8
North-South Corridor Northern Connector Project Community Update – December 2016 Artists impression of the Northern Connector at the Southern Interchange Northern Connector Project Employment and Training Connections NorthHub >>Project Overview The Northern Connector Project will involve the construction of a new six lane 15.5 kilometre motorway to the west of Port Wakefield Road, providing a vital freight and commuter link between the Northern Expressway and the South Road Superway, and the Port River Expressway. The Project will construct four interchanges at the Northern Expressway, Waterloo Corner Road, Bolivar Road and the South Road Superway to allow access on and off the non-stop corridor, as well as a shared use path adjacent the Northern Connector, and connecting into the Stuart O’Grady bike path. >>Jobs for Northern Adelaide Lendlease has been awarded the contract for the design and construction of the Northern Connector Project. They plan to set a new benchmark for local industry participation and employment for public infrastructure projects in South Australia. In delivering the project, Lendlease have committed to ensuring at least half of the 480 jobs a year on average will be awarded to northern suburbs workers, as well as 90 percent of all on site labour hours to be undertaken by South Australians. > Register for Project Updates >> Contact the Project Team if you would like to receive updates straight to your inbox. Contact details are on the back page of this newsletter. >> See page six for more information about industry and employment opportunities on the Northern Connector Project.

North-South Corridor Northern Connector Project · 2016 2017 >>November >>December >>January Relocation of Existing Utility Services Commencement of Works of the Southern Interchange

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: North-South Corridor Northern Connector Project · 2016 2017 >>November >>December >>January Relocation of Existing Utility Services Commencement of Works of the Southern Interchange

North-South CorridorNorthern Connector Project

Community Update – December 2016Artists impression of the Northern Connector at the Southern Interchange

Northern Connector ProjectEmployment and Training Connections

NorthHub

>>Project OverviewThe Northern Connector Project will involve the construction of a new six lane 15.5 kilometre motorway to the west of Port Wakefield Road, providing a vital freight and commuter link between the Northern Expressway and the South Road Superway, and the Port River Expressway. The Project will construct four interchanges at the Northern Expressway, Waterloo Corner Road, Bolivar Road and the South Road Superway to allow access on and off the non-stop corridor, as well as a shared use path adjacent the Northern Connector, and connecting into the Stuart O’Grady bike path.

>>Jobs for Northern AdelaideLendlease has been awarded the contract for the design and construction of the Northern Connector Project. They plan to set a new benchmark for local industry participation and employment for public infrastructure projects in South Australia.In delivering the project, Lendlease have committed to ensuring at least half of the 480 jobs a year on average will be awarded to northern suburbs workers, as well as 90 percent of all on site labour hours to be undertaken by South Australians.

> Register for Project Updates>> Contact the Project Team if you would like

to receive updates straight to your inbox. Contact details are on the back page of this newsletter.

>> See page six for more information about industry and employment opportunities on the Northern Connector Project.

Page 2: North-South Corridor Northern Connector Project · 2016 2017 >>November >>December >>January Relocation of Existing Utility Services Commencement of Works of the Southern Interchange

2016 2017

>>November >>December >>January

Relocation of Existing Utility Services

Commencement of Works of the Southern Interchange

Installation of Fencing around Key Work Areas

Clearing of area within the alignment to allow for construction

Installation of Traffic Barriers Along the Port River Expressway

2

North-South Corridor – Northern Connector Project

>>Project Milestones

FOR YOUR INFO...

While these works are taking place, you might notice crews working along sections of the road. 

To ensure the safety of the public and our crews, localised traffic management will be required at times, and advanced notification will be provided prior to any significant changes. 

Residents will be advised of any works that will affect their property, including access or service disruptions.

Works will mainly occur during the day.

If night works are required to avoid significant traffic delays or where larger service interruptions are required, residents will be notified in advance.

The Northern Connector Project involves the construction of a new six lane 15.5 kilometre motorway to the west of Port Wakefield Road.

Page 3: North-South Corridor Northern Connector Project · 2016 2017 >>November >>December >>January Relocation of Existing Utility Services Commencement of Works of the Southern Interchange

3

>> Works Completed to Date

EARLY OCTOBER 2016Completed the Realignment of Kings Road and Bolivar Road

MID OCTOBER 2016Completed the Upgrade of St Kilda Road and Robinson Road New Roundabout

OCTOBER 2016NorthHub Officially Opened on 4 October 2016

Community Update December 2016

Page 4: North-South Corridor Northern Connector Project · 2016 2017 >>November >>December >>January Relocation of Existing Utility Services Commencement of Works of the Southern Interchange

SUPERWAY

NORTHERN CONNECTOR

NORTHERN EXPRESSWAY

SHARED BIKE AND PEDESTRIAN PATH

RAILWAY LINE

LEGEND

WATERLOO CORNER

RAAF BASE

ST.KILDA

BOLIVAR

BURTON

4

North-South Corridor – Northern Connector Project

>> Northern Connector Project  Planned Works

Reduced Speed Limit

70km/h

Northern Connector ProjectEmployment and Training Connections

NorthHub

Main Site Compound &

Symes Road Anjanto Road Undo Road

Summer Road

Full Road Closures from Early 2017

Page 5: North-South Corridor Northern Connector Project · 2016 2017 >>November >>December >>January Relocation of Existing Utility Services Commencement of Works of the Southern Interchange

N

SA WATERWATER

TREATMENT PLANT

GLOBE DERBY PARK

TORRENS ISLAND

BARKER INLET

MANGROVES

PARAFIELD GARDENS

5

Community Update December 2016

Globe Derby Park Site Compound Establishment

Southern Interchange

Site Compound Establishment

Installation of Traffic

Barriers along Port River

Expressway

Shared User Path Diversion

Existing Path will be Diverted through an Alternative Access.

Please Follow Directional Signage.

Page 6: North-South Corridor Northern Connector Project · 2016 2017 >>November >>December >>January Relocation of Existing Utility Services Commencement of Works of the Southern Interchange

6

North-South Corridor – Northern Connector Project

NorthHub Centre for EmploymentThe NorthHub employment and training centre was officially opened on Tuesday 4 October 2016 by the Australian and South Australian Governments. NorthHub was established by Lendlease for connecting jobseekers with employment opportunities on the Northern Connector Project. It is a one-stop shop for vocational education and training, and service providers to meet with industry partners, subcontractors and workers. NorthHub is located at the Site Office at Waterloo Corner, to keep job seekers connected with the project.To find out more about how to get a job on the Northern Connector Project, contact the NorthHub Team. Contact details are overleaf.

Tendering for Work on the Northern Connector ProjectAll packages of work for the Northern Connector Project with Lendlease will be listed on the Industry Capability Network (ICN) Gateway. Industry Partners will release their own packages of work directly to the market. Lendlease will provide details of registered businesses from the ICN Gateway to all of the Industry Partners for their consideration.For more information about tendering for work on the Northern Connector, visit the ICN Gateway or email [email protected].

Northern Connector ProjectEmployment and Training Connections

NorthHub

Northern Connector | Employment and Training Connections

NorthHub

North-South Corridor

Creating Jobs | Growing Industry

NORTHERN CONNECTOR

THE NORTHERN CONNECTOR PROJECT MAXIMISES THE USE OF AUSTRALIAN AND SOUTH AUSTRALIAN STEEL WITH APPROXIMATELY 6,500 TONNES OF BILLET FROM THE WHYALLA STEEL WORKS

ALL JOBS ON THE NORTHERN CONNECTOR PROJECT WILL BE AVAILABLE THROUGH NORTHHUB NorthHub.sa.gov.au

EMPLOYMENT

480ON AVERAGE

FULL-TIME EQUIVALENT JOBS EACH YEAR DURING CONSTRUCTION

90%

50%

OF ALL ON-SITE LABOUR HOURS BY SOUTH AUSTRALIANS

OF ALL JOBS FILLED BY NORTHERN SUBURBS WORKERS

AT LEAST

AT LEAST

Page 7: North-South Corridor Northern Connector Project · 2016 2017 >>November >>December >>January Relocation of Existing Utility Services Commencement of Works of the Southern Interchange

7

Community Update December 2016

EMPLOYMENTFULL-TIME EQUIVALENT JOBS EACH YEAR DURING CONSTRUCTION

OF ALL ON-SITE LABOUR HOURS BY SOUTH AUSTRALIANS

OF ALL JOBS FILLED BY NORTHERN SUBURBS WORKERS

PROJECT LENGTH

4 ROAD INTERCHANGES

BENEFITS

16km PATHFOR CYCLISTS AND PEDESTRIANS

> NORTHERN INTERCHANGE AT THE NORTHERN EXPRESSWAY

> WATERLOO CORNER INTERCHANGE> BOLIVAR INTERCHANGE> SOUTHERN INTERCHANGE

AT THE SOUTH ROAD SUPERWAY

> IMPROVED FREIGHT RELIABILITY FOR ECONOMIC GROWTH> BETTER CONNECTION BETWEEN ADELAIDE,

THE NORTHERN SUBURBS AND BEYOND

15.5km3 LANES IN EACH DIRECTION

SUPERWAYNEXY

Page 8: North-South Corridor Northern Connector Project · 2016 2017 >>November >>December >>January Relocation of Existing Utility Services Commencement of Works of the Southern Interchange

Northern Connector ProjectEmployment and Training Connections

NorthHub

Artists impression of the Northern Connector at the Southern InterchangeCONTACT US

Please Note: The Project Information Line will be monitored over the Christmas Break for Urgent Construction Enquiries Only.

Project Information 1300 916 221

dpti.sa.gov.au/northernconnector

[email protected]

NorthHub1277-1291 Port Wakefield Road Waterloo Corner

Open Monday to Friday 10.00am – 4.00pm

1300 731 071

NorthHub.sa.gov.au

NorthHub@lendlease

Local Industry lendleasenorthernconnector.icn.org.au