Scope of Services Template2.7 Signalization (Activities 21 &
22) __________________________________37 2.8 Lighting (Activities
23 & 24) (Not applicable to this project)_____________38 2.9
Landscape Architecture (Activities 25 & 26) (Not applicable to
this project) 38 2.10 Survey (Activity 27) (optional services)
_____________________________38 2.11 Photogrammetry (Activity 28)
(Not applicable to this project) ____________38
2.12 Mapping (Activity 29) (optional services)
____________________________38 2.13 Terrestrial Mobile LiDAR
(Activity 30) (Not applicable to this project) ____38
2.14 Architecture (Activity 31)
________________________________________38 2.15 Noise Barriers
(Activity 32) (Not applicable to this project)
______________39
2.16 Intelligent Transportation Systems (Activities 33 & 34)
(Not applicable for this
project) _______________________________________________________39
2.18 3D Modeling (Activity 36) (Not applicable to this project)
______________39
2. 21 Provisions for Work
_____________________________________________40 2. 22 Services to
be Performed by the DEPARTMENT When appropriate and /or
available, the DEPARTMENT will provide project data including:
________46
3 PROJECT COMMON AND PROJECT GENERAL TASKS _______________47
Project Common Tasks
________________________________________________47 Project General
Tasks _________________________________________________49 3.1
Public Involvement
_____________________________________________50
3.1.1 Community Awareness Plan
______________________________________50 3.1.2 Notifications
___________________________________________________50 3.1.3
Preparing Mailing Lists
__________________________________________50
3.1.4 Median Modification Letters (Not applicable to this project)
_____________50 3.1.5 Driveway Modification Letters (Not applicable
to this project) ___________50 3.1.6 Newsletters (Not applicable to
this project) ___________________________50 3.1.7 Renderings and
Fly-Throughs _____________________________________50 3.1.8
PowerPoint Presentations
_________________________________________51
3.1.9 Public Meeting Preparations
______________________________________51
3.1.10 Public Meeting Attendance and Follow-up
___________________________51
3.1.11 Other Agency Meetings
__________________________________________51 3.1.12 Web Site (Not
applicable to this project) _____________________________51 3.2
Joint Project Agreements (optional services)
_________________________51 3.3 Specifications Package Preparation
(optional services) _________________51 3.4 Contract Maintenance
and Project Documentation _____________________52 3.5 Value
Engineering (Multi-Discipline Team) Review (Not applicable to
this
project)
_______________________________________________________52
A-3
3.6 Prime Consultant Project Manager Meetings (Not applicable to
this project) 52
3.7 Plans Update
__________________________________________________52
3.12 Landscape and Existing Vegetation Coordination (optional
services) ______53 3.13 Other Project General Tasks
______________________________________53
4 ROADWAY ANALYSIS ______________________________________________53
4.1 Typical Section Package (optional services)
__________________________53 4.2 Pavement Type Selection Report
(Not applicable to this project) __________54
4.3 Pavement Design Package (optional services)
________________________54 4.4 Cross-Slope Correction (Not
applicable to this project) _________________54
4.5 Horizontal/Vertical Master Design Files
_____________________________54 4.6 Access Management (Not
applicable to this project) ___________________54
4.7 Roundabout Evaluation (Not applicable to this project)
_________________54 4.8 Roundabout Final Design Analysis (Not
applicable to this project) ________54 4.9 Cross Section Design
Files (Not applicable to this project) ______________54
4.10 Traffic Control Analysis
_________________________________________54 4.11 Master TCP Design
Files (optional services) _________________________55
4.12 Selective Clearing and Grubbing (Not applicable to this
project) __________55 4.13 Tree Disposition Plans (Not applicable
to this project) __________________55 4.14 Design Variations and
Exceptions (optional services) __________________55
4.15 Design Report (Not applicable to this project)
________________________55
4.16 Quantities
_____________________________________________________55 4.17 Cost
Estimate __________________________________________________55 4.18
Technical Special Provisions and Modified Special Provisions
___________55
4.19 Other Roadway Analyses (Not applicable to this project)
________________55 4.20 Field Reviews
__________________________________________________55
4.21 Monitor Existing Structures (Not applicable to this project)
______________56
4.22 Technical Meetings
_____________________________________________56 4.23 Quality
Assurance/Quality Control _________________________________56 4.24
Independent Peer Review (Not applicable to this
project)________________56 4.25 Supervision
____________________________________________________56 4.26
Coordination
___________________________________________________56
5 ROADWAY PLANS
_________________________________________________56
5.2 Summary of Pay Items Including Quantity Input
______________________56 5.3 Typical Section Sheets (optional
services) ___________________________56 5.4 General Notes/Pay Item
Notes (optional services) _____________________56 5.5 Summary of
Quantities Sheets (optional services) _____________________56 5.6
Project Layout (Not applicable to this project)
________________________56 5.7 Plan/Profile Sheet (Not applicable
to this project) ______________________56 5.8 Profile Sheet (Not
applicable to this project) __________________________56
A-4
5.10 Special Profile (Not applicable to this project)
________________________56
5.11 Back-of-Sidewalk Profile Sheet (Not applicable to this
project) ___________56 5.12 Interchange Layout Sheet (Not
applicable to this project)________________56 5.13 Ramp Terminal
Details (Plan View) (Not applicable to this project) _______56 5.14
Intersection Layout Details (Not applicable to this project)
______________56 5.15 Special Details (Not applicable to this
project) ________________________57
5.16 Cross-Section Pattern Sheet(s) (Not applicable to this
project) ____________57 5.17 Roadway Soil Survey Sheet(s) (Not
applicable to this project) ____________57 5.18 Cross Sections (Not
applicable to this project) ________________________57 5.19
Temporary Traffic Control Plan Sheets (optional services)
______________57 5.20 Temporary Traffic Control Cross Section
Sheets (optional services) _______57
5.21 Temporary Traffic Control Detail Sheets (optional services)
_____________57
5.22 Utility Adjustment Sheets (optional services)
_________________________57 5.23 Selective Clearing and Grubbing
Sheet(s) (Not applicable to this project) ___57
5.24 Tree Disposition Plan Sheet(s) (Not applicable to this
project) ____________57
5.25 Project Network Control Sheet(s) (optional services)
___________________57 5.26 Environmental Detail Sheets (Not
applicable to this project) _____________57 5.27 Utility
Verification Sheet(s) (SUE Data) (optional services)
_____________57
5.28 Quality Assurance/Quality Control
_________________________________57 5.29 Supervision
____________________________________________________57
6a DRAINAGE ANALYSIS and tasks 6a.1 – 6a.25 are not applicable for
this
project._____________________________________________________________57
6a.1 Drainage Map Hydrology
________________________________________57
6a.3 Pond Siting Analysis and Report
___________________________________58 6a.4 Design of Cross Drains
__________________________________________58 6a.5 Design of Ditches
_______________________________________________58
6a.6 Design of Stormwater Management Facility (Offsite or Infield
Pond) ______58 6a.7 Design of Stormwater Management Facility
(Roadside Treatment Swales and
Linear Ponds)
__________________________________________________58
6a.12 Drainage Wells
_________________________________________________59
A-5
6b DRAINAGE PLANS and tasks 6b.1 – 6b.14 are not applicable for
this project. 60 6b.1 Drainage Map (Including Interchanges)
_____________________________60 6b.2 Bridge Hydraulics
Recommendation Sheets __________________________60 6b.3 Summary of
Drainage Structures ___________________________________60 6b.4
Optional Pipe/Culvert Material
____________________________________61
6b.5 Drainage Structure Sheet(s) (Per Structure)
___________________________61 6b.6 Miscellaneous Drainage Detail
Sheets _______________________________61
6b.7 Lateral Ditch Plan/Profile
________________________________________61 6b.8 Lateral Ditch Cross
Sections ______________________________________61
6b.9 Retention/Detention Pond Detail Sheet(s)
____________________________61 6b.10 Retention Pond Cross Sections
____________________________________61 6b.11 Erosion Control Plan
Sheet(s) _____________________________________61
6b.12 SWPPP Sheet(s)
________________________________________________61 6b.13 Quality
Assurance/Quality Control _________________________________61
6b.14 Supervision
____________________________________________________61
7.2 Identify Existing Utility Agency Owner(s) (optional services)
____________61
7.3 Make Utility Contacts (optional services)
____________________________61 7.4 Exception Processing (Not
applicable for this project) __________________62 7.5 Preliminary
Utility Meeting _______________________________________62
7.6 Individual/Field Meetings
________________________________________62 7.7 Collect and Review
Plans and Data from UAO(s) _____________________62 7.8
Subordination of Easements Coordination (Not applicable for this
project) _63
7.9 Utility Design Meeting
___________________________________________63 7.10 Review Utility
Markups & Work Schedules and Processing of Schedules
&
Agreements ___________________________________________________63
7.11 Utility Coordination/Follow-up
____________________________________63 7.12 Utility
Constructability Review
____________________________________63
7.13 Additional Utility Services (Not applicable for this project)
______________64
7.14 Processing Utility Work by Highway Contractor (UWHC) (Not
applicable for
this project)____________________________________________________64
7.15 Contract Plans to UAO(s)
________________________________________64 7.16
Certification/Close-Out
__________________________________________64 7.17 Other Utilities
(Not applicable for this project) ________________________64
A-6
CLEARANCES
_____________________________________________________64
8.1 Preliminary Project Research (Not applicable for this project)
____________65 8.2 Field Work (Not applicable for this project)
__________________________65 8.3 Agency Verification of Wetland
Data (Not applicable for this project) _____65 8.4 Complete and
Submit All Required Permit Applications ________________65 8.4.1
Complete and Submit all Required Wetland Permit Applications
(Not
applicable for this project)
________________________________________65 8.4.2 Complete and
Submit all Required Species Permit Applications __________65 8.5
Coordinate and Review Dredge and Fill Sketches (Not applicable for
this
project) _______________________________________________________65
8.6 Prepare USCG Permit Application
_________________________________65
8.7 Prepare Water Management District or Local Water Control
District Right of
Way Occupancy Permit Application ________________________________65
8.8 Prepare Coastal Construction Control Line (CCCL) Permit
Application (Not
applicable for this project)
________________________________________66
8.9 Prepare Tree Permit Information (Not applicable for this
project) _________66 8.10 Compensatory Mitigation Plan (Not
applicable for this project) ___________66 8.11 Mitigation
Coordination and Meetings (Not applicable for this project)
____66
8.12 Other Environmental Permits (Not applicable for this project)
____________66 8.13 Technical Support to the DEPARTMENT for
Environmental Clearances, and
Re-evaluations (Not applicable for this project)
_______________________66 8.14 Preparation of Environmental
Clearances and Reevaluations (Not applicable
for this project)
_________________________________________________67
8.17 Technical Meetings
_____________________________________________68 8.18 Quality
Assurance/Quality Control _________________________________68
8.19 Supervision
____________________________________________________68 8.20
Coordination
___________________________________________________68
9 STRUCTURES - SUMMARY AND MISCELLANEOUS TASKS AND
DRAWINGS ________________________________________________________68
9.1 Key Sheet and Index of Drawings
__________________________________68 9.2 Project Layout (Not
applicable for this project) _______________________68 9.3 General
Notes and Bid Item Notes__________________________________68 9.4
Miscellaneous Common Details (Not applicable for this project)
__________69
9.5 Incorporate Report of Core Borings (Not applicable for this
project) _______69
9.6 Standard Plans- Bridges
__________________________________________69
9.7 Existing Bridge Plans
____________________________________________69 9.8 Assemble Plan
Summary Boxes and Quantities _______________________69 9.9 Cost
Estimate __________________________________________________69 9.10
Technical Special Provisions and Modified Special Provisions
___________69 9.11 Field Reviews
__________________________________________________69
9.12 Technical Meetings
_____________________________________________69 9.13 Quality
Assurance/Quality Control _________________________________69
A-7
9.14 Independent Peer Review (Not applicable for this project)
_______________69
9.15 Supervision
____________________________________________________69
9.16 Coordination
___________________________________________________69
10.3 Ship Impact Criteria (Not applicable for this project)
___________________69 Superstructure Alternatives
_____________________________________________69 10.4 Short Span
Concrete (Not applicable for this project) ___________________69
10.5 Medium-Span Concrete
__________________________________________69 10.6 Long Span
Concrete (Not applicable for this project)
___________________69
10.7 Structural Steel
_________________________________________________69 Foundation and
Substructure Alternatives and tasks 10.8 – 10.10 are not applicable
for
this project.
____________________________________________________70 10.8
Pier/Bent (Not applicable for this project)
____________________________70
10.9 Shallow Foundations / GRS Abutments (Not applicable for this
project) ____70 10.10 Deep Foundations (Not applicable for this
project) _____________________70 Movable Span
_______________________________________________________70
10.11 Data Collection and Design Criteria (Not applicable for this
project)_______70 10.12 Movable Span Geometrics and Clearances
___________________________70
10.13 Deck System Evaluation (Not applicable for this
project)________________70 10.14 Framing Plan Development (Not
applicable for this project) _____________70 10.15 Main Girder
Preliminary Design (Not applicable for this project)
_________70
10.16 Conceptual Span Balance/Counterweight (Not applicable for
this project) __70
10.17 Support System Development (Not applicable for this project)
___________70 10.18 Drive Power Calculations
________________________________________70 10.19 Drive System
Development _______________________________________70
10.20 Power and Control Development
___________________________________70 10.21 Conceptual Pier Design
(Not applicable for this project) ________________70
10.22 Foundation Analysis (FL PIER) (Not applicable for this
project) __________70
10.23 Tender Visibility Study
__________________________________________70 Other BDR Issues
_____________________________________________________70 10.24
Aesthetics _____________________________________________________70
10.25 TCP/Staged Construction Requirements
_____________________________70 10.26 Constructability Requirements
_____________________________________70
10.27 Load Rating for Damaged/Widened Structures
________________________70
10.28 Quantity and Cost Estimates
______________________________________70
10.29 Quantity and Cost Estimates - Movable Span
_________________________71 10.30 Wall Type Justification (Not
applicable for this project)_________________71 Report Preparation
____________________________________________________71 10.31
Exhibits ______________________________________________________71
10.32 Exhibits - Movable Span
_________________________________________71
10.33 Report Preparation
______________________________________________71 10.34 Report
Preparation - Movable Span
_________________________________71
A-8
11 STRUCTURES - TEMPORARY BRIDGE and tasks 11.1 – 11.8 are
not
applicable for this project.
_____________________________________________71 General Layout
Design and Plans ________________________________________71 11.1
Overall Bridge Final Geometry
____________________________________71 11.2 General Plan and
Elevation _______________________________________71 11.3
Miscellaneous Details
___________________________________________71
End Bent Design and Plans
_____________________________________________71 11.4 End Bent
Structural Design _______________________________________71 11.5
End Bent Details _______________________________________________71
Intermediate Bent Design and Plans and tasks 11.6 – 11.7 are not
applicable for this
project.
_______________________________________________________71
Miscellaneous Substructure Design and Plans
_______________________________71 11.8 Foundation Layout
______________________________________________72
12 STRUCTURES - SHORT SPAN CONCRETE BRIDGE and tasks 12.1 –
12.28
are not applicable for this project.
______________________________________72 General Layout Design and
Plans ________________________________________72
12.1 Overall Bridge Final Geometry
____________________________________72 12.2 Expansion/Contraction
Analysis (Not applicable for this project) _________72
12.3 General Plan and Elevation
_______________________________________72 12.4 Construction Staging
____________________________________________72 12.5 Approach Slab
Plan and Details ____________________________________72
12.6 Miscellaneous Details
___________________________________________72
12.9 End Bent Plan and Elevation
______________________________________72 12.10 End Bent Details
_______________________________________________72 Intermediate Bent
Design and Plans ______________________________________72
12.11 Bent Geometry
_________________________________________________72 12.12 Bent
Stability Analysis ___________________________________________72
12.13 Bent Structural Design
___________________________________________72 12.14 Bent Plan and
Elevation __________________________________________72 12.15 Bent
Details ___________________________________________________72
Miscellaneous Substructure Design and Plans and task 12.16 is not
applicable for this
project.
_______________________________________________________72
A-9
Prestressed Slab Unit Bridges
___________________________________________73
12.22 Prestressed Slab Unit Design
______________________________________73 12.23 Prestressed Slab
Unit Layout ______________________________________73 12.24
Prestressed Slab Unit Details and Schedule
___________________________73 12.25 Deck Topping Reinforcing Layout
_________________________________73 12.26 Superstructure Sections
and Details _________________________________73
Reinforcing Bar Lists
__________________________________________________73 12.27
Preparation of Reinforcing Bar List
_________________________________73 Load Rating
_________________________________________________________73 12.28
Load Rating
___________________________________________________73
13 STRUCTURES - MEDIUM SPAN CONCRETE BRIDGE (optional services)
__73
General Layout Design and Plans
________________________________________73 13.1 Overall Bridge
Final Geometry (Not applicable for this project) __________73
13.2 Expansion/Contraction Analysis (Not applicable for this
project) _________73 13.3 General Plan and Elevation (optional
services) ________________________73
13.4 Construction Staging (Not applicable for this project)
__________________73 13.5 Approach Slab Plan and Details (optional
services) ____________________73 13.6 Miscellaneous Details
(optional services) ____________________________73
End Bent Design and Plans and tasks 13.7 – 13.11 are not applicable
for this project.73 13.7 End Bent Geometry
_____________________________________________74
13.8 Wingwall Design and Geometry
___________________________________74 13.9 End Bent Structural
Design _______________________________________74 13.10 End Bent
Plan and Elevation ______________________________________74
13.11 End Bent Details
_______________________________________________74
Intermediate Bent Design and Plans and tasks 13.12 – 13.16 are not
applicable for this
project. _______________________________________________________74
13.12 Bent Geometry
_________________________________________________74
13.15 Bent Plan and Elevation
__________________________________________74
13.16 Bent Details
___________________________________________________74 Pier Design
and Plans and tasks 13.17 – 13.21 are not applicable for this
project. ___74 13.17 Pier Geometry
_________________________________________________74 13.18 Pier
Stability Analysis ___________________________________________74
13.19 Pier Structural Design
___________________________________________74
13.20 Pier Plan and Elevation
__________________________________________74
13.21 Pier Details
____________________________________________________74
Miscellaneous Substructure Design and Plans and task 13.22 are not
applicable for this
project. _______________________________________________________74
13.22 Foundation Layout
______________________________________________74 Superstructure
Deck Design and Plans (optional services) _____________________74
13.23 Finish Grade Elevation (FGE) Calculation
___________________________74
13.24 Finish Grade Elevations
__________________________________________74 13.25 Bridge Deck
Design (optional services) _____________________________74
A-10
13.27 Diaphragm Design
______________________________________________75
13.28 Superstructure Plan (optional services)
______________________________75 13.29 Superstructure Section
(optional services)____________________________75 13.30
Miscellaneous Superstructure Details (optional services)
________________75 Reinforcing Bar Lists (optional services)
__________________________________75 13.31 Preparation of
Reinforcing Bar List (optional services) _________________75
Continuous Concrete Girder Design and tasks 13.32 – 13.48 are not
applicable for this
project. _______________________________________________________75
13.32 Section
Properties_______________________________________________75 13.33
Material Properties
______________________________________________75 13.34 Construction
Sequence ___________________________________________75
13.38 Time Dependent Analysis
________________________________________75
13.39 Stress Summary
________________________________________________75 13.40 Ultimate
Moments ______________________________________________75 13.41
Ultimate Shear
_________________________________________________75
13.42 Construction Loading
____________________________________________75 13.43 Framing Plan
__________________________________________________75
13.44 Girder Elevation, including Grouting Plan and Vent Locations
___________75 13.45 Girder Details
__________________________________________________75 13.46 Erection
Sequence ______________________________________________75
13.47 Splice Details
__________________________________________________75 13.48 Girder
Deflections and Camber ____________________________________75
Simple Span Concrete Design and tasks 13.49 – 13.51 are not
applicable for this
project.
_______________________________________________________76
13.51 Framing Plan
__________________________________________________76 Beam Stability
and task 13.52 is not applicable for this project.
_________________76 13.52 Beam/Girder Stability
___________________________________________76
Bearing and tasks 13.53 – 13.54 are not applicable for this
project. ______________76 13.53 Bearing Pad and Bearing Plate
Design ______________________________76 13.54 Bearing Pad and
Bearing Plate Details ______________________________76
Load Rating
_________________________________________________________76 13.55
Load Ratings
__________________________________________________76
14.4 Construction Staging(optional services)
_____________________________76 14.5 Approach Slab Plan and
Details(optional services) _____________________76
A-11
14.6 Miscellaneous Details(optional services)
____________________________76
End Bent Design and Plans and tasks 14.7 – 14.11 are not applicable
for this project.76
14.7 End Bent Geometry (Not applicable for this project)
___________________76 14.8 Wingwall Design and Geometry (Not
applicable for this project) _________76 14.9 End Bent Structural
Design (Not applicable for this project) _____________77 14.10 End
Bent Plan and Elevation (Not applicable for this project)
____________77 14.11 End Bent Details (Not applicable for this
project) ______________________77
Intermediate Bent Design and Plans and tasks 14.12 – 14.16 are not
applicable for this
project. _______________________________________________________77
14.12 Bent Geometry (Not applicable for this project)
_______________________77 14.13 Bent Stability Analysis (Not
applicable for this project) _________________77 14.14 Bent
Structural Design (Not applicable for this project)
_________________77
14.15 Bent Plan and Elevation (Not applicable for this project)
________________77
14.16 Bent Details (Not applicable for this project)
_________________________77 Pier Design and Plans and tasks 14.17 –
14.21 are not applicable for this project. ___77
14.17 Pier Geometry (Not applicable for this project)
________________________77
14.18 Pier Stability Analysis (Not applicable for this project)
_________________77 14.19 Pier Structural Design (Not applicable
for this project)__________________77 14.20 Pier Plan and Elevation
(Not applicable for this project) ________________77
14.21 Pier Details (Not applicable for this project)
__________________________77 Miscellaneous Substructure Design and
Plans and task 14.22 are not applicable for this
project. _______________________________________________________77
14.22 Foundation Layout (Not applicable for this project)
____________________77 Superstructure Deck Design and Plans
(optional services) _____________________77
14.23 Finish Grade Elevation (FGE) Calculation (optional services)
____________77 14.24 Finish Grade Elevations (optional services)
__________________________77
14.25 Bridge Deck Design (optional services)
_____________________________77 14.26 Bridge Deck Reinforcing and
Concrete Quantities (optional services) ______77
14.27 Superstructure Plan (optional services)
______________________________77 14.28 Superstructure Section
(optional services)____________________________77
14.29 Miscellaneous Bridge Deck Details (optional services)
_________________78 Reinforcing Bar Lists (optional services)
__________________________________78 14.30 Preparation of
Reinforcing Bar List (optional services) _________________78
Structural Steel Plate Girder Design and tasks 14.31 – 14.44 are
not applicable for this
project. _______________________________________________________78
14.31 Unit Modeling
_________________________________________________78
14.34 Cross-frame Design
_____________________________________________78 14.35 Connections
___________________________________________________78 14.36 Bearing
Assembly Design and Detailing (With Jacking Analysis) _________78
14.37 Splice Design
__________________________________________________78 14.38 Shear
Stud Connectors ___________________________________________78
14.39 Deflection Analysis
_____________________________________________78 14.40 Framing Plan
__________________________________________________78 14.41 Girder
Elevation ________________________________________________78
A-12
14.43 Splice Details
__________________________________________________78
14.44 Girder Deflections and Camber
____________________________________78 Structural Steel Box Girder
Design and tasks 14.45 – 14.59 are not applicable for this
project. _______________________________________________________78
14.45 Unit Modeling
_________________________________________________78 14.46 Section
Design _________________________________________________78
14.52 Splice Design
__________________________________________________79
14.55 Framing Plan
__________________________________________________79
14.59 Girder Deflections and Camber
____________________________________79 Erection Scheme and tasks
14.60 – 14.61 are not applicable for this project. _______79
14.60 Erection Scheme Analysis
________________________________________79 14.61 Erection
Scheme________________________________________________79 Load
Rating
_________________________________________________________79
14.62 Load Rating
___________________________________________________79
are not applicable for this project.
______________________________________79 General Layout Design and
Plans ________________________________________79
15.1 Final Bridge Geometry
___________________________________________79 15.2 Casting Geometry
Calculation _____________________________________79
15.3 Finish Grade Geometry
Calculation_________________________________79
15.4 Finish Grade Elevations
__________________________________________79 15.5 Construction
Schedule ___________________________________________79 15.6 General
Plan and Elevation _______________________________________79 15.7
Approach Slab Plan and Details
____________________________________79 15.8 Miscellaneous Details
___________________________________________80
15.9 Existing Bridge Plans
____________________________________________80
End Bent Design and Plans
_____________________________________________80
15.10 End Bent Geometry
_____________________________________________80 15.11 Wingwall
Geometry and Design ___________________________________80 15.12 End
Bent Structural Design _______________________________________80
15.13 End Bent Plan and Elevation
______________________________________80 15.14 End Bent Details
_______________________________________________80
Pier Design and Plans
_________________________________________________80 15.15 Pier
Geometry _________________________________________________80
A-13
15.18 Pier Structural Design
___________________________________________80 15.19 Pier Plan and
Elevation __________________________________________80 15.20 Pier
Details ____________________________________________________80
Miscellaneous Substructure Design and Plans
_______________________________80 15.21 Foundation Layout
______________________________________________80
Longitudinal Analysis
_________________________________________________80 15.22 Section
Properties_______________________________________________80 15.23
Material Properties
______________________________________________80 15.24 Superimposed
Dead Loads ________________________________________80 15.25
Construction Sequence
___________________________________________80
15.26 Tendon Layouts
________________________________________________80
15.29 Time Dependent Analysis
________________________________________81
15.30 Stress Summary
________________________________________________81 15.31 Ultimate
Moments ______________________________________________81 15.32
Ultimate Shear
_________________________________________________81
15.33 Construction Loading
____________________________________________81 Transverse Analysis
___________________________________________________81
15.37 Stress Summary
________________________________________________81 15.38 Ultimate
Moments ______________________________________________81
15.39 Construction Loading
____________________________________________81 Superstructure
Design _________________________________________________81
15.40 Typical
Segment________________________________________________81 15.41
Pier Segment
__________________________________________________81
15.45 Bearings
______________________________________________________81 15.46
Expansion Joints _______________________________________________81
15.47 Special Analysis
________________________________________________81
Superstructure Plans
___________________________________________________81 15.48 Typical
Sections ________________________________________________81
15.54 Expansion Joint Segments
________________________________________82 15.55 CIP Closure Joint
Details _________________________________________82 15.56 Casting
Geometry_______________________________________________82
A-14
Post-Tensioning Details
________________________________________________82
15.67 Erection Sequence and Details
_____________________________________82
15.68 Access Opening Details
__________________________________________82 15.69 Bearings
______________________________________________________82
15.70 Expansion Joints
_______________________________________________82
Reinforcing Bar Lists
__________________________________________________83 15.76
Preparation of Reinforcing Bar Lists
________________________________83 Load Rating
_________________________________________________________83
15.77 Load Rating (LRFR)
____________________________________________83
16 STRUCTURES - MOVABLE SPAN (optional services)
____________________83 Final Design Bascule Pier (optional
services) _______________________________83 16.1 Pier Deck (Not
applicable for this project) ___________________________83
16.2 Leaf/Pier Clearance Diagrams (Not applicable for this project)
___________83 16.3 Load Shoe Columns (Not applicable for this
project) ___________________83
16.4 Trunnion Columns (Not applicable for this project)
____________________83
16.5 Foundations (optional services)
____________________________________83 16.6 Footing (Not applicable
for this project) _____________________________83 16.7 Seal (Not
applicable for this project) ________________________________83
16.8 Back Wall (Approach Span Bearings) Closed Piers only (Not
applicable for
this
project)____________________________________________________83
16.9 Bascule Pier Deck Elevations (Not applicable for this project)
____________83
Bascule Pier Dimensions – Detailing (optional services)
______________________83
16.10 Pier Plan Views (optional services)
_________________________________83 16.11 Pier Elevations Views
(optional services) ____________________________83 16.12 Pier
Sections (optional services) ___________________________________83
Bascule Pier Reinforcing Details (optional services)
_________________________83 16.13 Pier Reinforcing (optional
services) ________________________________84
Bascule Pier Miscellaneous Details (optional services)
_______________________84 16.14 Pier Barrier Details (optional
services) ______________________________84
A-15
16.16 Handrail Details (optional
services)_________________________________84
16.17 Ladder and Hatch Details (Not applicable for this project)
_______________84 16.18 Pier Equipment (optional services)
_________________________________84 16.19 Bascule Pier Notes and
Summary of Quantities (Not applicable for this project)84 16.20
Miscellaneous Details (optional services)
____________________________84 Bascule Leaf Design (optional
services) ___________________________________84
16.21 Deck Design (Not applicable for this project)
_________________________84 16.22 Sidewalk Design (optional
services) ________________________________84 16.23 Stringer Design
(optional services) _________________________________84 16.24
Typical Floorbeam Design (Not applicable for this project)
______________84 16.25 End Floorbeam Design (Not applicable for
this project) _________________84
16.26 Deep Floorbeam Design (Not applicable for this project)
________________84
16.27 Sidewalk Bracket Design (optional services)
_________________________84 16.28 Roadway Bracket Design (Not
applicable for this project) _______________84
16.29 Main Girder Influence Lines (Not applicable for this project)
____________84
16.30 Main Girder Design (Not applicable for this project)
___________________84 16.31 Trunnion Girder Design (optional
services) __________________________84 16.32 Main Girder Camber
Data (Not applicable for this project) ______________84
16.33 Leaf Lateral Bracing Design (Not applicable for this project)
____________84 16.34 Counterweight Design (optional services)
____________________________84
16.35 Live Load Shoe Design (optional services)
___________________________84 16.36 Barrier Design (optional
services) __________________________________85 16.37 Deck
Elevations (Not applicable for this project)
______________________85
16.38 Balance Calculations (optional services)
_____________________________85 Bascule Leaf Detailing (optional
services) _________________________________85
16.39 Bascule GP&E (optional
services)__________________________________85 16.40 Bascule Leaf
Notes (optional services) ______________________________85
16.41 Framing Plan (optional services)
___________________________________85 16.42 Flooring Plan and
Details (optional services) _________________________85
16.43 Typical Section and Finish Grade Elevations (optional
services) __________85 16.44 Girder Elevation (Not applicable for
this project) ______________________85 16.45 Girder Details (Not
applicable for this project) ________________________85
16.46 Camber Layout (Not applicable for this project)
_______________________85 16.47 Floor Beams (Not applicable for
this project) _________________________85 16.48 Counterweight
Girder/Box (optional services) ________________________85
16.49 Trunnion Girder (Not applicable for this project)
______________________85 16.50 Cylinder Girder (Not applicable for
this project) _______________________85
16.51 Lateral Bracing Details (Not applicable for this project)
_________________85 16.52 Counterweight Bracing Details (optional
services) _____________________85 16.53 Joint Details (optional
services) ____________________________________85 16.54 Traffic
Barrier Details (optional services) ____________________________85
16.55 Pedestrian Rail and Support Details (optional services)
_________________85
16.56 Curb and Sidewalk Details (optional services)
________________________85 16.57 Barrier and Sidewalk Bracket
Details (optional services) ________________85 16.58 Counterweight
Details (optional services) ____________________________85
A-16
16.59 Stress Table or Influence Lines (Not applicable for this
project) __________85
Mechanical Design and tasks 16.60 – 16.63 are not applicable for
this project. _____86
16.60 Final Power Requirements
________________________________________86 16.61 Trunnion Assembly
(Not applicable for this project) ___________________86 16.62 Span
Locks ____________________________________________________86 16.63
Sump Pumps (Not applicable for this project)
_________________________86 Mechanical Drive Design and tasks 16.64
– 16.67 are not applicable for this project. 86
16.64 Drive Shafts, Couplings, Keys, Bearings and Supports
__________________86 16.65 Rack and Pinion, Bearings and Supports
_____________________________86 16.66 Drive Train
____________________________________________________86 16.67 Motor
Brakes and Machinery Brakes _______________________________86
Hydraulic Drive Design
________________________________________________86
16.68 Hydraulic Drive
________________________________________________86
16.70 Machinery Elevation (Not applicable for this project)
__________________86
16.71 Machinery Section (Not applicable for this project)
____________________86 16.72 Trunnion Assembly (Not applicable for
this project) ___________________86 16.73 Drive Details (Not
applicable for this project) _________________________86
16.74 Span Locks (optional services)
____________________________________86 Electrical Design (optional
services) ______________________________________86
16.75 Load Analysis (optional services)
__________________________________86 16.76 Power Distribution
(optional services) ______________________________86 16.77 Drive
Equipment (optional services)
________________________________86
16.78 Bridge Controls (optional services)
_________________________________86 16.79 Grounding (optional
services) _____________________________________86
16.80 Lightning and Surge Suppression (optional services)
___________________87 16.81 Pier Lighting (optional services)
___________________________________87
Electrical Detailing (optional services)
____________________________________87 16.82 Electrical Plan and
Elevation (optional services) ______________________87
16.83 Electrical Symbols and Abbreviations (optional services)
_______________87 16.84 Single/Three Line Diagram (optional
services) ________________________87 16.85 Panel Board and Light
Fixture Schedules (optional services) _____________87
16.86 Wire and Conduit Schedules and Diagrams (optional services)
___________87 16.87 Control Desk/Panel Layout (optional services)
________________________87 16.88 Control Schematics (optional
services) ______________________________87
16.89 PLC Logic (optional services)
_____________________________________87 16.90 Communication System
(Not applicable for this project) ________________87
16.91 Navigation Lighting Details (optional services)
_______________________87 16.92 Pedestrian Gate, Traffic Gate, and
Barrier Details (optional services) ______87 16.93 Submarine Cable
(optional services) ________________________________87 16.94
Miscellaneous Details (optional services)
____________________________87 Control House (optional services)
________________________________________87
16.95 Architectural Design (optional services)
_____________________________87 16.96 Architectural Details
(optional services) _____________________________87 16.97
Structural Design (optional services)
________________________________87
A-17
16.99 HVAC/Plumbing Design (optional
services)__________________________87
16.100 HVAC/Plumbing/Electrical Cables (optional
services)__________________87 Reinforcing Bar Lists (optional
services) __________________________________87 16.101 Preparation
of Reinforcing Bar List (optional services) _________________87
Load Rating (optional services)
__________________________________________88 16.102 Load Rating
(optional services) ____________________________________88
17 STRUCTURES - RETAINING WALLS and tasks 17.1 – 17.21 are not
applicable
for this project.
______________________________________________________88 General
Requirements _________________________________________________88
17.1 Key Sheet
_____________________________________________________88 17.2
Horizontal Wall Geometry
________________________________________88
17.6 Details
_______________________________________________________88 Temporary
Proprietary Walls ____________________________________________88
17.7 Vertical Wall Geometry
__________________________________________88
17.8 Semi-Standard Drawings
_________________________________________88 17.9 Wall Plan and
Elevations (Control Drawings) _________________________88
17.10 Details
_______________________________________________________88
Cast-In-Place Retaining Walls
___________________________________________88 17.11 Design
_______________________________________________________88
17.13 General Notes
__________________________________________________88 17.14 Wall
Plan and Elevations (Control Drawings) _________________________88
17.15 Sections and Details
_____________________________________________88
17.16 Reinforcing Bar List
_____________________________________________88 Other Retaining
Walls and Bulkheads _____________________________________88
17.17 Design
_______________________________________________________89
18 STRUCTURES - MISCELLANEOUS
__________________________________89
Concrete Box Culverts and tasks 18.1 – 18.2 are not applicable for
this project. ____89
18.1 Concrete Box Culverts
___________________________________________89
18.2 Concrete Box Culverts Extensions
_________________________________89 18.3 Concrete Box Culvert Data
Table Plan Sheets ________________________89 18.4 Concrete Box
Culvert Special Details Plan Sheets _____________________89 Strain
Poles and tasks 18.3 – 18.4 are not applicable for this project.
_____________89 18.5 Steel Strain Poles
_______________________________________________89 18.6 Concrete
Strain Poles ____________________________________________89 18.7
Strain Pole Data Table Plan Sheets
_________________________________89
A-18
18.8 Strain Pole Special Details Plan Sheets
______________________________89
Mast Arms and task 18.5 are not applicable for this project.
____________________89
18.9 Mast Arms
____________________________________________________89 18.10 Mast
Arms Data Table Plan Sheets _________________________________89
18.11 Mast Arms Special Details Plan Sheets
______________________________89 Overhead/Cantilever Sign Structure
and tasks 18.6 – 18.10 are not applicable for this
project.
_______________________________________________________89
18.17 Overhead/Cantilever Sign Structures Data Table Plan Sheets
_____________90
18.18 Overhead/Cantilever Sign Structures Special Details Plan
Sheets _________90 High Mast Lighting and task 18.11 are not
applicable for this project. ____________90
18.19 Non-Standard High Mast Lighting Structures
_________________________90
18.20 High Mast Lighting Special Details Plan Sheets
_______________________90 Noise Barrier Walls (Ground Mount) and
tasks 18.12 – 18.18 are not applicable for
this project.
____________________________________________________90
18.23 Summary of Quantities – Aesthetic Requirements
_____________________90 18.24 Control Drawings
_______________________________________________90 18.25 Design of
Noise Barrier Walls Covered by Standards
___________________90
18.26 Design of Noise Barrier Walls not Covered by Standards
________________90 18.27 Aesthetic Details
_______________________________________________90
Special Structures and tasks 18.19 – 18.22 are not applicable for
this project. ______90 18.28 Fender System
_________________________________________________90
18.29 Fender System Access
___________________________________________90 18.30 Special
Structures _______________________________________________90
18.31 Other Structures
________________________________________________90 18.32 Condition
Evaluation of Signal and Sign Structures, and High Mast Light
Poles
_________________________________________________________90
18.33 Condition Evaluation of Signal and Sign Structures, and High
Mast Light
Poles (No As built or Design Plans Available)
________________________90 18.34 Analytical Evaluation of Signal
and Sign Structures, and High Mast Light
Poles _________________________________________________________91
18.35 Ancillary Structures Report
_______________________________________91
19.5 Sign Panel Design Analysis (optional services)
_______________________91 19.6 Sign Lighting/Electrical
Calculations (optional services) ________________91
A-19
19.9 Technical Special Provisions and Modified Special Provisions
(optional
services) ______________________________________________________92
19.10 Other Signing and Pavement Marking Analysis N/A
___________________92 19.11 Field Reviews (optional services)
__________________________________92 19.12 Technical Meetings N/A
_________________________________________92
19.13 Quality Assurance/Quality Control
_________________________________92 19.14 Independent Peer Review
N/A _____________________________________92 19.15 Supervision
(optional services) ____________________________________92 19.16
Coordination (optional services)
___________________________________92
20 SIGNING AND PAVEMENT MARKING PLANS
________________________92
20.1 Key Sheet N/A
_________________________________________________92 20.2 Summary of
Pay Items Including Quantity Input (optional services)
_______92
20.3 Tabulation of Quantities (optional services)
__________________________92 20.4 General Notes/Pay Item Notes
(optional services) _____________________92
20.5 Project Layout (Not applicable for this project)
_______________________92 20.6 Plan Sheet (optional services)
_____________________________________92 20.7 Typical Details (Not
applicable for this project) _______________________92
20.8 Guide Sign Work Sheet(s) (optional
services)_________________________92 20.9 Traffic Monitoring Site
(Not applicable for this project)_________________92
20.10 Cross Sections (Not applicable for this project)
_______________________92 20.11 Special Service Point Details (Not
applicable for this project) ____________93 20.12 Special Details
(optional services) __________________________________93
20.13 Interim Standards (Not applicable for this project)
_____________________93
20.14 Quality Assurance/Quality Control
_________________________________93 20.15 Supervision
____________________________________________________93
21 SIGNALIZATION ANALYSIS and tasks 21.1 – 21.19 are not applicable
for this
project._____________________________________________________________93
21.1 Traffic Data Collection
__________________________________________93 21.2 Traffic Data
Analysis ____________________________________________93
21.8 Pole Elevation Analysis
__________________________________________94
21.9 Traffic Signal Operation
Report____________________________________94
21.10 Quantities
_____________________________________________________94 21.11 Cost
Estimate __________________________________________________94 21.12
Technical Special Provisions and Modified Special Provisions
___________94 21.13 Other Signalization Analysis
______________________________________94 21.14 Field Reviews
__________________________________________________94 21.15
Technical Meetings _____________________________________________94
21.16 Quality Assurance/Quality Control
_________________________________94
A-20
21.18 Supervision
____________________________________________________95
21.19 Coordination
___________________________________________________95
22 SIGNALIZATION PLANS and tasks 22.1 – 22.18 are not applicable
for this
project._____________________________________________________________95
22.1 Key Sheet
_____________________________________________________95 22.2
Summary of Pay Items Including Designer Interface Quantity Input
_______95
22.8 Guide Sign Worksheet
___________________________________________95 22.9 Special Details
_________________________________________________95
22.10 Special Service Point Details
______________________________________95 22.11 Mast Arm/Monotube
Tabulation Sheet ______________________________95
22.12 Strain Pole Schedule
____________________________________________95 22.13 TCP Signal
(Temporary) _________________________________________95 22.14
Temporary Detection Sheet
_______________________________________95
22.15 Utility Conflict Sheet
____________________________________________95 22.16 Interim
Standards _______________________________________________95
22.17 Quality Assurance/Quality Control
_________________________________95 22.18 Supervision
____________________________________________________96
23 LIGHTING ANALYSIS and tasks 23.1 – 23.18 are not applicable for
this
project._____________________________________________________________96
23.4 FDEP Coordination and Report
____________________________________97 23.5 Reference and Master
Design Files _________________________________97 23.6 Temporary
Lighting _____________________________________________97
23.7 Design Documentation
___________________________________________97 23.8 Quantities
_____________________________________________________97 23.9 Cost
Estimate __________________________________________________97 23.10
Technical Special Provisions and Modified Special Provisions
___________97 23.11 Other Lighting Analysis
__________________________________________97
23.12 Field Reviews
__________________________________________________98
23.13 Technical Meetings
_____________________________________________98
23.14 Quality Assurance/Quality Control
_________________________________98 23.15 Independent Peer Review
_________________________________________98 23.16 Supervision
____________________________________________________98 23.17
Coordination
___________________________________________________98
24 LIGHTING PLANS and tasks 24.1 – 24.14 are not applicable for
this project. _98 24.1 Key Sheet
_____________________________________________________98
A-21
24.2 Summary of Pay Item Sheet Including Designer Interface
Quantity Input ___98
24.3 Tabulation of Quantities
__________________________________________98
24.4 General Notes/Pay Item Notes
_____________________________________98 24.5 Pole Data, Legend
& Criteria ______________________________________98 24.6
Service Point Details
____________________________________________98 24.7 Project Layout
_________________________________________________98 24.8 Plan Sheet
_____________________________________________________98
24.9 Special Details
_________________________________________________98 24.10 Temporary
Lighting Data and Details _______________________________98 24.11
Traffic Control Plan Sheets
_______________________________________98 24.12 Interim Standards
_______________________________________________98 24.13 Quality
Assurance/Quality Control _________________________________98
24.14 Supervision
____________________________________________________99
25 LANDSCAPE ARCHITECTURE ANALYSIS and tasks 25.1 – 25.16 are
not
applicable for this project.
_____________________________________________99 25.1 Data
Collection_________________________________________________99
25.2 Site Inventory and Analysis for Proposed Landscape
___________________99 25.3 Planting Design
________________________________________________99 25.4 Irrigation
Design _______________________________________________99
25.5 Hardscape
Design______________________________________________100 25.6 Plan
Summary Boxes ___________________________________________100
25.7 Cost Estimates
________________________________________________100 25.8 Technical
Special Provisions and Modified Special Provisions __________100
25.9 Other Landscape Architecture
____________________________________100
25.10 Outdoor Advertising
___________________________________________100
25.14 Independent Peer Review
________________________________________100 25.15 Supervision
___________________________________________________100
25.16 Project Coordination
___________________________________________100
25.17 Interdisciplinary Coordination
____________________________________100
26 LANDSCAPE ARCHITECTURE PLANS and tasks 26.1 – 26.16 are
not
applicable for this project.
____________________________________________100 26.1 Key Sheet
____________________________________________________100 26.2
Tabulation of Quantities
_________________________________________100
26.3 General Notes
_________________________________________________100
26.4 Tree and Vegetation Inventory, Protection and Relocation Plans
_________100
26.5 Planting Plans for Linear Roadway Projects
_________________________101 26.6 Planting Plans (Interchanges and
Toll Plazas) ________________________101 26.7 Planting Details and
Notes _______________________________________101 26.8 Irrigation
Plans for Linear Roadway Project _________________________101 26.9
Irrigation Plans for Interchange and Toll Plazas
______________________101 26.10 Irrigation Details and Notes
______________________________________101 26.11 Hardscape Plans
_______________________________________________101
A-22
26.13 Landscape Maintenance Plan
_____________________________________101
26.14 Cost Estimate
_________________________________________________101 26.15 Quality
Assurance/Quality Control ________________________________101 26.16
Supervision
___________________________________________________101
27 SURVEY (optional services)
__________________________________________101 27.1 Horizontal
Project Control (HPC) _________________________________102
27.2 Vertical Project Control (VPC)
___________________________________102 27.3 Alignment and/or
Existing Right of Way (R/W) Lines (Not applicable for this
project) ______________________________________________________102
27.4 Aerial Targets (Not applicable for this project)
_______________________102 27.5 Reference Points (Not applicable
for this project) _____________________102
27.6 Topography/Digital Terrain Model (DTM) (3D) (optional
services) ______102 27.7 Planimetric (2D) (optional services)
_______________________________102
27.8 Roadway Cross Sections/Profiles (Not applicable for this
project) ________102 27.9 Side Street Surveys (Not applicable for
this project) ___________________102
27.10 Underground Utilities (optional services)
___________________________102 27.11 Outfall Survey (Not applicable
for this project) ______________________103 27.12 Drainage Survey
(Not applicable for this project) _____________________103
27.13 Bridge Survey (Minor/Major) (Not applicable for this project)
__________103 27.14 Channel Survey (optional services)
________________________________103
27.15 Pond Site Survey (Not applicable for this project)
____________________103 27.16 Mitigation Survey (Not applicable for
this project) ____________________103 27.17 Jurisdiction Line
Survey (Not applicable for this project) _______________103
27.18 Geotechnical Support (Not applicable for this project)
_________________103
27.19 Sectional/Grant Survey (Not applicable for this project)
________________103 27.20 Subdivision Location (Not applicable for
this project) _________________103 27.21 Maintained R/W (Not
applicable for this project) _____________________103
27.22 Boundary Survey (Not applicable for this project)
____________________103 27.23 Water Boundary Survey (Not applicable
for this project) _______________103
27.24 Right of Way Staking, Parcel / Right of Way Line (Not
applicable for this
project) ______________________________________________________103
27.25 Right of Way Monumentation (Not applicable for this project)
__________103 27.26 Line Cutting (Not applicable for this project)
________________________103 27.27 Work Zone Safety
_____________________________________________103 27.28
Miscellaneous Surveys N/A
______________________________________103
27.29 Supplemental Surveys (optional services)
___________________________104
27.30 Document Research (Not applicable for this project)
__________________104
27.31 Field Review (optional services)
__________________________________104 27.32 Technical Meetings N/A
_________________________________________104 27.33 Quality
Assurance/Quality Control (QA/QC) ________________________104 27.34
Supervision ___________________________________________________104
27.35 Coordination
__________________________________________________104
A-23
28 PHOTOGRAMMETRY and tasks 28.1 – 28.25 are not applicable for
this
project.____________________________________________________________104
28.6 Photo Products
________________________________________________105 28.7 Scanning
_____________________________________________________105 28.8 LiDAR
______________________________________________________105 28.9
Aerial Triangulation
____________________________________________105 28.10 Surfaces
_____________________________________________________105
28.11 Ortho Generation
______________________________________________105
28.14 Sheet Clipping
________________________________________________105
28.18 CADD Edit
___________________________________________________106 28.19 Data
Merging _________________________________________________106
28.20 Miscellaneous
_________________________________________________106 28.21 Field
Review _________________________________________________106 28.22
Technical Meetings
____________________________________________106
28.25 Coordination
__________________________________________________106
29 MAPPING (optional services)
_________________________________________106
Master CADD File
___________________________________________________107 29.1
Alignment (Not applicable for this project)
__________________________107
29.2 Section and 1/4 Section Lines (Not applicable for this
project) __________107
29.3 Subdivisions / Property Lines (Not applicable for this
project) ___________107 29.4 Existing Right of Way (Not applicable
for this project) ________________107 29.5 Topography (Not
applicable for this project)_________________________107 29.6
Parent Tract Properties and Existing Easements (Not applicable for
this
project)
______________________________________________________107
29.7 Proposed Right of Way Requirements (Not applicable for this
project) ____107
29.8 Limits of Construction (Not applicable for this project)
________________107
29.9 Jurisdictional/Agency Lines (Not applicable for this project)
____________107 Sheet Files and tasks 29.10 – 29.21 are not
applicable for this project. __________107 29.10 Control Survey
Cover Sheet (Not applicable for this project) ____________107 29.11
Control Survey Key Sheet (Not applicable for this project)
_____________107 29.12 Control Survey Detail Sheet (Not applicable
for this project) ____________107
29.13 Right of Way Map Cover Sheet (Not applicable for this
project) _________107 29.14 Right of Way Map Key Sheet (Not
applicable for this project) __________107
A-24
29.15 Right of Way Map Detail Sheet (Not applicable for this
project) _________107
29.16 Maintenance Map Cover Sheet (Not applicable for this project)
_________107
29.17 Maintenance Map Key Sheet (Not applicable for this project)
___________107 29.18 Maintenance Map Detail Sheet (Not applicable
for this project) _________107 29.19 Reference Point Sheet (Not
applicable for this project)_________________107 29.20 Project
Network Control Sheet (optional services) ____________________108
29.21 Table of Ownerships Sheet (Not applicable for this project)
_____________108
Miscellaneous Surveys and Sketches and tasks 29.22 – 29.36 are not
applicable for
this project.
___________________________________________________108 29.22 Parcel
Sketches________________________________________________108 29.23
TIITF Sketches ________________________________________________108
29.24 Other Specific Purpose Survey(s)
_________________________________108
29.26 Right of Way Monumentation Map
________________________________108 29.27 Title Search Map
______________________________________________108
29.28 Title Search Report
____________________________________________108
29.29 Legal Descriptions
_____________________________________________108 29.30 Final
Map/Plans Comparison _____________________________________108 29.31
Field Reviews
_________________________________________________108
29.32 Technical Meetings
____________________________________________108 29.33 Quality
Assurance/Quality Control ________________________________108
29.34 Supervision
___________________________________________________108 29.35
Coordination __________________________________________________108
29.36 Supplemental Mapping
_________________________________________108
30 TERRESTRIAL MOBILE LiDAR and tasks 30.1 – 30.19 are not
applicable for
this project.
________________________________________________________109 30.1
Terrestrial Mobile LiDAR Mission Planning
________________________109 30.2 Project Control Point Coordination
________________________________109
30.3 Terrestrial Mobile LiDAR Mobilization
____________________________109 30.4 Terrestrial Mobile LiDAR
Mission ________________________________109
30.5 Terrestrial Mobile LiDAR Processing
______________________________109
30.6 Terrestrial Mobile Photography Processing
__________________________109 30.7 Transformation / Adjustment
_____________________________________109 30.8 Classification /
Editing __________________________________________110 30.9 Specific
Surface Reporting ______________________________________110 30.10
Topographic (3D) Mapping
______________________________________110
30.11 Topographic (2D) Planimetric Mapping
____________________________110
30.12 CADD Edits
__________________________________________________110
30.18 Supervision
___________________________________________________110 30.19
Coordination
__________________________________________________111
Architectural Plans
___________________________________________________120
31.6 Floor Plan(s) (small scale)
_______________________________________120 31.7 Floor Plan(s)
(large scale) _______________________________________120 31.8
Exterior Elevation(s)
___________________________________________120 31.9 Roof Plan(s)
__________________________________________________120 31.10 Roof
Details __________________________________________________120
31.11 Interior Elevation(s)
____________________________________________120
31.14 Building Section(s)
____________________________________________120
31.18 Door and Window Finish Schedule
________________________________121 31.19 Door Jamb Detail(s) and
Window Details ___________________________121
31.20 Exterior Wall Section(s)
_________________________________________121 31.21 Interior Wall
Section(s) _________________________________________121 31.22
Overhead Door Detail(s) (Not applicable for this project)
______________121
31.23 Curtain Wall Detail(s)
__________________________________________121 31.24 Fascia, Soffit
and Parapet Details _________________________________121
31.25 Signage Detail(s)
______________________________________________121 31.26
Miscellaneous Detail(s)
_________________________________________121
31.27 Repetitive Sheets (Not applicable for this project)
____________________121 31.28 Design Narrative Reports (Not
applicable for this project) ______________121
31.29 Permitting
____________________________________________________121 31.30 Other
Pertinent Project Documentation _____________________________121
31.31 Cost Estimate
_________________________________________________121
31.32 Technical Special Provisions and Modified Special Provisions
Packages __121 31.33 Field Reviews
_________________________________________________121 31.34
Technical Meetings
____________________________________________121
31.35 Quality Assurance/Quality Control
________________________________121 31.36 Meeting with Independent
Peer Review (Not applicable for this project)___122
31.37 Supervision
___________________________________________________122 Structural
Plans _____________________________________________________122
31.38 General Notes, Abbreviations, Symbols, and Legend
__________________122 31.39 Foundation Plan(s) (Small
Scale)__________________________________122 31.40 Foundation
Plan(s) (Large Scale) (Not applicable for this project)
________122
31.41 Slab Plan(s) (Small Scale)
_______________________________________122 31.42 Slab Plan(s)
(Large Scale) (Not applicable for this project) _____________122
31.43 Slab Placement Plan(s)
__________________________________________122
A-26
31.45 Foundation Section(s)
__________________________________________122
31.51 Roof Loading Plan(s) and Detail(s)
________________________________122 31.52 Roof Section(s)
_______________________________________________122 31.53 Roof
Detail(s) _________________________________________________122
31.54 Bearing Wall Section(s)
_________________________________________122 31.55 Bearing Wall
Detail(s) __________________________________________122
31.56 Column Section(s) (Not applicable for this project)
___________________122
31.57 Column Detail(s) (Not applicable for this project)
____________________122 31.58 Miscellaneous Sections (Not
applicable for this project) _______________122
31.59 Repetitive Sheets (Not applicable for this project)
____________________122
31.60 Other Pertinent Project Documentation (Not applicable for
this project) ___123 31.61 Cost Estimate
_________________________________________________123 31.62
Technical Special Provisions and Modified Special Provisions
Packages __123
31.63 Field Reviews
_________________________________________________123 31.64
Technical Meetings
____________________________________________123
31.65 Quality Assurance/Quality Control
________________________________123 31.66 Independent Peer Review
(Not applicable for this project) ______________123 31.67
Supervision
___________________________________________________123
Mechanical Plans
____________________________________________________123 31.68
General Notes, Abbreviations, Symbols, Legend, and Code Issues
_______123
31.71 Detail(s)
_____________________________________________________123 31.72
Section(s)
____________________________________________________123
31.76 HVAC Calculations
____________________________________________123 31.77 Life Cycle
Cost Analysis ________________________________________123 31.78
Repetitive Sheets
______________________________________________124
31.79 Other Pertinent Project Documentation
_____________________________124 31.80 Cost Estimate
_________________________________________________124
31.81 Technical Special Provisions and Modified Special Provisions
Packages __124 31.82 Field Reviews
_________________________________________________124 31.83
Technical Meetings ____________________________________________124
31.84 Quality Assurance/Quality Control
________________________________124 31.85 Independent Peer Review
________________________________________124
31.86 Supervision
___________________________________________________124 Plumbing
Plans _____________________________________________________124
31.87 General Notes, Abbreviations, Symbols, Legend, and Code
Issues _______124
31.90 Isometric(s) (Large Scale)
_______________________________________124 31.91 Riser Diagram(s)
______________________________________________124 31.92 Detail(s)
_____________________________________________________124 31.93
Repetitive Sheets (Not applicable for this project)
____________________124 31.94 Other Pertinent Project Documentation
(Not applicable for this project) ___124
31.95 Cost Estimate
_________________________________________________124 31.96
Technical Special Provisions and Modified Special Provisions
Packages __125 31.97 Field Reviews
_________________________________________________125 31.98
Technical Meetings ____________________________________________125
31.99 Quality Assurance/Quality Control
________________________________125
31.100 Independent Peer Review (Not applicable for this project)
______________125
31.101 Supervision
___________________________________________________125 Fire
Protection Plans and tasks 31.102 – 31.114 are not applicable for
this project. 125
31.102 General Notes, Abbreviations, Symbols, Legend, and Code
Issues _______125
31.103 Fire Protection Plan
____________________________________________125 31.104 Riser
Diagram, Details, and Partial Plans ___________________________125
31.105 Hydraulic Calculation
__________________________________________125
31.106 Repetitive Sheets
______________________________________________125 31.107 Other
Pertinent Project Documentation
_____________________________125
31.111 Technical Meetings
____________________________________________125 31.112 Quality
Assurance/Quality Control ________________________________126
31.113 Independent Peer Review
________________________________________126 31.114 Supervision
___________________________________________________126
Electrical Plans
______________________________________________________126 31.115
General Notes, Abbreviations, Symbols, Legend, and Code Issues
_______126
31.119 Lighting Fixtures Detail(s)
_______________________________________126 31.120 Lightning
Protection Plan(s) _____________________________________126 31.121
Lightning Protection Details
_____________________________________126
31.122 Power Plan(s)
_________________________________________________126 31.123 Power
Distribution Riser
Diagram(s)_______________________________126
31.124 Panel Board Schedule(s)
________________________________________126 31.125 Data Plan(s)
__________________________________________________126 31.126 Data
Detail(s) _________________________________________________126
31.127 Communication Plan(s) (Not applicable for this project)
_______________126 31.128 Communication Detail(s) (Not applicable
for this project) ______________126
31.129 Security Alarm System Plan(s) (Not applicable for this
project) _________126 31.130 Miscellaneous Detail(s) (Not
applicable for this project) _______________126 31.131 Repetitive
Sheets (Not applicable for this project)
____________________126
A-28
31.133 Other Pertinent Project Documentation (Not applicable for
this project) ___127
31.134 Cost Estimate
_________________________________________________127 31.135
Technical Special Provisions and Modified Special Provisions
Packages __127 31.136 Field Reviews
_________________________________________________127 31.137
Technical Meetings ____________________________________________127
31.138 Quality Assurance/Quality Control
________________________________127
31.139 Independent Peer Review (Not applicable for this project)
_____________127 31.140 Supervision
__________________________________________________127 31.141 LEED
Certification (Not applicable for this project)
__________________127 31.142 Coordination
__________________________________________________127 31.143
Building Information Modeling (BIM) (Not applicable for this
project) ___127
32 NOISE BARRIERS IMPACT DESIGN ASSESSMENT IN THE DESIGN
PHASE and tasks 32.1 – 32.9 are not applicable for this project.
____________127
32.1 Noise Analysis
________________________________________________127 32.2 Noise
Barrier Evaluation
________________________________________129
32.3 Public Involvement
____________________________________________130 32.4 Outdoor
Advertising Identification ________________________________130 32.5
Noise Study Report (NSR) Addendum
_____________________________131
32.6 Technical Meetings
____________________________________________131 32.7 Quality
Assurance/Quality Control ________________________________131
32.8 Supervision
___________________________________________________131 32.9
Coordination
__________________________________________________131
33.1 ITS Analysis
__________________________________________________131 33.2
Communications Plan __________________________________________135
33.3 Lightning Protection Analysis
____________________________________136
33.4 Power Subsystem
______________________________________________136 33.5 Voltage Drop
Calculations _______________________________________137 33.6 Design
Documentation __________________________________________137
33.7 Existing ITS
__________________________________________________137 33.8 Queue
Analysis _______________________________________________137 33.9
Reference and Master ITS Design File
_____________________________137 33.10 Reference and Master
Communications Design File ___________________138 33.11 Pole
Elevation Analysis
_________________________________________138
33.12 Sign Panel Design Analysis
______________________________________138
33.13 Quantities
____________________________________________________138
A-29
are not applicable for this project.
_____________________________________140 34.1 Key Sheet
____________________________________________________140 34.2
Summary of Pay Items Including Designer Interface Quantity Input
______140 34.3 Tabulation of Quantities
_________________________________________140 34.4 General Notes /
Pay Item Notes ___________________________________140
34.5 Project Layout
________________________________________________140 34.6 Typical
and Special Details ______________________________________141 34.7
Plan Sheet ____________________________________________________141
34.8 ITS Communications Plans
______________________________________141 34.9 Fiber Optic Splice
Diagrams _____________________________________141
34.10 Lightning Protection Plans
_______________________________________142 34.11 Cross Sections
________________________________________________142
34.12 Guide Sign Work Sheet(s)
_______________________________________142 34.13 Special Service
Point Details _____________________________________142
34.14 Strain Pole Schedule
___________________________________________142 34.15 Overhead /
Cantilever Sign Structure ______________________________142 34.16
Other Overhead Sign Structures (Long Span, Monotube, etc.)
___________143
34.17 Traffic Control Plans
___________________________________________143 34.18 Interim
Standards ______________________________________________143
34.19 GIS Data and Asset Management Requirements
______________________143 34.20 Quality Assurance / Quality Control
_______________________________144 34.21 Supervision
___________________________________________________144
35 GEOTECHNICAL (optional services)
__________________________________144
35.1 Document Collection and Review (Not applicable for this
project) _______145 Roadway and tasks 35.2 – 35.24 are not
applicable for this project. _____________145 35.2 Develop Detailed
Boring Location Plan ____________________________145
35.3 Stake Borings/Utility Clearance
___________________________________145 35.4 Muck Probing
_________________________________________________145 35.5
Coordinate and Develop MOT Plans for Field Investigation
____________145
35.6 Drilling Access Permits
_________________________________________145 35.7 Property
Clearances ____________________________________________145 35.8
Groundwater Monitoring ________________________________________146
35.9 LBR / Resilient Modulus Sampling
________________________________146 35.10 Coordination of Field
Work ______________________________________146
35.11 Soil and Rock Classification - Roadway
____________________________146
35.12 Design LBR
__________________________________________________146
A-30
35.21 Geotechnical Recommendations
__________________________________147
35.27 Develop Detailed Boring Location Plan (Not applicable for
this project)___148 35.28 Stake Borings/Utility Clearance (Not
applicable for this project) _________148 35.29 Coordinate and
Develop MOT Plans for Field Investigation (Not applicable for
this project)___________________________________________________149
35.30 Drilling Access Permits (Not applicable for this project)
_______________149
35.31 Property Clearances (Not applicable for this project)
__________________149
35.32 Collection of Corrosion Samples (Not applicable for this
project) ________149 35.33 Coordination of Field Work (Not
applicable for this project) ____________149
35.34 Soil and Rock Classification - Structures (Not applicable for
this project) __149
35.35 Tabulation of Laboratory Data (Not applicable for this
project) __________149 35.36 Estimate Design Groundwater Level for
Structures (Not applicable for this
project)
______________________________________________________149
35.37 Selection of Foundation Alternatives (BDR) (Not applicable
for this project)149 35.38 Detailed Analysis of Selected Foundation
Alternate(s) (Not applicable for this
project) ______________________________________________________149
35.39 Bridge Construction and Testing Recommendations (Not
applicable for this
35.40 Lateral Load Analysis (Optional) (Not applicable for this
project) ________149 35.41 Walls (Not applicable for this project)
______________________________149
35.42 Sheet Pile Wall Analysis (Optional) (Not applicable for this
project) ______149 35.43 Design Soil Parameters for Signs, Signals,
High Mast Lights, and Strain Poles
and Geotechnical Recommendations (Not applicable for this project)
_____149 35.44 Box Culvert Analysis (Not applicable for this
project) _________________149
35.45 Preliminary Report - BDR
_______________________________________149 35.46 Final Report -
Bridge and Associated Walls _________________________150 35.47
Final Reports - Signs, Signals, Box Culvert, Walls, and High Mast
Lights (Not
applicable for this project)
_______________________________________150 35.48 SPT Boring
Drafting (Not applicable for this project) __________________150
35.49 Other Geotechnical (Not applicable for this project)
___________________150
35.50 Technical Special Provisions and Modified Special Provisions
(Not applicable
for this project)
________________________________________________150
35.51 Field Reviews (Not applicable for this project)
_______________________150 35.52 Technical Meetings (Not applicable
for this project) __________________150 35.53 Quality
Assurance/Quality Control ________________________________150 35.54
Supervision ___________________________________________________150
35.55 Coordination
__________________________________________________151
36 3D Modeling and tasks 36.1 – 36.9 are not applicable for this
project. _______151 36.1 Phase I 3D Design Model (30% Plans)
_____________________________151
A-31
36.4 Final 3D Model Design (100% Plans)
______________________________151 36.5 Cross Section Design
Files_______________________________________151 36.6 Template and
Assembly Development (Optional) _____________________152 36.7
Quality Assurance/Quality Control
________________________________152 36.8 Supervision
___________________________________________________152
36.9 Coordination
__________________________________________________152
37.4 Correspondence
_______________________________________________153 37.5
Professional Endorsement
_______________________________________153
37.8 Optional Services
______________________________________________153
38 INVOICING LIMITS
_______________________________________________154
HIGHWAY AND BRIDGE/STRUCTURAL DESIGN
This Exhibit forms an integral part of the agreement between the
State of Florida Department of
Transportation (hereinafter referred to as the DEPARTMENT or FDOT)
and
___________________________ (hereinafter referred to as the
CONSULTANT) relative to the
transportation facility described as follows:
Financial Project ID: 441462 1 32 01
Federal Aid Project No.: N/A
County Section No.: 86230
BRIDGE# 860043, Broward County
Context Classification: C3C
1 PURPOSE
The purpose of this Exhibit is to describe the scope of work and
the responsibilities of the
CONSULTANT and the DEPARTMENT in connection with the design and
preparation of a
complete set of construction contract documents and incidental
engineering services, as
necessary, for improvements to the transportation facility
described herein.
Major work mix includes: Bridge-Repair / Rehabilitation
Major work groups include: 4.4 Movable Span Bridge Design
Minor work groups include: 3.2 Major Highway Design, 4.1.1
Miscellaneous Structures,
5.4 Bridge Load Rating 7.1 Signing, Pavement Marking and
Channelization, 7.3
Signalization, 8.1 Control Surveying, 8.2 Design, Right of Way and
Construction
Surveying, and 8.3 Photogrammetric Mapping, 9.1 Soil Exploration,
9.2 Geotechnical
Classification Lab Testing, 14.0 Architect
Known alternative construction contracting methods include:
N/A
The general objective is for the CONSULTANT to prepare a set of
contract documents
including plans, specifications, supporting engineering analysis,
calculations and other
technical documents in accordance with FDOT policy, procedures and
requirements. These
Contract documents will be used by the contractor to build the
project and test the project
STAGE I FPID(S): 441462-1-32-01
A-33
components. These Contract documents will be used by the DEPARTMENT
or its
Construction Engineering Inspection (CEI) representatives for
inspection and final
acceptance of the project. The CONSULTANT shall follow a systems
engineering process
to ensure that all required project components are included in the
development of the
Contract documents and the project can be built as designed and to
specifications.
The Scope of Services establishes which items of work in the FDOT
Design Manual and
other pertinent manuals are specifically prescribed to accomplish
the work included in this
contract, and also indicate which items of work will be the
responsibility of the
CONSULTANT and/or the DEPARTMENT.
The CONSULTANT shall be aware that as a project is developed,
certain modifications
and/or improvements to the original concepts may be required. The
CONSULTANT shall
incorporate these refinements into the design and consider such
refinements to be an
anticipated and integral part of the work. This shall not be a
basis for any supplemental fee
request(s).
The CONSULTANT shall demonstrate good project management practices
while working
on this project. These include communication with the DEPARTMENT
and others as
necessary, management of time and resources, and documentation. The
CONSULTANT
shall set up and maintain throughout the design of the project a
contract file in accordance
with DEPARTMENT procedures. CONSULTANTs are expected to know the
laws and rules
governing their professions and are expected to provide services in
accordance with current
regulations, codes and ordinances and recognized standards
applicable to such professional
services. The Consultant shall provide qualified technical and
professional personnel to
perform to Department standards and procedures, the duties and
responsibilities assigned
under the terms of this agreement. The Consultant shall minimize to
the maximum extent
possible the Department’s need to apply its own resources to
assignments authorized by the
Department.
The DEPARTMENT will provide contract administration, management
services, and
technical reviews of all work associated with the development and
preparation of contract
documents, including Construction documents. The Department’s
technical reviews are for
high-level conformance and are not meant to be comprehensive
reviews. The
CONSULTANT shall be fully responsible for all work performed and
work products
developed under this Scope of Services. The DE