Public Works & Utility Commission
MEETING PLACE: Suamico Municipal Services Center
12781 Velp Avenue
Agenda
Tuesday, June 26, 2018
1) Call to Order
2) Approve Agenda
3) Approve Minutes of May 22, 2018 Meeting
4) Citizen Comments on Public Works & Utility Agenda Items
5) Public Forum
6) Well #3 Rehab Update/ Schedule
7) Winona Foods Wastewater Control Manhole
8) 2018 Capital Roadway Reconstruction Update
9) HWY 41 & CTY B Interchange Update
10) Future Agenda Items
11) Adj ourn
Approved by Administrator
Note: A majority ofmembers of the Village Board may be in attendance for informationgathering and sharing.
Any person wishing to attend who, because of a disability, requires special accommodationsshould contact the Suamico Village office at ( 920) 434-2212 with as much advanced notice as
possible, so that accommodations can be made.
Public Works & Utility Commission
Minutes
Tuesday, May 22, 2018 311' M
Members present: Matt Athey, Bill Bourbonnais, Joel Ebrfurth, Bryan Fischer, Paul Garvey andFred Krumberger
Absent: Dan Roddan
Staff: Andy Smits/ Deputy Public Works Director
1) Call to Order
Meeting was called to order by Chair, Matt Athey at 6: 02 P.M.
2) Approve Agenda
Motion was made by Joel Ehrfarth to approve the agenda; second by Bryan Fischer. Motion carried 4- 0.
3) Approve Minutes of April 24, 2018 MeetingMotion was made by Fred Krumberger to approve the minutes; second by Joel Ehrfurth. Motion carried 4- 0.
4) Citizen Comments on Public Works & Utility Agenda ItemsNone
5) Public Forum
None
Commission members Paul Garvey & Bill Bourbonnais arrived)
6) Consumer Confidence Report
STAFF REPORT/UPDATE:
Consumer Confidence Report (CCR) is required by the Federal Environmental ProtectionAgency (EPA). The CCR must be prepared and distributed by all community water systemsin order to provide information concerning water quality for the previous monitoring year. The report identifies detected contaminants, compliance with drinking water rules, andeducational language, and is based on information reported to the Wisconsin Department of
Natural Resources ( DNR).
This report does go out in the second quarter billing to the utility customers. The report does get posted on the website and at the four posting boards.
7) Snowstorm Evelyn and Winter Maintenance
The operations of the snowstorm were reviewed.
Look at getting two sets of tire chains for each truck; Eliminate down time of the equipment;
PW & Utility Minutes, 05- 22- 2018
Single axle plow spare truck ( 1997) was needed during this snowstorm; Department is getting a different single truck for next year; A big item is looking at extra salt storage; Capacity of salt on site; having more on inventory; Ordering salt and the delivery of the salt; Salt supply has changed over the years and is more difficult to get the road salt; Size of the present salt shed and an issue is that this never gets completely empty. Discussion was held on the possible need of a second salt storage shed for the future;
Members asked how the accidents per mile for this storm compared to other areamunicipalities;
Commission did request that Andy (Public Works Director) find this information out.
8) 2018 Capital Roadway Reconstruction UpdateSpreadsheet was given to commission of the roads that will be worked on this year.
The contracts for the roadway project were signed last week.
9) Well #3 Rehab Update
This work is being bid out at this time.
10) HWY 41 & CTY B Interchange Update
May 29 is the full closure on Cly B and is expected to be a month; this information is postedon reader boards.
Information is kept up- to- date on the websites. Signage was done with the local businesses.
11) Future Agenda Items
Continued updates on well #3 and the Highway Project.
12) Adj ouinMotion was made by Fred Krumberger to adjourn; second by Bryan Fischer. Motion carried 6- 0.
Meeting adjourned at 7: 00 P.M.
Recording Secretary, Jean De Bauche
2
PW & Utility Minutes, 05- 22-2018
5/ 22/ 2018
To: Terry Steinmann — President of Winona Foods
Subject: Metering Manhole Installation
Dear Mr. Steinmann,
The Village of Suamico will be going ahead with the installation of the metering manhole project that
has been discussed for the past several years. Data compiled indicates a discrepancy in wastewater
discharge being significantly higher than water being used from the municipal water supply to your
facility. Village code ( 9. 05) references the ability for Suamico to have the right to require such metering
control to firmly know and understand the composition and volume being discharged from an
industrial waste generator.
Please find the table below for an outline to what the project will entail and estimated costs involved.
This project will be funded by the property/ business owner and completed using Village specifications.
The Village needs to get moving on this project so it can be bid out and constructed in the 2018 calendar
year. In discussions, you did mention there was a leak just upstream about 10' from the current
sampling manhole that could be added to this project and fixed at the time of construction.
The Village will facilitate the project and draft a final bill upon completion of the project. Details of
maintenance will also need to be addressed at the completion of the project when the improvements
are turned over to your staff. They need to learn and understand the equipment that being installed.
Manhole with Flume 2, 500
Flume 2, 800
Connection to sanitary sewer 1,000
Electrical installation 6, 500
Meter/SCADA/ Energenecs 7,875
Lawn Restoration 1,000
Misc Site Work 2, 000
Contingency 15% 3, 551
Engineering 8,250
TOTAL PROJECT ESTIMATE 35, 476
If you have any questions regarding this project please feel free to call the Village at (920-434-8410).
Thanks,
Andy Smits
Director of Public Works and Utilities
12781 Velp Avenue
Suamico WI 54313
Winona Foods Meter Pit
Project Cost Estimate
Manhole with Flume $ 2, 500
Flume $ 2, 800
Connection to sanitary sewer $ 1,000
Electrical installation $ 6, 500
Mete r/ SCADA/ E n e rge necs $ 7,875
Lawn Restoration $ 1,000
Misc Site Work $ 2, 000
Contingency 15% $ 3, 551
Engineering $ 8, 250
TOTAL PROJECT ESTIMATE $ 35,476
Date Water Usage (Gal) Wastewater Discharge ( Gal)
1st Quarter - 2014 965,160 912,857
1st Quarter - 2014 965, 160 11886, 000
2nd Quarter - 2014 756, 370 No Data
3rd Quarter - 2014 1, 1831920 11564, 000
4th Quarter - 2014 11081, 980 11918, 857
1st Quarter - 2015 854,540 No Data
2nd Quarter - 2015 11383, 990 858,000
3rd Quarter - 2015 1, 1991510 1, 803, 200
4th Quarter - 2015 21195, 410 893, 714
4th Quarter - 2015 21195, 410 683,429
1st Quarter - 2016 439,340 No Data
2nd Quarter - 2016 428,170 11146,600
3rd Quarter - 2016 420,660 1, 324,800
4th Quarter - 2016 361..250' 1, 165,333
4th Quarter - 2016 361,251 31404,000
1st Quarter - 2017 647, 280 113500000
3rd Quarter - 2017 1, 0041640 935,333
4th Quarter - 2017 9140890 11984, 571
4th Quarter - 2017 914,890 3, 0621285
zC
NAS
N
D {
1(y'$ALN
1Ci-
i (
7yV//
O <
zryOOm
D
p0 .
npNO
ul
2HAIE- n.
z
m7i
is
21012
y
yF
m
m
O
09
Ned.
Zb
c
2or .
a
Z
F .
L "
y
o
0
T
0
T
m
N
00
i
m
o
D
O
TQib "'
O6 002
9DY -
ID
0
o
Ull
pi
F. C
p
yAAAr
mmi
GNG
OTAO
fll (
DlZpppOrpp'
n
fflMol,
OII
3
it
3
999-
O.&
DDO
COi
Hol
Z
n
v2
y
g
neem
m®
m
o
cmi°
o
z
o
3
m
ihcgic
ogZ
4o_
Z
Z -
y{
AA -
NIa
N
DZD
ND
ym
R
m
Oq
VIIIA^
Nfff
m
Obl
ZO
61
N
A
A
Zm
O
q
iiDDfOn
ii71 ^^
11
AN
r
g
S $
00 §
p
gig
Ztt(yynn
m
c
io
m ?
ZD
F
b'
m
of
z
3m
vmy
Co
r
Rm
p
A
C
OZNNff
I
my
Jai (
Ormr
10
34B
mW
2082
O
00
O
R
X23 •
Illa
0
Q
p0 '
v + -
1
O((}} _
ZU
OTI
OZ .
11•
t'
ZOInA
p
Z
iO
yZ
m
WooFn
O
NOA
11-2
4
O
A&
Awi
OTMNL:IbhT,lIi
ill _
Aj
rY
tet• - ._
station
ntrol panel
MZANORTHEAST ASPHALT. INC-
A - LBEC GROUP COMPANY
SU -1801 ScheduleProject Manager. Michelle Laehat
JOB NAME: Villad of Suamico R02dNV2ys Project 2018
CURRMIrr WEE: ENDING: 7 . MS July lugusl
WORK DESa= ON 7/ 9 - 7/ 14 7/ 16 - 7/ 21 727 - 725 17/ 30 - 9/ 4 F r: - 9/ 11 F 13 - 8/ 19 CONIMEN- N
Crawl R- po.. W1lty M T W R F S M T W R F S M T W R F S M T W R F S NI T 1V R F S M T IV R F S
Pittsfield - SL An tine
Traffic Control TC1dC Ftuhcr
Install Box Culvert NtrK<ctn• soot
Pulverize Roadway NEA
Fine GradeRoadwayNRA ad.•r• w.. it 1.<. a< a . ca ... r,.,, a ,. a... l. urmre ud. rc.
Pave Roadway NEAIdrv a,• nd durimrc dd. rinm
Shoulder Roadway Irl: c<fc; :c Fra.
Suamico - Nla lecrmt
Traffic Control I;, rdr.,dc rtnh<r
Pulverize Roadway NI:•4
Fine Grade Roadwav NF1 ad, r.„• a •,• wu<..,+<n+ a. rr.,. a,., d aa,rdo- rh;. rloK
PaveRoadwav Nen ad— r. r. ill 1,• — dd,,,mc dd, tim<
Shoulder Roadway Nrl: crfn R son<
Suamico - Shady, Lost Creek, Blackberry, ElderberryTraffic Control tiudc. de tl.hcc
Install Culverts Mcl: r<fiv sot, t • n n. trr<.u:, r a.,. l<tM. rR ra.,• 1,< r< .. da, Lwt Cd:
Pulverize Roadway NI -A
Fine Grade Roadway NGV 916vdm a, a 1-- j gad Na I T rRd arra c dr..
PaveRoadavav NHA dd..,• m•, . u, nl,<. o.< a, mdand. nrrr<
Shoulder Roadway 1cKccfn• c %.
Suamico - Brown & Moonlight
Traffic Control Hardadc n.a her
Install Culverts trl: cctn• a: so.,:
Suamico - Ives
Traffic Control li.rrundc n„ hc<
Fine Grade Roadwav N1- 1
Pave Roadwav NILA
Shoulder Roadwav dict cefn• & srra..
Suamico- Trapper's Bend
Traffic Control narriadc na.hcr
Mill and Sweep Roadwav NMA
Pave Roadwav NEA
Shoulder Roadwav Wrl: crfn A• soo.
Suamico- White Pine
Traffic Control Dardrade narher
Wedge Road%vav Net 11d. uwl:.: ut.., Nn. r< ar, raRc,•<., ra-.WIa, O,- r..
Suamico - St. Pa L<
Shoulder Roadwav Mct: cefn•& mx
USH II: G— Ntj- 0- 0, Y
3 Wu. I: mkAhrN StlrNu!<
V age of
vS
Well #3 Rehabilitation
Proposed Schedule
Description Completion Date
Meet with Village of Suamico to Review Documents: May 30, 2018Submit to WDNR June 1, 2018
Advertisement for Bids — First Publish Date: July 5, 2018Advertisement for Bids — Second Publish Date: July 12, 2018Receive Bids: July 18, 2018Public Works and Utility Commission Award of Bids: July 25, 2018WDNR Approval August 1, 2018
Village Board Award ofBids (Notice of Award): August 6, 2018
Executed Agreements: August 22, 2018
Preconstruction Conference: August 27, 2018
Notice to Proceed: August 27, 2018
Substantial Completion: September 17, 2018
Final Completion: October 15, 2018
The time between Substantial Completion and Final Completion is required to
obtain the results of water samples.