Appendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone Barguna Division R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 029.20-032.51 S 3.31 4640 Regional Overlay 50mm @ IRI 5-7 2016 19.09779 1.945 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 032.51-034.71 S 2.2 4640 Regional Overlay 60mm @ IRI 7-9 2016 10.26571 2.528 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 034.71-035.61 S 0.9 4640 Regional Overlay 50mm @ IRI 5-7 2016 3.4965 1.969 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 035.61-038.61 S 3 4640 Regional DBST @ Traff 4000-6000 2016 5.4834 2.214 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 038.61-042.21 S 3.6 4640 Regional Overlay 50mm @ IRI 5-7 2016 14.2884 1.957 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 043.40-043.52 S 0.12 1717 Regional Overlay 50mm @ IRI 5-7 2016 1.31943 0.099 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 044.81-045.03 L 0.22 1717 Regional Overlay 50mm @ IRI 7-9 2016 1.322685 0.94 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 044.81-045.03 R 0.22 1717 Regional Overlay 50mm @ IRI 7-9 2016 1.322685 0.94 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 046.15-049.27 S 3.13 1717 Regional DBST @ 25% Crk 2016 5.850812 0.805 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 049.27-051.27 S 2 1717 Regional Overlay 50mm @ IRI 5-7 2016 11.361 0.708 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 051.27-052.17 S 0.9 1717 Regional Overlay 50mm @ IRI 7-9 2016 3.591 1.97 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 052.17-055.27 S 3.1 1717 Regional DBST @ Traff 100-2000 2016 5.81932 1.027 R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 055.27-055.73 S 0.46 1717 Regional Overlay 50mm @ IRI 5-7 2016 1.81545 1.678 Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 036.41-045.10 S 8.69 2548 Zilla Overlay 40mm @ Traff >=2000 2016 27.95225 0.598 Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 045.10-045.20 S 0.1 2548 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.824 Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 045.20-049.70 S 4.5 2548 Zilla Overlay 40mm @ Traff >=2000 2016 14.25047 0.275 Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 055.00-055.10 S 0.1 2548 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.757 Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 056.00-056.20 S 0.2 2548 Zilla Overlay 40mm @ Traff >=2000 2016 0.838812 0.117 Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 031.04-034.83 S 3.79 1389 Zilla Overlay 40mm @ 1000-2000 2016 11.90553 0 Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 056.13-062.53 S 6.4 1390 Zilla Overlay 40mm @ 1000-2000 2016 23.14714 0 Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 066.43-067.53 S 1.1 1390 Zilla Overlay 40mm @ 1000-2000 2016 3.45543 0 Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 067.73-068.13 S 0.4 1390 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0 Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 068.13-068.93 S 0.8 1390 Zilla Overlay 40mm @ 1000-2000 2016 2.51304 0 Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 068.93-069.13 S 0.2 1390 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0 Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 069.13-070.73 S 1.6 1390 Zilla Overlay 40mm @ 1000-2000 2016 5.02608 0 Z8814 Barguna-Dewatala-Mathbaria-Baramasua Road Km 000.00-001.40 S 1.4 2108 Zilla Overlay 40mm @ Traff >=2000 2016 6.584844 0 Sub-Total Barguna Division 184.8074 Barisal Division N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 167.09-167.11 L 0.02 7342 National Overlay 50mm @ IRI 4-7 2016 0.12852 10.216 N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 167.09-167.11 R 0.02 7342 National Overlay 50mm @ IRI 4-7 2016 0.12852 10.216 N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 173.10-173.12 L 0.02 7342 National Overlay 50mm @ IRI 4-7 2016 0.13104 11.311 N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 173.10-173.12 R 0.02 7342 National Overlay 50mm @ IRI 4-7 2016 0.13104 11.311 N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 173.12-176.04 S 2.92 7342 National Overlay 50mm @ IRI 4-7 2016 17.18259 3.815 N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 176.04-176.68 S 0.64 7342 National DBST @ Traff >6000 2016 1.749748 5.985 N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 000.00-002.49 L 2.49 1666 National Overlay 50mm @ IRI 5-9 2016 16.47135 0.759 N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 000.00-002.49 R 2.49 1666 National Overlay 50mm @ IRI 5-9 2016 16.99425 0.701 N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 002.77-003.98 S 1.21 1666 National Overlay 50mm @ IRI 5-9 2016 7.3689 1.024 N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 004.00-005.15 S 1.15 1666 National Full Recon 110mm 2016 32.90978 0.091 N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 006.05-015.08 S 9.03 1666 National Overlay 50mm @ IRI 5-9 2016 54.9927 0.564 N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 015.08-016.56 S 1.48 1666 National DBST @ Traff 100-2000 2016 4.240496 0.699 R870 Barisal-Jhalokati-Bhandaria-Pirojpur Road Km 003.00-003.47 S 0.47 3154 Regional Overlay 50mm @ IRI 5-7 2016 2.720025 3.709 Page 1 of 163

NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Barisal ZoneBarguna DivisionR880 Patuakhali-Amtali-Barguna-Kakchira Road Km 029.20-032.51 S 3.31 4640 Regional Overlay 50mm @ IRI 5-7 2016 19.09779 1.945R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 032.51-034.71 S 2.2 4640 Regional Overlay 60mm @ IRI 7-9 2016 10.26571 2.528R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 034.71-035.61 S 0.9 4640 Regional Overlay 50mm @ IRI 5-7 2016 3.4965 1.969R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 035.61-038.61 S 3 4640 Regional DBST @ Traff 4000-6000 2016 5.4834 2.214R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 038.61-042.21 S 3.6 4640 Regional Overlay 50mm @ IRI 5-7 2016 14.2884 1.957R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 043.40-043.52 S 0.12 1717 Regional Overlay 50mm @ IRI 5-7 2016 1.31943 0.099R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 044.81-045.03 L 0.22 1717 Regional Overlay 50mm @ IRI 7-9 2016 1.322685 0.94R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 044.81-045.03 R 0.22 1717 Regional Overlay 50mm @ IRI 7-9 2016 1.322685 0.94R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 046.15-049.27 S 3.13 1717 Regional DBST @ 25% Crk 2016 5.850812 0.805R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 049.27-051.27 S 2 1717 Regional Overlay 50mm @ IRI 5-7 2016 11.361 0.708R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 051.27-052.17 S 0.9 1717 Regional Overlay 50mm @ IRI 7-9 2016 3.591 1.97R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 052.17-055.27 S 3.1 1717 Regional DBST @ Traff 100-2000 2016 5.81932 1.027R880 Patuakhali-Amtali-Barguna-Kakchira Road Km 055.27-055.73 S 0.46 1717 Regional Overlay 50mm @ IRI 5-7 2016 1.81545 1.678Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 036.41-045.10 S 8.69 2548 Zilla Overlay 40mm @ Traff >=2000 2016 27.95225 0.598Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 045.10-045.20 S 0.1 2548 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.824Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 045.20-049.70 S 4.5 2548 Zilla Overlay 40mm @ Traff >=2000 2016 14.25047 0.275Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 055.00-055.10 S 0.1 2548 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.757Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 056.00-056.20 S 0.2 2548 Zilla Overlay 40mm @ Traff >=2000 2016 0.838812 0.117Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 031.04-034.83 S 3.79 1389 Zilla Overlay 40mm @ 1000-2000 2016 11.90553 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 056.13-062.53 S 6.4 1390 Zilla Overlay 40mm @ 1000-2000 2016 23.14714 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 066.43-067.53 S 1.1 1390 Zilla Overlay 40mm @ 1000-2000 2016 3.45543 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 067.73-068.13 S 0.4 1390 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 068.13-068.93 S 0.8 1390 Zilla Overlay 40mm @ 1000-2000 2016 2.51304 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 068.93-069.13 S 0.2 1390 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 069.13-070.73 S 1.6 1390 Zilla Overlay 40mm @ 1000-2000 2016 5.02608 0Z8814 Barguna-Dewatala-Mathbaria-Baramasua Road Km 000.00-001.40 S 1.4 2108 Zilla Overlay 40mm @ Traff >=2000 2016 6.584844 0Sub-Total Barguna Division 184.8074

Barisal DivisionN8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 167.09-167.11 L 0.02 7342 National Overlay 50mm @ IRI 4-7 2016 0.12852 10.216N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 167.09-167.11 R 0.02 7342 National Overlay 50mm @ IRI 4-7 2016 0.12852 10.216N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 173.10-173.12 L 0.02 7342 National Overlay 50mm @ IRI 4-7 2016 0.13104 11.311N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 173.10-173.12 R 0.02 7342 National Overlay 50mm @ IRI 4-7 2016 0.13104 11.311N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 173.12-176.04 S 2.92 7342 National Overlay 50mm @ IRI 4-7 2016 17.18259 3.815N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 176.04-176.68 S 0.64 7342 National DBST @ Traff >6000 2016 1.749748 5.985N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 000.00-002.49 L 2.49 1666 National Overlay 50mm @ IRI 5-9 2016 16.47135 0.759N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 000.00-002.49 R 2.49 1666 National Overlay 50mm @ IRI 5-9 2016 16.99425 0.701N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 002.77-003.98 S 1.21 1666 National Overlay 50mm @ IRI 5-9 2016 7.3689 1.024N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 004.00-005.15 S 1.15 1666 National Full Recon 110mm 2016 32.90978 0.091N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 006.05-015.08 S 9.03 1666 National Overlay 50mm @ IRI 5-9 2016 54.9927 0.564N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 015.08-016.56 S 1.48 1666 National DBST @ Traff 100-2000 2016 4.240496 0.699R870 Barisal-Jhalokati-Bhandaria-Pirojpur Road Km 003.00-003.47 S 0.47 3154 Regional Overlay 50mm @ IRI 5-7 2016 2.720025 3.709

Page 1 of 163

Page 2: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z8033 Gariarpar-Banaripara-Kawkhali-Naikati Road Km 004.00-007.20 S 3.2 2296 Zilla Overlay 40mm @ Traff >=2000 2016 14.9424 0.048Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 000.00-000.10 S 0.1 1244 Zilla Overlay 40mm @ 1000-2000 2016 0.46695 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 001.00-003.03 S 2.03 1244 Zilla Overlay 40mm @ 1000-2000 2016 8.682086 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 008.02-008.97 S 0.95 1244 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 009.05-010.05 S 1 1244 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 010.05-010.17 S 0.12 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 010.17-010.27 S 0.1 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 010.27-010.77 S 0.5 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 010.77-011.77 S 1 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 011.77-012.07 S 0.3 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 012.07-012.57 S 0.5 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 012.57-013.37 S 0.8 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 013.37-013.67 S 0.3 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 013.67-013.87 S 0.2 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 013.87-014.17 S 0.3 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 014.17-019.83 S 5.66 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8034 Rahamatpur-Babuganj-Muladi-Hizla Road Km 020.88-022.37 S 1.49 800 Zilla Overlay 40mm @ IRI>12 2016 0 0Z8040 Barisal (Beltala)-Shaistabad-Fakirbari Road Km 004.80-005.90 S 1.1 1850 Zilla Overlay 40mm @ IRI>12 2016 3.45543 0Z8040 Barisal (Beltala)-Shaistabad-Fakirbari Road Km 006.00-006.80 S 0.8 1850 Zilla Rehab 75mm @ IRI 9-12 2016 8.85928 0.112Z8044 Barisal (Dinerpool)-Laxmipasha-Dumki Road Km 009.20-010.10 S 0.9 1089 Zilla Overlay 40mm @ 1000-2000 2016 2.796606 0Z8044 Barisal (Dinerpool)-Laxmipasha-Dumki Road Km 012.80-012.90 S 0.1 1089 Zilla Overlay 40mm @ IRI>12 2016 0.310734 0Z8049 Agailjhara By-Pass Road Km 000.00-000.10 S 0.1 2277 Zilla Overlay 40mm @ Traff >=2000 2016 0.467799 0.132Z8049 Agailjhara By-Pass Road Km 000.10-002.90 S 2.8 2277 Zilla Rehab 75mm @ IRI 9-12 2016 46.0922 0.032Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 001.00-001.80 S 0.8 1089 Zilla Overlay 40mm @ IRI>12 2016 2.485872 0Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 001.90-002.00 S 0.1 1089 Zilla Overlay 40mm @ IRI>12 2016 0.310734 0Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 002.10-002.30 S 0.2 1089 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 0.078Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 003.40-004.00 S 0.6 1089 Zilla Overlay 40mm @ 1000-2000 2016 1.864404 0Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 004.70-004.80 S 0.1 1089 Zilla Overlay 40mm @ 1000-2000 2016 0.310734 0.256Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 004.80-005.60 S 0.8 1089 Zilla Overlay 40mm @ IRI>12 2016 2.485872 0Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 005.60-005.90 S 0.3 1089 Zilla Overlay 40mm @ 1000-2000 2016 0.932202 0Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 005.90-006.40 S 0.5 1089 Zilla Overlay 40mm @ IRI>12 2016 1.57065 0Sub-Total Barisal Division 253.3738

Bhola DivisionR890 Bhola -Burhanuddin-Lalmohon-Char Manika Km 003.10-009.25 S 6.15 3545 Regional DBST @ 25% Crk 2016 16.72042 0.791R890 Bhola -Burhanuddin-Lalmohon-Char Manika Km 027.35-041.62 S 14.27 3545 Regional DBST @ 25% Crk 2016 38.76344 0.818R890 Bhola -Burhanuddin-Lalmohon-Char Manika Km 041.62-045.54 S 3.92 3603 Regional DBST @ 25% Crk 2016 10.64249 1.405R890 Bhola -Burhanuddin-Lalmohon-Char Manika Km 045.54-049.14 S 3.6 3603 Regional Full Recon 135mm @ IRI 12 2016 108.1872 1.32R890 Bhola -Burhanuddin-Lalmohon-Char Manika Km 049.14-051.04 S 1.9 3603 Regional Full Recon 135mm @ IRI 12 2016 57.0988 0.776R890 Bhola -Burhanuddin-Lalmohon-Char Manika Km 051.04-051.64 S 0.6 3603 Regional Rehab 135mm @ IRI 9-12 2016 14.9424 1.122R891 Bhola (Illisha Junction)-Illisha Road Km 000.00-000.62 S 0.62 2412 Regional Overlay 50mm @ IRI 7-9 2016 3.551625 2.025Z8913 Debirchar-Nazirpur-Lalmohon-Tazumuddin Road Km 001.60-001.80 S 0.2 4417 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 1.136Z8913 Debirchar-Nazirpur-Lalmohon-Tazumuddin Road Km 001.80-004.90 S 3.1 4417 Zilla Overlay 50mm @ IRI 6-9 2016 12.0435 2.139Z8913 Debirchar-Nazirpur-Lalmohon-Tazumuddin Road Km 004.90-009.60 S 4.7 4417 Zilla Rehab 75mm @ IRI 9-12 2016 52.89229 1.563Z8913 Debirchar-Nazirpur-Lalmohon-Tazumuddin Road Km 009.70-011.33 S 1.63 4417 Zilla Rehab 75mm @ IRI 9-12 2016 18.28723 1.601Z8913 Debirchar-Nazirpur-Lalmohon-Tazumuddin Road Km 014.40-017.40 S 3 1867 Zilla Overlay 40mm @ IRI>12 2016 13.14252 0

Page 2 of 163

Page 3: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z8915 Baghmara-Banglabazar-Daulatkhan Road Km 000.00-009.20 S 9.2 2829 Zilla Overlay 40mm @ Traff >=2000 2016 37.64806 0.345Z8915 Baghmara-Banglabazar-Daulatkhan Road Km 012.50-012.80 S 0.3 2811 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.739Z8915 Baghmara-Banglabazar-Daulatkhan Road Km 012.80-013.40 S 0.6 2811 Zilla Full Recon 75mm @ IRI>12 2016 10.58929 0.181Z8915 Baghmara-Banglabazar-Daulatkhan Road Km 013.41-014.60 S 1.19 2811 Zilla Overlay 40mm @ IRI>12 2016 5.556705 0Z8943 Tajumuddin-Kunjerhat Road Km 000.00-008.80 S 8.8 2373 Zilla Overlay 40mm @ Traff >=2000 2016 31.1549 0.011Sub-Total Bhola Division 435.38

Jhalokati DivisionR870 Barisal-Jhalokati-Bhandaria-Pirojpur Road Km 024.50-027.70 S 3.2 3154 Regional Overlay 50mm @ IRI 5-7 2016 18.5136 3.299Z8052 Binapani-Kachua-Patuakhali Road Km 000.00-004.10 S 4.1 3017 Zilla Rehab 75mm @ IRI 9-12 2016 45.52652 1.496Z8056 Dapdapia-Mollaherhat Road Km 000.00-000.20 S 0.2 1159 Zilla Overlay 40mm @ 1000-2000 2016 0.682596 0Z8056 Dapdapia-Mollaherhat Road Km 009.57-012.60 S 3.03 3122 Zilla Overlay 40mm @ Traff >=2000 2016 10.01939 0.287Z8056 Dapdapia-Mollaherhat Road Km 012.60-013.00 S 0.4 3122 Zilla Overlay 40mm @ Traff >=2000 2016 1.32444 0.627Z8056 Dapdapia-Mollaherhat Road Km 013.00-013.20 S 0.2 3122 Zilla Overlay 40mm @ Cracks >25% 2016 0.62712 0.055Z8056 Dapdapia-Mollaherhat Road Km 013.20-014.40 S 1.2 3122 Zilla Overlay 40mm @ Traff >=2000 2016 3.97332 0.656Z8056 Dapdapia-Mollaherhat Road Km 014.40-014.50 S 0.1 3122 Zilla Overlay 40mm @ Cracks >25% 2016 0.31356 0.055Z8056 Dapdapia-Mollaherhat Road Km 014.50-015.20 S 0.7 3122 Zilla Overlay 40mm @ Traff >=2000 2016 2.31777 0.748Z8056 Dapdapia-Mollaherhat Road Km 015.20-015.60 S 0.4 3122 Zilla Overlay 40mm @ Traff >=2000 2016 1.32444 0.273Z8056 Dapdapia-Mollaherhat Road Km 015.60-018.20 S 2.6 3122 Zilla Overlay 40mm @ Traff >=2000 2016 8.233602 0.86Z8056 Dapdapia-Mollaherhat Road Km 018.20-021.20 S 3 3122 Zilla Overlay 40mm @ Traff >=2000 2016 9.4239 0Z8058 Nalchity-Pir Moazzam Hossain Road Km 002.20-002.40 S 0.2 1939 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z8058 Nalchity-Pir Moazzam Hossain Road Km 004.90-006.20 S 1.3 1939 Zilla Overlay 40mm @ 1000-2000 2016 4.19406 0Z8058 Nalchity-Pir Moazzam Hossain Road Km 006.70-007.70 S 1 1939 Zilla Overlay 40mm @ 1000-2000 2016 3.2262 0Z8062 Pir Moazzem Hossain- Rajapur (Mirerhat) Road Km 000.00-003.20 S 3.2 1091 Zilla Overlay 40mm @ 1000-2000 2016 10.05216 0Z8702 Rajapur-Naikathi-Bekutia-Pirojpur Road Km 001.70-004.80 S 3.1 2354 Zilla Overlay 40mm @ Traff >=2000 2016 15.00183 0Z8702 Rajapur-Naikathi-Bekutia-Pirojpur Road Km 004.80-004.90 S 0.1 2054 Zilla Overlay 40mm @ Traff >=2000 2016 0.48393 0Z8705 Bhandaria-Paikhkhali-Kathalia Road Km 005.97-009.00 S 3.03 1854 Zilla Overlay 40mm @ 1000-2000 2016 14.12991 0Z8705 Bhandaria-Paikhkhali-Kathalia Road Km 009.00-009.10 S 0.1 1854 Zilla Overlay 40mm @ 1000-2000 2016 0.46695 0Z8705 Bhandaria-Paikhkhali-Kathalia Road Km 009.10-011.89 S 2.79 1854 Zilla Overlay 40mm @ 1000-2000 2016 13.00456 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 000.00-003.00 S 3 1390 Zilla Overlay 40mm @ IRI>12 2016 9.88236 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 003.80-004.20 S 0.4 1390 Zilla Overlay 40mm @ IRI>12 2016 1.25652 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 005.60-006.10 S 0.5 1151 Zilla Overlay 40mm @ IRI>12 2016 1.57065 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 006.30-006.40 S 0.1 932 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 006.60-007.20 S 0.6 932 Zilla Overlay 40mm @ IRI>12 2016 1.88478 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 013.70-015.40 S 1.7 932 Zilla Overlay 40mm @ IRI>12 2016 5.859798 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 015.60-015.70 S 0.1 932 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z8708 Rajapur-Kathalia-Amua-Bamna-Patharghata Road Km 018.30-019.20 S 0.9 1017 Zilla Overlay 40mm @ IRI>12 2016 2.82717 0Z8740 Kathalia (Bandaghata)-Kaikhali-Banaihat Road Km 005.10-005.20 S 0.1 917 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z8740 Kathalia (Bandaghata)-Kaikhali-Banaihat Road Km 005.40-005.50 S 0.1 917 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Sub-Total Jhalokati Division 188.0229

Patuakhali DivisionR880 Patuakhali-Amtali-Barguna-Kakchira Road Km 000.00-029.20 S 29.2 4640 Regional DBST @ 25% Crk 2016 108.9072 0.537R881 Amtali-Khepupara-Kuakata Road Km 024.40-026.60 S 2.2 3116 Regional Overlay 50mm @ IRI 7-9 2016 12.705 1.19R881 Amtali-Khepupara-Kuakata Road Km 026.60-033.50 S 6.9 3116 Regional Overlay 50mm @ IRI 5-7 2016 39.8475 1.069

Page 3 of 163

Page 4: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R881 Amtali-Khepupara-Kuakata Road Km 033.50-035.10 S 1.6 3116 Regional Overlay 50mm @ IRI 7-9 2016 9.24 1.207R881 Amtali-Khepupara-Kuakata Road Km 035.10-035.50 S 0.4 3116 Regional Overlay 50mm @ IRI 7-9 2016 2.31 1.253R881 Amtali-Khepupara-Kuakata Road Km 035.50-035.60 S 0.1 3116 Regional DBST @ Traff 2000-4000 2016 0.2717 1.602Z8052 Binapani-Kachua-Patuakhali Road Km 013.00-013.60 S 0.6 3576 Zilla Rehab 75mm @ IRI 9-12 2016 6.64446 1.668Z8052 Binapani-Kachua-Patuakhali Road Km 023.60-026.79 S 3.19 3171 Zilla Overlay 40mm @ Traff >=2000 2016 16.53105 0.014Z8804 Galachipa (Haridebpur)-Bhadura-Shakharia Road Km 003.60-007.10 S 3.5 2311 Zilla Overlay 40mm @ Traff >=2000 2016 16.34325 0.038Z8804 Galachipa (Haridebpur)-Bhadura-Shakharia Road Km 007.10-013.40 S 6.3 2311 Zilla Overlay 40mm @ Traff >=2000 2016 29.41318 0.066Z8804 Galachipa (Haridebpur)-Bhadura-Shakharia Road Km 013.40-015.90 S 2.5 2311 Zilla Overlay 40mm @ Traff >=2000 2016 11.67375 0Z8804 Galachipa (Haridebpur)-Bhadura-Shakharia Road Km 015.90-016.53 S 0.63 2311 Zilla Overlay 40mm @ Traff >=2000 2016 3.231022 0Z8806 Lebukhali-Dumki-Galachipa-Amragachhia Road Km 000.00-002.86 S 2.86 2335 Zilla Overlay 40mm @ Traff >=2000 2016 8.492547 0.444Z8806 Lebukhali-Dumki-Galachipa-Amragachhia Road Km 006.00-010.00 S 4 1628 Zilla Overlay 40mm @ 1000-2000 2016 17.72712 0Z8806 Lebukhali-Dumki-Galachipa-Amragachhia Road Km 070.98-073.99 S 3.01 921 Zilla Overlay 40mm @ Traff 100-1000 2016 14.03652 0.232Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 028.55-028.65 S 0.1 1089 Zilla Overlay 40mm @ 1000-2000 2016 0.310734 0Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 028.65-028.85 S 0.2 1089 Zilla Overlay 40mm @ 1000-2000 2016 0.621468 0Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 032.45-032.55 S 0.1 1089 Zilla Overlay 40mm @ 1000-2000 2016 0.310734 0Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 032.55-034.05 S 1.5 1089 Zilla Overlay 40mm @ 1000-2000 2016 4.66101 0Z8910 Barisal (Bairagirpool)-Tumchar-Bauphaul Road Km 037.25-037.35 S 0.1 1089 Zilla Overlay 40mm @ IRI>12 2016 0.310734 0Sub-Total Patuakhali Division 303.589

Pirojpur DivisionR870 Barisal-Jhalokati-Bhandaria-Pirojpur Road Km 042.28-044.00 S 1.72 3178 Regional Overlay 50mm @ IRI 5-7 2016 11.13512 1.52R870 Barisal-Jhalokati-Bhandaria-Pirojpur Road Km 044.00-054.27 S 10.27 3452 Regional Overlay 50mm @ IRI 5-7 2016 59.30926 0.856R870 Barisal-Jhalokati-Bhandaria-Pirojpur Road Km 058.37-059.77 S 1.4 3452 Regional Overlay 50mm @ IRI 7-9 2016 8.085 1.622R870 Barisal-Jhalokati-Bhandaria-Pirojpur Road Km 059.77-060.87 S 1.1 3452 Regional DBST @ 25% Crk 2016 2.9887 0.736R870 Barisal-Jhalokati-Bhandaria-Pirojpur Road Km 060.87-061.87 S 1 3452 Regional Overlay 50mm @ IRI 7-9 2016 5.775 1.507R870 Barisal-Jhalokati-Bhandaria-Pirojpur Road Km 063.26-064.25 S 1 3007 Regional Overlay 50mm @ IRI 5-7 2016 5.746125 1.15Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 000.00-001.10 S 1.1 4166 Zilla Overlay 50mm @ IRI 6-9 2016 4.35435 1.793Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 001.10-001.40 S 0.3 4166 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 1.314Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 001.40-002.30 S 0.9 4166 Zilla Rehab 75mm @ IRI 9-12 2016 9.96669 0.891Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 002.30-002.40 S 0.1 4166 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.284Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 002.40-003.10 S 0.7 4166 Zilla Rehab 75mm @ IRI 9-12 2016 7.751869 0.97Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 003.10-004.40 S 1.3 4166 Zilla Rehab 75mm @ IRI 9-12 2016 14.39633 1.143Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 004.50-006.70 S 2.2 4166 Zilla Rehab 75mm @ IRI 9-12 2016 24.36302 1.05Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 006.70-006.90 S 0.2 4166 Zilla Overlay 50mm @ IRI 6-9 2016 0.777 1.583Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 006.90-008.50 S 1.6 4166 Zilla Rehab 75mm @ IRI 9-12 2016 17.71856 1.114Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 008.80-011.10 S 2.3 4166 Zilla Rehab 75mm @ IRI 9-12 2016 25.47043 0.901Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 011.20-012.30 S 1.1 4166 Zilla Rehab 75mm @ IRI 9-12 2016 12.18151 1.115Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 012.30-012.60 S 0.3 4166 Zilla Overlay 50mm @ IRI 6-9 2016 1.161615 1.696Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 012.60-012.90 S 0.3 4166 Zilla Overlay 50mm @ IRI 6-9 2016 1.1655 2.1Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 013.20-014.00 S 0.8 4166 Zilla Rehab 75mm @ IRI 9-12 2016 8.85928 1.213Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 014.10-018.31 S 4.21 4166 Zilla Rehab 75mm @ IRI 9-12 2016 46.65518 1.186Z7707 Pirojpur-Sreeramkathi-Swarupkathi Road Km 018.31-031.00 S 12.69 4166 Zilla Rehab 75mm @ IRI 9-12 2016 149.6222 1.217Z7709 Priojpur Kheya Ghat-Hularhat Road Km 003.00-006.10 S 3.1 4166 Zilla Overlay 50mm @ IRI 6-9 2016 17.9025 0.692Z7709 Priojpur Kheya Ghat-Hularhat Road Km 006.10-006.18 S 0.08 4166 Zilla Overlay 50mm @ IRI 6-9 2016 0.462 1.603Z7711 Togra-Zianagar-Balipara-Kalaron-Synashi Road Km 000.00-001.00 S 1 899 Zilla Overlay 40mm @ Traff 100-1000 2016 4.76289 0Z7715 Pirojpur-Nazirpur By-Pass Road Km 000.00-002.54 S 2.54 1658 Zilla Overlay 40mm @ 1000-2000 2016 16.2405 0

Page 4 of 163

Page 5: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z8033 Gariarpar-Banaripara-Kawkhali-Naikati Road Km 022.31-025.70 S 3.39 2225 Zilla Overlay 40mm @ Traff >=2000 2016 15.81093 0.05Z8033 Gariarpar-Banaripara-Kawkhali-Naikati Road Km 032.83-032.93 S 0.1 2225 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 0.558Z8033 Gariarpar-Banaripara-Kawkhali-Naikati Road Km 032.93-033.03 S 0.1 2225 Zilla Overlay 40mm @ Traff >=2000 2016 0.310734 0.226Z8033 Gariarpar-Banaripara-Kawkhali-Naikati Road Km 035.63-036.33 S 0.7 2225 Zilla Rehab 75mm @ IRI 9-12 2016 7.668065 0.443Z8033 Gariarpar-Banaripara-Kawkhali-Naikati Road Km 040.51-043.61 S 3.1 2225 Zilla Overlay 40mm @ IRI>12 2016 13.10686 0Z8033 Gariarpar-Banaripara-Kawkhali-Naikati Road Km 046.71-046.81 S 0.1 2225 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z8033 Gariarpar-Banaripara-Kawkhali-Naikati Road Km 048.51-049.36 S 0.85 2225 Zilla Overlay 40mm @ IRI>12 2016 3.969075 0Z8037 Barisal-Karapur-Nabagram-Swarupkathi Road Km 023.20-023.40 S 0.2 729 Zilla Overlay 40mm @ IRI>12 2016 0.621468 0Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 010.00-020.60 S 10.6 2548 Zilla Overlay 40mm @ Traff >=2000 2016 33.29778 0.622Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 020.60-025.90 S 5.3 2548 Zilla Overlay 40mm @ Traff >=2000 2016 20.65362 0.164Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 025.90-026.40 S 0.5 2548 Zilla Rehab 75mm @ IRI 9-12 2016 7.1832 0.54Z8701 Charkhali-Tushkhali-Mathbaria-Patharghata Road Km 034.80-035.70 S 0.9 2548 Zilla Rehab 75mm @ IRI 9-12 2016 9.96669 0.88Z8703 Jhalokati (Dhanshiri)-Kawkhali Road Km 008.50-009.70 S 1.2 2054 Zilla Rehab 75mm @ IRI 9-12 2016 13.14526 0.576Z8705 Bhandaria-Paikhkhali-Kathalia Road Km 001.30-002.10 S 0.8 1854 Zilla Overlay 40mm @ 1000-2000 2016 3.7356 0Z8705 Bhandaria-Paikhkhali-Kathalia Road Km 005.80-005.97 S 0.17 1854 Zilla Overlay 40mm @ 1000-2000 2016 0.812493 0Z8814 Barguna-Dewatala-Mathbaria-Baramasua Road Km 021.10-030.91 S 9.81 2108 Zilla Overlay 40mm @ Traff >=2000 2016 31.58182 0Sub-Total Pirojpur Division 625.7028Total Barisal Zone 1990.876

Chittagong ZoneBandarban DivisionN108 Keranirhat-Bandarban Road Km 000.00-000.04 L 0.04 5161 National Overlay 50mm @ IRI 5-9 2016 0.273 3.842N108 Keranirhat-Bandarban Road Km 000.00-000.04 R 0.04 5161 National Overlay 50mm @ IRI 5-9 2016 0.273 3.842N108 Keranirhat-Bandarban Road Km 000.04-003.20 S 3.16 5161 National Overlay 50mm @ IRI 5-9 2016 19.2444 3.483N108 Keranirhat-Bandarban Road Km 003.20-006.10 S 2.9 5161 National Overlay 50mm @ IRI 5-9 2016 17.2711 3.645N108 Keranirhat-Bandarban Road Km 006.10-006.40 S 0.3 5161 National Rehab 150mm @ IRI 9-12 2016 8.18685 2.19N108 Keranirhat-Bandarban Road Km 006.40-016.00 S 9.6 5161 National Overlay 50mm @ IRI 5-9 2016 56.85712 3.979N108 Keranirhat-Bandarban Road Km 016.00-019.20 S 3.2 5161 National Overlay 50mm @ IRI 5-9 2016 18.9504 3.501N108 Keranirhat-Bandarban Road Km 019.20-020.60 S 1.4 5161 National Overlay 50mm @ IRI 5-9 2016 8.2908 2.726N108 Keranirhat-Bandarban Road Km 020.60-020.80 S 0.2 5161 National Full Recon 150mm @ IRI 12 2016 6.844704 1.909N108 Keranirhat-Bandarban Road Km 020.80-021.10 S 0.3 5161 National Overlay 50mm @ IRI 5-9 2016 1.7766 4.221N108 Keranirhat-Bandarban Road Km 021.10-021.30 S 0.2 5161 National Rehab 150mm @ IRI 9-12 2016 5.44824 2.156N108 Keranirhat-Bandarban Road Km 021.30-022.54 S 1.24 5161 National DBST @ Traff 4000-6000 2016 5.159716 1.196R161 Rangamati-Chandragona-Bandarban Road Km 030.73-037.09 S 6.36 2133 Regional Overlay 50mm @ IRI 7-9 2016 37.15303 1.483R161 Rangamati-Chandragona-Bandarban Road Km 037.09-037.19 S 0.1 2133 Regional DBST @ Traff 2000-4000 2016 0.273676 1.582R161 Rangamati-Chandragona-Bandarban Road Km 037.19-038.29 S 1.1 2133 Regional Overlay 50mm @ IRI 7-9 2016 6.3987 1.356R161 Rangamati-Chandragona-Bandarban Road Km 038.29-041.29 S 3 2133 Regional DBST @ Traff 2000-4000 2016 8.21028 1.321R161 Rangamati-Chandragona-Bandarban Road Km 041.29-042.19 S 0.9 2133 Regional Overlay 50mm @ IRI 7-9 2016 5.2353 1.381R161 Rangamati-Chandragona-Bandarban Road Km 042.19-043.89 S 1.7 2133 Regional DBST @ Traff 2000-4000 2016 4.554393 0.317R161 Rangamati-Chandragona-Bandarban Road Km 043.89-053.99 S 10.1 2133 Regional Overlay 50mm @ IRI 7-9 2016 50.80298 2.122R161 Rangamati-Chandragona-Bandarban Road Km 053.99-057.10 S 3.11 2133 Regional DBST @ Traff 2000-4000 2016 7.364947 2.022R161 Rangamati-Chandragona-Bandarban Road Km 057.10-060.19 S 3.09 2133 Regional DBST @ Traff 2000-4000 2016 8.467535 1.397R161 Rangamati-Chandragona-Bandarban Road Km 060.19-061.18 S 0.98 2133 Regional Overlay 50mm @ IRI 7-9 2016 6.374844 0.934Z1001 Ramu-Naikhongchhari Road Km 006.70-007.00 S 0.3 502 Zilla Overlay 40mm @ Traff 100-1000 2016 0.996641 0

Page 5 of 163

Page 6: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1005 Chiringa-Lama-Alikadam Road Km 008.18-011.40 S 3.22 2831 Zilla Overlay 40mm @ Traff >=2000 2016 10.04232 1.43Z1005 Chiringa-Lama-Alikadam Road Km 011.40-017.80 S 6.4 2831 Zilla Overlay 40mm @ Traff >=2000 2016 19.89008 1.841Z1005 Chiringa-Lama-Alikadam Road Km 017.80-019.20 S 1.4 2831 Zilla Rehab 75mm @ IRI 9-12 2016 15.33613 1.314Z1005 Chiringa-Lama-Alikadam Road Km 019.20-019.60 S 0.4 2831 Zilla Overlay 40mm @ Traff >=2000 2016 1.242936 1.454Z1005 Chiringa-Lama-Alikadam Road Km 019.60-020.51 S 0.9 2831 Zilla Rehab 75mm @ IRI 9-12 2016 9.869896 1.419Z1005 Chiringa-Lama-Alikadam Road Km 020.61-020.71 S 0.1 2831 Zilla Rehab 75mm @ IRI 9-12 2016 1.095438 2.464Z1005 Chiringa-Lama-Alikadam Road Km 020.71-021.31 S 0.6 2831 Zilla Overlay 40mm @ Traff >=2000 2016 1.864404 1.528Z1005 Chiringa-Lama-Alikadam Road Km 021.51-021.61 S 0.1 2831 Zilla Overlay 40mm @ Traff >=2000 2016 0.310734 0.13Z1005 Chiringa-Lama-Alikadam Road Km 021.61-021.71 S 0.1 2831 Zilla Rehab 75mm @ IRI 9-12 2016 1.095438 1.673Z1005 Chiringa-Lama-Alikadam Road Km 021.71-022.81 S 1.1 2831 Zilla Overlay 40mm @ Traff >=2000 2016 3.418074 1.358Z1005 Chiringa-Lama-Alikadam Road Km 022.81-023.21 S 0.4 2831 Zilla Rehab 75mm @ IRI 9-12 2016 4.381752 1.272Z1005 Chiringa-Lama-Alikadam Road Km 023.21-026.01 S 2.8 2831 Zilla Overlay 40mm @ Traff >=2000 2016 8.679879 1.45Z1005 Chiringa-Lama-Alikadam Road Km 026.01-026.21 S 0.2 2831 Zilla Rehab 75mm @ IRI 9-12 2016 2.18489 1.405Z1005 Chiringa-Lama-Alikadam Road Km 026.21-027.21 S 1 2831 Zilla Overlay 40mm @ Traff >=2000 2016 3.09885 1.55Z1005 Chiringa-Lama-Alikadam Road Km 027.90-028.51 S 0.61 2831 Zilla Overlay 40mm @ Traff >=2000 2016 1.877903 1.509Z1005 Chiringa-Lama-Alikadam Road Km 028.51-028.61 S 0.1 2831 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 2.06Z1005 Chiringa-Lama-Alikadam Road Km 028.61-029.21 S 0.6 2831 Zilla Overlay 40mm @ Traff >=2000 2016 1.85931 1.627Z1005 Chiringa-Lama-Alikadam Road Km 029.21-029.31 S 0.1 2831 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 1.795Z1005 Chiringa-Lama-Alikadam Road Km 029.31-032.41 S 3.1 2831 Zilla Overlay 40mm @ Traff >=2000 2016 9.635861 1.756Z1005 Chiringa-Lama-Alikadam Road Km 032.41-032.51 S 0.1 2831 Zilla Full Recon 75mm @ IRI>12 2016 1.599696 1.952Z1005 Chiringa-Lama-Alikadam Road Km 032.51-035.61 S 3.1 2831 Zilla Overlay 40mm @ Traff >=2000 2016 9.688517 1.543Z1005 Chiringa-Lama-Alikadam Road Km 035.81-035.91 S 0.1 2831 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 1.987Z1005 Chiringa-Lama-Alikadam Road Km 035.91-036.41 S 0.5 2831 Zilla Overlay 40mm @ Traff >=2000 2016 1.55367 1.116Z1005 Chiringa-Lama-Alikadam Road Km 036.99-037.71 S 0.72 2831 Zilla Overlay 40mm @ Traff >=2000 2016 2.23107 1.115Z1005 Chiringa-Lama-Alikadam Road Km 037.71-037.81 S 0.1 2831 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 1.674Z1005 Chiringa-Lama-Alikadam Road Km 039.11-039.21 S 0.1 2831 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 1.53Z1013 Tonkabati-Baro Aulia Road Km 000.00-020.05 S 20.05 1172 Zilla Overlay 40mm @ 1000-2000 2016 61.26554 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 000.40-001.00 S 0.6 1048 Zilla Overlay 40mm @ IRI>12 2016 2.75076 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 001.50-003.80 S 2.3 1048 Zilla Rehab 75mm @ IRI 9-12 2016 25.12623 0.34Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 003.80-004.10 S 0.3 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 004.10-005.70 S 1.6 1048 Zilla Rehab 75mm @ IRI 9-12 2016 17.49004 0.043Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 005.70-005.80 S 0.1 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 005.80-006.10 S 0.3 1048 Zilla Rehab 75mm @ IRI 9-12 2016 3.277335 0.172Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 006.10-006.20 S 0.1 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 006.20-006.30 S 0.1 1048 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.343Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 006.30-006.50 S 0.2 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 006.50-006.90 S 0.4 1048 Zilla Full Recon 75mm @ IRI>12 2016 6.34662 0.072Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 006.90-007.40 S 0.5 1048 Zilla Overlay 40mm @ 1000-2000 2016 1.549425 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 007.40-008.10 S 0.7 1048 Zilla Rehab 75mm @ IRI 9-12 2016 7.647114 0.113Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 008.19-009.30 S 1.11 1048 Zilla Full Recon 75mm @ IRI>12 2016 17.56427 0.05Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 009.30-009.60 S 0.3 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 009.60-009.90 S 0.3 1048 Zilla Rehab 75mm @ IRI 9-12 2016 3.277335 0.167Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 009.90-010.00 S 0.1 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 010.00-011.00 S 1 1048 Zilla Overlay 40mm @ IRI>12 2016 3.09885 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 011.00-011.10 S 0.1 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 011.10-011.50 S 0.4 1048 Zilla Full Recon 75mm @ IRI>12 2016 6.34662 0.116

Page 6 of 163

Page 7: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 011.50-011.60 S 0.1 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 011.60-012.10 S 0.5 1048 Zilla Full Recon 75mm @ IRI>12 2016 7.933275 0.047Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 012.10-012.50 S 0.4 1048 Zilla Overlay 40mm @ 1000-2000 2016 1.23954 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 012.50-014.10 S 1.6 1048 Zilla Rehab 75mm @ IRI 9-12 2016 17.58588 0.135Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 014.10-014.30 S 0.2 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.626562 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 014.30-015.80 S 1.5 1048 Zilla Overlay 40mm @ IRI>12 2016 4.699215 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 015.80-015.90 S 0.1 1048 Zilla Overlay 40mm @ 1000-2000 2016 0.313281 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 015.90-018.20 S 2.3 1048 Zilla Rehab 75mm @ IRI 9-12 2016 25.40159 0.238Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 018.20-018.50 S 0.3 746 Zilla Full Recon 75mm @ IRI>12 2016 4.773006 0.257Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 018.50-018.80 S 0.3 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.932202 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 018.80-022.60 S 3.8 729 Zilla Full Recon 75mm @ IRI>12 2016 60.45807 0.104Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 022.60-023.40 S 0.8 729 Zilla Full Recon 75mm @ IRI>12 2016 12.74393 0.206Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 023.40-023.70 S 0.3 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.932202 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 023.70-024.80 S 1.1 729 Zilla Full Recon 75mm @ IRI>12 2016 17.40539 0.129Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 024.80-027.90 S 3.1 729 Zilla Overlay 40mm @ Traff 100-1000 2016 9.47484 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 027.90-028.10 S 0.2 729 Zilla Rehab 75mm @ IRI 9-12 2016 2.15496 0.342Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 028.10-028.60 S 0.5 729 Zilla Overlay 40mm @ Traff 100-1000 2016 1.5282 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 028.60-029.90 S 1.3 729 Zilla Rehab 75mm @ IRI 9-12 2016 14.00724 0.183Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 029.90-030.80 S 0.9 729 Zilla Overlay 40mm @ Traff 100-1000 2016 2.75076 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 031.50-032.80 S 1.3 729 Zilla Overlay 40mm @ Traff 100-1000 2016 3.976376 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 032.80-035.00 S 2.2 729 Zilla Rehab 75mm @ IRI 9-12 2016 23.9021 0.485Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 042.91-046.01 S 3.1 729 Zilla Rehab 75mm @ IRI 9-12 2016 33.77301 0.589Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 046.01-047.61 S 1.6 729 Zilla Full Recon 75mm @ IRI>12 2016 25.31693 0.204Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 047.71-050.11 S 2.4 729 Zilla Full Recon 75mm @ IRI>12 2016 37.88684 0.125Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 050.11-050.81 S 0.7 729 Zilla Overlay 40mm @ Traff 100-1000 2016 2.145423 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 050.81-052.11 S 1.3 729 Zilla Full Recon 75mm @ IRI>12 2016 20.57 0.062Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 052.11-052.21 S 0.1 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.309885 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 052.21-052.71 S 0.5 729 Zilla Rehab 75mm @ IRI 9-12 2016 5.462225 0.621Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 052.71-052.87 S 0.17 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.520607 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 052.87-052.97 S 0.1 729 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.246Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 052.97-053.07 S 0.1 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.309885 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 053.07-055.37 S 2.3 729 Zilla Rehab 75mm @ IRI 9-12 2016 25.12623 0.214Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 056.27-056.57 S 0.3 729 Zilla Rehab 75mm @ IRI 9-12 2016 3.277335 0.392Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 056.57-057.07 S 0.5 729 Zilla Overlay 40mm @ Traff 100-1000 2016 1.549425 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 057.07-058.48 S 1.4 729 Zilla Rehab 75mm @ IRI 9-12 2016 15.30515 0.038Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 058.48-058.78 S 0.3 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.929655 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 058.78-060.18 S 1.4 729 Zilla Overlay 40mm @ Traff 100-1000 2016 4.33839 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 060.18-060.28 S 0.1 729 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.223Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 060.28-060.48 S 0.2 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.61977 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 060.48-060.58 S 0.1 729 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.182Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 063.78-063.88 S 0.1 729 Zilla Full Recon 75mm @ IRI>12 2016 1.569267 0.282Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 065.18-065.38 S 0.2 729 Zilla Rehab 75mm @ IRI 9-12 2016 2.160946 0.517Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 065.38-065.48 S 0.1 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.306489 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 067.08-067.48 S 0.4 729 Zilla Rehab 75mm @ IRI 9-12 2016 4.321892 0.612Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 067.68-068.38 S 0.7 729 Zilla Rehab 75mm @ IRI 9-12 2016 7.56331 0.426Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 068.68-068.78 S 0.1 729 Zilla Full Recon 75mm @ IRI>12 2016 1.569267 0.276

Page 7 of 163

Page 8: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 069.08-069.18 S 0.1 729 Zilla Full Recon 75mm @ IRI>12 2016 1.569267 0.248Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 069.28-069.58 S 0.3 729 Zilla Full Recon 75mm @ IRI>12 2016 4.707801 0.225Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 069.98-070.98 S 1 729 Zilla Rehab 75mm @ IRI 9-12 2016 10.80473 0.584Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 070.98-072.78 S 1.8 729 Zilla Overlay 40mm @ Traff 100-1000 2016 5.516802 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 072.78-073.08 S 0.3 729 Zilla Rehab 75mm @ IRI 9-12 2016 3.241419 0.208Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 073.58-073.98 S 0.4 729 Zilla Rehab 75mm @ IRI 9-12 2016 4.321892 0.189Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 073.98-074.68 S 0.7 729 Zilla Overlay 40mm @ Traff 100-1000 2016 2.145423 0Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 074.68-075.28 S 0.6 729 Zilla Rehab 75mm @ IRI 9-12 2016 6.482838 0.418Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 076.08-076.18 S 0.1 729 Zilla Rehab 75mm @ IRI 9-12 2016 1.080473 0.755Z1811 Bandarban-Thanchi-Alikadam-Gundum Road Km 108.66-109.66 S 1 729 Zilla Rehab 75mm @ IRI 9-12 2016 10.87546 0.607Z1812 Chimbuk-Ruma Road Km 001.00-001.60 S 0.6 729 Zilla Overlay 40mm @ Traff 100-1000 2016 1.874592 0Z1812 Chimbuk-Ruma Road Km 001.60-001.90 S 0.3 729 Zilla Rehab 75mm @ IRI 9-12 2016 3.304272 0.196Z1812 Chimbuk-Ruma Road Km 001.90-002.00 S 0.1 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.312432 0Z1812 Chimbuk-Ruma Road Km 002.00-002.70 S 0.7 729 Zilla Full Recon 75mm @ IRI>12 2016 11.19787 0.107Z1812 Chimbuk-Ruma Road Km 003.40-004.30 S 0.9 729 Zilla Rehab 75mm @ IRI 9-12 2016 10.00943 0.289Z1812 Chimbuk-Ruma Road Km 004.30-004.50 S 0.2 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.631656 0Z1812 Chimbuk-Ruma Road Km 004.50-004.90 S 0.4 729 Zilla Rehab 75mm @ IRI 9-12 2016 4.453584 0.451Z1812 Chimbuk-Ruma Road Km 004.90-005.00 S 0.1 729 Zilla Overlay 40mm @ Traff 100-1000 2016 0.315828 0Z1812 Chimbuk-Ruma Road Km 005.00-005.20 S 0.2 729 Zilla Rehab 75mm @ IRI 9-12 2016 2.226792 0.166Z1812 Chimbuk-Ruma Road Km 005.30-005.60 S 0.3 729 Zilla Full Recon 75mm @ IRI>12 2016 4.851252 0.099Z1812 Chimbuk-Ruma Road Km 005.80-006.30 S 0.5 729 Zilla Full Recon 75mm @ IRI>12 2016 8.020215 0.101Z1812 Chimbuk-Ruma Road Km 006.50-007.10 S 0.6 729 Zilla Full Recon 75mm @ IRI>12 2016 9.624258 0.092Z1812 Chimbuk-Ruma Road Km 007.50-007.60 S 0.1 729 Zilla Full Recon 75mm @ IRI>12 2016 1.604043 0.236Z1812 Chimbuk-Ruma Road Km 007.90-008.20 S 0.3 729 Zilla Full Recon 75mm @ IRI>12 2016 4.812129 0.222Z1812 Chimbuk-Ruma Road Km 008.30-013.50 S 5.2 729 Zilla Full Recon 75mm @ IRI>12 2016 83.62019 0.185Z1812 Chimbuk-Ruma Road Km 013.70-016.70 S 3 729 Zilla Full Recon 75mm @ IRI>12 2016 47.99088 0.106Z1812 Chimbuk-Ruma Road Km 019.80-022.70 S 2.9 729 Zilla Rehab 75mm @ IRI 9-12 2016 31.9413 0.518Z1813 Bandarban-Rowangchhari-Ruma Road Km 001.40-002.00 S 0.6 1711 Zilla Rehab 75mm @ IRI 9-12 2016 6.46488 0.526Z1813 Bandarban-Rowangchhari-Ruma Road Km 002.00-002.50 S 0.5 1711 Zilla Overlay 40mm @ 1000-2000 2016 1.5282 0Z1813 Bandarban-Rowangchhari-Ruma Road Km 002.50-002.60 S 0.1 1711 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 0.496Z1813 Bandarban-Rowangchhari-Ruma Road Km 002.60-002.80 S 0.2 1711 Zilla Overlay 40mm @ 1000-2000 2016 0.61128 0Z1813 Bandarban-Rowangchhari-Ruma Road Km 002.80-003.10 S 0.3 1711 Zilla Full Recon 75mm @ IRI>12 2016 4.69476 0.444Z1813 Bandarban-Rowangchhari-Ruma Road Km 003.20-005.80 S 2.6 1711 Zilla Rehab 75mm @ IRI 9-12 2016 28.02525 0.69Z1813 Bandarban-Rowangchhari-Ruma Road Km 005.80-005.90 S 0.1 1711 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 0.281Z1813 Bandarban-Rowangchhari-Ruma Road Km 005.90-006.00 S 0.1 1711 Zilla Overlay 40mm @ 1000-2000 2016 0.30564 0Z1813 Bandarban-Rowangchhari-Ruma Road Km 006.00-006.20 S 0.2 1711 Zilla Full Recon 75mm @ IRI>12 2016 3.12984 0.468Z1813 Bandarban-Rowangchhari-Ruma Road Km 006.20-006.50 S 0.3 1711 Zilla Overlay 40mm @ 1000-2000 2016 0.91692 0Z1813 Bandarban-Rowangchhari-Ruma Road Km 006.50-007.20 S 0.7 1711 Zilla Full Recon 75mm @ IRI>12 2016 10.95444 0.244Z1813 Bandarban-Rowangchhari-Ruma Road Km 007.20-007.50 S 0.3 1711 Zilla Overlay 40mm @ 1000-2000 2016 0.91692 0Z1813 Bandarban-Rowangchhari-Ruma Road Km 007.50-014.00 S 6.5 1711 Zilla Rehab 75mm @ IRI 9-12 2016 69.8524 0.364Z1813 Bandarban-Rowangchhari-Ruma Road Km 014.00-014.30 S 0.3 1711 Zilla Overlay 40mm @ 1000-2000 2016 0.89145 0Z1813 Bandarban-Rowangchhari-Ruma Road Km 014.33-015.80 S 1.48 1711 Zilla Rehab 75mm @ IRI 9-12 2016 15.47231 0.066Z1813 Bandarban-Rowangchhari-Ruma Road Km 015.90-016.10 S 0.2 1711 Zilla Rehab 75mm @ IRI 9-12 2016 2.0951 0.291Z1813 Bandarban-Rowangchhari-Ruma Road Km 016.50-016.80 S 0.3 1711 Zilla Rehab 75mm @ IRI 9-12 2016 3.174076 0.125Z1813 Bandarban-Rowangchhari-Ruma Road Km 016.80-017.30 S 0.5 1711 Zilla Overlay 40mm @ 1000-2000 2016 1.48575 0Z1813 Bandarban-Rowangchhari-Ruma Road Km 017.30-017.50 S 0.2 1711 Zilla Rehab 75mm @ IRI 9-12 2016 2.0951 0.301

Page 8 of 163

Page 9: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1813 Bandarban-Rowangchhari-Ruma Road Km 017.50-018.00 S 0.5 1711 Zilla Overlay 40mm @ 1000-2000 2016 1.48575 0Z1813 Bandarban-Rowangchhari-Ruma Road Km 018.00-018.40 S 0.4 1711 Zilla Rehab 75mm @ IRI 9-12 2016 4.1902 0.201Z1813 Bandarban-Rowangchhari-Ruma Road Km 018.40-018.60 S 0.2 1711 Zilla Overlay 40mm @ 1000-2000 2016 0.5943 0Sub-Total Bandarban Division 1416.25

Chittagong DivisionN1 Dhaka-Comilla-Chittagong-Teknaf Road Km 165.33-173.38 L 8.06 13764 National Overlay 80mm @ IRI 4-9 2016 125.1757 21.417N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 165.33-173.38 R 8.06 13923 National Overlay 80mm @ IRI 4-9 2016 125.1757 22.113N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 173.38-173.58 L 0.2 13764 National Full Recon 195mm 2016 13.72588 8.67N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 173.38-173.58 R 0.2 13923 National Full Recon 195mm 2016 13.72588 8.892N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 173.58-176.18 L 2.6 13764 National Full Recon 195mm 2016 178.4364 8.496N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 173.58-176.18 R 2.6 13923 National Full Recon 195mm 2016 178.4364 8.769N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 176.18-176.38 L 0.2 13764 National Full Recon 195mm 2016 13.72588 8.67N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 176.18-176.38 R 0.2 13923 National Full Recon 195mm 2016 13.72588 8.892N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 176.38-178.98 L 2.6 13764 National Full Recon 195mm 2016 178.4364 8.479N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 176.38-178.98 R 2.6 13923 National Full Recon 195mm 2016 178.4364 8.751N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 178.98-179.58 L 0.6 13764 National Full Recon 195mm 2016 41.17764 8.395N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 178.98-179.58 R 0.6 13923 National Full Recon 195mm 2016 41.17764 8.636N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 179.58-198.58 L 19 14334 National Overlay 80mm @ IRI 4-9 2016 295.2569 23.201N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 179.58-198.58 R 19 14600 National Overlay 80mm @ IRI 4-9 2016 295.2569 23.873N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 198.58-199.48 L 0.9 17233 National Full Recon 195mm @ IRI 12 2016 61.76646 11.61N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 198.58-199.48 R 0.9 18043 National Full Recon 195mm @ IRI 12 2016 61.76646 12.647N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 199.48-199.88 L 0.4 17233 National Full Recon 195mm @ IRI 12 2016 27.52039 11.61N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 199.48-199.88 R 0.4 18043 National Full Recon 195mm @ IRI 12 2016 27.52039 12.647N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 199.88-200.18 L 0.3 17233 National Full Recon 195mm @ IRI 12 2016 20.58882 11.61N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 199.88-200.18 R 0.3 18043 National Full Recon 195mm @ IRI 12 2016 20.58882 12.647N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 200.18-207.48 L 7.3 17233 National Full Recon 195mm @ IRI 12 2016 500.9946 11.61N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 200.18-207.48 R 7.3 18043 National Full Recon 195mm @ IRI 12 2016 500.9946 12.647N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 207.48-207.58 L 0.1 17233 National Full Recon 195mm @ IRI 12 2016 6.86294 11.506N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 207.48-207.58 R 0.1 18043 National Full Recon 195mm @ IRI 12 2016 6.86294 12.59N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 207.58-209.79 L 2.2 17233 National Rehab 195mm @ IRI 9-12 2016 125.4605 12.395N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 207.58-209.79 R 2.2 18043 National Rehab 195mm @ IRI 9-12 2016 125.4605 13.6N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 209.79-209.99 L 0.2 17233 National Full Recon 195mm @ IRI 12 2016 13.72588 11.535N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 209.79-209.99 R 0.2 18043 National Full Recon 195mm @ IRI 12 2016 13.72588 12.601N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 209.99-210.69 L 0.7 17233 National Rehab 195mm @ IRI 9-12 2016 39.90112 12.552N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 209.99-210.69 R 0.7 18043 National Rehab 195mm @ IRI 9-12 2016 39.90112 13.725N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 210.69-211.09 L 0.4 17233 National Full Recon 195mm @ IRI 12 2016 27.45176 11.61N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 210.69-211.09 R 0.4 18043 National Full Recon 195mm @ IRI 12 2016 27.45176 12.647N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 211.09-220.89 L 9.8 17233 National Overlay 80mm @ IRI 4-9 2016 152.2899 29.285N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 211.09-220.89 R 9.8 18043 National Overlay 80mm @ IRI 4-9 2016 152.2899 31.958N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 220.89-221.19 L 0.3 17233 National Full Recon 195mm @ IRI 12 2016 20.58882 11.61N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 220.89-221.19 R 0.3 18043 National Full Recon 195mm @ IRI 12 2016 20.58882 12.647N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 221.19-228.41 L 7.22 17233 National Rehab 195mm @ IRI 9-12 2016 411.5515 12.301N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 221.19-228.41 R 7.22 18043 National Rehab 195mm @ IRI 9-12 2016 411.5515 13.528N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 228.41-232.75 L 4.35 10561 National Overlay 80mm @ IRI 4-9 2016 76.25666 6.791N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 228.41-232.75 R 4.35 10561 National Overlay 80mm @ IRI 4-9 2016 75.96917 6.821

Page 9 of 163

Page 10: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 232.75-241.66 S 8.91 10561 National Overlay 80mm @ IRI 4-9 2016 104.5587 15.486N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 241.66-242.46 S 0.8 10561 National Overlay 80mm @ IRI 4-9 2016 9.45516 14.783N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 242.46-242.56 S 0.09 10561 National Full Recon 195mm 2016 4.888749 6.415N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 242.56-245.16 L 2.59 10561 National Rehab 195mm @ IRI 9-12 2016 117.9296 6.233N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 242.56-245.16 R 2.59 10561 National Rehab 195mm @ IRI 9-12 2016 117.9296 6.233N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 245.16-247.89 S 2.74 10561 National Overlay 80mm @ IRI 4-9 2016 33.79623 16.338N106 Chittagong-Hathazari-Rangamati Km 000.00-000.30 S 0.3 20563 National Overlay 80mm @ IRI 5-9 2016 5.430105 12.041N106 Chittagong-Hathazari-Rangamati Km 000.30-000.40 S 0.1 20563 National Full Recon 195mm @ IRI 12 2016 5.18371 7.134N106 Chittagong-Hathazari-Rangamati Km 000.40-000.50 S 0.1 20563 National Overlay 80mm @ IRI 5-9 2016 1.17363 19.6N106 Chittagong-Hathazari-Rangamati Km 000.50-001.00 S 0.5 20563 National Full Recon 195mm @ IRI 12 2016 25.91855 6.424N106 Chittagong-Hathazari-Rangamati Km 001.00-001.30 S 0.3 20563 National Overlay 80mm @ IRI 5-9 2016 3.52089 19.542N106 Chittagong-Hathazari-Rangamati Km 001.30-001.50 S 0.2 20563 National Rehab 195mm @ IRI 9-12 2016 8.61088 7.906N106 Chittagong-Hathazari-Rangamati Km 001.50-001.80 S 0.3 20563 National Overlay 80mm @ IRI 5-9 2016 3.52089 19.394N106 Chittagong-Hathazari-Rangamati Km 001.80-002.04 S 0.24 20563 National Rehab 195mm @ IRI 9-12 2016 10.33306 7.851N106 Chittagong-Hathazari-Rangamati Km 002.10-005.30 L 3.2 20563 National Overlay 80mm @ IRI 5-9 2016 38.62615 17.797N106 Chittagong-Hathazari-Rangamati Km 002.10-005.30 R 3.2 20563 National Overlay 80mm @ IRI 5-9 2016 38.73197 17.746N106 Chittagong-Hathazari-Rangamati Km 005.30-005.40 L 0.1 20563 National Rehab 195mm @ IRI 9-12 2016 4.438848 7.438N106 Chittagong-Hathazari-Rangamati Km 005.30-005.40 R 0.1 20563 National Rehab 195mm @ IRI 9-12 2016 4.42672 7.46N106 Chittagong-Hathazari-Rangamati Km 005.50-005.60 L 0.1 20563 National Full Recon 195mm 2016 5.344332 6.606N106 Chittagong-Hathazari-Rangamati Km 005.50-005.60 R 0.1 20563 National Full Recon 195mm 2016 5.32973 6.626N106 Chittagong-Hathazari-Rangamati Km 005.60-007.73 L 2.13 20563 National Overlay 80mm @ IRI 5-9 2016 25.76081 17.383N106 Chittagong-Hathazari-Rangamati Km 005.60-007.73 R 2.13 20563 National Overlay 80mm @ IRI 5-9 2016 25.69043 17.432N106 Chittagong-Hathazari-Rangamati Km 007.90-008.80 L 0.9 20563 National Overlay 80mm @ IRI 5-9 2016 10.86021 17.998N106 Chittagong-Hathazari-Rangamati Km 007.90-008.80 R 0.9 20563 National Overlay 80mm @ IRI 5-9 2016 10.86021 17.998N106 Chittagong-Hathazari-Rangamati Km 008.80-009.55 L 0.75 20563 National Rehab 195mm @ IRI 9-12 2016 33.15613 7.488N106 Chittagong-Hathazari-Rangamati Km 008.80-009.55 R 0.75 20563 National Rehab 195mm @ IRI 9-12 2016 33.15613 7.488N106 Chittagong-Hathazari-Rangamati Km 009.55-025.01 S 15.46 12388 National Overlay 80mm @ IRI 5-9 2016 148.7323 12.118N106 Chittagong-Hathazari-Rangamati Km 025.01-025.11 S 0.1 10703 National Full Recon 195mm @ IRI 12 2016 4.52662 3.794N106 Chittagong-Hathazari-Rangamati Km 025.11-025.28 S 0.17 10703 National Overlay 50mm @ IRI 5 2016 1.09368 9.867N106 Chittagong-Hathazari-Rangamati Km 025.28-030.41 S 5.13 2907 National Overlay 50mm @ IRI 5-9 2016 34.54093 3.956R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 000.00-000.04 L 0.04 3733 Regional DBST @ Traff 2000-4000 2016 0.11856 3.555R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 000.00-000.04 R 0.04 3733 Regional DBST @ 25% Crk 2016 0.12844 2.973R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 000.40-001.50 S 1.1 3733 Regional Full Recon 135mm 2016 33.41782 2.25R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 001.50-002.10 S 0.6 3733 Regional Rehab 135mm @ IRI 9-12 2016 15.13258 2.201R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 002.10-003.20 S 1.1 3733 Regional Rehab 135mm @ IRI 9-12 2016 27.74306 2.426R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 003.20-003.90 S 0.7 3733 Regional Rehab 135mm @ IRI 9-12 2016 17.69275 2.09R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 003.90-004.00 S 0.1 3733 Regional Full Recon 135mm 2016 3.05984 2.988R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 004.00-007.30 S 3.3 3733 Regional Overlay 50mm @ IRI 7-9 2016 19.404 5.178R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 007.30-010.30 S 3 3733 Regional DBST @ Traff 2000-4000 2016 8.26956 4.872R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 010.30-010.50 S 0.2 3733 Regional Overlay 50mm @ IRI 5-7 2016 1.1697 5.454R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 010.50-011.00 S 0.5 3733 Regional Rehab 135mm @ IRI 9-12 2016 12.61048 2.125R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 011.00-011.30 S 0.3 3733 Regional Overlay 50mm @ IRI 5-7 2016 1.75455 5.367R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 011.30-011.40 S 0.1 3733 Regional Full Recon 135mm 2016 3.043448 2.802R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 011.40-011.60 S 0.2 3733 Regional DBST @ Traff 2000-4000 2016 0.547564 5.243R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 011.60-011.80 S 0.2 3733 Regional Full Recon 135mm 2016 6.086896 2.517R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 011.80-011.90 S 0.1 3733 Regional Overlay 50mm @ IRI 5-7 2016 0.58485 5.796

Page 10 of 163

Page 11: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 011.90-012.40 S 0.5 3733 Regional Rehab 135mm @ IRI 9-12 2016 12.61048 2.419R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 012.40-013.30 S 0.9 3733 Regional Overlay 50mm @ IRI 7-9 2016 5.28255 5.266R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 013.30-013.70 S 0.4 3733 Regional Rehab 135mm @ IRI 9-12 2016 10.17894 2.124R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 013.70-014.00 S 0.3 3733 Regional Overlay 50mm @ IRI 7-9 2016 1.7703 5.08R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 014.00-018.60 S 4.6 3733 Regional Overlay 50mm @ IRI 7-9 2016 27.048 5.282R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 018.60-022.30 S 3.7 3733 Regional Overlay 50mm @ IRI 7-9 2016 18.21572 6.392R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 022.30-024.20 S 1.9 3525 Regional Rehab 135mm @ IRI 9-12 2016 31.14358 1.544R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 024.20-024.90 S 0.7 3525 Regional Overlay 50mm @ IRI 7-9 2016 2.6607 4.474R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 024.90-025.80 S 0.9 3525 Regional Rehab 135mm @ IRI 9-12 2016 14.75222 1.595R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 025.80-026.00 S 0.2 3525 Regional Overlay 50mm @ IRI 7-9 2016 0.7602 4.812R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 026.00-027.30 S 1.3 3525 Regional Rehab 135mm @ IRI 9-12 2016 21.17474 1.603R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 027.30-027.70 S 0.4 3525 Regional DBST @ Traff 2000-4000 2016 0.709384 3.91R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 027.70-027.90 S 0.2 3525 Regional Rehab 135mm @ IRI 9-12 2016 3.26016 1.895R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 027.90-028.10 S 0.2 3525 Regional Overlay 50mm @ IRI 7-9 2016 0.7581 4.819R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 028.10-028.30 S 0.2 3525 Regional Full Recon 135mm 2016 3.945008 1.894R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 028.30-031.40 S 3.1 3525 Regional Overlay 50mm @ IRI 7-9 2016 11.718 4.389R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 031.40-037.76 S 6.36 3525 Regional Overlay 50mm @ IRI 5-7 2016 23.43978 4.481R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 037.76-038.56 S 0.8 3525 Regional Overlay 50mm @ IRI 7-9 2016 3.0408 4.421R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 038.56-038.76 S 0.2 3525 Regional Rehab 135mm @ IRI 9-12 2016 3.278272 1.85R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 038.76-042.26 S 3.5 3525 Regional Overlay 50mm @ IRI 5-7 2016 13.26675 4.357R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 042.26-045.06 S 2.8 3525 Regional Overlay 50mm @ IRI 5-7 2016 10.639 4.305R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 045.06-045.16 S 0.1 3525 Regional Full Recon 135mm 2016 1.983432 2.444R151 Baraiyerhat-Karerhat-Narayanhat-Fatikchhari Km 045.16-047.70 S 2.55 3525 Regional Overlay 50mm @ IRI 5-7 2016 9.681147 4.337R152 Heako-Ramgarh-Jaliapara Road Km 001.50-001.70 S 0.2 1975 Regional Overlay 50mm @ IRI 7-9 2016 1.1781 2.783R152 Heako-Ramgarh-Jaliapara Road Km 003.00-005.00 S 2 1975 Regional Overlay 50mm @ IRI 7-9 2016 11.78689 2.324R152 Heako-Ramgarh-Jaliapara Road Km 005.80-006.00 S 0.2 1975 Regional Rehab 110mm @ IRI 9-12 2016 4.14064 1.041R152 Heako-Ramgarh-Jaliapara Road Km 006.10-006.20 S 0.1 1975 Regional Full Recon 110mm 2016 2.753172 0.709R152 Heako-Ramgarh-Jaliapara Road Km 006.20-008.30 S 2.1 1975 Regional Overlay 50mm @ IRI 5-7 2016 12.28185 2.009R152 Heako-Ramgarh-Jaliapara Road Km 008.30-008.40 S 0.1 1975 Regional Rehab 110mm @ IRI 9-12 2016 2.055532 1.134R152 Heako-Ramgarh-Jaliapara Road Km 008.40-008.70 S 0.3 1975 Regional Overlay 50mm @ IRI 5-7 2016 1.7514 2.148R152 Heako-Ramgarh-Jaliapara Road Km 008.70-010.50 S 1.8 1975 Regional Rehab 110mm @ IRI 9-12 2016 37.39885 0.933R152 Heako-Ramgarh-Jaliapara Road Km 010.50-014.70 S 4.2 1975 Regional Overlay 50mm @ IRI 5-7 2016 24.70188 2.452R152 Heako-Ramgarh-Jaliapara Road Km 014.70-014.73 S 0.03 1975 Regional Rehab 110mm @ IRI 9-12 2016 0.580725 1.727R160 Hathazari-Fatikchhari-Khagrachhari Road Km 003.10-006.20 S 3.1 7269 Regional Overlay 60mm @ IRI 5.5-9 2016 21.49161 10.72R160 Hathazari-Fatikchhari-Khagrachhari Road Km 007.20-007.50 S 0.3 7269 Regional DBST @ Traff >6000 2016 0.819546 10.879R160 Hathazari-Fatikchhari-Khagrachhari Road Km 007.50-017.30 S 9.8 7269 Regional Overlay 60mm @ IRI 5.5-9 2016 68.29405 9.881R160 Hathazari-Fatikchhari-Khagrachhari Road Km 017.30-020.30 S 3 7269 Regional Overlay 60mm @ IRI 5.5-9 2016 21.05433 10.595R160 Hathazari-Fatikchhari-Khagrachhari Road Km 020.30-023.50 S 3.2 7269 Regional Overlay 60mm @ IRI 5.5-9 2016 23.86653 8.383R160 Hathazari-Fatikchhari-Khagrachhari Road Km 023.50-024.00 S 0.5 7269 Regional DBST @ Traff >6000 2016 1.37826 11.618R160 Hathazari-Fatikchhari-Khagrachhari Road Km 024.50-024.60 S 0.1 1576 Regional DBST @ Traff 100-2000 2016 0.275652 1.683R160 Hathazari-Fatikchhari-Khagrachhari Road Km 025.50-025.70 S 0.2 1576 Regional DBST @ Traff 100-2000 2016 0.551304 1.985R160 Hathazari-Fatikchhari-Khagrachhari Road Km 025.70-031.88 S 6.18 1576 Regional Overlay 50mm @ IRI 5-7 2016 36.20862 1.391R163 Chittagong -Chandragona Road Km 000.00-002.40 S 2.4 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 16.21296 3.353R163 Chittagong -Chandragona Road Km 002.40-002.50 S 0.1 7716 Regional Full Recon 180mm 2016 3.77946 1.736R163 Chittagong -Chandragona Road Km 002.50-003.00 S 0.5 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 3.3777 4.471R163 Chittagong -Chandragona Road Km 003.00-003.10 S 0.1 7716 Regional Full Recon 180mm 2016 3.77946 1.798

Page 11 of 163

Page 12: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R163 Chittagong -Chandragona Road Km 003.10-004.60 S 1.5 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 10.13986 4.627R163 Chittagong -Chandragona Road Km 004.60-006.10 S 1.5 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 10.1331 3.13R163 Chittagong -Chandragona Road Km 006.10-006.20 S 0.1 7716 Regional Rehab 150mm @ IRI 9-12 2016 2.6082 2.205R163 Chittagong -Chandragona Road Km 006.20-009.20 S 3 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 19.77831 3.662R163 Chittagong -Chandragona Road Km 009.20-009.30 S 0.1 7716 Regional Rehab 150mm @ IRI 9-12 2016 2.5116 2.846R163 Chittagong -Chandragona Road Km 009.30-010.60 S 1.3 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 8.456759 4.818R163 Chittagong -Chandragona Road Km 010.60-010.70 S 0.1 7716 Regional Rehab 150mm @ IRI 9-12 2016 2.5116 2.261R163 Chittagong -Chandragona Road Km 010.70-011.00 S 0.3 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 1.95156 5.142R163 Chittagong -Chandragona Road Km 011.00-011.50 S 0.5 7716 Regional DBST @ Traff >6000 2016 1.2844 4.34R163 Chittagong -Chandragona Road Km 011.50-012.00 S 0.5 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 3.2526 4.901R163 Chittagong -Chandragona Road Km 012.00-015.10 S 3.1 7716 Regional DBST @ Traff >6000 2016 7.965849 4.247R163 Chittagong -Chandragona Road Km 015.10-017.40 S 2.3 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 15.01951 4.671R163 Chittagong -Chandragona Road Km 017.40-017.80 S 0.4 7716 Regional Rehab 150mm @ IRI 9-12 2016 10.2396 1.67R163 Chittagong -Chandragona Road Km 017.80-020.90 S 3.1 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 20.55393 4.153R163 Chittagong -Chandragona Road Km 020.90-021.00 S 0.1 7716 Regional Full Recon 180mm 2016 3.70947 2.278R163 Chittagong -Chandragona Road Km 021.00-021.30 S 0.3 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 1.98909 4.953R163 Chittagong -Chandragona Road Km 021.30-021.60 S 0.3 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 1.98909 5.328R163 Chittagong -Chandragona Road Km 021.60-022.10 S 0.5 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 3.31515 4.662R163 Chittagong -Chandragona Road Km 022.10-022.20 S 0.1 7716 Regional Full Recon 180mm 2016 3.70947 2.259R163 Chittagong -Chandragona Road Km 022.20-027.30 S 5.1 7716 Regional DBST @ 25% Crk 2016 13.40584 2.359R163 Chittagong -Chandragona Road Km 027.30-027.60 S 0.3 7716 Regional Overlay 60mm @ IRI 5.5-9 2016 2.02662 5.131R163 Chittagong -Chandragona Road Km 027.60-027.70 S 0.1 7716 Regional DBST @ 25% Crk 2016 0.26676 4.328R163 Chittagong -Chandragona Road Km 027.70-027.80 S 0.1 7716 Regional Rehab 150mm @ IRI 9-12 2016 2.6082 2.251R163 Chittagong -Chandragona Road Km 027.80-033.44 S 5.63 7716 Regional DBST @ Traff >6000 2016 15.02659 2.362R164 Baraichhari-Kaptai Road Km 009.70-010.18 S 0.48 2463 Regional Overlay 50mm @ IRI 5-7 2016 2.985066 0.881Z1012 Rangunia-Raozan Road Km 000.00-000.10 S 0.1 2882 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z1012 Rangunia-Raozan Road Km 000.10-001.60 S 1.5 2882 Zilla Rehab 75mm @ IRI 9-12 2016 16.56626 0.651Z1012 Rangunia-Raozan Road Km 001.60-002.20 S 0.6 2882 Zilla Overlay 40mm @ Traff >=2000 2016 1.874592 0.624Z1012 Rangunia-Raozan Road Km 002.20-002.70 S 0.5 2882 Zilla Full Recon 75mm @ IRI>12 2016 7.99848 0.698Z1012 Rangunia-Raozan Road Km 002.80-003.20 S 0.4 2882 Zilla Full Recon 75mm @ IRI>12 2016 6.398784 0.666Z1012 Rangunia-Raozan Road Km 003.20-003.80 S 0.6 2882 Zilla Overlay 40mm @ Traff >=2000 2016 1.874592 0.542Z1012 Rangunia-Raozan Road Km 003.80-004.10 S 0.3 2882 Zilla Overlay 40mm @ Traff >=2000 2016 0.937296 0.816Z1012 Rangunia-Raozan Road Km 004.10-004.50 S 0.4 2882 Zilla Overlay 40mm @ Traff >=2000 2016 1.249728 0.818Z1012 Rangunia-Raozan Road Km 004.50-005.00 S 0.5 2882 Zilla Rehab 75mm @ IRI 9-12 2016 5.518134 0.784Z1012 Rangunia-Raozan Road Km 005.00-005.40 S 0.4 2882 Zilla Overlay 40mm @ Traff >=2000 2016 1.249728 0.358Z1012 Rangunia-Raozan Road Km 005.40-007.00 S 1.6 2882 Zilla Full Recon 75mm @ IRI>12 2016 25.73424 0.391Z1012 Rangunia-Raozan Road Km 007.00-007.40 S 0.4 2882 Zilla Overlay 40mm @ Traff >=2000 2016 1.253124 0.552Z1012 Rangunia-Raozan Road Km 007.40-008.00 S 0.6 2882 Zilla Rehab 75mm @ IRI 9-12 2016 6.572628 0.651Z1012 Rangunia-Raozan Road Km 008.00-008.50 S 0.5 2882 Zilla Overlay 40mm @ Traff >=2000 2016 1.566405 0.764Z1012 Rangunia-Raozan Road Km 008.50-008.80 S 0.3 2882 Zilla Rehab 75mm @ IRI 9-12 2016 3.313251 0.827Z1012 Rangunia-Raozan Road Km 008.80-009.20 S 0.4 2882 Zilla Rehab 75mm @ IRI 9-12 2016 4.417668 0.518Z1012 Rangunia-Raozan Road Km 009.20-009.80 S 0.6 2882 Zilla Full Recon 75mm @ IRI>12 2016 9.546012 0.589Z1012 Rangunia-Raozan Road Km 009.80-009.90 S 0.1 2882 Zilla Seal Coat 2016 0.091728 0.25Z1012 Rangunia-Raozan Road Km 009.90-010.10 S 0.2 2882 Zilla Rehab 75mm @ IRI 9-12 2016 2.178904 1.123Z1012 Rangunia-Raozan Road Km 010.10-010.20 S 0.1 2882 Zilla Overlay 40mm @ Traff >=2000 2016 0.309036 0Z1012 Rangunia-Raozan Road Km 010.20-010.40 S 0.2 2882 Zilla Rehab 75mm @ IRI 9-12 2016 2.178904 1.234

Page 12 of 163

Page 13: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1012 Rangunia-Raozan Road Km 010.40-011.30 S 0.9 2882 Zilla Overlay 40mm @ Traff >=2000 2016 2.781324 0.44Z1012 Rangunia-Raozan Road Km 011.30-011.70 S 0.4 2882 Zilla Full Recon 75mm @ IRI>12 2016 6.120576 0.847Z1012 Rangunia-Raozan Road Km 011.70-012.40 S 0.7 2882 Zilla Overlay 40mm @ Traff >=2000 2016 2.02062 1.152Z1012 Rangunia-Raozan Road Km 012.40-013.60 S 1.2 2882 Zilla Full Recon 75mm @ IRI>12 2016 17.99658 0.538Z1012 Rangunia-Raozan Road Km 013.80-015.00 S 1.2 2882 Zilla Full Recon 75mm @ IRI>12 2016 18.2574 0.712Z1012 Rangunia-Raozan Road Km 015.10-015.30 S 0.2 2882 Zilla Full Recon 75mm @ IRI>12 2016 3.073329 1.046Z1025 Kumira-Sandwip Road Km 000.00-012.30 S 12.3 2569 Zilla Rehab 75mm @ IRI 9-12 2016 142.4119 1.958Z1084 Muhuriganj-Chittagong Beri Band Road Km 003.50-005.20 S 1.7 130 Zilla Seal Coat 2016 2.393347 1.494Z1084 Muhuriganj-Chittagong Beri Band Road Km 005.20-005.30 S 0.1 130 Zilla Overlay 40mm @ Traff 100-1000 2016 0.47544 0Z1084 Muhuriganj-Chittagong Beri Band Road Km 006.50-007.00 S 0.5 130 Zilla Overlay 40mm @ Traff 100-1000 2016 2.3772 0Z1084 Muhuriganj-Chittagong Beri Band Road Km 007.00-020.20 S 13.2 130 Zilla Overlay 40mm @ Traff 100-1000 2016 55.58994 0.036Z1086 Sitakunda-Hazarikhil-Fatikchhari Km 000.00-001.70 S 1.7 130 Zilla Overlay 40mm @ Traff 100-1000 2016 5.19588 0Z1087 Sitakunda-Hathazari Road Km 000.20-000.80 S 0.6 3979 Zilla Full Recon 75mm @ IRI>12 2016 9.311274 1.27Z1087 Sitakunda-Hathazari Road Km 001.00-001.30 S 0.3 3979 Zilla Full Recon 75mm @ IRI>12 2016 4.655637 1.491Z1617 Mariamnagar-Ranirhat (Gabtal) Road Km 000.00-003.10 S 3.1 2882 Zilla Overlay 40mm @ Traff >=2000 2016 12.31729 0.635Z1617 Mariamnagar-Ranirhat (Gabtal) Road Km 003.10-003.70 S 0.6 2882 Zilla Overlay 40mm @ Traff >=2000 2016 2.13948 0.989Z1617 Mariamnagar-Ranirhat (Gabtal) Road Km 003.70-006.70 S 3 2882 Zilla Overlay 40mm @ Traff >=2000 2016 10.67549 0.476Z1617 Mariamnagar-Ranirhat (Gabtal) Road Km 006.70-009.00 S 2.3 2882 Zilla Overlay 40mm @ Traff >=2000 2016 7.713165 1.082Z1618 Bhatiari - Hathajari Road Km 000.00-002.70 S 2.7 3883 Zilla Overlay 40mm @ Cracks >25% 2016 8.6832 0.95Z1618 Bhatiari - Hathajari Road Km 002.70-003.10 S 0.4 3883 Zilla Rehab 75mm @ IRI 9-12 2016 4.7888 1.965Z1618 Bhatiari - Hathajari Road Km 004.50-007.80 S 3.3 3883 Zilla Rehab 75mm @ IRI 9-12 2016 39.51957 1.827Z1618 Bhatiari - Hathajari Road Km 007.80-010.98 S 3.18 3883 Zilla Rehab 75mm @ IRI 9-12 2016 38.08293 1.92Z1619 Raozan (Gohira)-Fatikchhari Road Km 023.10-023.30 S 0.2 2845 Zilla Overlay 40mm @ Traff >=2000 2016 0.638448 0.404Z1619 Raozan (Gohira)-Fatikchhari Road Km 023.30-023.80 S 0.5 2845 Zilla Rehab 75mm @ IRI 9-12 2016 5.62684 0.845Z1619 Raozan (Gohira)-Fatikchhari Road Km 023.80-024.37 S 0.57 2845 Zilla Overlay 40mm @ Traff >=2000 2016 1.845301 0.359Z1623 Raozan -Brahmanchhari Road Km 004.40-004.50 S 0.1 1501 Zilla Overlay 40mm @ IRI>12 2016 0.312432 0Z1623 Raozan -Brahmanchhari Road Km 007.60-010.24 S 2.64 1501 Zilla Overlay 40mm @ 1000-2000 2016 8.251329 0Z1629 Raozan-Noapara (Jelepara) Road Km 007.60-009.60 S 2 2882 Zilla Overlay 40mm @ Traff >=2000 2016 5.943 1.184Z1629 Raozan-Noapara (Jelepara) Road Km 009.90-010.30 S 0.4 2882 Zilla Overlay 40mm @ Traff >=2000 2016 1.198788 0.959Z1629 Raozan-Noapara (Jelepara) Road Km 010.30-010.90 S 0.6 2882 Zilla Overlay 40mm @ Traff >=2000 2016 1.818558 0.9Z1629 Raozan-Noapara (Jelepara) Road Km 010.90-011.00 S 0.1 2882 Zilla Full Recon 75mm @ IRI>12 2016 1.551879 1.055Z1629 Raozan-Noapara (Jelepara) Road Km 011.00-013.20 S 2.2 2882 Zilla Overlay 40mm @ Traff >=2000 2016 6.555978 0.986Z1629 Raozan-Noapara (Jelepara) Road Km 013.20-013.60 S 0.4 2882 Zilla Full Recon 75mm @ IRI>12 2016 5.82498 0.788Z1629 Raozan-Noapara (Jelepara) Road Km 013.60-014.84 S 1.23 2882 Zilla Overlay 40mm @ Traff >=2000 2016 3.551587 1.182Z1636 Rangunia-Bangalhalia Road Km 000.30-000.50 S 0.2 1013 Zilla Overlay 40mm @ 1000-2000 2016 0.614676 0.156Z1636 Rangunia-Bangalhalia Road Km 000.50-001.20 S 0.7 1013 Zilla Overlay 40mm @ 1000-2000 2016 2.151366 0Z1636 Rangunia-Bangalhalia Road Km 001.20-001.70 S 0.5 1013 Zilla Seal Coat 2016 0.45612 0.791Z1636 Rangunia-Bangalhalia Road Km 001.70-002.30 S 0.6 1013 Zilla Overlay 40mm @ 1000-2000 2016 1.844028 0Z1636 Rangunia-Bangalhalia Road Km 008.40-008.80 S 0.4 1013 Zilla Overlay 40mm @ 1000-2000 2016 1.215768 0Z1636 Rangunia-Bangalhalia Road Km 010.50-010.60 S 0.1 1013 Zilla Overlay 40mm @ 1000-2000 2016 0.307338 0Z1636 Rangunia-Bangalhalia Road Km 011.90-012.40 S 0.5 1013 Zilla Overlay 40mm @ IRI>12 2016 1.55367 0Z1636 Rangunia-Bangalhalia Road Km 012.40-012.60 S 0.2 1013 Zilla Seal Coat 2016 0.184464 1.147Z1636 Rangunia-Bangalhalia Road Km 012.60-013.50 S 0.9 1013 Zilla Overlay 40mm @ 1000-2000 2016 2.796606 0Z1636 Rangunia-Bangalhalia Road Km 013.50-013.70 S 0.2 1013 Zilla Overlay 40mm @ 1000-2000 2016 0.621468 0.156Z1636 Rangunia-Bangalhalia Road Km 013.70-013.90 S 0.2 1013 Zilla Overlay 40mm @ 1000-2000 2016 0.621468 0Z1636 Rangunia-Bangalhalia Road Km 013.90-014.70 S 0.8 1013 Zilla Seal Coat 2016 0.737856 0.838

Page 13 of 163

Page 14: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1636 Rangunia-Bangalhalia Road Km 014.70-014.80 S 0.1 1013 Zilla Overlay 40mm @ 1000-2000 2016 0.310734 0Sub-Total Chittagong Division 6942.523

Cox's Bazar DivisionN1 Dhaka-Comilla-Chittagong-Teknaf Road Km 319.38-319.68 S 0.3 13284 National Full Recon 195mm @ IRI 12 2016 15.55113 9.265N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 332.68-332.78 S 0.1 6589 National Full Recon 180mm 2016 4.75932 5.153N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 332.78-332.88 S 0.1 6589 National Overlay 50mm @ IRI 4-7 2016 0.68544 12.68N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 332.88-332.98 S 0.1 9578 National Overlay 60mm @ IRI 7-9 2016 0.884707 15.76N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 332.98-333.18 S 0.2 9578 National Rehab 180mm @ IRI 9-12 2016 9.19632 6.21N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 333.18-336.28 S 3.1 9578 National Overlay 50mm @ IRI 4-7 2016 22.14114 13.583N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 336.28-337.31 S 1.03 9578 National Overlay 60mm @ IRI 7-9 2016 8.74499 14.516N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 358.49-371.89 S 13.4 5049 National Overlay 50mm @ IRI 4-9 2016 95.69742 5.308N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 371.89-372.09 S 0.2 5049 National DBST @ Traff 4000-6000 2016 0.67184 7.041N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 372.09-372.59 S 0.5 5049 National Overlay 50mm @ IRI 4-9 2016 3.57 6.324N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 372.59-372.79 S 0.2 5049 National Rehab 150mm @ IRI 9-12 2016 6.5688 3.231N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 372.79-373.09 S 0.3 5049 National Overlay 50mm @ IRI 4-9 2016 2.142 6.99N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 373.09-373.19 S 0.1 5049 National Rehab 150mm @ IRI 9-12 2016 3.2844 3.008N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 373.19-374.59 S 1.4 5049 National Overlay 50mm @ IRI 4-9 2016 9.996 5.38N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 374.59-374.79 S 0.2 5049 National Rehab 150mm @ IRI 9-12 2016 6.5688 3.545N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 374.79-380.89 S 6.1 5049 National Overlay 50mm @ IRI 4-9 2016 42.99164 5.359N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 380.89-380.99 S 0.1 5049 National Rehab 150mm @ IRI 9-12 2016 2.8014 4.115N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 381.88-384.48 S 2.6 5579 National Overlay 50mm @ IRI 4-9 2016 15.84009 4.939N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 384.48-384.68 S 0.2 5579 National Full Recon 150mm @ IRI 12 2016 7.03888 2.364N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 384.68-386.28 S 1.6 5579 National Overlay 50mm @ IRI 4-9 2016 9.744 4.701N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 386.28-386.48 S 0.2 5579 National DBST @ Traff 4000-6000 2016 0.57304 5.456N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 386.48-388.08 S 1.6 5579 National Overlay 50mm @ IRI 4-9 2016 9.744 4.368N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 388.08-388.38 S 0.3 5579 National DBST @ Traff 4000-6000 2016 0.862425 5.549N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 388.38-388.58 S 0.2 5579 National Overlay 50mm @ IRI 4-9 2016 1.218 4.85N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 388.58-388.78 S 0.2 5579 National Full Recon 150mm @ IRI 12 2016 7.03888 2.488N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 388.78-388.88 S 0.1 5579 National Overlay 50mm @ IRI 4-9 2016 0.609 5.28N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 388.88-389.18 S 0.3 5579 National Overlay 50mm @ IRI 4-9 2016 1.827 5.547N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 389.18-390.78 S 1.6 5579 National Overlay 50mm @ IRI 4-9 2016 9.744 4.525N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 390.78-390.88 S 0.1 5579 National Rehab 150mm @ IRI 9-12 2016 2.8014 3.181N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 390.88-393.28 S 2.4 5579 National Overlay 50mm @ IRI 4-9 2016 14.62209 4.508N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 393.28-393.38 S 0.1 5579 National Rehab 150mm @ IRI 9-12 2016 2.8014 3.367N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 393.38-396.38 S 3 5579 National Overlay 50mm @ IRI 4-9 2016 18.27 4.627N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 396.38-396.48 S 0.1 5579 National Full Recon 150mm @ IRI 12 2016 3.51944 3.044N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 396.48-398.39 S 1.9 5579 National Overlay 50mm @ IRI 4-9 2016 11.57709 4.538N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 398.39-398.59 S 0.2 5579 National Full Recon 150mm @ IRI 12 2016 7.03888 3.031N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 398.59-402.39 S 3.8 5579 National Overlay 50mm @ IRI 4-9 2016 23.14809 5.988N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 402.39-406.29 S 3.9 5579 National Overlay 50mm @ IRI 4-9 2016 23.751 4.701N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 406.29-406.49 S 0.2 5579 National Rehab 150mm @ IRI 9-12 2016 5.6028 3.173N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 406.49-408.99 S 2.5 5579 National Overlay 50mm @ IRI 4-9 2016 15.99264 5.136N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 408.99-409.19 S 0.2 5579 National Full Recon 150mm @ IRI 12 2016 7.16024 2.755N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 409.19-411.09 S 1.9 5579 National Overlay 50mm @ IRI 4-9 2016 11.7767 6.361N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 411.09-411.19 S 0.1 5579 National Rehab 150mm @ IRI 9-12 2016 2.8497 2.984

Page 14 of 163

Page 15: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 411.19-413.49 S 2.3 5579 National Overlay 50mm @ IRI 4-9 2016 14.2485 4.367N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 413.49-413.69 S 0.2 5579 National Rehab 150mm @ IRI 9-12 2016 5.6994 2.791N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 413.69-414.49 S 0.8 5579 National Overlay 50mm @ IRI 4-9 2016 4.956 5.031N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 414.49-414.59 S 0.1 5579 National Full Recon 150mm @ IRI 12 2016 3.58012 3.077N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 414.59-414.79 S 0.2 5579 National Overlay 50mm @ IRI 4-9 2016 1.239 6.559N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 414.79-415.09 S 0.3 5579 National Rehab 150mm @ IRI 9-12 2016 8.5491 2.824N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 415.09-415.39 S 0.3 5579 National Overlay 50mm @ IRI 4-9 2016 1.8585 5.361N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 415.39-415.79 S 0.4 5579 National Rehab 150mm @ IRI 9-12 2016 11.4273 2.315N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 415.79-417.39 S 1.6 5579 National Overlay 50mm @ IRI 4-9 2016 9.912 4.784N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 417.39-418.29 S 0.9 5579 National DBST @ Traff 4000-6000 2016 2.62314 6.085N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 418.29-419.69 S 1.4 5579 National Overlay 50mm @ IRI 4-9 2016 8.673 5.567N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 419.69-419.89 S 0.2 5579 National DBST @ Traff 4000-6000 2016 0.58292 5.772N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 419.89-420.39 S 0.5 5579 National Overlay 50mm @ IRI 4-9 2016 3.103695 5.131N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 420.39-421.29 S 0.9 5579 National Full Recon 150mm @ IRI 12 2016 32.22108 2.487N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 421.29-421.39 S 0.1 5579 National Overlay 50mm @ IRI 4-9 2016 0.6195 5.183N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 421.39-427.69 S 6.3 5579 National Rehab 150mm @ IRI 9-12 2016 177.4292 3.179N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 427.69-427.89 S 0.2 5579 National Overlay 50mm @ IRI 4-9 2016 1.218 6.035N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 427.89-429.19 S 1.3 5579 National Full Recon 150mm @ IRI 12 2016 45.75272 2.218N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 429.19-429.39 S 0.2 5579 National Overlay 50mm @ IRI 4-9 2016 1.22409 4.82N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 429.39-429.49 S 0.1 5579 National Full Recon 150mm @ IRI 12 2016 3.51944 3.134N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 429.49-433.29 S 3.8 5579 National Overlay 50mm @ IRI 4-9 2016 23.142 5.016N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 433.29-433.39 S 0.1 5579 National Rehab 150mm @ IRI 9-12 2016 2.8014 2.857N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 433.39-437.69 S 4.3 5579 National Overlay 50mm @ IRI 4-9 2016 26.19309 4.586N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 437.69-437.79 S 0.1 5579 National Full Recon 150mm @ IRI 12 2016 3.51944 3.09N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 437.79-439.09 S 1.3 5579 National Overlay 50mm @ IRI 4-9 2016 7.813806 6.721N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 439.09-439.89 S 0.8 5579 National Rehab 150mm @ IRI 9-12 2016 22.0248 2.669N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 439.89-442.59 S 2.7 5579 National Overlay 50mm @ IRI 4-9 2016 16.1595 5.583N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 442.59-442.79 S 0.2 5579 National Full Recon 150mm @ IRI 12 2016 6.91752 2.792N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 442.79-443.60 S 0.8 5579 National Overlay 50mm @ IRI 4-9 2016 4.793985 6.137N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 443.60-444.10 S 0.5 5579 National Rehab 150mm @ IRI 9-12 2016 13.7655 2.708N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 444.10-450.70 S 6.6 5579 National Overlay 50mm @ IRI 4-9 2016 38.81388 5.99N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 450.70-450.80 S 0.1 5579 National Full Recon 150mm @ IRI 12 2016 3.39808 3.252N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 450.80-451.60 S 0.8 5579 National Overlay 50mm @ IRI 4-9 2016 4.7124 5.755N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 451.60-451.70 S 0.1 5579 National Full Recon 150mm @ IRI 12 2016 3.45876 3.383N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 451.70-454.70 S 3 5579 National Overlay 50mm @ IRI 4-9 2016 17.96098 5.241N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 454.70-454.90 S 0.2 5579 National Overlay 50mm @ IRI 4-9 2016 1.197 5.306N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 454.90-455.00 S 0.1 5579 National Full Recon 150mm @ IRI 12 2016 3.45876 3.108N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 455.00-458.10 S 3.1 5579 National Overlay 50mm @ IRI 4-9 2016 18.55949 5.756N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 458.10-458.30 S 0.2 5579 National DBST @ Traff 4000-6000 2016 0.56316 5.734N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 458.30-460.20 S 1.9 5579 National Overlay 50mm @ IRI 4-9 2016 11.8503 5.021N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 460.20-460.40 S 0.2 5579 National DBST @ Traff 4000-6000 2016 0.62244 5.126N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 460.40-461.60 S 1.2 5579 National Overlay 50mm @ IRI 4-9 2016 7.944615 4.226N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 461.60-462.25 S 0.65 5579 National DBST @ Traff 4000-6000 2016 2.038491 4.908N109 Ramu Old Section Road Km 000.00-000.20 L 0.2 5161 National Overlay 50mm @ IRI 5-9 2016 1.68 2.692N109 Ramu Old Section Road Km 000.00-000.20 R 0.2 5161 National Overlay 50mm @ IRI 5-9 2016 1.701 2.647N109 Ramu Old Section Road Km 000.20-000.30 L 0.1 5161 National Full Recon 150mm 2016 4.8544 1.039

Page 15 of 163

Page 16: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N109 Ramu Old Section Road Km 000.20-000.30 R 0.1 5161 National Full Recon 150mm 2016 4.91508 1.013N109 Ramu Old Section Road Km 002.13-002.51 L 0.38 5161 National Overlay 50mm @ IRI 5-9 2016 3.2256 2.37N109 Ramu Old Section Road Km 002.13-002.51 R 0.38 5161 National Overlay 50mm @ IRI 5-9 2016 3.14496 2.452N110 Link Road-Cox`s Bazar Road Km 000.00-001.50 S 1.5 7296 National Overlay 50mm @ IRI 5-7 2016 12.6 4.071N110 Link Road-Cox`s Bazar Road Km 001.50-001.70 S 0.2 7296 National Rehab 180mm @ IRI 9-12 2016 9.2192 1.731N110 Link Road-Cox`s Bazar Road Km 001.70-004.70 S 3 7296 National Overlay 50mm @ IRI 5-7 2016 25.2084 4.025N110 Link Road-Cox`s Bazar Road Km 004.70-004.80 S 0.1 7296 National Rehab 180mm @ IRI 9-12 2016 4.26388 1.942N110 Link Road-Cox`s Bazar Road Km 004.80-006.40 S 1.6 7296 National Overlay 50mm @ IRI 5-7 2016 9.576 6.68N110 Link Road-Cox`s Bazar Road Km 006.50-006.60 S 0.1 7296 National Rehab 180mm @ IRI 9-12 2016 3.68768 2.883N110 Link Road-Cox`s Bazar Road Km 006.70-007.00 S 0.3 7296 National Rehab 180mm @ IRI 9-12 2016 11.09992 2.648N110 Link Road-Cox`s Bazar Road Km 007.00-008.20 S 1.2 7296 National Overlay 50mm @ IRI 5-7 2016 8.050559 5.445R170 Patiya-Anowara-Chokoria Road Km 056.85-057.01 S 0.16 5228 Regional Full Recon 150mm 2016 5.378554 2.394R170 Patiya-Anowara-Chokoria Road Km 057.13-057.51 S 0.38 4030 Regional Full Recon 150mm 2016 12.7996 2.747R170 Patiya-Anowara-Chokoria Road Km 057.51-057.61 S 0.1 4030 Regional Overlay 50mm @ IRI 5-7 2016 0.58905 4.085R170 Patiya-Anowara-Chokoria Road Km 057.61-058.01 S 0.4 4030 Regional Full Recon 150mm 2016 13.61659 1.834R170 Patiya-Anowara-Chokoria Road Km 058.01-058.71 S 0.7 4030 Regional Overlay 50mm @ IRI 5-7 2016 4.117459 3.476R170 Patiya-Anowara-Chokoria Road Km 058.93-062.11 S 3.17 4030 Regional DBST @ Traff 4000-6000 2016 8.799004 4.97R170 Patiya-Anowara-Chokoria Road Km 063.51-066.41 S 2.9 4030 Regional Rehab 150mm @ IRI 9-12 2016 78.4392 1.869R170 Patiya-Anowara-Chokoria Road Km 066.71-068.70 S 2 4030 Regional Full Recon 150mm 2016 67.56372 1.813R170 Patiya-Anowara-Chokoria Road Km 068.70-069.10 S 0.4 4030 Regional Overlay 60mm @ IRI 7-9 2016 2.787228 5.388R170 Patiya-Anowara-Chokoria Road Km 069.10-072.00 S 2.9 4030 Regional Rehab 150mm @ IRI 9-12 2016 77.73885 1.98R170 Patiya-Anowara-Chokoria Road Km 072.00-074.64 S 2.63 4030 Regional DBST @ Traff 4000-6000 2016 7.239407 4.356R172 Chokoria-Baderkhali Road Km 000.00-000.70 S 0.7 3630 Regional DBST @ Traff 2000-4000 2016 1.9019 0.789R172 Chokoria-Baderkhali Road Km 000.70-000.80 S 0.1 3630 Regional Full Recon 135mm 2016 2.956024 0.844R172 Chokoria-Baderkhali Road Km 000.90-001.00 S 0.1 3630 Regional DBST @ Traff 2000-4000 2016 0.27664 2.043R172 Chokoria-Baderkhali Road Km 001.30-002.60 S 1.3 3630 Regional Overlay 50mm @ IRI 7-9 2016 7.603049 1.382R172 Chokoria-Baderkhali Road Km 003.00-003.30 S 0.3 3630 Regional Overlay 50mm @ IRI 7-9 2016 1.7073 2.102R172 Chokoria-Baderkhali Road Km 003.30-005.10 S 1.8 3630 Regional Overlay 50mm @ IRI 5-7 2016 10.31367 1.318R172 Chokoria-Baderkhali Road Km 005.10-006.30 S 1.2 3630 Regional Overlay 50mm @ IRI 7-9 2016 6.9174 1.787R172 Chokoria-Baderkhali Road Km 006.30-007.40 S 1.1 3630 Regional Overlay 50mm @ IRI 5-7 2016 6.4218 1.069R172 Chokoria-Baderkhali Road Km 007.40-008.30 S 0.9 3630 Regional Overlay 50mm @ IRI 7-9 2016 5.2731 1.504R172 Chokoria-Baderkhali Road Km 009.80-009.90 S 0.1 3630 Regional Full Recon 135mm 2016 3.05984 0.513R172 Chokoria-Baderkhali Road Km 013.70-017.27 S 3.57 3630 Regional Overlay 50mm @ IRI 5-7 2016 21.44743 1.005R180 Laharpur-Jhinukmarket-Laboni More Km 000.10-000.80 S 0.7 7345 Regional DBST @ Traff >6000 2016 2.14396 4.619R180 Laharpur-Jhinukmarket-Laboni More Km 000.80-001.40 S 0.6 7345 Regional Overlay 60mm @ IRI 5.5-9 2016 4.65372 3.197R180 Laharpur-Jhinukmarket-Laboni More Km 001.40-001.50 S 0.1 7345 Regional DBST @ Traff >6000 2016 0.30628 5.395R180 Laharpur-Jhinukmarket-Laboni More Km 001.50-004.80 S 3.3 7345 Regional Overlay 60mm @ IRI 5.5-9 2016 25.68581 2.881R180 Laharpur-Jhinukmarket-Laboni More Km 004.80-006.11 S 1.3 7345 Regional DBST @ Traff >6000 2016 4.83132 3.138Z1002 Baraitali-Magnamaghat Road Km 005.40-006.96 S 1.56 1191 Zilla Overlay 40mm @ IRI>12 2016 6.307221 0Z1004 Janatabazar-Gorokghata Road Km 007.50-008.10 S 0.6 2831 Zilla Rehab 75mm @ IRI 9-12 2016 6.590586 2.086Z1004 Janatabazar-Gorokghata Road Km 008.90-009.10 S 0.2 2831 Zilla Rehab 75mm @ IRI 9-12 2016 2.196862 2.667Z1004 Janatabazar-Gorokghata Road Km 009.20-010.40 S 1.2 2831 Zilla Rehab 75mm @ IRI 9-12 2016 13.21709 2.219Z1004 Janatabazar-Gorokghata Road Km 010.70-011.00 S 0.3 2831 Zilla Rehab 75mm @ IRI 9-12 2016 3.304272 2.376Z1004 Janatabazar-Gorokghata Road Km 012.40-012.80 S 0.4 2831 Zilla Rehab 75mm @ IRI 9-12 2016 4.381752 2.197Z1004 Janatabazar-Gorokghata Road Km 016.60-016.80 S 0.2 2831 Zilla Rehab 75mm @ IRI 9-12 2016 2.196862 1.87Z1004 Janatabazar-Gorokghata Road Km 016.80-018.00 S 1.2 2831 Zilla Overlay 40mm @ Traff >=2000 2016 3.749184 1.561

Page 16 of 163

Page 17: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1009 Ramu-Fatehkharkul-Maricha Road Km 000.00-001.20 S 1.2 2290 Zilla Overlay 40mm @ Traff >=2000 2016 5.6034 0Z1009 Ramu-Fatehkharkul-Maricha Road Km 001.20-003.00 S 1.8 2290 Zilla Full Recon 75mm @ IRI>12 2016 40.55394 0.111Z1009 Ramu-Fatehkharkul-Maricha Road Km 003.00-003.60 S 0.6 2290 Zilla Overlay 40mm @ Traff >=2000 2016 1.900062 0.333Z1009 Ramu-Fatehkharkul-Maricha Road Km 003.60-003.90 S 0.3 2290 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 1.169Z1009 Ramu-Fatehkharkul-Maricha Road Km 003.90-004.20 S 0.3 2290 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.709Z1009 Ramu-Fatehkharkul-Maricha Road Km 004.20-007.80 S 3.6 2290 Zilla Rehab 75mm @ IRI 9-12 2016 53.35008 0.37Z1009 Ramu-Fatehkharkul-Maricha Road Km 007.80-007.90 S 0.1 2290 Zilla Overlay 40mm @ Traff >=2000 2016 0.45846 0.22Z1009 Ramu-Fatehkharkul-Maricha Road Km 007.90-010.90 S 3 2290 Zilla Full Recon 75mm @ IRI>12 2016 49.16457 0.505Z1009 Ramu-Fatehkharkul-Maricha Road Km 010.90-014.22 S 3.31 2290 Zilla Rehab 75mm @ IRI 9-12 2016 36.69956 0.85Z1121 Phultala-Magbazar Road Km 002.20-002.30 S 0.1 1502 Zilla Overlay 40mm @ IRI>12 2016 0.44997 0Z1123 Moronguna-Darbeshghata Road Km 000.00-001.00 S 1 2569 Zilla Rehab 75mm @ IRI 9-12 2016 11.0741 2.024Z1124 Harbang-Villagerpara-Toitong Road Km 000.00-001.78 S 1.77 2569 Zilla Rehab 75mm @ IRI 9-12 2016 19.3909 2.026Z1124 Harbang-Villagerpara-Toitong Road Km 025.10-028.03 S 2.92 2569 Zilla Rehab 75mm @ IRI 9-12 2016 32.39174 1.971Z1125 Ekatabazar-Pekuabazar-Magnamaghat Road Km 003.80-004.30 S 0.5 3918 Zilla Rehab 75mm @ IRI 9-12 2016 8.3804 1.678Z1125 Ekatabazar-Pekuabazar-Magnamaghat Road Km 007.40-007.70 S 0.3 3918 Zilla Full Recon 75mm @ IRI>12 2016 7.30296 0.912Z1125 Ekatabazar-Pekuabazar-Magnamaghat Road Km 007.70-009.30 S 1.6 3918 Zilla Overlay 40mm @ Traff >=2000 2016 7.484784 0Z1125 Ekatabazar-Pekuabazar-Magnamaghat Road Km 009.30-009.60 S 0.3 3918 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 1.56Z1125 Ekatabazar-Pekuabazar-Magnamaghat Road Km 009.60-013.00 S 3.4 3918 Zilla Overlay 40mm @ Traff >=2000 2016 15.8763 0.112Z1125 Ekatabazar-Pekuabazar-Magnamaghat Road Km 013.00-013.10 S 0.1 3918 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 1.453Z1125 Ekatabazar-Pekuabazar-Magnamaghat Road Km 016.80-017.10 S 0.3 3918 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 1.328Z1125 Ekatabazar-Pekuabazar-Magnamaghat Road Km 017.10-019.28 S 2.18 3918 Zilla Overlay 40mm @ Traff >=2000 2016 10.1655 0.403Z1126 Yangcha-Manikpur-Shantirbazar Road Km 004.56-004.60 S 0.04 1330 Zilla Overlay 40mm @ 1000-2000 2016 0.114207 0.336Z1126 Yangcha-Manikpur-Shantirbazar Road Km 014.50-014.60 S 0.1 1330 Zilla Overlay 40mm @ IRI>12 2016 0.310734 0Z1127 Lakkharchar-Betua Bazar-Bagguzzara Road Km 007.16-007.66 S 0.5 1502 Zilla Overlay 40mm @ 1000-2000 2016 1.57065 0Z1127 Lakkharchar-Betua Bazar-Bagguzzara Road Km 008.96-009.06 S 0.1 1502 Zilla Overlay 40mm @ 1000-2000 2016 0.311583 0.027Z1127 Lakkharchar-Betua Bazar-Bagguzzara Road Km 009.16-009.36 S 0.2 1502 Zilla Overlay 40mm @ 1000-2000 2016 0.623166 0Z1127 Lakkharchar-Betua Bazar-Bagguzzara Road Km 009.96-010.06 S 0.1 1502 Zilla Overlay 40mm @ IRI>12 2016 0.311583 0Z1127 Lakkharchar-Betua Bazar-Bagguzzara Road Km 010.16-010.46 S 0.3 1502 Zilla Overlay 40mm @ IRI>12 2016 0.934749 0Z1128 Illisha Bazar-Demusia-Bagguzzara Road Km 000.00-000.30 S 0.3 1225 Zilla Seal Coat 2016 0.27972 0.359Z1128 Illisha Bazar-Demusia-Bagguzzara Road Km 000.30-000.60 S 0.3 1225 Zilla Overlay 40mm @ IRI>12 2016 0.937296 0Z1128 Illisha Bazar-Demusia-Bagguzzara Road Km 000.70-001.10 S 0.4 1225 Zilla Overlay 40mm @ IRI>12 2016 1.249728 0Z1128 Illisha Bazar-Demusia-Bagguzzara Road Km 002.40-002.80 S 0.4 1225 Zilla Overlay 40mm @ IRI>12 2016 1.249728 0Z1128 Illisha Bazar-Demusia-Bagguzzara Road Km 005.80-005.90 S 0.1 1225 Zilla Seal Coat 2016 0.092232 0.055Z1128 Illisha Bazar-Demusia-Bagguzzara Road Km 006.30-006.60 S 0.3 1225 Zilla Overlay 40mm @ 1000-2000 2016 0.934749 0Z1128 Illisha Bazar-Demusia-Bagguzzara Road Km 006.60-006.90 S 0.3 1225 Zilla Overlay 40mm @ IRI>12 2016 0.934749 0Z1130 Dulahazra-Garzania-Kossopia-Baisari -Ukhia Road Km 015.60-024.26 S 8.65 1977 Zilla Rehab 75mm @ IRI 9-12 2016 94.29206 0.637Z1132 Khuruskul Bridge-Chowfaldandi-Eidgah Road Km 000.00-000.40 S 0.4 3292 Zilla Overlay 40mm @ Traff >=2000 2016 1.22256 1.195Z1132 Khuruskul Bridge-Chowfaldandi-Eidgah Road Km 000.40-000.60 S 0.2 3292 Zilla Full Recon 75mm @ IRI>12 2016 3.12984 0.916Z1132 Khuruskul Bridge-Chowfaldandi-Eidgah Road Km 000.60-000.77 S 0.17 3292 Zilla Overlay 40mm @ Traff >=2000 2016 0.531814 0Z1132 Khuruskul Bridge-Chowfaldandi-Eidgah Road Km 016.60-016.90 S 0.3 3292 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.107Z1132 Khuruskul Bridge-Chowfaldandi-Eidgah Road Km 016.90-017.30 S 0.4 3292 Zilla Full Recon 75mm @ IRI>12 2016 8.989596 0.571Z1504 Ukhia-Gundhum Road Km 000.10-000.20 S 0.1 1472 Zilla Rehab 75mm @ IRI 9-12 2016 1.083466 2.5Sub-Total Cox's Bazar Division 1997.372

Dohazari DivisionN1 Dhaka-Comilla-Chittagong-Teknaf Road Km 247.89-250.07 S 2.17 10561 National Overlay 80mm @ IRI 4-9 2016 25.13221 16.052

Page 17 of 163

Page 18: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 250.07-250.17 S 0.1 10561 National Full Recon 195mm 2016 5.1107 7.076N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 250.17-254.87 S 4.7 10561 National Overlay 80mm @ IRI 4-9 2016 54.39527 17.213N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 254.87-254.97 S 0.1 10561 National Full Recon 195mm 2016 5.1107 6.222N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 254.97-255.77 S 0.8 10803 National Overlay 80mm @ IRI 4-9 2016 9.2568 15.299N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 255.77-255.87 S 0.1 11422 National Full Recon 195mm @ IRI 12 2016 5.1107 7.496N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 255.87-256.97 S 1.1 11422 National Overlay 80mm @ IRI 4-9 2016 12.7281 17.129N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 256.97-257.17 S 0.2 11422 National Full Recon 195mm @ IRI 12 2016 10.27251 7.28N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 265.07-265.47 S 0.4 12902 National Overlay 80mm @ IRI 4-9 2016 5.42184 12.223N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 265.47-265.77 S 0.3 12902 National Full Recon 195mm 2016 17.96046 5.678N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 265.77-267.47 S 1.7 12902 National Overlay 80mm @ IRI 4-9 2016 21.70673 13.321N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 267.47-268.07 S 0.6 12902 National Rehab 195mm @ IRI 9-12 2016 26.19648 7.209N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 275.47-275.67 S 0.2 15146 National Full Recon 195mm 2016 10.51344 5.772N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 275.67-276.67 S 1 15146 National Overlay 80mm @ IRI 4-9 2016 11.9016 13.372N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 276.67-277.27 S 0.6 15146 National Rehab 195mm @ IRI 9-12 2016 26.19648 5.606N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 277.27-279.17 S 1.9 15146 National Overlay 80mm @ IRI 4-9 2016 22.61304 12.429N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 279.17-279.37 S 0.2 15146 National Full Recon 195mm 2016 10.51344 5.815N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 279.37-280.57 S 1.2 15146 National Overlay 80mm @ IRI 4-9 2016 14.29382 12.618N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 280.57-280.77 S 0.2 15146 National Full Recon 195mm 2016 10.51344 6.164N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 280.77-288.57 S 7.8 15146 National Overlay 80mm @ IRI 4-9 2016 100.0656 13.205N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 288.57-289.17 S 0.6 15146 National Rehab 195mm @ IRI 9-12 2016 26.24014 6.403N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 289.17-295.78 S 6.6 15146 National Overlay 80mm @ IRI 4-9 2016 78.56246 12.261N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 295.78-298.98 S 3.2 14172 National Rehab 195mm @ IRI 9-12 2016 138.7877 7.783N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 298.98-300.08 S 1.1 13284 National Overlay 80mm @ IRI 4-9 2016 12.90993 22.668N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 300.08-300.38 S 0.3 13284 National Full Recon 195mm @ IRI 12 2016 15.55113 8.885N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 300.38-301.48 S 1.1 13284 National Rehab 195mm @ IRI 9-12 2016 47.35984 10.314N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 301.48-301.68 S 0.2 13284 National Full Recon 195mm @ IRI 12 2016 10.36742 9.275N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 301.68-305.28 S 3.6 13284 National Rehab 195mm @ IRI 9-12 2016 155.0389 9.537N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 305.28-308.38 S 3.1 13284 National Full Recon 195mm @ IRI 12 2016 160.6432 8.856N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 308.38-310.08 S 1.7 13284 National Rehab 195mm @ IRI 9-12 2016 73.19248 10.238N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 310.08-310.58 S 0.5 13284 National Full Recon 195mm @ IRI 12 2016 25.91855 9.106N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 310.58-311.68 S 1.1 13284 National Overlay 80mm @ IRI 4-9 2016 12.90993 21.726N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 311.68-311.78 S 0.1 13284 National Full Recon 195mm @ IRI 12 2016 5.18371 9.428N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 311.78-313.38 S 1.61 13284 National Overlay 80mm @ IRI 4-9 2016 18.83676 22.653N107 Kalurghat-Maneswartek Road Km 000.00-003.20 S 3.2 6004 National DBST @ Traff >6000 2016 9.184448 3.162N107 Kalurghat-Maneswartek Road Km 003.20-003.70 S 0.5 6004 National Overlay 50mm @ IRI 5-7 2016 2.9925 5.163N107 Kalurghat-Maneswartek Road Km 003.70-003.80 S 0.1 6004 National Full Recon 180mm @ IRI 12 2016 3.98943 2.367N107 Kalurghat-Maneswartek Road Km 003.80-008.50 S 4.7 6004 National DBST @ Traff >6000 2016 13.04574 3.199N107 Kalurghat-Maneswartek Road Km 008.50-010.54 S 2.04 6004 National Overlay 50mm @ IRI 5-7 2016 11.96994 5.009R170 Patiya-Anowara-Chokoria Road Km 000.00-001.50 S 1.5 4002 Regional Overlay 50mm @ IRI 5-7 2016 5.93775 1.391R170 Patiya-Anowara-Chokoria Road Km 001.50-003.30 S 1.8 4002 Regional Overlay 60mm @ IRI 7-9 2016 8.466768 1.885R170 Patiya-Anowara-Chokoria Road Km 003.40-004.20 S 0.8 4002 Regional Rehab 150mm @ IRI 9-12 2016 14.02632 0.479R170 Patiya-Anowara-Chokoria Road Km 004.30-005.00 S 0.7 4002 Regional Full Recon 150mm 2016 15.52401 0.464R170 Patiya-Anowara-Chokoria Road Km 005.00-005.30 S 0.3 4002 Regional Overlay 50mm @ IRI 5-7 2016 1.15605 2.156R170 Patiya-Anowara-Chokoria Road Km 005.30-005.40 S 0.1 4002 Regional Full Recon 150mm 2016 2.226956 1.343R170 Patiya-Anowara-Chokoria Road Km 005.40-005.60 S 0.2 4002 Regional Overlay 50mm @ IRI 5-7 2016 0.7707 2.564R170 Patiya-Anowara-Chokoria Road Km 005.60-005.90 S 0.3 4002 Regional Rehab 150mm @ IRI 9-12 2016 5.31783 0.613

Page 18 of 163

Page 19: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R170 Patiya-Anowara-Chokoria Road Km 006.10-006.60 S 0.5 4002 Regional Full Recon 150mm 2016 11.13478 0.442R170 Patiya-Anowara-Chokoria Road Km 007.00-007.60 S 0.6 4002 Regional Full Recon 150mm 2016 13.36174 0.413R170 Patiya-Anowara-Chokoria Road Km 008.30-008.50 S 0.2 4002 Regional DBST @ Traff 4000-6000 2016 0.363584 2.103R170 Patiya-Anowara-Chokoria Road Km 009.10-010.60 S 1.5 4002 Regional DBST @ Traff 4000-6000 2016 2.72688 1.893R170 Patiya-Anowara-Chokoria Road Km 010.90-011.50 S 0.6 4002 Regional Full Recon 150mm 2016 12.96125 0.479R170 Patiya-Anowara-Chokoria Road Km 011.50-011.90 S 0.4 4002 Regional DBST @ Traff 4000-6000 2016 0.68172 2.134R170 Patiya-Anowara-Chokoria Road Km 011.90-012.20 S 0.3 4002 Regional Full Recon 150mm 2016 6.28038 0.701R170 Patiya-Anowara-Chokoria Road Km 012.20-012.30 S 0.1 4002 Regional Overlay 50mm @ IRI 5-7 2016 0.36225 3.989R170 Patiya-Anowara-Chokoria Road Km 012.30-014.30 S 2 4456 Regional Rehab 150mm @ IRI 9-12 2016 36.9012 0.386R170 Patiya-Anowara-Chokoria Road Km 014.60-015.40 S 0.8 7600 Regional DBST @ Traff >6000 2016 2.206406 4.692R170 Patiya-Anowara-Chokoria Road Km 015.50-015.60 S 0.1 7600 Regional Full Recon 180mm 2016 3.91944 1.88R170 Patiya-Anowara-Chokoria Road Km 015.60-016.60 S 1 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 7.0056 4.227R170 Patiya-Anowara-Chokoria Road Km 016.60-016.80 S 0.2 7600 Regional Full Recon 150mm @ IRI 12 2016 6.808296 1.909R170 Patiya-Anowara-Chokoria Road Km 016.80-017.00 S 0.2 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 1.403622 5.514R170 Patiya-Anowara-Chokoria Road Km 017.00-017.60 S 0.6 7600 Regional Rehab 150mm @ IRI 9-12 2016 16.25778 1.656R170 Patiya-Anowara-Chokoria Road Km 017.70-017.80 S 0.1 7600 Regional Rehab 150mm @ IRI 9-12 2016 2.70963 2.182R170 Patiya-Anowara-Chokoria Road Km 022.60-025.70 S 3.1 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 21.78789 2.829R170 Patiya-Anowara-Chokoria Road Km 025.70-026.00 S 0.3 7600 Regional DBST @ Traff >6000 2016 0.831402 2.372R170 Patiya-Anowara-Chokoria Road Km 026.00-026.30 S 0.3 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 2.105433 4.895R170 Patiya-Anowara-Chokoria Road Km 030.30-030.40 S 0.1 7600 Regional DBST @ Traff >6000 2016 0.275158 5.293R170 Patiya-Anowara-Chokoria Road Km 030.40-031.70 S 1.3 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 9.05849 2.911R170 Patiya-Anowara-Chokoria Road Km 031.70-031.90 S 0.2 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 1.396116 5.223R170 Patiya-Anowara-Chokoria Road Km 031.90-032.80 S 0.9 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 6.316299 3.271R170 Patiya-Anowara-Chokoria Road Km 035.20-036.60 S 1.4 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 9.825354 4.703R170 Patiya-Anowara-Chokoria Road Km 036.60-036.90 S 0.3 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 2.10168 4.409R170 Patiya-Anowara-Chokoria Road Km 037.10-038.20 S 1.1 7600 Regional Rehab 150mm @ IRI 9-12 2016 29.64461 1.466R170 Patiya-Anowara-Chokoria Road Km 038.30-039.40 S 1.1 7600 Regional DBST @ Traff >6000 2016 3.048474 4.511R170 Patiya-Anowara-Chokoria Road Km 039.40-040.40 S 1 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 7.01811 3.108R170 Patiya-Anowara-Chokoria Road Km 040.40-042.10 S 1.7 7600 Regional Rehab 150mm @ IRI 9-12 2016 45.9816 1.551R170 Patiya-Anowara-Chokoria Road Km 042.10-042.40 S 0.3 7600 Regional DBST @ Traff >6000 2016 0.832884 2.342R170 Patiya-Anowara-Chokoria Road Km 042.40-042.90 S 0.5 7600 Regional Full Recon 150mm @ IRI 12 2016 17.05108 1.837R170 Patiya-Anowara-Chokoria Road Km 042.90-044.71 S 1.81 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 12.68714 2.902R170 Patiya-Anowara-Chokoria Road Km 045.00-046.11 S 1.11 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 7.755199 3.153R170 Patiya-Anowara-Chokoria Road Km 046.11-046.21 S 0.1 7600 Regional Rehab 150mm @ IRI 9-12 2016 2.7048 2.202R170 Patiya-Anowara-Chokoria Road Km 046.21-046.31 S 0.1 7600 Regional DBST @ Traff >6000 2016 0.27664 3.764R170 Patiya-Anowara-Chokoria Road Km 046.31-046.51 S 0.2 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 1.40112 5.607R170 Patiya-Anowara-Chokoria Road Km 046.51-047.21 S 0.7 7600 Regional DBST @ 25% Crk 2016 1.93648 2.014R170 Patiya-Anowara-Chokoria Road Km 047.28-052.91 S 5.63 7600 Regional Overlay 60mm @ IRI 5.5-9 2016 39.34312 2.835R170 Patiya-Anowara-Chokoria Road Km 056.01-056.11 S 0.1 7600 Regional Full Recon 180mm 2016 3.926439 1.927R170 Patiya-Anowara-Chokoria Road Km 056.41-056.85 S 0.44 7600 Regional Full Recon 150mm @ IRI 12 2016 15.04633 2.273R171 Banshkhali (Charati)-Chunti Road Km 000.10-000.40 S 0.3 1662 Regional Overlay 50mm @ IRI 7-9 2016 1.1655 1.973R171 Banshkhali (Charati)-Chunti Road Km 000.40-000.60 S 0.2 1662 Regional Overlay 50mm @ IRI 5-7 2016 0.777 1.941R171 Banshkhali (Charati)-Chunti Road Km 000.60-002.10 S 1.5 1662 Regional Overlay 50mm @ IRI 7-9 2016 5.08725 1.89Z1018 Shikalbaha-Anwara Road Km 000.00-000.10 S 0.1 3669 Zilla Full Recon 75mm @ IRI>12 2016 3.86883 0.01Z1018 Shikalbaha-Anwara Road Km 006.30-006.40 S 0.1 3669 Zilla Rehab 75mm @ IRI 9-12 2016 2.086121 0.325Z1018 Shikalbaha-Anwara Road Km 006.40-007.65 S 1.25 3669 Zilla Overlay 40mm @ Traff >=2000 2016 8.521837 0

Page 19 of 163

Page 20: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1018 Shikalbaha-Anwara Road Km 007.65-008.08 S 0.43 3669 Zilla Overlay 40mm @ IRI>12 2016 2.924694 0Z1019 Keranirhat-Gunagari Road Km 000.00-006.00 S 6 3340 Zilla Overlay 40mm @ Traff >=2000 2016 26.38692 0.284Z1019 Keranirhat-Gunagari Road Km 006.00-006.10 S 0.1 3340 Zilla Overlay 40mm @ Traff >=2000 2016 0.317526 0Z1019 Keranirhat-Gunagari Road Km 006.10-006.40 S 0.3 3340 Zilla Overlay 40mm @ Traff >=2000 2016 0.952578 0.484Z1019 Keranirhat-Gunagari Road Km 006.40-007.50 S 1.1 3340 Zilla Overlay 40mm @ Traff >=2000 2016 3.502125 0.565Z1019 Keranirhat-Gunagari Road Km 008.40-008.90 S 0.5 3340 Zilla Rehab 75mm @ IRI 9-12 2016 5.65677 0.409Z1019 Keranirhat-Gunagari Road Km 008.90-019.14 S 10.24 3340 Zilla Overlay 40mm @ Traff >=2000 2016 32.68854 0.147Z1026 Khanahat-Dopchhari-Bandarban Road Km 000.30-000.50 S 0.2 1711 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 0.327Z1026 Khanahat-Dopchhari-Bandarban Road Km 000.70-001.40 S 0.7 1711 Zilla Rehab 75mm @ IRI 9-12 2016 7.647114 0.431Z1026 Khanahat-Dopchhari-Bandarban Road Km 002.10-003.20 S 1.1 1711 Zilla Rehab 75mm @ IRI 9-12 2016 11.98397 0.192Z1026 Khanahat-Dopchhari-Bandarban Road Km 003.40-004.20 S 0.8 1711 Zilla Rehab 75mm @ IRI 9-12 2016 8.667728 0.061Z1026 Khanahat-Dopchhari-Bandarban Road Km 004.50-006.20 S 1.7 1711 Zilla Overlay 40mm @ 1000-2000 2016 5.227819 0Z1026 Khanahat-Dopchhari-Bandarban Road Km 006.50-006.70 S 0.2 1711 Zilla Overlay 40mm @ 1000-2000 2016 0.614676 0Z1026 Khanahat-Dopchhari-Bandarban Road Km 006.70-007.00 S 0.3 1711 Zilla Rehab 75mm @ IRI 9-12 2016 2.020275 0.577Z1036 Hashimpur Rail Station-Bagicharhat-Boroma Km 003.60-004.10 S 0.5 1783 Zilla Rehab 75mm @ IRI 9-12 2016 5.32754 0.131Z1036 Hashimpur Rail Station-Bagicharhat-Boroma Km 004.70-005.00 S 0.3 1783 Zilla Rehab 75mm @ IRI 9-12 2016 3.178566 0.127Z1036 Hashimpur Rail Station-Bagicharhat-Boroma Km 006.30-006.40 S 0.1 1783 Zilla Rehab 75mm @ IRI 9-12 2016 1.059522 0.267Z1036 Hashimpur Rail Station-Bagicharhat-Boroma Km 007.40-007.50 S 0.1 1783 Zilla Overlay 40mm @ 1000-2000 2016 0.303942 0Z1036 Hashimpur Rail Station-Bagicharhat-Boroma Km 007.50-007.60 S 0.1 1783 Zilla Overlay 40mm @ 1000-2000 2016 0.303942 0.105Z1040 Gachbaria-Anowara Road Km 000.00-000.50 S 0.5 3206 Zilla Overlay 40mm @ Traff >=2000 2016 2.30079 0.108Z1040 Gachbaria-Anowara Road Km 000.50-001.60 S 1.1 3206 Zilla Overlay 40mm @ Traff >=2000 2016 5.061738 0.558Z1040 Gachbaria-Anowara Road Km 001.80-002.20 S 0.4 3206 Zilla Rehab 75mm @ IRI 9-12 2016 6.488824 0.66Z1040 Gachbaria-Anowara Road Km 002.20-002.70 S 0.5 3206 Zilla Overlay 40mm @ Traff >=2000 2016 2.296545 0.189Z1040 Gachbaria-Anowara Road Km 002.70-006.80 S 4.1 3206 Zilla Rehab 75mm @ IRI 9-12 2016 66.00349 0.372Z1040 Gachbaria-Anowara Road Km 006.80-007.00 S 0.2 3206 Zilla Overlay 40mm @ Traff >=2000 2016 0.920316 0.114Z1040 Gachbaria-Anowara Road Km 007.00-008.00 S 1 3206 Zilla Overlay 40mm @ Traff >=2000 2016 4.60158 0.4Z1040 Gachbaria-Anowara Road Km 008.00-008.10 S 0.1 3206 Zilla Overlay 40mm @ Traff >=2000 2016 0.478564 0.157Z1040 Gachbaria-Anowara Road Km 008.10-008.30 S 0.2 3206 Zilla Overlay 40mm @ Traff >=2000 2016 0.920316 0.551Z1040 Gachbaria-Anowara Road Km 008.50-010.10 S 1.6 3153 Zilla Full Recon 75mm @ IRI>12 2016 37.69718 0.168Z1040 Gachbaria-Anowara Road Km 010.10-010.20 S 0.1 2572 Zilla Overlay 40mm @ Traff >=2000 2016 0.459309 0Z1040 Gachbaria-Anowara Road Km 010.20-010.30 S 0.1 2572 Zilla Full Recon 75mm @ IRI>12 2016 2.351727 0.014Z1040 Gachbaria-Anowara Road Km 010.30-011.96 S 1.66 2572 Zilla Overlay 40mm @ Traff >=2000 2016 7.61075 0Z1040 Gachbaria-Anowara Road Km 011.96-012.36 S 0.4 2572 Zilla Rehab 75mm @ IRI 9-12 2016 6.500796 0.071Z1040 Gachbaria-Anowara Road Km 012.36-013.96 S 1.6 2572 Zilla Overlay 40mm @ Traff >=2000 2016 7.362528 0Z1040 Gachbaria-Anowara Road Km 013.96-016.48 S 2.52 2572 Zilla Rehab 75mm @ IRI 9-12 2016 40.72874 0.026Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 001.30-001.70 S 0.4 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.314252 0Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 001.70-001.90 S 0.2 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 001.90-002.40 S 0.5 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.549425 0Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 002.40-002.80 S 0.4 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.23954 0Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 002.80-003.00 S 0.2 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 003.00-003.50 S 0.5 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.549425 0Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 003.50-004.10 S 0.6 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.856211 0Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 004.10-004.60 S 0.5 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.549425 0Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 004.60-004.70 S 0.1 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1057 Patiya-Anadadatta-Haidgaon-Rangunia Road Km 004.70-009.28 S 4.58 1361 Zilla Overlay 40mm @ 1000-2000 2016 15.7732 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 000.70-000.80 S 0.1 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.3396 0

Page 20 of 163

Page 21: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1059 Patiya-Boalkhali (Kanongopara) Road Km 000.80-001.10 S 0.3 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.0188 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 001.10-001.20 S 0.1 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.3396 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 001.20-001.40 S 0.2 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.6792 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 001.40-001.60 S 0.2 1361 Zilla Overlay 40mm @ IRI>12 2016 0.6792 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 001.60-002.00 S 0.4 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.331232 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 002.00-002.10 S 0.1 1361 Zilla Overlay 40mm @ IRI>12 2016 0.326865 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 002.10-002.30 S 0.2 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.65373 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 002.30-002.50 S 0.2 1361 Zilla Overlay 40mm @ IRI>12 2016 0.65373 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 002.50-002.70 S 0.2 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.65373 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 002.70-002.80 S 0.1 1361 Zilla Overlay 40mm @ IRI>12 2016 0.326865 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 002.80-003.20 S 0.4 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.30746 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 003.20-003.30 S 0.1 1361 Zilla Overlay 40mm @ IRI>12 2016 0.326865 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 003.30-003.40 S 0.1 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.326865 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 003.40-003.80 S 0.4 1361 Zilla Overlay 40mm @ IRI>12 2016 1.30746 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 003.80-003.90 S 0.1 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.321075 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 003.90-004.30 S 0.4 1361 Zilla Overlay 40mm @ IRI>12 2016 1.297272 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 004.30-004.70 S 0.4 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.297272 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 004.70-004.90 S 0.2 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.648636 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 004.90-005.10 S 0.2 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.648636 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 005.10-006.60 S 1.5 1361 Zilla Overlay 40mm @ 1000-2000 2016 4.86477 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 006.60-007.00 S 0.4 1361 Zilla Seal Coat 2016 0.374976 0.179Z1059 Patiya-Boalkhali (Kanongopara) Road Km 007.00-007.20 S 0.2 1361 Zilla Overlay 40mm @ IRI>12 2016 0.631656 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 007.20-007.50 S 0.3 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.947484 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 007.50-007.60 S 0.1 1361 Zilla Overlay 40mm @ IRI>12 2016 0.315828 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 007.60-007.80 S 0.2 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.631656 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 007.80-008.50 S 0.7 1361 Zilla Overlay 40mm @ IRI>12 2016 2.222682 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 008.50-008.70 S 0.2 1361 Zilla Overlay 40mm @ 1000-2000 2016 0.635052 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 008.70-009.10 S 0.4 1361 Zilla Overlay 40mm @ IRI>12 2016 1.270104 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 009.10-009.90 S 0.8 1361 Zilla Overlay 40mm @ 1000-2000 2016 2.981688 0.083Z1059 Patiya-Boalkhali (Kanongopara) Road Km 009.90-010.30 S 0.4 1361 Zilla Overlay 40mm @ 1000-2000 2016 1.263312 0Z1059 Patiya-Boalkhali (Kanongopara) Road Km 010.30-011.20 S 0.9 1361 Zilla Overlay 40mm @ 1000-2000 2016 3.603538 0.145Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 000.00-000.03 L 0.03 2961 Zilla Full Recon 75mm @ IRI>12 2016 0.13041 6.772Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 000.00-000.03 R 0.03 2961 Zilla Full Recon 75mm @ IRI>12 2016 0.13041 6.772Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 000.03-000.20 S 0.17 2961 Zilla Full Recon 75mm @ IRI>12 2016 4.086615 0.182Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 000.20-000.30 S 0.1 2961 Zilla Overlay 40mm @ Traff >=2000 2016 0.3396 0Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 000.30-000.70 S 0.4 2961 Zilla Rehab 75mm @ IRI 9-12 2016 4.333864 0.842Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 000.70-001.31 S 0.61 2961 Zilla Overlay 40mm @ Traff >=2000 2016 1.859395 0.609Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 001.31-001.51 S 0.2 2961 Zilla Full Recon 75mm @ IRI>12 2016 3.147228 0.823Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 001.51-002.91 S 1.4 2961 Zilla Overlay 40mm @ Traff >=2000 2016 4.326504 1.011Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 002.91-003.31 S 0.4 2961 Zilla Rehab 75mm @ IRI 9-12 2016 4.357808 1.126Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 005.15-005.25 S 0.1 2961 Zilla Full Recon 75mm @ IRI>12 2016 1.595349 1.234Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 005.65-005.75 S 0.1 2961 Zilla Full Recon 75mm @ IRI>12 2016 1.595349 1.017Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 015.95-017.35 S 1.4 2961 Zilla Rehab 75mm @ IRI 9-12 2016 23.088 0.345Z1065 Maizzertek-Kanongapara-Udarbanna Road Km 018.95-019.05 S 0.1 2961 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 1.763Z1070 Patiya -Anowara Road Km 010.40-010.90 S 0.5 4267 Zilla Rehab 75mm @ IRI 9-12 2016 5.402365 1.122Z1070 Patiya -Anowara Road Km 010.90-011.30 S 0.4 4267 Zilla Overlay 50mm @ IRI 6-9 2016 1.5162 2.116

Page 21 of 163

Page 22: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1070 Patiya -Anowara Road Km 011.30-011.40 S 0.1 4267 Zilla Full Recon 75mm @ IRI>12 2016 1.569267 1.081Z1070 Patiya -Anowara Road Km 014.41-014.61 S 0.2 4267 Zilla Rehab 75mm @ IRI 9-12 2016 2.160946 1.673Z1070 Patiya -Anowara Road Km 014.91-015.11 S 0.2 4267 Zilla Full Recon 75mm @ IRI>12 2016 3.138534 0.946Z1070 Patiya -Anowara Road Km 015.31-015.81 S 0.5 4267 Zilla Rehab 75mm @ IRI 9-12 2016 5.402365 1.116Z1070 Patiya -Anowara Road Km 016.01-016.31 S 0.3 4267 Zilla Rehab 75mm @ IRI 9-12 2016 3.241419 1.265Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 000.00-000.20 S 0.2 3979 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 2.307Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 000.30-000.90 S 0.6 3979 Zilla Rehab 75mm @ IRI 9-12 2016 6.572628 1.969Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 001.50-001.90 S 0.4 3979 Zilla Rehab 75mm @ IRI 9-12 2016 4.405696 2.199Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 002.00-002.40 S 0.4 3979 Zilla Rehab 75mm @ IRI 9-12 2016 4.405696 1.845Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 003.90-004.00 S 0.1 3979 Zilla Full Recon 75mm @ IRI>12 2016 1.599696 1.941Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 004.90-005.10 S 0.2 3979 Zilla Rehab 75mm @ IRI 9-12 2016 2.179921 2.009Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 005.80-006.00 S 0.2 3979 Zilla Full Recon 75mm @ IRI>12 2016 3.182004 1.321Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 006.10-007.10 S 1 3979 Zilla Rehab 75mm @ IRI 9-12 2016 10.95438 1.588Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 007.10-007.70 S 0.6 3979 Zilla Overlay 40mm @ Traff >=2000 2016 1.864404 1.366Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 007.70-008.00 S 0.3 3979 Zilla Full Recon 75mm @ IRI>12 2016 4.773006 1.198Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 008.00-008.40 S 0.4 3979 Zilla Overlay 40mm @ Traff >=2000 2016 1.242936 1.322Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 008.40-008.50 S 0.1 3979 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 1.723Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 008.50-010.70 S 2.2 3979 Zilla Overlay 40mm @ Traff >=2000 2016 6.81747 1.549Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 010.70-010.80 S 0.1 3979 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 2.764Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 011.30-011.40 S 0.1 3979 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 2.378Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 012.40-012.60 S 0.2 3979 Zilla Full Recon 75mm @ IRI>12 2016 3.17331 1.514Z1088 CUFL Gate-Juidandi Ferry Ghat Road Km 012.60-014.60 S 2 3979 Zilla Overlay 40mm @ Traff >=2000 2016 5.945971 1.161Z1703 Anwara - Tailardwip Ferryghat Road Km 000.00-003.60 S 3.6 1773 Zilla Overlay 40mm @ IRI>12 2016 10.91135 0Z1703 Anwara - Tailardwip Ferryghat Road Km 004.20-004.40 S 0.2 1773 Zilla Full Recon 75mm @ IRI>12 2016 3.225474 0.13Z1703 Anwara - Tailardwip Ferryghat Road Km 004.60-005.20 S 0.6 1773 Zilla Full Recon 75mm @ IRI>12 2016 9.415602 0.063Z1703 Anwara - Tailardwip Ferryghat Road Km 005.30-005.80 S 0.5 1773 Zilla Full Recon 75mm @ IRI>12 2016 7.759395 0.146Z1802 Telegati-Allaher Darber Sharif Road Km 000.00-000.40 S 0.4 4372 Zilla Overlay 50mm @ Cracking >25%2016 1.5246 0.075Z1802 Telegati-Allaher Darber Sharif Road Km 000.40-000.80 S 0.4 4372 Zilla Rehab 75mm @ IRI 9-12 2016 4.345836 1.943Z1802 Telegati-Allaher Darber Sharif Road Km 000.80-000.90 S 0.1 4372 Zilla Overlay 50mm @ Cracking >25%2016 0.38115 0.673Z1802 Telegati-Allaher Darber Sharif Road Km 000.90-001.10 S 0.2 4372 Zilla Rehab 75mm @ IRI 9-12 2016 2.160946 2.132Z1802 Telegati-Allaher Darber Sharif Road Km 001.10-001.20 S 0.1 4372 Zilla Overlay 50mm @ Cracking >25%2016 0.37905 0.074Z1802 Telegati-Allaher Darber Sharif Road Km 001.20-001.50 S 0.3 4372 Zilla Full Recon 75mm @ IRI>12 2016 4.707801 1.548Z1802 Telegati-Allaher Darber Sharif Road Km 001.50-005.70 S 4.2 4372 Zilla Overlay 50mm @ Cracking >25%2016 15.87222 0.075Z1802 Telegati-Allaher Darber Sharif Road Km 005.70-007.00 S 1.3 4372 Zilla Rehab 75mm @ IRI 9-12 2016 14.04615 1.304Z1802 Telegati-Allaher Darber Sharif Road Km 008.60-008.90 S 0.3 4372 Zilla Rehab 75mm @ IRI 9-12 2016 3.250398 2.257Z1804 Maizzertek-(Ferry Connecting Road) Km 000.20-000.70 S 0.5 2494 Zilla Rehab 75mm @ IRI 9-12 2016 8.335505 0.653Z1804 Maizzertek-(Ferry Connecting Road) Km 000.70-001.50 S 0.8 2494 Zilla Overlay 40mm @ Traff >=2000 2016 3.749184 0Z1804 Maizzertek-(Ferry Connecting Road) Km 001.50-001.60 S 0.1 2494 Zilla Full Recon 75mm @ IRI>12 2016 2.399544 0.594Z1804 Maizzertek-(Ferry Connecting Road) Km 001.60-002.30 S 0.7 2494 Zilla Overlay 40mm @ Traff >=2000 2016 3.280536 0Z1804 Maizzertek-(Ferry Connecting Road) Km 002.30-002.40 S 0.1 2494 Zilla Full Recon 75mm @ IRI>12 2016 1.951803 0.806Sub-Total Dohazari Division 2276.722

Khagrachari DivisionR152 Heako-Ramgarh-Jaliapara Road Km 014.73-017.30 S 2.57 1975 Regional Overlay 50mm @ IRI 7-9 2016 15.15037 2.095R152 Heako-Ramgarh-Jaliapara Road Km 017.30-017.60 S 0.3 1975 Regional Overlay 50mm @ IRI 5-7 2016 1.76715 2.117R152 Heako-Ramgarh-Jaliapara Road Km 017.60-025.90 S 8.3 1975 Regional Overlay 50mm @ IRI 7-9 2016 48.46124 2.569

Page 22 of 163

Page 23: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R152 Heako-Ramgarh-Jaliapara Road Km 026.10-029.40 S 3.3 1975 Regional Overlay 50mm @ IRI 7-9 2016 19.1268 2.911R152 Heako-Ramgarh-Jaliapara Road Km 029.40-032.60 S 3.2 1975 Regional Rehab 110mm @ IRI 9-12 2016 65.5609 1.018R152 Heako-Ramgarh-Jaliapara Road Km 032.60-035.70 S 3.1 1975 Regional Rehab 110mm @ IRI 9-12 2016 63.60688 0.88R152 Heako-Ramgarh-Jaliapara Road Km 035.70-036.21 S 0.51 1975 Regional Overlay 50mm @ IRI 5-7 2016 2.959866 2.803R160 Hathazari-Fatikchhari-Khagrachhari Road Km 031.88-043.21 S 11.32 1576 Regional Rehab 110mm @ IRI 9-12 2016 232.3088 0.649R160 Hathazari-Fatikchhari-Khagrachhari Road Km 043.81-046.81 S 3 1576 Regional Full Recon 110mm 2016 87.18378 0.564R160 Hathazari-Fatikchhari-Khagrachhari Road Km 046.81-056.11 S 9.3 1576 Regional Rehab 110mm @ IRI 9-12 2016 191.5289 0.577R160 Hathazari-Fatikchhari-Khagrachhari Road Km 056.11-057.71 S 1.6 1576 Regional Overlay 50mm @ IRI 7-9 2016 9.3744 2.184R160 Hathazari-Fatikchhari-Khagrachhari Road Km 059.80-060.00 S 0.2 1576 Regional Rehab 110mm @ IRI 9-12 2016 4.14064 0.644R160 Hathazari-Fatikchhari-Khagrachhari Road Km 060.00-062.50 S 2.5 1576 Regional Overlay 50mm @ IRI 7-9 2016 14.70588 1.949R160 Hathazari-Fatikchhari-Khagrachhari Road Km 062.50-062.60 S 0.1 1576 Regional Full Recon 110mm 2016 2.767974 0.554R160 Hathazari-Fatikchhari-Khagrachhari Road Km 062.60-063.60 S 1 1576 Regional Overlay 50mm @ IRI 7-9 2016 5.8905 2.045R160 Hathazari-Fatikchhari-Khagrachhari Road Km 063.60-063.80 S 0.2 1576 Regional Rehab 110mm @ IRI 9-12 2016 4.148034 0.664R160 Hathazari-Fatikchhari-Khagrachhari Road Km 063.80-065.60 S 1.8 1576 Regional Overlay 50mm @ IRI 5-7 2016 10.6029 1.503R160 Hathazari-Fatikchhari-Khagrachhari Road Km 065.60-065.90 S 0.3 1576 Regional Rehab 110mm @ IRI 9-12 2016 6.222051 0.625R160 Hathazari-Fatikchhari-Khagrachhari Road Km 065.90-066.90 S 1 1576 Regional Overlay 50mm @ IRI 7-9 2016 5.8905 1.902R160 Hathazari-Fatikchhari-Khagrachhari Road Km 067.80-070.30 S 2.5 1576 Regional Overlay 50mm @ IRI 5-7 2016 14.67375 1.39R160 Hathazari-Fatikchhari-Khagrachhari Road Km 070.30-070.60 S 0.3 1576 Regional Rehab 110mm @ IRI 9-12 2016 6.166596 0.672R160 Hathazari-Fatikchhari-Khagrachhari Road Km 070.60-071.40 S 0.8 1576 Regional Overlay 50mm @ IRI 5-7 2016 4.6704 1.439R160 Hathazari-Fatikchhari-Khagrachhari Road Km 071.40-074.40 S 3 1576 Regional Overlay 50mm @ IRI 7-9 2016 18.46515 1.864R160 Hathazari-Fatikchhari-Khagrachhari Road Km 075.00-075.80 S 0.8 1576 Regional Rehab 110mm @ IRI 9-12 2016 16.59214 0.651R160 Hathazari-Fatikchhari-Khagrachhari Road Km 076.70-077.10 S 0.4 1576 Regional Rehab 110mm @ IRI 9-12 2016 8.296068 0.622R160 Hathazari-Fatikchhari-Khagrachhari Road Km 077.40-077.80 S 0.4 1576 Regional Full Recon 110mm 2016 11.0719 0.887R160 Hathazari-Fatikchhari-Khagrachhari Road Km 077.90-078.10 S 0.2 1576 Regional Rehab 110mm @ IRI 9-12 2016 4.148034 0.763R160 Hathazari-Fatikchhari-Khagrachhari Road Km 078.10-078.30 S 0.2 1576 Regional Overlay 50mm @ IRI 7-9 2016 1.1781 2.207R160 Hathazari-Fatikchhari-Khagrachhari Road Km 078.30-081.60 S 3.3 1576 Regional Full Recon 110mm 2016 90.71934 0.558R160 Hathazari-Fatikchhari-Khagrachhari Road Km 081.60-084.60 S 3 1576 Regional Rehab 110mm @ IRI 9-12 2016 61.88778 0.639R160 Hathazari-Fatikchhari-Khagrachhari Road Km 084.70-084.90 S 0.2 1576 Regional Full Recon 110mm 2016 5.52608 0.389R160 Hathazari-Fatikchhari-Khagrachhari Road Km 084.90-086.80 S 1.9 1576 Regional Overlay 50mm @ IRI 7-9 2016 11.172 1.9R160 Hathazari-Fatikchhari-Khagrachhari Road Km 086.80-087.40 S 0.6 1576 Regional Full Recon 110mm 2016 16.57824 0.523R160 Hathazari-Fatikchhari-Khagrachhari Road Km 088.00-088.40 S 0.4 1576 Regional Full Recon 110mm 2016 13.1047 0.205R160 Hathazari-Fatikchhari-Khagrachhari Road Km 090.30-091.50 S 1.2 1576 Regional Overlay 50mm @ IRI 5-7 2016 9.8532 1.173R160 Hathazari-Fatikchhari-Khagrachhari Road Km 091.50-092.20 S 0.7 1576 Regional Full Recon 110mm 2016 19.7212 0.343R160 Hathazari-Fatikchhari-Khagrachhari Road Km 092.20-092.40 S 0.2 1576 Regional Overlay 50mm @ IRI 5-7 2016 1.1991 2.159R162 Rangamati-Mohalchhari-Khagrachhari Km 040.18-043.48 S 3.3 868 Regional Overlay 50mm @ IRI 5-7 2016 12.85515 0.909R162 Rangamati-Mohalchhari-Khagrachhari Km 043.48-047.88 S 4.4 868 Regional Rehab 110mm @ IRI 9-12 2016 69.96314 0.321R162 Rangamati-Mohalchhari-Khagrachhari Km 047.88-048.38 S 0.5 868 Regional Overlay 50mm @ IRI 7-9 2016 2.94525 0.834R162 Rangamati-Mohalchhari-Khagrachhari Km 048.38-048.48 S 0.1 868 Regional Full Recon 110mm 2016 2.767974 0.065R162 Rangamati-Mohalchhari-Khagrachhari Km 048.48-048.68 S 0.2 868 Regional Overlay 50mm @ IRI 7-9 2016 1.1781 0.834R162 Rangamati-Mohalchhari-Khagrachhari Km 050.58-053.58 S 3 868 Regional Overlay 50mm @ IRI 7-9 2016 17.703 0.694R162 Rangamati-Mohalchhari-Khagrachhari Km 056.98-057.58 S 0.6 868 Regional Overlay 50mm @ IRI 7-9 2016 3.5406 0.787R162 Rangamati-Mohalchhari-Khagrachhari Km 057.58-057.88 S 0.3 868 Regional Overlay 50mm @ IRI 5-7 2016 1.7703 0.391R162 Rangamati-Mohalchhari-Khagrachhari Km 057.88-058.08 S 0.2 868 Regional Overlay 50mm @ IRI 7-9 2016 1.1802 0.782R162 Rangamati-Mohalchhari-Khagrachhari Km 058.88-060.08 S 1.2 868 Regional Rehab 110mm @ IRI 9-12 2016 24.93257 0.025Z1601 Manikchahri-Laksmichhari Road Km 001.50-005.30 S 3.8 1229 Zilla Overlay 40mm @ IRI>12 2016 10.32384 0Z1601 Manikchahri-Laksmichhari Road Km 005.70-007.30 S 1.6 1229 Zilla Overlay 40mm @ IRI>12 2016 4.34688 0

Page 23 of 163

Page 24: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1601 Manikchahri-Laksmichhari Road Km 007.50-009.40 S 1.9 1229 Zilla Overlay 40mm @ IRI>12 2016 5.16192 0Z1601 Manikchahri-Laksmichhari Road Km 009.60-011.80 S 2.2 1229 Zilla Overlay 40mm @ IRI>12 2016 5.97696 0Z1601 Manikchahri-Laksmichhari Road Km 012.10-013.50 S 1.4 1229 Zilla Overlay 40mm @ IRI>12 2016 3.80352 0Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 002.60-002.90 S 0.3 1752 Zilla Full Recon 75mm @ IRI>12 2016 4.786047 1.184Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 003.50-003.60 S 0.1 1752 Zilla Rehab 75mm @ IRI 9-12 2016 1.098431 2.286Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 003.80-004.50 S 0.7 1752 Zilla Rehab 75mm @ IRI 9-12 2016 7.657111 2.043Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 004.70-005.60 S 0.9 1752 Zilla Rehab 75mm @ IRI 9-12 2016 9.858942 1.891Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 006.14-009.14 S 3 1752 Zilla Rehab 75mm @ IRI 9-12 2016 32.77335 1.42Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 009.14-011.24 S 2.1 1752 Zilla Full Recon 75mm @ IRI>12 2016 33.21264 1.185Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 012.04-012.94 S 0.9 1752 Zilla Rehab 75mm @ IRI 9-12 2016 9.805068 2.069Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 012.94-015.74 S 2.8 1752 Zilla Rehab 75mm @ IRI 9-12 2016 30.58846 1.076Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 015.74-016.14 S 0.4 1752 Zilla Rehab 75mm @ IRI 9-12 2016 4.357808 2.131Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 016.14-016.24 S 0.1 1752 Zilla Overlay 40mm @ 1000-2000 2016 0.309036 0Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 016.24-018.64 S 2.4 1752 Zilla Rehab 75mm @ IRI 9-12 2016 26.13595 2.033Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 018.74-019.64 S 0.9 1752 Zilla Rehab 75mm @ IRI 9-12 2016 9.805068 2.04Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 019.84-019.94 S 0.1 1752 Zilla Rehab 75mm @ IRI 9-12 2016 1.095438 2.296Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 019.94-020.14 S 0.2 1752 Zilla Overlay 40mm @ 1000-2000 2016 0.930504 0Z1602 Jaliapara-Sindukchhari-Mahalchhari Road Km 020.14-022.02 S 1.88 1752 Zilla Rehab 75mm @ IRI 9-12 2016 30.85148 0.433Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 000.00-001.40 S 1.4 4848 Zilla Overlay 40mm @ Traff >=2000 2016 4.469136 0.1Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 001.40-001.60 S 0.2 4848 Zilla Overlay 50mm @ IRI 6-9 2016 0.7875 1.131Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 002.60-003.10 S 0.5 4848 Zilla Full Recon 75mm @ IRI>12 2016 8.150625 0.692Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 003.30-003.60 S 0.3 4848 Zilla Rehab 75mm @ IRI 9-12 2016 3.358146 1.387Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 003.60-003.70 S 0.1 4848 Zilla Overlay 40mm @ Traff >=2000 2016 0.317526 0Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 003.70-010.10 S 6.4 4848 Zilla Rehab 75mm @ IRI 9-12 2016 72.0123 0.856Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 010.10-010.80 S 0.7 4848 Zilla Rehab 75mm @ IRI 9-12 2016 7.919477 0.645Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 011.20-011.40 S 0.2 4848 Zilla Rehab 75mm @ IRI 9-12 2016 2.268694 1.365Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 011.40-011.60 S 0.2 4848 Zilla Overlay 40mm @ Traff >=2000 2016 0.640324 0Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 011.60-024.50 S 12.9 4848 Zilla Rehab 75mm @ IRI 9-12 2016 146.7055 1.024Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 024.50-024.90 S 0.4 4848 Zilla Overlay 50mm @ IRI 6-9 2016 1.5624 1.627Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 025.00-031.10 S 6.1 4848 Zilla Full Recon 75mm @ IRI>12 2016 97.56546 0.49Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 031.10-032.60 S 1.5 4848 Zilla Full Recon 75mm @ IRI>12 2016 24.19105 0.64Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 032.60-033.50 S 0.9 4848 Zilla Rehab 75mm @ IRI 9-12 2016 9.993627 1.108Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 033.50-036.60 S 3.1 4848 Zilla Overlay 50mm @ IRI 6-9 2016 12.00708 2.034Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 036.60-041.00 S 4.4 4848 Zilla Rehab 75mm @ IRI 9-12 2016 48.19927 0.705Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 041.00-044.29 S 3.3 4848 Zilla Overlay 50mm @ IRI 6-9 2016 12.67806 1.514Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 044.29-044.69 S 0.4 4848 Zilla Overlay 50mm @ IRI 6-9 2016 1.5204 0.772Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 044.69-044.79 S 0.1 4848 Zilla Full Recon 75mm @ IRI>12 2016 1.573614 1.604Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 044.79-044.99 S 0.2 4848 Zilla Overlay 50mm @ IRI 6-9 2016 0.7602 0.692Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 044.99-045.09 S 0.1 4848 Zilla Full Recon 75mm @ IRI>12 2016 1.573614 1.314Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 045.09-045.69 S 0.6 4848 Zilla Overlay 50mm @ IRI 6-9 2016 2.2806 1.176Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 045.69-045.99 S 0.3 4848 Zilla Rehab 75mm @ IRI 9-12 2016 3.250398 1.154Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 045.99-046.79 S 0.8 4848 Zilla Overlay 50mm @ IRI 6-9 2016 3.0492 1.437Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 046.79-047.39 S 0.6 4848 Zilla Rehab 75mm @ IRI 9-12 2016 6.590586 0.729Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 047.39-050.59 S 3.2 4848 Zilla Overlay 50mm @ IRI 6-9 2016 12.29376 1.2Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 050.59-053.19 S 2.6 4848 Zilla Overlay 50mm @ IRI 6-9 2016 9.9918 0.971Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 053.43-057.59 S 4.17 4848 Zilla Overlay 50mm @ IRI 6-9 2016 16.06139 1.426

Page 24 of 163

Page 25: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 057.59-057.79 S 0.2 4848 Zilla Overlay 40mm @ Traff >=2000 2016 0.611603 0.034Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 057.79-058.09 S 0.3 4848 Zilla Rehab 75mm @ IRI 9-12 2016 3.250398 0.833Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 058.09-058.29 S 0.2 4848 Zilla Overlay 40mm @ Traff >=2000 2016 0.61977 0Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 058.29-062.59 S 4.3 4848 Zilla Overlay 50mm @ IRI 6-9 2016 16.3443 1.44Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 062.59-062.69 S 0.1 4848 Zilla Overlay 40mm @ Traff >=2000 2016 0.30564 0Z1603 Khagrachhari-Dighinala-Bagaihat-Sajek Road Km 062.69-064.29 S 1.6 4848 Zilla Overlay 50mm @ IRI 6-9 2016 6.048 1.518Z1604 Khagrachhari-Panchhari Road Km 005.80-005.90 S 0.1 833 Zilla Full Recon 75mm @ IRI>12 2016 1.604043 0.169Z1604 Khagrachhari-Panchhari Road Km 012.10-013.90 S 1.8 833 Zilla Rehab 75mm @ IRI 9-12 2016 19.83665 0.234Z1604 Khagrachhari-Panchhari Road Km 014.80-015.40 S 0.6 833 Zilla Full Recon 75mm @ IRI>12 2016 9.65034 0.021Z1604 Khagrachhari-Panchhari Road Km 016.80-017.70 S 0.9 833 Zilla Rehab 75mm @ IRI 9-12 2016 9.96669 0.132Z1604 Khagrachhari-Panchhari Road Km 017.70-018.00 S 0.3 833 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.036Z1605 Dighinala-Chhoto Merung-Langadu Road Km 008.30-008.40 S 0.1 423 Zilla Overlay 40mm @ IRI>12 2016 0.312432 0Z1605 Dighinala-Chhoto Merung-Langadu Road Km 008.80-008.90 S 0.1 423 Zilla Overlay 40mm @ IRI>12 2016 0.313281 0Z1605 Dighinala-Chhoto Merung-Langadu Road Km 011.50-011.80 S 0.3 423 Zilla Overlay 40mm @ IRI>12 2016 0.941787 0Z1605 Dighinala-Chhoto Merung-Langadu Road Km 023.20-025.10 S 1.9 423 Zilla Overlay 40mm @ Traff 100-1000 2016 5.952339 0Z1605 Dighinala-Chhoto Merung-Langadu Road Km 040.60-040.63 S 0.03 423 Zilla Overlay 40mm @ Traff 100-1000 2016 0.096277 0Z1606 Baghaihat-Marisha Road Km 000.10-003.10 S 3 312 Zilla Overlay 40mm @ IRI>12 2016 9.1692 0Z1606 Baghaihat-Marisha Road Km 014.20-014.60 S 0.4 312 Zilla Overlay 40mm @ IRI>12 2016 1.22256 0Z1606 Baghaihat-Marisha Road Km 014.70-018.00 S 3.3 312 Zilla Overlay 40mm @ IRI>12 2016 10.08612 0Z1608 Matiranga-Tannakapara Road Km 000.00-000.40 S 0.4 1130 Zilla Overlay 40mm @ 1000-2000 2016 1.259916 0.038Z1608 Matiranga-Tannakapara Road Km 003.30-003.40 S 0.1 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.311583 0.169Z1608 Matiranga-Tannakapara Road Km 006.17-012.37 S 6.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 19.31503 0Z1608 Matiranga-Tannakapara Road Km 012.37-012.67 S 0.3 1130 Zilla Overlay 40mm @ IRI>12 2016 0.927108 0Z1608 Matiranga-Tannakapara Road Km 012.67-013.27 S 0.6 1130 Zilla Overlay 40mm @ 1000-2000 2016 1.854216 0Z1608 Matiranga-Tannakapara Road Km 013.27-015.27 S 2 1130 Zilla Overlay 40mm @ IRI>12 2016 6.14676 0Z1608 Matiranga-Tannakapara Road Km 015.27-015.47 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.618072 0Z1608 Matiranga-Tannakapara Road Km 015.47-015.87 S 0.4 1130 Zilla Overlay 40mm @ 1000-2000 2016 1.236144 0Z1608 Matiranga-Tannakapara Road Km 015.87-017.77 S 1.9 1130 Zilla Overlay 40mm @ 1000-2000 2016 5.852471 0Z1608 Matiranga-Tannakapara Road Km 017.77-018.27 S 0.5 1130 Zilla Overlay 40mm @ IRI>12 2016 1.53669 0Z1608 Matiranga-Tannakapara Road Km 018.27-018.67 S 0.4 1130 Zilla Overlay 40mm @ 1000-2000 2016 1.229352 0Z1608 Matiranga-Tannakapara Road Km 018.67-018.77 S 0.1 1130 Zilla Rehab 75mm @ IRI 9-12 2016 1.083466 0.012Z1608 Matiranga-Tannakapara Road Km 018.77-019.07 S 0.3 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.922014 0Z1608 Matiranga-Tannakapara Road Km 019.07-019.27 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.614676 0Z1608 Matiranga-Tannakapara Road Km 019.27-019.47 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.616374 0Z1608 Matiranga-Tannakapara Road Km 019.47-019.57 S 0.1 1130 Zilla Rehab 75mm @ IRI 9-12 2016 1.086459 0.013Z1608 Matiranga-Tannakapara Road Km 019.57-019.67 S 0.1 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.308187 0.175Z1608 Matiranga-Tannakapara Road Km 019.67-019.77 S 0.1 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.308187 0Z1608 Matiranga-Tannakapara Road Km 019.77-019.97 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.616374 0Z1608 Matiranga-Tannakapara Road Km 019.97-020.67 S 0.7 1130 Zilla Overlay 40mm @ 1000-2000 2016 2.157309 0Z1608 Matiranga-Tannakapara Road Km 020.67-021.07 S 0.4 1130 Zilla Overlay 40mm @ 1000-2000 2016 1.229352 0Z1608 Matiranga-Tannakapara Road Km 021.07-021.37 S 0.3 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.922014 0Z1608 Matiranga-Tannakapara Road Km 021.37-021.67 S 0.3 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.922014 0Z1608 Matiranga-Tannakapara Road Km 021.67-021.97 S 0.3 1130 Zilla Overlay 40mm @ IRI>12 2016 0.922014 0Z1608 Matiranga-Tannakapara Road Km 021.97-022.07 S 0.1 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.307338 0Z1608 Matiranga-Tannakapara Road Km 022.07-022.57 S 0.5 1130 Zilla Overlay 40mm @ 1000-2000 2016 1.53669 0Z1608 Matiranga-Tannakapara Road Km 022.57-024.07 S 1.5 1130 Zilla Overlay 40mm @ 1000-2000 2016 4.61007 0

Page 25 of 163

Page 26: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1608 Matiranga-Tannakapara Road Km 024.07-024.17 S 0.1 1130 Zilla Overlay 40mm @ IRI>12 2016 0.306489 0Z1608 Matiranga-Tannakapara Road Km 024.17-024.37 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.612978 0Z1608 Matiranga-Tannakapara Road Km 024.37-024.57 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.612978 0Z1608 Matiranga-Tannakapara Road Km 024.57-024.77 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.612978 0.038Z1608 Matiranga-Tannakapara Road Km 024.77-025.17 S 0.4 1130 Zilla Overlay 40mm @ 1000-2000 2016 1.225956 0Z1608 Matiranga-Tannakapara Road Km 025.17-025.37 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.616671 0Z1608 Matiranga-Tannakapara Road Km 025.37-026.47 S 1.1 1130 Zilla Overlay 40mm @ IRI>12 2016 3.418074 0Z1608 Matiranga-Tannakapara Road Km 026.47-026.67 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.621468 0.062Z1608 Matiranga-Tannakapara Road Km 026.67-026.97 S 0.3 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0Z1608 Matiranga-Tannakapara Road Km 026.97-027.37 S 0.4 1130 Zilla Overlay 40mm @ 1000-2000 2016 1.236144 0Z1608 Matiranga-Tannakapara Road Km 027.37-028.37 S 1 1130 Zilla Overlay 40mm @ 1000-2000 2016 3.09036 0Z1608 Matiranga-Tannakapara Road Km 028.37-029.47 S 1.1 1130 Zilla Overlay 40mm @ 1000-2000 2016 3.380718 0Z1608 Matiranga-Tannakapara Road Km 029.47-029.67 S 0.2 1130 Zilla Overlay 40mm @ IRI>12 2016 0.614676 0Z1608 Matiranga-Tannakapara Road Km 030.17-031.47 S 1.3 1130 Zilla Overlay 40mm @ 1000-2000 2016 3.951246 0Z1608 Matiranga-Tannakapara Road Km 031.47-031.67 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.61128 0Z1608 Matiranga-Tannakapara Road Km 031.67-032.67 S 1 1130 Zilla Overlay 40mm @ 1000-2000 2016 3.0564 0Z1608 Matiranga-Tannakapara Road Km 032.67-033.87 S 1.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 3.705341 0Z1608 Matiranga-Tannakapara Road Km 033.87-034.17 S 0.3 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.932202 0Z1608 Matiranga-Tannakapara Road Km 034.17-037.07 S 2.9 1130 Zilla Overlay 40mm @ 1000-2000 2016 8.962044 0Z1608 Matiranga-Tannakapara Road Km 037.07-037.17 S 0.1 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.307338 0Z1608 Matiranga-Tannakapara Road Km 037.17-039.97 S 2.8 1130 Zilla Overlay 40mm @ 1000-2000 2016 8.629236 0Z1608 Matiranga-Tannakapara Road Km 039.97-040.17 S 0.2 1130 Zilla Overlay 40mm @ 1000-2000 2016 0.618072 0Z1608 Matiranga-Tannakapara Road Km 040.17-045.87 S 5.7 1130 Zilla Overlay 40mm @ 1000-2000 2016 17.57899 0Z1610 Dighinala-Babuchhara-Panchhari Road Km 041.62-042.42 S 0.8 1493 Zilla Overlay 40mm @ IRI>12 2016 2.47908 0Sub-Total Khagrachari Division 2217.625

Rangamati DivisionN106 Chittagong-Hathazari-Rangamati Km 030.41-033.41 S 3 2907 National Overlay 50mm @ IRI 5-9 2016 23.00266 3.985N106 Chittagong-Hathazari-Rangamati Km 033.41-036.01 S 2.6 2907 National Overlay 50mm @ IRI 5-9 2016 19.93667 3.297N106 Chittagong-Hathazari-Rangamati Km 036.01-036.11 S 0.1 2907 National Rehab 135mm @ IRI 9-12 2016 3.30544 1.409N106 Chittagong-Hathazari-Rangamati Km 036.11-037.11 S 1 2907 National Overlay 50mm @ IRI 5-9 2016 7.665 3.537N106 Chittagong-Hathazari-Rangamati Km 037.11-037.81 S 0.7 2907 National Overlay 50mm @ IRI 5-9 2016 5.3655 3.587N106 Chittagong-Hathazari-Rangamati Km 037.81-039.91 S 2.1 2907 National Overlay 50mm @ IRI 5-9 2016 16.0965 2.831N106 Chittagong-Hathazari-Rangamati Km 039.91-040.31 S 0.4 2907 National DBST @ Traff 2000-4000 2016 1.44248 3.495N106 Chittagong-Hathazari-Rangamati Km 040.31-048.51 S 8.2 2907 National Overlay 50mm @ IRI 5-9 2016 63.37733 3.292N106 Chittagong-Hathazari-Rangamati Km 048.51-049.41 S 0.9 2584 National Overlay 50mm @ IRI 5-9 2016 6.993 1.68N106 Chittagong-Hathazari-Rangamati Km 049.41-051.71 S 2.3 2362 National Overlay 50mm @ IRI 5-9 2016 17.8227 0.597N106 Chittagong-Hathazari-Rangamati Km 051.71-051.91 S 0.2 2362 National DBST @ Traff 2000-4000 2016 0.7163 0.807N106 Chittagong-Hathazari-Rangamati Km 051.91-054.91 S 3 2362 National Overlay 50mm @ IRI 5-9 2016 22.84511 0.801N106 Chittagong-Hathazari-Rangamati Km 054.91-055.11 S 0.2 2362 National DBST @ Traff 2000-4000 2016 0.7163 0.797N106 Chittagong-Hathazari-Rangamati Km 055.11-059.01 S 3.9 2362 National Overlay 50mm @ IRI 5-9 2016 29.93445 0.642N106 Chittagong-Hathazari-Rangamati Km 059.01-065.22 S 6.2 2362 National DBST @ 25% Crk 2016 23.98559 0.228N106 Chittagong-Hathazari-Rangamati Km 065.22-066.85 S 1.63 2362 National Overlay 50mm @ IRI 5-9 2016 12.70395 0.846R161 Rangamati-Chandragona-Bandarban Road Km 001.40-001.80 S 0.4 2133 Regional DBST @ 25% Crk 2016 1.10656 0.437R161 Rangamati-Chandragona-Bandarban Road Km 001.80-001.90 S 0.1 2133 Regional DBST @ Traff 2000-4000 2016 0.27664 0.389R161 Rangamati-Chandragona-Bandarban Road Km 001.90-002.10 S 0.2 2133 Regional Overlay 50mm @ IRI 5-7 2016 1.176 1.173

Page 26 of 163

Page 27: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R161 Rangamati-Chandragona-Bandarban Road Km 002.10-017.40 S 15.3 2133 Regional Overlay 50mm @ IRI 7-9 2016 89.81509 1.453R161 Rangamati-Chandragona-Bandarban Road Km 017.40-020.99 S 3.59 2133 Regional DBST @ Traff 2000-4000 2016 9.890394 0.519R161 Rangamati-Chandragona-Bandarban Road Km 020.99-023.99 S 3 2133 Regional Overlay 50mm @ IRI 7-9 2016 17.325 1.593R161 Rangamati-Chandragona-Bandarban Road Km 023.99-026.99 S 3 2133 Regional Overlay 50mm @ IRI 7-9 2016 17.3938 1.623R161 Rangamati-Chandragona-Bandarban Road Km 026.99-030.09 S 3.1 2133 Regional Overlay 50mm @ IRI 7-9 2016 18.0978 1.346R161 Rangamati-Chandragona-Bandarban Road Km 030.09-030.73 S 0.64 2133 Regional Overlay 50mm @ IRI 7-9 2016 3.74556 1.427R162 Rangamati-Mohalchhari-Khagrachhari Km 003.00-006.50 S 3.5 1353 Regional Overlay 50mm @ IRI 7-9 2016 13.60139 4.583R162 Rangamati-Mohalchhari-Khagrachhari Km 006.50-009.90 S 3.4 1353 Regional Overlay 50mm @ IRI 7-9 2016 13.209 4.359R162 Rangamati-Mohalchhari-Khagrachhari Km 009.90-013.50 S 3.6 1353 Regional Overlay 50mm @ IRI 5-7 2016 13.986 3.889R162 Rangamati-Mohalchhari-Khagrachhari Km 021.00-024.27 S 3.27 1353 Regional Overlay 50mm @ IRI 7-9 2016 12.70783 4.294R162 Rangamati-Mohalchhari-Khagrachhari Km 025.17-026.27 S 1.1 1353 Regional Rehab 110mm @ IRI 9-12 2016 15.25013 1.599R162 Rangamati-Mohalchhari-Khagrachhari Km 026.27-028.47 S 2.2 1353 Regional Overlay 50mm @ IRI 5-7 2016 8.597106 4.065R162 Rangamati-Mohalchhari-Khagrachhari Km 028.47-034.07 S 5.6 1353 Regional Overlay 50mm @ IRI 7-9 2016 21.9324 4.084R162 Rangamati-Mohalchhari-Khagrachhari Km 034.07-034.67 S 0.6 1353 Regional Rehab 110mm @ IRI 9-12 2016 8.251704 1.828R162 Rangamati-Mohalchhari-Khagrachhari Km 034.67-037.78 S 3.1 1353 Regional Overlay 50mm @ IRI 7-9 2016 12.11251 4.387R162 Rangamati-Mohalchhari-Khagrachhari Km 037.78-038.68 S 0.9 1299 Regional Rehab 110mm @ IRI 9-12 2016 12.34428 1.53R162 Rangamati-Mohalchhari-Khagrachhari Km 038.68-039.67 S 0.99 868 Regional Overlay 50mm @ IRI 5-7 2016 3.856545 0.875Z1814 Bangalhalia-Rajasthali-Barkal Road Km 000.00-000.40 S 0.4 1242 Zilla Overlay 40mm @ 1000-2000 2016 1.3584 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 000.40-000.80 S 0.4 1242 Zilla Overlay 40mm @ 1000-2000 2016 1.3584 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 000.80-003.00 S 2.2 1242 Zilla Overlay 40mm @ 1000-2000 2016 8.517168 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 003.00-003.80 S 0.8 1242 Zilla Overlay 40mm @ 1000-2000 2016 3.19224 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 003.80-006.90 S 3.1 1242 Zilla Overlay 40mm @ 1000-2000 2016 12.36594 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 011.10-011.20 S 0.1 1242 Zilla Seal Coat 2016 0.09576 0.136Z1814 Bangalhalia-Rajasthali-Barkal Road Km 011.20-014.60 S 3.4 1242 Zilla Overlay 40mm @ 1000-2000 2016 13.6496 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 014.60-015.20 S 0.6 1242 Zilla Overlay 40mm @ IRI>12 2016 1.93572 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 015.20-015.50 S 0.3 1242 Zilla Overlay 40mm @ 1000-2000 2016 0.96786 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 015.50-016.50 S 1 1242 Zilla Overlay 40mm @ IRI>12 2016 3.2262 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 016.50-016.70 S 0.2 1242 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z1814 Bangalhalia-Rajasthali-Barkal Road Km 016.70-019.60 S 2.9 1242 Zilla Overlay 40mm @ 1000-2000 2016 9.254303 0Sub-Total Rangamati Division 607.1515Total Chittagong Zone 15457.64

Comilla ZoneBrahmanbaria DivisionN102 Comilla-Brahmanbaria (Sarail) Road Km 040.36-041.10 S 0.74 7211 National Full Recon 180mm @ IRI 12 2016 28.84708 5.955N102 Comilla-Brahmanbaria (Sarail) Road Km 041.47-043.00 S 1.53 7211 National Full Recon 180mm @ IRI 12 2016 59.96743 5.822N102 Comilla-Brahmanbaria (Sarail) Road Km 043.00-043.40 S 0.4 7211 National Overlay 60mm @ IRI 7-9 2016 2.80224 17.065N102 Comilla-Brahmanbaria (Sarail) Road Km 043.40-043.49 S 0.09 7211 National Full Recon 180mm @ IRI 12 2016 3.723468 6.384N102 Comilla-Brahmanbaria (Sarail) Road Km 043.49-043.89 S 0.4 7211 National Overlay 60mm @ IRI 7-9 2016 2.80224 16.829N102 Comilla-Brahmanbaria (Sarail) Road Km 043.89-044.19 S 0.3 7211 National Full Recon 180mm @ IRI 12 2016 11.75832 5.959N102 Comilla-Brahmanbaria (Sarail) Road Km 044.19-047.19 S 3 7211 National Rehab 180mm @ IRI 9-12 2016 97.1797 6.238N102 Comilla-Brahmanbaria (Sarail) Road Km 047.19-047.29 S 0.1 7211 National Full Recon 180mm @ IRI 12 2016 3.98943 6.342N102 Comilla-Brahmanbaria (Sarail) Road Km 047.29-049.67 S 2.38 7211 National Rehab 180mm @ IRI 9-12 2016 78.03591 6.308N102 Comilla-Brahmanbaria (Sarail) Road Km 049.67-050.07 S 0.4 7211 National Full Recon 180mm @ IRI 12 2016 15.95772 5.867N102 Comilla-Brahmanbaria (Sarail) Road Km 050.07-050.27 S 0.2 7211 National Rehab 180mm @ IRI 9-12 2016 6.56868 6.559

Page 27 of 163

Page 28: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N102 Comilla-Brahmanbaria (Sarail) Road Km 050.27-051.07 S 0.8 7211 National Full Recon 180mm @ IRI 12 2016 31.91544 5.754N102 Comilla-Brahmanbaria (Sarail) Road Km 051.07-051.45 S 0.38 7211 National Overlay 60mm @ IRI 7-9 2016 2.731058 16.734N102 Comilla-Brahmanbaria (Sarail) Road Km 051.45-051.65 S 0.2 7211 National Full Recon 180mm @ IRI 12 2016 7.97886 5.89N102 Comilla-Brahmanbaria (Sarail) Road Km 051.65-051.95 S 0.3 7211 National Rehab 180mm @ IRI 9-12 2016 9.85302 6.336N102 Comilla-Brahmanbaria (Sarail) Road Km 051.95-052.45 S 0.5 7211 National Full Recon 180mm @ IRI 12 2016 19.94715 5.686N102 Comilla-Brahmanbaria (Sarail) Road Km 052.45-053.45 S 1 7211 National Rehab 180mm @ IRI 9-12 2016 32.38244 6.061N102 Comilla-Brahmanbaria (Sarail) Road Km 053.52-054.15 S 0.63 7211 National Full Recon 180mm @ IRI 12 2016 25.20879 5.505N102 Comilla-Brahmanbaria (Sarail) Road Km 054.15-054.65 S 0.5 7211 National Full Recon 180mm @ IRI 12 2016 20.22711 5.726N102 Comilla-Brahmanbaria (Sarail) Road Km 054.65-055.97 S 1.31 7211 National Rehab 180mm @ IRI 9-12 2016 41.56626 6.149N102 Comilla-Brahmanbaria (Sarail) Road Km 055.97-056.27 S 0.3 7211 National Full Recon 180mm @ IRI 12 2016 11.12841 4.306N102 Comilla-Brahmanbaria (Sarail) Road Km 056.27-058.27 S 2 7211 National Rehab 180mm @ IRI 9-12 2016 61.10774 4.471N102 Comilla-Brahmanbaria (Sarail) Road Km 058.27-058.37 S 0.1 7211 National Full Recon 180mm 2016 3.70947 5.146N102 Comilla-Brahmanbaria (Sarail) Road Km 058.37-058.57 S 0.2 7211 National Rehab 180mm @ IRI 9-12 2016 6.10772 5.354N102 Comilla-Brahmanbaria (Sarail) Road Km 058.57-059.67 S 1.1 7211 National Full Recon 180mm @ IRI 12 2016 40.80417 4.469N102 Comilla-Brahmanbaria (Sarail) Road Km 059.67-062.07 S 2.4 7211 National Rehab 180mm @ IRI 9-12 2016 73.29264 5.022N102 Comilla-Brahmanbaria (Sarail) Road Km 062.07-062.77 S 0.7 7211 National Full Recon 180mm @ IRI 12 2016 26.00338 4.36N102 Comilla-Brahmanbaria (Sarail) Road Km 062.77-062.87 S 0.1 7211 National Rehab 180mm @ IRI 9-12 2016 3.05386 5.627N102 Comilla-Brahmanbaria (Sarail) Road Km 062.87-062.97 S 0.1 7211 National Full Recon 180mm 2016 3.70947 5.278N102 Comilla-Brahmanbaria (Sarail) Road Km 062.97-063.06 S 0.09 7211 National Overlay 60mm @ IRI 7-9 2016 0.616618 13.315N102 Comilla-Brahmanbaria (Sarail) Road Km 063.06-063.53 S 0.47 10963 National Rehab 195mm @ IRI 9-12 2016 15.04115 3.91N102 Comilla-Brahmanbaria (Sarail) Road Km 063.53-066.33 S 2.8 10963 National Full Recon 195mm @ IRI 12 2016 108.999 3.047N102 Comilla-Brahmanbaria (Sarail) Road Km 066.40-068.00 S 1.6 10963 National Rehab 195mm @ IRI 9-12 2016 53.4966 3.534N102 Comilla-Brahmanbaria (Sarail) Road Km 068.40-068.83 S 0.43 10963 National Overlay 80mm @ IRI 5-9 2016 3.891162 10.522N102 Comilla-Brahmanbaria (Sarail) Road Km 068.83-069.03 S 0.2 10963 National Full Recon 195mm 2016 8.0311 3.55N102 Comilla-Brahmanbaria (Sarail) Road Km 069.03-069.13 S 0.1 10963 National Rehab 195mm @ IRI 9-12 2016 3.3352 4.232N102 Comilla-Brahmanbaria (Sarail) Road Km 069.13-069.23 S 0.1 10963 National Full Recon 195mm 2016 4.01555 3.945N102 Comilla-Brahmanbaria (Sarail) Road Km 069.23-072.93 S 3.7 13760 National Overlay 80mm @ IRI 5-9 2016 40.19364 19.938N102 Comilla-Brahmanbaria (Sarail) Road Km 072.93-073.03 S 0.1 13760 National Full Recon 195mm 2016 5.25672 6.293N102 Comilla-Brahmanbaria (Sarail) Road Km 073.03-073.73 S 0.7 13760 National Rehab 195mm @ IRI 9-12 2016 30.56256 6.733N102 Comilla-Brahmanbaria (Sarail) Road Km 073.73-074.53 S 0.8 13760 National Full Recon 195mm 2016 42.05376 6.222N102 Comilla-Brahmanbaria (Sarail) Road Km 074.53-074.73 S 0.2 13760 National Rehab 195mm @ IRI 9-12 2016 8.73216 6.812N102 Comilla-Brahmanbaria (Sarail) Road Km 074.73-075.33 S 0.6 13760 National Full Recon 195mm 2016 31.59289 6.199N102 Comilla-Brahmanbaria (Sarail) Road Km 075.33-075.53 S 0.2 13760 National Rehab 195mm @ IRI 9-12 2016 8.73216 6.33N102 Comilla-Brahmanbaria (Sarail) Road Km 075.53-076.53 S 1 13760 National Full Recon 195mm @ IRI 12 2016 45.70426 6.511N102 Comilla-Brahmanbaria (Sarail) Road Km 076.57-077.23 S 0.67 13760 National Full Recon 195mm @ IRI 12 2016 29.2186 7.555N102 Comilla-Brahmanbaria (Sarail) Road Km 077.23-077.43 S 0.2 13760 National Full Recon 195mm @ IRI 12 2016 8.7612 7.485N102 Comilla-Brahmanbaria (Sarail) Road Km 077.43-077.73 S 0.3 13760 National Full Recon 195mm @ IRI 12 2016 13.1418 7.467N102 Comilla-Brahmanbaria (Sarail) Road Km 077.73-077.93 S 0.2 13760 National Full Recon 195mm @ IRI 12 2016 8.7612 7.247N102 Comilla-Brahmanbaria (Sarail) Road Km 077.93-078.23 S 0.3 13760 National Full Recon 195mm @ IRI 12 2016 13.1418 7.54N102 Comilla-Brahmanbaria (Sarail) Road Km 078.23-078.83 S 0.6 13760 National Rehab 195mm @ IRI 9-12 2016 21.90317 8.196N102 Comilla-Brahmanbaria (Sarail) Road Km 078.83-078.93 S 0.1 13760 National Full Recon 195mm @ IRI 12 2016 4.45361 7.628N102 Comilla-Brahmanbaria (Sarail) Road Km 079.09-079.23 S 0.14 13760 National Full Recon 195mm @ IRI 12 2016 6.368662 7.75N102 Comilla-Brahmanbaria (Sarail) Road Km 079.23-080.23 S 1 13760 National Rehab 195mm @ IRI 9-12 2016 37.02739 7.752N102 Comilla-Brahmanbaria (Sarail) Road Km 080.23-080.43 S 0.2 13760 National Rehab 195mm @ IRI 9-12 2016 7.39808 8.276N102 Comilla-Brahmanbaria (Sarail) Road Km 080.43-080.53 S 0.1 13760 National Overlay 50mm @ IRI 5 2016 0.6405 19.297N102 Comilla-Brahmanbaria (Sarail) Road Km 080.53-080.63 S 0.1 13760 National Full Recon 195mm @ IRI 12 2016 4.45361 7.884

Page 28 of 163

Page 29: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N102 Comilla-Brahmanbaria (Sarail) Road Km 080.63-081.03 S 0.4 13760 National Overlay 80mm @ IRI 5-9 2016 4.03332 21.339N102 Comilla-Brahmanbaria (Sarail) Road Km 081.03-081.23 S 0.2 13760 National Full Recon 195mm @ IRI 12 2016 8.90722 7.34N102 Comilla-Brahmanbaria (Sarail) Road Km 081.23-082.68 S 1.45 13760 National Rehab 195mm @ IRI 9-12 2016 53.59909 7.706N103 Brahmanbaria Town Road Km 000.00-003.17 S 3.17 16761 National Overlay 50mm @ IRI 5 2016 25.63035 2.102N103 Brahmanbaria Town Road Km 003.17-003.37 S 0.2 16761 National Full Recon 195mm 2016 8.83421 2.844N103 Brahmanbaria Town Road Km 003.37-003.67 S 0.3 16761 National Overlay 80mm @ IRI 5-9 2016 4.096134 2.166N103 Brahmanbaria Town Road Km 003.67-003.87 S 0.2 16761 National Overlay 80mm @ IRI 5-9 2016 2.4795 4.09N103 Brahmanbaria Town Road Km 003.87-004.78 S 0.91 16761 National Overlay 80mm @ IRI 5-9 2016 11.31892 1.655N2 Dhaka-Bhairab-Sylhet-Tamabil Km 073.57-073.60 L 0.03 11171 National Overlay 80mm @ IRI 4-9 2016 0.449616 14.743N2 Dhaka-Bhairab-Sylhet-Tamabil Km 073.57-073.60 R 0.03 11171 National Overlay 80mm @ IRI 4-9 2016 0.449616 14.427N2 Dhaka-Bhairab-Sylhet-Tamabil Km 097.75-097.85 S 0.1 13034 National Full Recon 195mm 2016 5.40274 8.12N2 Dhaka-Bhairab-Sylhet-Tamabil Km 097.85-107.61 S 9.76 13034 National Overlay 80mm @ IRI 4-9 2016 119.374 18.739N213 Ashuganj River Port Connecting Road Km 000.00-000.50 S 0.5 15853 National Overlay 80mm @ IRI 5-9 2016 6.34752 17.385R203 Bhulta-Araihazar-Shibpur-Radhika Road Km 020.48-028.55 S 8.07 4051 Regional Overlay 60mm @ IRI 7-9 2016 36.85796 2.326R203 Bhulta-Araihazar-Shibpur-Radhika Road Km 028.55-058.29 S 29.74 1969 Regional Overlay 50mm @ IRI 7-9 2016 113.9594 0.864R203 Bhulta-Araihazar-Shibpur-Radhika Road Km 058.80-059.13 S 0.33 1969 Regional Overlay 50mm @ IRI 7-9 2016 1.90575 0.588R203 Bhulta-Araihazar-Shibpur-Radhika Road Km 064.35-065.15 S 0.8 1969 Regional Overlay 50mm @ IRI 7-9 2016 2.772 1.215R203 Bhulta-Araihazar-Shibpur-Radhika Road Km 069.28-070.15 S 0.87 1969 Regional Overlay 50mm @ IRI 7-9 2016 3.01455 1.198R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 000.00-000.06 L 0.06 4884 Regional DBST Traff All 2016 0.26676 0R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 000.00-000.06 R 0.06 4884 Regional DBST Traff All 2016 0.2223 0R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 000.06-000.40 S 0.34 4884 Regional DBST @ Traff 4000-6000 2016 0.959052 1.62R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 000.40-000.90 S 0.5 4884 Regional Overlay 60mm @ IRI 7-9 2016 3.52782 1.863R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 000.90-001.00 S 0.1 4884 Regional Full Recon 150mm @ IRI 12 2016 3.422352 0.487R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 001.00-002.60 S 1.6 4884 Regional Overlay 60mm @ IRI 7-9 2016 11.13585 1.68R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 002.60-002.80 S 0.2 4884 Regional Full Recon 150mm @ IRI 12 2016 6.723344 0.346R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 002.80-011.20 S 8.4 4884 Regional Overlay 50mm @ IRI 5-7 2016 48.78041 0.922R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 011.22-014.00 S 2.79 4884 Regional Overlay 50mm @ IRI 5-7 2016 16.15925 0.896R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 014.10-017.90 S 3.81 4884 Regional Overlay 60mm @ IRI 7-9 2016 26.25547 1.572R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 017.93-019.30 S 1.38 4884 Regional Overlay 50mm @ IRI 5-7 2016 7.949245 1.331R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 019.30-019.70 S 0.4 4884 Regional DBST @ Traff 4000-6000 2016 1.082848 1.87R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 019.70-019.90 S 0.2 4884 Regional Overlay 50mm @ IRI 5-7 2016 1.1508 2.25R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 019.90-020.40 S 0.5 4884 Regional Full Recon 150mm @ IRI 12 2016 15.89816 0.332R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 020.40-020.91 S 0.5 4884 Regional Overlay 50mm @ IRI 5-7 2016 2.63025 1.868R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 020.91-021.51 S 0.6 4884 Regional DBST @ Traff 4000-6000 2016 1.482 1.894R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 021.51-021.61 S 0.1 4884 Regional DBST @ 25% Crk 2016 0.247 2.426R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 021.61-022.11 S 0.5 4884 Regional DBST @ Traff 4000-6000 2016 1.2844 1.866R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 022.14-025.13 S 2.99 4884 Regional Overlay 60mm @ IRI 7-9 2016 21.15497 1.733Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 041.31-048.20 S 6.89 2549 Zilla Overlay 40mm @ Traff >=2000 2016 21.45249 0.69Z1043 Bancharampur-Homna Road Km 000.70-000.80 S 0.1 4750 Zilla Full Recon 75mm @ IRI>12 2016 2.69514 1.271Z1043 Bancharampur-Homna Road Km 001.00-001.20 S 0.2 4750 Zilla Full Recon 75mm @ IRI>12 2016 4.946886 1.317Z1043 Bancharampur-Homna Road Km 001.60-004.80 S 3.2 4750 Zilla Full Recon 75mm @ IRI>12 2016 76.5072 1.283Z1043 Bancharampur-Homna Road Km 005.20-005.70 S 0.5 4750 Zilla Rehab 75mm @ IRI 9-12 2016 8.23075 1.859Z1043 Bancharampur-Homna Road Km 005.70-005.80 S 0.1 4750 Zilla Overlay 50mm @ Cracking >25%2016 0.3906 3.884Z1043 Bancharampur-Homna Road Km 005.80-009.00 S 3.2 4750 Zilla Full Recon 75mm @ IRI>12 2016 74.55974 1.375Z1043 Bancharampur-Homna Road Km 009.05-009.70 S 0.65 4750 Zilla Full Recon 75mm @ IRI>12 2016 15.58834 1.399Z1043 Bancharampur-Homna Road Km 009.70-009.80 S 0.1 4750 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.135

Page 29 of 163

Page 30: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1043 Bancharampur-Homna Road Km 009.80-013.00 S 3.2 4750 Zilla Full Recon 75mm @ IRI>12 2016 76.6463 1.263Z1043 Bancharampur-Homna Road Km 013.00-013.68 S 0.68 4750 Zilla Rehab 75mm @ IRI 9-12 2016 14.98559 1.119Z1201 Kashba-Kuti Road Km 003.20-004.90 S 1.7 3363 Zilla Overlay 40mm @ Traff >=2000 2016 5.556705 0.706Z1201 Kashba-Kuti Road Km 004.90-005.00 S 0.1 3363 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.981Z1201 Kashba-Kuti Road Km 005.00-005.40 S 0.4 3363 Zilla Overlay 40mm @ Traff >=2000 2016 1.25652 0.781Z1201 Kashba-Kuti Road Km 005.40-007.10 S 1.7 3363 Zilla Overlay 40mm @ Traff >=2000 2016 5.502207 0.983Z1201 Kashba-Kuti Road Km 007.10-007.90 S 0.8 3363 Zilla Overlay 40mm @ Traff >=2000 2016 3.26016 0.14Z1201 Kashba-Kuti Road Km 007.90-008.00 S 0.1 3363 Zilla Rehab 75mm @ IRI 9-12 2016 1.43664 0.533Z1201 Kashba-Kuti Road Km 008.00-008.80 S 0.8 3363 Zilla Overlay 40mm @ Cracks >25% 2016 3.08736 0.055Z1201 Kashba-Kuti Road Km 008.80-009.00 S 0.2 3363 Zilla Full Recon 75mm @ IRI>12 2016 4.17312 0.364Z1202 Dharkhar-Akhaura-Senarbadi Road Km 001.20-001.30 S 0.1 2067 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 0.359Z1202 Dharkhar-Akhaura-Senarbadi Road Km 001.30-010.60 S 9.3 2067 Zilla Overlay 40mm @ Traff >=2000 2016 29.85216 0Z1202 Dharkhar-Akhaura-Senarbadi Road Km 011.10-011.40 S 0.3 2067 Zilla Overlay 40mm @ Traff >=2000 2016 1.405519 0.143Z1202 Dharkhar-Akhaura-Senarbadi Road Km 011.50-012.20 S 0.7 2067 Zilla Overlay 40mm @ IRI>12 2016 3.277989 0Z1202 Dharkhar-Akhaura-Senarbadi Road Km 013.10-013.20 S 0.1 2067 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1202 Dharkhar-Akhaura-Senarbadi Road Km 013.20-014.70 S 1.5 2067 Zilla Overlay 40mm @ Traff >=2000 2016 7.00425 0Z1202 Dharkhar-Akhaura-Senarbadi Road Km 014.70-014.80 S 0.1 2067 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.123Z1202 Dharkhar-Akhaura-Senarbadi Road Km 014.80-015.06 S 0.25 2067 Zilla Overlay 40mm @ Traff >=2000 2016 1.127829 0Z2031 Nabinagar-Ashuganj Road Km 000.50-000.69 S 0.19 4593 Zilla Full Recon 75mm @ IRI>12 2016 3.007689 0.891Z2031 Nabinagar-Ashuganj Road Km 012.78-013.41 S 0.63 4593 Zilla Overlay 50mm @ IRI 6-9 2016 2.44755 1.358Z2031 Nabinagar-Ashuganj Road Km 016.61-019.47 S 2.86 4593 Zilla Overlay 50mm @ IRI 6-9 2016 11.1111 1.43Sub-Total Brahmanbaria Division 2262.438

Chandpur DivisionR140 Comilla-Chandpur-Lakshmipur-Begumganj Km 030.63-030.91 S 0.28 6002 Regional Overlay 60mm @ IRI 5.5-9 2016 2.129077 13.032R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 030.91-031.11 S 0.2 6002 Regional Full Recon 150mm @ IRI 12 2016 7.40296 5.07R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 031.11-037.11 S 6 9925 Regional Overlay 60mm @ IRI 5.5-9 2016 45.0435 15.59R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 037.11-037.71 S 0.6 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 4.210866 17.759R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 037.78-040.11 S 2.34 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 16.36508 17.833R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 040.11-040.71 S 0.6 10668 Regional Rehab 150mm @ IRI 9-12 2016 16.2288 7.678R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 040.71-042.01 S 1.3 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 8.912123 18.136R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 042.03-043.11 S 1.08 10668 Regional Rehab 150mm @ IRI 9-12 2016 27.67252 4.45R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 043.11-043.41 S 0.3 10668 Regional Rehab 150mm @ IRI 9-12 2016 7.705299 4.091R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 043.41-044.51 S 1.1 10668 Regional Rehab 150mm @ IRI 9-12 2016 28.26516 4.373R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 044.51-044.71 S 0.2 10668 Regional Full Recon 195mm 2016 7.88508 3.621R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 044.72-044.91 S 0.2 10668 Regional Rehab 150mm @ IRI 9-12 2016 5.138154 4.818R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 044.91-045.01 S 0.1 10668 Regional Full Recon 195mm 2016 3.94254 4.157R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 045.01-045.51 S 0.5 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 3.3777 10.978R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 045.51-045.61 S 0.1 10668 Regional Full Recon 195mm 2016 3.94254 3.82R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 045.61-046.01 S 0.4 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 2.70216 10.439R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 046.01-046.21 S 0.2 10668 Regional Rehab 150mm @ IRI 9-12 2016 5.2164 4.329R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 046.21-047.01 S 0.8 10668 Regional DBST @ Traff >6000 2016 2.13408 7.924R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 047.01-047.31 S 0.3 10668 Regional Full Recon 195mm 2016 11.82762 3.404R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 047.31-047.37 S 0.06 10668 Regional DBST @ 25% Crk 2016 0.154721 8.071R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 047.41-047.51 L 0.1 10668 Regional Full Recon 195mm 2016 3.28545 4.682R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 047.41-047.51 R 0.1 10668 Regional Full Recon 195mm 2016 3.28545 4.682

Page 30 of 163

Page 31: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 047.51-047.72 L 0.21 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 1.170936 13.473R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 047.51-047.72 R 0.21 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 1.170936 13.473R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 047.90-048.51 S 0.62 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 4.32946 16.062R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 048.51-048.61 S 0.1 10668 Regional Full Recon 195mm 2016 4.08856 6.406R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 048.61-054.41 S 5.8 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 39.55093 16.746R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 054.70-056.81 S 2.12 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 14.31469 10.718R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 056.81-056.92 S 0.1 10668 Regional Full Recon 195mm 2016 3.981965 4.076R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 056.92-057.92 S 1 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 6.80544 10.687R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 058.00-061.12 S 3.12 10668 Regional Rehab 150mm @ IRI 9-12 2016 82.88279 4.016R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 061.12-061.62 S 0.5 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 3.491003 17.809R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 061.71-062.62 S 0.91 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 6.382101 17.599R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 062.62-063.02 S 0.4 10668 Regional Rehab 150mm @ IRI 9-12 2016 10.8192 6.857R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 063.41-066.52 S 3.11 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 21.80143 17.291R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 066.52-067.71 S 1.19 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 8.364686 16.629R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 067.81-070.53 S 2.73 10668 Regional Overlay 60mm @ IRI 5.5-9 2016 19.11828 16.616R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 070.53-071.01 S 0.48 4453 Regional Rehab 150mm @ IRI 9-12 2016 12.92894 1.813R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 071.01-073.61 S 2.6 4453 Regional Overlay 50mm @ IRI 5-7 2016 15.29388 3.916R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 073.80-074.31 S 0.52 4453 Regional Overlay 60mm @ IRI 7-9 2016 3.628901 4.147R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 074.31-074.41 S 0.1 4453 Regional Full Recon 150mm 2016 3.39808 2.172R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 074.41-075.61 S 1.2 4453 Regional Overlay 60mm @ IRI 7-9 2016 8.406721 4.333R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 075.70-075.91 S 0.22 4453 Regional Overlay 60mm @ IRI 7-9 2016 1.527221 4.865R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 075.91-076.61 S 0.7 4453 Regional Overlay 50mm @ IRI 5-7 2016 4.07925 3.271R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 076.61-076.91 S 0.3 4453 Regional DBST @ Traff 4000-6000 2016 0.8151 4.417R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 076.91-077.51 S 0.6 4453 Regional DBST @ 25% Crk 2016 1.6302 2.555R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 077.51-077.61 S 0.1 4453 Regional Full Recon 150mm 2016 3.3374 1.901R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 078.71-080.31 S 1.6 4453 Regional Rehab 150mm @ IRI 9-12 2016 42.504 1.428R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 080.31-081.01 S 0.7 4453 Regional Overlay 50mm @ IRI 5-7 2016 4.0425 4.231R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 081.01-081.21 S 0.2 4453 Regional DBST @ Traff 4000-6000 2016 0.5434 4.109R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 081.21-081.51 S 0.3 4453 Regional Overlay 60mm @ IRI 7-9 2016 2.06415 4.121R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 081.51-081.81 S 0.3 4453 Regional Rehab 150mm @ IRI 9-12 2016 7.9695 1.349R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 081.81-082.82 S 1 4453 Regional Overlay 50mm @ IRI 5-7 2016 5.738733 4.055R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 082.91-085.64 S 2.73 4453 Regional Overlay 60mm @ IRI 7-9 2016 18.45575 4.803R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 085.68-087.14 S 1.46 4453 Regional Overlay 60mm @ IRI 7-9 2016 9.876395 4.712R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 087.14-087.24 S 0.1 4453 Regional Full Recon 150mm 2016 3.27672 2.259R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 087.24-087.74 S 0.5 4453 Regional Overlay 60mm @ IRI 7-9 2016 3.384455 4.954R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 087.74-087.84 S 0.1 4453 Regional Full Recon 150mm 2016 3.27672 2.3R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 087.84-089.40 S 1.56 4453 Regional Overlay 60mm @ IRI 7-9 2016 10.55194 4.685R146 Wireless Bazar More -Illish Chattar Road Km 000.40-000.80 S 0.4 3755 Regional Rehab 135mm @ IRI 9-12 2016 10.8672 0.426R860 Mostafapur-Shariatpur Harina-Chandpur Km 063.44-063.83 S 0.38 2956 Regional Full Recon 135mm 2016 11.57002 0.63R860 Mostafapur-Shariatpur Harina-Chandpur Km 063.83-064.44 S 0.62 1040 Regional DBST Traff All 2016 1.670955 0R860 Mostafapur-Shariatpur Harina-Chandpur Km 064.74-065.24 S 0.5 1040 Regional DBST Traff All 2016 1.3585 0R860 Mostafapur-Shariatpur Harina-Chandpur Km 065.34-065.85 S 0.5 1040 Regional DBST Traff All 2016 1.361217 0R860 Mostafapur-Shariatpur Harina-Chandpur Km 066.45-066.95 S 0.5 1040 Regional DBST Traff All 2016 1.3585 0R860 Mostafapur-Shariatpur Harina-Chandpur Km 067.15-067.25 S 0.1 1040 Regional DBST Traff All 2016 0.2717 0R860 Mostafapur-Shariatpur Harina-Chandpur Km 067.35-067.45 S 0.1 1040 Regional DBST Traff All 2016 0.2717 0R860 Mostafapur-Shariatpur Harina-Chandpur Km 068.85-068.95 S 0.1 1040 Regional Full Recon 110mm 2016 2.7137 0.115

Page 31 of 163

Page 32: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R860 Mostafapur-Shariatpur Harina-Chandpur Km 069.15-070.05 S 0.9 1040 Regional DBST Traff All 2016 2.4453 0R860 Mostafapur-Shariatpur Harina-Chandpur Km 070.75-070.85 S 0.1 1040 Regional DBST Traff All 2016 0.2717 0R860 Mostafapur-Shariatpur Harina-Chandpur Km 072.16-074.06 S 1.9 1040 Regional Overlay 50mm @ IRI 7-9 2016 10.97828 0.924Z1044 Gouripur-Kachua-Hajiganj Road Km 009.88-010.20 S 0.32 3617 Zilla Full Recon 75mm @ IRI>12 2016 7.933058 0.025Z1044 Gouripur-Kachua-Hajiganj Road Km 010.20-010.40 S 0.2 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.90852 0.229Z1044 Gouripur-Kachua-Hajiganj Road Km 010.40-010.80 S 0.4 3617 Zilla Rehab 75mm @ IRI 9-12 2016 6.76418 0.461Z1044 Gouripur-Kachua-Hajiganj Road Km 011.00-011.30 S 0.3 3617 Zilla Overlay 40mm @ Traff >=2000 2016 1.439055 0.636Z1044 Gouripur-Kachua-Hajiganj Road Km 011.30-011.50 S 0.2 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.913063 0.142Z1044 Gouripur-Kachua-Hajiganj Road Km 011.50-011.60 S 0.1 3617 Zilla Rehab 75mm @ IRI 9-12 2016 1.691045 0.443Z1044 Gouripur-Kachua-Hajiganj Road Km 011.60-011.70 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.45426 0.31Z1044 Gouripur-Kachua-Hajiganj Road Km 011.70-012.36 S 0.66 3617 Zilla Overlay 40mm @ Traff >=2000 2016 3.161124 0.38Z1044 Gouripur-Kachua-Hajiganj Road Km 012.36-012.66 S 0.3 3617 Zilla Overlay 40mm @ Cracks >25% 2016 1.36278 0.201Z1044 Gouripur-Kachua-Hajiganj Road Km 012.66-013.16 S 0.5 3617 Zilla Overlay 40mm @ Traff >=2000 2016 2.398425 0.343Z1044 Gouripur-Kachua-Hajiganj Road Km 013.16-014.46 S 1.3 3617 Zilla Overlay 40mm @ Cracks >25% 2016 6.202804 0.158Z1044 Gouripur-Kachua-Hajiganj Road Km 014.76-014.86 S 0.1 3617 Zilla Overlay 40mm @ IRI>12 2016 0.53487 0Z1044 Gouripur-Kachua-Hajiganj Road Km 014.86-015.46 S 0.6 3617 Zilla Overlay 40mm @ Cracks >25% 2016 2.662848 0.058Z1044 Gouripur-Kachua-Hajiganj Road Km 015.46-015.86 S 0.4 3617 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0.474Z1044 Gouripur-Kachua-Hajiganj Road Km 015.86-016.06 S 0.2 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.8844 0.234Z1044 Gouripur-Kachua-Hajiganj Road Km 016.06-016.76 S 0.7 3617 Zilla Overlay 40mm @ Traff >=2000 2016 3.26865 0.334Z1044 Gouripur-Kachua-Hajiganj Road Km 016.76-016.86 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.123Z1044 Gouripur-Kachua-Hajiganj Road Km 016.86-017.76 S 0.9 3617 Zilla Overlay 40mm @ Traff >=2000 2016 4.20255 0.483Z1044 Gouripur-Kachua-Hajiganj Road Km 017.76-017.86 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.379Z1044 Gouripur-Kachua-Hajiganj Road Km 017.86-018.06 S 0.2 3617 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.319Z1044 Gouripur-Kachua-Hajiganj Road Km 018.06-018.16 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.384Z1044 Gouripur-Kachua-Hajiganj Road Km 018.16-018.56 S 0.4 3617 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0.471Z1044 Gouripur-Kachua-Hajiganj Road Km 018.56-018.96 S 0.4 3617 Zilla Overlay 40mm @ Cracks >25% 2016 1.7688 0.105Z1044 Gouripur-Kachua-Hajiganj Road Km 018.96-019.06 S 0.1 3617 Zilla Full Recon 75mm @ IRI>12 2016 2.414758 0.384Z1044 Gouripur-Kachua-Hajiganj Road Km 019.06-019.16 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.41Z1044 Gouripur-Kachua-Hajiganj Road Km 019.16-019.56 S 0.4 3617 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.277Z1044 Gouripur-Kachua-Hajiganj Road Km 019.56-019.86 S 0.3 3617 Zilla Overlay 40mm @ Cracks >25% 2016 1.3266 0.198Z1044 Gouripur-Kachua-Hajiganj Road Km 019.86-019.96 S 0.1 3617 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.228Z1044 Gouripur-Kachua-Hajiganj Road Km 019.96-020.06 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.476Z1044 Gouripur-Kachua-Hajiganj Road Km 020.06-020.26 S 0.2 3617 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 0.448Z1044 Gouripur-Kachua-Hajiganj Road Km 020.26-020.36 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.476Z1044 Gouripur-Kachua-Hajiganj Road Km 020.36-020.46 S 0.1 3617 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.375Z1044 Gouripur-Kachua-Hajiganj Road Km 020.46-020.66 S 0.2 3617 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.204Z1044 Gouripur-Kachua-Hajiganj Road Km 020.66-026.27 S 5.6 3617 Zilla Overlay 40mm @ IRI>12 2016 24.01401 0Z1044 Gouripur-Kachua-Hajiganj Road Km 026.27-026.37 S 0.1 3617 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.423Z1044 Gouripur-Kachua-Hajiganj Road Km 026.37-026.67 S 0.3 3617 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.526Z1044 Gouripur-Kachua-Hajiganj Road Km 026.87-026.97 S 0.1 3617 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.696Z1044 Gouripur-Kachua-Hajiganj Road Km 026.97-027.37 S 0.4 3617 Zilla Overlay 40mm @ Cracks >25% 2016 1.7688 0.154Z1044 Gouripur-Kachua-Hajiganj Road Km 027.37-027.47 S 0.1 3617 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.328Z1044 Gouripur-Kachua-Hajiganj Road Km 027.47-027.57 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.386Z1044 Gouripur-Kachua-Hajiganj Road Km 027.57-027.77 S 0.2 3617 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.247Z1044 Gouripur-Kachua-Hajiganj Road Km 027.77-028.07 S 0.3 3617 Zilla Overlay 40mm @ Cracks >25% 2016 1.331022 0.182Z1044 Gouripur-Kachua-Hajiganj Road Km 028.07-029.77 S 1.7 3617 Zilla Rehab 75mm @ IRI 9-12 2016 27.98455 0.404

Page 32 of 163

Page 33: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1044 Gouripur-Kachua-Hajiganj Road Km 029.77-029.97 S 0.2 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.8844 0.19Z1044 Gouripur-Kachua-Hajiganj Road Km 029.97-030.07 S 0.1 3617 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.422Z1044 Gouripur-Kachua-Hajiganj Road Km 030.07-030.47 S 0.4 3617 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0.026Z1044 Gouripur-Kachua-Hajiganj Road Km 030.47-030.67 S 0.2 3617 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.205Z1044 Gouripur-Kachua-Hajiganj Road Km 030.67-030.97 S 0.3 3617 Zilla Overlay 40mm @ Cracks >25% 2016 1.3266 0.19Z1044 Gouripur-Kachua-Hajiganj Road Km 030.97-031.07 S 0.1 3617 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.333Z1044 Gouripur-Kachua-Hajiganj Road Km 031.07-031.27 S 0.2 3617 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.253Z1044 Gouripur-Kachua-Hajiganj Road Km 031.27-031.67 S 0.4 3617 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.2Z1044 Gouripur-Kachua-Hajiganj Road Km 031.77-031.87 S 0.1 3617 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.29Z1044 Gouripur-Kachua-Hajiganj Road Km 031.97-032.07 S 0.1 3617 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.755Z1044 Gouripur-Kachua-Hajiganj Road Km 032.17-033.27 S 1.1 3617 Zilla Rehab 75mm @ IRI 9-12 2016 18.12411 0.72Z1044 Gouripur-Kachua-Hajiganj Road Km 034.17-037.27 S 3.1 3617 Zilla Overlay 40mm @ Traff >=2000 2016 14.48012 0.475Z1044 Gouripur-Kachua-Hajiganj Road Km 038.97-039.97 S 1 3617 Zilla Rehab 75mm @ IRI 9-12 2016 16.4615 0.535Z1044 Gouripur-Kachua-Hajiganj Road Km 039.97-040.36 S 0.39 3617 Zilla Overlay 40mm @ Traff >=2000 2016 1.811766 0.119Z1050 Kaliapara-Kachua Road Km 000.00-000.30 S 0.3 1560 Zilla Seal Coat 2016 0.471744 1.198Z1050 Kaliapara-Kachua Road Km 000.30-000.50 S 0.2 1560 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z1050 Kaliapara-Kachua Road Km 000.50-000.80 S 0.3 1560 Zilla Seal Coat 2016 0.4158 0.635Z1050 Kaliapara-Kachua Road Km 000.80-002.40 S 1.6 1560 Zilla Overlay 40mm @ 1000-2000 2016 7.924421 0Z1050 Kaliapara-Kachua Road Km 002.40-003.10 S 0.7 1560 Zilla Overlay 40mm @ 1000-2000 2016 3.26865 0Z1050 Kaliapara-Kachua Road Km 003.10-003.40 S 0.3 1560 Zilla Overlay 40mm @ 1000-2000 2016 1.40085 0Z1050 Kaliapara-Kachua Road Km 003.40-003.60 S 0.2 1560 Zilla Overlay 40mm @ 1000-2000 2016 0.9339 0Z1050 Kaliapara-Kachua Road Km 003.60-003.90 S 0.3 1560 Zilla Overlay 40mm @ 1000-2000 2016 1.423773 0Z1050 Kaliapara-Kachua Road Km 003.90-004.10 S 0.2 1560 Zilla Overlay 40mm @ 1000-2000 2016 0.95088 0Z1050 Kaliapara-Kachua Road Km 004.10-006.90 S 2.8 1560 Zilla Overlay 40mm @ 1000-2000 2016 13.2933 0Z1050 Kaliapara-Kachua Road Km 006.90-007.20 S 0.3 1560 Zilla Overlay 40mm @ 1000-2000 2016 1.40085 0.03Z1050 Kaliapara-Kachua Road Km 007.20-007.40 S 0.2 1560 Zilla Overlay 40mm @ 1000-2000 2016 0.9339 0Z1050 Kaliapara-Kachua Road Km 007.40-007.50 S 0.1 1560 Zilla Seal Coat 2016 0.140364 0.303Z1050 Kaliapara-Kachua Road Km 007.50-013.31 S 5.8 1560 Zilla Overlay 40mm @ 1000-2000 2016 27.39271 0Z1062 Daudkandi-Goalmari-Matlab Utter Km 010.63-010.71 S 0.09 4224 Zilla Full Recon 75mm @ IRI>12 2016 1.437118 1.546Z1062 Daudkandi-Goalmari-Matlab Utter Km 010.71-010.91 S 0.2 4224 Zilla Overlay 50mm @ IRI 6-9 2016 0.798 1.509Z1062 Daudkandi-Goalmari-Matlab Utter Km 011.25-011.75 S 0.5 4224 Zilla Full Recon 75mm @ IRI>12 2016 7.933275 0.609Z1062 Daudkandi-Goalmari-Matlab Utter Km 011.75-013.75 S 2 4224 Zilla Overlay 50mm @ IRI 6-9 2016 7.668832 1.126Z1403 Chandpur (Nanupur)-Dokanghar-Harina Road Km 000.00-000.20 S 0.2 2835 Zilla Overlay 40mm @ IRI>12 2016 0.981444 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 013.15-017.27 S 4.13 1289 Zilla Rehab 75mm @ IRI 9-12 2016 44.81643 0.128Z1407 Muddafarganj-Chitosi-Ramganj Road Km 017.27-017.47 S 0.2 1289 Zilla Overlay 40mm @ 1000-2000 2016 0.61128 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 017.47-017.77 S 0.3 1289 Zilla Overlay 40mm @ IRI>12 2016 0.91692 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 017.77-018.17 S 0.4 1289 Zilla Overlay 40mm @ 1000-2000 2016 1.22256 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 018.17-018.37 S 0.2 1289 Zilla Overlay 40mm @ IRI>12 2016 0.618072 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 018.37-018.47 S 0.1 1289 Zilla Seal Coat 2016 0.09198 0.093Z1407 Muddafarganj-Chitosi-Ramganj Road Km 018.47-018.67 S 0.2 1289 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 018.67-019.07 S 0.4 1289 Zilla Overlay 40mm @ 1000-2000 2016 1.23954 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 019.57-019.77 S 0.2 1289 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 019.77-020.27 S 0.5 1289 Zilla Overlay 40mm @ 1000-2000 2016 1.549425 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 020.27-020.37 S 0.1 1289 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0.023Z1407 Muddafarganj-Chitosi-Ramganj Road Km 020.37-020.47 S 0.1 1289 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 020.47-020.76 S 0.29 1289 Zilla Overlay 40mm @ 1000-2000 2016 0.88937 0

Page 33 of 163

Page 34: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1422 Haziganj-Lakshmipur Road Km 000.00-000.30 S 0.3 4750 Zilla Full Recon 75mm @ IRI>12 2016 9.858996 0.618Z1422 Haziganj-Lakshmipur Road Km 000.30-001.10 S 0.8 4750 Zilla Overlay 50mm @ IRI 6-9 2016 4.62 2.442Z1422 Haziganj-Lakshmipur Road Km 001.10-001.20 S 0.1 4750 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 2.122Z1422 Haziganj-Lakshmipur Road Km 001.30-001.70 S 0.4 4750 Zilla Rehab 75mm @ IRI 9-12 2016 6.5846 1.705Z1422 Haziganj-Lakshmipur Road Km 001.70-002.70 S 1 4750 Zilla Overlay 50mm @ IRI 6-9 2016 5.780775 2.1Z1422 Haziganj-Lakshmipur Road Km 002.70-002.90 S 0.2 4750 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 1.663Z1422 Haziganj-Lakshmipur Road Km 002.90-004.20 S 1.3 4750 Zilla Overlay 50mm @ IRI 6-9 2016 7.507499 2.185Z1422 Haziganj-Lakshmipur Road Km 004.20-004.30 S 0.1 4750 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.547Z1422 Haziganj-Lakshmipur Road Km 004.30-006.73 S 2.43 4750 Zilla Overlay 50mm @ IRI 6-9 2016 14.04141 2.381Z1422 Haziganj-Lakshmipur Road Km 006.73-006.83 S 0.1 4750 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.547Z1422 Haziganj-Lakshmipur Road Km 007.33-007.43 S 0.1 4750 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.127Z1422 Haziganj-Lakshmipur Road Km 007.53-007.63 S 0.1 4750 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 1.918Z1422 Haziganj-Lakshmipur Road Km 007.63-008.13 S 0.5 4750 Zilla Overlay 50mm @ IRI 6-9 2016 2.8875 2.252Z1422 Haziganj-Lakshmipur Road Km 008.13-008.23 S 0.1 4750 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.987Z1422 Haziganj-Lakshmipur Road Km 008.23-009.43 S 1.2 4750 Zilla Overlay 50mm @ IRI 6-9 2016 6.935775 2.6Z1422 Haziganj-Lakshmipur Road Km 009.43-009.81 S 0.38 4750 Zilla Rehab 75mm @ IRI 9-12 2016 6.25537 1.631Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 007.76-008.50 S 0.75 1577 Zilla Overlay 40mm @ 1000-2000 2016 2.311742 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 008.50-009.00 S 0.5 1577 Zilla Overlay 40mm @ 1000-2000 2016 1.57914 0.154Z1445 Kachua-Matlab Dakhin Road Km 001.70-001.80 S 0.1 1183 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z1445 Kachua-Matlab Dakhin Road Km 001.80-001.90 S 0.1 1183 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0.188Z1445 Kachua-Matlab Dakhin Road Km 001.90-002.20 S 0.3 1183 Zilla Overlay 40mm @ IRI>12 2016 0.96786 0Z1445 Kachua-Matlab Dakhin Road Km 002.20-002.30 S 0.1 1183 Zilla Overlay 40mm @ 1000-2000 2016 0.325846 0Z1445 Kachua-Matlab Dakhin Road Km 002.30-002.50 S 0.2 1183 Zilla Overlay 40mm @ IRI>12 2016 0.675804 0Z1445 Kachua-Matlab Dakhin Road Km 002.50-002.60 S 0.1 1183 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z1445 Kachua-Matlab Dakhin Road Km 002.60-002.70 S 0.1 1183 Zilla Overlay 40mm @ IRI>12 2016 0.32262 0Z1445 Kachua-Matlab Dakhin Road Km 002.70-002.90 S 0.2 1183 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0.086Z1445 Kachua-Matlab Dakhin Road Km 002.90-003.00 S 0.1 1183 Zilla Overlay 40mm @ IRI>12 2016 0.388842 0Z1445 Kachua-Matlab Dakhin Road Km 003.20-004.10 S 0.9 1183 Zilla Overlay 40mm @ 1000-2000 2016 2.857734 0Z1445 Kachua-Matlab Dakhin Road Km 004.10-004.50 S 0.4 1183 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z1445 Kachua-Matlab Dakhin Road Km 004.50-004.70 S 0.2 1183 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z1445 Kachua-Matlab Dakhin Road Km 004.70-004.90 S 0.2 1183 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z1445 Kachua-Matlab Dakhin Road Km 007.90-008.60 S 0.7 1183 Zilla Overlay 40mm @ 1000-2000 2016 2.222682 0Z1445 Kachua-Matlab Dakhin Road Km 010.10-010.20 S 0.1 1183 Zilla Overlay 40mm @ IRI>12 2016 0.32262 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 000.00-000.20 S 0.2 1403 Zilla Overlay 40mm @ IRI>12 2016 0.947484 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 000.30-000.50 S 0.2 1403 Zilla Overlay 40mm @ IRI>12 2016 0.784476 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 002.00-002.10 S 0.1 1403 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 002.50-002.70 S 0.2 1403 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 002.70-002.80 S 0.1 1403 Zilla Seal Coat 2016 0.09198 0.202Z1824 Doabhanga-Shaharasti-Ramganj Road Km 002.80-002.90 S 0.1 1403 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 002.90-003.00 S 0.1 1403 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 003.10-003.60 S 0.5 1403 Zilla Overlay 40mm @ 1000-2000 2016 1.549425 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 003.60-003.80 S 0.2 1403 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 003.90-004.00 S 0.1 1403 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 004.60-004.90 S 0.3 1403 Zilla Overlay 40mm @ IRI>12 2016 0.929655 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 005.20-005.30 S 0.1 1403 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 005.60-006.50 S 0.9 1403 Zilla Overlay 40mm @ 1000-2000 2016 3.705885 0

Page 34 of 163

Page 35: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1824 Doabhanga-Shaharasti-Ramganj Road Km 007.10-007.20 S 0.1 1403 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 007.80-008.50 S 0.7 1403 Zilla Overlay 40mm @ IRI>12 2016 2.169195 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 008.80-009.00 S 0.2 1403 Zilla Overlay 40mm @ IRI>12 2016 0.635052 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 009.20-009.40 S 0.2 1403 Zilla Overlay 40mm @ IRI>12 2016 0.624864 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 009.40-010.40 S 1 1403 Zilla Overlay 40mm @ 1000-2000 2016 3.09885 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 010.70-010.90 S 0.2 1403 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 010.90-011.10 S 0.2 1403 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 011.30-011.70 S 0.4 1403 Zilla Overlay 40mm @ IRI>12 2016 1.242639 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 013.30-013.90 S 0.6 1403 Zilla Overlay 40mm @ 1000-2000 2016 1.850013 0Z8699 Chandra-Haimchar Road Km 000.10-000.20 S 0.1 1325 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z8699 Chandra-Haimchar Road Km 004.20-004.50 S 0.3 1325 Zilla Overlay 40mm @ IRI>12 2016 0.929655 0Z8699 Chandra-Haimchar Road Km 005.00-005.70 S 0.7 1325 Zilla Rehab 75mm @ IRI 9-12 2016 7.647114 0.108Z8699 Chandra-Haimchar Road Km 005.80-005.90 S 0.1 1325 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z8699 Chandra-Haimchar Road Km 006.20-006.70 S 0.5 1325 Zilla Overlay 40mm @ IRI>12 2016 1.549425 0Sub-Total Chandpur Division 1143.317

Comilla DivisionN101 Comilla - Bibirbazar Land Port Connecting Road Km 000.00-000.80 S 0.8 10914 National Overlay 80mm @ IRI 5-9 2016 9.2568 12.849N101 Comilla - Bibirbazar Land Port Connecting Road Km 000.80-001.20 S 0.4 10914 National Full Recon 195mm 2016 20.4428 4.333N101 Comilla - Bibirbazar Land Port Connecting Road Km 001.20-003.50 S 2.3 10914 National Overlay 80mm @ IRI 5-9 2016 26.62487 12.262N101 Comilla - Bibirbazar Land Port Connecting Road Km 003.50-003.60 S 0.1 10914 National Full Recon 195mm @ IRI 12 2016 5.1107 4.846N101 Comilla - Bibirbazar Land Port Connecting Road Km 003.60-004.00 S 0.4 10914 National Overlay 80mm @ IRI 5-9 2016 4.6284 12.469N101 Comilla - Bibirbazar Land Port Connecting Road Km 004.00-004.20 S 0.2 10914 National Rehab 195mm @ IRI 9-12 2016 8.4896 4.666N101 Comilla - Bibirbazar Land Port Connecting Road Km 004.20-004.50 S 0.3 10914 National Overlay 80mm @ IRI 5-9 2016 3.4713 12.698N101 Comilla - Bibirbazar Land Port Connecting Road Km 004.50-004.60 S 0.1 10914 National Rehab 195mm @ IRI 9-12 2016 4.2448 5.422N101 Comilla - Bibirbazar Land Port Connecting Road Km 004.60-006.02 S 1.42 10914 National Overlay 80mm @ IRI 5-9 2016 16.43082 12.041N102 Comilla-Brahmanbaria (Sarail) Road Km 000.00-000.20 S 0.2 10914 National Overlay 80mm @ IRI 5-9 2016 2.1489 14.475N102 Comilla-Brahmanbaria (Sarail) Road Km 000.20-000.40 S 0.2 10914 National Rehab 195mm @ IRI 9-12 2016 7.8832 6.384N102 Comilla-Brahmanbaria (Sarail) Road Km 000.40-000.90 S 0.5 10914 National Overlay 80mm @ IRI 5-9 2016 5.37225 15.818N102 Comilla-Brahmanbaria (Sarail) Road Km 000.90-001.30 S 0.4 10914 National Full Recon 195mm @ IRI 12 2016 17.81444 5.331N102 Comilla-Brahmanbaria (Sarail) Road Km 001.30-001.70 S 0.4 10914 National Overlay 80mm @ IRI 5-9 2016 3.76884 17.743N102 Comilla-Brahmanbaria (Sarail) Road Km 001.70-001.80 S 0.1 10914 National Full Recon 195mm @ IRI 12 2016 4.16157 6.401N102 Comilla-Brahmanbaria (Sarail) Road Km 001.80-001.90 S 0.1 10914 National Overlay 80mm @ IRI 5-9 2016 0.94221 18.06N102 Comilla-Brahmanbaria (Sarail) Road Km 001.90-002.10 S 0.2 10914 National Full Recon 195mm @ IRI 12 2016 8.32314 6.102N102 Comilla-Brahmanbaria (Sarail) Road Km 002.10-003.40 S 1.3 10914 National Rehab 195mm @ IRI 9-12 2016 46.03788 5.91N102 Comilla-Brahmanbaria (Sarail) Road Km 003.40-003.50 S 0.1 10914 National Full Recon 195mm @ IRI 12 2016 4.3806 5.996N102 Comilla-Brahmanbaria (Sarail) Road Km 003.50-003.70 S 0.2 10914 National Rehab 195mm @ IRI 9-12 2016 7.2768 6.13N102 Comilla-Brahmanbaria (Sarail) Road Km 003.70-003.80 S 0.1 10914 National Full Recon 195mm @ IRI 12 2016 4.3806 5.976N102 Comilla-Brahmanbaria (Sarail) Road Km 003.80-004.80 S 1 10914 National Overlay 80mm @ IRI 5-9 2016 9.918 16.622N102 Comilla-Brahmanbaria (Sarail) Road Km 004.80-004.90 S 0.1 10914 National Full Recon 195mm @ IRI 12 2016 4.3806 6.064N102 Comilla-Brahmanbaria (Sarail) Road Km 004.90-005.10 S 0.2 10914 National Rehab 195mm @ IRI 9-12 2016 7.240416 6.398N102 Comilla-Brahmanbaria (Sarail) Road Km 005.10-005.50 S 0.4 10914 National Full Recon 195mm @ IRI 12 2016 17.5224 5.635N102 Comilla-Brahmanbaria (Sarail) Road Km 005.50-006.20 S 0.7 10914 National Rehab 195mm @ IRI 9-12 2016 25.4688 5.921N102 Comilla-Brahmanbaria (Sarail) Road Km 006.20-006.30 S 0.1 10914 National Full Recon 195mm @ IRI 12 2016 4.3806 5.919N102 Comilla-Brahmanbaria (Sarail) Road Km 006.30-006.70 S 0.4 10914 National Overlay 80mm @ IRI 5-9 2016 3.9672 17.39N102 Comilla-Brahmanbaria (Sarail) Road Km 006.70-007.00 S 0.3 10914 National Full Recon 195mm @ IRI 12 2016 13.1418 5.546

Page 35 of 163

Page 36: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N102 Comilla-Brahmanbaria (Sarail) Road Km 007.00-008.20 S 1.2 10914 National Overlay 80mm @ IRI 5-9 2016 12.27849 15.257N102 Comilla-Brahmanbaria (Sarail) Road Km 008.20-008.60 S 0.4 10914 National Rehab 195mm @ IRI 9-12 2016 15.03872 6.577N102 Comilla-Brahmanbaria (Sarail) Road Km 008.60-010.10 S 1.5 10914 National Rehab 195mm @ IRI 9-12 2016 55.57656 6.007N102 Comilla-Brahmanbaria (Sarail) Road Km 010.10-010.40 S 0.3 10914 National Full Recon 195mm @ IRI 12 2016 13.1418 5.382N102 Comilla-Brahmanbaria (Sarail) Road Km 010.40-012.10 S 1.7 10914 National Overlay 80mm @ IRI 5-9 2016 16.15808 15.889N102 Comilla-Brahmanbaria (Sarail) Road Km 012.13-012.20 S 0.07 10914 National Full Recon 195mm 2016 2.984649 7.142N102 Comilla-Brahmanbaria (Sarail) Road Km 012.20-012.40 S 0.2 10914 National Overlay 80mm @ IRI 5-9 2016 1.85136 18.215N102 Comilla-Brahmanbaria (Sarail) Road Km 012.40-012.70 S 0.3 10914 National Full Recon 195mm @ IRI 12 2016 12.26568 5.869N102 Comilla-Brahmanbaria (Sarail) Road Km 012.70-013.30 S 0.6 10914 National Overlay 80mm @ IRI 5-9 2016 5.55408 16.716N102 Comilla-Brahmanbaria (Sarail) Road Km 013.30-013.50 S 0.2 10914 National Full Recon 195mm @ IRI 12 2016 8.17712 6.104N102 Comilla-Brahmanbaria (Sarail) Road Km 013.50-014.60 S 1.1 10914 National Overlay 80mm @ IRI 5-9 2016 10.18248 16.165N102 Comilla-Brahmanbaria (Sarail) Road Km 014.60-014.70 S 0.1 10914 National Full Recon 195mm 2016 4.01555 4.166N102 Comilla-Brahmanbaria (Sarail) Road Km 014.70-016.70 S 2 10914 National Rehab 195mm @ IRI 9-12 2016 69.09503 6.349N102 Comilla-Brahmanbaria (Sarail) Road Km 016.70-017.10 S 0.4 10914 National Full Recon 195mm @ IRI 12 2016 16.64628 5.896N102 Comilla-Brahmanbaria (Sarail) Road Km 017.10-019.30 S 2.2 10914 National Rehab 195mm @ IRI 9-12 2016 76.04256 6.432N102 Comilla-Brahmanbaria (Sarail) Road Km 019.30-019.40 S 0.1 10914 National Full Recon 195mm @ IRI 12 2016 4.16157 6.379N102 Comilla-Brahmanbaria (Sarail) Road Km 019.40-019.70 S 0.3 10914 National Rehab 195mm @ IRI 9-12 2016 10.35125 6.738N102 Comilla-Brahmanbaria (Sarail) Road Km 019.70-019.90 S 0.2 10914 National Full Recon 195mm @ IRI 12 2016 8.17712 5.984N102 Comilla-Brahmanbaria (Sarail) Road Km 019.90-020.10 S 0.2 10914 National Overlay 80mm @ IRI 5-9 2016 1.85136 18.058N102 Comilla-Brahmanbaria (Sarail) Road Km 020.11-023.40 S 3.29 10914 National Rehab 195mm @ IRI 9-12 2016 116.8392 6.427N102 Comilla-Brahmanbaria (Sarail) Road Km 023.40-023.60 S 0.2 10914 National Full Recon 195mm @ IRI 12 2016 8.7612 5.837N102 Comilla-Brahmanbaria (Sarail) Road Km 023.60-024.10 S 0.5 10914 National Overlay 80mm @ IRI 5-9 2016 4.959 16.645N102 Comilla-Brahmanbaria (Sarail) Road Km 024.10-024.40 S 0.3 10914 National Full Recon 195mm @ IRI 12 2016 13.1418 5.357N102 Comilla-Brahmanbaria (Sarail) Road Km 024.40-025.00 S 0.6 10914 National Overlay 50mm @ IRI 5 2016 3.78 13.892N102 Comilla-Brahmanbaria (Sarail) Road Km 025.00-026.50 S 1.5 8082 National Full Recon 180mm @ IRI 12 2016 66.51611 4.951N102 Comilla-Brahmanbaria (Sarail) Road Km 026.50-027.40 S 0.9 7211 National Rehab 180mm @ IRI 9-12 2016 37.33776 4.694N102 Comilla-Brahmanbaria (Sarail) Road Km 027.40-027.80 S 0.4 7211 National Full Recon 180mm @ IRI 12 2016 18.14141 5.019N102 Comilla-Brahmanbaria (Sarail) Road Km 027.80-029.00 S 1.2 7211 National Rehab 180mm @ IRI 9-12 2016 42.17784 5.699N102 Comilla-Brahmanbaria (Sarail) Road Km 029.00-031.50 S 2.5 7211 National Full Recon 180mm @ IRI 12 2016 105.5099 5.071N102 Comilla-Brahmanbaria (Sarail) Road Km 031.50-032.00 S 0.5 7211 National Overlay 60mm @ IRI 7-9 2016 3.753 15.444N102 Comilla-Brahmanbaria (Sarail) Road Km 032.00-033.90 S 1.9 7211 National Full Recon 180mm @ IRI 12 2016 79.7886 4.958N102 Comilla-Brahmanbaria (Sarail) Road Km 033.90-034.00 S 0.1 7211 National Overlay 60mm @ IRI 7-9 2016 0.7506 17.103N102 Comilla-Brahmanbaria (Sarail) Road Km 034.00-034.50 S 0.5 7211 National Full Recon 180mm @ IRI 12 2016 20.997 5.188N102 Comilla-Brahmanbaria (Sarail) Road Km 034.50-035.00 S 0.5 7211 National Overlay 50mm @ IRI 5-7 2016 3.15 15.022N102 Comilla-Brahmanbaria (Sarail) Road Km 035.00-035.30 S 0.3 7211 National Full Recon 180mm @ IRI 12 2016 12.55621 5.386N102 Comilla-Brahmanbaria (Sarail) Road Km 035.30-035.90 S 0.6 7211 National Overlay 50mm @ IRI 5-7 2016 3.5595 15.622N102 Comilla-Brahmanbaria (Sarail) Road Km 035.90-037.00 S 1.1 7211 National Full Recon 180mm @ IRI 12 2016 43.11384 5.766N102 Comilla-Brahmanbaria (Sarail) Road Km 037.00-037.10 S 0.1 7211 National Overlay 50mm @ IRI 5-7 2016 0.588 18.257N102 Comilla-Brahmanbaria (Sarail) Road Km 037.10-037.60 S 0.5 7211 National Rehab 180mm @ IRI 9-12 2016 16.1336 6.533N102 Comilla-Brahmanbaria (Sarail) Road Km 037.60-037.70 S 0.1 7211 National Overlay 50mm @ IRI 5-7 2016 0.588 17.663N102 Comilla-Brahmanbaria (Sarail) Road Km 037.70-038.20 S 0.5 7211 National Full Recon 180mm @ IRI 12 2016 19.5972 5.285N102 Comilla-Brahmanbaria (Sarail) Road Km 038.20-038.80 S 0.6 7211 National Overlay 60mm @ IRI 7-9 2016 4.20336 16.925N102 Comilla-Brahmanbaria (Sarail) Road Km 038.80-039.00 S 0.2 7211 National Full Recon 180mm @ IRI 12 2016 7.83888 5.954N102 Comilla-Brahmanbaria (Sarail) Road Km 039.00-040.10 S 1.1 7211 National Rehab 180mm @ IRI 9-12 2016 35.49392 6.264N102 Comilla-Brahmanbaria (Sarail) Road Km 040.10-040.36 S 0.26 7211 National Full Recon 180mm @ IRI 12 2016 10.34732 5.816N119 Chandina Town Old Section Road Km 000.00-000.40 S 0.4 5161 National Rehab 150mm @ IRI 9-12 2016 11.37948 1.268

Page 36 of 163

Page 37: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N119 Chandina Town Old Section Road Km 000.60-000.80 S 0.2 5161 National Full Recon 150mm @ IRI 12 2016 6.79616 2.455N119 Chandina Town Old Section Road Km 001.00-001.80 S 0.8 5161 National Rehab 150mm @ IRI 9-12 2016 21.6384 2.076N119 Chandina Town Old Section Road Km 001.80-002.30 S 0.5 5161 National Overlay 50mm @ IRI 5-9 2016 2.94588 4.649N119 Chandina Town Old Section Road Km 002.30-002.50 S 0.2 5161 National Rehab 150mm @ IRI 9-12 2016 5.4096 2.255N120 Comilla Town Old Section Road Km 000.00-000.12 L 0.12 7296 National Full Recon 180mm 2016 8.81874 1.432N120 Comilla Town Old Section Road Km 000.00-000.12 R 0.12 7296 National Full Recon 180mm 2016 8.81874 1.432N120 Comilla Town Old Section Road Km 000.12-000.80 S 0.68 7296 National Rehab 180mm @ IRI 9-12 2016 41.14068 0.864N120 Comilla Town Old Section Road Km 001.40-001.50 S 0.1 7296 National Full Recon 180mm 2016 7.34895 0.675N120 Comilla Town Old Section Road Km 003.11-003.21 S 0.1 7296 National Full Recon 180mm 2016 7.34895 1.439N120 Comilla Town Old Section Road Km 003.31-003.51 S 0.2 7296 National Overlay 60mm @ IRI 7-9 2016 2.81475 2.719N120 Comilla Town Old Section Road Km 004.21-007.31 S 3.1 7296 National Overlay 50mm @ IRI 5-7 2016 31.77905 2.317N120 Comilla Town Old Section Road Km 007.31-010.31 S 3 7296 National Overlay 50mm @ IRI 5-7 2016 18.18156 4.904N120 Comilla Town Old Section Road Km 012.61-012.91 S 0.3 7296 National Overlay 60mm @ IRI 7-9 2016 2.06415 7.337N120 Comilla Town Old Section Road Km 013.71-013.91 S 0.2 7296 National Full Recon 180mm 2016 10.21854 2.458N120 Comilla Town Old Section Road Km 014.01-014.11 S 0.1 7296 National Full Recon 180mm 2016 3.84945 3.112N120 Comilla Town Old Section Road Km 014.71-015.01 S 0.3 7296 National Rehab 180mm @ IRI 9-12 2016 9.5073 2.988N120 Comilla Town Old Section Road Km 015.71-016.01 S 0.3 7296 National Rehab 180mm @ IRI 9-12 2016 9.5073 2.523N120 Comilla Town Old Section Road Km 016.81-016.91 S 0.1 7296 National Rehab 180mm @ IRI 9-12 2016 3.1691 3.043N120 Comilla Town Old Section Road Km 016.91-020.94 S 4.03 7296 National Overlay 50mm @ IRI 5-7 2016 23.25592 5.883R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 004.30-004.90 L 0.6 11193 Regional DBST @ Traff >6000 2016 1.546417 7.719R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 004.30-004.90 R 0.6 11193 Regional DBST @ Traff >6000 2016 1.576156 7.563R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 004.90-004.94 L 0.04 10243 Regional Full Recon 195mm 2016 1.404712 5.867R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 004.90-004.94 R 0.04 10243 Regional Full Recon 195mm 2016 1.431726 5.667R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 004.94-005.50 S 0.56 10850 Regional Rehab 150mm @ IRI 9-12 2016 16.31574 8.974R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 005.50-005.60 S 0.1 10850 Regional Rehab 150mm @ IRI 9-12 2016 2.898 8.585R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 005.60-005.80 S 0.2 10850 Regional Full Recon 195mm 2016 8.7612 7.191R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 005.80-008.40 S 2.6 10850 Regional Overlay 60mm @ IRI 5.5-9 2016 19.65326 19.528R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 008.45-008.60 S 0.15 10850 Regional Overlay 60mm @ IRI 5.5-9 2016 1.175189 18.89R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 008.60-009.00 S 0.4 10850 Regional Rehab 150mm @ IRI 9-12 2016 11.7852 7.951R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 009.00-009.25 S 0.25 10850 Regional DBST @ 25% Crk 2016 0.741296 16.508R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 009.30-009.50 L 0.2 10243 Regional Overlay 60mm @ IRI 5.5-9 2016 1.152421 12.83R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 009.30-009.50 R 0.2 10243 Regional Overlay 60mm @ IRI 5.5-9 2016 1.152421 12.83R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 009.50-013.41 S 3.9 10405 Regional Overlay 60mm @ IRI 5.5-9 2016 29.45749 18.021R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 013.41-013.51 S 0.1 6002 Regional Rehab 150mm @ IRI 9-12 2016 2.9463 6.269R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 013.51-016.51 S 3 6002 Regional Overlay 60mm @ IRI 5.5-9 2016 22.48796 12.814R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 017.73-018.91 S 1.18 6002 Regional Overlay 60mm @ IRI 5.5-9 2016 8.716843 13.908R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 019.54-020.41 S 0.87 6002 Regional Overlay 60mm @ IRI 5.5-9 2016 6.391859 13.03R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 020.41-020.71 S 0.3 6002 Regional Rehab 150mm @ IRI 9-12 2016 8.577597 5.95R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 020.71-023.41 S 2.7 6002 Regional Overlay 60mm @ IRI 5.5-9 2016 20.09732 12.9R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 023.42-024.42 S 1 6002 Regional Overlay 60mm @ IRI 5.5-9 2016 7.506 12.764R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 025.62-026.81 S 1.19 6002 Regional Overlay 60mm @ IRI 5.5-9 2016 8.805413 13.833R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 026.81-026.91 S 0.1 6002 Regional Full Recon 150mm @ IRI 12 2016 3.58012 5.544R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 026.91-030.63 S 3.72 6002 Regional Overlay 60mm @ IRI 5.5-9 2016 27.75108 13.52R141 Lalmai-Laksham-Sonaimuri Road Km 000.00-000.30 S 0.3 6626 Regional Rehab 150mm @ IRI 9-12 2016 13.57713 2.819R141 Lalmai-Laksham-Sonaimuri Road Km 000.30-001.90 S 1.6 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 14.65171 11.907R141 Lalmai-Laksham-Sonaimuri Road Km 001.90-002.10 S 0.2 6626 Regional Rehab 150mm @ IRI 9-12 2016 7.07112 5.045

Page 37 of 163

Page 38: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R141 Lalmai-Laksham-Sonaimuri Road Km 002.10-005.10 S 3 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 27.33095 11.037R141 Lalmai-Laksham-Sonaimuri Road Km 005.10-009.30 S 4.2 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 38.36479 11.312R141 Lalmai-Laksham-Sonaimuri Road Km 009.30-011.10 S 1.8 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 16.43814 11.455R141 Lalmai-Laksham-Sonaimuri Road Km 011.44-012.40 S 0.96 6626 Regional DBST @ Traff >6000 2016 3.476377 10.693R141 Lalmai-Laksham-Sonaimuri Road Km 012.40-012.90 S 0.5 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 4.56615 11.326R141 Lalmai-Laksham-Sonaimuri Road Km 012.90-013.00 S 0.1 6626 Regional Rehab 150mm @ IRI 9-12 2016 3.5259 4.851R141 Lalmai-Laksham-Sonaimuri Road Km 013.00-013.60 S 0.6 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 5.47938 11.823R141 Lalmai-Laksham-Sonaimuri Road Km 013.60-013.70 S 0.1 6626 Regional Rehab 150mm @ IRI 9-12 2016 3.5259 5.297R141 Lalmai-Laksham-Sonaimuri Road Km 013.70-014.40 S 0.7 6626 Regional DBST @ Traff >6000 2016 2.52434 9.299R141 Lalmai-Laksham-Sonaimuri Road Km 014.47-014.70 S 0.23 6626 Regional Rehab 150mm @ IRI 9-12 2016 8.144829 4.611R141 Lalmai-Laksham-Sonaimuri Road Km 014.70-017.40 S 2.7 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 24.66634 11.099R141 Lalmai-Laksham-Sonaimuri Road Km 017.47-021.31 S 3.84 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 35.0315 11.951R141 Lalmai-Laksham-Sonaimuri Road Km 021.39-024.51 S 3.11 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 28.50674 11.131R141 Lalmai-Laksham-Sonaimuri Road Km 024.65-024.91 S 0.26 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 2.371746 12.088R141 Lalmai-Laksham-Sonaimuri Road Km 024.91-025.01 S 0.1 6626 Regional Rehab 150mm @ IRI 9-12 2016 3.570916 5.165R141 Lalmai-Laksham-Sonaimuri Road Km 025.01-027.31 S 2.3 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 21.06184 11.743R141 Lalmai-Laksham-Sonaimuri Road Km 027.31-027.51 S 0.2 6626 Regional Rehab 150mm @ IRI 9-12 2016 7.07112 5.472R141 Lalmai-Laksham-Sonaimuri Road Km 027.56-031.61 S 4.05 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 37.07798 11.949R141 Lalmai-Laksham-Sonaimuri Road Km 031.69-032.41 S 0.72 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 6.602428 11.417R141 Lalmai-Laksham-Sonaimuri Road Km 032.41-032.51 S 0.1 6626 Regional Rehab 150mm @ IRI 9-12 2016 3.53556 5.385R141 Lalmai-Laksham-Sonaimuri Road Km 032.51-033.41 S 0.9 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 8.241588 12.037R141 Lalmai-Laksham-Sonaimuri Road Km 033.41-033.43 S 0.02 6626 Regional Full Recon 150mm @ IRI 12 2016 1.066026 4.237R144 Laksam Old Section Road Km 000.20-000.30 S 0.1 3755 Regional Full Recon 135mm 2016 1.99436 1.841R144 Laksam Old Section Road Km 000.40-000.50 S 0.1 3755 Regional Full Recon 135mm 2016 1.99436 1.515R144 Laksam Old Section Road Km 000.50-000.60 S 0.1 3755 Regional DBST @ Traff 2000-4000 2016 0.18031 2.195R144 Laksam Old Section Road Km 000.60-000.70 S 0.1 3755 Regional Rehab 135mm @ IRI 9-12 2016 1.684416 1.411R144 Laksam Old Section Road Km 000.70-003.38 S 2.68 3755 Regional DBST @ 25% Crk 2016 7.969998 0.351Z1008 Chandina-Debidwar Road Km 001.50-001.70 S 0.2 2821 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.06Z1008 Chandina-Debidwar Road Km 001.70-003.70 S 2 2821 Zilla Overlay 40mm @ Traff >=2000 2016 9.34367 0.053Z1008 Chandina-Debidwar Road Km 003.70-003.90 S 0.2 2821 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.076Z1008 Chandina-Debidwar Road Km 003.90-004.90 S 1 2821 Zilla Overlay 40mm @ Traff >=2000 2016 4.6695 0.081Z1008 Chandina-Debidwar Road Km 004.90-005.10 S 0.2 2821 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.066Z1008 Chandina-Debidwar Road Km 005.10-006.60 S 1.5 2821 Zilla Overlay 40mm @ Traff >=2000 2016 7.00425 0.058Z1008 Chandina-Debidwar Road Km 006.60-006.70 S 0.1 2821 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.17Z1008 Chandina-Debidwar Road Km 006.70-010.20 S 3.5 2821 Zilla Overlay 40mm @ Traff >=2000 2016 12.87027 0.007Z1008 Chandina-Debidwar Road Km 010.20-010.30 S 0.1 2821 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 0.428Z1008 Chandina-Debidwar Road Km 010.30-011.60 S 1.3 2821 Zilla Overlay 40mm @ Traff >=2000 2016 4.031604 0.128Z1008 Chandina-Debidwar Road Km 011.60-011.90 S 0.3 2821 Zilla Overlay 40mm @ Traff >=2000 2016 0.929655 0.505Z1008 Chandina-Debidwar Road Km 011.90-014.33 S 2.43 2821 Zilla Overlay 40mm @ Traff >=2000 2016 8.489355 0.06Z1017 Chandina-Chapera-Companiganj Road Km 012.10-012.40 S 0.3 1588 Zilla Overlay 40mm @ IRI>12 2016 0.929655 0Z1017 Chandina-Chapera-Companiganj Road Km 012.50-012.70 S 0.2 1588 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0Z1017 Chandina-Chapera-Companiganj Road Km 012.80-013.40 S 0.6 1588 Zilla Overlay 40mm @ IRI>12 2016 1.85931 0Z1017 Chandina-Chapera-Companiganj Road Km 013.60-014.30 S 0.7 1588 Zilla Overlay 40mm @ IRI>12 2016 2.169195 0Z1017 Chandina-Chapera-Companiganj Road Km 014.30-014.40 S 0.1 1588 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0.117Z1022 Jhalam-Chandina Road Km 000.20-000.70 S 0.5 1516 Zilla Overlay 40mm @ IRI>12 2016 1.64706 0Z1022 Jhalam-Chandina Road Km 000.70-000.80 S 0.1 1516 Zilla Overlay 40mm @ 1000-2000 2016 0.33111 0

Page 38 of 163

Page 39: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1022 Jhalam-Chandina Road Km 000.80-002.80 S 2 1516 Zilla Overlay 40mm @ IRI>12 2016 6.4524 0Z1022 Jhalam-Chandina Road Km 002.80-003.40 S 0.6 1516 Zilla Overlay 40mm @ 1000-2000 2016 1.85931 0Z1022 Jhalam-Chandina Road Km 003.40-004.50 S 1.1 1516 Zilla Overlay 40mm @ IRI>12 2016 3.408735 0Z1022 Jhalam-Chandina Road Km 004.50-004.60 S 0.1 1516 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1022 Jhalam-Chandina Road Km 004.60-004.90 S 0.3 1516 Zilla Overlay 40mm @ IRI>12 2016 0.929655 0Z1022 Jhalam-Chandina Road Km 004.90-005.00 S 0.1 1516 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1022 Jhalam-Chandina Road Km 005.00-005.30 S 0.3 1516 Zilla Overlay 40mm @ IRI>12 2016 0.929655 0Z1022 Jhalam-Chandina Road Km 005.30-005.40 S 0.1 1516 Zilla Overlay 40mm @ 1000-2000 2016 0.27168 0Z1022 Jhalam-Chandina Road Km 005.40-005.80 S 0.4 1516 Zilla Overlay 40mm @ IRI>12 2016 1.08672 0Z1022 Jhalam-Chandina Road Km 005.80-006.20 S 0.4 1516 Zilla Overlay 40mm @ 1000-2000 2016 1.08672 0.084Z1022 Jhalam-Chandina Road Km 006.20-007.40 S 1.2 1516 Zilla Overlay 40mm @ IRI>12 2016 3.688056 0Z1022 Jhalam-Chandina Road Km 007.40-007.50 S 0.1 1516 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1022 Jhalam-Chandina Road Km 007.50-008.60 S 1.1 1516 Zilla Overlay 40mm @ IRI>12 2016 3.45543 0Z1022 Jhalam-Chandina Road Km 008.80-011.80 S 3 1516 Zilla Overlay 40mm @ IRI>12 2016 9.4239 0Z1022 Jhalam-Chandina Road Km 012.00-012.40 S 0.4 1516 Zilla Overlay 40mm @ IRI>12 2016 1.25652 0Z1022 Jhalam-Chandina Road Km 012.40-012.50 S 0.1 1516 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1022 Jhalam-Chandina Road Km 012.50-012.60 S 0.1 1516 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1028 Nimsar-Barura Road Km 001.00-001.20 S 0.2 1141 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1028 Nimsar-Barura Road Km 001.40-001.50 S 0.1 1141 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.021Z1028 Nimsar-Barura Road Km 001.80-002.00 S 0.2 1141 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1028 Nimsar-Barura Road Km 002.20-002.40 S 0.2 1141 Zilla Overlay 40mm @ IRI>12 2016 0.631401 0Z1028 Nimsar-Barura Road Km 002.40-002.50 S 0.1 1141 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.276Z1028 Nimsar-Barura Road Km 002.50-002.80 S 0.3 1141 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z1028 Nimsar-Barura Road Km 003.80-004.20 S 0.4 1141 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z1028 Nimsar-Barura Road Km 004.20-004.40 S 0.2 1141 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z1028 Nimsar-Barura Road Km 004.40-004.60 S 0.2 1141 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1028 Nimsar-Barura Road Km 004.70-004.90 S 0.2 1141 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1028 Nimsar-Barura Road Km 005.00-005.10 S 0.1 1141 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1028 Nimsar-Barura Road Km 005.30-005.70 S 0.4 1141 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z1028 Nimsar-Barura Road Km 005.70-005.90 S 0.2 1141 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z1028 Nimsar-Barura Road Km 005.90-006.00 S 0.1 1141 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1028 Nimsar-Barura Road Km 006.00-006.30 S 0.3 1141 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z1028 Nimsar-Barura Road Km 006.30-006.40 S 0.1 1141 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1028 Nimsar-Barura Road Km 007.10-007.20 S 0.1 1141 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1028 Nimsar-Barura Road Km 007.20-007.30 S 0.1 1141 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1028 Nimsar-Barura Road Km 007.30-007.50 S 0.2 1141 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1028 Nimsar-Barura Road Km 007.50-007.60 S 0.1 1141 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1028 Nimsar-Barura Road Km 007.60-007.90 S 0.3 1141 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z1028 Nimsar-Barura Road Km 008.40-008.50 S 0.1 1141 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1028 Nimsar-Barura Road Km 009.20-009.30 S 0.1 1141 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1028 Nimsar-Barura Road Km 009.40-009.50 S 0.1 1141 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1028 Nimsar-Barura Road Km 011.50-011.60 S 0.1 1141 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1028 Nimsar-Barura Road Km 013.20-013.28 S 0.08 1141 Zilla Overlay 40mm @ 1000-2000 2016 0.24188 0.422Z1029 Comilla Cantonment-Barura Road Km 000.00-013.30 S 13.3 4467 Zilla Rehab 75mm @ IRI 9-12 2016 143.7461 0.579Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 003.20-003.30 S 0.1 2127 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 003.30-007.10 S 3.8 2127 Zilla Overlay 40mm @ Traff >=2000 2016 17.74877 0

Page 39 of 163

Page 40: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 007.10-007.40 S 0.3 2127 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 007.40-008.40 S 1 2127 Zilla Overlay 40mm @ Traff >=2000 2016 4.6695 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 008.40-008.50 S 0.1 2127 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 008.50-008.80 S 0.3 2127 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 008.80-009.20 S 0.4 2127 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 009.20-009.60 S 0.4 2127 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0.108Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 009.60-009.80 S 0.2 2127 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 009.80-010.30 S 0.5 2127 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 010.30-010.50 S 0.2 2127 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 010.50-011.50 S 1 2127 Zilla Overlay 40mm @ Traff >=2000 2016 4.699665 0.04Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 011.50-011.70 S 0.2 2127 Zilla Overlay 40mm @ Traff >=2000 2016 0.978048 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 011.90-012.00 S 0.1 2127 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 012.00-012.10 S 0.1 2127 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.247Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 012.10-012.30 S 0.2 2127 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 012.30-013.10 S 0.8 2127 Zilla Overlay 40mm @ Traff >=2000 2016 3.7356 0.125Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 013.10-013.30 S 0.2 2127 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 013.30-014.00 S 0.7 2127 Zilla Overlay 40mm @ Traff >=2000 2016 3.26865 0.077Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 014.00-014.10 S 0.1 2127 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 014.10-021.41 S 7.3 2127 Zilla Overlay 40mm @ Traff >=2000 2016 33.9727 0.134Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 021.41-021.61 S 0.2 2127 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 026.11-026.41 S 0.3 2127 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z1041 Comilla-Burichang-Brahmanpara-Mirpur Km 028.91-029.01 S 0.1 2127 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 000.20-000.30 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.095Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 000.30-001.10 S 0.8 2549 Zilla Overlay 40mm @ Traff >=2000 2016 3.7356 0Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 001.10-001.20 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.013Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 001.40-001.50 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.001Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 001.80-002.00 S 0.2 2549 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 002.40-002.50 S 0.1 2549 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.278Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 002.80-002.90 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.156Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 003.10-003.20 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.119Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 003.60-003.70 S 0.1 2549 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 004.10-004.20 S 0.1 2549 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 004.80-005.00 S 0.2 2549 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 006.70-006.80 S 0.1 2549 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.294Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 006.80-008.10 S 1.3 2549 Zilla Overlay 40mm @ Traff >=2000 2016 6.075019 0.057Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 008.10-008.20 S 0.1 2549 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 010.00-010.10 S 0.1 2549 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.424Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 011.40-011.70 S 0.3 2549 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 0.275Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 012.20-012.30 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.122Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 013.70-013.80 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.249Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 014.20-014.30 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.251Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 016.30-016.40 S 0.1 2549 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.257Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 018.00-018.20 S 0.2 2549 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.114Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 018.50-018.60 S 0.1 2549 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.461Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 019.20-019.30 S 0.1 2549 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.35Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 019.70-019.80 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.048

Page 40 of 163

Page 41: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 021.21-021.31 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.862Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 021.71-022.21 S 0.5 2549 Zilla Rehab 75mm @ IRI 9-12 2016 5.462225 0.642Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 022.21-022.71 S 0.5 2549 Zilla Overlay 40mm @ Traff >=2000 2016 1.549425 0.595Z1042 Eliotganj-Ramchandrapur-Bancharampur Km 022.71-022.91 S 0.2 2549 Zilla Full Recon 75mm @ IRI>12 2016 3.17331 0.467Z1044 Gouripur-Kachua-Hajiganj Road Km 000.20-000.40 S 0.2 3617 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.323Z1044 Gouripur-Kachua-Hajiganj Road Km 000.40-000.50 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.465Z1044 Gouripur-Kachua-Hajiganj Road Km 000.50-000.80 S 0.3 3617 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.273Z1044 Gouripur-Kachua-Hajiganj Road Km 000.80-001.00 S 0.2 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.8844 0.192Z1044 Gouripur-Kachua-Hajiganj Road Km 001.00-007.70 S 6.7 3617 Zilla Rehab 75mm @ IRI 9-12 2016 110.325 0.366Z1044 Gouripur-Kachua-Hajiganj Road Km 007.70-007.90 S 0.2 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.8844 0.217Z1044 Gouripur-Kachua-Hajiganj Road Km 007.90-008.50 S 0.6 3617 Zilla Full Recon 75mm @ IRI>12 2016 14.0582 0.248Z1044 Gouripur-Kachua-Hajiganj Road Km 008.50-009.10 S 0.6 3617 Zilla Overlay 40mm @ Cracks >25% 2016 2.72556 0.117Z1044 Gouripur-Kachua-Hajiganj Road Km 009.10-009.20 S 0.1 3617 Zilla Full Recon 75mm @ IRI>12 2016 2.456055 0.44Z1044 Gouripur-Kachua-Hajiganj Road Km 009.20-009.30 S 0.1 3617 Zilla Overlay 40mm @ Cracks >25% 2016 0.45426 0.311Z1044 Gouripur-Kachua-Hajiganj Road Km 009.30-009.88 S 0.58 3617 Zilla Full Recon 75mm @ IRI>12 2016 14.17144 0.103Z1045 Chauddagram-Laksam Road Km 004.30-004.60 S 0.3 1978 Zilla Overlay 40mm @ 1000-2000 2016 1.40085 0Z1045 Chauddagram-Laksam Road Km 004.60-005.10 S 0.5 1978 Zilla Overlay 40mm @ 1000-2000 2016 1.91874 0.117Z1045 Chauddagram-Laksam Road Km 005.10-005.20 S 0.1 1978 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0.287Z1045 Chauddagram-Laksam Road Km 005.20-006.57 S 1.37 1978 Zilla Overlay 40mm @ 1000-2000 2016 4.413441 0Z1045 Chauddagram-Laksam Road Km 006.57-006.87 S 0.3 1978 Zilla Full Recon 75mm @ IRI>12 2016 4.95558 0.135Z1045 Chauddagram-Laksam Road Km 006.87-010.77 S 3.9 2247 Zilla Overlay 40mm @ Traff >=2000 2016 16.52663 0Z1045 Chauddagram-Laksam Road Km 010.77-010.97 S 0.2 2372 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 0.304Z1045 Chauddagram-Laksam Road Km 012.87-012.97 S 0.1 2372 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.196Z1045 Chauddagram-Laksam Road Km 013.57-013.67 S 0.1 2372 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.355Z1045 Chauddagram-Laksam Road Km 016.57-016.77 S 0.2 2372 Zilla Rehab 75mm @ IRI 9-12 2016 2.3944 1.198Z1045 Chauddagram-Laksam Road Km 018.47-018.77 S 0.3 2372 Zilla Overlay 40mm @ Traff >=2000 2016 1.22256 0Z1045 Chauddagram-Laksam Road Km 018.77-020.37 S 1.6 2372 Zilla Overlay 40mm @ Traff >=2000 2016 7.824384 0Z1045 Chauddagram-Laksam Road Km 020.37-020.47 S 0.1 2372 Zilla Rehab 75mm @ IRI 9-12 2016 1.7958 0.071Z1045 Chauddagram-Laksam Road Km 020.47-021.32 S 0.85 2372 Zilla Seal Coat 2016 1.27764 0.325Z1046 Harishchar-Kashinagar-Miabazar Road Km 014.40-014.50 S 0.1 3794 Zilla Full Recon 75mm @ IRI>12 2016 1.47798 0.862Z1046 Harishchar-Kashinagar-Miabazar Road Km 014.50-015.10 S 0.6 3794 Zilla Overlay 40mm @ Traff >=2000 2016 1.73196 0.223Z1046 Harishchar-Kashinagar-Miabazar Road Km 015.10-015.50 S 0.4 3794 Zilla Rehab 75mm @ IRI 9-12 2016 4.07048 0.76Z1046 Harishchar-Kashinagar-Miabazar Road Km 015.50-019.44 S 3.93 3794 Zilla Overlay 40mm @ Traff >=2000 2016 11.35877 0Z1047 Harishchar- Bijrabazar Road Km 000.80-000.90 S 0.1 3794 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 1.222Z1047 Harishchar- Bijrabazar Road Km 003.10-004.30 S 1.2 3794 Zilla Rehab 75mm @ IRI 9-12 2016 9.553656 1.287Z1047 Harishchar- Bijrabazar Road Km 005.10-005.30 S 0.2 3794 Zilla Rehab 75mm @ IRI 9-12 2016 1.61622 1.557Z1047 Harishchar- Bijrabazar Road Km 005.90-006.20 S 0.3 3794 Zilla Full Recon 75mm @ IRI>12 2016 3.52107 0.991Z1048 Laksham-Nagalkoat-Kodalia-chewara Bazar Km 000.00-001.30 S 1.3 1073 Zilla Seal Coat 2016 1.192464 0.3Z1048 Laksham-Nagalkoat-Kodalia-chewara Bazar Km 026.11-026.61 S 0.5 1073 Zilla Overlay 40mm @ 1000-2000 2016 1.48575 0.003Z1048 Laksham-Nagalkoat-Kodalia-chewara Bazar Km 026.61-029.21 S 2.6 1073 Zilla Overlay 40mm @ IRI>12 2016 15.71669 0Z1048 Laksham-Nagalkoat-Kodalia-chewara Bazar Km 029.31-029.41 S 0.1 1073 Zilla Overlay 40mm @ IRI>12 2016 0.7641 0Z1048 Laksham-Nagalkoat-Kodalia-chewara Bazar Km 029.41-029.61 S 0.2 1073 Zilla Overlay 40mm @ 1000-2000 2016 1.535841 0Z1048 Laksham-Nagalkoat-Kodalia-chewara Bazar Km 029.61-030.01 S 0.4 1073 Zilla Overlay 40mm @ IRI>12 2016 3.0564 0Z1048 Laksham-Nagalkoat-Kodalia-chewara Bazar Km 030.01-030.21 S 0.2 1073 Zilla Seal Coat 2016 0.4536 1.619Z1048 Laksham-Nagalkoat-Kodalia-chewara Bazar Km 030.21-030.51 S 0.3 1073 Zilla Overlay 40mm @ IRI>12 2016 2.2923 0Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 000.00-000.20 S 0.2 1560 Zilla Full Recon 75mm @ IRI>12 2016 3.451518 0.115

Page 41 of 163

Page 42: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 000.80-000.90 S 0.1 1560 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 001.00-001.40 S 0.4 1560 Zilla Full Recon 75mm @ IRI>12 2016 6.34662 0.125Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 002.00-002.10 S 0.1 1560 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 002.10-003.50 S 1.4 1560 Zilla Overlay 40mm @ 1000-2000 2016 4.341489 0.036Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 003.50-003.60 S 0.1 1560 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.262Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 003.60-004.40 S 0.8 1560 Zilla Overlay 40mm @ 1000-2000 2016 2.47908 0Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 004.70-005.00 S 0.3 1560 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0.047Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 005.00-005.50 S 0.5 1560 Zilla Overlay 40mm @ 1000-2000 2016 1.549425 0Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 005.50-005.60 S 0.1 1560 Zilla Seal Coat 2016 0.09198 0.401Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 005.60-005.70 S 0.1 1560 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 0.348Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 006.80-007.40 S 0.6 1560 Zilla Overlay 40mm @ IRI>12 2016 6.378112 0Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 008.59-008.89 S 0.3 1560 Zilla Full Recon 75mm @ IRI>12 2016 4.759965 0.124Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 008.89-009.09 S 0.2 1560 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0.068Z1051 Changani-Jungalia-Rajapara-Chaumohoni Road Km 009.09-009.29 S 0.2 1560 Zilla Full Recon 75mm @ IRI>12 2016 3.17331 0.178Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 000.00-000.30 S 0.3 10906 Zilla Overlay 40mm @ Traff >=2000 2016 1.403397 2.384Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 000.30-000.40 S 0.1 10906 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 3.162Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 000.40-003.50 S 3.1 10906 Zilla Overlay 40mm @ Traff >=2000 2016 14.48012 1.376Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 003.50-003.60 S 0.1 10906 Zilla Rehab 75mm @ IRI 9-12 2016 1.55636 4.416Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 006.89-007.39 S 0.5 10906 Zilla Full Recon 75mm @ IRI>12 2016 12.84539 2.084Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 007.39-008.19 S 0.8 10906 Zilla Overlay 50mm @ IRI 6-9 2016 4.6116 3.468Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 008.19-008.39 S 0.2 10906 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 3.472Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 011.59-014.69 S 3.1 4667 Zilla Overlay 50mm @ IRI 6-9 2016 11.20081 2.049Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 014.69-015.09 S 0.4 4667 Zilla Full Recon 75mm @ IRI>12 2016 5.442444 1.342Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 015.09-015.29 S 0.2 4667 Zilla Overlay 40mm @ Traff >=2000 2016 0.64524 0Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 015.29-015.39 S 0.1 4667 Zilla Rehab 75mm @ IRI 9-12 2016 1.13734 1.885Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 015.89-016.19 S 0.3 4667 Zilla Rehab 75mm @ IRI 9-12 2016 2.60391 2.079Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 016.29-016.39 S 0.1 4667 Zilla Full Recon 75mm @ IRI>12 2016 1.26063 2.151Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 016.39-016.79 S 0.4 4667 Zilla Overlay 50mm @ Cracking >25%2016 1.2852 0.568Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 016.79-016.89 S 0.1 4667 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 1.713Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 016.89-017.09 S 0.2 4667 Zilla Rehab 75mm @ IRI 9-12 2016 2.27468 1.498Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 017.09-017.19 S 0.1 4667 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 1.603Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 017.69-018.29 S 0.6 4667 Zilla Rehab 75mm @ IRI 9-12 2016 6.475655 1.291Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 018.39-019.29 S 0.9 4667 Zilla Rehab 75mm @ IRI 9-12 2016 8.727588 1.91Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 019.39-019.89 S 0.5 4667 Zilla Rehab 75mm @ IRI 9-12 2016 5.23775 1.774Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 020.09-020.19 S 0.1 4667 Zilla Full Recon 75mm @ IRI>12 2016 1.52145 1.748Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 020.32-020.62 S 0.3 4667 Zilla Full Recon 75mm @ IRI>12 2016 4.251366 1.47Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 020.72-021.62 S 0.9 4667 Zilla Rehab 75mm @ IRI 9-12 2016 7.811729 2.238Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 021.72-021.82 S 0.1 4667 Zilla Rehab 75mm @ IRI 9-12 2016 0.86797 2.705Z1052 Tomson Bridge-BARD-Kalirbazar-Barura Road Km 021.92-022.92 S 1 4667 Zilla Rehab 75mm @ IRI 9-12 2016 8.898099 1.973Z1062 Daudkandi-Goalmari-Matlab Utter Km 000.20-000.50 S 0.3 4224 Zilla Rehab 75mm @ IRI 9-12 2016 3.277335 1.418Z1062 Daudkandi-Goalmari-Matlab Utter Km 000.70-001.60 S 0.9 4224 Zilla Overlay 50mm @ IRI 6-9 2016 3.44925 1.097Z1062 Daudkandi-Goalmari-Matlab Utter Km 002.30-002.60 S 0.3 4224 Zilla Overlay 50mm @ IRI 6-9 2016 1.14975 1.917Z1062 Daudkandi-Goalmari-Matlab Utter Km 002.70-002.80 S 0.1 4224 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 2.037Z1062 Daudkandi-Goalmari-Matlab Utter Km 007.10-007.20 S 0.1 4224 Zilla Rehab 75mm @ IRI 9-12 2016 1.13734 1.942Z1062 Daudkandi-Goalmari-Matlab Utter Km 010.61-010.63 S 0.01 4224 Zilla Full Recon 75mm @ IRI>12 2016 0.214742 6.667Z1205 Companiganj-Muradnagar-Homna Road Km 000.10-000.90 S 0.8 6535 Zilla Rehab 75mm @ IRI 9-12 2016 13.1692 1.94

Page 42 of 163

Page 43: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1205 Companiganj-Muradnagar-Homna Road Km 000.90-001.70 S 0.8 6535 Zilla Overlay 50mm @ IRI 6-9 2016 4.62 2.407Z1205 Companiganj-Muradnagar-Homna Road Km 001.70-002.00 S 0.3 6535 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 1.843Z1205 Companiganj-Muradnagar-Homna Road Km 002.10-003.50 S 1.4 6535 Zilla Rehab 75mm @ IRI 9-12 2016 23.06256 1.806Z1205 Companiganj-Muradnagar-Homna Road Km 003.50-003.60 S 0.1 6535 Zilla Overlay 50mm @ Cracking >25%2016 0.5775 1.702Z1205 Companiganj-Muradnagar-Homna Road Km 003.60-003.80 S 0.2 6535 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 1.088Z1205 Companiganj-Muradnagar-Homna Road Km 007.89-021.57 S 13.68 4333 Zilla Overlay 40mm @ Traff >=2000 2016 47.38643 0.881Z1206 Companiganj-Nabinagar Road Km 000.20-000.40 S 0.2 6471 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 1.399Z1206 Companiganj-Nabinagar Road Km 000.40-000.50 S 0.1 6471 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 3.601Z1206 Companiganj-Nabinagar Road Km 000.50-000.60 S 0.1 6471 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.366Z1206 Companiganj-Nabinagar Road Km 002.10-002.20 S 0.1 6471 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.658Z1206 Companiganj-Nabinagar Road Km 002.20-002.30 S 0.1 6471 Zilla Overlay 50mm @ Cracking >25%2016 0.583275 0.982Z1206 Companiganj-Nabinagar Road Km 002.30-002.40 S 0.1 6471 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.329Z1206 Companiganj-Nabinagar Road Km 002.40-004.30 S 1.9 6471 Zilla Overlay 40mm @ Traff >=2000 2016 8.87205 0.986Z1206 Companiganj-Nabinagar Road Km 004.30-004.40 S 0.1 6471 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.751Z1219 Nimsar-Khangsanagar-Burichang Road Km 008.03-008.13 S 0.1 2821 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.455Z1219 Nimsar-Khangsanagar-Burichang Road Km 008.33-008.93 S 0.6 2821 Zilla Full Recon 75mm @ IRI>12 2016 10.06765 0.147Z1219 Nimsar-Khangsanagar-Burichang Road Km 009.43-009.63 S 0.2 2821 Zilla Full Recon 75mm @ IRI>12 2016 2.399544 0.84Z1219 Nimsar-Khangsanagar-Burichang Road Km 010.43-011.03 S 0.6 2821 Zilla Full Recon 75mm @ IRI>12 2016 6.39009 0.669Z1219 Nimsar-Khangsanagar-Burichang Road Km 011.13-012.73 S 1.6 2821 Zilla Full Recon 75mm @ IRI>12 2016 23.09126 0.33Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 000.00-000.20 S 0.2 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.61977 0Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 000.20-000.30 S 0.1 2549 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 0.892Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 000.30-000.40 S 0.1 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0.03Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 000.40-000.60 S 0.2 2549 Zilla Rehab 75mm @ IRI 9-12 2016 2.18489 0.786Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 000.60-000.90 S 0.3 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.929655 0Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 000.90-001.60 S 0.7 2549 Zilla Full Recon 75mm @ IRI>12 2016 11.10659 0.508Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 001.60-001.70 S 0.1 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0.03Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 001.70-001.80 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.902Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 001.80-002.50 S 0.7 2549 Zilla Overlay 40mm @ Traff >=2000 2016 2.172294 0.022Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 002.50-002.60 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.869Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 002.60-002.70 S 0.1 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 002.70-004.90 S 2.2 2549 Zilla Full Recon 75mm @ IRI>12 2016 34.90641 0.316Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 004.90-005.00 S 0.1 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 005.00-005.30 S 0.3 2549 Zilla Full Recon 75mm @ IRI>12 2016 4.759965 0.538Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 005.30-005.40 S 0.1 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 005.40-006.30 S 0.9 2549 Zilla Full Recon 75mm @ IRI>12 2016 14.27989 0.349Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 006.40-006.50 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.799Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 006.60-006.70 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.788Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 006.80-006.90 S 0.1 2549 Zilla Rehab 75mm @ IRI 9-12 2016 1.103369 1.429Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 007.70-008.00 S 0.3 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.929655 0.014Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 008.20-008.40 S 0.2 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.61977 0.084Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 008.40-008.60 S 0.2 2549 Zilla Rehab 75mm @ IRI 9-12 2016 2.18489 0.682Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 008.60-008.90 S 0.3 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.929655 0.021Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 008.90-009.00 S 0.1 2549 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 0.96Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 009.00-009.10 S 0.1 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0.011Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 009.10-009.50 S 0.4 2549 Zilla Full Recon 75mm @ IRI>12 2016 6.34662 0.551Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 009.50-009.60 S 0.1 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0

Page 43 of 163

Page 44: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 009.60-010.00 S 0.4 2549 Zilla Full Recon 75mm @ IRI>12 2016 6.34662 0.515Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 010.00-010.20 S 0.2 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.61977 0.003Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 010.20-010.70 S 0.5 2549 Zilla Full Recon 75mm @ IRI>12 2016 7.933275 0.37Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 010.70-010.90 S 0.2 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.61977 0Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 010.90-011.20 S 0.3 2549 Zilla Full Recon 75mm @ IRI>12 2016 4.759965 0.558Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 011.20-011.30 S 0.1 2549 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0.018Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 011.30-011.40 S 0.1 2549 Zilla Full Recon 75mm @ IRI>12 2016 1.602522 1.125Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 011.40-011.88 S 0.47 2549 Zilla Overlay 40mm @ Traff >=2000 2016 1.462657 0.018Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 011.88-011.93 S 0.06 2549 Zilla Full Recon 75mm @ IRI>12 2016 0.904393 1.616Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 013.40-014.58 S 1.18 2549 Zilla Overlay 40mm @ Traff >=2000 2016 3.794011 0Z1220 Rajachapitala-Ramchandrapur-Patchkitta Road Km 014.58-014.88 S 0.3 2549 Zilla Rehab 75mm @ IRI 9-12 2016 3.41202 0.757Z1221 Nabipur-Sreekail Road Km 000.00-000.10 S 0.1 892 Zilla Seal Coat 2016 0.09324 0.309Z1221 Nabipur-Sreekail Road Km 000.10-000.30 S 0.2 892 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1221 Nabipur-Sreekail Road Km 000.40-000.70 S 0.3 892 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z1221 Nabipur-Sreekail Road Km 000.90-001.10 S 0.2 892 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z1221 Nabipur-Sreekail Road Km 001.30-001.80 S 0.5 892 Zilla Overlay 40mm @ IRI>12 2016 2.288055 0Z1221 Nabipur-Sreekail Road Km 002.50-002.80 S 0.3 892 Zilla Overlay 40mm @ IRI>12 2016 1.40085 0Z1221 Nabipur-Sreekail Road Km 006.48-006.78 S 0.3 892 Zilla Overlay 40mm @ IRI>12 2016 1.24803 0Z1221 Nabipur-Sreekail Road Km 008.68-008.98 S 0.3 892 Zilla Overlay 40mm @ IRI>12 2016 1.255671 0Z1221 Nabipur-Sreekail Road Km 008.98-009.48 S 0.5 892 Zilla Seal Coat 2016 0.693 0.254Z1221 Nabipur-Sreekail Road Km 009.48-011.18 S 1.7 892 Zilla Overlay 40mm @ IRI>12 2016 7.783963 0Z1221 Nabipur-Sreekail Road Km 011.18-012.04 S 0.87 892 Zilla Seal Coat 2016 1.200276 1.482Z1221 Nabipur-Sreekail Road Km 012.04-012.24 S 0.2 892 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z1221 Nabipur-Sreekail Road Km 012.24-012.34 S 0.1 892 Zilla Overlay 40mm @ Traff 100-1000 2016 0.46695 0.224Z1221 Nabipur-Sreekail Road Km 012.34-012.54 S 0.2 892 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z1221 Nabipur-Sreekail Road Km 012.54-012.84 S 0.3 892 Zilla Seal Coat 2016 0.4158 1.387Z1221 Nabipur-Sreekail Road Km 012.84-012.94 S 0.1 892 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1221 Nabipur-Sreekail Road Km 012.94-013.04 S 0.1 892 Zilla Overlay 40mm @ Traff 100-1000 2016 0.46695 0.21Z1221 Nabipur-Sreekail Road Km 013.04-013.14 S 0.1 892 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1221 Nabipur-Sreekail Road Km 013.14-013.34 S 0.2 892 Zilla Overlay 40mm @ Traff 100-1000 2016 0.9339 0Z1221 Nabipur-Sreekail Road Km 013.74-013.74 S 0 892 Zilla Overlay 40mm @ IRI>12 2016 0.014008 0Z1221 Nabipur-Sreekail Road Km 013.74-013.94 S 0.2 892 Zilla Overlay 40mm @ Traff 100-1000 2016 0.9339 0.2Z1221 Nabipur-Sreekail Road Km 013.94-014.14 S 0.2 892 Zilla Overlay 40mm @ Traff 100-1000 2016 0.9339 0Z1221 Nabipur-Sreekail Road Km 014.14-017.54 S 3.4 892 Zilla Seal Coat 2016 4.550946 1.237Z1221 Nabipur-Sreekail Road Km 017.54-017.64 S 0.1 892 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1411 Khajuria-Pailgachha-Barura Road Km 005.10-005.20 S 0.1 1407 Zilla Overlay 40mm @ 1000-2000 2016 0.29715 0Z1411 Khajuria-Pailgachha-Barura Road Km 005.20-005.30 S 0.1 1407 Zilla Overlay 40mm @ 1000-2000 2016 0.29715 0Z1411 Khajuria-Pailgachha-Barura Road Km 005.30-005.40 S 0.1 1407 Zilla Overlay 40mm @ 1000-2000 2016 0.29715 0Z1411 Khajuria-Pailgachha-Barura Road Km 005.40-006.50 S 1.1 1407 Zilla Overlay 40mm @ IRI>12 2016 3.390057 0Z1411 Khajuria-Pailgachha-Barura Road Km 006.90-009.90 S 3 1407 Zilla Overlay 40mm @ 1000-2000 2016 9.29655 0Z1411 Khajuria-Pailgachha-Barura Road Km 016.00-016.30 S 0.3 1407 Zilla Overlay 40mm @ 1000-2000 2016 1.34991 0Z1411 Khajuria-Pailgachha-Barura Road Km 016.30-016.50 S 0.2 1407 Zilla Overlay 40mm @ 1000-2000 2016 0.9339 0Z1411 Khajuria-Pailgachha-Barura Road Km 016.50-018.10 S 1.6 1407 Zilla Overlay 40mm @ 1000-2000 2016 5.759616 0Z1411 Khajuria-Pailgachha-Barura Road Km 018.10-018.20 S 0.1 1407 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1411 Khajuria-Pailgachha-Barura Road Km 018.20-018.40 S 0.2 1407 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1414 Laksham-Muddaffarganj Road Km 000.00-000.10 S 0.1 3403 Zilla Full Recon 75mm @ IRI>12 2016 2.52126 0.556

Page 44 of 163

Page 45: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 000.00-000.10 S 0.1 682 Zilla Overlay 40mm @ Traff 100-1000 2016 0.309885 0Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 000.10-000.40 S 0.3 682 Zilla Overlay 40mm @ IRI>12 2016 0.929655 0Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 000.40-000.50 S 0.1 682 Zilla Seal Coat 2016 0.09198 1.28Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 000.50-001.00 S 0.5 682 Zilla Overlay 40mm @ IRI>12 2016 1.549425 0Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 001.00-001.10 S 0.1 682 Zilla Overlay 40mm @ Traff 100-1000 2016 0.309885 0.284Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 001.10-001.90 S 0.8 682 Zilla Overlay 40mm @ IRI>12 2016 2.47908 0Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 001.90-002.00 S 0.1 682 Zilla Overlay 40mm @ Traff 100-1000 2016 0.309885 0.283Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 002.00-002.30 S 0.3 682 Zilla Overlay 40mm @ Traff 100-1000 2016 0.929655 0Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 002.30-002.60 S 0.3 682 Zilla Seal Coat 2016 0.27594 1.495Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 002.60-002.90 S 0.3 682 Zilla Overlay 40mm @ IRI>12 2016 0.929655 0Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 002.90-004.20 S 1.3 682 Zilla Seal Coat 2016 1.19574 1.489Z1415 Laksam-Baiarabazar-Omarganj-Nangalkot Road Km 009.44-009.98 S 0.54 682 Zilla Overlay 40mm @ Traff 100-1000 2016 2.52153 0Sub-Total Comilla Division 3305.496

Feni DivisionN104 Feni-Noakhali Road Km 000.00-000.20 L 0.2 9320 National Overlay 60mm @ IRI 7-9 2016 1.90152 7.156N104 Feni-Noakhali Road Km 000.00-000.20 R 0.2 9320 National Overlay 60mm @ IRI 7-9 2016 1.95156 6.947N104 Feni-Noakhali Road Km 000.20-000.40 L 0.2 9320 National DBST @ Traff >6000 2016 0.75088 6.851N104 Feni-Noakhali Road Km 000.20-000.40 R 0.2 9320 National DBST @ Traff >6000 2016 0.77064 6.647N104 Feni-Noakhali Road Km 000.40-000.90 L 0.5 9320 National Overlay 50mm @ IRI 5-7 2016 3.99 6.715N104 Feni-Noakhali Road Km 000.40-000.90 R 0.5 9320 National Overlay 50mm @ IRI 5-7 2016 4.095 6.519N104 Feni-Noakhali Road Km 000.90-001.30 L 0.4 9320 National Rehab 180mm @ IRI 9-12 2016 17.51648 2.977N104 Feni-Noakhali Road Km 000.90-001.30 R 0.4 9320 National Rehab 180mm @ IRI 9-12 2016 17.97744 2.872N104 Feni-Noakhali Road Km 001.30-001.80 L 0.5 9320 National DBST @ 25% Crk 2016 1.8772 5.263N112 Feni-Noakhali Highway Link Road Km 000.00-002.42 S 2.42 7296 National Overlay 50mm @ IRI 5-7 2016 13.49271 3.162N112 Feni-Noakhali Highway Link Road Km 002.42-002.52 S 0.1 3806 National Full Recon 135mm 2016 2.02168 2.36N112 Feni-Noakhali Highway Link Road Km 002.62-002.72 S 0.1 3806 National Full Recon 135mm 2016 2.02168 2.063Z1030 Feni-Rajapur-Daganbhuiyan Road Km 004.50-004.90 S 0.4 1939 Zilla Overlay 40mm @ 1000-2000 2016 1.23954 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 004.90-005.90 S 1 1939 Zilla Overlay 40mm @ 1000-2000 2016 3.09036 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 007.50-008.00 S 0.5 1939 Zilla Overlay 40mm @ 1000-2000 2016 1.549425 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 008.00-008.20 S 0.2 1939 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 008.20-008.40 S 0.2 1939 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 008.40-009.50 S 1.1 1939 Zilla Overlay 40mm @ 1000-2000 2016 3.408735 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 009.50-009.90 S 0.4 1939 Zilla Overlay 40mm @ IRI>12 2016 1.433112 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 009.90-010.10 S 0.2 1939 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 010.90-011.00 S 0.1 1939 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 011.00-011.90 S 0.9 1939 Zilla Overlay 40mm @ 1000-2000 2016 2.82717 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 011.90-012.30 S 0.4 1939 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0.019Z1030 Feni-Rajapur-Daganbhuiyan Road Km 012.30-012.60 S 0.3 1939 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 012.60-012.70 S 0.1 1939 Zilla Seal Coat 2016 0.09324 0.182Z1030 Feni-Rajapur-Daganbhuiyan Road Km 012.70-012.90 S 0.2 1939 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.045Z1030 Feni-Rajapur-Daganbhuiyan Road Km 012.90-013.80 S 0.9 1939 Zilla Overlay 40mm @ 1000-2000 2016 2.82717 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 013.80-013.90 S 0.1 1939 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.427Z1030 Feni-Rajapur-Daganbhuiyan Road Km 015.10-015.30 S 0.2 1939 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.021Z1030 Feni-Rajapur-Daganbhuiyan Road Km 015.30-015.50 S 0.2 1939 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0.004Z1030 Feni-Rajapur-Daganbhuiyan Road Km 015.50-015.70 S 0.2 1939 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.108

Page 45 of 163

Page 46: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1030 Feni-Rajapur-Daganbhuiyan Road Km 015.70-015.80 S 0.1 1939 Zilla Seal Coat 2016 0.09324 0.325Z1030 Feni-Rajapur-Daganbhuiyan Road Km 015.80-016.00 S 0.2 1939 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 016.00-016.40 S 0.4 1939 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 016.40-016.50 S 0.1 1939 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.069Z1030 Feni-Rajapur-Daganbhuiyan Road Km 016.50-016.70 S 0.2 1939 Zilla Seal Coat 2016 0.18648 0.082Z1030 Feni-Rajapur-Daganbhuiyan Road Km 016.70-016.80 S 0.1 1939 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.086Z1030 Feni-Rajapur-Daganbhuiyan Road Km 016.80-017.80 S 1 1939 Zilla Overlay 40mm @ 1000-2000 2016 3.1413 0Z1030 Feni-Rajapur-Daganbhuiyan Road Km 017.80-018.70 S 0.9 1939 Zilla Overlay 40mm @ 1000-2000 2016 2.830311 0Z1031 Feni -Chagalnaiya-Karerhat Road Km 006.69-006.89 L 0.2 10568 Zilla Overlay 40mm @ Traff >=2000 2016 1.3584 0Z1031 Feni -Chagalnaiya-Karerhat Road Km 006.69-006.89 R 0.2 10568 Zilla Overlay 40mm @ Traff >=2000 2016 1.3584 0Z1031 Feni -Chagalnaiya-Karerhat Road Km 006.89-007.19 L 0.3 10568 Zilla Full Recon 75mm @ IRI>12 2016 10.13286 0.975Z1031 Feni -Chagalnaiya-Karerhat Road Km 006.89-007.19 R 0.3 10568 Zilla Full Recon 75mm @ IRI>12 2016 10.13286 0.975Z1031 Feni -Chagalnaiya-Karerhat Road Km 007.19-007.28 L 0.08 10568 Zilla Overlay 50mm @ Cracking >25%2016 0.64386 0.08Z1031 Feni -Chagalnaiya-Karerhat Road Km 007.19-007.28 R 0.08 10568 Zilla Overlay 50mm @ Cracking >25%2016 0.64386 0.08Z1031 Feni -Chagalnaiya-Karerhat Road Km 007.79-007.89 L 0.1 10568 Zilla Rehab 75mm @ IRI 9-12 2016 2.33454 1.188Z1031 Feni -Chagalnaiya-Karerhat Road Km 007.79-007.89 R 0.1 10568 Zilla Rehab 75mm @ IRI 9-12 2016 2.33454 1.188Z1031 Feni -Chagalnaiya-Karerhat Road Km 007.89-008.79 L 0.9 10568 Zilla Overlay 40mm @ Traff >=2000 2016 5.562648 0Z1031 Feni -Chagalnaiya-Karerhat Road Km 007.89-008.79 R 0.9 10568 Zilla Overlay 40mm @ Traff >=2000 2016 5.562648 0Z1031 Feni -Chagalnaiya-Karerhat Road Km 008.79-008.99 L 0.2 10568 Zilla Full Recon 75mm @ IRI>12 2016 6.25968 1.729Z1031 Feni -Chagalnaiya-Karerhat Road Km 008.79-008.99 R 0.2 10568 Zilla Full Recon 75mm @ IRI>12 2016 6.25968 1.729Z1031 Feni -Chagalnaiya-Karerhat Road Km 008.99-009.29 L 0.3 10568 Zilla Overlay 40mm @ Traff >=2000 2016 1.83384 0Z1031 Feni -Chagalnaiya-Karerhat Road Km 008.99-009.29 R 0.3 10568 Zilla Overlay 40mm @ Traff >=2000 2016 1.83384 0Z1031 Feni -Chagalnaiya-Karerhat Road Km 009.29-009.39 L 0.1 10568 Zilla Full Recon 75mm @ IRI>12 2016 3.12984 1.506Z1031 Feni -Chagalnaiya-Karerhat Road Km 009.29-009.39 R 0.1 10568 Zilla Full Recon 75mm @ IRI>12 2016 3.12984 1.506Z1031 Feni -Chagalnaiya-Karerhat Road Km 009.39-009.48 L 0.09 10568 Zilla Overlay 40mm @ Traff >=2000 2016 0.556265 0.001Z1031 Feni -Chagalnaiya-Karerhat Road Km 009.39-009.48 R 0.09 10568 Zilla Overlay 40mm @ Traff >=2000 2016 0.556265 0.001Z1031 Feni -Chagalnaiya-Karerhat Road Km 010.99-020.89 S 9.9 10568 Zilla Overlay 50mm @ Cracking >25%2016 60.84146 3.328Z1031 Feni -Chagalnaiya-Karerhat Road Km 020.89-021.59 S 0.69 10568 Zilla Rehab 75mm @ IRI 9-12 2016 11.49492 3.904Z1031 Feni -Chagalnaiya-Karerhat Road Km 021.59-023.39 S 1.8 10568 Zilla Overlay 50mm @ Cracking >25%2016 10.584 2.259Z1031 Feni -Chagalnaiya-Karerhat Road Km 023.61-026.99 S 3.37 10568 Zilla Overlay 50mm @ Cracking >25%2016 19.82736 2.731Z1031 Feni -Chagalnaiya-Karerhat Road Km 027.05-029.09 S 2.03 10568 Zilla Overlay 50mm @ Cracking >25%2016 11.95404 2.83Z1031 Feni -Chagalnaiya-Karerhat Road Km 029.20-029.59 S 0.39 10568 Zilla Overlay 50mm @ Cracking >25%2016 2.28732 2.758Z1031 Feni -Chagalnaiya-Karerhat Road Km 029.59-029.79 S 0.2 10568 Zilla Rehab 75mm @ IRI 9-12 2016 3.35216 3.586Z1031 Feni -Chagalnaiya-Karerhat Road Km 029.79-030.99 S 1.2 10568 Zilla Overlay 50mm @ IRI 6-9 2016 7.7364 1.466Z1031 Feni -Chagalnaiya-Karerhat Road Km 030.99-031.09 S 0.1 10568 Zilla Rehab 75mm @ IRI 9-12 2016 2.03524 1.341Z1031 Feni -Chagalnaiya-Karerhat Road Km 031.09-032.29 S 1.2 10568 Zilla Overlay 50mm @ Cracking >25%2016 8.007667 0.777Z1031 Feni -Chagalnaiya-Karerhat Road Km 032.29-032.39 S 0.1 10568 Zilla Rehab 75mm @ IRI 9-12 2016 1.73594 4.264Z1031 Feni -Chagalnaiya-Karerhat Road Km 032.39-033.09 S 0.7 10568 Zilla Overlay 50mm @ IRI 6-9 2016 4.2189 5.748Z1031 Feni -Chagalnaiya-Karerhat Road Km 033.09-035.29 S 2.2 10568 Zilla Overlay 50mm @ IRI 6-9 2016 12.243 3.734Z1031 Feni -Chagalnaiya-Karerhat Road Km 035.29-035.39 S 0.1 10568 Zilla Overlay 50mm @ Cracking >25%2016 0.5565 1.296Z1031 Feni -Chagalnaiya-Karerhat Road Km 035.39-035.59 S 0.2 10568 Zilla Rehab 75mm @ IRI 9-12 2016 3.17258 3.748Z1031 Feni -Chagalnaiya-Karerhat Road Km 035.59-035.94 S 0.35 10568 Zilla Overlay 50mm @ Cracking >25%2016 1.93662 1.899Z1033 Feni-Parsuram-Belonia Road Km 004.30-004.40 S 0.1 5199 Zilla Rehab 75mm @ IRI 9-12 2016 1.55636 1.907Z1033 Feni-Parsuram-Belonia Road Km 004.40-021.50 S 17.1 5199 Zilla Overlay 50mm @ Cracking >25%2016 100.3802 0.029Z1033 Feni-Parsuram-Belonia Road Km 021.50-021.80 S 0.3 5199 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 1.481Z1033 Feni-Parsuram-Belonia Road Km 021.80-021.90 S 0.1 5199 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.021

Page 46 of 163

Page 47: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1033 Feni-Parsuram-Belonia Road Km 021.90-022.00 S 0.1 5199 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 1.592Z1033 Feni-Parsuram-Belonia Road Km 022.00-024.20 S 2.2 5199 Zilla Overlay 40mm @ Traff >=2000 2016 9.413712 1.43Z1033 Feni-Parsuram-Belonia Road Km 024.20-024.40 S 0.2 4175 Zilla Overlay 50mm @ IRI 6-9 2016 0.798 1.368Z1033 Feni-Parsuram-Belonia Road Km 024.40-024.50 S 0.1 4175 Zilla Overlay 50mm @ IRI 6-9 2016 0.399 0.491Z1033 Feni-Parsuram-Belonia Road Km 024.50-024.70 S 0.2 4175 Zilla Overlay 50mm @ IRI 6-9 2016 0.798 1.383Z1033 Feni-Parsuram-Belonia Road Km 024.70-025.65 S 0.94 4175 Zilla Overlay 40mm @ Traff >=2000 2016 3.626418 0.387Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 000.00-000.40 L 0.4 2489 Zilla Overlay 40mm @ Traff >=2000 2016 3.032628 0Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 000.00-000.40 R 0.4 2489 Zilla Overlay 40mm @ Traff >=2000 2016 3.032628 0Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 000.40-000.99 L 0.59 2489 Zilla Overlay 40mm @ Traff >=2000 2016 3.756825 0Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 000.40-000.99 R 0.59 2489 Zilla Overlay 40mm @ Traff >=2000 2016 3.756825 0Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 000.99-002.65 S 1.66 2489 Zilla Overlay 40mm @ Traff >=2000 2016 10.20181 0Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 002.65-006.80 S 4.15 4107 Zilla Overlay 50mm @ Cracking >25%2016 25.61593 0.068Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 006.80-009.80 S 3 4107 Zilla Overlay 50mm @ IRI 6-9 2016 17.9235 0.277Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 009.80-016.30 S 6.5 4107 Zilla Overlay 50mm @ Cracking >25%2016 38.84022 0.016Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 016.30-016.40 S 0.1 4107 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 0.997Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 016.40-016.50 S 0.1 4107 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.753Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 016.88-019.10 S 2.22 4107 Zilla Overlay 40mm @ Traff >=2000 2016 11.17675 0.018Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 019.10-019.30 S 0.2 4107 Zilla Overlay 40mm @ Traff >=2000 2016 1.4433 0.352Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 019.30-020.10 S 0.8 4107 Zilla Overlay 50mm @ Cracking >25%2016 4.7376 0.084Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 020.10-020.20 S 0.1 4107 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.727Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 020.20-020.80 S 0.6 4107 Zilla Overlay 50mm @ IRI 6-9 2016 2.9106 2.026Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 020.80-021.00 S 0.2 4041 Zilla Rehab 75mm @ IRI 9-12 2016 2.3944 1.237Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 021.00-024.30 S 3.3 4041 Zilla Overlay 50mm @ IRI 6-9 2016 13.89886 1.062Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 024.30-024.60 S 0.3 4041 Zilla Rehab 75mm @ IRI 9-12 2016 3.5916 0.932Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 024.60-026.21 S 1.6 4041 Zilla Overlay 50mm @ Cracking >25%2016 6.909115 0.532Z1034 Feni-Sonagazi-Muhuriganj Project Road Km 026.21-029.31 S 3.1 4041 Zilla Full Recon 75mm @ IRI>12 2016 53.9028 0.469Z1035 Chhagalnaiya-Parsuram Road Km 005.90-006.00 S 0.1 3635 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.585Z1035 Chhagalnaiya-Parsuram Road Km 007.40-007.50 S 0.1 3635 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.471Z1035 Chhagalnaiya-Parsuram Road Km 021.20-021.30 S 0.1 3635 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.451Z1038 Parshuram-Gathuma Road Km 001.00-001.10 S 0.1 4175 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.396Z1081 Fulgazi -Fazilpur Road Km 003.77-003.87 S 0.1 1016 Zilla Overlay 40mm @ 1000-2000 2016 0.46695 0Z1081 Fulgazi -Fazilpur Road Km 010.37-010.47 S 0.1 994 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.447Z1081 Fulgazi -Fazilpur Road Km 018.31-018.37 S 0.06 994 Zilla Overlay 40mm @ Traff 100-1000 2016 0.197902 0.284Z1081 Fulgazi -Fazilpur Road Km 018.37-018.47 S 0.1 994 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.099Z1081 Fulgazi -Fazilpur Road Km 019.68-020.08 S 0.4 994 Zilla Overlay 40mm @ Traff 100-1000 2016 1.25652 0Z1081 Fulgazi -Fazilpur Road Km 020.08-020.23 S 0.15 994 Zilla Overlay 40mm @ Traff 100-1000 2016 0.474336 0.013Z1083 Feni Old Airport Road Km 000.00-002.30 S 2.3 4062 Zilla Overlay 40mm @ Traff >=2000 2016 11.07181 0Z1083 Feni Old Airport Road Km 002.30-002.50 S 0.2 4062 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 1.363Z1083 Feni Old Airport Road Km 002.50-002.70 S 0.2 4062 Zilla Overlay 50mm @ Cracking >25%2016 1.155 0.575Z1083 Feni Old Airport Road Km 002.70-002.75 S 0.05 4062 Zilla Full Recon 75mm @ IRI>12 2016 1.171516 1.629Z1134 Feni-Alokdia-Laskerhat-Chagalnaiya Km 000.30-000.40 S 0.1 1198 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.03Z1425 Boktarmunshi-Kazirhat-Daganbhuiyan Road Km 000.00-000.80 S 0.8 1844 Zilla Overlay 40mm @ 1000-2000 2016 3.66768 0Z1425 Boktarmunshi-Kazirhat-Daganbhuiyan Road Km 000.90-001.70 S 0.8 1844 Zilla Seal Coat 2016 1.1088 0.243Z1425 Boktarmunshi-Kazirhat-Daganbhuiyan Road Km 001.70-001.80 S 0.1 1844 Zilla Overlay 40mm @ 1000-2000 2016 0.46695 0Z1425 Boktarmunshi-Kazirhat-Daganbhuiyan Road Km 001.80-002.50 S 0.7 1844 Zilla Overlay 40mm @ 1000-2000 2016 3.26865 0.157Z1425 Boktarmunshi-Kazirhat-Daganbhuiyan Road Km 003.20-003.50 S 0.3 1844 Zilla Overlay 40mm @ 1000-2000 2016 1.40085 0

Page 47 of 163

Page 48: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1425 Boktarmunshi-Kazirhat-Daganbhuiyan Road Km 003.50-004.70 S 1.2 1844 Zilla Seal Coat 2016 1.664586 0.231Z1425 Boktarmunshi-Kazirhat-Daganbhuiyan Road Km 004.70-010.28 S 5.58 1844 Zilla Overlay 40mm @ 1000-2000 2016 17.72113 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 000.20-000.30 S 0.1 1167 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 000.40-000.60 S 0.2 1167 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 000.60-002.00 S 1.4 1167 Zilla Overlay 40mm @ 1000-2000 2016 4.39782 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 002.00-002.20 S 0.2 1167 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 002.20-003.20 S 1 1167 Zilla Overlay 40mm @ 1000-2000 2016 3.1413 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 003.20-003.40 S 0.2 1167 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1434 Sonagazi-Companiganj Road Km 000.00-005.34 S 5.34 1682 Zilla Overlay 40mm @ 1000-2000 2016 17.71665 0Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 023.70-024.51 S 0.81 3630 Zilla Overlay 40mm @ Cracks >25% 2016 4.533539 0.146Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 024.51-024.61 S 0.1 3630 Zilla Overlay 40mm @ Traff >=2000 2016 0.57732 0.271Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 024.61-030.26 S 5.65 3630 Zilla Overlay 40mm @ Cracks >25% 2016 27.69515 0.162Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 000.00-000.30 S 0.3 1213 Zilla Overlay 40mm @ 1000-2000 2016 1.013706 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 000.30-000.50 S 0.2 1213 Zilla Seal Coat 2016 0.18648 0.953Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 000.50-000.70 S 0.2 1213 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 000.70-000.80 S 0.1 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 000.80-001.20 S 0.4 1213 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 001.20-001.30 S 0.1 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.276Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 001.30-001.50 S 0.2 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 001.50-001.60 S 0.1 1213 Zilla Seal Coat 2016 0.09324 0.949Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 001.60-001.70 S 0.1 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 001.70-001.90 S 0.2 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 001.90-002.00 S 0.1 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 006.00-006.10 S 0.1 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 006.10-006.20 S 0.1 1213 Zilla Seal Coat 2016 0.09324 0.897Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 006.20-006.40 S 0.2 1213 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 006.40-006.50 S 0.1 1213 Zilla Seal Coat 2016 0.09324 0.495Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 006.50-006.80 S 0.3 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 006.80-007.00 S 0.2 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0.165Z1443 Feni -Amubhuyerhat-Pratappur-Senbag Road Km 007.00-007.10 S 0.1 1213 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1444 Feni-Biroli Bazar-Sonaimuri Road Km 007.52-007.82 S 0.3 3052 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z1444 Feni-Biroli Bazar-Sonaimuri Road Km 011.02-011.42 S 0.4 3052 Zilla Overlay 40mm @ Traff >=2000 2016 1.25652 0.398Z1444 Feni-Biroli Bazar-Sonaimuri Road Km 011.42-012.82 S 1.4 3052 Zilla Full Recon 75mm @ IRI>12 2016 30.06385 0.387Sub-Total Feni Division 831.7022

Laxmipur DivisionN809 Barisal-Bhola-Illisha-Lakshmipur Road Km 062.89-063.19 S 0.3 1082 National Rehab 110mm @ IRI 9-12 2016 6.10005 0.121N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 063.19-063.89 S 0.7 1082 National Overlay 50mm @ IRI 5-9 2016 4.5423 0.646N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 063.89-064.09 S 0.2 1082 National DBST @ Traff 100-2000 2016 0.5434 1.005N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 064.09-064.19 S 0.1 1082 National DBST @ 25% Crk 2016 0.2717 0.523N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 064.19-064.39 S 0.2 1082 National Overlay 50mm @ IRI 5-9 2016 1.155 0.959N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 064.39-066.59 S 2.2 1082 National DBST @ Traff 100-2000 2016 5.980117 0.506N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 066.59-066.69 S 0.1 1082 National Full Recon 110mm 2016 2.7137 0.255N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 066.69-067.29 S 0.6 1082 National DBST @ 25% Crk 2016 1.6302 0.522N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 067.29-067.39 S 0.1 1082 National Full Recon 110mm 2016 2.7137 0.39N809 Barisal-Bhola-Illisha-Lakshmipur Road Km 067.39-067.82 S 0.43 1082 National DBST @ 25% Crk 2016 1.547682 0.289

Page 48 of 163

Page 49: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 089.40-091.14 S 1.74 4453 Regional Overlay 50mm @ IRI 5-7 2016 9.85446 4.277R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 091.14-091.44 S 0.3 4453 Regional Full Recon 150mm 2016 9.83016 1.448R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 091.44-093.86 S 2.42 4453 Regional Overlay 60mm @ IRI 7-9 2016 16.36158 4.716R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 094.33-094.84 S 0.51 4453 Regional Overlay 50mm @ IRI 5-7 2016 3.02232 3.923R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 094.84-095.04 S 0.2 4453 Regional Full Recon 150mm 2016 6.79616 1.881R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 095.04-095.34 S 0.3 4453 Regional Overlay 50mm @ IRI 5-7 2016 1.764 4.142R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 095.34-095.44 S 0.1 4453 Regional Full Recon 150mm 2016 3.39808 2.087R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 095.44-095.84 S 0.4 4453 Regional Overlay 50mm @ IRI 5-7 2016 2.352 3.409R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 095.84-095.94 S 0.1 4453 Regional Full Recon 150mm 2016 3.39808 2.099R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 095.94-096.34 S 0.4 4453 Regional Overlay 60mm @ IRI 7-9 2016 2.80224 3.774R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 096.34-096.64 S 0.3 4453 Regional DBST @ Traff 4000-6000 2016 0.832686 4.255R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 096.64-097.34 S 0.7 4453 Regional Overlay 60mm @ IRI 7-9 2016 4.90392 3.659R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 097.34-097.54 S 0.2 4453 Regional DBST @ Traff 4000-6000 2016 0.55328 4.258R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 097.54-098.34 S 0.8 4453 Regional Overlay 50mm @ IRI 5-7 2016 4.704 3.231R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 098.34-098.64 S 0.3 4453 Regional DBST @ Traff 4000-6000 2016 0.82992 4.083R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 098.64-099.34 S 0.7 4453 Regional Overlay 60mm @ IRI 7-9 2016 4.90392 3.505R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 099.34-099.54 S 0.2 4453 Regional Full Recon 150mm 2016 6.79616 1.456R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 099.54-100.34 S 0.8 4453 Regional Overlay 60mm @ IRI 7-9 2016 5.60448 3.68R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 100.34-100.54 S 0.2 4453 Regional Full Recon 150mm 2016 6.79616 1.346R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 100.54-101.34 S 0.8 4453 Regional Overlay 50mm @ IRI 5-7 2016 4.70988 3.238R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 101.34-101.44 S 0.1 4453 Regional Full Recon 150mm 2016 3.39808 2.216R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 101.44-102.34 S 0.9 4453 Regional Overlay 60mm @ IRI 7-9 2016 6.30504 4.387R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 102.34-102.64 S 0.3 4453 Regional Full Recon 150mm 2016 10.19424 1.76R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 102.64-102.84 S 0.2 4453 Regional DBST @ Traff 4000-6000 2016 0.55328 3.847R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 102.84-103.64 S 0.8 4453 Regional Rehab 150mm @ IRI 9-12 2016 21.6384 1.189R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 103.71-106.74 S 3.04 4453 Regional Overlay 60mm @ IRI 7-9 2016 21.27601 4.124R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 106.84-107.84 S 1.01 4453 Regional Overlay 50mm @ IRI 5-7 2016 6.259512 2.996R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 107.84-107.90 S 0.05 4453 Regional Full Recon 150mm 2016 2.026105 1.789R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 107.90-107.94 S 0.05 6785 Regional Full Recon 150mm @ IRI 12 2016 1.796735 2.75R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 108.24-108.34 S 0.1 6785 Regional Full Recon 150mm @ IRI 12 2016 3.82284 1.989R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 108.34-108.54 S 0.2 6785 Regional Overlay 60mm @ IRI 5.5-9 2016 1.57626 4.569R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 108.54-108.64 S 0.1 6785 Regional Full Recon 150mm @ IRI 12 2016 3.82284 2.398R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 109.74-110.01 S 0.27 6785 Regional DBST @ 25% Crk 2016 0.833082 2.307R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 110.01-110.71 S 0.7 6785 Regional Full Recon 150mm @ IRI 12 2016 26.33512 1.43R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 110.71-112.01 S 1.3 7820 Regional Overlay 60mm @ IRI 5.5-9 2016 10.89621 4.49R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 112.01-112.11 S 0.1 8802 Regional Full Recon 150mm @ IRI 12 2016 4.42964 2.76R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 112.11-113.71 S 1.6 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 14.44056 5.779R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 113.81-114.01 S 0.21 8802 Regional DBST @ Traff >6000 2016 0.616512 8.592R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 114.01-114.11 S 0.1 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 0.7506 7.562R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 114.11-114.41 S 0.3 8802 Regional Rehab 150mm @ IRI 9-12 2016 8.694 3.355R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 114.41-115.31 S 0.9 8802 Regional DBST @ Traff >6000 2016 2.6676 6.595R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 115.31-115.51 S 0.2 8802 Regional Rehab 150mm @ IRI 9-12 2016 5.796 3.951R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 115.51-115.71 S 0.2 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 1.5012 9.349R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 115.71-116.01 S 0.3 8802 Regional Full Recon 150mm @ IRI 12 2016 10.9224 3.357R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 116.01-116.71 S 0.7 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 5.2542 6.833R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 116.71-116.81 S 0.1 8802 Regional Rehab 150mm @ IRI 9-12 2016 2.92698 4.179

Page 49 of 163

Page 50: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 116.81-117.81 S 1 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 7.506 6.507R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 117.91-118.31 S 0.4 8802 Regional Rehab 150mm @ IRI 9-12 2016 11.70792 4.02R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 118.31-118.51 S 0.2 8802 Regional DBST @ Traff >6000 2016 0.5928 6.369R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 118.51-118.61 S 0.1 8802 Regional Full Recon 180mm 2016 4.1994 3.393R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 118.61-118.91 S 0.3 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 2.2518 7.374R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 118.91-119.41 S 0.5 8802 Regional Rehab 150mm @ IRI 9-12 2016 14.49 3.485R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 119.41-119.71 S 0.3 8802 Regional DBST @ Traff >6000 2016 0.8892 6.656R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 119.71-119.81 S 0.1 8802 Regional Rehab 150mm @ IRI 9-12 2016 2.898 4.338R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 119.92-120.11 S 0.19 8802 Regional DBST @ 25% Crk 2016 0.572052 6.239R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 120.11-120.21 S 0.1 8802 Regional DBST @ Traff >6000 2016 0.2964 9.26R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 120.51-120.61 S 0.1 8802 Regional Full Recon 180mm 2016 4.1994 3.812R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 120.61-121.01 S 0.4 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 3.0024 7.599R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 121.01-121.32 S 0.3 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 2.259306 9.797R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 121.32-121.52 S 0.2 8802 Regional DBST @ Traff >6000 2016 0.5928 6.254R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 121.52-121.72 S 0.2 8802 Regional Full Recon 150mm @ IRI 12 2016 7.2816 3.169R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 121.72-121.82 S 0.1 8802 Regional DBST @ 25% Crk 2016 0.2964 6.449R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 121.82-122.92 S 1.1 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 8.561531 6.654R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 122.92-123.12 S 0.2 8802 Regional Full Recon 150mm @ IRI 12 2016 8.4952 2.942R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 123.12-123.72 S 0.6 8802 Regional DBST @ Traff >6000 2016 1.825824 5.645R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 123.72-123.82 S 0.1 8802 Regional Full Recon 180mm 2016 4.1994 3.916R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 124.02-124.12 S 0.1 8802 Regional Rehab 150mm @ IRI 9-12 2016 2.898 4.488R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 124.12-125.02 S 0.9 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 6.7554 8.777R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 125.08-127.65 S 2.57 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 19.29042 6.658R142 Begamganj-Sonaimuri-Ramganj Road Km 030.72-034.19 S 3.47 4118 Regional Rehab 150mm @ IRI 9-12 2016 92.20711 0.826R142 Begamganj-Sonaimuri-Ramganj Road Km 034.19-034.99 S 0.8 4118 Regional DBST @ Traff 4000-6000 2016 2.1736 3.192R142 Begamganj-Sonaimuri-Ramganj Road Km 034.99-035.69 S 0.7 4118 Regional Full Recon 150mm @ IRI 12 2016 23.3618 0.798R142 Begamganj-Sonaimuri-Ramganj Road Km 035.69-037.09 S 1.4 4118 Regional Overlay 60mm @ IRI 7-9 2016 9.63958 3.308R142 Begamganj-Sonaimuri-Ramganj Road Km 037.09-037.29 S 0.2 4118 Regional Full Recon 150mm 2016 6.91752 1.162R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 012.85-016.00 S 3.15 3993 Regional Overlay 50mm @ IRI 7-9 2016 12.57249 1.647R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 016.00-018.40 S 2.4 3993 Regional Overlay 50mm @ IRI 5-7 2016 9.072 1.293R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 018.40-018.50 S 0.1 3993 Regional Full Recon 135mm 2016 1.96704 1.301R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 018.50-019.00 S 0.5 3993 Regional Overlay 50mm @ IRI 7-9 2016 1.89 2.162R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 019.00-019.40 S 0.4 3993 Regional Rehab 135mm @ IRI 9-12 2016 6.52032 0.522R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 019.40-019.60 S 0.2 3993 Regional Overlay 50mm @ IRI 7-9 2016 0.756 2.782R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 019.60-019.80 S 0.2 3993 Regional Rehab 135mm @ IRI 9-12 2016 3.26016 0.777R145 Lakshmipur Town Old Section Road Km 000.40-000.70 S 0.3 3755 Regional Full Recon 135mm 2016 14.47414 0.087R147 Lakshmipur Town Bridge-Tero Baki Road Km 000.10-000.20 S 0.1 3733 Regional Rehab 135mm @ IRI 9-12 2016 2.58096 2.915R147 Lakshmipur Town Bridge-Tero Baki Road Km 000.50-000.60 S 0.1 3525 Regional Full Recon 135mm 2016 2.02168 2.248R147 Lakshmipur Town Bridge-Tero Baki Road Km 000.60-000.80 S 0.2 3525 Regional DBST @ Traff 2000-4000 2016 0.36556 3.839R147 Lakshmipur Town Bridge-Tero Baki Road Km 000.80-001.00 S 0.2 3525 Regional Rehab 135mm @ IRI 9-12 2016 3.35072 1.814R147 Lakshmipur Town Bridge-Tero Baki Road Km 001.00-001.30 S 0.3 3525 Regional Overlay 50mm @ IRI 7-9 2016 1.1655 4.575R147 Lakshmipur Town Bridge-Tero Baki Road Km 001.30-001.80 S 0.5 3525 Regional Full Recon 135mm 2016 10.35428 1.534R147 Lakshmipur Town Bridge-Tero Baki Road Km 001.80-002.21 S 0.41 3525 Regional Overlay 50mm @ IRI 5-7 2016 1.620202 4.328Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 000.00-000.20 S 0.2 3438 Zilla Overlay 40mm @ IRI>12 2016 2.686236 0Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 000.20-000.30 S 0.1 3438 Zilla Overlay 40mm @ Traff >=2000 2016 0.70467 0.087Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 000.30-000.70 S 0.4 3438 Zilla Overlay 40mm @ IRI>12 2016 2.706612 0

Page 50 of 163

Page 51: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 000.70-001.60 S 0.9 3438 Zilla Overlay 40mm @ Traff >=2000 2016 5.768955 0.085Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 001.60-002.10 S 0.5 3438 Zilla Rehab 75mm @ IRI 9-12 2016 11.28361 0.274Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 002.30-003.20 S 0.9 3438 Zilla Full Recon 75mm @ IRI>12 2016 22.41748 0.231Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 003.30-003.60 S 0.3 3438 Zilla Full Recon 75mm @ IRI>12 2016 7.43337 0.541Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 003.80-003.90 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.47779 0.39Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 004.00-004.20 S 0.2 3438 Zilla Full Recon 75mm @ IRI>12 2016 4.95558 0.204Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 004.40-004.70 S 0.3 3438 Zilla Full Recon 75mm @ IRI>12 2016 7.43337 0.31Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 005.30-005.50 S 0.2 3438 Zilla Rehab 75mm @ IRI 9-12 2016 3.41202 0.805Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 006.80-007.00 S 0.2 3438 Zilla Full Recon 75mm @ IRI>12 2016 4.980358 0.149Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 007.70-007.80 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.599506 0.497Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 007.80-008.50 S 0.7 3438 Zilla Overlay 40mm @ Cracks >25% 2016 4.10844 0.041Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 008.50-008.80 S 0.3 3438 Zilla Overlay 40mm @ Traff >=2000 2016 1.635174 0.263Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 008.80-009.50 S 0.7 3438 Zilla Overlay 40mm @ Cracks >25% 2016 3.26424 0.028Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 009.50-009.60 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.52126 0.47Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 009.60-010.70 S 1.1 3438 Zilla Overlay 40mm @ Traff >=2000 2016 5.41662 0.061Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 010.70-011.00 S 0.3 3438 Zilla Overlay 40mm @ Traff >=2000 2016 1.47726 0.517Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 012.80-012.90 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.52126 0.579Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 015.90-016.10 S 0.2 3438 Zilla Overlay 40mm @ IRI>12 2016 1.698 0Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 018.50-018.60 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.47779 0.608Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 018.70-018.80 S 0.1 3438 Zilla Rehab 75mm @ IRI 9-12 2016 2.15496 0.299Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 021.11-021.31 S 0.2 3438 Zilla Rehab 75mm @ IRI 9-12 2016 5.0881 0.248Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 021.41-021.61 S 0.2 3438 Zilla Rehab 75mm @ IRI 9-12 2016 4.675066 0.32Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 022.77-022.87 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.47779 0.516Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 023.07-023.27 S 0.2 3438 Zilla Rehab 75mm @ IRI 9-12 2016 3.41202 0.709Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 023.47-023.57 S 0.1 3438 Zilla Rehab 75mm @ IRI 9-12 2016 1.70601 0.801Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 024.27-024.37 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.47779 0.52Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 024.77-024.87 S 0.1 3438 Zilla Rehab 75mm @ IRI 9-12 2016 1.70601 0.801Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 025.47-025.57 S 0.1 3438 Zilla Rehab 75mm @ IRI 9-12 2016 1.67608 0.772Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 026.07-026.17 S 0.1 3438 Zilla Rehab 75mm @ IRI 9-12 2016 1.67608 0.748Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 026.47-026.57 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.43432 0.144Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 026.77-026.97 S 0.2 3438 Zilla Rehab 75mm @ IRI 9-12 2016 3.35216 0.374Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 027.67-027.77 S 0.1 3438 Zilla Rehab 75mm @ IRI 9-12 2016 1.67608 0.676Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 030.17-030.27 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.47779 0.215Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 030.57-030.97 S 0.4 3438 Zilla Rehab 75mm @ IRI 9-12 2016 6.895872 0.39Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 031.07-031.17 S 0.1 3438 Zilla Overlay 40mm @ IRI>12 2016 0.7641 0Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 033.47-033.57 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.43432 0.247Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 033.67-034.07 S 0.4 3438 Zilla Rehab 75mm @ IRI 9-12 2016 6.70432 0.371Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 034.37-034.57 S 0.2 3438 Zilla Rehab 75mm @ IRI 9-12 2016 3.35216 0.798Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 035.87-036.07 S 0.2 3438 Zilla Rehab 75mm @ IRI 9-12 2016 3.5916 0.517Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 039.88-040.78 S 0.9 3438 Zilla Rehab 75mm @ IRI 9-12 2016 15.62346 0.518Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 040.78-040.88 S 0.1 3438 Zilla Overlay 40mm @ Cracks >25% 2016 0.46632 0.205Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 040.88-041.18 S 0.3 3438 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.193Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 041.18-041.38 S 0.2 3438 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 041.38-041.48 S 0.1 3438 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.322Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 041.48-041.78 S 0.3 3438 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.227Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 041.78-041.98 S 0.2 3438 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 0.567

Page 51 of 163

Page 52: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 041.98-043.08 S 1.1 3438 Zilla Overlay 40mm @ Traff >=2000 2016 5.13645 0.367Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 043.08-043.28 S 0.2 3438 Zilla Full Recon 75mm @ IRI>12 2016 4.805608 0.21Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 043.28-043.68 S 0.4 3438 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0.492Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 043.68-043.78 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.423Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 043.78-044.18 S 0.4 3438 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0.033Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 044.18-044.68 S 0.5 3438 Zilla Rehab 75mm @ IRI 9-12 2016 8.23075 0.443Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 044.68-044.88 S 0.2 3438 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.235Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 044.88-044.98 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.652Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 044.98-045.48 S 0.5 3438 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0.39Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 045.48-045.68 S 0.2 3438 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 0.597Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 045.68-048.58 S 2.9 3438 Zilla Overlay 40mm @ Traff >=2000 2016 13.54622 0Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 048.58-048.88 S 0.3 3438 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.394Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 048.88-049.58 S 0.7 3438 Zilla Overlay 40mm @ Traff >=2000 2016 3.26865 0.067Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 049.58-050.78 S 1.2 3438 Zilla Overlay 40mm @ Traff >=2000 2016 5.6034 0.637Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 050.78-051.58 S 0.8 3438 Zilla Overlay 40mm @ Traff >=2000 2016 3.7356 0Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 051.58-051.68 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.362Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 051.68-051.88 S 0.2 3438 Zilla Overlay 40mm @ Cracks >25% 2016 0.8844 0.134Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 051.88-052.58 S 0.7 3438 Zilla Full Recon 75mm @ IRI>12 2016 16.75986 0.44Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 052.58-054.04 S 1.46 3438 Zilla Overlay 40mm @ Traff >=2000 2016 6.81747 0.251Z1407 Muddafarganj-Chitosi-Ramganj Road Km 020.86-021.26 S 0.4 1289 Zilla Overlay 40mm @ IRI>12 2016 1.23954 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 024.36-024.96 S 0.6 1289 Zilla Rehab 75mm @ IRI 9-12 2016 6.46488 0.032Z1407 Muddafarganj-Chitosi-Ramganj Road Km 025.36-025.56 S 0.2 1289 Zilla Overlay 40mm @ IRI>12 2016 0.61128 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 025.76-025.86 S 0.1 1289 Zilla Overlay 40mm @ IRI>12 2016 0.30564 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 028.66-028.76 S 0.1 1289 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1407 Muddafarganj-Chitosi-Ramganj Road Km 029.26-029.46 S 0.2 1289 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z1413 Char Alaxander-Ramgati Road Km 000.10-000.17 S 0.06 1709 Zilla Overlay 40mm @ IRI>12 2016 0.309036 0Z1417 Paniwala-Munshihat-Chatkhil Road Km 000.00-003.87 S 3.87 981 Zilla Overlay 40mm @ Traff 100-1000 2016 11.66399 0Z1422 Haziganj-Lakshmipur Road Km 009.81-013.33 S 3.52 4750 Zilla Overlay 40mm @ Traff >=2000 2016 16.58606 1.341Z1422 Haziganj-Lakshmipur Road Km 013.33-013.73 S 0.4 4750 Zilla Full Recon 75mm @ IRI>12 2016 9.587308 0.839Z1422 Haziganj-Lakshmipur Road Km 013.73-014.03 S 0.3 4750 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 1.39Z1422 Haziganj-Lakshmipur Road Km 014.03-014.33 S 0.3 4750 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 1.116Z1422 Haziganj-Lakshmipur Road Km 014.33-016.43 S 2.1 4750 Zilla Overlay 50mm @ IRI 6-9 2016 12.6126 0.907Z1422 Haziganj-Lakshmipur Road Km 016.43-016.73 S 0.3 4750 Zilla Full Recon 75mm @ IRI>12 2016 8.594019 0.54Z1422 Haziganj-Lakshmipur Road Km 016.73-017.43 S 0.7 4750 Zilla Overlay 50mm @ IRI 6-9 2016 3.9249 1.493Z1422 Haziganj-Lakshmipur Road Km 017.43-017.53 S 0.1 4750 Zilla Full Recon 75mm @ IRI>12 2016 2.190888 1.735Z1422 Haziganj-Lakshmipur Road Km 017.53-019.93 S 2.4 4750 Zilla Overlay 50mm @ IRI 6-9 2016 16.21035 1.411Z1422 Haziganj-Lakshmipur Road Km 019.93-020.03 S 0.1 4750 Zilla Full Recon 75mm @ IRI>12 2016 3.26025 0.52Z1422 Haziganj-Lakshmipur Road Km 020.03-021.03 S 1 4750 Zilla Overlay 50mm @ IRI 6-9 2016 7.728 0.831Z1422 Haziganj-Lakshmipur Road Km 021.03-021.13 S 0.1 4750 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.446Z1422 Haziganj-Lakshmipur Road Km 021.13-021.23 S 0.1 4750 Zilla Overlay 50mm @ Cracking >25%2016 0.5775 0.67Z1422 Haziganj-Lakshmipur Road Km 021.23-021.33 S 0.1 4750 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.082Z1422 Haziganj-Lakshmipur Road Km 021.33-022.23 S 0.9 4750 Zilla Overlay 50mm @ IRI 6-9 2016 5.1975 2.408Z1422 Haziganj-Lakshmipur Road Km 022.23-022.43 S 0.2 4750 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.845Z1422 Haziganj-Lakshmipur Road Km 022.53-023.13 S 0.6 4750 Zilla Rehab 75mm @ IRI 9-12 2016 9.893361 1.342Z1422 Haziganj-Lakshmipur Road Km 023.13-023.23 S 0.1 4750 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 2.461Z1422 Haziganj-Lakshmipur Road Km 023.23-025.33 S 2.1 4750 Zilla Overlay 50mm @ IRI 6-9 2016 12.1275 2.746

Page 52 of 163

Page 53: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1422 Haziganj-Lakshmipur Road Km 025.33-025.73 S 0.4 4750 Zilla Overlay 50mm @ IRI 6-9 2016 2.478 0.961Z1422 Haziganj-Lakshmipur Road Km 025.73-025.93 S 0.2 4750 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 1.745Z1422 Haziganj-Lakshmipur Road Km 026.03-026.23 S 0.2 4750 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 1.668Z1422 Haziganj-Lakshmipur Road Km 026.23-026.33 S 0.1 4750 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 2.461Z1422 Haziganj-Lakshmipur Road Km 026.33-026.53 S 0.2 4750 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.969Z1422 Haziganj-Lakshmipur Road Km 026.53-032.69 S 6.16 4750 Zilla Overlay 50mm @ IRI 6-9 2016 35.56245 2.446Z1422 Haziganj-Lakshmipur Road Km 032.69-037.42 S 4.73 4750 Zilla Rehab 75mm @ IRI 9-12 2016 65.97111 2.042Z1426 Chatkhil-Chandraganj Road Km 009.68-009.70 S 0.02 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.069109 1.111Z1426 Chatkhil-Chandraganj Road Km 010.30-010.70 S 0.4 1577 Zilla Overlay 40mm @ 1000-2000 2016 1.32444 0Z1426 Chatkhil-Chandraganj Road Km 011.20-011.30 S 0.1 1577 Zilla Overlay 40mm @ IRI>12 2016 0.33111 0Z1426 Chatkhil-Chandraganj Road Km 011.70-011.90 S 0.2 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.6792 0Z1426 Chatkhil-Chandraganj Road Km 011.90-012.00 S 0.1 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.3396 0Z1426 Chatkhil-Chandraganj Road Km 012.00-012.10 S 0.1 1577 Zilla Overlay 40mm @ IRI>12 2016 0.344694 0Z1426 Chatkhil-Chandraganj Road Km 012.60-012.80 S 0.2 1577 Zilla Overlay 40mm @ IRI>12 2016 1.0188 0Z1429 Shahid Mazharul Munir Sarak Km 013.95-017.40 S 3.45 2863 Zilla Overlay 40mm @ Traff >=2000 2016 11.48853 0.563Z1429 Shahid Mazharul Munir Sarak Km 017.40-018.00 S 0.6 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.91025 0.662Z1429 Shahid Mazharul Munir Sarak Km 018.00-018.10 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.318375 0Z1429 Shahid Mazharul Munir Sarak Km 018.10-019.10 S 1 2863 Zilla Rehab 75mm @ IRI 9-12 2016 11.22375 0.317Z1429 Shahid Mazharul Munir Sarak Km 019.10-019.30 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.63675 0.008Z1429 Shahid Mazharul Munir Sarak Km 019.30-019.95 S 0.65 2863 Zilla Full Recon 75mm @ IRI>12 2016 10.59581 0.158Z1429 Shahid Mazharul Munir Sarak Km 019.95-020.35 S 0.4 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.2735 0Z1429 Shahid Mazharul Munir Sarak Km 020.35-020.55 S 0.2 2863 Zilla Full Recon 75mm @ IRI>12 2016 3.26025 0.092Z1429 Shahid Mazharul Munir Sarak Km 020.55-021.15 S 0.6 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.91025 0Z1429 Shahid Mazharul Munir Sarak Km 021.15-021.35 S 0.2 2863 Zilla Full Recon 75mm @ IRI>12 2016 3.26025 0.053Z1429 Shahid Mazharul Munir Sarak Km 021.35-021.55 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.63675 0Z1429 Shahid Mazharul Munir Sarak Km 021.55-021.65 S 0.1 2863 Zilla Full Recon 75mm @ IRI>12 2016 1.630125 0.479Z1429 Shahid Mazharul Munir Sarak Km 021.65-022.16 S 0.5 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.595059 0Z1429 Shahid Mazharul Munir Sarak Km 022.16-022.36 S 0.2 2863 Zilla Full Recon 75mm @ IRI>12 2016 3.26025 0.257Z1429 Shahid Mazharul Munir Sarak Km 022.36-023.66 S 1.3 2863 Zilla Overlay 40mm @ Traff >=2000 2016 4.138875 0.592Z1429 Shahid Mazharul Munir Sarak Km 023.66-023.86 S 0.2 2863 Zilla Full Recon 75mm @ IRI>12 2016 3.26025 0.217Z1429 Shahid Mazharul Munir Sarak Km 023.86-024.26 S 0.4 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.2735 0.034Z1429 Shahid Mazharul Munir Sarak Km 024.26-024.96 S 0.7 2863 Zilla Rehab 75mm @ IRI 9-12 2016 7.856624 0.345Z1429 Shahid Mazharul Munir Sarak Km 024.96-025.06 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.342996 0Z1429 Shahid Mazharul Munir Sarak Km 025.06-025.26 S 0.2 2863 Zilla Overlay 40mm @ IRI>12 2016 0.913524 0Z1429 Shahid Mazharul Munir Sarak Km 025.26-025.36 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z1429 Shahid Mazharul Munir Sarak Km 025.36-025.46 S 0.1 2863 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.247Z1429 Shahid Mazharul Munir Sarak Km 025.46-025.56 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z1429 Shahid Mazharul Munir Sarak Km 025.56-025.86 S 0.3 2863 Zilla Rehab 75mm @ IRI 9-12 2016 3.277335 0.387Z1429 Shahid Mazharul Munir Sarak Km 025.86-025.96 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z1429 Shahid Mazharul Munir Sarak Km 025.96-026.06 S 0.1 2863 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 0.729Z1429 Shahid Mazharul Munir Sarak Km 026.06-026.26 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.61977 0Z1429 Shahid Mazharul Munir Sarak Km 026.26-028.46 S 2.2 2863 Zilla Rehab 75mm @ IRI 9-12 2016 24.04471 0.347Z1429 Shahid Mazharul Munir Sarak Km 028.46-028.66 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.61977 0Z1429 Shahid Mazharul Munir Sarak Km 028.66-028.76 S 0.1 2863 Zilla Rehab 75mm @ IRI 9-12 2016 1.415689 0.191Z1429 Shahid Mazharul Munir Sarak Km 028.76-028.86 S 0.1 2863 Zilla Seal Coat 2016 0.1638 0.261Z1429 Shahid Mazharul Munir Sarak Km 028.86-028.96 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.55185 0.1

Page 53 of 163

Page 54: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1429 Shahid Mazharul Munir Sarak Km 028.96-029.16 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.1037 0Z1429 Shahid Mazharul Munir Sarak Km 029.46-029.71 S 0.25 2863 Zilla Overlay 40mm @ IRI>12 2016 1.39618 0Z1432 Daserhat-Mandari Road Km 000.40-000.50 S 0.1 1167 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1432 Daserhat-Mandari Road Km 000.60-001.80 S 1.2 1167 Zilla Overlay 40mm @ IRI>12 2016 3.76956 0Z1432 Daserhat-Mandari Road Km 002.10-003.50 S 1.4 1167 Zilla Overlay 40mm @ IRI>12 2016 4.508011 0Z1432 Daserhat-Mandari Road Km 003.50-003.70 S 0.2 1167 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1432 Daserhat-Mandari Road Km 003.99-004.00 S 0.01 1167 Zilla Rehab 75mm @ IRI 9-12 2016 0.087396 1.79Z1432 Daserhat-Mandari Road Km 004.00-004.20 S 0.2 1167 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1432 Daserhat-Mandari Road Km 004.20-004.30 S 0.1 1167 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1432 Daserhat-Mandari Road Km 004.30-004.60 S 0.3 1167 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0Z1432 Daserhat-Mandari Road Km 004.60-004.70 S 0.1 1167 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 0.077Z1432 Daserhat-Mandari Road Km 004.70-005.00 S 0.3 1167 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0Z1432 Daserhat-Mandari Road Km 005.00-005.20 S 0.2 1167 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0Z1432 Daserhat-Mandari Road Km 005.20-005.30 S 0.1 1167 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1432 Daserhat-Mandari Road Km 005.30-005.50 S 0.2 1167 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0Z1432 Daserhat-Mandari Road Km 005.50-005.80 S 0.3 1167 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0Z1432 Daserhat-Mandari Road Km 005.80-008.60 S 2.8 1167 Zilla Overlay 40mm @ 1000-2000 2016 14.10183 0Z1432 Daserhat-Mandari Road Km 008.60-008.72 S 0.12 1167 Zilla Seal Coat 2016 0.254898 1.365Z1437 Batara Bazar Counecting Road Km 000.00-000.50 S 0.5 981 Zilla Overlay 40mm @ IRI>12 2016 1.506975 0Z1437 Batara Bazar Counecting Road Km 000.70-001.40 S 0.7 981 Zilla Overlay 40mm @ IRI>12 2016 2.103822 0Z1437 Batara Bazar Counecting Road Km 002.41-002.61 S 0.2 981 Zilla Overlay 40mm @ IRI>12 2016 0.599394 0Z1447 Ramganj By-Pass Road Km 000.00-000.40 S 0.4 1071 Zilla Overlay 40mm @ IRI>12 2016 2.47908 0Z1466 Nalgara -Kamarhat-Ramganj Road Km 000.00-000.40 S 0.4 788 Zilla Overlay 40mm @ IRI>12 2016 1.236144 0Z1466 Nalgara -Kamarhat-Ramganj Road Km 005.70-006.10 S 0.4 788 Zilla Overlay 40mm @ Traff 100-1000 2016 1.08672 0Z1466 Nalgara -Kamarhat-Ramganj Road Km 007.60-009.23 S 1.63 788 Zilla Overlay 40mm @ Traff 100-1000 2016 4.428384 0Z1472 Sardarbari-Khairhat-Mollarhat-Raipur Road Km 000.30-000.50 S 0.2 440 Zilla Overlay 40mm @ IRI>12 2016 0.61128 0Z1472 Sardarbari-Khairhat-Mollarhat-Raipur Road Km 004.30-004.60 S 0.3 440 Zilla Overlay 40mm @ Traff 100-1000 2016 0.955125 0.126Z1472 Sardarbari-Khairhat-Mollarhat-Raipur Road Km 004.60-005.10 S 0.5 440 Zilla Overlay 40mm @ IRI>12 2016 1.591875 0Z1472 Sardarbari-Khairhat-Mollarhat-Raipur Road Km 005.50-005.60 S 0.1 440 Zilla Overlay 40mm @ IRI>12 2016 0.318375 0Z1472 Sardarbari-Khairhat-Mollarhat-Raipur Road Km 005.70-006.00 S 0.3 440 Zilla Overlay 40mm @ IRI>12 2016 0.955125 0Z1472 Sardarbari-Khairhat-Mollarhat-Raipur Road Km 007.20-007.30 S 0.1 440 Zilla Overlay 40mm @ IRI>12 2016 0.32262 0Z1472 Sardarbari-Khairhat-Mollarhat-Raipur Road Km 007.30-007.70 S 0.4 440 Zilla Seal Coat 2016 0.436464 1.365Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 000.10-000.20 S 0.1 430 Zilla Overlay 40mm @ IRI>12 2016 0.33111 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 000.30-000.50 S 0.2 430 Zilla Overlay 40mm @ IRI>12 2016 0.66222 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 000.60-000.70 S 0.1 430 Zilla Overlay 40mm @ IRI>12 2016 0.33111 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 000.80-000.90 S 0.1 430 Zilla Overlay 40mm @ IRI>12 2016 0.33111 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 004.60-005.60 S 1 430 Zilla Overlay 40mm @ IRI>12 2016 3.1413 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 005.70-005.80 S 0.1 430 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 007.30-008.20 S 0.9 430 Zilla Overlay 40mm @ IRI>12 2016 2.82717 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 008.62-009.82 S 1.2 430 Zilla Overlay 40mm @ IRI>12 2016 3.423168 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 010.72-011.62 S 0.9 430 Zilla Overlay 40mm @ Traff 100-1000 2016 2.52153 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 012.52-012.62 S 0.1 430 Zilla Overlay 40mm @ Traff 100-1000 2016 0.28017 0.22Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 012.62-014.42 S 1.8 430 Zilla Overlay 40mm @ IRI>12 2016 5.516802 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 014.62-015.05 S 0.43 430 Zilla Overlay 40mm @ IRI>12 2016 1.401054 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 013.90-014.50 S 0.6 1403 Zilla Overlay 40mm @ IRI>12 2016 1.85931 0Z1824 Doabhanga-Shaharasti-Ramganj Road Km 014.90-015.10 S 0.2 1403 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0

Page 54 of 163

Page 55: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1824 Doabhanga-Shaharasti-Ramganj Road Km 015.30-015.61 S 0.31 1403 Zilla Overlay 40mm @ IRI>12 2016 0.963742 0Sub-Total Laxmipur Division 1363.941

Noakhali DivisionN104 Feni-Noakhali Road Km 019.20-031.05 S 11.85 8577 National Overlay 50mm @ IRI 5-7 2016 76.52138 9.327N104 Feni-Noakhali Road Km 031.10-032.80 L 1.7 8577 National Overlay 50mm @ IRI 5-7 2016 12.6735 7.693N104 Feni-Noakhali Road Km 031.10-032.80 R 1.7 8577 National Overlay 50mm @ IRI 5-7 2016 12.6735 7.693N104 Feni-Noakhali Road Km 032.80-033.10 L 0.3 8577 National Full Recon 180mm 2016 14.90787 2.999N104 Feni-Noakhali Road Km 032.80-033.10 R 0.3 8577 National Full Recon 180mm 2016 14.90787 2.999N104 Feni-Noakhali Road Km 033.10-033.20 L 0.1 8577 National Overlay 50mm @ IRI 5-7 2016 0.7455 9.019N104 Feni-Noakhali Road Km 033.10-033.20 R 0.1 8577 National Overlay 50mm @ IRI 5-7 2016 0.7455 9.019N104 Feni-Noakhali Road Km 033.20-033.60 L 0.4 8577 National Rehab 180mm @ IRI 9-12 2016 16.36408 3.339N104 Feni-Noakhali Road Km 033.20-033.60 R 0.4 8577 National Rehab 180mm @ IRI 9-12 2016 16.36408 3.339N104 Feni-Noakhali Road Km 033.60-034.30 L 0.7 8577 National Overlay 50mm @ IRI 5-7 2016 5.2185 8.203N104 Feni-Noakhali Road Km 033.60-034.30 R 0.7 8577 National Overlay 50mm @ IRI 5-7 2016 5.2185 8.203N104 Feni-Noakhali Road Km 034.30-034.40 L 0.1 8577 National Full Recon 180mm 2016 4.96929 3.015N104 Feni-Noakhali Road Km 034.30-034.40 R 0.1 8577 National Full Recon 180mm 2016 4.96929 3.015N104 Feni-Noakhali Road Km 034.80-034.90 L 0.1 8577 National Full Recon 180mm 2016 4.96929 3.181N104 Feni-Noakhali Road Km 034.80-034.90 R 0.1 8577 National Full Recon 180mm 2016 4.96929 3.181N104 Feni-Noakhali Road Km 034.90-035.15 L 0.25 8577 National Overlay 50mm @ IRI 5-7 2016 1.86375 8.108N104 Feni-Noakhali Road Km 034.90-035.15 R 0.25 8577 National Overlay 50mm @ IRI 5-7 2016 1.86375 8.108N104 Feni-Noakhali Road Km 035.15-041.60 S 6.45 10095 National Overlay 50mm @ IRI 5 2016 49.58239 13.6N104 Feni-Noakhali Road Km 041.60-041.70 S 0.1 10509 National Full Recon 195mm 2016 5.344332 5.737N104 Feni-Noakhali Road Km 041.70-043.10 S 1.4 10509 National Overlay 80mm @ IRI 5-9 2016 17.19451 13.726N104 Feni-Noakhali Road Km 043.10-043.30 S 0.2 10509 National Full Recon 195mm 2016 11.53558 5.558N104 Feni-Noakhali Road Km 043.30-043.50 S 0.2 10509 National Overlay 80mm @ IRI 5-9 2016 3.216738 11.358N104 Feni-Noakhali Road Km 043.50-043.60 S 0.1 10509 National Full Recon 195mm 2016 7.66605 3.494N104 Feni-Noakhali Road Km 043.60-045.75 S 2.15 10193 National Overlay 50mm @ IRI 5 2016 18.80861 7.723N104 Feni-Noakhali Road Km 045.75-045.85 S 0.1 9424 National Rehab 180mm @ IRI 9-12 2016 3.28434 6.718N104 Feni-Noakhali Road Km 045.85-046.15 S 0.3 9424 National DBST @ 25% Crk 2016 0.84474 8.431N104 Feni-Noakhali Road Km 046.15-046.35 S 0.2 9424 National Full Recon 180mm @ IRI 12 2016 7.97886 5.219N104 Feni-Noakhali Road Km 046.35-047.96 S 1.6 9424 National DBST @ 25% Crk 2016 5.14872 8.688N104 Feni-Noakhali Road Km 047.96-048.28 S 0.33 9424 National Full Recon 180mm 2016 17.21754 3.603N104 Feni-Noakhali Road Km 048.28-049.63 S 1.35 9424 National DBST @ 25% Crk 2016 4.990635 5.631R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 128.62-128.72 S 0.1 8802 Regional Full Recon 180mm 2016 4.1994 3.793R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 129.82-129.92 S 0.1 8802 Regional DBST @ Traff >6000 2016 0.2964 9.26R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 130.12-130.32 S 0.2 8802 Regional Full Recon 150mm @ IRI 12 2016 7.2816 3.766R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 137.02-137.22 S 0.2 8802 Regional Overlay 60mm @ IRI 5.5-9 2016 2.05164 5.716R140 Comilla-Chandpur-Lakshmipur-Begumganj Km 137.22-137.42 S 0.2 8802 Regional Rehab 150mm @ IRI 9-12 2016 7.9212 2.716R141 Lalmai-Laksham-Sonaimuri Road Km 033.43-033.71 S 0.28 6626 Regional Rehab 150mm @ IRI 9-12 2016 9.758145 4.616R141 Lalmai-Laksham-Sonaimuri Road Km 033.71-034.71 S 1 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 9.166478 11.06R141 Lalmai-Laksham-Sonaimuri Road Km 034.76-038.23 S 3.46 6626 Regional Overlay 60mm @ IRI 5.5-9 2016 28.11606 12.322R142 Begamganj-Sonaimuri-Ramganj Road Km 000.00-000.10 L 0.1 7926 Regional DBST @ 25% Crk 2016 0.5434 1.419R142 Begamganj-Sonaimuri-Ramganj Road Km 000.00-000.10 R 0.1 7926 Regional DBST @ 25% Crk 2016 0.361608 5.552R142 Begamganj-Sonaimuri-Ramganj Road Km 000.10-000.10 L 0 7926 Regional Full Recon 150mm @ IRI 12 2016 0.266992 1.578R142 Begamganj-Sonaimuri-Ramganj Road Km 000.10-000.10 R 0 7926 Regional Full Recon 150mm @ IRI 12 2016 0.177671 3.365

Page 55 of 163

Page 56: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R142 Begamganj-Sonaimuri-Ramganj Road Km 000.10-000.30 S 0.2 7926 Regional Full Recon 150mm @ IRI 12 2016 13.07071 1.539R142 Begamganj-Sonaimuri-Ramganj Road Km 000.30-002.40 S 2.1 7926 Regional Overlay 60mm @ IRI 5.5-9 2016 19.23953 6.786R142 Begamganj-Sonaimuri-Ramganj Road Km 002.40-002.60 S 0.2 7926 Regional Full Recon 150mm @ IRI 12 2016 8.883552 2.926R142 Begamganj-Sonaimuri-Ramganj Road Km 002.60-004.00 S 1.4 7926 Regional Overlay 60mm @ IRI 5.5-9 2016 12.82025 8.435R142 Begamganj-Sonaimuri-Ramganj Road Km 004.00-004.10 S 0.1 7926 Regional Full Recon 150mm @ IRI 12 2016 4.441776 3.146R142 Begamganj-Sonaimuri-Ramganj Road Km 004.10-005.20 S 1.1 7926 Regional DBST @ 25% Crk 2016 3.977688 5.66R142 Begamganj-Sonaimuri-Ramganj Road Km 005.20-005.80 S 0.6 7926 Regional Overlay 60mm @ IRI 5.5-9 2016 5.494392 9.043R142 Begamganj-Sonaimuri-Ramganj Road Km 005.80-006.00 S 0.2 7926 Regional Full Recon 150mm @ IRI 12 2016 8.883552 3.258R142 Begamganj-Sonaimuri-Ramganj Road Km 006.00-006.40 S 0.4 7926 Regional Overlay 60mm @ IRI 5.5-9 2016 3.662928 8.44R142 Begamganj-Sonaimuri-Ramganj Road Km 006.40-006.60 S 0.2 7926 Regional Full Recon 150mm @ IRI 12 2016 8.883552 3.163R142 Begamganj-Sonaimuri-Ramganj Road Km 006.60-006.90 S 0.3 7926 Regional DBST @ 25% Crk 2016 1.08844 5.782R142 Begamganj-Sonaimuri-Ramganj Road Km 006.90-007.10 S 0.2 7926 Regional Full Recon 150mm @ IRI 12 2016 8.883552 2.989R142 Begamganj-Sonaimuri-Ramganj Road Km 009.40-009.60 S 0.2 7926 Regional Full Recon 150mm @ IRI 12 2016 8.883552 2.927R142 Begamganj-Sonaimuri-Ramganj Road Km 010.40-010.60 S 0.2 7926 Regional Full Recon 150mm @ IRI 12 2016 8.883552 3.146R142 Begamganj-Sonaimuri-Ramganj Road Km 010.73-010.80 S 0.07 4118 Regional DBST @ 25% Crk 2016 0.255645 0.533R142 Begamganj-Sonaimuri-Ramganj Road Km 010.80-011.00 S 0.2 4118 Regional Rehab 150mm @ IRI 9-12 2016 5.33232 0.722R142 Begamganj-Sonaimuri-Ramganj Road Km 011.80-011.90 S 0.1 4118 Regional Full Recon 150mm 2016 3.3374 1.726R142 Begamganj-Sonaimuri-Ramganj Road Km 014.00-014.30 S 0.3 4118 Regional Rehab 150mm @ IRI 9-12 2016 7.9695 0.94R142 Begamganj-Sonaimuri-Ramganj Road Km 016.70-016.80 S 0.1 4118 Regional Full Recon 150mm 2016 3.355604 1.267R142 Begamganj-Sonaimuri-Ramganj Road Km 020.51-020.71 S 0.2 4118 Regional Rehab 150mm @ IRI 9-12 2016 5.313 0.949R142 Begamganj-Sonaimuri-Ramganj Road Km 020.81-020.91 S 0.1 4118 Regional Full Recon 150mm 2016 4.18692 0.522R142 Begamganj-Sonaimuri-Ramganj Road Km 020.91-023.81 S 2.9 4118 Regional Overlay 50mm @ IRI 5-7 2016 17.1129 2.439R142 Begamganj-Sonaimuri-Ramganj Road Km 023.81-024.11 S 0.3 4118 Regional Full Recon 150mm 2016 11.28648 0.796R142 Begamganj-Sonaimuri-Ramganj Road Km 024.11-024.41 S 0.3 4118 Regional Overlay 50mm @ IRI 5-7 2016 1.89 2.054R142 Begamganj-Sonaimuri-Ramganj Road Km 024.41-025.01 S 0.6 4118 Regional Full Recon 150mm 2016 19.54721 0.765R142 Begamganj-Sonaimuri-Ramganj Road Km 025.01-025.11 S 0.1 4118 Regional DBST @ 25% Crk 2016 0.3211 0.548R142 Begamganj-Sonaimuri-Ramganj Road Km 025.11-025.21 S 0.1 4118 Regional Rehab 150mm @ IRI 9-12 2016 3.1395 0.866R142 Begamganj-Sonaimuri-Ramganj Road Km 025.21-025.39 S 0.18 4118 Regional DBST @ 25% Crk 2016 0.587613 0.767R142 Begamganj-Sonaimuri-Ramganj Road Km 025.39-025.59 S 0.2 4118 Regional Full Recon 150mm @ IRI 12 2016 7.075288 1.368R142 Begamganj-Sonaimuri-Ramganj Road Km 025.59-027.59 S 2 4118 Regional Overlay 50mm @ IRI 5-7 2016 11.38769 3.126R142 Begamganj-Sonaimuri-Ramganj Road Km 027.74-028.79 S 1.05 4118 Regional Overlay 50mm @ IRI 5-7 2016 6.063749 3.011R142 Begamganj-Sonaimuri-Ramganj Road Km 028.79-029.49 S 0.7 4118 Regional Rehab 150mm @ IRI 9-12 2016 18.73074 0.856R142 Begamganj-Sonaimuri-Ramganj Road Km 029.49-029.79 S 0.3 4118 Regional Overlay 50mm @ IRI 5-7 2016 1.7325 3.318R142 Begamganj-Sonaimuri-Ramganj Road Km 029.79-030.72 S 0.93 4118 Regional Full Recon 150mm @ IRI 12 2016 31.03782 0.639R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 000.20-000.40 S 0.2 3993 Regional Full Recon 135mm 2016 4.3712 0.753R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 001.00-001.20 S 0.2 3993 Regional Full Recon 135mm 2016 4.15264 0.743R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 001.20-003.10 S 1.9 3993 Regional Overlay 50mm @ IRI 5-7 2016 7.58499 1.354R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 003.10-003.20 S 0.1 3993 Regional Full Recon 135mm 2016 2.07632 1.294R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 003.70-003.90 S 0.2 3993 Regional Overlay 50mm @ IRI 5-7 2016 0.798 2.823R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 003.90-004.20 S 0.3 3993 Regional Overlay 50mm @ IRI 7-9 2016 1.197 2.321R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 004.80-006.10 S 1.3 3993 Regional Overlay 50mm @ IRI 5-7 2016 5.187 1.348R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 006.10-006.30 S 0.2 3993 Regional Full Recon 135mm 2016 4.15264 0.724R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 006.40-006.60 S 0.2 3993 Regional Full Recon 135mm 2016 4.15264 0.775R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 006.60-006.80 S 0.2 3993 Regional Overlay 50mm @ IRI 5-7 2016 0.798 2.708R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 006.80-007.60 S 0.8 3993 Regional Rehab 135mm @ IRI 9-12 2016 13.78233 0.339R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 007.60-008.10 S 0.5 3993 Regional Overlay 50mm @ IRI 5-7 2016 1.995 1.747

Page 56 of 163

Page 57: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 008.10-008.40 S 0.3 3993 Regional Rehab 135mm @ IRI 9-12 2016 5.16192 0.627R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 008.40-009.10 S 0.7 3993 Regional Overlay 50mm @ IRI 5-7 2016 2.793 1.419R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 010.60-010.70 S 0.1 3993 Regional Full Recon 135mm 2016 2.07632 1.199R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 010.70-011.80 S 1.1 3993 Regional Overlay 50mm @ IRI 5-7 2016 4.39299 1.26R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 011.80-011.90 S 0.1 3993 Regional Full Recon 135mm 2016 2.07632 1.191R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 011.90-012.50 S 0.6 3993 Regional Overlay 50mm @ IRI 5-7 2016 2.394 1.752R143 Maijdi-Chayani-Basurhat-Chandraganj Road Km 012.50-012.85 S 0.35 3993 Regional Rehab 135mm @ IRI 9-12 2016 6.02224 0.652Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 054.04-057.18 S 3.14 3438 Zilla Overlay 40mm @ Traff >=2000 2016 14.6669 0.311Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 057.18-060.98 S 3.8 3438 Zilla Overlay 40mm @ Cracks >25% 2016 16.8036 0.016Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 060.98-061.08 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.412Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 061.08-062.08 S 1 3438 Zilla Overlay 40mm @ Cracks >25% 2016 4.426422 0.055Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 062.08-062.18 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.668Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 062.18-063.38 S 1.2 3438 Zilla Overlay 40mm @ Traff >=2000 2016 5.6034 0.26Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 063.38-063.48 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.47Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 063.48-063.98 S 0.5 3438 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 063.98-064.08 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.545Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 064.08-065.58 S 1.5 3438 Zilla Overlay 40mm @ Cracks >25% 2016 6.633 0.039Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 065.58-065.68 S 0.1 3438 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.344Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 065.68-066.38 S 0.7 3438 Zilla Overlay 40mm @ Traff >=2000 2016 3.273319 0Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 066.38-066.48 S 0.1 3438 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.489Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 066.48-068.48 S 2 3438 Zilla Overlay 40mm @ Cracks >25% 2016 8.844 0.019Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 068.48-068.68 S 0.2 3438 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.329Z1405 Lakshmipur-Char Alaxandar-Sonapur Road Km 068.68-071.69 S 3.01 3438 Zilla Overlay 40mm @ Traff >=2000 2016 14.07139 0Z1416 Kallandi-Chanderhat Road Km 000.00-000.10 S 0.1 1620 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0.075Z1416 Kallandi-Chanderhat Road Km 000.10-000.20 S 0.1 1620 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z1416 Kallandi-Chanderhat Road Km 000.20-000.30 S 0.1 1620 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0.009Z1416 Kallandi-Chanderhat Road Km 000.30-003.10 S 2.8 1620 Zilla Overlay 40mm @ 1000-2000 2016 9.03336 0Z1416 Kallandi-Chanderhat Road Km 003.10-003.30 S 0.2 1620 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0.071Z1416 Kallandi-Chanderhat Road Km 003.30-003.40 S 0.1 1620 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 0.013Z1416 Kallandi-Chanderhat Road Km 003.40-004.30 S 0.9 1620 Zilla Overlay 40mm @ 1000-2000 2016 2.906806 0Z1416 Kallandi-Chanderhat Road Km 004.30-004.40 S 0.1 1620 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 0.009Z1416 Kallandi-Chanderhat Road Km 004.40-004.80 S 0.4 1620 Zilla Overlay 40mm @ 1000-2000 2016 1.29048 0Z1416 Kallandi-Chanderhat Road Km 004.80-005.00 S 0.2 1620 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z1416 Kallandi-Chanderhat Road Km 005.00-005.40 S 0.4 1620 Zilla Overlay 40mm @ 1000-2000 2016 1.29048 0Z1416 Kallandi-Chanderhat Road Km 005.40-005.50 S 0.1 1620 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z1416 Kallandi-Chanderhat Road Km 005.50-007.40 S 1.9 1620 Zilla Overlay 40mm @ 1000-2000 2016 6.12978 0Z1417 Paniwala-Munshihat-Chatkhil Road Km 003.87-004.27 S 0.4 981 Zilla Overlay 40mm @ IRI>12 2016 1.23954 0Z1420 Choumohoni-Chhaterpaya Road Km 009.80-010.40 S 0.6 4205 Zilla Overlay 40mm @ Traff >=2000 2016 1.88478 0Z1420 Choumohoni-Chhaterpaya Road Km 010.40-010.80 S 0.4 4205 Zilla Overlay 50mm @ IRI 6-9 2016 1.554 0.861Z1420 Choumohoni-Chhaterpaya Road Km 010.80-010.90 S 0.1 4205 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z1420 Choumohoni-Chhaterpaya Road Km 010.90-011.10 S 0.2 4205 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.955Z1420 Choumohoni-Chhaterpaya Road Km 011.10-011.70 S 0.6 4205 Zilla Overlay 40mm @ Traff >=2000 2016 1.878497 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 000.00-000.30 S 0.3 2611 Zilla Full Recon 75mm @ IRI>12 2016 8.47665 0.04Z1421 Sonaimuri-Senbag-Kallandi Road Km 000.30-000.40 S 0.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.55185 0.265Z1421 Sonaimuri-Senbag-Kallandi Road Km 000.40-000.50 S 0.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.55185 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 000.50-002.60 S 2.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 11.94543 0.121

Page 57 of 163

Page 58: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1421 Sonaimuri-Senbag-Kallandi Road Km 002.60-002.70 S 0.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 002.70-002.90 S 0.2 2611 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 002.90-004.00 S 1.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 5.13645 0.058Z1421 Sonaimuri-Senbag-Kallandi Road Km 004.00-004.50 S 0.5 2611 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 004.50-005.90 S 1.4 2611 Zilla Overlay 40mm @ Traff >=2000 2016 6.5373 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 005.90-006.50 S 0.6 2611 Zilla Overlay 40mm @ Traff >=2000 2016 2.8017 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 006.50-006.90 S 0.4 2611 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 006.90-007.40 S 0.5 2611 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 007.40-007.70 S 0.3 2611 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.01Z1421 Sonaimuri-Senbag-Kallandi Road Km 007.70-007.80 S 0.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 007.80-008.30 S 0.5 2611 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 008.30-008.40 S 0.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 008.40-009.30 S 0.9 2611 Zilla Overlay 40mm @ Traff >=2000 2016 4.20255 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 009.30-009.70 S 0.4 2611 Zilla Seal Coat 2016 0.5544 0.364Z1421 Sonaimuri-Senbag-Kallandi Road Km 009.70-010.50 S 0.8 2611 Zilla Rehab 75mm @ IRI 9-12 2016 13.1692 0.315Z1421 Sonaimuri-Senbag-Kallandi Road Km 010.50-010.60 S 0.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 010.60-011.00 S 0.4 2611 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 011.30-011.50 S 0.2 2611 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 011.90-012.50 S 0.6 2611 Zilla Overlay 40mm @ Traff >=2000 2016 2.8017 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 012.50-012.64 S 0.14 2611 Zilla Seal Coat 2016 0.19404 0.35Z1421 Sonaimuri-Senbag-Kallandi Road Km 012.64-012.74 S 0.1 2611 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 012.74-012.94 S 0.2 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 012.94-013.04 S 0.1 2611 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.252Z1421 Sonaimuri-Senbag-Kallandi Road Km 013.04-013.34 S 0.3 2611 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 013.34-014.24 S 0.9 2611 Zilla Rehab 75mm @ IRI 9-12 2016 14.81535 0.096Z1421 Sonaimuri-Senbag-Kallandi Road Km 014.24-014.54 S 0.3 2611 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 014.54-014.84 S 0.3 2611 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.107Z1421 Sonaimuri-Senbag-Kallandi Road Km 014.84-015.54 S 0.7 2611 Zilla Overlay 40mm @ Traff >=2000 2016 3.26865 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 015.54-017.64 S 2.1 2611 Zilla Overlay 40mm @ IRI>12 2016 9.805949 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 017.64-017.74 S 0.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 017.74-018.04 S 0.3 2611 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.186Z1421 Sonaimuri-Senbag-Kallandi Road Km 018.04-018.24 S 0.2 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 018.24-018.34 S 0.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 018.34-018.45 S 0.11 2611 Zilla Seal Coat 2016 0.158004 0.346Z1421 Sonaimuri-Senbag-Kallandi Road Km 018.85-020.25 S 1.4 2611 Zilla Overlay 40mm @ Traff >=2000 2016 6.5373 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 020.25-020.35 S 0.1 2611 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 020.35-020.65 S 0.3 2611 Zilla Rehab 75mm @ IRI 9-12 2016 4.956408 0.192Z1421 Sonaimuri-Senbag-Kallandi Road Km 020.65-021.95 S 1.3 2611 Zilla Overlay 40mm @ Traff >=2000 2016 6.070349 0Z1421 Sonaimuri-Senbag-Kallandi Road Km 021.95-024.37 S 2.42 2611 Zilla Full Recon 75mm @ IRI>12 2016 57.81075 0.159Z1424 Sonapur-Char Jabber-Steamer Ghat Road Km 015.70-015.80 S 0.1 3721 Zilla Rehab 75mm @ IRI 9-12 2016 1.91552 0.363Z1424 Sonapur-Char Jabber-Steamer Ghat Road Km 015.80-027.61 S 11.81 3721 Zilla Overlay 40mm @ Cracks >25% 2016 52.40041 0.055Z1424 Sonapur-Char Jabber-Steamer Ghat Road Km 027.61-028.01 S 0.4 3721 Zilla Rehab 75mm @ IRI 9-12 2016 6.5846 0.771Z1424 Sonapur-Char Jabber-Steamer Ghat Road Km 028.01-028.70 S 0.69 3721 Zilla Overlay 40mm @ Cracks >25% 2016 3.055602 0.092Z1426 Chatkhil-Chandraganj Road Km 000.00-000.20 S 0.2 1577 Zilla Overlay 40mm @ IRI>12 2016 0.91692 0Z1426 Chatkhil-Chandraganj Road Km 000.20-000.90 S 0.7 1577 Zilla Overlay 40mm @ 1000-2000 2016 2.19891 0Z1426 Chatkhil-Chandraganj Road Km 003.40-003.90 S 0.5 1577 Zilla Overlay 40mm @ IRI>12 2016 1.57065 0

Page 58 of 163

Page 59: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1426 Chatkhil-Chandraganj Road Km 003.90-004.00 S 0.1 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.017Z1426 Chatkhil-Chandraganj Road Km 004.00-004.30 S 0.3 1577 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z1426 Chatkhil-Chandraganj Road Km 004.30-004.60 S 0.3 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z1426 Chatkhil-Chandraganj Road Km 004.60-004.80 S 0.2 1577 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1426 Chatkhil-Chandraganj Road Km 004.90-006.00 S 1.1 1577 Zilla Overlay 40mm @ 1000-2000 2016 3.45543 0Z1426 Chatkhil-Chandraganj Road Km 006.20-006.40 S 0.2 1577 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1426 Chatkhil-Chandraganj Road Km 007.20-007.40 S 0.2 1577 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z1426 Chatkhil-Chandraganj Road Km 008.40-008.70 S 0.3 1577 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z1429 Shahid Mazharul Munir Sarak Km 000.00-000.10 S 0.1 2863 Zilla Seal Coat 2016 0.12096 0.263Z1429 Shahid Mazharul Munir Sarak Km 000.10-000.20 S 0.1 2863 Zilla Full Recon 75mm @ IRI>12 2016 1.595349 0.49Z1429 Shahid Mazharul Munir Sarak Km 000.20-000.40 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.61128 0Z1429 Shahid Mazharul Munir Sarak Km 000.40-000.50 S 0.1 2863 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 0.727Z1429 Shahid Mazharul Munir Sarak Km 000.50-000.80 S 0.3 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.91692 0Z1429 Shahid Mazharul Munir Sarak Km 000.80-001.10 S 0.3 2863 Zilla Full Recon 75mm @ IRI>12 2016 4.69476 0.31Z1429 Shahid Mazharul Munir Sarak Km 001.10-001.20 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.30564 0Z1429 Shahid Mazharul Munir Sarak Km 001.20-001.30 S 0.1 2863 Zilla Rehab 75mm @ IRI 9-12 2016 1.07748 0.835Z1429 Shahid Mazharul Munir Sarak Km 001.30-001.60 S 0.3 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.91692 0Z1429 Shahid Mazharul Munir Sarak Km 001.60-001.70 S 0.1 2863 Zilla Rehab 75mm @ IRI 9-12 2016 1.07748 0.675Z1429 Shahid Mazharul Munir Sarak Km 001.70-001.90 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.61128 0Z1429 Shahid Mazharul Munir Sarak Km 001.90-002.00 S 0.1 2863 Zilla Rehab 75mm @ IRI 9-12 2016 1.095438 0.545Z1429 Shahid Mazharul Munir Sarak Km 002.00-002.60 S 0.6 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.887921 0Z1429 Shahid Mazharul Munir Sarak Km 002.60-003.10 S 0.5 2863 Zilla Rehab 75mm @ IRI 9-12 2016 5.53705 0.296Z1429 Shahid Mazharul Munir Sarak Km 003.10-003.30 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0Z1429 Shahid Mazharul Munir Sarak Km 003.30-003.90 S 0.6 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.88478 0.668Z1429 Shahid Mazharul Munir Sarak Km 003.90-004.10 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0.073Z1429 Shahid Mazharul Munir Sarak Km 004.10-005.00 S 0.9 2863 Zilla Overlay 40mm @ Traff >=2000 2016 2.804247 0.707Z1429 Shahid Mazharul Munir Sarak Km 005.00-005.10 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z1429 Shahid Mazharul Munir Sarak Km 005.10-005.50 S 0.4 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.23954 0.64Z1429 Shahid Mazharul Munir Sarak Km 005.50-005.90 S 0.4 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.23954 0Z1429 Shahid Mazharul Munir Sarak Km 005.90-006.00 S 0.1 2863 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.7Z1429 Shahid Mazharul Munir Sarak Km 006.00-006.80 S 0.8 2863 Zilla Overlay 40mm @ Traff >=2000 2016 2.47908 0.114Z1429 Shahid Mazharul Munir Sarak Km 006.80-006.90 S 0.1 2863 Zilla Rehab 75mm @ IRI 9-12 2016 1.103369 0.53Z1429 Shahid Mazharul Munir Sarak Km 006.90-007.10 S 0.2 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.61977 0.001Z1429 Shahid Mazharul Munir Sarak Km 007.10-007.60 S 0.5 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.549425 0.568Z1429 Shahid Mazharul Munir Sarak Km 007.60-007.90 S 0.3 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.911826 0Z1429 Shahid Mazharul Munir Sarak Km 007.90-009.40 S 1.5 2863 Zilla Overlay 40mm @ Traff >=2000 2016 4.45725 0.781Z1429 Shahid Mazharul Munir Sarak Km 009.40-009.50 S 0.1 2863 Zilla Rehab 75mm @ IRI 9-12 2016 1.04755 0.49Z1429 Shahid Mazharul Munir Sarak Km 009.50-009.60 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.29715 0Z1429 Shahid Mazharul Munir Sarak Km 009.60-011.20 S 1.6 2863 Zilla Overlay 40mm @ Traff >=2000 2016 4.835904 0.703Z1429 Shahid Mazharul Munir Sarak Km 011.20-011.60 S 0.4 2863 Zilla Overlay 40mm @ Traff >=2000 2016 1.242639 0Z1429 Shahid Mazharul Munir Sarak Km 011.60-012.40 S 0.8 2863 Zilla Overlay 40mm @ Traff >=2000 2016 2.47908 0.609Z1429 Shahid Mazharul Munir Sarak Km 012.40-012.50 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z1429 Shahid Mazharul Munir Sarak Km 012.50-012.60 S 0.1 2863 Zilla Rehab 75mm @ IRI 9-12 2016 1.092445 0.588Z1429 Shahid Mazharul Munir Sarak Km 012.60-013.70 S 1.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 3.408735 0.49Z1429 Shahid Mazharul Munir Sarak Km 013.70-013.80 S 0.1 2863 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z1429 Shahid Mazharul Munir Sarak Km 013.80-013.95 S 0.15 2863 Zilla Rehab 75mm @ IRI 9-12 2016 1.627743 0.69

Page 59 of 163

Page 60: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 000.20-000.50 S 0.3 1577 Zilla Overlay 40mm @ IRI>12 2016 0.96786 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 000.70-000.90 S 0.2 1577 Zilla Overlay 40mm @ IRI>12 2016 0.626562 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 001.00-001.20 S 0.2 1577 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 001.20-001.30 S 0.1 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0.327Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 001.30-001.40 S 0.1 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 001.40-001.50 S 0.1 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0.52Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 001.50-001.80 S 0.3 1577 Zilla Overlay 40mm @ IRI>12 2016 0.911826 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 002.50-003.10 S 0.6 1577 Zilla Overlay 40mm @ IRI>12 2016 1.85931 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 003.60-003.70 S 0.1 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 003.70-003.80 S 0.1 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0.469Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 003.80-003.90 S 0.1 1577 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 003.90-004.10 S 0.2 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.61128 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 004.10-004.20 S 0.1 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.27168 0.045Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 004.20-004.60 S 0.4 1577 Zilla Overlay 40mm @ 1000-2000 2016 1.107096 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 004.60-005.90 S 1.3 1577 Zilla Overlay 40mm @ 1000-2000 2016 3.807765 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 005.90-006.20 S 0.3 1577 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0.2Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 006.20-006.80 S 0.6 1577 Zilla Overlay 40mm @ 1000-2000 2016 1.85931 0Z1430 Chatkhil-Chitoshi-Shaharasti (Kalibari) Road Km 006.80-007.20 S 0.4 1577 Zilla Overlay 40mm @ 1000-2000 2016 1.242639 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 007.50-007.60 S 0.1 1167 Zilla Overlay 40mm @ IRI>12 2016 0.319224 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 007.80-007.90 S 0.1 1167 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 007.90-008.00 S 0.1 1167 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.231Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 008.00-008.40 S 0.4 1167 Zilla Overlay 40mm @ IRI>12 2016 1.25652 0Z1433 Daganbhuiyan-Choudhurihat-Basurhat Km 008.50-008.60 S 0.1 1167 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z1434 Sonagazi-Companiganj Road Km 007.00-010.80 S 3.8 1682 Zilla Overlay 40mm @ 1000-2000 2016 14.87278 0Z1434 Sonagazi-Companiganj Road Km 010.80-019.60 S 8.8 1682 Zilla Overlay 40mm @ 1000-2000 2016 35.5003 0.151Z1438 Tamuruddin Link Road Km 000.00-017.45 S 17.45 3721 Zilla Rehab 75mm @ IRI 9-12 2016 198.9881 1.074Z1439 Hatiya (Bhuiyan hat)- Jahajmara Road Km 000.00-033.85 S 33.85 3721 Zilla Rehab 75mm @ IRI 9-12 2016 568.3661 0.416Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 000.00-000.10 S 0.1 2667 Zilla Overlay 40mm @ Traff >=2000 2016 0.5094 0.148Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 000.10-000.40 S 0.3 2667 Zilla Overlay 40mm @ Traff >=2000 2016 1.5282 0.047Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 000.40-002.30 S 1.9 2667 Zilla Overlay 40mm @ Traff >=2000 2016 9.6786 0Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 002.30-002.40 S 0.1 2667 Zilla Overlay 40mm @ IRI>12 2016 0.5094 0Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 002.40-003.00 S 0.6 2667 Zilla Overlay 40mm @ Traff >=2000 2016 3.0564 0Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 003.00-003.10 S 0.1 2667 Zilla Overlay 40mm @ Traff >=2000 2016 0.5094 0Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 004.34-004.74 S 0.4 2667 Zilla Overlay 40mm @ Traff >=2000 2016 2.0376 0.008Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 004.74-007.54 S 2.8 2667 Zilla Overlay 40mm @ Traff >=2000 2016 14.26829 0Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 007.54-008.24 S 0.7 2667 Zilla Overlay 40mm @ Traff >=2000 2016 3.5658 0.021Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 008.24-010.34 S 2.1 2667 Zilla Overlay 40mm @ Traff >=2000 2016 10.6974 0Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 010.34-010.44 S 0.1 2667 Zilla Rehab 75mm @ IRI 9-12 2016 1.7958 0.062Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 010.44-021.24 S 10.8 2667 Zilla Overlay 40mm @ Traff >=2000 2016 50.99019 0.068Z1441 Sonapur-Companiganj-Daganbhuiyan Road Km 021.24-021.31 S 0.08 2667 Zilla Overlay 40mm @ Traff >=2000 2016 0.350213 0.074Z1444 Feni-Biroli Bazar-Sonaimuri Road Km 013.12-016.69 S 3.57 3052 Zilla Full Recon 75mm @ IRI>12 2016 85.35334 0.302Z1448 Chanderhat-Bashurhat Road Km 000.20-000.30 S 0.1 1071 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1448 Chanderhat-Bashurhat Road Km 000.30-000.60 S 0.3 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0Z1448 Chanderhat-Bashurhat Road Km 000.60-000.70 S 0.1 1071 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z1448 Chanderhat-Bashurhat Road Km 000.70-001.20 S 0.5 1071 Zilla Overlay 40mm @ 1000-2000 2016 1.549425 0Z1448 Chanderhat-Bashurhat Road Km 001.20-001.30 S 0.1 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0

Page 60 of 163

Page 61: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z1448 Chanderhat-Bashurhat Road Km 001.30-001.60 S 0.3 1071 Zilla Overlay 40mm @ 1000-2000 2016 1.036629 0.132Z1448 Chanderhat-Bashurhat Road Km 001.60-001.70 S 0.1 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z1448 Chanderhat-Bashurhat Road Km 001.70-002.00 S 0.3 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0.073Z1448 Chanderhat-Bashurhat Road Km 002.00-002.80 S 0.8 1071 Zilla Overlay 40mm @ 1000-2000 2016 2.47908 0Z1448 Chanderhat-Bashurhat Road Km 003.30-003.50 S 0.2 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1448 Chanderhat-Bashurhat Road Km 003.50-003.70 S 0.2 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z1448 Chanderhat-Bashurhat Road Km 003.96-004.00 S 0.04 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.127053 0.081Z1448 Chanderhat-Bashurhat Road Km 004.30-004.40 S 0.1 1071 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z1448 Chanderhat-Bashurhat Road Km 004.40-004.70 S 0.3 1071 Zilla Overlay 40mm @ 1000-2000 2016 1.40085 0Z1448 Chanderhat-Bashurhat Road Km 004.70-005.30 S 0.6 1071 Zilla Overlay 40mm @ 1000-2000 2016 2.297394 0Z1448 Chanderhat-Bashurhat Road Km 005.30-005.40 S 0.1 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.33111 0.271Z1448 Chanderhat-Bashurhat Road Km 005.40-005.50 S 0.1 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.33111 0Z1448 Chanderhat-Bashurhat Road Km 005.50-006.50 S 1 1071 Zilla Overlay 40mm @ 1000-2000 2016 2.90358 0.004Z1448 Chanderhat-Bashurhat Road Km 006.50-007.20 S 0.7 1071 Zilla Overlay 40mm @ 1000-2000 2016 1.96119 0Z1448 Chanderhat-Bashurhat Road Km 007.20-007.46 S 0.26 1071 Zilla Overlay 40mm @ 1000-2000 2016 0.736847 0.089Z1449 Dadpurbazar-Khalifarhat Road Km 000.00-001.60 S 1.6 606 Zilla Overlay 40mm @ Traff 100-1000 2016 5.029221 0Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 000.00-002.90 S 2.9 430 Zilla Overlay 40mm @ IRI>12 2016 9.503706 0Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 003.60-003.90 S 0.3 430 Zilla Overlay 40mm @ IRI>12 2016 0.929655 0Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 006.40-008.30 S 1.9 430 Zilla Overlay 40mm @ IRI>12 2016 5.887815 0Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 008.40-008.60 S 0.2 430 Zilla Overlay 40mm @ IRI>12 2016 0.61977 0Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 009.40-011.20 S 1.8 430 Zilla Overlay 40mm @ IRI>12 2016 5.516802 0Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 011.20-011.40 S 0.2 430 Zilla Overlay 40mm @ Traff 100-1000 2016 0.61128 0Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 011.40-013.50 S 2.1 430 Zilla Overlay 40mm @ Traff 100-1000 2016 6.418439 0Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 013.50-013.80 S 0.3 430 Zilla Overlay 40mm @ Traff 100-1000 2016 0.91692 0.181Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 013.80-013.90 S 0.1 430 Zilla Overlay 40mm @ IRI>12 2016 0.30564 0Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 013.90-014.00 S 0.1 430 Zilla Overlay 40mm @ Traff 100-1000 2016 0.30564 0.197Z1508 Dinmoni Bazar-Moulavibazar-Companirhat Km 014.00-014.30 S 0.3 430 Zilla Overlay 40mm @ IRI>12 2016 0.91692 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 015.05-018.22 S 3.17 430 Zilla Overlay 40mm @ IRI>12 2016 10.48957 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 018.32-018.52 S 0.2 430 Zilla Overlay 40mm @ IRI>12 2016 0.66222 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 018.82-019.72 S 0.9 430 Zilla Overlay 40mm @ IRI>12 2016 2.972349 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 020.12-020.42 S 0.3 430 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z1510 Lakshmipur-Dattapara-Chatkhil Road Km 020.52-021.42 S 0.9 430 Zilla Overlay 40mm @ IRI>12 2016 4.04973 0Sub-Total Noakhali Division 2340.016Total Comilla Zone 11246.91

Dhaka ZoneDhaka DivisionN105 Madanpur -Joydevpur Km 021.37-031.26 S 9.89 10509 National Rehab 195mm @ IRI 9-12 2016 437.2029 8.136N105 Madanpur -Joydevpur Km 031.28-031.35 L 0.07 10509 National Overlay 80mm @ IRI 5-9 2016 0.796415 20.03N105 Madanpur -Joydevpur Km 031.28-031.35 R 0.07 10509 National Overlay 80mm @ IRI 5-9 2016 0.796415 20.03N302 Tongi-Ashulia-Zerabo-EPZ Road Km 000.00-000.15 L 0.15 31897 National Rehab 195mm @ IRI 9-12 2016 18.192 9.853N302 Tongi-Ashulia-Zerabo-EPZ Road Km 000.00-000.15 R 0.15 31897 National Rehab 195mm @ IRI 9-12 2016 14.5536 12.683N302 Tongi-Ashulia-Zerabo-EPZ Road Km 000.15-005.78 S 5.63 22161 National Rehab 195mm @ IRI 9-12 2016 311.7011 7.673N302 Tongi-Ashulia-Zerabo-EPZ Road Km 005.80-005.90 L 0.1 22821 National Overlay 80mm @ IRI 5-9 2016 0.949153 31.193N302 Tongi-Ashulia-Zerabo-EPZ Road Km 005.80-005.90 R 0.1 22821 National Overlay 80mm @ IRI 5-9 2016 0.932788 31.75

Page 61 of 163

Page 62: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N302 Tongi-Ashulia-Zerabo-EPZ Road Km 005.90-013.45 S 7.55 30456 National Overlay 80mm @ IRI 5-9 2016 104.4589 57.809N302 Tongi-Ashulia-Zerabo-EPZ Road Km 013.45-013.55 L 0.1 22525 National Overlay 80mm @ IRI 5-9 2016 1.42158 20.612N302 Tongi-Ashulia-Zerabo-EPZ Road Km 013.45-013.55 R 0.1 22525 National Overlay 80mm @ IRI 5-9 2016 1.42158 20.612N302 Tongi-Ashulia-Zerabo-EPZ Road Km 013.55-017.56 S 4.01 22525 National Overlay 80mm @ IRI 5-9 2016 49.25477 24.565N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 000.00-001.70 L 1.7 18810 National Overlay 80mm @ IRI 4-9 2016 21.07575 24.488N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 000.00-001.70 R 1.7 18810 National Overlay 80mm @ IRI 4-9 2016 21.07575 24.483N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 001.70-001.80 L 0.1 18810 National Full Recon 195mm 2016 5.47575 9.812N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 001.70-001.80 R 0.1 18810 National Full Recon 195mm 2016 5.47575 9.844N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 001.80-011.80 L 10 19186 National Overlay 80mm @ IRI 4-9 2016 123.9874 25.009N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 001.80-011.80 R 10 18667 National Overlay 80mm @ IRI 4-9 2016 123.9874 24.804N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 011.80-011.90 L 0.1 19167 National Full Recon 195mm 2016 5.47575 10.202N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 011.80-011.90 R 0.1 18515 National Full Recon 195mm 2016 5.47575 10.152N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 011.90-022.34 L 10.44 19167 National Overlay 80mm @ IRI 4-9 2016 129.7999 25.416N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 011.90-022.34 R 10.44 18515 National Overlay 80mm @ IRI 4-9 2016 130.6629 25.565N501 Mirpur Bridge-Dhour Road Km 000.20-007.80 S 7.6 12874 National Overlay 80mm @ IRI 5-9 2016 91.84615 15.016N501 Mirpur Bridge-Dhour Road Km 007.80-011.94 S 4.14 12874 National Overlay 80mm @ IRI 5-9 2016 50.44818 17.213N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 000.00-000.87 S 0.87 25825 National Overlay 80mm @ IRI 4-9 2016 18.93941 14.89N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 000.87-000.97 L 0.1 24576 National Overlay 80mm @ IRI 4-9 2016 1.452491 13.711N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 000.87-000.97 R 0.1 24576 National Overlay 80mm @ IRI 4-9 2016 1.452491 13.711N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 001.00-001.17 L 0.17 24576 National Overlay 80mm @ IRI 4-9 2016 2.444787 13.61N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 001.00-001.17 R 0.17 24576 National Overlay 80mm @ IRI 4-9 2016 2.444787 13.61N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 001.17-001.28 S 0.11 23076 National Overlay 80mm @ IRI 4-9 2016 3.071571 8.795N802 2nd Buriganga Bridge Approach Road to National HigKm 004.53-004.55 S 0.02 6504 National Overlay 50mm @ IRI 5-7 2016 0.28182 1.265R112 Demra-Amulia-Rampura Road Km 001.60-001.70 S 0.1 4323 Regional Rehab 150mm @ IRI 9-12 2016 2.7531 1.808R112 Demra-Amulia-Rampura Road Km 002.30-002.40 S 0.1 4323 Regional Rehab 150mm @ IRI 9-12 2016 2.7531 1.485R112 Demra-Amulia-Rampura Road Km 002.40-003.50 S 1.1 4323 Regional Overlay 50mm @ IRI 5-7 2016 6.5835 3.193R112 Demra-Amulia-Rampura Road Km 003.50-004.10 S 0.6 4323 Regional Overlay 60mm @ IRI 7-9 2016 4.27842 4.257R112 Demra-Amulia-Rampura Road Km 005.10-006.00 S 0.9 4323 Regional Overlay 60mm @ IRI 7-9 2016 6.424761 4.153R112 Demra-Amulia-Rampura Road Km 008.10-008.20 S 0.1 4323 Regional Rehab 150mm @ IRI 9-12 2016 3.5259 0.765R504 Hemayetpur - Singair - Manikgonj Road Km 003.20-004.01 S 0.81 4080 Regional Overlay 50mm @ IRI 5-7 2016 4.70085 1.78R802 Majina-Kayetpara-Trimohoni Link Road Km 003.10-004.46 S 1.36 3486 Regional Overlay 50mm @ IRI 7-9 2016 5.837579 5.352R810 Postagola-Chasara Road Km 000.00-000.20 L 0.2 15171 Regional DBST @ Traff >6000 2016 0.80028 17.763R810 Postagola-Chasara Road Km 000.00-000.20 R 0.2 15171 Regional DBST @ Traff >6000 2016 0.80028 17.763R810 Postagola-Chasara Road Km 010.52-010.64 R 0.12 15171 Regional DBST @ Traff >6000 2016 0.540831 16.363R814 R812 to Muktarpur Ferryghat Link Road Km 000.00-000.75 S 0.75 9353 Regional Overlay 60mm @ IRI 5.5-9 2016 6.737023 11.865R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 004.00-004.20 S 0.2 4818 Regional Overlay 50mm @ IRI 5-7 2016 1.1655 2.037Z1102 Matuail-Manikandi-Shakerjaiga Road Km 006.50-007.17 S 0.67 4101 Zilla Rehab 75mm @ IRI 9-12 2016 6.966207 2.298Z3004 Mirpur-Pallabi-Dhaur Road Km 000.30-001.65 L 1.35 2569 Zilla Rehab 75mm @ IRI 9-12 2016 29.49601 0.15Z3004 Mirpur-Pallabi-Dhaur Road Km 000.30-001.65 R 1.35 2569 Zilla Rehab 75mm @ IRI 9-12 2016 29.09196 0.161Z3004 Mirpur-Pallabi-Dhaur Road Km 001.65-001.72 S 0.07 2569 Zilla Rehab 75mm @ IRI 9-12 2016 1.46657 0.363Z3005 Bhasantek-Dewanpara-Kalsiberibandh Road Km 000.00-003.43 S 3.43 6168 Zilla Rehab 75mm @ IRI 9-12 2016 45.46508 2.422Z3006 West End of Mostofa Kamal Link to Pallabi Road Km 000.00-005.74 S 5.74 4215 Zilla Rehab 75mm @ IRI 9-12 2016 193.2763 0.631Z3007 Zerabo-Earpur-Diakhali Madrasha Road Km 000.00-005.74 S 5.74 4215 Zilla Full Recon 75mm @ IRI>12 2016 94.8498 1.591Z5044 R504 to Harindhara Link Road Km 000.00-001.13 S 1.13 5768 Zilla Rehab 75mm @ IRI 9-12 2016 16.90297 3.267Z5069 Turag-Ruhitpur-Baorvita Road Km 000.00-010.22 S 10.22 2082 Zilla Rehab 75mm @ IRI 9-12 2016 167.6248 0.133Z5069 Turag-Ruhitpur-Baorvita Road Km 010.22-017.53 S 7.31 5004 Zilla Rehab 75mm @ IRI 9-12 2016 121.2419 1.516

Page 62 of 163

Page 63: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z8002 Keraniganj-Kholamura-Mirpur Road Km 000.00-001.70 S 1.7 5768 Zilla Overlay 40mm @ Traff >=2000 2016 8.096913 0.162Z8002 Keraniganj-Kholamura-Mirpur Road Km 001.70-002.60 S 0.9 5768 Zilla Rehab 75mm @ IRI 9-12 2016 15.13859 2.209Z8002 Keraniganj-Kholamura-Mirpur Road Km 011.20-014.20 S 3 5768 Zilla Overlay 50mm @ IRI 6-9 2016 17.703 1.562Z8002 Keraniganj-Kholamura-Mirpur Road Km 017.60-019.40 S 1.8 5768 Zilla Overlay 50mm @ IRI 6-9 2016 10.6029 3.35Z8002 Keraniganj-Kholamura-Mirpur Road Km 020.00-020.70 S 0.7 5768 Zilla Rehab 75mm @ IRI 9-12 2016 11.75351 2.803Z8201 Kamrangirchar-Kurerghat-Shialkhali-Keraniganj Km 000.00-007.47 S 7.47 3940 Zilla Rehab 75mm @ IRI 9-12 2016 97.47961 0.847Z8208 Basilla Bridge Approach Road Km 000.00-000.30 S 0.3 13707 Zilla Full Recon 75mm @ IRI>12 2016 9.51993 4.582Z8208 Basilla Bridge Approach Road Km 000.30-001.00 S 0.7 13707 Zilla Overlay 50mm @ IRI 6-9 2016 5.3655 3.556Z8208 Basilla Bridge Approach Road Km 001.00-001.10 S 0.1 13707 Zilla Full Recon 75mm @ IRI>12 2016 3.17331 4.586Z8208 Basilla Bridge Approach Road Km 001.20-001.40 S 0.2 13707 Zilla Full Recon 75mm @ IRI>12 2016 6.34662 4.581Z8208 Basilla Bridge Approach Road Km 001.40-001.50 S 0.1 13707 Zilla Overlay 50mm @ IRI 6-9 2016 0.7665 3.365Z8208 Basilla Bridge Approach Road Km 001.50-001.60 S 0.1 13707 Zilla Full Recon 75mm @ IRI>12 2016 3.17331 4.295Z8208 Basilla Bridge Approach Road Km 001.60-002.20 S 0.6 13707 Zilla Overlay 50mm @ IRI 6-9 2016 4.599 1.486Z8208 Basilla Bridge Approach Road Km 002.20-003.00 S 0.8 13707 Zilla Full Recon 75mm @ IRI>12 2016 25.38648 4.583Z8208 Basilla Bridge Approach Road Km 003.10-006.00 S 2.9 13707 Zilla Full Recon 75mm @ IRI>12 2016 97.69882 4.3Sub-Total Dhaka Division 2756.642

Gazipur DivisionN105 Madanpur -Joydevpur Km 031.35-031.46 L 0.11 10509 National Rehab 195mm @ IRI 9-12 2016 4.869392 8.097N105 Madanpur -Joydevpur Km 031.35-031.46 R 0.11 10509 National Rehab 195mm @ IRI 9-12 2016 4.869392 8.097N105 Madanpur -Joydevpur Km 031.46-033.73 S 2.27 10509 National Rehab 195mm @ IRI 9-12 2016 108.6081 7.15N105 Madanpur -Joydevpur Km 033.78-033.87 L 0.09 10509 National Overlay 80mm @ IRI 5-9 2016 1.037753 20.83N105 Madanpur -Joydevpur Km 033.78-033.87 R 0.09 10509 National Overlay 80mm @ IRI 5-9 2016 1.037753 20.83N105 Madanpur -Joydevpur Km 033.87-034.48 S 0.61 10509 National Overlay 80mm @ IRI 5-9 2016 7.916548 19.291N105 Madanpur -Joydevpur Km 034.48-034.58 S 0.1 10509 National Full Recon 195mm 2016 5.300526 7.575N105 Madanpur -Joydevpur Km 034.58-037.88 S 3.3 10509 National Overlay 80mm @ IRI 5-9 2016 39.87532 19.948N105 Madanpur -Joydevpur Km 037.98-045.90 S 7.92 10509 National Overlay 80mm @ IRI 5-9 2016 95.30802 19.415N105 Madanpur -Joydevpur Km 045.99-046.09 L 0.1 10928 National Overlay 80mm @ IRI 5-9 2016 0.9918 24.698N105 Madanpur -Joydevpur Km 045.99-046.09 R 0.1 10928 National Overlay 80mm @ IRI 5-9 2016 0.9918 24.698N105 Madanpur -Joydevpur Km 046.09-046.15 L 0.06 12358 National Overlay 80mm @ IRI 5-9 2016 0.64467 28.966N105 Madanpur -Joydevpur Km 046.09-046.15 R 0.06 12358 National Overlay 80mm @ IRI 5-9 2016 0.64467 28.966N105 Madanpur -Joydevpur Km 046.15-047.49 S 1.34 12358 National Overlay 80mm @ IRI 5-9 2016 16.10931 24.196N105 Madanpur -Joydevpur Km 047.49-047.59 S 0.1 12358 National Full Recon 195mm 2016 5.32973 8.499N105 Madanpur -Joydevpur Km 047.59-048.68 S 1.1 12358 National Overlay 80mm @ IRI 5-9 2016 13.21326 22.721N105 Madanpur -Joydevpur Km 048.68-048.88 L 0.2 12358 National Overlay 80mm @ IRI 5-9 2016 2.392222 24.271N105 Madanpur -Joydevpur Km 048.68-048.88 R 0.2 12358 National Overlay 80mm @ IRI 5-9 2016 2.392222 24.271N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 000.00-029.96 R 29.96 23735 National Overlay 80mm @ IRI 4-9 2016 516.5168 10.47N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 029.96-033.71 L 3.75 12560 National Overlay 80mm @ IRI 4-9 2016 46.46583 20.982N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 029.96-033.71 R 3.75 12703 National Overlay 80mm @ IRI 4-9 2016 46.15606 21.86N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 033.71-033.81 L 0.1 12560 National Rehab 195mm @ IRI 9-12 2016 4.548 9.858N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 033.71-033.81 R 0.1 12703 National Rehab 195mm @ IRI 9-12 2016 4.51768 10.149N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 033.81-038.81 R 5 12703 National Overlay 80mm @ IRI 4-9 2016 61.59888 21.894N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 038.81-039.01 L 0.2 12560 National Rehab 195mm @ IRI 9-12 2016 9.096 9.354N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 038.81-039.01 R 0.2 12703 National Rehab 195mm @ IRI 9-12 2016 9.03536 9.601N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 041.81-042.01 L 0.2 12560 National Rehab 195mm @ IRI 9-12 2016 9.096 9.435N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 041.81-042.01 R 0.2 12703 National Rehab 195mm @ IRI 9-12 2016 9.03536 9.685

Page 63 of 163

Page 64: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 042.01-045.41 L 3.4 12346 National Overlay 80mm @ IRI 4-9 2016 42.1639 20.773N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 042.01-045.41 R 3.4 12490 National Overlay 80mm @ IRI 4-9 2016 41.8828 21.906N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 045.41-045.61 L 0.2 9539 National Full Recon 180mm 2016 10.4985 7.063N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 045.41-045.61 R 0.2 9697 National Full Recon 180mm 2016 10.42851 7.173N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 045.61-056.00 L 10.39 9539 National Overlay 50mm @ IRI 4-7 2016 79.85754 19.398N3 Dhaka (Banani)-Joydebpur-Mymensingh Road Km 045.61-056.00 R 10.39 9697 National Overlay 50mm @ IRI 4-7 2016 79.74845 19.781N406 Kaliakoir Town Old Section Km 000.00-000.04 L 0.04 18982 National Overlay 80mm @ IRI 5-9 2016 0.41077 37.507N406 Kaliakoir Town Old Section Km 000.00-000.04 R 0.04 18982 National Overlay 80mm @ IRI 5-9 2016 0.404985 38.334N406 Kaliakoir Town Old Section Km 000.04-000.60 S 0.56 18982 National Overlay 80mm @ IRI 5-9 2016 6.911193 31.361N406 Kaliakoir Town Old Section Km 000.60-001.00 S 0.4 18982 National Full Recon 195mm 2016 21.61096 11.418N406 Kaliakoir Town Old Section Km 001.00-002.00 S 1 18982 National Rehab 195mm @ IRI 9-12 2016 44.69168 13.41N406 Kaliakoir Town Old Section Km 002.00-003.04 S 1.04 18982 National Rehab 195mm @ IRI 9-12 2016 46.12642 13.667R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 000.00-000.40 S 0.4 9891 Regional DBST @ 25% Crk 2016 0.92872 13.843R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 001.10-002.50 S 1.4 15423 Regional DBST @ Traff >6000 2016 4.868864 22.82R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 002.50-002.60 S 0.1 9891 Regional Full Recon 180mm 2016 3.77946 5.478R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 002.60-002.80 S 0.2 9891 Regional Overlay 60mm @ IRI 5.5-9 2016 1.35108 14.337R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 002.80-003.00 S 0.2 9891 Regional Full Recon 180mm 2016 7.55892 5.036R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 003.00-003.10 S 0.1 9891 Regional Overlay 60mm @ IRI 5.5-9 2016 0.67554 14.894R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 003.10-003.20 S 0.1 9891 Regional Full Recon 180mm 2016 3.77946 5.411R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 003.20-005.05 S 1.85 9891 Regional Overlay 60mm @ IRI 5.5-9 2016 12.48398 13.577R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 005.45-007.30 S 1.85 15423 Regional Overlay 60mm @ IRI 5.5-9 2016 16.31945 27.954R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 007.30-007.40 S 0.1 15423 Regional Full Recon 195mm 2016 4.89167 10.811R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 007.40-010.60 S 3.2 15423 Regional Overlay 60mm @ IRI 5.5-9 2016 26.82144 29.341R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 010.60-010.70 S 0.1 15423 Regional Rehab 150mm @ IRI 9-12 2016 3.2361 13.765R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 010.70-012.50 S 1.8 15423 Regional Overlay 60mm @ IRI 5.5-9 2016 15.94274 26.966R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 013.95-016.74 S 2.79 15339 Regional Overlay 60mm @ IRI 5.5-9 2016 23.768 28.675R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 018.01-019.54 S 1.53 9790 Regional Overlay 60mm @ IRI 5.5-9 2016 10.16425 12.925R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 020.24-024.39 S 4.15 9790 Regional Overlay 60mm @ IRI 5.5-9 2016 27.53563 13.056R302 Kaliganj Bazar Road Km 006.40-007.32 S 0.92 5656 Regional Overlay 60mm @ IRI 5.5-9 2016 6.378248 8.21R303 Tongi By-Pass Road Km 000.00-001.40 S 1.4 22745 Regional Overlay 60mm @ IRI 5.5-9 2016 13.12736 24.04R310 Joydebpur-Gazipur-Azmatpur-Itakhola Road Km 000.00-001.60 S 1.6 17361 Regional DBST @ Traff >6000 2016 7.161024 16.908R310 Joydebpur-Gazipur-Azmatpur-Itakhola Road Km 001.60-002.00 S 0.4 17361 Regional Full Recon 150mm @ IRI 12 2016 20.6312 8.531R310 Joydebpur-Gazipur-Azmatpur-Itakhola Road Km 002.00-002.40 S 0.4 17361 Regional Overlay 60mm @ IRI 5.5-9 2016 4.2534 22.305R310 Joydebpur-Gazipur-Azmatpur-Itakhola Road Km 002.40-002.70 S 0.3 17361 Regional Full Recon 150mm @ IRI 12 2016 15.4734 8.56R310 Joydebpur-Gazipur-Azmatpur-Itakhola Road Km 002.70-003.73 S 1.03 17361 Regional Overlay 60mm @ IRI 5.5-9 2016 10.95251 23.062R310 Joydebpur-Gazipur-Azmatpur-Itakhola Road Km 003.73-004.40 S 0.67 2335 Regional DBST @ 25% Crk 2016 1.833629 0.242R310 Joydebpur-Gazipur-Azmatpur-Itakhola Road Km 004.40-004.60 S 0.2 2335 Regional Overlay 50mm @ IRI 7-9 2016 1.155 1.033R312 Rajendrapur Chourasta-Motkhola Road Km 000.00-000.13 L 0.13 6233 Regional DBST @ 25% Crk 2016 0.35815 10.131R312 Rajendrapur Chourasta-Motkhola Road Km 000.00-000.13 R 0.13 6233 Regional DBST @ Traff >6000 2016 0.38285 11.317R312 Rajendrapur Chourasta-Motkhola Road Km 000.13-004.00 S 3.88 6233 Regional Overlay 60mm @ IRI 5.5-9 2016 29.1827 12.57R312 Rajendrapur Chourasta-Motkhola Road Km 004.00-004.10 S 0.1 6233 Regional Full Recon 180mm 2016 5.24925 3.894R312 Rajendrapur Chourasta-Motkhola Road Km 004.10-005.50 S 1.4 6233 Regional Overlay 60mm @ IRI 5.5-9 2016 10.57846 12.902R312 Rajendrapur Chourasta-Motkhola Road Km 005.50-005.70 S 0.2 6233 Regional Full Recon 180mm 2016 7.892142 4.987R312 Rajendrapur Chourasta-Motkhola Road Km 005.70-006.30 S 0.6 6233 Regional Overlay 60mm @ IRI 5.5-9 2016 4.195854 14.58R312 Rajendrapur Chourasta-Motkhola Road Km 006.30-006.40 S 0.1 6233 Regional Full Recon 180mm 2016 3.905442 5.735R312 Rajendrapur Chourasta-Motkhola Road Km 006.40-016.20 S 9.8 6233 Regional Overlay 60mm @ IRI 5.5-9 2016 67.9193 14.643

Page 64 of 163

Page 65: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R312 Rajendrapur Chourasta-Motkhola Road Km 016.20-018.52 S 2.31 6233 Regional DBST @ Traff >6000 2016 6.847264 9.824R312 Rajendrapur Chourasta-Motkhola Road Km 018.52-018.90 S 0.39 2602 Regional DBST @ Traff 2000-4000 2016 1.059946 1.643R312 Rajendrapur Chourasta-Motkhola Road Km 018.90-019.10 S 0.2 2602 Regional Overlay 50mm @ IRI 7-9 2016 1.1613 3.434R312 Rajendrapur Chourasta-Motkhola Road Km 019.10-024.30 S 5.2 2602 Regional Overlay 50mm @ IRI 5-7 2016 30.25422 2.163R312 Rajendrapur Chourasta-Motkhola Road Km 024.30-024.40 S 0.1 2602 Regional DBST @ Traff 2000-4000 2016 0.273676 3.619R312 Rajendrapur Chourasta-Motkhola Road Km 024.40-037.21 S 12.8 2602 Regional DBST @ Traff 2000-4000 2016 34.65384 1.378R312 Rajendrapur Chourasta-Motkhola Road Km 037.21-037.51 S 0.3 2602 Regional Rehab 135mm @ IRI 9-12 2016 4.89024 2.011R312 Rajendrapur Chourasta-Motkhola Road Km 041.23-043.03 S 1.8 2602 Regional Overlay 50mm @ IRI 7-9 2016 8.6184 4.523R313 Mawna-Kapasia-Hitirdia-Monohardi Km 000.60-004.40 S 3.8 1277 Regional Overlay 50mm @ IRI 7-9 2016 22.344 0.889R313 Mawna-Kapasia-Hitirdia-Monohardi Km 004.40-004.70 S 0.3 1277 Regional Overlay 50mm @ IRI 5-7 2016 1.764 0.497R313 Mawna-Kapasia-Hitirdia-Monohardi Km 004.70-006.54 S 1.84 1277 Regional DBST @ Traff 100-2000 2016 5.042831 0.639R313 Mawna-Kapasia-Hitirdia-Monohardi Km 007.74-010.84 S 3.1 1277 Regional DBST @ Traff 100-2000 2016 8.57584 0.602R313 Mawna-Kapasia-Hitirdia-Monohardi Km 010.84-011.14 S 0.3 1277 Regional DBST @ Traff 100-2000 2016 0.82992 0.651R313 Mawna-Kapasia-Hitirdia-Monohardi Km 011.14-011.64 S 0.5 1277 Regional DBST Traff All 2016 1.3832 0R313 Mawna-Kapasia-Hitirdia-Monohardi Km 011.64-012.04 S 0.4 1277 Regional Overlay 50mm @ IRI 7-9 2016 2.352 0.935R313 Mawna-Kapasia-Hitirdia-Monohardi Km 012.04-012.34 S 0.3 1277 Regional DBST @ Traff 100-2000 2016 0.832686 0.007R313 Mawna-Kapasia-Hitirdia-Monohardi Km 012.34-013.40 S 1.06 1277 Regional Overlay 50mm @ IRI 7-9 2016 6.25044 0.666R313 Mawna-Kapasia-Hitirdia-Monohardi Km 014.14-014.74 S 0.6 1277 Regional DBST @ Traff 100-2000 2016 1.055184 1.578R313 Mawna-Kapasia-Hitirdia-Monohardi Km 014.74-017.74 S 3 1277 Regional Overlay 50mm @ IRI 7-9 2016 11.214 2.099R313 Mawna-Kapasia-Hitirdia-Monohardi Km 021.04-024.11 S 3.07 1277 Regional DBST @ 25% Crk 2016 5.47842 0.222R313 Mawna-Kapasia-Hitirdia-Monohardi Km 024.11-042.35 S 18.24 1277 Regional Overlay 50mm @ IRI 7-9 2016 46.16391 2.458R314 Gafargaon-Bormi-Mawna Road Km 000.00-000.30 S 0.3 2162 Regional Overlay 50mm @ IRI 5-7 2016 1.16865 4.178R314 Gafargaon-Bormi-Mawna Road Km 000.30-001.50 S 1.2 2162 Regional DBST @ Traff 2000-4000 2016 2.199288 3.449R314 Gafargaon-Bormi-Mawna Road Km 001.50-002.60 S 1.1 2162 Regional Overlay 50mm @ IRI 7-9 2016 4.28505 4.144R314 Gafargaon-Bormi-Mawna Road Km 002.60-003.40 S 0.8 2162 Regional Overlay 50mm @ IRI 7-9 2016 3.1164 4.573R314 Gafargaon-Bormi-Mawna Road Km 004.10-005.00 S 0.9 2162 Regional Rehab 135mm @ IRI 9-12 2016 14.99674 1.361R314 Gafargaon-Bormi-Mawna Road Km 005.00-007.30 S 2.3 2162 Regional Overlay 50mm @ IRI 7-9 2016 8.891065 3.872R314 Gafargaon-Bormi-Mawna Road Km 007.30-007.40 S 0.1 2162 Regional Rehab 135mm @ IRI 9-12 2016 1.666304 2.004R314 Gafargaon-Bormi-Mawna Road Km 007.40-007.50 S 0.1 2162 Regional Overlay 50mm @ IRI 5-7 2016 0.3864 5.462R314 Gafargaon-Bormi-Mawna Road Km 007.50-008.10 S 0.6 2162 Regional Rehab 135mm @ IRI 9-12 2016 9.997824 1.563R314 Gafargaon-Bormi-Mawna Road Km 008.10-008.70 S 0.6 2162 Regional Overlay 50mm @ IRI 7-9 2016 2.331 4.053R314 Gafargaon-Bormi-Mawna Road Km 008.70-008.80 S 0.1 2162 Regional Full Recon 135mm 2016 2.027144 2.174R314 Gafargaon-Bormi-Mawna Road Km 008.80-009.90 S 1.1 2162 Regional Overlay 50mm @ IRI 7-9 2016 4.28505 4.07R314 Gafargaon-Bormi-Mawna Road Km 009.90-010.90 S 1 2162 Regional Rehab 135mm @ IRI 9-12 2016 16.79888 1.454R314 Gafargaon-Bormi-Mawna Road Km 013.17-014.89 S 1.72 2162 Regional Overlay 50mm @ IRI 7-9 2016 6.679638 4.305R314 Gafargaon-Bormi-Mawna Road Km 015.59-018.53 S 2.94 2162 Regional Overlay 50mm @ IRI 7-9 2016 11.37175 4.278R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 003.00-009.60 S 6.6 2553 Regional Overlay 50mm @ IRI 5-7 2016 26.54592 1.916R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 013.00-014.40 S 1.4 2553 Regional Overlay 50mm @ IRI 7-9 2016 5.7771 2.518R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 014.40-015.50 S 1.1 2553 Regional Overlay 50mm @ IRI 5-7 2016 4.4583 3.084R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 015.50-021.70 S 6.2 2553 Regional Overlay 50mm @ IRI 7-9 2016 25.13265 2.822R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 021.70-025.00 S 3.3 2553 Regional Overlay 50mm @ IRI 7-9 2016 13.2363 2.914R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 025.00-028.00 S 3 2553 Regional Overlay 50mm @ IRI 7-9 2016 12.03701 2.867R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 028.00-031.26 S 3.26 2553 Regional Overlay 50mm @ IRI 5-7 2016 14.57303 2.542R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 031.26-031.40 S 0.14 3610 Regional Overlay 50mm @ IRI 5-7 2016 1.123815 0.856R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 031.40-037.56 S 6.16 4314 Regional DBST @ Traff 4000-6000 2016 11.62819 1.176R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 037.56-039.47 S 1.91 4314 Regional DBST @ Traff 4000-6000 2016 3.587329 0.829

Page 65 of 163

Page 66: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R316 Kapasia Bazar Old Section Km 000.00-000.60 S 0.6 2553 Regional Overlay 50mm @ IRI 7-9 2016 4.7061 1.269Z3008 Board Bazar-Zugitalla-Gazipur Road Km 000.60-000.70 S 0.1 1193 Zilla Overlay 40mm @ IRI>12 2016 0.460158 0Z3008 Board Bazar-Zugitalla-Gazipur Road Km 004.10-004.60 S 0.5 1193 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.479Z3008 Board Bazar-Zugitalla-Gazipur Road Km 004.80-006.72 S 1.92 1193 Zilla Rehab 75mm @ IRI 9-12 2016 24.03313 0.024Z3009 Sripur-Bairagirchala Road Km 000.00-001.10 S 1.1 2219 Zilla Overlay 40mm @ Traff >=2000 2016 5.089755 0.018Z3009 Sripur-Bairagirchala Road Km 001.10-001.20 S 0.1 2219 Zilla Overlay 40mm @ Traff >=2000 2016 0.463554 0Z3009 Sripur-Bairagirchala Road Km 001.60-001.90 S 0.3 2219 Zilla Rehab 75mm @ IRI 9-12 2016 4.902534 0.016Z3009 Sripur-Bairagirchala Road Km 003.10-005.38 S 2.28 2219 Zilla Overlay 40mm @ Traff >=2000 2016 7.63268 0Z3010 Kaliganj-Tumulia-Ulukhola Road Km 000.00-006.83 S 6.83 1742 Zilla Overlay 40mm @ 1000-2000 2016 25.44498 0Z3010 Kaliganj-Tumulia-Ulukhola Road Km 006.83-007.93 S 1.1 1742 Zilla Overlay 40mm @ 1000-2000 2016 3.343362 0Z3024 Master Bari-Mirzapur-Nuhashpalli-Mawna Road Km 000.00-003.00 S 3 1440 Zilla Overlay 40mm @ 1000-2000 2016 14.08491 0Z3024 Master Bari-Mirzapur-Nuhashpalli-Mawna Road Km 015.20-015.30 S 0.1 1440 Zilla Rehab 75mm @ IRI 9-12 2016 0.95776 3.824Z3024 Master Bari-Mirzapur-Nuhashpalli-Mawna Road Km 015.40-015.90 S 0.5 1440 Zilla Full Recon 75mm @ IRI>12 2016 6.9552 0.725Z3024 Master Bari-Mirzapur-Nuhashpalli-Mawna Road Km 016.00-016.40 S 0.4 1440 Zilla Full Recon 75mm @ IRI>12 2016 5.56416 0.649Z3024 Master Bari-Mirzapur-Nuhashpalli-Mawna Road Km 016.80-016.90 S 0.1 1440 Zilla Rehab 75mm @ IRI 9-12 2016 0.95776 3.675Z3024 Master Bari-Mirzapur-Nuhashpalli-Mawna Road Km 017.60-018.00 S 0.4 1440 Zilla Rehab 75mm @ IRI 9-12 2016 3.83104 3.502Z3024 Master Bari-Mirzapur-Nuhashpalli-Mawna Road Km 018.00-018.50 S 0.5 1440 Zilla Overlay 40mm @ 1000-2000 2016 1.829595 0.195Z3024 Master Bari-Mirzapur-Nuhashpalli-Mawna Road Km 018.50-018.90 S 0.4 1440 Zilla Overlay 40mm @ 1000-2000 2016 1.8678 0.28Z3024 Master Bari-Mirzapur-Nuhashpalli-Mawna Road Km 021.20-021.90 S 0.7 1440 Zilla Full Recon 75mm @ IRI>12 2016 16.73595 0.214Z3025 Kapashia-Pabur-Fuldi-Kaliganj Road Km 017.40-017.50 S 0.1 1262 Zilla Rehab 75mm @ IRI 9-12 2016 1.071494 0.548Z3025 Kapashia-Pabur-Fuldi-Kaliganj Road Km 017.70-017.80 S 0.1 1262 Zilla Rehab 75mm @ IRI 9-12 2016 1.071494 0.648Z3026 Mawna (M.C Bazar)-Shishupalli Road Km 000.00-001.30 S 1.3 1875 Zilla Overlay 40mm @ 1000-2000 2016 3.962283 0.032Z3026 Mawna (M.C Bazar)-Shishupalli Road Km 001.30-001.50 S 0.2 1875 Zilla Overlay 40mm @ 1000-2000 2016 0.606186 0Z3026 Mawna (M.C Bazar)-Shishupalli Road Km 001.50-001.60 S 0.1 1875 Zilla Overlay 40mm @ 1000-2000 2016 0.303093 0Z3026 Mawna (M.C Bazar)-Shishupalli Road Km 001.60-002.50 S 0.9 1875 Zilla Overlay 40mm @ 1000-2000 2016 2.727837 0Z3026 Mawna (M.C Bazar)-Shishupalli Road Km 002.50-003.00 S 0.5 1875 Zilla Overlay 40mm @ 1000-2000 2016 1.51971 0.051Z3026 Mawna (M.C Bazar)-Shishupalli Road Km 003.00-003.30 S 0.3 1875 Zilla Rehab 75mm @ IRI 9-12 2016 3.250398 0.077Z3026 Mawna (M.C Bazar)-Shishupalli Road Km 003.30-004.02 S 0.71 1875 Zilla Overlay 40mm @ 1000-2000 2016 2.148904 0Sub-Total Gazipur Division 2349.979

Manikganj DivisionN5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 022.34-028.05 S 5.71 13049 National Overlay 80mm @ IRI 4-9 2016 78.29946 21.045N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 028.10-028.22 L 0.12 13049 National Overlay 80mm @ IRI 4-9 2016 1.353807 25.829N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 028.10-028.22 R 0.12 13049 National Overlay 80mm @ IRI 4-9 2016 1.353807 25.829N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 028.22-034.61 S 6.39 13049 National Overlay 80mm @ IRI 4-9 2016 71.82616 25.58N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 034.69-034.84 L 0.16 13049 National Rehab 195mm @ IRI 9-12 2016 6.203472 11.756N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 034.69-034.84 R 0.16 13049 National Rehab 195mm @ IRI 9-12 2016 5.63952 13.106N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 034.84-043.88 S 9.04 13049 National Overlay 80mm @ IRI 4-9 2016 115.6598 22.312N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 043.89-048.00 L 4.11 13049 National Overlay 80mm @ IRI 4-9 2016 40.80265 28.068N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 043.89-048.00 R 4.11 13049 National Overlay 80mm @ IRI 4-9 2016 40.80265 28.068N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 048.00-049.87 S 1.87 13049 National Overlay 80mm @ IRI 4-9 2016 21.01955 25.784N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 049.89-050.02 L 0.13 13049 National Overlay 80mm @ IRI 4-9 2016 1.538943 26.521N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 049.89-050.02 R 0.13 13049 National Overlay 80mm @ IRI 4-9 2016 1.538943 26.521N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 050.02-051.42 S 1.4 13049 National Overlay 80mm @ IRI 4-9 2016 25.4562 18.533N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 051.48-054.58 L 3.1 13049 National Overlay 80mm @ IRI 4-9 2016 30.7458 27.934N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 051.48-054.58 R 3.1 13049 National Overlay 80mm @ IRI 4-9 2016 30.7458 27.934

Page 66 of 163

Page 67: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 054.58-054.85 L 0.27 13049 National Overlay 80mm @ IRI 4-9 2016 2.697696 30.264N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 054.58-054.85 R 0.27 13049 National Overlay 80mm @ IRI 4-9 2016 2.697696 30.264N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 054.85-061.75 S 6.9 13049 National Overlay 80mm @ IRI 4-9 2016 78.92744 25.479N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 061.78-063.65 L 1.87 13049 National Overlay 80mm @ IRI 4-9 2016 18.55658 28.319N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 061.78-063.65 R 1.87 13049 National Overlay 80mm @ IRI 4-9 2016 18.55658 28.319N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 063.65-065.79 S 2.13 13049 National Overlay 80mm @ IRI 4-9 2016 24.13942 25.603N540 Nabinagar-EPZ-Kaliakoir (Chandra) Road Km 000.00-000.10 L 0.1 11109 National Overlay 80mm @ IRI 5-9 2016 1.094286 28.481N540 Nabinagar-EPZ-Kaliakoir (Chandra) Road Km 000.00-000.10 R 0.1 10760 National Overlay 80mm @ IRI 5-9 2016 1.097592 25.07N540 Nabinagar-EPZ-Kaliakoir (Chandra) Road Km 000.10-009.30 L 9.2 6777 National Overlay 50mm @ IRI 5-7 2016 70.23584 16.824N540 Nabinagar-EPZ-Kaliakoir (Chandra) Road Km 000.10-009.30 R 9.2 6981 National Overlay 50mm @ IRI 5-7 2016 71.20194 17.5N540 Nabinagar-EPZ-Kaliakoir (Chandra) Road Km 009.30-009.50 L 0.2 6509 National Rehab 180mm @ IRI 9-12 2016 8.41252 6.034N540 Nabinagar-EPZ-Kaliakoir (Chandra) Road Km 009.30-009.50 R 0.2 6747 National Rehab 180mm @ IRI 9-12 2016 8.29728 6.581N540 Nabinagar-EPZ-Kaliakoir (Chandra) Road Km 009.50-014.09 L 4.59 6509 National DBST @ Traff >6000 2016 16.46535 14.155N540 Nabinagar-EPZ-Kaliakoir (Chandra) Road Km 009.50-014.09 R 4.59 6747 National DBST @ Traff >6000 2016 16.32927 15.062R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 039.47-040.36 S 0.89 4314 Regional Overlay 50mm @ IRI 5-7 2016 3.54711 1.455R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 040.36-040.46 S 0.1 4314 Regional Rehab 150mm @ IRI 9-12 2016 1.8354 1.309R315 Mawna-Kaliakoir-Dhamrai-Nabinagar Km 043.46-046.56 S 3.1 5072 Regional DBST Traff 4000-600 2016 386.51 0R504 Hemayetpur - Singair - Manikgonj Road Km 013.90-014.00 S 0.1 4080 Regional DBST @ Traff 4000-6000 2016 0.2717 3.242R504 Hemayetpur - Singair - Manikgonj Road Km 030.50-030.70 S 0.2 4080 Regional DBST @ Traff 4000-6000 2016 0.494 2.439R506 Aricha-Ghior-Daulatpur-Tangail Road Km 003.40-012.80 S 9.4 2459 Regional DBST @ Traff 2000-4000 2016 26.09981 0.39R506 Aricha-Ghior-Daulatpur-Tangail Road Km 012.80-013.20 S 0.4 2459 Regional Overlay 50mm @ IRI 7-9 2016 2.3562 1.097R506 Aricha-Ghior-Daulatpur-Tangail Road Km 013.20-013.30 S 0.1 2459 Regional Full Recon 135mm 2016 3.065304 0.131R506 Aricha-Ghior-Daulatpur-Tangail Road Km 013.30-013.50 S 0.2 2459 Regional Overlay 50mm @ IRI 5-7 2016 1.1781 0.551R506 Aricha-Ghior-Daulatpur-Tangail Road Km 014.00-014.30 S 0.3 2459 Regional Overlay 50mm @ IRI 7-9 2016 1.76715 1.051R506 Aricha-Ghior-Daulatpur-Tangail Road Km 014.30-015.00 S 0.7 2459 Regional DBST Traff All 2016 1.939938 0R506 Aricha-Ghior-Daulatpur-Tangail Road Km 016.10-016.40 S 0.3 2459 Regional Overlay 50mm @ IRI 5-7 2016 1.7703 0.852R506 Aricha-Ghior-Daulatpur-Tangail Road Km 016.40-017.50 S 1.1 2459 Regional DBST @ Traff 2000-4000 2016 3.051245 0.973R506 Aricha-Ghior-Daulatpur-Tangail Road Km 017.50-017.60 S 0.1 2459 Regional DBST @ 25% Crk 2016 0.276146 0.475Z5063 Golra-Saturia Road Km 002.90-005.80 S 2.9 2481 Zilla Overlay 40mm @ Traff >=2000 2016 13.54622 0Z5063 Golra-Saturia Road Km 008.30-009.00 S 0.7 2481 Zilla Overlay 40mm @ Traff >=2000 2016 3.227049 0Z5063 Golra-Saturia Road Km 010.20-010.50 S 0.3 2847 Zilla Full Recon 75mm @ IRI>12 2016 7.185591 0.103Z5064 Baniajuri-Zitka-Harirampur Road Km 023.60-023.70 S 0.1 2899 Zilla Rehab 75mm @ IRI 9-12 2016 1.322906 0.737Z5064 Baniajuri-Zitka-Harirampur Road Km 023.70-024.30 S 0.6 2899 Zilla Overlay 40mm @ Traff >=2000 2016 2.64888 0Z5064 Baniajuri-Zitka-Harirampur Road Km 024.30-024.40 S 0.1 2899 Zilla Full Recon 75mm @ IRI>12 2016 2.425626 0.129Z8209 Dohar-Kartikpur-Balirtek Road Km 014.10-023.28 S 9.18 4118 Zilla Rehab 75mm @ IRI 9-12 2016 99.18742 2.039Sub-Total Manikganj Division 1375.402

Munshiganj DivisionN8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 003.15-003.17 R 0.02 15421 National Overlay 50mm @ IRI 4 2016 0.16065 9.586N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 003.70-003.88 L 0.17 15421 National Overlay 80mm @ IRI 4-9 2016 2.157165 10.835N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 003.70-003.88 R 0.17 15421 National Overlay 80mm @ IRI 4-9 2016 2.157165 10.835N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 033.70-033.78 L 0.08 7354 National Overlay 50mm @ IRI 4-7 2016 0.620865 9.176N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 033.70-033.78 R 0.08 7354 National Overlay 50mm @ IRI 4-7 2016 0.620865 9.176N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 033.78-034.85 S 1.07 7354 National DBST @ 25% Crk 2016 6.07867 2.096R814 R812 to Muktarpur Ferryghat Link Road Km 001.29-002.03 S 0.75 9353 Regional Overlay 60mm @ IRI 5.5-9 2016 6.362223 13.287R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 018.69-021.20 S 2.51 5751 Regional Overlay 60mm @ IRI 5.5-9 2016 17.28382 3.445

Page 67 of 163

Page 68: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 021.29-024.00 S 2.71 5751 Regional Overlay 60mm @ IRI 5.5-9 2016 20.017 3.858R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 024.00-024.30 S 0.3 5751 Regional Overlay 60mm @ IRI 5.5-9 2016 2.06415 5.534R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 027.43-027.83 S 0.4 5751 Regional Overlay 60mm @ IRI 5.5-9 2016 3.65292 1.908R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 039.66-042.01 S 2.35 5751 Regional Overlay 60mm @ IRI 5.5-9 2016 16.52196 3.414R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 042.01-042.41 S 0.4 5751 Regional Overlay 60mm @ IRI 5.5-9 2016 2.812248 5.064R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 054.44-058.34 S 3.89 3799 Regional DBST @ 25% Crk 2016 10.77513 1.526R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 066.95-068.60 S 1.65 3799 Regional Overlay 50mm @ IRI 7-9 2016 9.71964 3.342R820 Zinzira-Nawabganj-Dohar-Srinagar Road Km 069.80-072.05 S 2.26 3799 Regional Overlay 50mm @ IRI 7-9 2016 15.49195 2.793R821 Sreenagar Bazar bypass Road Km 000.00-001.29 S 1.28 4818 Regional Overlay 50mm @ IRI 5-7 2016 7.420875 2.345Z5069 Turag-Ruhitpur-Baorvita Road Km 017.53-024.58 S 7.05 4315 Zilla Rehab 75mm @ IRI 9-12 2016 76.34102 1.689Z8004 Munshiganj-Kunderbazar-Srinagar Road Km 000.40-002.10 S 1.7 3948 Zilla Rehab 75mm @ IRI 9-12 2016 24.72817 0.676Z8004 Munshiganj-Kunderbazar-Srinagar Road Km 002.10-002.30 S 0.2 3948 Zilla Overlay 40mm @ Traff >=2000 2016 0.614676 0.339Z8004 Munshiganj-Kunderbazar-Srinagar Road Km 002.30-002.50 S 0.2 3948 Zilla Full Recon 75mm @ IRI>12 2016 3.147228 0.727Z8004 Munshiganj-Kunderbazar-Srinagar Road Km 002.50-003.00 S 0.5 3948 Zilla Overlay 40mm @ Traff >=2000 2016 2.211645 0.451Z8004 Munshiganj-Kunderbazar-Srinagar Road Km 003.00-004.20 S 1.2 3948 Zilla Rehab 75mm @ IRI 9-12 2016 13.82766 0.683Z8004 Munshiganj-Kunderbazar-Srinagar Road Km 007.30-007.90 S 0.6 3948 Zilla Overlay 40mm @ Traff >=2000 2016 1.874592 0.818Z8004 Munshiganj-Kunderbazar-Srinagar Road Km 007.90-008.50 S 0.6 3948 Zilla Rehab 75mm @ IRI 9-12 2016 6.626502 0.845Z8004 Munshiganj-Kunderbazar-Srinagar Road Km 008.50-011.50 S 3 3948 Zilla Overlay 40mm @ Traff >=2000 2016 9.44937 0.98Z8004 Munshiganj-Kunderbazar-Srinagar Road Km 011.50-020.46 S 8.95 3948 Zilla Overlay 40mm @ Cracks >25% 2016 35.63513 0.135Z8205 Padma By-Pass (Alternative Road of ZKDS Road) Km 002.20-002.30 S 0.1 2521 Zilla Overlay 40mm @ Traff >=2000 2016 0.309036 0Z8205 Padma By-Pass (Alternative Road of ZKDS Road) Km 006.10-006.40 S 0.3 2521 Zilla Overlay 40mm @ Traff >=2000 2016 0.924561 0.33Z8207 Dohar-Kartikpur-Jhowkanda (Mainut) Road Km 000.00-000.10 S 0.1 3108 Zilla Overlay 40mm @ Cracks >25% 2016 0.452652 0.132Z8207 Dohar-Kartikpur-Jhowkanda (Mainut) Road Km 000.10-000.60 S 0.5 3108 Zilla Full Recon 75mm @ IRI>12 2016 12.21507 0.498Z8207 Dohar-Kartikpur-Jhowkanda (Mainut) Road Km 000.60-000.70 S 0.1 3108 Zilla Overlay 40mm @ Cracks >25% 2016 0.451848 0.076Z8207 Dohar-Kartikpur-Jhowkanda (Mainut) Road Km 000.70-001.50 S 0.8 3108 Zilla Rehab 75mm @ IRI 9-12 2016 13.43258 0.382Z8207 Dohar-Kartikpur-Jhowkanda (Mainut) Road Km 001.50-002.90 S 1.4 3108 Zilla Overlay 40mm @ Cracks >25% 2016 6.30336 0.044Z8207 Dohar-Kartikpur-Jhowkanda (Mainut) Road Km 002.90-003.30 S 0.4 3108 Zilla Full Recon 75mm @ IRI>12 2016 9.772056 0.567Z8209 Dohar-Kartikpur-Balirtek Road Km 000.00-000.50 S 0.5 4118 Zilla Full Recon 75mm @ IRI>12 2016 8.17236 1.274Z8209 Dohar-Kartikpur-Balirtek Road Km 000.70-000.90 S 0.2 4118 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 2.395Z8209 Dohar-Kartikpur-Balirtek Road Km 001.10-001.20 S 0.1 4118 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 3.146Z8209 Dohar-Kartikpur-Balirtek Road Km 001.30-001.60 S 0.3 4118 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 2.15Z8209 Dohar-Kartikpur-Balirtek Road Km 001.60-002.90 S 1.3 4118 Zilla Overlay 50mm @ IRI 6-9 2016 5.0505 3.298Z8209 Dohar-Kartikpur-Balirtek Road Km 002.90-003.60 S 0.7 4118 Zilla Rehab 75mm @ IRI 9-12 2016 7.751869 2.037Z8209 Dohar-Kartikpur-Balirtek Road Km 004.00-004.50 S 0.5 4118 Zilla Rehab 75mm @ IRI 9-12 2016 5.53705 2.119Z8209 Dohar-Kartikpur-Balirtek Road Km 004.50-004.80 S 0.3 4118 Zilla Overlay 50mm @ IRI 6-9 2016 1.1655 3.18Z8209 Dohar-Kartikpur-Balirtek Road Km 004.80-005.20 S 0.4 4118 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 2.05Sub-Total Munshiganj Division 380.9858

Narayanganj DivisionN1 Dhaka-Comilla-Chittagong-Teknaf Road Km 000.00-008.30 L 8.3 20852 National Overlay 80mm @ IRI 4-9 2016 115.9471 18.634N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 000.00-008.30 R 8.3 20260 National Overlay 80mm @ IRI 4-9 2016 140.3715 19.711N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 008.30-008.40 L 0.1 18918 National Full Recon 195mm 2016 5.40274 10.114N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 008.30-008.40 R 0.1 18946 National Full Recon 195mm 2016 5.47575 10.167N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 008.40-012.20 L 3.8 20581 National Overlay 80mm @ IRI 4-9 2016 50.94215 19.074N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 008.40-012.20 R 3.8 20952 National Overlay 80mm @ IRI 4-9 2016 52.00999 18.314N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 012.20-012.30 L 0.1 2992 National Full Recon 135mm 2016 1.6392 4.063

Page 68 of 163

Page 69: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 012.20-012.30 R 0.1 20489 National Full Recon 195mm 2016 5.32973 7.936N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 012.30-013.20 L 0.9 20947 National Full Recon 195mm @ IRI 12 2016 44.87924 8.427N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 012.30-013.20 R 0.9 20489 National Full Recon 195mm 2016 47.96757 7.796N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 013.20-014.30 L 1.1 20947 National Full Recon 195mm 2016 58.68032 7.997N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 013.20-014.30 R 1.1 20489 National Full Recon 195mm 2016 58.68032 7.936N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 014.30-016.40 L 2.1 20947 National Overlay 80mm @ IRI 4-9 2016 25.34049 21.385N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 014.30-016.40 R 2.1 20489 National Rehab 195mm @ IRI 9-12 2016 92.96111 8.954N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 016.40-016.70 L 0.3 20947 National Full Recon 195mm 2016 15.98919 7.996N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 016.40-016.70 R 0.3 20489 National Full Recon 195mm 2016 15.98919 7.934N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 016.70-019.70 L 3 20947 National Overlay 80mm @ IRI 4-9 2016 35.80398 21.844N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 016.70-019.70 R 3 20489 National Full Recon 195mm 2016 161.6441 7.841N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 019.70-019.80 L 0.1 20947 National Full Recon 195mm 2016 5.25672 8.129N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 019.70-019.80 R 0.1 20489 National Full Recon 195mm 2016 5.40274 7.818N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 019.80-020.30 L 0.5 20895 National Rehab 195mm @ IRI 9-12 2016 22.2852 9.445N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 019.80-020.30 R 0.5 20515 National Full Recon 195mm 2016 26.97719 8.375N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 020.30-020.60 L 0.3 17341 National Full Recon 195mm 2016 16.20822 10.973N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 020.30-020.60 R 0.3 17050 National Full Recon 195mm 2016 16.20822 11.234N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 020.60-022.60 L 2 17341 National Rehab 195mm @ IRI 9-12 2016 130.8611 8.179N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 020.60-022.60 R 2 17050 National Rehab 195mm @ IRI 9-12 2016 91.08128 11.926N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 022.60-022.70 L 0.1 17341 National Full Recon 195mm 2016 28.10885 1.991N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 022.60-022.70 R 0.1 17050 National Full Recon 195mm 2016 6.13284 9.827N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 022.70-024.90 L 2.2 17151 National Rehab 195mm @ IRI 9-12 2016 114.6496 10.411N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 022.70-024.90 R 2.2 17239 National Rehab 195mm @ IRI 9-12 2016 96.76476 12.212N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 024.90-025.50 L 0.6 17050 National Full Recon 195mm 2016 31.62793 11.526N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 024.90-025.50 R 0.6 17341 National Full Recon 195mm 2016 31.84696 11.211N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 025.50-025.70 L 0.2 17050 National Rehab 195mm @ IRI 9-12 2016 8.85344 12.522N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 025.50-025.70 R 0.2 17341 National Rehab 195mm @ IRI 9-12 2016 9.096 12.09N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 025.70-025.80 L 0.1 17050 National Full Recon 195mm 2016 5.32973 11.329N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 025.70-025.80 R 0.1 17341 National Full Recon 195mm 2016 5.47575 10.822N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 025.80-027.60 L 1.8 17050 National Rehab 195mm @ IRI 9-12 2016 80.00842 12.357N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 025.80-027.60 R 1.8 17341 National Rehab 195mm @ IRI 9-12 2016 81.53654 11.783N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 027.60-028.00 L 0.4 17050 National Full Recon 195mm 2016 21.8738 11.096N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 027.60-028.00 R 0.4 17341 National Full Recon 195mm 2016 21.8738 10.867N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 028.00-028.40 L 0.4 17050 National Rehab 195mm @ IRI 9-12 2016 18.192 11.985N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 028.00-028.40 R 0.4 17341 National Rehab 195mm @ IRI 9-12 2016 18.192 11.735N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 028.40-028.60 L 0.2 17050 National Full Recon 195mm 2016 10.9515 11.08N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 028.40-028.60 R 0.2 17341 National Full Recon 195mm 2016 10.9515 10.852N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 028.60-030.70 L 2.1 17050 National Rehab 195mm @ IRI 9-12 2016 95.50799 12.235N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 028.60-030.70 R 2.1 17341 National Full Recon 195mm 2016 114.9907 10.663N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 030.70-030.90 L 0.2 17050 National Full Recon 195mm 2016 10.9515 11.072N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 030.70-030.90 R 0.2 17341 National Full Recon 195mm 2016 10.9515 10.852N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 030.90-031.40 L 0.5 17307 National Rehab 195mm @ IRI 9-12 2016 22.67936 12.136N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 030.90-031.40 R 0.5 17083 National Full Recon 195mm 2016 27.26923 11.055N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 031.40-031.50 L 0.1 17341 National Full Recon 195mm 2016 5.32973 11.166N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 031.40-031.50 R 0.1 17050 National Full Recon 195mm 2016 5.25672 11.557N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 031.50-032.00 L 0.5 17341 National Rehab 195mm @ IRI 9-12 2016 22.17787 12.305

Page 69 of 163

Page 70: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 031.50-032.00 R 0.5 17050 National Rehab 195mm @ IRI 9-12 2016 21.87406 12.207N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 032.00-032.30 L 0.3 17341 National Full Recon 195mm 2016 15.98919 11.166N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 032.00-032.30 R 0.3 17050 National Full Recon 195mm 2016 15.77016 11.557N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 032.30-032.70 L 0.4 17341 National Rehab 195mm @ IRI 9-12 2016 17.70688 12.467N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 032.30-032.70 R 0.4 17050 National Full Recon 195mm 2016 21.02688 11.3N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 032.70-033.60 L 0.9 17341 National Full Recon 195mm 2016 47.96757 11.122N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 032.70-033.60 R 0.9 17050 National Full Recon 195mm 2016 47.31048 11.534N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 033.60-035.40 L 1.8 17341 National Rehab 195mm @ IRI 9-12 2016 79.68096 12.4N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 033.60-035.40 R 1.8 17050 National Rehab 195mm @ IRI 9-12 2016 78.58944 12.252N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 035.40-035.50 L 0.1 17341 National Full Recon 195mm 2016 5.32973 11.165N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 035.40-035.50 R 0.1 17050 National Full Recon 195mm 2016 5.25672 11.557N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 035.50-037.70 L 2.2 17341 National Overlay 80mm @ IRI 4-9 2016 30.29288 25.399N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 035.50-037.70 R 2.2 17050 National Rehab 195mm @ IRI 9-12 2016 88.84973 13.354N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 037.70-037.80 L 0.1 17341 National Full Recon 195mm 2016 5.25672 11.314N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 037.70-037.80 R 0.1 17050 National Full Recon 195mm 2016 5.32973 11.368N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 037.80-038.04 L 0.24 17341 National Rehab 195mm @ IRI 9-12 2016 10.30395 12.442N1 Dhaka-Comilla-Chittagong-Teknaf Road Km 037.80-038.04 R 0.24 17050 National Rehab 195mm @ IRI 9-12 2016 10.44706 12.432N2 Dhaka-Bhairab-Sylhet-Tamabil Km 000.00-000.13 L 0.13 21504 National Overlay 80mm @ IRI 4-9 2016 1.633164 21.949N2 Dhaka-Bhairab-Sylhet-Tamabil Km 000.00-000.13 R 0.13 21504 National Overlay 80mm @ IRI 4-9 2016 1.633164 21.953N2 Dhaka-Bhairab-Sylhet-Tamabil Km 000.13-006.70 S 6.57 21876 National Overlay 80mm @ IRI 4-9 2016 89.39314 17.069N2 Dhaka-Bhairab-Sylhet-Tamabil Km 006.70-006.80 S 0.1 21106 National Full Recon 195mm 2016 5.32973 9.871N2 Dhaka-Bhairab-Sylhet-Tamabil Km 006.80-011.00 S 4.2 21106 National Overlay 80mm @ IRI 4-9 2016 50.62065 24.648N2 Dhaka-Bhairab-Sylhet-Tamabil Km 011.11-011.28 L 0.17 21106 National Overlay 80mm @ IRI 4-9 2016 1.909215 26.32N2 Dhaka-Bhairab-Sylhet-Tamabil Km 011.11-011.28 R 0.17 21106 National Overlay 80mm @ IRI 4-9 2016 1.909215 26.32N2 Dhaka-Bhairab-Sylhet-Tamabil Km 011.28-011.49 S 0.21 21106 National Overlay 80mm @ IRI 4-9 2016 3.991995 23.601N2 Dhaka-Bhairab-Sylhet-Tamabil Km 011.49-018.66 S 7.17 13631 National Overlay 80mm @ IRI 4-9 2016 86.68652 17.437R110 Jatrabari-Demra-Narayanganj Road Km 009.52-010.88 S 1.36 5788 Regional DBST @ Traff 4000-6000 2016 5.742493 9.314R110 Jatrabari-Demra-Narayanganj Road Km 010.88-010.98 S 0.1 5788 Regional Rehab 150mm @ IRI 9-12 2016 4.7334 3.655R110 Jatrabari-Demra-Narayanganj Road Km 010.98-018.93 S 7.94 5788 Regional DBST @ 25% Crk 2016 36.49632 7.053R111 Signboard at 6th km of N1 -Narayanganj Road Km 000.00-000.03 S 0.03 19655 Regional Rehab 150mm @ IRI 9-12 2016 2.3184 7.201R111 Signboard at 6th km of N1 -Narayanganj Road Km 005.15-008.11 L 2.95 19655 Regional Overlay 60mm @ IRI 5.5-9 2016 26.94898 29.004R111 Signboard at 6th km of N1 -Narayanganj Road Km 005.15-008.11 R 2.95 19655 Regional Overlay 60mm @ IRI 5.5-9 2016 26.65324 29.31R113 Madanpur-Madanganj-Sayedpur Road Km 000.00-002.00 S 2 4323 Regional Overlay 50mm @ IRI 5-7 2016 11.76 4.015R113 Madanpur-Madanganj-Sayedpur Road Km 002.00-002.20 S 0.2 4323 Regional Rehab 150mm @ IRI 9-12 2016 5.4096 1.649R113 Madanpur-Madanganj-Sayedpur Road Km 002.20-011.40 S 9.2 4323 Regional DBST @ Traff 4000-6000 2016 25.22638 3.024R113 Madanpur-Madanganj-Sayedpur Road Km 011.40-012.12 S 0.72 4323 Regional Overlay 60mm @ IRI 7-9 2016 4.940199 5.463R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 000.00-000.05 L 0.05 5321 Regional DBST @ Traff 4000-6000 2016 0.154128 2.657R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 000.00-000.05 R 0.05 5321 Regional DBST @ Traff 4000-6000 2016 0.156697 2.501R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 000.05-000.40 S 0.35 5321 Regional Overlay 60mm @ IRI 5.5-9 2016 2.838469 1.244R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 000.40-001.80 S 1.4 5321 Regional Overlay 60mm @ IRI 5.5-9 2016 9.702756 1.183R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 001.80-002.20 S 0.4 5321 Regional DBST @ Traff 4000-6000 2016 1.094704 2.439R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 002.60-003.40 S 0.8 5321 Regional Overlay 60mm @ IRI 5.5-9 2016 5.544432 2.619R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 003.40-004.80 S 1.4 5321 Regional Overlay 60mm @ IRI 5.5-9 2016 9.702756 1.394R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 004.81-007.10 S 2.29 5321 Regional Overlay 60mm @ IRI 5.5-9 2016 15.87787 2.038R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 007.14-009.33 S 2.19 5321 Regional Overlay 60mm @ IRI 5.5-9 2016 15.43221 1.572R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 010.50-010.70 S 0.2 4013 Regional Rehab 150mm @ IRI 9-12 2016 5.5545 2.105

Page 70 of 163

Page 71: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 010.80-012.20 S 1.4 4013 Regional Rehab 150mm @ IRI 9-12 2016 38.40816 1.744R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 012.30-013.10 S 0.8 4013 Regional Rehab 150mm @ IRI 9-12 2016 21.67704 1.758R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 013.97-015.24 S 1.27 4013 Regional Overlay 50mm @ IRI 5-7 2016 9.74988 3.34R201 Tarabo-Demra Road Km 000.00-002.20 S 2.19 19205 Regional DBST @ Traff >6000 2016 8.099945 37.115R202 Bhulta-Rupganj-Kayetpara-Rampura Road Km 000.20-000.30 S 0.1 4051 Regional Full Recon 150mm 2016 3.21604 1.672R202 Bhulta-Rupganj-Kayetpara-Rampura Road Km 001.20-001.30 S 0.1 4051 Regional Rehab 150mm @ IRI 9-12 2016 1.8837 1.213R202 Bhulta-Rupganj-Kayetpara-Rampura Road Km 001.30-002.30 S 1 4051 Regional DBST @ 25% Crk 2016 1.9266 0.519R202 Bhulta-Rupganj-Kayetpara-Rampura Road Km 002.30-003.50 S 1.2 4051 Regional Full Recon 150mm 2016 28.39824 0.669R202 Bhulta-Rupganj-Kayetpara-Rampura Road Km 003.60-003.70 S 0.1 4051 Regional Rehab 150mm @ IRI 9-12 2016 1.8837 1.277R202 Bhulta-Rupganj-Kayetpara-Rampura Road Km 003.70-008.85 S 5.14 4051 Regional Overlay 60mm @ IRI 7-9 2016 29.47869 2.316R203 Bhulta-Araihazar-Shibpur-Radhika Road Km 016.60-019.88 S 3.28 4051 Regional Overlay 50mm @ IRI 5-7 2016 18.93622 1.828R802 Majina-Kayetpara-Trimohoni Link Road Km 000.03-003.10 S 3.07 15171 Regional Rehab 150mm @ IRI 9-12 2016 92.0825 11.336Z1061 Madanganj (Minarbari)-Langalbandh Road Km 000.00-003.87 S 3.87 1483 Zilla Overlay 40mm @ 1000-2000 2016 12.02851 0Z1066 Sonargaon College-Kaikhertek-Nabiganj Road Km 001.70-001.90 S 0.2 5694 Zilla Rehab 75mm @ IRI 9-12 2016 3.226454 1.993Z1066 Sonargaon College-Kaikhertek-Nabiganj Road Km 001.90-002.20 S 0.3 5694 Zilla Overlay 50mm @ IRI 6-9 2016 1.69785 2.887Z1066 Sonargaon College-Kaikhertek-Nabiganj Road Km 002.20-002.30 S 0.1 5694 Zilla Rehab 75mm @ IRI 9-12 2016 1.610234 2.371Z1066 Sonargaon College-Kaikhertek-Nabiganj Road Km 002.50-003.20 S 0.7 5694 Zilla Full Recon 75mm @ IRI>12 2016 16.61423 0.871Sub-Total Narayanganj Division 3423.209

Narsingdi DivisionN2 Dhaka-Bhairab-Sylhet-Tamabil Km 018.66-025.42 S 6.76 13341 National Overlay 80mm @ IRI 4-9 2016 81.52398 16.951N2 Dhaka-Bhairab-Sylhet-Tamabil Km 025.51-026.04 L 0.53 13341 National Overlay 80mm @ IRI 4-9 2016 5.869802 18.411N2 Dhaka-Bhairab-Sylhet-Tamabil Km 025.51-026.04 R 0.53 13341 National Overlay 80mm @ IRI 4-9 2016 5.869802 18.411N2 Dhaka-Bhairab-Sylhet-Tamabil Km 026.04-027.38 S 1.34 13341 National Overlay 80mm @ IRI 4-9 2016 16.5462 16.863N2 Dhaka-Bhairab-Sylhet-Tamabil Km 027.43-027.88 L 0.44 13341 National Overlay 80mm @ IRI 4-9 2016 4.917344 19.764N2 Dhaka-Bhairab-Sylhet-Tamabil Km 027.43-027.88 R 0.44 13341 National Overlay 80mm @ IRI 4-9 2016 4.917344 19.764N2 Dhaka-Bhairab-Sylhet-Tamabil Km 027.88-029.83 S 1.95 13341 National Overlay 80mm @ IRI 4-9 2016 29.84822 9.435N2 Dhaka-Bhairab-Sylhet-Tamabil Km 029.83-030.08 L 0.24 13341 National Overlay 80mm @ IRI 4-9 2016 2.691249 19.864N2 Dhaka-Bhairab-Sylhet-Tamabil Km 029.83-030.08 R 0.24 13341 National Overlay 80mm @ IRI 4-9 2016 2.691249 19.849N2 Dhaka-Bhairab-Sylhet-Tamabil Km 030.08-033.44 S 3.36 14438 National Overlay 80mm @ IRI 4-9 2016 117.8576 5.078N2 Dhaka-Bhairab-Sylhet-Tamabil Km 033.61-035.43 S 1.83 14489 National Overlay 80mm @ IRI 4-9 2016 22.36046 20.396N2 Dhaka-Bhairab-Sylhet-Tamabil Km 035.43-035.63 S 0.2 14489 National Full Recon 195mm 2016 10.80548 8.608N2 Dhaka-Bhairab-Sylhet-Tamabil Km 035.63-036.82 S 1.18 14489 National Overlay 80mm @ IRI 4-9 2016 18.542 20.277N2 Dhaka-Bhairab-Sylhet-Tamabil Km 036.83-037.37 L 0.53 14489 National Overlay 80mm @ IRI 4-9 2016 8.79396 17.852N2 Dhaka-Bhairab-Sylhet-Tamabil Km 036.83-037.37 R 0.53 14489 National Overlay 80mm @ IRI 4-9 2016 8.79396 17.852N2 Dhaka-Bhairab-Sylhet-Tamabil Km 037.37-042.53 S 5.16 14489 National Overlay 80mm @ IRI 4-9 2016 63.80051 20.268N2 Dhaka-Bhairab-Sylhet-Tamabil Km 042.54-042.77 L 0.23 14489 National Overlay 80mm @ IRI 4-9 2016 3.231615 18.641N2 Dhaka-Bhairab-Sylhet-Tamabil Km 042.54-042.77 R 0.23 14489 National Overlay 80mm @ IRI 4-9 2016 3.231615 18.641N2 Dhaka-Bhairab-Sylhet-Tamabil Km 042.77-050.17 S 7.41 11825 National Overlay 80mm @ IRI 4-9 2016 93.39475 16.01N2 Dhaka-Bhairab-Sylhet-Tamabil Km 050.24-050.39 L 0.15 11701 National Overlay 80mm @ IRI 4-9 2016 2.163777 18.496N2 Dhaka-Bhairab-Sylhet-Tamabil Km 050.24-050.39 R 0.15 11701 National Overlay 80mm @ IRI 4-9 2016 2.163777 18.496N2 Dhaka-Bhairab-Sylhet-Tamabil Km 050.39-051.67 S 1.28 11701 National Overlay 80mm @ IRI 4-9 2016 15.8688 20.658N2 Dhaka-Bhairab-Sylhet-Tamabil Km 051.74-051.87 L 0.13 11701 National Overlay 80mm @ IRI 4-9 2016 1.758792 20.26N2 Dhaka-Bhairab-Sylhet-Tamabil Km 051.74-051.87 R 0.13 11701 National Overlay 80mm @ IRI 4-9 2016 1.758792 20.26N2 Dhaka-Bhairab-Sylhet-Tamabil Km 051.87-052.67 S 0.8 11701 National Overlay 80mm @ IRI 4-9 2016 9.918 22.155N2 Dhaka-Bhairab-Sylhet-Tamabil Km 052.67-052.82 L 0.15 11701 National Overlay 80mm @ IRI 4-9 2016 1.9836 19.777

Page 71 of 163

Page 72: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N2 Dhaka-Bhairab-Sylhet-Tamabil Km 052.67-052.82 R 0.15 11701 National Overlay 80mm @ IRI 4-9 2016 1.9836 19.777N2 Dhaka-Bhairab-Sylhet-Tamabil Km 052.82-054.44 S 1.62 11701 National Overlay 80mm @ IRI 4-9 2016 20.02196 20.486N2 Dhaka-Bhairab-Sylhet-Tamabil Km 054.44-054.73 L 0.29 12632 National Overlay 80mm @ IRI 4-9 2016 3.903724 19.86N2 Dhaka-Bhairab-Sylhet-Tamabil Km 054.44-054.73 R 0.29 12632 National Overlay 80mm @ IRI 4-9 2016 3.903724 19.86N2 Dhaka-Bhairab-Sylhet-Tamabil Km 054.73-058.88 S 4.15 13210 National Overlay 80mm @ IRI 4-9 2016 51.44962 21.129N2 Dhaka-Bhairab-Sylhet-Tamabil Km 058.94-059.13 L 0.19 13210 National Overlay 80mm @ IRI 4-9 2016 2.472888 21.251N2 Dhaka-Bhairab-Sylhet-Tamabil Km 058.94-059.13 R 0.19 13210 National Overlay 80mm @ IRI 4-9 2016 2.472888 21.351N2 Dhaka-Bhairab-Sylhet-Tamabil Km 059.13-063.85 S 4.72 13210 National Overlay 80mm @ IRI 4-9 2016 58.541 21.521N2 Dhaka-Bhairab-Sylhet-Tamabil Km 063.94-064.05 L 0.11 13210 National Overlay 80mm @ IRI 4-9 2016 1.428192 20.516N2 Dhaka-Bhairab-Sylhet-Tamabil Km 063.94-064.05 R 0.11 13210 National Overlay 80mm @ IRI 4-9 2016 1.428192 20.516N2 Dhaka-Bhairab-Sylhet-Tamabil Km 064.05-067.94 S 3.89 13210 National Overlay 80mm @ IRI 4-9 2016 47.61995 21.448N2 Dhaka-Bhairab-Sylhet-Tamabil Km 067.94-068.04 S 0.1 13210 National Full Recon 195mm 2016 5.40274 9.316N2 Dhaka-Bhairab-Sylhet-Tamabil Km 068.04-070.10 S 2.06 13210 National Overlay 80mm @ IRI 4-9 2016 27.6778 19.705N2 Dhaka-Bhairab-Sylhet-Tamabil Km 070.14-070.85 L 0.71 13210 National Overlay 80mm @ IRI 4-9 2016 9.336144 21.67N2 Dhaka-Bhairab-Sylhet-Tamabil Km 070.14-070.85 R 0.71 13210 National Overlay 80mm @ IRI 4-9 2016 9.336144 21.67N2 Dhaka-Bhairab-Sylhet-Tamabil Km 070.85-071.11 S 0.26 13210 National Overlay 80mm @ IRI 4-9 2016 5.15736 15.824N2 Dhaka-Bhairab-Sylhet-Tamabil Km 071.14-072.74 L 1.6 13210 National Overlay 80mm @ IRI 4-9 2016 22.4808 19.396N2 Dhaka-Bhairab-Sylhet-Tamabil Km 071.14-072.74 R 1.6 13210 National Overlay 80mm @ IRI 4-9 2016 22.4808 19.349N2 Dhaka-Bhairab-Sylhet-Tamabil Km 072.74-072.94 L 0.2 13210 National Full Recon 195mm 2016 12.4117 7.789N2 Dhaka-Bhairab-Sylhet-Tamabil Km 072.74-072.94 R 0.2 13210 National Full Recon 195mm 2016 12.4117 7.792N2 Dhaka-Bhairab-Sylhet-Tamabil Km 072.94-073.54 L 0.6 12388 National Overlay 80mm @ IRI 4-9 2016 8.4303 17.91N2 Dhaka-Bhairab-Sylhet-Tamabil Km 072.94-073.54 R 0.6 12388 National Overlay 80mm @ IRI 4-9 2016 8.4303 17.693R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 015.24-017.30 S 2.07 4013 Regional Overlay 50mm @ IRI 5-7 2016 14.63569 3.633R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 017.59-017.60 S 0.01 4013 Regional DBST @ Traff 4000-6000 2016 0.02221 12.522R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 017.60-018.30 S 0.7 4013 Regional Rehab 150mm @ IRI 9-12 2016 19.00122 2.121R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 020.00-020.20 S 0.2 4013 Regional Rehab 150mm @ IRI 9-12 2016 5.42892 2.207R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 020.40-020.50 S 0.1 4013 Regional Full Recon 150mm @ IRI 12 2016 3.392012 2.505R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 020.50-021.70 S 1.2 4013 Regional Overlay 60mm @ IRI 7-9 2016 8.346672 5.843R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 021.70-021.90 S 0.2 4013 Regional Full Recon 150mm 2016 6.747616 1.854R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 022.20-022.40 S 0.2 4013 Regional Overlay 60mm @ IRI 7-9 2016 1.391112 6.154R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 022.50-022.60 S 0.1 4013 Regional Full Recon 150mm @ IRI 12 2016 3.373808 2.701R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 022.60-024.70 S 2.1 4013 Regional Overlay 50mm @ IRI 5-7 2016 12.2598 5.239R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 024.70-025.00 S 0.3 4013 Regional DBST @ Traff 4000-6000 2016 0.823992 5.202R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 025.41-025.83 S 0.41 4013 Regional DBST @ 25% Crk 2016 1.139855 3.067R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 025.83-025.93 L 0.1 4013 Regional DBST @ 25% Crk 2016 0.26676 4.041R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 025.83-025.93 R 0.1 4013 Regional DBST @ 25% Crk 2016 0.26676 4.041R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 025.93-026.10 S 0.18 4013 Regional DBST @ Traff 4000-6000 2016 0.491402 1.88R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 026.10-026.90 S 0.8 4013 Regional Rehab 150mm @ IRI 9-12 2016 21.71568 1.656R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 026.90-027.59 S 0.68 4013 Regional Overlay 60mm @ IRI 7-9 2016 4.801913 5.825R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 027.59-027.72 L 0.14 4013 Regional Overlay 60mm @ IRI 7-9 2016 0.937312 6.23R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 027.59-027.72 R 0.14 4013 Regional Overlay 60mm @ IRI 7-9 2016 0.935623 6.249R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 027.72-028.06 S 0.34 4013 Regional Overlay 60mm @ IRI 7-9 2016 2.381904 5.808R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 028.06-028.22 L 0.16 4013 Regional Overlay 60mm @ IRI 7-9 2016 1.120896 6.694R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 028.06-028.22 R 0.16 3868 Regional Overlay 50mm @ IRI 7-9 2016 0.2016 15.753R114 Nayapur-Araihazar-Narsingdi-Raipura Road Km 028.22-029.43 S 1.21 3868 Regional Overlay 50mm @ IRI 7-9 2016 4.71639 4.874R210 Shahepratap-Narsingdi Road Km 002.00-002.10 S 0.1 9917 Regional Full Recon 150mm @ IRI 12 2016 6.25004 0.984

Page 72 of 163

Page 73: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R211 Itakhola-Motkhola-Kotiadi Road Km 010.80-011.10 S 0.3 3919 Regional Rehab 135mm @ IRI 9-12 2016 8.313408 1.643R211 Itakhola-Motkhola-Kotiadi Road Km 011.10-014.78 S 3.68 3924 Regional Overlay 50mm @ IRI 5-7 2016 21.99214 4.849R211 Itakhola-Motkhola-Kotiadi Road Km 014.78-018.08 S 3.3 4312 Regional Overlay 50mm @ IRI 5-7 2016 19.68717 3.778R211 Itakhola-Motkhola-Kotiadi Road Km 018.08-022.52 S 4.44 4312 Regional Overlay 50mm @ IRI 5-7 2016 26.43354 4.507R211 Itakhola-Motkhola-Kotiadi Road Km 022.52-024.02 S 1.5 4312 Regional Overlay 60mm @ IRI 7-9 2016 10.62099 4.728R211 Itakhola-Motkhola-Kotiadi Road Km 024.02-025.42 S 1.4 4312 Regional Rehab 150mm @ IRI 9-12 2016 37.93482 1.738R211 Itakhola-Motkhola-Kotiadi Road Km 026.32-026.46 S 0.13 4312 Regional Rehab 150mm @ IRI 9-12 2016 3.585599 1.914R211 Itakhola-Motkhola-Kotiadi Road Km 026.46-027.62 S 1.17 2484 Regional Rehab 135mm @ IRI 9-12 2016 29.46044 1.076R211 Itakhola-Motkhola-Kotiadi Road Km 027.92-028.22 S 0.3 2484 Regional Rehab 135mm @ IRI 9-12 2016 7.60704 1.122R211 Itakhola-Motkhola-Kotiadi Road Km 028.42-028.72 S 0.3 2484 Regional Overlay 50mm @ IRI 7-9 2016 1.73565 3.804R211 Itakhola-Motkhola-Kotiadi Road Km 028.72-029.52 S 0.8 2484 Regional Overlay 50mm @ IRI 5-7 2016 5.3592 2.275R211 Itakhola-Motkhola-Kotiadi Road Km 029.52-030.82 S 1.3 2484 Regional Rehab 135mm @ IRI 9-12 2016 32.84611 1.032R211 Itakhola-Motkhola-Kotiadi Road Km 030.92-031.12 S 0.2 2484 Regional Full Recon 135mm 2016 6.097824 1.014R212 Akdaria -Shekher Bazar-Agarpur Road Km 000.00-000.40 S 0.4 1682 Regional Overlay 50mm @ IRI 5-7 2016 3.276 0.057R212 Akdaria -Shekher Bazar-Agarpur Road Km 000.40-001.10 S 0.7 1682 Regional DBST @ Traff 100-2000 2016 2.033304 0.413R212 Akdaria -Shekher Bazar-Agarpur Road Km 001.10-002.50 S 1.4 1682 Regional Overlay 50mm @ IRI 5-7 2016 8.1585 0.363R212 Akdaria -Shekher Bazar-Agarpur Road Km 002.50-002.60 S 0.1 1682 Regional DBST Traff All 2016 0.27417 0R212 Akdaria -Shekher Bazar-Agarpur Road Km 002.60-003.80 S 1.2 1682 Regional DBST @ 25% Crk 2016 3.29004 0.086R212 Akdaria -Shekher Bazar-Agarpur Road Km 003.80-004.50 S 0.7 1682 Regional DBST @ Traff 100-2000 2016 1.960686 0.443R212 Akdaria -Shekher Bazar-Agarpur Road Km 004.50-004.70 S 0.2 1682 Regional DBST @ 25% Crk 2016 0.560196 0.202R212 Akdaria -Shekher Bazar-Agarpur Road Km 004.70-005.70 S 1 1682 Regional DBST @ Traff 100-2000 2016 2.803781 0.471R212 Akdaria -Shekher Bazar-Agarpur Road Km 006.40-006.70 S 0.3 1682 Regional DBST @ Traff 100-2000 2016 0.831402 0.513R212 Akdaria -Shekher Bazar-Agarpur Road Km 006.70-008.00 S 1.3 1682 Regional DBST @ Traff 100-2000 2016 3.56421 0.123R212 Akdaria -Shekher Bazar-Agarpur Road Km 008.00-008.10 S 0.1 1682 Regional DBST Traff All 2016 0.27417 0R212 Akdaria -Shekher Bazar-Agarpur Road Km 009.79-012.89 S 3.1 1682 Regional Overlay 50mm @ IRI 7-9 2016 18.0978 0.613R212 Akdaria -Shekher Bazar-Agarpur Road Km 012.89-013.39 S 0.5 1682 Regional Overlay 50mm @ IRI 7-9 2016 2.90325 0.612R212 Akdaria -Shekher Bazar-Agarpur Road Km 013.39-015.49 S 2.1 1682 Regional Overlay 50mm @ IRI 7-9 2016 12.26564 0.612R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 024.39-028.13 S 3.74 11087 Regional Overlay 60mm @ IRI 5.5-9 2016 33.15205 22.945R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 028.25-031.43 S 3.18 11087 Regional Overlay 60mm @ IRI 5.5-9 2016 30.24368 21.053R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 031.43-032.14 S 0.7 11087 Regional Rehab 150mm @ IRI 9-12 2016 25.73231 9.044R301 Tongi-Kaliganj-Gorashal-Panchdona Road Km 032.22-033.04 S 0.82 11087 Regional Rehab 150mm @ IRI 9-12 2016 29.99043 8.953R310 Joydebpur-Gazipur-Azmatpur-Itakhola Road Km 028.14-037.34 S 9.2 2335 Regional Overlay 50mm @ IRI 7-9 2016 53.80036 0.763Z2032 Belabo-Batiban-Kuliarchar Road Km 001.10-001.11 S 0.01 510 Zilla Overlay 40mm @ IRI>12 2016 0.01681 0Z2032 Belabo-Batiban-Kuliarchar Road Km 002.01-002.21 S 0.2 510 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z2032 Belabo-Batiban-Kuliarchar Road Km 004.31-004.51 S 0.2 510 Zilla Overlay 40mm @ IRI>12 2016 0.5943 0Z2032 Belabo-Batiban-Kuliarchar Road Km 005.21-005.41 S 0.2 510 Zilla Overlay 40mm @ IRI>12 2016 0.614676 0Z2035 Shibpur-Daripura-Kamrabo Road Km 004.00-004.20 S 0.2 1177 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z2035 Shibpur-Daripura-Kamrabo Road Km 004.20-004.50 S 0.3 1177 Zilla Overlay 40mm @ 1000-2000 2016 0.96786 0Z2035 Shibpur-Daripura-Kamrabo Road Km 004.50-005.10 S 0.6 1177 Zilla Overlay 40mm @ IRI>12 2016 1.93572 0Z2035 Shibpur-Daripura-Kamrabo Road Km 007.40-007.90 S 0.5 1177 Zilla Overlay 40mm @ 1000-2000 2016 1.55367 0Z2035 Shibpur-Daripura-Kamrabo Road Km 010.40-010.50 S 0.1 1177 Zilla Seal Coat 2016 0.0882 0.408Z2035 Shibpur-Daripura-Kamrabo Road Km 010.50-010.80 S 0.3 1177 Zilla Overlay 40mm @ 1000-2000 2016 0.89145 0Z2035 Shibpur-Daripura-Kamrabo Road Km 010.80-012.00 S 1.2 1177 Zilla Overlay 40mm @ 1000-2000 2016 3.5658 0Z2035 Shibpur-Daripura-Kamrabo Road Km 012.10-012.80 S 0.7 1177 Zilla Overlay 40mm @ 1000-2000 2016 2.023506 0Z2035 Shibpur-Daripura-Kamrabo Road Km 012.80-013.80 S 1 1177 Zilla Overlay 40mm @ 1000-2000 2016 2.547 0Z2035 Shibpur-Daripura-Kamrabo Road Km 013.80-015.00 S 1.2 1177 Zilla Overlay 40mm @ 1000-2000 2016 3.280536 0

Page 73 of 163

Page 74: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 000.50-002.10 S 1.6 2893 Zilla Rehab 75mm @ IRI 9-12 2016 17.71856 1.267Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 002.10-002.50 S 0.4 2893 Zilla Overlay 40mm @ Traff >=2000 2016 1.738752 0.178Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 002.50-002.80 S 0.3 2893 Zilla Rehab 75mm @ IRI 9-12 2016 3.843012 0.932Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 002.80-003.00 S 0.2 2893 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 1.523Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 003.00-003.10 S 0.1 2893 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.372Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 003.10-003.60 S 0.5 2893 Zilla Overlay 40mm @ Traff >=2000 2016 1.57065 1.169Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 003.60-004.00 S 0.4 2893 Zilla Rehab 75mm @ IRI 9-12 2016 4.884576 1.088Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 004.00-005.00 S 1 2893 Zilla Overlay 40mm @ Traff >=2000 2016 4.4148 0Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 005.00-005.08 L 0.08 2893 Zilla Rehab 75mm @ IRI 9-12 2016 1.1972 0.761Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 005.00-005.08 R 0.08 2893 Zilla Rehab 75mm @ IRI 9-12 2016 1.1972 0.761Z2037 Gorashal-Daladia-Palash-Fulbaria-Charsindur Km 005.08-012.11 S 7.03 2893 Zilla Rehab 75mm @ IRI 9-12 2016 69.17496 1.697Z2039 Palas-Gorashal Road Km 000.00-011.32 S 11.32 3995 Zilla Overlay 40mm @ Cracks >25% 2016 49.95279 0.038Z2039 Palas-Gorashal Road Km 011.32-011.34 L 0.03 3995 Zilla Rehab 75mm @ IRI 9-12 2016 0.374125 1.379Z2039 Palas-Gorashal Road Km 011.32-011.34 R 0.03 3995 Zilla Rehab 75mm @ IRI 9-12 2016 0.374125 1.379Z2039 Palas-Gorashal Road Km 011.34-012.16 S 0.81 3995 Zilla Overlay 40mm @ Traff >=2000 2016 3.800973 0.311Z2042 Narsingdi (Morjal)-Belabo Road Km 002.30-002.60 S 0.3 2398 Zilla Overlay 40mm @ IRI>12 2016 0 0Z2042 Narsingdi (Morjal)-Belabo Road Km 004.90-005.30 S 0.4 2398 Zilla Rehab 75mm @ IRI 9-12 2016 4.54936 0.99Z2044 Shibpur-Dulalpur-Lakpur-Monohardi Road Km 000.50-003.60 S 3.1 2360 Zilla Rehab 75mm @ IRI 9-12 2016 51.03065 0.298Z2044 Shibpur-Dulalpur-Lakpur-Monohardi Road Km 006.60-009.90 S 3.3 2360 Zilla Overlay 40mm @ Traff >=2000 2016 15.10116 0Z2044 Shibpur-Dulalpur-Lakpur-Monohardi Road Km 013.90-015.40 S 1.5 2360 Zilla Full Recon 75mm @ IRI>12 2016 34.10222 0.019Z2044 Shibpur-Dulalpur-Lakpur-Monohardi Road Km 015.40-015.80 S 0.4 2360 Zilla Overlay 40mm @ Traff >=2000 2016 1.698 0Z2044 Shibpur-Dulalpur-Lakpur-Monohardi Road Km 015.80-016.00 S 0.2 2360 Zilla Rehab 75mm @ IRI 9-12 2016 2.993 0.182Z2044 Shibpur-Dulalpur-Lakpur-Monohardi Road Km 020.90-023.60 S 2.7 2360 Zilla Rehab 75mm @ IRI 9-12 2016 41.94091 0.014Z2044 Shibpur-Dulalpur-Lakpur-Monohardi Road Km 023.60-024.00 S 0.4 2360 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0.053Z2044 Shibpur-Dulalpur-Lakpur-Monohardi Road Km 024.00-024.10 S 0.1 2360 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.032Z2044 Shibpur-Dulalpur-Lakpur-Monohardi Road Km 024.10-025.07 S 0.96 2360 Zilla Overlay 40mm @ Traff >=2000 2016 4.506067 0.014Z2045 Panchdona-Charsindur Road Km 000.20-001.00 S 0.8 2300 Zilla Overlay 40mm @ Traff >=2000 2016 3.7356 0Z2045 Panchdona-Charsindur Road Km 001.00-001.10 S 0.1 2300 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.204Z2045 Panchdona-Charsindur Road Km 001.10-002.60 S 1.5 2300 Zilla Overlay 40mm @ Traff >=2000 2016 7.00425 0Z2045 Panchdona-Charsindur Road Km 002.60-002.70 S 0.1 2300 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.183Z2045 Panchdona-Charsindur Road Km 002.70-004.60 S 1.9 2300 Zilla Overlay 40mm @ Traff >=2000 2016 8.87205 0Z2045 Panchdona-Charsindur Road Km 004.60-004.90 S 0.3 2300 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.139Z2045 Panchdona-Charsindur Road Km 004.90-005.20 S 0.3 2300 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z2045 Panchdona-Charsindur Road Km 005.20-005.30 S 0.1 2300 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.355Z2045 Panchdona-Charsindur Road Km 005.30-007.90 S 2.6 2300 Zilla Rehab 75mm @ IRI 9-12 2016 42.81636 0.079Z2045 Panchdona-Charsindur Road Km 007.90-008.40 S 0.5 2300 Zilla Rehab 75mm @ IRI 9-12 2016 8.23075 0.273Z2045 Panchdona-Charsindur Road Km 008.40-010.10 S 1.7 2300 Zilla Overlay 40mm @ Traff >=2000 2016 7.93815 0Z2045 Panchdona-Charsindur Road Km 010.10-010.20 S 0.1 2300 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.355Z2045 Panchdona-Charsindur Road Km 010.20-010.60 S 0.4 2300 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0Z2045 Panchdona-Charsindur Road Km 010.60-011.00 S 0.4 2300 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0Z2045 Panchdona-Charsindur Road Km 011.00-011.10 S 0.1 2300 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.256Z2045 Panchdona-Charsindur Road Km 015.80-017.20 S 1.4 2300 Zilla Overlay 40mm @ Traff >=2000 2016 6.541969 0Z2045 Panchdona-Charsindur Road Km 017.20-018.30 S 1.1 2300 Zilla Rehab 75mm @ IRI 9-12 2016 18.10765 0.064Z2045 Panchdona-Charsindur Road Km 018.30-018.77 S 0.47 2300 Zilla Overlay 40mm @ Traff >=2000 2016 2.185326 0Z2047 Panchdona-Danga-Palas Road Km 000.00-001.20 S 1.2 5069 Zilla Full Recon 75mm @ IRI>12 2016 29.94214 0.627Z2047 Panchdona-Danga-Palas Road Km 001.20-001.30 S 0.1 4414 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0

Page 74 of 163

Page 75: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z2047 Panchdona-Danga-Palas Road Km 001.30-001.90 S 0.6 4414 Zilla Full Recon 75mm @ IRI>12 2016 9.65034 0.74Z2048 Panchdona-Danga-Palas Road Km 000.00-003.45 S 3.45 4414 Zilla Rehab 75mm @ IRI 9-12 2016 36.18238 1.093Z2055 Narsindi-Karimpur-Jamalpur-Alokbali Road Km 000.00-001.56 S 1.56 4505 Zilla Rehab 75mm @ IRI 9-12 2016 17.11074 0.763Z2055 Narsindi-Karimpur-Jamalpur-Alokbali Road Km 002.55-011.05 S 8.49 4505 Zilla Rehab 75mm @ IRI 9-12 2016 92.77042 0.73Z2055 Narsindi-Karimpur-Jamalpur-Alokbali Road Km 014.28-015.00 S 0.72 4505 Zilla Rehab 75mm @ IRI 9-12 2016 6.532881 1.13Z2123 Monohardi-Urulia-Bajitpur Road Km 000.90-001.00 S 0.1 2126 Zilla Full Recon 75mm @ IRI>12 2016 1.34757 0.322Sub-Total Narsingdi Division 2110.839Total Dhaka Zone 12397.06

Gopalganj ZoneFaridpur DivisionN7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 018.65-023.90 S 5.25 7694 National Overlay 50mm @ IRI 4-7 2016 40.76842 10.148N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 023.90-024.00 S 0.1 7694 National Full Recon 180mm 2016 5.10927 5.927N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 024.00-025.60 S 1.6 7694 National Overlay 50mm @ IRI 4-7 2016 12.264 13.46N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 025.60-025.80 S 0.2 7694 National Rehab 180mm @ IRI 9-12 2016 9.87252 6.213N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 025.80-029.20 S 3.4 7694 National Overlay 50mm @ IRI 4-7 2016 26.061 14.753N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 029.20-029.75 S 0.55 7694 National Overlay 60mm @ IRI 7-9 2016 4.977103 15.311N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 029.75-029.85 L 0.1 7694 National Overlay 60mm @ IRI 7-9 2016 0.91323 14.822N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 029.75-029.85 R 0.1 7694 National Overlay 60mm @ IRI 7-9 2016 0.91323 14.822N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 029.85-031.00 S 1.15 7694 National Overlay 60mm @ IRI 7-9 2016 10.54781 15.86N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 031.00-031.10 S 0.1 7694 National Full Recon 180mm 2016 5.10927 5.826N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 031.10-033.10 S 2 7694 National Overlay 60mm @ IRI 7-9 2016 18.42393 14.503N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 033.10-035.40 S 2.3 7694 National Full Recon 180mm 2016 119.123 5.7N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 035.40-035.80 S 0.4 7694 National Rehab 180mm @ IRI 9-12 2016 20.01552 5.484N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 035.80-036.40 S 0.6 7694 National Full Recon 180mm 2016 30.7816 5.686N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 036.40-036.50 S 0.1 7694 National Overlay 50mm @ IRI 4-7 2016 0.7665 14.208N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 036.50-037.20 S 0.7 7694 National Full Recon 180mm 2016 35.76489 5.399N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 037.20-037.30 S 0.1 7694 National Overlay 60mm @ IRI 7-9 2016 0.91323 14.337N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 037.30-037.50 S 0.2 7694 National Rehab 180mm @ IRI 9-12 2016 9.87252 6.115N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 037.50-037.70 S 0.2 7694 National Overlay 50mm @ IRI 4-7 2016 1.533 14.549N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 037.70-037.90 S 0.2 7694 National Rehab 180mm @ IRI 9-12 2016 9.87252 5.764N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 037.90-038.90 S 1 7694 National Overlay 50mm @ IRI 4-7 2016 7.686 14.202N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 038.90-039.10 S 0.2 7694 National Full Recon 180mm 2016 10.35852 5.86N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 039.10-039.40 S 0.3 7694 National Overlay 60mm @ IRI 7-9 2016 2.77722 14.609N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 039.40-040.60 S 1.2 7694 National Rehab 180mm @ IRI 9-12 2016 60.04656 5.482N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 040.60-042.21 S 1.6 7677 National Overlay 50mm @ IRI 4-7 2016 12.43977 14.15N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 042.21-042.41 S 0.2 7600 National Full Recon 180mm 2016 10.35852 5.225N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 042.41-042.81 S 0.4 7600 National Overlay 50mm @ IRI 4-7 2016 3.0702 13.327N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 042.81-043.81 S 1 7600 National Full Recon 180mm 2016 51.0927 4.871N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 043.81-044.11 S 0.3 7600 National Overlay 60mm @ IRI 7-9 2016 2.73969 13.686N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 044.11-044.41 S 0.3 7600 National Full Recon 180mm 2016 15.32781 5.307N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 044.41-044.51 S 0.1 7600 National Overlay 50mm @ IRI 4-7 2016 0.7665 12.383N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 044.51-044.61 S 0.1 7600 National Full Recon 180mm 2016 5.10927 5.126N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 044.61-044.81 S 0.2 7600 National Overlay 60mm @ IRI 7-9 2016 1.82646 13.122N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 044.81-046.11 S 1.3 7600 National Full Recon 180mm 2016 66.42051 4.935

Page 75 of 163

Page 76: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 046.11-049.11 S 3 7600 National Overlay 60mm @ IRI 7-9 2016 27.3969 12.81N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 049.11-052.11 S 3 7600 National Overlay 60mm @ IRI 7-9 2016 27.40603 13.683N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 052.11-052.91 S 0.8 7913 National Overlay 50mm @ IRI 4-7 2016 6.132 13.079N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 052.91-053.01 S 0.1 7998 National Full Recon 180mm 2016 5.10927 5.246N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 053.01-059.70 S 6.7 7998 National Overlay 60mm @ IRI 7-9 2016 61.14988 13.694N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 059.70-060.90 S 1.2 7998 National Rehab 180mm @ IRI 9-12 2016 59.28448 5.114N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 060.90-062.93 S 2.03 7998 National Overlay 50mm @ IRI 4-7 2016 15.52163 13.528N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 062.93-063.08 L 0.15 3468 National Overlay 50mm @ IRI 4-9 2016 0.6216 4.725N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 062.93-063.08 R 0.15 3468 National Overlay 50mm @ IRI 4-9 2016 0.6216 4.725N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 063.08-064.80 S 1.73 7998 National Overlay 50mm @ IRI 4-7 2016 16.86415 6.86N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 064.80-065.76 S 0.96 7998 National Rehab 180mm @ IRI 9-12 2016 60.11959 3.039N803 Faridpur Town Old Section Road Km 004.55-004.78 L 0.23 6504 National Overlay 50mm @ IRI 5-7 2016 1.74762 4.507N803 Faridpur Town Old Section Road Km 004.55-004.78 R 0.23 6504 National Overlay 50mm @ IRI 5-7 2016 1.74762 4.507N803 Faridpur Town Old Section Road Km 004.78-005.92 S 1.14 6504 National Overlay 50mm @ IRI 5-7 2016 12.24153 1.895N804 Bhanga-Faridpur (Goalchamot) Road Km 000.00-000.01 S 0 5164 National Overlay 50mm @ IRI 5-9 2016 0.09891 1.123N804 Bhanga-Faridpur (Goalchamot) Road Km 000.01-000.05 L 0.05 5164 National Overlay 50mm @ IRI 5-9 2016 0.41769 6.224N804 Bhanga-Faridpur (Goalchamot) Road Km 000.01-000.05 R 0.05 5164 National Overlay 50mm @ IRI 5-9 2016 0.21735 12.619N804 Bhanga-Faridpur (Goalchamot) Road Km 000.05-000.40 S 0.35 5164 National Overlay 50mm @ IRI 5-9 2016 2.68275 7.244N804 Bhanga-Faridpur (Goalchamot) Road Km 000.40-000.90 S 0.5 5164 National Full Recon 150mm 2016 22.1482 2.788N804 Bhanga-Faridpur (Goalchamot) Road Km 000.90-001.90 S 1 5164 National Overlay 50mm @ IRI 5-9 2016 7.665 6.811N804 Bhanga-Faridpur (Goalchamot) Road Km 001.90-002.80 S 0.9 5164 National Rehab 150mm @ IRI 9-12 2016 31.76836 2.729N804 Bhanga-Faridpur (Goalchamot) Road Km 002.80-003.60 S 0.8 5164 National Overlay 50mm @ IRI 5-9 2016 6.132 7.245N804 Bhanga-Faridpur (Goalchamot) Road Km 003.60-009.70 S 6.1 5164 National Overlay 50mm @ IRI 5-9 2016 46.82822 7.26N804 Bhanga-Faridpur (Goalchamot) Road Km 009.70-009.80 S 0.1 5164 National Full Recon 150mm 2016 4.42964 3.074N804 Bhanga-Faridpur (Goalchamot) Road Km 009.80-010.94 S 1.14 5164 National Overlay 50mm @ IRI 5-9 2016 8.72277 8.852N804 Bhanga-Faridpur (Goalchamot) Road Km 010.94-011.24 S 0.3 5164 National Full Recon 150mm 2016 13.28892 2.703N804 Bhanga-Faridpur (Goalchamot) Road Km 011.24-012.04 S 0.8 5164 National Overlay 50mm @ IRI 5-9 2016 6.132 8.122N804 Bhanga-Faridpur (Goalchamot) Road Km 012.04-012.24 S 0.2 5164 National Rehab 150mm @ IRI 9-12 2016 7.087059 3.169N804 Bhanga-Faridpur (Goalchamot) Road Km 012.24-013.44 S 1.2 5164 National Overlay 50mm @ IRI 5-9 2016 9.198 8.049N804 Bhanga-Faridpur (Goalchamot) Road Km 013.44-013.54 S 0.1 5164 National Rehab 150mm @ IRI 9-12 2016 3.5259 2.848N804 Bhanga-Faridpur (Goalchamot) Road Km 013.54-013.84 S 0.3 5164 National Overlay 50mm @ IRI 5-9 2016 2.2995 7.273N804 Bhanga-Faridpur (Goalchamot) Road Km 013.84-014.54 S 0.7 5164 National Rehab 150mm @ IRI 9-12 2016 24.6813 2.944N804 Bhanga-Faridpur (Goalchamot) Road Km 014.54-014.74 S 0.2 5164 National Overlay 50mm @ IRI 5-9 2016 1.533 7.404N804 Bhanga-Faridpur (Goalchamot) Road Km 014.74-014.84 S 0.1 5164 National Rehab 150mm @ IRI 9-12 2016 3.5259 2.98N804 Bhanga-Faridpur (Goalchamot) Road Km 014.84-016.54 S 1.7 5164 National Overlay 50mm @ IRI 5-9 2016 13.0305 7.595N804 Bhanga-Faridpur (Goalchamot) Road Km 016.54-016.80 S 0.26 5164 National Full Recon 150mm 2016 11.33988 2.885N804 Bhanga-Faridpur (Goalchamot) Road Km 016.80-016.94 S 0.14 8257 National Full Recon 180mm 2016 7.408441 3.573N804 Bhanga-Faridpur (Goalchamot) Road Km 016.94-017.74 S 0.8 8257 National Overlay 60mm @ IRI 7-9 2016 7.30584 9.967N804 Bhanga-Faridpur (Goalchamot) Road Km 017.74-019.04 S 1.3 8257 National Full Recon 180mm 2016 66.42051 3.678N804 Bhanga-Faridpur (Goalchamot) Road Km 019.04-027.38 S 8.34 8257 National Overlay 60mm @ IRI 7-9 2016 76.14512 9.284N804 Bhanga-Faridpur (Goalchamot) Road Km 027.44-029.54 L 2.1 8257 National Overlay 50mm @ IRI 5-7 2016 15.6555 9.403N804 Bhanga-Faridpur (Goalchamot) Road Km 027.44-029.54 R 2.1 8257 National Overlay 50mm @ IRI 5-7 2016 15.6555 9.403N804 Bhanga-Faridpur (Goalchamot) Road Km 030.35-030.36 L 0.01 3185 National Overlay 50mm @ IRI 5-9 2016 0.10647 0.7N804 Bhanga-Faridpur (Goalchamot) Road Km 030.35-030.36 R 0.01 3185 National Overlay 50mm @ IRI 5-9 2016 0.10647 0.7N808 Faridpur Town Bypass Road Km 000.00-005.30 S 5.3 4892 National DBST @ 25% Crk 2016 20.76233 3.57Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 030.11-030.21 S 0.1 3917 Zilla Rehab 75mm @ IRI 9-12 2016 1.101424 2.767

Page 76 of 163

Page 77: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 032.51-036.53 S 4.03 3917 Zilla Overlay 40mm @ Cracks >25% 2016 11.91181 1.214Z8067 Nagarkanda-Bhanga Road Km 000.30-000.40 S 0.1 2335 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 1.759Z8401 Bhanga (Pukuria)-Sadarpur Road Km 000.40-001.30 S 0.9 3304 Zilla Rehab 75mm @ IRI 9-12 2016 14.81535 0.233Z8401 Bhanga (Pukuria)-Sadarpur Road Km 002.70-008.80 S 6.1 3304 Zilla Overlay 40mm @ Traff >=2000 2016 28.48862 0.36Z8401 Bhanga (Pukuria)-Sadarpur Road Km 008.80-008.90 S 0.1 3304 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.293Z8401 Bhanga (Pukuria)-Sadarpur Road Km 008.90-012.26 S 3.36 3304 Zilla Overlay 40mm @ Traff >=2000 2016 12.14501 1.098Z8402 Faridpur-Hatgazaria--Sadarpur Road Km 008.30-008.40 S 0.1 2490 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.441Z8405 Faridpur-Alipur-S.S.Ghat Road Km 000.00-009.75 S 9.75 2569 Zilla Overlay 40mm @ IRI>12 2016 0 0Sub-Total Faridpur Division 1419.512

Gopalganj DivisionN805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 016.90-017.00 S 0.1 4283 National Rehab 150mm @ IRI 9-12 2016 3.6225 2.855N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 029.86-036.57 S 6.71 4283 National Overlay 50mm @ IRI 5-9 2016 53.46738 5.329N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 036.57-037.01 S 0.44 4283 National DBST @ Traff 4000-6000 2016 1.61538 6.216N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 037.01-037.72 S 0.71 4453 National Overlay 50mm @ IRI 5-9 2016 6.231225 5.47N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 076.99-077.38 L 0.4 4955 National Overlay 50mm @ IRI 5-9 2016 1.95426 7.763N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 076.99-077.38 R 0.4 4955 National Overlay 50mm @ IRI 5-9 2016 1.95426 7.763N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 077.38-080.06 S 2.68 4955 National Overlay 50mm @ IRI 5-9 2016 21.11288 3.478Z8021 Baraitala-Muksudpur Road Km 002.20-005.20 S 3 2484 Zilla Overlay 40mm @ IRI>12 2016 14.01317 0Z8021 Baraitala-Muksudpur Road Km 006.10-008.20 S 2.1 2484 Zilla Full Recon 75mm @ IRI>12 2016 50.23176 0.01Z8021 Baraitala-Muksudpur Road Km 008.20-008.60 S 0.4 2484 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0Z8021 Baraitala-Muksudpur Road Km 008.60-008.90 S 0.3 2484 Zilla Overlay 40mm @ IRI>12 2016 1.40085 0Z8021 Baraitala-Muksudpur Road Km 008.90-009.70 S 0.8 2484 Zilla Overlay 40mm @ Traff >=2000 2016 3.7356 0.002Z8021 Baraitala-Muksudpur Road Km 009.70-010.10 S 0.4 2484 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z8021 Baraitala-Muksudpur Road Km 010.30-010.40 S 0.1 2484 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z8021 Baraitala-Muksudpur Road Km 010.80-011.10 S 0.3 2484 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 0.097Z8021 Baraitala-Muksudpur Road Km 012.20-012.30 S 0.1 2484 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z8023 Garakhola - Kashiani (Bashpur) Road Km 001.50-003.40 S 1.9 1648 Zilla Rehab 75mm @ IRI 9-12 2016 28.61916 0.721Z8023 Garakhola - Kashiani (Bashpur) Road Km 004.30-005.50 S 1.2 1648 Zilla Rehab 75mm @ IRI 9-12 2016 19.7538 0.592Z8031 Gouranadi-Paisarhat-Kotalipara-Gopalganj Road Km 036.35-036.55 S 0.2 2574 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 0.508Z8031 Gouranadi-Paisarhat-Kotalipara-Gopalganj Road Km 039.45-039.55 S 0.1 2574 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.046Z8032 Kotalipara-Rajoir Road Km 015.00-015.10 S 0.1 883 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z8032 Kotalipara-Rajoir Road Km 015.70-015.90 S 0.2 883 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z8032 Kotalipara-Rajoir Road Km 017.10-017.14 S 0.04 883 Zilla Overlay 40mm @ IRI>12 2016 0.168102 0Z8035 Kotalipara-Pirerbari- Dakshin Dashar Road Km 001.20-001.80 S 0.6 883 Zilla Overlay 40mm @ IRI>12 2016 2.8017 0Z8035 Kotalipara-Pirerbari- Dakshin Dashar Road Km 002.10-002.50 S 0.4 883 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z8420 Bijoypasha-Talarhati-Joynagarghat Road Km 000.00-003.20 S 3.2 2015 Zilla Overlay 40mm @ Traff >=2000 2016 13.2893 0Z8420 Bijoypasha-Talarhati-Joynagarghat Road Km 003.40-003.50 S 0.1 2015 Zilla Full Recon 75mm @ IRI>12 2016 1.3041 0.969Z8420 Bijoypasha-Talarhati-Joynagarghat Road Km 004.50-004.60 S 0.1 2015 Zilla Full Recon 75mm @ IRI>12 2016 1.3041 1.215Z8420 Bijoypasha-Talarhati-Joynagarghat Road Km 004.70-004.80 S 0.1 2015 Zilla Rehab 75mm @ IRI 9-12 2016 0.8979 1.615Z8420 Bijoypasha-Talarhati-Joynagarghat Road Km 005.30-006.10 S 0.8 2015 Zilla Rehab 75mm @ IRI 9-12 2016 7.174221 1.148Z8430 Tungipara - Kotalipara (Majbadi) Road Km 000.00-000.80 S 0.8 2090 Zilla Seal Coat 2016 1.512 0.056Z8430 Tungipara - Kotalipara (Majbadi) Road Km 006.50-009.20 S 2.7 2090 Zilla Overlay 40mm @ IRI>12 2016 12.61232 0Z8430 Tungipara - Kotalipara (Majbadi) Road Km 009.20-009.30 S 0.1 2090 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Sub-Total Gopalganj Division 267.8027

Page 77 of 163

Page 78: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Madaripur DivisionN8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 045.20-048.46 S 3.26 7236 National Overlay 50mm @ IRI 4-7 2016 26.49402 9.87N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 068.10-077.50 S 9.4 5101 National Overlay 50mm @ IRI 4-9 2016 72.08166 5.713N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 077.50-080.40 S 2.9 5528 National Full Recon 150mm 2016 131.2751 4.051N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 080.40-080.60 S 0.2 5585 National Overlay 50mm @ IRI 4-9 2016 1.533 9.927N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 080.60-082.80 S 2.2 5585 National Rehab 150mm @ IRI 9-12 2016 77.53454 4.995N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 082.80-083.90 S 1.1 5585 National Overlay 50mm @ IRI 4-9 2016 8.4315 9.526N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 083.90-084.50 S 0.6 5585 National Rehab 150mm @ IRI 9-12 2016 21.1554 4.616N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 084.50-087.34 S 2.84 5585 National Overlay 50mm @ IRI 4-9 2016 21.7456 9.911N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 087.40-087.45 L 0.06 7411 National Overlay 60mm @ IRI 7-9 2016 0.511409 12.012N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 087.40-087.45 R 0.06 7411 National Overlay 60mm @ IRI 7-9 2016 0.511409 12.012N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 087.45-097.29 S 9.84 7411 National Overlay 60mm @ IRI 7-9 2016 89.8801 11.445N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 097.29-097.49 S 0.2 7411 National Rehab 180mm @ IRI 9-12 2016 9.87252 4.692N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 097.49-099.79 S 2.3 7411 National Overlay 50mm @ IRI 4-7 2016 17.62183 10.602N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 099.79-100.09 S 0.3 7411 National Rehab 180mm @ IRI 9-12 2016 14.80878 5.054N8 Dhaka -Mawa-Bhanga-Barisal-Patuakhali Road Km 100.09-103.12 S 3.03 7411 National Overlay 50mm @ IRI 4-7 2016 23.305 10.92N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 002.30-002.40 S 0.1 4283 National Rehab 150mm @ IRI 9-12 2016 3.6225 2.73N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 010.00-010.10 S 0.1 4283 National Full Recon 150mm 2016 4.551 2.225R860 Mostafapur-Shariatpur Harina-Chandpur Km 000.00-000.70 S 0.7 4285 Regional Overlay 50mm @ IRI 5-7 2016 5.4831 0.933R860 Mostafapur-Shariatpur Harina-Chandpur Km 000.70-002.40 S 1.7 4285 Regional Rehab 150mm @ IRI 9-12 2016 45.18706 0.48R860 Mostafapur-Shariatpur Harina-Chandpur Km 002.40-002.80 S 0.4 4285 Regional Overlay 50mm @ IRI 5-7 2016 2.31 2.687R860 Mostafapur-Shariatpur Harina-Chandpur Km 002.80-002.90 S 0.1 4285 Regional Full Recon 150mm 2016 3.3374 1.274R860 Mostafapur-Shariatpur Harina-Chandpur Km 002.90-003.60 S 0.7 4285 Regional Overlay 50mm @ IRI 5-7 2016 4.09395 2.206R860 Mostafapur-Shariatpur Harina-Chandpur Km 003.60-003.70 S 0.1 4285 Regional Full Recon 150mm 2016 3.3374 1.292R860 Mostafapur-Shariatpur Harina-Chandpur Km 003.70-005.10 S 1.4 4285 Regional Overlay 50mm @ IRI 5-7 2016 8.085 2.303R860 Mostafapur-Shariatpur Harina-Chandpur Km 005.10-005.30 S 0.2 4285 Regional Full Recon 150mm 2016 6.771888 0.848R860 Mostafapur-Shariatpur Harina-Chandpur Km 005.30-012.56 S 7.26 4285 Regional DBST @ 25% Crk 2016 22.34352 0.778Z8011 Pacchar-Sibchar-Madaripur Road Km 000.00-009.50 S 9.5 3839 Zilla Overlay 40mm @ Traff >=2000 2016 44.20824 0Z8011 Pacchar-Sibchar-Madaripur Road Km 009.50-009.60 S 0.1 3839 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.602Z8011 Pacchar-Sibchar-Madaripur Road Km 009.70-009.80 S 0.1 3839 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.527Z8011 Pacchar-Sibchar-Madaripur Road Km 009.80-010.00 S 0.2 3839 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.196Z8011 Pacchar-Sibchar-Madaripur Road Km 010.00-010.20 S 0.2 3839 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.475Z8011 Pacchar-Sibchar-Madaripur Road Km 014.60-015.40 S 0.8 3839 Zilla Overlay 40mm @ Traff >=2000 2016 3.7356 0.442Z8011 Pacchar-Sibchar-Madaripur Road Km 015.50-016.40 S 0.9 3839 Zilla Rehab 75mm @ IRI 9-12 2016 14.83181 0.778Z8011 Pacchar-Sibchar-Madaripur Road Km 016.50-017.50 S 1 3839 Zilla Full Recon 75mm @ IRI>12 2016 23.9085 0.358Z8011 Pacchar-Sibchar-Madaripur Road Km 017.60-018.10 S 0.5 3839 Zilla Full Recon 75mm @ IRI>12 2016 11.95425 0.191Z8011 Pacchar-Sibchar-Madaripur Road Km 018.10-018.30 S 0.2 3839 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.237Z8011 Pacchar-Sibchar-Madaripur Road Km 018.30-018.40 S 0.1 3839 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.638Z8011 Pacchar-Sibchar-Madaripur Road Km 018.80-019.10 S 0.3 3839 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 0.722Z8011 Pacchar-Sibchar-Madaripur Road Km 019.20-019.50 S 0.3 3839 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 0.412Z8011 Pacchar-Sibchar-Madaripur Road Km 020.40-020.51 S 0.1 3839 Zilla Rehab 75mm @ IRI 9-12 2016 1.662611 0.526Z8011 Pacchar-Sibchar-Madaripur Road Km 030.01-030.11 S 0.1 3839 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.581Z8032 Kotalipara-Rajoir Road Km 017.14-017.20 S 0.06 883 Zilla Overlay 40mm @ IRI>12 2016 0.298848 0Z8032 Kotalipara-Rajoir Road Km 018.50-018.70 S 0.2 883 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z8603 Madaripur-Pathariar Par-Agailjhara Road Km 006.60-007.30 S 0.7 3287 Zilla Full Recon 75mm @ IRI>12 2016 16.75986 0.031

Page 78 of 163

Page 79: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z8603 Madaripur-Pathariar Par-Agailjhara Road Km 007.30-007.90 S 0.6 3287 Zilla Overlay 40mm @ Traff >=2000 2016 2.934144 0.125Z8603 Madaripur-Pathariar Par-Agailjhara Road Km 007.90-008.90 S 1 3287 Zilla Overlay 40mm @ IRI>12 2016 4.6695 0Z8603 Madaripur-Pathariar Par-Agailjhara Road Km 012.30-012.90 S 0.6 3287 Zilla Full Recon 75mm @ IRI>12 2016 14.3451 0.005Z8603 Madaripur-Pathariar Par-Agailjhara Road Km 013.20-013.51 S 0.3 3287 Zilla Overlay 40mm @ Traff >=2000 2016 1.363409 0.607Z8604 Madaripur-Kalkini-Bhurghata Road Km 000.20-000.40 S 0.2 2670 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 0.472Z8604 Madaripur-Kalkini-Bhurghata Road Km 010.90-011.40 S 0.5 2670 Zilla Rehab 75mm @ IRI 9-12 2016 8.247211 0.278Z8604 Madaripur-Kalkini-Bhurghata Road Km 011.60-011.70 S 0.1 2670 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.391Z8604 Madaripur-Kalkini-Bhurghata Road Km 011.80-012.10 S 0.3 2670 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 0.297Z8604 Madaripur-Kalkini-Bhurghata Road Km 012.90-013.10 S 0.2 2670 Zilla Rehab 75mm @ IRI 9-12 2016 3.118706 0.322Z8604 Madaripur-Kalkini-Bhurghata Road Km 015.60-015.90 S 0.3 2670 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.775Z8604 Madaripur-Kalkini-Bhurghata Road Km 015.90-018.59 S 2.68 2670 Zilla Overlay 40mm @ Traff >=2000 2016 11.20293 0Sub-Total Madaripur Division 825.1928

Rajbari DivisionN7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 000.00-000.90 S 0.9 6995 National Overlay 50mm @ IRI 4-7 2016 7.2954 10.918N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 000.90-001.00 S 0.1 6995 National Full Recon 180mm 2016 5.10927 4.488N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 001.00-003.00 R 2 6995 National Overlay 60mm @ IRI 7-9 2016 18.765 12.993N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 001.00-003.25 L 2.25 6995 National Overlay 60mm @ IRI 7-9 2016 21.12001 12.936N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 003.00-003.25 R 0.25 6995 National Overlay 50mm @ IRI 4-7 2016 1.976625 12.181N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 003.25-011.50 S 8.25 7021 National Overlay 50mm @ IRI 4-7 2016 64.96875 10.232N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 011.50-011.70 S 0.2 7049 National Full Recon 180mm 2016 10.4985 4.306N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 011.70-013.89 S 2.19 7082 National Overlay 50mm @ IRI 4-7 2016 20.7185 8.009N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 013.89-013.98 L 0.09 7694 National Overlay 50mm @ IRI 4-7 2016 0.70518 13.228N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 013.89-013.98 R 0.09 7694 National Overlay 50mm @ IRI 4-7 2016 0.70518 13.228N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 013.98-018.65 S 4.67 7694 National Overlay 50mm @ IRI 4-7 2016 42.28096 8.377N701 Daulatdia Ferryghat by-pass Road Km 000.00-000.20 S 0.2 5047 National Overlay 50mm @ IRI 5-9 2016 1.533 5.9N701 Daulatdia Ferryghat by-pass Road Km 000.20-000.70 S 0.5 5047 National Overlay 50mm @ IRI 5-9 2016 3.8325 7.074N701 Daulatdia Ferryghat by-pass Road Km 000.70-001.00 S 0.3 5047 National Overlay 50mm @ IRI 5-9 2016 2.2995 6.239R710 Ahaladipur-Kumarkhali-Kushtia Km 000.00-000.03 L 0.03 3956 Regional Overlay 50mm @ IRI 5-7 2016 0.147 12.002R710 Ahaladipur-Kumarkhali-Kushtia Km 000.03-002.80 S 2.77 3956 Regional Overlay 50mm @ IRI 5-7 2016 19.15866 2.591R710 Ahaladipur-Kumarkhali-Kushtia Km 002.80-003.00 S 0.2 3956 Regional Rehab 135mm @ IRI 9-12 2016 5.79584 0.857R710 Ahaladipur-Kumarkhali-Kushtia Km 003.00-003.80 S 0.8 3956 Regional Overlay 50mm @ IRI 5-7 2016 5.376 2.373R710 Ahaladipur-Kumarkhali-Kushtia Km 003.80-003.90 S 0.1 3956 Regional Full Recon 135mm 2016 3.49696 1.457R710 Ahaladipur-Kumarkhali-Kushtia Km 003.90-004.30 S 0.4 3956 Regional Overlay 50mm @ IRI 5-7 2016 2.52 2.68R710 Ahaladipur-Kumarkhali-Kushtia Km 004.30-004.40 S 0.1 3956 Regional Full Recon 135mm @ IRI 12 2016 3.11448 1.623R710 Ahaladipur-Kumarkhali-Kushtia Km 010.00-010.04 L 0.04 3956 Regional Overlay 50mm @ IRI 7-9 2016 0.042 17.365R710 Ahaladipur-Kumarkhali-Kushtia Km 015.87-016.17 S 0.3 3956 Regional Rehab 135mm @ IRI 9-12 2016 11.41056 0.615R710 Ahaladipur-Kumarkhali-Kushtia Km 016.17-019.97 S 3.8 3956 Regional Overlay 50mm @ IRI 5-7 2016 33.52482 1.767R710 Ahaladipur-Kumarkhali-Kushtia Km 019.97-020.17 S 0.2 3956 Regional Rehab 135mm @ IRI 9-12 2016 7.60704 0.463R710 Ahaladipur-Kumarkhali-Kushtia Km 021.57-021.67 S 0.1 3956 Regional Rehab 135mm @ IRI 9-12 2016 2.58096 1.694R710 Ahaladipur-Kumarkhali-Kushtia Km 023.57-023.77 S 0.2 3956 Regional Overlay 50mm @ IRI 7-9 2016 1.197 4.39R710 Ahaladipur-Kumarkhali-Kushtia Km 025.27-025.47 S 0.2 3956 Regional Rehab 135mm @ IRI 9-12 2016 5.16192 1.24R710 Ahaladipur-Kumarkhali-Kushtia Km 028.67-034.78 S 6.1 3956 Regional Overlay 50mm @ IRI 5-7 2016 36.52047 3.852R710 Ahaladipur-Kumarkhali-Kushtia Km 037.98-040.98 S 3 3956 Regional Overlay 50mm @ IRI 5-7 2016 17.64588 3.05R710 Ahaladipur-Kumarkhali-Kushtia Km 042.51-046.11 S 3.6 6134 Regional Overlay 60mm @ IRI 5.5-9 2016 25.23417 6.464R711 Rajbari-Joukura Ferryghat Road Km 000.00-001.00 S 1 4460 Regional DBST @ 25% Crk 2016 2.19336 5.551

Page 79 of 163

Page 80: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R711 Rajbari-Joukura Ferryghat Road Km 001.00-001.10 S 0.1 4460 Regional Full Recon 150mm 2016 2.591036 4.253R711 Rajbari-Joukura Ferryghat Road Km 001.10-002.70 S 1.6 4460 Regional Overlay 60mm @ IRI 7-9 2016 8.552174 10.27R711 Rajbari-Joukura Ferryghat Road Km 002.70-002.80 S 0.1 4460 Regional Full Recon 150mm 2016 2.591036 4.217R711 Rajbari-Joukura Ferryghat Road Km 002.80-005.70 S 2.9 4460 Regional Overlay 60mm @ IRI 7-9 2016 15.49113 10.127R711 Rajbari-Joukura Ferryghat Road Km 005.70-006.20 S 0.5 4460 Regional Overlay 60mm @ IRI 7-9 2016 2.670885 10.177R711 Rajbari-Joukura Ferryghat Road Km 006.20-006.30 S 0.1 4460 Regional Overlay 50mm @ IRI 5-7 2016 0.44835 11.105R711 Rajbari-Joukura Ferryghat Road Km 006.30-006.48 S 0.18 4460 Regional Rehab 150mm @ IRI 9-12 2016 3.691714 4.192R712 Tottipur at R771-Machpara Link Road Km 000.00-000.30 S 0.3 2361 Regional DBST @ 25% Crk 2016 0.549822 1.231R712 Tottipur at R771-Machpara Link Road Km 000.30-001.30 S 1 2361 Regional Overlay 50mm @ IRI 7-9 2016 3.885 1.519Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 006.20-007.20 S 1 3917 Zilla Full Recon 75mm @ IRI>12 2016 13.92431 1.321Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 007.20-010.30 S 3.1 3917 Zilla Overlay 40mm @ Cracks >25% 2016 8.897868 1.402Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 018.60-019.70 S 1.1 3917 Zilla Full Recon 75mm @ IRI>12 2016 16.78377 0.883Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 019.90-021.21 S 1.3 3917 Zilla Rehab 75mm @ IRI 9-12 2016 14.25165 1.759Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 021.21-021.31 S 0.1 3917 Zilla Overlay 40mm @ Traff >=2000 2016 0.310734 0.616Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 021.31-021.81 S 0.5 3917 Zilla Rehab 75mm @ IRI 9-12 2016 5.47719 1.374Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 021.81-022.21 S 0.4 3917 Zilla Overlay 40mm @ Traff >=2000 2016 1.242936 1.24Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 022.21-022.31 S 0.1 3917 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 1.494Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 022.41-023.11 S 0.7 3917 Zilla Rehab 75mm @ IRI 9-12 2016 7.668065 1.779Z7102 Rajbari-Baliakandi-Jamalpur-Madhukhali Road Km 023.11-026.11 S 3 3917 Zilla Overlay 40mm @ Traff >=2000 2016 9.325127 0.777Z7106 Goalonda-Godarbazar-Habashpur Road Km 001.80-001.90 S 0.1 1335 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7106 Goalonda-Godarbazar-Habashpur Road Km 002.00-002.60 S 0.6 1335 Zilla Overlay 40mm @ IRI>12 2016 1.887921 0Z7106 Goalonda-Godarbazar-Habashpur Road Km 004.20-005.30 S 1.1 1335 Zilla Overlay 40mm @ IRI>12 2016 3.45543 0Z7106 Goalonda-Godarbazar-Habashpur Road Km 018.90-019.60 S 0.7 1335 Zilla Overlay 40mm @ IRI>12 2016 2.19891 0Sub-Total Rajbari Division 512.3357

Sariatpur DivisionR860 Mostafapur-Shariatpur Harina-Chandpur Km 023.77-025.07 S 1.3 2956 Regional Full Recon 135mm 2016 45.46048 0.011R860 Mostafapur-Shariatpur Harina-Chandpur Km 025.17-025.37 S 0.2 2956 Regional Full Recon 135mm 2016 6.99392 0.187R860 Mostafapur-Shariatpur Harina-Chandpur Km 025.37-025.77 S 0.4 2956 Regional Overlay 50mm @ IRI 5-7 2016 2.688 0.774R860 Mostafapur-Shariatpur Harina-Chandpur Km 025.77-025.87 S 0.1 2956 Regional Full Recon 135mm 2016 3.49696 0.239R860 Mostafapur-Shariatpur Harina-Chandpur Km 026.07-026.17 S 0.1 2956 Regional Full Recon 135mm 2016 3.49696 0.09R860 Mostafapur-Shariatpur Harina-Chandpur Km 026.17-026.67 S 0.5 2956 Regional Overlay 50mm @ IRI 7-9 2016 3.36 1.239R860 Mostafapur-Shariatpur Harina-Chandpur Km 026.67-026.97 S 0.3 2956 Regional Full Recon 135mm 2016 10.31057 0.043R860 Mostafapur-Shariatpur Harina-Chandpur Km 027.37-027.47 S 0.1 2956 Regional Full Recon 135mm 2016 3.38768 0.168R860 Mostafapur-Shariatpur Harina-Chandpur Km 028.37-028.67 S 0.3 2956 Regional Full Recon 135mm 2016 10.16304 0.065R860 Mostafapur-Shariatpur Harina-Chandpur Km 028.87-028.97 S 0.1 2956 Regional Full Recon 135mm @ IRI 12 2016 3.027056 0.974R860 Mostafapur-Shariatpur Harina-Chandpur Km 028.97-029.57 S 0.6 2956 Regional Overlay 50mm @ IRI 7-9 2016 3.465 2.086R860 Mostafapur-Shariatpur Harina-Chandpur Km 029.57-030.07 S 0.5 2956 Regional Full Recon 135mm 2016 15.026 0.606R860 Mostafapur-Shariatpur Harina-Chandpur Km 030.07-030.17 S 0.1 2956 Regional Overlay 50mm @ IRI 7-9 2016 0.5775 2.423R860 Mostafapur-Shariatpur Harina-Chandpur Km 030.17-031.17 S 1 2956 Regional Full Recon 135mm 2016 30.052 0.313R860 Mostafapur-Shariatpur Harina-Chandpur Km 031.17-031.77 S 0.6 2956 Regional Overlay 50mm @ IRI 7-9 2016 3.465 1.799R860 Mostafapur-Shariatpur Harina-Chandpur Km 031.77-032.07 S 0.3 2956 Regional Full Recon 135mm 2016 9.0156 0.395R860 Mostafapur-Shariatpur Harina-Chandpur Km 032.67-032.98 S 0.3 2956 Regional Overlay 50mm @ IRI 5-7 2016 1.738275 2.053R860 Mostafapur-Shariatpur Harina-Chandpur Km 032.98-033.08 S 0.1 2956 Regional Full Recon 135mm 2016 3.0052 0.746R860 Mostafapur-Shariatpur Harina-Chandpur Km 033.08-033.98 S 0.9 2956 Regional Overlay 50mm @ IRI 7-9 2016 5.1975 2.067R860 Mostafapur-Shariatpur Harina-Chandpur Km 033.98-034.28 S 0.3 2956 Regional Full Recon 135mm 2016 9.0156 0.647

Page 80 of 163

Page 81: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R860 Mostafapur-Shariatpur Harina-Chandpur Km 035.08-035.78 S 0.7 2956 Regional DBST @ Traff 2000-4000 2016 1.9019 0.398R860 Mostafapur-Shariatpur Harina-Chandpur Km 035.98-036.08 S 0.1 2956 Regional Full Recon 135mm 2016 3.0052 1.087R860 Mostafapur-Shariatpur Harina-Chandpur Km 036.18-036.68 S 0.5 2956 Regional Full Recon 135mm 2016 15.026 0.594R860 Mostafapur-Shariatpur Harina-Chandpur Km 036.68-036.88 S 0.2 2956 Regional Overlay 50mm @ IRI 7-9 2016 1.155 1.921R860 Mostafapur-Shariatpur Harina-Chandpur Km 036.88-038.38 S 1.5 2956 Regional DBST @ Traff 2000-4000 2016 4.078217 0.342R860 Mostafapur-Shariatpur Harina-Chandpur Km 039.18-039.28 S 0.1 2956 Regional DBST @ Traff 2000-4000 2016 0.2717 1.994R860 Mostafapur-Shariatpur Harina-Chandpur Km 039.28-039.48 S 0.2 2956 Regional Overlay 50mm @ IRI 5-7 2016 1.155 1.352R860 Mostafapur-Shariatpur Harina-Chandpur Km 039.48-039.58 S 0.1 2956 Regional DBST @ Traff 2000-4000 2016 0.2717 0.579R860 Mostafapur-Shariatpur Harina-Chandpur Km 039.58-040.58 S 1 2956 Regional Overlay 50mm @ IRI 5-7 2016 5.775 1.104R860 Mostafapur-Shariatpur Harina-Chandpur Km 040.58-040.98 S 0.4 2956 Regional Overlay 50mm @ IRI 7-9 2016 2.31 1.881R860 Mostafapur-Shariatpur Harina-Chandpur Km 040.98-041.38 S 0.4 2956 Regional Overlay 50mm @ IRI 5-7 2016 2.31 1.244R860 Mostafapur-Shariatpur Harina-Chandpur Km 041.38-041.58 S 0.2 2956 Regional Overlay 50mm @ IRI 7-9 2016 1.155 1.935R860 Mostafapur-Shariatpur Harina-Chandpur Km 042.18-042.28 S 0.1 2956 Regional DBST @ Traff 2000-4000 2016 0.2717 2.139R860 Mostafapur-Shariatpur Harina-Chandpur Km 042.28-044.38 S 2.1 2956 Regional Overlay 50mm @ IRI 5-7 2016 12.1275 1.054R860 Mostafapur-Shariatpur Harina-Chandpur Km 044.98-045.88 S 0.9 2956 Regional Overlay 50mm @ IRI 7-9 2016 5.1975 1.55R860 Mostafapur-Shariatpur Harina-Chandpur Km 045.88-045.98 S 0.1 2956 Regional Full Recon 135mm 2016 3.0052 0.656R860 Mostafapur-Shariatpur Harina-Chandpur Km 045.98-047.68 S 1.7 2956 Regional Overlay 50mm @ IRI 5-7 2016 9.823275 1.081R860 Mostafapur-Shariatpur Harina-Chandpur Km 047.68-049.28 S 1.6 2956 Regional Overlay 50mm @ IRI 7-9 2016 9.24 1.702R860 Mostafapur-Shariatpur Harina-Chandpur Km 049.48-049.58 S 0.1 2956 Regional Full Recon 135mm 2016 3.0052 1.087R860 Mostafapur-Shariatpur Harina-Chandpur Km 049.58-050.18 S 0.6 2956 Regional Overlay 50mm @ IRI 7-9 2016 3.465 2.027R860 Mostafapur-Shariatpur Harina-Chandpur Km 050.18-050.38 S 0.2 2956 Regional Rehab 135mm @ IRI 9-12 2016 4.9808 0.439R860 Mostafapur-Shariatpur Harina-Chandpur Km 052.78-052.98 S 0.2 2956 Regional Full Recon 135mm 2016 6.0104 0.341R860 Mostafapur-Shariatpur Harina-Chandpur Km 055.28-055.58 S 0.3 2956 Regional Full Recon 135mm 2016 9.0156 0.327R861 Monohar Bazar More at R860-Shariatpur Road Km 000.00-002.90 S 2.9 5727 Regional Overlay 60mm @ IRI 5.5-9 2016 20.1055 1.804R861 Monohar Bazar More at R860-Shariatpur Road Km 005.60-005.70 S 0.1 5727 Regional Full Recon 150mm 2016 3.3374 1.759R861 Monohar Bazar More at R860-Shariatpur Road Km 005.70-006.90 S 1.2 5727 Regional DBST @ Traff 4000-6000 2016 3.268551 1.684Z8012 Shariatpur-Janjira-Kawrakandi (Kathalbari) Road Km 001.50-001.70 S 0.2 3347 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.269Z8012 Shariatpur-Janjira-Kawrakandi (Kathalbari) Road Km 001.70-004.00 S 2.3 3347 Zilla Overlay 40mm @ Traff >=2000 2016 10.74452 0.006Z8012 Shariatpur-Janjira-Kawrakandi (Kathalbari) Road Km 004.00-004.10 S 0.1 3347 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.335Z8012 Shariatpur-Janjira-Kawrakandi (Kathalbari) Road Km 004.10-015.31 S 11.21 3347 Zilla Overlay 40mm @ Cracks >25% 2016 49.55735 0.002Z8012 Shariatpur-Janjira-Kawrakandi (Kathalbari) Road Km 025.41-025.71 S 0.3 2251 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 0.72Z8012 Shariatpur-Janjira-Kawrakandi (Kathalbari) Road Km 025.71-026.11 S 0.4 2251 Zilla Overlay 40mm @ Traff >=2000 2016 1.25652 0Z8012 Shariatpur-Janjira-Kawrakandi (Kathalbari) Road Km 026.11-026.61 S 0.5 2251 Zilla Overlay 40mm @ Traff >=2000 2016 1.57065 0Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 000.40-000.90 S 0.5 3043 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.803Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 002.47-003.17 S 0.7 3043 Zilla Rehab 75mm @ IRI 9-12 2016 7.751869 0.934Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 003.37-004.57 S 1.2 3043 Zilla Rehab 75mm @ IRI 9-12 2016 13.28892 1.538Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 004.57-004.97 S 0.4 3043 Zilla Overlay 40mm @ Traff >=2000 2016 1.25652 1.353Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 004.97-005.07 S 0.1 3043 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 1.573Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 005.17-005.27 S 0.1 3043 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 1.908Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 005.47-005.67 S 0.2 3043 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 1.905Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 005.87-007.77 S 1.9 3043 Zilla Rehab 75mm @ IRI 9-12 2016 21.04079 1.51Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 007.77-008.08 S 0.3 3043 Zilla Overlay 40mm @ Traff >=2000 2016 0.945531 1.269Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 008.08-008.68 S 0.6 3043 Zilla Full Recon 75mm @ IRI>12 2016 9.65034 0.909Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 008.98-010.28 S 1.3 3043 Zilla Full Recon 75mm @ IRI>12 2016 20.90907 0.759Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 010.28-010.58 S 0.3 3043 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 1.649Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 010.58-010.78 S 0.2 3043 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 1.056

Page 81 of 163

Page 82: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 010.88-010.98 S 0.1 3043 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.33Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 012.38-012.68 S 0.3 3043 Zilla Full Recon 75mm @ IRI>12 2016 4.841254 0.879Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 012.98-013.98 S 1 3043 Zilla Rehab 75mm @ IRI 9-12 2016 11.0741 1.081Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 013.98-014.28 S 0.3 3043 Zilla Overlay 40mm @ Cracks >25% 2016 0.89244 0.974Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 014.28-014.88 S 0.6 3043 Zilla Full Recon 75mm @ IRI>12 2016 9.65034 0.796Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 015.58-017.28 S 1.7 3043 Zilla Full Recon 75mm @ IRI>12 2016 27.35871 0.82Z8065 Shariatpur-Ganganagar-Mongalmazirghat Road Km 020.60-025.30 S 4.69 1806 Zilla Overlay 40mm @ 1000-2000 2016 21.6749 0Z8601 Shariatpur (Burirhat)-Goshairhat Road Km 001.90-002.00 S 0.1 2087 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z8601 Shariatpur (Burirhat)-Goshairhat Road Km 002.00-002.90 S 0.9 2087 Zilla Overlay 40mm @ Traff >=2000 2016 4.207219 0.12Z8601 Shariatpur (Burirhat)-Goshairhat Road Km 002.90-003.10 S 0.2 2087 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 0.054Z8601 Shariatpur (Burirhat)-Goshairhat Road Km 003.10-004.30 S 1.2 2087 Zilla Overlay 40mm @ Traff >=2000 2016 5.6034 0.074Z8601 Shariatpur (Burirhat)-Goshairhat Road Km 008.90-009.00 S 0.1 2087 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.228Z8602 Shariatpur-Naria Road Km 000.00-000.20 S 0.2 3287 Zilla Overlay 40mm @ Traff >=2000 2016 0.719952 0Z8602 Shariatpur-Naria Road Km 000.20-003.20 S 3 3287 Zilla Overlay 40mm @ Traff >=2000 2016 9.936611 0.85Z8602 Shariatpur-Naria Road Km 003.20-003.50 S 0.3 3287 Zilla Full Recon 75mm @ IRI>12 2016 5.08599 0.302Z8602 Shariatpur-Naria Road Km 003.50-003.60 S 0.1 3287 Zilla Overlay 40mm @ Traff >=2000 2016 0.33111 0Z8602 Shariatpur-Naria Road Km 006.75-007.05 S 0.3 3287 Zilla Full Recon 75mm @ IRI>12 2016 4.972098 0.191Z8602 Shariatpur-Naria Road Km 007.05-007.35 S 0.3 3287 Zilla Overlay 40mm @ Traff >=2000 2016 0.96786 0Z8602 Shariatpur-Naria Road Km 007.35-007.65 S 0.3 3287 Zilla Rehab 75mm @ IRI 9-12 2016 3.41202 0.542Z8602 Shariatpur-Naria Road Km 007.65-007.75 S 0.1 3287 Zilla Overlay 40mm @ Traff >=2000 2016 0.32262 0Z8602 Shariatpur-Naria Road Km 007.75-008.35 S 0.6 3287 Zilla Overlay 40mm @ Traff >=2000 2016 1.93572 0.796Z8602 Shariatpur-Naria Road Km 009.35-009.45 S 0.1 3287 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 0.574Z8602 Shariatpur-Naria Road Km 009.55-009.65 S 0.1 3287 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 0.829Z8605 Kaneswar-Damudya Road Km 002.20-002.40 S 0.2 2708 Zilla Rehab 75mm @ IRI 9-12 2016 2.225894 0.82Z8605 Kaneswar-Damudya Road Km 002.40-003.59 S 1.18 2708 Zilla Overlay 40mm @ Traff >=2000 2016 3.72244 0.43Z8606 Bhojeswar By-Pass Road Km 000.00-000.10 S 0.1 1976 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z8606 Bhojeswar By-Pass Road Km 000.10-000.20 S 0.1 1976 Zilla Rehab 75mm @ IRI 9-12 2016 1.13734 0.064Z8606 Bhojeswar By-Pass Road Km 000.20-000.33 S 0.13 1976 Zilla Seal Coat 2016 0.128318 0.228Z8606 Bhojeswar By-Pass Road Km 000.33-000.90 S 0.57 1976 Zilla Overlay 40mm @ IRI>12 2016 1.826029 0Sub-Total Sariatpur Division 599.7621Total Gopalganj Zone 3624.605

Khulna ZoneBagerhat DivisionN7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 219.12-239.30 S 20.19 9937 National Overlay 50mm @ IRI 4-7 2016 151.9853 15.594N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 239.30-242.80 S 3.5 9937 National Overlay 60mm @ IRI 7-9 2016 29.33595 17.32N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 080.06-084.23 S 4.17 5829 National DBST @ 25% Crk 2016 15.51165 4.022N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 084.23-084.35 L 0.12 5829 National DBST @ 25% Crk 2016 0.308256 8.581N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 084.23-084.35 R 0.12 5829 National DBST @ 25% Crk 2016 0.320112 8.475N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 100.40-100.50 S 0.1 5829 National Rehab 150mm @ IRI 9-12 2016 3.6225 3.432N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 100.50-107.90 S 7.4 4785 National DBST @ Traff 4000-6000 2016 27.417 4.064N805 Bhanga-Mollahhat-Fakirhat-Noapara Road Km 107.90-108.00 S 0.1 4782 National Full Recon 150mm 2016 4.551 1.99R770 Noapara-Bagerhat-Pirojpur Road Km 000.00-000.05 L 0.05 4227 Regional Overlay 50mm @ IRI 5-7 2016 0.470253 1.116R770 Noapara-Bagerhat-Pirojpur Road Km 000.00-000.05 R 0.05 4227 Regional Overlay 50mm @ IRI 5-7 2016 0.05145 16.69R770 Noapara-Bagerhat-Pirojpur Road Km 018.18-021.48 S 3.3 4227 Regional Overlay 50mm @ IRI 5-7 2016 20.7963 2.163

Page 82 of 163

Page 83: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R770 Noapara-Bagerhat-Pirojpur Road Km 021.48-021.88 S 0.4 4227 Regional Overlay 60mm @ IRI 7-9 2016 2.90232 3.761R771 Rupsha-Fakirhat-Bagerhat Road Km 009.00-009.50 S 0.5 2905 Regional Rehab 135mm @ IRI 9-12 2016 8.393553 0.524R771 Rupsha-Fakirhat-Bagerhat Road Km 009.80-013.00 S 3.2 2905 Regional DBST @ Traff 2000-4000 2016 8.251776 1.182R771 Rupsha-Fakirhat-Bagerhat Road Km 013.00-014.52 S 1.52 2905 Regional Overlay 50mm @ IRI 7-9 2016 8.795325 1.141R771 Rupsha-Fakirhat-Bagerhat Road Km 014.82-017.92 S 3.1 1671 Regional Overlay 50mm @ IRI 5-7 2016 17.9025 0.258R771 Rupsha-Fakirhat-Bagerhat Road Km 017.92-018.12 S 0.2 1671 Regional DBST @ Traff 100-2000 2016 0.5434 0.471R771 Rupsha-Fakirhat-Bagerhat Road Km 018.12-028.13 S 10 1671 Regional DBST @ 25% Crk 2016 22.72854 0.228R771 Rupsha-Fakirhat-Bagerhat Road Km 028.13-031.18 S 3.05 1671 Regional Overlay 50mm @ IRI 7-9 2016 13.17954 0.861Z7045 Terakhada-Mollahat Road Km 012.00-012.50 S 0.5 2237 Zilla Overlay 40mm @ Traff >=2000 2016 1.34991 0Z7045 Terakhada-Mollahat Road Km 012.50-013.90 S 1.4 2237 Zilla Full Recon 75mm @ IRI>12 2016 17.04024 0.222Z7045 Terakhada-Mollahat Road Km 013.90-014.00 S 0.1 2237 Zilla Overlay 40mm @ Traff >=2000 2016 0.23772 0Z7045 Terakhada-Mollahat Road Km 014.00-014.30 S 0.3 2237 Zilla Rehab 75mm @ IRI 9-12 2016 2.51412 0.614Z7045 Terakhada-Mollahat Road Km 014.30-014.40 S 0.1 2237 Zilla Overlay 40mm @ Traff >=2000 2016 0.23772 0Z7045 Terakhada-Mollahat Road Km 014.40-014.60 S 0.2 2237 Zilla Full Recon 75mm @ IRI>12 2016 2.43432 0.303Z7045 Terakhada-Mollahat Road Km 014.60-014.70 S 0.1 2237 Zilla Overlay 40mm @ Traff >=2000 2016 0.23772 0Z7045 Terakhada-Mollahat Road Km 014.70-015.90 S 1.2 2237 Zilla Full Recon 75mm @ IRI>12 2016 15.19237 0.342Z7054 Chitalmari-Tungipara (Patgati) Road Km 010.80-011.10 S 0.3 3095 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.355Z7703 Bagerhat (Signboard)-Kachua Road Km 002.90-005.40 S 2.5 1825 Zilla Full Recon 75mm @ IRI>12 2016 43.26995 0.283Z7703 Bagerhat (Signboard)-Kachua Road Km 005.60-006.20 S 0.6 1825 Zilla Full Recon 75mm @ IRI>12 2016 9.546012 0.322Z7703 Bagerhat (Signboard)-Kachua Road Km 006.30-007.20 S 0.9 1825 Zilla Full Recon 75mm @ IRI>12 2016 14.31902 0.437Z7708 Bagerhat-Chitolmari Road Km 000.00-000.20 S 0.2 2108 Zilla Overlay 40mm @ Traff >=2000 2016 2.594544 0.213Z7708 Bagerhat-Chitolmari Road Km 000.20-006.20 S 6 2108 Zilla Rehab 75mm @ IRI 9-12 2016 67.53333 0.101Z7708 Bagerhat-Chitolmari Road Km 007.50-008.30 S 0.8 2108 Zilla Overlay 40mm @ Traff >=2000 2016 2.51304 0Z7708 Bagerhat-Chitolmari Road Km 014.30-015.70 S 1.4 2108 Zilla Full Recon 75mm @ IRI>12 2016 22.51746 0.161Z7708 Bagerhat-Chitolmari Road Km 016.30-016.70 S 0.4 2108 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 0.614Z7708 Bagerhat-Chitolmari Road Km 023.00-023.30 S 0.3 2108 Zilla Full Recon 75mm @ IRI>12 2016 4.95558 0.163Z7708 Bagerhat-Chitolmari Road Km 023.50-024.00 S 0.5 2108 Zilla Overlay 40mm @ IRI>12 2016 2.21589 0Z7716 Nazirpur-Kuchua Road Km 000.00-000.30 S 0.3 1305 Zilla Overlay 40mm @ IRI>12 2016 1.0188 0Z7716 Nazirpur-Kuchua Road Km 000.60-000.70 S 0.1 1305 Zilla Overlay 40mm @ IRI>12 2016 0.3396 0Z7716 Nazirpur-Kuchua Road Km 001.20-001.40 S 0.2 1305 Zilla Overlay 40mm @ IRI>12 2016 0.6792 0Z7716 Nazirpur-Kuchua Road Km 001.50-001.60 S 0.1 1305 Zilla Overlay 40mm @ IRI>12 2016 0.3396 0Z7716 Nazirpur-Kuchua Road Km 001.90-003.40 S 1.5 1305 Zilla Overlay 40mm @ IRI>12 2016 4.71195 0Z7716 Nazirpur-Kuchua Road Km 003.50-003.60 S 0.1 1305 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7716 Nazirpur-Kuchua Road Km 003.70-004.20 S 0.5 1305 Zilla Overlay 40mm @ IRI>12 2016 1.57065 0Z7716 Nazirpur-Kuchua Road Km 004.60-005.10 S 0.5 1305 Zilla Overlay 40mm @ IRI>12 2016 1.573791 0Z7716 Nazirpur-Kuchua Road Km 005.20-005.30 S 0.1 1305 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7717 Bagerhat-Rampal -Mongla Road Km 010.00-010.40 S 0.4 2813 Zilla Full Recon 75mm @ IRI>12 2016 6.0858 0.707Z7717 Bagerhat-Rampal -Mongla Road Km 010.60-011.80 S 1.2 2813 Zilla Full Recon 75mm @ IRI>12 2016 18.2574 0.49Z7717 Bagerhat-Rampal -Mongla Road Km 012.20-013.40 S 1.2 2813 Zilla Full Recon 75mm @ IRI>12 2016 18.2574 0.53Z7717 Bagerhat-Rampal -Mongla Road Km 013.50-013.80 S 0.3 2813 Zilla Full Recon 75mm @ IRI>12 2016 4.56435 0.665Z7717 Bagerhat-Rampal -Mongla Road Km 014.00-014.40 S 0.4 2813 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.1Z7717 Bagerhat-Rampal -Mongla Road Km 014.50-014.90 S 0.4 2813 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.25Z7717 Bagerhat-Rampal -Mongla Road Km 015.00-015.10 S 0.1 2813 Zilla Full Recon 75mm @ IRI>12 2016 2.414758 0.332Z7717 Bagerhat-Rampal -Mongla Road Km 015.50-015.60 S 0.1 2813 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.334Z7717 Bagerhat-Rampal -Mongla Road Km 016.30-016.90 S 0.6 2813 Zilla Full Recon 75mm @ IRI>12 2016 14.3451 0.241Z7717 Bagerhat-Rampal -Mongla Road Km 017.20-018.00 S 0.8 2813 Zilla Full Recon 75mm @ IRI>12 2016 19.1268 0.126

Page 83 of 163

Page 84: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7717 Bagerhat-Rampal -Mongla Road Km 018.00-018.50 S 0.5 2813 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0.195Z7717 Bagerhat-Rampal -Mongla Road Km 018.50-019.70 S 1.2 2813 Zilla Full Recon 75mm @ IRI>12 2016 19.45717 0.37Z7717 Bagerhat-Rampal -Mongla Road Km 019.80-020.70 S 0.9 2813 Zilla Full Recon 75mm @ IRI>12 2016 13.69305 0.522Z7717 Bagerhat-Rampal -Mongla Road Km 020.80-020.90 S 0.1 2813 Zilla Full Recon 75mm @ IRI>12 2016 1.52145 1.228Z7717 Bagerhat-Rampal -Mongla Road Km 021.70-033.87 S 12.17 2813 Zilla Rehab 75mm @ IRI 9-12 2016 132.2003 1.02Z7718 Kachua-Talighati-Herma-Rampal Road Km 000.00-001.63 S 1.63 1448 Zilla Overlay 40mm @ 1000-2000 2016 4.912738 0Z7719 Bagerhat Circuit House-Karapara Road Km 000.00-001.00 S 1 1265 Zilla Overlay 40mm @ 1000-2000 2016 3.20073 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 000.20-000.30 S 0.1 1165 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 000.40-000.60 S 0.2 1165 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 001.00-001.10 S 0.1 1165 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 002.30-002.50 S 0.2 1165 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 003.70-003.80 S 0.1 1165 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 005.20-005.30 S 0.1 1165 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 005.70-005.90 S 0.2 1165 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 006.20-006.40 S 0.2 1165 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 009.80-009.90 S 0.1 1165 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 011.40-011.50 S 0.1 1165 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 020.30-020.40 S 0.1 1165 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7801 Chitalmari-Fakirhat (Faltita) Road Km 020.80-020.90 S 0.1 1165 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Sub-Total Bagerhat Division 852.8079

Chuadanga DivisionR743 Jibannagar-Duttanagar Road Km 000.00-001.40 S 1.4 4451 Regional Overlay 50mm @ IRI 5-7 2016 8.085 1.662R743 Jibannagar-Duttanagar Road Km 002.70-002.80 S 0.1 4451 Regional Rehab 150mm @ IRI 9-12 2016 1.71465 0.954R743 Jibannagar-Duttanagar Road Km 003.10-003.40 S 0.3 4451 Regional Overlay 60mm @ IRI 7-9 2016 1.332315 2.538R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 069.51-070.10 S 0.59 4937 Regional Rehab 150mm @ IRI 9-12 2016 15.87718 0.989R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 070.10-071.60 S 1.5 4937 Regional Overlay 60mm @ IRI 7-9 2016 10.5084 3.457R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 071.60-071.90 S 0.3 4937 Regional Full Recon 150mm @ IRI 12 2016 10.19424 0.942R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 071.90-075.30 S 3.4 4937 Regional Overlay 60mm @ IRI 7-9 2016 32.1557 1.744R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 075.30-078.30 S 3 4937 Regional Overlay 60mm @ IRI 7-9 2016 32.2758 1.819R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 079.61-079.81 L 0.2 4937 Regional Overlay 60mm @ IRI 7-9 2016 1.42614 3.049R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 079.61-079.81 R 0.2 4937 Regional Overlay 60mm @ IRI 7-9 2016 1.55124 2.524R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 079.81-080.27 L 0.46 4937 Regional Overlay 50mm @ IRI 5-7 2016 2.77704 2.932R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 079.81-080.27 R 0.46 4937 Regional Overlay 50mm @ IRI 5-7 2016 3.02064 2.287R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 083.81-083.91 S 0.1 4937 Regional Full Recon 150mm 2016 3.45876 1.074R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 083.91-084.21 S 0.3 4937 Regional Overlay 50mm @ IRI 5-7 2016 1.7955 2.639R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 084.21-084.31 S 0.1 4937 Regional Full Recon 150mm 2016 3.45876 1.359R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 084.31-085.01 S 0.7 4937 Regional Overlay 50mm @ IRI 5-7 2016 4.1895 2.266R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 085.81-086.11 S 0.3 4937 Regional Rehab 150mm @ IRI 9-12 2016 8.2593 1.028R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 086.11-086.81 S 0.7 4937 Regional Overlay 50mm @ IRI 5-7 2016 4.1895 3.047R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 086.81-086.91 S 0.1 4937 Regional Rehab 150mm @ IRI 9-12 2016 2.7531 1.633R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 086.91-087.01 S 0.1 4937 Regional DBST @ Traff 4000-6000 2016 0.28158 2.007R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 087.01-087.21 S 0.2 4937 Regional DBST @ Traff 4000-6000 2016 0.56316 2.979R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 088.61-088.71 S 0.1 4937 Regional Full Recon 150mm 2016 3.3374 1.887R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 088.71-088.91 S 0.2 4937 Regional Overlay 60mm @ IRI 7-9 2016 1.3761 4.48R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 088.91-092.01 S 3.1 4937 Regional Full Recon 150mm 2016 126.4086 1.084

Page 84 of 163

Page 85: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 092.23-093.21 S 0.98 4937 Regional DBST @ 25% Crk 2016 3.61608 0.861R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 093.21-093.61 S 0.4 4937 Regional Full Recon 150mm 2016 18.204 0.867R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 096.11-096.21 S 0.1 4937 Regional Rehab 150mm @ IRI 9-12 2016 2.7048 1.324R747 Kustia-Poradah-Chuadanga Road Km 017.61-024.80 S 7.2 3272 Regional Full Recon 135mm @ IRI 12 2016 216.2241 0.859R747 Kustia-Poradah-Chuadanga Road Km 024.80-027.80 S 3 3272 Regional Rehab 135mm @ IRI 9-12 2016 76.61376 0.574R747 Kustia-Poradah-Chuadanga Road Km 029.20-029.30 S 0.1 3272 Regional Full Recon 135mm 2016 3.11448 1.345R747 Kustia-Poradah-Chuadanga Road Km 029.40-029.70 S 0.3 3272 Regional Rehab 135mm @ IRI 9-12 2016 7.768689 0.62R747 Kustia-Poradah-Chuadanga Road Km 030.50-030.90 S 0.4 3272 Regional Full Recon 135mm 2016 12.45792 0.909R747 Kustia-Poradah-Chuadanga Road Km 036.00-036.20 S 0.2 3272 Regional Full Recon 135mm 2016 6.66608 0.718R747 Kustia-Poradah-Chuadanga Road Km 039.90-040.00 S 0.1 3272 Regional Full Recon 135mm 2016 3.33304 1.028R747 Kustia-Poradah-Chuadanga Road Km 041.40-041.50 S 0.1 3272 Regional Full Recon 135mm 2016 3.33304 1.028R747 Kustia-Poradah-Chuadanga Road Km 042.40-043.00 S 0.6 3272 Regional Full Recon 135mm 2016 19.99824 0.747R747 Kustia-Poradah-Chuadanga Road Km 043.20-043.43 S 0.23 3272 Regional Full Recon 135mm 2016 7.53267 0.84R747 Kustia-Poradah-Chuadanga Road Km 043.43-043.47 L 0.04 3272 Regional Overlay 50mm @ IRI 7-9 2016 0.2646 2.318R747 Kustia-Poradah-Chuadanga Road Km 043.43-043.47 R 0.04 3272 Regional Overlay 50mm @ IRI 7-9 2016 0.2436 3.265R748 Chuadanga-Darsana-Kaliganj Road Km 002.77-003.90 S 1.13 4937 Regional Overlay 50mm @ IRI 5-7 2016 8.89875 1.465R748 Chuadanga-Darsana-Kaliganj Road Km 015.40-017.40 S 2 4937 Regional Overlay 60mm @ IRI 7-9 2016 13.2606 3.988R748 Chuadanga-Darsana-Kaliganj Road Km 018.38-021.50 S 3.13 3076 Regional Overlay 50mm @ IRI 5-7 2016 19.39219 1.849R748 Chuadanga-Darsana-Kaliganj Road Km 024.60-026.50 S 1.9 3076 Regional Overlay 50mm @ IRI 5-7 2016 12.369 1.386R748 Chuadanga-Darsana-Kaliganj Road Km 026.50-026.60 S 0.1 3076 Regional Full Recon 135mm 2016 3.38768 0.625R749 Darsana-Mujibnagar Road Km 000.00-006.00 S 6 3590 Regional Overlay 50mm @ IRI 7-9 2016 34.839 1.539R749 Darsana-Mujibnagar Road Km 006.70-007.00 S 0.3 3590 Regional Overlay 50mm @ IRI 7-9 2016 1.7325 2.406R749 Darsana-Mujibnagar Road Km 007.00-008.80 S 1.8 3590 Regional Overlay 50mm @ IRI 5-7 2016 10.395 1.314R749 Darsana-Mujibnagar Road Km 008.80-009.40 S 0.6 3590 Regional Overlay 50mm @ IRI 7-9 2016 3.465 2.182R749 Darsana-Mujibnagar Road Km 011.30-012.00 S 0.7 3590 Regional Overlay 50mm @ IRI 7-9 2016 4.0425 2.126R749 Darsana-Mujibnagar Road Km 013.20-014.00 S 0.8 3590 Regional Overlay 50mm @ IRI 7-9 2016 4.62 2.05R749 Darsana-Mujibnagar Road Km 017.10-023.24 S 6.14 3590 Regional Overlay 50mm @ IRI 5-7 2016 23.59986 1.537Z7456 Bamundi-Hatboalia-Alamdanga Road Km 014.60-014.90 S 0.3 3305 Zilla Full Recon 75mm @ IRI>12 2016 4.759965 0.456Z7456 Bamundi-Hatboalia-Alamdanga Road Km 015.60-015.80 S 0.2 3305 Zilla Rehab 75mm @ IRI 9-12 2016 2.15496 1.081Z7456 Bamundi-Hatboalia-Alamdanga Road Km 016.10-016.30 S 0.2 3305 Zilla Full Recon 75mm @ IRI>12 2016 3.12984 0.584Z7456 Bamundi-Hatboalia-Alamdanga Road Km 017.00-018.20 S 1.2 3305 Zilla Full Recon 75mm @ IRI>12 2016 18.77904 0.304Z7456 Bamundi-Hatboalia-Alamdanga Road Km 018.50-019.20 S 0.7 3305 Zilla Full Recon 75mm @ IRI>12 2016 11.2283 0.318Z7456 Bamundi-Hatboalia-Alamdanga Road Km 019.90-021.00 S 1.1 3305 Zilla Full Recon 75mm @ IRI>12 2016 17.69229 0.145Z7456 Bamundi-Hatboalia-Alamdanga Road Km 021.20-021.30 S 0.1 3305 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.624Z7456 Bamundi-Hatboalia-Alamdanga Road Km 021.40-022.90 S 1.5 3305 Zilla Full Recon 75mm @ IRI>12 2016 20.99601 0.427Sub-Total Chuadanga Division 883.4156

Jessore DivisionN7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 134.68-137.81 S 3.13 8022 National Overlay 60mm @ IRI 7-9 2016 23.60975 20.558N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 137.81-138.01 S 0.2 8022 National Rehab 180mm @ IRI 9-12 2016 9.06108 7.615N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 138.01-138.51 S 0.5 8022 National Overlay 50mm @ IRI 4-7 2016 4.9455 11.749N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 138.51-138.61 S 0.1 8022 National Full Recon 180mm 2016 7.13898 3.781N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 138.61-139.51 S 0.9 8022 National Overlay 50mm @ IRI 4-7 2016 6.2559 17.528N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 139.51-139.71 S 0.2 8022 National Full Recon 180mm @ IRI 12 2016 7.97886 8.603N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 139.71-139.91 S 0.2 8022 National Overlay 60mm @ IRI 7-9 2016 1.42614 22.131N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 139.91-140.01 S 0.1 8022 National Full Recon 180mm @ IRI 12 2016 3.98943 8.908

Page 85 of 163

Page 86: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 140.01-143.61 S 3.6 8022 National Overlay 50mm @ IRI 4-7 2016 22.19476 20.552N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 143.61-143.71 S 0.1 8022 National Full Recon 180mm @ IRI 12 2016 4.54935 7.661N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 143.71-146.71 S 3 8022 National Overlay 60mm @ IRI 7-9 2016 26.94654 16.938N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 146.71-147.22 S 0.51 8896 National Overlay 50mm @ IRI 4-7 2016 4.99968 11.628N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 147.22-150.32 S 3.1 9947 National Overlay 60mm @ IRI 7-9 2016 28.5816 16.68N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 150.65-151.19 S 0.54 9947 National Rehab 180mm @ IRI 9-12 2016 26.85326 6.999N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 151.22-151.28 L 0.05 9947 National Full Recon 180mm 2016 2.154292 9.808N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 151.22-151.28 R 0.05 9947 National Full Recon 180mm 2016 2.154292 9.808N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 151.28-151.73 S 0.45 9947 National Full Recon 180mm 2016 25.34128 6.202N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 151.73-154.33 S 2.6 9947 National Rehab 180mm @ IRI 9-12 2016 141.8803 6.674N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 154.33-154.63 S 0.3 9947 National Rehab 180mm @ IRI 9-12 2016 15.2145 7.041N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 154.63-155.33 S 0.7 9947 National Overlay 60mm @ IRI 7-9 2016 6.56775 17.087N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 155.33-155.43 S 0.1 9947 National Full Recon 180mm 2016 5.24925 6.744N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 155.43-156.23 S 0.8 9947 National Rehab 180mm @ IRI 9-12 2016 40.572 6.701N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 156.23-156.43 S 0.2 9947 National Full Recon 180mm 2016 10.4985 6.646N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 156.43-158.83 S 2.4 9947 National Rehab 180mm @ IRI 9-12 2016 114.413 7.491N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 159.40-159.53 S 0.13 9947 National Rehab 180mm @ IRI 9-12 2016 5.7477 7.864N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 159.53-159.83 S 0.3 9947 National Full Recon 180mm @ IRI 12 2016 14.27796 7.358N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 159.83-163.33 S 3.5 9947 National DBST @ Traff >6000 2016 12.07187 14.998N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 163.33-165.93 S 2.6 9947 National Overlay 60mm @ IRI 7-9 2016 23.74398 17.123N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 165.93-166.13 S 0.2 9947 National Full Recon 180mm 2016 10.21854 6.841N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 166.13-172.63 S 6.5 9947 National Rehab 180mm @ IRI 9-12 2016 335.413 6.742N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 172.63-175.93 S 3.3 9947 National DBST @ Traff >6000 2016 14.37836 12.228N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 175.93-177.23 S 1.3 9947 National Rehab 180mm @ IRI 9-12 2016 59.77608 8.014N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 177.42-185.05 S 7.63 9947 National Overlay 60mm @ IRI 7-9 2016 68.87068 17.867N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 000.00-000.06 L 0.06 5047 National DBST @ 25% Crk 2016 0.216965 2.642N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 000.00-000.06 R 0.06 5047 National DBST @ 25% Crk 2016 0.216965 2.642N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 000.30-000.60 S 0.3 5047 National Rehab 150mm @ IRI 9-12 2016 10.4328 2.38N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 000.60-003.60 S 3 5047 National Overlay 50mm @ IRI 5-9 2016 26.586 4.438N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 003.60-004.30 S 0.7 5047 National Overlay 50mm @ IRI 5-9 2016 5.292 4.067N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 004.30-006.60 S 2.3 5047 National Overlay 50mm @ IRI 5-9 2016 17.84685 4.946N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 006.60-007.30 S 0.7 5047 National Overlay 50mm @ IRI 5-9 2016 5.8653 4.307N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 007.30-007.90 S 0.6 5047 National Full Recon 150mm 2016 26.21376 2.125N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 007.90-011.80 S 3.9 5047 National Overlay 50mm @ IRI 5-9 2016 29.85255 4.449N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 011.80-011.90 S 0.1 5047 National Full Recon 150mm 2016 5.024304 2.114N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 011.90-016.30 S 4.4 5047 National Overlay 50mm @ IRI 5-9 2016 33.6336 4.979N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 016.40-018.10 S 1.7 5047 National Overlay 50mm @ IRI 5-9 2016 12.852 5.194N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 018.10-020.80 S 2.7 5047 National Full Recon 150mm 2016 117.9619 2.022N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 020.80-022.57 S 1.77 5047 National Overlay 50mm @ IRI 5-9 2016 13.98142 4.104N706 Jessore (Daratana More)-Benapole Road Km 000.00-002.83 S 2.83 10775 National Full Recon 195mm 2016 145.046 4.363N706 Jessore (Daratana More)-Benapole Road Km 002.83-003.40 S 0.57 6194 National Full Recon 180mm 2016 33.55111 3.263N706 Jessore (Daratana More)-Benapole Road Km 003.40-004.10 S 0.7 6194 National Overlay 60mm @ IRI 7-9 2016 6.410124 12.699N706 Jessore (Daratana More)-Benapole Road Km 004.10-004.60 S 0.5 6194 National Rehab 180mm @ IRI 9-12 2016 21.1311 4.696N706 Jessore (Daratana More)-Benapole Road Km 004.60-005.30 S 0.7 6194 National Rehab 180mm @ IRI 9-12 2016 29.52449 4.391N706 Jessore (Daratana More)-Benapole Road Km 005.30-006.00 S 0.7 6194 National Full Recon 180mm 2016 35.86288 4.308N706 Jessore (Daratana More)-Benapole Road Km 006.00-006.40 S 0.4 6194 National Overlay 60mm @ IRI 7-9 2016 3.662928 12.944

Page 86 of 163

Page 87: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N706 Jessore (Daratana More)-Benapole Road Km 006.40-006.70 S 0.3 6194 National Rehab 180mm @ IRI 9-12 2016 12.65335 4.875N706 Jessore (Daratana More)-Benapole Road Km 006.70-006.90 S 0.2 6194 National Overlay 50mm @ IRI 5-7 2016 1.5372 12.514N706 Jessore (Daratana More)-Benapole Road Km 006.90-008.70 S 1.8 6194 National Full Recon 180mm 2016 92.21882 4.418N706 Jessore (Daratana More)-Benapole Road Km 008.70-011.80 S 3.1 6194 National Overlay 60mm @ IRI 7-9 2016 28.38769 12.796N706 Jessore (Daratana More)-Benapole Road Km 011.80-012.40 S 0.6 6194 National Rehab 180mm @ IRI 9-12 2016 25.3067 4.662N706 Jessore (Daratana More)-Benapole Road Km 012.40-012.60 S 0.2 6194 National Overlay 50mm @ IRI 5-7 2016 1.5372 12.734N706 Jessore (Daratana More)-Benapole Road Km 012.60-013.70 S 1.1 6194 National Full Recon 180mm 2016 56.40718 4.205N706 Jessore (Daratana More)-Benapole Road Km 013.70-013.80 S 0.1 6194 National Overlay 50mm @ IRI 5-7 2016 0.7686 12.715N706 Jessore (Daratana More)-Benapole Road Km 013.80-014.60 S 0.8 6194 National Rehab 180mm @ IRI 9-12 2016 33.74227 4.386N706 Jessore (Daratana More)-Benapole Road Km 014.60-016.80 S 2.2 6194 National Overlay 50mm @ IRI 5-7 2016 16.9092 12.75N706 Jessore (Daratana More)-Benapole Road Km 016.80-016.90 S 0.1 6194 National Rehab 180mm @ IRI 9-12 2016 4.217784 4.953N706 Jessore (Daratana More)-Benapole Road Km 016.90-017.00 S 0.1 6194 National Overlay 50mm @ IRI 5-7 2016 0.7686 12.867N706 Jessore (Daratana More)-Benapole Road Km 017.00-017.70 S 0.7 6194 National Rehab 180mm @ IRI 9-12 2016 29.52449 4.666N706 Jessore (Daratana More)-Benapole Road Km 017.70-020.86 S 3.15 6194 National Overlay 50mm @ IRI 5-7 2016 24.24165 12.827N706 Jessore (Daratana More)-Benapole Road Km 020.86-022.16 S 1.3 6194 National Overlay 60mm @ IRI 7-9 2016 11.90452 12.63N706 Jessore (Daratana More)-Benapole Road Km 022.16-023.96 S 1.8 6194 National Full Recon 180mm 2016 92.27006 4.405N706 Jessore (Daratana More)-Benapole Road Km 023.96-024.86 S 0.9 6194 National Overlay 60mm @ IRI 7-9 2016 8.241588 12.951N706 Jessore (Daratana More)-Benapole Road Km 024.86-025.56 S 0.7 6194 National Rehab 180mm @ IRI 9-12 2016 29.52449 4.682N706 Jessore (Daratana More)-Benapole Road Km 025.56-026.86 S 1.3 6194 National Rehab 180mm @ IRI 9-12 2016 54.83119 4.496N706 Jessore (Daratana More)-Benapole Road Km 026.86-027.17 S 0.31 6194 National Full Recon 180mm 2016 16.03583 4.494N706 Jessore (Daratana More)-Benapole Road Km 027.17-027.77 S 0.6 6194 National DBST @ Traff >6000 2016 2.169648 11.082N706 Jessore (Daratana More)-Benapole Road Km 027.77-027.97 S 0.2 6194 National Rehab 180mm @ IRI 9-12 2016 8.435568 4.322N706 Jessore (Daratana More)-Benapole Road Km 027.97-032.27 S 4.3 6194 National Overlay 50mm @ IRI 5-7 2016 33.05749 11.906N706 Jessore (Daratana More)-Benapole Road Km 032.27-033.35 S 1.08 6194 National Overlay 60mm @ IRI 7-9 2016 9.880748 13.134N706 Jessore (Daratana More)-Benapole Road Km 033.37-033.65 L 0.28 6194 National Overlay 50mm @ IRI 5-7 2016 2.144394 12.658N706 Jessore (Daratana More)-Benapole Road Km 033.37-033.65 R 0.28 3035 National Overlay 50mm @ IRI 5-9 2016 1.083915 6.472N706 Jessore (Daratana More)-Benapole Road Km 034.05-034.97 L 0.93 6194 National DBST @ Traff >6000 2016 3.344874 11.845N706 Jessore (Daratana More)-Benapole Road Km 034.97-035.66 L 0.69 6194 National Overlay 50mm @ IRI 5-7 2016 5.295654 13.433N707 Jessore Town Old Section -Monihar-Murali) Road Km 000.00-003.32 S 3.32 10839 National Overlay 80mm @ IRI 5-9 2016 52.95882 10.738N707 Jessore Town Old Section -Monihar-Murali) Road Km 003.32-003.92 S 0.6 10839 National Overlay 50mm @ IRI 5 2016 9.45 5.587N707 Jessore Town Old Section -Monihar-Murali) Road Km 003.92-004.02 S 0.1 10839 National Rehab 195mm @ IRI 9-12 2016 9.096 2.335N707 Jessore Town Old Section -Monihar-Murali) Road Km 004.02-004.22 S 0.2 10839 National Overlay 80mm @ IRI 5-9 2016 4.959 5.502N707 Jessore Town Old Section -Monihar-Murali) Road Km 004.22-004.32 S 0.1 10839 National Overlay 80mm @ IRI 5-9 2016 2.4795 5.865N707 Jessore Town Old Section -Monihar-Murali) Road Km 004.32-004.34 S 0.02 10839 National Full Recon 195mm 2016 2.1903 2.091N707 Jessore Town Old Section -Monihar-Murali) Road Km 004.34-004.72 S 0.38 10839 National Full Recon 195mm 2016 20.30846 5.861N707 Jessore Town Old Section -Monihar-Murali) Road Km 004.72-006.36 S 1.64 10839 National Overlay 80mm @ IRI 5-9 2016 19.85603 17.238N711 Benapole Town Old Section Road Km 000.00-003.58 S 3.58 11059 National Overlay 80mm @ IRI 5-9 2016 35.68397 16.562N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 037.81-041.31 S 3.5 3102 National Rehab 135mm @ IRI 9-12 2016 87.164 0.927N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 041.31-041.61 S 0.3 3102 National Full Recon 135mm 2016 9.0156 1.325N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 041.71-043.01 S 1.3 3102 National Rehab 135mm @ IRI 9-12 2016 32.3752 0.937N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 043.11-043.21 S 0.1 3102 National Rehab 135mm @ IRI 9-12 2016 2.4904 1.41N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 043.21-044.71 S 1.5 3102 National Overlay 50mm @ IRI 5-9 2016 8.6625 3.325N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 044.71-046.41 S 1.7 3102 National Rehab 135mm @ IRI 9-12 2016 42.3617 1.115N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 046.41-049.11 S 2.7 3102 National Overlay 50mm @ IRI 5-9 2016 15.5925 3.385N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 049.11-050.11 S 1 3102 National Overlay 50mm @ IRI 5-9 2016 5.775 3.557R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 000.00-005.41 S 5.41 4015 Regional DBST @ Traff 4000-6000 2016 16.64993 2.535

Page 87 of 163

Page 88: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 006.31-007.20 S 0.89 4015 Regional Overlay 50mm @ IRI 5-7 2016 5.145525 5.528R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 007.20-007.70 S 0.5 4015 Regional Full Recon 150mm 2016 16.687 1.782R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 007.70-007.80 S 0.1 4015 Regional Overlay 50mm @ IRI 5-7 2016 0.5775 6.138R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 007.80-007.90 S 0.1 4015 Regional Full Recon 150mm 2016 3.3374 2.192R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 007.90-008.10 S 0.2 4015 Regional Overlay 50mm @ IRI 5-7 2016 1.155 5.53R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 008.10-008.20 S 0.1 4015 Regional Full Recon 150mm 2016 3.3374 2.416R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 008.20-008.30 S 0.1 4015 Regional Overlay 50mm @ IRI 5-7 2016 0.5775 5.874R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 008.30-008.40 S 0.1 4015 Regional Full Recon 150mm 2016 3.3374 2.473R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 008.40-008.50 S 0.1 4015 Regional Overlay 60mm @ IRI 7-9 2016 0.68805 7.045R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 008.50-008.90 S 0.4 4015 Regional Full Recon 150mm 2016 13.3496 2.101R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 008.90-009.60 S 0.7 4015 Regional Overlay 60mm @ IRI 7-9 2016 4.81635 5.994R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 009.60-009.70 S 0.1 4015 Regional Full Recon 150mm 2016 3.3374 2.494R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 009.70-010.20 S 0.5 4015 Regional Overlay 50mm @ IRI 5-7 2016 2.8875 5.167R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 010.20-010.30 S 0.1 4015 Regional Full Recon 150mm 2016 3.3374 2.163R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 010.43-010.90 S 0.47 4015 Regional Overlay 50mm @ IRI 5-7 2016 2.720025 5.125R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 010.90-011.20 S 0.3 4015 Regional Full Recon 150mm 2016 10.0122 2.154R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 011.20-011.90 S 0.7 4015 Regional Overlay 60mm @ IRI 7-9 2016 4.81635 6.094R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 011.90-012.20 S 0.3 4015 Regional Full Recon 150mm 2016 10.0122 2.154R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 012.20-012.40 S 0.2 4015 Regional Overlay 50mm @ IRI 5-7 2016 1.155 6.114R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 012.40-012.70 S 0.3 4015 Regional Full Recon 150mm 2016 10.0122 2.141R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 012.70-014.00 S 1.3 4015 Regional DBST @ 25% Crk 2016 3.534817 4.187R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 014.00-014.10 S 0.1 4015 Regional Rehab 150mm @ IRI 9-12 2016 2.6565 2.463R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 014.10-014.60 S 0.5 4015 Regional Overlay 50mm @ IRI 5-7 2016 2.8875 4.982R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 014.60-014.80 S 0.2 4015 Regional DBST @ Traff 4000-6000 2016 0.5434 5.614R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 014.80-015.60 S 0.8 4015 Regional Overlay 50mm @ IRI 5-7 2016 4.62 5.249R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 015.60-016.00 S 0.4 4015 Regional DBST @ Traff 4000-6000 2016 1.0868 5.424R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 016.00-017.30 S 1.3 4015 Regional Overlay 60mm @ IRI 7-9 2016 8.944649 5.708R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 017.30-017.50 S 0.2 4015 Regional Rehab 150mm @ IRI 9-12 2016 5.313 2.191R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 017.50-026.40 S 8.9 4015 Regional Overlay 50mm @ IRI 5-7 2016 51.40328 5.37R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 026.40-026.71 S 0.31 4015 Regional Overlay 60mm @ IRI 7-9 2016 2.105433 6.223R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 026.71-036.27 S 9.56 4015 Regional Overlay 50mm @ IRI 5-7 2016 55.41556 5.002R755 Jessore-Monirampur-Keshabpur-Chuknagar Km 036.27-038.27 S 2 4015 Regional Overlay 50mm @ IRI 5-7 2016 11.75155 4.685R765 Navaran-Illishpur- Satkhira Road Km 000.00-000.90 S 0.9 4408 Regional Overlay 50mm @ IRI 5-7 2016 5.3487 2.232R765 Navaran-Illishpur- Satkhira Road Km 000.90-001.10 S 0.2 4408 Regional Full Recon 150mm 2016 6.6748 2.182R765 Navaran-Illishpur- Satkhira Road Km 001.10-004.20 S 3.1 4408 Regional Overlay 50mm @ IRI 5-7 2016 17.9025 4.669R765 Navaran-Illishpur- Satkhira Road Km 004.20-007.20 S 3 4408 Regional Overlay 50mm @ IRI 5-7 2016 17.33078 4.722R765 Navaran-Illishpur- Satkhira Road Km 007.20-008.40 S 1.2 4408 Regional Overlay 60mm @ IRI 7-9 2016 8.2566 5.552R765 Navaran-Illishpur- Satkhira Road Km 008.40-008.60 S 0.2 4408 Regional Full Recon 150mm 2016 6.6748 2.247R765 Navaran-Illishpur- Satkhira Road Km 008.60-009.00 S 0.4 4408 Regional Overlay 60mm @ IRI 7-9 2016 2.7522 4.392R765 Navaran-Illishpur- Satkhira Road Km 009.00-009.20 S 0.2 4408 Regional Full Recon 150mm 2016 6.6748 1.914R765 Navaran-Illishpur- Satkhira Road Km 009.20-009.50 S 0.3 4408 Regional Overlay 60mm @ IRI 7-9 2016 2.06415 5.55R765 Navaran-Illishpur- Satkhira Road Km 009.50-009.80 S 0.3 4408 Regional Full Recon 150mm 2016 10.0122 1.66R765 Navaran-Illishpur- Satkhira Road Km 009.80-011.70 S 1.9 4408 Regional Overlay 60mm @ IRI 7-9 2016 13.07295 4.289R765 Navaran-Illishpur- Satkhira Road Km 011.70-011.80 S 0.1 4408 Regional Full Recon 150mm 2016 3.3374 2.33R765 Navaran-Illishpur- Satkhira Road Km 011.80-012.50 S 0.7 4408 Regional Overlay 60mm @ IRI 7-9 2016 4.81635 4.498R765 Navaran-Illishpur- Satkhira Road Km 012.50-013.70 S 1.2 4408 Regional Rehab 150mm @ IRI 9-12 2016 31.90456 1.602

Page 88 of 163

Page 89: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R765 Navaran-Illishpur- Satkhira Road Km 013.70-014.40 S 0.7 4408 Regional DBST @ Traff 4000-6000 2016 1.9019 3.845R765 Navaran-Illishpur- Satkhira Road Km 014.40-015.40 S 1 4408 Regional Overlay 60mm @ IRI 7-9 2016 6.8805 5.567R765 Navaran-Illishpur- Satkhira Road Km 015.40-016.11 S 0.7 4408 Regional Overlay 50mm @ IRI 5-7 2016 4.071375 5.055Z7031 Churamonkathi-Chaugachha Road Km 000.40-000.70 S 0.3 3114 Zilla Full Recon 75mm @ IRI>12 2016 6.39009 0.45Z7031 Churamonkathi-Chaugachha Road Km 001.30-002.00 S 0.7 3114 Zilla Full Recon 75mm @ IRI>12 2016 16.64466 0.342Z7031 Churamonkathi-Chaugachha Road Km 002.00-002.30 S 0.3 3114 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.1Z7031 Churamonkathi-Chaugachha Road Km 002.30-003.80 S 1.5 3114 Zilla Full Recon 75mm @ IRI>12 2016 35.86275 0.22Z7031 Churamonkathi-Chaugachha Road Km 004.00-004.30 S 0.3 3114 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.083Z7031 Churamonkathi-Chaugachha Road Km 004.30-004.90 S 0.6 3114 Zilla Overlay 40mm @ Traff >=2000 2016 2.806369 0.158Z7031 Churamonkathi-Chaugachha Road Km 004.90-005.80 S 0.9 3114 Zilla Rehab 75mm @ IRI 9-12 2016 13.38769 0.652Z7031 Churamonkathi-Chaugachha Road Km 006.10-006.20 S 0.1 3114 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.478Z7031 Churamonkathi-Chaugachha Road Km 006.20-007.00 S 0.8 3114 Zilla Overlay 40mm @ Traff >=2000 2016 3.15828 0.456Z7031 Churamonkathi-Chaugachha Road Km 007.00-007.20 S 0.2 3114 Zilla Rehab 75mm @ IRI 9-12 2016 3.406034 0.422Z7031 Churamonkathi-Chaugachha Road Km 007.40-007.60 S 0.2 3114 Zilla Full Recon 75mm @ IRI>12 2016 4.851252 0.161Z7031 Churamonkathi-Chaugachha Road Km 007.80-014.10 S 6.3 3114 Zilla Rehab 75mm @ IRI 9-12 2016 91.65422 0.803Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 014.08-017.60 S 3.53 1780 Zilla Overlay 40mm @ IRI>12 2016 11.07937 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 019.70-020.76 S 1.06 1780 Zilla Full Recon 75mm @ IRI>12 2016 16.9846 0.038Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 020.96-021.16 S 0.2 1780 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.121Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 021.56-021.76 S 0.2 1780 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.057Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 022.46-022.66 S 0.2 1780 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.062Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 022.76-023.26 S 0.5 1780 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.021Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 023.26-023.36 S 0.1 1780 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 023.36-023.56 S 0.2 1780 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.211Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 023.86-024.86 S 1 1780 Zilla Overlay 40mm @ IRI>12 2016 3.1413 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 024.86-024.96 S 0.1 1780 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 024.96-025.76 S 0.8 1780 Zilla Overlay 40mm @ IRI>12 2016 2.516181 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 026.06-028.26 S 2.2 1780 Zilla Overlay 40mm @ IRI>12 2016 6.91086 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 028.36-030.66 S 2.3 1780 Zilla Overlay 40mm @ IRI>12 2016 7.22499 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 030.96-031.86 S 0.9 1780 Zilla Overlay 40mm @ IRI>12 2016 2.82717 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 032.06-033.44 S 1.38 1780 Zilla Overlay 40mm @ IRI>12 2016 4.331852 0Z7058 Sutighata-Dakuria Road Km 000.00-003.00 S 3 741 Zilla Overlay 40mm @ IRI>12 2016 10.00971 0Z7058 Sutighata-Dakuria Road Km 003.70-004.10 S 0.4 741 Zilla Overlay 40mm @ IRI>12 2016 1.25652 0Z7058 Sutighata-Dakuria Road Km 005.00-005.80 S 0.8 741 Zilla Overlay 40mm @ IRI>12 2016 2.51304 0Z7058 Sutighata-Dakuria Road Km 006.70-006.80 S 0.1 741 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7058 Sutighata-Dakuria Road Km 009.10-009.50 S 0.4 741 Zilla Overlay 40mm @ IRI>12 2016 1.25652 0Z7058 Sutighata-Dakuria Road Km 009.70-009.80 S 0.1 741 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7058 Sutighata-Dakuria Road Km 011.50-013.10 S 1.6 741 Zilla Overlay 40mm @ IRI>12 2016 5.308024 0Z7059 Bolianpur-Kuada Road Km 000.20-001.30 S 1.1 1055 Zilla Overlay 40mm @ IRI>12 2016 3.45543 0Z7501 Bagherpara Link Road Km 000.00-003.30 S 3.3 1530 Zilla Overlay 40mm @ IRI>12 2016 15.63349 0Z7551 Monirampur-Jikorgachha Road Km 000.20-000.30 S 0.1 1123 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.185Z7551 Monirampur-Jikorgachha Road Km 000.60-001.10 S 0.5 1123 Zilla Overlay 40mm @ IRI>12 2016 1.57065 0Z7551 Monirampur-Jikorgachha Road Km 001.20-001.30 S 0.1 1123 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.184Z7551 Monirampur-Jikorgachha Road Km 001.50-001.60 S 0.1 1123 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.042Z7551 Monirampur-Jikorgachha Road Km 001.80-002.00 S 0.2 1123 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.139Z7551 Monirampur-Jikorgachha Road Km 002.10-002.20 S 0.1 1123 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.185Z7551 Monirampur-Jikorgachha Road Km 002.40-004.30 S 1.9 1123 Zilla Full Recon 75mm @ IRI>12 2016 30.55941 0.016

Page 89 of 163

Page 90: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7551 Monirampur-Jikorgachha Road Km 004.70-005.00 S 0.3 1123 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.104Z7551 Monirampur-Jikorgachha Road Km 005.30-006.50 S 1.2 1123 Zilla Full Recon 75mm @ IRI>12 2016 19.30068 0.065Z7551 Monirampur-Jikorgachha Road Km 006.50-006.60 S 0.1 1123 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z7551 Monirampur-Jikorgachha Road Km 006.60-007.13 S 0.52 1123 Zilla Overlay 40mm @ IRI>12 2016 1.646041 0Z7551 Monirampur-Jikorgachha Road Km 007.73-009.13 S 1.4 1123 Zilla Overlay 40mm @ IRI>12 2016 4.39782 0Z7551 Monirampur-Jikorgachha Road Km 009.63-009.73 S 0.1 1123 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.184Z7551 Monirampur-Jikorgachha Road Km 009.83-009.93 S 0.1 1123 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.185Z7551 Monirampur-Jikorgachha Road Km 009.93-010.93 S 1 1123 Zilla Rehab 75mm @ IRI 9-12 2016 11.0741 0.216Z7551 Monirampur-Jikorgachha Road Km 010.93-012.83 S 1.9 1123 Zilla Overlay 40mm @ IRI>12 2016 6.455796 0Z7551 Monirampur-Jikorgachha Road Km 012.93-014.03 S 1.1 1123 Zilla Overlay 40mm @ IRI>12 2016 3.45543 0Z7551 Monirampur-Jikorgachha Road Km 014.53-015.13 S 0.6 1127 Zilla Overlay 40mm @ IRI>12 2016 2.06307 0Z7552 Keshabpur- Sharaskhati -Kalaroa Road Km 000.30-003.30 S 3 3255 Zilla Full Recon 75mm @ IRI>12 2016 40.4271 1.702Z7552 Keshabpur- Sharaskhati -Kalaroa Road Km 003.70-005.00 S 1.3 3255 Zilla Rehab 75mm @ IRI 9-12 2016 12.07107 2.252Z7552 Keshabpur- Sharaskhati -Kalaroa Road Km 005.30-005.90 S 0.6 3255 Zilla Full Recon 75mm @ IRI>12 2016 8.08542 1.539Z7552 Keshabpur- Sharaskhati -Kalaroa Road Km 005.90-011.38 S 5.48 3034 Zilla Rehab 75mm @ IRI 9-12 2016 60.205 1.381Z7553 Keshabpur -Betgram Road Km 000.20-000.90 S 0.7 3435 Zilla Rehab 75mm @ IRI 9-12 2016 10.18219 0.491Z7553 Keshabpur -Betgram Road Km 001.00-007.50 S 6.5 3435 Zilla Rehab 75mm @ IRI 9-12 2016 71.99272 1.053Z7553 Keshabpur -Betgram Road Km 011.90-014.97 S 3.06 3435 Zilla Overlay 40mm @ Traff >=2000 2016 9.624943 0.852Z7553 Keshabpur -Betgram Road Km 019.77-022.77 S 3 3435 Zilla Full Recon 75mm @ IRI>12 2016 48.2517 0.476Z7553 Keshabpur -Betgram Road Km 022.97-023.07 S 0.1 3435 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z7553 Keshabpur -Betgram Road Km 023.07-023.27 S 0.2 3435 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.973Z7553 Keshabpur -Betgram Road Km 023.27-023.37 S 0.1 3435 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z7553 Keshabpur -Betgram Road Km 023.37-023.67 S 0.3 3435 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 0.982Z7619 Modhanpur College More-Trimohoni Bazar Road Km 000.00-000.60 S 0.6 2187 Zilla Overlay 40mm @ IRI>12 2016 1.981566 0Z7619 Modhanpur College More-Trimohoni Bazar Road Km 000.60-000.70 S 0.1 2187 Zilla Overlay 40mm @ Traff >=2000 2016 0.309885 0Z7619 Modhanpur College More-Trimohoni Bazar Road Km 000.70-002.60 S 1.9 2187 Zilla Overlay 40mm @ IRI>12 2016 5.887815 0Z7619 Modhanpur College More-Trimohoni Bazar Road Km 002.60-002.70 S 0.1 2187 Zilla Seal Coat 2016 0.09198 0.114Z7619 Modhanpur College More-Trimohoni Bazar Road Km 002.70-003.90 S 1.2 2187 Zilla Overlay 40mm @ IRI>12 2016 3.71862 0Z7619 Modhanpur College More-Trimohoni Bazar Road Km 019.81-019.91 S 0.1 2187 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.085Z7619 Modhanpur College More-Trimohoni Bazar Road Km 019.91-020.31 S 0.4 2187 Zilla Overlay 40mm @ Traff >=2000 2016 1.259661 0.035Z7619 Modhanpur College More-Trimohoni Bazar Road Km 020.31-020.71 S 0.4 2187 Zilla Overlay 40mm @ Traff >=2000 2016 1.25652 0.009Z7619 Modhanpur College More-Trimohoni Bazar Road Km 020.71-021.01 S 0.3 2187 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0Z7619 Modhanpur College More-Trimohoni Bazar Road Km 021.01-021.11 S 0.1 2187 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.021Z7619 Modhanpur College More-Trimohoni Bazar Road Km 021.11-021.31 S 0.2 2187 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0Z7619 Modhanpur College More-Trimohoni Bazar Road Km 021.31-021.81 S 0.5 2187 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.039Sub-Total Jessore Division 3750.595

Jhenaidah DivisionN7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 090.84-092.81 S 1.97 8620 National Overlay 50mm @ IRI 4-7 2016 15.28868 12.198N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 092.81-093.21 S 0.4 8620 National DBST @ Traff >6000 2016 1.482 11.366N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 093.21-096.71 S 3.5 8620 National Overlay 50mm @ IRI 4-7 2016 27.5625 11.384N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 096.71-100.11 S 3.4 8620 National Overlay 60mm @ IRI 7-9 2016 31.90988 12.666N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 100.11-103.11 S 3 8620 National Overlay 50mm @ IRI 4-7 2016 23.436 12.347N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 103.11-103.70 S 0.59 8326 National Overlay 50mm @ IRI 4-7 2016 4.545345 12.236N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 103.71-103.76 L 0.05 8090 National Overlay 50mm @ IRI 4-7 2016 0.36792 12.733N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 103.71-103.76 R 0.05 8090 National Overlay 50mm @ IRI 4-7 2016 0.36792 12.733

Page 90 of 163

Page 91: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 103.76-105.61 S 1.85 8090 National Overlay 50mm @ IRI 4-7 2016 14.87619 10.999N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 105.67-106.03 S 0.36 8090 National Overlay 50mm @ IRI 4-7 2016 2.81988 9.564N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 106.40-106.81 S 0.41 8323 National Overlay 50mm @ IRI 4-7 2016 3.12732 12.779N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 106.81-107.01 S 0.2 8620 National Rehab 180mm @ IRI 9-12 2016 9.87252 4.827N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 107.01-110.01 S 3 8620 National Overlay 50mm @ IRI 4-7 2016 18.6165 15.045N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 110.01-115.71 S 5.7 8620 National Overlay 60mm @ IRI 7-9 2016 44.43206 15.204N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 115.73-116.01 S 0.28 8620 National Overlay 50mm @ IRI 4-7 2016 1.611225 10.658N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 116.01-117.61 S 1.6 8620 National Overlay 60mm @ IRI 7-9 2016 12.97037 13.218N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 117.68-118.61 S 0.93 8620 National Rehab 180mm @ IRI 9-12 2016 40.83234 5.915N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 118.61-119.51 S 0.9 8620 National Full Recon 180mm 2016 45.22754 4.828N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 119.51-122.80 S 3.29 8159 National Rehab 180mm @ IRI 9-12 2016 196.0555 4.959N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 122.80-123.61 S 0.81 8022 National Rehab 180mm @ IRI 9-12 2016 39.93434 7.322N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 123.79-126.71 S 2.92 8022 National Overlay 60mm @ IRI 7-9 2016 26.71198 16.717N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 126.77-127.81 S 1.04 8022 National Rehab 180mm @ IRI 9-12 2016 51.3371 7.234N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 127.81-128.11 S 0.3 8022 National Full Recon 180mm 2016 15.32781 6.449N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 128.11-131.11 S 3 8022 National Rehab 180mm @ IRI 9-12 2016 148.0878 7.309N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 131.11-134.68 S 3.57 8022 National Overlay 60mm @ IRI 7-9 2016 27.70322 19.669N703 Jhenaidah Town Old Section Road Km 000.00-000.01 S 0.01 4979 National DBST @ 25% Crk 2016 0.114114 0.035N703 Jhenaidah Town Old Section Road Km 000.01-000.03 L 0.02 4979 National DBST @ Traff 4000-6000 2016 0.077163 1.528N703 Jhenaidah Town Old Section Road Km 000.01-000.03 R 0.02 4979 National DBST @ Traff 4000-6000 2016 0.070642 2.868N703 Jhenaidah Town Old Section Road Km 002.17-003.10 S 0.93 4979 National Overlay 50mm @ IRI 5-9 2016 6.864795 2.13N703 Jhenaidah Town Old Section Road Km 003.10-003.40 S 0.3 4979 National Rehab 150mm @ IRI 9-12 2016 8.694 1.311N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 000.00-000.90 S 0.9 10037 National Overlay 80mm @ IRI 5-9 2016 7.393869 11.434N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 001.02-003.77 S 2.75 10387 National Overlay 80mm @ IRI 5-9 2016 49.0941 9.012N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 003.92-006.80 S 2.88 10387 National Overlay 80mm @ IRI 5-9 2016 34.75267 16.453N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 006.93-008.80 S 1.88 10387 National Overlay 80mm @ IRI 5-9 2016 23.98916 14.952N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 008.80-009.00 S 0.2 10387 National Full Recon 195mm 2016 10.65946 5.864N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 009.00-010.90 S 1.9 10387 National Overlay 80mm @ IRI 5-9 2016 22.92711 17.054N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 010.92-012.86 S 1.93 10387 National Overlay 80mm @ IRI 5-9 2016 23.34945 16.64N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 012.92-014.26 S 1.34 10387 National Rehab 195mm @ IRI 9-12 2016 59.09671 6.143N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 014.26-014.46 S 0.2 10387 National Rehab 195mm @ IRI 9-12 2016 8.97472 6.289N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 014.46-015.86 S 1.4 10387 National Overlay 80mm @ IRI 5-9 2016 18.28218 14.963N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 015.90-016.06 S 0.15 10387 National Overlay 80mm @ IRI 5-9 2016 1.997981 14.952N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 016.06-016.36 S 0.3 10387 National Full Recon 195mm 2016 17.30337 5.479N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 016.36-018.26 S 1.9 10387 National Overlay 80mm @ IRI 5-9 2016 24.02636 16N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 018.90-020.06 S 1.16 10387 National Overlay 80mm @ IRI 5-9 2016 13.9614 16.106N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 020.06-020.26 S 0.2 10387 National Full Recon 195mm 2016 10.65946 6.014N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 020.26-021.16 S 0.9 10387 National Overlay 80mm @ IRI 5-9 2016 10.86021 16.686N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 021.16-021.52 S 0.36 10387 National Full Recon 195mm 2016 19.13373 5.619N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 000.00-000.01 S 0.01 3707 National DBST @ Traff 2000-4000 2016 0.006916 14.377N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 000.01-000.03 L 0.02 9013 National Overlay 50mm @ IRI 5-7 2016 0.16401 16.806N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 000.01-000.03 R 0.02 9013 National Overlay 50mm @ IRI 5-7 2016 0.15015 19.325N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 000.03-002.13 S 2.1 9013 National Overlay 50mm @ IRI 5-7 2016 16.32477 12.565N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 002.20-002.21 L 0.01 9013 National Full Recon 180mm 2016 0.377946 11.612N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 002.20-002.21 R 0.01 9013 National Full Recon 180mm 2016 0.377946 11.612N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 002.21-002.90 S 0.69 9013 National Full Recon 180mm @ IRI 12 2016 27.57536 6.133

Page 91 of 163

Page 92: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 002.90-003.00 S 0.1 9013 National Full Recon 180mm @ IRI 12 2016 3.98943 6.854N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 003.00-003.39 S 0.39 9013 National Rehab 180mm @ IRI 9-12 2016 12.80893 6.819N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 003.66-003.70 S 0.04 9013 National Overlay 50mm @ IRI 5-7 2016 0.2772 18.087N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 003.70-003.90 S 0.2 9013 National Full Recon 180mm @ IRI 12 2016 9.23868 5.633N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 003.90-004.20 S 0.3 9013 National Overlay 50mm @ IRI 5-7 2016 2.079 15.609N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 004.20-005.20 S 1 9013 National Rehab 180mm @ IRI 9-12 2016 38.0292 6.036N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 005.20-005.90 S 0.7 9013 National Overlay 60mm @ IRI 7-9 2016 5.77962 15.946N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 005.90-006.00 S 0.1 9013 National Full Recon 180mm @ IRI 12 2016 4.61934 5.657N712 Jhenaidaha -Arappur Intersection-Alhera Road Km 006.00-006.15 S 0.15 9013 National Overlay 50mm @ IRI 5-7 2016 1.0395 15.87R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 097.11-097.21 S 0.1 4937 Regional Rehab 150mm @ IRI 9-12 2016 2.7048 1.204R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 098.31-098.41 S 0.1 4937 Regional Rehab 150mm @ IRI 9-12 2016 2.7048 1.175R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 109.11-109.31 S 0.2 4937 Regional Overlay 60mm @ IRI 7-9 2016 1.40112 3.916R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 114.98-115.41 S 0.43 3076 Regional Overlay 50mm @ IRI 7-9 2016 2.53428 2.12R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 115.41-115.72 S 0.31 3076 Regional DBST @ Traff 2000-4000 2016 0.871416 1.138R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 115.72-116.02 S 0.3 3076 Regional Overlay 50mm @ IRI 7-9 2016 1.970892 1.46R748 Chuadanga-Darsana-Kaliganj Road Km 037.06-040.20 S 3.14 3076 Regional Overlay 50mm @ IRI 5-7 2016 18.7929 1.383R748 Chuadanga-Darsana-Kaliganj Road Km 043.30-043.60 S 0.3 3076 Regional Overlay 50mm @ IRI 7-9 2016 1.7955 2.532R748 Chuadanga-Darsana-Kaliganj Road Km 044.15-044.50 S 0.35 3076 Regional Overlay 50mm @ IRI 5-7 2016 2.124675 1.572R748 Chuadanga-Darsana-Kaliganj Road Km 044.50-044.60 S 0.1 3076 Regional Full Recon 135mm 2016 3.11448 1.217R748 Chuadanga-Darsana-Kaliganj Road Km 049.90-052.00 S 2.1 3076 Regional Overlay 50mm @ IRI 5-7 2016 12.19365 2.233R748 Chuadanga-Darsana-Kaliganj Road Km 056.60-057.20 S 0.6 3076 Regional Overlay 50mm @ IRI 7-9 2016 3.654 1.886R748 Chuadanga-Darsana-Kaliganj Road Km 057.20-059.50 S 2.3 3076 Regional Overlay 50mm @ IRI 5-7 2016 14.007 1.366R748 Chuadanga-Darsana-Kaliganj Road Km 059.50-059.90 S 0.4 3076 Regional Overlay 50mm @ IRI 7-9 2016 2.436 2.248Z7021 Arpara-Kaliganj Road Km 014.40-016.80 S 2.4 4120 Zilla Full Recon 75mm @ IRI>12 2016 40.79225 0.756Z7021 Arpara-Kaliganj Road Km 016.80-017.20 S 0.4 4120 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 1.29Z7021 Arpara-Kaliganj Road Km 017.20-018.00 S 0.8 4120 Zilla Full Recon 75mm @ IRI>12 2016 12.86712 0.916Z7021 Arpara-Kaliganj Road Km 018.00-018.70 S 0.7 4120 Zilla Overlay 50mm @ IRI 6-9 2016 2.7195 1.738Z7021 Arpara-Kaliganj Road Km 018.70-020.20 S 1.5 4120 Zilla Full Recon 75mm @ IRI>12 2016 24.12585 0.813Z7021 Arpara-Kaliganj Road Km 020.20-020.40 S 0.2 4120 Zilla Overlay 50mm @ IRI 6-9 2016 0.777 1.411Z7021 Arpara-Kaliganj Road Km 020.40-023.40 S 3 4120 Zilla Rehab 75mm @ IRI 9-12 2016 33.2223 1.543Z7021 Arpara-Kaliganj Road Km 023.40-025.00 S 1.6 4120 Zilla Full Recon 75mm @ IRI>12 2016 25.73424 0.896Z7021 Arpara-Kaliganj Road Km 025.20-029.20 S 4 4120 Zilla Full Recon 75mm @ IRI>12 2016 72.68184 0.703Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 000.20-002.00 S 1.8 4451 Zilla Full Recon 75mm @ IRI>12 2016 43.19179 0.533Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 002.00-002.10 S 0.1 4451 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 0.906Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 002.10-002.20 S 0.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.949Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 002.20-002.40 S 0.2 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 1.666Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 002.40-003.70 S 1.3 4451 Zilla Full Recon 75mm @ IRI>12 2016 31.08105 0.472Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 003.70-004.20 S 0.5 4451 Zilla Overlay 50mm @ IRI 6-9 2016 2.8875 0.814Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 004.20-004.60 S 0.4 4451 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.421Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 004.60-004.80 S 0.2 4451 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.013Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 004.80-004.90 S 0.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.95Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 004.90-005.20 S 0.3 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.738275 0.455Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 005.20-005.55 S 0.35 4451 Zilla Full Recon 75mm @ IRI>12 2016 8.391884 0.661Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 005.65-006.05 S 0.4 4451 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.647Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 006.05-006.15 S 0.1 4451 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 1.432Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 006.15-007.25 S 1.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 26.29935 0.514

Page 92 of 163

Page 93: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 007.25-007.35 S 0.1 4451 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 0.451Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 007.35-007.55 S 0.2 4451 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.752Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 007.55-008.25 S 0.7 4451 Zilla Overlay 50mm @ IRI 6-9 2016 4.0425 0.443Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 008.25-010.35 S 2.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 50.20785 0.566Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 010.35-010.65 S 0.3 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.738275 1.404Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 010.65-012.35 S 1.7 4451 Zilla Full Recon 75mm @ IRI>12 2016 40.64445 0.573Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 012.35-012.55 S 0.2 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 1.469Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 012.55-012.65 S 0.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.949Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 012.65-012.75 S 0.1 4451 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 1.49Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 012.75-012.95 S 0.2 4451 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.748Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 012.95-013.65 S 0.7 4451 Zilla Overlay 50mm @ IRI 6-9 2016 4.0425 1.317Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 013.65-014.25 S 0.6 4451 Zilla Full Recon 75mm @ IRI>12 2016 14.3451 0.613Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 014.25-014.35 S 0.1 4451 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 1.199Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 014.35-014.85 S 0.5 4451 Zilla Full Recon 75mm @ IRI>12 2016 11.95425 0.627Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 014.85-014.95 S 0.1 4451 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 0.906Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 014.95-015.05 S 0.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.949Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 015.05-015.35 S 0.3 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.7325 1.375Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 015.35-016.95 S 1.6 4451 Zilla Full Recon 75mm @ IRI>12 2016 38.2536 0.575Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 016.95-017.25 S 0.3 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.7325 1.103Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 017.25-019.05 S 1.8 4451 Zilla Full Recon 75mm @ IRI>12 2016 43.0353 0.578Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 019.05-019.35 S 0.3 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.7325 0.578Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 019.35-020.45 S 1.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 26.29935 0.511Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 020.55-022.55 S 2 4451 Zilla Full Recon 75mm @ IRI>12 2016 47.8409 0.565Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 022.55-022.75 S 0.2 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 0.794Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 022.75-023.15 S 0.4 4451 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.649Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 023.15-023.65 S 0.5 4451 Zilla Overlay 50mm @ IRI 6-9 2016 2.8875 0.387Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 023.65-023.75 S 0.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.95Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 023.75-023.85 S 0.1 4451 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 0.568Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 023.85-024.05 S 0.2 4451 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.748Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 024.05-024.55 S 0.5 4451 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0.746Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 024.55-025.45 S 0.9 4451 Zilla Full Recon 75mm @ IRI>12 2016 21.51765 0.592Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 025.45-025.75 S 0.3 4451 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.627Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 025.75-027.15 S 1.4 4451 Zilla Full Recon 75mm @ IRI>12 2016 33.4719 0.54Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 027.65-028.75 S 1.1 4451 Zilla Rehab 75mm @ IRI 9-12 2016 18.10765 0.496Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 028.75-029.65 S 0.9 4451 Zilla Full Recon 75mm @ IRI>12 2016 21.51765 0.474Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 029.65-029.75 S 0.1 4451 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.047Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 029.75-032.80 S 3.05 4451 Zilla Full Recon 75mm @ IRI>12 2016 67.75017 0.6Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 032.80-033.10 S 0.3 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.1655 2.012Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 033.10-033.20 S 0.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.716Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 033.20-033.70 S 0.5 4451 Zilla Overlay 50mm @ IRI 6-9 2016 1.9425 0.955Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 033.70-035.80 S 2.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 33.77619 0.736Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 036.00-036.10 S 0.1 4451 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.714Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 036.40-036.60 S 0.2 4451 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.748Z7023 Khalishpur-Maheshpur-Jadabpur Road Km 040.75-048.71 S 7.96 4451 Zilla Rehab 75mm @ IRI 9-12 2016 88.11661 1.159Z7024 Gopalpur-Talsar BazarMaheshpur Road Km 012.10-012.20 S 0.1 2021 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.425Z7024 Gopalpur-Talsar BazarMaheshpur Road Km 012.80-013.30 S 0.5 2021 Zilla Rehab 75mm @ IRI 9-12 2016 5.53705 0.186

Page 93 of 163

Page 94: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7024 Gopalpur-Talsar BazarMaheshpur Road Km 014.40-014.50 S 0.1 2021 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.425Z7024 Gopalpur-Talsar BazarMaheshpur Road Km 015.80-016.10 S 0.3 2021 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z7024 Gopalpur-Talsar BazarMaheshpur Road Km 017.30-017.40 S 0.1 2021 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.112Z7024 Gopalpur-Talsar BazarMaheshpur Road Km 017.70-018.10 S 0.4 2021 Zilla Full Recon 75mm @ IRI>12 2016 6.43356 0.128Z7024 Gopalpur-Talsar BazarMaheshpur Road Km 018.30-018.40 S 0.1 2021 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.425Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 000.00-000.40 S 0.4 1780 Zilla Overlay 40mm @ IRI>12 2016 1.338024 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 000.50-002.30 S 1.8 1780 Zilla Overlay 40mm @ IRI>12 2016 5.65434 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 002.30-002.40 S 0.1 1780 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.069Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 002.40-003.50 S 1.1 1780 Zilla Overlay 40mm @ IRI>12 2016 3.45543 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 003.90-004.30 S 0.4 1780 Zilla Full Recon 75mm @ IRI>12 2016 6.43356 0.019Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 004.40-004.90 S 0.5 1780 Zilla Overlay 40mm @ IRI>12 2016 1.57065 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 005.00-008.10 S 3.1 1780 Zilla Overlay 40mm @ IRI>12 2016 9.741171 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 008.10-011.20 S 3.1 1780 Zilla Rehab 75mm @ IRI 9-12 2016 34.32971 0.167Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 011.20-012.50 S 1.3 1780 Zilla Overlay 40mm @ IRI>12 2016 4.08369 0Z7057 Kaliganj-Khajura-Raipur-Bagharapara Road Km 012.60-014.08 S 1.47 1780 Zilla Overlay 40mm @ IRI>12 2016 4.630276 0Z7404 Amtali-Tailtupi-Alamdanga Road Km 005.70-006.20 S 0.5 1395 Zilla Overlay 40mm @ IRI>12 2016 1.5282 0Z7404 Amtali-Tailtupi-Alamdanga Road Km 006.40-008.10 S 1.7 1395 Zilla Overlay 40mm @ IRI>12 2016 5.19588 0Z7404 Amtali-Tailtupi-Alamdanga Road Km 008.20-008.60 S 0.4 1395 Zilla Rehab 75mm @ IRI 9-12 2016 4.30992 0.078Z7404 Amtali-Tailtupi-Alamdanga Road Km 009.10-010.00 S 0.9 1395 Zilla Overlay 40mm @ IRI>12 2016 2.75076 0Z7404 Amtali-Tailtupi-Alamdanga Road Km 010.20-013.60 S 3.4 1395 Zilla Overlay 40mm @ IRI>12 2016 10.65155 0Z7404 Amtali-Tailtupi-Alamdanga Road Km 013.90-015.80 S 1.9 1395 Zilla Overlay 40mm @ IRI>12 2016 6.194304 0Z7404 Amtali-Tailtupi-Alamdanga Road Km 024.40-024.70 S 0.3 1395 Zilla Overlay 40mm @ IRI>12 2016 0.91692 0Z7404 Amtali-Tailtupi-Alamdanga Road Km 024.80-025.10 S 0.3 1395 Zilla Overlay 40mm @ IRI>12 2016 0.91692 0Z7404 Amtali-Tailtupi-Alamdanga Road Km 025.80-025.90 S 0.1 1395 Zilla Overlay 40mm @ IRI>12 2016 0.30564 0Z7404 Amtali-Tailtupi-Alamdanga Road Km 027.40-027.50 S 0.1 1395 Zilla Overlay 40mm @ IRI>12 2016 0.30564 0Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 003.90-004.40 S 0.5 5627 Zilla Full Recon 75mm @ IRI>12 2016 12.08466 0.324Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 004.50-004.90 S 0.4 5627 Zilla Full Recon 75mm @ IRI>12 2016 9.667728 0.336Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 004.90-005.10 S 0.2 5627 Zilla Overlay 50mm @ IRI 6-9 2016 1.1676 0.972Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 005.30-007.00 S 1.7 5627 Zilla Overlay 50mm @ IRI 6-9 2016 9.9246 1.088Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 008.70-008.90 S 0.2 5627 Zilla Overlay 50mm @ IRI 6-9 2016 1.1676 0.767Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 008.90-009.60 S 0.7 5627 Zilla Full Recon 75mm @ IRI>12 2016 16.79681 0.409Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 009.70-009.90 S 0.2 5627 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.61Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 009.90-010.60 S 0.7 5627 Zilla Overlay 50mm @ IRI 6-9 2016 4.0425 1.554Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 010.60-011.00 S 0.4 5627 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.467Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 011.00-012.70 S 1.7 5627 Zilla Overlay 50mm @ IRI 6-9 2016 9.8175 1.228Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 012.70-012.80 S 0.1 5627 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.7Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 013.60-013.80 S 0.2 5627 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 1.803Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 014.90-015.90 S 1 5627 Zilla Overlay 50mm @ IRI 6-9 2016 5.775 1.546Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 015.90-016.40 S 0.5 5627 Zilla Full Recon 75mm @ IRI>12 2016 11.95425 0.177Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 016.40-016.60 S 0.2 5627 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 1.02Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 019.00-019.30 S 0.3 5627 Zilla Overlay 50mm @ IRI 6-9 2016 1.7325 1.802Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 019.30-019.90 S 0.6 5627 Zilla Overlay 50mm @ IRI 6-9 2016 3.465 1.117Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 020.10-020.90 S 0.8 5627 Zilla Overlay 50mm @ IRI 6-9 2016 4.62 1.028Z7405 Shekhpara-Shailkupa-Langalbandh Road Km 020.90-026.98 S 6.08 5627 Zilla Overlay 50mm @ IRI 6-9 2016 35.12355 1.617Z7457 Jhenaidah-Harinakundu Road Km 000.00-006.79 S 6.78 3305 Zilla Rehab 75mm @ IRI 9-12 2016 81.83925 0.527Z7457 Jhenaidah-Harinakundu Road Km 006.79-011.59 S 4.8 3305 Zilla Full Recon 75mm @ IRI>12 2016 73.0296 0.294

Page 94 of 163

Page 95: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7457 Jhenaidah-Harinakundu Road Km 011.69-012.59 S 0.9 3305 Zilla Full Recon 75mm @ IRI>12 2016 14.24077 0.321Z7457 Jhenaidah-Harinakundu Road Km 012.69-016.39 S 3.7 3305 Zilla Full Recon 75mm @ IRI>12 2016 56.61533 0.297Z7458 Garagonj-Shailakupa Road Km 005.60-005.70 S 0.1 5627 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.493Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 000.10-003.70 S 3.6 4120 Zilla Full Recon 75mm @ IRI>12 2016 101.2503 0.342Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 003.70-003.90 S 0.2 4120 Zilla Overlay 50mm @ IRI 6-9 2016 1.26 0.974Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 003.90-004.30 S 0.4 4120 Zilla Full Recon 75mm @ IRI>12 2016 10.4328 0.443Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 004.30-004.60 S 0.3 4120 Zilla Overlay 50mm @ IRI 6-9 2016 1.89 0.637Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 004.60-005.60 S 1 4120 Zilla Full Recon 75mm @ IRI>12 2016 26.082 0.227Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 005.60-006.40 S 0.8 4120 Zilla Rehab 75mm @ IRI 9-12 2016 14.3664 0.361Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 006.40-006.50 S 0.1 4120 Zilla Full Recon 75mm @ IRI>12 2016 2.6082 0.437Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 006.50-011.40 S 4.9 4120 Zilla Overlay 50mm @ IRI 6-9 2016 33.90555 0.677Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 011.40-012.70 S 1.3 4120 Zilla Overlay 50mm @ IRI 6-9 2016 8.189999 0.658Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 012.70-012.90 S 0.2 4120 Zilla Overlay 50mm @ IRI 6-9 2016 1.26 0.965Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 012.90-014.20 S 1.3 4120 Zilla Overlay 50mm @ IRI 6-9 2016 8.189999 0.601Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 014.20-014.50 S 0.3 4120 Zilla Rehab 75mm @ IRI 9-12 2016 5.3874 0.309Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 014.50-019.40 S 4.9 4120 Zilla Overlay 50mm @ IRI 6-9 2016 30.87 0.647Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 019.40-022.40 S 3 4120 Zilla Overlay 50mm @ IRI 6-9 2016 18.9 0.941Z7460 Dakbanglabazar-Gopalpur-Kaliganj Road Km 022.40-023.08 S 0.68 4120 Zilla Overlay 50mm @ IRI 6-9 2016 4.3029 0.587Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 000.00-000.30 S 0.3 1188 Zilla Overlay 40mm @ IRI>12 2016 1.459431 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 000.40-000.50 S 0.1 1188 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 001.00-001.40 S 0.4 1188 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 002.00-002.40 S 0.4 1188 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 002.50-004.00 S 1.5 1188 Zilla Overlay 40mm @ IRI>12 2016 4.724685 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 004.20-005.40 S 1.2 1188 Zilla Overlay 40mm @ IRI>12 2016 3.772701 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 006.50-008.20 S 1.7 1188 Zilla Overlay 40mm @ IRI>12 2016 5.34021 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 008.40-009.10 S 0.7 1188 Zilla Overlay 40mm @ IRI>12 2016 2.19891 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 009.10-009.30 S 0.2 1188 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0.066Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 009.30-009.40 S 0.1 1188 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 009.40-009.90 S 0.5 1188 Zilla Overlay 40mm @ 1000-2000 2016 1.57065 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 009.90-010.50 S 0.6 1188 Zilla Overlay 40mm @ IRI>12 2016 1.88478 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 011.10-011.50 S 0.4 1188 Zilla Overlay 40mm @ IRI>12 2016 1.25652 0Z7488 Nayanipara-Joluli-Jadabpur-Gopalpur Road Km 011.90-012.20 S 0.3 1188 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Sub-Total Jhenaidah Division 3150.022

Khulna DivisionN7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 185.05-199.04 S 13.99 9924 National Overlay 50mm @ IRI 4-7 2016 135.5841 10.874N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 199.04-199.08 L 0.04 9911 National Overlay 50mm @ IRI 4-7 2016 0.33726 13.435N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 199.04-199.08 R 0.04 9911 National Overlay 50mm @ IRI 4-7 2016 0.33726 13.435N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 199.08-200.85 S 1.77 9911 National Overlay 50mm @ IRI 4-7 2016 17.91426 6.974N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 200.93-202.03 L 1.1 9911 National Overlay 50mm @ IRI 4-7 2016 7.5075 15.254N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 200.93-202.03 R 1.1 9911 National Overlay 50mm @ IRI 4-7 2016 7.5075 15.254N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 203.90-204.72 L 0.82 9911 National Overlay 50mm @ IRI 4-7 2016 5.5965 14.969N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 203.90-204.72 R 0.82 9911 National Overlay 50mm @ IRI 4-7 2016 5.5965 14.894N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 209.91-210.46 L 0.55 9911 National Overlay 50mm @ IRI 4-7 2016 4.21575 13.043N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 209.91-210.46 R 0.55 9911 National Overlay 50mm @ IRI 4-7 2016 4.21575 13.043N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 211.53-211.93 L 0.4 9911 National DBST @ Traff >6000 2016 0.988 11.539

Page 95 of 163

Page 96: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 211.53-211.93 R 0.4 9911 National DBST @ Traff >6000 2016 0.988 11.539N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 211.93-212.13 L 0.2 9911 National Full Recon 180mm 2016 6.999 5.097N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 211.93-212.13 R 0.2 9911 National Full Recon 180mm 2016 6.999 5.097N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 212.13-213.11 L 0.98 9911 National DBST @ Traff >6000 2016 2.41813 11.053N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 212.13-213.11 R 0.98 9911 National DBST @ Traff >6000 2016 2.41813 11.053N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 213.11-215.30 S 2.19 9924 National Overlay 50mm @ IRI 4-7 2016 17.98209 11.931N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 217.20-217.30 S 0.1 9937 National Full Recon 180mm 2016 5.10927 5.674R760 Khulna-Chuknagar-Satkhira Road Km 000.00-000.04 S 0.04 13553 Regional DBST @ 25% Crk 2016 0.169936 7.289R760 Khulna-Chuknagar-Satkhira Road Km 001.00-004.70 S 3.7 13376 Regional DBST @ 25% Crk 2016 15.15246 7.217R760 Khulna-Chuknagar-Satkhira Road Km 005.73-007.80 S 2.07 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 15.97487 9.766R760 Khulna-Chuknagar-Satkhira Road Km 007.80-008.40 S 0.6 5825 Regional Full Recon 150mm 2016 22.20888 4.134R760 Khulna-Chuknagar-Satkhira Road Km 008.40-008.71 S 0.3 5825 Regional DBST @ 25% Crk 2016 0.907033 9.358R760 Khulna-Chuknagar-Satkhira Road Km 008.71-008.91 S 0.2 5825 Regional Full Recon 150mm 2016 7.40296 4.321R760 Khulna-Chuknagar-Satkhira Road Km 008.91-012.21 S 3.3 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 25.18263 10.447R760 Khulna-Chuknagar-Satkhira Road Km 012.21-012.31 S 0.1 5825 Regional Full Recon 150mm @ IRI 12 2016 3.70148 4.657R760 Khulna-Chuknagar-Satkhira Road Km 012.31-014.61 S 2.3 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 17.55153 9.731R760 Khulna-Chuknagar-Satkhira Road Km 014.61-014.71 S 0.1 5825 Regional Full Recon 150mm @ IRI 12 2016 3.70148 4.939R760 Khulna-Chuknagar-Satkhira Road Km 014.71-015.31 S 0.6 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 4.57866 10.689R760 Khulna-Chuknagar-Satkhira Road Km 015.31-015.61 S 0.3 5825 Regional Full Recon 150mm 2016 11.10444 4.711R760 Khulna-Chuknagar-Satkhira Road Km 015.61-016.01 S 0.4 5825 Regional DBST @ Traff 4000-6000 2016 1.20536 9.432R760 Khulna-Chuknagar-Satkhira Road Km 016.01-016.21 S 0.2 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 1.52622 10.977R760 Khulna-Chuknagar-Satkhira Road Km 016.21-017.01 S 0.8 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 6.10488 10.774R760 Khulna-Chuknagar-Satkhira Road Km 017.01-020.01 S 3 5825 Regional Full Recon 150mm 2016 111.0814 3.991R760 Khulna-Chuknagar-Satkhira Road Km 020.01-023.21 S 3.2 5825 Regional Full Recon 150mm 2016 118.4474 4.393R760 Khulna-Chuknagar-Satkhira Road Km 023.21-027.01 S 3.8 5825 Regional Full Recon 150mm 2016 140.6933 4.057R760 Khulna-Chuknagar-Satkhira Road Km 027.01-027.11 S 0.1 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 0.76311 11.233R760 Khulna-Chuknagar-Satkhira Road Km 027.11-027.21 S 0.1 5825 Regional Full Recon 150mm @ IRI 12 2016 3.70148 4.696R760 Khulna-Chuknagar-Satkhira Road Km 027.21-029.51 S 2.3 5825 Regional DBST @ Traff 4000-6000 2016 6.93082 9.292R760 Khulna-Chuknagar-Satkhira Road Km 029.71-030.25 S 0.53 5825 Regional DBST @ Traff 4000-6000 2016 1.616674 9.9R760 Khulna-Chuknagar-Satkhira Road Km 030.25-032.21 S 1.96 5825 Regional DBST @ 25% Crk 2016 6.103024 8.331R760 Khulna-Chuknagar-Satkhira Road Km 032.21-032.31 S 0.1 5825 Regional Full Recon 150mm @ IRI 12 2016 3.70148 4.836R760 Khulna-Chuknagar-Satkhira Road Km 032.31-033.38 S 1.07 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 8.172908 10.226Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 012.07-012.37 S 0.3 565 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 012.37-012.47 S 0.1 565 Zilla Overlay 40mm @ Traff 100-1000 2016 0.31413 0.128Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 012.47-012.57 S 0.1 565 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 012.57-014.87 S 2.3 565 Zilla Seal Coat 2016 2.14452 0.585Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 014.87-015.07 S 0.2 565 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 015.17-015.27 S 0.1 565 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 015.47-016.07 S 0.6 565 Zilla Overlay 40mm @ IRI>12 2016 1.88478 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 017.67-017.77 S 0.1 565 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 017.77-017.87 S 0.1 565 Zilla Seal Coat 2016 0.09324 0.341Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 017.87-018.57 S 0.7 565 Zilla Overlay 40mm @ IRI>12 2016 2.19891 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 018.77-019.27 S 0.5 565 Zilla Overlay 40mm @ IRI>12 2016 1.57065 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 019.37-020.17 S 0.8 565 Zilla Overlay 40mm @ IRI>12 2016 2.51304 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 020.47-026.87 S 6.4 565 Zilla Overlay 40mm @ IRI>12 2016 20.10432 0Z7040 Fulbari Railgate-Dighalia-Terokhada Road Km 028.47-028.57 S 0.1 565 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0

Page 96 of 163

Page 97: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 001.70-001.90 S 0.2 2881 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 1.376Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 002.30-003.30 S 1 2881 Zilla Rehab 75mm @ IRI 9-12 2016 11.0741 1.016Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 005.00-005.30 S 0.3 2881 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.414Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 006.00-006.30 S 0.3 2881 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.414Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 007.30-007.40 S 0.1 2881 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.047Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 008.30-008.50 S 0.2 2881 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.609Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 008.60-008.80 S 0.2 2881 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.563Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 008.80-012.30 S 3.5 2881 Zilla Overlay 40mm @ Traff >=2000 2016 10.99455 0.408Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 016.00-016.40 S 0.4 2881 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 1.116Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 020.80-021.30 S 0.5 2881 Zilla Full Recon 75mm @ IRI>12 2016 8.025866 0.369Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 021.40-021.50 S 0.1 2881 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 1.721Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 021.90-022.90 S 1 2881 Zilla Full Recon 75mm @ IRI>12 2016 16.0839 0.408Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 023.00-023.60 S 0.6 2881 Zilla Rehab 75mm @ IRI 9-12 2016 6.64446 0.957Z7043 Fultala-Shahapur-Miximil-Dumuria Road Km 027.82-028.78 S 0.96 2881 Zilla Rehab 75mm @ IRI 9-12 2016 10.63114 0.964Z7047 Terakhada-Barnal-Kalia Road Km 000.00-000.20 S 0.2 1599 Zilla Overlay 40mm @ 1000-2000 2016 0.631656 0Z7047 Terakhada-Barnal-Kalia Road Km 000.20-000.90 S 0.7 1599 Zilla Full Recon 75mm @ IRI>12 2016 11.25873 0.102Z7047 Terakhada-Barnal-Kalia Road Km 001.20-004.20 S 3 1599 Zilla Full Recon 75mm @ IRI>12 2016 48.2517 0.089Z7047 Terakhada-Barnal-Kalia Road Km 004.20-005.60 S 1.4 1599 Zilla Rehab 75mm @ IRI 9-12 2016 15.50374 0.347Z7553 Keshabpur -Betgram Road Km 028.01-028.03 S 0.01 3435 Zilla Rehab 75mm @ IRI 9-12 2016 0.166111 3.831Z7553 Keshabpur -Betgram Road Km 029.01-029.48 S 0.47 3435 Zilla Overlay 40mm @ Traff >=2000 2016 1.485835 0.209Z7553 Keshabpur -Betgram Road Km 029.48-031.28 S 1.8 3435 Zilla Full Recon 75mm @ IRI>12 2016 28.95102 0.538Z7553 Keshabpur -Betgram Road Km 031.48-031.58 S 0.1 3435 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.231Z7553 Keshabpur -Betgram Road Km 032.08-032.28 S 0.2 3435 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.789Z7553 Keshabpur -Betgram Road Km 032.48-033.07 S 0.59 3435 Zilla Rehab 75mm @ IRI 9-12 2016 6.500496 0.99Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 038.82-052.00 S 13.19 3256 Zilla Rehab 75mm @ IRI 9-12 2016 149.5636 1.102Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 000.00-006.90 S 6.9 2552 Zilla Overlay 40mm @ Traff >=2000 2016 32.22422 0.011Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 006.90-007.00 S 0.1 2552 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.026Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 007.00-019.90 S 12.9 2552 Zilla Overlay 40mm @ Traff >=2000 2016 60.24122 0.055Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 019.90-023.00 S 3.1 2552 Zilla Overlay 40mm @ IRI>12 2016 14.48012 0Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 026.40-026.50 S 0.1 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.048Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 026.50-026.60 S 0.1 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.165Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 026.60-027.00 S 0.4 2552 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.042Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 027.10-027.50 S 0.4 2552 Zilla Rehab 75mm @ IRI 9-12 2016 6.5846 0.187Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 028.20-028.40 S 0.2 2552 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.044Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 029.00-029.80 S 0.8 2552 Zilla Rehab 75mm @ IRI 9-12 2016 13.1692 0.146Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 030.20-030.30 S 0.1 2552 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.07Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 030.59-030.89 S 0.3 2552 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.079Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 031.09-031.19 S 0.1 2552 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.27Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 031.19-031.39 S 0.2 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.11Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 031.39-033.69 S 2.3 2552 Zilla Overlay 40mm @ IRI>12 2016 10.73985 0Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 033.69-033.99 S 0.3 2552 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 033.99-034.19 S 0.2 2552 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 035.09-035.29 S 0.2 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.11Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 035.29-035.59 S 0.3 2552 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.06Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 035.59-035.89 S 0.3 2552 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.062Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 035.89-035.99 S 0.1 2552 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.165

Page 97 of 163

Page 98: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 035.99-036.39 S 0.4 2552 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 036.39-039.49 S 3.1 2552 Zilla Rehab 75mm @ IRI 9-12 2016 51.03065 0.208Z7604 Betgram-Tala-Paikgachha-Koyra Road Km 039.49-063.59 S 24.09 2552 Zilla Overlay 40mm @ Traff >=2000 2016 112.5069 0.032Z7610 Koyra-Noabaki-Shyamnagar Road Km 000.90-001.20 S 0.3 1702 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.152Sub-Total Khulna Division 1511.057

Kushtia DivisionN704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 021.52-021.86 S 0.34 10387 National Full Recon 195mm 2016 18.17438 5.644N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 021.90-025.26 S 3.36 10387 National Full Recon 195mm 2016 179.1322 6.067N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 025.26-025.76 S 0.5 10387 National Overlay 80mm @ IRI 5-9 2016 6.03345 16.265N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 025.76-025.86 S 0.1 10387 National Full Recon 195mm 2016 5.32973 6.024N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 025.86-026.46 S 0.6 10387 National Overlay 80mm @ IRI 5-9 2016 7.24014 16.324N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 026.46-026.76 S 0.3 10387 National Full Recon 195mm 2016 15.98919 5.725N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 026.89-026.96 S 0.07 10387 National Overlay 80mm @ IRI 5-9 2016 0.844683 16.663N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 026.96-027.66 S 0.7 10387 National Full Recon 195mm 2016 37.30811 5.874N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 027.66-028.46 S 0.8 10387 National Rehab 195mm @ IRI 9-12 2016 35.41376 6.228N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 028.46-028.56 S 0.1 10387 National Full Recon 195mm 2016 5.32973 5.949N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 028.56-030.66 S 2.1 10387 National Rehab 195mm @ IRI 9-12 2016 92.96111 6.108N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 030.66-030.76 S 0.1 10387 National Full Recon 195mm 2016 5.32973 5.94N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 030.76-030.86 S 0.1 10387 National Rehab 195mm @ IRI 9-12 2016 4.42672 6.161N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 030.88-032.06 S 1.18 10387 National Overlay 80mm @ IRI 5-9 2016 14.23894 16.725N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 032.06-032.56 S 0.5 10387 National Rehab 195mm @ IRI 9-12 2016 22.1336 6.36N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 032.56-032.76 S 0.2 10387 National Overlay 80mm @ IRI 5-9 2016 2.41338 17.019N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 032.76-033.46 S 0.7 10387 National Rehab 195mm @ IRI 9-12 2016 30.98704 6.468N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 033.46-033.86 S 0.4 10387 National Overlay 80mm @ IRI 5-9 2016 4.82676 16.696N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 033.86-034.36 S 0.5 10387 National Rehab 195mm @ IRI 9-12 2016 22.1336 6.395N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 034.36-034.46 S 0.1 10387 National Overlay 80mm @ IRI 5-9 2016 1.20669 15.935N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 034.46-035.36 S 0.9 10387 National Rehab 195mm @ IRI 9-12 2016 39.84048 6.764N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 035.36-036.96 S 1.6 10387 National Rehab 195mm @ IRI 9-12 2016 70.82752 6.173N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 036.96-037.16 S 0.2 10387 National Full Recon 195mm 2016 10.65946 6.015N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 037.16-041.66 S 4.5 10387 National Overlay 80mm @ IRI 5-9 2016 54.30105 16.647N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 042.04-045.76 S 3.72 10387 National Rehab 195mm @ IRI 9-12 2016 205.785 4.507N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 045.76-045.78 L 0.02 10037 National Rehab 195mm @ IRI 9-12 2016 0.633688 8.792N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 045.76-045.78 R 0.02 10037 National Rehab 195mm @ IRI 9-12 2016 0.57608 9.361N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 045.78-048.24 S 2.46 10387 National Overlay 80mm @ IRI 5-9 2016 31.70487 15.296N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 048.76-049.04 S 0.28 10387 National Rehab 195mm @ IRI 9-12 2016 13.19648 5.941N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 049.04-049.14 S 0.1 10387 National Full Recon 195mm 2016 5.69478 5.63N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 049.14-052.74 S 3.6 10387 National Rehab 195mm @ IRI 9-12 2016 167.8758 6.181N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 052.74-055.84 S 3.1 10387 National Overlay 80mm @ IRI 5-9 2016 37.40739 16.415N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 055.84-063.56 S 7.73 10387 National Rehab 195mm @ IRI 9-12 2016 345.2879 6.272N713 Kushtia Town By-Pass Road Km 000.00-006.60 S 6.6 4160 National Full Recon 150mm @ IRI 12 2016 0 0R710 Ahaladipur-Kumarkhali-Kushtia Km 046.11-066.51 S 20.4 6134 Regional Overlay 60mm @ IRI 5.5-9 2016 146.2247 8.418R710 Ahaladipur-Kumarkhali-Kushtia Km 066.51-066.55 L 0.04 4089 Regional Overlay 60mm @ IRI 7-9 2016 0.046287 22.842R710 Ahaladipur-Kumarkhali-Kushtia Km 066.51-066.55 R 0.04 6134 Regional Overlay 60mm @ IRI 5.5-9 2016 0.226806 13.365R710 Ahaladipur-Kumarkhali-Kushtia Km 066.55-073.09 S 6.54 6134 Regional Overlay 60mm @ IRI 5.5-9 2016 46.73088 8.51R710 Ahaladipur-Kumarkhali-Kushtia Km 073.09-073.11 L 0.02 6134 Regional DBST @ Traff >6000 2016 0.078052 5.319

Page 98 of 163

Page 99: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R710 Ahaladipur-Kumarkhali-Kushtia Km 073.09-073.11 R 0.02 6134 Regional DBST @ Traff >6000 2016 0.078052 5.319R713 Charikoal at R711-Shilahdah Link Road Km 000.00-000.60 S 0.6 2187 Regional DBST Traff All 2016 1.668732 0R713 Charikoal at R711-Shilahdah Link Road Km 000.70-001.20 S 0.5 2187 Regional DBST Traff All 2016 1.3585 0R713 Charikoal at R711-Shilahdah Link Road Km 001.30-001.40 S 0.1 2187 Regional DBST Traff All 2016 0.2717 0R713 Charikoal at R711-Shilahdah Link Road Km 001.50-003.50 S 2 2187 Regional DBST Traff All 2016 5.434 0R713 Charikoal at R711-Shilahdah Link Road Km 004.10-004.70 S 0.6 2187 Regional DBST Traff All 2016 1.6302 0R713 Charikoal at R711-Shilahdah Link Road Km 004.90-005.44 S 0.54 2187 Regional DBST Traff All 2016 1.366379 0R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 000.00-000.60 S 0.6 4937 Regional DBST @ Traff 4000-6000 2016 2.018484 0.643R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 000.60-000.90 S 0.3 4937 Regional Rehab 150mm @ IRI 9-12 2016 8.2593 0.885R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 000.90-003.90 S 3 4937 Regional Overlay 50mm @ IRI 5-7 2016 17.955 3.117R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 004.05-006.30 S 2.25 4937 Regional Overlay 50mm @ IRI 5-7 2016 13.48421 2.206R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 006.30-006.40 S 0.1 4937 Regional Full Recon 150mm 2016 3.45876 1.324R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 006.40-007.70 S 1.3 4937 Regional Overlay 50mm @ IRI 5-7 2016 7.780499 2.917R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 007.74-010.70 S 2.96 4937 Regional Overlay 60mm @ IRI 7-9 2016 20.83876 2.831R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 010.79-017.20 S 6.41 4937 Regional Overlay 60mm @ IRI 7-9 2016 44.93392 3.385R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 017.20-017.70 S 0.5 4937 Regional Overlay 60mm @ IRI 7-9 2016 3.56535 2.549R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 017.70-020.10 S 2.4 4937 Regional Full Recon 150mm @ IRI 12 2016 83.01024 0.84R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 020.10-021.00 S 0.9 4937 Regional Overlay 60mm @ IRI 7-9 2016 6.41763 2.512R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 021.00-021.30 S 0.3 4937 Regional Full Recon 150mm 2016 10.37628 1.543R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 021.30-021.70 S 0.4 4937 Regional Overlay 60mm @ IRI 7-9 2016 2.85228 2.936R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 021.70-023.78 S 2.08 4937 Regional Rehab 150mm @ IRI 9-12 2016 57.23695 0.78R747 Kustia-Poradah-Chuadanga Road Km 000.00-000.10 S 0.1 3272 Regional Full Recon 135mm 2016 2.75932 1.147R747 Kustia-Poradah-Chuadanga Road Km 000.15-003.00 S 2.85 3272 Regional Rehab 135mm @ IRI 9-12 2016 73.9445 0.295R747 Kustia-Poradah-Chuadanga Road Km 003.10-003.50 S 0.4 3272 Regional Full Recon 135mm 2016 12.45792 0.584R747 Kustia-Poradah-Chuadanga Road Km 003.50-003.80 S 0.3 3272 Regional Overlay 50mm @ IRI 5-7 2016 1.7955 1.642R747 Kustia-Poradah-Chuadanga Road Km 003.80-004.20 S 0.4 3272 Regional Full Recon 135mm 2016 12.54534 0.897R747 Kustia-Poradah-Chuadanga Road Km 004.30-004.50 S 0.2 3272 Regional Full Recon 135mm 2016 5.79184 0.868R747 Kustia-Poradah-Chuadanga Road Km 004.60-005.30 S 0.7 3272 Regional Full Recon 135mm @ IRI 12 2016 20.56852 0.964R747 Kustia-Poradah-Chuadanga Road Km 005.30-005.80 S 0.5 3272 Regional Overlay 50mm @ IRI 5-7 2016 2.8875 2.71R747 Kustia-Poradah-Chuadanga Road Km 005.80-017.61 S 11.8 3272 Regional Full Recon 135mm @ IRI 12 2016 354.7338 0.857Z7409 Bheramara Rail Station-Bheramara Ferry Ghat Road Km 000.00-001.00 S 1 3119 Zilla Overlay 40mm @ Traff >=2000 2016 5.8581 0.019Z7409 Bheramara Rail Station-Bheramara Ferry Ghat Road Km 001.00-002.60 S 1.6 3119 Zilla Rehab 75mm @ IRI 9-12 2016 26.3384 0.966Z7411 Bheramara-Daulatpur Road Km 000.00-006.90 S 6.9 3718 Zilla Overlay 40mm @ Cracks >25% 2016 44.3808 0.012Z7451 8th km of Kushtia-Miupur Thana Connecting Road Km 000.00-002.00 S 2 1663 Zilla Overlay 40mm @ 1000-2000 2016 6.48636 0.119Z7451 8th km of Kushtia-Miupur Thana Connecting Road Km 002.00-002.09 S 0.09 1663 Zilla Full Recon 75mm @ IRI>12 2016 1.447551 0.314Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 000.10-001.70 S 1.6 4348 Zilla Rehab 75mm @ IRI 9-12 2016 17.71856 1.154Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 001.70-001.80 S 0.1 4348 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 001.80-003.00 S 1.2 4348 Zilla Full Recon 75mm @ IRI>12 2016 19.14419 0.721Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 003.00-004.00 S 1 4348 Zilla Overlay 50mm @ IRI 6-9 2016 3.78 1.515Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 004.00-004.10 S 0.1 4348 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 1.611Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 004.10-004.50 S 0.4 4348 Zilla Rehab 75mm @ IRI 9-12 2016 4.30992 1.3Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 004.50-004.60 S 0.1 4348 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 1.456Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 004.60-006.20 S 1.6 4348 Zilla Rehab 75mm @ IRI 9-12 2016 17.23968 1.21Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 006.20-006.30 S 0.1 4348 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 1.827Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 006.30-006.70 S 0.4 4348 Zilla Overlay 50mm @ IRI 6-9 2016 1.512 1.951Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 006.70-006.80 S 0.1 4348 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 1.621

Page 99 of 163

Page 100: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 006.80-007.00 S 0.2 4348 Zilla Overlay 50mm @ IRI 6-9 2016 0.756 2.381Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 007.00-007.30 S 0.3 4348 Zilla Overlay 50mm @ IRI 6-9 2016 1.134 2.655Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 007.40-007.80 S 0.4 4348 Zilla Rehab 75mm @ IRI 9-12 2016 4.30992 1.494Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 007.80-008.20 S 0.4 4348 Zilla Overlay 50mm @ IRI 6-9 2016 1.512 2.124Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 008.20-008.80 S 0.6 4348 Zilla Overlay 50mm @ IRI 6-9 2016 2.268 2.645Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 008.90-009.00 S 0.1 4348 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 1.767Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 009.00-009.10 S 0.1 4348 Zilla Overlay 50mm @ IRI 6-9 2016 0.378 2.215Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 009.10-012.50 S 3.4 4348 Zilla Full Recon 75mm @ IRI>12 2016 53.20728 0.881Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 012.50-015.60 S 3.1 4348 Zilla Rehab 75mm @ IRI 9-12 2016 33.40188 1.357Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 015.60-018.70 S 3.1 4348 Zilla Overlay 50mm @ IRI 6-9 2016 11.718 2.584Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 018.70-019.00 S 0.3 4348 Zilla Overlay 50mm @ IRI 6-9 2016 1.134 2.457Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 019.00-019.60 S 0.6 4348 Zilla Rehab 75mm @ IRI 9-12 2016 6.46488 1.497Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 019.60-019.90 S 0.3 4348 Zilla Overlay 50mm @ IRI 6-9 2016 1.134 2.59Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 019.90-021.80 S 1.9 4348 Zilla Rehab 75mm @ IRI 9-12 2016 20.69959 1.38Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 022.00-022.10 S 0.1 4348 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.774Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 022.10-022.80 S 0.7 4348 Zilla Overlay 50mm @ IRI 6-9 2016 2.70396 2.277Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 022.80-023.60 S 0.8 4348 Zilla Full Recon 75mm @ IRI>12 2016 12.86712 0.842Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 023.60-023.90 S 0.3 4348 Zilla Overlay 50mm @ IRI 6-9 2016 1.1655 1.424Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 023.90-025.20 S 1.3 4348 Zilla Full Recon 75mm @ IRI>12 2016 20.90907 0.797Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 025.20-025.80 S 0.6 4348 Zilla Overlay 50mm @ IRI 6-9 2016 2.331 1.591Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 025.80-026.20 S 0.4 4348 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 1.158Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 026.20-026.30 S 0.1 4348 Zilla Overlay 50mm @ IRI 6-9 2016 0.3885 0.996Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 026.30-026.60 S 0.3 4348 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 1.147Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 026.60-026.80 S 0.2 4348 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 1.579Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 026.80-027.70 S 0.9 4348 Zilla Full Recon 75mm @ IRI>12 2016 14.47551 0.865Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 027.70-028.80 S 1.1 4348 Zilla Rehab 75mm @ IRI 9-12 2016 12.18151 1.311Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 028.80-030.10 S 1.3 4348 Zilla Rehab 75mm @ IRI 9-12 2016 14.39633 1.119Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 030.10-031.40 S 1.3 4348 Zilla Overlay 50mm @ IRI 6-9 2016 5.0505 2.027Z7461 Mirpur-Shehala-Pragpur BDR Camp Road Km 031.40-031.60 S 0.2 4348 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 1.194Z7463 Bheramara- Mirpur Thana Road Km 000.20-007.60 S 7.4 1663 Zilla Rehab 75mm @ IRI 9-12 2016 84.16316 0.462Z7463 Bheramara- Mirpur Thana Road Km 007.70-007.80 S 0.1 1663 Zilla Full Recon 75mm @ IRI>12 2016 1.69533 0.35Z7463 Bheramara- Mirpur Thana Road Km 008.10-008.80 S 0.7 1663 Zilla Overlay 40mm @ IRI>12 2016 2.234568 0Z7463 Bheramara- Mirpur Thana Road Km 009.40-009.50 S 0.1 1663 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.255Z7464 Sadarpur-Jutiadanga-Ashannagar-Hatbolia Road Km 003.60-003.90 S 0.3 1663 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.004Z7464 Sadarpur-Jutiadanga-Ashannagar-Hatbolia Road Km 004.00-004.30 S 0.3 1663 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 0.566Z7465 Sadarpur Bazar-Halsha Rail Bazar Road Km 000.00-017.20 S 17.19 2489 Zilla Rehab 75mm @ IRI 9-12 2016 185.7873 0.968Sub-Total Kushtia Division 3150.901

Magura DivisionN7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 066.65-067.50 S 0.85 7600 National Overlay 60mm @ IRI 7-9 2016 7.789852 14.261N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 067.50-070.60 S 3.1 7600 National Overlay 60mm @ IRI 7-9 2016 28.31926 12.954N7 Daulatdia-Faridpur-Jhenaidah-Jessore-Khulna-Mong Km 070.60-071.00 S 0.4 7655 National Rehab 180mm @ IRI 9-12 2016 19.74504 5.032N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 022.57-025.80 S 3.23 5047 National Overlay 50mm @ IRI 5-9 2016 24.85652 5.679N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 025.80-028.80 S 3 5047 National DBST @ Traff 4000-6000 2016 10.84824 5.166N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 028.80-034.90 S 6.1 5047 National Overlay 50mm @ IRI 5-9 2016 49.25445 4.315N702 Jessore (Daratana More)-Magura (Vaina More) RoadKm 034.90-043.75 S 8.85 5047 National Overlay 50mm @ IRI 5-9 2016 68.39281 3.729

Page 100 of 163

Page 101: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R720 Magura-Narail Road Km 000.20-000.80 S 0.6 1972 Regional Full Recon 110mm 2016 16.2822 0.165R720 Magura-Narail Road Km 001.00-001.20 S 0.2 1972 Regional DBST Traff All 2016 0.723216 0R720 Magura-Narail Road Km 001.20-001.40 S 0.2 1972 Regional Overlay 50mm @ IRI 7-9 2016 1.5372 0.465R720 Magura-Narail Road Km 001.40-001.60 S 0.2 1972 Regional DBST Traff All 2016 0.723216 0R720 Magura-Narail Road Km 001.60-003.20 S 1.6 1972 Regional Overlay 50mm @ IRI 7-9 2016 10.0128 0.757R720 Magura-Narail Road Km 003.20-003.30 S 0.1 1972 Regional Full Recon 110mm 2016 2.7137 0.481R720 Magura-Narail Road Km 003.30-005.00 S 1.7 1972 Regional Overlay 50mm @ IRI 5-7 2016 9.8175 0.625R720 Magura-Narail Road Km 005.00-005.30 S 0.3 1972 Regional Full Recon 110mm 2016 8.168237 0.157R720 Magura-Narail Road Km 005.30-005.40 S 0.1 1972 Regional Overlay 50mm @ IRI 5-7 2016 0.5775 0.945R720 Magura-Narail Road Km 005.40-006.60 S 1.2 1972 Regional Full Recon 110mm 2016 32.5644 0.077R720 Magura-Narail Road Km 006.70-007.20 S 0.5 1972 Regional Full Recon 110mm 2016 13.5685 0.138R720 Magura-Narail Road Km 007.20-007.50 S 0.3 1972 Regional Overlay 50mm @ IRI 5-7 2016 1.7325 0.682R720 Magura-Narail Road Km 007.50-007.70 S 0.2 1972 Regional Full Recon 110mm 2016 5.4274 0.427R720 Magura-Narail Road Km 007.70-007.80 S 0.1 1972 Regional DBST @ Traff 100-2000 2016 0.2717 0.375R720 Magura-Narail Road Km 007.80-007.90 S 0.1 1972 Regional Full Recon 110mm 2016 2.7137 0.308R720 Magura-Narail Road Km 007.90-008.24 S 0.34 1972 Regional Overlay 50mm @ IRI 5-7 2016 1.893654 0.852R720 Magura-Narail Road Km 009.26-015.39 S 6.13 1972 Regional Overlay 50mm @ IRI 7-9 2016 34.69274 1.004R720 Magura-Narail Road Km 015.39-016.20 S 0.82 1972 Regional Full Recon 110mm 2016 22.19807 0.26R720 Magura-Narail Road Km 016.39-017.80 S 1.42 1972 Regional Full Recon 110mm 2016 38.48026 0.24R720 Magura-Narail Road Km 017.90-020.60 S 2.7 1972 Regional Full Recon 110mm 2016 73.2699 0.214R720 Magura-Narail Road Km 020.80-021.00 S 0.2 1972 Regional Full Recon 110mm 2016 5.4274 0.402R720 Magura-Narail Road Km 021.40-021.50 S 0.1 1972 Regional Full Recon 110mm 2016 2.7137 0.101R720 Magura-Narail Road Km 021.50-021.90 S 0.4 1972 Regional Overlay 50mm @ IRI 7-9 2016 2.31 1.177R720 Magura-Narail Road Km 021.90-023.90 S 2 1972 Regional Full Recon 110mm 2016 54.274 0.076R720 Magura-Narail Road Km 024.20-024.60 S 0.4 1972 Regional Full Recon 110mm 2016 10.8548 0.308R720 Magura-Narail Road Km 024.60-024.80 S 0.2 1972 Regional Overlay 50mm @ IRI 7-9 2016 1.155 1.127R720 Magura-Narail Road Km 024.80-025.50 S 0.7 1972 Regional Full Recon 110mm 2016 18.9959 0.267R720 Magura-Narail Road Km 025.70-026.40 S 0.7 1972 Regional Full Recon 110mm 2016 18.9959 0.267R720 Magura-Narail Road Km 026.50-027.90 S 1.4 1972 Regional Full Recon 110mm 2016 37.9918 0.089R720 Magura-Narail Road Km 028.10-028.30 S 0.2 1972 Regional Full Recon 110mm 2016 5.4274 0.267R720 Magura-Narail Road Km 028.40-030.93 S 2.53 1972 Regional Full Recon 110mm 2016 68.54806 0.025Z7007 Ramnagar-Hazratala-Sripur Road Km 000.00-000.30 S 0.3 1529 Zilla Overlay 40mm @ 1000-2000 2016 1.107945 0Z7007 Ramnagar-Hazratala-Sripur Road Km 000.30-001.60 S 1.3 1529 Zilla Overlay 40mm @ 1000-2000 2016 4.08369 0Z7007 Ramnagar-Hazratala-Sripur Road Km 002.00-003.10 S 1.1 1529 Zilla Rehab 75mm @ IRI 9-12 2016 12.18151 0.507Z7012 Magura-Mohammadpur Road Km 000.00-011.40 S 11.4 1902 Zilla Overlay 40mm @ IRI>12 2016 53.42587 0Z7012 Magura-Mohammadpur Road Km 018.90-021.30 S 2.4 1902 Zilla Overlay 40mm @ IRI>12 2016 10.08612 0Z7021 Arpara-Kaliganj Road Km 000.00-001.00 S 1 4120 Zilla Overlay 50mm @ IRI 6-9 2016 5.145 2.533Z7021 Arpara-Kaliganj Road Km 001.02-001.40 S 0.38 4120 Zilla Overlay 50mm @ IRI 6-9 2016 1.45635 2.332Z7021 Arpara-Kaliganj Road Km 001.40-001.50 S 0.1 4120 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 1.875Z7021 Arpara-Kaliganj Road Km 001.60-001.90 S 0.3 4120 Zilla Full Recon 75mm @ IRI>12 2016 4.759965 1.154Z7021 Arpara-Kaliganj Road Km 001.90-002.60 S 0.7 4120 Zilla Rehab 75mm @ IRI 9-12 2016 7.647114 1.549Z7021 Arpara-Kaliganj Road Km 002.60-003.60 S 1 4120 Zilla Full Recon 75mm @ IRI>12 2016 15.86655 0.974Z7021 Arpara-Kaliganj Road Km 003.60-003.80 S 0.2 4120 Zilla Overlay 50mm @ IRI 6-9 2016 0.7665 2.872Z7021 Arpara-Kaliganj Road Km 003.80-004.40 S 0.6 4120 Zilla Full Recon 75mm @ IRI>12 2016 9.51993 0.879Z7021 Arpara-Kaliganj Road Km 004.40-004.70 S 0.3 4120 Zilla Overlay 50mm @ IRI 6-9 2016 1.1907 2.651Z7021 Arpara-Kaliganj Road Km 004.70-006.70 S 2 4120 Zilla Full Recon 75mm @ IRI>12 2016 32.1678 1.01

Page 101 of 163

Page 102: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7021 Arpara-Kaliganj Road Km 006.80-008.50 S 1.7 4120 Zilla Full Recon 75mm @ IRI>12 2016 27.34263 0.979Z7021 Arpara-Kaliganj Road Km 008.50-009.70 S 1.2 4120 Zilla Overlay 50mm @ IRI 6-9 2016 4.662 2.15Z7021 Arpara-Kaliganj Road Km 009.70-012.30 S 2.6 4120 Zilla Rehab 75mm @ IRI 9-12 2016 28.79266 1.27Z7021 Arpara-Kaliganj Road Km 012.30-012.80 S 0.5 4120 Zilla Rehab 75mm @ IRI 9-12 2016 5.53705 1.591Z7021 Arpara-Kaliganj Road Km 012.80-013.40 S 0.6 4120 Zilla Full Recon 75mm @ IRI>12 2016 9.65034 0.917Z7021 Arpara-Kaliganj Road Km 013.40-013.80 S 0.4 4120 Zilla Overlay 50mm @ IRI 6-9 2016 1.554 2.892Z7021 Arpara-Kaliganj Road Km 013.80-014.20 S 0.4 4120 Zilla Full Recon 75mm @ IRI>12 2016 6.43356 1.005Z7021 Arpara-Kaliganj Road Km 014.20-014.30 S 0.1 4120 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 2.514Z7201 Arpara-Salikha Road Km 000.00-006.80 S 6.8 2854 Zilla Full Recon 75mm @ IRI>12 2016 124.1503 0.694Z7201 Arpara-Salikha Road Km 006.80-009.00 S 2.2 2854 Zilla Full Recon 75mm @ IRI>12 2016 39.87938 0.505Z7201 Arpara-Salikha Road Km 009.07-009.86 S 0.8 2854 Zilla Overlay 40mm @ Traff >=2000 2016 3.726261 1.122Z7201 Arpara-Salikha Road Km 009.86-011.52 S 1.65 2854 Zilla Rehab 75mm @ IRI 9-12 2016 18.04719 1.461Z7506 Lohagara-Nahata-Mohammadpur Road Km 027.27-027.37 S 0.1 1068 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z7506 Lohagara-Nahata-Mohammadpur Road Km 027.87-030.37 S 2.5 1068 Zilla Overlay 40mm @ IRI>12 2016 11.67375 0Z7506 Lohagara-Nahata-Mohammadpur Road Km 035.93-040.33 S 4.4 1068 Zilla Overlay 40mm @ IRI>12 2016 19.76132 0Z7506 Lohagara-Nahata-Mohammadpur Road Km 040.63-046.63 S 6 1068 Zilla Overlay 40mm @ 1000-2000 2016 28.017 0Z7506 Lohagara-Nahata-Mohammadpur Road Km 051.03-052.83 S 1.8 1068 Zilla Overlay 40mm @ IRI>12 2016 8.4051 0Z7506 Lohagara-Nahata-Mohammadpur Road Km 053.13-055.53 S 2.4 1068 Zilla Overlay 40mm @ IRI>12 2016 11.2068 0Z7506 Lohagara-Nahata-Mohammadpur Road Km 055.93-056.33 S 0.4 1068 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z7506 Lohagara-Nahata-Mohammadpur Road Km 056.43-060.33 S 3.9 1068 Zilla Overlay 40mm @ IRI>12 2016 18.21105 0Sub-Total Magura Division 1244.753

Meherpur DivisionR745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 023.78-026.90 S 3.12 4937 Regional DBST @ Traff 4000-6000 2016 8.649352 3.128R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 026.90-027.50 S 0.6 4937 Regional Overlay 60mm @ IRI 7-9 2016 4.20336 2.686R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 027.50-030.10 S 2.6 4937 Regional Overlay 60mm @ IRI 7-9 2016 18.21456 3.178R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 030.10-031.70 S 1.6 4937 Regional DBST @ Traff 4000-6000 2016 4.42624 3.093R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 031.70-033.00 S 1.3 4937 Regional Rehab 150mm @ IRI 9-12 2016 35.1624 0.857R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 033.70-034.40 S 0.7 4937 Regional Overlay 60mm @ IRI 7-9 2016 4.90392 3.857R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 034.40-034.70 S 0.3 4937 Regional Rehab 150mm @ IRI 9-12 2016 8.1144 1.254R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 034.70-035.60 S 0.9 4937 Regional Overlay 60mm @ IRI 7-9 2016 6.30504 3.478R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 035.60-037.10 S 1.5 4937 Regional Rehab 150mm @ IRI 9-12 2016 40.572 0.954R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 037.10-038.70 S 1.6 4937 Regional Overlay 60mm @ IRI 7-9 2016 11.20896 3.305R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 038.70-039.00 S 0.3 4937 Regional DBST @ Traff 4000-6000 2016 0.82992 3.402R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 039.00-042.50 S 3.5 4937 Regional Overlay 50mm @ IRI 5-7 2016 20.58 2.748R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 042.50-053.30 S 10.8 4937 Regional Overlay 60mm @ IRI 7-9 2016 75.79558 3.201R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 053.30-056.20 S 2.9 4937 Regional Overlay 50mm @ IRI 5-7 2016 17.1129 2.751R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 056.20-058.80 S 2.6 4937 Regional Overlay 60mm @ IRI 7-9 2016 18.21456 2.707R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 058.80-060.10 S 1.3 4937 Regional Overlay 60mm @ IRI 7-9 2016 9.107279 2.7R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 060.10-063.10 S 3 4937 Regional Overlay 60mm @ IRI 7-9 2016 21.0168 3.306R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 063.10-066.90 S 3.8 4937 Regional Overlay 60mm @ IRI 7-9 2016 26.62128 2.52R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 066.90-068.00 S 1.1 4937 Regional Overlay 60mm @ IRI 7-9 2016 7.70616 3.219R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 068.00-069.40 S 1.4 4937 Regional Overlay 50mm @ IRI 5-7 2016 8.232 2.292R745 Kushtia-Meherpur-Chuadanga-Jhenaidah Km 069.40-069.51 S 0.11 4937 Regional Rehab 150mm @ IRI 9-12 2016 3.056424 1.284R746 Meherpur-Mujibnagar (BDR Camp) Road Km 000.00-003.00 S 3 4937 Regional Overlay 50mm @ IRI 5-7 2016 30.7755 0.922R746 Meherpur-Mujibnagar (BDR Camp) Road Km 003.00-006.10 S 3.1 4937 Regional Overlay 60mm @ IRI 7-9 2016 21.32955 3.727

Page 102 of 163

Page 103: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R746 Meherpur-Mujibnagar (BDR Camp) Road Km 006.10-006.40 S 0.3 4937 Regional Rehab 150mm @ IRI 9-12 2016 7.9695 1.206R749 Darsana-Mujibnagar Road Km 023.24-026.70 S 3.46 3590 Regional Overlay 50mm @ IRI 5-7 2016 15.29051 1.306Z7452 Gangni-Kathuli-Kulbaria Road Km 012.44-013.24 S 0.8 2559 Zilla Overlay 40mm @ IRI>12 2016 3.740269 0Z7452 Gangni-Kathuli-Kulbaria Road Km 013.84-013.94 S 0.1 2559 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z7452 Gangni-Kathuli-Kulbaria Road Km 014.74-014.84 S 0.1 2559 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z7452 Gangni-Kathuli-Kulbaria Road Km 014.94-015.14 S 0.2 2559 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z7452 Gangni-Kathuli-Kulbaria Road Km 015.64-015.94 S 0.3 2559 Zilla Overlay 40mm @ IRI>12 2016 1.40085 0Z7452 Gangni-Kathuli-Kulbaria Road Km 016.34-016.44 S 0.1 2559 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z7452 Gangni-Kathuli-Kulbaria Road Km 019.54-020.35 S 0.81 2559 Zilla Overlay 40mm @ IRI>12 2016 3.800973 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 000.00-000.20 S 0.2 649 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 001.30-001.60 S 0.3 649 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 002.20-002.30 S 0.1 649 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 002.50-002.60 S 0.1 649 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 002.80-003.80 S 1 649 Zilla Overlay 40mm @ IRI>12 2016 3.1413 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 004.00-004.70 S 0.7 649 Zilla Overlay 40mm @ IRI>12 2016 2.19891 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 005.00-006.30 S 1.3 649 Zilla Overlay 40mm @ IRI>12 2016 4.086831 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 007.20-007.40 S 0.2 649 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 007.90-009.10 S 1.2 649 Zilla Overlay 40mm @ IRI>12 2016 3.76956 0Z7466 Meherpur-North Shalikha-Kaligangni Road Km 009.20-010.16 S 0.96 649 Zilla Overlay 40mm @ IRI>12 2016 3.012507 0Z7467 Amjhupi-Madandanga-Shampur-Noapara Road Km 004.10-005.00 S 0.9 3852 Zilla Full Recon 75mm @ IRI>12 2016 14.47551 0.854Z7467 Amjhupi-Madandanga-Shampur-Noapara Road Km 005.10-005.70 S 0.6 3852 Zilla Full Recon 75mm @ IRI>12 2016 9.65034 0.879Z7467 Amjhupi-Madandanga-Shampur-Noapara Road Km 005.90-006.70 S 0.8 3852 Zilla Full Recon 75mm @ IRI>12 2016 12.86712 0.778Z7467 Amjhupi-Madandanga-Shampur-Noapara Road Km 006.90-007.60 S 0.7 3852 Zilla Full Recon 75mm @ IRI>12 2016 11.25873 0.844Z7468 Chandpur-Dargatala-Jadukhali-Jatarpur Road Km 001.60-001.80 S 0.2 3852 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.879Z7468 Chandpur-Dargatala-Jadukhali-Jatarpur Road Km 008.60-008.70 S 0.1 3852 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 1.284Sub-Total Meherpur Division 508.7882

Narail DivisionN806 Bhatiapara-Lohagara-Narail-Jessore Road Km 004.44-004.64 S 0.2 3030 National Rehab 135mm @ IRI 9-12 2016 4.9808 0.635N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 006.24-014.14 S 7.9 3030 National Full Recon 135mm 2016 243.0531 0.479N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 014.14-014.34 S 0.2 3030 National Overlay 50mm @ IRI 5-9 2016 1.155 2.43N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 014.34-014.84 S 0.5 3030 National Full Recon 135mm 2016 15.026 0.667N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 014.84-015.24 S 0.4 3030 National Overlay 50mm @ IRI 5-9 2016 2.31 2.43N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 015.24-016.74 S 1.5 3030 National Full Recon 135mm 2016 45.078 0.376N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 016.74-017.64 S 0.9 3030 National Overlay 50mm @ IRI 5-9 2016 5.203275 1.975N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 017.64-018.04 S 0.4 3030 National Full Recon 135mm 2016 12.0208 0.375N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 018.14-018.34 S 0.2 3030 National Overlay 50mm @ IRI 5-9 2016 1.155 2.559N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 021.14-021.34 S 0.2 3290 National Overlay 50mm @ IRI 5-9 2016 1.155 2.893N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 021.34-024.70 S 3.36 5477 National Overlay 50mm @ IRI 5-9 2016 21.53361 5.769N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 024.70-027.91 S 3.2 5477 National Rehab 150mm @ IRI 9-12 2016 85.03456 1.95N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 027.91-028.31 S 0.4 5477 National Full Recon 150mm @ IRI 12 2016 13.3496 2.036N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 028.31-028.71 S 0.4 5477 National Rehab 150mm @ IRI 9-12 2016 10.626 2.016N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 028.71-030.71 S 2 5477 National Rehab 150mm @ IRI 9-12 2016 53.13 2.293N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 030.71-033.81 S 3.1 3161 National Full Recon 135mm 2016 93.16119 0.917N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 033.81-034.01 S 0.2 3102 National Full Recon 135mm 2016 6.0104 1.487N806 Bhatiapara-Lohagara-Narail-Jessore Road Km 034.11-034.62 S 0.52 3102 National Rehab 135mm @ IRI 9-12 2016 12.85046 1.106

Page 103 of 163

Page 104: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R720 Magura-Narail Road Km 030.93-032.51 S 1.58 1972 Regional Full Recon 110mm 2016 42.74078 0.214R720 Magura-Narail Road Km 032.61-032.71 S 0.1 1972 Regional Full Recon 110mm 2016 2.7137 0.459R720 Magura-Narail Road Km 032.91-034.01 S 1.1 1972 Regional Full Recon 110mm 2016 29.8507 0.245R720 Magura-Narail Road Km 034.11-036.01 S 1.9 1972 Regional DBST @ Traff 100-2000 2016 5.1623 0.983R720 Magura-Narail Road Km 036.06-036.11 S 0.05 1972 Regional Full Recon 110mm 2016 1.35685 0.243R720 Magura-Narail Road Km 036.11-036.41 S 0.3 1972 Regional Overlay 50mm @ IRI 7-9 2016 1.7325 1.11R720 Magura-Narail Road Km 036.41-036.71 S 0.3 1972 Regional Full Recon 110mm 2016 8.1411 0.34R720 Magura-Narail Road Km 036.71-037.21 S 0.5 1972 Regional DBST @ Traff 100-2000 2016 1.3585 0.991R720 Magura-Narail Road Km 037.21-037.41 S 0.2 1972 Regional Full Recon 110mm 2016 5.4274 0.404R720 Magura-Narail Road Km 037.41-037.91 S 0.5 1972 Regional Overlay 50mm @ IRI 5-7 2016 2.8875 0.758R720 Magura-Narail Road Km 037.91-038.01 S 0.1 1972 Regional Full Recon 110mm 2016 2.7137 0.595R720 Magura-Narail Road Km 038.01-038.41 S 0.4 1972 Regional Overlay 50mm @ IRI 5-7 2016 2.31 0.681R720 Magura-Narail Road Km 038.41-038.61 S 0.2 1972 Regional Full Recon 110mm 2016 5.4274 0.402R720 Magura-Narail Road Km 038.61-038.81 S 0.2 1972 Regional Overlay 50mm @ IRI 5-7 2016 1.155 0.839R720 Magura-Narail Road Km 038.81-039.01 S 0.2 1972 Regional Full Recon 110mm 2016 5.4274 0.404R720 Magura-Narail Road Km 039.01-039.11 S 0.1 1972 Regional Overlay 50mm @ IRI 5-7 2016 0.5775 0.851R720 Magura-Narail Road Km 039.11-039.21 S 0.1 1972 Regional Full Recon 110mm 2016 2.7137 0.595R720 Magura-Narail Road Km 039.21-040.31 S 1.1 1972 Regional Overlay 50mm @ IRI 5-7 2016 6.3525 0.666R720 Magura-Narail Road Km 040.31-040.41 S 0.1 1972 Regional Full Recon 110mm 2016 2.7137 0.59R720 Magura-Narail Road Km 040.41-040.81 S 0.4 1972 Regional Overlay 50mm @ IRI 5-7 2016 2.315775 0.715R720 Magura-Narail Road Km 040.81-041.01 S 0.2 1972 Regional Full Recon 110mm 2016 5.4274 0.402R720 Magura-Narail Road Km 041.01-041.91 S 0.9 1972 Regional Overlay 50mm @ IRI 5-7 2016 5.1975 0.611R720 Magura-Narail Road Km 041.91-042.11 S 0.2 1972 Regional Full Recon 110mm 2016 5.4274 0.417R720 Magura-Narail Road Km 042.11-043.71 S 1.6 1972 Regional Full Recon 110mm 2016 43.4192 0.047R720 Magura-Narail Road Km 043.71-044.11 S 0.4 1972 Regional Full Recon 110mm 2016 10.8548 0.309R720 Magura-Narail Road Km 044.11-044.41 S 0.3 1972 Regional Overlay 50mm @ IRI 7-9 2016 1.7325 1.082R720 Magura-Narail Road Km 044.41-044.61 S 0.2 1972 Regional Full Recon 110mm 2016 5.4274 0.429R720 Magura-Narail Road Km 044.61-044.81 S 0.2 1972 Regional Overlay 50mm @ IRI 5-7 2016 1.155 0.706R720 Magura-Narail Road Km 044.81-044.91 S 0.1 1972 Regional Full Recon 110mm 2016 2.7137 0.63R720 Magura-Narail Road Km 044.91-045.21 S 0.3 1972 Regional Overlay 50mm @ IRI 5-7 2016 1.7325 0.655R720 Magura-Narail Road Km 045.21-046.61 S 1.4 1972 Regional Full Recon 110mm 2016 37.9918 0.189R720 Magura-Narail Road Km 046.81-047.01 S 0.2 1972 Regional Full Recon 110mm 2016 5.535948 0.398Z7030 Narail-Fultala Road Km 000.00-000.30 S 0.3 2651 Zilla Seal Coat 2016 0.768852 0.602Z7030 Narail-Fultala Road Km 000.30-000.70 S 0.4 2651 Zilla Overlay 40mm @ IRI>12 2016 1.898364 0Z7030 Narail-Fultala Road Km 001.90-002.40 S 0.5 2651 Zilla Overlay 40mm @ IRI>12 2016 2.33475 0Z7030 Narail-Fultala Road Km 002.40-002.50 S 0.1 2651 Zilla Seal Coat 2016 0.1386 0.407Z7030 Narail-Fultala Road Km 002.50-002.90 S 0.4 2651 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z7030 Narail-Fultala Road Km 002.90-003.10 S 0.2 2651 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z7030 Narail-Fultala Road Km 003.10-003.90 S 0.8 2651 Zilla Full Recon 75mm @ IRI>12 2016 14.11906 0.248Z7030 Narail-Fultala Road Km 003.90-004.90 S 1 2651 Zilla Overlay 40mm @ Traff >=2000 2016 3.3111 0Z7030 Narail-Fultala Road Km 004.90-005.60 S 0.7 2651 Zilla Full Recon 75mm @ IRI>12 2016 11.88426 0.207Z7030 Narail-Fultala Road Km 005.60-007.10 S 1.5 2651 Zilla Overlay 40mm @ Traff >=2000 2016 4.96665 0Z7030 Narail-Fultala Road Km 007.10-008.60 S 1.5 2651 Zilla Full Recon 75mm @ IRI>12 2016 25.42995 0.217Z7030 Narail-Fultala Road Km 008.70-008.80 S 0.1 2651 Zilla Full Recon 75mm @ IRI>12 2016 1.69533 0.819Z7030 Narail-Fultala Road Km 009.10-009.20 S 0.1 2651 Zilla Full Recon 75mm @ IRI>12 2016 1.69533 0.59Z7030 Narail-Fultala Road Km 009.30-009.70 S 0.4 2651 Zilla Full Recon 75mm @ IRI>12 2016 6.78132 0.368

Page 104 of 163

Page 105: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7030 Narail-Fultala Road Km 010.00-018.30 S 8.3 2651 Zilla Full Recon 75mm @ IRI>12 2016 138.1701 0.239Z7502 Narail-Kalia Road Km 000.40-001.70 S 1.3 1074 Zilla Overlay 40mm @ IRI>12 2016 4.160949 0Z7502 Narail-Kalia Road Km 001.70-001.80 S 0.1 1074 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z7502 Narail-Kalia Road Km 001.80-002.90 S 1.1 1074 Zilla Overlay 40mm @ IRI>12 2016 3.45543 0Z7502 Narail-Kalia Road Km 002.90-004.10 S 1.2 1074 Zilla Overlay 40mm @ 1000-2000 2016 3.76956 0Z7502 Narail-Kalia Road Km 004.10-004.40 S 0.3 1074 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z7502 Narail-Kalia Road Km 004.40-004.90 S 0.5 1074 Zilla Overlay 40mm @ 1000-2000 2016 2.18193 0Z7502 Narail-Kalia Road Km 004.90-005.50 S 0.6 1074 Zilla Overlay 40mm @ IRI>12 2016 2.806369 0Z7502 Narail-Kalia Road Km 005.50-006.20 S 0.7 1074 Zilla Overlay 40mm @ 1000-2000 2016 3.26865 0Z7502 Narail-Kalia Road Km 006.20-006.40 S 0.2 1074 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z7502 Narail-Kalia Road Km 007.60-007.70 S 0.1 1074 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z7502 Narail-Kalia Road Km 008.00-008.30 S 0.3 1074 Zilla Overlay 40mm @ IRI>12 2016 1.40085 0Z7502 Narail-Kalia Road Km 008.50-008.90 S 0.4 1074 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z7502 Narail-Kalia Road Km 009.00-009.10 S 0.1 1074 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z7502 Narail-Kalia Road Km 009.20-009.50 S 0.3 1074 Zilla Overlay 40mm @ IRI>12 2016 1.40085 0Z7502 Narail-Kalia Road Km 010.00-010.40 S 0.4 1074 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z7502 Narail-Kalia Road Km 010.70-011.40 S 0.7 1074 Zilla Overlay 40mm @ IRI>12 2016 2.73378 0Z7502 Narail-Kalia Road Km 011.60-011.90 S 0.3 1074 Zilla Overlay 40mm @ IRI>12 2016 0.86598 0Z7502 Narail-Kalia Road Km 012.90-013.50 S 0.6 1074 Zilla Overlay 40mm @ IRI>12 2016 1.73196 0Z7502 Narail-Kalia Road Km 013.60-013.90 S 0.3 1074 Zilla Overlay 40mm @ IRI>12 2016 0.86598 0Z7502 Narail-Kalia Road Km 014.40-015.00 S 0.6 1074 Zilla Overlay 40mm @ IRI>12 2016 1.80837 0Z7502 Narail-Kalia Road Km 015.30-015.50 S 0.2 1074 Zilla Overlay 40mm @ IRI>12 2016 0.60279 0Z7502 Narail-Kalia Road Km 015.80-016.40 S 0.6 1074 Zilla Overlay 40mm @ IRI>12 2016 2.720196 0Z7502 Narail-Kalia Road Km 016.70-017.10 S 0.4 1074 Zilla Overlay 40mm @ IRI>12 2016 1.8678 0Z7502 Narail-Kalia Road Km 017.60-018.20 S 0.6 1074 Zilla Overlay 40mm @ IRI>12 2016 2.8017 0Z7502 Narail-Kalia Road Km 018.30-018.40 S 0.1 1074 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z7502 Narail-Kalia Road Km 021.98-022.38 S 0.4 1074 Zilla Overlay 40mm @ IRI>12 2016 1.25652 0Z7502 Narail-Kalia Road Km 022.68-023.18 S 0.5 1074 Zilla Rehab 75mm @ IRI 9-12 2016 5.53705 0.072Z7502 Narail-Kalia Road Km 023.38-023.48 S 0.1 1074 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z7502 Narail-Kalia Road Km 023.58-023.78 S 0.2 1074 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z7502 Narail-Kalia Road Km 023.88-025.13 S 1.25 1074 Zilla Overlay 40mm @ IRI>12 2016 4.545121 0Z7504 Narail (Tularampur)-Maijpara Road Km 000.10-000.20 S 0.1 2634 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z7504 Narail (Tularampur)-Maijpara Road Km 000.40-000.70 S 0.3 2634 Zilla Overlay 40mm @ IRI>12 2016 2.8017 0Z7504 Narail (Tularampur)-Maijpara Road Km 000.80-000.90 S 0.1 2634 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z7504 Narail (Tularampur)-Maijpara Road Km 001.00-003.30 S 2.3 2634 Zilla Overlay 40mm @ IRI>12 2016 21.4797 0Z7504 Narail (Tularampur)-Maijpara Road Km 003.90-005.20 S 1.3 2634 Zilla Overlay 40mm @ IRI>12 2016 12.15004 0Z7504 Narail (Tularampur)-Maijpara Road Km 005.90-006.00 S 0.1 2634 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z7504 Narail (Tularampur)-Maijpara Road Km 006.20-007.20 S 1 2634 Zilla Overlay 40mm @ IRI>12 2016 9.339 0Z7504 Narail (Tularampur)-Maijpara Road Km 007.20-007.60 S 0.4 2634 Zilla Overlay 40mm @ Traff >=2000 2016 3.7356 0.086Z7504 Narail (Tularampur)-Maijpara Road Km 007.60-008.90 S 1.3 2634 Zilla Overlay 40mm @ IRI>12 2016 8.068047 0Sub-Total Narail Division 1220.948

Satkhira DivisionN715 Alipur - Bhomra Landport Connecting Road Km 005.20-005.30 S 0.1 11059 National Overlay 80mm @ IRI 5-9 2016 1.20669 14.166N715 Alipur - Bhomra Landport Connecting Road Km 005.30-005.40 S 0.1 11059 National Full Recon 195mm 2016 5.32973 4.799N715 Alipur - Bhomra Landport Connecting Road Km 005.40-008.20 S 2.8 11059 National Overlay 80mm @ IRI 5-9 2016 33.77525 13.549

Page 105 of 163

Page 106: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N715 Alipur - Bhomra Landport Connecting Road Km 009.04-009.23 S 0.19 11059 National Overlay 80mm @ IRI 5-9 2016 4.28127 5.264R760 Khulna-Chuknagar-Satkhira Road Km 033.38-054.19 S 20.81 5825 Regional DBST @ 25% Crk 2016 66.30054 8.252R760 Khulna-Chuknagar-Satkhira Road Km 054.19-054.79 S 0.6 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 4.8789 11.033R760 Khulna-Chuknagar-Satkhira Road Km 054.79-058.44 S 3.65 5825 Regional DBST @ 25% Crk 2016 11.11318 8.547R760 Khulna-Chuknagar-Satkhira Road Km 058.44-058.50 S 0.06 5825 Regional Overlay 60mm @ IRI 5.5-9 2016 0.708917 6.517R765 Navaran-Illishpur- Satkhira Road Km 016.11-017.90 S 1.79 4408 Regional Overlay 50mm @ IRI 5-7 2016 10.36613 4.642R765 Navaran-Illishpur- Satkhira Road Km 017.90-018.00 S 0.1 4408 Regional Full Recon 150mm 2016 3.3374 2.58R765 Navaran-Illishpur- Satkhira Road Km 018.00-020.80 S 2.8 4408 Regional Overlay 60mm @ IRI 7-9 2016 19.2654 4.387R765 Navaran-Illishpur- Satkhira Road Km 020.80-021.20 S 0.4 4408 Regional Full Recon 150mm 2016 13.3496 1.636R765 Navaran-Illishpur- Satkhira Road Km 021.20-022.20 S 1 4408 Regional Overlay 50mm @ IRI 5-7 2016 5.775 4.987R765 Navaran-Illishpur- Satkhira Road Km 022.20-022.40 S 0.2 4408 Regional Full Recon 150mm 2016 6.6748 2.07R765 Navaran-Illishpur- Satkhira Road Km 022.40-023.30 S 0.9 4408 Regional Overlay 50mm @ IRI 5-7 2016 5.203275 4.921R765 Navaran-Illishpur- Satkhira Road Km 023.30-023.40 S 0.1 4408 Regional Rehab 150mm @ IRI 9-12 2016 2.6565 2.156R765 Navaran-Illishpur- Satkhira Road Km 023.40-024.70 S 1.3 4408 Regional DBST @ 25% Crk 2016 3.5321 3.091R765 Navaran-Illishpur- Satkhira Road Km 024.70-025.40 S 0.7 4408 Regional Full Recon 150mm 2016 23.3618 1.838R765 Navaran-Illishpur- Satkhira Road Km 025.40-026.60 S 1.2 4408 Regional Overlay 50mm @ IRI 5-7 2016 6.93 4.923R765 Navaran-Illishpur- Satkhira Road Km 026.60-026.80 S 0.2 4408 Regional Rehab 150mm @ IRI 9-12 2016 5.313 1.881R765 Navaran-Illishpur- Satkhira Road Km 026.80-028.30 S 1.5 4408 Regional Overlay 50mm @ IRI 5-7 2016 8.6625 4.934R765 Navaran-Illishpur- Satkhira Road Km 028.30-029.00 S 0.7 4408 Regional Rehab 150mm @ IRI 9-12 2016 18.5955 1.675R765 Navaran-Illishpur- Satkhira Road Km 029.00-029.30 S 0.3 4408 Regional Overlay 50mm @ IRI 5-7 2016 1.7325 5.167R765 Navaran-Illishpur- Satkhira Road Km 029.30-029.50 S 0.2 4408 Regional Full Recon 150mm 2016 6.6748 2.276R765 Navaran-Illishpur- Satkhira Road Km 029.50-029.80 S 0.3 4408 Regional Overlay 50mm @ IRI 5-7 2016 1.7325 5.314R765 Navaran-Illishpur- Satkhira Road Km 029.80-029.90 S 0.1 4408 Regional Full Recon 150mm 2016 3.3374 2.632R765 Navaran-Illishpur- Satkhira Road Km 029.90-030.00 S 0.1 4408 Regional DBST @ Traff 4000-6000 2016 0.2717 4.448R765 Navaran-Illishpur- Satkhira Road Km 030.00-030.30 S 0.3 4408 Regional Full Recon 150mm 2016 10.0122 1.783R765 Navaran-Illishpur- Satkhira Road Km 030.30-030.50 S 0.2 4408 Regional Rehab 150mm @ IRI 9-12 2016 5.313 1.768R765 Navaran-Illishpur- Satkhira Road Km 030.50-031.20 S 0.7 4408 Regional Full Recon 150mm 2016 33.30118 1.118R765 Navaran-Illishpur- Satkhira Road Km 031.20-031.70 S 0.5 4408 Regional DBST @ Traff 4000-6000 2016 1.43507 2.669R765 Navaran-Illishpur- Satkhira Road Km 031.70-032.70 S 1 4408 Regional Full Recon 150mm @ IRI 12 2016 34.01478 1.423R765 Navaran-Illishpur- Satkhira Road Km 032.70-035.90 S 3.2 4408 Regional DBST @ 25% Crk 2016 8.85248 2.509R765 Navaran-Illishpur- Satkhira Road Km 035.90-036.30 S 0.4 4408 Regional Rehab 150mm @ IRI 9-12 2016 10.8192 1.646R765 Navaran-Illishpur- Satkhira Road Km 036.30-038.50 S 2.2 4408 Regional DBST @ Traff 4000-6000 2016 6.41212 2.648R765 Navaran-Illishpur- Satkhira Road Km 038.50-038.60 S 0.1 4408 Regional Full Recon 150mm 2016 4.42964 1.38R765 Navaran-Illishpur- Satkhira Road Km 038.60-041.41 S 2.8 4408 Regional DBST @ 25% Crk 2016 10.17015 1.72Z7552 Keshabpur- Sharaskhati -Kalaroa Road Km 011.38-019.65 S 8.27 3028 Zilla Rehab 75mm @ IRI 9-12 2016 79.21633 1.907Z7552 Keshabpur- Sharaskhati -Kalaroa Road Km 019.65-019.93 S 0.27 3028 Zilla Overlay 40mm @ Traff >=2000 2016 1.270104 0.476Z7602 Satkhira-Shakhipur-Kaliganj Road Km 005.30-005.60 S 0.3 7301 Zilla Overlay 50mm @ IRI 6-9 2016 1.7325 2.626Z7602 Satkhira-Shakhipur-Kaliganj Road Km 005.60-006.50 S 0.9 7301 Zilla Full Recon 75mm @ IRI>12 2016 21.51765 1.392Z7602 Satkhira-Shakhipur-Kaliganj Road Km 006.50-006.70 S 0.2 7301 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 2.397Z7602 Satkhira-Shakhipur-Kaliganj Road Km 006.70-007.10 S 0.4 7301 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 1.575Z7602 Satkhira-Shakhipur-Kaliganj Road Km 007.10-007.20 S 0.1 7301 Zilla Overlay 50mm @ Cracking >25%2016 0.5775 1.998Z7602 Satkhira-Shakhipur-Kaliganj Road Km 007.20-008.70 S 1.5 7301 Zilla Rehab 75mm @ IRI 9-12 2016 24.69225 2.057Z7602 Satkhira-Shakhipur-Kaliganj Road Km 008.70-009.30 S 0.6 7301 Zilla Overlay 50mm @ IRI 6-9 2016 3.465 3.123Z7602 Satkhira-Shakhipur-Kaliganj Road Km 009.30-009.70 S 0.4 7301 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 1.503Z7602 Satkhira-Shakhipur-Kaliganj Road Km 009.70-010.00 S 0.3 7301 Zilla Rehab 75mm @ IRI 9-12 2016 4.954911 1.614Z7602 Satkhira-Shakhipur-Kaliganj Road Km 010.00-011.00 S 1 7301 Zilla Full Recon 75mm @ IRI>12 2016 23.9085 1.34

Page 106 of 163

Page 107: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7602 Satkhira-Shakhipur-Kaliganj Road Km 011.00-011.50 S 0.5 7301 Zilla Overlay 50mm @ IRI 6-9 2016 2.8875 2.85Z7602 Satkhira-Shakhipur-Kaliganj Road Km 011.50-012.10 S 0.6 7301 Zilla Rehab 75mm @ IRI 9-12 2016 9.8769 2.167Z7602 Satkhira-Shakhipur-Kaliganj Road Km 012.10-014.30 S 2.2 7301 Zilla Overlay 50mm @ IRI 6-9 2016 12.705 3.092Z7602 Satkhira-Shakhipur-Kaliganj Road Km 014.30-014.60 S 0.3 7301 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 1.53Z7602 Satkhira-Shakhipur-Kaliganj Road Km 014.90-015.10 S 0.2 7301 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 3.016Z7602 Satkhira-Shakhipur-Kaliganj Road Km 017.00-017.10 S 0.1 7301 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 3.393Z7602 Satkhira-Shakhipur-Kaliganj Road Km 018.50-018.80 S 0.3 7301 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 1.807Z7602 Satkhira-Shakhipur-Kaliganj Road Km 018.80-019.10 S 0.3 7301 Zilla Overlay 50mm @ IRI 6-9 2016 1.738275 4.425Z7602 Satkhira-Shakhipur-Kaliganj Road Km 019.10-019.20 S 0.1 7301 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.89Z7602 Satkhira-Shakhipur-Kaliganj Road Km 019.20-019.32 S 0.12 7301 Zilla Overlay 50mm @ IRI 6-9 2016 0.68145 4.607Z7602 Satkhira-Shakhipur-Kaliganj Road Km 019.32-019.72 S 0.4 7301 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 1.529Z7602 Satkhira-Shakhipur-Kaliganj Road Km 019.72-020.02 S 0.3 7301 Zilla Overlay 50mm @ IRI 6-9 2016 1.7325 2.901Z7602 Satkhira-Shakhipur-Kaliganj Road Km 020.02-020.52 S 0.5 7301 Zilla Rehab 75mm @ IRI 9-12 2016 8.23075 2.594Z7602 Satkhira-Shakhipur-Kaliganj Road Km 021.32-021.52 S 0.2 7301 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 1.755Z7602 Satkhira-Shakhipur-Kaliganj Road Km 021.52-022.02 S 0.5 7301 Zilla Overlay 50mm @ IRI 6-9 2016 2.8875 4.283Z7602 Satkhira-Shakhipur-Kaliganj Road Km 022.02-022.82 S 0.8 7301 Zilla Overlay 50mm @ IRI 6-9 2016 4.6368 4.904Z7602 Satkhira-Shakhipur-Kaliganj Road Km 022.82-023.02 S 0.2 7301 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 4.588Z7602 Satkhira-Shakhipur-Kaliganj Road Km 023.02-023.22 S 0.2 7301 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 5.152Z7602 Satkhira-Shakhipur-Kaliganj Road Km 025.02-025.92 S 0.9 7301 Zilla Overlay 50mm @ IRI 6-9 2016 5.1975 4.752Z7602 Satkhira-Shakhipur-Kaliganj Road Km 025.92-028.92 S 3 7301 Zilla Overlay 40mm @ Traff >=2000 2016 14.69619 0Z7602 Satkhira-Shakhipur-Kaliganj Road Km 028.92-030.12 S 1.2 7301 Zilla Full Recon 75mm @ IRI>12 2016 28.6902 1.554Z7602 Satkhira-Shakhipur-Kaliganj Road Km 030.12-030.32 S 0.2 7301 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 2.868Z7602 Satkhira-Shakhipur-Kaliganj Road Km 030.32-032.92 S 2.6 7301 Zilla Rehab 75mm @ IRI 9-12 2016 42.7999 2.109Z7602 Satkhira-Shakhipur-Kaliganj Road Km 032.92-033.52 S 0.6 7301 Zilla Overlay 50mm @ IRI 6-9 2016 3.470775 3.246Z7602 Satkhira-Shakhipur-Kaliganj Road Km 033.52-035.04 S 1.52 7301 Zilla Full Recon 75mm @ IRI>12 2016 42.53387 0.832Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 003.10-004.20 S 1.1 2552 Zilla Overlay 40mm @ Traff >=2000 2016 5.22984 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 004.20-004.40 S 0.2 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.95088 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 004.40-005.20 S 0.8 2552 Zilla Overlay 40mm @ Traff >=2000 2016 3.80352 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 005.20-005.60 S 0.4 2552 Zilla Overlay 40mm @ Traff >=2000 2016 1.906514 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 005.60-006.30 S 0.7 2552 Zilla Overlay 40mm @ Traff >=2000 2016 3.32808 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 006.30-006.40 S 0.1 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.47544 0.207Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 006.40-006.50 S 0.1 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.47544 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 006.50-006.80 S 0.3 2552 Zilla Overlay 40mm @ Traff >=2000 2016 1.42632 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 006.80-007.00 S 0.2 2552 Zilla Rehab 75mm @ IRI 9-12 2016 3.35216 0.069Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 007.00-007.60 S 0.6 2552 Zilla Overlay 40mm @ Traff >=2000 2016 2.85264 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 007.60-008.00 S 0.4 2552 Zilla Rehab 75mm @ IRI 9-12 2016 6.70432 0.048Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 008.00-008.20 S 0.2 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.95088 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 008.20-008.70 S 0.5 2552 Zilla Overlay 40mm @ IRI>12 2016 2.3772 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 008.70-009.00 S 0.3 2552 Zilla Overlay 40mm @ Traff >=2000 2016 1.42632 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 009.00-009.60 S 0.6 2552 Zilla Rehab 75mm @ IRI 9-12 2016 10.05648 0.082Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 009.60-009.80 S 0.2 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.95088 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 009.80-011.00 S 1.2 2552 Zilla Overlay 40mm @ Traff >=2000 2016 5.70528 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 011.00-011.90 S 0.9 2552 Zilla Overlay 40mm @ Traff >=2000 2016 4.27896 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 011.90-013.10 S 1.2 2552 Zilla Overlay 40mm @ Traff >=2000 2016 5.70528 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 013.10-013.40 S 0.3 2552 Zilla Overlay 40mm @ Traff >=2000 2016 1.423773 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 013.40-014.10 S 0.7 2552 Zilla Overlay 40mm @ Traff >=2000 2016 3.26865 0

Page 107 of 163

Page 108: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 014.10-014.20 S 0.1 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 014.20-014.70 S 0.5 2552 Zilla Rehab 75mm @ IRI 9-12 2016 8.247211 0.056Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 017.70-017.90 S 0.2 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.016Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 022.30-022.50 S 0.2 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.055Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 022.50-022.60 S 0.1 2552 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.127Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 022.60-022.70 S 0.1 2552 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 022.70-028.88 S 6.18 2959 Zilla Overlay 40mm @ Traff >=2000 2016 20.98728 1.372Z7603 Satkhira-Asasuni-Goaldanga-Paikgachha Road Km 032.80-038.82 S 6.01 3256 Zilla Rehab 75mm @ IRI 9-12 2016 98.983 0.326Z7605 Satkhira Town Bypass Road Km 000.00-012.35 S 12.35 3256 Zilla Overlay 40mm @ IRI>12 2016 0 0Z7607 Satkhira (Shakhipur)-Debhata Road Km 000.00-000.70 S 0.7 4354 Zilla Overlay 50mm @ IRI 6-9 2016 4.0425 1.125Z7607 Satkhira (Shakhipur)-Debhata Road Km 000.70-001.10 S 0.4 4354 Zilla Overlay 50mm @ IRI 6-9 2016 2.31 1.833Z7607 Satkhira (Shakhipur)-Debhata Road Km 001.10-002.10 S 1 4354 Zilla Overlay 50mm @ IRI 6-9 2016 5.775 0.609Z7607 Satkhira (Shakhipur)-Debhata Road Km 002.10-004.60 S 2.5 4354 Zilla Rehab 75mm @ IRI 9-12 2016 41.17021 0.519Z7607 Satkhira (Shakhipur)-Debhata Road Km 004.60-005.42 S 0.82 4354 Zilla Overlay 50mm @ IRI 6-9 2016 4.298238 1.558Z7609 Banshipur-Munshiganj Road Km 000.00-000.10 S 0.1 3278 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.356Z7609 Banshipur-Munshiganj Road Km 000.10-002.90 S 2.8 3278 Zilla Overlay 40mm @ Traff >=2000 2016 13.0746 0.52Z7609 Banshipur-Munshiganj Road Km 002.90-003.00 S 0.1 3278 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z7609 Banshipur-Munshiganj Road Km 003.00-006.00 S 3 3278 Zilla Full Recon 75mm @ IRI>12 2016 71.74941 0.039Z7609 Banshipur-Munshiganj Road Km 006.00-007.70 S 1.7 3278 Zilla Rehab 75mm @ IRI 9-12 2016 27.98455 0.279Z7609 Banshipur-Munshiganj Road Km 007.70-008.00 S 0.3 3278 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z7609 Banshipur-Munshiganj Road Km 008.00-010.61 S 2.6 3278 Zilla Rehab 75mm @ IRI 9-12 2016 42.86575 0.361Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 000.00-000.20 S 0.2 2278 Zilla Overlay 40mm @ Traff >=2000 2016 0.75561 0Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 002.70-004.00 S 1.3 2278 Zilla Overlay 40mm @ Traff >=2000 2016 4.812132 0Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 004.00-004.80 S 0.8 2278 Zilla Overlay 40mm @ Traff >=2000 2016 2.720196 0Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 004.90-005.10 S 0.2 2278 Zilla Overlay 40mm @ Traff >=2000 2016 0.6792 0.006Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 005.10-005.40 S 0.3 2278 Zilla Overlay 40mm @ Traff >=2000 2016 1.0188 0Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 005.40-005.50 S 0.1 2278 Zilla Full Recon 75mm @ IRI>12 2016 1.7388 0.622Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 005.50-005.70 S 0.2 2278 Zilla Overlay 40mm @ Traff >=2000 2016 0.6792 0Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 005.70-006.00 S 0.3 2278 Zilla Full Recon 75mm @ IRI>12 2016 5.2164 0.166Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 006.30-006.60 S 0.3 2278 Zilla Overlay 40mm @ Traff >=2000 2016 1.0188 0Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 006.80-007.10 S 0.3 2278 Zilla Rehab 75mm @ IRI 9-12 2016 3.68139 0.603Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 007.10-007.30 S 0.2 2278 Zilla Overlay 40mm @ Traff >=2000 2016 0.71316 0Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 007.50-008.10 S 0.6 2278 Zilla Overlay 40mm @ Traff >=2000 2016 2.13948 0Z7613 Tala-Islamkati-Sujanshaha-Satkhira Road Km 008.10-008.50 S 0.4 2278 Zilla Full Recon 75mm @ IRI>12 2016 7.30296 0.025Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 000.00-000.20 S 0.2 3360 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.029Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 000.20-001.70 S 1.5 3360 Zilla Rehab 75mm @ IRI 9-12 2016 24.69225 0.577Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 001.70-003.60 S 1.9 3360 Zilla Overlay 40mm @ Traff >=2000 2016 8.87205 0Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 003.60-003.80 S 0.2 3360 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.277Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 003.80-004.50 S 0.7 3360 Zilla Overlay 40mm @ Traff >=2000 2016 3.26865 0Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 004.50-006.10 S 1.6 3360 Zilla Overlay 40mm @ Traff >=2000 2016 7.475869 0.375Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 014.10-014.20 S 0.1 3360 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.247Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 019.35-019.65 S 0.3 3360 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 0.333Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 019.65-019.75 S 0.1 3360 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.119Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 019.75-019.95 S 0.2 3360 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 0.47Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 021.05-021.95 S 0.9 3360 Zilla Full Recon 75mm @ IRI>12 2016 21.51765 0.38Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 021.95-022.75 S 0.8 3360 Zilla Overlay 40mm @ Traff >=2000 2016 3.7356 0.126

Page 108 of 163

Page 109: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 022.75-022.85 S 0.1 3360 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.373Z7617 Kaliganj-Shyamnagar-Betkhali Road Km 022.85-027.29 S 4.43 3360 Zilla Overlay 40mm @ Traff >=2000 2016 20.69056 0.362Z7618 Ashasuni-Shamnagar Road Km 000.80-003.90 S 3.1 3360 Zilla Rehab 75mm @ IRI 9-12 2016 55.48423 0.275Z7618 Ashasuni-Shamnagar Road Km 003.90-004.10 S 0.2 3360 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.634Z7618 Ashasuni-Shamnagar Road Km 004.20-004.30 S 0.1 3360 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.579Z7618 Ashasuni-Shamnagar Road Km 004.40-005.70 S 1.3 3360 Zilla Full Recon 75mm @ IRI>12 2016 31.10496 0.443Z7618 Ashasuni-Shamnagar Road Km 005.70-005.90 S 0.2 3360 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.013Z7618 Ashasuni-Shamnagar Road Km 005.90-006.30 S 0.4 3360 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.466Z7618 Ashasuni-Shamnagar Road Km 007.80-008.20 S 0.4 3360 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.228Z7618 Ashasuni-Shamnagar Road Km 008.20-008.30 S 0.1 3360 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.069Z7618 Ashasuni-Shamnagar Road Km 008.30-008.70 S 0.4 3360 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.314Z7618 Ashasuni-Shamnagar Road Km 008.70-008.80 S 0.1 3360 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.237Z7618 Ashasuni-Shamnagar Road Km 008.80-009.10 S 0.3 3360 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.665Z7618 Ashasuni-Shamnagar Road Km 009.10-009.20 S 0.1 3360 Zilla Overlay 40mm @ Cracks >25% 2016 0.4422 0.091Z7618 Ashasuni-Shamnagar Road Km 009.20-010.40 S 1.2 3360 Zilla Rehab 75mm @ IRI 9-12 2016 19.7538 0.494Z7618 Ashasuni-Shamnagar Road Km 010.40-011.10 S 0.7 3360 Zilla Overlay 40mm @ Traff >=2000 2016 3.26865 0.108Z7618 Ashasuni-Shamnagar Road Km 011.10-011.20 S 0.1 3360 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.553Z7618 Ashasuni-Shamnagar Road Km 011.20-011.30 S 0.1 3360 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.086Z7618 Ashasuni-Shamnagar Road Km 011.30-011.40 S 0.1 3360 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.544Z7618 Ashasuni-Shamnagar Road Km 011.40-011.60 S 0.2 3360 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.169Z7618 Ashasuni-Shamnagar Road Km 011.60-011.70 S 0.1 3360 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.794Z7618 Ashasuni-Shamnagar Road Km 011.70-012.70 S 1 3360 Zilla Overlay 40mm @ Traff >=2000 2016 4.6695 0Z7618 Ashasuni-Shamnagar Road Km 012.70-012.80 S 0.1 3360 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.481Z7618 Ashasuni-Shamnagar Road Km 013.50-014.00 S 0.5 3360 Zilla Full Recon 75mm @ IRI>12 2016 11.97816 0.631Sub-Total Satkhira Division 1536.608Total Khulna Zone 17809.9

Mymensingh ZoneJamalpur DivisionN4 Joydebpur-Tangail-Jamalpur Road Km 126.57-127.10 S 0.53 5925 National Overlay 50mm @ IRI 4-9 2016 2.772 6.664N4 Joydebpur-Tangail-Jamalpur Road Km 127.10-127.30 S 0.2 5925 National Overlay 50mm @ IRI 4-9 2016 1.05 8.155N4 Joydebpur-Tangail-Jamalpur Road Km 127.30-128.50 S 1.2 5925 National Overlay 50mm @ IRI 4-9 2016 6.3 6.596N4 Joydebpur-Tangail-Jamalpur Road Km 128.50-128.70 S 0.2 5925 National Rehab 150mm @ IRI 9-12 2016 4.83 3.525N4 Joydebpur-Tangail-Jamalpur Road Km 128.70-129.40 S 0.7 5925 National Overlay 50mm @ IRI 4-9 2016 3.675 7.17N4 Joydebpur-Tangail-Jamalpur Road Km 129.40-130.20 S 0.8 5925 National Rehab 150mm @ IRI 9-12 2016 19.32 3.32N4 Joydebpur-Tangail-Jamalpur Road Km 130.20-131.20 S 1 5925 National Overlay 50mm @ IRI 4-9 2016 5.25 6.821N4 Joydebpur-Tangail-Jamalpur Road Km 131.20-131.30 S 0.1 5925 National Rehab 150mm @ IRI 9-12 2016 2.415 4.069N4 Joydebpur-Tangail-Jamalpur Road Km 131.30-133.10 S 1.8 5925 National Overlay 50mm @ IRI 4-9 2016 9.45 6.663N4 Joydebpur-Tangail-Jamalpur Road Km 133.10-133.30 S 0.2 5925 National Rehab 150mm @ IRI 9-12 2016 4.83 3.887N4 Joydebpur-Tangail-Jamalpur Road Km 133.30-133.50 S 0.2 5925 National Overlay 50mm @ IRI 4-9 2016 1.05 7.406N4 Joydebpur-Tangail-Jamalpur Road Km 133.50-133.90 S 0.4 5925 National Rehab 150mm @ IRI 9-12 2016 9.66 3.305N4 Joydebpur-Tangail-Jamalpur Road Km 133.90-137.40 S 3.5 5925 National Overlay 50mm @ IRI 4-9 2016 18.375 7.108N4 Joydebpur-Tangail-Jamalpur Road Km 137.40-146.31 S 8.9 5925 National Overlay 50mm @ IRI 4-9 2016 46.75125 6.605Z4018 Baushi-Gopalpur-Bhuapur Road Km 003.00-004.60 S 1.6 3186 Zilla Rehab 75mm @ IRI 9-12 2016 17.47912 1.928Z4018 Baushi-Gopalpur-Bhuapur Road Km 004.70-005.20 S 0.5 3186 Zilla Rehab 75mm @ IRI 9-12 2016 5.47719 2.199

Page 109 of 163

Page 110: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z4021 Jamalpur-Islampur-Dewanganj Road Km 000.00-003.10 S 3.1 2763 Zilla Overlay 40mm @ Traff >=2000 2016 17.63942 0Z4021 Jamalpur-Islampur-Dewanganj Road Km 003.10-009.50 S 6.4 2763 Zilla Overlay 40mm @ Traff >=2000 2016 31.84587 0Z4021 Jamalpur-Islampur-Dewanganj Road Km 009.50-009.70 S 0.2 2763 Zilla Rehab 75mm @ IRI 9-12 2016 4.01062 0.367Z4023 Digpaith-Sarisabari-Tarakandi Road Km 022.81-023.21 S 0.4 1866 Zilla Overlay 40mm @ IRI>12 2016 1.932324 0Z4025 Jamalpur-Kalibari-Sharisabari Road Km 000.00-003.10 S 3.1 4485 Zilla Overlay 50mm @ IRI 6-9 2016 11.59154 1.179Z4025 Jamalpur-Kalibari-Sharisabari Road Km 003.10-003.30 S 0.2 4485 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.382Z4025 Jamalpur-Kalibari-Sharisabari Road Km 003.30-003.70 S 0.4 4485 Zilla Overlay 50mm @ IRI 6-9 2016 2.31 0.506Z4025 Jamalpur-Kalibari-Sharisabari Road Km 003.70-006.80 S 3.1 4485 Zilla Rehab 75mm @ IRI 9-12 2016 34.70084 0.628Z4025 Jamalpur-Kalibari-Sharisabari Road Km 007.90-011.03 S 3.13 4485 Zilla Overlay 40mm @ Traff >=2000 2016 10.63627 0.839Z4025 Jamalpur-Kalibari-Sharisabari Road Km 011.03-012.30 S 1.27 4485 Zilla Rehab 75mm @ IRI 9-12 2016 14.47083 0.534Z4025 Jamalpur-Kalibari-Sharisabari Road Km 012.30-012.70 S 0.4 4485 Zilla Overlay 50mm @ IRI 6-9 2016 1.638 0.566Z4025 Jamalpur-Kalibari-Sharisabari Road Km 012.70-012.80 S 0.1 4485 Zilla Rehab 75mm @ IRI 9-12 2016 1.16727 1.093Z4025 Jamalpur-Kalibari-Sharisabari Road Km 012.80-016.75 S 3.95 4485 Zilla Overlay 50mm @ IRI 6-9 2016 21.71639 0.794Z4101 Jamalpur-Chechua-Muktagachha Road Km 021.10-021.60 S 0.5 3375 Zilla Rehab 75mm @ IRI 9-12 2016 8.3804 0.271Z4101 Jamalpur-Chechua-Muktagachha Road Km 024.40-025.20 S 0.8 3375 Zilla Overlay 40mm @ Traff >=2000 2016 3.80352 0.063Z4101 Jamalpur-Chechua-Muktagachha Road Km 025.20-027.40 S 2.2 3375 Zilla Rehab 75mm @ IRI 9-12 2016 36.87376 0.258Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 000.00-001.10 S 1.1 1744 Zilla Overlay 40mm @ 1000-2000 2016 3.511464 0Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 001.10-001.20 S 0.1 1744 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.321Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 001.20-004.30 S 3.1 1744 Zilla Overlay 40mm @ 1000-2000 2016 9.659073 0Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 004.30-008.40 S 4.1 1744 Zilla Overlay 40mm @ 1000-2000 2016 12.74009 0Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 008.40-008.60 S 0.2 1744 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 008.60-009.40 S 0.8 1744 Zilla Overlay 40mm @ 1000-2000 2016 2.47908 0Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 009.40-009.50 S 0.1 1744 Zilla Rehab 75mm @ IRI 9-12 2016 1.463577 0.016Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 009.50-040.70 S 31.2 1744 Zilla Overlay 40mm @ 1000-2000 2016 99.86278 0.042Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 040.70-043.80 S 3.1 1744 Zilla Overlay 40mm @ 1000-2000 2016 9.580116 0Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 043.80-046.80 S 3 1744 Zilla Overlay 40mm @ 1000-2000 2016 9.22014 0Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 047.40-047.50 S 0.1 1744 Zilla Full Recon 75mm @ IRI>12 2016 1.573614 0.191Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 049.70-050.40 S 0.7 1744 Zilla Rehab 75mm @ IRI 9-12 2016 7.626163 0.635Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 051.90-052.90 S 1 1744 Zilla Rehab 75mm @ IRI 9-12 2016 12.72025 0.177Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 053.10-054.60 S 1.5 1744 Zilla Rehab 75mm @ IRI 9-12 2016 16.34178 0.572Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 054.70-057.70 S 3 1744 Zilla Full Recon 75mm @ IRI>12 2016 46.9476 0.074Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 003.80-004.00 S 0.2 1531 Zilla Overlay 40mm @ 1000-2000 2016 0.70467 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 004.00-007.10 S 3.1 1531 Zilla Overlay 40mm @ 1000-2000 2016 10.00122 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 007.10-007.90 S 0.8 1531 Zilla Overlay 40mm @ 1000-2000 2016 2.58096 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 007.90-010.80 S 2.9 1531 Zilla Overlay 40mm @ 1000-2000 2016 10.3162 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 011.60-014.50 S 2.9 1531 Zilla Overlay 40mm @ 1000-2000 2016 9.35598 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 014.50-015.30 S 0.8 1531 Zilla Overlay 40mm @ 1000-2000 2016 2.58096 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 015.30-017.90 S 2.6 1531 Zilla Overlay 40mm @ 1000-2000 2016 8.321898 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 017.90-020.80 S 2.9 1531 Zilla Overlay 40mm @ 1000-2000 2016 9.479085 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 023.30-024.10 S 0.8 1531 Zilla Overlay 40mm @ 1000-2000 2016 2.58096 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 024.10-024.30 S 0.2 1531 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 024.30-027.10 S 2.8 1531 Zilla Overlay 40mm @ 1000-2000 2016 9.03336 0Z4615 Bakshiganj-Sanandabari-Char Rajibpur Road Km 027.10-027.40 S 0.3 1531 Zilla Overlay 40mm @ 1000-2000 2016 0.96786 0Z4622 Islampur Sub-Registrar Office-Rishipara Road Km 000.10-001.70 S 1.6 2176 Zilla Overlay 40mm @ IRI>12 2016 7.484784 0Z4622 Islampur Sub-Registrar Office-Rishipara Road Km 001.70-001.80 S 0.1 2176 Zilla Overlay 40mm @ Traff >=2000 2016 0.468648 0.195Z4622 Islampur Sub-Registrar Office-Rishipara Road Km 001.80-002.10 S 0.3 2176 Zilla Overlay 40mm @ IRI>12 2016 1.405944 0

Page 110 of 163

Page 111: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z4622 Islampur Sub-Registrar Office-Rishipara Road Km 002.10-002.91 S 0.81 2176 Zilla Overlay 40mm @ Traff >=2000 2016 3.791362 0Z4801 Bhuanpur-Tarakandi Road Km 017.00-027.10 S 10.1 1716 Zilla Overlay 40mm @ 1000-2000 2016 49.73442 0Z4801 Bhuanpur-Tarakandi Road Km 027.10-028.05 S 0.95 1716 Zilla Rehab 75mm @ IRI 9-12 2016 16.24122 0.306Sub-Total Jamalpur Division 747.832

Kishoreganj DivisionN2 Dhaka-Bhairab-Sylhet-Tamabil Km 068.79-070.10 S 1.31 13210 National Overlay 80mm @ IRI 4-9 2016 18.54269 18.647N2 Dhaka-Bhairab-Sylhet-Tamabil Km 070.14-070.85 L 0.71 13210 National Full Recon 195mm 2016 41.23604 6.393N2 Dhaka-Bhairab-Sylhet-Tamabil Km 070.14-070.85 R 0.71 13210 National Full Recon 195mm 2016 41.23604 6.39N2 Dhaka-Bhairab-Sylhet-Tamabil Km 070.85-071.08 S 0.23 13210 National Overlay 80mm @ IRI 4-9 2016 4.601952 15.826R211 Itakhola-Motkhola-Kotiadi Road Km 035.34-035.54 S 0.2 2484 Regional Rehab 135mm @ IRI 9-12 2016 5.035136 0.932R211 Itakhola-Motkhola-Kotiadi Road Km 035.54-036.44 S 0.9 2484 Regional Overlay 50mm @ IRI 5-7 2016 5.32035 2.355R211 Itakhola-Motkhola-Kotiadi Road Km 036.44-036.54 S 0.1 2484 Regional Rehab 135mm @ IRI 9-12 2016 2.67152 1.015R211 Itakhola-Motkhola-Kotiadi Road Km 036.54-037.64 S 1.1 2484 Regional Overlay 50mm @ IRI 5-7 2016 6.8145 2.295R211 Itakhola-Motkhola-Kotiadi Road Km 037.64-037.74 S 0.1 2484 Regional Full Recon 135mm 2016 3.22376 1.562R211 Itakhola-Motkhola-Kotiadi Road Km 037.74-040.84 S 3.1 2484 Regional DBST @ Traff 2000-4000 2016 8.468642 1.875R211 Itakhola-Motkhola-Kotiadi Road Km 040.84-041.44 S 0.6 2484 Regional Overlay 50mm @ IRI 7-9 2016 3.465 3.233R211 Itakhola-Motkhola-Kotiadi Road Km 041.44-041.54 S 0.1 2484 Regional DBST @ Traff 2000-4000 2016 0.2717 3.316R211 Itakhola-Motkhola-Kotiadi Road Km 041.54-041.74 S 0.2 2484 Regional Rehab 135mm @ IRI 9-12 2016 4.9808 1.438R211 Itakhola-Motkhola-Kotiadi Road Km 041.74-044.54 S 2.8 2484 Regional Overlay 50mm @ IRI 5-7 2016 16.7286 2.982R211 Itakhola-Motkhola-Kotiadi Road Km 044.54-045.11 S 0.57 2484 Regional DBST @ Traff 2000-4000 2016 1.582158 3.031R212 Akdaria -Shekher Bazar-Agarpur Road Km 018.31-021.62 S 3.3 1682 Regional Overlay 50mm @ IRI 7-9 2016 19.34056 0.625R212 Akdaria -Shekher Bazar-Agarpur Road Km 021.62-023.41 S 1.79 1682 Regional Overlay 50mm @ IRI 7-9 2016 10.49221 0.603R360 Mymensingh -Kishoreganj -Bhairab Km 000.00-000.06 L 0.06 7720 Regional Overlay 60mm @ IRI 5.5-9 2016 1.20096 1.805R360 Mymensingh -Kishoreganj -Bhairab Km 000.00-000.06 R 0.06 7720 Regional Overlay 60mm @ IRI 5.5-9 2016 1.23849 1.727R360 Mymensingh -Kishoreganj -Bhairab Km 000.06-001.50 S 1.44 7720 Regional Overlay 60mm @ IRI 5.5-9 2016 11.65532 7.619R360 Mymensingh -Kishoreganj -Bhairab Km 001.50-002.90 S 1.4 7720 Regional Full Recon 150mm @ IRI 12 2016 49.27216 4.09R360 Mymensingh -Kishoreganj -Bhairab Km 033.60-033.80 S 0.2 3362 Regional Rehab 135mm @ IRI 9-12 2016 5.089472 2.411R360 Mymensingh -Kishoreganj -Bhairab Km 046.84-047.30 S 0.46 3362 Regional DBST @ Traff 2000-4000 2016 1.281634 2.943R360 Mymensingh -Kishoreganj -Bhairab Km 047.48-048.37 S 0.89 3362 Regional Overlay 50mm @ IRI 5-7 2016 5.27058 4.614R360 Mymensingh -Kishoreganj -Bhairab Km 049.40-050.70 S 1.3 3362 Regional DBST @ 25% Crk 2016 3.62758 2.797R360 Mymensingh -Kishoreganj -Bhairab Km 055.90-056.50 S 0.6 3362 Regional Overlay 50mm @ IRI 7-9 2016 3.5658 4.193R360 Mymensingh -Kishoreganj -Bhairab Km 059.40-059.50 L 0.1 3362 Regional DBST @ 25% Crk 2016 0.30628 2.146R360 Mymensingh -Kishoreganj -Bhairab Km 059.40-059.50 R 0.1 3362 Regional DBST @ 25% Crk 2016 0.31122 2.094R360 Mymensingh -Kishoreganj -Bhairab Km 062.43-063.90 S 1.47 3362 Regional DBST @ Traff 2000-4000 2016 4.038524 3.804R360 Mymensingh -Kishoreganj -Bhairab Km 063.99-065.30 S 1.31 3362 Regional DBST @ 25% Crk 2016 3.607321 4.402R360 Mymensingh -Kishoreganj -Bhairab Km 067.03-068.03 S 1 3362 Regional DBST @ Traff 2000-4000 2016 2.753763 3.311R360 Mymensingh -Kishoreganj -Bhairab Km 070.03-071.19 S 1.16 3362 Regional DBST @ 25% Crk 2016 3.197958 3.898R360 Mymensingh -Kishoreganj -Bhairab Km 075.09-078.43 S 3.35 3362 Regional DBST @ 25% Crk 2016 9.272904 3.319R360 Mymensingh -Kishoreganj -Bhairab Km 079.23-080.24 S 1.01 3362 Regional DBST @ Traff 2000-4000 2016 2.790739 3.366R360 Mymensingh -Kishoreganj -Bhairab Km 083.23-084.27 S 1.04 3362 Regional DBST @ Traff 2000-4000 2016 2.873879 3.324R360 Mymensingh -Kishoreganj -Bhairab Km 087.34-090.26 S 2.92 3362 Regional DBST @ 25% Crk 2016 8.040769 3.522R360 Mymensingh -Kishoreganj -Bhairab Km 093.36-094.25 S 0.89 3362 Regional DBST @ 25% Crk 2016 2.450003 4.566R360 Mymensingh -Kishoreganj -Bhairab Km 095.36-097.10 S 1.74 3362 Regional DBST @ Traff 2000-4000 2016 4.7819 3.162R360 Mymensingh -Kishoreganj -Bhairab Km 097.26-099.20 S 1.94 3362 Regional DBST @ Traff 2000-4000 2016 5.372349 3.312R360 Mymensingh -Kishoreganj -Bhairab Km 099.28-100.27 S 1 3362 Regional DBST @ 25% Crk 2016 2.752568 4.235

Page 111 of 163

Page 112: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R360 Mymensingh -Kishoreganj -Bhairab Km 101.26-103.40 S 2.14 3362 Regional DBST @ Traff 2000-4000 2016 5.86214 3.81R360 Mymensingh -Kishoreganj -Bhairab Km 103.41-105.70 S 2.29 3362 Regional DBST @ 25% Crk 2016 6.326756 4.337R360 Mymensingh -Kishoreganj -Bhairab Km 106.52-108.35 S 1.83 3362 Regional DBST @ 25% Crk 2016 5.079866 3.262R360 Mymensingh -Kishoreganj -Bhairab Km 109.45-110.37 S 0.92 3362 Regional DBST @ 25% Crk 2016 2.546861 3.747R360 Mymensingh -Kishoreganj -Bhairab Km 111.58-112.53 S 0.94 3362 Regional DBST @ 25% Crk 2016 2.611481 3.326R360 Mymensingh -Kishoreganj -Bhairab Km 113.44-116.39 S 2.94 3362 Regional DBST @ 25% Crk 2016 10.47122 1.909Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 014.92-020.60 S 5.68 2373 Zilla Full Recon 75mm @ IRI>12 2016 88.37807 1.49Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 020.60-021.10 S 0.5 2373 Zilla Overlay 40mm @ Traff >=2000 2016 1.53669 1.864Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 021.10-023.10 S 2 2373 Zilla Full Recon 75mm @ IRI>12 2016 31.6855 1.705Z3601 Katiadi-Bajitpur-Astogram Road Km 000.30-004.50 S 4.2 1460 Zilla Rehab 75mm @ IRI 9-12 2016 45.39067 0.26Z3601 Katiadi-Bajitpur-Astogram Road Km 008.20-008.30 S 0.1 1460 Zilla Overlay 40mm @ IRI>12 2016 0.417708 0Z3601 Katiadi-Bajitpur-Astogram Road Km 014.90-015.50 S 0.6 1460 Zilla Rehab 75mm @ IRI 9-12 2016 6.500796 0.435Z3601 Katiadi-Bajitpur-Astogram Road Km 016.50-016.70 S 0.2 1460 Zilla Overlay 40mm @ IRI>12 2016 0.61128 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 000.00-000.10 S 0.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.360825 0.437Z3602 Kishoreganj-Nikli-Moharkona Road Km 000.10-002.20 S 2.1 1959 Zilla Overlay 40mm @ IRI>12 2016 8.112195 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 002.20-002.30 S 0.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.494772 0.153Z3602 Kishoreganj-Nikli-Moharkona Road Km 002.30-002.50 S 0.2 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.979746 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 002.50-002.90 S 0.4 1959 Zilla Overlay 40mm @ 1000-2000 2016 1.959492 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 002.90-003.10 S 0.2 1959 Zilla Full Recon 75mm @ IRI>12 2016 3.295026 0.168Z3602 Kishoreganj-Nikli-Moharkona Road Km 003.10-003.30 S 0.2 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.643542 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 003.30-004.20 S 0.9 1959 Zilla Overlay 40mm @ 1000-2000 2016 2.857734 0.091Z3602 Kishoreganj-Nikli-Moharkona Road Km 004.20-004.60 S 0.4 1959 Zilla Full Recon 75mm @ IRI>12 2016 6.43356 0.064Z3602 Kishoreganj-Nikli-Moharkona Road Km 004.60-004.70 S 0.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 004.70-005.20 S 0.5 1959 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.037Z3602 Kishoreganj-Nikli-Moharkona Road Km 005.20-005.60 S 0.4 1959 Zilla Overlay 40mm @ 1000-2000 2016 1.266708 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 005.60-006.30 S 0.7 1959 Zilla Overlay 40mm @ 1000-2000 2016 2.246454 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 006.30-006.50 S 0.2 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.641844 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 006.50-007.10 S 0.6 1959 Zilla Rehab 75mm @ IRI 9-12 2016 6.799437 0.242Z3602 Kishoreganj-Nikli-Moharkona Road Km 007.10-007.30 S 0.2 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.641844 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 007.30-007.70 S 0.4 1959 Zilla Overlay 40mm @ IRI>12 2016 1.283688 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 007.70-007.90 S 0.2 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.641844 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 007.90-008.80 S 0.9 1959 Zilla Overlay 40mm @ 1000-2000 2016 2.895939 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 008.80-009.80 S 1 1959 Zilla Overlay 40mm @ 1000-2000 2016 3.2262 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 009.80-010.50 S 0.7 1959 Zilla Rehab 75mm @ IRI 9-12 2016 7.919477 0.175Z3602 Kishoreganj-Nikli-Moharkona Road Km 010.50-010.60 S 0.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.320922 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 010.60-011.10 S 0.5 1959 Zilla Overlay 40mm @ IRI>12 2016 1.60461 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 011.30-012.40 S 1.1 1959 Zilla Rehab 75mm @ IRI 9-12 2016 12.52211 0.161Z3602 Kishoreganj-Nikli-Moharkona Road Km 012.40-012.50 S 0.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 012.50-014.00 S 1.5 1959 Zilla Rehab 75mm @ IRI 9-12 2016 16.97031 0.187Z3602 Kishoreganj-Nikli-Moharkona Road Km 014.00-014.10 S 0.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.320922 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 014.10-014.90 S 0.8 1959 Zilla Overlay 40mm @ IRI>12 2016 2.567376 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 014.90-015.20 S 0.3 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.962766 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 015.20-015.80 S 0.6 1959 Zilla Full Recon 75mm @ IRI>12 2016 9.858996 0.165Z3602 Kishoreganj-Nikli-Moharkona Road Km 015.80-016.10 S 0.3 1959 Zilla Overlay 40mm @ 1000-2000 2016 1.349299 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 016.10-017.40 S 1.3 1959 Zilla Overlay 40mm @ IRI>12 2016 4.481022 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 017.40-017.50 S 0.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.326016 0

Page 112 of 163

Page 113: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z3602 Kishoreganj-Nikli-Moharkona Road Km 017.50-018.50 S 1 1959 Zilla Overlay 40mm @ IRI>12 2016 3.28563 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 018.50-019.60 S 1.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 3.530142 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 019.60-019.80 S 0.2 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.641844 0.165Z3602 Kishoreganj-Nikli-Moharkona Road Km 019.80-019.90 S 0.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.320922 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 019.90-022.11 S 2.2 1959 Zilla Overlay 40mm @ 1000-2000 2016 7.100866 0.051Z3602 Kishoreganj-Nikli-Moharkona Road Km 022.11-022.21 S 0.1 1959 Zilla Overlay 40mm @ 1000-2000 2016 0.307338 0Z3602 Kishoreganj-Nikli-Moharkona Road Km 022.21-024.41 S 2.2 1959 Zilla Overlay 40mm @ 1000-2000 2016 6.780114 0.028Z3602 Kishoreganj-Nikli-Moharkona Road Km 026.61-026.71 S 0.1 1959 Zilla Full Recon 75mm @ IRI>12 2016 1.547532 0.397Z3603 Kishoreganj-Karimganj-Mithamain Road Km 000.50-001.10 S 0.6 7510 Zilla Rehab 75mm @ IRI 9-12 2016 10.05648 2.575Z3603 Kishoreganj-Karimganj-Mithamain Road Km 001.10-001.60 S 0.5 7510 Zilla Overlay 50mm @ Cracking >25%2016 2.93475 2.882Z3603 Kishoreganj-Karimganj-Mithamain Road Km 001.60-001.80 S 0.2 7510 Zilla Rehab 75mm @ IRI 9-12 2016 3.346174 2.92Z3603 Kishoreganj-Karimganj-Mithamain Road Km 001.80-008.40 S 6.6 7510 Zilla Overlay 50mm @ Cracking >25%2016 38.81976 2.745Z3603 Kishoreganj-Karimganj-Mithamain Road Km 008.40-008.70 S 0.3 7510 Zilla Rehab 75mm @ IRI 9-12 2016 5.037219 2.728Z3603 Kishoreganj-Karimganj-Mithamain Road Km 008.70-009.60 S 0.9 7510 Zilla Overlay 50mm @ IRI 6-9 2016 5.292 3.71Z3603 Kishoreganj-Karimganj-Mithamain Road Km 009.60-010.00 S 0.4 7510 Zilla Overlay 50mm @ IRI 6-9 2016 2.352 5.228Z3603 Kishoreganj-Karimganj-Mithamain Road Km 010.00-010.20 S 0.2 7510 Zilla Overlay 50mm @ IRI 6-9 2016 1.176 4.44Z3603 Kishoreganj-Karimganj-Mithamain Road Km 010.20-010.60 S 0.4 7510 Zilla Full Recon 75mm @ IRI>12 2016 9.73728 1.859Z3603 Kishoreganj-Karimganj-Mithamain Road Km 010.60-012.00 S 1.4 7510 Zilla Overlay 50mm @ IRI 6-9 2016 8.23788 5.084Z3603 Kishoreganj-Karimganj-Mithamain Road Km 012.00-012.30 S 0.3 7510 Zilla Overlay 50mm @ IRI 6-9 2016 1.764 4.519Z3603 Kishoreganj-Karimganj-Mithamain Road Km 012.30-012.60 S 0.3 7510 Zilla Full Recon 75mm @ IRI>12 2016 7.30296 2.009Z3603 Kishoreganj-Karimganj-Mithamain Road Km 012.60-012.90 S 0.3 7510 Zilla Overlay 50mm @ IRI 6-9 2016 1.76715 4.918Z3603 Kishoreganj-Karimganj-Mithamain Road Km 012.90-013.60 S 0.7 7510 Zilla Rehab 75mm @ IRI 9-12 2016 11.75351 2.511Z3603 Kishoreganj-Karimganj-Mithamain Road Km 013.60-013.90 S 0.3 7510 Zilla Overlay 50mm @ IRI 6-9 2016 1.76085 3.855Z3603 Kishoreganj-Karimganj-Mithamain Road Km 013.90-014.90 S 1 7510 Zilla Rehab 75mm @ IRI 9-12 2016 16.61115 2.733Z3603 Kishoreganj-Karimganj-Mithamain Road Km 014.90-015.10 S 0.2 7510 Zilla Overlay 50mm @ Cracking >25%2016 1.1655 2.556Z3603 Kishoreganj-Karimganj-Mithamain Road Km 015.10-016.70 S 1.6 7510 Zilla Overlay 50mm @ IRI 6-9 2016 9.245775 5.046Z3603 Kishoreganj-Karimganj-Mithamain Road Km 016.70-019.80 S 3.09 7510 Zilla Overlay 50mm @ Cracking >25%2016 17.69397 2.33Z3604 Kishoreganj-Hossainpur Road Km 014.50-014.81 S 0.31 4232 Zilla Overlay 50mm @ IRI 6-9 2016 1.81692 0.906Z3607 Nandail Chowrasta-Tarail Road Km 000.00-004.50 S 4.5 1634 Zilla Overlay 40mm @ 1000-2000 2016 21.47598 0Z3607 Nandail Chowrasta-Tarail Road Km 004.50-004.60 S 0.1 1634 Zilla Overlay 40mm @ IRI>12 2016 0.471195 0Z3607 Nandail Chowrasta-Tarail Road Km 004.60-016.09 S 11.49 1634 Zilla Overlay 40mm @ 1000-2000 2016 53.63388 0Z3608 Nandail-Atharabari-Kendua Road Km 000.60-003.70 S 3.1 2004 Zilla Rehab 75mm @ IRI 9-12 2016 48.26272 0.385Z3608 Nandail-Atharabari-Kendua Road Km 003.70-005.50 S 1.8 2004 Zilla Rehab 75mm @ IRI 9-12 2016 26.99087 0.117Z3608 Nandail-Atharabari-Kendua Road Km 005.50-009.12 S 3.62 2004 Zilla Overlay 40mm @ Traff >=2000 2016 12.67282 0Z3609 Bojra-Kuliarchar Road Km 003.10-003.30 S 0.2 1492 Zilla Overlay 40mm @ 1000-2000 2016 0.612978 0Z3609 Bojra-Kuliarchar Road Km 003.30-003.50 S 0.2 1492 Zilla Overlay 40mm @ IRI>12 2016 0.612978 0Z3609 Bojra-Kuliarchar Road Km 003.50-003.70 S 0.2 1492 Zilla Overlay 40mm @ 1000-2000 2016 0.612978 0Z3615 Trisal-Anandaganj-Gouripur Road Km 003.10-008.50 S 5.4 1178 Zilla Overlay 40mm @ 1000-2000 2016 16.92031 0Z3615 Trisal-Anandaganj-Gouripur Road Km 008.50-008.60 S 0.1 1178 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z3615 Trisal-Anandaganj-Gouripur Road Km 011.60-011.80 S 0.2 1178 Zilla Overlay 40mm @ 1000-2000 2016 0.61977 0Z3615 Trisal-Anandaganj-Gouripur Road Km 011.80-013.90 S 2.1 1178 Zilla Overlay 40mm @ 1000-2000 2016 6.436268 0Z3615 Trisal-Anandaganj-Gouripur Road Km 013.90-014.00 S 0.1 1178 Zilla Overlay 40mm @ 1000-2000 2016 0.30564 0Z3615 Trisal-Anandaganj-Gouripur Road Km 014.00-017.40 S 3.4 1178 Zilla Overlay 40mm @ 1000-2000 2016 10.39482 0Z3615 Trisal-Anandaganj-Gouripur Road Km 017.80-017.90 S 0.1 1178 Zilla Overlay 40mm @ IRI>12 2016 0.30564 0Z3615 Trisal-Anandaganj-Gouripur Road Km 017.90-018.60 S 0.7 1178 Zilla Overlay 40mm @ 1000-2000 2016 2.13948 0Z3615 Trisal-Anandaganj-Gouripur Road Km 018.60-019.20 S 0.6 1178 Zilla Overlay 40mm @ IRI>12 2016 1.83384 0

Page 113 of 163

Page 114: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z3615 Trisal-Anandaganj-Gouripur Road Km 019.20-019.30 S 0.1 1178 Zilla Overlay 40mm @ 1000-2000 2016 0.30564 0Z3615 Trisal-Anandaganj-Gouripur Road Km 019.30-019.90 S 0.6 1178 Zilla Overlay 40mm @ 1000-2000 2016 1.83384 0Z3615 Trisal-Anandaganj-Gouripur Road Km 019.90-021.74 S 1.84 1178 Zilla Overlay 40mm @ 1000-2000 2016 5.620719 0Z3616 Pakundia-Kishoreganj Road Km 000.00-000.20 S 0.2 1202 Zilla Overlay 40mm @ 1000-2000 2016 0.621468 0Z3616 Pakundia-Kishoreganj Road Km 000.20-000.90 S 0.7 1202 Zilla Overlay 40mm @ IRI>12 2016 2.175138 0Z3616 Pakundia-Kishoreganj Road Km 000.90-001.00 S 0.1 1202 Zilla Overlay 40mm @ 1000-2000 2016 0.310734 0Z3616 Pakundia-Kishoreganj Road Km 001.00-001.50 S 0.5 1202 Zilla Overlay 40mm @ IRI>12 2016 1.55367 0Z3616 Pakundia-Kishoreganj Road Km 001.50-001.70 S 0.2 1202 Zilla Overlay 40mm @ 1000-2000 2016 0.621468 0Z3616 Pakundia-Kishoreganj Road Km 001.70-002.20 S 0.5 1202 Zilla Overlay 40mm @ IRI>12 2016 1.557915 0Z3616 Pakundia-Kishoreganj Road Km 002.20-002.30 S 0.1 1202 Zilla Overlay 40mm @ 1000-2000 2016 0.317271 0Z3616 Pakundia-Kishoreganj Road Km 002.30-005.00 S 2.7 1202 Zilla Overlay 40mm @ IRI>12 2016 8.619048 0Z3616 Pakundia-Kishoreganj Road Km 005.90-006.80 S 0.9 1202 Zilla Overlay 40mm @ 1000-2000 2016 4.217832 0Z3617 Pakundia - Toke Bazar Road Km 003.70-006.80 S 3.1 7510 Zilla Rehab 75mm @ IRI 9-12 2016 51.03065 2.61Z3617 Pakundia - Toke Bazar Road Km 006.80-012.00 S 5.2 7510 Zilla Full Recon 75mm @ IRI>12 2016 124.1698 1.501Sub-Total Kishoreganj Division 1237.803

Mymensingh DivisionN303 Churkhai Bazar Link Road Km 000.00-001.01 S 1.01 9653 National Overlay 60mm @ IRI 7-9 2016 6.942424 15.442N309 Mymensingh Town By-Pass Road Km 000.00-003.16 S 3.16 8665 National Overlay 50mm @ IRI 5-7 2016 24.12186 16.014N401 Madhupur-Mymensingh Road Km 016.90-017.20 S 0.3 4513 National Rehab 150mm @ IRI 9-12 2016 8.41869 3.388N401 Madhupur-Mymensingh Road Km 017.20-032.10 S 14.9 4513 National Overlay 50mm @ IRI 5-9 2016 91.0539 6.746N401 Madhupur-Mymensingh Road Km 032.10-032.20 S 0.1 4513 National Rehab 150mm @ IRI 9-12 2016 2.7531 3.744N401 Madhupur-Mymensingh Road Km 032.20-036.40 S 4.2 4513 National Overlay 50mm @ IRI 5-9 2016 25.137 6.857N401 Madhupur-Mymensingh Road Km 036.41-042.60 S 6.2 4513 National Overlay 50mm @ IRI 5-9 2016 38.05279 7.301N401 Madhupur-Mymensingh Road Km 042.60-043.30 S 0.7 4513 National Overlay 50mm @ IRI 5-9 2016 4.263 6.944R314 Gafargaon-Bormi-Mawna Road Km 021.41-023.51 S 2.1 2162 Regional Overlay 50mm @ IRI 7-9 2016 8.180549 3.874R314 Gafargaon-Bormi-Mawna Road Km 023.59-025.41 S 1.82 2162 Regional Overlay 50mm @ IRI 7-9 2016 7.097601 4.189R314 Gafargaon-Bormi-Mawna Road Km 025.41-025.51 S 0.1 2162 Regional Rehab 135mm @ IRI 9-12 2016 1.679888 1.883R314 Gafargaon-Bormi-Mawna Road Km 025.51-025.81 S 0.3 2162 Regional Overlay 50mm @ IRI 5-7 2016 1.172545 4.393R314 Gafargaon-Bormi-Mawna Road Km 025.81-026.41 S 0.6 2162 Regional Rehab 135mm @ IRI 9-12 2016 9.970656 1.324R314 Gafargaon-Bormi-Mawna Road Km 026.49-027.11 S 0.62 2162 Regional Overlay 50mm @ IRI 7-9 2016 2.394189 4.292R314 Gafargaon-Bormi-Mawna Road Km 027.11-027.71 S 0.6 2162 Regional Rehab 135mm @ IRI 9-12 2016 9.861984 1.534R314 Gafargaon-Bormi-Mawna Road Km 027.71-030.82 S 3.1 2162 Regional DBST @ Traff 2000-4000 2016 5.668008 3.491R314 Gafargaon-Bormi-Mawna Road Km 030.83-031.52 S 0.68 2162 Regional Full Recon 135mm 2016 20.45088 1.094R314 Gafargaon-Bormi-Mawna Road Km 031.52-031.62 S 0.1 2162 Regional Overlay 50mm @ IRI 5-7 2016 0.5754 3.861R314 Gafargaon-Bormi-Mawna Road Km 031.62-032.12 S 0.5 2162 Regional Rehab 135mm @ IRI 9-12 2016 12.40672 1.165R314 Gafargaon-Bormi-Mawna Road Km 032.12-032.72 S 0.6 2162 Regional DBST @ Traff 2000-4000 2016 1.624272 2.556R314 Gafargaon-Bormi-Mawna Road Km 032.72-033.22 S 0.5 2162 Regional Full Recon 135mm 2016 14.97136 1.255R314 Gafargaon-Bormi-Mawna Road Km 033.54-036.62 S 3.08 2162 Regional Full Recon 135mm 2016 91.35245 0.769R314 Gafargaon-Bormi-Mawna Road Km 036.62-037.22 S 0.59 2162 Regional Overlay 50mm @ IRI 7-9 2016 3.374763 3.529R314 Gafargaon-Bormi-Mawna Road Km 037.22-037.32 S 0.1 2162 Regional Full Recon 135mm 2016 2.961488 1.338R314 Gafargaon-Bormi-Mawna Road Km 037.52-039.12 S 1.6 2162 Regional Rehab 135mm @ IRI 9-12 2016 39.91885 0.691R314 Gafargaon-Bormi-Mawna Road Km 039.12-040.32 S 1.2 2162 Regional Overlay 50mm @ IRI 7-9 2016 6.948385 3.02R314 Gafargaon-Bormi-Mawna Road Km 040.32-040.52 S 0.2 2162 Regional Rehab 135mm @ IRI 9-12 2016 4.998912 0.957R314 Gafargaon-Bormi-Mawna Road Km 040.52-042.82 S 2.3 2162 Regional Rehab 135mm @ IRI 9-12 2016 57.4125 0.806R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 003.60-006.40 S 2.79 12647 Regional Overlay 60mm @ IRI 5.5-9 2016 22.02035 17.159

Page 114 of 163

Page 115: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 006.45-006.52 L 0.07 3557 Regional Overlay 50mm @ IRI 7-9 2016 0.49245 6.509R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 006.45-006.52 R 0.07 3557 Regional Overlay 50mm @ IRI 7-9 2016 0.49245 6.509R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 006.52-012.80 S 6.28 3557 Regional Overlay 50mm @ IRI 5-7 2016 31.0066 8.425R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 012.80-014.40 S 1.6 3499 Regional Overlay 50mm @ IRI 7-9 2016 6.3168 5.222R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 014.40-014.60 S 0.2 3499 Regional Rehab 135mm @ IRI 9-12 2016 3.405056 2.487R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 014.60-017.70 S 3.1 3499 Regional Rehab 135mm @ IRI 9-12 2016 52.37415 2.055R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 017.70-021.23 S 3.53 3557 Regional Overlay 50mm @ IRI 7-9 2016 22.26345 7.939R371 Mymensingh-Phulpur-Nakla-Sherpur Km 000.00-000.60 L 0.6 4982 Regional Overlay 60mm @ IRI 7-9 2016 5.32926 8.587R371 Mymensingh-Phulpur-Nakla-Sherpur Km 000.00-000.60 R 0.6 4982 Regional Overlay 60mm @ IRI 7-9 2016 4.8789 9.466R371 Mymensingh-Phulpur-Nakla-Sherpur Km 000.60-001.20 S 0.6 4982 Regional Overlay 60mm @ IRI 7-9 2016 4.443552 10.331R371 Mymensingh-Phulpur-Nakla-Sherpur Km 001.52-005.10 S 3.59 4982 Regional DBST @ Traff 4000-6000 2016 10.48426 8.754R371 Mymensingh-Phulpur-Nakla-Sherpur Km 005.10-006.20 S 1.1 4982 Regional Rehab 150mm @ IRI 9-12 2016 31.878 4.076R371 Mymensingh-Phulpur-Nakla-Sherpur Km 006.20-008.20 S 2 4982 Regional DBST @ Traff 4000-6000 2016 5.88848 8.585R371 Mymensingh-Phulpur-Nakla-Sherpur Km 008.20-008.50 S 0.3 4982 Regional Rehab 150mm @ IRI 9-12 2016 8.5491 4.387R371 Mymensingh-Phulpur-Nakla-Sherpur Km 008.50-009.00 S 0.5 4982 Regional Overlay 60mm @ IRI 7-9 2016 3.69045 10.346R371 Mymensingh-Phulpur-Nakla-Sherpur Km 009.00-009.40 S 0.4 4982 Regional Overlay 60mm @ IRI 7-9 2016 2.95236 10.609R371 Mymensingh-Phulpur-Nakla-Sherpur Km 009.40-019.50 S 10.1 4982 Regional DBST @ Traff 4000-6000 2016 30.18587 8.177R371 Mymensingh-Phulpur-Nakla-Sherpur Km 019.54-023.99 S 4.45 4982 Regional DBST @ Traff 4000-6000 2016 13.51273 8.079R371 Mymensingh-Phulpur-Nakla-Sherpur Km 023.99-024.08 L 0.09 4982 Regional DBST @ Traff 4000-6000 2016 0.26676 8.941R371 Mymensingh-Phulpur-Nakla-Sherpur Km 023.99-024.08 R 0.09 4982 Regional DBST @ Traff 4000-6000 2016 0.275652 8.257R371 Mymensingh-Phulpur-Nakla-Sherpur Km 024.08-027.00 S 2.92 4323 Regional Overlay 50mm @ IRI 5-7 2016 18.79458 9.329R371 Mymensingh-Phulpur-Nakla-Sherpur Km 027.03-027.20 S 0.17 5788 Regional Overlay 60mm @ IRI 5.5-9 2016 1.245996 16.809R371 Mymensingh-Phulpur-Nakla-Sherpur Km 027.20-027.30 S 0.1 5788 Regional Full Recon 150mm @ IRI 12 2016 3.6408 6.599R371 Mymensingh-Phulpur-Nakla-Sherpur Km 027.30-029.10 S 1.8 5788 Regional Overlay 60mm @ IRI 5.5-9 2016 13.42073 16.507R371 Mymensingh-Phulpur-Nakla-Sherpur Km 029.10-029.30 S 0.2 5788 Regional Rehab 150mm @ IRI 9-12 2016 5.7477 6.989R371 Mymensingh-Phulpur-Nakla-Sherpur Km 029.30-030.50 S 1.2 5788 Regional Overlay 60mm @ IRI 5.5-9 2016 8.947153 18.577R371 Mymensingh-Phulpur-Nakla-Sherpur Km 030.50-030.60 S 0.1 5788 Regional Rehab 150mm @ IRI 9-12 2016 2.898 7.978R371 Mymensingh-Phulpur-Nakla-Sherpur Km 030.60-033.60 S 3 5788 Regional Overlay 60mm @ IRI 5.5-9 2016 22.518 16.995R371 Mymensingh-Phulpur-Nakla-Sherpur Km 033.60-033.70 S 0.1 5788 Regional Rehab 150mm @ IRI 9-12 2016 2.87385 8.045R371 Mymensingh-Phulpur-Nakla-Sherpur Km 033.70-034.77 S 1.07 5788 Regional Overlay 60mm @ IRI 5.5-9 2016 7.927275 16.609R372 Shambhuganj-Puratan Ferry Ghat Road Km 000.00-001.92 S 1.92 6533 Regional Full Recon 150mm @ IRI 12 2016 63.49555 2.818Z3030 Bhaluka-Shakhipur Road Km 000.00-003.00 S 3 2248 Zilla Overlay 40mm @ Traff >=2000 2016 9.656348 0.041Z3030 Bhaluka-Shakhipur Road Km 003.00-003.50 S 0.5 2248 Zilla Overlay 40mm @ Traff >=2000 2016 1.59612 0.111Z3030 Bhaluka-Shakhipur Road Km 003.50-003.60 S 0.1 2248 Zilla Full Recon 75mm @ IRI>12 2016 1.630125 0.337Z3030 Bhaluka-Shakhipur Road Km 007.00-007.20 S 0.2 2248 Zilla Overlay 40mm @ Traff >=2000 2016 0.641844 0Z3030 Bhaluka-Shakhipur Road Km 014.60-016.50 S 1.91 2248 Zilla Overlay 40mm @ Traff >=2000 2016 5.180937 0.682Z3030 Bhaluka-Shakhipur Road Km 016.50-016.90 S 0.4 2248 Zilla Overlay 40mm @ Traff >=2000 2016 1.08672 0.474Z3031 Bhaluka-Gafargaon Road Km 000.00-003.10 S 3.1 6392 Zilla Rehab 75mm @ IRI 9-12 2016 43.34364 3.254Z3031 Bhaluka-Gafargaon Road Km 003.10-003.80 S 0.7 4369 Zilla Full Recon 75mm @ IRI>12 2016 11.2283 1.014Z3031 Bhaluka-Gafargaon Road Km 003.80-004.00 S 0.2 4369 Zilla Overlay 50mm @ IRI 6-9 2016 0.8064 2.917Z3031 Bhaluka-Gafargaon Road Km 004.00-006.90 S 2.9 6392 Zilla Rehab 75mm @ IRI 9-12 2016 38.55116 3.312Z3031 Bhaluka-Gafargaon Road Km 006.90-007.10 S 0.2 4369 Zilla Overlay 40mm @ Traff >=2000 2016 0.614676 0.938Z3031 Bhaluka-Gafargaon Road Km 007.10-007.70 S 0.6 4369 Zilla Full Recon 75mm @ IRI>12 2016 9.441684 1.222Z3031 Bhaluka-Gafargaon Road Km 007.70-007.90 S 0.2 4369 Zilla Overlay 50mm @ IRI 6-9 2016 0.7602 1.736Z3031 Bhaluka-Gafargaon Road Km 007.90-008.60 S 0.7 4369 Zilla Full Recon 75mm @ IRI>12 2016 11.77602 0.891Z3031 Bhaluka-Gafargaon Road Km 008.60-009.50 S 0.9 4369 Zilla Overlay 50mm @ IRI 6-9 2016 3.4398 1.944

Page 115 of 163

Page 116: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z3031 Bhaluka-Gafargaon Road Km 009.50-011.60 S 2.1 4369 Zilla Rehab 75mm @ IRI 9-12 2016 24.20993 1.455Z3031 Bhaluka-Gafargaon Road Km 011.60-012.00 S 0.4 6392 Zilla Overlay 50mm @ IRI 6-9 2016 1.995 3.816Z3031 Bhaluka-Gafargaon Road Km 012.00-012.30 S 0.3 4369 Zilla Full Recon 75mm @ IRI>12 2016 4.720842 1.124Z3031 Bhaluka-Gafargaon Road Km 012.30-012.60 S 0.3 4369 Zilla Rehab 75mm @ IRI 9-12 2016 3.250398 1.462Z3031 Bhaluka-Gafargaon Road Km 012.60-015.50 S 2.9 4369 Zilla Rehab 75mm @ IRI 9-12 2016 37.4963 1.194Z3031 Bhaluka-Gafargaon Road Km 015.50-016.10 S 0.6 4369 Zilla Rehab 75mm @ IRI 9-12 2016 6.835413 1.666Z3031 Bhaluka-Gafargaon Road Km 016.10-016.90 S 0.8 6392 Zilla Full Recon 75mm @ IRI>12 2016 17.28367 1.801Z3032 Fulbaria-Ashim-Sangkibanga-Bagar Bazar Road Km 006.10-010.20 S 4.1 3082 Zilla Overlay 40mm @ Traff >=2000 2016 12.86991 0.541Z3033 Mymensingh-Gafargaon-Toke Road Km 000.00-004.10 S 4.1 7124 Zilla Overlay 40mm @ Traff >=2000 2016 21.76093 0.043Z3033 Mymensingh-Gafargaon-Toke Road Km 004.10-004.20 S 0.1 7124 Zilla Rehab 75mm @ IRI 9-12 2016 1.628192 2.366Z3033 Mymensingh-Gafargaon-Toke Road Km 004.60-005.00 S 0.4 4941 Zilla Overlay 50mm @ IRI 6-9 2016 1.5372 1.297Z3033 Mymensingh-Gafargaon-Toke Road Km 005.60-005.70 S 0.1 4941 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 1.47Z3033 Mymensingh-Gafargaon-Toke Road Km 005.70-006.30 S 0.6 4941 Zilla Overlay 50mm @ IRI 6-9 2016 2.3058 0.807Z3033 Mymensingh-Gafargaon-Toke Road Km 006.30-008.30 S 2 4941 Zilla Rehab 75mm @ IRI 9-12 2016 21.9796 1.114Z3033 Mymensingh-Gafargaon-Toke Road Km 008.30-008.40 S 0.1 4941 Zilla Overlay 50mm @ Cracking >25%2016 0.3864 0.213Z3033 Mymensingh-Gafargaon-Toke Road Km 008.40-011.40 S 3 4941 Zilla Rehab 75mm @ IRI 9-12 2016 32.96391 1.047Z3033 Mymensingh-Gafargaon-Toke Road Km 011.40-011.50 S 0.1 4941 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 1.748Z3033 Mymensingh-Gafargaon-Toke Road Km 011.50-011.90 S 0.4 4941 Zilla Overlay 50mm @ IRI 6-9 2016 1.5372 1.634Z3033 Mymensingh-Gafargaon-Toke Road Km 011.90-012.10 S 0.2 4941 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 1.413Z3033 Mymensingh-Gafargaon-Toke Road Km 012.10-012.40 S 0.3 4941 Zilla Overlay 40mm @ Traff >=2000 2016 0.932202 0Z3033 Mymensingh-Gafargaon-Toke Road Km 012.40-017.20 S 4.8 4941 Zilla Rehab 75mm @ IRI 9-12 2016 52.73567 1.124Z3033 Mymensingh-Gafargaon-Toke Road Km 018.80-019.50 S 0.7 4941 Zilla Rehab 75mm @ IRI 9-12 2016 7.751869 1.209Z3033 Mymensingh-Gafargaon-Toke Road Km 019.50-019.70 S 0.2 4941 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0.073Z3033 Mymensingh-Gafargaon-Toke Road Km 019.70-019.90 S 0.2 4941 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 1.004Z3033 Mymensingh-Gafargaon-Toke Road Km 019.90-021.11 S 1.2 4941 Zilla Overlay 50mm @ IRI 6-9 2016 4.640663 0.75Z3033 Mymensingh-Gafargaon-Toke Road Km 021.11-021.91 S 0.8 4941 Zilla Rehab 75mm @ IRI 9-12 2016 8.811392 1.116Z3033 Mymensingh-Gafargaon-Toke Road Km 021.91-022.31 S 0.4 4941 Zilla Overlay 50mm @ IRI 6-9 2016 1.5456 0.898Z3033 Mymensingh-Gafargaon-Toke Road Km 022.31-023.71 S 1.4 4941 Zilla Overlay 40mm @ Traff >=2000 2016 4.374048 1.515Z3033 Mymensingh-Gafargaon-Toke Road Km 023.71-024.01 S 0.3 4941 Zilla Overlay 50mm @ IRI 6-9 2016 1.1592 0.89Z3033 Mymensingh-Gafargaon-Toke Road Km 024.01-024.41 S 0.4 4941 Zilla Rehab 75mm @ IRI 9-12 2016 4.405696 1.483Z3033 Mymensingh-Gafargaon-Toke Road Km 024.81-025.01 S 0.2 4941 Zilla Rehab 75mm @ IRI 9-12 2016 2.202848 1.411Z3033 Mymensingh-Gafargaon-Toke Road Km 025.01-025.91 S 0.9 4941 Zilla Overlay 50mm @ IRI 6-9 2016 3.481464 1.104Z3033 Mymensingh-Gafargaon-Toke Road Km 025.91-026.71 S 0.8 4941 Zilla Rehab 75mm @ IRI 9-12 2016 8.763504 1.211Z3033 Mymensingh-Gafargaon-Toke Road Km 027.91-028.21 S 0.3 4941 Zilla Overlay 50mm @ IRI 6-9 2016 1.1466 0.774Z3033 Mymensingh-Gafargaon-Toke Road Km 028.21-028.71 S 0.5 4941 Zilla Overlay 50mm @ IRI 6-9 2016 1.911 1.18Z3033 Mymensingh-Gafargaon-Toke Road Km 029.61-030.31 S 0.7 4941 Zilla Rehab 75mm @ IRI 9-12 2016 7.647114 1.073Z3033 Mymensingh-Gafargaon-Toke Road Km 030.31-030.61 S 0.3 4941 Zilla Overlay 50mm @ IRI 6-9 2016 1.1529 0.882Z3033 Mymensingh-Gafargaon-Toke Road Km 030.61-030.71 S 0.1 4941 Zilla Rehab 75mm @ IRI 9-12 2016 1.095438 1.946Z3033 Mymensingh-Gafargaon-Toke Road Km 030.81-031.21 S 0.4 4941 Zilla Full Recon 75mm @ IRI>12 2016 6.364008 0.842Z3033 Mymensingh-Gafargaon-Toke Road Km 031.21-031.91 S 0.7 4941 Zilla Overlay 50mm @ IRI 6-9 2016 2.6901 1.488Z3033 Mymensingh-Gafargaon-Toke Road Km 031.91-032.11 S 0.2 4941 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 1.416Z3033 Mymensingh-Gafargaon-Toke Road Km 032.11-033.41 S 1.3 4941 Zilla Overlay 50mm @ IRI 6-9 2016 4.9959 1.424Z3033 Mymensingh-Gafargaon-Toke Road Km 033.41-034.21 S 0.8 4941 Zilla Rehab 75mm @ IRI 9-12 2016 8.774458 0.915Z3033 Mymensingh-Gafargaon-Toke Road Km 034.21-034.51 S 0.3 4941 Zilla Overlay 50mm @ IRI 6-9 2016 1.1529 1.264Z3033 Mymensingh-Gafargaon-Toke Road Km 034.51-034.61 S 0.1 4941 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 1.908Z3033 Mymensingh-Gafargaon-Toke Road Km 034.61-035.71 S 1.1 4941 Zilla Overlay 50mm @ IRI 6-9 2016 4.2273 1.138

Page 116 of 163

Page 117: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z3033 Mymensingh-Gafargaon-Toke Road Km 035.71-036.11 S 0.4 4941 Zilla Rehab 75mm @ IRI 9-12 2016 4.896548 0.957Z3033 Mymensingh-Gafargaon-Toke Road Km 036.11-036.81 S 0.7 7124 Zilla Overlay 50mm @ IRI 6-9 2016 3.969 1.764Z3033 Mymensingh-Gafargaon-Toke Road Km 036.81-037.41 S 0.6 7124 Zilla Rehab 75mm @ IRI 9-12 2016 9.69732 1.923Z3033 Mymensingh-Gafargaon-Toke Road Km 037.41-037.71 S 0.3 7124 Zilla Overlay 40mm @ Traff >=2000 2016 1.37538 0.422Z3033 Mymensingh-Gafargaon-Toke Road Km 037.71-039.41 S 1.7 7124 Zilla Rehab 75mm @ IRI 9-12 2016 27.4919 1.632Z3033 Mymensingh-Gafargaon-Toke Road Km 039.91-040.01 S 0.1 7124 Zilla Rehab 75mm @ IRI 9-12 2016 1.61622 2.104Z3033 Mymensingh-Gafargaon-Toke Road Km 040.11-041.01 S 0.9 4941 Zilla Rehab 75mm @ IRI 9-12 2016 10.34381 0.929Z3033 Mymensingh-Gafargaon-Toke Road Km 041.01-041.61 S 0.6 4941 Zilla Overlay 50mm @ Cracking >25%2016 2.2995 0.55Z3033 Mymensingh-Gafargaon-Toke Road Km 041.61-044.21 S 2.6 4941 Zilla Rehab 75mm @ IRI 9-12 2016 32.1512 0.885Z3033 Mymensingh-Gafargaon-Toke Road Km 044.21-044.31 S 0.1 4941 Zilla Overlay 50mm @ Cracking >25%2016 0.3801 0.17Z3033 Mymensingh-Gafargaon-Toke Road Km 044.31-044.81 S 0.5 4941 Zilla Rehab 75mm @ IRI 9-12 2016 5.41733 1.228Z3033 Mymensingh-Gafargaon-Toke Road Km 044.91-046.39 S 1.48 4941 Zilla Rehab 75mm @ IRI 9-12 2016 18.18607 0.935Z3033 Mymensingh-Gafargaon-Toke Road Km 046.39-046.59 S 0.2 4941 Zilla Overlay 50mm @ IRI 6-9 2016 0.7665 0.668Z3033 Mymensingh-Gafargaon-Toke Road Km 046.59-047.29 S 0.7 4941 Zilla Rehab 75mm @ IRI 9-12 2016 9.763166 0.529Z3033 Mymensingh-Gafargaon-Toke Road Km 047.29-047.39 S 0.1 4941 Zilla Overlay 50mm @ Cracking >25%2016 0.3864 0.487Z3033 Mymensingh-Gafargaon-Toke Road Km 047.39-047.69 S 0.3 4941 Zilla Rehab 75mm @ IRI 9-12 2016 3.304272 1.481Z3033 Mymensingh-Gafargaon-Toke Road Km 047.69-047.79 S 0.1 4941 Zilla Overlay 40mm @ Traff >=2000 2016 0.312432 0Z3033 Mymensingh-Gafargaon-Toke Road Km 047.79-048.29 S 0.5 4941 Zilla Full Recon 75mm @ IRI>12 2016 7.99848 0.778Z3033 Mymensingh-Gafargaon-Toke Road Km 048.29-048.59 S 0.3 4941 Zilla Overlay 50mm @ IRI 6-9 2016 1.1592 1.623Z3033 Mymensingh-Gafargaon-Toke Road Km 048.59-049.29 S 0.7 4941 Zilla Rehab 75mm @ IRI 9-12 2016 7.720982 1.073Z3033 Mymensingh-Gafargaon-Toke Road Km 049.29-049.69 S 0.4 4941 Zilla Overlay 40mm @ Traff >=2000 2016 1.249728 0.019Z3033 Mymensingh-Gafargaon-Toke Road Km 049.69-050.59 S 0.9 4941 Zilla Rehab 75mm @ IRI 9-12 2016 9.885879 1.195Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 003.90-004.00 S 0.1 2373 Zilla Full Recon 75mm @ IRI>12 2016 1.560573 1.873Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 004.70-005.00 S 0.3 2373 Zilla Rehab 75mm @ IRI 9-12 2016 3.690369 1.721Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 005.60-005.70 S 0.1 2373 Zilla Full Recon 75mm @ IRI>12 2016 1.551879 2.024Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 005.80-006.60 S 0.8 2373 Zilla Full Recon 75mm @ IRI>12 2016 12.41503 1.789Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 006.70-006.80 S 0.1 2373 Zilla Full Recon 75mm @ IRI>12 2016 1.551879 2.51Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 007.10-007.30 S 0.2 2373 Zilla Full Recon 75mm @ IRI>12 2016 3.147228 1.932Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 007.30-007.50 S 0.2 2373 Zilla Rehab 75mm @ IRI 9-12 2016 2.166932 2.677Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 007.50-008.10 S 0.6 2373 Zilla Full Recon 75mm @ IRI>12 2016 9.441684 1.869Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 008.10-008.50 S 0.4 2373 Zilla Rehab 75mm @ IRI 9-12 2016 4.333864 2.338Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 008.50-009.00 S 0.5 2373 Zilla Full Recon 75mm @ IRI>12 2016 7.86807 1.69Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 009.10-009.90 S 0.8 2373 Zilla Full Recon 75mm @ IRI>12 2016 12.55414 1.458Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 010.00-010.90 S 0.9 2373 Zilla Full Recon 75mm @ IRI>12 2016 14.04516 1.61Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 011.40-013.60 S 2.2 2373 Zilla Full Recon 75mm @ IRI>12 2016 40.54882 1.249Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 013.60-014.20 S 0.6 2373 Zilla Rehab 75mm @ IRI 9-12 2016 9.69732 1.505Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 014.20-014.30 S 0.1 2373 Zilla Full Recon 75mm @ IRI>12 2016 2.34738 1.245Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 014.30-014.70 S 0.4 2373 Zilla Rehab 75mm @ IRI 9-12 2016 4.872604 2.209Z3034 Trisal-Balipara-Nandail (Kanurampur) Road Km 014.70-014.92 S 0.22 2373 Zilla Full Recon 75mm @ IRI>12 2016 3.477687 1.694Z3035 Mymensingh-Fulbaria Road Km 014.20-014.70 S 0.5 1686 Zilla Rehab 75mm @ IRI 9-12 2016 8.29061 0.205Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 001.00-001.90 S 0.9 2454 Zilla Rehab 75mm @ IRI 9-12 2016 14.59985 0.383Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 013.50-013.70 S 0.2 2454 Zilla Rehab 75mm @ IRI 9-12 2016 3.23244 0.89Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 016.00-016.40 S 0.4 2454 Zilla Overlay 40mm @ Traff >=2000 2016 1.827048 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 016.40-017.00 S 0.6 2454 Zilla Rehab 75mm @ IRI 9-12 2016 9.679362 0.228Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 017.20-017.40 S 0.2 2454 Zilla Rehab 75mm @ IRI 9-12 2016 3.226454 0.379Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 017.70-018.00 S 0.3 2454 Zilla Rehab 75mm @ IRI 9-12 2016 4.839681 0.819

Page 117 of 163

Page 118: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z3042 Dakhin Harina-Shakchura Road Km 000.00-003.30 S 3.3 4941 Zilla Overlay 50mm @ IRI 6-9 2016 12.78973 2.495Z3042 Dakhin Harina-Shakchura Road Km 003.30-004.60 S 1.3 4941 Zilla Rehab 75mm @ IRI 9-12 2016 14.42955 1.253Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 005.20-005.50 S 0.3 3856 Zilla Rehab 75mm @ IRI 9-12 2016 3.340188 1.895Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 008.60-009.00 S 0.4 3856 Zilla Overlay 40mm @ Traff >=2000 2016 1.263312 1.384Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 009.00-009.30 S 0.3 3856 Zilla Full Recon 75mm @ IRI>12 2016 4.851252 1.315Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 009.70-010.60 S 0.9 3856 Zilla Full Recon 75mm @ IRI>12 2016 14.55376 1.154Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 010.60-011.30 S 0.7 3856 Zilla Overlay 40mm @ Traff >=2000 2016 2.210796 1.494Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 011.30-012.40 S 1.1 3856 Zilla Rehab 75mm @ IRI 9-12 2016 12.24736 1.484Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 012.40-012.60 S 0.2 3856 Zilla Overlay 40mm @ Traff >=2000 2016 0.631656 1.169Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 012.60-013.30 S 0.7 3856 Zilla Rehab 75mm @ IRI 9-12 2016 7.793771 1.766Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 013.30-013.50 S 0.2 3856 Zilla Overlay 40mm @ Traff >=2000 2016 0.631656 1.116Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 013.50-013.60 S 0.1 3856 Zilla Rehab 75mm @ IRI 9-12 2016 1.113396 2.278Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 013.60-013.80 S 0.2 3856 Zilla Overlay 40mm @ Traff >=2000 2016 0.631656 1.036Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 013.80-013.90 S 0.1 3856 Zilla Full Recon 75mm @ IRI>12 2016 1.617084 1.633Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 013.90-014.00 S 0.1 3856 Zilla Overlay 40mm @ Traff >=2000 2016 0.315828 0.605Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 014.00-014.20 S 0.2 3856 Zilla Full Recon 75mm @ IRI>12 2016 3.234168 1.503Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 014.80-015.10 S 0.3 3856 Zilla Full Recon 75mm @ IRI>12 2016 4.851252 1.302Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 016.10-019.00 S 2.9 3856 Zilla Rehab 75mm @ IRI 9-12 2016 32.28848 1.266Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 019.00-019.70 S 0.7 3856 Zilla Overlay 40mm @ Traff >=2000 2016 2.210796 1.433Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 019.90-020.70 S 0.8 3856 Zilla Overlay 40mm @ Traff >=2000 2016 2.526624 1.393Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 020.70-023.60 S 2.9 3856 Zilla Rehab 75mm @ IRI 9-12 2016 32.28848 1.222Z3711 Phulpur-Haluaghat-Tinkuni More Road Km 024.50-025.80 S 1.3 3856 Zilla Overlay 40mm @ Traff >=2000 2016 4.105764 1.509Z3712 Haluaghat-Munshirhat-Dhobaura Road Km 000.00-003.00 S 3 2495 Zilla Overlay 40mm @ Traff >=2000 2016 14.26795 0Z3712 Haluaghat-Munshirhat-Dhobaura Road Km 003.00-003.20 S 0.2 2495 Zilla Overlay 40mm @ Traff >=2000 2016 0.949182 0.012Z3712 Haluaghat-Munshirhat-Dhobaura Road Km 003.20-019.20 S 16 2495 Zilla Overlay 40mm @ Traff >=2000 2016 62.09052 0.125Z4101 Jamalpur-Chechua-Muktagachha Road Km 027.55-034.10 S 6.55 3375 Zilla Overlay 40mm @ Traff >=2000 2016 31.15083 0Z4101 Jamalpur-Chechua-Muktagachha Road Km 034.10-034.40 S 0.3 3375 Zilla Rehab 75mm @ IRI 9-12 2016 5.02824 0.589Z4105 Fulbaria-Muktagachha Road Km 000.00-001.10 S 1.1 1050 Zilla Overlay 40mm @ 1000-2000 2016 3.418074 0Z4105 Fulbaria-Muktagachha Road Km 010.70-010.80 S 0.1 1050 Zilla Rehab 75mm @ IRI 9-12 2016 1.086459 0.006Z4105 Fulbaria-Muktagachha Road Km 010.90-011.60 S 0.7 1050 Zilla Overlay 40mm @ IRI>12 2016 2.157309 0Z4105 Fulbaria-Muktagachha Road Km 011.80-011.90 S 0.1 1050 Zilla Overlay 40mm @ IRI>12 2016 0.308187 0Z4105 Fulbaria-Muktagachha Road Km 013.80-013.90 S 0.1 1050 Zilla Overlay 40mm @ 1000-2000 2016 0.307338 0.156Z4105 Fulbaria-Muktagachha Road Km 013.90-014.20 S 0.3 1050 Zilla Overlay 40mm @ IRI>12 2016 0.924561 0Sub-Total Mymensingh Division 2025.408

Netrokona DivisionR370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 021.91-022.01 S 0.1 3557 Regional Full Recon 135mm 2016 3.93408 2.07R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 022.01-022.11 S 0.1 3557 Regional Overlay 50mm @ IRI 5-7 2016 0.756 6.014R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 022.11-022.31 S 0.2 3557 Regional Rehab 135mm @ IRI 9-12 2016 6.52032 2.247R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 022.37-022.71 S 0.33 4054 Regional Overlay 50mm @ IRI 5-7 2016 1.304604 4.356R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 022.71-022.81 S 0.1 4054 Regional Rehab 150mm @ IRI 9-12 2016 1.79676 2.161R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 022.91-023.51 S 0.6 4054 Regional Overlay 60mm @ IRI 7-9 2016 2.792232 5.086R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 023.51-024.11 S 0.6 4054 Regional Overlay 60mm @ IRI 7-9 2016 2.792232 4.699R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 024.11-024.21 S 0.1 4054 Regional Rehab 150mm @ IRI 9-12 2016 1.79676 2.143R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 024.21-024.71 S 0.5 4054 Regional Overlay 60mm @ IRI 7-9 2016 2.32686 4.581R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 024.71-025.31 S 0.6 4054 Regional Rehab 150mm @ IRI 9-12 2016 10.79853 1.71

Page 118 of 163

Page 119: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 025.31-028.31 S 3 4054 Regional Overlay 50mm @ IRI 5-7 2016 11.6865 3.982R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 028.31-029.41 S 1.1 4054 Regional Overlay 50mm @ IRI 5-7 2016 4.28505 3.89R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 029.41-030.01 S 0.6 4054 Regional DBST @ Traff 4000-6000 2016 1.101477 4.365R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 030.11-030.21 S 0.1 4054 Regional Rehab 150mm @ IRI 9-12 2016 1.79193 2.407R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 030.51-031.21 S 0.7 4054 Regional Overlay 60mm @ IRI 7-9 2016 3.222576 5.097R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 031.21-033.81 S 2.6 4054 Regional Overlay 50mm @ IRI 5-7 2016 10.0464 3.791R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 033.81-034.11 S 0.3 4054 Regional Overlay 60mm @ IRI 7-9 2016 1.381104 5.407R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 034.11-036.51 S 2.4 12647 Regional Overlay 60mm @ IRI 5.5-9 2016 15.73913 20.137R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 036.51-036.71 S 0.2 12647 Regional Rehab 150mm @ IRI 9-12 2016 5.5545 7.437R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 037.41-037.71 S 0.3 12647 Regional Overlay 60mm @ IRI 5.5-9 2016 2.157975 17.806R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 040.98-041.04 S 0.06 12647 Regional Overlay 60mm @ IRI 5.5-9 2016 0.435898 21.476R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 041.04-041.88 S 0.84 3557 Regional Overlay 50mm @ IRI 5-7 2016 4.950938 7.55R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 041.88-041.98 S 0.1 3557 Regional Full Recon 135mm @ IRI 12 2016 3.070768 3.404R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 041.98-051.58 S 9.6 3557 Regional DBST @ 25% Crk 2016 26.65784 5.185R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 051.58-051.68 S 0.1 3557 Regional Full Recon 135mm @ IRI 12 2016 3.076232 3.009R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 051.68-061.78 S 10.1 3557 Regional DBST @ 25% Crk 2016 27.19762 5.56R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 061.78-061.98 S 0.2 3499 Regional Full Recon 135mm 2016 3.955936 2.179R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 061.98-062.68 S 0.7 3499 Regional Rehab 135mm @ IRI 9-12 2016 11.47395 2.075R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 062.68-062.88 S 0.2 3499 Regional Full Recon 135mm 2016 3.955936 2.175R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 062.88-069.29 S 6.4 3499 Regional Overlay 50mm @ IRI 5-7 2016 25.94731 5.146R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 069.29-073.88 S 4.59 3499 Regional Overlay 50mm @ IRI 7-9 2016 17.44659 5.573Z3608 Nandail-Atharabari-Kendua Road Km 009.12-020.00 S 10.88 2004 Zilla Overlay 40mm @ Traff >=2000 2016 36.02477 0.039Z3608 Nandail-Atharabari-Kendua Road Km 020.00-020.10 S 0.1 2004 Zilla Full Recon 75mm @ IRI>12 2016 1.69533 1.092Z3608 Nandail-Atharabari-Kendua Road Km 020.10-021.11 S 1.01 2004 Zilla Overlay 40mm @ Traff >=2000 2016 3.344211 0.059Z3701 Netrokona-Madan-Kaliajuri Road Km 003.60-003.70 S 0.1 1101 Zilla Overlay 40mm @ IRI>12 2016 0.468648 0Z3701 Netrokona-Madan-Kaliajuri Road Km 010.50-010.60 S 0.1 1101 Zilla Overlay 40mm @ IRI>12 2016 0.473742 0Z3701 Netrokona-Madan-Kaliajuri Road Km 012.76-012.86 S 0.1 1101 Zilla Overlay 40mm @ IRI>12 2016 0.474591 0Z3701 Netrokona-Madan-Kaliajuri Road Km 018.66-018.76 S 0.1 1101 Zilla Overlay 40mm @ IRI>12 2016 0.47544 0Z3701 Netrokona-Madan-Kaliajuri Road Km 024.96-031.17 S 6.2 1101 Zilla Overlay 40mm @ 1000-2000 2016 28.00793 0Z3703 Netrokona (Thakurakona)-Kalmakanda Road Km 000.00-000.06 S 0.06 1763 Zilla Overlay 40mm @ 1000-2000 2016 0.376956 0.053Z3703 Netrokona (Thakurakona)-Kalmakanda Road Km 000.06-010.40 S 10.34 1763 Zilla Overlay 40mm @ 1000-2000 2016 33.62877 0Z3703 Netrokona (Thakurakona)-Kalmakanda Road Km 010.40-010.50 S 0.1 1763 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.39Z3703 Netrokona (Thakurakona)-Kalmakanda Road Km 010.50-012.90 S 2.4 1763 Zilla Overlay 40mm @ 1000-2000 2016 7.521877 0Z3703 Netrokona (Thakurakona)-Kalmakanda Road Km 012.90-013.40 S 0.5 1763 Zilla Rehab 75mm @ IRI 9-12 2016 5.522085 0.904Z3703 Netrokona (Thakurakona)-Kalmakanda Road Km 013.40-021.05 S 7.65 1763 Zilla Overlay 40mm @ 1000-2000 2016 27.20631 0Z3704 Susang Durgapur-Shamganj Road Km 000.00-000.60 S 0.6 4107 Zilla Rehab 75mm @ IRI 9-12 2016 10.23606 0.882Z3704 Susang Durgapur-Shamganj Road Km 000.60-001.40 S 0.8 4107 Zilla Overlay 50mm @ IRI 6-9 2016 4.788 1.366Z3704 Susang Durgapur-Shamganj Road Km 001.40-016.00 S 14.6 4107 Zilla Rehab 75mm @ IRI 9-12 2016 269.6893 0.864Z3704 Susang Durgapur-Shamganj Road Km 016.00-019.10 S 3.1 4107 Zilla Full Recon 75mm @ IRI>12 2016 87.7268 0.34Z3704 Susang Durgapur-Shamganj Road Km 019.10-022.31 S 3.2 4107 Zilla Full Recon 75mm @ IRI>12 2016 80.28809 0.579Z3704 Susang Durgapur-Shamganj Road Km 022.31-025.61 S 3.3 4107 Zilla Full Recon 75mm @ IRI>12 2016 76.91304 0.735Z3704 Susang Durgapur-Shamganj Road Km 025.61-028.61 S 3 4107 Zilla Full Recon 75mm @ IRI>12 2016 72.50796 0.629Z3704 Susang Durgapur-Shamganj Road Km 028.61-032.21 S 3.6 4107 Zilla Full Recon 75mm @ IRI>12 2016 86.09451 0.755Z3704 Susang Durgapur-Shamganj Road Km 032.21-035.51 S 3.3 4107 Zilla Full Recon 75mm @ IRI>12 2016 79.20895 0.665Z3704 Susang Durgapur-Shamganj Road Km 035.51-036.52 S 1.01 4107 Zilla Full Recon 75mm @ IRI>12 2016 24.46361 0.637Z3706 Netrokona-Kendua Road Km 000.00-000.20 S 0.2 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.9339 0

Page 119 of 163

Page 120: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z3706 Netrokona-Kendua Road Km 000.20-003.20 S 3 1410 Zilla Overlay 40mm @ 1000-2000 2016 12.48446 0Z3706 Netrokona-Kendua Road Km 003.20-004.40 S 1.2 1410 Zilla Overlay 40mm @ 1000-2000 2016 4.727232 0Z3706 Netrokona-Kendua Road Km 004.40-004.90 S 0.5 1410 Zilla Overlay 40mm @ 1000-2000 2016 2.30079 0Z3706 Netrokona-Kendua Road Km 004.90-005.00 S 0.1 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z3706 Netrokona-Kendua Road Km 005.00-005.30 S 0.3 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z3706 Netrokona-Kendua Road Km 005.30-005.40 S 0.1 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z3706 Netrokona-Kendua Road Km 005.40-005.70 S 0.3 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z3706 Netrokona-Kendua Road Km 005.70-007.50 S 1.8 1410 Zilla Overlay 40mm @ 1000-2000 2016 6.314972 0Z3706 Netrokona-Kendua Road Km 010.90-011.10 S 0.2 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z3706 Netrokona-Kendua Road Km 011.10-014.10 S 3 1410 Zilla Overlay 40mm @ 1000-2000 2016 10.5481 0Z3706 Netrokona-Kendua Road Km 014.10-014.90 S 0.8 1410 Zilla Overlay 40mm @ 1000-2000 2016 2.533416 0Z3706 Netrokona-Kendua Road Km 014.90-015.10 S 0.2 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.633354 0Z3706 Netrokona-Kendua Road Km 015.10-015.20 S 0.1 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.316677 0Z3706 Netrokona-Kendua Road Km 015.20-015.30 S 0.1 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.316677 0.007Z3706 Netrokona-Kendua Road Km 015.30-016.10 S 0.8 1410 Zilla Overlay 40mm @ 1000-2000 2016 2.509381 0Z3706 Netrokona-Kendua Road Km 016.10-016.30 S 0.2 1410 Zilla Overlay 40mm @ 1000-2000 2016 0.61128 0Z3706 Netrokona-Kendua Road Km 016.30-026.86 S 10.55 1410 Zilla Overlay 40mm @ 1000-2000 2016 36.82004 0Z3707 Netrokona-Purbadhala-Hugla-Dhobaura Road Km 009.80-024.37 S 14.57 1072 Zilla Overlay 40mm @ 1000-2000 2016 49.47632 0Z3707 Netrokona-Purbadhala-Hugla-Dhobaura Road Km 024.37-029.67 S 5.3 1072 Zilla Overlay 40mm @ 1000-2000 2016 16.20198 0Z3707 Netrokona-Purbadhala-Hugla-Dhobaura Road Km 031.47-033.00 S 1.53 1072 Zilla Overlay 40mm @ 1000-2000 2016 4.683152 0Z3709 Netrokona-Birishiri Road Km 005.10-005.60 S 0.5 1309 Zilla Overlay 40mm @ IRI>12 2016 2.30928 0Z3710 Netrokona-Bishiura-Ishwarganj Road Km 000.00-002.30 S 2.3 1149 Zilla Overlay 40mm @ 1000-2000 2016 7.22499 0Sub-Total Netrokona Division 1322.286

Sherpur DivisionR371 Mymensingh-Phulpur-Nakla-Sherpur Km 034.77-041.80 S 7.03 5788 Regional Overlay 60mm @ IRI 5.5-9 2016 52.54068 16.468R460 Jamalpur-Sherpur-Bangaon Road Km 000.00-007.80 S 7.8 5537 Regional Overlay 60mm @ IRI 5.5-9 2016 62.74266 2.257R460 Jamalpur-Sherpur-Bangaon Road Km 007.80-008.00 S 0.2 5537 Regional Rehab 150mm @ IRI 9-12 2016 5.6028 1.574R460 Jamalpur-Sherpur-Bangaon Road Km 029.70-030.10 S 0.4 4314 Regional Overlay 60mm @ IRI 7-9 2016 2.90232 2.435Z3040 Nalitabari-Baruazani-Bagaitala-Haluaghat Road Km 004.60-004.80 S 0.2 1206 Zilla Overlay 40mm @ 1000-2000 2016 0.606186 0Z3040 Nalitabari-Baruazani-Bagaitala-Haluaghat Road Km 010.00-010.10 S 0.1 1206 Zilla Rehab 75mm @ IRI 9-12 2016 1.071494 0.165Z4604 Sherpur-Longorpara-Sribardi Road Km 002.30-002.40 S 0.1 928 Zilla Overlay 40mm @ IRI>12 2016 0.32262 0Z4616 Sribardi-Viadanga-Jhinaigati Road Km 013.35-013.45 S 0.1 1858 Zilla Overlay 40mm @ 1000-2000 2016 0.326865 0.452Z4616 Sribardi-Viadanga-Jhinaigati Road Km 015.15-019.47 S 4.32 1858 Zilla Overlay 40mm @ 1000-2000 2016 15.23989 0Sub-Total Sherpur Division 141.3555

Tangail DivisionN4 Joydebpur-Tangail-Jamalpur Road Km 090.12-091.50 S 1.38 10069 National Overlay 80mm @ IRI 4-9 2016 18.83309 11.079N4 Joydebpur-Tangail-Jamalpur Road Km 091.50-091.60 S 0.1 10069 National Rehab 195mm @ IRI 9-12 2016 3.51712 9.846N4 Joydebpur-Tangail-Jamalpur Road Km 091.60-094.00 S 2.4 10069 National Overlay 80mm @ IRI 4-9 2016 23.00976 18.703N4 Joydebpur-Tangail-Jamalpur Road Km 094.00-094.30 S 0.3 10069 National Rehab 195mm @ IRI 9-12 2016 10.55136 8.509N4 Joydebpur-Tangail-Jamalpur Road Km 094.30-094.40 S 0.1 10069 National Overlay 80mm @ IRI 4-9 2016 0.95874 19.579N4 Joydebpur-Tangail-Jamalpur Road Km 094.40-094.60 S 0.2 10069 National Rehab 195mm @ IRI 9-12 2016 7.03424 8.626N4 Joydebpur-Tangail-Jamalpur Road Km 094.60-095.40 S 0.8 10069 National Overlay 80mm @ IRI 4-9 2016 7.66992 19.025N4 Joydebpur-Tangail-Jamalpur Road Km 095.40-097.70 S 2.3 10069 National Full Recon 195mm @ IRI 12 2016 104.1123 6.786

Page 120 of 163

Page 121: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N4 Joydebpur-Tangail-Jamalpur Road Km 097.70-098.80 S 1.1 10069 National Overlay 80mm @ IRI 4-9 2016 10.54614 19.293N4 Joydebpur-Tangail-Jamalpur Road Km 098.80-099.90 S 1.1 10069 National Rehab 195mm @ IRI 9-12 2016 38.68832 8.486N4 Joydebpur-Tangail-Jamalpur Road Km 099.90-103.20 S 3.3 10069 National Overlay 80mm @ IRI 4-9 2016 31.63842 18.164N4 Joydebpur-Tangail-Jamalpur Road Km 103.20-104.20 S 1 10069 National Rehab 195mm @ IRI 9-12 2016 35.1712 8.632N4 Joydebpur-Tangail-Jamalpur Road Km 104.20-105.00 S 0.8 10069 National Full Recon 195mm @ IRI 12 2016 34.11027 7.526N4 Joydebpur-Tangail-Jamalpur Road Km 105.00-105.64 S 0.64 10069 National Overlay 80mm @ IRI 4-9 2016 7.88481 15.861N4 Joydebpur-Tangail-Jamalpur Road Km 105.64-106.20 S 0.56 5925 National Overlay 50mm @ IRI 4-9 2016 4.4415 4.585N4 Joydebpur-Tangail-Jamalpur Road Km 106.20-106.50 S 0.3 5925 National Full Recon 150mm 2016 13.653 1.89N4 Joydebpur-Tangail-Jamalpur Road Km 106.50-112.30 S 5.8 5925 National Overlay 50mm @ IRI 4-9 2016 36.9054 4.999N4 Joydebpur-Tangail-Jamalpur Road Km 112.30-112.50 S 0.2 5925 National Full Recon 150mm @ IRI 12 2016 7.03888 3.138N4 Joydebpur-Tangail-Jamalpur Road Km 112.50-112.60 S 0.1 5925 National Overlay 50mm @ IRI 4-9 2016 0.609 7.168N4 Joydebpur-Tangail-Jamalpur Road Km 112.60-113.60 S 1 5925 National Full Recon 150mm @ IRI 12 2016 35.1944 2.561N4 Joydebpur-Tangail-Jamalpur Road Km 113.60-114.30 S 0.7 5925 National Overlay 50mm @ IRI 4-9 2016 4.263 5.051N4 Joydebpur-Tangail-Jamalpur Road Km 114.30-114.60 S 0.3 5925 National DBST @ Traff 4000-6000 2016 0.85956 6.052N4 Joydebpur-Tangail-Jamalpur Road Km 114.60-117.80 S 3.2 5925 National Overlay 50mm @ IRI 4-9 2016 19.488 7.002N4 Joydebpur-Tangail-Jamalpur Road Km 117.80-118.40 S 0.6 5925 National DBST @ Traff 4000-6000 2016 1.772472 5.704N4 Joydebpur-Tangail-Jamalpur Road Km 118.40-121.50 S 3.1 5925 National Overlay 50mm @ IRI 4-9 2016 21.4179 4.109N4 Joydebpur-Tangail-Jamalpur Road Km 121.50-126.57 S 5.07 5925 National Overlay 50mm @ IRI 4-9 2016 26.628 7.358N401 Madhupur-Mymensingh Road Km 000.00-003.00 S 3 4513 National Overlay 50mm @ IRI 5-9 2016 21.609 4.573N401 Madhupur-Mymensingh Road Km 006.10-009.20 S 3.1 4513 National Overlay 50mm @ IRI 5-9 2016 18.7488 6.902N401 Madhupur-Mymensingh Road Km 009.20-014.97 S 5.77 4513 National Overlay 50mm @ IRI 5-9 2016 34.53345 6.796N403 Mirzapur Town old Section Road Km 001.80-001.90 S 0.1 4506 National DBST @ Traff 4000-6000 2016 0.277628 2.646N403 Mirzapur Town old Section Road Km 003.72-003.73 R 0.01 4506 National Overlay 50mm @ IRI 5-9 2016 0.17052 0.245N407 Korotia-Bhanga Road Km 000.00-002.21 S 2.21 2840 National Rehab 135mm @ IRI 9-12 2016 40.15485 2.446N408 Korotia Bazar Portion Road Km 000.00-000.20 S 0.2 8521 National Overlay 60mm @ IRI 7-9 2016 1.3761 15.646N408 Korotia Bazar Portion Road Km 000.20-000.50 S 0.3 8521 National Full Recon 180mm 2016 11.54835 5.178N408 Korotia Bazar Portion Road Km 000.50-003.53 S 3.03 18982 National Full Recon 195mm 2016 122.4156 14.289R480 Elenga-Bhuanpur (Char Gabsara) Road Km 000.00-001.52 S 1.52 3810 Regional Overlay 50mm @ IRI 7-9 2016 9.19296 2.521Z3030 Bhaluka-Shakhipur Road Km 018.50-022.41 S 3.9 2248 Zilla Overlay 40mm @ Traff >=2000 2016 13.92445 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 018.00-018.20 S 0.2 2454 Zilla Rehab 75mm @ IRI 9-12 2016 3.226454 0.889Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 018.30-018.80 S 0.5 2454 Zilla Rehab 75mm @ IRI 9-12 2016 8.066135 0.632Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 018.90-019.90 S 1 2454 Zilla Rehab 75mm @ IRI 9-12 2016 16.1622 0.415Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 019.90-020.20 S 0.3 2454 Zilla Overlay 40mm @ Traff >=2000 2016 1.37538 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 020.20-020.70 S 0.5 2454 Zilla Rehab 75mm @ IRI 9-12 2016 8.096065 0.758Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 020.70-021.00 S 0.3 2454 Zilla Overlay 40mm @ Traff >=2000 2016 1.377927 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 021.00-021.10 S 0.1 2454 Zilla Full Recon 75mm @ IRI>12 2016 2.351727 0.452Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 021.10-024.40 S 3.3 2454 Zilla Rehab 75mm @ IRI 9-12 2016 53.33526 0.173Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 024.40-024.60 S 0.2 2454 Zilla Overlay 40mm @ Traff >=2000 2016 0.91692 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 024.60-025.20 S 0.6 2454 Zilla Rehab 75mm @ IRI 9-12 2016 9.679362 0.975Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 025.20-025.40 S 0.2 2454 Zilla Overlay 40mm @ Traff >=2000 2016 0.915222 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 025.40-025.50 S 0.1 2454 Zilla Full Recon 75mm @ IRI>12 2016 2.343033 0.365Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 025.50-025.60 S 0.1 2454 Zilla Overlay 40mm @ Traff >=2000 2016 0.457611 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 025.60-026.60 S 1 2454 Zilla Rehab 75mm @ IRI 9-12 2016 16.1622 0.425Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 026.60-028.50 S 1.9 2454 Zilla Rehab 75mm @ IRI 9-12 2016 30.70818 0.218Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 028.50-035.20 S 6.7 2454 Zilla Rehab 75mm @ IRI 9-12 2016 108.2867 0.419Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 035.20-035.70 S 0.5 2454 Zilla Overlay 40mm @ Traff >=2000 2016 2.2923 0

Page 121 of 163

Page 122: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 035.70-036.10 S 0.4 2454 Zilla Rehab 75mm @ IRI 9-12 2016 6.46488 0.508Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 036.10-036.20 S 0.1 2454 Zilla Overlay 40mm @ Traff >=2000 2016 0.45846 0.014Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 036.20-036.70 S 0.5 2454 Zilla Rehab 75mm @ IRI 9-12 2016 8.036205 0.368Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 036.70-037.40 S 0.7 2454 Zilla Overlay 40mm @ Traff >=2000 2016 3.179505 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 039.30-039.70 S 0.4 2454 Zilla Overlay 40mm @ Traff >=2000 2016 1.837236 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 039.70-039.80 S 0.1 2454 Zilla Rehab 75mm @ IRI 9-12 2016 1.619213 0.445Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 041.90-042.40 S 0.5 2454 Zilla Rehab 75mm @ IRI 9-12 2016 8.096065 0.437Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 042.40-042.50 S 0.1 2454 Zilla Overlay 40mm @ Traff >=2000 2016 0.459309 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 042.50-044.40 S 1.9 2454 Zilla Rehab 75mm @ IRI 9-12 2016 30.76505 0.324Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 044.40-044.70 S 0.3 2454 Zilla Overlay 40mm @ Traff >=2000 2016 1.37538 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 044.70-045.20 S 0.5 2454 Zilla Rehab 75mm @ IRI 9-12 2016 8.0811 0.759Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 045.20-045.70 S 0.5 2454 Zilla Overlay 40mm @ Traff >=2000 2016 2.2923 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 046.30-046.90 S 0.6 2454 Zilla Overlay 40mm @ Traff >=2000 2016 2.822076 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 046.90-047.50 S 0.6 2454 Zilla Rehab 75mm @ IRI 9-12 2016 10.2181 0.547Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 048.40-048.70 S 0.3 2454 Zilla Overlay 40mm @ Traff >=2000 2016 1.449243 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 048.70-048.90 S 0.2 2454 Zilla Overlay 40mm @ Traff >=2000 2016 0.966162 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 048.90-049.00 S 0.1 2454 Zilla Overlay 40mm @ Traff >=2000 2016 0.483081 0Z3037 Bhoradoba-Sagardighi-Ghatail-Bhuanpur Road Km 049.90-059.50 S 9.6 1424 Zilla Overlay 40mm @ IRI>12 2016 32.19408 0Z4007 Mirzapur (Pakullah)-Delduar-Elasin Road Km 000.00-003.70 S 3.7 2976 Zilla Overlay 40mm @ Traff >=2000 2016 15.23942 0Z4007 Mirzapur (Pakullah)-Delduar-Elasin Road Km 003.70-007.70 S 4 2976 Zilla Overlay 40mm @ Traff >=2000 2016 16.44075 1.397Z4007 Mirzapur (Pakullah)-Delduar-Elasin Road Km 008.00-008.10 S 0.1 2976 Zilla Full Recon 75mm @ IRI>12 2016 1.577961 1.738Z4007 Mirzapur (Pakullah)-Delduar-Elasin Road Km 008.30-008.80 S 0.5 2976 Zilla Rehab 75mm @ IRI 9-12 2016 5.432295 2.013Z4007 Mirzapur (Pakullah)-Delduar-Elasin Road Km 008.90-010.70 S 1.8 2976 Zilla Rehab 75mm @ IRI 9-12 2016 19.50239 1.65Z4007 Mirzapur (Pakullah)-Delduar-Elasin Road Km 011.20-011.90 S 0.7 2976 Zilla Rehab 75mm @ IRI 9-12 2016 7.595096 1.554Z4011 Mirzapur (Gorai)-Shakhipur Road Km 000.00-001.20 S 1.2 2976 Zilla Rehab 75mm @ IRI 9-12 2016 20.00521 0.672Z4011 Mirzapur (Gorai)-Shakhipur Road Km 001.20-007.30 S 6.1 2976 Zilla Rehab 75mm @ IRI 9-12 2016 99.13714 1.122Z4011 Mirzapur (Gorai)-Shakhipur Road Km 007.30-007.70 S 0.4 2976 Zilla Rehab 75mm @ IRI 9-12 2016 6.680376 0.303Z4011 Mirzapur (Gorai)-Shakhipur Road Km 007.80-008.80 S 1 2976 Zilla Rehab 75mm @ IRI 9-12 2016 16.70094 0.783Z4011 Mirzapur (Gorai)-Shakhipur Road Km 009.00-011.20 S 2.2 2976 Zilla Rehab 75mm @ IRI 9-12 2016 44.11682 0.776Z4011 Mirzapur (Gorai)-Shakhipur Road Km 011.70-012.10 S 0.4 2976 Zilla Rehab 75mm @ IRI 9-12 2016 6.692348 1.17Z4011 Mirzapur (Gorai)-Shakhipur Road Km 012.50-012.90 S 0.4 2976 Zilla Rehab 75mm @ IRI 9-12 2016 6.70432 1.169Z4011 Mirzapur (Gorai)-Shakhipur Road Km 013.30-013.70 S 0.4 2976 Zilla Rehab 75mm @ IRI 9-12 2016 6.656432 1.178Z4011 Mirzapur (Gorai)-Shakhipur Road Km 013.90-014.30 S 0.4 2976 Zilla Rehab 75mm @ IRI 9-12 2016 6.656432 1.17Z4011 Mirzapur (Gorai)-Shakhipur Road Km 014.40-015.50 S 1.1 2976 Zilla Rehab 75mm @ IRI 9-12 2016 18.30519 0.881Z4011 Mirzapur (Gorai)-Shakhipur Road Km 015.60-017.00 S 1.4 2976 Zilla Rehab 75mm @ IRI 9-12 2016 23.33941 0.683Z4011 Mirzapur (Gorai)-Shakhipur Road Km 017.20-017.90 S 0.7 2976 Zilla Rehab 75mm @ IRI 9-12 2016 11.77446 0.976Z4011 Mirzapur (Gorai)-Shakhipur Road Km 018.00-018.80 S 0.8 2976 Zilla Rehab 75mm @ IRI 9-12 2016 13.40864 0.8Z4011 Mirzapur (Gorai)-Shakhipur Road Km 021.80-021.90 S 0.1 2976 Zilla Full Recon 75mm @ IRI>12 2016 1.643166 1.611Z4011 Mirzapur (Gorai)-Shakhipur Road Km 025.40-026.00 S 0.6 2976 Zilla Rehab 75mm @ IRI 9-12 2016 13.14526 0.85Z4011 Mirzapur (Gorai)-Shakhipur Road Km 026.20-026.78 S 0.58 2976 Zilla Rehab 75mm @ IRI 9-12 2016 12.61945 0.582Z4012 Korotia-Basail-Shakhipur Road Km 000.00-000.03 L 0.03 8711 Zilla Overlay 40mm @ Traff >=2000 2016 0.11886 1.637Z4012 Korotia-Basail-Shakhipur Road Km 000.00-000.03 R 0.03 8711 Zilla Overlay 40mm @ Traff >=2000 2016 0.116737 0.539Z4012 Korotia-Basail-Shakhipur Road Km 007.90-008.10 S 0.2 4351 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 2.043Z4012 Korotia-Basail-Shakhipur Road Km 008.36-008.40 S 0.04 4351 Zilla Rehab 75mm @ IRI 9-12 2016 0.454038 3.571Z4012 Korotia-Basail-Shakhipur Road Km 008.40-011.60 S 3.2 8711 Zilla Overlay 50mm @ IRI 6-9 2016 16.20026 5.802Z4012 Korotia-Basail-Shakhipur Road Km 011.60-016.40 S 4.8 8711 Zilla Rehab 75mm @ IRI 9-12 2016 79.03166 2.867

Page 122 of 163

Page 123: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z4012 Korotia-Basail-Shakhipur Road Km 016.40-016.70 S 0.3 8711 Zilla Overlay 50mm @ IRI 6-9 2016 1.7325 5.43Z4012 Korotia-Basail-Shakhipur Road Km 016.70-019.70 S 3 8711 Zilla Rehab 75mm @ IRI 9-12 2016 50.01303 3.364Z4012 Korotia-Basail-Shakhipur Road Km 019.80-021.21 S 1.4 8711 Zilla Rehab 75mm @ IRI 9-12 2016 23.48188 3.648Z4012 Korotia-Basail-Shakhipur Road Km 021.21-021.41 S 0.2 8711 Zilla Overlay 50mm @ IRI 6-9 2016 1.176 6.452Z4012 Korotia-Basail-Shakhipur Road Km 021.41-021.61 S 0.2 8711 Zilla Rehab 75mm @ IRI 9-12 2016 3.35216 3.917Z4012 Korotia-Basail-Shakhipur Road Km 021.71-022.21 S 0.5 8711 Zilla Rehab 75mm @ IRI 9-12 2016 8.3804 3.884Z4012 Korotia-Basail-Shakhipur Road Km 022.21-022.42 S 0.21 8711 Zilla Overlay 50mm @ IRI 6-9 2016 1.24068 6.44Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 003.00-003.10 S 0.1 3186 Zilla Full Recon 75mm @ IRI>12 2016 2.542995 0.609Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 003.10-006.00 S 2.9 3186 Zilla Overlay 40mm @ Traff >=2000 2016 12.6552 0.27Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 006.00-006.10 S 0.1 3186 Zilla Full Recon 75mm @ IRI>12 2016 1.78227 2.261Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 006.10-006.50 S 0.4 3186 Zilla Overlay 40mm @ Traff >=2000 2016 1.39236 2.465Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 006.50-007.60 S 1.1 3186 Zilla Rehab 75mm @ IRI 9-12 2016 20.82625 0.506Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 007.60-011.10 S 3.5 3186 Zilla Overlay 40mm @ Traff >=2000 2016 13.37175 1.081Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 011.10-011.80 S 0.7 3186 Zilla Rehab 75mm @ IRI 9-12 2016 8.203543 1.48Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 011.80-012.20 S 0.4 3186 Zilla Overlay 40mm @ Traff >=2000 2016 1.331232 1.692Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 012.20-012.30 S 0.1 3186 Zilla Rehab 75mm @ IRI 9-12 2016 1.173256 2.052Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 012.30-012.40 S 0.1 3186 Zilla Overlay 40mm @ Cracks >25% 2016 0.315168 0.728Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 012.40-013.20 S 0.8 3186 Zilla Rehab 75mm @ IRI 9-12 2016 9.362104 1.405Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 013.40-015.10 S 1.7 3186 Zilla Rehab 75mm @ IRI 9-12 2016 19.48742 1.327Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 015.20-016.20 S 1 3186 Zilla Rehab 75mm @ IRI 9-12 2016 11.53457 1.277Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 016.20-016.60 S 0.4 3186 Zilla Overlay 40mm @ Traff >=2000 2016 1.30746 1.733Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 016.60-018.80 S 2.2 3186 Zilla Full Recon 75mm @ IRI>12 2016 37.01036 0.905Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 018.80-019.10 S 0.3 3186 Zilla Overlay 40mm @ Traff >=2000 2016 0.985689 1.681Z4017 Ghatail-Shaliajani-Gopalpur-Sarisabari Road Km 019.10-022.06 S 2.96 3186 Zilla Full Recon 75mm @ IRI>12 2016 50.79078 0.918Z4018 Baushi-Gopalpur-Bhuapur Road Km 011.00-011.10 S 0.1 3186 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 1.455Z4018 Baushi-Gopalpur-Bhuapur Road Km 025.91-026.01 S 0.1 3186 Zilla Rehab 75mm @ IRI 9-12 2016 1.652136 1.353Z4019 Baushi-Gopalpur-Bhuapur Road Km 004.60-005.70 S 1.1 3186 Zilla Full Recon 75mm @ IRI>12 2016 26.39498 0.414Z4019 Baushi-Gopalpur-Bhuapur Road Km 009.00-009.40 S 0.4 3186 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 0.518Z4020 Baushi-Gopalpur-Bhuapur Road Km 002.20-002.50 S 0.3 3186 Zilla Full Recon 75mm @ IRI>12 2016 7.131036 0.591Z4020 Baushi-Gopalpur-Bhuapur Road Km 002.90-003.00 S 0.1 3186 Zilla Full Recon 75mm @ IRI>12 2016 2.369115 0.796Z4020 Baushi-Gopalpur-Bhuapur Road Km 003.10-003.80 S 0.7 3186 Zilla Rehab 75mm @ IRI 9-12 2016 10.99928 1.476Z4020 Baushi-Gopalpur-Bhuapur Road Km 004.10-005.30 S 1.2 3186 Zilla Rehab 75mm @ IRI 9-12 2016 12.92976 2.038Z4020 Baushi-Gopalpur-Bhuapur Road Km 005.40-006.10 S 0.7 3186 Zilla Rehab 75mm @ IRI 9-12 2016 7.542359 2.162Z4020 Baushi-Gopalpur-Bhuapur Road Km 013.88-015.48 S 1.6 3186 Zilla Rehab 75mm @ IRI 9-12 2016 16.48377 2.203Z4801 Bhuanpur-Tarakandi Road Km 000.00-002.10 S 2.1 1716 Zilla Overlay 40mm @ 1000-2000 2016 10.16253 0Z4801 Bhuanpur-Tarakandi Road Km 002.10-005.10 S 3 1716 Zilla Overlay 40mm @ IRI>12 2016 14.46696 0Z4801 Bhuanpur-Tarakandi Road Km 005.10-011.50 S 6.4 1716 Zilla Full Recon 75mm @ IRI>12 2016 157.7439 0.018Z4801 Bhuanpur-Tarakandi Road Km 015.40-015.50 S 0.1 1716 Zilla Full Recon 75mm @ IRI>12 2016 2.473443 0.027Z5061 Kalampur Bus Stand-Balia-Warsi-Mirzapur Road Km 021.83-024.18 S 2.35 2180 Zilla Rehab 75mm @ IRI 9-12 2016 39.82932 0.237Sub-Total Tangail Division 2242.846Total Mymensingh Zone 7717.53

Rajshahi ZoneNaogaon DivisionN516 Naogaon Town By-Pass Road Km 000.00-000.04 L 0.04 5221 National DBST @ Traff 4000-6000 2016 0.248976 1.784

Page 123 of 163

Page 124: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N516 Naogaon Town By-Pass Road Km 000.00-000.04 R 0.04 5221 National DBST @ Traff 4000-6000 2016 0.229216 2.805N516 Naogaon Town By-Pass Road Km 000.04-007.95 S 7.91 4745 National DBST @ 25% Crk 2016 41.459 1.837N516 Naogaon Town By-Pass Road Km 007.95-008.00 L 0.05 4655 National Overlay 50mm @ IRI 5-9 2016 0.609 3.108N516 Naogaon Town By-Pass Road Km 007.95-008.00 R 0.05 4655 National Overlay 50mm @ IRI 5-9 2016 0.6615 2.212R543 Mohadebpur Bypass Road Km 000.07-000.26 L 0.19 3864 Regional Overlay 50mm @ IRI 7-9 2016 0.29925 7.167R543 Mohadebpur Bypass Road Km 000.07-000.26 R 0.19 3864 Regional Overlay 50mm @ IRI 7-9 2016 0.29925 7.167R543 Mohadebpur Bypass Road Km 000.40-000.90 L 0.5 3864 Regional Overlay 50mm @ IRI 7-9 2016 0.63 8.2R543 Mohadebpur Bypass Road Km 000.40-000.90 R 0.5 3864 Regional Overlay 50mm @ IRI 7-9 2016 0.63 8.2R543 Mohadebpur Bypass Road Km 000.90-001.92 S 1.02 3864 Regional Overlay 50mm @ IRI 7-9 2016 5.8905 2.479R544 Santahar Atrai Road Km 000.00-000.20 S 0.2 3864 Regional Full Recon 135mm 2016 6.218032 1.016R544 Santahar Atrai Road Km 000.60-000.90 S 0.3 3864 Regional Full Recon 135mm @ IRI 12 2016 8.52384 0.727R544 Santahar Atrai Road Km 000.90-001.80 S 0.9 3864 Regional Overlay 50mm @ IRI 5-7 2016 4.914 1.715R544 Santahar Atrai Road Km 001.80-001.90 S 0.1 3864 Regional Full Recon 135mm 2016 2.84128 1.577R544 Santahar Atrai Road Km 001.90-004.00 S 2.1 3864 Regional Overlay 50mm @ IRI 5-7 2016 11.466 2.029R544 Santahar Atrai Road Km 004.00-004.20 S 0.2 3864 Regional Full Recon 135mm 2016 5.68256 1.296R544 Santahar Atrai Road Km 004.20-006.90 S 2.7 3864 Regional Overlay 50mm @ IRI 5-7 2016 14.742 1.868R544 Santahar Atrai Road Km 006.90-007.00 S 0.1 3864 Regional Full Recon 135mm 2016 2.84128 1.259R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 048.80-051.35 S 2.55 5424 Regional Overlay 60mm @ IRI 5.5-9 2016 29.15706 6.245R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 052.00-055.99 S 3.99 7135 Regional Overlay 60mm @ IRI 5.5-9 2016 30.74758 12.822R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 057.00-059.06 S 2.06 7135 Regional Overlay 60mm @ IRI 5.5-9 2016 17.24116 12.003R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 059.06-068.98 S 9.92 2844 Regional Overlay 50mm @ IRI 7-9 2016 60.63946 4.689R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 069.96-070.40 S 0.44 2844 Regional Overlay 50mm @ IRI 7-9 2016 2.541 5.273R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 070.40-070.96 L 0.56 2844 Regional Overlay 50mm @ IRI 7-9 2016 6.0564 1.941R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 070.40-070.96 R 0.56 2844 Regional Overlay 50mm @ IRI 7-9 2016 6.0564 1.941R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 070.96-073.01 S 2.05 2844 Regional Overlay 50mm @ IRI 7-9 2016 11.92889 4.61R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 073.99-076.01 S 2.03 2844 Regional Overlay 50mm @ IRI 7-9 2016 11.69438 5.227R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 077.00-097.03 S 20.03 2864 Regional Overlay 50mm @ IRI 7-9 2016 115.8836 2.78R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 098.00-111.61 S 13.6 2872 Regional Overlay 50mm @ IRI 7-9 2016 78.56887 2.421R547 Naogaon-Badalgachhi-Patnitala-honpur Km 000.00-000.10 S 0.1 2925 Regional DBST @ 25% Crk 2016 0.7657 0.048R547 Naogaon-Badalgachhi-Patnitala-honpur Km 000.10-000.30 S 0.2 2925 Regional Full Recon 135mm 2016 6.0104 1.265R547 Naogaon-Badalgachhi-Patnitala-honpur Km 000.30-000.40 S 0.1 2925 Regional Overlay 50mm @ IRI 5-7 2016 0.5775 3.335R547 Naogaon-Badalgachhi-Patnitala-honpur Km 000.40-000.70 S 0.3 2925 Regional Full Recon 135mm 2016 9.0156 1.132R547 Naogaon-Badalgachhi-Patnitala-honpur Km 000.70-000.80 S 0.1 2925 Regional Overlay 50mm @ IRI 7-9 2016 0.5775 3.15R547 Naogaon-Badalgachhi-Patnitala-honpur Km 000.80-001.70 S 0.9 2925 Regional Full Recon 135mm @ IRI 12 2016 24.88305 0.596R547 Naogaon-Badalgachhi-Patnitala-honpur Km 001.70-001.80 S 0.1 2925 Regional Overlay 50mm @ IRI 7-9 2016 0.3885 4.833R547 Naogaon-Badalgachhi-Patnitala-honpur Km 001.80-002.10 S 0.3 2925 Regional Full Recon 135mm 2016 6.06504 1.344R547 Naogaon-Badalgachhi-Patnitala-honpur Km 002.10-003.10 S 1 2925 Regional DBST @ Traff 2000-4000 2016 1.8278 3.132R547 Naogaon-Badalgachhi-Patnitala-honpur Km 003.10-003.20 S 0.1 2925 Regional Full Recon 135mm 2016 2.02168 2.12R547 Naogaon-Badalgachhi-Patnitala-honpur Km 003.20-003.40 S 0.2 2925 Regional DBST @ 25% Crk 2016 0.36556 2.493R547 Naogaon-Badalgachhi-Patnitala-honpur Km 003.40-003.80 S 0.4 2925 Regional Full Recon 135mm 2016 8.08672 1.168R547 Naogaon-Badalgachhi-Patnitala-honpur Km 003.80-004.00 S 0.2 2925 Regional Overlay 50mm @ IRI 5-7 2016 0.777 4.557R547 Naogaon-Badalgachhi-Patnitala-honpur Km 004.00-004.70 S 0.7 2925 Regional Rehab 135mm @ IRI 9-12 2016 15.15069 1.18R547 Naogaon-Badalgachhi-Patnitala-honpur Km 004.70-004.90 S 0.2 2925 Regional Overlay 50mm @ IRI 7-9 2016 0.777 4.363R547 Naogaon-Badalgachhi-Patnitala-honpur Km 004.90-005.30 S 0.4 2925 Regional Rehab 135mm @ IRI 9-12 2016 6.70144 1.371R547 Naogaon-Badalgachhi-Patnitala-honpur Km 005.30-005.80 S 0.5 2925 Regional Overlay 50mm @ IRI 7-9 2016 1.9425 3.882R547 Naogaon-Badalgachhi-Patnitala-honpur Km 005.80-005.90 S 0.1 2925 Regional Full Recon 135mm 2016 2.02168 2.12

Page 124 of 163

Page 125: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R547 Naogaon-Badalgachhi-Patnitala-honpur Km 005.90-006.90 S 1 2925 Regional Overlay 50mm @ IRI 7-9 2016 4.431 3.04R547 Naogaon-Badalgachhi-Patnitala-honpur Km 006.90-007.80 S 0.9 2925 Regional Full Recon 135mm 2016 27.0468 0.529R547 Naogaon-Badalgachhi-Patnitala-honpur Km 007.80-008.10 S 0.3 2925 Regional Overlay 50mm @ IRI 5-7 2016 1.7325 2.135R547 Naogaon-Badalgachhi-Patnitala-honpur Km 008.10-008.60 S 0.5 2925 Regional Full Recon 135mm 2016 15.026 0.734R547 Naogaon-Badalgachhi-Patnitala-honpur Km 008.60-008.70 S 0.1 2925 Regional DBST @ Traff 2000-4000 2016 0.2717 2.838R547 Naogaon-Badalgachhi-Patnitala-honpur Km 008.70-008.80 S 0.1 2925 Regional Full Recon 135mm 2016 3.0052 1.539R547 Naogaon-Badalgachhi-Patnitala-honpur Km 008.80-009.30 S 0.5 2925 Regional DBST @ Traff 2000-4000 2016 1.3585 2.367R547 Naogaon-Badalgachhi-Patnitala-honpur Km 009.30-009.40 S 0.1 2925 Regional Full Recon 135mm 2016 3.0052 1.27R547 Naogaon-Badalgachhi-Patnitala-honpur Km 009.40-010.10 S 0.7 2925 Regional Overlay 50mm @ IRI 7-9 2016 4.0425 2.716R547 Naogaon-Badalgachhi-Patnitala-honpur Km 010.10-010.40 S 0.3 2925 Regional Full Recon 135mm 2016 9.0156 1.164R547 Naogaon-Badalgachhi-Patnitala-honpur Km 010.40-010.50 S 0.1 2925 Regional DBST @ 25% Crk 2016 0.2717 1.227R547 Naogaon-Badalgachhi-Patnitala-honpur Km 010.50-010.60 S 0.1 2925 Regional Rehab 135mm @ IRI 9-12 2016 2.4904 1.132R547 Naogaon-Badalgachhi-Patnitala-honpur Km 010.60-010.90 S 0.3 2925 Regional DBST @ Traff 2000-4000 2016 0.8151 2.471R547 Naogaon-Badalgachhi-Patnitala-honpur Km 010.90-011.40 S 0.5 2925 Regional Full Recon 135mm 2016 15.026 0.762R547 Naogaon-Badalgachhi-Patnitala-honpur Km 011.40-011.90 S 0.5 2925 Regional Overlay 50mm @ IRI 5-7 2016 2.8875 2.631R547 Naogaon-Badalgachhi-Patnitala-honpur Km 011.90-012.00 S 0.1 2925 Regional Full Recon 135mm 2016 3.0052 1.513R547 Naogaon-Badalgachhi-Patnitala-honpur Km 012.01-012.90 S 0.89 2925 Regional Overlay 50mm @ IRI 7-9 2016 5.13975 2.643R547 Naogaon-Badalgachhi-Patnitala-honpur Km 012.90-013.00 S 0.1 2925 Regional Full Recon 135mm 2016 3.0052 1.518R547 Naogaon-Badalgachhi-Patnitala-honpur Km 013.00-013.40 S 0.4 2925 Regional DBST @ Traff 2000-4000 2016 1.0868 2.746R547 Naogaon-Badalgachhi-Patnitala-honpur Km 013.40-015.10 S 1.7 2925 Regional Full Recon 135mm 2016 51.0884 0.689R547 Naogaon-Badalgachhi-Patnitala-honpur Km 015.10-015.20 S 0.1 2925 Regional DBST @ Traff 2000-4000 2016 0.2717 2.595R547 Naogaon-Badalgachhi-Patnitala-honpur Km 015.20-015.40 S 0.2 2925 Regional Full Recon 135mm 2016 6.0104 0.77R547 Naogaon-Badalgachhi-Patnitala-honpur Km 015.40-015.50 S 0.1 2925 Regional DBST @ Traff 2000-4000 2016 0.2717 2.487R547 Naogaon-Badalgachhi-Patnitala-honpur Km 015.50-015.60 S 0.1 2925 Regional Full Recon 135mm 2016 3.0052 1.524R547 Naogaon-Badalgachhi-Patnitala-honpur Km 015.60-015.70 S 0.1 2925 Regional DBST @ 25% Crk 2016 0.2717 1.786R547 Naogaon-Badalgachhi-Patnitala-honpur Km 015.70-016.00 S 0.3 3064 Regional DBST @ Traff 2000-4000 2016 0.8151 3.008R547 Naogaon-Badalgachhi-Patnitala-honpur Km 016.60-016.70 S 0.1 3318 Regional Full Recon 135mm 2016 2.02168 2.359R547 Naogaon-Badalgachhi-Patnitala-honpur Km 016.70-017.20 S 0.5 3318 Regional Overlay 50mm @ IRI 7-9 2016 1.9425 4.831R547 Naogaon-Badalgachhi-Patnitala-honpur Km 017.20-017.40 S 0.2 3318 Regional Full Recon 135mm 2016 4.04336 2.171R547 Naogaon-Badalgachhi-Patnitala-honpur Km 017.40-017.80 S 0.4 3318 Regional Overlay 50mm @ IRI 7-9 2016 1.554 4.944R547 Naogaon-Badalgachhi-Patnitala-honpur Km 017.80-018.00 S 0.2 3318 Regional Full Recon 135mm 2016 4.04336 2.075R547 Naogaon-Badalgachhi-Patnitala-honpur Km 018.00-018.20 S 0.2 3318 Regional Overlay 50mm @ IRI 7-9 2016 0.777 5.209R547 Naogaon-Badalgachhi-Patnitala-honpur Km 018.20-018.60 S 0.4 3318 Regional Full Recon 135mm 2016 8.08672 1.962R547 Naogaon-Badalgachhi-Patnitala-honpur Km 018.60-019.10 S 0.5 3318 Regional Overlay 50mm @ IRI 7-9 2016 1.9425 4.606R547 Naogaon-Badalgachhi-Patnitala-honpur Km 019.10-019.30 S 0.2 3318 Regional Full Recon 135mm 2016 4.04336 2.177R547 Naogaon-Badalgachhi-Patnitala-honpur Km 019.30-021.40 S 2.1 3318 Regional Overlay 50mm @ IRI 7-9 2016 8.158499 4.952R547 Naogaon-Badalgachhi-Patnitala-honpur Km 021.40-021.50 S 0.1 3318 Regional Full Recon 135mm 2016 2.02168 2.565R547 Naogaon-Badalgachhi-Patnitala-honpur Km 021.50-021.70 S 0.2 3318 Regional Overlay 50mm @ IRI 7-9 2016 0.777 4.932R547 Naogaon-Badalgachhi-Patnitala-honpur Km 021.70-021.90 S 0.2 3318 Regional Full Recon 135mm 2016 4.04336 2.112R547 Naogaon-Badalgachhi-Patnitala-honpur Km 021.90-022.40 S 0.5 3318 Regional Overlay 50mm @ IRI 5-7 2016 1.9425 4.704R547 Naogaon-Badalgachhi-Patnitala-honpur Km 022.40-022.50 S 0.1 3318 Regional Full Recon 135mm 2016 2.02168 2.53R547 Naogaon-Badalgachhi-Patnitala-honpur Km 022.50-023.00 S 0.5 3318 Regional Rehab 135mm @ IRI 9-12 2016 10.16536 1.298R547 Naogaon-Badalgachhi-Patnitala-honpur Km 023.01-023.80 S 0.79 3318 Regional Overlay 50mm @ IRI 5-7 2016 3.45072 3.568R547 Naogaon-Badalgachhi-Patnitala-honpur Km 023.80-026.50 S 2.7 3318 Regional Rehab 135mm @ IRI 9-12 2016 45.23472 1.647R547 Naogaon-Badalgachhi-Patnitala-honpur Km 026.50-026.90 S 0.4 3318 Regional Overlay 50mm @ IRI 7-9 2016 1.554 4.841R547 Naogaon-Badalgachhi-Patnitala-honpur Km 026.90-027.00 S 0.1 3318 Regional Full Recon 135mm 2016 2.02168 2.578

Page 125 of 163

Page 126: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R547 Naogaon-Badalgachhi-Patnitala-honpur Km 027.00-028.10 S 1.1 3318 Regional Overlay 50mm @ IRI 7-9 2016 5.57865 3.899R547 Naogaon-Badalgachhi-Patnitala-honpur Km 028.10-028.20 S 0.1 3318 Regional Full Recon 135mm @ IRI 12 2016 3.0052 2.042R547 Naogaon-Badalgachhi-Patnitala-honpur Km 028.20-028.50 S 0.3 3318 Regional Overlay 50mm @ IRI 5-7 2016 1.7325 3.817R547 Naogaon-Badalgachhi-Patnitala-honpur Km 028.50-028.70 S 0.2 3318 Regional Full Recon 135mm @ IRI 12 2016 6.0104 1.66R547 Naogaon-Badalgachhi-Patnitala-honpur Km 028.70-030.20 S 1.5 3318 Regional Overlay 50mm @ IRI 7-9 2016 8.6625 3.766R547 Naogaon-Badalgachhi-Patnitala-honpur Km 030.20-030.90 S 0.7 3318 Regional Full Recon 135mm @ IRI 12 2016 21.0364 1.572R547 Naogaon-Badalgachhi-Patnitala-honpur Km 030.90-032.00 S 1.1 3318 Regional DBST @ Traff 2000-4000 2016 2.9887 3.315R547 Naogaon-Badalgachhi-Patnitala-honpur Km 032.00-033.40 S 1.4 3318 Regional Rehab 135mm @ IRI 9-12 2016 53.69302 0.6R548 Naogaon-Atrai-Natore Road Km 000.00-000.50 S 0.5 3552 Regional Full Recon 135mm @ IRI 12 2016 12.62184 0.138R548 Naogaon-Atrai-Natore Road Km 000.50-000.80 S 0.3 3552 Regional Overlay 50mm @ IRI 7-9 2016 1.1655 2.072R548 Naogaon-Atrai-Natore Road Km 001.70-001.90 S 0.2 3552 Regional Overlay 50mm @ IRI 7-9 2016 0.777 2.46R548 Naogaon-Atrai-Natore Road Km 001.90-002.00 S 0.1 3552 Regional Full Recon 135mm 2016 2.02168 1.075R548 Naogaon-Atrai-Natore Road Km 002.00-002.90 S 0.9 3552 Regional Overlay 50mm @ IRI 5-7 2016 3.8367 1.066R548 Naogaon-Atrai-Natore Road Km 002.90-003.20 S 0.3 3552 Regional Full Recon 135mm 2016 6.06504 0.486R548 Naogaon-Atrai-Natore Road Km 003.20-004.10 S 0.9 3552 Regional Overlay 50mm @ IRI 7-9 2016 3.4965 1.373R548 Naogaon-Atrai-Natore Road Km 004.10-004.20 S 0.1 3552 Regional Full Recon 135mm 2016 2.02168 1.145R548 Naogaon-Atrai-Natore Road Km 004.20-004.40 S 0.2 3552 Regional Overlay 50mm @ IRI 7-9 2016 0.777 2.176R548 Naogaon-Atrai-Natore Road Km 004.40-004.50 S 0.1 3552 Regional Full Recon 135mm 2016 2.02168 1.091R548 Naogaon-Atrai-Natore Road Km 004.50-004.70 S 0.2 3552 Regional DBST @ 25% Crk 2016 0.36556 1.398R548 Naogaon-Atrai-Natore Road Km 004.70-005.20 S 0.5 3552 Regional DBST @ Traff 2000-4000 2016 0.9139 1.333R548 Naogaon-Atrai-Natore Road Km 005.20-005.40 S 0.2 3552 Regional DBST @ Traff 2000-4000 2016 0.5434 0.783R548 Naogaon-Atrai-Natore Road Km 005.40-006.00 S 0.6 3552 Regional Rehab 135mm @ IRI 9-12 2016 14.9424 0.131R548 Naogaon-Atrai-Natore Road Km 006.00-006.80 S 0.8 3552 Regional Overlay 50mm @ IRI 7-9 2016 4.62 1.163R548 Naogaon-Atrai-Natore Road Km 006.80-007.30 S 0.5 3552 Regional Full Recon 135mm @ IRI 12 2016 15.026 0.062R548 Naogaon-Atrai-Natore Road Km 007.30-007.40 S 0.1 3552 Regional Overlay 50mm @ IRI 5-7 2016 0.5775 2.331R548 Naogaon-Atrai-Natore Road Km 007.40-007.80 S 0.4 3552 Regional Full Recon 135mm @ IRI 12 2016 12.0208 0.307R548 Naogaon-Atrai-Natore Road Km 007.80-009.00 S 1.2 3552 Regional Overlay 50mm @ IRI 7-9 2016 5.607 1.064R548 Naogaon-Atrai-Natore Road Km 009.00-009.40 S 0.4 3552 Regional Full Recon 135mm 2016 8.08672 0.414R548 Naogaon-Atrai-Natore Road Km 009.40-009.90 S 0.5 3552 Regional Overlay 50mm @ IRI 5-7 2016 1.9425 1.544R548 Naogaon-Atrai-Natore Road Km 009.90-015.90 S 6 3552 Regional Rehab 135mm @ IRI 9-12 2016 100.5216 0.159R548 Naogaon-Atrai-Natore Road Km 016.30-016.40 S 0.1 3552 Regional Full Recon 135mm 2016 2.02168 1.068R548 Naogaon-Atrai-Natore Road Km 016.40-017.20 S 0.8 3552 Regional Overlay 50mm @ IRI 7-9 2016 3.108 1.471R548 Naogaon-Atrai-Natore Road Km 017.20-017.30 S 0.1 3552 Regional Full Recon 135mm 2016 2.02168 1.062R548 Naogaon-Atrai-Natore Road Km 017.30-017.90 S 0.6 3552 Regional Overlay 50mm @ IRI 5-7 2016 2.331 1.426R548 Naogaon-Atrai-Natore Road Km 017.90-018.00 S 0.1 3552 Regional Full Recon 135mm 2016 2.02168 1.063R548 Naogaon-Atrai-Natore Road Km 018.00-019.90 S 1.9 3552 Regional DBST @ Traff 2000-4000 2016 3.47282 1.175R548 Naogaon-Atrai-Natore Road Km 019.90-020.40 S 0.5 3552 Regional Rehab 135mm @ IRI 9-12 2016 8.3768 0.349R548 Naogaon-Atrai-Natore Road Km 020.40-020.50 S 0.1 3552 Regional Overlay 50mm @ IRI 5-7 2016 0.3885 3.414R548 Naogaon-Atrai-Natore Road Km 020.50-021.20 S 0.7 3552 Regional Rehab 135mm @ IRI 9-12 2016 11.72752 0.308R548 Naogaon-Atrai-Natore Road Km 021.20-021.30 S 0.1 3552 Regional Overlay 50mm @ IRI 5-7 2016 0.3885 3.442R548 Naogaon-Atrai-Natore Road Km 021.30-021.80 S 0.5 3552 Regional Full Recon 135mm 2016 10.1084 0.377R548 Naogaon-Atrai-Natore Road Km 021.80-022.40 S 0.6 3552 Regional Overlay 50mm @ IRI 7-9 2016 2.331 1.626R548 Naogaon-Atrai-Natore Road Km 023.70-025.70 S 2 3552 Regional Overlay 50mm @ IRI 7-9 2016 7.77 1.283R548 Naogaon-Atrai-Natore Road Km 026.90-027.60 S 0.7 3552 Regional Overlay 50mm @ IRI 7-9 2016 2.7195 1.809R548 Naogaon-Atrai-Natore Road Km 027.60-028.00 S 0.4 3552 Regional Full Recon 135mm @ IRI 12 2016 11.03728 0.261R549 Badalgachhi-Joypurhat Road Km 000.00-003.80 S 3.8 1719 Regional Overlay 50mm @ IRI 7-9 2016 21.4263 0.563

Page 126 of 163

Page 127: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R549 Badalgachhi-Joypurhat Road Km 003.80-004.20 S 0.4 1719 Regional Overlay 50mm @ IRI 7-9 2016 2.226 0.778R549 Badalgachhi-Joypurhat Road Km 004.20-006.00 S 1.8 1719 Regional DBST @ Traff 100-2000 2016 4.71276 0.61R549 Badalgachhi-Joypurhat Road Km 006.00-006.40 S 0.4 1719 Regional Overlay 50mm @ IRI 7-9 2016 2.226 0.766R549 Badalgachhi-Joypurhat Road Km 006.40-014.18 S 7.78 1719 Regional DBST @ Traff 100-2000 2016 20.29273 0.571R685 Rajshahi-Nawhata-Chowmasia Road Km 048.45-066.42 S 17.97 4734 Regional Overlay 60mm @ IRI 7-9 2016 136.6812 4.688Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 016.90-023.80 S 6.9 3590 Zilla Overlay 40mm @ Traff >=2000 2016 29.8893 0.481Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 023.80-024.00 S 0.2 3590 Zilla Rehab 75mm @ IRI 9-12 2016 3.05286 0.784Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 025.80-025.90 S 0.1 3590 Zilla Rehab 75mm @ IRI 9-12 2016 1.52643 0.945Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 027.40-029.00 S 1.6 3590 Zilla Overlay 40mm @ Traff >=2000 2016 6.92784 0.294Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 029.00-030.30 S 1.3 3590 Zilla Overlay 40mm @ Traff >=2000 2016 5.62887 0.514Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 030.40-030.50 S 0.1 3590 Zilla Full Recon 75mm @ IRI>12 2016 2.21697 0.301Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 030.60-031.50 S 0.9 3590 Zilla Overlay 40mm @ Traff >=2000 2016 3.89691 0.663Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 031.50-032.00 S 0.5 3590 Zilla Overlay 40mm @ Traff >=2000 2016 2.16495 0.345Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 032.00-032.50 S 0.5 3590 Zilla Overlay 40mm @ Traff >=2000 2016 2.16495 0.791Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 037.20-037.40 S 0.2 3590 Zilla Overlay 40mm @ Traff >=2000 2016 0.86598 0.444Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 037.40-038.40 S 1 3590 Zilla Overlay 40mm @ Traff >=2000 2016 4.3299 0.297Z5456 Mahadebpur-Saraigachhi-Porsha (Nitpur) Road Km 002.30-002.40 S 0.1 1492 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.149Z5456 Mahadebpur-Saraigachhi-Porsha (Nitpur) Road Km 002.40-003.00 S 0.6 1492 Zilla Overlay 40mm @ 1000-2000 2016 2.8017 0Z5456 Mahadebpur-Saraigachhi-Porsha (Nitpur) Road Km 003.00-003.10 S 0.1 1492 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.037Z5456 Mahadebpur-Saraigachhi-Porsha (Nitpur) Road Km 003.10-029.40 S 26.3 1492 Zilla Overlay 40mm @ 1000-2000 2016 89.31141 0Z5456 Mahadebpur-Saraigachhi-Porsha (Nitpur) Road Km 029.40-032.70 S 3.3 1492 Zilla Overlay 40mm @ 1000-2000 2016 10.45034 0Z5456 Mahadebpur-Saraigachhi-Porsha (Nitpur) Road Km 032.70-034.30 S 1.6 1492 Zilla Overlay 40mm @ 1000-2000 2016 5.02608 0Z5463 Enayaetpur-Mohadebpur-Patakatahat (Manda) Road Km 005.88-006.41 L 0.52 2757 Zilla Overlay 40mm @ Traff >=2000 2016 2.718922 0.169Z5463 Enayaetpur-Mohadebpur-Patakatahat (Manda) Road Km 005.88-006.41 R 0.52 2757 Zilla Overlay 40mm @ Traff >=2000 2016 2.718922 0.169Z5463 Enayaetpur-Mohadebpur-Patakatahat (Manda) Road Km 006.41-023.58 S 17.17 2757 Zilla Overlay 40mm @ Traff >=2000 2016 53.06148 1.236Z5469 Atrai-Singra Road Km 003.00-005.30 S 2.3 1102 Zilla Overlay 40mm @ 1000-2000 2016 7.228131 0Z5469 Atrai-Singra Road Km 005.30-005.50 S 0.2 1102 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z5469 Atrai-Singra Road Km 005.50-007.10 S 1.6 1102 Zilla Overlay 40mm @ 1000-2000 2016 5.02608 0Z5469 Atrai-Singra Road Km 007.80-008.80 S 1 1102 Zilla Overlay 40mm @ 1000-2000 2016 3.1413 0Z5469 Atrai-Singra Road Km 009.40-010.10 S 0.7 1102 Zilla Overlay 40mm @ IRI>12 2016 2.202051 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 000.30-000.60 S 0.3 2446 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 000.60-000.80 S 0.2 2446 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.002Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 000.80-001.80 S 1 2446 Zilla Full Recon 75mm @ IRI>12 2016 23.9085 0.03Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 001.80-002.10 S 0.3 2446 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.006Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 002.10-002.20 S 0.1 2446 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 002.20-002.30 S 0.1 2446 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 002.30-002.40 S 0.1 2446 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.136Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 002.40-002.70 S 0.3 2446 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 002.70-004.80 S 2.1 2446 Zilla Rehab 75mm @ IRI 9-12 2016 34.56915 0.013Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 004.80-005.10 S 0.3 2446 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 005.10-008.10 S 3 2446 Zilla Overlay 40mm @ Traff >=2000 2016 14.0085 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 008.10-008.60 S 0.5 2446 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 008.60-008.80 S 0.2 2446 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 008.80-009.90 S 1.1 2446 Zilla Overlay 40mm @ Traff >=2000 2016 5.13645 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 009.90-010.50 S 0.6 2446 Zilla Overlay 40mm @ IRI>12 2016 2.8017 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 010.50-010.60 S 0.1 2446 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0

Page 127 of 163

Page 128: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 010.60-011.50 S 0.9 2446 Zilla Overlay 40mm @ IRI>12 2016 3.728808 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 011.50-011.90 S 0.4 2446 Zilla Seal Coat 2016 0.5544 0.052Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 011.90-012.40 S 0.5 2446 Zilla Full Recon 75mm @ IRI>12 2016 11.95425 0.008Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 012.80-013.90 S 1.1 2446 Zilla Rehab 75mm @ IRI 9-12 2016 18.10765 0.052Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 013.90-014.00 S 0.1 2446 Zilla Seal Coat 2016 0.1386 0.405Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 014.00-014.20 S 0.2 2446 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 014.20-014.30 S 0.1 2446 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 014.30-014.40 S 0.1 2446 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.004Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 014.40-014.70 S 0.3 2446 Zilla Seal Coat 2016 0.4158 0.359Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 014.70-017.70 S 3 2446 Zilla Rehab 75mm @ IRI 9-12 2016 49.3845 0.013Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 017.70-020.70 S 3 2446 Zilla Overlay 40mm @ Traff >=2000 2016 9.88236 0.152Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 020.70-020.90 S 0.2 2446 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0.767Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 020.90-021.20 S 0.3 2446 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.351Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 022.40-023.30 S 0.9 2446 Zilla Full Recon 75mm @ IRI>12 2016 14.47551 0.233Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 023.40-023.60 S 0.2 2446 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.367Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 024.10-024.30 S 0.2 2446 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.449Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 024.50-024.60 S 0.1 2446 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.584Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 025.40-025.60 S 0.2 2446 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.474Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 025.80-026.70 S 0.9 2446 Zilla Overlay 40mm @ Traff >=2000 2016 2.82717 0.799Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 026.80-027.00 S 0.2 2446 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.63Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 027.60-027.80 S 0.2 2446 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.988Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 028.30-028.60 S 0.3 2446 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.324Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 028.60-028.90 S 0.3 2446 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.774Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 028.90-029.00 S 0.1 2446 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.677Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 029.20-029.30 S 0.1 2446 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.903Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 029.60-029.90 S 0.3 2446 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.353Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 030.20-030.50 S 0.3 2446 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 0.888Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 030.90-031.40 S 0.5 2446 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.234Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 031.80-032.70 S 0.9 2446 Zilla Full Recon 75mm @ IRI>12 2016 14.47551 0.314Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 032.70-033.10 S 0.4 2446 Zilla Overlay 40mm @ Traff >=2000 2016 1.25652 0.667Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 033.10-033.50 S 0.4 2446 Zilla Full Recon 75mm @ IRI>12 2016 6.43356 0.371Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 034.50-035.00 S 0.5 2446 Zilla Rehab 75mm @ IRI 9-12 2016 5.53705 0.521Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 036.00-036.10 S 0.1 2446 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.687Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 036.10-036.70 S 0.6 2446 Zilla Overlay 40mm @ Traff >=2000 2016 1.88478 0.826Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 036.70-037.30 S 0.6 2446 Zilla Full Recon 75mm @ IRI>12 2016 9.65034 0.267Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 037.30-037.90 S 0.6 2446 Zilla Overlay 40mm @ Traff >=2000 2016 1.88478 0.521Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 037.90-038.10 S 0.2 2446 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.376Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 038.40-038.50 S 0.1 2446 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.644Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 038.70-039.60 S 0.9 2446 Zilla Full Recon 75mm @ IRI>12 2016 14.47551 0.186Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 039.60-039.70 S 0.1 2446 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0.575Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 039.70-040.20 S 0.5 2446 Zilla Rehab 75mm @ IRI 9-12 2016 5.53705 0.483Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 041.30-041.40 S 0.1 2446 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.68Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 041.40-042.40 S 1 2446 Zilla Overlay 40mm @ Traff >=2000 2016 3.1413 0.693Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 043.50-044.00 S 0.5 2446 Zilla Overlay 40mm @ Traff >=2000 2016 1.57065 0.42Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 044.00-044.70 S 0.7 2446 Zilla Rehab 75mm @ IRI 9-12 2016 7.751869 0.627Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 044.70-044.80 S 0.1 2446 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0.578

Page 128 of 163

Page 129: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 044.80-046.90 S 2.1 2446 Zilla Full Recon 75mm @ IRI>12 2016 33.77619 0.292Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 046.90-047.40 S 0.5 2446 Zilla Overlay 40mm @ Traff >=2000 2016 1.57065 0.729Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 047.40-048.40 S 1 2446 Zilla Full Recon 75mm @ IRI>12 2016 16.0839 0.257Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 048.80-049.30 S 0.5 2446 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.302Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 049.70-050.40 S 0.7 2446 Zilla Full Recon 75mm @ IRI>12 2016 11.25873 0.252Z6852 Manda-Niamatpur-Shibpur-Porsha Road Km 050.50-051.02 S 0.52 2446 Zilla Full Recon 75mm @ IRI>12 2016 8.363627 0.344Z6856 Manda-Bagmara-Atrai Road Km 003.00-003.10 S 0.1 1747 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z6856 Manda-Bagmara-Atrai Road Km 003.10-003.80 S 0.7 1747 Zilla Rehab 75mm @ IRI 9-12 2016 7.751869 0.178Z6856 Manda-Bagmara-Atrai Road Km 003.80-004.10 S 0.3 1747 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z6856 Manda-Bagmara-Atrai Road Km 004.10-004.30 S 0.2 1747 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.042Z6856 Manda-Bagmara-Atrai Road Km 004.30-004.70 S 0.4 1747 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z6856 Manda-Bagmara-Atrai Road Km 004.70-005.20 S 0.5 1747 Zilla Rehab 75mm @ IRI 9-12 2016 5.53705 0.015Z6856 Manda-Bagmara-Atrai Road Km 005.20-006.20 S 1 1747 Zilla Overlay 40mm @ 1000-2000 2016 3.1413 0Z6856 Manda-Bagmara-Atrai Road Km 006.20-006.30 S 0.1 1747 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.125Z6856 Manda-Bagmara-Atrai Road Km 006.30-006.40 S 0.1 1747 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z6856 Manda-Bagmara-Atrai Road Km 008.00-008.30 S 0.3 1747 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 0.04Z6856 Manda-Bagmara-Atrai Road Km 008.30-010.10 S 1.8 1747 Zilla Overlay 40mm @ 1000-2000 2016 5.65434 0Z6856 Manda-Bagmara-Atrai Road Km 025.42-026.82 S 1.4 1747 Zilla Overlay 40mm @ 1000-2000 2016 4.99212 0Z6856 Manda-Bagmara-Atrai Road Km 029.12-029.22 S 0.1 1747 Zilla Overlay 40mm @ 1000-2000 2016 0.35658 0Z6856 Manda-Bagmara-Atrai Road Km 029.22-029.32 S 0.1 1747 Zilla Overlay 40mm @ 1000-2000 2016 0.35658 0.026Z6856 Manda-Bagmara-Atrai Road Km 029.32-029.92 S 0.6 1747 Zilla Overlay 40mm @ 1000-2000 2016 2.13948 0Z6856 Manda-Bagmara-Atrai Road Km 029.92-030.02 S 0.1 1747 Zilla Overlay 40mm @ 1000-2000 2016 0.351486 0.046Z6856 Manda-Bagmara-Atrai Road Km 030.02-033.02 S 3 1747 Zilla Overlay 40mm @ 1000-2000 2016 9.6786 0Z6856 Manda-Bagmara-Atrai Road Km 039.52-041.00 S 1.49 1747 Zilla Overlay 40mm @ 1000-2000 2016 4.790907 0Z6856 Manda-Bagmara-Atrai Road Km 042.52-046.54 S 4.03 1747 Zilla Overlay 40mm @ 1000-2000 2016 13.32718 0Sub-Total Naogaon Division 2138.255

Natore DivisionN502 Bogra (Jahangirabad)-Natore Road Km 031.51-034.51 S 3 6211 National Overlay 50mm @ IRI 5-7 2016 17.955 12.905N502 Bogra (Jahangirabad)-Natore Road Km 034.51-037.51 S 3 6211 National Overlay 60mm @ IRI 7-9 2016 25.94187 11.81N502 Bogra (Jahangirabad)-Natore Road Km 037.51-038.61 S 1.1 6211 National Overlay 50mm @ IRI 5-7 2016 6.5835 12.287N502 Bogra (Jahangirabad)-Natore Road Km 038.61-039.91 S 1.3 6211 National DBST @ Traff >6000 2016 3.66054 12.412N502 Bogra (Jahangirabad)-Natore Road Km 039.91-040.51 S 0.6 6211 National Overlay 60mm @ IRI 7-9 2016 4.27842 13.114N502 Bogra (Jahangirabad)-Natore Road Km 061.52-063.29 S 1.77 6211 National Overlay 50mm @ IRI 5-7 2016 14.14854 10.009N507 Hatikamrul-Banpara Road Km 025.17-051.25 S 26.08 5745 National Overlay 50mm @ IRI 5-9 2016 314.8677 6.511N507 Hatikamrul-Banpara Road Km 051.25-051.26 L 0.01 13562 National Overlay 80mm @ IRI 5-9 2016 0.186789 19.689N507 Hatikamrul-Banpara Road Km 051.25-051.26 R 0.01 13562 National Overlay 80mm @ IRI 5-9 2016 0.120669 27.896N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 069.00-085.60 S 16.6 7304 National Overlay 50mm @ IRI 4-7 2016 133.3475 7.941N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 089.50-090.00 S 0.5 8212 National DBST @ Traff >6000 2016 2.29216 9.932N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 097.40-100.30 S 2.9 9783 National Full Recon 180mm 2016 186.7977 3.926N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 100.30-100.90 S 0.6 9845 National DBST @ Traff >6000 2016 2.72688 9.964N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 100.90-103.30 S 2.4 10140 National Full Recon 195mm 2016 129.6658 5.641N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 103.30-104.60 S 1.3 10140 National Overlay 80mm @ IRI 4-9 2016 15.68697 14.933N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 104.60-105.40 S 0.8 10140 National Full Recon 195mm 2016 42.63784 5.925N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 105.40-113.82 S 8.42 9838 National DBST @ Traff >6000 2016 30.3642 13.944R548 Naogaon-Atrai-Natore Road Km 037.20-053.32 S 16.12 3552 Regional Overlay 50mm @ IRI 7-9 2016 92.08315 1.191

Page 129 of 163

Page 130: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5209 Singra-Gurudaspur-Chatmohor Road Km 016.58-016.78 S 0.2 2762 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 1.051Z5209 Singra-Gurudaspur-Chatmohor Road Km 020.48-020.88 S 0.4 2762 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 0.82Z5209 Singra-Gurudaspur-Chatmohor Road Km 020.88-021.18 S 0.3 2762 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.839Z5209 Singra-Gurudaspur-Chatmohor Road Km 021.18-021.28 S 0.1 2762 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 1.556Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 002.30-002.40 S 0.1 1818 Zilla Overlay 40mm @ IRI>12 2016 0.27168 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 003.00-003.30 S 0.3 1818 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 003.60-003.70 S 0.1 1818 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 003.90-004.10 S 0.2 1818 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 007.30-007.70 S 0.4 1818 Zilla Overlay 40mm @ IRI>12 2016 1.25652 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 015.02-015.12 S 0.1 1818 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.089Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 015.82-016.02 S 0.2 1818 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 016.62-018.42 S 1.8 1818 Zilla Overlay 40mm @ IRI>12 2016 5.657481 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 019.42-019.52 S 0.1 1818 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 021.62-021.82 S 0.2 1818 Zilla Overlay 40mm @ IRI>12 2016 0.54336 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 026.42-027.12 S 0.7 1818 Zilla Overlay 40mm @ IRI>12 2016 2.08005 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 027.22-028.62 S 1.4 1818 Zilla Rehab 75mm @ IRI 9-12 2016 14.6657 0.04Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 031.92-032.02 S 0.1 1818 Zilla Overlay 40mm @ IRI>12 2016 0.29715 0Z5210 Kaliganj-Naldangerhat-Sarkutia Bazar Road Km 032.22-032.52 S 0.3 1818 Zilla Overlay 40mm @ IRI>12 2016 0.89145 0Z5211 Natore (Dalsarak)-Bildahar-Gurudaspur Road Km 000.00-000.70 S 0.7 2185 Zilla Overlay 40mm @ Traff >=2000 2016 2.763495 0Z5211 Natore (Dalsarak)-Bildahar-Gurudaspur Road Km 000.70-000.80 S 0.1 2185 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.397Z5211 Natore (Dalsarak)-Bildahar-Gurudaspur Road Km 003.00-004.60 S 1.6 2185 Zilla Overlay 40mm @ IRI>12 2016 6.864207 0Z5211 Natore (Dalsarak)-Bildahar-Gurudaspur Road Km 004.90-005.00 S 0.1 2185 Zilla Overlay 40mm @ IRI>12 2016 0.41601 0Z5211 Natore (Dalsarak)-Bildahar-Gurudaspur Road Km 005.20-005.50 S 0.3 2185 Zilla Overlay 40mm @ IRI>12 2016 1.24803 0Z5211 Natore (Dalsarak)-Bildahar-Gurudaspur Road Km 007.20-007.40 S 0.2 2185 Zilla Rehab 75mm @ IRI 9-12 2016 3.11272 0.172Z5211 Natore (Dalsarak)-Bildahar-Gurudaspur Road Km 008.10-008.20 S 0.1 2185 Zilla Overlay 40mm @ IRI>12 2016 0.44148 0Z6006 Baneswar-Charghat-Lalpur-Ishwardi Road Km 031.18-047.27 S 16.09 3465 Zilla Overlay 40mm @ Traff >=2000 2016 82.65575 0.425Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 000.00-000.60 S 0.6 4900 Zilla Overlay 50mm @ Cracking >25%2016 3.465 0.003Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 000.60-000.80 S 0.2 4900 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.755Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 000.80-001.50 S 0.7 4900 Zilla Overlay 50mm @ IRI 6-9 2016 4.0425 1.973Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 001.50-001.80 S 0.3 4900 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 1.197Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 001.80-005.70 S 3.9 4900 Zilla Overlay 50mm @ IRI 6-9 2016 21.2585 2.146Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 005.70-006.70 S 1 4900 Zilla Rehab 75mm @ IRI 9-12 2016 14.33647 1.228Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 006.70-010.40 S 3.7 4900 Zilla Overlay 50mm @ IRI 6-9 2016 17.72039 2.014Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 010.40-010.90 S 0.5 4900 Zilla Rehab 75mm @ IRI 9-12 2016 6.43495 1.538Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 010.90-011.00 S 0.1 4900 Zilla Overlay 50mm @ Cracking >25%2016 0.4515 1.665Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 011.00-012.70 S 1.7 4900 Zilla Overlay 50mm @ IRI 6-9 2016 8.83575 1.981Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 012.70-013.00 S 0.3 4900 Zilla Overlay 50mm @ IRI 6-9 2016 1.7325 2.423Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 013.00-014.40 S 1.4 4900 Zilla Overlay 50mm @ IRI 6-9 2016 8.085 0.502Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 014.40-016.20 S 1.8 4900 Zilla Overlay 50mm @ IRI 6-9 2016 10.0926 2.494Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 017.80-017.90 S 0.1 4900 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 1.674Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 017.90-018.10 S 0.2 4900 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 2.002Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 018.10-018.20 S 0.1 4900 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 1.741Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 018.20-019.20 S 1 4900 Zilla Overlay 50mm @ IRI 6-9 2016 5.775 1.953Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 019.20-020.47 S 1.27 4900 Zilla Overlay 50mm @ IRI 6-9 2016 5.925402 3.322Z6011 Lalpur- Dayarampur- Shankerbagerhat - Natore Km 020.47-021.76 S 1.29 2455 Zilla Overlay 40mm @ Traff >=2000 2016 4.552864 0.129Z6014 Bonpara-Gopalpur-Lalpur Road Km 000.00-000.10 S 0.1 4294 Zilla Full Recon 75mm @ IRI>12 2016 3.195045 0.37

Page 130 of 163

Page 131: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z6014 Bonpara-Gopalpur-Lalpur Road Km 000.90-001.00 S 0.1 4294 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 1.305Z6014 Bonpara-Gopalpur-Lalpur Road Km 001.10-001.30 S 0.2 4294 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 1.366Z6014 Bonpara-Gopalpur-Lalpur Road Km 001.40-001.80 S 0.4 4294 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 1.249Z6014 Bonpara-Gopalpur-Lalpur Road Km 001.80-003.10 S 1.3 4294 Zilla Rehab 75mm @ IRI 9-12 2016 21.39995 1.24Z6014 Bonpara-Gopalpur-Lalpur Road Km 003.10-003.40 S 0.3 4294 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 1.245Z6014 Bonpara-Gopalpur-Lalpur Road Km 003.40-006.20 S 2.8 4294 Zilla Rehab 75mm @ IRI 9-12 2016 46.0922 1.418Z6014 Bonpara-Gopalpur-Lalpur Road Km 006.20-006.60 S 0.4 4294 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 1.03Z6014 Bonpara-Gopalpur-Lalpur Road Km 006.60-007.40 S 0.8 4294 Zilla Overlay 50mm @ IRI 6-9 2016 6.51 0.755Z6014 Bonpara-Gopalpur-Lalpur Road Km 007.40-007.50 S 0.1 4294 Zilla Rehab 75mm @ IRI 9-12 2016 2.84335 0.158Z6014 Bonpara-Gopalpur-Lalpur Road Km 007.50-007.60 S 0.1 4294 Zilla Overlay 50mm @ IRI 6-9 2016 0.9975 0.143Z6014 Bonpara-Gopalpur-Lalpur Road Km 007.60-009.40 S 1.8 4294 Zilla Rehab 75mm @ IRI 9-12 2016 41.6446 0.224Z6014 Bonpara-Gopalpur-Lalpur Road Km 009.40-010.20 S 0.8 4294 Zilla Overlay 50mm @ IRI 6-9 2016 4.62 1.602Z6014 Bonpara-Gopalpur-Lalpur Road Km 010.20-011.80 S 1.6 4294 Zilla Full Recon 75mm @ IRI>12 2016 38.2536 1.116Z6014 Bonpara-Gopalpur-Lalpur Road Km 011.80-011.90 S 0.1 4294 Zilla Overlay 50mm @ Cracking >25%2016 0.5775 0.257Z6014 Bonpara-Gopalpur-Lalpur Road Km 011.90-012.20 S 0.3 4294 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 1.185Z6014 Bonpara-Gopalpur-Lalpur Road Km 012.20-017.02 S 4.82 4294 Zilla Overlay 40mm @ Traff >=2000 2016 22.54791 0Z6014 Bonpara-Gopalpur-Lalpur Road Km 017.02-018.72 S 1.7 4294 Zilla Rehab 75mm @ IRI 9-12 2016 27.98455 1.122Z6015 Ahamadpur-Baraigram-Gurudashpur Road Km 015.28-015.48 S 0.2 2326 Zilla Overlay 40mm @ IRI>12 2016 0.83202 0Z6015 Ahamadpur-Baraigram-Gurudashpur Road Km 016.78-016.91 S 0.13 2326 Zilla Overlay 40mm @ Traff >=2000 2016 0.402086 0.013Z6015 Ahamadpur-Baraigram-Gurudashpur Road Km 016.91-017.61 S 0.7 2326 Zilla Full Recon 75mm @ IRI>12 2016 11.25873 0.105Z6015 Ahamadpur-Baraigram-Gurudashpur Road Km 017.61-019.31 S 1.7 2326 Zilla Overlay 40mm @ Traff >=2000 2016 5.643303 0.471Z6015 Ahamadpur-Baraigram-Gurudashpur Road Km 019.31-019.71 S 0.4 2326 Zilla Rehab 75mm @ IRI 9-12 2016 5.26768 0.255Z6020 Arani-Bagatipara Road Km 006.30-009.69 S 3.39 1670 Zilla Overlay 40mm @ 1000-2000 2016 10.502 0Z6029 Baraigram Thana-Zonail-Chatmohor Road Km 008.10-010.00 S 1.9 2141 Zilla Overlay 40mm @ Traff >=2000 2016 8.533299 0Z6029 Baraigram Thana-Zonail-Chatmohor Road Km 010.00-010.10 S 0.1 2141 Zilla Overlay 40mm @ IRI>12 2016 0.471619 0Sub-Total Natore Division 1588.346

Nawabganj DivisionN6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 196.89-196.99 S 0.1 2654 National DBST Traff All 2016 0.33098 0R547 Naogaon-Badalgachhi-Patnitala-honpur Km 100.85-100.99 S 0.13 3318 Regional Overlay 50mm @ IRI 5-7 2016 0.756525 5.503R682 Ujanpara-Bijoynagar Road (Old Part) Km 000.00-001.33 S 1.33 5788 Regional Overlay 60mm @ IRI 5.5-9 2016 10.74834 16.507Z6802 Kansat-Gomostapur-Rohonpur Road Km 000.00-004.30 S 4.3 2809 Zilla Overlay 40mm @ Traff >=2000 2016 16.72021 0.019Z6802 Kansat-Gomostapur-Rohonpur Road Km 005.14-005.50 S 0.36 2809 Zilla Overlay 40mm @ Traff >=2000 2016 1.130868 0.69Z6802 Kansat-Gomostapur-Rohonpur Road Km 010.12-013.80 S 3.68 2809 Zilla Overlay 40mm @ Traff >=2000 2016 12.72289 0.186Z6802 Kansat-Gomostapur-Rohonpur Road Km 014.51-022.10 S 7.59 2804 Zilla Overlay 40mm @ Traff >=2000 2016 34.61748 0Z6802 Kansat-Gomostapur-Rohonpur Road Km 022.10-025.17 S 3.07 2768 Zilla Overlay 40mm @ Traff >=2000 2016 10.86173 0.919Z6802 Kansat-Gomostapur-Rohonpur Road Km 025.17-027.87 S 2.7 2768 Zilla Overlay 40mm @ Traff >=2000 2016 8.369994 0.872Z6802 Kansat-Gomostapur-Rohonpur Road Km 027.87-028.37 S 0.5 2768 Zilla Overlay 40mm @ Traff >=2000 2016 1.549425 0.546Z6802 Kansat-Gomostapur-Rohonpur Road Km 028.37-028.47 S 0.1 2768 Zilla Rehab 75mm @ IRI 9-12 2016 1.361815 0.712Z6802 Kansat-Gomostapur-Rohonpur Road Km 028.47-028.57 S 0.1 2768 Zilla Overlay 40mm @ Traff >=2000 2016 0.403275 0.023Z6802 Kansat-Gomostapur-Rohonpur Road Km 028.57-028.87 S 0.3 2768 Zilla Full Recon 75mm @ IRI>12 2016 4.759965 0.486Z6802 Kansat-Gomostapur-Rohonpur Road Km 028.87-028.97 S 0.1 2768 Zilla Seal Coat 2016 0.09198 0.24Z6802 Kansat-Gomostapur-Rohonpur Road Km 028.97-030.07 S 1.1 2768 Zilla Full Recon 75mm @ IRI>12 2016 17.4532 0.464Z6802 Kansat-Gomostapur-Rohonpur Road Km 030.57-030.77 S 0.2 2768 Zilla Full Recon 75mm @ IRI>12 2016 3.17331 0.496Z6802 Kansat-Gomostapur-Rohonpur Road Km 030.77-031.07 S 0.3 2768 Zilla Overlay 40mm @ Traff >=2000 2016 0.929655 0.519Z6802 Kansat-Gomostapur-Rohonpur Road Km 031.17-031.87 S 0.7 2768 Zilla Full Recon 75mm @ IRI>12 2016 11.10659 0.375

Page 131 of 163

Page 132: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z6803 Nawabganj-Amnura Road Km 000.00-001.30 S 1.3 2951 Zilla Overlay 40mm @ Traff >=2000 2016 5.761313 0Z6803 Nawabganj-Amnura Road Km 001.30-001.50 S 0.2 2951 Zilla Rehab 75mm @ IRI 9-12 2016 3.11272 0.259Z6803 Nawabganj-Amnura Road Km 001.50-011.93 S 10.43 2951 Zilla Overlay 40mm @ Traff >=2000 2016 48.237 0Z6805 Rahonpur-Bholahati BDR Camp Road Km 005.00-005.20 S 0.2 1857 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.972Z6805 Rahonpur-Bholahati BDR Camp Road Km 005.60-006.30 S 0.7 1857 Zilla Rehab 75mm @ IRI 9-12 2016 7.751869 1.002Z6805 Rahonpur-Bholahati BDR Camp Road Km 006.90-007.00 S 0.1 1857 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.481Z6805 Rahonpur-Bholahati BDR Camp Road Km 007.00-007.10 S 0.1 1857 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.082Z6805 Rahonpur-Bholahati BDR Camp Road Km 007.10-007.30 S 0.2 1857 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.657Z6805 Rahonpur-Bholahati BDR Camp Road Km 007.30-007.50 S 0.2 1857 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0.294Z6805 Rahonpur-Bholahati BDR Camp Road Km 007.50-007.60 S 0.1 1857 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.907Z6805 Rahonpur-Bholahati BDR Camp Road Km 007.60-008.40 S 0.8 1857 Zilla Overlay 40mm @ 1000-2000 2016 2.51304 0Z6805 Rahonpur-Bholahati BDR Camp Road Km 008.40-008.50 S 0.1 1857 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.54Z6805 Rahonpur-Bholahati BDR Camp Road Km 008.50-010.40 S 1.9 1857 Zilla Rehab 75mm @ IRI 9-12 2016 21.05186 0.876Z6805 Rahonpur-Bholahati BDR Camp Road Km 010.40-010.60 S 0.2 1857 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.379Z6805 Rahonpur-Bholahati BDR Camp Road Km 010.60-010.80 S 0.2 1857 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0.288Z6805 Rahonpur-Bholahati BDR Camp Road Km 010.80-011.00 S 0.2 1857 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.685Z6805 Rahonpur-Bholahati BDR Camp Road Km 011.00-025.50 S 14.5 1857 Zilla Overlay 40mm @ 1000-2000 2016 45.55513 0Z6805 Rahonpur-Bholahati BDR Camp Road Km 025.50-025.80 S 0.3 1857 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.621Z6812 Dhansura-Parbatipur-Adda Link Road Km 000.10-000.20 S 0.1 2035 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.077Z6812 Dhansura-Parbatipur-Adda Link Road Km 000.30-000.40 S 0.1 2035 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.077Z6812 Dhansura-Parbatipur-Adda Link Road Km 000.70-000.90 S 0.2 2035 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z6812 Dhansura-Parbatipur-Adda Link Road Km 002.30-002.40 S 0.1 2035 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z6812 Dhansura-Parbatipur-Adda Link Road Km 002.70-002.80 S 0.1 2035 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.322Z6812 Dhansura-Parbatipur-Adda Link Road Km 003.40-003.60 S 0.2 2035 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 0.282Z6812 Dhansura-Parbatipur-Adda Link Road Km 004.50-004.60 S 0.1 2035 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z6813 Godagari-Nachol-Niamatpur Road Km 032.83-042.83 S 10 3199 Zilla Overlay 40mm @ Traff >=2000 2016 46.70434 0.491Z6818 Baragaria-Gohalbari-Jadabpur Kheya Ghat Km 002.20-002.60 S 0.4 2745 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 0.816Z6818 Baragaria-Gohalbari-Jadabpur Kheya Ghat Km 002.60-003.10 S 0.5 2745 Zilla Overlay 40mm @ Traff >=2000 2016 1.57065 0Z6818 Baragaria-Gohalbari-Jadabpur Kheya Ghat Km 003.10-003.50 S 0.4 2745 Zilla Rehab 75mm @ IRI 9-12 2016 4.440714 0.825Z6818 Baragaria-Gohalbari-Jadabpur Kheya Ghat Km 003.50-004.60 S 1.09 2745 Zilla Overlay 40mm @ Traff >=2000 2016 3.436582 0.241Z6819 Boalia-Chowdhala Road Km 000.00-000.20 S 0.2 1562 Zilla Overlay 40mm @ IRI>12 2016 0.69618 0Z6819 Boalia-Chowdhala Road Km 000.20-000.60 S 0.4 1562 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z6819 Boalia-Chowdhala Road Km 000.60-000.70 S 0.1 1562 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z6819 Boalia-Chowdhala Road Km 000.70-000.90 S 0.2 1562 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z6819 Boalia-Chowdhala Road Km 000.90-001.00 S 0.1 1562 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z6819 Boalia-Chowdhala Road Km 001.40-001.50 S 0.1 1562 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z6819 Boalia-Chowdhala Road Km 001.50-002.10 S 0.6 1562 Zilla Overlay 40mm @ 1000-2000 2016 1.88478 0Z6819 Boalia-Chowdhala Road Km 003.50-003.90 S 0.4 1562 Zilla Overlay 40mm @ IRI>12 2016 1.25652 0Sub-Total Nawabganj Division 371.9899

Pabna DivisionN5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 103.34-107.64 S 4.3 2496 National Overlay 50mm @ IRI 4-9 2016 32.9595 0.567N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 123.25-123.29 L 0.04 5174 National Overlay 50mm @ IRI 4-9 2016 0.32193 6.411N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 123.25-123.29 R 0.04 5174 National Overlay 50mm @ IRI 4-9 2016 0.32193 6.411N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 123.29-126.94 S 3.65 5174 National Overlay 50mm @ IRI 4-9 2016 29.10306 3.096N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 126.94-127.84 S 0.9 5174 National Overlay 50mm @ IRI 4-9 2016 7.03185 6.814

Page 132 of 163

Page 133: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N504 Nagarbari (Pratappur)-Kashinathpur Road Km 004.67-006.65 S 1.99 5635 National Overlay 50mm @ IRI 5-9 2016 14.68051 4.169N505 Baderhat-Kazirhat (Latifpur) Road Km 000.00-002.60 S 2.6 5635 National Overlay 50mm @ IRI 5-9 2016 19.6833 4.513N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 016.40-016.88 L 0.48 4344 National Overlay 50mm @ IRI 4-9 2016 2.053485 5.942N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 016.40-016.88 R 0.48 4344 National Overlay 50mm @ IRI 4-9 2016 2.053485 5.942N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 033.20-033.22 L 0.02 6290 National Overlay 50mm @ IRI 4-7 2016 0.1281 12.498N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 033.20-033.22 R 0.02 6290 National Overlay 50mm @ IRI 4-7 2016 0.1281 12.498N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 037.10-037.55 L 0.45 6290 National Overlay 50mm @ IRI 4-7 2016 1.94586 11.116N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 037.10-037.55 R 0.45 6290 National Overlay 50mm @ IRI 4-7 2016 1.94586 11.116N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 049.40-049.50 S 0.1 6290 National Overlay 50mm @ IRI 4-7 2016 0.7665 8.38N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 051.29-051.33 L 0.04 6290 National Overlay 50mm @ IRI 4-7 2016 0.2562 10.36N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 051.29-051.33 R 0.04 6290 National Overlay 50mm @ IRI 4-7 2016 0.3066 6.903N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 067.41-067.58 L 0.16 6646 National Overlay 50mm @ IRI 4-7 2016 0.9471 7.216N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 067.41-067.58 R 0.16 6646 National Overlay 50mm @ IRI 4-7 2016 0.9471 7.216N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 068.00-068.01 S 0.01 6646 National Overlay 50mm @ IRI 4-7 2016 0.06132 6.22N604 Pabna Town Old Section (Bus Stand-Gachpara) RoaKm 000.00-000.07 S 0.07 9991 National Overlay 50mm @ IRI 5-7 2016 0.62475 3.34N604 Pabna Town Old Section (Bus Stand-Gachpara) RoaKm 000.10-001.11 L 1.01 9991 National Overlay 50mm @ IRI 5-7 2016 7.44555 4.031N604 Pabna Town Old Section (Bus Stand-Gachpara) RoaKm 000.10-001.11 R 1.01 9991 National Overlay 50mm @ IRI 5-7 2016 7.44555 4.031N604 Pabna Town Old Section (Bus Stand-Gachpara) RoaKm 001.11-001.90 S 0.79 9991 National Overlay 60mm @ IRI 7-9 2016 12.30671 1.36N604 Pabna Town Old Section (Bus Stand-Gachpara) RoaKm 005.80-006.00 L 0.2 9991 National Overlay 50mm @ IRI 5-7 2016 1.512 3.819N604 Pabna Town Old Section (Bus Stand-Gachpara) RoaKm 005.80-006.00 R 0.2 9991 National Overlay 50mm @ IRI 5-7 2016 1.512 3.819N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 069.26-070.75 L 1.49 10387 National Overlay 80mm @ IRI 5-9 2016 14.03893 18.934N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 069.26-070.75 R 1.49 10037 National Overlay 80mm @ IRI 5-9 2016 13.54634 10.88N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 081.46-081.54 L 0.08 9013 National Overlay 50mm @ IRI 5-7 2016 0.61425 13.356N704 Jhenaidah-Kushtia-Paksey Ferry-Dasuria Road Km 081.46-081.54 R 0.08 9013 National Overlay 50mm @ IRI 5-7 2016 0.401625 13.874R601 Pabna-Sujanagar- Baderhat Km 018.30-020.80 S 2.5 3550 Regional Overlay 50mm @ IRI 5-7 2016 15.4875 1.486R601 Pabna-Sujanagar- Baderhat Km 045.90-047.40 S 1.5 3550 Regional Rehab 135mm @ IRI 9-12 2016 37.356 0.512R604 Tebunia-Chatmohor-Handial-Hamkuria Road Km 000.00-003.00 S 3 4205 Regional Overlay 50mm @ IRI 5-7 2016 17.325 1.528R604 Tebunia-Chatmohor-Handial-Hamkuria Road Km 009.00-015.40 S 6.4 4205 Regional Overlay 50mm @ IRI 5-7 2016 36.95422 1.575R604 Tebunia-Chatmohor-Handial-Hamkuria Road Km 018.60-025.10 S 6.5 4205 Regional Rehab 150mm @ IRI 9-12 2016 172.6725 0.234R604 Tebunia-Chatmohor-Handial-Hamkuria Road Km 025.10-026.50 S 1.4 4205 Regional Overlay 60mm @ IRI 7-9 2016 9.6327 1.686R604 Tebunia-Chatmohor-Handial-Hamkuria Road Km 033.02-040.58 S 7.56 4205 Regional Rehab 150mm @ IRI 9-12 2016 200.9377 0.307R605 Sujangar-Lalan Shah Bridge Approach Road Km 012.70-016.10 S 3.4 4205 Regional Overlay 50mm @ IRI 5-7 2016 19.635 1.743R605 Sujangar-Lalan Shah Bridge Approach Road Km 034.80-038.00 S 3.2 4205 Regional Overlay 50mm @ IRI 5-7 2016 18.48 1.75Z6006 Baneswar-Charghat-Lalpur-Ishwardi Road Km 047.27-053.36 S 6.09 6001 Zilla Rehab 75mm @ IRI 9-12 2016 105.241 0.644Z6017 Chinakhora-Biswa Road-Khetupara-Santhia Road Km 000.00-008.20 S 8.2 1996 Zilla Overlay 40mm @ 1000-2000 2016 24.92324 0Z6017 Chinakhora-Biswa Road-Khetupara-Santhia Road Km 012.06-012.26 S 0.2 1996 Zilla Overlay 40mm @ IRI>12 2016 0.621468 0Z6022 Ishwardi-Kadamchilan Road Km 000.00-000.04 S 0.04 1292 Zilla Seal Coat 2016 0.19404 1.269Z6022 Ishwardi-Kadamchilan Road Km 001.00-001.05 L 0.05 1292 Zilla Seal Coat 2016 0.07812 0.487Z6022 Ishwardi-Kadamchilan Road Km 001.00-001.05 R 0.05 1292 Zilla Seal Coat 2016 0.07812 0.487Z6022 Ishwardi-Kadamchilan Road Km 001.40-001.46 L 0.06 1292 Zilla Seal Coat 2016 0.093744 0.283Z6022 Ishwardi-Kadamchilan Road Km 001.40-001.46 R 0.06 1292 Zilla Seal Coat 2016 0.093744 0.283Z6022 Ishwardi-Kadamchilan Road Km 001.46-001.60 S 0.14 1292 Zilla Overlay 40mm @ 1000-2000 2016 1.12917 0Z6022 Ishwardi-Kadamchilan Road Km 001.60-001.80 S 0.2 1292 Zilla Overlay 40mm @ 1000-2000 2016 1.3584 0Z6022 Ishwardi-Kadamchilan Road Km 001.80-002.00 S 0.2 1292 Zilla Seal Coat 2016 0.4032 0.398Z6022 Ishwardi-Kadamchilan Road Km 002.00-002.90 S 0.9 1292 Zilla Overlay 40mm @ 1000-2000 2016 4.936086 0Z6022 Ishwardi-Kadamchilan Road Km 002.90-003.10 S 0.2 1292 Zilla Seal Coat 2016 0.24696 0.81

Page 133 of 163

Page 134: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z6022 Ishwardi-Kadamchilan Road Km 003.10-004.05 S 0.95 1292 Zilla Overlay 40mm @ IRI>12 2016 3.564374 0Z6027 Ghagrakhali-Sonatola Road Km 000.00-005.52 S 5.52 3943 Zilla Rehab 75mm @ IRI 9-12 2016 52.37271 2.932Z6028 Satiakhola-Manpur-Chabbismile Biswa Road Km 006.00-006.10 S 0.1 576 Zilla Overlay 40mm @ IRI>12 2016 0.310734 0Z6029 Baraigram Thana-Zonail-Chatmohor Road Km 001.20-001.30 S 0.1 2141 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6029 Baraigram Thana-Zonail-Chatmohor Road Km 001.30-002.40 S 1.1 2141 Zilla Overlay 40mm @ Traff >=2000 2016 3.45543 0Z6029 Baraigram Thana-Zonail-Chatmohor Road Km 002.90-003.80 S 0.9 2141 Zilla Overlay 40mm @ Traff >=2000 2016 2.830311 0Z6029 Baraigram Thana-Zonail-Chatmohor Road Km 003.90-004.50 S 0.6 2141 Zilla Overlay 40mm @ Traff >=2000 2016 1.88478 0Z6029 Baraigram Thana-Zonail-Chatmohor Road Km 004.50-005.70 S 1.2 2141 Zilla Overlay 40mm @ Traff >=2000 2016 3.76956 0Z6031 Chatmohor-Dangergaon-Pabna Road Km 000.00-032.00 S 32 1004 Zilla Overlay 40mm @ 1000-2000 2016 77.70048 0Sub-Total Pabna Division 989.1699

Rajshahi DivisionN6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 113.82-119.29 S 5.47 9783 National Overlay 50mm @ IRI 4-7 2016 48.70488 14.172N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 119.31-120.09 L 0.78 3289 National Overlay 50mm @ IRI 4-9 2016 3.2928 4.611N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 119.31-120.09 R 0.78 9956 National Overlay 50mm @ IRI 4-7 2016 6.174 15.901N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 120.09-129.81 S 9.72 10097 National Overlay 80mm @ IRI 4-9 2016 128.15 13.701N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 129.81-137.11 S 7.31 8386 National Overlay 50mm @ IRI 4-7 2016 66.07701 9.331N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 137.11-137.21 L 0.1 3265 National Overlay 50mm @ IRI 4-9 2016 0.42 5.855N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 137.11-137.21 R 0.1 8386 National Overlay 50mm @ IRI 4-7 2016 0.7875 14.836N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 140.01-140.41 R 0.41 8386 National Overlay 50mm @ IRI 4-7 2016 3.205125 13.855N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 140.41-141.91 S 1.49 8386 National Overlay 50mm @ IRI 4-7 2016 17.24415 6.77N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 141.91-142.01 S 0.1 8386 National Overlay 50mm @ IRI 4-7 2016 1.155 8.757N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 142.01-143.11 S 1.1 8386 National Overlay 50mm @ IRI 4-7 2016 12.705 6.762N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 143.11-143.81 S 0.7 8386 National Full Recon 180mm 2016 41.20311 4.572N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 143.81-144.31 S 0.5 8386 National Overlay 50mm @ IRI 4-7 2016 3.15 16.462N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 144.31-145.01 S 0.7 8386 National Full Recon 180mm @ IRI 12 2016 29.43779 6.856N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 145.11-145.51 S 0.41 8386 National Full Recon 180mm 2016 21.62453 5.081N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 145.61-146.28 L 0.68 3265 National Full Recon 135mm 2016 12.18909 2.497N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 145.61-146.28 R 0.68 8386 National Full Recon 180mm 2016 44.00131 3.767N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 146.28-146.51 S 0.22 8386 National Full Recon 180mm 2016 21.16498 2.067N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 146.51-146.82 S 0.32 8386 National Overlay 50mm @ IRI 4-7 2016 3.245004 6.559N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 146.82-147.64 S 0.82 8386 National Overlay 50mm @ IRI 4-7 2016 6.78468 13.236N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 149.74-149.81 S 0.06 8386 National Rehab 180mm @ IRI 9-12 2016 6.188582 2.01N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 149.81-150.08 S 0.28 8386 National DBST @ 25% Crk 2016 1.949719 2.73N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 150.08-157.51 S 7.43 8113 National Overlay 50mm @ IRI 4-7 2016 51.68914 15.102N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 157.51-157.61 S 0.1 7987 National Full Recon 180mm @ IRI 12 2016 4.26939 6.129N6 Kashinathpur-Natore-Rajshahi-Nawabganj-BaliadighiKm 157.61-158.61 S 1 7987 National Overlay 50mm @ IRI 4-7 2016 6.405 16.344N603 Rajshahi Town By-Pass Road Km 000.00-000.03 L 0.03 8508 National Overlay 60mm @ IRI 7-9 2016 0.536679 5.606N603 Rajshahi Town By-Pass Road Km 000.00-000.03 R 0.03 8508 National Overlay 60mm @ IRI 7-9 2016 0.536679 5.606N603 Rajshahi Town By-Pass Road Km 000.03-006.50 S 6.47 8508 National Overlay 60mm @ IRI 7-9 2016 59.33797 13.868N603 Rajshahi Town By-Pass Road Km 006.50-012.50 S 6 8508 National Rehab 180mm @ IRI 9-12 2016 252.3756 5.966N603 Rajshahi Town By-Pass Road Km 012.50-013.66 S 1.16 8508 National Rehab 180mm @ IRI 9-12 2016 48.75055 6.179N603 Rajshahi Town By-Pass Road Km 013.66-013.76 L 0.1 8508 National Rehab 180mm @ IRI 9-12 2016 4.20626 6.127N603 Rajshahi Town By-Pass Road Km 013.66-013.76 R 0.1 8508 National Rehab 180mm @ IRI 9-12 2016 4.20626 6.127N603 Rajshahi Town By-Pass Road Km 013.76-018.40 S 4.64 8508 National Rehab 180mm @ IRI 9-12 2016 195.2546 6.099N603 Rajshahi Town By-Pass Road Km 018.40-019.00 S 0.6 8508 National Rehab 180mm @ IRI 9-12 2016 25.23756 6.104

Page 134 of 163

Page 135: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N603 Rajshahi Town By-Pass Road Km 019.00-019.70 S 0.7 8508 National DBST @ Traff >6000 2016 2.52434 13.381N603 Rajshahi Town By-Pass Road Km 019.70-019.80 S 0.1 8508 National Full Recon 180mm 2016 5.10927 5.365N603 Rajshahi Town By-Pass Road Km 019.80-021.03 S 1.23 8508 National Overlay 60mm @ IRI 7-9 2016 11.21447 15.55N605 Rajshahi Greater Road Km 000.10-000.40 L 0.3 8508 National Full Recon 180mm 2016 35.6949 1.438N605 Rajshahi Greater Road Km 000.10-000.50 R 0.4 8508 National Full Recon 180mm 2016 48.43308 1.381N605 Rajshahi Greater Road Km 000.50-000.80 R 0.3 8508 National Overlay 50mm @ IRI 5-7 2016 5.4495 4.663N605 Rajshahi Greater Road Km 000.80-001.20 R 0.4 8508 National Full Recon 180mm 2016 48.43308 1.224N605 Rajshahi Greater Road Km 000.90-001.30 L 0.4 8508 National Rehab 180mm @ IRI 9-12 2016 34.572 1.794N605 Rajshahi Greater Road Km 001.60-002.00 L 0.4 8508 National Rehab 180mm @ IRI 9-12 2016 34.572 1.908N605 Rajshahi Greater Road Km 002.00-002.56 R 0.56 8508 National Overlay 60mm @ IRI 7-9 2016 5.114088 16.038N605 Rajshahi Greater Road Km 002.90-002.96 S 0.06 8508 National Overlay 50mm @ IRI 5-7 2016 1.0962 4.634R681 Ujanpara-Bijoynagar Road (Old Part) Km 000.10-000.50 S 0.4 2049 Regional Full Recon 135mm 2016 12.0208 0.312R681 Ujanpara-Bijoynagar Road (Old Part) Km 000.50-000.80 S 0.3 2049 Regional Overlay 50mm @ IRI 7-9 2016 1.7325 1.374R681 Ujanpara-Bijoynagar Road (Old Part) Km 001.70-002.30 S 0.6 2049 Regional Full Recon 135mm 2016 18.0312 0.087R681 Ujanpara-Bijoynagar Road (Old Part) Km 002.70-002.80 S 0.1 2049 Regional Full Recon 135mm 2016 3.0052 0.148R681 Ujanpara-Bijoynagar Road (Old Part) Km 002.80-003.90 S 1.1 2049 Regional Overlay 50mm @ IRI 7-9 2016 6.3525 1.406R681 Ujanpara-Bijoynagar Road (Old Part) Km 003.90-004.10 S 0.2 2049 Regional Full Recon 135mm 2016 6.0104 0.031R681 Ujanpara-Bijoynagar Road (Old Part) Km 004.20-004.40 S 0.2 2049 Regional Overlay 50mm @ IRI 7-9 2016 1.155 1.545R681 Ujanpara-Bijoynagar Road (Old Part) Km 004.40-004.60 S 0.2 2049 Regional Overlay 50mm @ IRI 5-7 2016 1.155 1.494R681 Ujanpara-Bijoynagar Road (Old Part) Km 006.60-007.40 S 0.8 2049 Regional DBST Traff All 2016 2.1736 0R681 Ujanpara-Bijoynagar Road (Old Part) Km 007.40-007.70 S 0.3 2049 Regional Overlay 50mm @ IRI 7-9 2016 1.7325 1.497R681 Ujanpara-Bijoynagar Road (Old Part) Km 007.70-007.90 S 0.2 2049 Regional Full Recon 135mm 2016 6.0104 0.194R685 Rajshahi-Nawhata-Chowmasia Road Km 002.90-003.03 L 0.13 11606 Regional Overlay 60mm @ IRI 5.5-9 2016 1.284777 6.686R685 Rajshahi-Nawhata-Chowmasia Road Km 002.90-003.03 R 0.13 11606 Regional Overlay 60mm @ IRI 5.5-9 2016 1.235988 6.969R685 Rajshahi-Nawhata-Chowmasia Road Km 008.85-024.12 S 15.27 11606 Regional DBST @ Traff >6000 2016 41.9412 4.025R685 Rajshahi-Nawhata-Chowmasia Road Km 030.58-031.54 S 0.96 4734 Regional Overlay 50mm @ IRI 5-7 2016 5.538225 6.694Z6004 Puthia - Bagmara Road Km 000.00-007.40 S 7.4 1673 Zilla Overlay 40mm @ 1000-2000 2016 34.6218 0.086Z6004 Puthia - Bagmara Road Km 007.40-007.60 S 0.2 1673 Zilla Overlay 40mm @ 1000-2000 2016 0.9339 0Z6004 Puthia - Bagmara Road Km 007.60-009.80 S 2.2 1673 Zilla Overlay 40mm @ 1000-2000 2016 10.2729 0Z6004 Puthia - Bagmara Road Km 009.80-010.10 S 0.3 1673 Zilla Overlay 40mm @ 1000-2000 2016 1.405519 0Z6004 Puthia - Bagmara Road Km 010.10-012.20 S 2.1 1673 Zilla Overlay 40mm @ 1000-2000 2016 9.805949 0Z6004 Puthia - Bagmara Road Km 012.20-012.60 S 0.4 1673 Zilla Overlay 40mm @ 1000-2000 2016 1.8678 0Z6004 Puthia - Bagmara Road Km 013.20-013.30 S 0.1 1673 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.033Z6004 Puthia - Bagmara Road Km 013.30-016.30 S 3 1673 Zilla Overlay 40mm @ 1000-2000 2016 14.0085 0Z6004 Puthia - Bagmara Road Km 016.30-016.50 S 0.2 1673 Zilla Overlay 40mm @ 1000-2000 2016 0.9339 0Z6005 Sahibpur - Dirgapur - Taherpur Road Km 000.00-000.20 S 0.2 2969 Zilla Seal Coat 2016 0.2772 0.335Z6005 Sahibpur - Dirgapur - Taherpur Road Km 000.20-000.90 S 0.7 2969 Zilla Overlay 40mm @ Traff >=2000 2016 3.26865 0.217Z6005 Sahibpur - Dirgapur - Taherpur Road Km 000.90-001.10 S 0.2 2969 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.047Z6005 Sahibpur - Dirgapur - Taherpur Road Km 001.10-001.20 S 0.1 2969 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z6005 Sahibpur - Dirgapur - Taherpur Road Km 001.20-001.70 S 0.5 2969 Zilla Overlay 40mm @ Traff >=2000 2016 2.33475 0Z6005 Sahibpur - Dirgapur - Taherpur Road Km 001.70-002.60 S 0.9 2969 Zilla Overlay 40mm @ Traff >=2000 2016 4.20255 0.169Z6005 Sahibpur - Dirgapur - Taherpur Road Km 002.60-003.20 S 0.6 2969 Zilla Overlay 40mm @ Traff >=2000 2016 2.8017 0Z6005 Sahibpur - Dirgapur - Taherpur Road Km 003.20-003.50 S 0.3 2969 Zilla Overlay 40mm @ Traff >=2000 2016 1.405519 0.215Z6005 Sahibpur - Dirgapur - Taherpur Road Km 003.50-003.60 S 0.1 2969 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.198Z6005 Sahibpur - Dirgapur - Taherpur Road Km 003.60-006.30 S 2.7 2969 Zilla Rehab 75mm @ IRI 9-12 2016 44.44605 0.144Z6005 Sahibpur - Dirgapur - Taherpur Road Km 006.30-009.30 S 3 2969 Zilla Overlay 40mm @ Traff >=2000 2016 13.85568 0

Page 135 of 163

Page 136: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z6005 Sahibpur - Dirgapur - Taherpur Road Km 009.30-009.50 S 0.2 2969 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.11Z6005 Sahibpur - Dirgapur - Taherpur Road Km 009.50-011.70 S 2.2 2969 Zilla Overlay 40mm @ Traff >=2000 2016 7.34379 0.529Z6005 Sahibpur - Dirgapur - Taherpur Road Km 011.90-012.10 S 0.2 2969 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0.536Z6005 Sahibpur - Dirgapur - Taherpur Road Km 012.10-012.80 S 0.7 2969 Zilla Overlay 40mm @ Traff >=2000 2016 2.19891 0.978Z6005 Sahibpur - Dirgapur - Taherpur Road Km 013.10-013.20 S 0.1 2969 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.54Z6005 Sahibpur - Dirgapur - Taherpur Road Km 013.70-015.26 S 1.56 2969 Zilla Overlay 40mm @ Traff >=2000 2016 4.887863 0.321Z6005 Sahibpur - Dirgapur - Taherpur Road Km 015.36-017.16 S 1.8 2969 Zilla Overlay 40mm @ Traff >=2000 2016 5.853006 0.749Z6005 Sahibpur - Dirgapur - Taherpur Road Km 017.86-017.96 S 0.1 2969 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6005 Sahibpur - Dirgapur - Taherpur Road Km 017.96-018.26 S 0.3 2969 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.845Z6005 Sahibpur - Dirgapur - Taherpur Road Km 018.26-018.36 S 0.1 2969 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6005 Sahibpur - Dirgapur - Taherpur Road Km 018.36-018.46 S 0.1 2969 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.801Z6005 Sahibpur - Dirgapur - Taherpur Road Km 018.46-019.36 S 0.9 2969 Zilla Overlay 40mm @ Traff >=2000 2016 2.82717 0.904Z6005 Sahibpur - Dirgapur - Taherpur Road Km 019.36-019.86 S 0.5 2969 Zilla Overlay 40mm @ Traff >=2000 2016 1.57065 0.946Z6005 Sahibpur - Dirgapur - Taherpur Road Km 019.86-019.96 S 0.1 2969 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6005 Sahibpur - Dirgapur - Taherpur Road Km 019.96-020.16 S 0.2 2969 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.809Z6005 Sahibpur - Dirgapur - Taherpur Road Km 020.16-022.92 S 2.76 2969 Zilla Overlay 40mm @ Traff >=2000 2016 8.673129 0.83Z6006 Baneswar-Charghat-Lalpur-Ishwardi Road Km 002.90-003.10 S 0.2 4732 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 1.878Z6006 Baneswar-Charghat-Lalpur-Ishwardi Road Km 003.10-005.50 S 2.4 4732 Zilla Overlay 50mm @ IRI 6-9 2016 13.86578 1.646Z6006 Baneswar-Charghat-Lalpur-Ishwardi Road Km 005.50-005.70 S 0.2 4732 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 1.229Z6006 Baneswar-Charghat-Lalpur-Ishwardi Road Km 005.70-031.18 S 25.48 2214 Zilla Overlay 40mm @ Traff >=2000 2016 118.9555 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 000.00-000.70 S 0.7 2884 Zilla Overlay 40mm @ Traff >=2000 2016 2.264283 0.713Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 000.70-002.30 S 1.6 2884 Zilla Overlay 40mm @ Traff >=2000 2016 6.24864 0.005Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 002.30-002.40 S 0.1 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.144Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 004.20-004.40 S 0.2 2884 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.24Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 004.40-004.50 S 0.1 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 004.50-004.70 S 0.2 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0.674Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 004.70-005.00 S 0.3 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.003Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 006.20-006.50 S 0.3 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 006.50-008.50 S 2 2884 Zilla Overlay 40mm @ Traff >=2000 2016 6.2826 0.417Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 008.50-008.60 S 0.1 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 008.60-009.10 S 0.5 2884 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.098Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 009.10-009.20 S 0.1 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 009.20-009.30 S 0.1 2884 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.499Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 009.30-010.20 S 0.9 2884 Zilla Overlay 40mm @ Traff >=2000 2016 2.830311 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 010.20-010.70 S 0.5 2884 Zilla Rehab 75mm @ IRI 9-12 2016 5.53705 0.392Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 010.70-010.80 S 0.1 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 010.80-010.90 S 0.1 2884 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.46Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 010.90-011.10 S 0.2 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0.067Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 011.10-011.30 S 0.2 2884 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.41Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 011.30-011.50 S 0.2 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 011.50-012.30 S 0.8 2884 Zilla Full Recon 75mm @ IRI>12 2016 12.86712 0.124Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 012.30-012.60 S 0.3 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.344Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 012.60-013.40 S 0.8 2884 Zilla Full Recon 75mm @ IRI>12 2016 12.86712 0.267Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 013.40-013.80 S 0.4 2884 Zilla Overlay 40mm @ Traff >=2000 2016 1.25652 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 013.80-013.90 S 0.1 2884 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.447Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 013.90-014.10 S 0.2 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.62826 0

Page 136 of 163

Page 137: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 014.10-014.20 S 0.1 2884 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.588Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 014.20-014.30 S 0.1 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 014.30-014.40 S 0.1 2884 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.435Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 014.40-014.80 S 0.4 2884 Zilla Overlay 40mm @ Traff >=2000 2016 1.25652 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 014.80-014.90 S 0.1 2884 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.668Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 014.90-015.40 S 0.5 2884 Zilla Overlay 40mm @ Traff >=2000 2016 1.57065 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 015.40-015.70 S 0.3 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.629Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 015.70-016.20 S 0.5 2884 Zilla Overlay 40mm @ Traff >=2000 2016 1.57065 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 016.20-016.40 S 0.2 2884 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.437Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 016.40-016.70 S 0.3 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.945531 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 016.70-017.20 S 0.5 2884 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.265Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 017.20-017.30 S 0.1 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 017.30-017.40 S 0.1 2884 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.497Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 017.40-017.70 S 0.3 2884 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.193Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 017.70-018.20 S 0.5 2884 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.105Z6010 Rajshahi-Hatgodagari-Faliarbil-Mohonganj Road Km 018.60-018.80 S 0.2 2884 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.354Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 000.00-001.00 S 1 1996 Zilla Overlay 40mm @ 1000-2000 2016 3.18375 0Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 001.00-001.10 S 0.1 1996 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.188Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 001.10-002.50 S 1.4 1996 Zilla Overlay 40mm @ 1000-2000 2016 4.39782 0Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 002.50-002.80 S 0.3 1996 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 002.80-003.90 S 1.1 1996 Zilla Overlay 40mm @ 1000-2000 2016 3.458571 0Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 003.90-004.20 S 0.3 1996 Zilla Overlay 40mm @ 1000-2000 2016 0.94239 0Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 004.20-005.60 S 1.4 1996 Zilla Overlay 40mm @ 1000-2000 2016 4.39782 0Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 005.60-005.70 S 0.1 1996 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.222Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 005.70-006.20 S 0.5 1996 Zilla Overlay 40mm @ 1000-2000 2016 1.57065 0Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 007.10-007.20 S 0.1 1996 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.102Z6018 Sarda Bazar- Sadipur-Salua Maleker More- Puthia R Km 007.20-007.90 S 0.7 1996 Zilla Overlay 40mm @ 1000-2000 2016 2.19891 0Z6020 Arani-Bagatipara Road Km 000.00-001.60 S 1.6 1670 Zilla Overlay 40mm @ 1000-2000 2016 5.243424 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 000.00-000.60 S 0.6 3607 Zilla Full Recon 75mm @ IRI>12 2016 16.74464 0.221Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 001.10-001.40 S 0.3 3607 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.844Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 001.50-004.60 S 3.1 3607 Zilla Rehab 75mm @ IRI 9-12 2016 48.24716 1.181Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 004.60-007.80 S 3.2 3607 Zilla Rehab 75mm @ IRI 9-12 2016 36.40625 1.355Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 007.80-008.60 S 0.8 3607 Zilla Rehab 75mm @ IRI 9-12 2016 9.09872 1.505Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 008.80-010.00 S 1.2 3607 Zilla Full Recon 75mm @ IRI>12 2016 19.82232 0.929Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 010.20-013.20 S 3 3607 Zilla Rehab 75mm @ IRI 9-12 2016 34.1202 1.181Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 013.20-013.72 S 0.51 3607 Zilla Full Recon 75mm @ IRI>12 2016 8.49056 0.883Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 013.72-016.90 S 3.19 1572 Zilla Rehab 75mm @ IRI 9-12 2016 36.24702 0.256Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 016.90-017.30 S 0.4 1572 Zilla Overlay 40mm @ 1000-2000 2016 1.29048 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 017.30-017.70 S 0.4 1572 Zilla Full Recon 75mm @ IRI>12 2016 6.60744 0.219Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 017.70-017.90 S 0.2 1572 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 017.90-019.10 S 1.2 1572 Zilla Rehab 75mm @ IRI 9-12 2016 13.79174 0.154Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 020.00-020.40 S 0.4 1572 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 0.304Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 020.40-022.00 S 1.6 1572 Zilla Overlay 40mm @ 1000-2000 2016 5.02608 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 022.00-022.10 S 0.1 1572 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.151Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 022.10-023.00 S 0.9 1572 Zilla Overlay 40mm @ 1000-2000 2016 2.82717 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 023.00-023.10 S 0.1 1572 Zilla Full Recon 75mm @ IRI>12 2016 1.60839 0.429

Page 137 of 163

Page 138: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 023.10-023.30 S 0.2 1572 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 023.30-023.80 S 0.5 1572 Zilla Full Recon 75mm @ IRI>12 2016 8.04195 0.197Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 023.80-024.60 S 0.8 1572 Zilla Overlay 40mm @ 1000-2000 2016 2.519832 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 024.60-024.80 S 0.2 1572 Zilla Rehab 75mm @ IRI 9-12 2016 2.33454 0.303Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 024.80-027.80 S 3 1572 Zilla Overlay 40mm @ 1000-2000 2016 9.45252 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 027.80-027.90 S 0.1 1572 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 027.90-028.00 S 0.1 1572 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.225Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 028.00-028.70 S 0.7 1572 Zilla Overlay 40mm @ 1000-2000 2016 2.169195 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 028.70-029.30 S 0.6 1572 Zilla Full Recon 75mm @ IRI>12 2016 9.51993 0.059Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 029.30-029.90 S 0.6 1572 Zilla Overlay 40mm @ 1000-2000 2016 1.85931 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 029.90-030.00 S 0.1 1572 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.477Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 030.00-030.10 S 0.1 1572 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 030.10-030.20 S 0.1 1572 Zilla Full Recon 75mm @ IRI>12 2016 1.586655 0.449Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 031.77-031.97 S 0.2 1572 Zilla Full Recon 75mm @ IRI>12 2016 3.17331 0.051Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 031.97-032.27 S 0.3 1572 Zilla Overlay 40mm @ 1000-2000 2016 0.929655 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 032.27-032.57 S 0.3 1572 Zilla Full Recon 75mm @ IRI>12 2016 4.759965 0.125Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 032.57-032.67 S 0.1 1572 Zilla Overlay 40mm @ 1000-2000 2016 0.309885 0Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 032.67-033.37 S 0.7 1572 Zilla Full Recon 75mm @ IRI>12 2016 11.10659 0.334Z6809 Rajshahi-Damkurahat-Kakanhat-Amnura Road Km 033.37-036.31 S 2.94 1572 Zilla Overlay 40mm @ 1000-2000 2016 9.10752 0Z6855 Bagshara-Bildharampur-Palashbari-Gunigram Road Km 008.80-008.90 S 0.1 252 Zilla Overlay 40mm @ IRI>12 2016 0.309885 0Z6855 Bagshara-Bildharampur-Palashbari-Gunigram Road Km 011.90-014.90 S 3 252 Zilla Overlay 40mm @ Traff 100-1000 2016 9.29655 0Z6855 Bagshara-Bildharampur-Palashbari-Gunigram Road Km 025.72-025.92 S 0.2 252 Zilla Overlay 40mm @ IRI>12 2016 0.66222 0Z6855 Bagshara-Bildharampur-Palashbari-Gunigram Road Km 026.62-027.22 S 0.6 252 Zilla Overlay 40mm @ IRI>12 2016 1.98666 0Sub-Total Rajshahi Division 2279.676

Sirajganj DivisionN405 Elenga-Nalka-Hatikamrul Road Km 036.14-040.78 S 4.64 18982 National Rehab 195mm @ IRI 9-12 2016 206.6284 12.485N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 127.84-130.54 S 2.69 5174 National Overlay 50mm @ IRI 4-9 2016 20.94015 5.064N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 130.84-135.58 S 4.74 5174 National Overlay 50mm @ IRI 4-9 2016 37.00251 5.158N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 135.58-138.74 S 3.16 8206 National Overlay 50mm @ IRI 4-7 2016 24.25702 10.403N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 138.74-138.84 S 0.1 8206 National DBST @ Traff >6000 2016 0.36062 9.308N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 139.00-152.04 S 13.04 8206 National Overlay 50mm @ IRI 4-7 2016 101.0315 9.895N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 152.04-161.74 S 9.7 8206 National Overlay 60mm @ IRI 7-9 2016 90.16082 10.665N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 161.74-163.24 S 1.5 8206 National Overlay 50mm @ IRI 4-7 2016 11.64723 10.4N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 163.24-163.54 S 0.3 8206 National Rehab 180mm @ IRI 9-12 2016 15.01164 3.778N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 163.54-165.04 S 1.5 8206 National Overlay 60mm @ IRI 7-9 2016 13.8861 11.021N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 165.04-165.25 S 0.21 8206 National Overlay 50mm @ IRI 4-7 2016 1.661719 10.811N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 165.25-165.37 L 0.12 8206 National Overlay 50mm @ IRI 4-7 2016 0.95046 11.021N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 165.25-165.37 R 0.12 8206 National Overlay 50mm @ IRI 4-7 2016 0.95046 11.021N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 165.37-167.64 S 2.26 8206 National Overlay 50mm @ IRI 4-7 2016 18.62902 8.141N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 167.64-170.84 S 3.2 8206 National Rehab 180mm @ IRI 9-12 2016 160.1742 4.114N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 170.84-180.94 S 10.1 8206 National Overlay 60mm @ IRI 7-9 2016 93.38263 11.015N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 180.94-181.04 S 0.1 8206 National Rehab 180mm @ IRI 9-12 2016 5.00388 4.311N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 181.04-181.84 S 0.8 8206 National Overlay 50mm @ IRI 4-7 2016 6.216 10.785N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 181.84-182.59 S 0.75 8206 National Overlay 50mm @ IRI 4-7 2016 5.83527 9.273N520 Ullapara Town Link Road Km 000.00-002.60 S 2.6 5752 National Overlay 50mm @ IRI 5-9 2016 15.29388 5.283

Page 138 of 163

Page 139: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R451 Nalka-Sirajganj Road Km 000.03-009.20 S 9.18 6522 Regional Overlay 60mm @ IRI 5.5-9 2016 64.74255 5.915R451 Nalka-Sirajganj Road Km 009.20-010.40 S 1.2 6522 Regional Overlay 60mm @ IRI 5.5-9 2016 8.26348 8.716R451 Nalka-Sirajganj Road Km 010.40-011.20 S 0.8 6522 Regional Overlay 60mm @ IRI 5.5-9 2016 5.5044 8.654R451 Nalka-Sirajganj Road Km 011.20-011.50 S 0.3 6522 Regional DBST @ Traff >6000 2016 0.8151 7.931R451 Nalka-Sirajganj Road Km 011.50-012.49 S 0.99 6522 Regional Overlay 60mm @ IRI 5.5-9 2016 8.639556 6.087R451 Nalka-Sirajganj Road Km 012.80-013.53 L 0.73 6522 Regional Overlay 60mm @ IRI 5.5-9 2016 6.849225 6.835R451 Nalka-Sirajganj Road Km 012.80-013.53 R 0.73 6522 Regional Overlay 60mm @ IRI 5.5-9 2016 6.849225 6.835R451 Nalka-Sirajganj Road Km 013.53-014.44 S 0.91 6522 Regional Overlay 60mm @ IRI 5.5-9 2016 6.261255 8.784Z5041 Raiganj (Bhuiyagati)-Nimgachhi-Taras Road Km 000.00-001.60 S 1.6 1738 Zilla Overlay 40mm @ 1000-2000 2016 5.4336 0Z5041 Raiganj (Bhuiyagati)-Nimgachhi-Taras Road Km 013.90-014.00 S 0.1 1738 Zilla Overlay 40mm @ 1000-2000 2016 0.3396 0.451Z5042 Sirajganj-Raiganj (Chandaikona) Road Km 013.30-013.40 S 0.1 3143 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.625Z5042 Sirajganj-Raiganj (Chandaikona) Road Km 013.80-014.10 S 0.3 3143 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.448Z5042 Sirajganj-Raiganj (Chandaikona) Road Km 014.20-014.30 S 0.1 3143 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.418Z5042 Sirajganj-Raiganj (Chandaikona) Road Km 014.40-014.60 S 0.2 3143 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 0.46Z5042 Sirajganj-Raiganj (Chandaikona) Road Km 014.70-016.00 S 1.3 3143 Zilla Rehab 75mm @ IRI 9-12 2016 21.39995 0.554Z5042 Sirajganj-Raiganj (Chandaikona) Road Km 016.20-021.43 S 5.23 3143 Zilla Full Recon 75mm @ IRI>12 2016 125.0415 0.557Z5043 Taras-Gurudaspur Road Km 007.00-007.20 S 0.2 1463 Zilla Overlay 40mm @ IRI>12 2016 0.631401 0Z5046 Ullahpara-Purnimagati-Taras Road Km 018.30-020.70 S 2.4 2126 Zilla Overlay 40mm @ Traff >=2000 2016 7.53912 0Z5046 Ullahpara-Purnimagati-Taras Road Km 020.70-021.70 S 1 2126 Zilla Overlay 40mm @ Traff >=2000 2016 3.1413 0Z5046 Ullahpara-Purnimagati-Taras Road Km 022.10-022.40 S 0.3 2126 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0.034Z5046 Ullahpara-Purnimagati-Taras Road Km 022.90-024.10 S 1.2 2126 Zilla Overlay 40mm @ Traff >=2000 2016 3.772701 0Z5046 Ullahpara-Purnimagati-Taras Road Km 024.10-024.70 S 0.6 2126 Zilla Overlay 40mm @ Traff >=2000 2016 1.88478 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 000.00-000.90 S 0.9 949 Zilla Overlay 40mm @ Traff 100-1000 2016 3.988602 0.147Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 001.40-003.00 S 1.6 949 Zilla Overlay 40mm @ Traff 100-1000 2016 5.02608 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 003.00-003.10 S 0.1 949 Zilla Overlay 40mm @ Traff 100-1000 2016 0.31413 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 003.10-003.30 S 0.2 949 Zilla Overlay 40mm @ Traff 100-1000 2016 0.62826 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 003.30-003.40 S 0.1 949 Zilla Overlay 40mm @ Traff 100-1000 2016 0.317271 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 003.40-004.10 S 0.7 949 Zilla Overlay 40mm @ Traff 100-1000 2016 2.19891 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 004.10-004.20 S 0.1 949 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 004.20-004.30 S 0.1 949 Zilla Overlay 40mm @ Traff 100-1000 2016 0.31413 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 004.30-004.40 S 0.1 949 Zilla Overlay 40mm @ Traff 100-1000 2016 0.31413 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 004.40-004.60 S 0.2 949 Zilla Overlay 40mm @ Traff 100-1000 2016 0.62826 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 004.60-004.70 S 0.1 949 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.072Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 005.00-005.30 S 0.3 949 Zilla Overlay 40mm @ Traff 100-1000 2016 0.94239 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 005.30-006.00 S 0.7 949 Zilla Overlay 40mm @ Traff 100-1000 2016 2.19891 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 006.00-006.10 S 0.1 949 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 006.10-006.30 S 0.2 949 Zilla Overlay 40mm @ Traff 100-1000 2016 0.62826 0.079Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 006.80-006.90 S 0.1 949 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 006.90-008.80 S 1.9 949 Zilla Overlay 40mm @ Traff 100-1000 2016 5.96847 0Z5048 Ullapara-Lahiri Mohonpur-Bhangura Road Km 009.10-011.80 S 2.7 949 Zilla Overlay 40mm @ Traff 100-1000 2016 8.484651 0Z5049 Taras-Raniraht-Sherpur Road Km 000.00-001.20 S 1.2 1463 Zilla Overlay 40mm @ 1000-2000 2016 3.891816 0Z5049 Taras-Raniraht-Sherpur Road Km 001.20-001.40 S 0.2 1463 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z5049 Taras-Raniraht-Sherpur Road Km 001.40-002.00 S 0.6 1463 Zilla Overlay 40mm @ 1000-2000 2016 1.88478 0Z5049 Taras-Raniraht-Sherpur Road Km 002.00-002.50 S 0.5 1463 Zilla Overlay 40mm @ IRI>12 2016 1.57065 0Z5049 Taras-Raniraht-Sherpur Road Km 002.50-003.10 S 0.6 1463 Zilla Overlay 40mm @ 1000-2000 2016 1.88478 0Z5049 Taras-Raniraht-Sherpur Road Km 003.10-004.30 S 1.2 1463 Zilla Overlay 40mm @ 1000-2000 2016 3.772701 0

Page 139 of 163

Page 140: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5049 Taras-Raniraht-Sherpur Road Km 005.00-006.00 S 1 1463 Zilla Overlay 40mm @ 1000-2000 2016 3.1413 0Z5049 Taras-Raniraht-Sherpur Road Km 006.80-006.90 S 0.1 1463 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0Z5049 Taras-Raniraht-Sherpur Road Km 006.90-007.30 S 0.4 1463 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z5049 Taras-Raniraht-Sherpur Road Km 007.30-007.50 S 0.2 1463 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0.061Z5049 Taras-Raniraht-Sherpur Road Km 007.50-008.20 S 0.7 1463 Zilla Overlay 40mm @ 1000-2000 2016 2.19891 0Z5049 Taras-Raniraht-Sherpur Road Km 009.90-010.30 S 0.4 1463 Zilla Overlay 40mm @ IRI>12 2016 1.259661 0Z5049 Taras-Raniraht-Sherpur Road Km 012.10-012.40 S 0.3 1463 Zilla Overlay 40mm @ IRI>12 2016 0.94239 0Z5049 Taras-Raniraht-Sherpur Road Km 014.10-014.20 S 0.1 1463 Zilla Overlay 40mm @ IRI>12 2016 0.31413 0Z5049 Taras-Raniraht-Sherpur Road Km 014.60-014.80 S 0.2 1463 Zilla Overlay 40mm @ IRI>12 2016 0.62826 0Z5058 Ullahpara-Belkuchi Road Km 000.00-000.02 L 0.01 2359 Zilla Overlay 40mm @ IRI>12 2016 0.191025 0Z5058 Ullahpara-Belkuchi Road Km 000.00-000.02 R 0.01 2359 Zilla Overlay 40mm @ IRI>12 2016 0.191025 0Z5058 Ullahpara-Belkuchi Road Km 000.02-000.10 S 0.09 2359 Zilla Overlay 40mm @ IRI>12 2016 0.746908 0Z5058 Ullahpara-Belkuchi Road Km 003.60-003.70 S 0.1 2359 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z5058 Ullahpara-Belkuchi Road Km 004.30-004.40 S 0.1 2359 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z5058 Ullahpara-Belkuchi Road Km 006.70-006.80 S 0.1 2359 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z5058 Ullahpara-Belkuchi Road Km 007.20-007.40 S 0.2 2359 Zilla Overlay 40mm @ IRI>12 2016 0.9339 0Z5402 Sirajganj-Kadda-Samespur Road Km 008.86-009.06 S 0.2 4544 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 1.606Z5402 Sirajganj-Kadda-Samespur Road Km 009.36-009.56 S 0.2 4544 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 1.821Z5402 Sirajganj-Kadda-Samespur Road Km 009.86-010.06 S 0.2 4544 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 1.85Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 000.10-000.20 S 0.1 1917 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 0.253Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 001.10-001.20 S 0.1 1917 Zilla Overlay 40mm @ IRI>12 2016 0.310734 0Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 001.30-001.50 S 0.2 1917 Zilla Overlay 40mm @ IRI>12 2016 0.621468 0Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 002.50-002.60 S 0.1 1917 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 0.253Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 002.90-003.00 S 0.1 1917 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 0.097Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 003.20-003.40 S 0.2 1917 Zilla Overlay 40mm @ IRI>12 2016 0.621468 0Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 004.40-004.60 S 0.2 1917 Zilla Overlay 40mm @ IRI>12 2016 0.621468 0Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 005.00-005.20 S 0.2 1917 Zilla Full Recon 75mm @ IRI>12 2016 3.182004 0.074Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 005.40-005.60 S 0.2 1917 Zilla Full Recon 75mm @ IRI>12 2016 3.182004 0.013Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 006.40-006.60 S 0.2 1917 Zilla Overlay 40mm @ IRI>12 2016 0.621468 0Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 007.60-007.70 S 0.1 1917 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 0.253Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 008.20-008.50 S 0.3 1917 Zilla Full Recon 75mm @ IRI>12 2016 4.773006 0.014Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 010.10-010.30 S 0.2 1917 Zilla Overlay 40mm @ IRI>12 2016 0.650334 0Z5404 Sirajganj (Pepulbaria)-Dhunat Road Km 010.60-010.80 S 0.2 1917 Zilla Full Recon 75mm @ IRI>12 2016 3.182004 0.019Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 000.30-001.80 S 1.5 4903 Zilla Full Recon 75mm @ IRI>12 2016 23.86503 1.186Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 002.10-002.20 S 0.1 4903 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 1.941Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 002.30-002.40 S 0.1 4903 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 2.281Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 002.70-004.80 S 2.1 4903 Zilla Rehab 75mm @ IRI 9-12 2016 21.74714 2.066Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 004.80-005.10 S 0.3 4903 Zilla Overlay 50mm @ IRI 6-9 2016 1.1529 3.279Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 005.10-006.40 S 1.3 4903 Zilla Rehab 75mm @ IRI 9-12 2016 14.24069 2.035Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 010.70-013.90 S 3.2 4903 Zilla Rehab 75mm @ IRI 9-12 2016 34.28781 1.736Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 014.00-014.20 S 0.2 4903 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 2.096Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 014.30-014.40 S 0.1 4903 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 2.109Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 014.70-016.60 S 1.9 4903 Zilla Rehab 75mm @ IRI 9-12 2016 20.75645 1.916Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 017.50-017.90 S 0.4 4903 Zilla Full Recon 75mm @ IRI>12 2016 6.364008 1.321Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 017.90-019.10 S 1.2 4903 Zilla Overlay 50mm @ IRI 6-9 2016 4.6116 3.189Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 019.10-019.20 S 0.1 4903 Zilla Full Recon 75mm @ IRI>12 2016 1.591002 2.284

Page 140 of 163

Page 141: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 019.20-019.30 S 0.1 4903 Zilla Overlay 50mm @ IRI 6-9 2016 0.3843 2.777Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 019.30-019.50 S 0.2 4903 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 2.408Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 019.70-019.90 S 0.2 4903 Zilla Full Recon 75mm @ IRI>12 2016 3.182004 1.472Z5405 Sirajganj (Bagbati)-Dhunat (Sonamukhi) Road Km 020.50-021.14 S 0.64 4903 Zilla Rehab 75mm @ IRI 9-12 2016 7.010803 1.944Z5408 Kadda-Khamarkhand-Belkuchi (Tamai) Road Km 000.00-000.20 S 0.2 316 Zilla Overlay 40mm @ IRI>12 2016 0.621468 0Z5408 Kadda-Khamarkhand-Belkuchi (Tamai) Road Km 000.60-000.70 S 0.1 316 Zilla Overlay 40mm @ IRI>12 2016 0.310734 0Z5408 Kadda-Khamarkhand-Belkuchi (Tamai) Road Km 005.80-006.10 S 0.3 316 Zilla Overlay 40mm @ IRI>12 2016 0.932202 0Z5408 Kadda-Khamarkhand-Belkuchi (Tamai) Road Km 007.80-007.89 S 0.09 316 Zilla Overlay 40mm @ IRI>12 2016 0.276553 0Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 000.00-000.40 S 0.4 9334 Zilla Overlay 50mm @ IRI 6-9 2016 2.352 6.558Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 000.40-000.60 S 0.2 9334 Zilla Rehab 75mm @ IRI 9-12 2016 3.35216 3.892Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 003.60-004.10 S 0.5 9334 Zilla Overlay 50mm @ IRI 6-9 2016 2.94 6.026Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 004.10-004.20 S 0.1 9334 Zilla Full Recon 75mm @ IRI>12 2016 2.43432 2.88Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 004.20-005.00 S 0.8 9334 Zilla Overlay 50mm @ IRI 6-9 2016 4.704 6.564Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 005.00-006.10 S 1.1 9334 Zilla Overlay 50mm @ IRI 6-9 2016 6.468 6.052Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 006.10-006.50 S 0.4 9334 Zilla Overlay 50mm @ IRI 6-9 2016 2.352 6.826Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 006.50-006.70 S 0.2 9334 Zilla Rehab 75mm @ IRI 9-12 2016 3.35216 4.016Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 007.20-007.30 S 0.1 9334 Zilla Rehab 75mm @ IRI 9-12 2016 1.67608 4.63Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 010.80-016.50 S 5.7 9334 Zilla Overlay 50mm @ IRI 6-9 2016 32.9175 5.219Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 016.50-017.80 S 1.3 9334 Zilla Overlay 50mm @ IRI 6-9 2016 7.513275 3.841Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 017.80-018.90 S 1.1 9334 Zilla Overlay 50mm @ IRI 6-9 2016 6.3525 3.721Z5409 Saidabad-Yunis Ali Medical College Hospital Road Km 019.00-019.63 S 0.63 9334 Zilla Overlay 50mm @ IRI 6-9 2016 3.327345 5.912Z6032 Taras-Hamkuria Road Km 000.00-002.10 S 2.1 948 Zilla Seal Coat 2016 1.77282 0.154Z6032 Taras-Hamkuria Road Km 003.70-003.80 S 0.1 948 Zilla Overlay 40mm @ IRI>12 2016 0.27168 0Z6032 Taras-Hamkuria Road Km 005.00-005.30 S 0.3 948 Zilla Overlay 40mm @ Traff 100-1000 2016 0.99333 0Z6032 Taras-Hamkuria Road Km 005.30-008.40 S 3.1 948 Zilla Seal Coat 2016 3.045697 1.915Sub-Total Sirajganj Division 1452.61Total Rajshahi Zone 8820.046

Rangpur ZoneBogra DivisionN5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 182.59-193.58 S 10.99 8206 National Overlay 50mm @ IRI 4-7 2016 102.7016 8.265N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 193.58-196.00 S 2.42 14450 National Overlay 80mm @ IRI 4-9 2016 34.72226 17.658N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 198.00-198.20 S 0.2 14450 National Overlay 80mm @ IRI 4-9 2016 2.44644 21.239N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 198.24-199.24 L 1 14450 National Overlay 80mm @ IRI 4-9 2016 12.2322 21.422N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 198.24-199.24 R 1 14450 National Overlay 80mm @ IRI 4-9 2016 12.2322 21.422N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 199.24-218.14 S 18.9 14450 National Overlay 80mm @ IRI 4-9 2016 243.7111 20.245N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 226.45-247.33 S 20.88 7721 National Overlay 50mm @ IRI 4-7 2016 159.1682 17.491N502 Bogra (Jahangirabad)-Natore Road Km 003.10-012.25 S 9.15 7229 National Overlay 50mm @ IRI 5-7 2016 56.39602 7.66N502 Bogra (Jahangirabad)-Natore Road Km 012.25-014.20 S 1.95 7229 National Overlay 50mm @ IRI 5-7 2016 12.42195 8.162N502 Bogra (Jahangirabad)-Natore Road Km 014.20-014.30 S 0.1 7229 National Rehab 180mm @ IRI 9-12 2016 5.433566 1.138N502 Bogra (Jahangirabad)-Natore Road Km 014.30-018.00 S 3.7 7229 National Overlay 50mm @ IRI 5-7 2016 22.02795 7.299N502 Bogra (Jahangirabad)-Natore Road Km 018.00-018.20 S 0.2 7229 National Rehab 180mm @ IRI 9-12 2016 6.3382 3.105N502 Bogra (Jahangirabad)-Natore Road Km 018.20-021.90 S 3.7 7229 National Overlay 60mm @ IRI 7-9 2016 26.80017 8.051N502 Bogra (Jahangirabad)-Natore Road Km 021.90-022.30 S 0.4 7229 National Overlay 60mm @ IRI 7-9 2016 2.7522 8.687N502 Bogra (Jahangirabad)-Natore Road Km 022.30-025.58 S 3.28 7229 National Overlay 50mm @ IRI 5-7 2016 23.61864 8.408

Page 141 of 163

Page 142: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N502 Bogra (Jahangirabad)-Natore Road Km 025.58-028.50 S 2.92 6211 National Overlay 50mm @ IRI 5-7 2016 18.77035 10.468N502 Bogra (Jahangirabad)-Natore Road Km 028.50-028.60 S 0.1 6211 National Rehab 180mm @ IRI 9-12 2016 3.28434 5.653N502 Bogra (Jahangirabad)-Natore Road Km 028.60-029.80 S 1.2 6211 National Overlay 60mm @ IRI 7-9 2016 10.73358 11.261N502 Bogra (Jahangirabad)-Natore Road Km 029.80-030.50 S 0.7 6211 National Overlay 60mm @ IRI 7-9 2016 4.99149 13.595N502 Bogra (Jahangirabad)-Natore Road Km 030.50-031.51 S 1.01 6211 National Overlay 50mm @ IRI 5-7 2016 6.06879 12.458N510 Bogra Station Road Km 002.70-002.78 S 0.08 12842 National Overlay 50mm @ IRI 5 2016 1.6758 0.649N515 Bogra 2nd Town By-Pass Road Km 000.00-001.60 S 1.6 3974 National Overlay 50mm @ IRI 5-9 2016 16.5312 1.325N515 Bogra 2nd Town By-Pass Road Km 001.60-001.70 S 0.1 3974 National Rehab 135mm @ IRI 9-12 2016 3.30544 0.886N515 Bogra 2nd Town By-Pass Road Km 001.70-002.30 S 0.6 3974 National Overlay 50mm @ IRI 5-9 2016 4.599 2.318N515 Bogra 2nd Town By-Pass Road Km 002.30-002.50 S 0.2 3974 National DBST @ Traff 2000-4000 2016 0.72124 2.542N515 Bogra 2nd Town By-Pass Road Km 002.50-005.70 S 3.2 3974 National Overlay 50mm @ IRI 5-9 2016 24.528 1.966N515 Bogra 2nd Town By-Pass Road Km 005.70-008.70 S 3 3974 National Overlay 50mm @ IRI 5-9 2016 22.995 2.316N515 Bogra 2nd Town By-Pass Road Km 008.70-009.04 S 0.34 3974 National Overlay 50mm @ IRI 5-9 2016 2.6061 2.387N515 Bogra 2nd Town By-Pass Road Km 009.04-009.08 L 0.04 3900 National Overlay 50mm @ IRI 5-9 2016 0.1428 7.374N515 Bogra 2nd Town By-Pass Road Km 009.04-009.08 R 0.04 3900 National Overlay 50mm @ IRI 5-9 2016 0.147 7.251N515 Bogra 2nd Town By-Pass Road Km 009.08-015.60 S 6.52 3974 National Overlay 50mm @ IRI 5-9 2016 49.96814 1.9N515 Bogra 2nd Town By-Pass Road Km 015.60-015.70 S 0.1 3974 National Rehab 135mm @ IRI 9-12 2016 3.30544 1.097R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 029.30-042.60 S 13.3 9198 Regional Overlay 60mm @ IRI 5.5-9 2016 94.1657 12.747R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 042.60-042.81 S 0.21 5424 Regional DBST @ Traff 4000-6000 2016 0.578721 8.203R546 Railgate-Shantahar Road Km 000.00-003.00 S 3 4517 Regional Overlay 50mm @ IRI 5-7 2016 16.191 2.161R550 Mokamtala-Kalai-Joypurhat Road Km 000.00-000.20 L 0.2 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 1.40112 11.819R550 Mokamtala-Kalai-Joypurhat Road Km 000.00-000.20 R 0.2 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 1.40112 11.819R550 Mokamtala-Kalai-Joypurhat Road Km 000.20-009.40 S 9.2 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 64.45152 9.155R550 Mokamtala-Kalai-Joypurhat Road Km 009.40-009.70 S 0.3 5704 Regional Rehab 150mm @ IRI 9-12 2016 8.1144 3.857R550 Mokamtala-Kalai-Joypurhat Road Km 009.70-012.80 S 3.1 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 21.71035 11.008R550 Mokamtala-Kalai-Joypurhat Road Km 012.80-013.24 S 0.44 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 3.08947 9.666Z5032 Bogra-Sariakandi Road Km 003.00-007.80 S 4.8 5478 Zilla Overlay 50mm @ IRI 6-9 2016 27.72 0.226Z5032 Bogra-Sariakandi Road Km 008.10-008.50 S 0.4 5478 Zilla Overlay 50mm @ IRI 6-9 2016 2.3142 2.258Z5032 Bogra-Sariakandi Road Km 008.50-008.70 S 0.2 5478 Zilla Overlay 40mm @ Traff >=2000 2016 0.96786 0Z5032 Bogra-Sariakandi Road Km 008.70-008.90 S 0.2 5478 Zilla Overlay 50mm @ IRI 6-9 2016 1.197 0.905Z5032 Bogra-Sariakandi Road Km 008.90-012.20 S 3.3 5478 Zilla Overlay 50mm @ Cracking >25%2016 19.0575 0.281Z5032 Bogra-Sariakandi Road Km 012.20-015.40 S 3.2 5478 Zilla Overlay 50mm @ IRI 6-9 2016 18.47422 2.078Z5032 Bogra-Sariakandi Road Km 015.40-015.90 S 0.5 5478 Zilla Overlay 50mm @ IRI 6-9 2016 2.8875 2.31Z5032 Bogra-Sariakandi Road Km 015.90-020.50 S 4.6 5478 Zilla Overlay 50mm @ IRI 6-9 2016 26.565 0.262Z5032 Bogra-Sariakandi Road Km 020.50-022.59 S 2.09 5478 Zilla Overlay 50mm @ IRI 6-9 2016 12.55855 1.836Z5034 Sherpur-Kaigari-Nandigram Road Km 009.90-010.40 S 0.5 1368 Zilla Overlay 40mm @ IRI>12 2016 1.6131 0Z5034 Sherpur-Kaigari-Nandigram Road Km 010.80-010.90 S 0.1 1368 Zilla Overlay 40mm @ IRI>12 2016 0.32262 0Z5034 Sherpur-Kaigari-Nandigram Road Km 010.90-011.20 S 0.3 1368 Zilla Overlay 40mm @ 1000-2000 2016 0.96786 0Z5034 Sherpur-Kaigari-Nandigram Road Km 011.20-011.80 S 0.6 1368 Zilla Overlay 40mm @ IRI>12 2016 1.93572 0Z5034 Sherpur-Kaigari-Nandigram Road Km 012.00-012.10 S 0.1 1368 Zilla Overlay 40mm @ 1000-2000 2016 0.325846 0Z5034 Sherpur-Kaigari-Nandigram Road Km 012.10-012.30 S 0.2 1368 Zilla Overlay 40mm @ IRI>12 2016 0.64524 0Z5034 Sherpur-Kaigari-Nandigram Road Km 012.30-012.50 S 0.2 1368 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0.101Z5034 Sherpur-Kaigari-Nandigram Road Km 012.50-012.90 S 0.4 1368 Zilla Overlay 40mm @ 1000-2000 2016 1.29048 0Z5034 Sherpur-Kaigari-Nandigram Road Km 012.90-013.00 S 0.1 1368 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z5034 Sherpur-Kaigari-Nandigram Road Km 013.00-013.10 S 0.1 1368 Zilla Overlay 40mm @ IRI>12 2016 0.32262 0Z5034 Sherpur-Kaigari-Nandigram Road Km 013.10-013.30 S 0.2 1368 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0

Page 142 of 163

Page 143: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5034 Sherpur-Kaigari-Nandigram Road Km 013.30-014.10 S 0.8 1368 Zilla Overlay 40mm @ IRI>12 2016 2.58096 0Z5034 Sherpur-Kaigari-Nandigram Road Km 014.70-016.87 S 2.17 1368 Zilla Overlay 40mm @ 1000-2000 2016 6.997627 0Z5035 Mokamtala-Sonatala-Hatsherpur-Sariakandi Km 009.80-012.80 S 3 4942 Zilla Overlay 50mm @ IRI 6-9 2016 17.325 0.819Z5035 Mokamtala-Sonatala-Hatsherpur-Sariakandi Km 018.10-028.00 S 9.9 4862 Zilla Overlay 50mm @ IRI 6-9 2016 45.84195 0.771Z5035 Mokamtala-Sonatala-Hatsherpur-Sariakandi Km 031.00-034.50 S 3.5 4862 Zilla Overlay 50mm @ IRI 6-9 2016 13.5975 1.606Z5035 Mokamtala-Sonatala-Hatsherpur-Sariakandi Km 034.50-034.60 S 0.1 4862 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 1.74Z5035 Mokamtala-Sonatala-Hatsherpur-Sariakandi Km 034.60-037.10 S 2.5 4862 Zilla Overlay 50mm @ IRI 6-9 2016 9.7125 1.545Z5035 Mokamtala-Sonatala-Hatsherpur-Sariakandi Km 037.10-037.40 S 0.3 4862 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 1.373Z5035 Mokamtala-Sonatala-Hatsherpur-Sariakandi Km 037.40-038.80 S 1.4 4862 Zilla Overlay 50mm @ IRI 6-9 2016 5.439 1.858Z5035 Mokamtala-Sonatala-Hatsherpur-Sariakandi Km 038.80-039.10 S 0.3 4862 Zilla Rehab 75mm @ IRI 9-12 2016 3.32223 1.195Z5035 Mokamtala-Sonatala-Hatsherpur-Sariakandi Km 039.10-041.30 S 2.2 4862 Zilla Overlay 50mm @ IRI 6-9 2016 9.933 1.267Z5039 Bogra (Jhapgari)-Khetlal Road Km 000.00-000.90 S 0.9 6901 Zilla Overlay 50mm @ IRI 6-9 2016 5.8212 1.341Z5039 Bogra (Jhapgari)-Khetlal Road Km 000.90-001.20 S 0.3 6901 Zilla Overlay 50mm @ IRI 6-9 2016 1.7325 3.594Z5039 Bogra (Jhapgari)-Khetlal Road Km 001.20-001.30 S 0.1 6901 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 3.522Z5039 Bogra (Jhapgari)-Khetlal Road Km 001.30-002.20 S 0.9 6901 Zilla Overlay 50mm @ IRI 6-9 2016 5.1975 3.947Z5039 Bogra (Jhapgari)-Khetlal Road Km 002.20-003.30 S 1.1 6901 Zilla Rehab 75mm @ IRI 9-12 2016 18.10765 2.936Z5039 Bogra (Jhapgari)-Khetlal Road Km 003.30-003.70 S 0.4 6901 Zilla Overlay 50mm @ Cracking >25%2016 2.31 3.665Z5039 Bogra (Jhapgari)-Khetlal Road Km 003.70-003.90 S 0.2 6901 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 3.554Z5039 Bogra (Jhapgari)-Khetlal Road Km 004.20-004.30 S 0.1 6901 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 4.126Z5039 Bogra (Jhapgari)-Khetlal Road Km 004.30-005.10 S 0.8 6901 Zilla Overlay 50mm @ IRI 6-9 2016 4.62 6.172Z5039 Bogra (Jhapgari)-Khetlal Road Km 005.10-005.40 S 0.3 6901 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 3.546Z5039 Bogra (Jhapgari)-Khetlal Road Km 005.50-005.90 S 0.4 6901 Zilla Rehab 75mm @ IRI 9-12 2016 6.5846 3.396Z5039 Bogra (Jhapgari)-Khetlal Road Km 006.10-006.50 S 0.4 6901 Zilla Full Recon 75mm @ IRI>12 2016 9.5634 1.966Z5039 Bogra (Jhapgari)-Khetlal Road Km 006.50-009.50 S 3 6901 Zilla Rehab 75mm @ IRI 9-12 2016 49.3845 2.513Z5039 Bogra (Jhapgari)-Khetlal Road Km 009.50-009.70 S 0.2 6901 Zilla Full Recon 75mm @ IRI>12 2016 4.7817 2.012Z5039 Bogra (Jhapgari)-Khetlal Road Km 009.70-009.80 S 0.1 6901 Zilla Overlay 50mm @ Cracking >25%2016 0.5775 2.577Z5039 Bogra (Jhapgari)-Khetlal Road Km 009.80-010.20 S 0.4 6901 Zilla Rehab 75mm @ IRI 9-12 2016 6.5846 3.249Z5039 Bogra (Jhapgari)-Khetlal Road Km 010.20-010.40 S 0.2 6901 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 6.441Z5039 Bogra (Jhapgari)-Khetlal Road Km 010.40-010.60 S 0.2 6901 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 3.583Z5039 Bogra (Jhapgari)-Khetlal Road Km 010.60-010.80 S 0.2 6901 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 6.406Z5039 Bogra (Jhapgari)-Khetlal Road Km 010.80-011.10 S 0.3 6901 Zilla Rehab 75mm @ IRI 9-12 2016 4.93845 3.407Z5039 Bogra (Jhapgari)-Khetlal Road Km 011.10-012.10 S 1 6901 Zilla Overlay 50mm @ IRI 6-9 2016 5.775 3.852Z5039 Bogra (Jhapgari)-Khetlal Road Km 012.10-012.70 S 0.6 6901 Zilla Rehab 75mm @ IRI 9-12 2016 9.8769 2.661Z5039 Bogra (Jhapgari)-Khetlal Road Km 012.70-012.90 S 0.2 6901 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 3.853Z5039 Bogra (Jhapgari)-Khetlal Road Km 012.90-013.60 S 0.7 6901 Zilla Rehab 75mm @ IRI 9-12 2016 11.52305 2.599Z5039 Bogra (Jhapgari)-Khetlal Road Km 013.60-016.30 S 2.7 4317 Zilla Overlay 50mm @ IRI 6-9 2016 11.42505 2.533Z5039 Bogra (Jhapgari)-Khetlal Road Km 016.30-016.40 S 0.1 6901 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 4.126Z5039 Bogra (Jhapgari)-Khetlal Road Km 016.40-017.20 S 0.8 6901 Zilla Overlay 50mm @ IRI 6-9 2016 4.62 6.225Z5039 Bogra (Jhapgari)-Khetlal Road Km 017.20-018.60 S 1.4 6901 Zilla Overlay 50mm @ IRI 6-9 2016 8.085 5.742Z5039 Bogra (Jhapgari)-Khetlal Road Km 020.00-020.40 S 0.4 4317 Zilla Overlay 50mm @ IRI 6-9 2016 1.596 3.519Z5039 Bogra (Jhapgari)-Khetlal Road Km 020.40-021.40 S 1 4317 Zilla Overlay 50mm @ IRI 6-9 2016 3.99 3.232Z5039 Bogra (Jhapgari)-Khetlal Road Km 021.40-022.76 S 1.36 4317 Zilla Overlay 50mm @ IRI 6-9 2016 5.4264 3.578Z5040 Sultanganj-Madla-Bagbari-Gabtali Road Km 000.00-012.65 S 12.65 6901 Zilla Overlay 50mm @ IRI 6-9 2016 65.08425 6.697Z5040 Sultanganj-Madla-Bagbari-Gabtali Road Km 012.65-015.70 S 3.05 4317 Zilla Overlay 50mm @ IRI 6-9 2016 13.09393 2.423Z5040 Sultanganj-Madla-Bagbari-Gabtali Road Km 015.70-015.94 S 0.24 4317 Zilla Overlay 50mm @ IRI 6-9 2016 0.96159 3.458Z5051 Baiguni-Durgahata-Poradah Road Km 000.00-010.49 S 10.48 925 Zilla Overlay 40mm @ Traff 100-1000 2016 31.69028 0

Page 143 of 163

Page 144: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5053 Kahalu Thana Connecting Road Km 010.60-010.99 S 0.39 4114 Zilla Overlay 50mm @ IRI 6-9 2016 2.13759 1.842Z5072 Dhunot-Baliadighi-Poradah-Mokamtala Road Km 019.82-021.02 S 1.2 1822 Zilla Overlay 40mm @ 1000-2000 2016 3.76956 0Z5072 Dhunot-Baliadighi-Poradah-Mokamtala Road Km 021.92-022.12 S 0.2 1822 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z5072 Dhunot-Baliadighi-Poradah-Mokamtala Road Km 022.12-023.52 S 1.4 1822 Zilla Overlay 40mm @ 1000-2000 2016 4.39782 0Z5072 Dhunot-Baliadighi-Poradah-Mokamtala Road Km 026.72-026.82 S 0.1 1822 Zilla Overlay 40mm @ 1000-2000 2016 0.31413 0.003Z5072 Dhunot-Baliadighi-Poradah-Mokamtala Road Km 026.82-030.12 S 3.3 1822 Zilla Overlay 40mm @ 1000-2000 2016 10.36629 0Z5072 Dhunot-Baliadighi-Poradah-Mokamtala Road Km 030.12-033.32 S 3.2 1822 Zilla Overlay 40mm @ 1000-2000 2016 10.05216 0Z5072 Dhunot-Baliadighi-Poradah-Mokamtala Road Km 033.32-035.62 S 2.3 1822 Zilla Overlay 40mm @ 1000-2000 2016 10.21262 0.133Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 001.60-002.10 S 0.5 3025 Zilla Overlay 40mm @ Traff >=2000 2016 1.6131 0.969Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 002.10-002.80 S 0.7 3025 Zilla Overlay 40mm @ Traff >=2000 2016 2.25834 0.982Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 002.80-002.90 S 0.1 3025 Zilla Rehab 75mm @ IRI 9-12 2016 1.13734 1.542Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 003.60-004.60 S 1 3025 Zilla Overlay 40mm @ Traff >=2000 2016 3.396 0.954Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 004.60-005.00 S 0.4 3135 Zilla Overlay 40mm @ Traff >=2000 2016 1.385568 0.754Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 005.70-007.40 S 1.7 3182 Zilla Overlay 40mm @ Traff >=2000 2016 5.91753 1.196Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 016.10-016.30 S 0.2 3182 Zilla Full Recon 75mm @ IRI>12 2016 3.39066 0.499Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 016.80-016.90 S 0.1 3182 Zilla Full Recon 75mm @ IRI>12 2016 1.69533 0.837Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 017.90-018.00 S 0.1 3182 Zilla Full Recon 75mm @ IRI>12 2016 1.734453 0.749Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 018.40-018.60 S 0.2 3182 Zilla Rehab 75mm @ IRI 9-12 2016 2.3944 1.295Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 018.80-019.30 S 0.5 3182 Zilla Rehab 75mm @ IRI 9-12 2016 5.986 0.981Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 019.30-019.70 S 0.4 3182 Zilla Overlay 40mm @ Traff >=2000 2016 1.3584 0.817Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 019.70-019.90 S 0.2 3182 Zilla Rehab 75mm @ IRI 9-12 2016 2.3944 0.798Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 019.90-020.20 S 0.3 3182 Zilla Overlay 40mm @ Traff >=2000 2016 1.0188 0.784Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 020.20-021.90 S 1.7 3182 Zilla Rehab 75mm @ IRI 9-12 2016 20.3524 0.809Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 021.90-022.20 S 0.3 3182 Zilla Overlay 40mm @ Traff >=2000 2016 1.0188 0.826Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 022.20-022.90 S 0.7 3182 Zilla Overlay 40mm @ Traff >=2000 2016 2.3772 0.983Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 022.90-023.00 S 0.1 3182 Zilla Overlay 40mm @ Traff >=2000 2016 0.3396 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 023.00-023.20 S 0.2 3182 Zilla Rehab 75mm @ IRI 9-12 2016 2.3944 0.67Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 023.20-023.40 S 0.2 3182 Zilla Overlay 40mm @ Cracks >25% 2016 0.6432 0.582Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 023.40-023.74 S 0.34 3182 Zilla Rehab 75mm @ IRI 9-12 2016 4.07048 0.772Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 023.74-026.80 S 3.06 2251 Zilla Overlay 40mm @ Traff >=2000 2016 10.41774 0.065Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 026.80-027.70 S 0.9 2251 Zilla Overlay 40mm @ Traff >=2000 2016 3.0564 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 027.70-028.30 S 0.6 2251 Zilla Overlay 40mm @ Traff >=2000 2016 2.0376 0.033Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 028.30-029.20 S 0.9 2251 Zilla Overlay 40mm @ Traff >=2000 2016 3.0564 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 030.20-030.80 S 0.6 2251 Zilla Overlay 40mm @ Traff >=2000 2016 2.689632 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 030.80-031.10 S 0.3 2251 Zilla Overlay 40mm @ Traff >=2000 2016 1.42632 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 031.10-031.40 S 0.3 2251 Zilla Rehab 75mm @ IRI 9-12 2016 3.609558 0.309Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 031.40-032.30 S 0.9 2251 Zilla Overlay 40mm @ Traff >=2000 2016 2.97999 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 032.30-032.90 S 0.6 2251 Zilla Overlay 40mm @ Traff >=2000 2016 1.98666 0.049Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 032.90-033.80 S 0.9 2251 Zilla Overlay 40mm @ Traff >=2000 2016 2.97999 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 033.80-034.50 S 0.7 2251 Zilla Overlay 40mm @ Traff >=2000 2016 2.31777 0.162Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 034.50-034.80 S 0.3 2251 Zilla Overlay 40mm @ Traff >=2000 2016 0.99333 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 034.80-035.40 S 0.6 2251 Zilla Overlay 40mm @ Traff >=2000 2016 1.98666 0.143Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 035.40-035.70 S 0.3 2251 Zilla Overlay 40mm @ Traff >=2000 2016 0.99333 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 035.70-036.00 S 0.3 2251 Zilla Rehab 75mm @ IRI 9-12 2016 3.50181 0.511Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 036.00-036.90 S 0.9 2251 Zilla Overlay 40mm @ Traff >=2000 2016 2.97999 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 036.90-037.50 S 0.6 2251 Zilla Overlay 40mm @ Traff >=2000 2016 1.98666 0.071

Page 144 of 163

Page 145: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 037.50-038.40 S 0.9 2251 Zilla Overlay 40mm @ Traff >=2000 2016 2.97999 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 038.40-039.10 S 0.7 2251 Zilla Overlay 40mm @ Traff >=2000 2016 2.31777 0.135Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 039.10-039.40 S 0.3 2251 Zilla Overlay 40mm @ Traff >=2000 2016 0.99333 0Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 039.40-040.00 S 0.6 2251 Zilla Overlay 40mm @ Traff >=2000 2016 1.98666 0.137Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 040.30-040.60 S 0.3 2251 Zilla Rehab 75mm @ IRI 9-12 2016 3.50181 0.696Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 041.50-041.90 S 0.4 2251 Zilla Overlay 40mm @ Traff >=2000 2016 1.32444 0.164Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 042.00-043.51 S 1.51 2251 Zilla Overlay 40mm @ Traff >=2000 2016 5.013005 0.045Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 000.00-003.00 S 3 3590 Zilla Overlay 40mm @ Traff >=2000 2016 10.49364 1.048Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 006.00-006.50 S 0.5 3590 Zilla Overlay 40mm @ Traff >=2000 2016 1.6131 1.038Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 006.50-008.10 S 1.6 3590 Zilla Overlay 40mm @ Traff >=2000 2016 5.528688 0.954Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 009.40-009.70 S 0.3 3590 Zilla Overlay 40mm @ Cracks >25% 2016 0.94068 0.318Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 009.70-010.60 S 0.9 3590 Zilla Rehab 75mm @ IRI 9-12 2016 10.50543 0.639Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 011.10-011.60 S 0.5 3590 Zilla Rehab 75mm @ IRI 9-12 2016 5.83635 1.112Z5207 Nandigram (Katham)-Kaliganj-Raninagar Road Km 014.20-014.25 S 0.05 3590 Zilla Overlay 40mm @ Traff >=2000 2016 0.168866 0Z5401 Sirajganj-Kazipur-Dhunat-Sherpur Road Km 039.13-042.53 S 3.4 6440 Zilla Overlay 50mm @ IRI 6-9 2016 20.3847 3.044Z5401 Sirajganj-Kazipur-Dhunat-Sherpur Road Km 043.23-043.43 S 0.2 6440 Zilla Overlay 50mm @ IRI 6-9 2016 1.155 4.29Z5401 Sirajganj-Kazipur-Dhunat-Sherpur Road Km 044.33-044.53 S 0.2 6440 Zilla Rehab 75mm @ IRI 9-12 2016 3.2923 2.491Z5401 Sirajganj-Kazipur-Dhunat-Sherpur Road Km 051.53-051.83 S 0.3 6440 Zilla Rehab 75mm @ IRI 9-12 2016 4.921988 2.372Z5401 Sirajganj-Kazipur-Dhunat-Sherpur Road Km 054.93-055.20 S 0.28 6440 Zilla Overlay 50mm @ IRI 6-9 2016 2.492826 1.048Z5471 Kahalu-Choumohoni-Adamdighi Road Km 000.00-000.20 S 0.2 2820 Zilla Full Recon 75mm @ IRI>12 2016 3.30372 0.356Z5471 Kahalu-Choumohoni-Adamdighi Road Km 000.70-000.90 S 0.2 2820 Zilla Full Recon 75mm @ IRI>12 2016 3.30372 0.359Z5471 Kahalu-Choumohoni-Adamdighi Road Km 000.90-001.20 S 0.3 2820 Zilla Overlay 40mm @ Traff >=2000 2016 0.96786 0Z5471 Kahalu-Choumohoni-Adamdighi Road Km 001.20-001.50 S 0.3 2820 Zilla Full Recon 75mm @ IRI>12 2016 4.95558 0.245Z5471 Kahalu-Choumohoni-Adamdighi Road Km 001.80-001.90 S 0.1 2820 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 0.698Z5471 Kahalu-Choumohoni-Adamdighi Road Km 002.70-002.80 S 0.1 2820 Zilla Rehab 75mm @ IRI 9-12 2016 1.13734 0.885Z5471 Kahalu-Choumohoni-Adamdighi Road Km 004.70-005.10 S 0.4 2820 Zilla Full Recon 75mm @ IRI>12 2016 7.129471 0.153Z5471 Kahalu-Choumohoni-Adamdighi Road Km 006.20-006.40 S 0.2 2820 Zilla Full Recon 75mm @ IRI>12 2016 3.39066 0.331Z5471 Kahalu-Choumohoni-Adamdighi Road Km 006.40-008.50 S 2.1 2820 Zilla Overlay 40mm @ Traff >=2000 2016 6.917651 0Z5471 Kahalu-Choumohoni-Adamdighi Road Km 008.50-008.90 S 0.4 2820 Zilla Full Recon 75mm @ IRI>12 2016 6.60744 0.189Z5471 Kahalu-Choumohoni-Adamdighi Road Km 009.00-009.20 S 0.2 2820 Zilla Full Recon 75mm @ IRI>12 2016 3.30372 0.356Z5471 Kahalu-Choumohoni-Adamdighi Road Km 013.00-013.10 S 0.1 2820 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 0.38Z5471 Kahalu-Choumohoni-Adamdighi Road Km 013.40-013.60 S 0.2 2820 Zilla Full Recon 75mm @ IRI>12 2016 3.30372 0.356Z5471 Kahalu-Choumohoni-Adamdighi Road Km 013.70-013.80 S 0.1 2820 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 0.696Z5471 Kahalu-Choumohoni-Adamdighi Road Km 013.90-014.10 S 0.2 2820 Zilla Full Recon 75mm @ IRI>12 2016 3.30372 0.078Z5471 Kahalu-Choumohoni-Adamdighi Road Km 014.10-014.20 S 0.1 2820 Zilla Overlay 40mm @ Traff >=2000 2016 0.32262 0Z5471 Kahalu-Choumohoni-Adamdighi Road Km 014.20-014.60 S 0.4 2820 Zilla Full Recon 75mm @ IRI>12 2016 6.43356 0.215Z5471 Kahalu-Choumohoni-Adamdighi Road Km 014.60-014.70 S 0.1 2820 Zilla Overlay 40mm @ Traff >=2000 2016 0.29715 0Z5471 Kahalu-Choumohoni-Adamdighi Road Km 014.70-015.90 S 1.2 2820 Zilla Full Recon 75mm @ IRI>12 2016 18.27261 0.042Z5471 Kahalu-Choumohoni-Adamdighi Road Km 015.90-016.20 S 0.3 2820 Zilla Overlay 40mm @ Traff >=2000 2016 0.89145 0Z5471 Kahalu-Choumohoni-Adamdighi Road Km 016.20-016.70 S 0.5 2820 Zilla Full Recon 75mm @ IRI>12 2016 7.60725 0.224Z5471 Kahalu-Choumohoni-Adamdighi Road Km 017.00-017.80 S 0.8 2820 Zilla Full Recon 75mm @ IRI>12 2016 12.1716 0.133Z5471 Kahalu-Choumohoni-Adamdighi Road Km 017.90-018.50 S 0.6 2820 Zilla Full Recon 75mm @ IRI>12 2016 8.60706 0.242Z5471 Kahalu-Choumohoni-Adamdighi Road Km 018.80-018.90 S 0.1 2820 Zilla Rehab 75mm @ IRI 9-12 2016 0.95776 1.2Z5471 Kahalu-Choumohoni-Adamdighi Road Km 019.00-019.10 S 0.1 2820 Zilla Full Recon 75mm @ IRI>12 2016 1.39104 0.875Z5471 Kahalu-Choumohoni-Adamdighi Road Km 019.20-019.40 S 0.2 2820 Zilla Full Recon 75mm @ IRI>12 2016 2.78208 0.231Z5471 Kahalu-Choumohoni-Adamdighi Road Km 019.70-020.30 S 0.6 2820 Zilla Full Recon 75mm @ IRI>12 2016 8.34624 0.286

Page 145 of 163

Page 146: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5471 Kahalu-Choumohoni-Adamdighi Road Km 020.50-020.70 S 0.2 2820 Zilla Full Recon 75mm @ IRI>12 2016 2.78208 0.311Z5471 Kahalu-Choumohoni-Adamdighi Road Km 021.30-021.41 S 0.11 2820 Zilla Full Recon 75mm @ IRI>12 2016 1.502323 0.823Z5472 Adamdighi-Santahar Sailo-Raninagar Road Km 000.00-003.80 S 3.8 1158 Zilla Overlay 40mm @ 1000-2000 2016 11.93694 0Z5472 Adamdighi-Santahar Sailo-Raninagar Road Km 003.80-004.20 S 0.4 1158 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z5472 Adamdighi-Santahar Sailo-Raninagar Road Km 004.20-004.90 S 0.7 1158 Zilla Overlay 40mm @ 1000-2000 2016 2.19891 0Z5472 Adamdighi-Santahar Sailo-Raninagar Road Km 004.90-005.30 S 0.4 1158 Zilla Overlay 40mm @ 1000-2000 2016 1.25652 0Z5472 Adamdighi-Santahar Sailo-Raninagar Road Km 007.50-009.90 S 2.4 1158 Zilla Overlay 40mm @ 1000-2000 2016 8.802432 0Z5472 Adamdighi-Santahar Sailo-Raninagar Road Km 009.90-010.60 S 0.7 1158 Zilla Overlay 40mm @ 1000-2000 2016 3.143847 0.149Z5505 Mahastangarh-Shibganj-Amtoli Road Km 000.00-002.90 S 2.9 3394 Zilla Overlay 40mm @ Traff >=2000 2016 13.54155 0.069Z5505 Mahastangarh-Shibganj-Amtoli Road Km 006.00-007.90 S 1.9 3394 Zilla Overlay 40mm @ Traff >=2000 2016 8.87205 0.069Z5507 Mokamtala-Guzia-Shibganj Road Km 006.60-006.80 S 0.2 2728 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.553Z5507 Mokamtala-Guzia-Shibganj Road Km 006.80-008.80 S 2 2728 Zilla Overlay 40mm @ Traff >=2000 2016 6.2826 0.93Z5507 Mokamtala-Guzia-Shibganj Road Km 008.80-009.00 S 0.2 2728 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.553Z5507 Mokamtala-Guzia-Shibganj Road Km 009.00-009.63 S 0.63 2728 Zilla Overlay 40mm @ Traff >=2000 2016 1.979019 0.828Sub-Total Bogra Division 2093.565

Dinajpur DivisionN5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 394.46-424.17 S 29.7 3893 National Overlay 50mm @ IRI 4-9 2016 185.2701 6.654N508 Dinajpur-Beldanga Road Km 000.00-015.98 S 15.98 2550 National DBST @ 25% Crk 2016 61.39704 1.04R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 051.30-052.20 S 0.9 7282 Regional Overlay 60mm @ IRI 5.5-9 2016 6.07986 14.496R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 052.20-058.60 S 6.4 7282 Regional Overlay 60mm @ IRI 5.5-9 2016 43.22781 14.351R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 058.60-059.00 S 0.4 7282 Regional Rehab 150mm @ IRI 9-12 2016 10.4328 5.848R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 059.00-061.40 S 2.4 7282 Regional Overlay 60mm @ IRI 5.5-9 2016 16.21296 14.225R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 061.40-061.60 S 0.2 7282 Regional Rehab 150mm @ IRI 9-12 2016 5.2164 6.067R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 061.60-066.22 S 4.62 7282 Regional Overlay 60mm @ IRI 5.5-9 2016 33.01592 18.714R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 100.40-105.62 S 5.23 3889 Regional Overlay 50mm @ IRI 7-9 2016 31.72266 7.568R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 105.62-106.68 S 1.06 6455 Regional DBST @ 25% Crk 2016 2.879585 0.975R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 106.68-106.73 L 0.05 6455 Regional Overlay 60mm @ IRI 5.5-9 2016 0.3753 3.474R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 106.68-106.73 R 0.05 6455 Regional Overlay 60mm @ IRI 5.5-9 2016 0.3753 3.474R586 Fulbari Bus Stand-Dinajpur Govt. College Km 000.00-003.27 S 3.27 6701 Regional DBST @ 25% Crk 2016 11.27769 5.358Z5002 Thakurgaon-Nekmand-Pirganj-Birganj Road Km 053.85-057.25 S 3.4 845 Zilla Overlay 40mm @ Traff 100-1000 2016 12.15259 0Z5006 Dinajpur-Bochaganj-Bakultala Road Km 000.00-006.30 S 6.3 5497 Zilla Overlay 50mm @ IRI 6-9 2016 36.58095 2.108Z5007 Birganj-Kaharol Road Km 000.00-001.00 S 1 2144 Zilla Overlay 40mm @ Traff >=2000 2016 4.80534 0Z5007 Birganj-Kaharol Road Km 002.00-002.30 S 0.3 2144 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.081Z5007 Birganj-Kaharol Road Km 002.30-003.40 S 1.1 2144 Zilla Overlay 40mm @ Traff >=2000 2016 4.342635 0Z5007 Birganj-Kaharol Road Km 004.40-004.80 S 0.4 2144 Zilla Overlay 40mm @ Traff >=2000 2016 1.29048 0.002Z5007 Birganj-Kaharol Road Km 006.10-006.60 S 0.5 2144 Zilla Overlay 40mm @ Traff >=2000 2016 1.6131 0.051Z5007 Birganj-Kaharol Road Km 006.60-009.37 S 2.77 2144 Zilla Overlay 40mm @ Traff >=2000 2016 11.12368 0Z5008 Birganj-Khansama-Darwani Road Km 000.00-002.00 S 2 3643 Zilla Overlay 40mm @ Traff >=2000 2016 7.48818 0.092Z5008 Birganj-Khansama-Darwani Road Km 002.40-002.50 S 0.1 3643 Zilla Rehab 75mm @ IRI 9-12 2016 1.13734 1.68Z5008 Birganj-Khansama-Darwani Road Km 004.40-004.60 S 0.2 3643 Zilla Overlay 40mm @ Traff >=2000 2016 0.64524 0.351Z5008 Birganj-Khansama-Darwani Road Km 004.60-005.20 S 0.6 3643 Zilla Overlay 40mm @ Traff >=2000 2016 1.93572 0.993Z5008 Birganj-Khansama-Darwani Road Km 005.20-005.30 S 0.1 3643 Zilla Overlay 40mm @ Traff >=2000 2016 0.32262 0Z5008 Birganj-Khansama-Darwani Road Km 005.30-005.40 S 0.1 3643 Zilla Rehab 75mm @ IRI 9-12 2016 1.13734 1.018Z5008 Birganj-Khansama-Darwani Road Km 005.40-005.90 S 0.5 3643 Zilla Overlay 40mm @ Traff >=2000 2016 1.6131 0.55Z5008 Birganj-Khansama-Darwani Road Km 008.50-009.00 S 0.5 3643 Zilla Overlay 40mm @ Traff >=2000 2016 1.6131 1.139

Page 146 of 163

Page 147: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5008 Birganj-Khansama-Darwani Road Km 009.00-009.80 S 0.8 3643 Zilla Overlay 40mm @ Traff >=2000 2016 3.450336 0.169Z5008 Birganj-Khansama-Darwani Road Km 009.80-010.30 S 0.5 3643 Zilla Rehab 75mm @ IRI 9-12 2016 7.826695 0.302Z5008 Birganj-Khansama-Darwani Road Km 010.30-015.20 S 4.9 3643 Zilla Overlay 40mm @ Traff >=2000 2016 17.34408 0.67Z5008 Birganj-Khansama-Darwani Road Km 016.70-017.00 S 0.3 3643 Zilla Overlay 40mm @ Traff >=2000 2016 0.96786 0.418Z5008 Birganj-Khansama-Darwani Road Km 017.00-019.50 S 2.5 3643 Zilla Overlay 40mm @ Traff >=2000 2016 8.0655 1.078Z5008 Birganj-Khansama-Darwani Road Km 020.00-020.10 S 0.1 3643 Zilla Rehab 75mm @ IRI 9-12 2016 1.13734 1.719Z5008 Birganj-Khansama-Darwani Road Km 020.40-020.59 S 0.19 3643 Zilla Rehab 75mm @ IRI 9-12 2016 2.172319 1.198Z5503 Joypurhat-Panchbibi-Hili Road Km 019.96-021.83 S 1.87 621 Zilla Seal Coat 2016 2.725884 0.485Z5802 Dinajpur-Khanpur Road Km 006.30-011.00 S 4.7 6335 Zilla Overlay 50mm @ IRI 6-9 2016 20.8257 0.723Z5802 Dinajpur-Khanpur Road Km 011.00-011.10 S 0.1 9000 Zilla Rehab 75mm @ IRI 9-12 2016 1.4965 3.173Z5802 Dinajpur-Khanpur Road Km 011.10-013.24 S 2.14 9000 Zilla Overlay 50mm @ IRI 6-9 2016 8.7633 3.092Z5804 Chirirbandar-Amtali Simantha Fari Road Km 000.10-000.60 S 0.5 1990 Zilla Overlay 40mm @ IRI>12 2016 2.2923 0Z5804 Chirirbandar-Amtali Simantha Fari Road Km 001.10-003.20 S 2.1 1990 Zilla Full Recon 75mm @ IRI>12 2016 35.7845 0.03Z5804 Chirirbandar-Amtali Simantha Fari Road Km 003.20-003.50 S 0.3 1990 Zilla Overlay 40mm @ 1000-2000 2016 0.96786 0Z5804 Chirirbandar-Amtali Simantha Fari Road Km 003.50-004.20 S 0.7 1990 Zilla Full Recon 75mm @ IRI>12 2016 11.56302 0.071Z5804 Chirirbandar-Amtali Simantha Fari Road Km 004.20-004.30 S 0.1 1990 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z5804 Chirirbandar-Amtali Simantha Fari Road Km 004.30-005.40 S 1.1 1990 Zilla Overlay 40mm @ IRI>12 2016 3.552046 0Z5804 Chirirbandar-Amtali Simantha Fari Road Km 005.40-005.50 S 0.1 1990 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z5804 Chirirbandar-Amtali Simantha Fari Road Km 005.50-006.10 S 0.6 1990 Zilla Overlay 40mm @ IRI>12 2016 1.93572 0Z5804 Chirirbandar-Amtali Simantha Fari Road Km 006.20-007.00 S 0.8 1990 Zilla Overlay 40mm @ IRI>12 2016 2.58096 0Z5804 Chirirbandar-Amtali Simantha Fari Road Km 007.10-013.30 S 6.2 1990 Zilla Overlay 40mm @ IRI>12 2016 20.00244 0Z5804 Chirirbandar-Amtali Simantha Fari Road Km 013.30-013.40 S 0.1 1990 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0.078Z5804 Chirirbandar-Amtali Simantha Fari Road Km 013.40-013.50 S 0.1 1990 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 0.283Z5804 Chirirbandar-Amtali Simantha Fari Road Km 013.50-014.10 S 0.6 1990 Zilla Overlay 40mm @ 1000-2000 2016 1.93572 0.056Z5804 Chirirbandar-Amtali Simantha Fari Road Km 014.10-014.60 S 0.5 1990 Zilla Full Recon 75mm @ IRI>12 2016 8.2593 0.005Z5804 Chirirbandar-Amtali Simantha Fari Road Km 014.60-016.45 S 1.85 1990 Zilla Overlay 40mm @ 1000-2000 2016 5.745471 0Z5851 Birampur-Nawabganj-Bhaduria Road Km 000.00-003.00 S 3 3036 Zilla Overlay 40mm @ Traff >=2000 2016 13.4991 0Z5851 Birampur-Nawabganj-Bhaduria Road Km 003.00-006.00 S 3 3036 Zilla Overlay 40mm @ Traff >=2000 2016 11.9709 0.642Z5851 Birampur-Nawabganj-Bhaduria Road Km 008.90-009.00 S 0.1 3036 Zilla Rehab 75mm @ IRI 9-12 2016 1.04755 2.507Z5851 Birampur-Nawabganj-Bhaduria Road Km 018.10-018.80 S 0.7 3036 Zilla Rehab 75mm @ IRI 9-12 2016 7.332849 1.041Z5851 Birampur-Nawabganj-Bhaduria Road Km 018.80-022.64 S 3.84 3036 Zilla Overlay 40mm @ Traff >=2000 2016 11.41353 1.613Sub-Total Dinajpur Division 713.9642

Gaibanda DivisionN5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 247.33-257.86 S 10.52 7721 National Overlay 50mm @ IRI 4-7 2016 79.90054 17.306N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 259.16-262.36 S 3.2 7721 National Overlay 50mm @ IRI 4-7 2016 24.528 17.261N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 262.36-263.86 S 1.5 7721 National Overlay 60mm @ IRI 7-9 2016 13.69845 18.276N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 263.86-264.06 S 0.2 7721 National Full Recon 180mm 2016 10.21854 6.756N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 264.06-264.96 S 0.9 7721 National Overlay 60mm @ IRI 7-9 2016 8.21907 18.267N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 264.96-271.16 S 6.2 7721 National Overlay 60mm @ IRI 7-9 2016 56.62939 18.061N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 271.16-272.96 S 1.8 6994 National Overlay 60mm @ IRI 7-9 2016 16.43814 15.867N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 272.96-273.56 S 0.6 5815 National DBST @ Traff 4000-6000 2016 2.167326 10.921N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 273.56-276.76 S 3.2 5815 National Overlay 50mm @ IRI 4-9 2016 24.4944 11.368N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 276.76-280.18 S 3.42 5815 National Overlay 50mm @ IRI 4-9 2016 26.1913 12.037R555 Palashbari-Gaibandah Road Km 017.50-021.02 S 3.52 6492 Regional Overlay 60mm @ IRI 5.5-9 2016 29.9539 4.635R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 000.00-004.68 S 4.68 7774 Regional DBST @ Traff >6000 2016 13.21006 13.968

Page 147 of 163

Page 148: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R585 Gobindagnj-Birampur-Fulbari-Dinajpur Km 005.00-014.20 S 9.2 3925 Regional DBST @ 25% Crk 2016 29.28124 4.784Z5476 Dhupni-Belka Road Km 000.00-000.40 S 0.4 2231 Zilla Full Recon 75mm @ IRI>12 2016 9.04176 0.256Z5476 Dhupni-Belka Road Km 000.50-001.00 S 0.5 2231 Zilla Full Recon 75mm @ IRI>12 2016 11.3022 0.067Z5476 Dhupni-Belka Road Km 001.00-001.20 S 0.2 2231 Zilla Overlay 40mm @ Traff >=2000 2016 0.847302 0.136Z5476 Dhupni-Belka Road Km 001.20-001.40 S 0.2 2231 Zilla Full Recon 75mm @ IRI>12 2016 3.30372 0.8Z5476 Dhupni-Belka Road Km 001.40-003.41 S 2.01 2231 Zilla Overlay 40mm @ Traff >=2000 2016 6.484662 0Z5551 Dariapur-Kamarzani Road Km 003.10-004.80 S 1.7 1194 Zilla Overlay 40mm @ 1000-2000 2016 5.48454 0Z5552 Gaibandha-Varathkhali-Saghata Road Km 022.10-022.20 S 0.1 3924 Zilla Overlay 40mm @ Traff >=2000 2016 0.32262 0Z5552 Gaibandha-Varathkhali-Saghata Road Km 022.40-024.70 S 2.3 3924 Zilla Overlay 40mm @ Traff >=2000 2016 7.42026 0.566Z5552 Gaibandha-Varathkhali-Saghata Road Km 026.50-026.60 S 0.1 3924 Zilla Full Recon 75mm @ IRI>12 2016 1.65186 0.812Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 000.00-003.70 S 3.7 1326 Zilla Overlay 40mm @ 1000-2000 2016 14.66987 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 014.40-015.40 S 1 1326 Zilla Overlay 40mm @ 1000-2000 2016 3.2262 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 018.10-018.20 S 0.1 1326 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 018.20-018.30 S 0.1 1326 Zilla Overlay 40mm @ 1000-2000 2016 0.32262 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 018.30-018.40 S 0.1 1326 Zilla Overlay 40mm @ IRI>12 2016 0.32262 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 018.40-018.60 S 0.2 1326 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 018.60-019.10 S 0.5 1326 Zilla Overlay 40mm @ 1000-2000 2016 1.634325 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 019.10-020.90 S 1.8 1326 Zilla Overlay 40mm @ 1000-2000 2016 5.639058 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 020.90-021.70 S 0.8 1326 Zilla Overlay 40mm @ 1000-2000 2016 2.58096 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 021.70-022.20 S 0.5 1326 Zilla Overlay 40mm @ 1000-2000 2016 1.6131 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 022.20-023.30 S 1.1 1326 Zilla Overlay 40mm @ 1000-2000 2016 3.54882 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 023.30-023.60 S 0.3 1326 Zilla Overlay 40mm @ 1000-2000 2016 0.96786 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 023.60-023.90 S 0.3 1326 Zilla Overlay 40mm @ 1000-2000 2016 0.96786 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 024.00-024.20 S 0.2 1326 Zilla Overlay 40mm @ IRI>12 2016 0.64524 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 024.20-024.50 S 0.3 1326 Zilla Overlay 40mm @ 1000-2000 2016 0.96786 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 024.50-025.10 S 0.6 1326 Zilla Overlay 40mm @ IRI>12 2016 1.93572 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 025.10-025.20 S 0.1 1326 Zilla Seal Coat 2016 0.09576 0.053Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 025.20-025.90 S 0.7 1326 Zilla Overlay 40mm @ 1000-2000 2016 3.019044 0Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 025.90-026.50 S 0.6 1326 Zilla Overlay 40mm @ 1000-2000 2016 2.64888 0.025Z5554 Gaibandha-Nakaihat-Gobindaganj Road Km 026.50-027.30 S 0.8 1326 Zilla Overlay 40mm @ 1000-2000 2016 3.53184 0Z5558 Gaibandha City By-Pass Road Km 000.00-001.95 S 1.95 1649 Zilla Rehab 75mm @ IRI 9-12 2016 18.5202 1.216Z5559 Balashighat-Sayedpur Road Km 000.00-001.20 S 1.2 1649 Zilla Rehab 75mm @ IRI 9-12 2016 11.09804 0.772Z5852 Palashbari-Ghoraghat Road Km 000.10-001.20 S 1.1 2054 Zilla Overlay 40mm @ IRI>12 2016 5.41662 0Z5852 Palashbari-Ghoraghat Road Km 001.20-001.50 S 0.3 2054 Zilla Overlay 40mm @ Traff >=2000 2016 1.47726 0Z5852 Palashbari-Ghoraghat Road Km 001.50-001.70 S 0.2 2054 Zilla Full Recon 75mm @ IRI>12 2016 3.39066 0.337Z5852 Palashbari-Ghoraghat Road Km 001.70-001.80 S 0.1 2054 Zilla Overlay 40mm @ Traff >=2000 2016 0.33111 0.096Z5852 Palashbari-Ghoraghat Road Km 001.80-002.80 S 1 2054 Zilla Full Recon 75mm @ IRI>12 2016 16.5186 0.076Z5852 Palashbari-Ghoraghat Road Km 002.80-003.00 S 0.2 2054 Zilla Overlay 40mm @ Traff >=2000 2016 0.641844 0.047Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 018.67-022.96 S 4.29 4429 Zilla Full Recon 75mm @ IRI>12 2016 71.96693 1.233Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 022.96-023.46 S 0.5 4429 Zilla Rehab 75mm @ IRI 9-12 2016 5.83635 1.963Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 023.46-026.56 S 3.1 4429 Zilla Full Recon 75mm @ IRI>12 2016 52.55523 1.292Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 026.56-030.07 S 3.51 4429 Zilla Rehab 75mm @ IRI 9-12 2016 44.24046 1.734Sub-Total Gaibanda Division 662.0881

Joypurhat DivisionR545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 111.61-112.21 S 0.6 2872 Regional DBST @ Traff 2000-4000 2016 1.6302 1.134

Page 148 of 163

Page 149: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 112.21-112.51 S 0.3 2872 Regional DBST @ Traff 2000-4000 2016 0.8151 1.954R545 Bogra-Naogaon-Dhamoirhat-Joypurhat Km 119.61-120.93 S 1.33 2872 Regional Overlay 50mm @ IRI 5-7 2016 9.196162 1.391R549 Badalgachhi-Joypurhat Road Km 014.18-017.18 S 3 1719 Regional Overlay 50mm @ IRI 7-9 2016 16.947 0.645R550 Mokamtala-Kalai-Joypurhat Road Km 013.24-016.50 S 3.26 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 22.83125 9.97R550 Mokamtala-Kalai-Joypurhat Road Km 016.50-016.60 S 0.1 5704 Regional Rehab 150mm @ IRI 9-12 2016 2.7048 4.525R550 Mokamtala-Kalai-Joypurhat Road Km 016.60-022.80 S 6.2 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 47.62307 8.801R550 Mokamtala-Kalai-Joypurhat Road Km 022.80-023.60 S 0.8 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 7.60608 6.577R550 Mokamtala-Kalai-Joypurhat Road Km 023.60-025.30 S 1.7 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 15.41858 7.86R550 Mokamtala-Kalai-Joypurhat Road Km 036.00-036.84 S 0.84 5704 Regional Overlay 60mm @ IRI 5.5-9 2016 8.469333 6.364Z5039 Bogra (Jhapgari)-Khetlal Road Km 026.60-027.50 S 0.9 4317 Zilla Overlay 50mm @ IRI 6-9 2016 3.4965 1.971Z5039 Bogra (Jhapgari)-Khetlal Road Km 027.50-027.60 S 0.1 4317 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 2.565Z5039 Bogra (Jhapgari)-Khetlal Road Km 027.60-028.70 S 1.1 4317 Zilla Overlay 50mm @ IRI 6-9 2016 4.2735 2.24Z5039 Bogra (Jhapgari)-Khetlal Road Km 028.70-029.70 S 1 4317 Zilla Overlay 50mm @ IRI 6-9 2016 3.885 2.237Z5039 Bogra (Jhapgari)-Khetlal Road Km 029.70-030.00 S 0.3 4317 Zilla Overlay 50mm @ IRI 6-9 2016 1.1655 2.231Z5039 Bogra (Jhapgari)-Khetlal Road Km 030.00-030.10 S 0.1 4317 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 2.863Z5039 Bogra (Jhapgari)-Khetlal Road Km 030.10-030.65 S 0.55 4317 Zilla Overlay 50mm @ IRI 6-9 2016 2.13675 2.322Z5202 Nandigram-Talora-Dhupchachhia-Akkelpur Road Km 043.51-045.60 S 2.09 2251 Zilla Overlay 40mm @ Traff >=2000 2016 6.920198 0Z5452 Joypurhat-Akkelpur-Badalgachhi-Road Km 000.00-003.20 S 3.2 3419 Zilla Overlay 40mm @ Traff >=2000 2016 14.72506 0.319Z5452 Joypurhat-Akkelpur-Badalgachhi-Road Km 007.50-009.70 S 2.2 3419 Zilla Overlay 40mm @ Traff >=2000 2016 7.732692 1.094Z5452 Joypurhat-Akkelpur-Badalgachhi-Road Km 009.70-010.00 S 0.3 3419 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 1.061Z5452 Joypurhat-Akkelpur-Badalgachhi-Road Km 016.24-016.24 S 0.01 1485 Zilla Overlay 40mm @ 1000-2000 2016 0.021989 5.677Z5501 Joypurhat-Khetlal Road Km 002.50-003.30 S 0.8 2739 Zilla Overlay 40mm @ Traff >=2000 2016 3.7356 0.012Z5508 Khetlal-Gopinathpur-Akkelpur Road Km 003.00-003.30 S 0.3 1836 Zilla Overlay 40mm @ 1000-2000 2016 0.96786 0Z5508 Khetlal-Gopinathpur-Akkelpur Road Km 003.30-003.50 S 0.2 1836 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z5508 Khetlal-Gopinathpur-Akkelpur Road Km 003.50-003.70 S 0.2 1836 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z5508 Khetlal-Gopinathpur-Akkelpur Road Km 003.70-003.90 S 0.2 1836 Zilla Overlay 40mm @ 1000-2000 2016 0.64524 0Z5508 Khetlal-Gopinathpur-Akkelpur Road Km 003.90-005.10 S 1.2 1836 Zilla Overlay 40mm @ 1000-2000 2016 3.87144 0Z5508 Khetlal-Gopinathpur-Akkelpur Road Km 005.10-007.40 S 2.3 1836 Zilla Overlay 40mm @ 1000-2000 2016 7.42026 0Z5508 Khetlal-Gopinathpur-Akkelpur Road Km 009.10-009.50 S 0.4 1836 Zilla Overlay 40mm @ 1000-2000 2016 1.29048 0Z5508 Khetlal-Gopinathpur-Akkelpur Road Km 009.50-012.80 S 3.3 1836 Zilla Overlay 40mm @ 1000-2000 2016 10.64323 0Z5508 Khetlal-Gopinathpur-Akkelpur Road Km 012.80-018.25 S 5.45 1836 Zilla Overlay 40mm @ 1000-2000 2016 19.69677 0Z5509 Hili-Shalaipur-Kalai Road Km 010.80-011.00 S 0.2 2101 Zilla Full Recon 75mm @ IRI>12 2016 3.0429 0.358Z5509 Hili-Shalaipur-Kalai Road Km 014.50-015.30 S 0.8 2101 Zilla Rehab 75mm @ IRI 9-12 2016 8.85928 0.385Z5509 Hili-Shalaipur-Kalai Road Km 015.30-015.40 S 0.1 2101 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0Z5509 Hili-Shalaipur-Kalai Road Km 015.40-015.50 S 0.1 2101 Zilla Rehab 75mm @ IRI 9-12 2016 1.10741 0.542Z5509 Hili-Shalaipur-Kalai Road Km 015.50-015.80 S 0.3 2101 Zilla Overlay 40mm @ Traff >=2000 2016 0.94239 0Z5509 Hili-Shalaipur-Kalai Road Km 015.80-016.00 S 0.2 2101 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 0.47Z5510 Hili-Shalaipur-Kalai Road Km 000.00-000.76 S 0.76 3419 Zilla Rehab 75mm @ IRI 9-12 2016 12.51074 0.588Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 000.00-001.10 S 1.1 4429 Zilla Rehab 75mm @ IRI 9-12 2016 12.51074 1.913Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 001.10-001.30 S 0.2 4429 Zilla Full Recon 75mm @ IRI>12 2016 3.30372 1.696Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 001.30-001.60 S 0.3 4429 Zilla Rehab 75mm @ IRI 9-12 2016 3.41202 1.957Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 001.60-001.80 S 0.2 4429 Zilla Full Recon 75mm @ IRI>12 2016 3.30372 1.554Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 001.80-002.60 S 0.8 4429 Zilla Rehab 75mm @ IRI 9-12 2016 9.09872 1.845Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 002.60-003.00 S 0.4 4429 Zilla Rehab 75mm @ IRI 9-12 2016 4.54936 2.265Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 003.00-003.80 S 0.8 4429 Zilla Overlay 50mm @ IRI 6-9 2016 3.4608 3.564Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 003.80-004.80 S 1 4429 Zilla Rehab 75mm @ IRI 9-12 2016 11.3734 2.091

Page 149 of 163

Page 150: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 005.30-005.70 S 0.4 4429 Zilla Full Recon 75mm @ IRI>12 2016 7.720272 1.181Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 005.70-007.50 S 1.8 4429 Zilla Rehab 75mm @ IRI 9-12 2016 20.63374 1.667Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 007.50-007.71 S 0.21 4429 Zilla Full Recon 75mm @ IRI>12 2016 3.329367 1.897Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 007.71-008.31 S 0.6 4429 Zilla Rehab 75mm @ IRI 9-12 2016 6.967704 2.153Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 008.31-008.51 S 0.2 4429 Zilla Full Recon 75mm @ IRI>12 2016 3.0429 1.787Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 008.61-011.61 S 3 4429 Zilla Rehab 75mm @ IRI 9-12 2016 32.59377 2.354Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 011.61-011.81 S 0.2 4429 Zilla Overlay 50mm @ IRI 6-9 2016 0.8022 2.199Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 011.81-011.91 S 0.1 4429 Zilla Full Recon 75mm @ IRI>12 2016 1.56492 2.408Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 011.91-012.01 S 0.1 4429 Zilla Overlay 40mm @ Traff >=2000 2016 0.30564 1.695Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 012.01-012.91 S 0.9 4429 Zilla Full Recon 75mm @ IRI>12 2016 15.37534 1.196Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 012.91-013.01 S 0.1 4429 Zilla Overlay 50mm @ IRI 6-9 2016 0.5775 1.877Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 013.01-013.91 S 0.9 4429 Zilla Rehab 75mm @ IRI 9-12 2016 14.51904 1.974Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 014.21-014.51 S 0.3 4429 Zilla Full Recon 75mm @ IRI>12 2016 4.95558 1.631Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 014.51-014.61 S 0.1 4429 Zilla Overlay 40mm @ Traff >=2000 2016 0.32262 1.671Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 014.61-015.71 S 1.1 4429 Zilla Full Recon 75mm @ IRI>12 2016 18.17046 1.266Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 015.71-015.91 S 0.2 4429 Zilla Overlay 50mm @ Cracking >25%2016 0.798 1.924Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 015.91-018.46 S 2.55 4429 Zilla Full Recon 75mm @ IRI>12 2016 42.15547 1.396Z5855 Joypurhat-Rajabirat-Gobindaganj Road Km 018.46-018.67 S 0.21 4429 Zilla Rehab 75mm @ IRI 9-12 2016 2.399787 2.156Z5856 Panchbibi-Dugdugi-Ghoraghat Road Km 000.00-001.40 S 1.4 2848 Zilla Overlay 40mm @ Traff >=2000 2016 7.583268 0Z5856 Panchbibi-Dugdugi-Ghoraghat Road Km 003.00-003.90 S 0.9 2848 Zilla Overlay 40mm @ Traff >=2000 2016 2.865375 1.188Z5856 Panchbibi-Dugdugi-Ghoraghat Road Km 004.60-006.10 S 1.5 2848 Zilla Overlay 40mm @ Traff >=2000 2016 4.96665 0.284Z5856 Panchbibi-Dugdugi-Ghoraghat Road Km 006.10-006.60 S 0.5 2848 Zilla Overlay 40mm @ Traff >=2000 2016 1.57065 0.99Z5856 Panchbibi-Dugdugi-Ghoraghat Road Km 006.60-007.30 S 0.7 2848 Zilla Overlay 40mm @ Traff >=2000 2016 2.19891 1.151Z5856 Panchbibi-Dugdugi-Ghoraghat Road Km 007.90-008.00 S 0.1 2848 Zilla Overlay 40mm @ Traff >=2000 2016 0.31413 0.192Sub-Total Joypurhat Division 506.0548

Kurigram DivisionN506 Rangpur-Barobari-Kurigram Road Km 037.47-046.92 S 9.46 3236 National Overlay 50mm @ IRI 5-9 2016 66.72859 1.904Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 061.10-067.30 S 6.2 1744 Zilla Rehab 75mm @ IRI 9-12 2016 72.5563 0.418Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 070.30-075.90 S 5.6 1744 Zilla Rehab 75mm @ IRI 9-12 2016 72.90948 0.333Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 076.50-085.89 S 9.39 1744 Zilla Rehab 75mm @ IRI 9-12 2016 104.8066 0.391Z4606 Jamalpur-Dhanua Kamalpur-Datbhanga Road Km 085.89-086.92 S 1.03 1744 Zilla Rehab 75mm @ IRI 9-12 2016 11.18137 0.077Z5611 Rajarhat-Teesta Road Km 006.43-010.45 S 4.02 2785 Zilla Overlay 40mm @ Traff >=2000 2016 13.31062 0.692Z5616 Nageswari-Kularhat-Kashipur-Lalmonirhat Road Km 001.30-001.80 S 0.5 3021 Zilla Overlay 40mm @ Traff >=2000 2016 1.6131 0.828Z5616 Nageswari-Kularhat-Kashipur-Lalmonirhat Road Km 013.70-014.00 S 0.3 3021 Zilla Full Recon 75mm @ IRI>12 2016 4.82517 0.377Z5616 Nageswari-Kularhat-Kashipur-Lalmonirhat Road Km 015.10-015.30 S 0.2 3021 Zilla Full Recon 75mm @ IRI>12 2016 3.21678 0.599Z5616 Nageswari-Kularhat-Kashipur-Lalmonirhat Road Km 015.80-016.20 S 0.4 3021 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 1.095Z5617 Nageswari-Newasi-Kharibari-Fulbari Road Km 005.10-007.40 S 2.3 905 Zilla Overlay 40mm @ Traff 100-1000 2016 7.42026 0Z5617 Nageswari-Newasi-Kharibari-Fulbari Road Km 016.40-017.00 S 0.6 905 Zilla Overlay 40mm @ IRI>12 2016 1.93572 0Z5621 Kurigram-Ulipur-Chillmari Road Km 001.00-014.80 S 13.8 3016 Zilla Overlay 40mm @ Cracks >25% 2016 61.46296 0.12Z5623 Ulipur-Bojra-Chillmari Road Km 006.10-010.00 S 3.9 5659 Zilla Overlay 50mm @ IRI 6-9 2016 15.1515 2.461Z5623 Ulipur-Bojra-Chillmari Road Km 010.00-010.40 S 0.4 5659 Zilla Rehab 75mm @ IRI 9-12 2016 4.42964 2.011Z5623 Ulipur-Bojra-Chillmari Road Km 010.40-011.60 S 1.2 5659 Zilla Overlay 50mm @ IRI 6-9 2016 4.662 2.886Z5623 Ulipur-Bojra-Chillmari Road Km 011.60-011.80 S 0.2 5659 Zilla Rehab 75mm @ IRI 9-12 2016 2.21482 2.196Z5623 Ulipur-Bojra-Chillmari Road Km 013.40-016.80 S 3.4 5659 Zilla Overlay 50mm @ IRI 6-9 2016 13.8159 2.566Z5623 Ulipur-Bojra-Chillmari Road Km 016.80-017.64 S 0.84 10174 Zilla Overlay 50mm @ IRI 6-9 2016 4.851 4.467

Page 150 of 163

Page 151: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5624 Bhurungamari-Madarganj-Nageswari Road Km 000.00-011.59 S 11.59 3404 Zilla Rehab 75mm @ IRI 9-12 2016 161.3032 0.931Z5624 Bhurungamari-Madarganj-Nageswari Road Km 029.49-032.59 S 3.1 3404 Zilla Rehab 75mm @ IRI 9-12 2016 36.18537 0.989Z5624 Bhurungamari-Madarganj-Nageswari Road Km 032.59-033.59 S 1 3404 Zilla Rehab 75mm @ IRI 9-12 2016 11.61284 1.092Z5624 Bhurungamari-Madarganj-Nageswari Road Km 036.40-049.50 S 13.1 3404 Zilla Rehab 75mm @ IRI 9-12 2016 166.6225 0.872Sub-Total Kurigram Division 847.2454

Lalmonirhat DivisionN506 Rangpur-Barobari-Kurigram Road Km 036.50-037.47 S 0.97 3236 National Overlay 50mm @ IRI 5-9 2016 5.5902 3.714N509 Barabari-Lalmonirhat-Burimary Road Km 007.50-009.60 S 2.1 1940 National Rehab 110mm @ IRI 9-12 2016 42.70035 0.04N509 Barabari-Lalmonirhat-Burimary Road Km 009.60-011.55 S 1.95 1940 National Overlay 50mm @ IRI 5-9 2016 11.60933 0.921N509 Barabari-Lalmonirhat-Burimary Road Km 012.00-012.03 R 0.03 1940 National Overlay 50mm @ IRI 5-9 2016 0.16695 1.838N509 Barabari-Lalmonirhat-Burimary Road Km 027.63-027.83 S 0.2 6389 National Rehab 180mm @ IRI 9-12 2016 6.22296 1.654N509 Barabari-Lalmonirhat-Burimary Road Km 027.83-028.53 S 0.7 6389 National Overlay 60mm @ IRI 7-9 2016 4.72878 5.218N509 Barabari-Lalmonirhat-Burimary Road Km 028.53-028.83 S 0.3 6389 National Rehab 180mm @ IRI 9-12 2016 9.33444 1.642N509 Barabari-Lalmonirhat-Burimary Road Km 028.83-028.93 S 0.1 6389 National Overlay 50mm @ IRI 5-7 2016 0.567 5.595N509 Barabari-Lalmonirhat-Burimary Road Km 028.93-030.33 S 1.4 6389 National DBST @ Traff >6000 2016 3.73464 4.12N509 Barabari-Lalmonirhat-Burimary Road Km 030.33-030.53 S 0.2 6389 National Overlay 50mm @ IRI 5-7 2016 1.134 4.54N509 Barabari-Lalmonirhat-Burimary Road Km 030.53-032.63 S 2.1 6389 National DBST @ Traff >6000 2016 5.601959 4.128N509 Barabari-Lalmonirhat-Burimary Road Km 032.63-033.03 S 0.4 6389 National Overlay 50mm @ IRI 5-7 2016 2.268 4.212N509 Barabari-Lalmonirhat-Burimary Road Km 033.03-033.13 S 0.1 6389 National Rehab 180mm @ IRI 9-12 2016 3.11148 1.901N509 Barabari-Lalmonirhat-Burimary Road Km 033.13-035.53 S 2.4 6389 National Overlay 60mm @ IRI 7-9 2016 16.21296 4.435N509 Barabari-Lalmonirhat-Burimary Road Km 035.73-038.73 S 3 6389 National DBST @ Traff >6000 2016 8.0028 4.156N509 Barabari-Lalmonirhat-Burimary Road Km 038.73-041.83 S 3.1 6389 National Overlay 60mm @ IRI 7-9 2016 20.94174 4.305N509 Barabari-Lalmonirhat-Burimary Road Km 041.83-049.63 S 7.8 6389 National Overlay 50mm @ IRI 5-7 2016 44.226 4.489N509 Barabari-Lalmonirhat-Burimary Road Km 049.63-049.83 S 0.2 6389 National Rehab 180mm @ IRI 9-12 2016 6.22296 1.525N509 Barabari-Lalmonirhat-Burimary Road Km 074.03-077.42 S 3.4 6389 National Overlay 60mm @ IRI 7-9 2016 22.9616 5.039N509 Barabari-Lalmonirhat-Burimary Road Km 077.42-078.22 S 0.8 6389 National Overlay 50mm @ IRI 5-7 2016 4.536 3.843N509 Barabari-Lalmonirhat-Burimary Road Km 078.22-079.92 S 1.7 6389 National Overlay 50mm @ IRI 5-7 2016 9.639 3.815N509 Barabari-Lalmonirhat-Burimary Road Km 079.92-086.12 S 6.2 6389 National Overlay 60mm @ IRI 7-9 2016 41.88348 4.318N509 Barabari-Lalmonirhat-Burimary Road Km 086.12-086.42 S 0.3 6389 National Rehab 180mm @ IRI 9-12 2016 9.33444 1.562N509 Barabari-Lalmonirhat-Burimary Road Km 086.42-087.02 S 0.6 6389 National Overlay 50mm @ IRI 5-7 2016 3.402 4.652N509 Barabari-Lalmonirhat-Burimary Road Km 087.02-087.22 S 0.2 6389 National Rehab 180mm @ IRI 9-12 2016 6.22296 1.547Z5901 Lalmonirhat-Phulbari Road Km 004.10-004.90 S 0.8 2683 Zilla Overlay 40mm @ Traff >=2000 2016 2.64888 0.414Z5902 Lalmonirhat-Haragachha Road Km 000.10-000.40 S 0.3 1359 Zilla Overlay 40mm @ IRI>12 2016 1.40085 0Z5902 Lalmonirhat-Haragachha Road Km 001.70-002.70 S 1 1359 Zilla Overlay 40mm @ IRI>12 2016 4.6695 0Z5902 Lalmonirhat-Haragachha Road Km 002.90-003.40 S 0.5 1359 Zilla Overlay 40mm @ IRI>12 2016 2.33475 0Z5902 Lalmonirhat-Haragachha Road Km 004.00-004.80 S 0.8 1359 Zilla Overlay 40mm @ IRI>12 2016 3.151488 0Z5902 Lalmonirhat-Haragachha Road Km 004.90-005.37 S 0.47 1359 Zilla Overlay 40mm @ IRI>12 2016 1.503409 0Sub-Total Lalmonirhat Division 306.0649

Nilphamari DivisionN5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 359.26-363.55 S 4.29 6309 National Overlay 50mm @ IRI 4-7 2016 32.88285 11.285N518 Sayedpur Town Old Section Km 000.00-003.70 S 3.7 5752 National Overlay 50mm @ IRI 5-9 2016 29.72025 1.786N518 Sayedpur Town Old Section Km 003.70-003.90 S 0.2 5752 National DBST @ Traff 4000-6000 2016 0.6916 3.361N518 Sayedpur Town Old Section Km 003.90-004.16 S 0.26 5752 National Overlay 50mm @ IRI 5-9 2016 2.184 1.853

Page 151 of 163

Page 152: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5003 Boda-Debiganj-Domar (Rail Gate) Road Km 029.70-029.80 S 0.1 2032 Zilla Overlay 40mm @ IRI>12 2016 0.46695 0Z5008 Birganj-Khansama-Darwani Road Km 024.30-024.50 S 0.2 3643 Zilla Rehab 75mm @ IRI 9-12 2016 2.27468 1.129Z5011 Sayedpur-Parbatipur Road Km 000.00-001.70 S 1.7 3869 Zilla Overlay 40mm @ Traff >=2000 2016 8.443305 0.443Z5011 Sayedpur-Parbatipur Road Km 001.70-001.90 S 0.2 3869 Zilla Overlay 40mm @ Traff >=2000 2016 0.98484 0.228Z5011 Sayedpur-Parbatipur Road Km 001.90-002.50 S 0.6 3869 Zilla Rehab 75mm @ IRI 9-12 2016 10.41564 0.577Z5022 Nilphamari (Tengonmari)-Kishoreganj Road Km 002.80-003.60 S 0.8 1522 Zilla Overlay 40mm @ 1000-2000 2016 2.7168 0Z5054 Boragarihat-Khoksharhat-Dimla Road Km 003.00-003.20 S 0.2 1429 Zilla Overlay 40mm @ 1000-2000 2016 0.62826 0Z5703 Jaldhaka -Dimla-Tunirhat Road Km 017.70-017.90 S 0.2 2059 Zilla Rehab 75mm @ IRI 9-12 2016 2.3944 1.958Z5703 Jaldhaka -Dimla-Tunirhat Road Km 017.90-018.10 S 0.2 2059 Zilla Overlay 40mm @ Traff >=2000 2016 0.6792 0.841Z5703 Jaldhaka -Dimla-Tunirhat Road Km 018.10-018.50 S 0.4 2059 Zilla Full Recon 75mm @ IRI>12 2016 6.9552 1.005Z5703 Jaldhaka -Dimla-Tunirhat Road Km 019.00-019.10 S 0.1 2059 Zilla Rehab 75mm @ IRI 9-12 2016 1.1972 2.287Z5703 Jaldhaka -Dimla-Tunirhat Road Km 019.30-019.60 S 0.3 2059 Zilla Rehab 75mm @ IRI 9-12 2016 3.5916 2.078Z5703 Jaldhaka -Dimla-Tunirhat Road Km 019.70-022.80 S 3.1 2059 Zilla Rehab 75mm @ IRI 9-12 2016 52.23683 1.213Z5703 Jaldhaka -Dimla-Tunirhat Road Km 023.00-023.30 S 0.3 2059 Zilla Rehab 75mm @ IRI 9-12 2016 5.20782 0.537Z5703 Jaldhaka -Dimla-Tunirhat Road Km 023.40-028.86 S 5.46 2059 Zilla Rehab 75mm @ IRI 9-12 2016 68.63547 1.835Z5704 Domar-Jaldhaka Road Km 000.00-000.30 S 0.3 2059 Zilla Full Recon 75mm @ IRI>12 2016 7.43337 0.696Z5704 Domar-Jaldhaka Road Km 000.40-000.50 S 0.1 2059 Zilla Full Recon 75mm @ IRI>12 2016 2.47779 0.733Z5704 Domar-Jaldhaka Road Km 000.70-000.80 S 0.1 2059 Zilla Full Recon 75mm @ IRI>12 2016 2.47779 0.733Z5704 Domar-Jaldhaka Road Km 000.80-000.90 S 0.1 2059 Zilla Overlay 40mm @ Traff >=2000 2016 0.48393 0.653Z5704 Domar-Jaldhaka Road Km 000.90-001.00 S 0.1 2059 Zilla Full Recon 75mm @ IRI>12 2016 2.47779 0.732Z5704 Domar-Jaldhaka Road Km 001.20-001.40 S 0.2 2059 Zilla Full Recon 75mm @ IRI>12 2016 4.95558 0.705Z5704 Domar-Jaldhaka Road Km 001.50-001.70 S 0.2 2059 Zilla Full Recon 75mm @ IRI>12 2016 4.938192 0.709Z5704 Domar-Jaldhaka Road Km 001.90-002.10 S 0.2 2059 Zilla Full Recon 75mm @ IRI>12 2016 4.86864 0.529Z5704 Domar-Jaldhaka Road Km 002.20-002.40 S 0.2 2059 Zilla Rehab 75mm @ IRI 9-12 2016 3.35216 1.184Z5704 Domar-Jaldhaka Road Km 002.60-002.70 S 0.1 2059 Zilla Rehab 75mm @ IRI 9-12 2016 1.67608 1.115Z5704 Domar-Jaldhaka Road Km 002.80-003.50 S 0.7 2059 Zilla Full Recon 75mm @ IRI>12 2016 16.91852 0.486Z5704 Domar-Jaldhaka Road Km 003.70-003.80 S 0.1 2059 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.838Z5704 Domar-Jaldhaka Road Km 004.20-004.70 S 0.5 2059 Zilla Rehab 75mm @ IRI 9-12 2016 8.23075 1.075Z5704 Domar-Jaldhaka Road Km 004.70-005.20 S 0.5 2059 Zilla Overlay 40mm @ Traff >=2000 2016 2.339419 0.7Z5704 Domar-Jaldhaka Road Km 005.20-005.30 S 0.1 2059 Zilla Full Recon 75mm @ IRI>12 2016 2.39085 0.817Z5704 Domar-Jaldhaka Road Km 005.30-005.70 S 0.4 2059 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0.625Z5704 Domar-Jaldhaka Road Km 005.70-006.00 S 0.3 2059 Zilla Full Recon 75mm @ IRI>12 2016 7.17255 0.79Z5704 Domar-Jaldhaka Road Km 006.00-006.30 S 0.3 2059 Zilla Overlay 40mm @ Traff >=2000 2016 1.40085 0.603Z5704 Domar-Jaldhaka Road Km 006.30-006.80 S 0.5 2059 Zilla Full Recon 75mm @ IRI>12 2016 11.95425 0.783Z5704 Domar-Jaldhaka Road Km 006.80-007.00 S 0.2 2059 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.821Z5704 Domar-Jaldhaka Road Km 007.00-007.50 S 0.5 2059 Zilla Full Recon 75mm @ IRI>12 2016 11.95425 0.789Z5704 Domar-Jaldhaka Road Km 007.50-007.89 S 0.39 2059 Zilla Overlay 40mm @ Traff >=2000 2016 1.816435 0.728Z5706 Domar -Chilahati-Bholaganj Road Km 003.40-005.50 S 2.1 2094 Zilla Overlay 40mm @ Traff >=2000 2016 9.716804 0Z5706 Domar -Chilahati-Bholaganj Road Km 005.50-006.80 S 1.3 2092 Zilla Rehab 75mm @ IRI 9-12 2016 15.17451 1.079Z5706 Domar -Chilahati-Bholaganj Road Km 006.90-007.90 S 1 2092 Zilla Rehab 75mm @ IRI 9-12 2016 11.6727 1.105Z5706 Domar -Chilahati-Bholaganj Road Km 008.90-010.50 S 1.6 2092 Zilla Rehab 75mm @ IRI 9-12 2016 18.67632 1.038Z5706 Domar -Chilahati-Bholaganj Road Km 011.70-012.40 S 0.7 2092 Zilla Rehab 75mm @ IRI 9-12 2016 8.170889 1.092Z5707 Nilphamari-Domar Road Km 019.10-021.33 S 2.23 2612 Zilla Rehab 75mm @ IRI 9-12 2016 37.52689 0.68Z5709 Nilphamari By-Pass Road Km 000.00-003.00 S 3 1249 Zilla Overlay 40mm @ 1000-2000 2016 10.06065 0Z5709 Nilphamari By-Pass Road Km 003.00-003.10 S 0.1 1249 Zilla Rehab 75mm @ IRI 9-12 2016 1.1972 0.152Sub-Total Nilphamari Division 449.0146

Page 152 of 163

Page 153: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Panchgarh DivisionN5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 454.77-470.81 S 16.05 6544 National Overlay 50mm @ IRI 4-7 2016 98.9057 4.808N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 470.81-471.01 S 0.2 6544 National Rehab 180mm @ IRI 9-12 2016 7.97916 2.389Z5001 Panchagarh-Goalpara-Ruhea Road Km 010.50-011.50 S 1 1691 Zilla Rehab 75mm @ IRI 9-12 2016 12.64309 0.267Z5021 Panchagarh Sugarmill-Saldanga-Debiganj Road Km 010.70-010.80 S 0.1 3346 Zilla Rehab 75mm @ IRI 9-12 2016 1.148713 2.888Sub-Total Panchgarh Division 120.6767

Rangpur DivisionN5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 280.18-282.86 S 2.68 5815 National Overlay 50mm @ IRI 4-9 2016 20.57286 10.974N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 282.86-283.16 S 0.3 5815 National Rehab 150mm @ IRI 9-12 2016 10.5777 5.281N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 283.16-286.66 S 3.5 5815 National Overlay 50mm @ IRI 4-9 2016 26.8275 11.43N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 286.66-289.56 S 2.9 5815 National DBST @ Traff 4000-6000 2016 10.44716 10.351N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 289.56-306.16 S 16.61 10193 National Overlay 80mm @ IRI 4-9 2016 200.3829 16.872N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 306.16-307.16 S 1 10193 National Overlay 80mm @ IRI 4-9 2016 12.0669 17.582N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 307.16-308.06 S 0.9 8305 National Overlay 50mm @ IRI 4-7 2016 6.87015 17.022N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 308.06-308.46 S 0.4 8044 National Rehab 180mm @ IRI 9-12 2016 19.47456 7.03N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 308.46-321.96 S 13.5 8052 National Overlay 50mm @ IRI 4-7 2016 102.0751 16.906N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 321.96-323.27 S 1.31 10193 National Overlay 80mm @ IRI 4-9 2016 15.54349 17.971N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 323.55-323.67 L 0.12 10193 National Overlay 80mm @ IRI 4-9 2016 1.705896 14.472N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 323.55-323.67 R 0.12 10193 National Overlay 80mm @ IRI 4-9 2016 1.705896 14.472N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 323.80-326.57 L 2.77 10193 National Overlay 80mm @ IRI 4-9 2016 39.30669 14.627N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 323.80-326.57 R 2.77 10193 National Overlay 80mm @ IRI 4-9 2016 39.30669 14.627N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 326.75-331.15 L 4.4 8044 National Overlay 50mm @ IRI 4-7 2016 39.732 13.219N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 326.75-331.15 R 4.4 8044 National Overlay 50mm @ IRI 4-7 2016 39.732 13.219N506 Rangpur-Barobari-Kurigram Road Km 020.50-021.46 S 0.96 7152 National Overlay 60mm @ IRI 7-9 2016 9.257025 7.799N517 Rangpur Town Old Section Km 000.00-000.27 S 0.27 9435 National Overlay 50mm @ IRI 5-7 2016 2.372895 12.943N517 Rangpur Town Old Section Km 000.30-000.80 L 0.5 3551 National Overlay 50mm @ IRI 5-9 2016 1.68 6.466N517 Rangpur Town Old Section Km 000.30-000.80 R 0.5 3551 National Overlay 50mm @ IRI 5-9 2016 1.68 6.466N517 Rangpur Town Old Section Km 000.81-001.76 L 0.95 3551 National Overlay 50mm @ IRI 5-9 2016 3.2088 6.03N517 Rangpur Town Old Section Km 000.81-001.76 R 0.95 3551 National Overlay 50mm @ IRI 5-9 2016 3.2088 6.03N517 Rangpur Town Old Section Km 001.76-002.00 S 0.24 9435 National Overlay 60mm @ IRI 7-9 2016 1.80144 19.959N517 Rangpur Town Old Section Km 002.00-003.00 S 1 9435 National Overlay 50mm @ IRI 5-7 2016 6.3 14.976N517 Rangpur Town Old Section Km 003.88-005.08 L 1.2 9435 National Overlay 50mm @ IRI 5-7 2016 6.349035 12.41R557 Madhypara-Badarganj Road Km 000.00-003.20 S 3.2 2437 Regional Overlay 50mm @ IRI 5-7 2016 18.48 1.342R557 Madhypara-Badarganj Road Km 003.20-003.63 S 0.43 2437 Regional Overlay 50mm @ IRI 7-9 2016 2.48325 2.172Z5018 Gangachhara-Monthanahat-Garagram-Nilphamari Km 007.90-010.61 S 2.71 4896 Zilla Overlay 50mm @ IRI 6-9 2016 10.8129 1.613Z5019 Police Line- Jalkar- Sothapir- Pakkar Matha Road Km 000.00-003.81 S 3.81 8426 Zilla Overlay 50mm @ IRI 6-9 2016 19.12239 3.164Z5075 Sadullahpur -Pirganj-Nawabganj Road Km 030.22-030.32 S 0.1 2358 Zilla Full Recon 75mm @ IRI>12 2016 1.7388 0.24Z5612 Shahebganj-Haragachha Road Km 001.40-001.80 S 0.4 3778 Zilla Overlay 40mm @ Traff >=2000 2016 1.8678 0Z5612 Shahebganj-Haragachha Road Km 001.80-002.00 S 0.2 3778 Zilla Overlay 40mm @ Traff >=2000 2016 0.9339 0.315Z5612 Shahebganj-Haragachha Road Km 003.20-003.30 S 0.1 3778 Zilla Overlay 40mm @ Traff >=2000 2016 0.46695 0.441Z5612 Shahebganj-Haragachha Road Km 003.30-004.50 S 1.2 3778 Zilla Overlay 40mm @ Traff >=2000 2016 5.6034 0Z5612 Shahebganj-Haragachha Road Km 004.50-004.60 S 0.1 3778 Zilla Rehab 75mm @ IRI 9-12 2016 1.64615 0.647Z5612 Shahebganj-Haragachha Road Km 005.80-005.90 S 0.1 3778 Zilla Rehab 75mm @ IRI 9-12 2016 1.544388 1.228

Page 153 of 163

Page 154: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z5612 Shahebganj-Haragachha Road Km 008.10-008.20 S 0.1 3778 Zilla Rehab 75mm @ IRI 9-12 2016 1.13734 2.038Sub-Total Rangpur Division 688.0228

Thakurgaon DivisionN5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 424.17-436.06 S 11.89 3893 National Overlay 50mm @ IRI 4-9 2016 74.907 6.558N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 436.06-442.41 S 6.35 6544 National Overlay 50mm @ IRI 4-7 2016 39.75082 4.682N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 442.41-445.61 S 3.2 6544 National Overlay 50mm @ IRI 4-7 2016 19.824 5.578N5 Dhaka (Mirpur)- Bogra-Rangpur- Banglabandh Km 445.61-454.77 S 9.16 6544 National Overlay 50mm @ IRI 4-7 2016 56.24073 4.804R587 Thakurgaon Town Old Section Km 000.00-000.90 R 0.9 13429 Regional Overlay 60mm @ IRI 5.5-9 2016 9.0072 8.279R587 Thakurgaon Town Old Section Km 001.20-001.70 L 0.5 13429 Regional Overlay 60mm @ IRI 5.5-9 2016 4.7538 9.986R587 Thakurgaon Town Old Section Km 001.20-001.70 R 0.5 13429 Regional Overlay 60mm @ IRI 5.5-9 2016 4.7538 9.986R587 Thakurgaon Town Old Section Km 002.00-006.14 S 4.14 13429 Regional Overlay 60mm @ IRI 5.5-9 2016 35.78786 11.815Z5002 Thakurgaon-Nekmand-Pirganj-Birganj Road Km 036.55-039.75 S 3.2 5229 Zilla Overlay 50mm @ IRI 6-9 2016 19.152 1.597Z5002 Thakurgaon-Nekmand-Pirganj-Birganj Road Km 039.75-041.25 S 1.5 5229 Zilla Overlay 40mm @ Traff >=2000 2016 7.1316 1.076Z5002 Thakurgaon-Nekmand-Pirganj-Birganj Road Km 041.25-046.95 S 5.7 5229 Zilla Overlay 50mm @ IRI 6-9 2016 33.516 1.252Z5002 Thakurgaon-Nekmand-Pirganj-Birganj Road Km 046.95-048.85 S 1.9 5229 Zilla Overlay 50mm @ IRI 6-9 2016 11.172 1.164Z5002 Thakurgaon-Nekmand-Pirganj-Birganj Road Km 048.86-048.95 S 0.09 5229 Zilla Rehab 75mm @ IRI 9-12 2016 1.491711 1.762Z5002 Thakurgaon-Nekmand-Pirganj-Birganj Road Km 048.95-049.27 S 0.32 5229 Zilla Overlay 50mm @ IRI 6-9 2016 1.85808 1.827Z5004 Ranishankoil-Haripur Road Km 009.10-009.30 S 0.2 2295 Zilla Overlay 40mm @ Traff >=2000 2016 0.6792 0.077Z5004 Ranishankoil-Haripur Road Km 009.30-009.40 S 0.1 2295 Zilla Overlay 40mm @ Traff >=2000 2016 0.3396 0Z5004 Ranishankoil-Haripur Road Km 009.40-009.80 S 0.4 2295 Zilla Overlay 40mm @ Traff >=2000 2016 1.3584 0Z5004 Ranishankoil-Haripur Road Km 009.80-010.30 S 0.5 2295 Zilla Overlay 40mm @ Traff >=2000 2016 1.698 0.018Z5004 Ranishankoil-Haripur Road Km 010.30-010.70 S 0.4 2295 Zilla Overlay 40mm @ Traff >=2000 2016 1.3584 0Z5004 Ranishankoil-Haripur Road Km 010.70-016.80 S 6.1 2295 Zilla Overlay 40mm @ Traff >=2000 2016 20.7122 0.025Z5055 Thakurgaon-Pirganj Road Km 000.00-000.80 S 0.8 4161 Zilla Overlay 50mm @ IRI 6-9 2016 5.04 0.191Z5055 Thakurgaon-Pirganj Road Km 000.80-001.90 S 1.1 4161 Zilla Overlay 50mm @ IRI 6-9 2016 6.93 0.808Sub-Total Thakurgaon Division 357.4624Total Rangpur Zone 6744.159

Sylhet ZoneHabiganj DivisionN2 Dhaka-Bhairab-Sylhet-Tamabil Km 107.61-107.71 S 0.1 13034 National Overlay 80mm @ IRI 4-9 2016 1.210988 19.316N2 Dhaka-Bhairab-Sylhet-Tamabil Km 107.72-108.17 L 0.44 13034 National Overlay 80mm @ IRI 4-9 2016 8.82702 12.138N2 Dhaka-Bhairab-Sylhet-Tamabil Km 107.72-108.17 R 0.44 13034 National Overlay 80mm @ IRI 4-9 2016 6.620265 15.852N2 Dhaka-Bhairab-Sylhet-Tamabil Km 108.17-116.13 S 7.96 13034 National Overlay 80mm @ IRI 4-9 2016 97.36831 18.425N2 Dhaka-Bhairab-Sylhet-Tamabil Km 116.22-116.32 L 0.1 11447 National Overlay 80mm @ IRI 4-9 2016 1.07445 23.278N2 Dhaka-Bhairab-Sylhet-Tamabil Km 116.22-116.32 R 0.1 11447 National Overlay 80mm @ IRI 4-9 2016 1.07445 23.278N2 Dhaka-Bhairab-Sylhet-Tamabil Km 116.32-116.52 L 0.19 9551 National Overlay 50mm @ IRI 4-7 2016 1.317225 24.632N2 Dhaka-Bhairab-Sylhet-Tamabil Km 116.32-116.52 R 0.19 9551 National Overlay 50mm @ IRI 4-7 2016 1.317225 24.632N2 Dhaka-Bhairab-Sylhet-Tamabil Km 116.52-131.14 S 14.62 9551 National DBST @ Traff >6000 2016 53.44487 17.09N2 Dhaka-Bhairab-Sylhet-Tamabil Km 131.14-131.24 L 0.1 3065 National Overlay 50mm @ IRI 4-9 2016 0.42 7.581N2 Dhaka-Bhairab-Sylhet-Tamabil Km 131.14-131.24 R 0.1 3065 National Overlay 50mm @ IRI 4-9 2016 0.42 7.581N2 Dhaka-Bhairab-Sylhet-Tamabil Km 131.24-140.81 S 9.58 9551 National Overlay 50mm @ IRI 4-7 2016 75.02448 19.964N2 Dhaka-Bhairab-Sylhet-Tamabil Km 140.81-140.91 S 0.1 9551 National Full Recon 180mm @ IRI 12 2016 5.24925 7.413

Page 154 of 163

Page 155: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N2 Dhaka-Bhairab-Sylhet-Tamabil Km 140.91-141.18 S 0.27 9551 National DBST @ Traff >6000 2016 0.989235 16.844N2 Dhaka-Bhairab-Sylhet-Tamabil Km 141.21-141.41 L 0.2 10409 National Overlay 80mm @ IRI 4-9 2016 2.6448 19.408N2 Dhaka-Bhairab-Sylhet-Tamabil Km 141.21-141.41 R 0.2 10409 National Overlay 80mm @ IRI 4-9 2016 2.6448 19.408N2 Dhaka-Bhairab-Sylhet-Tamabil Km 141.41-141.43 L 0.02 15025 National Overlay 80mm @ IRI 4-9 2016 0.224808 23.946N2 Dhaka-Bhairab-Sylhet-Tamabil Km 141.41-141.43 R 0.02 15025 National Overlay 80mm @ IRI 4-9 2016 0.224808 23.946N2 Dhaka-Bhairab-Sylhet-Tamabil Km 141.43-144.72 S 3.28 15025 National Overlay 80mm @ IRI 4-9 2016 40.17054 24.749N2 Dhaka-Bhairab-Sylhet-Tamabil Km 144.72-144.82 S 0.1 15025 National Full Recon 195mm 2016 5.40274 10.275N2 Dhaka-Bhairab-Sylhet-Tamabil Km 144.82-145.32 S 0.5 15025 National Rehab 195mm @ IRI 9-12 2016 22.4368 10.536N2 Dhaka-Bhairab-Sylhet-Tamabil Km 145.32-145.52 S 0.2 15025 National Rehab 195mm @ IRI 9-12 2016 8.97472 10.979N2 Dhaka-Bhairab-Sylhet-Tamabil Km 145.52-145.84 S 0.33 15025 National Rehab 195mm @ IRI 9-12 2016 14.62879 10.411N2 Dhaka-Bhairab-Sylhet-Tamabil Km 145.92-146.08 L 0.17 9060 National Overlay 60mm @ IRI 7-9 2016 1.661328 18.117N2 Dhaka-Bhairab-Sylhet-Tamabil Km 145.92-146.08 R 0.17 9060 National Overlay 60mm @ IRI 7-9 2016 1.661328 18.117N2 Dhaka-Bhairab-Sylhet-Tamabil Km 146.08-158.22 S 12.14 8615 National Overlay 50mm @ IRI 4-7 2016 95.32399 16.121N2 Dhaka-Bhairab-Sylhet-Tamabil Km 158.22-158.32 S 0.1 8615 National Full Recon 180mm @ IRI 12 2016 5.17926 7.007N2 Dhaka-Bhairab-Sylhet-Tamabil Km 158.32-179.35 S 21.03 8615 National Overlay 50mm @ IRI 4-7 2016 166.25 16.682N2 Dhaka-Bhairab-Sylhet-Tamabil Km 179.42-179.60 L 0.17 8615 National Overlay 60mm @ IRI 7-9 2016 1.07586 18.257N2 Dhaka-Bhairab-Sylhet-Tamabil Km 179.42-179.60 R 0.17 8615 National Overlay 60mm @ IRI 7-9 2016 1.07586 18.257N2 Dhaka-Bhairab-Sylhet-Tamabil Km 179.60-181.58 S 1.99 8615 National Overlay 50mm @ IRI 4-7 2016 15.42345 17.875N2 Dhaka-Bhairab-Sylhet-Tamabil Km 181.62-181.73 L 0.11 8615 National Overlay 60mm @ IRI 7-9 2016 1.070856 18.107N2 Dhaka-Bhairab-Sylhet-Tamabil Km 181.62-181.73 R 0.11 8615 National Overlay 60mm @ IRI 7-9 2016 1.070856 18.107N2 Dhaka-Bhairab-Sylhet-Tamabil Km 181.73-185.22 S 3.49 8615 National Overlay 60mm @ IRI 7-9 2016 32.34536 18.783N2 Dhaka-Bhairab-Sylhet-Tamabil Km 185.22-185.42 S 0.2 8615 National Rehab 180mm @ IRI 9-12 2016 10.00776 6.948N2 Dhaka-Bhairab-Sylhet-Tamabil Km 185.42-189.21 S 3.79 7816 National Overlay 50mm @ IRI 4-7 2016 29.41722 13.694N204 Jagadishpur-Chunarughat-Shaistaganj Km 032.11-032.21 S 0.1 2720 National Rehab 135mm @ IRI 9-12 2016 2.454176 0.826N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 000.90-001.00 S 0.1 6044 National Rehab 180mm @ IRI 9-12 2016 4.14864 1.65R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 025.13-025.61 S 0.48 4884 Regional Overlay 50mm @ IRI 5-7 2016 3.026457 1.187R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 025.61-025.71 S 0.1 4884 Regional Full Recon 150mm 2016 3.27672 0.914R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 025.71-028.71 S 3 4884 Regional Overlay 50mm @ IRI 5-7 2016 17.136 1.271R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 028.71-029.11 S 0.4 4884 Regional DBST @ Traff 4000-6000 2016 1.080872 1.155R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 029.11-029.71 S 0.6 4884 Regional Overlay 60mm @ IRI 7-9 2016 4.112625 1.552R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 029.71-030.31 S 0.6 4884 Regional Overlay 50mm @ IRI 5-7 2016 3.4524 1.59R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 030.31-030.51 S 0.2 4884 Regional Overlay 60mm @ IRI 7-9 2016 1.373598 2.479R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 030.51-031.41 S 0.9 4884 Regional Overlay 60mm @ IRI 7-9 2016 6.181191 1.356R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 031.41-032.81 S 1.4 4884 Regional Rehab 150mm @ IRI 9-12 2016 37.05576 0.272R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 032.81-033.71 S 0.9 4884 Regional Overlay 50mm @ IRI 5-7 2016 5.16915 1.512R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 033.71-039.81 S 6.1 4884 Regional Overlay 60mm @ IRI 7-9 2016 41.60313 1.75R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 039.81-041.71 S 1.9 4884 Regional DBST @ Traff 4000-6000 2016 5.105984 1.697R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 041.71-041.91 S 0.2 4884 Regional Overlay 50mm @ IRI 5-7 2016 1.134 2.318R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 041.91-048.11 S 6.2 4884 Regional Overlay 60mm @ IRI 7-9 2016 42.20734 1.683R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 048.11-048.71 S 0.6 4884 Regional Overlay 50mm @ IRI 5-7 2016 3.402 1.536R220 Sarail-Nasirnagar-Lakhai-Habiganj Road Km 048.71-051.41 S 2.7 4884 Regional Overlay 60mm @ IRI 7-9 2016 23.10347 1.231R221 Kamarpur, Habiganj to Nasratpur Km 000.40-000.60 S 0.2 4884 Regional Overlay 60mm @ IRI 7-9 2016 1.7514 1.08R222 Shaestaganj-Laskarpur Railgate link Road Km 000.00-000.98 S 0.98 4884 Regional Overlay 60mm @ IRI 7-9 2016 6.693851 1.739R240 Shaistaganj-Habiganj-Sherpur Road Km 013.59-013.69 L 0.1 6601 Regional DBST @ 25% Crk 2016 0.366548 4.621R240 Shaistaganj-Habiganj-Sherpur Road Km 013.69-013.89 L 0.2 6601 Regional DBST @ Traff >6000 2016 0.733096 7.726R240 Shaistaganj-Habiganj-Sherpur Road Km 013.69-013.89 R 0.2 6601 Regional DBST @ Traff >6000 2016 1.3585 2.056

Page 155 of 163

Page 156: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R240 Shaistaganj-Habiganj-Sherpur Road Km 014.90-017.02 S 2.12 3189 Regional Overlay 50mm @ IRI 5-7 2016 14.98098 0.733R240 Shaistaganj-Habiganj-Sherpur Road Km 017.40-023.39 S 5.99 3189 Regional Overlay 50mm @ IRI 5-7 2016 35.12896 1.023R240 Shaistaganj-Habiganj-Sherpur Road Km 023.39-023.69 S 0.3 3189 Regional Overlay 50mm @ IRI 7-9 2016 1.76085 2.967R240 Shaistaganj-Habiganj-Sherpur Road Km 026.49-026.69 S 0.2 3189 Regional Overlay 50mm @ IRI 7-9 2016 1.1634 2.28R240 Shaistaganj-Habiganj-Sherpur Road Km 035.99-039.19 S 3.2 3189 Regional Overlay 50mm @ IRI 5-7 2016 18.48 1.314R240 Shaistaganj-Habiganj-Sherpur Road Km 040.29-040.39 L 0.1 3189 Regional Overlay 50mm @ IRI 5-7 2016 0.546 2.438R240 Shaistaganj-Habiganj-Sherpur Road Km 040.29-040.39 R 0.1 3189 Regional Overlay 50mm @ IRI 5-7 2016 0.5985 1.408R240 Shaistaganj-Habiganj-Sherpur Road Km 040.39-043.69 S 3.3 3189 Regional DBST @ Traff 2000-4000 2016 8.97968 0.692R240 Shaistaganj-Habiganj-Sherpur Road Km 049.90-050.67 S 0.77 3189 Regional Overlay 50mm @ IRI 5-7 2016 4.60845 1.561R241 Auskandi-Raniganj-Jagannathpur-Pagla Road Km 006.50-006.90 S 0.4 1586 Regional Rehab 110mm @ IRI 9-12 2016 8.118612 0.56Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 001.30-001.80 S 0.5 2491 Zilla Rehab 75mm @ IRI 9-12 2016 8.29061 0.615Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 001.80-001.90 S 0.1 2491 Zilla Overlay 40mm @ Traff >=2000 2016 0.470346 0.095Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 001.90-002.80 S 0.9 2491 Zilla Rehab 75mm @ IRI 9-12 2016 14.93968 0.381Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 003.50-004.00 S 0.5 2491 Zilla Overlay 40mm @ Traff >=2000 2016 2.364465 0Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 004.00-005.10 S 1.1 2491 Zilla Overlay 40mm @ Traff >=2000 2016 5.22984 0Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 005.10-005.30 S 0.2 2491 Zilla Rehab 75mm @ IRI 9-12 2016 3.35216 0.438Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 005.30-005.60 S 0.3 2491 Zilla Overlay 40mm @ Traff >=2000 2016 1.42632 0Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 005.60-006.50 S 0.9 2491 Zilla Rehab 75mm @ IRI 9-12 2016 15.08472 0.41Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 006.90-007.70 S 0.8 2491 Zilla Overlay 40mm @ Traff >=2000 2016 3.749184 0Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 007.70-008.70 S 1 2491 Zilla Overlay 40mm @ Traff >=2000 2016 4.67799 0Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 008.70-008.80 S 0.1 2491 Zilla Full Recon 75mm @ IRI>12 2016 2.425626 0.544Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 009.10-009.30 S 0.2 2491 Zilla Rehab 75mm @ IRI 9-12 2016 3.340188 0.728Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 010.30-010.40 S 0.1 2491 Zilla Full Recon 75mm @ IRI>12 2016 2.412585 0.523Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 010.40-011.70 S 1.3 2491 Zilla Overlay 40mm @ Traff >=2000 2016 6.108156 0Z2008 Chunarughat-Satuajuri-Natunbazar Road Km 011.70-012.10 S 0.4 2491 Zilla Rehab 75mm @ IRI 9-12 2016 6.728264 0.136Z2010 Murarbandh Dargahsharif Road Km 000.50-001.80 S 1.3 2451 Zilla Rehab 75mm @ IRI 9-12 2016 14.20178 1.529Z2010 Murarbandh Dargahsharif Road Km 001.80-002.20 S 0.4 2451 Zilla Overlay 40mm @ Traff >=2000 2016 1.242936 1.04Z2010 Murarbandh Dargahsharif Road Km 002.20-002.38 S 0.18 2451 Zilla Rehab 75mm @ IRI 9-12 2016 1.971788 1.535Sub-Total Habiganj Division 1121.583

Moulavi Bazar DivisionN2 Dhaka-Bhairab-Sylhet-Tamabil Km 189.21-190.82 S 1.61 7739 National Overlay 50mm @ IRI 4-7 2016 12.5097 13.755N2 Dhaka-Bhairab-Sylhet-Tamabil Km 190.83-190.97 L 0.14 7739 National Overlay 50mm @ IRI 4-7 2016 1.218 12.799N2 Dhaka-Bhairab-Sylhet-Tamabil Km 190.83-190.97 R 0.14 7739 National Overlay 50mm @ IRI 4-7 2016 1.218 12.799N2 Dhaka-Bhairab-Sylhet-Tamabil Km 190.97-191.21 S 0.24 7739 National Overlay 50mm @ IRI 4-7 2016 2.016 11.731N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 026.96-031.51 S 4.55 6044 National DBST @ Traff >6000 2016 12.03048 5.629N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 043.41-043.60 L 0.19 6044 National DBST @ Traff >6000 2016 0.51623 5.109N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 043.41-043.60 R 0.19 6044 National DBST @ Traff >6000 2016 0.51623 5.109N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 046.90-046.91 S 0.01 6044 National Overlay 50mm @ IRI 5-7 2016 0.1302 0.994N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 046.91-047.21 S 0.3 6044 National Overlay 60mm @ IRI 7-9 2016 4.65372 1.345N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 053.99-057.11 S 3.13 6044 National DBST @ Traff >6000 2016 8.529681 5.429N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 060.31-061.41 S 1.1 6044 National Overlay 50mm @ IRI 5-7 2016 6.38715 6.025N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 063.78-067.22 S 3.44 6044 National Overlay 50mm @ IRI 5-7 2016 20.15496 5.819N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 067.72-067.99 L 0.27 6044 National Overlay 50mm @ IRI 5-7 2016 3.5154 0.93N207 Mirpur-Srimongal-Moulvibazar-Sherpur Road Km 067.72-067.99 R 0.27 6044 National Overlay 50mm @ IRI 5-7 2016 3.54375 0.919N208 Moulvibazar-Rajnagar-Fenchuganj-Sylhet Road Km 013.43-013.46 S 0.03 9000 National Overlay 50mm @ IRI 5-7 2016 0.19992 9.878

Page 156 of 163

Page 157: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 001.54-004.20 S 2.67 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 18.44347 2.392R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 004.20-004.30 S 0.1 5028 Regional DBST @ Traff 4000-6000 2016 0.28652 4.051R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 004.30-005.10 S 0.8 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 5.80464 2.335R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 005.10-005.60 S 0.5 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 3.6279 3.926R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 007.20-007.30 S 0.1 5028 Regional DBST @ Traff 4000-6000 2016 0.276146 4.445R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 010.30-013.40 S 3.1 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 22.50024 1.959R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 016.40-016.50 S 0.1 5028 Regional DBST @ Traff 4000-6000 2016 0.268242 4.837R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 016.50-017.20 S 0.7 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 4.798836 2.652R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 017.28-019.10 S 1.83 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 12.72172 2.157R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 019.10-019.20 S 0.1 5028 Regional DBST @ Traff 4000-6000 2016 0.274664 4.436R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 022.32-023.02 S 0.7 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 4.807593 3.214R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 023.26-027.02 S 3.76 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 25.65595 3.23R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 027.02-027.32 S 0.3 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 2.041632 5.374R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 027.32-030.82 S 3.5 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 24.00104 2.767R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 030.82-030.92 S 0.1 5028 Regional Rehab 150mm @ IRI 9-12 2016 2.63718 1.786R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 031.32-031.62 S 0.3 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 2.041632 4.748R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 031.62-032.81 S 1.2 5028 Regional Overlay 60mm @ IRI 5.5-9 2016 8.44644 2.875R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 032.81-034.12 S 1.31 3877 Regional Overlay 50mm @ IRI 5-7 2016 7.638141 1.613R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 034.31-036.02 S 1.72 3877 Regional Overlay 50mm @ IRI 5-7 2016 9.760065 2.014R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 036.11-042.32 S 6.22 3877 Regional Overlay 50mm @ IRI 5-7 2016 35.44622 1.827R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 042.32-043.32 S 1 3877 Regional Overlay 50mm @ IRI 7-9 2016 5.7855 2.447R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 046.82-047.02 S 0.2 3877 Regional Overlay 50mm @ IRI 7-9 2016 1.1424 3.211R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 048.42-048.72 S 0.3 3877 Regional Rehab 135mm @ IRI 9-12 2016 7.498368 0.664R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 048.72-051.42 S 2.7 3877 Regional Overlay 50mm @ IRI 5-7 2016 15.71172 1.478R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 051.42-052.42 S 1 3877 Regional Overlay 50mm @ IRI 7-9 2016 6.3945 1.716R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 056.01-057.50 S 1.5 3877 Regional DBST @ Traff 2000-4000 2016 4.101583 0.799R282 Juri-Lathitila Road Km 000.00-000.15 L 0.15 2835 Regional DBST @ Traff 2000-4000 2016 0.40755 0.987R282 Juri-Lathitila Road Km 000.00-000.15 R 0.15 2835 Regional DBST @ Traff 2000-4000 2016 0.42237 0.401R282 Juri-Lathitila Road Km 000.20-001.70 S 1.5 2835 Regional DBST @ Traff 2000-4000 2016 5.04621 0.158R282 Juri-Lathitila Road Km 001.70-001.80 S 0.1 2835 Regional DBST @ Traff 2000-4000 2016 0.26676 2.058R282 Juri-Lathitila Road Km 001.80-002.50 S 0.7 2835 Regional Overlay 50mm @ IRI 5-7 2016 3.97467 0.84R282 Juri-Lathitila Road Km 002.50-004.60 S 2.1 2835 Regional Overlay 50mm @ IRI 7-9 2016 11.9511 1.63R282 Juri-Lathitila Road Km 004.60-005.10 S 0.5 2835 Regional Overlay 50mm @ IRI 7-9 2016 2.8455 1.453R282 Juri-Lathitila Road Km 005.10-007.25 S 2.15 2835 Regional DBST @ Traff 2000-4000 2016 4.494926 1.43R282 Juri-Lathitila Road Km 007.25-009.55 S 2.3 2835 Regional DBST @ Traff 2000-4000 2016 3.960852 1.746R282 Juri-Lathitila Road Km 009.55-009.65 S 0.1 2835 Regional DBST @ 25% Crk 2016 0.17043 3.25R282 Juri-Lathitila Road Km 009.65-010.75 S 1.1 2835 Regional DBST @ Traff 2000-4000 2016 1.869296 2.024R282 Juri-Lathitila Road Km 010.75-012.79 S 2.04 2835 Regional Overlay 50mm @ IRI 7-9 2016 7.379316 1.914R282 Juri-Lathitila Road Km 012.79-012.99 S 0.2 2835 Regional Rehab 135mm @ IRI 9-12 2016 3.088096 0.932R282 Juri-Lathitila Road Km 012.99-014.29 S 1.3 2835 Regional Overlay 50mm @ IRI 5-7 2016 4.641 1.645R282 Juri-Lathitila Road Km 014.29-014.39 S 0.1 2835 Regional Full Recon 135mm 2016 1.85776 1.519R282 Juri-Lathitila Road Km 014.39-016.12 S 1.73 2835 Regional Overlay 50mm @ IRI 7-9 2016 5.926221 2.145Z2002 Moulvibazar-Shamshernagar Road Km 003.00-006.10 S 3.1 2797 Zilla Overlay 40mm @ Traff >=2000 2016 14.44913 0.258Z2002 Moulvibazar-Shamshernagar Road Km 006.10-015.70 S 9.6 2797 Zilla Overlay 40mm @ Traff >=2000 2016 44.7457 0.117Z2002 Moulvibazar-Shamshernagar Road Km 015.70-020.50 S 4.8 2797 Zilla Overlay 40mm @ Traff >=2000 2016 22.69887 0.267Z2002 Moulvibazar-Shamshernagar Road Km 021.30-021.50 S 0.2 2797 Zilla Overlay 40mm @ Traff >=2000 2016 0.922014 0.428

Page 157 of 163

Page 158: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z2002 Moulvibazar-Shamshernagar Road Km 025.50-025.60 S 0.1 2797 Zilla Overlay 40mm @ Traff >=2000 2016 0.461007 0.224Z2002 Moulvibazar-Shamshernagar Road Km 025.60-033.09 S 7.49 2797 Zilla Overlay 40mm @ Traff >=2000 2016 34.77914 0.189Z2003 Kulaura-Shamshernagar-Srimangal Road Km 000.00-000.80 S 0.8 3038 Zilla Overlay 40mm @ Traff >=2000 2016 3.762768 0.146Z2003 Kulaura-Shamshernagar-Srimangal Road Km 000.80-002.20 S 1.4 3038 Zilla Overlay 40mm @ Traff >=2000 2016 4.63554 0.15Z2003 Kulaura-Shamshernagar-Srimangal Road Km 002.20-004.30 S 2.1 3038 Zilla Overlay 40mm @ Traff >=2000 2016 6.703703 1.184Z2003 Kulaura-Shamshernagar-Srimangal Road Km 006.20-006.90 S 0.7 3038 Zilla Overlay 40mm @ Traff >=2000 2016 2.115708 1.084Z2003 Kulaura-Shamshernagar-Srimangal Road Km 007.70-008.30 S 0.6 3038 Zilla Overlay 40mm @ Traff >=2000 2016 2.740572 0.19Z2003 Kulaura-Shamshernagar-Srimangal Road Km 008.30-010.50 S 2.2 3038 Zilla Overlay 40mm @ Traff >=2000 2016 8.274354 0.229Z2003 Kulaura-Shamshernagar-Srimangal Road Km 010.50-011.00 S 0.5 3038 Zilla Overlay 40mm @ Traff >=2000 2016 1.68102 0.861Z2003 Kulaura-Shamshernagar-Srimangal Road Km 012.00-012.50 S 0.5 3038 Zilla Overlay 40mm @ Traff >=2000 2016 1.5282 0.989Z2003 Kulaura-Shamshernagar-Srimangal Road Km 012.50-013.60 S 1.1 3038 Zilla Overlay 40mm @ Traff >=2000 2016 3.36204 0.693Z2003 Kulaura-Shamshernagar-Srimangal Road Km 013.60-014.10 S 0.5 3038 Zilla Overlay 40mm @ Traff >=2000 2016 1.5282 1.071Z2003 Kulaura-Shamshernagar-Srimangal Road Km 015.60-016.10 S 0.5 3038 Zilla Overlay 40mm @ Traff >=2000 2016 1.872045 0.247Z2003 Kulaura-Shamshernagar-Srimangal Road Km 016.10-016.30 S 0.2 3038 Zilla Overlay 40mm @ Traff >=2000 2016 0.614676 0.815Z2003 Kulaura-Shamshernagar-Srimangal Road Km 017.50-018.20 S 0.7 3038 Zilla Overlay 40mm @ Traff >=2000 2016 3.215163 0.175Z2003 Kulaura-Shamshernagar-Srimangal Road Km 018.60-018.90 S 0.3 3038 Zilla Overlay 40mm @ Traff >=2000 2016 1.372833 0.34Z2003 Kulaura-Shamshernagar-Srimangal Road Km 018.90-019.60 S 0.7 3038 Zilla Overlay 40mm @ Traff >=2000 2016 3.185448 0.066Z2003 Kulaura-Shamshernagar-Srimangal Road Km 019.60-019.80 S 0.2 3038 Zilla Overlay 40mm @ Traff >=2000 2016 0.910128 0.215Z2003 Kulaura-Shamshernagar-Srimangal Road Km 019.80-021.20 S 1.4 3038 Zilla Overlay 40mm @ Traff >=2000 2016 6.394668 0Z2003 Kulaura-Shamshernagar-Srimangal Road Km 023.30-024.40 S 1.1 3038 Zilla Overlay 40mm @ Traff >=2000 2016 5.052399 0.04Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 000.00-000.20 S 0.2 2415 Zilla Overlay 40mm @ Traff >=2000 2016 0.621468 0.154Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 000.20-000.80 S 0.6 2415 Zilla Overlay 40mm @ Traff >=2000 2016 1.83384 0.674Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 000.80-000.90 S 0.1 2415 Zilla Overlay 40mm @ Traff >=2000 2016 0.30564 0Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 000.90-001.10 S 0.2 2415 Zilla Overlay 40mm @ Traff >=2000 2016 0.61128 0.267Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 001.10-001.20 S 0.1 2415 Zilla Overlay 40mm @ Traff >=2000 2016 0.30564 0Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 001.20-001.60 S 0.4 2415 Zilla Overlay 40mm @ Traff >=2000 2016 1.22256 0.64Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 001.60-003.40 S 1.8 2415 Zilla Overlay 40mm @ Traff >=2000 2016 5.532084 0.457Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 003.40-006.00 S 2.6 2415 Zilla Overlay 40mm @ Traff >=2000 2016 7.968714 0.721Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 006.00-007.10 S 1.1 2415 Zilla Overlay 40mm @ Traff >=2000 2016 3.343362 0.506Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 007.10-007.50 S 0.4 2415 Zilla Overlay 40mm @ Traff >=2000 2016 1.215768 0.434Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 007.50-007.60 S 0.1 2415 Zilla Overlay 40mm @ Traff >=2000 2016 0.304791 0Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 007.60-007.70 S 0.1 2415 Zilla Full Recon 75mm @ IRI>12 2016 1.560573 0.62Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 007.70-009.70 S 2 2415 Zilla Overlay 40mm @ Traff >=2000 2016 7.01274 0.107Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 009.70-009.80 S 0.1 2415 Zilla Full Recon 75mm @ IRI>12 2016 1.573614 0.483Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 009.80-011.70 S 1.9 2415 Zilla Overlay 40mm @ Traff >=2000 2016 5.839422 0.599Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 011.70-011.80 S 0.1 2415 Zilla Full Recon 75mm @ IRI>12 2016 1.573614 0.482Z2822 Kulaura-Prithmipasha-Hazipur-Sharifpur Road Km 011.80-012.63 S 0.82 2415 Zilla Overlay 40mm @ Traff >=2000 2016 2.535538 0.418Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 000.20-000.30 S 0.1 1735 Zilla Rehab 75mm @ IRI 9-12 2016 1.622206 0.08Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 000.60-004.00 S 3.4 1735 Zilla Rehab 75mm @ IRI 9-12 2016 54.1533 0.015Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 004.00-007.00 S 3 1735 Zilla Rehab 75mm @ IRI 9-12 2016 32.60463 0.104Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 008.00-008.20 S 0.2 1735 Zilla Full Recon 75mm @ IRI>12 2016 3.12984 0.464Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 008.40-008.90 S 0.5 1735 Zilla Rehab 75mm @ IRI 9-12 2016 5.3874 0.725Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 009.20-009.80 S 0.6 1735 Zilla Rehab 75mm @ IRI 9-12 2016 6.46488 0.329Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 009.80-010.00 S 0.2 1735 Zilla Overlay 40mm @ 1000-2000 2016 0.61128 0Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 010.00-010.60 S 0.6 1735 Zilla Rehab 75mm @ IRI 9-12 2016 6.46488 0.332Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 010.60-010.80 S 0.2 1735 Zilla Overlay 40mm @ 1000-2000 2016 0.61128 0

Page 158 of 163

Page 159: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 010.80-011.50 S 0.7 1735 Zilla Rehab 75mm @ IRI 9-12 2016 7.553134 0.331Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 011.50-012.00 S 0.5 1735 Zilla Overlay 40mm @ 1000-2000 2016 1.5282 0Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 012.00-012.80 S 0.8 1735 Zilla Rehab 75mm @ IRI 9-12 2016 8.476176 0.39Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 016.10-016.60 S 0.5 1735 Zilla Overlay 40mm @ 1000-2000 2016 1.47726 0Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 016.60-017.00 S 0.4 1735 Zilla Full Recon 75mm @ IRI>12 2016 6.051024 0.258Z2823 Juri-Fultala-Batuli (with link to Gazipur) Road Km 017.40-022.38 S 4.98 1735 Zilla Overlay 40mm @ 1000-2000 2016 14.87068 0Z2824 Juri-Fultala-Batuli (with link to Gazipur) Road Km 003.30-004.00 S 0.7 1735 Zilla Rehab 75mm @ IRI 9-12 2016 7.668065 0.782Z2824 Juri-Fultala-Batuli (with link to Gazipur) Road Km 004.10-004.30 S 0.2 1735 Zilla Rehab 75mm @ IRI 9-12 2016 2.190876 0.901Z2824 Juri-Fultala-Batuli (with link to Gazipur) Road Km 008.10-008.80 S 0.7 1735 Zilla Rehab 75mm @ IRI 9-12 2016 7.605212 0.749Z2824 Juri-Fultala-Batuli (with link to Gazipur) Road Km 008.90-009.10 S 0.2 1735 Zilla Full Recon 75mm @ IRI>12 2016 3.155922 0.289Z2824 Juri-Fultala-Batuli (with link to Gazipur) Road Km 009.60-010.10 S 0.5 1735 Zilla Full Recon 75mm @ IRI>12 2016 7.976745 0.334Z2824 Juri-Fultala-Batuli (with link to Gazipur) Road Km 013.00-015.18 S 2.18 1735 Zilla Rehab 75mm @ IRI 9-12 2016 23.82622 0.703Sub-Total Moulavi Bazar Division 791.349

Sunamganj DivisionR241 Auskandi-Raniganj-Jagannathpur-Pagla Road Km 010.59-015.20 S 4.61 1586 Regional DBST @ Traff 100-2000 2016 12.7931 0.66R241 Auskandi-Raniganj-Jagannathpur-Pagla Road Km 015.20-015.30 S 0.1 1586 Regional Full Recon 110mm 2016 2.76304 0.289R241 Auskandi-Raniganj-Jagannathpur-Pagla Road Km 018.60-022.90 S 4.3 1586 Regional Overlay 50mm @ IRI 5-7 2016 25.50382 1.372R241 Auskandi-Raniganj-Jagannathpur-Pagla Road Km 023.40-024.10 S 0.7 1586 Regional Overlay 50mm @ IRI 7-9 2016 3.9837 1.991R241 Auskandi-Raniganj-Jagannathpur-Pagla Road Km 024.10-045.02 S 20.92 1586 Regional Overlay 50mm @ IRI 5-7 2016 119.9229 1.714R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 073.88-074.39 S 0.51 3499 Regional Overlay 50mm @ IRI 7-9 2016 2.478861 4.412R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 074.39-074.49 S 0.1 3557 Regional Full Recon 135mm @ IRI 12 2016 2.95056 3.23R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 074.49-074.69 S 0.2 3557 Regional Overlay 50mm @ IRI 5-7 2016 1.134 7.142R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 074.69-074.79 S 0.1 3557 Regional Full Recon 135mm @ IRI 12 2016 2.95056 3.18R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 074.79-075.09 S 0.3 3557 Regional Rehab 135mm @ IRI 9-12 2016 7.33536 2.842R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 075.09-080.46 S 5.38 3557 Regional Full Recon 135mm @ IRI 12 2016 159.4737 2.685R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 081.94-082.25 S 0.31 3557 Regional Overlay 50mm @ IRI 7-9 2016 1.74069 8.956R370 Mymensingh-Raghurampur-Netrokona-Mohonganj Km 085.85-131.00 S 45.15 3557 Regional Overlay 50mm @ IRI 7-9 2016 233.2242 9.124Z2802 Gobindaganj-Chhatak-Dwarabazar Road Km 003.10-006.40 S 3.3 4470 Zilla Overlay 50mm @ IRI 6-9 2016 19.3347 1.451Z2802 Gobindaganj-Chhatak-Dwarabazar Road Km 006.40-008.80 S 2.4 4470 Zilla Overlay 40mm @ Traff >=2000 2016 11.39493 0Z2802 Gobindaganj-Chhatak-Dwarabazar Road Km 008.80-008.90 S 0.1 4470 Zilla Rehab 75mm @ IRI 9-12 2016 1.667101 0.614Z2805 Dharmapasha-Madayanagar Road Km 000.00-018.96 S 18.96 1793 Zilla Rehab 75mm @ IRI 9-12 2016 206.0361 1.042Z2806 Niamatpur-Tahirpur Road Km 008.00-009.80 S 1.8 1696 Zilla Rehab 75mm @ IRI 9-12 2016 21.5496 0.057Z2807 Madanpur-Dirai-Sullah Road Km 005.00-005.40 S 0.4 2001 Zilla Rehab 75mm @ IRI 9-12 2016 6.596572 0.636Z2807 Madanpur-Dirai-Sullah Road Km 005.40-005.60 S 0.2 2001 Zilla Overlay 40mm @ Traff >=2000 2016 0.935598 0Z2807 Madanpur-Dirai-Sullah Road Km 005.60-006.40 S 0.8 2001 Zilla Rehab 75mm @ IRI 9-12 2016 13.14526 0.293Z2807 Madanpur-Dirai-Sullah Road Km 006.40-006.50 S 0.1 2001 Zilla Overlay 40mm @ Traff >=2000 2016 0.466101 0.081Z2807 Madanpur-Dirai-Sullah Road Km 006.50-006.80 S 0.3 2001 Zilla Overlay 40mm @ Traff >=2000 2016 1.398303 0Z2807 Madanpur-Dirai-Sullah Road Km 006.80-007.70 S 0.9 2001 Zilla Overlay 40mm @ Traff >=2000 2016 4.19192 0Z2807 Madanpur-Dirai-Sullah Road Km 010.60-011.30 S 0.7 2001 Zilla Overlay 40mm @ Traff >=2000 2016 3.274593 0Z2807 Madanpur-Dirai-Sullah Road Km 011.30-011.50 S 0.2 2001 Zilla Overlay 40mm @ Traff >=2000 2016 0.940276 0Z2807 Madanpur-Dirai-Sullah Road Km 011.50-013.20 S 1.7 2001 Zilla Rehab 75mm @ IRI 9-12 2016 27.93367 0.109Z2807 Madanpur-Dirai-Sullah Road Km 013.20-013.40 S 0.2 2001 Zilla Overlay 40mm @ Traff >=2000 2016 0.930504 0Z2807 Madanpur-Dirai-Sullah Road Km 013.40-013.60 S 0.2 2001 Zilla Rehab 75mm @ IRI 9-12 2016 3.280328 0.521Z2807 Madanpur-Dirai-Sullah Road Km 013.60-013.80 S 0.2 2001 Zilla Overlay 40mm @ Traff >=2000 2016 0.928806 0Z2807 Madanpur-Dirai-Sullah Road Km 013.80-013.90 S 0.1 2001 Zilla Full Recon 75mm @ IRI>12 2016 2.377809 0.579

Page 159 of 163

Page 160: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

Z2807 Madanpur-Dirai-Sullah Road Km 013.90-015.20 S 1.3 2001 Zilla Overlay 40mm @ Traff >=2000 2016 6.026201 0Z2807 Madanpur-Dirai-Sullah Road Km 015.20-015.30 S 0.1 2001 Zilla Full Recon 75mm @ IRI>12 2016 2.360421 0.411Z2807 Madanpur-Dirai-Sullah Road Km 015.30-015.40 S 0.1 2001 Zilla Overlay 40mm @ Traff >=2000 2016 0.461007 0.188Z2807 Madanpur-Dirai-Sullah Road Km 015.40-015.50 S 0.1 2001 Zilla Full Recon 75mm @ IRI>12 2016 2.360421 0.43Z2807 Madanpur-Dirai-Sullah Road Km 019.10-020.00 S 0.9 2001 Zilla Overlay 40mm @ Traff >=2000 2016 4.187268 0Z2807 Madanpur-Dirai-Sullah Road Km 020.00-020.10 S 0.1 2001 Zilla Rehab 75mm @ IRI 9-12 2016 1.640164 0.273Z2807 Madanpur-Dirai-Sullah Road Km 020.10-020.91 S 0.8 2001 Zilla Overlay 40mm @ Traff >=2000 2016 3.726668 0Z2807 Madanpur-Dirai-Sullah Road Km 020.91-021.31 S 0.4 2001 Zilla Rehab 75mm @ IRI 9-12 2016 6.560656 0.184Z2807 Madanpur-Dirai-Sullah Road Km 022.61-022.81 S 0.2 2001 Zilla Rehab 75mm @ IRI 9-12 2016 3.280328 0.211Z2807 Madanpur-Dirai-Sullah Road Km 022.81-022.91 S 0.1 2001 Zilla Overlay 40mm @ Traff >=2000 2016 0.465252 0Z2807 Madanpur-Dirai-Sullah Road Km 022.91-023.11 S 0.2 2001 Zilla Rehab 75mm @ IRI 9-12 2016 3.280328 0.136Z2811 Dowarabazar-Sunamganj Road Km 009.40-009.60 S 0.2 640 Zilla Overlay 40mm @ IRI>12 2016 0.624864 0Z2811 Dowarabazar-Sunamganj Road Km 009.80-010.00 S 0.2 640 Zilla Overlay 40mm @ IRI>12 2016 0.624864 0Z2813 Sunamganj-Tekerhat-Badaghat-Tahirpur Road Km 000.00-040.59 S 40.59 9227 Zilla Rehab 75mm @ IRI 9-12 2016 728.9152 3.601Sub-Total Sunamganj Division 1667.15

Sylhet DivisionN2 Dhaka-Bhairab-Sylhet-Tamabil Km 191.21-191.23 S 0.01 7739 National Overlay 50mm @ IRI 4-7 2016 0.126 11.579N2 Dhaka-Bhairab-Sylhet-Tamabil Km 191.23-191.43 S 0.2 7739 National Rehab 180mm @ IRI 9-12 2016 10.8192 5.363N2 Dhaka-Bhairab-Sylhet-Tamabil Km 191.43-191.91 S 0.49 7739 National Overlay 50mm @ IRI 4-7 2016 4.023075 12.254N2 Dhaka-Bhairab-Sylhet-Tamabil Km 191.93-192.16 L 0.23 3191 National Overlay 50mm @ IRI 4-9 2016 0.987 5.534N2 Dhaka-Bhairab-Sylhet-Tamabil Km 191.93-192.16 R 0.23 3191 National Overlay 50mm @ IRI 4-9 2016 0.987 5.534N2 Dhaka-Bhairab-Sylhet-Tamabil Km 192.16-205.08 S 12.92 7739 National Overlay 50mm @ IRI 4-7 2016 100.5474 12.951N2 Dhaka-Bhairab-Sylhet-Tamabil Km 205.08-205.43 S 0.34 12871 National Overlay 80mm @ IRI 4-9 2016 4.220109 17.299N2 Dhaka-Bhairab-Sylhet-Tamabil Km 205.43-206.13 S 0.7 12871 National Rehab 195mm @ IRI 9-12 2016 31.45639 7.363N2 Dhaka-Bhairab-Sylhet-Tamabil Km 206.13-207.33 S 1.2 12871 National Overlay 80mm @ IRI 4-9 2016 14.67864 16.41N2 Dhaka-Bhairab-Sylhet-Tamabil Km 207.33-207.63 S 0.3 12871 National DBST @ Traff >6000 2016 1.09668 16.743N2 Dhaka-Bhairab-Sylhet-Tamabil Km 207.63-209.03 S 1.4 12871 National Overlay 80mm @ IRI 4-9 2016 17.12508 15.507N2 Dhaka-Bhairab-Sylhet-Tamabil Km 209.03-209.13 S 0.1 12871 National Full Recon 195mm 2016 5.40274 7.145N2 Dhaka-Bhairab-Sylhet-Tamabil Km 209.13-214.73 S 5.6 12871 National Overlay 80mm @ IRI 4-9 2016 68.51255 15.91N2 Dhaka-Bhairab-Sylhet-Tamabil Km 214.73-214.83 S 0.1 12871 National Full Recon 195mm 2016 5.456767 7.458N2 Dhaka-Bhairab-Sylhet-Tamabil Km 214.83-219.33 S 4.5 12871 National Overlay 80mm @ IRI 4-9 2016 55.0449 15.962N2 Dhaka-Bhairab-Sylhet-Tamabil Km 219.33-219.93 S 0.6 12871 National Full Recon 195mm 2016 32.47047 6.733N2 Dhaka-Bhairab-Sylhet-Tamabil Km 219.93-220.63 S 0.7 12871 National Rehab 195mm @ IRI 9-12 2016 31.41152 6.972N2 Dhaka-Bhairab-Sylhet-Tamabil Km 220.63-220.73 S 0.1 12871 National Full Recon 195mm 2016 5.40274 7.125N2 Dhaka-Bhairab-Sylhet-Tamabil Km 220.73-221.13 S 0.4 12871 National Overlay 80mm @ IRI 4-9 2016 4.89288 18.444N2 Dhaka-Bhairab-Sylhet-Tamabil Km 221.13-221.33 S 0.2 12871 National Full Recon 195mm 2016 10.80548 7.44N2 Dhaka-Bhairab-Sylhet-Tamabil Km 221.33-222.03 S 0.7 12871 National Overlay 80mm @ IRI 4-9 2016 8.56254 16.513N2 Dhaka-Bhairab-Sylhet-Tamabil Km 222.03-222.13 S 0.1 12871 National Rehab 195mm @ IRI 9-12 2016 4.48736 7.81N2 Dhaka-Bhairab-Sylhet-Tamabil Km 222.13-222.83 S 0.7 12871 National Overlay 80mm @ IRI 4-9 2016 8.56254 15.853N2 Dhaka-Bhairab-Sylhet-Tamabil Km 222.83-223.13 S 0.3 12871 National Overlay 80mm @ IRI 4-9 2016 3.66966 18.196N2 Dhaka-Bhairab-Sylhet-Tamabil Km 223.13-223.92 S 0.79 12871 National Overlay 80mm @ IRI 4-9 2016 9.67567 15.626N2 Dhaka-Bhairab-Sylhet-Tamabil Km 223.93-224.13 L 0.2 10301 National Overlay 80mm @ IRI 4-9 2016 1.653 10.793N2 Dhaka-Bhairab-Sylhet-Tamabil Km 223.93-224.13 R 0.2 10301 National Overlay 80mm @ IRI 4-9 2016 1.653 10.793N2 Dhaka-Bhairab-Sylhet-Tamabil Km 224.13-224.22 L 0.09 9071 National Overlay 50mm @ IRI 4-7 2016 0.483 8.772N2 Dhaka-Bhairab-Sylhet-Tamabil Km 224.13-224.22 R 0.09 9071 National Overlay 50mm @ IRI 4-7 2016 0.483 8.772

Page 160 of 163

Page 161: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

N2 Dhaka-Bhairab-Sylhet-Tamabil Km 224.22-225.32 S 1.1 9071 National Overlay 50mm @ IRI 4-7 2016 8.55855 7.809N2 Dhaka-Bhairab-Sylhet-Tamabil Km 225.33-225.43 L 0.1 9071 National Full Recon 180mm 2016 5.5992 3.383N2 Dhaka-Bhairab-Sylhet-Tamabil Km 225.33-225.43 R 0.1 9071 National Full Recon 180mm 2016 5.5992 3.383N2 Dhaka-Bhairab-Sylhet-Tamabil Km 225.43-225.53 L 0.1 9071 National Overlay 50mm @ IRI 4-7 2016 0.8148 8.264N2 Dhaka-Bhairab-Sylhet-Tamabil Km 225.43-225.53 R 0.1 9071 National Overlay 50mm @ IRI 4-7 2016 0.8148 8.264N2 Dhaka-Bhairab-Sylhet-Tamabil Km 225.53-228.80 S 3.27 9071 National Overlay 50mm @ IRI 4-7 2016 26.00205 7.183N2 Dhaka-Bhairab-Sylhet-Tamabil Km 228.85-229.15 L 0.3 9071 National Overlay 50mm @ IRI 4-7 2016 3.09624 3.63N2 Dhaka-Bhairab-Sylhet-Tamabil Km 228.85-229.15 R 0.3 9071 National Overlay 50mm @ IRI 4-7 2016 2.394 8.041N2 Dhaka-Bhairab-Sylhet-Tamabil Km 230.25-235.55 S 5.3 6036 National Overlay 50mm @ IRI 4-7 2016 40.63983 12.619N2 Dhaka-Bhairab-Sylhet-Tamabil Km 235.55-235.75 S 0.2 6036 National Rehab 180mm @ IRI 9-12 2016 9.87252 4.836N2 Dhaka-Bhairab-Sylhet-Tamabil Km 235.75-264.05 S 28.31 6038 National Overlay 50mm @ IRI 4-7 2016 216.9655 12.667N2 Dhaka-Bhairab-Sylhet-Tamabil Km 264.05-264.15 S 0.1 6057 National Rehab 180mm @ IRI 9-12 2016 4.93626 4.794N2 Dhaka-Bhairab-Sylhet-Tamabil Km 264.15-264.85 S 0.7 6057 National Overlay 50mm @ IRI 4-7 2016 5.3655 12.35N2 Dhaka-Bhairab-Sylhet-Tamabil Km 264.85-265.05 S 0.2 6057 National Rehab 180mm @ IRI 9-12 2016 9.87252 4.706N2 Dhaka-Bhairab-Sylhet-Tamabil Km 265.05-266.65 S 1.6 6057 National Overlay 50mm @ IRI 4-7 2016 12.264 12.453N2 Dhaka-Bhairab-Sylhet-Tamabil Km 266.65-266.75 S 0.1 6057 National Full Recon 180mm 2016 5.10927 4.229N2 Dhaka-Bhairab-Sylhet-Tamabil Km 266.75-271.96 S 5.2 6057 National Overlay 50mm @ IRI 4-7 2016 39.87333 12.086N2 Dhaka-Bhairab-Sylhet-Tamabil Km 271.96-272.06 S 0.1 6057 National Full Recon 180mm 2016 5.10927 4.495N2 Dhaka-Bhairab-Sylhet-Tamabil Km 272.06-286.52 S 14.46 5925 National Overlay 50mm @ IRI 4-9 2016 110.8359 12.12N205 Chandipool-Keean Bridge Road Km 000.50-002.48 S 1.98 2720 National Overlay 50mm @ IRI 5-9 2016 17.19673 0.876N206 Keean Bridge-Nayarpool Road Km 000.90-001.60 L 0.7 6189 National Overlay 50mm @ IRI 5-7 2016 4.557 1.35N206 Keean Bridge-Nayarpool Road Km 000.90-001.60 R 0.7 6189 National Overlay 50mm @ IRI 5-7 2016 4.41 1.439N208 Moulvibazar-Rajnagar-Fenchuganj-Sylhet Road Km 030.60-033.96 S 3.36 6418 National Overlay 50mm @ IRI 5-7 2016 20.03904 7.249N210 Sylhet Town Bypass Road Km 005.00-005.39 S 0.39 15853 National Overlay 80mm @ IRI 5-9 2016 4.731084 13.494N210 Sylhet Town Bypass Road Km 005.39-005.45 R 0.06 15853 National DBST @ Traff >6000 2016 0.213408 11.506N210 Sylhet Town Bypass Road Km 005.75-005.98 L 0.23 15853 National DBST @ Traff >6000 2016 0.829426 10.376N210 Sylhet Town Bypass Road Km 005.75-005.98 R 0.23 15853 National DBST @ Traff >6000 2016 0.829426 10.376N210 Sylhet Town Bypass Road Km 006.56-010.84 S 4.28 15853 National Overlay 80mm @ IRI 5-9 2016 51.6946 12.912N212 Tamabil Landport Connecting Road Km 000.00-000.49 S 0.49 3367 National Overlay 50mm @ IRI 5-9 2016 4.892895 1.733R248 Ambarkhana - Shahi Eidgaon -Tilagar Road Km 000.00-004.26 S 4.26 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 55.54504 5.003R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 001.30-007.24 L 5.94 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 40.72155 9.681R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 001.30-007.24 R 5.94 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 40.87017 9.652R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 007.24-007.60 S 0.36 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 2.603956 12.854R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 007.60-009.75 S 2.15 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 15.37049 11.019R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 010.30-013.30 S 3 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 20.92512 12.704R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 013.30-015.29 S 1.99 7019 Regional DBST @ Traff >6000 2016 5.487021 11.284R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 015.30-017.77 L 2.47 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 17.25195 12.82R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 015.30-017.77 R 2.47 7019 Regional Rehab 150mm @ IRI 9-12 2016 38.36826 10.586R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 017.77-022.30 S 4.53 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 31.112 12.624R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 022.31-022.55 L 0.25 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 1.710242 12.384R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 022.31-022.55 R 0.25 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 1.701047 12.441R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 022.55-026.41 S 3.86 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 26.91712 12.719R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 026.41-027.31 S 0.9 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 6.30504 11.431R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 027.31-027.51 S 0.2 7019 Regional Full Recon 150mm @ IRI 12 2016 6.808296 4.42R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 027.51-031.01 S 3.5 7019 Regional Overlay 60mm @ IRI 5.5-9 2016 24.52661 12.206R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 031.01-031.78 S 0.77 7019 Regional DBST @ Traff >6000 2016 2.13079 11.374

Page 161 of 163

Page 162: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 031.88-032.09 L 0.2 2688 Regional Overlay 50mm @ IRI 5-7 2016 1.174456 1.496R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 031.88-032.09 R 0.2 2688 Regional Overlay 50mm @ IRI 5-7 2016 1.163799 1.939R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 041.41-041.60 L 0.19 2688 Regional Overlay 50mm @ IRI 7-9 2016 1.10503 2.041R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 041.41-041.60 R 0.19 2688 Regional Overlay 50mm @ IRI 7-9 2016 1.099014 2.381R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 045.98-089.22 S 43.24 3123 Regional Overlay 50mm @ IRI 7-9 2016 249.6995 3.244R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 089.22-089.42 L 0.2 3123 Regional Overlay 50mm @ IRI 7-9 2016 1.176 2.785R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 089.22-089.42 R 0.2 3123 Regional Overlay 50mm @ IRI 7-9 2016 1.1529 3.436R250 Sylhet-Golapganj-Charkhai-Jakiganj Road Km 089.42-089.70 S 0.28 3123 Regional Overlay 50mm @ IRI 7-9 2016 1.22892 4.468R251 Golapganj-Dhaka Dakhin-Baraigram-Vadeswar Km 000.00-003.30 S 3.3 8732 Regional Overlay 60mm @ IRI 5.5-9 2016 23.62103 3.075R251 Golapganj-Dhaka Dakhin-Baraigram-Vadeswar Km 003.30-006.30 S 3 8732 Regional DBST @ Traff >6000 2016 7.54338 4.142R251 Golapganj-Dhaka Dakhin-Baraigram-Vadeswar Km 006.30-009.30 S 3 8732 Regional Overlay 60mm @ IRI 5.5-9 2016 20.0477 4.12R251 Golapganj-Dhaka Dakhin-Baraigram-Vadeswar Km 009.30-011.30 S 2 8732 Regional Rehab 150mm @ IRI 9-12 2016 44.436 2.108R251 Golapganj-Dhaka Dakhin-Baraigram-Vadeswar Km 011.40-012.60 S 1.2 8732 Regional Rehab 150mm @ IRI 9-12 2016 26.6616 1.909R251 Golapganj-Dhaka Dakhin-Baraigram-Vadeswar Km 012.80-013.62 S 0.82 8732 Regional Overlay 60mm @ IRI 5.5-9 2016 4.42555 5.074R280 Sylhet-Sunamganj Road Km 000.60-001.60 L 1 9929 Regional Overlay 60mm @ IRI 5.5-9 2016 8.79453 9.691R280 Sylhet-Sunamganj Road Km 000.60-001.60 R 1 9929 Regional Overlay 60mm @ IRI 5.5-9 2016 8.757 9.736R280 Sylhet-Sunamganj Road Km 001.60-001.90 L 0.3 9929 Regional Rehab 150mm @ IRI 9-12 2016 10.2879 3.741R280 Sylhet-Sunamganj Road Km 001.60-001.90 R 0.3 9929 Regional Rehab 150mm @ IRI 9-12 2016 10.143 3.83R280 Sylhet-Sunamganj Road Km 001.90-004.56 L 2.66 9929 Regional Overlay 60mm @ IRI 5.5-9 2016 26.12213 8.286R280 Sylhet-Sunamganj Road Km 001.90-004.56 R 2.66 9929 Regional Overlay 60mm @ IRI 5.5-9 2016 26.25524 8.247R280 Sylhet-Sunamganj Road Km 004.60-006.20 L 1.6 9929 Regional Overlay 60mm @ IRI 5.5-9 2016 14.21136 7.854R280 Sylhet-Sunamganj Road Km 004.60-006.20 R 1.6 9929 Regional Overlay 60mm @ IRI 5.5-9 2016 14.21136 7.854R280 Sylhet-Sunamganj Road Km 006.20-006.43 L 0.23 9929 Regional Rehab 150mm @ IRI 9-12 2016 7.853097 4.159R280 Sylhet-Sunamganj Road Km 006.20-006.43 R 0.23 9929 Regional Rehab 150mm @ IRI 9-12 2016 7.853097 4.159R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 057.50-057.83 S 0.32 3877 Regional Overlay 50mm @ IRI 5-7 2016 1.894914 1.421R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 060.13-060.23 S 0.1 3877 Regional DBST @ Traff 2000-4000 2016 0.274664 2.599R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 062.53-062.83 S 0.3 3877 Regional Overlay 50mm @ IRI 7-9 2016 1.75455 2.213R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 062.90-064.30 S 1.4 3877 Regional Overlay 50mm @ IRI 5-7 2016 8.630212 1.349R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 067.41-067.50 L 0.09 3877 Regional Overlay 50mm @ IRI 5-7 2016 0.563587 1.807R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 067.41-067.50 R 0.09 3877 Regional Overlay 50mm @ IRI 5-7 2016 0.5586 1.881R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 067.50-068.91 S 1.41 3877 Regional Overlay 50mm @ IRI 5-7 2016 11.04272 0.807R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 068.93-071.31 S 2.38 3877 Regional Overlay 50mm @ IRI 7-9 2016 13.95028 1.859R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 071.31-072.11 S 0.8 3877 Regional DBST @ Traff 2000-4000 2016 2.201264 1.768R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 072.11-073.01 S 0.9 3877 Regional Overlay 50mm @ IRI 7-9 2016 5.269499 2.033R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 073.01-073.81 S 0.8 3877 Regional DBST @ Traff 2000-4000 2016 2.205216 1.835R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 073.81-076.81 S 3 3877 Regional Overlay 50mm @ IRI 5-7 2016 18.9945 1.142R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 076.81-077.11 S 0.3 3877 Regional DBST @ Traff 2000-4000 2016 0.826956 1.856R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 077.11-077.71 S 0.6 3877 Regional Overlay 50mm @ IRI 5-7 2016 3.5154 1.417R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 077.71-078.21 S 0.5 3877 Regional DBST @ Traff 2000-4000 2016 1.37826 2.308R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 079.11-080.61 S 1.5 3877 Regional DBST @ Traff 2000-4000 2016 4.13478 1.826R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 080.61-081.01 S 0.4 3877 Regional Overlay 50mm @ IRI 5-7 2016 2.352 1.461R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 081.01-082.21 S 1.2 3877 Regional DBST @ Traff 2000-4000 2016 3.31968 1.772R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 082.21-082.80 S 0.59 3877 Regional Overlay 50mm @ IRI 5-7 2016 3.49272 1.198R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 082.80-082.87 L 0.07 3877 Regional Overlay 50mm @ IRI 7-9 2016 0.47775 1.547R281 Rajnagar-Kulaura-Bianibazar-Charkhai Road Km 082.80-082.87 R 0.07 3877 Regional Overlay 50mm @ IRI 7-9 2016 0.4851 1.472R283 Sylhet-Sunamganj Bypass Road Km 000.00-003.00 S 3 3620 Regional Overlay 50mm @ IRI 5-7 2016 25.36595 5.658

Page 162 of 163

Page 163: NPV/ AADT No Barisal ZoneAppendix-A Annual Needs Report 2016-2017 Road No Road Name Chainage Cway Lengt h (km) AADT Road Class Work Name Year Fin Cost (Mill Tk) NPV/ Cost Barisal Zone

Appendix-AAnnual Needs Report2016-2017

Road No Road Name Chainage Cway Lengt

h (km) AADT Road Class Work Name Year Fin Cost

(Mill Tk)NPV/ Cost

R283 Sylhet-Sunamganj Bypass Road Km 004.00-004.10 S 0.1 3620 Regional Rehab 135mm @ IRI 9-12 2016 3.359776 2.617R283 Sylhet-Sunamganj Bypass Road Km 004.10-006.63 S 2.52 3620 Regional Overlay 50mm @ IRI 5-7 2016 19.71749 5.957Z2012 Shari-Gowainghat Road Km 002.70-003.20 S 0.5 468 Zilla Overlay 40mm @ Traff 100-1000 2016 2.279565 0Z2012 Shari-Gowainghat Road Km 003.50-003.80 S 0.3 468 Zilla Overlay 40mm @ Traff 100-1000 2016 1.34991 0Z2012 Shari-Gowainghat Road Km 007.60-007.70 S 0.1 468 Zilla Overlay 40mm @ IRI>12 2016 0.45846 0Z2013 Sylhet (Telikhal)-Sultanpur-Balaganj Road Km 014.70-015.50 S 0.8 4700 Zilla Overlay 50mm @ IRI 6-9 2016 3.36 0.55Z2013 Sylhet (Telikhal)-Sultanpur-Balaganj Road Km 015.50-015.80 S 0.3 4700 Zilla Full Recon 75mm @ IRI>12 2016 5.2164 0.293Z2013 Sylhet (Telikhal)-Sultanpur-Balaganj Road Km 015.80-016.10 S 0.3 4700 Zilla Overlay 50mm @ IRI 6-9 2016 1.26 0.497Z2013 Sylhet (Telikhal)-Sultanpur-Balaganj Road Km 016.10-016.20 S 0.1 4700 Zilla Full Recon 75mm @ IRI>12 2016 1.677942 0.648Z2013 Sylhet (Telikhal)-Sultanpur-Balaganj Road Km 018.30-018.70 S 0.4 6875 Zilla Overlay 50mm @ IRI 6-9 2016 1.764 2.822Z2013 Sylhet (Telikhal)-Sultanpur-Balaganj Road Km 021.80-023.40 S 1.6 4700 Zilla Overlay 50mm @ IRI 6-9 2016 6.216 0.655Z2013 Sylhet (Telikhal)-Sultanpur-Balaganj Road Km 023.43-025.05 S 1.62 4700 Zilla Overlay 50mm @ IRI 6-9 2016 6.274275 0.725Z2014 Seola-Sutarkandi Road Km 000.00-004.16 S 4.16 3869 Zilla Overlay 40mm @ Traff >=2000 2016 21.52869 0.54Z2016 Rashidpur-Biswanath-Lama Kazi Road Km 016.70-016.96 S 0.26 4978 Zilla Overlay 50mm @ IRI 6-9 2016 1.45152 1.593Z2808 Badaghat-Biman Bandar Road Km 008.60-008.70 S 0.1 2001 Zilla Overlay 40mm @ IRI>12 2016 0 0Z2808 Badaghat-Biman Bandar Road Km 008.70-011.90 S 3.2 2001 Zilla Overlay 40mm @ IRI>12 2016 0 0Z2808 Badaghat-Biman Bandar Road Km 011.90-012.50 S 0.6 2001 Zilla Overlay 40mm @ IRI>12 2016 0 0Z2812 Beanibazar-Budbaribazar-Golapganj-Fenchuganj Km 000.00-002.00 S 2 4322 Zilla Overlay 50mm @ IRI 6-9 2016 6.3 2.07Z2812 Beanibazar-Budbaribazar-Golapganj-Fenchuganj Km 002.00-002.60 S 0.6 4322 Zilla Full Recon 75mm @ IRI>12 2016 7.837641 1.469Z2812 Beanibazar-Budbaribazar-Golapganj-Fenchuganj Km 002.60-004.50 S 1.9 4322 Zilla Overlay 50mm @ IRI 6-9 2016 5.985 1.889Z2812 Beanibazar-Budbaribazar-Golapganj-Fenchuganj Km 004.50-004.90 S 0.4 4322 Zilla Full Recon 75mm @ IRI>12 2016 5.2164 1.381Z2812 Beanibazar-Budbaribazar-Golapganj-Fenchuganj Km 004.90-005.10 S 0.2 4322 Zilla Overlay 50mm @ IRI 6-9 2016 0.63945 2.084Z2832 Daudabad-Daudpur-Vadeswar Road Km 007.50-010.00 S 2.5 1824 Zilla Rehab 75mm @ IRI 9-12 2016 27.61042 0.066Z2832 Daudabad-Daudpur-Vadeswar Road Km 010.50-010.60 S 0.1 1824 Zilla Overlay 40mm @ 1000-2000 2016 0.313281 0.182Z2832 Daudabad-Daudpur-Vadeswar Road Km 011.50-011.70 S 0.2 1824 Zilla Overlay 40mm @ 1000-2000 2016 0.623166 0Z2832 Daudabad-Daudpur-Vadeswar Road Km 012.90-013.40 S 0.5 1824 Zilla Overlay 40mm @ 1000-2000 2016 1.56216 0Z2832 Daudabad-Daudpur-Vadeswar Road Km 013.40-013.90 S 0.5 1824 Zilla Rehab 75mm @ IRI 9-12 2016 5.50712 0.143Z2832 Daudabad-Daudpur-Vadeswar Road Km 013.90-014.00 S 0.1 1824 Zilla Overlay 40mm @ 1000-2000 2016 0.312432 0Z2832 Daudabad-Daudpur-Vadeswar Road Km 014.00-014.50 S 0.5 1824 Zilla Rehab 75mm @ IRI 9-12 2016 5.50712 0.265Z2832 Daudabad-Daudpur-Vadeswar Road Km 014.50-014.80 S 0.3 2569 Zilla Rehab 75mm @ IRI 9-12 2016 3.304272 2.522Sub-Total Sylhet Division 2184.512Total Sylhet Zone 5764.594

Total Bangladesh 91573.32

Page 163 of 163