52
NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION Planning for New Reactors, Necessary Transmission and Reliability Standarfds March 16, 2010 David R. Nevius Senior Vice President - NERC

NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

NORTH AMERICAN ELECTRICRELIABILITY CORPORATION

Planning for New Reactors,Necessary Transmissionand Reliability Standarfds

March 16, 2010

David R. Nevius

Senior Vice President - NERC

Page 2: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Long-Term Reliability Issues• Decreased Demand, Higher Margins

• New Renewable Resources

* Natural Gas the Leading Fuel for NewCapacity

* Transmission Siting and Construction

• Climate Legislation

* Cyber Security

NEPRCNORTH AMERICAN ELECTRICRELIABILITY CORPORATION

Page 3: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Addition of Variable Resources

=-Nrn

0 2,000 MW of Solar Generation

Less than 2,000 MW of Solar Generation* 2,000 MW of Wind Generation

Lessw than 2,000 MW of Wind Generation

NERC 3NORTH AMERICAN ELECTRICRELIABILITY CORPORATION

Page 4: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Variable OutputLimited Dispatchability

,ow 4000

T3

... Ave-rag Wind

.....Avergge So'8-

130W 1 0,30

3 13 17 21

NERC Hour4

NORTH AMAER'ICAN ELECTRICRELIABILITY C ORPOR"ATI ON

Page 5: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Transmission Planning, Sitingand Construction

Transmission Line Additions > 100kV- CircuitMiles by Transmission Status

U)1W1=

UG

40,000

35,000

30,000

25,000

20,000

15,000

10,000

5,000

0

24,000 miles ofPlanned Transmission

An additional 12,000miles of ConceptualTransmission -

Economics orCongestion

5%

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Under Construction Planned - - - Conceptual

NERCNORTH AMERICAN ELECTRICRELIABILITY CORPORATION

HydroIntegration

1%

NuclearIntegration

3%Other18%

5

Page 6: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Y

Update on ReliabilityStandards

March 16, 2010

Keith O'Neal - DirectorDivision of Reliability Standards

Office of Electric Reliability

Page 7: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

FERC's Role

* Reliability Standards are drafted Imodified via an industry processfacilitated by the ElectricReliability Organization* (ERO)

* FERC does not draft ReliabilityStandards

* FERC certified the North

American Electric ReliabilityCorporation (NERC) as the ERO

2

Page 8: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

FERC's Role, Cont.

FERC Reliability Standard actions:" Approve as mandatory* Remand back to the ERO* Approve as mandatory, & direct

modifications to the standard

3

Page 9: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

NUC-001-2 Update

" Nuclear Power Plants (NPPs) areimportant to bulk power systemreliability

" FERC staff coordinated with NRCstaff

" Coordination efforts successful &will continue

4

Page 10: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

NUC-001-2 Update, Cont.

* Commission approved NUC-001-1w/directives 10/16/08 (Order 716)

* On 8/14/09, ERO filed a modifiedversion of NUC-001- clarifying references to coping

times & off-site powerrestoration and

-specifying that integratedutilities document complianceprocedures

5

Page 11: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

NUC-001-2 Update, Cont.

* Commission approved NUC-001-2on 1/21/10 (RD09-10-000)

* Effective date of NUC-001-2 is411/10

6

Page 12: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

U USo N RCUNITED STATES N>UCLEAR REGULATORY COMMISSION

Protecting People and the Environment

UPDATE ON PLANNING FORNEW REACTORS

March 16, 2010

David B. Matthews, Director

Division of New Reactor Licensing

Office of New Reactors

Page 13: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Transmission and Grid Reliability

* Regulatory RequirementsRegarding Transmission

- 10 CFR- Part 50, Appendix A, General DesignCriterion 17 (requirements for independent,offsite power sources)

* Importance of Grid Reliability onReactor SafetyTransmission line(s) serving as the offsitepower source provide power to safely shutdown the reactor

2

Page 14: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

River Bend*ESBWR - 1 Unit

WA

ORto

Grand Gulf*ESBWR - 1 Unit Callaway*

EPR - 1 UnitFermiESBWR- 1 Unit

/ME

yrMN

NV

CAAZ_

ry

CO

NM

V

IL IN

MO

Nil Nine Mile Point*NY MA EPR - I Unit

MI #--"CT'RI Bell BendPA• EPR - 1 Unit

oN MO"IEu •PSE&G ESP

4 NCO North Annaa ... sc\ ESBWR -1Unit

HarrisAP1000 - 2 Units

IBlue CastleDesign/Uni

Tx

'ts - TBA

Comanche PeakUSAPWR - 2 Units

William LeeAP1O0O - 2 Units

i- Turkey PointAP1000 - 2 Units

FLBellefontdAP1000 - 2

Victoria CountyDesign/Units - TBA

ISA

VogtleAPOQO0 - 2

•outh TexasBWR - 2 Units

// Levy CountyUnits / AP1000 - 2 Units

V.C. SummerAP1O00 - 2 Units

1 OABWR N AP1000 1 EPR A ESBWR * USAPWR V Design/Units - TBA * ESP*Review Suspended by Applicant

3

Page 15: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

SITUATIONALAWARENESS AND EVENT

ANALYSISMarch 16, 2010

David Andrejcak

Office of Electric Reliability

Page 16: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Division of Bulk PowerSystem Analysis

* August 14th, 2003* Reliability Authority to FERC

through EPACT 05

* Office of Electric Reliability

* Situational awareness and eventanalysis

* Provide technical analysis of BulkPower issues to the Commission

2

Page 17: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Reliability Monitoring Center

3

Page 18: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Reliability Monitoring CenterLdlvoke 'A-4 F-1- 14@ et

Aft0 Ikos

4

Page 19: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Event Anal 'sis11

5

Page 20: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Situational Awareness

* Daily Monitoring* Coordination with ES-ISAC

-- Electricity Sector InformationSharing and Analysis Center

-- Monitoring of emergencynotifications, conference callsand coordination

-- Bi-weekly event reviews

• Notification of senior staff6

Page 21: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

AnMe~tiug A-PI Cp and lh4& EnOVilnOwrneill

Reliability Standards and otherJoint Activities

Joint NRC/FERC Meeting

David L. Skeen, Acting DirectorDivision of Engineering

Office of Nuclear Reactor Regulation

March 16, 2010

Page 22: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

U.S.NRCqNII4,11.;1 viWIZ. ,V2J[I 1Y.A Iifl ld;Ltri.A¶InLY oogsihif.I~olPNotect bg Ii'kcqjlr and the Ejavironrineot-

Overview

* Progress since April 8, 2008 JointCommission Meeting

* Reliability Standards Activities

" Joint Event Investigations

* Grid Assessment for Power Up-Rates andenforcement discretion actions

* Grid Condition Monitoring

March 16, 20102

Page 23: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

01 .. NApril 8, 2008L'O Pro tec'ting PN iple'avd Me Eimiv mme'nt

I .J rIi*.WIlvI OIIMvLO~Follow -up

* NRC, FERC and NERC staff continueto meet quarterly

* NRC shared lessons learned withFERC on DHS's review of the nuclearsector

° NRC shared experience with FERC onenforcement

* NRC participated in Joint Grid EventInvestigations.

March 16, 20103

Page 24: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

U,SNRC%- US- H BE::I:" m?'o.NR'Co" Rxel iability Standards ActivitiesProtecting PX.opi. and Me En-vuunient

* Continued working closely with FERC/NERC inthe Reliability Standards and other processes

* NRC Staff is participating in the NIST SmartGrid Interoperability Panel providing oversight-of standards development for Smart Griddevelopment.

March 16, 20104

Page 25: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

UJoint Event InvestigationsPrai tarurg PknupIl and theEniom t

* NRC staff participated with NERC andFERC staff in the investigation of theFlorida Grid Event in Feb 2009

* NRC staff participated with NERC andFERC on the assessment effort for powerrestoration after 2008 hurricanes

March 16, 20105

Page 26: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

SUUSNRC Grid Assessment in SupportProlertiL, Arci, .fIta•-h.e ETliLY 4.me of Power Uprate Evaluations

* NRC Staff uses grid assessments as partthe evaluation of power uprate licenseamendments

* NRC Staff continues to utilize support (asneeded) from NERC and FERC Staff forenforcement discretion cases at NPPswhich involve consideration of gridreliability and its relationship..to nuclearsafety.

March 16, 20106

Page 27: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

U.S.NRCIL'gITglI VSE ~ItI:i.I U.AIL fM IS

Praterting Araqle and Mec ErnvironatemptGrid Monitoring

" NRC continues to monitor grid status withsupport from FERC/NERC

" A Grid Status Report is prepared daily andposted on the internal NRC website byNRR/DE

March 16, 20107

Page 28: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

ýUSNRCPrnter~.-tig Puiple anzd the Environmneort

List of Acronyms

* DHS - Department of Homeland Security* FERC - Federal Energy Regulatory Commission* NERC - North American Electric Reliability Corporation* NIST - National Institute of Standards and Technology* NRC - Nuclear Regulatory Commission

March 16, 20108

Page 29: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

I I

NERCNO-RTH AMERICAN ELECTRICRELIABILITY CORPORATION

Cybersecu rity Activities

March 16, 2010

Gerry W. Cauley

President & CEO - NERC

Page 30: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Cybersecurity Topics

" Overall Vision

" Action Plan for Identification of CriticalCyber Assets

" Bulk Power System CriticalInfrastructure Protection Policy

" Aurora Issue - Next Steps

° NRC-NERC MOU Implementation Plan

NERCNORTH AMERICAN ELECTRICRELIABILITY CORPORATION

Page 31: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Overall Vision" Policy level goals for physical and

cybersecurity protection

* Proactive mitigation of security risks* "Bright Line" criteria for identifying

critical bulk power system assets

• Availability of actionable information

" Incident reporting, analysis & feedback

• Communicate industry efforts to thegovernment and public

NERCNORTH AMERICAN ELECTRICRELIABILITY CORPORATION

Page 32: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Action Plan for Identification ofCritical Cyber Assets

* July '09 survey results reported to FERC

* Revised draft standard on identificationof critical/critical cyber assets posted

" Criteria for evaluating impact on criticalfunctions as high, medium or low

" Apply to remaining CIP standards

• Risk driven monitoring in 2010

NERC 4NORTH AMERICAN ELECTRICRELIABILITY CORPORATION

Page 33: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Critical InfrastructureProtection Policy

" Initial policy developed for discussion

" Guidance on prevention/detection,resilience, response and restoration, andhelp set priorities

" Used in communicating expectations• Sharp focus on definition/scope of CIP

concerns and intelligence threats

* Recommend for NERC board approvalfollowing review of comments

NEP-CNORTH AMERICAN ELECTRICRELIABILITY CORPORATION

Page 34: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Aurora IssueNext Steps

* June 2007 Advisory on Aurora issue lackeddetails and mitigation suggestions

• Technical team worked with federal partnerswith emphasis on protection and control

* DRAFT Overview, Alert, FAQs, UtilityChecklist, and technical references posted forindustry review and comment

• Assess ability of registered entities to applyinformation to enhance existing mitigations

* Plan for future Alerts based on responsesNERC 6NORTH AMERICAN ELECTRICRELIABILITY CORPORATION

Page 35: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

NRC-NERC MOUImplementation Plan

* MOU effective December 30, 2009

* January 19 response to FERC order on plansand schedule for plant ownersloperators tocome into compliance with CIP standards

* Bright Line Survey document for use indetermining which Systems, Structures andComponents fall under NERC CIP standards

" Plan for four industry workshops

° Finalize entity Bright Line documents

NERO 7 77"NORTH AMERICAN ELECTRICRELIABILITY CORPORATION

Page 36: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Cyber SecurityMarch 16, 2010Regis F. Binder

FERCDirector, Logistics &

SecurityOffice of Electric Reliability

Page 37: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Technical FeasibilityExceptions (TFE)

* Enables more demandingrequirements

* Conceptually authorized in OrderNo. 706 in January 2008

* Requires compensating measuresand/or mitigating measures

2

Page 38: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

TFE's Cont.

• Proposed plan for terminatingthe Exception

* Approval during audit process

3

Page 39: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

TFE's Cont.* Order issued Jan. 21, 2010* Approved new Rules of Procedure but

required compliance filing regarding:- Class-Type TFEs- Consistency in administering TFE

process- Role of Regional Entities in TFE

process- Reports by Regional Entities & ERO

on TFEs

4

Page 40: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Critical Assets

* Current risk-based approach

- Critical Assets - controlcenter, generators, etc.

- Critical Cyber Assets -

essential to operation ofCritical Assets

5

Page 41: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Critical Assets cont.* New Approach being

considered

-Categorize Assets - High,Medium or Low impact

- Categorize cyber systemswith potential to adverselyimpact reliable operations

6

Page 42: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

Addressing Cyber SecurityStandards in Nuclear Power Plants

" Raised at April 8, 2008 jointFERC/NRC meeting

" Order 706-B issued in March 2009- "Balance of plant" is subject to

ERO & FERC- Exceptions can be obtained for

equipment subject to NRC cybersecurity regulations

7

Page 43: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

FERC's Request forAdditional Authority

* Seeking to solve currentshortcomings:- Time to develop standard- Public aspect of process- Uncertain outcome

* Context of emergency action

8

Page 44: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

~CUS.NRC

United States Nu:clear Regulatory Commission

Protecting People and the Environment

Cyber Security Activities

Scott MorrisDeputy Director for Reactor Security

Division of Security PolicyOffice of Nuclear Security & Incident Response

Page 45: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

KC U.S.NRCUnitcd Statcs Nuclear Regulatory Commission11ýwtectin . .•.,r••om,.o Discussion TopicsProtecting People and the Environment

" New Regulations* Regulatory Guidance

" Site-specific Plans* Implementation Schedules

" Oversight Program

" NERC Memorandum of Understanding

" Other Activities

2

Page 46: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

U.US.NRCUnited States Nuclear Regulatory Commission

Protecting People and the Environment New Regulations

e New cyber security requirements issuedMarch 2009 (10 CFR 73.54)

Protect against Design Basis Threat

Safety, Security and Emergency Responsefunctions

- Defense-in-Depth mandate

3

Page 47: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

KU.S.NRCUnited States Nuclcar Regulatory Commission

Protecting People and the Environment Regulatory Guidance

* Comprehensive implementing guidanceissued Jan. 2010 (Reg. Guide 5.71)- Adapts security controls in National Institute

of Science & Technology standards- Includes generic cyber security plan template

4

Page 48: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

#U.S.NRCUnited States Nuclear Regulatory Commission

Protecting People and the EnvironmentSite-Specific Plans

" All operating reactors have submitted plans" Staff to complete reviews by Oct. 2010" Plans will be operating license conditions

(i.e., enforceable)

5

Page 49: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

SU.S.NRCUnited States Nuclear Regulatory Commission

Protecting People and the EnvironmentImplementation Schedules

* Each site submitted a proposed "fullimplementation" date

* Dates vary (influenced by multiple factors)

" Final date will be an operating licensecondition

6

Page 50: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

SU.S.NRCUnited States Nuclear Regulatory Commission

Protecting People and the Environment Oversight Program

* Early stage of development

* Broad stakeholder input will be obtained

* "Pilot" inspections likely

* Coordination with NERC audits planned

7

Page 51: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

SU.S.NRCUnited States Nuclear Rcgulatory Commission NERC NRC MOUProtecting People and the Environment

* Published in Federal Register (Jan. 2010)

" Support for multiple industry workshops

" Review of exception requests

° Coordination inspections I audits

8

Page 52: NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION … · Long-Term Reliability Issues • Decreased Demand, Higher Margins ... * Continued working closely with FERC/NERC in the Reliability

SU.S.NRCUnited States Nuclear Regulatory Commission

Protecting People and the Environment Other Activities

" Actively monitoring cyber threat* Participating in intergovernmental

activities

" Established Cyber Assessment Team

9