1

THOMAS AND MCPHERSON GREEN INFRASTRUCTURE PROJECTNorth Point Breeze Neighborhood

February 19, 2019

Page 2: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

2

AGENDA• Background• Project Goals• Review Preliminary Design Findings• Breakout Session with Design Team• Selection of Preferred Alternatives

Page 3: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

3

At the turn of the 20th century, Pittsburgh embarked on its biggest infrastructure improvement campaign, building sewers, water lines, roads, and power lines that created the city we know today.

Page 4: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

4

PITTSBURGH HAS A STORMWATER MANAGEMENT PROBLEM• Averages 38 inches of rain a year

• Rainfall no longer falls evenly across the year

• More severe storms dump more rain quicker

• Aging stormwater infrastructure was built for a different time, less population, and communities that had more green space and less pavement

“Heavy Rains Cause Flash Flooding Across Western, PA Region,” CBS Pittsburgh, June 20, 2018 at 4:36 pm

Page 5: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

5

Page 6: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

6

Page 7: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

7

• Poor water quality

• CSOs/SSOs

• Illicit discharges – sewage in storm sewers

• Surface flooding

• Basement sewage flooding

• Sewers that are 80 – 100+ years old

We need an AFFORDABLE PLAN to address ALL OF THESE ISSUES

WE HAVE A STORMWATER MANAGEMENT PROBLEM

Page 8: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

8

LOCAL CHANGES TO MANAGE STORMWATER

• Pennsylvania and Allegheny County’s Stormwater Ordinance – Act 167

• In Pittsburgh, no one agency is responsible for stormwater

• PWSA is assuming stormwater responsibilities from City and forming a Stormwater Division

• Pittsburgh’s stormwater ordinances need to change

Page 9: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

9

GREEN FIRST PLAN - ENGINEERED

We need to keep rainwater out of the system. We can be most effective by focusing efforts on the sheds that contribute the most to the system.

Page 10: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

10

M16

O27

M19M29

A42

A41

GREEN FIRST PLAN - PROCESS

Identified the top 30 shedsand overlaid other criteria…

and chose 6 priority shedsGoal: Comprehensive watershed-scale solutions

RISK

OPPORTUNITY

DEVELOPMENT

SYNERGIES

LOWER RISK

EASY TO IMPLEMENT

HIGH ACTIVITY

MULTIPLE BENEFITS

Page 11: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

11

WHAT IS GREEN STORMWATER

INFRASTRUCTURE?

Page 12: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

12

GREEN STORMWATER INFRASTRUCTURE

Page 13: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

13

• 47 sub-basins• Total DA 63.6 acres• Project goals

• Manage 6-12 acres

• Capture 1.5” of runoff

• 41% impervious

PROJECT BACKGROUND

North Border: McPherson Blvd.East Border: N. Murtland St.

South Border: Penn Ave.West Border: Fifth Ave.

Page 14: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

14

EXISTING CONDITIONS

Page 15: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

15

Boulevard Frontage/Connector

ROADWAY TYPOLOGIES

Green Alley/WayResidential Side Street

Definition: Classification of places within its context according to its form, character or function.

Page 16: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

16

ROADWAY TYPOLOGIES BY STREET NAME

TYPOLOGY STREET NAMEBoulevard Thomas, McPherson

Frontage/Connector N. & S. Linden, N. DallasResidential Side-Street Meade, North Point Breeze CourtGreen Alley/Way June Way, Wren Way, Lark Way, Starling Way

Page 17: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

17

Permeable Pavement

Bioretention

IDENTIFICATION OF ALTERNATIVE GSI TECHNOLOGIES

Underground Storage

Page 18: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

18

PROJECT AREA GREEN STORMWATER INFRASTRUCTURE SOLUTIONS

TYPOLOGY STREET NAMEBoulevard Thomas, McPherson

Frontage/Connector N. & S. Linden, N. DallasResidential Side-Street Meade, North Point Breeze CourtGreen Alley/Way June Way, Wren Way, Lark Way, Starling Way

Page 19: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

19

BOULEVARD TYPOLOGY: GSI ALTERNATIVE

Page 20: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

20

Thomas Boulevard (Before)

Thomas Boulevard (After)

BOULEVARD EXTENSION: GSI ALTERNATIVE

Page 21: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

21

PROJECT AREA TYPOLOGIES

TYPOLOGY STREET NAMEBoulevard Thomas, McPherson

Frontage/Connector N. & S. Linden, N. DallasResidential Side-Street Meade, North Point Breeze CourtGreen Alley/Way June Way, Wren Way, Lark Way, Starling Way

Page 22: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

22

South Linden (Before)

South Linden (After)

FRONTAGE/CONNECTOR TYPOLOGY: UNDERGROUND STORAGE ALTERNATIVE

Page 23: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

23

South Linden (Before)

South Linden (After)

FRONTAGE/CONNECTOR TYPOLOGY: PERMEABLE PAVER ALTERNATIVE

Page 24: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

24

South Linden (Before)

South Linden (After)

FRONTAGE/CONNECTOR TYPOLOGY: BIOSWALE ALTERNATIVE

Page 25: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

25

PROJECT AREA TYPOLOGIES

TYPOLOGY STREET NAMEBoulevard Thomas, McPherson

Frontage/Connector N. & S. Linden, N. DallasResidential Side-Street Meade, North Point Breeze CourtGreen Alley/Way June Way, Wren Way, Lark Way, Starling Way

Page 26: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

26

Meade Street (Before)

Meade Street (After)

RESIDENTIAL SIDE STREET:PERMEABLE PAVER ALTERNATIVE

Page 27: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

27

PROJECT AREA TYPOLOGIES

TYPOLOGY STREET NAMEBoulevard Thomas, McPherson

Frontage/Connector N. & S. Linden, N. DallasResidential Side-Street Meade, North Point Breeze CourtGreen Alley/Way June Way, Wren Way, Lark Way, Starling Way

Page 28: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

28

Starling Way (Before)

Starling Way (After)

GREEN ALLEY/WAY: PERMEABLE PAVER ALTERNATIVE

Page 29: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

29

CURRENT PROJECT DESIGN AND CONSTRUCTION SCHEDULE• 60% Final Design Plans Complete June 2019

• Community Meeting #2 July 2019

• 90% Final Design Plans Complete August 2019

• Community Meeting #3 September 2019

• Community Meeting #4 February 2020

Construction Phase Estimated 2/2020 through 10/2020

Page 30: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

30

SHARED STORMWATER RESPONSIBILITIES

We are all in this together. There are civic and private responsibilities for managing stormwater. Collectively we can create flood prepared communities that are safer, healthier places to live.

Page 31: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

31

COMMENTS AND DISCUSSION

• Breakout Session

• Provide feedback on the proposed projects, let us know if you experience basement backups, surface flooding, or localized street flooding in the area

• Selection of Preferred Alternative

• Vote on your preferred alternative

Page 32: North Point Breeze Neighborhood - PWSA...Communications Project Manager 412.676.6684 or rzito@pgh2o.com Should you have any questions, do not hesitate to contact: To receive project

32

Ana Flores, EITDesign Project Manager412.255.8800 x 8035 or [email protected]

Rebecca ZitoCommunications Project Manager412.676.6684 or [email protected]

Should you have any questions, do not hesitate to contact: