2012.05.30 1
NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION
Rogers Communications Inc1600 – 4710 Kingsway,
Burnaby, British Columbia V5H 4W4
Mayor and Council District of West Vancouver
Introduction
Rogers Communications Inc. (Rogers) is pleased to submit this one of three applications for Type 3 cell towers on the Ministry of Transportation and Highways Right of Way in the District of West Vancouver. The proposed infrastructure will address significant coverage gaps and meet rapidly growing demand for wireless service in residential neighbourhoods north and south of the Upper Levels Highway.
Rogers would like to thank the District of West Vancouver for its guidance on this project. We believe the creative solution that emerged from this process – one that engaged architects, urban designers, engineers, network planners from Rogers and the other wireless providers along with input from West Vancouver staff – is a first for the wireless industry in Canada.
Background
Over two years ago, Rogers proposed several wireless telecommunications structures, including one in West Vancouver at Taylor Way and Highway 1, which raised community and local government concerns. In response to these concerns, the Ministry of Transportation and Infrastructure (MoTI) convened meetings with Rogers, the District of West Vancouver and Industry Canada, and asked Rogers to work with local governments to develop a corridor plan for the north shore. The objective was to facilitate more orderly and predicable installation of wireless infrastructure to serve these communities over the mid to long-term and address concerns about proliferation of towers along the right-of-way by accommodating multiple carriers. Rogers was also challenged to address aesthetic and urban design issues in the belief that more could be done to improve the appearance of the towers in the community and minimize the visual impact.
Process
In response, Rogers’ senior management approved a significant pilot project to seek solutions to these community challenges. Rogers engaged Design DIALOG to develop tower and urban design (tower siting) concepts. Senior radio frequency engineers and other technical land use specialists worked with DIALOG to develop the preliminary concepts. These were shared with the District of West Vancouver in late June last year and presented subsequently to the District’s Design Review Committee for their consideration and feedback.
2013.05.30
NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION
2
Result
This collaborative approach has been a very positive experience for Rogers and has produced significant innovations in both process and tower design. A diverse group of stakeholders worked together to meet multiple objectives and the outcome reflects hundreds of hours of work and a significant financial investment. To our knowledge this is the first time in Canada that a tower design incorporates the required radio equipment inside the base, reducing the need for multiple exterior cabinets. Also innovative is the shape of the tower. Cell towers are typically round (monopole) or lattice style. This design, a blade shape, allows the structure to be oriented such that the visual impact is reduced. The team was also able to accommodate three levels of antennas meeting the request to accommodate multiple carriers.
Next Steps
This proposal identifies three sites to meet the immediate and medium-term needs of West Vancouver residents in the surrounding neighbourhoods. The towers are proposed for Taylor Way, 15th and 26th Avenues. All wireless companies were invited to share this tower and Rogers is pleased to report that TELUS has expressed strong interest in co-locating on all three of the proposed structures.
The heavily residential character, terrain and tall trees of West Vancouver create a real challenge for wireless providers as cellular technology relies on line-of-sight to transmit and receive signals. These unique characteristics of West Vancouver have resulted in wireless installations being concentrated in commercial areas along Marine Drive and at higher elevations, with mid-levels of West Vancouver being served primarily by cell sites in Vancouver, which are increasingly running at near maximum capacity serving the customers closest to them in Vancouver. These sites will soon be unable to serve West Vancouver as the demands on them from Vancouver users increases. The three sites proposed in these applications will not fix or address all coverage problems in the District of West Vancouver, but will go a long way to addressing the most significant current coverage gaps that have been created by rapidly increasing demand in residential areas north and south of the highway.
In closing, Rogers would like to acknowledge and thank the District of West Vancouver for the opportunity to work together so productively over the past two years.
Sincerely,
Leon LerouxDirector, Network Implementation, Western Canada Rogers Communications Inc.
2012.05.30 3
NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION
50 m 100 m0 m CELLULAR INFRASTRUCTURENORTH SHORE CORRIDOR PROPOSAL
15th STREET
LOCATION OF PROPOSED CELLULAR TOWER
A
B
2013.05.30
NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION
414
4.97
146.1
7
147.4
3
148.28 148.3
0
148.9
214
9.15
149.2
114
9.2514
9.25
149.1
7149.0
6
148.9
2
147.8
1
146.5
7
145.3
0
144.1
914
4.22 14
5.36 14
6.63 14
7.85
149.2
3
149.6
6
149.3
9
149.1
6
148.9
214
8.93
149.2
2
149.9
115
0.68 15
1.08
151.0
915
0.82
150.1
0
150.9
5149.9
4
150.2
7
149.8
3
151.3
8
150.7
4
150.0
7
149.5
2
149.1
6
148.6
4
148.3
7
147.9
2
147.2
6
146.2
7
145.2
0
144.1
4
143.3
9
144.6
8
145.5
1
146.3
9
147.1
8
148.0
9
148.2
4
147.57
146.6
5
146.0
2
145.2
0
144.7
0
144.6
0
143.8
3
143.9
2
145.3
5
146.7
2
147.3
5
147.5
514
7.46
146.9
1
147.4
6
147.8
4
147.9
014
7.22
146.7
714
5.98
146.1
014
6.64
147.0
1
147.2
4
147.5
6
147.9
314
8.40
148.78
149.11
149.11
148.8
914
8.65
148.1
8146.77
145.0
6
144.0
614
4.16 14
4.86
146.39146.18
145.1
614
3.73
144.1
814
5.47
147.5
1
146.9
2
146.5
2
146.0
2
145.4
0
144.8
0
144.2
2
143.5
2
143.70
144.8
6
145.8
014
6.27
146.6
6
146.9
114
6.9314
7.11
147.1
5
146.5
6
145.8
8
145.5
9
145.0
0
144.2
8
144.4
7
144.7
4
144.6
1
143.8
2
143.2
8
147.4
8
LSEB
148.3
2
S
145.9
6
144.3
7
S
146.0
1TT
=155
.53
145.7
5
148.3
1EB
148.2
3
144.8
7
S
147.22
147.2
7
146.3
1LS
145.5
2 LS
149.0
9S
149.21
S
149.4
6 S
149.5
1
EB
149.6
9
S
149.8
9
S
150.7
4S
LS15
0.17
EB
148.2
5
148.7
7
148.6
1
148.4
2
148.33148.82
149.0
214
9.15
149.2
0
TT=1
58.50
164.0
0
TT=1
51.40
143.1
3
144.7
3
144.99
150.7
4
UB
CONIF.Ø:0.15 SIGN
CONIF.Ø:0.30
CULVERT INV. EL.=144.31CORRUGATED STEELØ:0.60
SIGN
CONIF.Ø:[email protected]
CULVERT INV. EL.=143.13CORRUGATED STEELØ:0.45 CONIF.Ø:0.35
ELEC.CONTROLPANEL
CONCRETE BARRIER
FOG LINE
CONCRETEMEDIAN
EDGE OF ASPHALT
EDGE OF ASPHALT
FOG LINE
FOG LINE
BUSHES
BUSHES
DITCH
DITCH
DITCH
EDGE OF ASPHALT
CROSS CREEK ROAD
TRANS CANADA HIGHWAY
EDGE OF ASPHALT
CONCRETE BARRIER
8121
.576
SK8
SK7PROPOSED CELLTOWER
147.2
614
7.87
N
PR
OJ
NO
RTH
142.6
5
INDICATES SPOT ELEVATION
INDICATES HUB SETHUB
INDICATES CATCH BASIN
INDICATES ELECTRICAL BOX
INDICATES LAMP STANDARD
INDICATES MANHOLE
INDICATES SIGN
INDICATES TOP OF TREETT
S
CB
EB
LS
MH
LEGEND
UB INDICATES UTILITY BOX
2012.05.30 5
NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION
SK7 SITE SECTION
65-321
EXIT RAMPCROSS CREEK ROAD
65-321
148.00150.00
146.00144.00 147.87
TYPICAL 2 STOREY RESIDENCES
149.00
SK7-15th ST SITE SECTION
2013.05.17
CELLULAR INFRASTRUCTURENORTH SHORE CORRIDOR PROPOSAL
15TH STREET
2013.05.30
NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION
6
SK8 SITE SECTION
SCHOOL BUS
EXIT RAMP
TRANS-CANADA HWY (#1)
CROSS CREEK ROADEXIT RAMP
148.00
150.00
146.00
144.00
152.00
154.00
156.00
158.00
160.00
162.00
164.00
166.00
168.00
170.00
172.00
142.00
140.00
138.00
136.00
147.87
TYPICAL 2 STOREY RESIDENCE
TYPICAL 2 STOREY RESIDENCE
SK8-15th ST SITE SECTION
2013.05.17
CELLULAR INFRASTRUCTURENORTH SHORE CORRIDOR PROPOSAL
15TH STREET
2012.05.30 7
NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION
CLE
AR
POLY
CAR
BON
ATE
PAN
ELS
(VER
TIC
AL
EXTR
USI
ON
)w
/ IN
TEG
RAT
ED L
ED
LIG
HTI
NG
EQEQEQ
36000mm
+/- 7800
800mm
4000mm4000mm5050mm5050mm5050mm5050mm
13050mm FLARE
ANTENNAE ZONE MICROWAVE ZONE RRU & STRUCTURAL WIDE FLANGE ZO POWER PACK ZONEPARAPET
16m
m S
TEEL
FLO
OR
PLAT
ESBE
TWEE
N A
NTE
NN
AE
ZON
ES
SK
14
SK
12 SK
11
SK
15
EQEQEQ
36000mm
+/- 7800
800mm
4000mm4000mm5050mm5050mm5050mm5050mm
13050mm FLARE
CO
MPO
SITE
W
OO
DPA
NEL
ANTENNAE ZONE MICROWAVE ZONE RRU & STRUCTURAL WIDE FLANGE ZO POWER RACK ZONEPARAPET
CLE
AR P
OLY
CAR
BON
ATE
PAN
ELS
(VER
TIC
AL E
XTR
USI
ON
)w
/ IN
TEG
RAT
ED L
ED L
IGH
TIN
G
BEN
T ST
EEL
PLAT
E c/
wH
IGH
PER
FOR
MAN
CE
CO
ATIN
G, W
HIT
E
SK
14
SK
13
SK
12 SK
11
SK
15 R
OU
ND
HSS
INSI
DE
13050mm FLARE 13050mm FLARE
LOU
VRE
LIG
HT
CH
ARC
OAL
HO
RIZ
ON
TAL
REV
EALS
@ST
RU
CTU
RAL
JO
INTS
CO
MPO
SITE
PAN
ELLI
GH
T C
HAR
CO
AL
CO
MPO
SITE
PAN
ELLI
GH
T C
HAR
CO
AL
LOU
VRE
LIG
HT
CH
ARC
OAL
MIC
RO
WAV
E AN
TEN
NA
PAN
EL A
NTE
NN
AE, T
YP.
FLU
SSH
PO
WER
CAB
INET
DO
OR
S, P
AIN
T TO
MAT
CH
ADJA
CEN
T ST
EEL
LEFT
ELE
VA
TIO
NB
AC
K E
LEV
ATI
ON
FRO
NT
ELE
VA
TIO
NR
IGH
T E
LEV
ATI
ON
CEL
LULA
R IN
FRAS
TRU
CTU
RE
NO
RTH
SH
OR
E C
OR
RID
OR
PR
OPO
SAL
SK2-
TOW
ER E
LEVA
TIO
NS
2013
.05.
30
2013.05.30
NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION
8
CELLULAR INFRASTRUCTURENORTH SHORE CORRIDOR PROPOSAL
1 PLAN @ SLAB LEVEL
RRU
RRU
1337mm713mm
2235mm
210m
m
R 250mm
903m
m
210m
m
2050mm
480m
m
196.4° 202.3°
196.4°
LOUVRE FROM 13050MM TO PARAPET LEVEL
BENT STEEL PLATE ACCESS DOORS C/WHIGH PERFORMANCE COATING
NON-STRUCTURAL PLATE BELOW RRU'S=WORKING PLANE (APPROX 1/VERTICAL METER)
VENT HOLES IN STRUCTURE.
BENT STEEL PLATE C/W HIGH PERFORMANCE COATING
STEEL PLATE RIBS BELOW/5050MM WITH ELECTRICAL CHASE ALLOWANCESTRUCTURAL STEEL WIDE FLANGES
210m
m
903m
m
210m
m
2050mm
COMPOSITE PANELTO 13050mm
1320mm730mm
215m
m92
0mm
423m
m
1346
mm
COMPOSITE PANELTO 13050mm
POWER RACKS
2SK2
2050mm
924m
m
3
SK2
1SK2
1850
mm
BENT STEEL PLATE ACCESS DOORS C/WHIGH PERFORMANCE COATING
CONCRETE SLAB FOUNDATION (SIZE TBD)
STRUCTURAL STEEL WIDE FLANGES
4SK2
196.4° 202.3°
196.4°BENT STEEL PLATE C/WHIGH PERFORMANCE COATING
MWA
REMOVABLE RADIO FREQUENCY FRIENDLY ACCESS PANEL
STRUCTURAL STEEL WIDE FLANGES BELOW-TERMINATE AT RADIO FREQUENCY FRIENDLY CLADDING
LOUVRE
HSS ATTACHED TO WIDE FLANGE BELOW
RADIO FREQUENCY FRIENDLY CLADDING
R 250mm
196.4° 202.3°
196.4°2235mm
480m
m
903m
m
HSS 406X13MM ROUND
610mm DIA MICROWAVE DISH
R 250mm
196.4° 202.3°
196.4°2235mm
480m
m
903m
m INTERMEDIATE STEEL FLOOR PLATE ATTACHED TO ROUND HSS
REMOVABLE RADIO FREQUENCY FRIENDLY ACCESS PANEL (4 PER LEVEL, TYP)
ANTENNA C/W 50mm DIA STEEL PIPE MOUNTS
ANT.
ANT.LOUVRE
RADIO FREQUENCY FRIENDLY CLADDING
ANT.
HSS 406x13MM ROUND
ANT.
ANT.
ANT.
530mm 530mm
CONCRETE FOUNDATION BELOW
SLOPED CAP PLATE
FLARED PORTION OF TOWER BELOW
FLASHED LOUVRE AT HEIGHT OF TOP PLATEDOWN
TERMINATION OF RADIO FREQUENCY FRIENCLY CLADDING AT PARAPET
2 PLAN @ RRU LEVELS
3 PLAN @ MICROWAVE LEVEL
4 PLAN @ ANTENNA LEVEL
5 ROOF PLAN
SK1-TOWER PLANS
2012.05.30 9
NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION
NORTH SHORE CORRIDOR CONCEPTCOLOUR + MATERIAL STUDY
MATERIAL PALETTECOMPONENTS
COLOUR FLEXIBILITY
HIGH PERFORMANCE COATED STEEL POLY CARBONATE PANELS FIBRE GLASS PANELS PAINTED LOUVERS COMPOSITE PANELS
OR
URETHANE TOP COAT
EPOXY PRIMERZINC RICH PRIMER
STEEL STRUCTURE
HIGH PERFORMANCE COATED STEEL
COMPOSITE CLADDING
VENTILATION LOUVRES
MICROWAVE ANTENNA
RADIO ANTENNAE
POLYCARBONATE OR FIBREGLASS PANELS