2

Nuevo Pudahuel • 26 airports managed worldwide.• In Paris Aéroport (Paris Charles de Gaulle

and Orly) more than 97M passengers werewelcomed in 2016.

• 35 airports in France, Portugal, Cambodia,Japan, Dominican Republic and Chile.

• 130M passengers in 2016.

• # 7 worldwide in airport terminalconstruction.

• 19 airports built in 11 countries.

3

NUEVO PUDAHUEL CONCESSION

• 20 years: 2015 - 2035• Operation and remodeling of the current 110,000 m2 terminal• Construction of the new 200,000 m2 international terminal• Investment of 900 million dollars• Total capacity of 30MM PAX per year from 2020 onwards• Regulated and commercial services• Levels of service• State Sharing: 77.56%.

4

TRAFFIC, CONNECTIVITY AND CAPACITY

Flights per inhabitantEurope 1.7USA 2.8South America 0.6Chile 1.0

Domestic International

Arrival of 6 new operators in less than 2 years: Alitalia, British Airways, Avianca Brasil, JetSmart, LAW and Plus Ultra

According to July Chilean institute statistics, air tickets have gone down by 33.8% in the last 12 months.

Traffic vs Capacity

5

450.000Cubic Meters of Concrete

23.000Tons of Steel

4 km of Moving

Walkways

5 kmof Conveyor Belts

(BHS)

300.000Square Meters of Taxiways

280.000Square Meters of Platform

International Terminal 2020: Main Facts

67 Jet Bridges 5.815 new parking spaces

18.000 square meters of new retail space

New International Terminal of 200.000

square meters

Governmental and support buildings

6

Freight DomesticExpress MailHandling

Freight Import

Freight Export

SAG – Aduanas - Sernapesca

Short term Parking

Long Term Parking

Government buildings

Current Airport vs. Nuevo Pudahuel Project

7

SOUTH VIEW NEW TERMINAL 2020

88

Current state of the works

PuestosContacto

Código E 10

Código C 8

PuestosRemotos

Código E 4

Código C 11

Pista Longitud

17R-35L 0 m

17L-35R TotalidadOBRAS DAP-01

CIERRE PISTA 17D23 SEPT -> 15 DIC

OBRAS DAP-01 OBRAS DAP-02

Puestos Remotos Sin PIT / Uso camión JET A1

Código E -

Código C 16

Puestos Remotos Con PIT / Sin iluminación

Código E 4

Código C 3

Con combustible

Sin combustible

Iluminación PLAT

9

Virtual T2 Visit

10

11

BOARDING FLOOR (LEVEL 3) NEW TERMINAL T2M

12

ARRIVALS FLOOR (LEVEL 1) TERMINAL T2M