34
www.IH45northandmore.com NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet September 2015

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet September 2015

Page 2: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com 2

RECOMMENDED ALTERNATIVES

Environmental Impact Statement (EIS)

Project Divided into 3 Segments

– Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown Loop System

(12.3 mi)

One “Proposed Recommended Alternative” per segment = single corridor end to end (24 mi total)

Page 3: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

NEED AND PURPOSE FOR PROPOSED PROJECT

Need for Proposed Project – Population and employment increases – Existing and future I-45 traffic – Current design standards and improved safety – Efficient traffic movement, including during

evacuation events

Purpose of Proposed Project – Manage congestion – Enhance safety – Improve mobility and operational efficiency

All NHHIP Segments are in Top 30 Most Congested Roadways in Texas Segments 2 and 3 in Top 10

3

11

9

6

27

16

23 3

Top 100 Congested Roadway Segments

Page 4: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 1

Segment 1 Features – New Roadway Capacity

• Add four (4) MaX lanes (HOV+Express) • Add one (1) frontage road lane in each

direction • Add full-width shoulders • Add bike/pedestrian features along

frontage roads

– Between Beltway 8 and Airline Drive • ROW required on west side of I-45

– Between Airline Drive and I-610 • ROW required on east side of I-45

4

Page 5: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 1

5

PRELIMINARY-SUBJECT TO CHANGE

Page 6: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 1

6

PRELIMINARY-SUBJECT TO CHANGE

MaX Lanes

MaX Lanes

Page 7: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 2

Segment 2 Features – New Roadway Capacity

• Add four (4) MaX lanes (HOV+Express) • Add full-width shoulders • Add bike/pedestrian features along

frontage roads

– Between I-610 and Cavalcade St. • Mainlanes are elevated • Frontage roads are at grade • Approx. 10 to 80 feet of additional ROW

– Between Cavalcade St. and Quitman St. • Mainlanes are depressed • Frontage roads are at grade • No new ROW except at intersections

7

Page 8: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 2

8

View of Proposed Improvements near North Main St.

PRELIMINARY-SUBJECT TO CHANGE

Page 9: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 2 View of Proposed Improvements near North Main St. with Potential Green Space

9

PRELIMINARY-SUBJECT TO CHANGE

MaX Lanes MaX

Lanes

Page 10: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 2

10

Proposed Improvements near North Main St.

PRELIMINARY-SUBJECT TO CHANGE

POTENTIAL GREEN SPACE

NOTE: Green space option is conceptual only and would require separate development and funding.

Page 11: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

GREEN SPACE EXAMPLE: EXPOSITION / COMMERCE – DALLAS

DEPRESSED SECTION – SOUTH OF PATTON STREET

11

Page 12: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

GREEN SPACE EXAMPLE: KLYDE WARREN PARK – DALLAS

12

Page 13: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com 13

GREEN SPACE EXAMPLE: KLYDE WARREN PARK – DALLAS

Page 14: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

Segment 3 Features – Realign I-45 to be parallel with I-10 and

US 59/I-69* – Depress US 59/I-69* from Spur 527 to

Downtown – Add I-10 Express Lanes from I-45 to

US 59/I-69* – Remove existing I-45 Pierce Elevated

Improved Access to/from Downtown Improved Hardy Toll Road Access Improved SH 288 Lanes Access

14

*Per Minute Order 114231 dated March 26, 2015, the Texas Transportation Commission designated US 59 within the project limits as I-69.

Page 15: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

15

Remove Pierce

Elevated

Realign US 59 / I-69

Realign I-10

PRELIMINARY-SUBJECT TO

CHANGE

Downtown Connectors

replace existing Pierce Elevated

New I-10 Express Lanes

Connectors

Page 16: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

16

PRELIMINARY-SUBJECT TO CHANGE

Page 17: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

17

PRELIMINARY-SUBJECT TO CHANGE

MaX Lanes

Page 18: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

18

PRELIMINARY-SUBJECT TO CHANGE

Page 19: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

19

PRELIMINARY-SUBJECT TO CHANGE

Page 20: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

20

PRELIMINARY-SUBJECT TO CHANGE

Page 21: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

21

PRELIMINARY-SUBJECT TO CHANGE

Page 22: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

22

PRELIMINARY-SUBJECT TO CHANGE

Page 23: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

23

PRELIMINARY-SUBJECT TO CHANGE

Page 24: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

24

PRELIMINARY-SUBJECT TO CHANGE

Page 25: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

25

PRELIMINARY-SUBJECT TO CHANGE

MaX Lanes

Page 26: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

26

PRELIMINARY-SUBJECT TO CHANGE

Page 27: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

27

PRELIMINARY-SUBJECT TO CHANGE

Page 28: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

28

PRELIMINARY-SUBJECT TO CHANGE

MaX Lanes

Page 29: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com 29

Current Configuration and Operations Area for the GRB

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

PRELIMINARY-SUBJECT TO CHANGE

Page 30: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com 30

Current Configuration and Operations Area for the GRB

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

PRELIMINARY-SUBJECT TO CHANGE

Existing GRB Ramp (Access to Outer Halls)

US 59/I-69 Elevated

Access to Inner Halls (inside TxDOT ROW)

GRB

Page 31: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com 31

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

PRELIMINARY-SUBJECT TO CHANGE

Proposed Improvements behind GRB

POTENTIAL GREEN SPACE GRB OPERATIONS AREA

EXIST GRB RAMP

RECONFIGURED GRB OPERATIONS AREA TO SERVICE

INNER HALLS

NOTE: Green space option is conceptual only and would require separate development and funding.

Page 32: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com 32

Artist’s Sketch of Potential Green Space near the GRB Convention Center

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

MINUTE MAID PARK

NOTE: Green space option is conceptual only and would require separate development and funding.

PRELIMINARY-SUBJECT TO CHANGE

GRB OPERATIONS AREA

Page 33: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

George R. Brown Convention Center Minute Maid Park Minute Maid Park

US 59 Elevated Section (current)

Existing

Artist’s Rendering

Looking North from Capital Street

33

PROPOSED RECOMMENDED ALTERNATIVE: SEGMENT 3

PRELIMINARY-SUBJECT TO CHANGE

NOTE: Green space option is conceptual only and would require separate development and funding.

Page 34: NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) · Project Divided into 3 Segments – Segment 1: Beltway 8 to I-610 (9 mi) – Segment 2: I-610 to I-10 (3 mi) – Segment 3: Downtown

www.IH45northandmore.com

SEGMENT 3 – DOWNTOWN TRAFFIC ANALYSIS RESULTS

Reduction in Delay

Increase in Systemwide Speed

Increase in Downtown Access

20% 35% 24+ MPH 15%

34

PRELIMINARY-SUBJECT TO CHANGE

The improvements in the Proposed Recommended Alternative result in a systemwide speed increase that directly improves the flow on all surrounding freeways - a significant, positive improvement to the region’s air quality.

Proposed Recommended Alternative Compared to the No-Build Alternative (AM Peak)