4
भारत सरकार Government of India विुत मंालय Ministry of Power के रीय विुत ाविकरण Central Electricity Authority तापीय पररयोजना ,योजना एिं विकास भाग Thermal Project Planning & Development Division No. 264/SHAKTI B (iv)/CEA/TPPD/2017 Dated: 11.12.2017 Notification Notice Inviting applications for linkages to States as per B (iv) of New Coal Linkages Policy for Power Sector 2017 SHAKTI issued by Ministry of Coal. Govt. of India on 22.05.2017 notified a new more transparent coal allocation policy for Power sector, 2017 SHAKTI (Scheme for Harnessing and Allocating Koyala (coal) Transparently in India). As per the new SHAKTI policy, para B(iv), coal linkages may be earmarked for fresh PPAs, by declaring the availability of coal linkages with description, to the states. States may indicate these linkages to Discoms/SDAs. A methodology (copy enclosed) for linkages to states as per para B(iv) of new allocation policy for power sector SHAKTI 2017 has been prepared by CEA and approved by Ministry of Power (MoP), OM dated 06.10.2017. MoP vide letter dated 02.11.2017 requested CEA to invite applications from states for Coal linkages as per policy. In this regard, states are requested to furnish the applications for coal linkages as per para B(iv) of SHAKTI 2017 policy, based on the power scenario in state (present/future) in the enclosed format (annexure I) to this division of CEA by 15.01.2018 else it will be assumed that no linkage is required under para B(iv) of SHAKTI policy. Encl: As Above. Yours faithfully (N S Mondal) Director (TPP&D) सेवा भवन, आर. के. पुरम-I, नई दिली-110066 टेलीफै स: 011-26107990. ईमेल: [email protected] वेबसाइट: www.cea.nic.in Sewa Bhawan, R.K Puram-I, New Delhi-110066 Telefax: 011-26107990. Email: [email protected] .Website: www.cea.nic.in

Notification - CEAcea.nic.in/.../thermal/tppd/new_coal_linkage_policy.pdfpara B(iv) of SHAKTI – 2017 policy, based on the power scenario in state (present/future) in the enclosed

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Notification - CEAcea.nic.in/.../thermal/tppd/new_coal_linkage_policy.pdfpara B(iv) of SHAKTI – 2017 policy, based on the power scenario in state (present/future) in the enclosed

भारत सरकार

Government of India विद्युत मंत्रालय

Ministry of Power के न्द्री य विद्यु त प्रा विक रण

Central Electricity Authority

तापीय पररयोजना ,योजना एिं विकास प्रभाग

Thermal Project Planning & Development Division

No. 264/SHAKTI – B (iv)/CEA/TPPD/2017 Dated: 11.12.2017

Notification

Notice Inviting applications for linkages to States as per B (iv) of New Coal Linkages

Policy for Power Sector 2017 – SHAKTI issued by Ministry of Coal.

Govt. of India on 22.05.2017 notified a new more transparent coal allocation policy

for Power sector, 2017 – SHAKTI (Scheme for Harnessing and Allocating Koyala (coal)

Transparently in India). As per the new SHAKTI policy, para B(iv), coal linkages may be

earmarked for fresh PPAs, by declaring the availability of coal linkages with description, to the

states. States may indicate these linkages to Discoms/SDAs.

A methodology (copy enclosed) for linkages to states as per para B(iv) of new

allocation policy for power sector SHAKTI – 2017 has been prepared by CEA and approved

by Ministry of Power (MoP), OM dated 06.10.2017. MoP vide letter dated 02.11.2017

requested CEA to invite applications from states for Coal linkages as per policy.

In this regard, states are requested to furnish the applications for coal linkages as per

para B(iv) of SHAKTI – 2017 policy, based on the power scenario in state (present/future) in

the enclosed format (annexure –I) to this division of CEA by 15.01.2018 else it will be assumed

that no linkage is required under para B(iv) of SHAKTI policy.

Encl: As Above.

Yours faithfully

(N S Mondal)

Director (TPP&D)

सेवा भवन, आर. के. परुम-I, नई दिल्ली-110066 टेलीफैक्स: 011-26107990. ईमेल: [email protected] वेबसाइट: www.cea.nic.in

Sewa Bhawan, R.K Puram-I, New Delhi-110066 Telefax: 011-26107990. Email: [email protected] .Website:

www.cea.nic.in

Page 2: Notification - CEAcea.nic.in/.../thermal/tppd/new_coal_linkage_policy.pdfpara B(iv) of SHAKTI – 2017 policy, based on the power scenario in state (present/future) in the enclosed

Methodology for linkages to States as per para B(iv) of New Allocation

Policy for Power Sector 2017 - SHAKTI

Coal linkages would be earmarked to States on the recommendation of Ministry of Power

in commensurate to the likely Power-Deficit in the state. The States may allocate this coal

to DISCOMs / SDAs which in turn may allocate to power plants.

Following are the broad guidelines for the states:

1. This exercise shall be carried out once in a year. The applicant state will submit its

application for coal linkage under above policy to CEA by 31st January.

2. The Demand-Supply Gap in the State shall be taken in to account while

recommending coal linkages to the States.

3. Demand/ Supply scenario in each state shall be submitted as per attached format in

Annexure-I and the same shall be verified by CEA keeping in view of the demand

projections as per Electric Power Survey (EPS).

4. Preference would be given to the States as per their performance in UDAY scheme.

***

Page 3: Notification - CEAcea.nic.in/.../thermal/tppd/new_coal_linkage_policy.pdfpara B(iv) of SHAKTI – 2017 policy, based on the power scenario in state (present/future) in the enclosed

Page 1 of 2

Annexure-I

FORMAT FOR FURNISHING DETAILS BY STATE FOR GETTING COAL LINKAGE FOR FRESH PPA UNDER SHAKTI SCHEME PARA B(iv)

1. Name of State: ………………………………………………………….

2. Name of the Lead Procurer / DISCOM: ………………………………………………………….

3. Capacity (MW) for which Coal Linkage required: ………………………………………………………....

4. Power Scenario in State (Present/ Future): (To be given separately as per Peak Hour Demand (MW) and Total Energy Requirement (MUs)

Sl. No.

Power Scenario in State (Present/ Future) Present 1st Year (Year…...)

2nd Year (Year…...)

… … Up to Terminal

year of PPA

1 Total Available Capacity

2 Fuel wise Break-up of available capacity

2.1 Thermal Power Capacity

2.2 Hydro Power Capacity

2.3 Renewable Capacity

2.4 Capacity of Others

3 Sector wise Break-up of available capacity

3.1 Owned Capacity of the State

3.2 Share from Central Sector

3.3 PPAs from IPPs

3.4 Power Capacity from Others

5 Total Peak Demand of the State

6 Total Peak Supply Available

7 Total Gap in Demand & Supply (Demand to be met)

8 Demand to be met from Thermal Power

Page 4: Notification - CEAcea.nic.in/.../thermal/tppd/new_coal_linkage_policy.pdfpara B(iv) of SHAKTI – 2017 policy, based on the power scenario in state (present/future) in the enclosed

Page 2 of 2

9 Thermal Power Demand to be met through State Capacity

10 Thermal Power Demand to be Met through Central Sector

11 Thermal Power Demand to be met through IPPs

12 Year Wise Fresh PPAs to be floated

5. Anticipated date of PPA Materialization: ………………………………………………………….

6. Suggested Point of Drawl: ………………………………………………………….

Signature of Authorized Person

of State/ State Designated Agency

Date:

Name:

Designation

Seal:

Contact No./ Fax No.:

Address: