12
Non-Confidential Material Lake Operations Presentation May 9 th , 2002 Sven Hallermann

Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Embed Size (px)

Citation preview

Page 1: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Lake Operations Presentation

May 9th, 2002

Sven Hallermann

Page 2: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Lake Operations Agenda

• Lake Use - Safety, Safety, Safety, and Operations• Women’s Health and Driving Clinic• Men’s Driving Clinic• Potential Property Improvements• Watering your lot from the Lake• Work Party• Thank you!

Page 3: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Lake Use - Safety:• Active Skier always has right of way:

– Do not idle down a lake until you have been motioned by the active skier

• Especially when that skier is a child - wakes are larger to children than they are to adults.

– Always get visual and verbal contact with the active driver/skier before proceeding through an active lake

– Be aware of your waiting area relative to the current skier’s stopping area. Are you in their way?

– Any perpendicular motion across a lake generates rollers down the entire length of the lake

– Boat driving classes are a great place to learn and experience the safest and best way to use the lakes!

Page 4: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Lake Use - Operations:• New waiting docks on lakes 2, 3, & 4 - Please use them

while waiting for next rotation– Signal to active skier when someone is waiting…

• Please replace buoys as you damage them– All supplies necessary are in the locker on lake 1, (3538)

• Current erosion issues:– Must idle between lakes to stop channel erosion– If your boat generates a wake that goes over the stones on the

island, please do not circle the island.• We identified the problem and have plans to fix it...

– Do not alter the shoreline on your property without first getting the written consent from the board and the ACC.

• We encourage improvements, but want to make sure they are in line with the design of the property

Page 5: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Woman’s Driving Clinic:• When - May 18th 10:00 AM• Where - Hallermann’s House• Who - All Female POA members and their guests• Content:

– Women’s Wellness Clinic - Sheryl Mayer R.N.

– Class room boat/lake operations with Kim Butterfield, (rated tournament driver, competitive skier, wife, and mother)

– On the water driving clinic with Kim and skier behind boat

• What to Bring:– Your boat or someone else’s

– Your Ski - You will be the skiers...

Page 6: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Men’s Driving Clinic:• When - June 8th 10:00 AM• Where - Hallermann’s House• Who - All Male POA members and their guests• Content:

– Class room boat/lake operations with AWSA Drivers

– On the water driving clinic with AWSA Driver and skier behind boat.

• What to Bring:– Your boat or someone else’s

– Your Ski - You will be the skiers…

• RSVP to Hallermann’s - Must have 4 people

Page 7: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Property Improvements:• Focus:

– 1st Reduce erosion on property and reduce silt into the lakes

– 2nd Improve aesthetic appearance of the property

• Who:– Lake Operations Committee

• How:– Suggestions from POA Members

– Survey of the property - Operations Committee

• What to expect:– Recommended solutions to fix erosion problems and enhance

the appearance of the property

– Cost of those recommendation - Work Party Activity...

Page 8: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Property Improvements:

Page 9: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Areas of Focus:A: Fix Boat Ramp

B: Fix Erosion around the top of the Island

D, D1, M, & E: Erosion from off water lots and silt flow into the lakes

Place stones around the culvert openings

C: Cultivate grass into the berm - Fix sprinkler system

F: Complete the sod throughout the boat ramp park

G: Cultivate grass on East and Southwest berms of lake 4

H: Cultivate grass on East side of property

K: Fix valve - Done, (Devin Miller - Thank you).

L: Smooth Shoreline in lake 1 part

Page 10: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Watering from the Lakes:• The Board has approved using lake water to irrigate your

lots– Notification of the board is required– Watering rights will change throughout the year as the lake level

fluctuates - Focus is to establish vegetation– Requirements:

• No flooding of property

• Sprinkler system must be in working condition or erosion will occur

• No un-monitored sprinkling unless on a timer

• Remain considerate of neighbors

• Water at night - least evaporation (The best time is before sun up.)

• Maintain the vegetation once it is established

Page 11: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Work Party:• June 1st or June 8th - Feedback welcome on the date

• Activities:

·Fix Boat Ramp ·Kill Fungus on Berm

·Paint/Clean Buoys ·Build Lake 4 Waiting Dock

·Stain Docks ·Boat Bumpers on Waiting Docks

·Fix Island ·Seed Swales

·Fix Drainage in Flower Beds at both Entrances

·Weed-eat around the Bushes on the Berm

·Pick up trash in common areas

· Clean grass around silt trap

• I need volunteers to “Chair” above activities?

• Additional Activities:– Rent a trash container for POA Members to clean their lots

Page 12: Non-Confidential Material Lake Operations Presentation May 9 th, 2002 Sven Hallermann

Non-Confidential Material

Thank you and Request for Help:• Special Thanks to those that helped in the past:

– All the board members

– Mike Thompson - Track-hoe operator

– Devin Miller - Marking the property and fixing the drain valve

– Doug and Mary Taft - Free use of his equipment on multiple occasions, (trucks, bob-cats, and box blade).

– Jerry and Cindy Reed - Use of their trash bin, lumber, and their employees’ labor

– All work party volunteers

• Request for help in the future:– The work load is greater than the current volunteers can support.