Transformer Testing
8/20/2019 NPTI Presentation General
2/17
2
Life of a transformer…
8/20/2019 NPTI Presentation General
3/17
3
Life of a transformer – With proper maintenance…
Service/repair;• Oil regeneration• Drying• New/refurbished bushings• New/refurbished LTC
• Etc...
Extra years in service!Diagnostic testing
8/20/2019 NPTI Presentation General
4/17
4
Transformer stress factors
Electrical Stress• Develops within the insulation material separating conductors at different
potentials. It ages the dielectric materiel (even at rated voltages)
Thermal Stress• Develops across all assembly components. It ages the dielectric material
(even at rated temperatures). Stress to insulation worsened by hightemperature and repeated changes in temperature.
Mechanical Stress
• Deforms/displaces assembly components. High shock events during shippingdisplaces components. High current events deform the windings.
Chemical Stress• Oil additives have deteriorated insulation components.
Environmental Stress (contaminants)• Salt and other corrosive substances in the environment have deterioratedtanks and peripheral equipment.
8/20/2019 NPTI Presentation General
5/17
5
Applicable Standards
IEEE C57.12.90
• Standard test code IEEE 62
• Field test guide
8/20/2019 NPTI Presentation General
6/17
6
IEEE 62
byMegger
/
/
/
1
/
/ /
/
/
/ /
()
/ /
/
()
( )
( )
/1
/
8/20/2019 NPTI Presentation General
7/17
7
Transformer testing tool-box from Megger!
8/20/2019 NPTI Presentation General
8/17
8
MTO
Winding resistance measurements• 1 or 2-ch measurement
• Single or dual current injection (HV and
LV simultaneously)
Tap-changer testing• Winding resistance/tap
• Timing/Maker-before-break verification
Automatic demagnetization of
transformer core• Important to perform before all kinds on
excitation current tests (Delta, TTR,FRAX)
• Recommended in IEEE as standard
procedure before taking the transformerin service
8/20/2019 NPTI Presentation General
9/17
9
TTR
Transformer turn-ratio measurement
Polarity and phase deviation test Excitation current measurement
8/20/2019 NPTI Presentation General
10/17
10
MIT/S1
DC insulation testing
• Insulation resistance
• Polarization index
• Step voltage
• Dielectric discharge
8/20/2019 NPTI Presentation General
11/17
11
Delta
10 kV insulation testing @ 50/60 Hz• Tan delta/power factor and capacitance
• Winding – winding
• Winding – tank
• Bushings
• Oil
Excitation current measurement
HV TTR
8/20/2019 NPTI Presentation General
12/17
12
IDAX
Insulation diagnostics(DFR/FDS) from mHz to kHz
• Tan delta/power factor andcapacitance
• Winding – winding
• Winding – tank
• Bushings
• Oil
Automatic moisture assessmentof cellulose insulation (MODS)
8/20/2019 NPTI Presentation General
13/17
13
MLR
Short-circuit impedance/leakagereactance measurement @ 50/60Hz
Capacitor bank testing
8/20/2019 NPTI Presentation General
14/17
14
FRAX
Sweep frequency response analysisfrom Hz to MHz
Excitation impedance measurement
Short-circuit impedance testing
FRSL (Frequency response of stray
losses) measurements
8/20/2019 NPTI Presentation General
15/17
15
Low resistance measurements of;
• HV leads and connections
• Ground connections
• weep frequency response analysisfrom Hz to MHz
Winding resistance on small
transformers (DLRO10), < 10kVA
Microohmmeters
8/20/2019 NPTI Presentation General
16/17
16
Oil testing
Dielectric strength (OTS)
Moisture content (KF)
8/20/2019 NPTI Presentation General
17/17
17
Transformer testing tool-box from Megger!