29
North Dakota Pipeline Authority Justin J. Kringstad March 10, 2011 House Energy and Natural Resources

North Dakota Pipeline Authority - dmr.nd.gov House...Natural Gasoline 22 Natural Gas Processing With Ethane Extraction Natural Gas Liquids “Y-Grade” if left unfractionated. ND

Embed Size (px)

Citation preview

North Dakota Pipeline AuthorityJustin J. KringstadMarch 10, 2011

House Energy and Natural Resources

2

March 9, 2011: 172 Drilling Rigs

2

3

North Dakota Crude Oil

4

$0

$100

$200

$300

$400

$500

$600

$700

$800

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,0001

97

0

19

75

19

80

19

85

19

90

19

95

20

00

20

05

20

10

20

15

20

20

20

25

20

30

20

35

20

40

20

45

20

50

20

55

ND

Sw

ee

t P

ric

e $

/ba

rre

l

Ba

rre

ls p

er

Da

yNorth Dakota Oil Production and Price

History Bakken - Three Forks P10 Bakken - Three Forks P50

Bakken - Three Forks P90 $/Barrel History & DOE-EIA Projected $/Barrel P50

$/Barrel P10

Forecasting Williston Basin Oil Production, BOPD

Production forecast is for visual demonstration purposes only and shouldnot be considered accurate for any near or long term planning.

Today

5

Forecasting Williston Basin Oil Production, BOPD

Production forecast is for visual demonstration purposes only and shouldnot be considered accurate for any near or long term planning.

Today

6

Challenges*

1) Moving oil out of the

Williston Basin

2) Moving oil within the

Williston Basin

*Modified from Bridger and Belle Fourche Pipelines

2

1

7

Several Exciting Developments For Post 2010 Crude Oil Transport

Enbridge Bakken Expansion Program

Keystone XL Marketlink

True Co.’s Baker 300

Plains Bakken North

Unit Train Development8

Williston Basin Oil Production & Export Capacity, BOPD

Production forecast is for visual demonstration purposes only and shouldnot be considered accurate for any near or long term planning.

*Projects still in the proposed or internal review process

Today

Pipeline Transportation Only

9

1010

Rail Transportation

EOG – Stanley, ND

Dakota Transport Solutions – New Town, ND

Existing & Planned Rail Locations

11

Existing1) Stampede

2) Donnybrook

3) Ross

4) Stanley – EOG

5) Minot – ND Port Services

6) Dore

7) New Town – Dakota

Transport Solutions

8) Beulah

Planned1) Trenton – Savage

2) Epping – Rangeland

3) Tioga – Hess

4) Dickinson - EDOG

1

2

4 5

6 7

8

1 2 3

4

3

Existing & Planned Rail Locations

12

1

2

4 5

6 7

8

1 2 3

4

3

0

100,000

200,000

300,000

400,000

500,000

2007 2008 2009 2010 2011 2012

Bar

rels

Pe

r D

ay

Rail Loading Capacity

Williston Basin Oil Production & Export Capacity, BOPD

Production forecast is for visual demonstration purposes only and shouldnot be considered accurate for any near or long term planning.

*Projects still in the proposed or internal review process

Today

13

Williston Basin Oil Production & Export Capacity, BOPD

Production forecast is for visual demonstration purposes only and shouldnot be considered accurate for any near or long term planning.

*Projects still in the proposed or internal review process

Today

Pipeline Transportation Only

14

15

North Dakota Crude Pricing

($12.00)

($10.00)

($8.00)

($6.00)

($4.00)

($2.00)

$0.00

$2.00

$4.00

$6.00

$8.00

Dec

-05

Mar

-06

Jun

-06

Sep

-06

Dec

-06

Mar

-07

Jun

-07

Sep

-07

Dec

-07

Mar

-08

Jun

-08

Sep

-08

Dec

-08

Mar

-09

Jun

-09

Sep

-09

Dec

-09

Mar

-10

Jun

-10

Sep

-10

Dec

-10

ND Tax Department Average Crude Oil Discounts - 90% NYMEX

Natural Gas Projects

1616

ND Gas Production

17

0

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

MC

F/D

ay

Produced

Sold

Natural Gas Challenges

18

19

$2.3 - $2.7+ BILLION In the Next 1-3 Yrs 20

Natural Gas Processing

21

0

200

400

600

800

1000

1200

2006 2008 2010 2011 2012

MM

CFD

Gas Production

Plant Capacity

Raw Natural Gas Processing Plant

Consumer Quality Natural

GasMethane

Ethane

Propane

Butane

Natural Gasoline

22

Natural Gas ProcessingWith Ethane Extraction

Natural GasLiquids

“Y-Grade” if left

unfractionated

ND Gas Gathering Statistics

23

0

500

1000

1500

2000

2500

3000

3500

12

/1/2

01

0

9/1

/20

10

6/1

/20

10

3/1

/20

10

12

/1/2

00

9

9/1

/20

09

6/1

/20

09

3/1

/20

09

12

/1/2

00

8

9/1

/20

08

6/1

/20

08

3/1

/20

08

12

/1/2

00

7

9/1

/20

07

6/1

/20

07

3/1

/20

07

12

/1/2

00

6

9/1

/20

06

6/1

/20

06

3/1

/20

06

12

/1/2

00

5

9/1

/20

05

6/1

/20

05

Wells With Gas Sales

Wells Without Gas Sales

24

North Dakota Natural Gas

Processing and Gathering

25

Mountrail/Burke Counties

Bear Tracker Energy150+ Well Connections in

2011

Tie into Pecan’s Stanley Facility

26

McKenzie County

ONEOK Garden Creek Plant

Q4 2011: 100 MMCFD

Hiland Partners Watford City Plant

Q2 2011: 50 MMCFD

Saddle Butte PipelineQ2 2011: 45 MMCFD

27

Williams County

ONEOK Stateline I PlantQ3 2012: 100 MMCFD

ONEOK Stateline II PlantQ4 2012: 100 MMCFD

Hess Tioga PlantCurrent: 110 MMCFDQ4 2012: 250 MMCFD

28

Stark County

Whiting Belfield PlantQ4 2011: 30 MMCFD

Bakken ExpressNatural Gas Trucking

Petro Hunt Little Knife Plant

North Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405Bismarck, ND 58505-0840

Phone: (701)220-6227Fax: (701)328-2820

E-mail: [email protected]

Website: www.pipeline.nd.gov

Thank You!