32
November 2018 Investor Update Doris Mine and Plant

November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

November 2018 Investor Update

Doris Mine and Plant

Page 2: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Caution Regarding Forward-Looking Information

Readers are cautioned that we will be making forward-looking

comments. To fully understand the risks inherent in our comments,

forecasts and estimates you are encouraged to read our

Management Discussion and Analysis for the third quarter ended

September 30, 2018 together with our Financial Statements for the

same period.

Page 3: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Q3 Highlights – Building Momentum

• Continued Plant improvement

• Throughput of 1,385 tpd for Q3 and 1,900 tpd in October

• Q3 recovery of 80% (despite 75% in July) and 82% in October

• Gravity concentrator installation nearing completion

• Continued mine improvement

• Mine production of 1,125 tpd in Q3 and 1,975 tpd in October

• Development in Q3 to generate three production areas for Q4 –

Doris Hinge, Doris BTD, Doris Crown Pillar and one development area

in Doris Connector

• Nunavut Water Board final hearing completed in October and NIRB

issued Madrid-Boston Project Certificate in early November

• Completion of C$90 million equity offering

1

Page 4: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Strategy to Deliver Value – Driving NAVPS Growth

Establish operational excellence at Doris Mine

Plant: YE Target 2,000 tpd and 90% recovery, then push to exceed

Mine: YE Target 1,500 tpd underground with grade discipline, then push to exceed

Near-term Madrid development to provide additional ore to Doris

Hope Bay development plan: high value / prudent risk assessment

Generate discrete project returns & build infrastructure for belt-wide optionality

Value-focused exploration strategy

Grow resources at Doris to extend life

Focus Madrid drilling on highest likelihood priority production targets

Establish scale at Boston to inform infrastructure decisions

Prioritize 90+ regional exploration targets

Aggressively use flow-through financing (TMAC already has ~$800M in tax pools)

Choose and actively manage the right risks to take as a junior

producer/developer 2

Page 5: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Progress on Key Value Drivers

Q4 2017 Q3 2018 October

Plant

Recovery (%) 69 80 82

Throughput (tpd) 757 1,385 1,900

Mine

Production (tpd) 618 1,123 1,975

Grade (g/t) 9.1 8.4 7.3

Development (m) 1,500 1,800 n/a

Gold Production (oz) 21,200 33,100 10,470

Gold Poured (oz) 17,500 33,460 10,540

3

Page 6: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

0.90x

0.84x

0.73x

0.72x

0.72x

0.61x

0.55x

0.53x

0.52x

0.52x

0.44x

0.36x

0.23x

SSR Mining (SSRM)

Wesdome (WDO)

Torex (TXG)

SEMAFO (SMF)

Atlantic Gold (AGB)

TMAC (TMR)

Golden Star (GSC)

Alacer (ASR)

Roxgold (ROXG)

Pretium (PVG)

Asanko (AKG)

Argonaut (AR)

Guyana (GUY)

TMAC’s Value Proposition

Hope Bay Located in Tier One Jurisdiction

One of the World’s Highest Grade Gold Camps

Near-Term Growth from Mill Expansion and Optimization

Opportunities for NAVPS Growth Through Optimizing Development of Three Defined Mines

Unparalleled Exploration Upside to Drive Resource Growth

Production Expansion Opportunity as New Deposits Developed

Rationale For Premium Multiple Street Consensus P/NAV (Ratio)

4

Source: BMO Capital Markets

Note: Medians exclude TMAC.

1. Calculated as reserves of producing assets divided by 2019E gold equivalent production.

Mine Life Index (Years)(1)

22.019.9

15.8

11.9 11.89.8 9.6

7.3 6.8 6.7 6.2 6.04.6

PV

G

TMR

GU

Y

SSR

M

ASR

AR

AK

G

WD

O

TXG

SM

F

GSC

AG

B

RO

XG

Denotes > 50% of Gold

Reserves in Canada/USA

Overall Median: 0.54x

Canada/USA

Median: 0.78x

Page 7: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

--

0.5x

1.0x

1.5x

2.0x

Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18

Peer Range Peer Median TMAC

0.61x

0.54x

First Gold Pour

(NAVPS: C$13.76)

NAVPS: C$8.67

Processing Plant Issues

Announced

Historical Consensus P/NAV Multiple vs. Peers

5

(40%)

(20%)

--

20%

40%

60% Overall average premium until 14-Jul-17: 30.4%

Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18

Overall average discount since 10-May-18: 11.1%

Source: BMO Capital Markets

Note: TMAC peers include Alacer, Argonaut, Asanko, Atlantic Gold, Golden Star, Guyana, Pretium, Roxgold, SEMAFO, SSR Mining, Torex, and Wesdome.

Page 8: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Operations

6

Page 9: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Improving Plant Performance

7

Page 10: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Successful Ramp Up of Plant

8

Page 11: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Expansion of Gravity Effort

Grind/Flotation Feed Surge bins (2)

Remove cleaner Jigs

Move Spinners to Crushing Circuit

Falcon SB1350 (2)

KnelsonXD20 (2)

Replace Regrind Cyclones (2)

Falcon C2000 (2)

9

Page 12: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Ramp Up Doris Mine

• Mine is ramping up to targets

• High grade Hinge, BTD and Doris Crown Pillar important to Q4 and 2019 plan

• Doris BTD underexplored and highly prospective – drilling platforms being established

with exploration plan

10

Doris North Doris Connector Doris Central

Extension

East Limb

BTD Connector BTD Central

N Hinge

Crown Pillar

Doris North BTD

Planned Development

Existing Development

Mining Area Timing

Doris North

Hinge

Q4-18 to

Q2-19

Doris North

Crown PillarQ4-18

Doris North

BTD

Q4-18

Onward

Doris

Connector

Q4-18 to

Q4-20

Doris

Central

Q4-19 to

Q4-21

Doris BTD

Connector

2019

Exploration

Doris BTD

Central

2020

Exploration

Page 13: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Finance

11

Page 14: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

2018 Cash Costs and AISC (US$/oz)

Q1 2018 Q2 2018 Q3 2018

Ounces Sold 19,540 25,760 32,140

Cash Costs $1,049 $928 $825

Less: Non-Cash Inventory NRV Adjustment(2) (-) (12) (47)

Cash Costs excluding NRV adjustment $1,049 $916 $778

Corporate general and administration costs 169 132 103

Underground development 215 198 149

Site Infrastructure projects 174 104 139

All-in sustaining costs before the following $1,607 $1,350 $1,169

South dam 190 256 19

Marine outfall pipeline 10 20 131

Gravity concentrator project - 4 90

Add back: Non-Cash Inventory NRV Adjustment(2) - 12 47

AISC $1,807 $1,642 $1,456(2)The net realisable value adjustment on ore stockpiles is a non-recurring adjustment. Refer to the management discussion and analysis for the third

quarter of 2018 for further details. 12

Page 15: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

(3) AISC excluding the south dam, marine outfall pipeline, gravity concentrator project and inventory NRV adjustments - Cash Cost excluding

inventory NRV adjustments

Gold Production and Costs

(3)(3)

13

Page 16: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Key Financial Metrics

Q2 2018 Q3 2018

Gold Sold (ounces) 25,760 32,140

Revenue (C$ millions) 43.3 50.3

Realized Gold Price (US$/oz) 1,300 1,201

Cash Costs (US$/oz) 928 825

AISC (US$/oz) 1,642 1,456

Cash flow from Operating Activities (C$ millions) 14.6 6.1

EBITDA (C$ millions) 4.9 15.7

Capital Expenditures (C$ millions) 27.1 28.4

Ending Unrestricted Cash Balance(4) (C$ millions) 24.2 13.6

Debt(4) (C$ millions) 205.2 202.2(4) Excludes the impact of the net proceeds of $88.0M from equity issue closed October 3, 2018 and the payments on October 31, 2018 to reduce debt

from US$160M to US$125.8M 14

Page 17: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Exploration

15

Doris North High Grade Gold

Page 18: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

0

10

20

30

40

50

60

70

80

90

0

10

20

30

40

50

60

70

Ye

llow

kn

ife

He

mlo

Re

d L

ake

Kirkla

nd

-

Lard

er

Lake

No

ran

da

Ca

dill

ac

-Va

l-

D'O

r

Tim

min

s-

Ma

the

son

Ho

pe

Ba

y

Str

ike

Le

ng

th (

km

)

Cu

mu

lativ

e R

eso

urc

e (M

oz)

1

Cumulative Resources (M oz Au)

Strike Length (km)

?

1 “Cumulative Resource” refers to the estimated sum of historical production and current resource

estimates. Source: Metals Economics Group, Intierra, and company reports.

?

?

Hope Bay and Archean Greenstone Belts

Madrid

20 km

Doris

Boston

80 km

Measured and Indicated Resources of 17.8 Mt at

8.6 g/t gold containing 4.9 M ounces

16

Page 19: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

19

TM5015611.3 g/t Au/16.2 mIncluding 26.2 g/t Au/5.6 m

TM50168126.5 g/t Au/0.7 mAnd 38.2 g/t Au/9.7 m

TM5017216.4 g/t Au/6.5 m

• BTD Extension remains open

to the north

• BTD ramp development will

provide drill platforms for

drilling on additional ~100 m

strike to the north in 2019

Doris: Extend BTD Resources

TM50148 (Previous Hole)

261.4 g/t Au over 7.1 m

Incl. 2,710 g/t Au over 0.66 m

TM00058 (Previous Hole)

112.8 g/t Au over 1.5m

TM5017524.2 g/t Au/10.2 mAnd 57.8 g/t Au/1.5 m

-500 m

17

BTD North Resources

Indicated:

0.07 mt @ 18.3 g/t Au, 40 koz Au

Inferred:

0.20 mt @ 14.7 g/t Au, 94 koz Au 0 m

Page 20: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Doris: Expand Connector and BTD Connector

18

Proposed UG

development

Doris Connector

Production support

definition drilling

BTD Connector Resources

Indicated: 0.14 mt @ 8.4 g/t Au, 38 koz Au

Inferred: 1.06 mt @ 7.5 g/t Au, 254 koz Au

250 m

N

0 m

-500 m

BTD Connector

Infill drilling to upgrade

and expand current

resource

Connector-Central Resources

Indicated: 1.54 mt @ 9.4 g/t Au, 463 koz Au

Inferred: 0.20 mt @ 5.8 g/t Au, 38 koz Au

Open

Page 21: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

1 m

Structural

Repetition?

Development Face

Doris North

BTD

Regional

500 m

Mine-Regional Scale Structural Patterns

Possible Structural Repetition of Stratigraphy?

25 m

Doris Regional: Lateral Near-Mine Extension

W E

W E

W E

Production Scale

Mine Scale

Quartz Vein

Doris BTD

Theoretical Structural Pattern

19

Page 22: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

22

TM003817.4 g/t Au/65.7 mIncluding 14.4 g/t Au/26.1 m

TM0039217.1 g/t Au/1.5 mAnd 12.6 g/t Au/15.5 m

Naartok West

Naartok East

High Grade

Plunge

W E

• 44 drillholes completed in 2018 drill

program

• Focused above 150 metre level,

within and below the Naartok West

crown pillar recovery area

• Confirmed the plunge and

continuity within wide, high grade

core

Madrid: Naartok West Advancing to Development

0 m

-500 m

20

Naartok Resources (West and East)

Indicated:

7.44 mt @ 7.5 g/t Au, 1.8 Moz Au

Inferred:

1.12 mt @ 6.8 g/t Au, 0.2 Moz Au

TM003966.6 g/t Au/42.2 mIncluding 32.9 g/t Au/5.0 m

Page 23: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

23

N S

TM0042210.4 g/t Au/9.6 m

TM004344.9 g/t Au/29.5 mIncluding 10.9 g/t Au/10.5 m

• 31 drillholes completed in 2018 drill

program

• Materially added Au ozs within the

crown pillar, not previously

identified with the wide spaced

historical drilling

• Potential opportunity to add Au ozs

within the crown pillar in 2019 with

additional drilling

Madrid: Naartok East Advancing to Development

Structural Trend

TM004434.9 g/t Au/27.6 mIncluding 12.9 g/t Au/5.5 m

0 m

-500 m

TM0044111.0 g/t Au/12.5 m

21

Naartok Resources (West and East)

Indicated:

7.44 mt @ 7.5 g/t Au, 1.8 Moz Au

Inferred:

1.12 mt @ 6.8 g/t Au, 0.2 Moz Au

Page 24: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Naartok

East

Naartok

West

RandSuluk

Crown Pillar Beneath Patch Lake

Indicated

Inferred

Inferred

Madrid: Suluk Zone Advancing to Development

250 m

N

0 m

-500 m

• Potential for 2019 winter drill program from ice to increase and upgrade

mineral resources as well as supporting metallurgical testwork22

Suluk Resources

Indicated: 3.20 mt @ 7.7 g/t Au, 0.8 Moz Au

Inferred: 2.58 mt @ 6.3 g/t Au, 0.5 Moz Au

Page 25: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Doris

Madrid

Au > 10 g/t High Resolution

Gravity Image1st order

Structure

2nd order

Structure

Gold

Deposit

Pogey

Kamik

North Doris

Quaqtuq

Dinger

Gunn

Madrid Regional: Establish

New Economic Deposits

23

• > 25 Years of modern exploration

• 4 owners

• > 1 million metres of historic drilling, more than 95% on established

deposits

• Enormous amount of high quality data available

• >90 Exploration targets identified

Exploration Datasets

Airborne geophysics Geological mapping

Magnetic Outrcrop sampling

Electro-Magnetic Gold in glacial till sampling

High resolution gravity gradiometry Diamond drilling

Ground geophysics RC drilling

Magnetic

Induced polarization

Seismic

Page 26: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

11SBD411A

12.46m @ 10.16 g/t12.38m @ 10.62 g/t2.7m @ 16.1 g/t

94NOD118

9.1m @ 16 g/t

93NOD047

2.5m @ 238 g/t

S00243

5.7m @ 35.1 g/t

B3/Newton

Intersection

N SB2 Zone

250 m

-50m

-100m

-200m

-300m

-400m

-500m

11SBD414

7.1m @ 28.5 g/t4.8m @ 17.3 g/t7.8m @46.6 g/t

S04-322

3.7m @ 36.3 g/t

Boston: Increase Resource Scale

24

Significant Growth Potential of Established Deposit

High Priority Regional Targets

Boston ResourcesIndicated: 3.7 Mt @ 9.2 g/t Au

1,096,000 ozs Au

Inferred: 1.4 Mt @ 7.4 g/t Au

330,000 ozs Au

1 Km

Boston Deposit

Alteration Trend

N

25.6 g/t Au/1.2m

37.5 g/t Au/1.0m

> 10 g/t Au

Surface Sample

Page 27: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

• Complete gravity enhancement in Plant and deliver 90% recovery

• Continue to build on successes of increasing plant throughput

• Feed the Plant

• Take advantage of three production areas and one development

area to continue ramp up of Doris mine production

• Deliver plan for development of Madrid, including 2019 ore

• Scope tactical 2019 exploration plan to support near-term production

and ongoing belt-wide development

• Secure Water Licences by Q1 2019 now that Madrid-Boston Project

Certificate secured from NIRB

• Advance analysis of optimized Hope Bay Belt development

Near-Term Priorities

25

Page 28: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Appendices

26

Page 29: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Mineral Reserves (as at June 30, 2017)

Category/Deposit Tonnes(t 000)

Grade(g/t Au)

Contained Au(oz 000)

Proven

Doris 493 15.8 250

Boston 657 8.5 180

Total Proven 1,150 11.6 430

Probable

Doris 1,652 8.3 442

Madrid North 8,350 6.7 1,802

Madrid South 692 10.3 230

Boston 2,687 8.1 703

Total Probable 13,381 7.4 3,177

Total P & P

Doris 2,145 10.0 692

Madrid North 8,350 6.7 1,802

Madrid South 692 10.3 230

Boston 3,343 8.2 883

Total P & P 14,531 7.7 3,607

27

Page 30: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Mineral Resources (as at June 30, 2017)

Category/Deposit Tonnes(t 000)

Grade(g/t Au)

Contained Au(oz 000)

Measured

Doris 281 22.9 207

Boston 608 10.3 201

Total Measured 889 14.3 408

Indicated

Doris 1,838 9.6 567

Madrid North 11,443 7.5 2,759

Madrid South 571 15.4 282

Boston 3,103 9.0 895

Total Indicated 16,954 8.3 4,503

Total M&I 17,843 8.6 4,911

Inferred

Doris 1,521 8.2 400

Madrid North 4,125 6.4 843

Madrid South 420 9.0 122

Boston 1,393 7.4 330

Total Inferred 7,459 7.1 1,69428

Page 31: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Information Regarding Scientific and

Technical Information

• Notes:

• CIM definitions were followed for Mineral Reserves and Mineral Resources.

• Numbers may not add due to rounding.

• Mineral Reserves are estimated using a cut-off grade of 4.4 g/t for Doris and Madrid North. Madrid

South and Boston use a 4.7 g/t Au cut-off grade.

• Mineral Reserves are estimated using an average long-term gold price of US$1250 per ounce and a

US$/C$ exchange rate of 0.85.

• A minimum mining width of 1.5 metres for longhole mining and 3 metres for Drift and Fill mining was

used.

• Density was calculated using the geological block model density field.

• A 95% extraction factor was applied to longhole mining.

• The application of dilution varied by deposit, and depended on stope thickness.

• Mineral Resources are estimated at a cut-off grade of 4.0 g/t Au for Doris and Madrid North, and 4.5 g/t

Au for Madrid South and Boston.

• Mineral Resources are estimated using a long-term gold price of US$1400 per ounce, and a US$/C$

exchange rate of 0.85.

• A minimum mining width of approximately 1.5 metres was used.

• A 50 metre crown pillar allowance was applied to resources located below lakes.

• Doris North has been depleted based on surveyed mining cavities up to the end of May 2017. For the

month of June 2017, a mathematical depletion was used based on production figures and the

average dilution used for the Mineral Reserve estimate for Doris North.

• Mineral Resources are inclusive of those resources converted to Mineral Reserves.

• Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. 29

Page 32: November 2018 Investor Update...2018/11/15  · 0.5x 1.0x 1.5x 2.0x Jun-16 Aug-16 Oct-16 Dec-16 Feb-17 Apr-17 Jun-17 Aug-17 Oct-17 Dec-17 Feb-18 Apr-18 Jun-18 Aug-18 Oct-18 Peer Range

Information Regarding Scientific and

Technical Information

• Several slides reported drill intervals representing down-hole thickness;

true width varies depending on the dip of the drill hole. True widths are

estimated to be approximately 50% to 85% of down hole widths.

Composite intervals are based on geological observations. Gold values

used to calculate composite intervals are uncut.

• Reported historical drill hole intersections have been obtained from

TMAC Resources’ Hope Bay Drillhole Database which has been

independently validated by Roscoe Postle Associates Inc (“RPA”) and

reported in Section 12 - Data Verification of the “Technical Report on the

Hope Bay Project Nunavut, Canada” dated May 28th, 2015.

• Please refer to the news published June 14, 2018 and November 8, 2018

which are both available from TMAC’s website at

www.tmacresources.com for the complete text of the releases covering

the results of this work.

30