18
Rev # Date/Quote Description Equipment References Drawing Index # Note that not all drawings will be required for each mount / drawings package A, B, C 00a _1 Room Layout - Contains overhead view of Skytron equipment SkyVision Routing - Contains overhead view of Skytron SkyVision conduit routing Elevation/Mounting Details - Contains elevation drawings of equipment with mounting details Carrier Details - Contains front, left and right side views of equipment carriers detailing accessories and outlet placement Medical Gas Details - Contains medical gas details required for the riser plate installation Electrical Wiring Detail - Contains detailed wiring diagram and circuit requirements for equipment booms and lights Communication Details - Contains a breakdown of required communications cabling and connections Light Fixture Details - Contains details of light wiring for fixture mounts and back box details SKYTRON products found within this package are specifically built for your facility. Ensure that all of your custom specifications have been included. Deviating from the specific equipment placement could cause conflicts within the room and should be approved by a Skytron Representative. I have read the appropriate requirements from the Skytron Pre-Installation Guide for Ergon Skybooms and consulted with the individual trades. I understand there are specific ceiling height, medical gas, electrical, video/communications and structural requirements that must be supplied by the customer's representatives to support this project. Please be aware modification to the site specific document could result in Change Order/Drawing Change fees. These fees take place after the second Submital Revision or the first Fabrication Revision. Please speak with your Skytron Representative if you have any questions with regards to these fees. PLEASE READ THE FOLLOWING CAREFULLY EACH DRAWING MUST BE INITIALED AND DATED Accepted by: (signature) 00b _2 _3 _4 _5 _6 Accepted by: (print) Requested Delivery Date Date: P.O. #: NORTHWEST HOSPITAL CENTER New Submittal Package Drawing Package Revision Summary 0 1 2 3 4 5 6 7 6/20/2013 37178 - 5 Accepted - with changes Rejected Accepted - as is Updated Room Layout 6/21/2013 37178 - 5

NORTHWEST HOSPITAL CENTER - brown-heim.com

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NORTHWEST HOSPITAL CENTER - brown-heim.com

Rev # Date/Quote Description

Equipment References DrawingIndex #

Note that not all drawings will be required for each mount / drawings package

A, B, C

00a

_1

Room Layout - Contains overhead view of Skytron equipment

SkyVision Routing - Contains overhead view of Skytron SkyVision conduit routing

Elevation/Mounting Details - Contains elevation drawings of equipment with mounting details

Carrier Details - Contains front, left and right side views of equipment carriers detailing accessories and outlet placement

Medical Gas Details - Contains medical gas details required for the riser plateinstallation

Electrical Wiring Detail - Contains detailed wiring diagram and circuit requirements for equipment booms and lights

Communication Details - Contains a breakdown of required communications cabling and connections

Light Fixture Details - Contains details of light wiring for fixture mounts and back box details

SKYTRON products found within this package are specifically built for your facility. Ensure that all of your custom specifications have been included.Deviating from the specific equipment placement could cause conflicts within the room and should be approved by a Skytron Representative.

I have read the appropriate requirements from the Skytron Pre-Installation Guide for Ergon Skybooms and consulted with the individualtrades. I understand there are specific ceiling height, medical gas, electrical, video/communications and structural requirements that

must be supplied by the customer's representatives to support this project. Please be aware modification to the site specific documentcould result in Change Order/Drawing Change fees. These fees take place after the second Submital Revision or the first Fabrication

Revision. Please speak with your Skytron Representative if you have any questions with regards to these fees.

PLEASE READ THE FOLLOWING CAREFULLY

EACH DRAWING MUST BE INITIALED AND DATED

Accepted by:(signature)

00b

_2

_3

_4

_5

_6

Accepted by:(print)

Requested Delivery Date

Date:

P.O. #:

NORTHWEST HOSPITAL CENTER

New Submittal Package

Drawing Package Revision Summary

0

1

2

3

4

5

6

7

6/20/201337178 - 5

Accepted - with changes RejectedAccepted - as is

Updated Room Layout6/21/201337178 - 5

Page 2: NORTHWEST HOSPITAL CENTER - brown-heim.com

01 9

A7.01

5

6

7

8

OR #5E32

RESTRICTEDCORRIDOR

E17

CLEANCOREE20

?

?

SCRUBE17H

5'

4'-014"

4'

5'

DESC

RIPT

ION:

ROO

M LA

YOUT

00aSHEETINITIAL:

DATE:

NORT

HWES

T HO

SPIT

ALCE

NTER

PROJ

ECT

#: 13

-072

-KP

SUBM

ITTA

LPL

OT D

ATE:

ROOM

TYP

E: G

EN O

RRE

V. #:

16/2

1/201

3

EQUIPMENT SCHEDULE

ID DESCRIPTION

A ANESTHESIA / MONITOR BOOM

B EQUIPMENT / MONITOR BOOM WITH LIGHTS

C UTILITY / MONITOR BOOM

IN THE EVENT THAT FIXTURE LOCATIONS NEED TOCHANGE PLEASE CHECK WITH SKYTRON ON THE

REVISED LAYOUT LOCATION*SITE SPECIFIC LAYOUT*

* IF SKYVISION IS APPLICABLESEE END OF BOOM PACKAGE*

Page 3: NORTHWEST HOSPITAL CENTER - brown-heim.com

A7.01

3

2

A7.0110OR #04

E31

ALCOVEE20C

?

?

??

SCRUBE17G

4

1

4'

5'

5'

4'

DESC

RIPT

ION:

ROO

M LA

YOUT

01aSHEETINITIAL:

DATE:

NORT

HWES

T HO

SPIT

ALCE

NTER

PROJ

ECT

#: 13

-072

-KP

SUBM

ITTA

LPL

OT D

ATE:

ROOM

TYP

E: G

EN O

RRE

V. #:

16/2

1/201

3

EQUIPMENT SCHEDULE

ID DESCRIPTION

A ANESTHESIA / MONITOR BOOM

B EQUIPMENT / MONITOR BOOM WITH LIGHTS

C UTILITY / MONITOR BOOM

IN THE EVENT THAT FIXTURE LOCATIONS NEED TOCHANGE PLEASE CHECK WITH SKYTRON ON THE

REVISED LAYOUT LOCATION*SITE SPECIFIC LAYOUT*

* IF SKYVISION IS APPLICABLESEE END OF BOOM PACKAGE*

Page 4: NORTHWEST HOSPITAL CENTER - brown-heim.com

OR #4E31

OR #3E30

A7.024

1

2

3

5'

4'

5'

4'

DESC

RIPT

ION:

ROO

M LA

YOUT

02aSHEETINITIAL:

DATE:

NORT

HWES

T HO

SPIT

ALCE

NTER

PROJ

ECT

#: 13

-072

-KP

SUBM

ITTA

LPL

OT D

ATE:

ROOM

TYP

E: G

EN O

RRE

V. #:

16/2

1/201

3

EQUIPMENT SCHEDULE

ID DESCRIPTION

A ANESTHESIA / MONITOR BOOM

B EQUIPMENT / MONITOR BOOM WITH LIGHTS

C UTILITY / MONITOR BOOM

IN THE EVENT THAT FIXTURE LOCATIONS NEED TOCHANGE PLEASE CHECK WITH SKYTRON ON THE

REVISED LAYOUT LOCATION*SITE SPECIFIC LAYOUT*

* IF SKYVISION IS APPLICABLESEE END OF BOOM PACKAGE*

Page 5: NORTHWEST HOSPITAL CENTER - brown-heim.com

A1SHEET

STRUCTURAL REQUIREMENTS - Architect and Structural Engineer

Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.

Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces place 90° apart and positioned at a 45° and 60° angle is recommended.

Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications that thesway bracing be fastened to the structural ceiling.

Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.

Expansion AnchorsTest 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors mustmeet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.

Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate is ASTM 500 Grade B, 6" diameter tube. Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.

Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.

Mounting Structure DesignSeismic structural applications may differ. Please contact your local SKYTRON distributor for specific calculations. The mountingstructure must be designed and fabricated to position the bottom of the SKYTRON mounting plate 10" (-0", +1") above thefinished ceiling. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. Themounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation at the mountingplate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior to installation ofthe fixture. Please contact your SKYTRON representative to schedule testing.

Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.

Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.

SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.

Additional Skytron Supplied ItemsIn addition to the pre-installation kit. SKYTRON provides the following items:

(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)INITIAL:DATE:

STRUCTURALCEILING

STRUCTURALCEILING

STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)

SWAY BRACING3" x 3" x 1/4" (4)

GUSSET 6" DIA.SUPPORT

TUBE

FINISHED CEILING

20"DIAMETER OPENING

REQUIRED(CENTERED UNDER MOUNT)

12" MIN. / 60" MAX.

*10" (-0"/+1") TYPICALREFER TO JOB SPECIFIC ELEVATION ABOVE

MOUNTING PLATE(SKYTRON SUPPLIED)

45°- 60°

FIXTURE HUBTYP. 1/4"

PJP

ACCESS DOOR24" x 24"

(REQUIRED)

TYP. 1/4"TOP & BOTTOM

STRUCTURALCEILING PLATE

17" DIA. x 1"

EXPANSION ANCHORS:HILTI KB-II (ICBO 4627)

CARBON STEEL

NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult

specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld, weld slag or etc.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each

application.• *Critical Dimension

11" HIGH CLEAR SPACEABOVE MOUNTING PLATE

REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL

COMPONENT INSTALLATION

FIXTURE WEIGHT:MOMENT LOAD:

809 LBS.4584 FT. LBS.

OPA NUMBER: 2510-07

DESC

RIPT

ION:

ELE

VATI

ON D

ETAI

LS

120" CEILING HEIGHT

0" FLOOR

*SITE SPECIFIC ELEVATION DETAILS* 6/20/2

013

72"

61"

31 1/2"

11 1/16"

3" 10"

51 3/16"

35 7/16"

12"

18"

70"

34"

25"

NORT

HWES

T HO

SPIT

ALPR

OJEC

T #:

13-0

72-K

PSU

BMIT

TAL

PLOT

DAT

E:

MDL:

ET2F

VBM3

6/2AF

C2QT

Y.: 3

REV.

#: 0

9"

77"

Page 6: NORTHWEST HOSPITAL CENTER - brown-heim.com

GAS OUTLETS:

NORT

HWES

T HO

SPIT

AL

DIMENSIONS:INITIAL:

PLO

T DA

TE: 6

/20/

2013

SUBM

ITTA

LPR

OJE

CT #

: 13-

072-

KP

DESC

RIPT

ION:

CAR

RIER

DET

AILS

SHEETA2

QTY

: 3

R

EV #

: 0

DATE: ELECTRICAL:

MO

DEL

#: E

T2FV

BM36

/2AF

C2

CARRIER

*SITE SPECIFIC CARRIER DETAILS*

WHITE - REQUIRES"J" BOX

RED

VACUUMVACUUM

OXYGENOXYGEN

NITROUS OXIDEWAGDMEDICAL AIR

VERTICAL NITROGENSYSTEM (DISS)

(2) 125V, 20A DUPLEX - WHITECHEMETRON37"H x 11 1/2"W x 8"D(4) 125V, 20A DUPLEX - RED

ACCESSORY LIST(2) BOLT ON VACUUM SLIDES

Page 7: NORTHWEST HOSPITAL CENTER - brown-heim.com

A3SHEET

MEDICAL GAS REQUIREMENTS - Medical Gas / Piping Engineer

Notes:• Ohio Medical manufactured gas outlets supplied unless otherwise specified.Pricing and lead time could vary if another MFGR is chosen.• Medical gas riser plates comply with NFPA 99-2005 Edition Cleanliness of gas outlets must be maintained through installation.• Purge gas lines and test at least 24 hrs. prior to installation.• Test results must be made available to SKYTRON for verification & comparison.• Check valve must be removed during installation to prevent damage to o-rings, refer to Ergon pre-installation guide for removal

instructions.** Caution - Check valves have 2 different sizes, please keep Instrument Air and Oxygen separate from the others **

Each Skyboom fixture is fabricated in accordance to the specifications required by the customer. The configuration drawingssupplied by SKYTRON will indicate the type and quantity of gas supply lines required. D.I.S.S. connection medical grade hosesconnect the fixture to the riser plate connectors. The customer is responsible to deliver the appropriate medical gas from thefacility supply to the riser plate connectors and for the design of a medical gas system with adequate flow capacity capable ofcompensating for the accumulative flow restrictions associated with conventional construction methods i.e. flex gas hoses.SKYTRON provides medical gas riser plate(s) and the appropriate connectors for attachment to the Mounting Plate.The riser plate attaches to the mounting plate and will accommodate up to 12 gas connectors. The connectors are D.I.S.S.type medical gas connectors with removable single check valves and provide a 1/2" copper tube for attachment to facility supplylines. Caps are provided with Vacuum & WAGD gas connectors to facilitate testing procedures.

All connection and testing of medical gas piping to be performed in accordance with NFPA 9-2005 Edition-5.1.6 requirements.

Recommended Gas Riser PlacementWhen mount is in center of room, riser plate should face head end of room, when mount is near walls, riser plate should be adjacentto wall. If more than one riser plate is required they should be placed next to each other.

INITIAL:DATE:

GAS CONNECTOR ASSEMBLY (w/ SECONDARY CHECK)*SUPPLIED w/FIXTURE*

9"

DISS CONNECTOR(w/ REMOVABLE PRIMARY

CHECK. PASSIVE EVAC,VACUUM & WAGD DO NOT

HAVE PRIMARY CHECK.)*SUPPLIED w/MOUNTING KIT*

D I S SCHEMETRON

* VERIFY AND INITIAL GAS FACEPLATE STYLE REQUESTED *

CGA ColorStandard

Note #1 - Any room (Critical Care Area) designed for a permanently located respiratory ventilator or anesthesia machine shall have an outlet capable of a transient flow rate of:170 LPM (6 SCFM) for 3 seconds at the station outlet.

Note #2 - For testing and certification purposes, individual station inlets shall be capable of a flow rate of: 3 SCFM, while maintaining a system pressure of not less than 12" (300mm) at the nearest adjacent vacuum inlet. Facility supply must be 115 LPM MINIMUM. (Vacuum D.I.S.S. connectors omit primary check valves for optimal flow). 12in/HG.

Note #3 - WAGD (Waste Anesthetic Gas Disposal) systems employing a design where the WAGD lines are "tied in" to MedVac lines must produce the same flow rates as theMedVac inlets.

Note #4 - Nitrogen system requires nitrogen supplied directly from facility supply line rated at 185psi MIN to 200psi MAX. Avoid designs which feature multiple-in-line Nitrogencontrol systems in order to avoid loss of flow capability.

Additional references: Health Care Facilities Handbook 2002, Section 5.1.11, page 211 and section 5.1.12.13.10.1 thru 5.1.12.3.10.5, page 224. NFPA 99, 2002 guideline figure A.5.1.6.

• TYPE K COPPERTUBING

• 1/2" O.D. UNLESSOTHERWISE STATED

Medical Air(Yellow)

Test GasCanada Color

StandardMedical Air

(Black)

AbbreviatedName

MedAir

StandardPressure

50 - 55 psig

MaximumPressure

55 psig

AllowablePressure Drop

5 psig

Minimum Flow Rates

3.5 SCFM per outlet (100NL/min)N2NF see note #1Carbon Dioxide

(Gray)Carbon Dioxide

(Gray) CO2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFHeliox

(Brown)Heliox

(Brown) Heliox 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFNitrogen(Black)

Nitrogen(Black) N2 or HPN2 160 - 185 psig 200 psig 5 psig

5 SCFM per outlet (140NL/min)free air per outletN2NF see note #4

Nitrous Oxide(Blue)

Nitrous Oxide(Blue) N2O 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF

Oxygen(Green)

Oxygen(White) O2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF see note #1

Vacuum(White)

Vacuum(Yellow) MedVac 12in/Hg (300mm) N/A 3 SCFM per outlet (85NL/min) see note #2

Waste AnestheticGas Disposal

(Purple) WAGDVaries withsystem type

At a minimum, each inlet must be able todraw a continuous 50 lpm (1.8 SCFM)

through the interface

Waste AnestheticGas Disposal

(Purple) see note #3

PURITANOHMEDA

NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult

specific structural criteria defined by a structural engineer.• Mounting bolts and nuts shipped with fixture.

INLET TUBE

RISER PLATE

JUNCTIONBOX

BRACKET

GENERIC RISER PLATE INSTALLATION

DESC

RIPT

ION:

MED

ICAL

GAS

DET

AILS

*SITE SPECIFIC GAS DETAILS*

6/20/2

013

NORT

HWES

T HO

SPIT

ALPR

OJEC

T #:

13-0

72-K

PSU

BMIT

TAL

PLOT

DAT

E:

MDL:

ET2F

VBM3

6/2AF

C2QT

Y.: 3

REV.

#: 0

CHECK VALVEREMOVAL TOOL

OXYG

EN

OXYG

EN

NITR

OUS

OXID

E

NITR

OGEN

MED

ICAL

AIR

WAG

D

VACU

UM

VACU

UM

Page 8: NORTHWEST HOSPITAL CENTER - brown-heim.com

DESC

RIPT

ION:

ELE

CTRI

CAL W

IRIN

G DE

TAILS

A4SHEET

ELECTRICAL REQUIREMENTS - Electrical Engineer

Each Skyboom fixture is fabricated in accordance to the specifications required by the customer. The Configuration drawings supplied by SKYTRON will indicate the type and quantity of circuits required. SKYTRON provides all wiring and electrical materials for connection from fixtureto junction box or pump enclosure (if applicable). SKYTRON supplies either an electrical junction box (8-5/8" x 4-5/8" x 1-3/4") to facilitate fieldwiring for up to six circuits that is mounted on the mounting plate in the correct position OR if applicable, a hydraulic pump enclosure/junction box(18"L x 6"W x 12"H) that is to be remote mounted within 24" of the mounting structure (by contractor). The pump enclosure can be shipped withthe installation kit upon request. Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz power supply line enclosed in rigid metal conduit. All electrical materials for connection to SKYTRON supplied junction box or pump enclosure and installation labor for such materials to be provided by customer. All wiring and materials to be in accordance with federal,state and local codes. It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patient care area.

Specific conductor colors and/or wiring for isolated applications are available upon request.

INITIAL:DATE:

3 INPUT LEADS

CARRIER UTILITIES PANELFIXTURE JUNCTION BOX

AT MOUNTING PLATE

120 VAC, 20 AMP

120 VAC, 20 AMP CIRCUIT 1

CIRCUIT 2

(4) 125V, 20A, DUPLEX OUTLETS - RED(2) 125V, 20A, DUPLEX OUTLETS - WHITE

NON-ISOLATED POWERSYSTEMS

INTERNAL FIXTURE WIRINGTYPICAL WIRE TYPE:

12AWG, 600V, XHHW-2, 90°CWHITE, BLACK, GREEN

120 VAC, 20 AMP CIRCUIT 3

ARM COVERARM COVER

ARM COVERARM COVER

GROUND(FOR ELECTRICAL)

PROTECTED EARTH(FOR CHASSIS)

NORMALDUPLEX

CRITICALDUPLEX

CRITICALDUPLEX

GENERIC BOOM ELECTRICAL WIRINGDIAGRAM FOR FIXED / SPRING ARMS

LGN

GENERIC WIRING DIAGRAM

ULTRAFLEXTYPE USL CONDUIT

ULTRAFLEXTYPE USL CONDUIT

GREENBLACK (L)WHITE (N)

GREENBLACK (L)WHITE (N)

CRITICAL NORMAL

*SITE SPECIFIC WIRING DETAILS* 6/20/2

013

NORT

HWES

T HO

SPIT

ALPR

OJEC

T #:

13-0

72-K

PSU

BMIT

TAL

PLOT

DAT

E:

MDL:

ET2F

VBM3

6/2AF

C2QT

Y.: 3

REV.

#: 0

RED

RED

WHITE

Page 9: NORTHWEST HOSPITAL CENTER - brown-heim.com

B1SHEET

STRUCTURAL REQUIREMENTS - Architect and Structural Engineer

Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.

Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces place 90° apart and positioned at a 45° and 60° angle is recommended.

Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications that thesway bracing be fastened to the structural ceiling.

Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.

Expansion AnchorsTest 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors mustmeet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.

Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate is ASTM 500 Grade B, 6" diameter tube. Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.

Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.

Mounting Structure DesignSeismic structural applications may differ. Please contact your local SKYTRON distributor for specific calculations. The mountingstructure must be designed and fabricated to position the bottom of the SKYTRON mounting plate 10" (-0", +1") above thefinished ceiling. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. Themounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation at the mountingplate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior to installation ofthe fixture. Please contact your SKYTRON representative to schedule testing.

Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.

Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.

SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.

Additional Skytron Supplied ItemsIn addition to the pre-installation kit. SKYTRON provides the following items:

(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)INITIAL:DATE:

STRUCTURALCEILING

STRUCTURALCEILING

STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)

SWAY BRACING3" x 3" x 1/4" (4)

GUSSET 6" DIA.SUPPORT

TUBE

FINISHED CEILING

20"DIAMETER OPENING

REQUIRED(CENTERED UNDER MOUNT)

12" MIN. / 60" MAX.

*10" (-0"/+1") TYPICALREFER TO JOB SPECIFIC ELEVATION ABOVE

MOUNTING PLATE(SKYTRON SUPPLIED)

45°- 60°

FIXTURE HUBTYP. 1/4"

PJP

ACCESS DOOR24" x 24"

(REQUIRED)

TYP. 1/4"TOP & BOTTOM

STRUCTURALCEILING PLATE

17" DIA. x 1"

EXPANSION ANCHORS:HILTI KB-II (ICBO 4627)

CARBON STEEL

NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult

specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld, weld slag or etc.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each

application.• *Critical Dimension

11" HIGH CLEAR SPACEABOVE MOUNTING PLATE

REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL

COMPONENT INSTALLATION

FIXTURE WEIGHT:MOMENT LOAD:

1028 LBS.5607 FT. LBS.

OPA NUMBER: 2510-07

DESC

RIPT

ION:

ELE

VATI

ON D

ETAI

LS

120" CEILING HEIGHT

0" FLOOR

*SITE SPECIFIC ELEVATION DETAILS* 6/20/2

013

MODE

L #: E

CT2F

KM48

/2AFC

2/AUT

75QT

Y.: 3

REV.

#: 0

72"

PROJ

ECT

#: 13

-072

-KP

SUBM

ITTA

LPL

OT D

ATE:

61"

31 1/2"

11 1/16"

3" 10"

51 3/16"

35 7/16"

12"

18"9"

77"

23"

70"

16 1/2"

19"

42 15/16"

80"

35 1/4"

80"

REFER TO AUT75 DATA SHEETFOR SURGICAL LIGHT

SPECIFICATIONS

NORT

HWES

T HO

SPIT

AL

Page 10: NORTHWEST HOSPITAL CENTER - brown-heim.com

CHEMETRON(4) 125V, 20A DUPLEX - RED

(4) 125V, 20A DUPLEX - WHITE54"H x 22"W x 30"D

ACCESSORY LIST(2) BOLT ON VACUUM SLIDES(3) KMSH

NORT

HWES

T HO

SPIT

AL

GAS OUTLETS:DIMENSIONS:INITIAL:

PLO

T DA

TE: 6

/20/

2013

SUBM

ITTA

LPR

OJE

CT #

: 13-

072-

KP

DESC

RIPT

ION:

CAR

RIER

DET

AILS

SHEETB2

QTY

: 3

R

EV #

: 0

DATE: ELECTRICAL:

MO

DEL

#: E

CT2F

KM48

/2AF

C2/A

UT75

CARRIER

*SITE SPECIFIC CARRIER DETAILS*

VACUUMVACUUM

NITROGEN CONTROLSYSTEM - DISS

CARBON DIOXIDE - DISSCARBON DIOXIDE - DISS

RED

WHITEREQUIRES"J" BOX

Page 11: NORTHWEST HOSPITAL CENTER - brown-heim.com

B3SHEET

MEDICAL GAS REQUIREMENTS - Medical Gas / Piping Engineer

Notes:• Ohio Medical manufactured gas outlets supplied unless otherwise specified.Pricing and lead time could vary if another MFGR is chosen.• Medical gas riser plates comply with NFPA 99-2005 Edition Cleanliness of gas outlets must be maintained through installation.• Purge gas lines and test at least 24 hrs. prior to installation.• Test results must be made available to SKYTRON for verification & comparison.• Check valve must be removed during installation to prevent damage to o-rings, refer to Ergon pre-installation guide for removal

instructions.** Caution - Check valves have 2 different sizes, please keep Instrument Air and Oxygen separate from the others **

Each Skyboom fixture is fabricated in accordance to the specifications required by the customer. The configuration drawingssupplied by SKYTRON will indicate the type and quantity of gas supply lines required. D.I.S.S. connection medical grade hosesconnect the fixture to the riser plate connectors. The customer is responsible to deliver the appropriate medical gas from thefacility supply to the riser plate connectors and for the design of a medical gas system with adequate flow capacity capable ofcompensating for the accumulative flow restrictions associated with conventional construction methods i.e. flex gas hoses.SKYTRON provides medical gas riser plate(s) and the appropriate connectors for attachment to the Mounting Plate.The riser plate attaches to the mounting plate and will accommodate up to 12 gas connectors. The connectors are D.I.S.S.type medical gas connectors with removable single check valves and provide a 1/2" copper tube for attachment to facility supplylines. Caps are provided with Vacuum & WAGD gas connectors to facilitate testing procedures.

All connection and testing of medical gas piping to be performed in accordance with NFPA 9-2005 Edition-5.1.6 requirements.

Recommended Gas Riser PlacementWhen mount is in center of room, riser plate should face head end of room, when mount is near walls, riser plate should be adjacentto wall. If more than one riser plate is required they should be placed next to each other.

INITIAL:DATE:

GAS CONNECTOR ASSEMBLY (w/ SECONDARY CHECK)*SUPPLIED w/FIXTURE*

9"

DISS CONNECTOR(w/ REMOVABLE PRIMARY

CHECK. PASSIVE EVAC,VACUUM & WAGD DO NOT

HAVE PRIMARY CHECK.)*SUPPLIED w/MOUNTING KIT*

D I S SCHEMETRON

* VERIFY AND INITIAL GAS FACEPLATE STYLE REQUESTED *

CGA ColorStandard

Note #1 - Any room (Critical Care Area) designed for a permanently located respiratory ventilator or anesthesia machine shall have an outlet capable of a transient flow rate of:170 LPM (6 SCFM) for 3 seconds at the station outlet.

Note #2 - For testing and certification purposes, individual station inlets shall be capable of a flow rate of: 3 SCFM, while maintaining a system pressure of not less than 12" (300mm) at the nearest adjacent vacuum inlet. Facility supply must be 115 LPM MINIMUM. (Vacuum D.I.S.S. connectors omit primary check valves for optimal flow). 12in/HG.

Note #3 - WAGD (Waste Anesthetic Gas Disposal) systems employing a design where the WAGD lines are "tied in" to MedVac lines must produce the same flow rates as theMedVac inlets.

Note #4 - Nitrogen system requires nitrogen supplied directly from facility supply line rated at 185psi MIN to 200psi MAX. Avoid designs which feature multiple-in-line Nitrogencontrol systems in order to avoid loss of flow capability.

Additional references: Health Care Facilities Handbook 2002, Section 5.1.11, page 211 and section 5.1.12.13.10.1 thru 5.1.12.3.10.5, page 224. NFPA 99, 2002 guideline figure A.5.1.6.

• TYPE K COPPERTUBING

• 1/2" O.D. UNLESSOTHERWISE STATED

Medical Air(Yellow)

Test GasCanada Color

StandardMedical Air

(Black)

AbbreviatedName

MedAir

StandardPressure

50 - 55 psig

MaximumPressure

55 psig

AllowablePressure Drop

5 psig

Minimum Flow Rates

3.5 SCFM per outlet (100NL/min)N2NF see note #1Carbon Dioxide

(Gray)Carbon Dioxide

(Gray) CO2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFHeliox

(Brown)Heliox

(Brown) Heliox 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFNitrogen(Black)

Nitrogen(Black) N2 or HPN2 160 - 185 psig 200 psig 5 psig

5 SCFM per outlet (140NL/min)free air per outletN2NF see note #4

Nitrous Oxide(Blue)

Nitrous Oxide(Blue) N2O 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF

Oxygen(Green)

Oxygen(White) O2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF see note #1

Vacuum(White)

Vacuum(Yellow) MedVac 12in/Hg (300mm) N/A 3 SCFM per outlet (85NL/min) see note #2

Waste AnestheticGas Disposal

(Purple) WAGDVaries withsystem type

At a minimum, each inlet must be able todraw a continuous 50 lpm (1.8 SCFM)

through the interface

Waste AnestheticGas Disposal

(Purple) see note #3

PURITANOHMEDA

NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult

specific structural criteria defined by a structural engineer.• Mounting bolts and nuts shipped with fixture.

INLET TUBE

RISER PLATE

JUNCTIONBOX

BRACKET

GENERIC RISER PLATE INSTALLATION

DESC

RIPT

ION:

MED

ICAL

GAS

DET

AILS

*SITE SPECIFIC GAS DETAILS*

6/20/2

013

CHECK VALVEREMOVAL TOOL

MODE

L #: E

CT2F

KM48

/2AFC

2/AUT

75QT

Y.: 3

REV.

#: 0

PROJ

ECT

#: 13

-072

-KP

SUBM

ITTA

LPL

OT D

ATE:

NORT

HWES

T HO

SPIT

AL

NITR

OGEN

CARB

ON D

IOXI

DE

CARB

ON D

IOXI

DE

VACU

UM

VACU

UM

Page 12: NORTHWEST HOSPITAL CENTER - brown-heim.com

DESC

RIPT

ION:

ELE

CTRI

CAL W

IRIN

G DE

TAILS

B4SHEET

ELECTRICAL REQUIREMENTS - Electrical Engineer

Each Skyboom fixture is fabricated in accordance to the specifications required by the customer. The Configuration drawings supplied by SKYTRON will indicate the type and quantity of circuits required. SKYTRON provides all wiring and electrical materials for connection from fixtureto junction box or pump enclosure (if applicable). SKYTRON supplies either an electrical junction box (8-5/8" x 4-5/8" x 1-3/4") to facilitate fieldwiring for up to six circuits that is mounted on the mounting plate in the correct position OR if applicable, a hydraulic pump enclosure/junction box(18"L x 6"W x 12"H) that is to be remote mounted within 24" of the mounting structure (by contractor). The pump enclosure can be shipped withthe installation kit upon request. Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz power supply line enclosed in rigid metal conduit. All electrical materials for connection to SKYTRON supplied junction box or pump enclosure and installation labor for such materials to be provided by customer. All wiring and materials to be in accordance with federal,state and local codes. It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patient care area.

Specific conductor colors and/or wiring for isolated applications are available upon request.

INITIAL:DATE:

5 INPUT LEADS

CARRIER UTILITIES PANEL

120 VAC, 15 AMPAURORA LIGHT

LIGHT CIRCUITTO WALL CONTROL

SEE PAGE 6

FIXTURE JUNCTION BOXAT MOUNTING PLATE

CIRCUIT 5

120 VAC, 20 AMP

120 VAC, 20 AMP

120 VAC, 20 AMP

120 VAC, 20 AMP

CIRCUIT 1

CIRCUIT 2

CIRCUIT 3

CIRCUIT 4

(4) 125V, 20A, DUPLEX OUTLETS - RED

NON-ISOLATED POWERSYSTEMS

INTERNAL FIXTURE WIRINGTYPICAL WIRE TYPE:

12AWG, 600V, XHHW-2, 90°CWHITE, BLACK, GREEN

ARM COVERARM COVER

ARM COVERARM COVER

GROUND(FOR ELECTRICAL)

PROTECTED EARTH(FOR CHASSIS)

NORMALDUPLEX

CRITICALDUPLEX

CRITICALDUPLEX

GENERIC BOOM ELECTRICAL WIRINGDIAGRAM FOR FIXED / SPRING ARMS

LGN

GENERIC WIRING DIAGRAM

ULTRAFLEXTYPE USL CONDUIT

ULTRAFLEXTYPE USL CONDUIT

GREENBLACK (L)WHITE (N)

GREENBLACK (L)WHITE (N)

CRITICAL NORMAL

*SITE SPECIFIC WIRING DETAILS* 6/20/2

013

MODE

L #: E

CT2F

KM48

/2AFC

2/AUT

75QT

Y.: 3

REV.

#: 0

PROJ

ECT

#: 13

-072

-KP

SUBM

ITTA

LPL

OT D

ATE:

NORT

HWES

T HO

SPIT

AL

RED

RED

WHITE

WHITE

(4) 125V, 20A, DUPLEX OUTLETS - WHITE

Page 13: NORTHWEST HOSPITAL CENTER - brown-heim.com

DESC

RIPT

ION:

LIGH

T FI

XTUR

E DE

TAILS

B6SHEETINITIAL:

DATE:

JUNCTION BOX BY OTHERSWITHIN 12" OF MOUNT

TYPE USL CONDUITBY SKYTRON

3/4" METAL CONDUIT 12AWG,3 WIRES PER LIGHTHEADRED, GREEN, WHITE30VDC OUTPUT

3/4" METAL CONDUIT120VAC, 15AINPUT DEDICATED

WALL CONTROL(SKYTRON SUPPLIED)

TO BE MOUNTED NEARENTRANCE DOOR OR

AT N.D.C.

THIS DIAGRAM IS FOR INFORMATIONAL PURPOSES ONLY.THIS WILL NOT MATCH YOUR EXACT MODEL.

FLOOR

SPECIAL GROUNDING REQUIREMENTS - Electrical Engineer

Proper performance and safety of this fixture can only be achieved by an adequate grounding system. Fixture ground must be a dedicated ground point ultimately bonded to the facilities grounding system to prevent the migration of electrical interference generated by other devices.

Notes:• 2 Dedicated conduit runs required at wall control to separate 120VAC input lines from 30VDC output lines to light fixture to prevent migration of

electrical magnetic interference which will disrupt the operation of the light.• **No shared ground.** Each light head must have separate individual ground.

GENERIC AURORA WALL CONTROLMOUNTING DETAILS

RECESSED MOUNT

A B

C

ANCHOR (4)

RECESS MOUNTFLANGE

SCREW (4)

RECESS DEPTH

FRONTPANEL

SURFACE MOUNT

ANCHOR (4)

E

D

SCREW (4)

FRONTPANEL

OPTIONAL BACK-BOX INSTALLATION

ANCHOR (4)

RECESS MOUNTFLANGE

SCREW (4)

GROMMETS (2)

CONTROL BOX WITH RECESSMOUNT FLANGE INSTALLED

"BACK-BOX" DIMENSIONSSINGLE / DUAL

8-1/2"W x 11-5/8"H x 4"DTRIPLE

10-1/2"W x 14-1/2"H x 4"D

FINISHED WALL120VAC

30VDC

CONDUIT CONNECTOR

3/4" CONDUIT

DIMENSION

SINGLE / DUAL

8"

4"

10"

6 - 7/8"

7 - 5/8"

5 - 7/8"

11 - 3/4"W x 14"H

TRIPLE

10"

4"

13 - 1/2"

8 - 5/8"

11"

6 - 3/8"

13 - 3/4"W x 17 - 1/4"HRECESS MOUNT FLANGE

A

B

C

D

E

F

F3"

C

3"

A

1"

JUNCTION BOX

OPA #: OPA-1607-07

*GENERIC LIGHT FIXTURE DETAILS* 6/20/2

013

MODE

L #: E

CT2F

KM48

/2AFC

2/AUT

75QT

Y.: 3

REV.

#: 0

PROJ

ECT

#: 13

-072

-KP

SUBM

ITTA

LPL

OT D

ATE:

NORT

HWES

T HO

SPIT

AL

Page 14: NORTHWEST HOSPITAL CENTER - brown-heim.com

C1SHEET

STRUCTURAL REQUIREMENTS - Architect and Structural Engineer

Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.

Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces place 90° apart and positioned at a 45° and 60° angle is recommended.

Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications that thesway bracing be fastened to the structural ceiling.

Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.

Expansion AnchorsTest 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors mustmeet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.

Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate is ASTM 500 Grade B, 6" diameter tube. Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.

Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.

Mounting Structure DesignSeismic structural applications may differ. Please contact your local SKYTRON distributor for specific calculations. The mountingstructure must be designed and fabricated to position the bottom of the SKYTRON mounting plate 10" (-0", +1") above thefinished ceiling. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. Themounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation at the mountingplate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior to installation ofthe fixture. Please contact your SKYTRON representative to schedule testing.

Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.

Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.

SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.

Additional Skytron Supplied ItemsIn addition to the pre-installation kit. SKYTRON provides the following items:

(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)INITIAL:DATE:

STRUCTURALCEILING

STRUCTURALCEILING

STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)

SWAY BRACING3" x 3" x 1/4" (4)

GUSSET 6" DIA.SUPPORT

TUBE

FINISHED CEILING

20"DIAMETER OPENING

REQUIRED(CENTERED UNDER MOUNT)

12" MIN. / 60" MAX.

*10" (-0"/+1") TYPICALREFER TO JOB SPECIFIC ELEVATION ABOVE

MOUNTING PLATE(SKYTRON SUPPLIED)

45°- 60°

FIXTURE HUBTYP. 1/4"

PJP

ACCESS DOOR24" x 24"

(REQUIRED)

TYP. 1/4"TOP & BOTTOM

STRUCTURALCEILING PLATE

17" DIA. x 1"

EXPANSION ANCHORS:HILTI KB-II (ICBO 4627)

CARBON STEEL

NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult

specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld, weld slag or etc.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each

application.• *Critical Dimension

11" HIGH CLEAR SPACEABOVE MOUNTING PLATE

REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL

COMPONENT INSTALLATION

FIXTURE WEIGHT:MOMENT LOAD:

809 LBS.4584 FT. LBS.

OPA NUMBER: 2510-07

DESC

RIPT

ION:

ELE

VATI

ON D

ETAI

LS

120" CEILING HEIGHT

0" FLOOR

*SITE SPECIFIC ELEVATION DETAILS* 6/20/2

013

MODE

L #: E

T2FV

BM36

/2AFC

2QT

Y.: 3

REV.

#: 0

PROJ

ECT

#: 13

-072

-KP

SUBM

ITTA

LPL

OT D

ATE:

72"

61"

31 1/2"

11 1/16"

3" 10"

51 3/16"

35 7/16"

12"

18"

70"

34"

25"

NORT

HWES

T HO

SPIT

AL77"

9"

Page 15: NORTHWEST HOSPITAL CENTER - brown-heim.com

WHITE - REQUIRES"J" BOX

RED

MEDICAL AIR

VACUUMVACUUM

VERTICAL NITROGENSYSTEM - DISS

NITROUS OXIDE

WAGDOXYGEN

OXYGEN

CHEMETRON

ACCESSORY LIST(2) BOLT ON VACUUM SLIDE

37"H x 11 1/2"W x 8"D(4) 125V, 20A DUPLEX - RED

(2) 125V, 20A DUPLEX - WHITEDIMENSIONS:

NORT

HWES

T HO

SPIT

AL

INITIAL:C2

PLO

T DA

TE: 6

/20/

2013

ELECTRICAL:GAS OUTLETS:

PRO

JECT

#: 1

3-07

2-KP

DESC

RIPT

ION:

CAR

RIER

DET

AILS

SHEET

SUBM

ITTA

LQ

TY: 3

REV

#: 0

DATE:

MO

DEL

#: E

T2FV

BM36

/2AF

C2

CARRIER

*SITE SPECIFIC CARRIER DETAILS*

Page 16: NORTHWEST HOSPITAL CENTER - brown-heim.com

C3SHEET

MEDICAL GAS REQUIREMENTS - Medical Gas / Piping Engineer

Notes:• Ohio Medical manufactured gas outlets supplied unless otherwise specified.Pricing and lead time could vary if another MFGR is chosen.• Medical gas riser plates comply with NFPA 99-2005 Edition Cleanliness of gas outlets must be maintained through installation.• Purge gas lines and test at least 24 hrs. prior to installation.• Test results must be made available to SKYTRON for verification & comparison.• Check valve must be removed during installation to prevent damage to o-rings, refer to Ergon pre-installation guide for removal

instructions.** Caution - Check valves have 2 different sizes, please keep Instrument Air and Oxygen separate from the others **

Each Skyboom fixture is fabricated in accordance to the specifications required by the customer. The configuration drawingssupplied by SKYTRON will indicate the type and quantity of gas supply lines required. D.I.S.S. connection medical grade hosesconnect the fixture to the riser plate connectors. The customer is responsible to deliver the appropriate medical gas from thefacility supply to the riser plate connectors and for the design of a medical gas system with adequate flow capacity capable ofcompensating for the accumulative flow restrictions associated with conventional construction methods i.e. flex gas hoses.SKYTRON provides medical gas riser plate(s) and the appropriate connectors for attachment to the Mounting Plate.The riser plate attaches to the mounting plate and will accommodate up to 12 gas connectors. The connectors are D.I.S.S.type medical gas connectors with removable single check valves and provide a 1/2" copper tube for attachment to facility supplylines. Caps are provided with Vacuum & WAGD gas connectors to facilitate testing procedures.

All connection and testing of medical gas piping to be performed in accordance with NFPA 9-2005 Edition-5.1.6 requirements.

Recommended Gas Riser PlacementWhen mount is in center of room, riser plate should face head end of room, when mount is near walls, riser plate should be adjacentto wall. If more than one riser plate is required they should be placed next to each other.

INITIAL:DATE:

GAS CONNECTOR ASSEMBLY (w/ SECONDARY CHECK)*SUPPLIED w/FIXTURE*

9"

DISS CONNECTOR(w/ REMOVABLE PRIMARY

CHECK. PASSIVE EVAC,VACUUM & WAGD DO NOT

HAVE PRIMARY CHECK.)*SUPPLIED w/MOUNTING KIT*

D I S SCHEMETRON

* VERIFY AND INITIAL GAS FACEPLATE STYLE REQUESTED *

CGA ColorStandard

Note #1 - Any room (Critical Care Area) designed for a permanently located respiratory ventilator or anesthesia machine shall have an outlet capable of a transient flow rate of:170 LPM (6 SCFM) for 3 seconds at the station outlet.

Note #2 - For testing and certification purposes, individual station inlets shall be capable of a flow rate of: 3 SCFM, while maintaining a system pressure of not less than 12" (300mm) at the nearest adjacent vacuum inlet. Facility supply must be 115 LPM MINIMUM. (Vacuum D.I.S.S. connectors omit primary check valves for optimal flow). 12in/HG.

Note #3 - WAGD (Waste Anesthetic Gas Disposal) systems employing a design where the WAGD lines are "tied in" to MedVac lines must produce the same flow rates as theMedVac inlets.

Note #4 - Nitrogen system requires nitrogen supplied directly from facility supply line rated at 185psi MIN to 200psi MAX. Avoid designs which feature multiple-in-line Nitrogencontrol systems in order to avoid loss of flow capability.

Additional references: Health Care Facilities Handbook 2002, Section 5.1.11, page 211 and section 5.1.12.13.10.1 thru 5.1.12.3.10.5, page 224. NFPA 99, 2002 guideline figure A.5.1.6.

• TYPE K COPPERTUBING

• 1/2" O.D. UNLESSOTHERWISE STATED

Medical Air(Yellow)

Test GasCanada Color

StandardMedical Air

(Black)

AbbreviatedName

MedAir

StandardPressure

50 - 55 psig

MaximumPressure

55 psig

AllowablePressure Drop

5 psig

Minimum Flow Rates

3.5 SCFM per outlet (100NL/min)N2NF see note #1Carbon Dioxide

(Gray)Carbon Dioxide

(Gray) CO2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFHeliox

(Brown)Heliox

(Brown) Heliox 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFNitrogen(Black)

Nitrogen(Black) N2 or HPN2 160 - 185 psig 200 psig 5 psig

5 SCFM per outlet (140NL/min)free air per outletN2NF see note #4

Nitrous Oxide(Blue)

Nitrous Oxide(Blue) N2O 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF

Oxygen(Green)

Oxygen(White) O2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF see note #1

Vacuum(White)

Vacuum(Yellow) MedVac 12in/Hg (300mm) N/A 3 SCFM per outlet (85NL/min) see note #2

Waste AnestheticGas Disposal

(Purple) WAGDVaries withsystem type

At a minimum, each inlet must be able todraw a continuous 50 lpm (1.8 SCFM)

through the interface

Waste AnestheticGas Disposal

(Purple) see note #3

PURITANOHMEDA

NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult

specific structural criteria defined by a structural engineer.• Mounting bolts and nuts shipped with fixture.

INLET TUBE

RISER PLATE

JUNCTIONBOX

BRACKET

GENERIC RISER PLATE INSTALLATION

DESC

RIPT

ION:

MED

ICAL

GAS

DET

AILS

*SITE SPECIFIC GAS DETAILS*

6/20/2

013

NORT

HWES

T HO

SPIT

ALPR

OJEC

T #:

13-0

72-K

PSU

BMIT

TAL

PLOT

DAT

E:

MDL:

ET2F

VBM3

6/2AF

C2QT

Y.: 3

REV.

#: 0

CHECK VALVEREMOVAL TOOL

OXYG

EN

OXYG

EN

NITR

OUS

OXID

E

NITR

OGEN

MED

ICAL

AIR

WAG

D

VACU

UM

VACU

UM

Page 17: NORTHWEST HOSPITAL CENTER - brown-heim.com

DESC

RIPT

ION:

ELE

CTRI

CAL W

IRIN

G DE

TAILS

C4SHEET

ELECTRICAL REQUIREMENTS - Electrical Engineer

Each Skyboom fixture is fabricated in accordance to the specifications required by the customer. The Configuration drawings supplied by SKYTRON will indicate the type and quantity of circuits required. SKYTRON provides all wiring and electrical materials for connection from fixtureto junction box or pump enclosure (if applicable). SKYTRON supplies either an electrical junction box (8-5/8" x 4-5/8" x 1-3/4") to facilitate fieldwiring for up to six circuits that is mounted on the mounting plate in the correct position OR if applicable, a hydraulic pump enclosure/junction box(18"L x 6"W x 12"H) that is to be remote mounted within 24" of the mounting structure (by contractor). The pump enclosure can be shipped withthe installation kit upon request. Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz power supply line enclosed in rigid metal conduit. All electrical materials for connection to SKYTRON supplied junction box or pump enclosure and installation labor for such materials to be provided by customer. All wiring and materials to be in accordance with federal,state and local codes. It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patient care area.

Specific conductor colors and/or wiring for isolated applications are available upon request.

INITIAL:DATE:

3 INPUT LEADS

CARRIER UTILITIES PANELFIXTURE JUNCTION BOX

AT MOUNTING PLATE

120 VAC, 20 AMP

120 VAC, 20 AMP CIRCUIT 1

CIRCUIT 2

(4) 125V, 20A, DUPLEX OUTLETS - RED(2) 125V, 20A, DUPLEX OUTLETS - WHITE

NON-ISOLATED POWERSYSTEMS

INTERNAL FIXTURE WIRINGTYPICAL WIRE TYPE:

12AWG, 600V, XHHW-2, 90°CWHITE, BLACK, GREEN

120 VAC, 20 AMP CIRCUIT 3

ARM COVERARM COVER

ARM COVERARM COVER

GROUND(FOR ELECTRICAL)

PROTECTED EARTH(FOR CHASSIS)

NORMALDUPLEX

CRITICALDUPLEX

CRITICALDUPLEX

GENERIC BOOM ELECTRICAL WIRINGDIAGRAM FOR FIXED / SPRING ARMS

LGN

GENERIC WIRING DIAGRAM

ULTRAFLEXTYPE USL CONDUIT

ULTRAFLEXTYPE USL CONDUIT

GREENBLACK (L)WHITE (N)

GREENBLACK (L)WHITE (N)

CRITICAL NORMAL

*SITE SPECIFIC WIRING DETAILS* 6/20/2

013

NORT

HWES

T HO

SPIT

ALPR

OJEC

T #:

13-0

72-K

PSU

BMIT

TAL

PLOT

DAT

E:

MDL:

ET2F

VBM3

6/2AF

C2QT

Y.: 3

REV.

#: 0

RED

RED

WHITE

Page 18: NORTHWEST HOSPITAL CENTER - brown-heim.com

INITIAL:DATE:

MOUNTING STRUCTURE TEST JIG

WEIGHT SUPPORT TUBE

1-1/4" NUTS

1-1/4" THREADED RODS (6)

MOUNTING HUBASSEMBLY

12mm NUT (6)

12mm x 30mm BOLT (4)

CHAIN

CHAIN FALL

LOWER RADIAL ARM

UPPER RADIAL ARM

5/8" NUT (2)

12mm NUT (2)

WEIGHTS (6)

TESTING - MOUNTING STRUCTURE

Each mounting structure must be tested by a Skytron representative to verify that there is no more than two-tenths of a degree of rotational movement at the mounting plate prior to installing a fixture. A mounting structure test jig is available from a Skytron representative to facilitate thisprocess. The mounting structure test jig is a fixture which simulates the weights and moment loads created by a Skytron fixture. It consists of ahub assembly, an upper and lower radial arm, a chain fall, weight support tube and six 100 lb. weights (refer to illustration).

The drawing package and the test jig instructions are required to perform an accurate test.

The test jig instructions include the load simulator weight chart, the test jig report form and complete instructions for performing the test.

upper armlength (major)

lower armlength (major)

upper armlength (minor)

lower armlength (minor)

† equipmentweight capacity

minimumceiling height fixture weight moment load * test weight

200 lbs400 lbs400 lbs400 lbs600 lbs600 lbs600 lbs600 lbs600 lbs600 lbs

600 lbs600 lbs600 lbs

500 lbs

600 lbs600 lbs200 lbs300 lbs

400 lbs400 lbs

N/A

200 lbs300 lbs

100 lbs200 lbs

1410 ft lbs2843 ft lbs3074 ft lbs3149 ft lbs4584 ft lbs4272 ft lbs6102 ft lbs5318 ft lbs4158 ft lbs4526 ft lbs

4362 ft lbs5239 ft lbs5607 ft lbs

3994 ft lbs

4927 ft lbs5288 ft lbs1690 ft lbs2058 ft lbs

2888 ft lbs6256 ft lbs

N/AN/A

1204 ft lbs1810 ft lbs

549 lbs622 lbs611 lbs646 lbs809 lbs830 lbs

1100 lbs1108 lbs743 lbs832 lbs

858 lbs939 lbs

1028 lbs

769 lbs

960 lbs1049 lbs397 lbs486 lbs

597 lbs686 lbs

N/AN/A

478 lbs434 lbs

145 lbs

N/AN/A

N/AN/A

N/AN/A

N/AN/A

N/AN/A

N/AN/A

650 ft lbs

7'-9"8'-8"8'-2"8'-5"

9'-11"9'-11"8'-9"8'-9"8'-9"9'-5"8'-9"9'-5"

9'-6" ***9'-11"

9'-6" ***9'-11"9'-6"9'-6"

9'-11"9'-11"9'-0"7'-7"8'-5"

275 lbs275 lbs

N/A275 lbs

205/66 lbs210/66 lbs

205/175 lbs225/175 lbs

215 lbs215 lbs

255 lbs215/66 lbs215/66 lbs

255 lbs

255/66 lbs255/66 lbs

66 lbs66 lbs

66/66 lbs66/66 lbs

235 lbs184 lbs

N/A

N/AN/AN/AN/A

N/AN/AN/AN/A

N/A

N/AN/AN/AN/A

N/AN/A

N/AN/A N/A

N/AN/A

N/AN/AN/AN/AN/A

N/AN/AN/A

N/AN/A

35.5"35.5"

35.5"35.5"35.5"35.5"

35.5"35.5"35.5"

35.5"

35.5"35.5"

31.5"31.5"31.5"

31.5"

31.5"31.5"31.5"31.5"31.5"31.5"31.5"31.5"31.5"31.5"31.5"31.5"31.5"

39.5"

39.5"39.5"39.5"

39.5"39.5" 31.5"

44.5"

44.5"

61"

61"

61"61"

61"61"

51"

51"51"

51"51"51"51"

51"51"

51"51"

51"

59"59"

41.5"48"

41.5"41.5"

E1_E2_

E2VBM36E2H_

ET2_/2AF_ET2-C_/2AF_

ETM2_/2_ETM2-C_/2-C_EC2_/LIGHT(1)

EC2_/LIGHTS(2)EC2-C_/LIGHT(1)

EC2-C_/LIGHTS(2)ECT2_/2AF_/LIGHT(1)

ECT2_/2AF_/LIGHTS(2)ECT2-C_/2AF_/LIGHT(1)

ECT2-C_/2AF_/LIGHTS(2)LC2AF_/LIGHT(1)

LC2ALF_/LIGHTS(2)LCT2AF_/2AF_/LIGHT(1)

LCT2AF_/2AF_/LIGHTS(2)COLUMN (ALL)

Q1_Q2_

(ALL) LFSLFS(ALL) EXTENDED LIGHT ARMS

BOOM

* SKYTRON recommends testing all mounts to 600 lbs **** Center of flatscreen will be 70" at level† Refer to Operator's Manual for exact weight capacity

LC2ALF_/LIGHT(1)LC2AF_/LIGHTS(2)

300 lbs1800 ft lbs400 lbs9'-6"66 lbsN/AN/A35.5"59"300 lbs2150 ft lbs500 lbs9'-6"66 lbsN/AN/A35.5"59"