- 1 Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile. COMPANY PROFILE N N O O O O R R M M O O H H A A M M M M A A D D G G H H A A R R W W A A L L C C O O N N S S T T R R U U C C T T I I O O N N C C O O M M P P A A N N Y Y President: Eng Noor Mohammad Gharwal Vice President: Ahmad Shekib Gharwal [email protected] , [email protected] www.noormgharwal.com Local +93(0) 777201620 – 799201620 – 786325034 International: +971528297033 Head address: Khair Khana, First Street, House No. 300, District 11; Kabul, Afghanistan

NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 1 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

CCOOMMPPAANNYY PPRROOFFIILLEE

NNOOOORR MMOOHHAAMMMMAADD GGHHAARRWWAALL CCOONNSSTTRRUUCCTTIIOONN CCOOMMPPAANNYY

President: Eng Noor Mohammad Gharwal

Vice President: Ahmad Shekib Gharwal

[email protected] , [email protected] www.noormgharwal.com

Local +93(0) 777201620 – 799201620 – 786325034 International: +971528297033

Head address: Khair Khana, First Street, House No. 300, District 11; Kabul, Afghanistan

Page 2: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 2 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

About us, Noor Mohammad Gharwal Construction, Business, Co. Established: 2003 Core activity: Construction Projects, Force Protection Barrier, K-span, O&M Service, DRMO Removal & Disposal Client base: U.S Army, Defense Logistic Agency, FLUOR, KBR and LBG JV B&V. Short Preface, We find the ways to make our organization successful these are Quality, Cost, Innovation, and speed. The basic Construction Project have been completed and have Engineers, Management of employer education experiences in Different sciences and work disciplines that it provides as broad and good as possible Combination In regard of achieving company goals and Afghanistan reconstruction needs Together. Gathering founder past experiences in the Company, the ultimate desire of N M G C C. is to offer total construction services with a whole. Package which includes general construction geographical survey work, architecture and civil engineering Contracting management in different scopes as a well in Service to U.S Army and other International Organizations in-wide policy encouraging shared performance responsibility ensures the highest degree of professional service and results on all projects.

N M G C C is an active company registered by Afghan Investment Support Agency (AISA) Cage Code: 9WGZ2 DUNS Number: 850455409 JCCS Vendor ID Number: 53461 JCCS Registered Company Name: Noor Mohammad Gharwal Construction Company AISA License Number: D-35904

N M G

Construction, Managements

Page 3: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,
Page 4: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 4 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Company Management Chart

CONSTRUCTION

CHIEF

SITE

ENGINEER

CHAIR MAN

PROJECT MANAGER

TECHNICAL

OFFICE MANAGER

AUDITOR

PURCHASING MANAGER

PERSONAL MANAGER

JURIST

ADVISER

FINANCE MANAGER

ACCOUNTING

CHIEF

GENERAL

COMMITTEE

DIRECTOR EXECUTIVE COMMITTE

Page 5: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 5 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

N M G C C is Afghan Engineering Construction Company to Provide Services Firm established in 2003, with a Strong and firm basis supported by well equipped and experienced unit Comprising of local & foreign engineers and experts Noor Mohammad Gharwal Construction, Business Co… Has entered the Afghan Construction & Service etc… The Lead Project Management and Sustainable Infrastructural Services Provider for the Full Project Life Cycle in Afghanistan for U.S government & LOGCAP At N M G C C we've been in the business of engineering building long enough to know construction inside, out and from top to bottom. But not so long that we've become unyielding and set in our ways. The truth is, we're always looking for better methods of building and better solutions to complicated Construction problems. With N M G C C. Company as your contractor, you'll find us bringing a spirited Exuberance to your project. You'll see us involved in every stage of planning and construction. And you'll benefit from our experience, skill and building expertise. But most of all, you'll appreciate our upfront, No-nonsense honesty. we are fully aware of past and present of our country, we do know how to work & Cooperate with Client and we offer quality services and income opportunities for our people. All our efforts are dedicated to improving & secure the requirement of basses for them . These are essentials I expect from my construction company because our customers expect them from us.

We create Positive, memorable experiences and lasting relationships because our actions Are guided by our core Values Company uses innovative construction methods to respond uniquely and specifically to each project Need. We are a forward-thinking company with a solid background of proven performance and Experiences We turn bricks and mortar into visions realized. N M G C C. is guided by board of Directors-Director General and his management team, which is comprised of all department and section heads, carries out its management and operations teams & we will ensure that all resources of the company will be fully available to meet project commitments and expectations N M G C C. makes ongoing reports to keep project managers up-to-date with all aspects of cost and schedule milestones. We incorporate International Building Codes, QC, and Safety Standards on projects sites. VICC provides Construction &Logistic Services for military and civilian facilities that require protection from: Conventional weapons, accidental explosions, and terrorist threats.

Page 6: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 6 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

N M G C C. provide the road building & crush plant service (Gravel) though out all FOB’s

Area of activity

Page 7: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 7 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

I) Building construction (Concert B-huts, Barrack, Large CMU , General buildings etc)

II) Concert Barrier ( Alaska Barrier, T-wall,

Bunker, Jersey Barrier, Taxes Barrier etc…) III) .Road construction.

IV) Reinforcement Canal V) Construction of Stone Wall, Concert light

pole up to 18.5m, Guard Tower, Conex &…

VI) Maintaining of Dams . VII) Landscape and construction of

Parks & Services.

VIII) Bridges and Overpasses . IX) High raised buildings, factories and

industrial parks. X) Substations (Underground Facilities).

XI) Military and possessive FOB’s XII) Service & Maintenance of

Generators, Electronic equipments, A/C & Small / large vehicles

XIII) Service of Trash Bins, Port-a

Johns, Toilets & Waste Management

XIV) Leas & sell of heavy Equipments, Teller truck, Flat Bed …

XV) Transportation & Courier Service available on all FOB’s of Afghanistan

XVI) Service of Metallic & Non Metallic Scrape at all location of DLA Disposition

XVII) Logistic & Food Service on all location of Afghanistan (Secure & insecure)

Page 8: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 8 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Past Performance Experience RCC-S Kandahar Airfield, AF

Construction Service on IDIQ Award (W914L-09-D-0003)

Contract Title Taxes Barrier & Pre Cast Bunker Tops

Contract Number & Award date W91B4L-09-D-0003-0004 / 10.Feb.2009 Contract duration & Location 90 Days /FOB Leatherneck, Ralph Henning Contract Value $ 477,410.00 Contracting Officer name, Address, E-mail & Tele Jeffery W. Pruitt Tel: 318-841-1415 Cell: 0798500512

Email: [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Jersey, Taxes Barrier & Bunker Tops

Contract Number & Award date W91B4L-09-D-0003-0001 / 11.Dec.2008 Contract duration & Location 30 Days /FOB Ramrod NWY 1 – LT Brian Wilson Contract Value $ 34,050.00 Contracting Officer name, Address, E-mail & Tele Jeffery W. Pruitt Tel: 318-841-1415 Cell: 0798500512

Email: [email protected] Identify this projects delivered by design & build method This project was concert reinforcement

Contract Title Taxes Barrier Projects

Contract Number & Award date W91B4L-09-D-0003-0002 / 12.Dec.2008 Contract duration & Location 30 Days /FOB Ramrod NWY 1 – LT Brian Wilson Contract Value $ 40,180.00 Contracting Officer name, Address, E-mail & Tele Jeffery W. Pruitt Tel: 318-841-1415 Cell: 0798500512

Email: [email protected] Identify this projects delivered by design & build method This project was concert reinforcement

Contract Title Taxes Barrier (131)

Contract Number & Award date W91B4L-09-D-0003-0003 / 15.Dec.2008 Contract duration & Location 45 Days /Kandahar Air Filed / NCE SFC Griffin Contract Value $ 64,190.00 Contracting Officer name, Address, E-mail & Tele Jeffery W. Pruitt Tel: 318-841-1415 Cell: 0798500512

Email: [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Page 9: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 9 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Contract Title Taxes Barrier & Pre Cast Bunker Tops

Contract Number & Award date W91B4L-09-D-0003-0005 / 12.Feb.2009 Contract duration & Location 90 Days /FOB Dwyer, Garmser / LTC Henning Contract Value $ 399,000.00 Contracting Officer name, Address, E-mail & Tele Jeffery W. Pruitt Tel: 318-841-1415 Cell: 0798500512

Email: [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Taxes Barrier & Pre Cast Bunker Tops

Contract Number & Award date W91B4L-09-D-0003-0005 / 12.Feb.2009 Contract duration & Location 90 Days /FOB Dwyer, Garmser / TF Castle Contract Value $ 399,000.00 Contracting Officer name, Address, E-mail & Tele Jeffery W. Pruitt Tel: 318-841-1415 Cell: 0798500512

Email: [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Taxes Barrier & Pre Cast Bunker Tops

Contract Number & Award date W91B4L-09-D-0003-0006 / 19.Feb.2009 Contract duration & Location 90 Days / KAF – CMSgt Lincol M. Stevens 25th NCR Contract Value $ 1,280,000.00 Contracting Officer name, Address, E-mail & Tele Jeffery W. Pruitt Tel: 318-841-1415 Cell: 0798500512

Email: [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Taxes Barrier & Pre Cast Bunker Tops

Contract Number & Award date W91B4L-09-D-0003-0007 / 23.Feb.2009 Contract duration & Location 90 Days / COP Spin Buldak David Molzhon Contract Value $ 427,800.00 Contracting Officer name, Address, E-mail & Tele Billy J. Morris Tel: 0798403441

Email: [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Page 10: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 10 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Contract Title Taxes Barrier

Contract Number & Award date W91B4L-09-D-0003-0008 / 26.Feb.2009 Contract duration & Location 90 Days / Kandahar 09355 Griffin William NCE Contract Value $ 490,000.00 Contracting Officer name, Address, E-mail & Tele Jeffery W. Pruitt Tel: 318-841-1415 Cell: 0798500512

Email: [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Pre Cast Bunker Tops (3500 PSI)

Contract Number & Award date W91B4L-09-D-0003-0009 / 16.Mar.2009 Contract duration & Location 55 Days / FOB Train Kowt, Urzgan Province Capt Hostetler Contract Value $ 1,002,000.00 Contracting Officer name, Address, E-mail & Tele Andera Matson / Contingency Contracting Officer Tel:

318-841-1415 [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Taxes Barrier and Bunker Tops

Contract Number & Award date W91B4L-09-D-0003-0012 / 13.Aug.2009 Contract duration & Location 30 Days 401ST AFSB (AMC) KAF/ Daniel Raymond Contract Value $ 60,930 Contracting Officer name, Address, E-mail & Tele Maj David E. Luttrell 0794428467 /

[email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Alaska Barrier and 21’ Bunker

Contract Number & Award date W91B4L-09-D-0003-0013 /24.Aug.2009 Contract duration & Location 85 Days / KAF Defense Intelligence Support Office area 59 Contract Value $ 385,000.00 Contracting Officer name, Address, E-mail & Tele Maj David E. Luttrell 0794428467 /

[email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Page 11: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 11 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Contract Title Taxes Barrier, Bunker Tops & Sand Bags Contract Number & Award date W91B4L-09-D-0003-0014 /27.Aug.2009 Contract duration & Location 30 Days / FOB Frontenac LT Steve Sherman Contract Value $ 38,390.00 Contracting Officer name, Address, E-mail & Tele Douglas Janney / Contracting Officer TEL: 318-841-1245

[email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Alaska Barrier Contract Number & Award date W91B4L-09-D-0003-0015 /02.Sep.2009 Contract duration & Location 30 Days / Kandahar Air Filed Contract Value $ 100,380.00 Contracting Officer name, Address, E-mail & Tele Douglas Janney / Contracting Officer TEL: 318-841-1245

[email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Taxes Barrier and Bunker Tops Contract Number & Award date W91B4L-09-D-0003-0016 /08.Sep.2009 Contract duration & Location 30 Days /FOB Wolverine Zabul Province GRID:42R Lukawski, Michael

Contract Value $ 17,850.00 Contracting Officer name, Address, E-mail & Tele Douglas Janney / Contracting Officer TEL: 318-841-1245

[email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Alaska Barrier Contract Number & Award date W91B4L-09-D-0003-0017 /08.Sep.2009 Contract duration & Location 30 Days / Kandahar Air Filed CPT Brain Contract Value $ 17,850.00 Contracting Officer name, Address, E-mail & Tele Barry L. Williams TEL: 318-841-1245

E-Mail- [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Page 12: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 12 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Construction Service on Alaska Barrier Award (W914L-09-P-1064)

Construction Service on Alaska Barrier Award (W914L-10-P-1195)

Construction Service on Alaska Barrier Award (W914L-10-P-1482)

Construction Service on Fill Material 5000 CM Dirt Award (W914L-10-P-1479)

Contract Title Alaska Barrier & BUNKER TOP ATTACH HARDWARE Contract Number & Award date W91B4L-09-P-1064 Contract duration & Location 30 Days / Kandahar Air Filed 1LT Damon Duster Contract Value $ 55,598.00 Contracting Officer name, Address, E-mail & Tele Barry L. Williams TEL: 318-841-1245

E-Mail- [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Alaska Barrier with Installation Contract Number & Award date W91B4L-10-P-1195 Contract duration & Location 30 Days / Kandahar Air Filed 1LT Damon Duster Contract Value $ 19,000.00 Contracting Officer name, Address, E-mail & Tele Donald Mcintyre Tele: 318-421-6206 /KRCC

E-mail: [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Taxes Barrier and Bunker Tops Contract Number & Award date W91B4L-10-P-1482 Contract duration & Location 30 Days / Kandahar FOB Lindsey 09355 Dylan M Contract Value AFN 991,291.00 Contracting Officer name, Address, E-mail & Tele MAJ Jeff EtienneKAF RCC APO AE 09355

E-Mail- [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Fill of HESCO 5000 CM Contract Number & Award date W91B4L-10-P-1479 Contract duration & Location 30d 1ST BCT, 4TH IN DIV (I/4ID) COP CARON 1LT ANTHONY

Kandahar Contract Value AFN2,220,000.00 Contracting Officer name, Address, E-mail & Tele Lesly A. RichardsonKAF RCC APO AE 09355

E-Mail- [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Page 13: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 13 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Construction Service on Taxes Barrier Award (W914L-10-P-1491)

Construction Service on Alaska Barrier Award (W914L-10-P-1495)

Construction Service on Taxes Barrier & Bunker Tops Award (W914L-10-P-1513)

Construction Service on T-wall Award (W914L-10-P-1523)

Contract Title Taxes Barrier & Bunker Tops Contract Number & Award date 20-Aug-10 W91B4L-10-P-1491 Contract duration & Location 15 Days FOB Lindsey / Dylan Mixson Contract Value AFN 369,885.00 Contracting Officer name, Address, E-mail & Tele MAJ Jeff EtienneKAF RCC APO AE 09355

E-Mail- [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Alaska Barrier Contract Number & Award date 20-Aug-10 W91B4L-10-P-1495 Contract duration & Location 15 Days Kandahar Air filed Albert Hofer Contract Value AFN 1,001,147.00 Contracting Officer name, Address, E-mail & Tele MAJ Jeff EtienneKAF RCC APO AE 09355

E-Mail- [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Taxes Barrier and Bunker Tops Contract Number & Award date 22-Aug-10 W91B4L-10-P-1513 Contract duration & Location 30 Days FOB Ramrod, Kandahar Province Davidson Contract Value AFN 4,188,022.00 Contracting Officer name, Address, E-mail & Tele MAJ Jeff EtienneKAF RCC APO AE 09355

E-Mail- [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title T-Wall (3500 PSI) Contract Number & Award date 22-Aug-10 W91B4L-10-P-1523 Contract duration & Location 15 Days Kandahar Air Filed / 2LT Chelsea Hinton Contract Value AFN 461,866.00 Contracting Officer name, Address, E-mail & Tele Jenifer Garlan KAF RCC APO AE 09355

E-Mail- [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Page 14: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 14 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Construction Service on Alaska Barrier (W91B4L-10-P-1564)

Construction Service on Taxes Barrier & Bunker Tops (201010116093802)

Supplies of Water Systems items (W91B4L-11-P-0137)

Supplies of Steel Culverts & Re bar (W91B4L-11-P-0296)

Contract Title Alaska Barrier Contract Number & Award date 31-Aug-2010 W91B4L-10-P-1564 Contract duration & Location 15 Days Kandahar Air Filed / Pull Miller Contract Value AFN 2,263,677.00 Contracting Officer name, Address, E-mail & Tele MICHAEL V. QUINTO LTJG, SC, USN

DSN 318-421-6202 [email protected]. Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Taxes Barrier on CERP Projects Contract Number & Award date 30 Nov 10 201010116093802 Contract duration & Location 30 Days Kandahar / MGRS 41 RQQ 356287634 FOB

Howz-e-Madad Contract Value $ 174,240.00 Contracting Officer name, Address, E-mail & Tele MAJ Jeff Wakelyn / KRCC APO AE 09355 Identify this projects delivered by design & build method This project was a concert reinforcement

Contract Title Water System items 75 LINE ITEMS Contract Number & Award date 05 Mar 11 W91B4L-11-P-0137 Contract duration & Location 30 days KAF 777 EPBS TSgt Stephan Contract Value AFN 2,000,00.00PRN: F3UUKH0318A010 Contracting Officer name, Address, E-mail & Tele Sack man Adam /TEL:318-841-1248

EMAIL [email protected] Identify this projects delivered by design & build method This project was a water supplies projects

Contract Title 24’’ & 36’’ Steel Culverts & Re bar Contract Number & Award date 16 Dec 10 W91B4L-11-P-0296 Contract duration & Location 30 days FOB Waltan Kandahar AF, Michael Contract Value AFN 668,000.00 Contracting Officer name, Address, E-mail & Tele Sgt Swenson, SakinaDSN: 318-421-6209

Email: [email protected] Identify this projects delivered by design & build method This project was a concert reinforcement

Page 15: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 15 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Past Performance Experience RCC Kabul Camp Eggers – Phoenix

Construction Service on Camp Morehead (W91BM-08-P-0470)

Construction Service on Camp Morehead (W91BM-08-P-0470)

Construction Service on Deleyah, 394 M Stone wall (W91BM-08-C-7139)

Contract Title Construction of Force Protection Security Stone Wall 394M

Contract Number & Award date 3 W91B4M-08-C-7139 Contract duration & Location 90 days Doleyah, Sahark District Ghor Province Contract Value $ 94,395.00 Contracting Officer name, Address, E-mail & Tele Kateris S. Warner / TEL: 237-2246 E-mail:

[email protected] KRCC Camp Phoenix Identify this projects delivered by design & build method This project was a construction of stone wall

Contract Title Doors & HAVAC delivery & installation Contract Number & Award date 16 Dec 10 W91B4M-08-P-0470 Contract duration & Location 45 days Camp Morehead, Kabul AF Connie Brown Contract Value $ 23,650.00 Contracting Officer name, Address, E-mail & Tele Dreamy Peckhem / Contracting Officer TEL: 237-

3459 EMAIL: [email protected]

Identify this projects delivered by design & build method This project was a construction supplies

Contract Title Construct concrete Pad Measuring 1.5×10x31550 benches firing

Contract Number & Award date 16 Dec 10 W91B4M-08-P-0470 Contract duration & Location 45 days Camp Morehead, Kabul AF Connie Brown Contract Value $ 23,6500.00 Contracting Officer name, Address, E-mail & Tele Dreamy Peckhem / Contracting Officer TEL: 237-

3459 EMAIL: [email protected]

Identify this projects delivered by design & build method This project was a construction supplies

Contract Title Construction of Force Protection Security Stone Wall 394M

Contract Number & Award date 3 W91B4M-08-C-7139 Contract duration & Location 90 days Doleyah, Sahark District Ghor Province Contract Value $ 94,395.00 Contracting Officer name, Address, E-mail & Tele Kateris S. Warner / TEL: 237-2246 E-mail:

[email protected] KRCC Camp Phoenix Identify this projects delivered by design & build method This project was a construction of stone wall

Page 16: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 16 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Page 17: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 17 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Construction Service on Camp Morehead (W91BM-08-C-4067)

Construction Service on Camp Morehead (W91BM-08-C-4067)

Supplies of Slaughter House strong shelves (W91JA4-11-P-0114)

Daily septic removal service at ANA Sewage Sharana, (W91B4M-08-P-7406)

Contract Title Expand Fence line Contract Number & Award date 19-Jul-2008 W91B4M-08-C-4067 Contract duration & Location 30 days Camp Morehead, Kabul AF Connie Brown Contract Value $ 76,700.00 Contracting Officer name, Address, E-mail & Tele Richard.H. Pfeiffer Tele: 318-237-0519 or e-mail:

[email protected] Identify this projects delivered by design & build method This project was a construction of Fence line

Contract Title Expand Fence line Contract Number & Award date 19-Jul-2008 W91B4M-08-C-4067 Contract duration & Location 30 days Camp Morehead, Kabul AF Connie Brown Contract Value $ 76,700.00 Contracting Officer name, Address, E-mail & Tele Richard.H. Pfeiffer Tele: 318-237-0519 or e-mail:

[email protected] Identify this projects delivered by design & build method This project was a construction of Fence line

Contract Title Slaughter House equipments (Interlake Tear Drop, Meat band saw, Global Pallet Rack, Nest Totes boxes & wire mesh)

Contract Number & Award date 03-Dec-2010 W91JA4-11-P-0114 Contract duration & Location 30 days Slaughter House, Kabul Afghanistan Contract Value AFN 6,929,019.83 Contracting Officer name, Address, E-mail & Tele PRCC, ELIJAH G. HORNER, 1 Lt, USAF, DSN: 318-

237-2246 [email protected] Identify this projects delivered by design & build method This project was a Slaughter House strong shelves

Contract Title

Daily Black & Grey removal service at ANA Sewage Sharana until 80M3 as such for Paktia province

Contract Number & Award date W91B4M-08-P-7406

Contract duration & Location 30 days Slaughter House, Kabul Afghanistan Contract Value AFN 6,929,019.83 Contracting Officer name, Address, E-mail & Tele PRCC Cell:0797943756 Jawanshir Jalili Contingency

Contracting [email protected] Identify this projects delivered by design & build method

This project was a service ANA Sewage Sharana, Paktia

Page 18: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 18 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Past Performance (Experience)

DRMO Removal & Disposal Service

BPA Contract of Property removal Scrape removal in Afghanistan

Contract No. 39-1601 Date of Award: 12/13/10 Invitation No. 39-1601-0001 Bidder No. 3001305185 From: DLA Disposition Services, World Sales Office, 74 Washington Avenue North, Battle Creek, MI 49037-3092 Maximum Contract Price: $17,360,000.00,

Sales Contracting Officer (SCO): David Flietstra, DLA Disposition Services, Sales Contracting Officer, Southwest Asia email: [email protected] Period of Service: Jan 1, 2011 – Dec 31, 2013 Maximum amount of Removal on KG: 240k Tons Operation Bases: FOB Leatherneck, Shindand & Dwyer Service still in progress…

Page 19: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 19 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

On: Thursday, July 28, 2011 11:43 AM Mr. Chief Robert Tunstall Wrote: Noor Mohammad Gharwal, Sir - it has been my pleasure to work with your company and your very gracious staff. It has made my time in Afghanistan very productive and pleasant. Chief Thomas Athey is my replacement and is equally excited to work with you. You are a great partner to us at DLA and we continue to thank you for your hard work. Again thanks for your time. V/R, LSC(SW) Robert A. Tunstall, III USN OIC - DLA Disposition Services - Camp Leatherneck, Afghanistan Senior Enlisted Leader - DLA Disposition Services - Afghanistan DSN: 312-661-7879, ext. 6187 COM: 269-961-7478 ext. 6187 CELL: 070-628-5433 NIPR: [email protected] or [email protected] SIPR: [email protected] "Hooyah Navy!" If you are in need of demil and non-demil support - we stand ready to assist On Wednesday, May 11, 2011 9:22 AM MSG William Mays, wrote: Classification: UNCLASSIFIED Caveats: FOUO Sir Thanks for all the support you have given us in our mission in RC-South. My time is coming short for my tour in Afghanistan and I am turning over the scrap removal mission to LS1 Gavanis in the next few days. It has been an honor and a privilege working with you and your employees. I wish you and your employees success in all that you do. Again I thank you in helping us complete our missions here in RC-South. MSG William Mays, US Army EDRT NCOIC DLA Disposition Services Kandahar APO, AE 09355 DSN: 318-421-7506 SIPR:841-2165 Roshan: 079-634-5723 NIPR: [email protected] SIPR: [email protected] Classification: UNCLASSIFIED Caveats: FOUO

Page 20: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 20 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Past Performance (Experience)

Kellogg Brown & Root Service Contracts

*Note*: Listed Projects information as in title of projects, we’ve in our record all projects information has done by NMGCC

Company Name Gov Agency & POC Name

E-mail Address Phone No. of POC

Duration Date In Progress Completed

Place of Contract & Description of Contract

Contract Number & Amount

Robert McConnell Subcontracts Supervisor KBR - LOGCAP III

E-mail: [email protected] 0799 424852

24 Months

2007 Completed General Labors service at Helmand, Laghman, Paktia

Prime contract #(DAAA-09-02-D-0007)

$ 295,000.00

KBR Procurement, KBR - LOGCAP III 0799 256 324

Jeff Nodine, Subcontracts Manager, [email protected]

22 Months

2007 Completed General Labors service at Khost, Zabul, Kabul, Mazer-e-Sharif

Prime contract #(DAAA-09-02-D-0007)

$ 179,500.0

KBR Procurement, KBR - LOGCAP III +93 799 358 912,

Kenneth Nwokike, KBR, [email protected] KBR LOGCAP III Camp Phoenix

12 Months

2008 Completed Kabul & Nangarhar, (FOB Fenty & Phoniex) Lease of 25 & 50 ton crane

Prime contract #(DAAA-09-02-D-0007)

$ 220,000.00

KBR Procurement, KBR - LOGCAP III +93 799 358 912,

Kenneth Nwokike, KBR, [email protected] KBR LOGCAP III Camp Phoenix

2 Month 2008 Completed Construction of 500 M stone Retaining Walls for Five (5) Each Sloped Tiers at Camp Morehead, Resh Khor Village,

Prime contract #(DAAA-09-02-D-0007)

$ 234,750.00

KBR Procurement, KBR - LOGCAP III +93 799 358 912,

Kenneth Nwokike, KBR, [email protected] KBR LOGCAP III Camp Phoenix

1 Months 2009 Completed Construction and Installation Light Poles Camp Phoenix, Kabul

Prime contract #(DAAA-09-02-D-0007)

$ 73,500.00

KBR Procurement, KBR - LOGCAP III +93 799 358 912,

Daniel Freeman, Subcontracts Supervisor, [email protected]

6 Months 2007 Completed AMC Concert pads at FOB Farah, Ghazni, Asadabad,

Prime contract #(DAAA-09-02-D-0007)

$ 300,000.00

KBR Procurement, KBR - LOGCAP III +93 799 358 912,

Daniel Freeman, Subcontracts Supervisor, [email protected]

24 Months

2008-2010

Completed Black & Grey water removal, Port-a John & Trash removal service at FOB Lindsey, Rushmore, Morehead, Gardez, Qalat, Jalalabad

Prime contract #(DAAA-09-02-D-0007)

$ 400,000.00 $ 394,000.00 $ 174,000.00 $ 219,000.00 $ 89,000.00

Robert McConnell Subcontracts Supervisor KBR - LOGCAP III

E-mail: [email protected] 0799 424852

6 Months 2006 Completed Construction 4 Guard Tower, 1800 M3 Gravel, Hesco filling & Barrier

Prime contract #(DAAA-09-02-D-0007)

$ 140,000.00

Page 21: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 21 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Past Performance (Experience)

FLUOR, Dyne Corps & LBG JV B&V Contracts

Company Name Gov Agency &

POC Name

E-mail Address Phone No. of POC Duration Date In Progress Or Completed

Place of Contract & Description of Contract

Contract Number & Amount

100 Fluor Daniel Drive Greenville, SC 29607

USA

[email protected] [email protected].

6 Months

1-Apr-10

Completed Camp Hughie, Jalalabd

SST Removal,

Port-a Johns & Trash removal service

L4CP-005-90-K10239 $ 93,000.0

100 Fluor Daniel Drive Greenville, SC 29607

USA

[email protected] [email protected].

6 Months

1-Apr-10

Completed FOB Lighting, Gardez

SST Removal,

Port-a Johns & Trash removal service

L4CP-005-90-K10238 $ 97,000.0

100 Fluor Daniel Drive Greenville, SC 29607

USA

[email protected] [email protected].

6 Months

1-Apr-10

Completed Camp Morehead

Kabul SST

Removal, Trash

removal service

L4CP-005-90-K10239 $ 93,000.0

100 Fluor Daniel Drive Greenville, SC 29607

USA

[email protected] [email protected].

6 Months

1-Apr-10

Completed FOB Dubbs, Kabul &

FOB Sharana, Pakikta Grease

Inspector service

L4CP-005-90-K10254 $ 71,400.0

100 Fluor Daniel Drive Greenville, SC 29607

USA

David Rood/Contracts administrator [email protected]

[email protected].

24

Months

1-

Mar-10

Completed

FOB Shank, Logar

Province Non-Potable

water delivery

L4CP-005-90-K1083 $ 94,000.0

100 Fluor Daniel Drive Greenville, SC 29607

USA

David Rood/Contracts administrator [email protected]

[email protected].

24

Months

1-

Mar-10

Completed

FOB Airborne,

Maidan shar Province

Non-potable water

delivery

L4CP-005-90-K1083 $ 194,000.0

Page 22: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 22 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

(LBG/B&V) House No.7, Street 13, Lane 1st,

Wazir Akbar Khan,

Power Plant Project Email: [email protected]

Phone: +1-202-250-3705

24

Months

01-July-10

Progress

100 MW

Power Plan, Kabul,

Afghanistan Port-a John

Service

042181.TO27.SC003 Mod : 0002 $120,000.00

(LBG/B&V) House No.7, Street 13, Lane 1st,

Wazir Akbar Khan,

Power Plant Project Email: [email protected]

Phone: +1-202-250-3705

15 days

09-June-

11

Completed

100 MW

Power Plan, 50,000 BTU

A/C Samsung

AIRP -05-11-TO27-389

$ 18,000.00

100 Fluor Daniel Drive Greenville, SC 29607

USA

Joseph Bellestri- Subcontract Admin [email protected]

+1 8645465360 [email protected]

16 Months

1-Apr-13 30-

June-2013

In Progress

FOB Shank, Logar

Province

L4CP-005-90-K10368 $ 294,120.0

Page 23: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 23 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

DLA Disposition Service Certificate of Appreciation

Page 24: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 24 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

Letter of Recommendation award to NMGCC

Page 25: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 25 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

NEC 2008 Certificate

Page 26: NOOR MOHAMMAD GHARWAL CONSTRUCTION COMPANY · Noor Mohammad Gharwal Construction, Business, Co. Established: 2003. Core activity: Construction Projects, Force Protection Barrier,

- 26 – Note: These Documents are property Copying, Distributing and Reproduction of these Contents are prohibited. © 2013 N.M.G.C.C Company Profile.

NMGCC electrical personnel certificates