2012.05.30 1 NORTH SHORE CORRIDOR CONCEPT CELLULAR INDUSTRY SOLUTION Rogers Communications Inc 1600 – 4710 Kingsway, Burnaby, British Columbia V5H 4W4 Mayor and Council District of West Vancouver Introduction Rogers Communications Inc. (Rogers) is pleased to submit this one of three applications for Type 3 cell towers on the Ministry of Transportation and Highways Right of Way in the District of West Vancouver. The proposed infrastructure will address significant coverage gaps and meet rapidly growing demand for wireless service in residential neighbourhoods north and south of the Upper Levels Highway. Rogers would like to thank the District of West Vancouver for its guidance on this project. We believe the creative solution that emerged from this process – one that engaged architects, urban designers, engineers, network planners from Rogers and the other wireless providers along with input from West Vancouver staff – is a first for the wireless industry in Canada. Background Over two years ago, Rogers proposed several wireless telecommunications structures, including one in West Vancouver at Taylor Way and Highway 1, which raised community and local government concerns. In response to these concerns, the Ministry of Transportation and Infrastructure (MoTI) convened meetings with Rogers, the District of West Vancouver and Industry Canada, and asked Rogers to work with local governments to develop a corridor plan for the north shore. The objective was to facilitate more orderly and predicable installation of wireless infrastructure to serve these communities over the mid to long-term and address concerns about proliferation of towers along the right-of-way by accommodating multiple carriers. Rogers was also challenged to address aesthetic and urban design issues in the belief that more could be done to improve the appearance of the towers in the community and minimize the visual impact. Process In response, Rogers’ senior management approved a significant pilot project to seek solutions to these community challenges. Rogers engaged Design DIALOG to develop tower and urban design (tower siting) concepts. Senior radio frequency engineers and other technical land use specialists worked with DIALOG to develop the preliminary concepts. These were shared with the District of West Vancouver in late June last year and presented subsequently to the District’s Design Review Committee for their consideration and feedback.

NORTH SHORE CORRIDOR CONCEPT - Home | District of … · north shore corridor concept ... this design, a blade shape, ... rru & structural wide flange zo power pack zone parapet 16mm

  • Upload
    vomien

  • View
    223

  • Download
    0

Embed Size (px)

Citation preview

2012.05.30 1

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

Rogers Communications Inc1600 – 4710 Kingsway,

Burnaby, British Columbia V5H 4W4

Mayor and Council District of West Vancouver

Introduction

Rogers Communications Inc. (Rogers) is pleased to submit this one of three applications for Type 3 cell towers on the Ministry of Transportation and Highways Right of Way in the District of West Vancouver. The proposed infrastructure will address significant coverage gaps and meet rapidly growing demand for wireless service in residential neighbourhoods north and south of the Upper Levels Highway.

Rogers would like to thank the District of West Vancouver for its guidance on this project. We believe the creative solution that emerged from this process – one that engaged architects, urban designers, engineers, network planners from Rogers and the other wireless providers along with input from West Vancouver staff – is a first for the wireless industry in Canada.

Background

Over two years ago, Rogers proposed several wireless telecommunications structures, including one in West Vancouver at Taylor Way and Highway 1, which raised community and local government concerns. In response to these concerns, the Ministry of Transportation and Infrastructure (MoTI) convened meetings with Rogers, the District of West Vancouver and Industry Canada, and asked Rogers to work with local governments to develop a corridor plan for the north shore. The objective was to facilitate more orderly and predicable installation of wireless infrastructure to serve these communities over the mid to long-term and address concerns about proliferation of towers along the right-of-way by accommodating multiple carriers. Rogers was also challenged to address aesthetic and urban design issues in the belief that more could be done to improve the appearance of the towers in the community and minimize the visual impact.

Process

In response, Rogers’ senior management approved a significant pilot project to seek solutions to these community challenges. Rogers engaged Design DIALOG to develop tower and urban design (tower siting) concepts. Senior radio frequency engineers and other technical land use specialists worked with DIALOG to develop the preliminary concepts. These were shared with the District of West Vancouver in late June last year and presented subsequently to the District’s Design Review Committee for their consideration and feedback.

2013.05.30

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

2

Result

This collaborative approach has been a very positive experience for Rogers and has produced significant innovations in both process and tower design. A diverse group of stakeholders worked together to meet multiple objectives and the outcome reflects hundreds of hours of work and a significant financial investment. To our knowledge this is the first time in Canada that a tower design incorporates the required radio equipment inside the base, reducing the need for multiple exterior cabinets. Also innovative is the shape of the tower. Cell towers are typically round (monopole) or lattice style. This design, a blade shape, allows the structure to be oriented such that the visual impact is reduced. The team was also able to accommodate three levels of antennas meeting the request to accommodate multiple carriers.

Next Steps

This proposal identifies three sites to meet the immediate and medium-term needs of West Vancouver residents in the surrounding neighbourhoods. The towers are proposed for Taylor Way, 15th and 26th Avenues. All wireless companies were invited to share this tower and Rogers is pleased to report that TELUS has expressed strong interest in co-locating on all three of the proposed structures.

The heavily residential character, terrain and tall trees of West Vancouver create a real challenge for wireless providers as cellular technology relies on line-of-sight to transmit and receive signals. These unique characteristics of West Vancouver have resulted in wireless installations being concentrated in commercial areas along Marine Drive and at higher elevations, with mid-levels of West Vancouver being served primarily by cell sites in Vancouver, which are increasingly running at near maximum capacity serving the customers closest to them in Vancouver. These sites will soon be unable to serve West Vancouver as the demands on them from Vancouver users increases. The three sites proposed in these applications will not fix or address all coverage problems in the District of West Vancouver, but will go a long way to addressing the most significant current coverage gaps that have been created by rapidly increasing demand in residential areas north and south of the highway.

In closing, Rogers would like to acknowledge and thank the District of West Vancouver for the opportunity to work together so productively over the past two years.

Sincerely,

Leon LerouxDirector, Network Implementation, Western Canada Rogers Communications Inc.

2012.05.30 3

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

50 m 100 m0 m CELLULAR INFRASTRUCTURENORTH SHORE CORRIDOR PROPOSAL

15th STREET

LOCATION OF PROPOSED CELLULAR TOWER

A

B

2013.05.30

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

414

4.97

146.1

7

147.4

3

148.28 148.3

0

148.9

214

9.15

149.2

114

9.2514

9.25

149.1

7149.0

6

148.9

2

147.8

1

146.5

7

145.3

0

144.1

914

4.22 14

5.36 14

6.63 14

7.85

149.2

3

149.6

6

149.3

9

149.1

6

148.9

214

8.93

149.2

2

149.9

115

0.68 15

1.08

151.0

915

0.82

150.1

0

150.9

5149.9

4

150.2

7

149.8

3

151.3

8

150.7

4

150.0

7

149.5

2

149.1

6

148.6

4

148.3

7

147.9

2

147.2

6

146.2

7

145.2

0

144.1

4

143.3

9

144.6

8

145.5

1

146.3

9

147.1

8

148.0

9

148.2

4

147.57

146.6

5

146.0

2

145.2

0

144.7

0

144.6

0

143.8

3

143.9

2

145.3

5

146.7

2

147.3

5

147.5

514

7.46

146.9

1

147.4

6

147.8

4

147.9

014

7.22

146.7

714

5.98

146.1

014

6.64

147.0

1

147.2

4

147.5

6

147.9

314

8.40

148.78

149.11

149.11

148.8

914

8.65

148.1

8146.77

145.0

6

144.0

614

4.16 14

4.86

146.39146.18

145.1

614

3.73

144.1

814

5.47

147.5

1

146.9

2

146.5

2

146.0

2

145.4

0

144.8

0

144.2

2

143.5

2

143.70

144.8

6

145.8

014

6.27

146.6

6

146.9

114

6.9314

7.11

147.1

5

146.5

6

145.8

8

145.5

9

145.0

0

144.2

8

144.4

7

144.7

4

144.6

1

143.8

2

143.2

8

147.4

8

LSEB

148.3

2

S

145.9

6

144.3

7

S

146.0

1TT

=155

.53

145.7

5

148.3

1EB

148.2

3

144.8

7

S

147.22

147.2

7

146.3

1LS

145.5

2 LS

149.0

9S

149.21

S

149.4

6 S

149.5

1

EB

149.6

9

S

149.8

9

S

150.7

4S

LS15

0.17

EB

148.2

5

148.7

7

148.6

1

148.4

2

148.33148.82

149.0

214

9.15

149.2

0

TT=1

58.50

164.0

0

TT=1

51.40

143.1

3

144.7

3

144.99

150.7

4

UB

CONIF.Ø:0.15 SIGN

CONIF.Ø:0.30

CULVERT INV. EL.=144.31CORRUGATED STEELØ:0.60

SIGN

CONIF.Ø:[email protected]

CULVERT INV. EL.=143.13CORRUGATED STEELØ:0.45 CONIF.Ø:0.35

ELEC.CONTROLPANEL

CONCRETE BARRIER

FOG LINE

CONCRETEMEDIAN

EDGE OF ASPHALT

EDGE OF ASPHALT

FOG LINE

FOG LINE

BUSHES

BUSHES

DITCH

DITCH

DITCH

EDGE OF ASPHALT

CROSS CREEK ROAD

TRANS CANADA HIGHWAY

EDGE OF ASPHALT

CONCRETE BARRIER

8121

.576

SK8

SK7PROPOSED CELLTOWER

147.2

614

7.87

N

PR

OJ

NO

RTH

142.6

5

INDICATES SPOT ELEVATION

INDICATES HUB SETHUB

INDICATES CATCH BASIN

INDICATES ELECTRICAL BOX

INDICATES LAMP STANDARD

INDICATES MANHOLE

INDICATES SIGN

INDICATES TOP OF TREETT

S

CB

EB

LS

MH

LEGEND

UB INDICATES UTILITY BOX

2012.05.30 5

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

SK7 SITE SECTION

65-321

EXIT RAMPCROSS CREEK ROAD

65-321

148.00150.00

146.00144.00 147.87

TYPICAL 2 STOREY RESIDENCES

149.00

SK7-15th ST SITE SECTION

2013.05.17

CELLULAR INFRASTRUCTURENORTH SHORE CORRIDOR PROPOSAL

15TH STREET

2013.05.30

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

6

SK8 SITE SECTION

SCHOOL BUS

EXIT RAMP

TRANS-CANADA HWY (#1)

CROSS CREEK ROADEXIT RAMP

148.00

150.00

146.00

144.00

152.00

154.00

156.00

158.00

160.00

162.00

164.00

166.00

168.00

170.00

172.00

142.00

140.00

138.00

136.00

147.87

TYPICAL 2 STOREY RESIDENCE

TYPICAL 2 STOREY RESIDENCE

SK8-15th ST SITE SECTION

2013.05.17

CELLULAR INFRASTRUCTURENORTH SHORE CORRIDOR PROPOSAL

15TH STREET

2012.05.30 7

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

CLE

AR

POLY

CAR

BON

ATE

PAN

ELS

(VER

TIC

AL

EXTR

USI

ON

)w

/ IN

TEG

RAT

ED L

ED

LIG

HTI

NG

EQEQEQ

36000mm

+/- 7800

800mm

4000mm4000mm5050mm5050mm5050mm5050mm

13050mm FLARE

ANTENNAE ZONE MICROWAVE ZONE RRU & STRUCTURAL WIDE FLANGE ZO POWER PACK ZONEPARAPET

16m

m S

TEEL

FLO

OR

PLAT

ESBE

TWEE

N A

NTE

NN

AE

ZON

ES

SK

14

SK

12 SK

11

SK

15

EQEQEQ

36000mm

+/- 7800

800mm

4000mm4000mm5050mm5050mm5050mm5050mm

13050mm FLARE

CO

MPO

SITE

W

OO

DPA

NEL

ANTENNAE ZONE MICROWAVE ZONE RRU & STRUCTURAL WIDE FLANGE ZO POWER RACK ZONEPARAPET

CLE

AR P

OLY

CAR

BON

ATE

PAN

ELS

(VER

TIC

AL E

XTR

USI

ON

)w

/ IN

TEG

RAT

ED L

ED L

IGH

TIN

G

BEN

T ST

EEL

PLAT

E c/

wH

IGH

PER

FOR

MAN

CE

CO

ATIN

G, W

HIT

E

SK

14

SK

13

SK

12 SK

11

SK

15 R

OU

ND

HSS

INSI

DE

13050mm FLARE 13050mm FLARE

LOU

VRE

LIG

HT

CH

ARC

OAL

HO

RIZ

ON

TAL

REV

EALS

@ST

RU

CTU

RAL

JO

INTS

CO

MPO

SITE

PAN

ELLI

GH

T C

HAR

CO

AL

CO

MPO

SITE

PAN

ELLI

GH

T C

HAR

CO

AL

LOU

VRE

LIG

HT

CH

ARC

OAL

MIC

RO

WAV

E AN

TEN

NA

PAN

EL A

NTE

NN

AE, T

YP.

FLU

SSH

PO

WER

CAB

INET

DO

OR

S, P

AIN

T TO

MAT

CH

ADJA

CEN

T ST

EEL

LEFT

ELE

VA

TIO

NB

AC

K E

LEV

ATI

ON

FRO

NT

ELE

VA

TIO

NR

IGH

T E

LEV

ATI

ON

CEL

LULA

R IN

FRAS

TRU

CTU

RE

NO

RTH

SH

OR

E C

OR

RID

OR

PR

OPO

SAL

SK2-

TOW

ER E

LEVA

TIO

NS

2013

.05.

30

2013.05.30

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

8

CELLULAR INFRASTRUCTURENORTH SHORE CORRIDOR PROPOSAL

1 PLAN @ SLAB LEVEL

RRU

RRU

1337mm713mm

2235mm

210m

m

R 250mm

903m

m

210m

m

2050mm

480m

m

196.4° 202.3°

196.4°

LOUVRE FROM 13050MM TO PARAPET LEVEL

BENT STEEL PLATE ACCESS DOORS C/WHIGH PERFORMANCE COATING

NON-STRUCTURAL PLATE BELOW RRU'S=WORKING PLANE (APPROX 1/VERTICAL METER)

VENT HOLES IN STRUCTURE.

BENT STEEL PLATE C/W HIGH PERFORMANCE COATING

STEEL PLATE RIBS BELOW/5050MM WITH ELECTRICAL CHASE ALLOWANCESTRUCTURAL STEEL WIDE FLANGES

210m

m

903m

m

210m

m

2050mm

COMPOSITE PANELTO 13050mm

1320mm730mm

215m

m92

0mm

423m

m

1346

mm

COMPOSITE PANELTO 13050mm

POWER RACKS

2SK2

2050mm

924m

m

3

SK2

1SK2

1850

mm

BENT STEEL PLATE ACCESS DOORS C/WHIGH PERFORMANCE COATING

CONCRETE SLAB FOUNDATION (SIZE TBD)

STRUCTURAL STEEL WIDE FLANGES

4SK2

196.4° 202.3°

196.4°BENT STEEL PLATE C/WHIGH PERFORMANCE COATING

MWA

REMOVABLE RADIO FREQUENCY FRIENDLY ACCESS PANEL

STRUCTURAL STEEL WIDE FLANGES BELOW-TERMINATE AT RADIO FREQUENCY FRIENDLY CLADDING

LOUVRE

HSS ATTACHED TO WIDE FLANGE BELOW

RADIO FREQUENCY FRIENDLY CLADDING

R 250mm

196.4° 202.3°

196.4°2235mm

480m

m

903m

m

HSS 406X13MM ROUND

610mm DIA MICROWAVE DISH

R 250mm

196.4° 202.3°

196.4°2235mm

480m

m

903m

m INTERMEDIATE STEEL FLOOR PLATE ATTACHED TO ROUND HSS

REMOVABLE RADIO FREQUENCY FRIENDLY ACCESS PANEL (4 PER LEVEL, TYP)

ANTENNA C/W 50mm DIA STEEL PIPE MOUNTS

ANT.

ANT.LOUVRE

RADIO FREQUENCY FRIENDLY CLADDING

ANT.

HSS 406x13MM ROUND

ANT.

ANT.

ANT.

530mm 530mm

CONCRETE FOUNDATION BELOW

SLOPED CAP PLATE

FLARED PORTION OF TOWER BELOW

FLASHED LOUVRE AT HEIGHT OF TOP PLATEDOWN

TERMINATION OF RADIO FREQUENCY FRIENCLY CLADDING AT PARAPET

2 PLAN @ RRU LEVELS

3 PLAN @ MICROWAVE LEVEL

4 PLAN @ ANTENNA LEVEL

5 ROOF PLAN

SK1-TOWER PLANS

2012.05.30 9

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

NORTH SHORE CORRIDOR CONCEPTCOLOUR + MATERIAL STUDY

MATERIAL PALETTECOMPONENTS

COLOUR FLEXIBILITY

HIGH PERFORMANCE COATED STEEL POLY CARBONATE PANELS FIBRE GLASS PANELS PAINTED LOUVERS COMPOSITE PANELS

OR

URETHANE TOP COAT

EPOXY PRIMERZINC RICH PRIMER

STEEL STRUCTURE

HIGH PERFORMANCE COATED STEEL

COMPOSITE CLADDING

VENTILATION LOUVRES

MICROWAVE ANTENNA

RADIO ANTENNAE

POLYCARBONATE OR FIBREGLASS PANELS

2013.05.30

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

10

PHOTO-SIMULATION A

2012.05.30 11

NORTH SHORE CORRIDOR CONCEPTCELLULAR INDUSTRY SOLUTION

PHOTO-SIMULATION B