Pier 1 Pier 1 Pier 1 Gate B Gate B Gate C Gate C Gate D Gate D Gate E Gate E Ferry Plaza Ferry Plaza Ferry Plaza Ferry Building Ferry Building Agriculture Agriculture Building Building The Embarcadero The Embarcadero Harry Bridges Plaza Harry Bridges Plaza The Embarcadero The Embarcadero Gate B Gate C Gate D Gate E Ferry Building Agriculture Building The Embarcadero Harry Bridges Plaza The Embarcadero North Basin South Basin Lagoon Pier 2 Pier 2 Pier 2 0 100 200 FEET Source: Roma Design Group, et al, 2010, Google Earth Pro 2013. 28067812 Downtown San Francisco Ferry Terminal South Basin Expansion San Francisco Bay Area Water Emergency Transportation Authority PROJECT AREA AND VICINITY MAP FIGURE 1 8/5/15 hk...T:\WETA\Permits 2015\July2015\Fig1_project_area_vicinity_map.ai Project Area Mean High Water/High Tide Line San Francisco Bay San Pablo Bay P a ci f i c O c e a n " ) % & ' ( 80 Project Location ALAMEDA SAN MATEO MARIN CONTRA COSTA SAN FRANCISCO Orinda Pinole Novato Moraga Oakland Vallejo Hayward Alameda Concord Benicia Pacifica Piedmont Richmond Millbrae Brisbane Larkspur Martinez Hercules San Ramon Sausalito Lafayette Union City San Rafael Burlingame Emeryville San Leandro Mill Valley Walnut Creek San Francisco Pleasant Hill % & ' ( 680 % & ' ( 580 % & ' ( 238 % & ' ( 80 % & ' ( 880 % & ' ( 780 % & ' ( 280 % & ' ( 980 % & ' ( 380 % & ' ( 238 % & ' ( 580 % & ' ( 580 | ÿ 1 | ÿ 92 | ÿ 4 | ÿ 101 | ÿ 112 | ÿ 35 | ÿ 123 | ÿ 13 | ÿ 185 | ÿ 131 | ÿ 84 | ÿ 242 | ÿ 29 | ÿ 84

North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

Pier 1Pier 1Pier 1

Gate BGate B

Gate CGate C

Gate DGate DGate EGate E

Ferry PlazaFerry PlazaFerry Plaza

Ferry BuildingFerry Building AgricultureAgricultureBuildingBuilding

The EmbarcaderoThe EmbarcaderoHarry Bridges PlazaHarry Bridges Plaza

The EmbarcaderoThe Embarcadero

Gate B

Gate C

Gate DGate E

Ferry Building AgricultureBuilding

The EmbarcaderoHarry Bridges Plaza

The Embarcadero

North Basin South Basin

Lagoon

Pier 2Pier 2Pier 2

0 100 200FEET

Source: Roma Design Group, et al, 2010, Google Earth Pro 2013.

28067812

Downtown San Francisco Ferry TerminalSouth Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority

PROJECT AREA AND VICINITY MAP

FIGURE 1

8/5/

15 h

k...T

:\WE

TA\P

erm

its 2

015\

July

2015

\Fig

1_pr

ojec

t_ar

ea_v

icin

ity_m

ap.a

i

Project AreaMean High Water/High Tide Line

S a n

F r a n c i s c o

B a y

S a n

P a b l o

B a y

Pa

ci

fi

cO

ce

an

")

%&'(80

ProjectLocation

A L A M E D A

S A N M A T E O

M A R I N

C O N T R A C O S T A

S A NF R A N C I S C O

Orinda

Pinole

Novato

Moraga

Oakland

Vallejo

Hayward

Alameda

Concord

Benicia

Pacifica

Piedmont

Richmond

Millbrae

Brisbane

Larkspur

Martinez

Hercules

San Ramon

Sausalito

Lafayette

Union City

San Rafael

Burlingame

Emeryville

San Leandro

Mill Valley Walnut Creek

San Francisco

Pleasant Hill

%&'(680

%&'(580

%&'(238

%&'(80

%&'(880

%&'(780

%&'(280

%&'(980

%&'(380

%&'(238

%&'(580

%&'(580

|ÿ1

|ÿ92

|ÿ4|ÿ101

|ÿ112

|ÿ35

|ÿ123

|ÿ13

|ÿ185

|ÿ131

|ÿ84

|ÿ242

|ÿ29

|ÿ84

Page 2: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015

0 50 100 150 ft

THE EMBARCADERO

FERRY BUILDING

SOUTH BASIN

EXISTING GATE ETO BE RELOCATED

AND EXTENDED GATE F GATE G

AGRICULTUREBUILDING

FERRYPLAZA

THE EMBARCADERO

FERRY BUILDING

EAST BAYSIDE PROMENADE

PIER 14BREAKWATER

INTERIM ACCESSSTRUCTURE

GATE C

GATE D

GATE B

FIGURE 2: PROJECT IMPROVEMENTS

EMBARCADEROEMBARCADEROPLAZAPLAZA

AGRICULTUREBUILDING

Downtown San Francisco Ferry Terminal South Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority28067812

10/08

/15 h

k T:\

WET

A\Pe

rmits

2015

\BCD

C_Se

pt15\F

igs_W

ETA_

BCDC

_Sep

t15.in

dd

Source: Roma Design Group, et al, 2015

FIGURE 2

SOUTH BASIN IMPROVEMENTS PLAN VIEW

FEET

Source: Roma Design Group, et al, 2015

0 75 150

Existing Elements

New Project Improvements

Mean High Water/High Tide Line

Page 3: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

SEAWALL

MAINTAINAND PROTECT

MAINTAIN FENDERING

GATE E

PIER 2

MAINTAINAND PROTECT

DEMOLISHAND REMOVE

10/8

/15

hk.

..T:\W

ETA

\Per

mits

201

5\B

CD

C_S

ept1

5\Fi

g3_d

emo_

repa

ir.ai

0 50 100FEET

SOUTH BASIN

Source: Roma Design Group, et al, 2011

Demolish and Remove

Maintain and Protect

Notes: 1. The America's Cup project will remove the building

located on Pier 2 prior to project construction.2. Portions of Pier 2 will be replaced.

28067812

Downtown San Francisco Ferry TerminalSouth Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority

AREAS PROPOSED FOR DEMOLITON AND REPAIR

FIGURE 3

Page 4: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015

FIGURE 4: AREAS PROPOSED FOR IMPROVEMENT

EXISTING GATE ETO BE RELOCATED

AND EXTENDED

ADAPT EXISTINGSTRUCTURE TO

NEW GRADE

NEW BERTHING STRUCTURES

GATE F GATE G

NEW FENDERING NEW FENDERING

INTERIM ACCESSSTRUCTURE

NEW DECK AND PILES

EAST BAYSIDE PROMENADE

0 50’ 100’ 200’

EMBARCADEROEMBARCADEROPLAZAPLAZA

Downtown San Francisco Ferry Terminal South Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority28067812

10/08

/15 h

k T:\

WET

A\Pe

rmits

2015

\BCD

C_Se

pt15\F

igs_W

ETA_

BCDC

_Sep

t15.in

dd

Source: Roma Design Group, et al, 2015

FIGURE 4

AREAS PROPOSED FOR IMPROVEMENT

Source: Roma Design Group, et al, 2015

0 50 100

New Deck and Piles

Relocated Float and Gangway

New Berthing Structures and Fendering

Interim Access Structure

Existing Areas to be Adapted to the New Grade

Page 5: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015

FIGURE 7: SIMULATED VIEW OF BERTHING FACILITIES

Gangway

Guide Piles

Float

Entry Portal

Downtown San Francisco Ferry Terminal South Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority28067812

07/27

/15 h

k T:\

WET

A\Pe

rmits

2015

\July_

2015

\Figs

_WET

A_Ju

l15.in

dd

Source: Roma Design Group, et al, 2015

FIGURE 5

SIMULATED VIEW OF BERTHING FACILITIES

Page 6: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

Downtown San Francisco Ferry Terminal South Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority28067812

10/08

/15 h

k T:\

WET

A\Pe

rmits

2015

\BCD

C_Se

pt15\F

igs_W

ETA_

BCDC

_Sep

t15.in

dd

Source: Roma Design Group, et al, 2015

FIGURE 6

SITE PLAN

Source: Roma Design Group, et al, 2015

Page 7: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015

FIGURE 8: MODEL VIEW OF PLAZA AND PROMENADE

Downtown San Francisco Ferry Terminal South Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority28067812

07/27

/15 h

k T:\

WET

A\Pe

rmits

2015

\July_

2015

\Figs

_WET

A_Ju

l15.in

dd

Source: Roma Design Group, et al, 2015

FIGURE 7

MODEL VIEW OF EMBARCADERO PLAZA AND PROMENADE

Page 8: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015

FIGURE 9: CROSS-SECTION FROM THE BAY TO THE EMBARCADEROC R O S S - S E C T I O N F R O M T H E B A Y T O T H E E M B A R C A D E R O

South Basin Ferry Terminal Design ProjectPrepared for the Water Emergency Transportation Authority and the Port of San Francisco by ROMA Design Group

M A Y 2 0 1 5

0 8’ 16’ 32’

GATES E, F & GFERRY TERMINAL ENTRANCES

EAST BAYSIDEPROMENADE EXTENSION

NEW EMBARCADERO PLAZA

EXISTING SEAWALL

EXISTING EMBARCADERO PROMENADE

Downtown San Francisco Ferry Terminal South Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority28067812

07/27

/15 h

k T:\

WET

A\Pe

rmits

2015

\July_

2015

\Figs

_WET

A_Ju

l15.in

dd

Source: Roma Design Group, et al, 2015

FIGURE 8

TYPICAL CROSS-SECTION VIEW FROM SAN FRANCISCO BAY TO EMBARCADERO

0 16 32FEET

Page 9: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

Seawall

Downtown San Francisco Ferry Terminal South Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority28067812

09/09

/15 h

k T:\

WET

A\Pe

rmits

2015

\BCD

C_Se

pt15\F

igs_W

ETA_

BCDC

_Sep

t15.in

dd

Source: Google Earth Pro., 2015

FIGURE 10

VIEWS OF THE EXISTING PROJECT AREA

The Embarcadero

View Point

Page 10: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

EDG

E OF BART PLATFO

RM

EXISTING 90 L.F. OFPERIMETER ACCESS

TO BAY & 50 FT WIDEVIEW CORRIDOR TO

BAY & BERTHINGACTIVITIES

PORT OF SFSOUTH BAYSIDE

PROMENADE (NOTPART OF PROJECT)

220 L.F. OF NEW PERIMETER ACCESSTO BAY & 140 FT WIDE VIEW CORRIDOR

TO BAY & BERTHING ACTIVITIES

220 L.F. OF NEW PERIMETER ACCESSTO BAY & 140 FT WIDE VIEW CORRIDOR

TO BAY & BERTHING ACTIVITIES

200 L.F. OF NEW PERIMETER ACCESS TO BAY & A 180˚ VISTA TO PIER 14, DOWNCOAST ALONG EMBARCADERO PROMENADE TO RINCON PARK, BOW & ARROW SCULPTURE, BAY BRIDGE & BACK TO CITY SKYLINE

40 F

T

140 FT27 FT

27 F

T

140 FT50 FT

210 FT WINDOW

145 FT

110 FT

100 FT X 130 FT

TOTAL PUBLIC ACCESS AREA = 36,000 SF

EMBARCADERO PROMENADE

PUBLIC ACCESS 50 YEAR SLR ELEVATION (29,100 SF )

(5,300 SF )PUBLIC ACCESS TRANSITION AREA

INTERIM INFILL AREA AT EXISTING GRADEOF AGRICULTURE BUILDING APRONS (2,500 SF)

PROMENADEPROMENADE

PLAZA

PIER

14

AGRICULTUREBUILDING

FERRYBUILDING

LIMIT OF PROJECT WORK

INTERIM ACCESS STRUCTURE(1,600 SF)

40 F

T

40 F

T

0 20’ 40’ 80’PROPOSED PUBLIC ACCESS AND VIEW CORRIDORS

Downtown San Francisco Ferry Terminal South Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority28067812

10/12

/15 h

k T:\

WET

A\Pe

rmits

2015

\BCD

C_Se

pt15\F

igs_W

ETA_

BCDC

_Sep

t15.in

dd

Source: Roma Design Group, et al, 2015

FIGURE 11

PUBLIC ACCESS PLAN

Source: Roma Design Group, et al, 2015

0 40 80

Perimeter Access

View Corridors

Public Access (50 year sea level rise elevation)

Public Access (transition grade)

Page 11: North Basin South Basin Lagoon - San Francisco Bay Ferry...SOUTH BASIN FERRY TERMINAL DESIGN PROJECT U.S. Army Corps of Engineers, Department of Army Permit Application • Prepared

SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • August 10, 2015

FIGURE 5: AREAS REQUIRING DREDGING DURING CONSTRUCTION

0 50 100 150 ft

0 50’ 100’ 200’

GATE E GATE F GATE G

DREDGE VOLUMES GATE F GATE G TOTAL

Area (AC) 0.78 1.64 2.42Cut Volume (CY) 3,600 9,549 13,1492’ Overdredge (CY) 2,406 4,924 7,330

Total Cut Volume (CY) 6,006 14,473 20,479

Downtown San Francisco Ferry Terminal South Basin Expansion

San Francisco Bay Area Water Emergency Transportation Authority28067812

09/28

/15 h

k T:\

WET

A\Pe

rmits

2015

\BCD

C_Se

pt15\F

igs_W

ETA_

BCDC

_Sep

t15.in

dd

Source: Roma Design Group, et al, 2015

FIGURE 12

AREAS REQUIRING DREDGING DURING CONSTRUCTION

Source: Roma Design Group, et al, 2015

0 100 200FEET