to incl
on of parts o
ng project te
ed and how
ssignment w
s.
ts.
the learning
d by various
th initiations
Page
tivities
ayesian upda
develop hum
alyses.
overy analys
presentation
ude in the p
of the analys
eam.
they were s
was carried o
g project.
members o
s to division
2 of 26
ates to estab
man error
ses.
on the vario
resentation
sis.
solved.
out.
of the PRA
representati
blish
ous
are:
on
NRR Offi
TOPIC:
PURPOS
PREREQ
COMPET
AREA:
LEVEL
OF EFFO
ACTIVIT
ice Instructio
SE:
QUISITE:
TENCY
ORT:
TY:
on ADM-507
Descriptio
GYO On
ROTATIO
(OPTIONA
To give the
scope, all-
Completio
activities.
MODELIN
3-6 month
As directe
Regulatory
comprehe
combinatio
developme
experience
and develo
The candi
tree mode
directly he
submittals
initiatives
availability
7
on of Specifi
OJT-Gn-the-Jo
ON TO RES I
AL)
e analyst ca
-hazards PR
on of all PRA
NG EXPERIE
hs
d by the SR
y Research
nsive site le
on of directly
ent of new m
e in providin
opment of th
date will gai
eling practice
elp gain insig
s made by re
made by lice
y and schedu
c GYO PRA
GYO-ROb Rotati
IN SUPPOR
andidate exp
RA model ba
A Core Funda
ENCE
RM for SECY
(RES) is cur
evel 3 PRA p
y adapting le
models. The
ng support to
hese models
n familiarity
es and data a
ghts in future
egional SRAs
ensees. Thi
uling of activ
A Analyst Act
OT-1 ion Activ
RT OF THE L
perience in m
sed on licen
amental and
Y-11-089, the
rrently perfo
project. Som
evel 1 licens
e candidate c
o RES and th
s.
with detailed
analyses. T
e work involv
s and variou
is rotation is
vities.
Page
tivities
vity 1
LEVEL 3 PR
modeling ele
nsee input.
d PRA Funda
e Office of N
rming a full-
me of the wo
see models a
can gain inv
heir contract
d event and
The technica
ving the revie
us risk-inform
optional, su
3 of 26
RA PROGRA
ments of a f
amental
Nuclear
-scope
rk involves a
as well as
valuable
tors in adapt
system faul
al experience
ew of SDP
med licensin
ubject to
AM
full
a
tion
lt
e will
g
NRR Offi
EVALUA
CRITERI
TASKS:
ice Instructio
ATION
IA:
on ADM-507
Descriptio
At the com
• Profici
were d
• Profici
SAPH
• Perform
other m
• Quanti
core d
uncert
A represen
shall be pe
approval o
7
on of Specifi
mpletion of th
ency in mod
developed as
ency in adap
IRE SPAR fo
m human re
methodology
ify results an
amage and
ainty.
ntative samp
erformed un
of the home
c GYO PRA
his rotation,
deling variou
s part of the
pting license
ormat.
eliability anal
y that RES h
nd discuss th
large-early r
ple related to
der the guid
Branch Chie
A Analyst Act
the candida
us sequence
Level 3 PRA
ee’s models
ysis calculat
has develope
he dominant
release in te
o each of the
dance of the
ef.
Page
tivities
te should de
s and system
A program.
and data int
tions using S
ed for this pr
t sequences
erms of cut s
e evaluation
technical m
4 of 26
emonstrate:
m models th
to the NRC
SPAR-H, or
roject.
s in relation t
sets with
n criterion ab
entor and
hat
to
bove
NRR Offi
TOPIC:
PURPOS
PREREQ
COMPET
AREA:
LEVEL
OF EFFO
ACTIVIT
ice Instructio
SE:
QUISITE:
TENCY
ORT:
TY:
on ADM-507
Descriptio
GYO On
REMOTE
LABORAT
To give the
Standardiz
gain exper
Completio
activities a
co-requisit
MODELIN
2-3 month
SPAR mod
by INL for
licensee in
and ASP a
The goal o
detailed de
SDP analy
models to
The HQ an
provide te
rotation wi
performed
7
on of Specifi
OJT-Gn-the-Jo
OR ON-SIT
TORY (INL)
e analyst ca
zed Plant An
rtise and com
on of all PRA
and P-201, “
te.
NG EXPERIE
hs
dels are pla
use by NRC
nput and are
activities.
of this rotatio
evelopment
ysis on a find
account for
nalyst needs
chnical supp
ill be under t
d partially at
c GYO PRA
GYO-ROb Rotati
TE ROTATIO
TO ASSIST
andidate an u
nalysis Risk
mpetency in
A Core Funda
SAPHIRE” a
ENCE
nt- and site-
C personnel.
e used exten
on is to give
of SPAR mo
ding, SRAs o
specific per
s to be able
port to the S
the guidance
NRC HQ or
A Analyst Act
OT-2 ion Activ
ON TO IDAH
T IN SPAR M
understandin
(SPAR) mo
n making cha
amental and
and P-202, “
specific inde
. The mode
nsively in SD
the candida
odels. In the
often have t
rformance de
to either rev
RAs on how
e of INL pers
at INL in Ida
Page
tivities
vity 2
HO NATIONA
MODEL DEV
ng of the con
del developm
anges to exis
d PRA Funda
“Advanced S
ependent mo
ls are develo
DP, new reac
ate experienc
e course of p
o make cha
eficiencies o
view these c
w to make the
sonnel and c
aho Falls, ID
5 of 26
AL
VELOPMEN
ncepts of
ment in orde
sting models
amental
SAPHIRE” a
odels develo
oped with so
ctor licensing
ce on the
preparing an
nges to exis
or conditions
hanges or
e changes.
can be
D.
NT
er to
s.
s a
oped
ome
g,
n
sting
s.
This
NRR Offi
EVALUA
CRITERI
TASKS:
ice Instructio
ATION
IA:
on ADM-507
Descriptio
At the com
demonstra
• Profici
SPAR
configu
• Quanti
core d
• Revise
• Modify
the ba
Represent
criteria sha
by the ana
7
on of Specifi
mpletion of th
ate:
ency with SA
model to ac
urations, suc
ify results us
amage cut s
e human reli
y event and f
se case.
tative examp
all be develo
alyst candida
c GYO PRA
his rotationa
APHIRE sof
ccount for ch
ccess criteria
sing SAPHIR
sets and trac
ability analy
fault trees to
ples encomp
oped by the
ate with app
A Analyst Act
l activity, the
ftware in mo
hanges made
a, and data.
RE software
ce back cont
ysis calculatio
o account for
passing all o
technical me
roval of the
Page
tivities
e candidate
difying and m
e in the syst
and discuss
tributing seq
ons.
r different co
of the above
entor and to
home Branc
6 of 26
should
manipulating
tem
s the domina
quences.
onditions out
evaluation
o be perform
ch Chief.
g the
ant
tside
ed
NRR Offi
TOPIC:
PURPOS
PREREQ
COMPET
AREA:
LEVEL
OF EFFO
ACTIVIT
ice Instructio
SE:
QUISITE:
TENCY
ORT:
TY:
on ADM-507
Descriptio
GYO On
ROTATIO
WITH LIC
To give the
models in
(a)(4) work
support, a
Completio
activities.
MODELIN
1 month
Analysts a
PRA input
are used t
is to give t
personnel
candidate
insights fro
managem
licensee P
combined
The rotatio
7
on of Specifi
OJT-Gn-the-Jo
ON TO SITE
ENSEE STA
e analyst ca
support of v
kweek asses
nd SDP perf
on of all PRA
NG EXPERIE
are expected
t to various N
to manage a
the candidat
from the pe
should part
om the licen
ent approva
PRA personn
with OJT-G
on is subject
c GYO PRA
GYO-ROb Rotati
RESIDENT
AFF ON PRA
andidate exp
various techn
ssments in t
formance de
A Core Funda
ENCE
d to understa
NRC inspect
and assess w
te experienc
erspective of
icipate in at
see. With s
al, the analys
nel on mode
YO-ROT-4,
t to availabil
A Analyst Act
OT-3 ion Activ
INSPECTO
A MODEL D
perience on h
nical issues
the Maintena
eficiencies.
amental and
and and inte
tion activities
workweek ris
ce on how lic
f the site res
least one in
senior reside
st candidate
ling details.
“Regional O
ity at one sit
Page
tivities
vity 3
OR’S OFFICE
DEVELOPM
how licensee
such as 10
ance Rule, in
d PRA Funda
erpret how lic
s as well as
sk. The goa
censees inte
ident inspec
spection pre
ent inspector
should work
This activity
Office Rotatio
te.
7 of 26
E TO WORK
ENT AND U
es use risk
CFR 50.65
nspection
amental
censees dev
models whi
al of this rota
rface with N
ctor. The an
epared with
r and license
k with site
y can be
ons to DRP”
K
USE.
velop
ch
tion
NRC
alyst
risk
ee
”.
NRR Offi
EVALUA
CRITERI
TASKS:
ice Instructio
ATION
IA:
on ADM-507
Descriptio
At the com
• Unders
making
• Unders
workw
• Unders
• Ability
Represent
criteria sha
home Bran
7
on of Specifi
mpletion of th
standing of h
g inspection
standing of h
week schedu
standing of h
to adapt the
tative examp
all be prepar
nch Chief.
c GYO PRA
his activity, t
how licensee
decisions.
how licensee
le as well as
how licensee
ese concepts
ples encomp
red by the te
A Analyst Act
the candidat
e models are
es use risk m
s maintenan
es cope with
s to NRC SP
passing all o
echnical men
Page
tivities
e should de
e used and
models in de
ce schedulin
h emergent w
PAR models
of the above
ntor with app
8 of 26
monstrate:
evaluated in
eveloping a
ng practices
work.
s.
evaluation
proval of the
n
.
e
NRR Offi
TOPIC:
PURPOS
PREREQ
COMPET
AREA:
LEVEL
OF EFFO
ACTIVIT
ice Instructio
SE:
QUISITE:
TENCY
ORT:
TY:
on ADM-507
Descriptio
GYO On
REGIONA
PROJECT
To give the
Senior Re
informed i
Completio
activities,
Regulation
PRA IN RE
1-2 month
Analysts in
expected t
Significanc
by regiona
performan
gain a per
finding, the
Division of
be combin
Inspector’s
Developm
7
on of Specifi
OJT-Gn-the-Jo
AL OFFICE R
TS (DRP)
e analyst ca
actor Analys
nspection ac
on of all PRA
and all ISA a
n.
EGULATION
h
n the DRA P
to provide e
ce and Enfo
al SRAs. Th
nce deficienc
rspective and
e analyst ca
f Reactor Pr
ned with OJT
s Office to W
ment and Use
c GYO PRA
GYO-ROb Rotati
ROTATIONS
andidate exp
sts and insp
ctivities.
A Core Funda
and classroo
N
PRA Operatio
ither technic
orcement Re
hese packag
cies discove
d understan
andidate sha
rojects (DRP
T-GYO-ROT
Work with Lic
e”. It is inte
A Analyst Act
OT-4 ion Activ
S TO DIVISI
perience wor
ectors on SD
amental and
om training a
onal Suppor
cal guidance
view Panel (
es evaluate
red typically
ding of the p
ll take a rota
P) at a region
T-3, “Rotation
censee Staff
nded for the
Page
tivities
vity 4
ION OF REA
rking with reg
DP findings
d PRA Funda
activities from
rt branch (AP
e or peer rev
(SERP) pac
the risk imp
y on inspectio
process lead
ational assig
nal office. T
n to Site Res
f on PRA Mo
e analyst can
9 of 26
ACTOR
gional office
and risk-
amental
m PRA In-
POB) are
iew on
kages prepa
pact of
on findings.
ding up to a S
gnment with t
his activity c
sident
odel
ndidate to wo
e
ared
To
SDP
the
can
ork
NRR Offi
EVALUA
CRITERI
TASKS:
ice Instructio
ATION
IA:
on ADM-507
Descriptio
with inspe
enter the S
candidate
and active
required to
from poten
At the com
• Unders
addres
• Unders
finding
• Unders
finding
• Unders
prepar
• Unders
• If avail
prepar
• Ability
For this ro
For Greate
candidate
examples
prepared b
7
on of Specifi
ctors and th
SDP program
shall assist
ely participat
o participate
ntially greate
mpletion of th
standing of t
ssed at the r
standing of h
gs through th
standing of h
gs through th
standing of d
re for a SER
standing of h
lable, an und
ration for a re
to discuss t
otation, the te
er-than-gree
is expected
encompass
by the techn
c GYO PRA
e regional S
m. For pote
the SRA in
e at the mee
e in any Regu
er-than-gree
his activity, t
the inspectio
regional offic
how SRAs w
he SDP.
how SRAs e
he SDP.
detailed step
RP meeting.
how to cond
derstanding
egulatory co
hese details
echnical me
en SDP findi
to develop
sing all of the
nical mentor
A Analyst Act
SRAs on the
ntially greate
preparation
eting of the p
ulatory Conf
n SDP findin
the candidat
on process a
ce by the SR
work with ins
engage the l
ps used at th
duct a SDP P
of how regio
onference.
s with the pe
ntor will typi
ngs, with gu
a Phase 3 a
e above eval
with approv
Page
tivities
disposition
er-than-gree
of a SERP p
panel. The c
ferences wh
ngs.
e should de
and how all f
RAs.
spectors to d
icensee on t
he regional o
Phase 3 ana
onal office s
rspective of
cally be a re
uidance from
analysis. Re
luation criter
al of the hom
10 of 26
of findings t
en findings, t
package for
candidate is
ich might ar
monstrate:
findings are
disposition
the modeling
office on how
alysis.
taff work on
HQ office st
egional SRA
m the SRA, th
epresentative
ria shall be
me Branch C
hat
the
HQ
s also
ise
g of
w to
taff.
.
he
e
Chief.
NRR Offi
TOPIC:
PURPOS
PREREQ
COMPET
AREA:
LEVEL
OF EFFO
ACTIVIT
EVALUA
CRITERI
ice Instructio
SE:
QUISITE:
TENCY
ORT:
TY:
ATION
IA:
on ADM-507
Descriptio
GYO On
ROTATIO
To give the
branches
Completio
activities.
PRA IN RE
1-2 month
The candi
branch or
RES, or N
At the com
rotational
areas of a
• Discus
• Discus
branch
• Discus
candid
7
on of Specifi
OJT-Gn-the-Jo
ON TO OTHE
e analyst ca
outside the c
on of all PRA
EGULATION
hs
date will wor
home office
MSS. .
mpletion of th
branch chief
ssignment:
ss the details
ss any challe
h.
ss lessons le
date has in h
c GYO PRA
GYO-ROb Rotati
ER PRA BRA
andidate exp
candidate’s
A Core Funda
N
rk in any one
e. Rotations
his rotation,
f and technic
s of the work
enges that th
earned that h
his/her home
A Analyst Act
OT-5 ion Activ
ANCHES
perience with
home branc
amental and
e of the bran
can be in P
the candida
cal mentor to
k assignmen
he candidate
have a direc
e branch.
Page
tivities
vity 5
h risk-informe
ch or home o
d PRA Funda
nches outsid
RA branche
te shall mee
o discuss th
nts.
e had in wor
ct bearing on
11 of 26
ed activities
office. .
amental
de of the hom
es in NRR, N
et with the
e following
king in the
n the work th
in
me
NRO,
he
NRR Offi
TASKS:
ice Instructioon ADM-507
Descriptio
Branch-sp
technical m
while on ro
presentati
division m
learned.
7
on of Specifi
pecific tasks
mentor. The
otation. At t
on to memb
anagement
c GYO PRA
shall be ass
e candidate
he end of th
ers of the ro
on work the
A Analyst Act
signed by the
is responsib
his rotation, t
otational bra
e candidate p
Page
tivities
e rotational b
ble for all trai
the candidat
nch, the hom
performed a
12 of 26
branch chief
ining activitie
te will make
me branch, a
nd lessons
f and
es
a
and
NRR Offi
TOPIC:
PURPOS
COMPET
AREA:
PREREQ
LEVEL
OF EFFO
ACTIVIT
EVALUA
CRITERI
ice Instructio
SE:
TENCY
QUISITE:
ORT:
TY:
ATION
IA:
on ADM-507
Descriptio
GYO On
ROTATIO
To give the
activities s
Performan
PRA IN RE
Completio
NEI 99-02
1-2 month
The candi
and/or the
rotation to
completing
At the com
rotational
areas of a
• Discus
• Discus
branch
• Discus
candid
7
on of Specifi
OJT-Gn-the-Jo
ON TO NRR/
e analyst ca
such as the M
nce Index (M
EGULATION
on of PRA F
2”.
hs (part-time)
date will wor
e Performanc
IRIB, the ca
g ISA-GYO-
mpletion of th
branch chief
ssignment:
ss the details
ss any challe
h.
ss lessons le
date has in h
c GYO PRA
GYO-ROb Rotati
DIRS FOR M
andidate exp
Maintenance
MSPI).
N
Fundamenta
)
rk part-time
ce Assessm
andidate sho
2, “MSPI an
his rotation,
f and technic
s of the work
enges that th
earned that h
his/her home
A Analyst Act
OT-6 ion Activ
MAINTENAN
perience with
e Rule and M
al Activities a
in the React
ent Branch (
ould complet
d NEI 99-02
the candida
cal mentor to
k assignmen
he candidate
have a direc
e branch.
Page
tivities
vity 6
NCE RULE
h other agen
Mitigating Sy
and ISA-GY
tor Inspectio
(IPAB) of DI
te or be in th
2”.
te shall mee
o discuss th
nts.
e had in wor
ct bearing on
13 of 26
AND MSPI
ncy risk-infor
ystems
YO-2, “MSP
on Branch (IR
RS. For the
he process o
et with the
e following
king in the
n the work th
rmed
I and
RIB)
e
of
he
NRR Offi
TASKS:
ice Instructioon ADM-507
Descriptio
Branch-sp
technical m
while on ro
presentati
division m
learned.
7
on of Specifi
pecific tasks
mentor. The
otation. At t
on to memb
anagement
c GYO PRA
shall be ass
e candidate
he end of th
ers of the ro
on work the
A Analyst Act
signed by the
is responsib
his rotation, t
otational bra
e candidate p
Page
tivities
e rotational b
ble for all trai
the candidat
nch, the hom
performed a
14 of 26
branch chief
ining activitie
te will make
me branch, a
nd lessons
f and
es
a
and
NRR Offi
TOPIC:
PURPOS
COMPET
AREA:
PREREQ
LEVEL
OF EFFO
ACTIVIT
ice Instructio
SE:
TENCY
QUISITE:
ORT:
TY:
on ADM-507
Descriptio
GYO On
CONDUCT
To give the
3 analysis
PRA IN RE
Completio
activities.
1 month
For most p
shutdown,
have been
to give the
issues enc
It is intend
part-time b
required c
candidate
Fundamen
be an APO
technical m
3 analysis
comments
stakeholde
7
on of Specifi
OJTn-the-Jo
T A PHASE
e analyst ca
the risk sign
EGULATION
on of all PRA
potentially G
, analysts in
n responsible
e analyst can
countered in
ded that the c
basis and sh
classroom tra
has comple
ntal Activities
OB shutdow
mentor will s
. The candi
s from review
ers. Afterwa
c GYO PRA
T-GYO-1ob Traini
E 3 SHUTDO
andidate exp
nificance of
N
A Core Funda
Greater-than-
the DRA PR
e for prepari
ndidate expe
n performing
candidate’s
hould not inte
aining. This
eted ISA-6, “
s group. Th
n subject ma
supervise the
date will foll
wers (the DR
ard, the cand
A Analyst Act
1 ing Activ
OWN RISK A
perience in c
a low power
amental and
-Green SDP
RA Operatio
ing the Phas
erience in so
a Phase 3 s
work on the
erfere with o
activity sho
Overview of
he technical
atter expert.
e candidate
ow through
RA senior lev
didate will de
Page
tivities
vity 1
ASSESSME
onducting a
r or shutdow
d PRA Funda
P findings tha
onal Support
se 3 analysis
ome of the u
shutdown SD
e assessmen
other training
uld not start
f Shutdown R
mentor for t
It is expect
in preparatio
the process
vel advisor)
eliver a Sign
15 of 26
NT
HQ SDP Ph
wn finding.
amental
at are at
branch (AP
s. This activ
nique techn
DP assessm
nt to be on a
g activities o
t until the
Risk” of the
this activity w
ted that the
on of the Ph
by soliciting
and other
nificance and
hase
OB)
vity is
ical
ment.
or
PRA
will
hase
g
d
NRR Offi
EVALUA
CRITERI
TASKS:
ice Instructio
ATION
IA:
on ADM-507
Descriptio
Enforceme
and will pa
expected t
necessary
At the com
following a
• Unders
regard
• Unders
configu
• Unders
depen
• Unders
• Unders
A presenta
with insigh
senior leve
Branch Ch
7
on of Specifi
ent Review P
articipate in t
that the cand
y.
mpletion of th
areas of com
standing of t
d to time-to-b
standing the
urations dur
standing of h
dencies, ope
standing of p
standing the
ation of the P
hts gained fr
el advisor wi
hief for asse
c GYO PRA
Panel (SERP
the panel me
didate will p
his activity, t
mpetency:
thermodyna
boil, cooling
e state of var
ing the mod
human reliab
erator diagn
procedures
e developme
Phase 3 ana
rom the SER
ill be made t
ssment.
A Analyst Act
P) briefing to
eeting with t
articipate at
the candidat
mic conditio
and vessel i
rious system
eled conditio
bility analysi
osis, and ac
and unique
ent of a Phas
alysis prepar
RP meeting a
to the techni
Page
tivities
o HQ office m
the other sta
a regulatory
e should de
ons at the rea
inventory.
m interaction
on.
is with respe
ctions taken.
conditions in
se 3 SDP an
red by the ca
and input fro
ical mentor a
16 of 26
managemen
akeholders.
y conference
monstrate th
actor core w
s and
ect to timing,
.
n the plant.
nalysis.
andidate alo
om the DRA
and home
nt
It is
e, if
he
with
,
ong
NRR Offi
TOPIC:
PURPOS
COMPET
AREA:
PREREQ
LEVEL
OF EFFO
ACTIVIT
EVALUA
CRITERI
ice Instructio
SE:
TENCY
QUISITE:
ORT:
TY:
ATION
IA:
on ADM-507
Descriptio
GYO On
WRITE A
To give the
after revie
PRA IN RE
Completio
PRA in Re
Technical
2 months
The candi
response t
can includ
Activities c
Additional
stakeholde
At the com
following a
• Applica
standa
• Interpr
7
on of Specifi
OJTn-the-Jo
RISK-INFO
e analyst ca
w of a risk-in
EGULATION
on of all PRA
egulation ser
Review qua
date will wor
to any licens
de license am
can include t
Information
ers, and inte
mpletion of th
areas of com
ation and int
ards for revie
retation of lic
c GYO PRA
T-GYO-2ob Traini
RMED SAF
andidate exp
nformed req
N
A Core Funda
ries. The ca
alification.
rk closely wi
see risk-info
mendments o
the preparat
(RAIs), pos
erface with o
his activity, t
mpetency:
terpretation
ew of amend
censee peer
A Analyst Act
2 ing Activ
ETY EVALU
perience in p
uest for lice
amental and
andidate also
ith the techn
rmed reques
or review of
tion and reso
ssible public
other branche
the candidat
of RG 1.200
dments.
r review resu
Page
tivities
vity 2
UATION (SE
preparing a s
nsing action
d classroom
o must poss
nical mentor
st for licensi
vendor topic
olution of Re
meetings w
es and/or of
e should de
0 and ANS/A
ults.
17 of 26
E)
safety evalua
n.
training in th
ess a React
on preparin
ng action. T
cal reports.
equests for
with licensees
ffices.
monstrate th
ASME quality
ation
he
tor
g the
This
s and
he
y
NRR Offi
TASKS:
ice Instructioon ADM-507
Descriptio
• Unders
Nation
• Prepar
risk-inf
A presenta
gained wil
7
on of Specifi
standing sup
nal Fire Prote
ration of the
formed SE.
ation of the S
l be made to
c GYO PRA
pporting stan
ection Assoc
regulatory a
SE prepared
o the home B
A Analyst Act
ndards used
ciation (NFP
and technica
d by the can
Branch Chie
Page
tivities
d for evaluat
PA) Standard
al evaluation
didate along
ef for assess
18 of 26
ion such as
d 805.
n sections of
g with insigh
sment.
a
ts
NRR Offi
TOPIC:
PURPOS
PREQUI
COMPET
AREAS:
LEVEL
OF EFFO
REFERE
ice Instructio
SE:
SITE:
TENCY
ORT:
ENCES: •
•
•
on ADM-507
Descriptio
GYO In
NFPA-805
The purpo
the risk-inf
licensees
Standard 8
might be e
evaluate S
Completio
training. T
NRR/DRA
PRA IN RE
40 hours
Regulatory
Assessme
Licensing
Regulatory
Protection
Regulatory
Technical
Informed A
7
on of Specifi
ISAndepend
5 REVIEW
ose of this ac
formed licen
transitioning
805 (10 CFR
either engag
SDP analyse
on of PRA Fu
This activity
A/AFPB.
EGULATION
y Guide (RG
ent in Risk-In
Basis”, Rev
y Guide (RG
n for Existing
y Guide (RG
Adequacy o
Activities”, R
c GYO PRA
A-GYO-1dent Stud
ctivity is for t
nse amendm
g to the Natio
R 50.48(c)).
ed in review
es for plants
undamental
should be co
N
G) 1.174, “An
nformed Dec
. 1, Novemb
G) 1.205, “Ri
g Light-Wate
G) 1.200, “An
of Probabilist
Rev. 2, March
A Analyst Act
1 dy Activ
the candidat
ment request
onal Fire Pro
Reliability a
w of license a
transitioning
activities an
ompleted pr
n Approach f
cisions of Pla
ber 2002
sk-Informed
r Nuclear Po
n Approach f
tic Risk Asse
h 2009
Page
tivities
vity 1
te to become
submittals m
otection Ass
and Risk Ana
amendment
g to NFPA-8
nd EPRI/RES
rior to a rotat
for Using Pr
ant-Specific
d, Performan
ower Plants”
for Determin
essment Re
19 of 26
e familiar wit
made by
sociation (NF
alysts must
requests or
805.
S Fire PRA
tion to
robabilistic R
Changes to
nce-Based F
”, May 2006
ning the
esults for Ris
th
FPA)
Risk
o the
ire
sk-
NRR Offi
EVALUA
CRITERI
TASKS:
ice Instructio
•
•
•
•
ATION
IA:
•
•
•
•
•
•
•
on ADM-507
Descriptio
NEI 04-02
Based Fire
NEI 00-01
NFPA-805
At least onplant along
At the com
understan
request.
The stude
and guida
concentrat
The NFPA
perspectiv
Fire safe s
Cable hot
Fire PRA r
The peer r
Fire vulne
Modificatio
7
on of Specifi
2, “Guidance
e Protection
, “Guidance
5, List of Fre
ne representg with RAI, l
mpletion of th
ding of the v
nt should se
nce of the T
ted in this se
A-805 transit
ve.
shutdown an
shorts and s
results.
review proce
rabilities enc
ons made by
c GYO PRA
e for Impleme
Program Un
e for Post Fir
equently Ask
tative licenseicensee res
his activity, t
various parts
elf-study the
Technical Me
elf-study are
tion process
nalysis.
spurious act
ess.
countered.
y licensee to
A Analyst Act
enting a Ris
nder 10 CFR
re Safe Shut
ked Question
e amendmeponses, and
the analyst s
s of a NFPA
references
entor. The a
e:
from the reg
tuation.
o reduce bas
Page
tivities
k- Informed,
R 50.48(c)”.
tdown Circui
ns (FAQ).
nt request fod peer review
should have
-805 license
along with th
areas that sh
gulatory and
seline risk.
20 of 26
Performanc
it Analysis”.
or a transitiow comments
a clear
e amendmen
he interactio
hould be
d industry
ce-
oning s.
nt
on
NRR Offi
TOPIC:
PURPOS
PREQUI
COMPET
AREAS:
LEVEL
OF EFFO
REFERE
EVALUA
CRITERI
ice Instructio
SE:
SITE:
TENCY
ORT:
ENCES: •
•
•
ATION
IA:
on ADM-507
Descriptio
GYO In
MSPI AND
The purpo
the concep
program.
uses resul
which are
MSPI is no
Reliability
review and
Completio
PRA IN RE
40 hours
NEI 99-02
Inspection
Regulatory
Maintenan
At the com
understan
7
on of Specifi
ISAndepend
D NEI-99-02
ose of this ac
pts of the M
The program
lts from the l
often used f
ot directly re
and Risk An
d audit chan
on of PRA Fu
EGULATION
2, “Reactor O
n Manual Ch
y Guide (RG
nce at Nucle
mpletion of th
ding of the M
c GYO PRA
A-GYO-2dent Stud
2
ctivity is for t
itigating Sys
m, which is p
licensee’s ac
for risk-infor
eviewed by th
nalysts may
nges to the u
undamental.
N
Oversight Pro
apter IMC-0
G) 1.160, “Mo
ear Power Pl
his activity, t
MSPI progra
A Analyst Act
2 dy Activ
the candidat
stems Perfor
part of the R
ctive baselin
med licensin
he NRR Div
be called up
underlying lic
ocess Perfo
0608, “Perfor
onitoring the
ants”
the analyst s
am.
Page
tivities
vity 2
te to become
rmance Inde
Reactor Over
ne risk asses
ng submittals
ision of Risk
pon by proce
censee PRA
rmance Indi
rmance Indic
e Effectivene
should have
21 of 26
e familiar wit
ex (MSPI)
rsight Progra
ssment mod
s. Although
k Assessmen
ess owners t
A models.
cators”.
cator Progra
ess of
a clear
th
am,
dels
nt,
to
am”.
NRR Offi
TASKS:
ice Instructio
•
•
•
•
on ADM-507
Descriptio
The stude
and guida
concentrat
Methods o
indices.
Use of Bir
Concerns
Review of
of Nuclear
7
on of Specifi
nt should se
nce of the T
ted in this se
of calculation
nbaum impo
over PRA q
reports from
r Power Ope
c GYO PRA
elf-study the
Technical Me
elf-study are
n of Unreliab
ortance rank
uality in the
m Consolidat
erations (INP
A Analyst Act
references
entor. The a
e:
bility (URI) a
king.
underlying P
ted Data En
PO).
Page
tivities
along with th
areas that sh
nd Unavaila
PRA analysi
try (CDE) fro
22 of 26
he interactio
hould be
ability (UAI)
is.
om the Instit
on
tute
NRR Offi
TOPIC:
PURPOS
PREQUI
COMPET
AREAS:
LEVEL
OF EFFO
REFERE
EVALUA
CRITERI
TASKS:
ice Instructio
SE:
SITE:
TENCY
ORT:
ENCES: •
ATION
IA:
on ADM-507
Descriptio
GYO In
SAMGs
The purpo
the Severe
Analysts n
for events
might beco
Completio
PRA IN RE
TBD
TBD
TBD.
TBD
7
on of Specifi
ISAndepend
ose of this ac
e Accident M
need to beco
occurring p
ome standal
on of PRA Fu
EGULATION
c GYO PRA
A-GYO-3dent Stud
ctivity is for t
Management
ome familiar
ast core dam
lone proced
undamentals
N
A Analyst Act
3 dy Activ
the candidat
t Guidelines
with guidan
mage. In lig
ures.
s.
Page
tivities
vity 3
te to become
s. Reliability
ce that licen
ht of recent
23 of 26
e familiar wit
and Risk
nsees will tak
events, SAM
th
ke
MGs
NRR Offi
TOPIC:
PURPOS
PREQUI
COMPET
AREAS:
LEVEL
OF EFFO
REFERE
EVALUA
CRITERI
TASKS:
ice Instructio
SE:
SITE:
TENCY
ORT:
ENCES: •
ATION
IA:
on ADM-507
Descriptio
GYO In
SAMA
The purpo
the Severe
their licens
become fa
approach.
Completio
PRA IN RE
TBD
NUREG-1
Renewal O
TBD.
TBD
7
on of Specifi
ISAndepend
ose of this ac
e Accident M
se extension
amiliar with l
on of PRA Fu
EGULATION
437, “Gener
Of Nuclear P
c GYO PRA
A-GYO-4dent Stud
ctivity is for t
Mitigation Alt
n application
icense renew
undamentals
N
ric Environm
Plants”.
A Analyst Act
4 dy Activ
the candidat
ternatives (S
ns. Reliabilit
wal activities
s.
mental Impac
Page
tivities
vity 4
te to become
SAMA) used
ty and Risk A
s which use
ct Statement
24 of 26
e familiar wit
by licensee
Analysts nee
a risk-inform
t For License
th
es in
ed to
med
e
NRR Offi
TOPIC:
PREQUI
COMPET
AREAS:
LEVEL
OF EFFO
REFERE
ice Instructio
SITE:
TENCY
ORT:
ENCES:
•
•
•
•
•
on ADM-507
Descriptio
GYO In
REGULAT
PURPOSE
regula
analy
used
Completio
PRA IN RE
40 hours
Maintenan (h)
Contents osub
Contents orep(d)
Safety GoSta
Policy Staand
7
on of Specifi
ISAndepend
TORY FRAM
E: The pu
atory framew
sts must und
by the NRC
on of PRA Fu
EGULATION
nce of record)(1) to (h)(3)
of applicatiobsections (a
of applicatioport; 10 CFR)(1) (2011)
als for the Oatement, 51
tement on Sd Existing P
c GYO PRA
A-GYO-5dent Stud
MEWORK F
rpose of this
work for new
derstand the
in the cond
undamentals
N
ds, making o(2007)
ns; technicaa)(8), (a)(23)
ns, technicaR 52.79, sub
Operations oFed. Reg. 3
Severe Reaclants, 50 Fe
A Analyst Act
5 dy Activ
FOR NEW R
s activity is t
w reactor PR
e risk termin
uct of its reg
s.
of reports; 10
al information, and (a)(27
al informationsections (a)
f Nuclear Po30028 (Aug.
ctor Accidented. Reg. 321
Page
tivities
vity 5
EACTOR P
o become fa
RA. Reliabilit
ologies and
gulatory activ
0 CFR 50.71
n; 10 CFR 5) (2009)
n in final saf(17), (a)(38)
ower Plants:21, 1986)
ts Regarding38 (Aug. 8,
25 of 26
RA (OPTION
amiliar with t
ty and risk
philosophie
vities.
1, subsection
2.47,
fety analysis ), (a)(46), an
Policy
g Future Des1985)
NAL)
the
s
ns
nd
signs
NRR Offi
EVALUA
CRITERI
.
TASKS:
ice Instructio
•
•
•
•
ATION
IA: At
th
Th
•
•
•
•
•
•
on ADM-507
Descriptio
Use of Pro Ac 199
Regulatory As to t
Regulatory Po Se (In Re
Standard R and 200
t the comple
e reliability a
he candidate
Discuss thPRA in reg
Discuss th
Discuss thcombined
Discuss thapplication
Discuss th
Discuss thin RG 1.17
7
on of Specifi
obabilistic Rtivities; Fina95)
y Guide (RGsessment inthe Licensin
y Guide (RGower Plants, evere Accideformation N
eferencing a
Review Pland Severe Ac07
etion of this a
and risk ana
e must be ab
he Commissgulatory mat
he quantitativ
he requiremelicense (CO
he scope of Pns.
he acceptanc
he five key p74.
c GYO PRA
isk Assessmal Policy Stat
G) 1.174, An n Risk-Informng Basis, Re
G) 1.206, CoSections C.
ent Evaluatioeeded for a Certified De
n (SRP) Secccident Evalu
activity, you
lyst’s role in
ble to:
ion policy sttters.
ve health ob
ents for newOL) applicant
PRA informa
ce criteria in
rinciples of r
A Analyst Act
ment Methodtement, 60 F
Approach fomed Decisionv. 1, Nov. 20
mbined LiceI.19 (Probab
on) and the laCombined L
esign), June
ction 19.0, Pruation for Ne
should have
new reacto
tatement reg
bjectives (QH
w reactor dests, both befo
ation that is
n SRP 19.0.
risk-informed
Page
tivities
ds in NuclearFed. Reg. 42
or Using Prons of Plant-S002
ense Applicabilistic Risk Aast page of License App2007
robabilistic Rew Reactors
e a clear und
r activities.
garding expa
HO) and sub
sign certificatore and after
requested in
d decision m
26 of 26
r Regulatory2622 (Aug. 1
obabilistic RiSpecific Cha
ations for NuAssessmentC.III.1
plication
Risk Assesss, Rev. 2, Ju
derstanding
anding the us
bsidiary goal
tion (DC) anr licensing.
n COL
making outlin
y 16,
isk anges
uclear t and
ment une
of
se of
s.
nd
ned
Enclosure 4
Forms
"Gro
w Y
ou
r O
wn
" P
RA
An
alys
t Q
ual
ific
atio
n a
nd
Tra
inin
g P
rog
ram
A
ctiv
ity
Sig
n-o
ff S
hee
t
Can
did
ate
Nam
e
H
om
e B
ran
ch
H
om
e B
ran
ch
Ch
ief
Tra
inin
g
Act
ivit
y D
escr
ipti
on
D
ate
C
om
ple
ted
Ap
pro
vals
B
ran
ch C
hie
f
Nam
e
Init
ials
Dat
e T
ech
nic
al
Men
tor
(s)
N
ame
"Gro
w Y
ou
r O
wn
" P
RA
An
alys
t Q
ual
ific
atio
n a
nd
Tra
inin
g P
rog
ram
E
qu
ival
ency
Ju
stif
icat
ion
Fo
rm
Ple
ase
fill
ou
t a
sep
arat
e in
div
idu
al f
orm
fo
r ea
ch w
aive
r o
r eq
uiv
alen
cy.
Can
did
ate’
s N
ame
C
and
idat
e’s
Ho
me
Bra
nch
Tra
inin
g
Act
ivit
y T
rain
ing
Act
ivit
y D
escr
ipti
on
Wai
ve o
r R
epla
ce?
(W
/R)
Wai
ver
Just
ific
atio
n o
r R
epla
cem
ent
Tra
inin
g A
ctiv
ity
Ap
pro
vals
B
ran
ch C
hie
f N
ame
B
ran
ch C
hie
f S
ign
atu
re
Man
ager
N
ame
M
anag
er
Sig
nat
ure
Dat
e S
ign
ed
D
ate
Sig
ned