Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements Don Lintner (NHU) Eric Lynne (Donohue)

Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Not Your Typical

Turbo Blower New Holstein Utilities’ Blower Improvements

Don Lintner (NHU)

Eric Lynne (Donohue)

Page 2: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Background

New Holstein Utilities

Population (~3200)

Design

Flow (1.33 mgd)

Load (1600 ppd BOD)

Current

Flow (0.5 mgd)

Load (680 ppd BOD)

Page 3: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Background

Permit Requirements

BOD (20/30 mg/L)

TSS (20/30 mg/L)

TP (1.0 mg/L)

No disinfection

Operational Practices

Extended Air (Nitrification)

Septage Receiving (Slugs)

Page 4: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Background

Aeration Blowers

Type – Rotary Lobe

Function – Aeration and Digester

Condition – End of Useful Life

Reliability Concerns

Inefficient

Page 5: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Background

Aeration Blowers

Operational Limitations

Constant Speed

40HP / 30HP

Age

2 Failed

2 Used Units

40 HP

40 HP

30 HP

30 HP

30 HP

DIGESTER AERATION

Typically run 70 / 100 HP

for 1600 scfm / 2300 scfm

(mixing limited)

Page 6: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Facilities Plan

Blower Replacement

Ancillary Systems

Building

Decant Tanks

WAS Control

Sludge Pumps

Standby Generator

DO Control

Lab Temperature

Workshop/Garage Bay

Page 7: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Facilities Plan

Blower Replacement Alternatives

Replace In-Kind – Rotary Lobe Blowers

Single Stage Centrifugal (Turbo) Blowers

Efficiency

Life Cycle Cost Evaluation

Upgrade Electrical Service

230V vs. 480V Power

Recommended Further Consideration

Page 8: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Facilities Plan / Preliminary Design

Single Stage Centrifugal Blowers

High Speed Turbo (Sulzer/APG-Neuros)

Specialized Electronics

Cost

Integrally Geared with Sliding Vane (Turblex)

High Capacity / Cost

Integrally Geared with VFD (Inovair)

New

D.O. Control

Modulating Valve to Aerobic Digester

Page 9: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Inovair Blower

Concept

Advantages

Moderate Cost / Efficiency

Basic Components

Disadvantages

Not Best Efficiency

Limited Installations and Experience

Milwaukee Industrial Application

Rib Mountain (eternally almost complete)

Unclear lifespan

Page 10: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Design Concepts

Design:

A. Evaluated Blower Bid

B. D.O. Control

C. Modulating Valve

D. 3-D Model

Page 11: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

A) Blower Evaluation

Evaluated Bid:

Rotary Lobe Blowers

Inovair

Early Adopter=Attractive Pricing

(and random issues…)

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

1,000,000

0 5 10 15 20

PW Cumulative

Cost (2015$)

Years after Installation

HST - Inovair

PD - Aerzen

Assumed $0.10/kwh for two blowers operated 24 hours per day, total of 2000 scfm.

Page 12: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

B) Dissolved Oxygen Control

Page 13: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

C) Modulating Digester Valve

Concept

Throttle digester header when liquid

levels are lower to balance airflows

Less overall horsepower

(Note: can’t pinch both ends)

Allow flexibility to run a dedicated

blower(s) to each side

50 HP

50 HP

50 HP

DIGESTER AERATION

5-6 psi 1-6 psi

50 HP

M M

Page 14: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

D) 3-D Models

Design:

3-D Model

Pump Gallery – Operator Input allowed

ability to pull/push flow every direction

Page 15: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Funding

BIDS

Low Bidder:

$2,149,000

GRANTS

Aeration Blower:

Projected Energy Savings ($16,500)

Building Heat:

Electric Heat Gas Heat Savings ($7,500)

Grant Value

$ 33,976 WPPI

$ 68,165 Focus on Energy

$364,382 CWF Principal Forgiveness

$466,523 Total (22%)

$1,682,477 (net cost)

Page 16: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 17: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 18: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 19: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 20: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 21: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 22: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

(No trees were harmed on this portion of the project)

Page 23: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Construction and Startup Photos

Page 24: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower
Page 25: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Valved

Flexibility

Design:

Eliminated 1 pump

Some flowpaths can flow

by gravity or pump

Rotary lobe pumps allow

multi-use

All three can really move

some sludge

Sacrificed Automation

Page 26: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower
Page 27: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Startup Plan

How to sequence blower demo/startup to

prove new units are fully functional?

(...Very Carefully)

Page 28: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

The Blowers Work!*

Designed to typically need 2 blowers

Now to Optimize

Reduce DO

Reduce Mixing Limited

Reduce Digester Airflow

Limitations:

Blower Turndown (Range 70-100%)

Inovair now offers wider-range units,

consider varying sizes (or rpms?)

Page 29: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Blower PLC Programming

Surge Protection Feature

Manual reset

Head rise to surge worse at VFDmin

Ramps up VFD, fights valve PID

Page 30: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Blower PLC Programming

Mass Airflow - Winter Operation

Adjusted PLC Temp Setting

Operation

Page 31: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Current

Operating smooth now

Maintenance Items:

Expensive Oil

Belt Tensioning

Air Filter

Observed Energy Savings

Average

Peak

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

J F M A M J J A S O N D

$ /

lb B

OD

Rem

oved

Electric Utility

3-YRS BEFORE

AFTER

Page 32: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Benchmarking

See Focus at Booth #136

Download Guide @

www.focusonenergy.com/guidebooks

Page 33: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Operation

Benchmark – Activated Sludge

5.4 MWh/MGD (average)

3.3 MWh/MGD (Top 25%)

3.0 MWh/MGD (Best Practice)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

J F M A M J J A S O N D

MW

h /

MG

D

Electric Utility

3-YRS BEFORE

AFTER

Benchmarking

How does it compare?

Data Crunch

Keep Updated

Page 34: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

J F M A M J J A S O N D

kW

h /

lb B

OD

Electric Utility

Operation

3-YRS BEFORE

AFTER

Benchmark – Extended Air

2.9 MWh/MGD

Normalized for Loading

Heating Impact

Summer

vs

Winter

Page 35: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

0

200

400

600

800

1000

1200

1400

1600

1800

2000

$0.00 $2,000.00 $4,000.00 $6,000.00 $8,000.00 $10,000.00 $12,000.00

Heati

ng D

egre

e D

ays

(deg F

)

Electric and Natural Gas

Operation

3-YRS BEFORE AFTER

Heating Improvements

Cost:

$40,000

Benefit:

Reduced OPEX

Lab temp control

2-10 year payback without grants

Demand charge reductions

Page 36: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0 500 1000 1500 2000

$ /

lb B

OD

Heating Degree Days (deg F)

Electric and Natural Gas

Operation

Normalize for BOD

and Heating

Blower System Efficiency

34.6 % Reduction

Page 37: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

0

50

100

150

200

250

Aug-1

2

Oct-

12

Dec-1

2

Feb-1

3

Apr-

13

Jun-1

3

Aug-1

3

Oct-

13

Dec-1

3

Feb-1

4

Apr-

14

Jun-1

4

Aug-1

4

Oct-

14

Dec-1

4

Feb-1

5

Apr-

15

Jun-1

5

Aug-1

5

Oct-

15

Dec-1

5

Feb-1

6

Apr-

16

Jun-1

6

Aug-1

6

Peak 1

5 m

in k

W

Demand Charge

Operation

3-YRS BEFORE

AFTER

Minimized Electric Heat

(some areas still have electric heat)

Page 38: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Summary

Blower Replacement

Blowers

Optimization 2.0

Control System

Heating System

- Come Visit!

INSERT Photo

Page 39: Not Your Typical Turbo Blower - WWOA · Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements ... Lab Temperature Workshop/Garage Bay . Facilities Plan Blower

Summary

More than Just a Blower Replacement Project

Blowers

Continued Optimization

Control System

Heating System