Noise Feasibility Study Proposed Residential Development 829 Essa Road Barrie, Ontario Prepared for: 2591451 Ontario Inc. 65 Cedar Pointe Drive, Suite 251 Barrie, Ontario L4N 9R3 Prepared by Yvonne Lo, BASc, PEng and Sheeba Paul, MEng, PEng August 13, 2019 HGC Project File: 01800996

Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study

Proposed Residential Development

829 Essa Road

Barrie, Ontario

Prepared for:

2591451 Ontario Inc. 65 Cedar Pointe Drive, Suite 251

Barrie, Ontario L4N 9R3

Prepared by

Yvonne Lo, BASc, PEng

and

Sheeba Paul, MEng, PEng

August 13, 2019

HGC Project File: 01800996

Page 2: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Table of Contents

1  Introduction and Summary ............................................................................................................. 1 

2  Site Description and Noise Sources ................................................................................................ 2 

3  Sound Level Criteria ....................................................................................................................... 2 

4  Traffic Noise Assessment ............................................................................................................... 4 

4.1  Road Traffic Data .................................................................................................................... 4 

4.2  Traffic Noise Predictions ......................................................................................................... 4 

5  Discussion and Recommendations ................................................................................................. 5 

5.1  Outdoor Living Areas .............................................................................................................. 5 

5.2  Indoor Living Areas and Ventilation Requirements ................................................................ 6 

5.3  Building Façade Constructions ................................................................................................ 6 

5.4  Warning Clauses ...................................................................................................................... 7 

6  Summary of Recommendations ...................................................................................................... 8 

6.1  Implementation ........................................................................................................................ 9 

Figure 1 – Key Plan Figure 2 – Proposed Site Plan Showing Prediction Locations Figure 3 – Proposed Site Plan Showing Ventilation and Barrier Requirements Appendix A – Road Traffic Data Appendix B – Sample STAMSON 5.04 Output Appendix C – Acoustic Barrier Specification

Page 3: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study, Proposed Residential Development Page 1 829 Essa Road, Barrie, Ontario August 13, 2019

1 Introduction and Summary

HGC Engineering was retained by 2591451 Ontario Inc. to conduct a noise feasibility study for a

proposed residential development to be located on the west side of Essa Road, north of Athabasca

Road specifically at 829 Essa Road, in the City of Barrie, Ontario. The proposed development

consists of one street townhouse block for a total of ten units. The study is required by the

municipality as part of their planning and approvals process.

Road traffic for Essa Road was obtained from City of Barrie personnel. This data was used to predict

future traffic sound levels at the proposed dwellings and in the rear yards. The predicted sound levels

were evaluated in accordance with the Ministry of the Environment, Conservation and Parks’

(MECP) noise guidelines.

Predicted sound levels exceed MECP guideline limits at the dwelling units closest to Essa Road. If

the area on the ground floor is considered an outdoor amenity area, an acoustic barrier will be

required for the rear yard of the dwelling unit with flanking exposure to Essa Road. Any rooftop

terraces should include a minimum 1.07 m high solid parapet. Forced air ventilation systems with

ductwork sized for the future installation of central air conditioning by the occupant will be required

for the first four dwelling units closest to Essa Road. Any exterior wall and double-glazed window

construction meeting the minimum requirements of the Ontario Building Code (OBC) will provide

sufficient sound insulation for all proposed dwelling units. The MECP guidelines require that

warning clauses be used to inform future residents of the traffic noise impacts, proximity to existing

institutional and commercial uses, and to address sound level excesses.

Page 4: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario August 13, 2019

2 Site Description and Noise Sources

Figure 1 is a key plan showing the location of the proposed development. The site is located on the

west side of Essa Road and north of Athabaska Road, specifically at 829 Essa Road in the City of

Barrie, Ontario. Figure 2 shows the proposed site plan dated October 29, 2018. The proposed

development will consist of one block of 3-storey townhouses for a total of ten units.

The primary source of sound is vehicular traffic on Essa Road. There is an existing 1.5-storey

dwelling unit occupying the site which will be demolished to make way for the proposed

development. There are existing residences to the north, south and west. Timothy Christian School is

located to the northeast of the subject site. There is a container storage provider (“Secure Store”) east

of the development. Noise from the facility was not heard at the time of the site visit, nonetheless, a

warning clause is recommended to inform future occupants of the development of the proximity to

existing commercial uses and that sounds may be audible, as included in Section 5.4. There are no

other sources of stationary noise within 500 m of the subject site.

3 Sound Level Criteria

Guidelines for acceptable levels of road traffic noise impacting residential developments are outlined

in the MECP publication NPC-300 “Environmental Noise Guideline Stationary and Transportation

Sources – Approval and Planning”, Part C release date October 21, 2013 and are listed in Table 1

below. The values in Table 1 are energy equivalent (average) sound levels [LEQ] in units of

A-weighted decibels [dBA].

Page 5: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study, Proposed Residential Development Page 3 829 Essa Road, Barrie, Ontario August 13, 2019

Table 1: Road Traffic Sound Level Criteria

Area Daytime LEQ (16 hour)

Road Night-time LEQ (8 hour)

Road

Outdoor Living Area 55 dBA --

Inside Living/Dining Rooms 45 dBA 45 dBA

Inside Bedrooms 45 dBA 40 dBA

Daytime refers to the period between 07:00 and 23:00. Nighttime refers to the time period between

23:00 and 07:00. The term Outdoor Living Area (OLA) is used in reference to an outdoor patio,

backyard, terrace, or other area where passive recreation is expected to occur.

The MECP guidelines allow the sound levels in an OLA be exceeded by up to 5 dBA (i.e. up to

60 dBA), without mitigation, if warning clauses are placed in the purchase and rental agreements to

the property. Where OLA sound levels exceed 60 dBA, physical mitigation is required to reduce the

OLA sound level to below 60 dBA and as close to 55 dBA as technically, economically and

administratively feasible.

A central air conditioning system as an alternative means of ventilation to open windows is required

for dwellings where nighttime sound levels outside bedroom or living/dining room windows are

greater than 60 dBA and where daytime sound levels outside bedroom or living/dining room

windows are 65 dBA or greater. Forced-air ventilation with ducts sized to accommodate the future

installation of central air conditioning is required when nighttime sound levels at bedroom or

living/dining room windows are in the range of 51 to 60 dBA or when daytime sound levels at

bedroom or living/dining room windows are in the range of 56 to 65 dBA.

Building components such as walls, windows and doors must be designed to achieve indoor sound

level criteria when the plane of window nighttime sound level is greater than 60 dBA or the daytime

sound level is greater than 65 dBA. The use of warning clauses to notify future residents of possible

excesses is also required.

Page 6: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study, Proposed Residential Development Page 4 829 Essa Road, Barrie, Ontario August 13, 2019

4 Traffic Noise Assessment

4.1 Road Traffic Data

Road traffic data for Essa Road was obtained from City of Barrie personnel. Data was provided in

the form of current Annual Average Daily Traffic (AADT) volumes, and are provided in

Appendix A. The traffic volumes were grown to the year 2029 using a growth rate of 2.5% per year.

A commercial vehicle percentage of 3% was obtained and split into 1.2% medium trucks and 1.8%

heavy trucks. A day/night split of 90%/10% and a speed limit of 60 km/h was used in the analysis.

Table 2 summarizes the road traffic data used in the analysis.

Table 2: Projected Road Traffic Data to 2029

Road Name Cars Medium Trucks

Heavy Trucks

Total

Essa Road Daytime 8 018 95 153 8 266 Nighttime 891 11 17 918 Total 8 909 106 170 9 185

4.2 Traffic Noise Predictions

To assess the levels of road traffic noise which will impact the site in the future, predictions were

made using STAMSON version 5.04, a computer algorithm developed by the MECP. Sample

STAMSON output is included in Appendix B.

Predictions of the traffic sound levels were made at various dwellings in the proposed development.

The results of these predictions are summarized in Table 3. The acoustic requirements may be

subject to modifications if the site plan is changed significantly.

Sound levels were predicted at the plane of the windows of the proposed dwelling units during the

daytime and nighttime to investigate ventilation and building façade construction requirements.

Sound levels were also predicted in the potential rooftop terraces of the townhouse units to

investigate the need for acoustic barriers.

Page 7: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study, Proposed Residential Development Page 5 829 Essa Road, Barrie, Ontario August 13, 2019

Table 3: Future Road Traffic Sound Levels, [dBA], Without Mitigation

Prediction Location

Description Daytime in OLA LEQ-16 hr

Daytime at Façade

LEQ-16 hr

Nighttime at Façade

LEQ-8 hr

[A] Townhouse unit with flanking exposure to Essa Road

<55* / 61+ 63 57

[B] Townhouse unit with some exposure to Essa Road

<55 55 <50

Note: * Assuming a standard 1.07 m high solid parapet around the roof edge. + Assuming a ground floor outdoor amenity area.

5 Discussion and Recommendations

The predictions indicate that the future traffic sound levels during the daytime and nighttime at the

proposed dwellings closest to Essa Road will exceed MECP guidelines. The following discussion

outlines recommendations for ventilation requirements, building façade constructions, and warning

clauses to achieve the noise criteria stated in Table 1.

5.1 Outdoor Living Areas

The proposed townhouse units may have rooftop terraces greater than 4 metres in depth. The

predicted daytime sound levels in the rooftop terraces of all the townhouse units will be less than

55 dBA, assuming a standard 1.07 m high solid parapet around the perimeter of the area. Further

physical mitigation will not be required.

If the area at ground level is an outdoor living area, the predicted sound level will be 61 dBA, 6 dBA

in excess of the MECP’s limit of 55 dBA. Physical mitigation in the form of an acoustic barrier will

be required. An acoustic barrier 2.0 m in height will reduce sound levels in the rear yard to less than

55 dBA.

When grading information is available, the acoustic barrier heights should be refined. An acoustic

barrier may be a combination of an acoustic wall and an earth berm. The wall component of the

barrier should be of a solid construction with a surface density of no less than 20 kg/m2. The walls

may be constructed from a variety of materials such as wood, brick, pre-cast concrete or other

concrete/wood composite systems provided that it is free of gaps or cracks. The heights and extents

Page 8: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study, Proposed Residential Development Page 6 829 Essa Road, Barrie, Ontario August 13, 2019 of the barriers should be chosen to reduce the sound levels in the OLA’s to below 60 dBA and as

close to 55 dBA as is technically, administratively and economically feasible, subject to the approval

of the municipality respecting any applicable fence height by-laws. A sample acoustic fence

specification is provided in Appendix C.

5.2 Indoor Living Areas and Ventilation Requirements

Provision for the Future Installation of Air Conditioning

The predicted sound levels at the façades of the proposed dwelling units closest to Essa

Road (prediction location [A]) will be between 56 and 65 dBA during the daytime hours and

between 51 and 60 dBA during the nighttime hours. These dwelling units require the provision for

the future installation of central air conditioning systems. This requirement is typically satisfied

through the installation of forced air ventilation systems with ductwork sized for the future

installation of central air conditioning by the occupant.

Figure 3 shows the ventilation requirements for the development. Window or through-the-wall air

conditioning units are not recommended for any residential unit because of the noise they produce

and because the units penetrate through the exterior wall which degrades the overall noise insulating

properties of the envelope. The location, installation and sound ratings of the outdoor air

conditioning devices should minimize noise impacts and comply with criteria of MECP publication

NPC-300.

5.3 Building Façade Constructions

The proposed dwelling units will have daytime and nighttime sound levels at the top storey façade

that are less than 65 dBA and 60 dBA, respectively. Any exterior wall and double glazed window

construction meeting the minimum requirements of the Ontario Building Code (OBC) will provide

adequate sound insulation for the dwelling units. Any insulated metal exterior door meeting OBC

requirements will be sufficient to provide noise insulation.

Page 9: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study, Proposed Residential Development Page 7 829 Essa Road, Barrie, Ontario August 13, 2019 5.4 Warning Clauses

The MECP guidelines recommend that warning clauses be included in the property and tenancy

agreements for all units/lots with anticipated traffic sound level excesses. Examples are provided

below.

Suggested wording for future dwellings with sound level excesses is given below:

Type A:

Purchasers and tenants are advised that sound levels due to increasing road traffic may occasionally interfere with some activities of the dwelling occupants as the sound levels exceed the Municipality’s and the Ministry of the Environment, Conservation and Parks’ noise criteria.

If the area on the ground floor is considered and outdoor amenity area, suggested wording for future

dwelling units with daytime OLA sound levels exceeding the MECP criteria by 6 dB or more, for

which physical mitigation has been provided is given below.

Type A:

Purchasers/tenants are advised that despite the inclusion of noise control features in the development and within the building units, sound levels due to increasing road traffic may occasionally interfere with some activities of the dwelling occupants as the sound levels exceed the Municipality’s and the Ministry of the Environment, Conservation and Parks’ noise criteria. The acoustical barrier as installed shall be maintained, repaired or replaced by the owner. Any maintenance, repair or replacement shall be with the same material, to the same standards and having the same colour and appearance of the original.

A suggested wording for future dwellings requiring forced air ventilation systems is given below.

Type B:

This dwelling unit has been designed with the provision for adding central air conditioning at the occupant’s discretion. Installation of central air conditioning by the occupant in low and medium density developments will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Municipality and the Ministry of the Environment, Conservation and Parks.

Page 10: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study, Proposed Residential Development Page 8 829 Essa Road, Barrie, Ontario August 13, 2019 Suitable wording for dwellings near existing institutional and commercial facilities.

Type C:

Purchasers/tenants are advised that due to the proximity of existing institutional and commercial uses, sound levels from these facilities may at times be audible.

These sample clauses are provided by the MECP as examples and can be modified by the

Municipality as required.

6 Summary of Recommendations

In summary, HGC Engineering has reviewed the site plan and performed calculations to determine

the potential road traffic noise impact on the residential properties with respect to MECP guidelines.

The following are the recommendations.

1. A 2.0 m high acoustic barrier is required for the rear yard of the end unit adjacent to Essa Road.

When grading information is available, the acoustic barrier height should be refined. A solid

1.07 m high parapet is required around the perimeter of any rooftop amenity areas.

2. Forced air ventilation systems with ductwork sized for the future installation of central air

conditioning will be required for the proposed dwelling units closest to Essa Road. The location,

installation and sound ratings of the air conditioning devices should comply with NPC-300, as

applicable.

3. Any building construction meeting the minimum requirements of the Ontario Building Code will

provide sufficient acoustical insulation for the proposed dwelling units.

4. Warning clauses should be used to inform future residents of the traffic noise excesses and the

proximity to nearby commercial and institutional uses.

Page 11: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Noise Feasibility Study, Proposed Residential Development Page 9 829 Essa Road, Barrie, Ontario August 13, 2019

Table 4: Summary of Noise Control Requirements and Noise Warning Clauses

Prediction Location

Acoustic Barrier

Ventilation Requirements*

Type of Warning Clause

Required AIF

[A] + Forced Air A, B, C OBC [B] -- -- C OBC

Remaining Units -- -- C OBC Notes: -- no specific requirement OBC – meeting the minimum requirements of the Ontario Building Code *The location, installation and sound rating of the air conditioning condensers must be compliant with MECP Guideline NPC-300, as applicable. If the area on the ground floor is considered an outdoor amenity area, the rear yard will require an acoustic barrier. When grading information is available, acoustic barrier heights should be refined. + A 1.07 m high solid parapet is required for any rooftop amenity areas.

6.1 Implementation

To ensure that the noise recommendations outlined above are fully implemented, it is recommended

that:

1. If the area on the ground floor is considered an outdoor amenity area, an acoustic barrier will

be required for the rear yard of the dwelling unit with flanking exposure to Essa Road. When

grading plans are available, acoustic barrier heights should be refined.

2. Prior to the issuance of building permits for this development, the Municipality’s building

inspector or a Professional Engineer qualified to perform acoustical engineering services in

the Province of Ontario should certify that the noise control measures have been properly

incorporated.

3. Prior to assumption, the Municipality’s building inspector or a Professional Engineer

qualified to perform acoustical engineering services in the Province of Ontario should certify

that the noise control measures have been properly installed and constructed.

Page 12: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Figure 1: Key Plan

 

ylo
Polygon
ylo
Callout
Subject Site
Page 13: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

23.0

Existing Bus Stop

to be Relocated

4.72

5.00

3.51

7.05

5.84

4.50

3

.

7

1

4.80

6.00

5.48 4.88 4.88

3.18

4.88 5.00 5.00 4.88 4.88 4.88 5.48

5.00

2

.

0

5

7.65

12.33

14.89

1.82

6.18

2.90

60.96

14.95

1

1

.

2

8

54.77

24.38

30.00

4.49

7.65

CONCEPTUAL SITE PLAN - 10 UNITS

829 ESSA ROAD - CITY OF BARRIE

PART OF LOT 3, CONCESSION 11

IN THE FORMER TOWNSHIP OF INNISFIL

829 ESSA ROAD, CITY OF BARRIE

KEY MAP

SCHEDULE OF REVISIONS

No. Date Description By

N

CURRENT OP

LAND USE DESIGNATION

CURRENT ZONE

RESIDENTIAL

R1

Scale 1: 10,000

File: 18-803

Date: October 29, 2018 Scale: 1:125

Drawn By: AM

Source: Concept plan prepared by SRN Architects, dated August 28, 2018.

Note: Information shown is approximate and subject to change.

SUBJECT LANDS

Area: ±0.146ha (0.36ac)

LEGEND

E

S

S

A

R

D

INNOVATIVE PLANNING SOLUTIONS

P L A N N E R S • P R O J E C T M A N A G E R S • L A N D D E V E L O P E R S

150 DUNLOP STREET EAST, SUITE 201, BARRIE, ONTARIO L4M 1B1

tel: 705 • 812 • 3281 fax: 705 • 812 • 3438 e: [email protected] www.ipsconsultinginc.com

10 TOWNHOUSE UNITS

ZONING TABLE

PROVISION

REQUIRED

MU2 ZONE

Setbacks

Interior Side Yard

Rear Yard

Landscaped Open Space

Driveway Length

1m for 75% (min)

5m fro 25% (max)

3.0m (max)

7.0m (min)

-

-

Front Yard

Lot Coverage

Density

-

Height 7.5m (min) - 16.5m (max)

Amenity Area

Lot Frontage -

Parking Spaces 15 (1.5/unit)

Contiguous Units -

-

PROVIDED

Exterior Side Yard 3.0m (min)

4.72m

5.00m

6.00m

101.7%

7.65m

53.8%

3 Storeys

24.38m

20

10

>15m²

3.71m

- 68.6 u/ha

Lot Area - 1,457.26m²

G.F.A. % of Site -

CONCEPTUAL

SITE PLAN

A

T

H

A

B

A

S

K

A

R

D

C

O

LU

M

BIA

R

D

M

A

P

L

E

V

I

E

W

D

R

W

15m0 105

36.3%

3.0m (min)

1.2m (min)

5.0m (min)

25%

-

50%

3 Storeys

11.0m

15 (1.5/unit)

8

10m² / unit

2.0m (min)

-

-

250% (max)

REQUIRED

RM3 ZONE

>35m²Dwelling Unit Area 35m² (min) 35m² (min)

Width of Garage Door - 2.7m2.7m

Existing Dwelling

#829

Existing Shed

Existing Shed

SUBJECT LANDS

10 STREET TOWNHOUSE UNITS

EXISTING WATER SERVICES

EXISTING STORM SERVICES

EXISTING SANITARY SERVICES

EXISTING HYDRANT

ylo
Text Box
[A]
ylo
Text Box
[B]
ylo
Text Box
Figure 2: Proposed Site Plan Showing Prediction Locations
Page 14: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

23.0

Existing Bus Stop

to be Relocated

4.72

5.00

3.51

7.05

5.84

4.50

3

.

7

1

4.80

6.00

5.48 4.88 4.88

3.18

4.88 5.00 5.00 4.88 4.88 4.88 5.48

5.00

2

.

0

5

7.65

12.33

14.89

1.82

6.18

2.90

60.96

14.95

1

1

.

2

8

54.77

24.38

30.00

4.49

7.65

CONCEPTUAL SITE PLAN - 10 UNITS

829 ESSA ROAD - CITY OF BARRIE

PART OF LOT 3, CONCESSION 11

IN THE FORMER TOWNSHIP OF INNISFIL

829 ESSA ROAD, CITY OF BARRIE

KEY MAP

SCHEDULE OF REVISIONS

No. Date Description By

N

CURRENT OP

LAND USE DESIGNATION

CURRENT ZONE

RESIDENTIAL

R1

Scale 1: 10,000

File: 18-803

Date: October 29, 2018 Scale: 1:125

Drawn By: AM

Source: Concept plan prepared by SRN Architects, dated August 28, 2018.

Note: Information shown is approximate and subject to change.

SUBJECT LANDS

Area: ±0.146ha (0.36ac)

LEGEND

E

S

S

A

R

D

INNOVATIVE PLANNING SOLUTIONS

P L A N N E R S • P R O J E C T M A N A G E R S • L A N D D E V E L O P E R S

150 DUNLOP STREET EAST, SUITE 201, BARRIE, ONTARIO L4M 1B1

tel: 705 • 812 • 3281 fax: 705 • 812 • 3438 e: [email protected] www.ipsconsultinginc.com

10 TOWNHOUSE UNITS

ZONING TABLE

PROVISION

REQUIRED

MU2 ZONE

Setbacks

Interior Side Yard

Rear Yard

Landscaped Open Space

Driveway Length

1m for 75% (min)

5m fro 25% (max)

3.0m (max)

7.0m (min)

-

-

Front Yard

Lot Coverage

Density

-

Height 7.5m (min) - 16.5m (max)

Amenity Area

Lot Frontage -

Parking Spaces 15 (1.5/unit)

Contiguous Units -

-

PROVIDED

Exterior Side Yard 3.0m (min)

4.72m

5.00m

6.00m

101.7%

7.65m

53.8%

3 Storeys

24.38m

20

10

>15m²

3.71m

- 68.6 u/ha

Lot Area - 1,457.26m²

G.F.A. % of Site -

CONCEPTUAL

SITE PLAN

A

T

H

A

B

A

S

K

A

R

D

C

O

LU

M

BIA

R

D

M

A

P

L

E

V

I

E

W

D

R

W

15m0 105

36.3%

3.0m (min)

1.2m (min)

5.0m (min)

25%

-

50%

3 Storeys

11.0m

15 (1.5/unit)

8

10m² / unit

2.0m (min)

-

-

250% (max)

REQUIRED

RM3 ZONE

>35m²Dwelling Unit Area 35m² (min) 35m² (min)

Width of Garage Door - 2.7m2.7m

Existing Dwelling

#829

Existing Shed

Existing Shed

SUBJECT LANDS

10 STREET TOWNHOUSE UNITS

EXISTING WATER SERVICES

EXISTING STORM SERVICES

EXISTING SANITARY SERVICES

EXISTING HYDRANT

ylo
Text Box
Figure 3: Proposed Site Plan Showing Ventilation and Barrier Requirements
ylo
Text Box
[A]
ylo
Text Box
[B]
ylo
Rectangle
ylo
Text Box
LEGEND
ylo
Text Box
Forced air heating with ducts sized for the future installation of air conditioning by the occupant
ylo
Rectangle
ylo
Text Box
Acoustic Barrier Required if the area at the ground floor is an Outdoor Amenity Area
ylo
Line
ylo
Polygonal Line
ylo
Callout
2.0 m high acoustic barrier required
Page 15: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

APPENDIX A

Road Traffic Data

Page 16: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

1

Sheeba Paul

From: Justin MacDonald <[email protected]>Sent: August-27-18 12:43 PMTo: Yvonne LoSubject: RE: Road Traffic Data Request - Salem Road and Country Road 27

Follow Up Flag: Flag for follow upFlag Status: Flagged

Sorry for the confusion:  Essa Road – 7,000 vehicles per day with 3% commercial and heavy vehicles with a growth rate of 2% compounded yearly.   Thanks,  Justin MacDonald, C.E.T., Senior Transportation Operations Technologist Roads, Parks & Fleet 

                                                                                                 City of Barrie: Barrie Operations Centre, 165 Ferndale Drive North, Barrie ON, L4N 9V9 Office: 705‐739‐4220 5178  

From: Yvonne Lo [mailto:[email protected]]  Sent: Monday, August 27, 2018 9:19 AM To: Justin MacDonald <[email protected]> Subject: RE: Road Traffic Data Request ‐ Salem Road and Country Road 27  Hi Justin,   I just checked the original data request; can you please confirm whether there is traffic data for Essa Road within the vicinity of this site?   Thank you again.  Best, Yvonne Lo, BASc, EIT Project Consultant HGC Engineering NOISE | VIBRATION | ACOUSTICS Howe Gastmeier Chapnik Limited 2000 Argentia Road, Plaza One, Suite 203, Mississauga, Ontario, Canada L5N 1P7 t: 905.826.4044 e: [email protected] Visit our website: www.hgcengineering.com Follow Us – LinkedIn | Twitter | YouTube This e-mail and any attachments may contain confidential and privileged information. If you are not the intended recipient, please notify the sender immediately by return e-mail, delete this e-mail and destroy any copies. Any dissemination or use of this information by a person other than the intended recipient is unauthorized and may be illegal.

 

Page 17: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

2

From: Yvonne Lo  Sent: August‐27‐18 8:22 AM To: 'Justin MacDonald' Subject: RE: Road Traffic Data Request ‐ Salem Road and Country Road 27  Thank you for the information Justin.  Best, Yvonne Lo, BASc, EIT Project Consultant HGC Engineering NOISE | VIBRATION | ACOUSTICS Howe Gastmeier Chapnik Limited 2000 Argentia Road, Plaza One, Suite 203, Mississauga, Ontario, Canada L5N 1P7 t: 905.826.4044 e: [email protected] Visit our website: www.hgcengineering.com Follow Us – LinkedIn | Twitter | YouTube This e-mail and any attachments may contain confidential and privileged information. If you are not the intended recipient, please notify the sender immediately by return e-mail, delete this e-mail and destroy any copies. Any dissemination or use of this information by a person other than the intended recipient is unauthorized and may be illegal.

 

From: Justin MacDonald [mailto:[email protected]]  Sent: August‐27‐18 8:18 AM To: Yvonne Lo Subject: RE: Road Traffic Data Request ‐ Salem Road and Country Road 27  Good morning,  Staff do not have traffic volumes for County Road 27.  The current traffic volume for Salem Road is 400 vehicles per day.  The growth rate is 6% compounded yearly to a horizon year of 2031.  Thanks,  Justin MacDonald, C.E.T., Senior Transportation Operations Technologist Roads, Parks & Fleet 

                                                                                                 City of Barrie: Barrie Operations Centre, 165 Ferndale Drive North, Barrie ON, L4N 9V9 Office: 705‐739‐4220 5178  

From: Yvonne Lo [mailto:[email protected]]  Sent: Tuesday, August 21, 2018 2:39 PM To: Justin MacDonald <[email protected]> Subject: RE: Road Traffic Data Request ‐ Salem Road and Country Road 27  Hi Justin,   Just checking on my traffic data request from earlier last week. Do you have any updates on this?  Thank you. 

Page 18: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

3

 Best, Yvonne Lo, BASc, EIT Project Consultant HGC Engineering NOISE | VIBRATION | ACOUSTICS Howe Gastmeier Chapnik Limited 2000 Argentia Road, Plaza One, Suite 203, Mississauga, Ontario, Canada L5N 1P7 t: 905.826.4044 e: [email protected] Visit our website: www.hgcengineering.com Follow Us – LinkedIn | Twitter | YouTube This e-mail and any attachments may contain confidential and privileged information. If you are not the intended recipient, please notify the sender immediately by return e-mail, delete this e-mail and destroy any copies. Any dissemination or use of this information by a person other than the intended recipient is unauthorized and may be illegal.

 

From: Yvonne Lo  Sent: August‐15‐18 4:25 PM To: 'Justin MacDonald' Subject: Road Traffic Data Request ‐ Salem Road and Country Road 27  Hi Justin,   HGC Engineering is conducting a noise feasibility study for a proposed residential development on the east side of Country Road 27, north of Salem Road. The location is indicated in the link below:  https://goo.gl/maps/HQ9MezzQRNP2  We are requesting road traffic information for Country Road 27, Salem Road and Essa Road (volumes and commercial truck percentages). Can you please let me know if this information is available.  Thank you.  Best, Yvonne Lo, BASc, EIT Project Consultant HGC Engineering NOISE | VIBRATION | ACOUSTICS Howe Gastmeier Chapnik Limited 2000 Argentia Road, Plaza One, Suite 203, Mississauga, Ontario, Canada L5N 1P7 t: 905.826.4044 e: [email protected] Visit our website: www.hgcengineering.com Follow Us – LinkedIn | Twitter | YouTube This e-mail and any attachments may contain confidential and privileged information. If you are not the intended recipient, please notify the sender immediately by return e-mail, delete this e-mail and destroy any copies. Any dissemination or use of this information by a person other than the intended recipient is unauthorized and may be illegal.

 

Page 19: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

APPENDIX B

Sample STAMSON 5.04 Output

Page 20: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

STAMSON 5.0 NORMAL REPORT Date: 30-04-2019 09:16:26 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a.te Time Period: Day/Night 16/8 hours Description: Predicted daytime and nighttime sound levels at the top-storey façade of the townhouse unit with flanking exposure to Essa Road, Prediction Location [A]. Road data, segment # 1: Essa Rd (day/night) ------------------------------------------- Car traffic volume : 8018/891 veh/TimePeriod * Medium truck volume : 95/11 veh/TimePeriod * Heavy truck volume : 153/17 veh/TimePeriod * Posted speed limit : 60 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): 7000 Percentage of Annual Growth : 2.50 Number of Years of Growth : 11.00 Medium Truck % of Total Volume : 1.15 Heavy Truck % of Total Volume : 1.85 Day (16 hrs) % of Total Volume : 90.00 Data for Segment # 1: Essa Rd (day/night) ----------------------------------------- Angle1 Angle2 : -90.00 deg 90.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : 15.00 / 15.00 m Receiver height : 7.50 / 7.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: Essa Rd (day) ---------------------------------- Source height = 1.17 m ROAD (0.00 + 63.38 + 0.00) = 63.38 dBA Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq ---------------------------------------------------------------------------- -90 90 0.49 64.54 0.00 0.00 -1.16 0.00 0.00 0.00 63.38 ---------------------------------------------------------------------------- Segment Leq : 63.38 dBA Total Leq All Segments: 63.38 dBA Results segment # 1: Essa Rd (night) ------------------------------------

Page 21: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

Source height = 1.17 m ROAD (0.00 + 56.86 + 0.00) = 56.86 dBA Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq ---------------------------------------------------------------------------- -90 90 0.49 58.02 0.00 0.00 -1.16 0.00 0.00 0.00 56.86 ---------------------------------------------------------------------------- Segment Leq : 56.86 dBA Total Leq All Segments: 56.86 dBA TOTAL Leq FROM ALL SOURCES (DAY): 63.38 (NIGHT): 56.86

Page 22: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

STAMSON 5.0 NORMAL REPORT Date: 13-08-2019 14:31:53 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a_olag.te Time Period: 16 hours Description: Predicted daytime sound levels at the ground floor outdoor amenity area of the dwelling unit with flanking exposure to Essa Road, Prediction Location [A]. Road data, segment # 1: Essa Rd ------------------------------- Car traffic volume : 8018 veh/TimePeriod * Medium truck volume : 95 veh/TimePeriod * Heavy truck volume : 153 veh/TimePeriod * Posted speed limit : 60 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: Essa Rd ----------------------------- Angle1 Angle2 : -90.00 deg 45.00 deg Wood depth : 0 (No woods.) No of house rows : 0 Surface : 1 (Absorptive ground surface) Receiver source distance : 19.00 m Receiver height : 1.50 m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: Essa Rd ---------------------------- Source height = 1.17 m ROAD (0.00 + 60.55 + 0.00) = 60.55 dBA Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq ---------------------------------------------------------------------------- -90 45 0.66 64.54 0.00 -1.70 -2.29 0.00 0.00 0.00 60.55 ---------------------------------------------------------------------------- Segment Leq : 60.55 dBA Total Leq All Segments: 60.55 dBA TOTAL Leq FROM ALL SOURCES: 60.55

Page 23: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

STAMSON 5.0 NORMAL REPORT Date: 13-08-2019 14:32:16 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a_olag.te Time Period: 16 hours Description: Predicted daytime sound levels at the ground floor outdoor amenity area of the dwelling unit with flanking exposure to Essa Road, with Mitigation, Prediction Location [A]. Road data, segment # 1: Essa Rd ------------------------------- Car traffic volume : 8018 veh/TimePeriod * Medium truck volume : 95 veh/TimePeriod * Heavy truck volume : 153 veh/TimePeriod * Posted speed limit : 60 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) Data for Segment # 1: Essa Rd ----------------------------- Angle1 Angle2 : -90.00 deg 45.00 deg Wood depth : 0 (No woods.) No of house rows : 0 Surface : 1 (Absorptive ground surface) Receiver source distance : 19.00 m Receiver height : 1.50 m Topography : 2 (Flat/gentle slope; with barrier) Barrier angle1 : -90.00 deg Angle2 : 45.00 deg Barrier height : 2.00 m Barrier receiver distance : 2.75 m Source elevation : 0.00 m Receiver elevation : 0.00 m Barrier elevation : 0.00 m Reference angle : 0.00 Results segment # 1: Essa Rd ---------------------------- Source height = 1.17 m Barrier height for grazing incidence ------------------------------------ Source ! Receiver ! Barrier ! Elevation of Height (m) ! Height (m) ! Height (m) ! Barrier Top (m) ------------+-------------+-------------+-------------- 1.17 ! 1.50 ! 1.45 ! 1.45 ROAD (0.00 + 53.85 + 0.00) = 53.85 dBA Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq ---------------------------------------------------------------------------- -90 45 0.55 64.54 0.00 -1.59 -2.15 0.00 0.00 -6.94 53.85 ---------------------------------------------------------------------------- Segment Leq : 53.85 dBA Total Leq All Segments: 53.85 dBA

Page 24: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

TOTAL Leq FROM ALL SOURCES: 53.85

Page 25: Noise Feasibility Study Proposed Residential Development ... Hall/Planning-and... · Noise Feasibility Study, Proposed Residential Development Page 2 829 Essa Road, Barrie, Ontario

APPENDIX C

Acoustic Barrier Specification