10
MAIN STREET OLD WEBSTER ROAD INTERSTATE 395 DUDLEY ROAD LARNARD ROAD HARWOOD STREET SUNSET AVENUE HOLBROOK ROAD HOLLY STREET HOPE AVENUE NOTTINGHAM ROAD PRATT AVENUE CAREY LANE BACON STREET ASHTON STREET WINTER STREET DUDLEY OXFORD ROAD INTERSTATE 395 INDUSTRIAL PARK EA PATTON STREET OLD WEBSTER ROAD HARWOOD STREET OVER FRENCH RIVER BRIDGE REPAIRS BRIDGE NO.: O-06-012(102) TOWN OF OXFORD, MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS PROJECT LOCATION SHEET NO. DESCRIPTION JUNE, 2015 BID DOCUMENTS One Hundred Foxborough Boulevard, Foxborough, Massachusetts 02035 LOCATION PLAN SCALE: 1"=1000' SHEET INDEX 1 TITLE SHEET AND INDEX GENERAL NOTES & LEGEND (C-1) EXISTING CONDITIONS PLAN (C-2) CONSTRUCTION PLAN (C-3) DETAILS (C-4) DETAILS & TRAFFIC MANAGEMENT PLAN (C-5) BRIDGE PLANS AND NOTES (S-1) SLOPE PAVING DETAILS (S-2) CONCRETE REPAIR ELEVATIONS AND DETAILS (S-3) 2 3 4 5 6 7 8 9 APPROACH SLAB AND GUARDRAIL DETAILS (S-4) 10

NOTTINGHAM ROAD TOWN OF OXFORD, DUDLEY …€¦ · nottingham road pratt avenue carey lane bacon street ... cadd no. chk.by sb lfk mk ... 5.all guardrail shall comply with massdot

  • Upload
    ngodan

  • View
    215

  • Download
    2

Embed Size (px)

Citation preview

M

A

I

N

S

T

R

E

E

T

O

L

D

W

E

B

S

T

E

R

R

O

A

D

I

N

T

E

R

S

T

A

T

E

3

9

5

D

U

D

L

E

Y

R

O

A

D

L

A

R

N

A

R

D

R

O

A

D

H

A

R

W

O

O

D

S

T

R

E

E

T

S

U

N

S

E

T

A

V

E

N

U

E

HO

LB

RO

O

K R

O

AD

H

O

L

L

Y

S

T

R

E

E

T

H

O

P

E

A

V

E

N

U

E

N

O

T

T

I

N

G

H

A

M

R

O

A

D

PR

AT

T A

VE

NU

E

C

A

R

E

Y

L

A

N

E

B

A

C

O

N

S

T

R

E

E

T

A

S

H

T

O

N

S

T

R

E

E

T

W

I

N

T

E

R

S

T

R

E

E

T

D

U

D

L

E

Y

O

X

F

O

R

D

R

O

A

D

IN

TE

R

ST

AT

E 395

I

N

D

U

S

T

R

I

A

L

P

A

R

K

E

A

S

T

P

A

T

T

O

N

S

T

R

E

E

T

O

L

D

W

E

B

S

T

E

R

R

O

A

D

HARWOOD STREET OVER FRENCH

RIVER BRIDGE REPAIRS

BRIDGE NO.: O-06-012(102)

TOWN OF OXFORD,

MASSACHUSETTS

DEPARTMENT OF

PUBLIC WORKS

PROJECT LOCATION

SHEET NO.

DESCRIPTION

JUNE, 2015

BID DOCUMENTS

One Hundred Foxborough Boulevard, Foxborough, Massachusetts 02035

LOCATION PLAN

SCALE: 1"=1000'

SHEET INDEX

1 TITLE SHEET AND INDEX

GENERAL NOTES & LEGEND (C-1)

EXISTING CONDITIONS PLAN (C-2)

CONSTRUCTION PLAN (C-3)

DETAILS (C-4)

DETAILS & TRAFFIC MANAGEMENT PLAN (C-5)

BRIDGE PLANS AND NOTES (S-1)

SLOPE PAVING DETAILS (S-2)

CONCRETE REPAIR ELEVATIONS AND DETAILS (S-3)

2

3

4

5

6

7

8

9

APPROACH SLAB AND GUARDRAIL DETAILS (S-4)

10

1. TOPOGRAPHICAL INFORMATION BASED ON AN ON THE GROUND SURVEY PERFORMED BY CHAPPELL ENGINEERING

ASSOCIATES, IN APRIL 2014. COORDINATES ARE BASED ON NORTH AMERICAN DATUM (NAD) 1983.

2. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE

NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL

DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE

FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE

TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. THE CONTRACTOR SHALL DIG TEST

PITS WITH THE LOCATIONS BEING APPROVED BY THE ENGINEER PRIOR TO COMMENCEMENT OF WORK TO

EXACTLY LOCATE EXISTING UTILIITES.

3. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, THE LOCATION, ELEVATION

AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR AND THE

INFORMATION FURNISHED TO THE ENGINEER FOR RESOLUTION OF THE CONFLICT.

4. THE CONTRACTOR SHALL MAKE ALL ARRANGEMENTS FOR THE ALTERATION AND ADJUSTMENT OF GAS, ELECTRIC,

TELEPHONE AND ANY OTHER PRIVATE UTILITIES BY THE UTILITY OWNER. ANY ALTERATIONS SHALL BE

INCIDENTAL TO THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY SUPPORT OF ALL

UTILITIES TO REMAIN IN PLACE AND SHALL DESCRIBE IN WRITING, TO THE SATISFACTION OF THE ENGINEER, HIS

METHOD OF TEMPORARY SUPPORT.

5. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE

RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

6. THE TERM "PROPOSED (PROP)" INDICATES WORK TO BE CONSTRUCTED USING NEW MATERIALS OR, WHERE

APPLICABLE, RE-USING EXISTING MATERIALS IDENTIFIED AS "REMOVE AND RESET (R&R)".

7. ALL EXISTING STATE, COUNTY AND TOWN LOCATION LINES AND PRIVATE PROPERTY LINES HAVE BEEN

ESTABLISHED FROM AVAILABLE INFORMATION AND THEIR EXACT LOCATION ARE NOT GUARANTEED.

8. ALL EXCESS MATERIAL FROM ROADWAY RECONSTRUCTION OR THE EXCAVATION PROCESS SHALL BE REUSED ON

SITE OR REMOVED FROM THE SITE AND DISPOSED OF IN A LEGAL AND PROPER MANNER.

9. THE CONTRACTOR SHALL CALL DIGSAFE AT 1-888-344-7233 AT LEAST 72 HOURS, SATURDAYS, AND HOLIDAYS

EXCLUDED, PRIOR TO EXCAVATING AT ANY LOCATION. A COPY OF THE DIGSAFE PROJECT REFERENCE

NUMBER(S) SHALL BE GIVEN TO THE TOWN PRIOR TO EXCAVATION.

10. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO HIRE A PROFESSIONAL LAND SURVEYOR REGISTERED IN THE

COMMONWEALTH OF MASSACHUSETTS FOR ALL LAYOUT WORK INCLUDING BASELINE LAYOUT. LAYOUT SHALL

INCLUDE ALL PROPOSED WORK AS SHOWN IN THE CONTRACT DOCUMENTS, OR AS DIRECTED BY THE ENGINEER

OR TOWN. ONCE LAID OUT, ALL PROPOSED WORK SHALL BE DEEMED ACCEPTABLE BY THE ENGINEER OR TOWN

PRIOR TO ANY COMMENCEMENT OF WORK. ANY AND ALL WORK RELATED TO THE CONSTRUCTION LAYOUT SHALL

BE INCIDENTAL TO THE PROJECT.

11. JOINTS BETWEEN HOT MIX ASPHALT TRENCH PAVEMENT AND SAWCUT EXISTING PAVEMENT SHALL BE SEALED

WITH BITUMEN AND BACKSANDED.

12. IF DEEMED NECESSARY DUE TO THE WORK, THE CONTRACTOR SHALL COORDINATE WITH THE TOWN OF OXFORD

DEPARTMENT OF PUBLIC WORKS, THE OXFORD FIRE DEPARTMENT, AND THE ENGINEER FOR APPROVAL OF

SHUTTING DOWN ANY EXISTING WATER MAINS AND SHALL ALSO OBTAIN APPROVAL FOR DISRUPTING ANY

EXISTING SEWER FLOWS.

13. THE CONTRACTOR SHALL BE AWARE THAT ONLY TOWN PERSONNEL ARE ALLOWED TO OPERATE WATER GATES

AND HYDRANTS. ANY REQUESTS TO OPERATE THE GATES SHALL BE COORDINATED THROUGH THE ENGINEER.

14. THE EXISTING GAS MAIN LOCATIONS ARE SHOWN IN AN APPROXIMATE LOCATION. THE CONTRACTOR IS

RESPONSIBLE FOR CONTACTING THE GAS COMPANY PRIOR TO COMMENCEMENT OF ANY WORK AND CONFIRMING

SIZES, TYPES OF GAS LINES, AND EXACT LOCATIONS OR CHANGE OF PIPE TYPE. ALL COORDINATION AND

ARRANGEMENTS WITH THE UTILITY COMPANIES SHALL BE INCIDENTAL TO THE PROJECT. ANY DELAY IN WORK

DUE TO CONFLICTS WITH THE PROPOSED WORK AND ACTUAL LOCATION OF EXISTING GAS MAIN SHALL BE

INCIDENTAL TO THE PROJECT.

15. THE CONTRACTOR SHALL COORDINATE ANY WORK FOR THE PROJECT WITH ALL ADJACENT/CONCURRENT

PROJECTS AND CONTRACTORS.

16. THE CONTRACTOR SHALL INSTALL PRIOR TO COMMENCEMENT OF WORK, MAINTAIN, AND REMOVE AT THE END OF

THE PROJECT INLET SEDIMENT CONTROL BAGS IN ALL CATCH BASINS, WITHIN OR ADJACENT TO THE PROJECT

LIMITS. THE CONTRACTOR SHALL ALSO MAINTAIN SILT FENCE AND COMPOST FILTER TUBES AS SHOWN ON THE

PLANS THROUGHOUT THE DURATION OF THE PROJECT AND REMOVE AT THE END.

17. ANY GRASS AREAS DISTURBED BY THE WORK SHALL BE RESTORED WITH LOAM AND SEED.

18. ANY LANDSCAPED AREAS DISTURBED BY THE WORK SHALL BE RESTORED TO EXISTING CONDITIONS WITH

EXISTING OR NEW GROUND COVER MATERIALS AS DIRECTED BY THE ENGINEER. ANY PLANTS, SHRUBS, OR

FLOWERS DISTURBED BY THE WORK SHALL BE RESET TO EXISTING CONDITIONS OR REPLACED WITH NEW

PLANTS, SHRUBS, OR FLOWERS AS DIRECTED BY THE ENGINEER. ALL WORK TO RESTORE LANDSCAPE AREAS,

NEW GROUND COVER MATERIALS, NEW PLANTS, NEW SHRUBS, OR NEW FLOWERS REQUIRED BY THE ENGINEER

SHALL BE INCIDENTAL TO THE PROJECT.

19. CONTRACTOR TO COORDINATE WITH UTILITY POLE OWNERS IN AREAS WHERE UNDERGROUND UTILITY WORK IS

WITHIN CLOSE PROXIMITY AND POSSIBLE UTILITY POLE SHORING IS REQUIRED WHILE INSTALLING PROPOSED

UTILITIES.

20. RAISE AND ADJUST FRAMES AND GRATES, FRAMES AND COVERS AND GATE BOXES PRIOR TO PAVEMENT

OVERLAY.

21. ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM (NAVD) 1988.

GENERAL NOTES

FENCE LINE (SIZE AND TYPE NOTED)

TREE (SIZE AND TYPE NOTED)

CENTERLINE OF CONSTRUCTION

BASE OR SURVEY LINE

CITY,TOWN OR COUNTY BOUNDARY

CITY OR TOWN OR COUNTY LAYOUT LINE

HIGHWAY / PROPERTY BOUND (TYPE NOTED)

HIGHWAY GUARD (TYPE NOTED)

TELEPHONE MANHOLE

ELECTRIC HANDHOLE (NUMBER AS NOTED)

CURB (OR BERM)-TYPE NOTED

N00°

+57.59

12

00'00"E

NAME

LABEL / DATE

MHB,SB,CB

PC

+57.59

EASEMENT LINE

N00° 00'00"E

LABEL / DATE

MHB,SB,CB

STATE BOUNDARY

W

MB

SEWER

GAS

E

DRAIN

FA

SEWER MAIN

W

MB

S

E

G

MAIL BOX

OVERHEAD ELECTRIC

WATER MAIN

GAS MAIN

ELECTRIC DUCT

D

PM

FA

DRAIN PIPE

GUY POLE

UTILITY POLE

STREET LIGHT

PARKING METER

FIRE ALARM BOX

HYDRANT

DMH

CS

WMH

TMH

EMH

EHH

(OR GI, LB)

CBCI

CB

(OR GICI)

DMH

CS

WMH

TMH

DRAINAGE MANHOLE

CURB STOP

WATER GATE

GAS GATE

SEWER MANHOLE

WATER MANHOLE

EMH

EHH

EMH

(OR GICI)

CB

ELECTRIC MANHOLE

LB LEACHING BASIN

GENERAL SYMBOLS

12" OAK

LP

C.I.T.

F&G

F&C

CIP

RCP

CMP

DI

ACCM

PIPE

WG

HYD

DS

INV.

PVC

UP

CB

DMH

HDPE

CBCI

RIM

GI

SMH

S

STL

LIGHT POLE

CHANGE IN TYPE

FRAME AND GRATE

FRAME AND COVER

CAST IRON PIPE

REINFORCED CONCRETE PIPE

CORRUGATED METAL PIPE

DUCTILE IRON PIPE

ASPHALT COATED CORRUGATED METAL

PIPE

WATER GATE

HYDRANT

DOWN SPOUT

INVERT ELEVATION

POLYVINYL CHLORIDE

UTILITY POLE

CATCH BASIN

DRAIN MANHOLE

HIGH DENSITY POLYETHYLENE

STEEL CATCH BASIN CURB INLET

RIM ELEVATION

GUTTER INLET

SEWER MANHOLE

SLOPE

STEEL

NOT TO SCALE

BENCH MARK

ABANDON

MAIL BOX

GRANITE CURB

EXISTING

FOUNDATION

FLOW LINE

PROPERTY LINE

PAVEMENT

PAVED WATERWAY

REINFORCED CONCRETE

REMOVE

REMODEL

RETAIN

RIGHT- OF- WAY

RAILROAD

REMOVE AND RESET

REMOVE AND STACK

REMOVE AND DISCARD

STONE BOUND

SPECIAL CATCH BASIN

WITH

FRAME AND COVER

SIDEWALK

HOT MIX ASPHALT

SLOPED GRANITE CURB

HOT MIX ASPHALT CURB

RETAINING WALL

CONCRETE CURB

CONTINUED

MILES PER HOUR

TYPICAL

RIGHT OF ENTRY

NOW OR FORMERLY

PROPOSED

ADJUST

CEMENT CONCRETE

BASELINE

CONSTRUCTION

TEMPORARY

SPECIFICATIONS

REHABILITATION

PROPERTY LINE

N.T.S.

B.M.

ABAN.

MB

GRAN. CURB

(OR GC)

EXIST.

(OR EX.)

FDN.

FL (OR F)

P

PVMT

P.W.W.

RC

REM.

REMOD.

RET.

R.O.W.

R.R.

R&R

R&S

R&D

SB

SCB

W/

F&C

SW

HMA

SGC

BC

RET. WALL

CC

CONT.

MPH

TYP.,

OR (TYP.)

ROE

N/F

PROP.

ADJ.

CEM. CONC.

B

CONST.

TEMP.

SPEC.

REHAB.

P

L

EDGE OF ROAD

ABBREVIATIONS

UTILITIES

L

L

L

GENERAL CONTINUED

EXISTING PROPOSED

CATCH BASIN

(OR GUTTER INLET)

Description

SHEET

App.B

yC

k.B

yD

r.B

yD

ate

No.

DE

VO

RP

PA

OF

DA

TE

RE

GIS

TE

RE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R

AP

P.B

YD

SN

.B

YD

R.B

YJO

B N

O.

CO

NT

RA

CT

:S

CA

LE

:C

AD

D N

O.

CH

K.B

Y

SB

LF

KM

KN

AP

--

--

10

HA

RW

OO

D S

TR

EE

T O

VE

R F

RE

NC

H R

IV

ER

B

RID

GE

R

EP

AIR

S

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

OX

FO

RD

, M

A

GE

NE

RA

L N

OT

ES

A

ND

L

EG

EN

D

C

-

1

2

Description

SHEET

App.B

yC

k.B

yD

r.B

yD

ate

No.

DE

VO

RP

PA

OF

DA

TE

RE

GIS

TE

RE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R

AP

P.B

YD

SN

.B

YD

R.B

YJO

B N

O.

CO

NT

RA

CT

:S

CA

LE

:C

AD

D N

O.

CH

K.B

Y

SB

LF

KM

KN

AP

--

--

10

HA

RW

OO

D S

TR

EE

T O

VE

R F

RE

NC

H R

IV

ER

B

RID

GE

R

EP

AIR

S

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

OX

FO

RD

, M

A

20

SCALE: 1" = 20'

0 50 100

EX

IS

TIN

G C

ON

DIT

IO

NS

P

LA

N

As N

oted

C

-

2

3

Description

SHEET

App.B

yC

k.B

yD

r.B

yD

ate

No.

DE

VO

RP

PA

OF

DA

TE

RE

GIS

TE

RE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R

AP

P.B

YD

SN

.B

YD

R.B

YJO

B N

O.

CO

NT

RA

CT

:S

CA

LE

:C

AD

D N

O.

CH

K.B

Y

SB

LF

KM

KN

AP

--

--

10

HA

RW

OO

D S

TR

EE

T O

VE

R F

RE

NC

H R

IV

ER

B

RID

GE

R

EP

AIR

S

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

OX

FO

RD

, M

A

20

SCALE: 1" = 20'

0 50 100

NOTES

1. FOR ROADWAY GRADING SEE SHEET

2. FOR STRUCTURAL GRADING SEE SHEET

3. THE CONTRACTOR SHALL USE EXTREME CAUTION WHEN WORKING IN

PROXIMITY TO OVERHEAD WIRES AND BURIED UTILITIES.

4. GUARDRAIL SHALL HAVE A FLARED END SECTION WITH A RATE OF 17:1

WHERE IT CAN BE ACHIEVED, OR AS INDICATED ON PLANS.

5. ALL GUARDRAIL SHALL COMPLY WITH MASSDOT STANDARD DETAILS AS

REQUIRED.

6. COMPOST FILTER TUBES ARE SHOWN IN THEIR INITIAL LOCATION. THE

CONTRACTOR SHALL REMOVE AND RESET THEM TO THE APPROPRIATE

LOCATIONS OUTSIDE OF HIS DIRECT WORK ZONE AS WORK PROGRESSES.

GRADING PLAN

20

SCALE: 1" = 20'

0 50 100

CONSTRUCTION PLAN

CO

NS

TR

UC

TIO

N P

LA

N

As S

how

n

C

-

3

4

DETECTABLE

WARNING PANEL

(SEE MASSDOT

DWG E 107.6.5)

SECTION A-A

ROADWAY

CC=4"

8"

NOTE:

ROADWAY, GUTTER, AND FIRST 6"

OF SIDEWALK TO BE ADJUSTED

FOR FIELD CONDITIONS

DETECTABLE WARNING

PANELW

(ON NARROW SIDEWALK)

N.T.S.

CEMENT CONCRETE WHEELCHAIR RAMP TYPE "B"

THE CONTRACTOR SHALL INSPECT ALL PORTIONS OF THE SITE IN ANTICIPATION OF

RAINFALL EVENTS TO DETERMINE IF SITE GRADING IS SUFFICIENT TO PREVENT

EROSION OF SLOPES OR WATERCOURSES WITHIN THE PROJECT LIMITS. SHOULD

ADDITIONAL MEASURES BE REQUIRED, THEY ARE TO BE IMPLEMENTED

IMMEDIATELY. IN NO CASE SHALL THE INSTALLATION OF ADDITIONAL MEASURES

NECESSARY TO PROTECT SLOPES WITHIN THE PROJECT LIMITS BE DELAYED

BEYOND THE COMMENCEMENT OF PRECIPITATION.

A STOCKPILE OF ADDITIONAL COMPOST TUBES, SILTATION FENCE AND CRUSHED

STONE SHALL BE KEPT ON SITE THROUGHOUT THE CONSTRUCTION WORK. THIS

MATERIAL SHALL BE INSTALLED AT THE DIRECTION OF THE ENGINEER TO MITIGATE

ANY EROSION/SEDIMENTATION CONDITIONS WHICH MAY ARISE.

FOR DESCRIPTION, MATERIALS, AND CONSTRUCTION METHOD, SEE SPECIAL

PROVISIONS. FOR LOCATION OF PROPOSED EROSION CONTROL MEASURES, SEE

PLANS. AREAS DISTURBED BY EROSION BARRIERS SHALL BE LOAMED AND SEEDED,

OR OTHERWISE RESTORED TO ORIGINAL CONDITION.

ALL DISTURBED EARTH SLOPES SHALL BE STABILIZED WITH PERMANENT

VEGETATIVE COVER AS SOON AS POSSIBLE. DISTURBED AREAS THAT ARE NOT

SUBJECT TO CONSTRUCTION TRAFFIC SHALL RECEIVE A PERMANENT OR

TEMPORARY VEGETATIVE COVER AS SOON AS FINAL CONTOURS ARE ESTABLISHED.

IF THE SEASON PREVENTS THE ESTABLISHMENT OF A VEGETATIVE COVER,

DISTURBED AREAS SHALL BE THOROUGHLY MULCHED. MULCHED AREAS SHALL BE

SEEDED AS SOON AS WEATHER CONDITIONS ALLOW.

COMPOST FILTER TUBES OR EQUIVALENT BARRIER APPROVED BY THE ENGINEER,

SHALL BE PLACED AROUND CATCH BASIN INLETS DURING CONSTRUCTION AND

SHALL BE MAINTAINED UNTIL CONTRIBUTING AREAS ARE PAVED. INLET SEDIMENT

CONTROL BAGS APPROVED BY THE ENGINEER SHALL BE PLACED BETWEEN FRAMES

AND GRATES TO PREVENT ANY TYPE OF SILT RUN-OFF INTO ANY EXISTING OR NEW

CATCH BASINS.

THE CONTRACTOR SHALL REMOVE ALL SEDIMENTATION CONTROL SYSTEMS,

REMOVE ALL ACCUMULATED SEDIMENTS, AND SEED THE DISTURBED AREAS WHEN

THE CONTROL SYSTEMS ARE NO LONGER REQUIRED. THE CONTRACTOR SHALL

REQUEST AND RECEIVE PERMISSION FROM THE ENGINEER PRIOR TO REMOVING

ANY CONTROL SYSTEM.

STOCKPILED SOIL SHALL BE SURROUNDED WITH STAKED STRAW BALES AND

SILTATION FENCES TO PREVENT AND CONTROL SILTATION AND EROSION.

STOCKPILES THAT WILL REMAIN EXPOSED FOR MORE THAN 30 DAYS SHALL BE

STABILIZED WITH MULCH OR SEEDED FOR TEMPORARY VEGETATIVE COVER.

ALL DISTURBED AREAS THAT WILL REMAIN EXPOSED OR UNDISTURBED FOR A

PERIOD OF FOURTEEN (14) DAYS OR LONGER, SHALL BE STABILIZED WITH MULCH

OR SEEDED FOR TEMPORARY VEGETATIVE COVER.

12.

IT IS THE INTENT OF THE CONTRACT PLANS AND DETAILS TO CONTROL EROSION AND SEDIMENTATION IN ALL PORTIONS OF THE SITE. THE CONTRACTOR

IS ALERTED THAT CONTROL OF EROSION AND SEDIMENTATION IS CONSIDERED TO BE ESPECIALLY IMPORTANT IN AND AROUND THE AREAS SHOWN ON

THE PLANS AND DELINEATED AS WETLANDS AND WATERCOURSES. THE CONTRACTOR IS TO IMPLEMENT THE EROSION AND SEDIMENTATION CONTROLS

INDICATED ON THE PLANS IN ACCORDANCE WITH THE FOLLOWING NOTES, BUT IS ALERTED TO THE FACT THAT ADDITIONAL MEASURES MAY BE REQUIRED

TO COMPLY WITH THIS INTENT, AS FIELD CONDITIONS MAY WARRANT. SHOULD SUCH MEASURES BE DETERMINED TO BE REQUIRED OR ORDERED BY THE

ENGINEER, THEY ARE TO BE IMPLEMENTED IMMEDIATELY. ANY AND ALL REQUIREMENTS FOR ANY TYPE OF EROSION CONTROL MEASURES SHALL BE

INCIDENTAL TO THE PROJECT.

ALL WORK SHALL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE

PROVISIONS OF ALL APPLICABLE PERMITS AND APPROVALS ISSUED BY LOCAL AND

STATE REGULATION FOR ACTIVITIES INVOLVING WETLANDS, WATERCOURSES

AND/OR EROSION CONTROLS, AND AS DIRECTED BY THE ENGINEER. ALL EROSION

AND SEDIMENTATION CONTROL MEASURES SHALL BE CONSTRUCTED IN

ACCORDANCE WITH THE MASS DEP'S EROSION AND SEDIMENTATION CONTROL

GUIDELINES, AUGUST, 1983 AND THE U.S.D.A. SCS'S EROSION AND SEDIMENT

CONTROL IN SITE DEVELOPMENT, MASSACHUSETTS CONSERVATION GUIDE,

SEPTEMBER 1983.

TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE

INSTALLED PRIOR TO THE COMMENCEMENT OF ANY SITEWORK, SHALL BE

MAINTAINED DURING CONSTRUCTION, AND SHALL REMAIN IN PLACE UNTIL ALL

SITEWORK IS COMPLETED AND GROUND COVER IS ESTABLISHED (AT LEAST 75%

UNIFORM COVERAGE BY NEW SEEDLINGS).

ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED IN

EFFECTIVE CONDITION THROUGHOUT THE CONSTRUCTION PERIOD. THE

CONTRACTOR SHALL INSPECT THE EROSION CONTROLS DAILY AND CLEAN

ACCUMULATED MATERIALS FROM BEHIND THEM, AS NECESSARY. ALL EROSION AND

SEDIMENTATION CONTROL MEASURES FOUND TO BE IN NEED OF REPAIR OR

REPLACEMENT SHALL BE IMMEDIATELY CORRECTED, SO AS TO MAINTAIN THE

INTEGRITY OF THE EROSION AND SEDIMENTATION CONTROL SYSTEM.

SEDIMENT REMOVED FROM CONTROL STRUCTURES SHALL BE DISPOSED OF IN A

MANNER WHICH IS CONSISTENT WITH THE INTENT OF THESE PLANS. NO EQUIPMENT

OR MATERIAL OF ANY KIND SHALL BE STOCKPILED OR DEPOSITED IN ANY

REGULATED AREA UNLESS SPECIFICALLY SHOWN ON THE CONTRACT PLANS OR

AUTHORIZED BY PROJECT PERMITS/APPROVALS.

11.

10.

9.

8.

7.

SLOPE CHECK

SILTATION FENCE DETAIL

DITCH CHECK

DEWATERING POOL SHALL BE MAINTAINED AND CLEANED ON A REGULAR BASIS.

SEDIMENTS REMOVED FROM POOL SHALL BE DISPOSED ACCORDING TO DEP

GUIDELINES AND ORDER OF CONDITIONS.

ALL EROSION CONTROL DEVICES, INCLUDING DEWATERING POOL SHALL BE IN

PLACE PRIOR TO COMMENCEMENT OF ANY DEWATERING ACTIVITIES.

DEWATERING POOL LOCATION SHALL BE AT LEAST 100 FT OR AS FAR AWAY AS

POSSIBLE FROM RESOURCE AREA AS DIRECTED BY THE ENGINEER.

ANY DEWATERING OPERATIONS DEEMED NECESSARY BY THE CONTRACTOR OR

REQUIRED BY THE ENGINEER SHALL BE INCIDENTAL TO THE PROJECT.

ALL WORK ASSOCIATED WITH TEMPORARY EROSION CONTROL MEASURES AND

ACTIVITIES NOT INCLUDED UNDER A SPECIFIC PAY ITEM SHALL BE CONSIDERED

INCIDENTAL TO THE PROJECT.

13.

DEWATERING DISCHARGE AFTER TREATMENT SHALL BE LESS THAN 25

NEPHELOMETRIC TURBIDITY UNITS (NTU).

COMPOST FILTER TUBE

MINIMUM 12 INCHES IN DIAMETER WITH AN EFFECTIVE HEIGHT OF 9.5 INCHES.

TUBES FOR COMPOST FILTERS SHALL BE JUTE MESH OR APPROVED BIODEGRADABLE

MATERIAL. ADDITIONAL TUBES SHALL BE USED AT THE DIRECTION OF THE ENGINEER.

TAMP TUBES IN PLACE TO ENSURE GOOD CONTACT WITH SOIL SURFACE. IT IS NOT

NECESSARY TO TRENCH TUBES INTO EXISTING GRADE.

UNDISTURBED SUBGRADE

EXISTING

TREE

EXISTING

PAVEMENT

PLACING TUBES AGAINST THE UPHILL SIDE OF WELL-

ANCHORED, STATIONARY FEATURES SUCH AS EXISTING

TREES CAN PROVIDE ADDITIONAL BRACING.

CURVE ENDS UPHILL TO PREVENT DIVERSION OF

UNFILTERED RUN-OFF.

PROVIDE A 3 FT. MINIMUM OVERLAP AT ENDS OF TUBES TO JOIN

IN A CONTINUOUS BARRIER AND MINIMIZE UNIMPEDED FLOW.

STAKE JOINING TUBES SNUGLY AGAINST EACH OTHER TO

PREVENT UNFILTERED FLOW BETWEEN THEM.

SECURE ENDS OF TUBES WITH STAKES SPACED 18 IN. APART

THROUGH TOPS OF TUBES.

PROTECTED AREA

LIMIT OF WORK

COMPOST FILTER TUBE (TYP.)

LOOSE COMPOST LAYER

UNTREATED HARDWOOD STAKE (TYP.)

STREAM

2 INCH X 2 INCH X 3 FEET

UNTREATED HARDWOOD STAKES, UP TO 5 FT. APART OR AS REQUIRED TO SECURE TUBES IN

PLACE.

WHEN STAKING IS NOT POSSIBLE, SUCH AS WHEN TUBES MUST BE PLACED ON PAVEMENT,

HEAVY CONCRETE OR CINDER BLOCKS CAN BE USED BEHIND TUBES UP TO 5 FT. APART OR AS

REQUIRED TO SECURE TUBES IN PLACE.

3.0 FT. MIN.

AR

EA

O

F D

IS

TU

RB

AN

CE

2 FT.

MIN.

AR

EA

O

F D

IS

TU

RB

AN

CE

PR

OT

EC

TE

D A

RE

A

GENERAL NOTES:

1. PROVIDE A MINIMUM TUBE DIAMETER OF 12 INCHES

FOR SLOPES UP TO 50 FEET IN LENGTH WITH A

SLOPE RATIO OF 3H:1V OR STEEPER. LONGER

SLOPES OF 3H:1V MAY REQUIRE LARGER TUBE

DIAMETER OR ADDITIONAL COURSING OF FILTER

TUBES TO CREATE A FILTER BERM. REFER TO

MANUFACTURER'S RECOMMENDATIONS FOR

SITUATIONS WITH LONGER OR STEEPER SLOPES.

2. INSTALL TUBES ALONG CONTOURS AND

PERPENDICULAR TO SHEET OR CONCENTRATED

FLOW.

3. DO NOT INSTALL IN PERENNIAL, EPHEMERAL OR

INTERMITTENT STREAMS.

4. CONFIGURE TUBES AROUND EXISTING SITE

FEATURES TO MINIMIZE SITE DISTURBANCE AND

MAXIMIZE CAPTURE AREA OF STORMWATER

RUN-OFF.

TUBES CAN BE PLACED DIRECTLY

ON EXISTING PAVEMENT WHEN

NECESSARY.

EXISTING HEADWALL

OR OTHER OBSTACLE

SINGLE COMPOST FILTER TUBE DETAIL

2 IN. DEEP x 12 IN. WIDE LAYER OF

LOOSE COMPOST MATERIAL PLACED ON

UPHILL/FLOW SIDE OF TUBES TO FILL

SPACE BETWEEN SOIL SURFACE AND

TUBES.

DIRECTION

OF FLOW

1.

2.

3.

4.

5.

6.

EROSION CONTROL NOTES:

DEWATERING NOTES:

1.

2.

3.

4.

5.

DISTANCE VARIES TO

ACCOMMODATE FLOW

STRAW BALES STAKED WITH 2

STAKES PER BALE

FILTER FABRIC

HAY BALE STAKE (TYP)

PLAN

DISCHARGE HOSE

DISCHARGE HOSE

SECTION A-A

DEWATERING DISCHARGE DISPOSAL DETAIL

2" X 2" x 40"

WOOD POST

NOT TO SCALE

STANDARD FILTER FABRIC

BACKFILL

EXISTING SOIL

FLOW

6" x 6"

TRENCH

STANDARD FILTER

FABRIC EXTENDS

INTO TRENCH

NOT TO SCALE

WHEN JOINING TWO OR MORE SILTATION FENCES TIE

THE TWO END POSTS TOGETHER WITH NYLON CORD.

DIRECTION OF FLOW

PLAN VIEW

D

I

R

E

C

T

I

O

N

O

F

F

L

O

W

NOT TO SCALE

DIRECTION OF FLOW

PLAN VIEW - JOINING DETAIL

COMPOST

FILTER

TUBES

UNTREATED

STAKES

Description

SHEET

App.B

yC

k.B

yD

r.B

yD

ate

No.

DE

VO

RP

PA

OF

DA

TE

RE

GIS

TE

RE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R

AP

P.B

YD

SN

.B

YD

R.B

YJO

B N

O.

CO

NT

RA

CT

:S

CA

LE

:C

AD

D N

O.

CH

K.B

Y

SB

LF

KM

KN

AP

--

--

10

HA

RW

OO

D S

TR

EE

T O

VE

R F

RE

NC

H R

IV

ER

B

RID

GE

R

EP

AIR

S

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

OX

FO

RD

, M

A

DE

TA

IL

S

As S

how

n

C

-

4

5

1. PLACEMENT OF ALL CONSTRUCTION SIGNS, DRUMS, BARRICADES, TRAFFIC DEVICES

AND THE SHAPE, SIZE & COLOR OF ALL TEMPORARY TRAFFIC SIGNS SHALL CONFORM

WITH THE 2003 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND

REVISIONS.

2. ADVANCE WARNING SIGN PLACEMENT AND TAPER LENGTH SHALL BE ADJUSTED

ACCORDING TO STREET CONDITIONS AND DRIVEWAY OPENINGS.

3. ALL DRUMS SHALL BE APPROXIMATELY PLACED AND RELOCATED AS NECESSARY TO

MAINTAIN ADEQUATE ABUTTER ACCESS AT ALL TIMES.

4. THE CONTRACTOR SHALL NOTIFY EACH ABUTTER AT LEAST 24 HOURS IN ADVANCE OF

THE START OF ANY WORK THAT WILL REQUIRE THE TEMPORARY CLOSURE OF ACCESS,

SUCH AS EXISTING PAVEMENT EXCAVATION, TEMPORARY DRIVEWAY PAVEMENT

PLACEMENT AND SIMILAR OPERATIONS.

5. NONESSENTIAL TRAFFIC CONTROL DEVICES SHALL BE COVERED OR REMOVED DURING

NON-WORKING HOURS.

6. PEDESTRIANS SHALL BE PROVIDED WITH ACCESS AND SAFE PASSAGE THROUGH THE

TEMPORARY TRAFFIC CONTROL ZONE AT ALL TIMES.

7. ADVISORY SPEED PLATES (W13-1) SHALL BE USED IF APPLICABLE AND AS DIRECTED BY

THE ENGINEER.

8. R2-10A SIGN TO BE ERECTED BETWEEN THE FIRST AND SECOND ADVANCED

CONSTRUCTION WARNING SIGNS.

9. MAINTAIN ONE LANE (MIN. 11' WIDTH) AT ALL TIMES DURING CONSTRUCTION. UNLESS

OTHERWISE APPROVED BY THE OXFORD DPW.

10. CONTRACTOR SHALL SUBMIT TRAFFIC MANAGEMENT PLANS TO THE OXFORD DPW FOR

APPROVAL PRIOR TO THE BEGINNING OF CONSTRUCTION.

11. CONTRACTOR SHALL UTILIZE POLICE DETAILS DURING TRAFFIC MANAGEMENT SETUP,

BREAKDOWN AND AS NEEDED.

12. TRAFFIC MANAGEMENT CONFIGURATION SHALL COMPLY WITH MUTCD FIGURE 6H-12.

(T

Y

P

)

N.T.S.

100'

TA

PE

R

100'

BU

FF

ER

20'

500'

100'

WORK AREA

500'

100'

TA

PE

R

5

0

0

'

5

0

0

'

W

3

-3

W

2

0

-4

11'(MIN)

W

3-3

W

20-4

R2-6B 36" 36"

36"48"R2-10b

36"48"R2-10a

N.T.S.

48"

36"

W3-3

36"

W20-4

48"

W20-1

48"

18"W13-1

18"

TEMPORARY TRAFFIC SIGN SUMMARY

HEIGHT

SIZE OF SIGN

IDENTIFI-

CATION

NUMBER

WIDTH

TEXT

(OPT)

48"

1

0

0

0

'

1

0

0

0

'

W

2

0

-1

R

2

-1

0

a

R

2

-1

0

b

R

2

-1

0

b

R

2

-1

0

a

W

2

0

-1

NOTES:

REFLECTORIZED CHANNELIZING DEVICE

REFLECTORIZED DRUM WITH LIGHT

TRAFFIC FLOW DURING CONSTRUCTION

NORMAL TRAFFIC FLOW POLICE DETAIL

TEMPORARY TRAFFIC SIGNAL

BARRICADE TYPE III

SIGN CONSTRUCTION

WORK AREA

NOT TO SCALE

ARROW BOARD

LEGEND

TYPICAL TEMPORARY LANE CLOSURE (ONE LANE-

BI-DIRECTIONAL WITH TEMPORARY SIGNALS)

BU

FF

ER

CEMENT CONCRETE

6" MIN.

6"

GRAVEL BORROW,TYPE B

HMA BINDER COURSE

(MIN.)

MIN.

12"

PROP HOT MIX

ASPHALT TOP COURSE

PROP GRAN CURB

TYPE VA4, 6"

REVEAL

CEMENT CONCRETE

SCALE:

1

N.T.S.

CURB INSTALLATION IN FULL DEPTH PAVEMENT

PROP HMA

SIDEWALK

8" GRAVEL

BORROW

LEVEL

1'-0"(MIN.)

1'-0"

1" REVEAL

SHOULDER

75°

BASE

COURSE

SUBBASE

BINDER COURSE

1:2 MAX

ROUND

4" LOAM,

SEEDED

(TYP.)

SCALE:

2

N.T.S.

MODIFIED 1' WIDE CAPE COD BERM WITH 1" REVEAL

3" +

TO

P G

RA

DE

TOP COURSE

EDGE OF

PAVEMENT NOTES

4" DENSE GRADED CRUSHED STONE OVER 8" GRAVEL BORROW,

TYPE B

4" HOT MIX ASPHALT PLACED IN TWO LAYERS; (1 1/2" TOP COURSE

OVER 2 1/2" BINDER COURSE)

PROPOSED FULL DEPTH PAVEMENT:

BITUMEN FOR TACK COAT SHALL BE APPLIED AT A RATE OF 0.07 GAL/SY

SURFACE:

SUBBASE:

R

10-6

R

1

0

-6

STOP LINE

36"

R10-6

24"

DYCL

STOP LINE

DYCL

Description

SHEET

App.B

yC

k.B

yD

r.B

yD

ate

No.

DE

VO

RP

PA

OF

DA

TE

RE

GIS

TE

RE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R

AP

P.B

YD

SN

.B

YD

R.B

YJO

B N

O.

CO

NT

RA

CT

:S

CA

LE

:C

AD

D N

O.

CH

K.B

Y

SB

LF

KM

KN

AP

--

--

10

HA

RW

OO

D S

TR

EE

T O

VE

R F

RE

NC

H R

IV

ER

B

RID

GE

R

EP

AIR

S

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

OX

FO

RD

, M

A

DE

TA

IL

S &

T

RA

FF

IC

M

AN

AG

EM

EN

T P

LA

N

As S

how

n

C

-

5

6

Description

SHEET

App.B

yC

k.B

yD

r.B

yD

ate

No.

DE

VO

RP

PA

OF

DA

TE

RE

GIS

TE

RE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R

AP

P.B

YD

SN

.B

YD

R.B

YJO

B N

O.

CO

NT

RA

CT

:S

CA

LE

:C

AD

D N

O.

CH

K.B

Y

SB

LF

KM

KN

AP

--

--

10

HA

RW

OO

D S

TR

EE

T O

VE

R F

RE

NC

H R

IV

ER

B

RID

GE

R

EP

AIR

S

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

OX

FO

RD

, M

A

BR

ID

GE

P

LA

NS

&

N

OT

ES

As N

oted

S

-

1

7

Description

SHEET

App.B

yC

k.B

yD

r.B

yD

ate

No.

DE

VO

RP

PA

OF

DA

TE

RE

GIS

TE

RE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R

AP

P.B

YD

SN

.B

YD

R.B

YJO

B N

O.

CO

NT

RA

CT

:S

CA

LE

:C

AD

D N

O.

CH

K.B

Y

SB

LF

KM

KN

AP

--

--

10

HA

RW

OO

D S

TR

EE

T O

VE

R F

RE

NC

H R

IV

ER

B

RID

GE

R

EP

AIR

S

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

OX

FO

RD

, M

A

SL

OP

E P

AV

IN

G D

ET

IA

LS

As N

oted

S

-

2

8

Description

SHEET

App.B

yC

k.B

yD

r.B

yD

ate

No.

DE

VO

RP

PA

OF

DA

TE

RE

GIS

TE

RE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R

AP

P.B

YD

SN

.B

YD

R.B

YJO

B N

O.

CO

NT

RA

CT

:S

CA

LE

:C

AD

D N

O.

CH

K.B

Y

SB

LF

KM

KN

AP

--

--

10

HA

RW

OO

D S

TR

EE

T O

VE

R F

RE

NC

H R

IV

ER

B

RID

GE

R

EP

AIR

S

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

OX

FO

RD

, M

A

CO

NC

RE

TE

R

EP

AIR

E

LE

VA

TIO

NS

A

ND

D

ET

AIL

S

As N

oted

S

-

3

9

Description

SHEET

App.B

yC

k.B

yD

r.B

yD

ate

No.

DE

VO

RP

PA

OF

DA

TE

RE

GIS

TE

RE

D P

RO

FE

SS

IO

NA

L E

NG

IN

EE

R

AP

P.B

YD

SN

.B

YD

R.B

YJO

B N

O.

CO

NT

RA

CT

:S

CA

LE

:C

AD

D N

O.

CH

K.B

Y

SB

LF

KM

KN

AP

--

--

10

HA

RW

OO

D S

TR

EE

T O

VE

R F

RE

NC

H R

IV

ER

B

RID

GE

R

EP

AIR

S

DE

PA

RT

ME

NT

O

F P

UB

LIC

W

OR

KS

OX

FO

RD

, M

A

AP

PR

OA

CH

S

LA

B A

ND

G

UA

RD

RA

IL

D

ET

AIL

S

As N

oted

S

-

4

10