Norconsult LNG AS
Click icon to add picture
Norconsult LNG AS
2
• Norconsult LNG was established in 2006 for the purpose of promoting services for development of gas infrastructure.
• Owner structure:• Norconsult AS 88 %• G.H. Engineering AS 12 %
• Company based on the execution of Lyse Rogass and Skangass Small Scale LNG Plant and distribution chain projects
• Previous certified according to ISO9001:2008 and ISO 17020. In a re-certification process.
• Management: • Stian Erichsen (Managing Director)• Thor Eirik Ruud (System Manager ?)• Gunnar Humlekjær (Senior Adviser ?)
Possible deliveries: Early phase● Evaluation of LNG as an energy source ● Investment analysis● Concept evaluations and development● Plant or terminal capacity assessments ● Site evaluation● Hazard and risk identification
● Initial environmental assessment● Requirements and GAP analysis● Development of policies, goals and acceptance criteria for HSE and
quality performance● Advisory services related to hazardous materials, major accidents and
emergency preparedness ● Technology qualification studies
3
Our services
4
• Services related to the entire LNG value chain!• Present throughout the whole project lifetime:
– Concept selection– Concept & permitting engineering– Tendering process– Design - Terminals and small scale LNG plants
• Processes (liquefaction, utility systems, district heating and regasification)• Harbors and jetties• Storage facilities (tanks and rock caverns)• Site selection (geology, soil conditions & infrastructure)
– Risk analysis– Safety analysis & HSE– Financial assessments (investments, operations & contract model)– Contact with Authorities– Third party verification studies
Possible deliveries: Detail design
● Philosophies for design, operation & maintenance● Design documents for all disciplines
• System descriptions, process and main utility systems• Process simulation • Fabrication drawings• Sizing of process equipment, piping & layout • Civil• Instrumentation and automation• Electro
● Layout and safety● Infrastructure and interface management● Assistance in application processes to authorities● Development and implementation of management systems (HSE,
quality)
5
Possible deliveries: Construction phase
● Supplier and fabrication follow-up● Construction management● Site supervision● HSE management and follow-up● Mechanical Completion● Commissioning● Final documentation
6
External governing documents - Law, regulations, codes and standards
Design in Europe are based on the following norms & standards. ● EN 1473 - Installation and Equipment for liquefied natural gas Design
onshore installations● EN 13645 - Installation and equipment for LNG , Design of onshore
installations with storage capacity between 5 t and 200 t● EN 13458 - Cryogenic vessels● NS-EN 1532 Installation and equipment for liquefied natural gas Ship
to shore interface● ATEX directive -on equipment and protective systems intended for
use in potentially explosive atmospheres (ATEX)● Seveso II directive - control of major-accident hazards involving
dangerous substances● National laws and other regulations (B&E, NFPA, CSA, LNGA2010-
MSB)
References I
8
Project Client Description Year
Complete LNG chain SLNGaz Owners Engineer 2014LNG Terminal Helsingborg Helsingborg Havn Concept selection with construction budget 2014
LNG Terminal Vyborg Cryogas Russia FEED LNG Terminal storage capacity 30000 m3 2013
TTI Oven 2 TTI Tyssedal Pre-Feasibility LNG storage capacity 12000 m3 2013LNG terminal Narvik Naturgass Nord Initial localization report 2013
LNG terrminal Lysekil Skangass ASProject ManagementLNG storage tank design (30000m3) 2013
LNG terminal, Øra Skangass ASProject Management. 6000 m3 storage capacity with gasification, truck loading and bunkering 2009
LNG Base load plant, Risavika Skangass AS
Technical and management services in Clients organization (300 000 tonns/year)Design LNG storage tank (30000m3), site prep and jetty. 2010
Höegh LNG FPSO Höegh LNG ASTechnical and management services in Clients organization. Follow-up of engineering contractor. 2012
LNG process evaluation Höegh LNG AS
Evaluation and verification of process data and performances including sensitivity analyses. 2009
Höegh FPSO and LNG Höegh LNG AS
New technology qualification for LNG cooldown on floating facilities 2012
LNG production plant. Naturgass Møre AS Project Management and Tender documents 2008
References II Satellite Terminals
9
Project Client Description Year
Glava Askim Skangass ASProject Management/Municipality engineering. 2011
Dynea Lillestrøm Skangass ASProject Management/Municipality engineering 2012
Mosjøen Aluminium Bechtel/Gasnor Technical support 2007
Norgips AS Skangass ASProject Management/ Municipality engineering 2012
Nordic Paper Skangass ASProject Management/Municipality engineering 2012
Uddeholms Skangass ASProject Management /Municipality engineering 2012
SCA Skangass ASProject Management/Municipality engineering
2011
Reference project, Skangass LNG plantSkangass established a green field LNG base load production facility downstream the Kårstø/Rogass terminals in Stavanger Norway. Feed gas from Europipe system which is a high pressure system > 120 barg.
Our scope included: Project Management Team as owners engineer including the following services: Project Manager, Authority application manager, HSE Manager, Schedule Manager, Procurement Manager, Area Managers (Process, Jetty, Supply Gas)Disciplines: Technical Safety, Instrument, Electro, Telecom
Annual production 300 000 tons/year with storage capacity of 30 000 m3 LNG. Some key elements: • Supercritical CO2 removal• Supercritical drying• Supercritical NG liquefaction and stainless steel Spiral Wound Heat Exchanger• Export of boil off gas, no flaring
Design Code: EN1473
Reference project - Øra LNG terminal
11
• Storage capacity of 6.500 m3
• Process including; • evaporators • regulating and control system • safety systems • import pipeline • quay facilities• bunkering
• Design Code:
EN13645
12
LNG Tank Design, Skangass
● Tank Design 30 000m3 LNG - Extensive analyse work
● - Civil design● - Follow-up construction at site,
• Concrete work• Steel fabrication• Civil work• Insulation
• Risavika• Lysekil• Design code:
• EN1473• 14620 1-5
Risk Management
We provide advice within:
● Working environment assessments
● Emergency preparedness
● HSE control systems
● IT security
● Quality Management Systems
● Risk Management
● Technical safety
● Monitoring
The society we live in is in constant change and is growing ever more complex, global and open. As a result, society’s vulnerability is also increasing. This means that risk assessments, preventive measures and emergency response are becoming increasingly important elements for all players – from public authorities to private businesses.
Norconsult has been involved for a long time in work to create a safe and well-functioning society.
14
Logistic chain simulation
● Tests test-feasibility of a supply chain in an early stage● Determines efficiency, lead time, capacities in new
production lines ● Detects lack of cost effectiveness in processes● Test capacity limitations in a logistic chain● Test demands for back-up systems
Monte Carlo Simulation
15
Simulation of Logistic Chains
?Vessel frequency, waiting time, berth occupancy, use of infrastructure conflicts
?Silo filling, max/minimum levelrequired capacity
?
Capacities, Lead time, Production
Required capacity
?Required capacity, waiting time, no of trucks
Thank you