67
No limits No boundaries IHC Handling Systems product overview 2014/2015

No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

Embed Size (px)

Citation preview

Page 1: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

No limitsNo boundaries

IHC Handling Systems product overview 2014/2015

Page 2: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

3Product overview 2014/2015

‘Lots of reasons why.’ IHC Handling Systems

Page 3: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

5Product overview 2014/2015 Company vision

w w

IHC MerwedeNo limitsNo boundaries

No limits, no boundaries. This means

that issues such as ‘large’, ‘heavy’

and ‘deep’ are relative terms to us.

The crux is identifying opportunities

and translating these into practical

applications. As a global expert in the

field of tools for installing foundations

and structures, we know our market.

And our market - in turn - is fully

aware of what we have to offer as a

technology innovator, as a reliable

partner and as a producer of efficient

fail-safe tools to ensure the best

possible safety.

IHC Handling Systems, part of IHC

Merwede, is a leading supplier of

high-quality handling systems and

services as well as a problem solver

for handling issues. At IHC Handling

Systems we have a rich history as

an innovative company experienced

through various offshore installation

or removal ‘challenges’. We have been

ahead of market developments for

many years now. How? Innovation

and thinking in terms of the market

are deeply entrenched in our

company’s DNA. We enjoy limitless

conceptualisation.

Together with our sister companies

IHC Hydrohammer® and IHC Sea Steel

we offer a full package of offshore

installation equipment, either from

our standard range of products or to

our clients specific needs or require-

ments. We invite you to step into our

world in order to learn more about

our company, products and services

and the reason we are proud to say

‘No limits, no boundaries’.

IHC Merwede is focussed on the continuous development of design and construction

activities for the specialist maritime sector. It is the global market leader for efficient

dredging and mining vessels and equipment – with vast experience accumulated

over decades – and a reliable supplier of custom-built ships and supplies for offshore

construction.

IHC Merwede has in-house expertise for engineering and manufacturing innovative

vessels and advanced equipment, as well as providing life-cycle support. Its integrated

systematic approach has helped to develop optimum product performance and

long-term business partnerships.

The company’s broad customer base includes dredging operators, oil and gas

corporations, offshore contractors and government authorities.

IHC Merwede has over 3,000 employees based at various locations in The Nether-

lands, Brazil, China, Croatia, France, India, Malaysia, the Middle East, Nigeria, Serbia,

Singapore, Slovakia, South Africa, the United Kingdom and the United States.

Technological innovation will remain the company’s underlying strength through its

continuous investment in research and development. Moreover, it helps to safeguard

a sustainable environment.

Page 4: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

7Product overview 2014/2015

DalianLafayette, LA

Broussard Louisiana / Hydro-Ram Inc.

Rio de Janeiro

Houston, TX

Wayne, NJ

Stocksfield

Blandford ForumKomarno

Lago

Cape Town

s

Dubai / Hytec International L.L.C.

Kuala Lumpur / Panah Jaya Services Sdn Bhd

Perth / Machinery Supply

Ho Chi Minh / STAR Engineering Joint Stock CompanyMumbai

Singapore

Guangzhou

Shanghai

TianjinBeijingBelgrade

Pescara / SB Oil Tools

The Netherlands

RijeVerberie

ka

Seoul / Equipment & Service Inc.

Agents IHC Handling SystemsIHC MerwedeIHC Merwede | Agents IHC Handling Systems

Company vision

Locations in the worldThe Netherlands, Brazil, China, Croatia, France, India, Malaysia, the Middle East, Nigeria, Serbia, Singapore, Slovakia, South Africa, the United Kingdom and the United States.

Page 5: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

9Product overview 2014/2015 Oil & Gas

Oil & Gas

Structures

IHC Handling Systems

long history in the Oil

& Gas industry has

a strong connection

with the installation

of structures. The

challenges, faced by

our customers led

to the design and fa­

brication of dedicated

equipment which

‘nowadays’ is avail­

able on a rental or a

purchase basis.

Deep Water

Over the years, the

Oil & Gas industry

moved (and still is

moving) from shallow

to deeper, and even

ultra­deep waters. IHC

Handling Systems sup­

ported its customers

during this ‘evolution’

by designing and

producing equipment

capable of with­

standing deep water

con ditions.

Pipelay

IHC Handling Systems

involvement in the

pipelaying market

started in the mid 90’s

with the supply of our

first line-up clamps.

Since then, the growth

of offshore activities

led to a demand for a

wide range of equip­

ment, all of which is

currently available

within our product

range.

Decommissioning

A relatively new

market in which IHC

Handling Systems

is involved in is the

removal market. The

removal of structures,

jackets, subsea tem­

plates and pipelines

requires specialised

and customised

equipment or, in other

cases, equipment that

is a ‘spin-off’ from

existing tools.

We invite you to step into our world of equipment in order to learn more about our company and the reason we are proud to say ‘Your world, our challenge’.

Page 6: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

11Product overview 2014/2015 Content

Oil & Gas StructuresInternal Lifting Tool (ILT) 25

External Lifting Tool (ELT) 29

Upending Frame (UF) 31

Leveling Tool (LT) 35

Pile Anti Running Clamp (PARC) 39

Jacket Pile Gripper (JPG) 41

Hydraulic Release Shackle (HRS) 45

Pile Plug (PiPl) 47

Skidding System (SkS) 49

Bear Cage (BC) 51

Deep WaterDeep Water Internal Lifting Tool (ILT) 53

Pin Release Mechanism (PRM) 55

Chain Clamp (CC) 57

Suction Pile Lifting Frame (SPLF) 59

Accumulator Set (AS) 61

Hydraulic Release Shackle (HRS) 63

Subsea Connection Frame (SCF) 65

PipelayPipe Recovery Tool (PRT) 67

Pipe Abandonment Tool (PAT) 69

Abandonment & Recovery Cable Connector (A&R) 71

Pin Release Mechanism (PRM) 73

Bear Cage (BC) 75

DecommissioningInternal Lifting Tool (ILT) 77

External Lifting Tool (ELT) 79

Buoyancy Clamps (BuC) 81

Hydraulic Release Shackle (HRS) 83

Page 7: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

13Product overview 2014/2015 Wind

ILT

Stru

ctur

esO

il &

Gas

Jackets & Tripods

The offshore wind

industry is currently

moving into deeper

waters and due to the

ever­increasing capa­

city of wind turbines,

jackets and tripods are

more often chosen

as foundation type.

For the installation of

structure foun dations

IHC Handling Systems

can contribute its

experiences from the

Oil & Gas market.

Monopiles

Since 2001, IHC

Handling Systems

is involved in the

in stallation of

monopiles, starting

with the installation

of the Horns Rev I

project off the Danish

coast. Since then, IHC

Handling Systems

has been involved in

95% of all monopile

projects that followed

Horns Rev I.

Gravity Based

A rare type of

foun dation is the

Gravity Base foun­

dation, which requires

huge constructions

to be handled and

installed offshore.

IHC Handling Systems

experience in handling

and lifting heavy

constructions is an

assurance for the

successful installation

of these foundations.

Deck Equipment

Apart from the equip­

ment used during

the installation of

foundations, IHC

Handling Systems is

increasingly involved

in the handling of

structures, piles, etc

on deck of installation

vessels, this varies

from the hydraulic

operated pile storage

frames to guiding and/

or positioning frames.

The offshore wind business is clearly a growth market. During the coming decades sizeable wind farms will be created, especially offshore. IHC Handling Systems has been involved in this market from the very early start and nowadays, it is a very important ‘second’ pillar of the business.

Wind

Page 8: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

15Product overview 2014/2015 Content

Wind MonopilesUpending Tool (UT) 85

Flange Pile Upending Tool (FPUT) 89

Monopile Plug (MoPl) 91

Jacket & TripodsInternal Lifting Tool (ILT) 93

Upending Frame (UF) 95

Leveling Tool (LT) 97

Jacket Pile Gripper (JPG) 99

Hydraulic Release Shackle (HRS) 101

Pile Plug (PiPl) 103

Gravity BasedPin Release Mechanism (PRM) 105

Deck EquipmentStacking Frame (SF) 107Pile Guiding and Positioning Frame (PGPF) 109Saddle & Hook (S&H) 111

Page 9: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

17Product overview 2014/2015 Concepts

ILT

Stru

ctur

esO

il &

Gas

IHC Handling Systems has a rich history as an innovative ‘problem-solving’ company and has gained extensive exp erience through various offshore installation or removal ‘challenges’. Innovation and thinking in terms of solutions for our customers are deeply entrenched in our company, starting from our experienced sales team, through our engineering and our service department. IHC Handling Systems is capable of limitless conceptualization.

Concepts

Page 10: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

19Product overview 2014/2015 Content

Concepts VariousFlange Structure Lifting Tool (FSLT) 113

Pipe Cutter (PC) 115

Upending Hinge (UH) 117

Hammer Gripper (HG) 119

Page 11: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

21Product overview 2014/2015 Supporting Equipment

All IHC Handling Systems equipment is hydraulically operated, both for surface and for subsea operations. IHC offers its cus tomers complete equipment packages, which result in a ‘plug-and-play’ solution. A major advantage for our customers is the fact that they can rely on equipment packages that already have been tested as an assembly. Obviously, having one single point of contact for an equipment package that consists of several components is an additional benefit for the customer.

SupportingEquipment

Page 12: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

23Product overview 2014/2015 Content

Supporting Equipment VariousHydraulic Power Pack 5,5 kW (PP5.5) 121

Hydraulic Power Pack 22 kW (PP22) 123

Diesel Power Pack ( PP157) 125

Hydraulic Hose Reel 2 x 160m / 2x 320m / 4x 160m (HR) 127

Hydraulic Hose Reel 6 x 200m (HR) 129

Hot Stab (HS) 131

Page 13: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

25Product overview 2014/2015

ILTInternal Lifting Tool

Stru

ctur

esO

il &

Gas

ILT

ILT’s are used for upending of piles, conductors and lifting of jackets, templates, buoyancy tanks and modules.

• Standardpilerange16”-96”

• Liftingcapacitiesof200t-2000t

• Standardoperatingwaterdepthis500m

• Specialmodificationsallowfor:

-pileOD108”

-waterdepthupto2500m

-capacityupto2000t

-CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforrental&purchase

AnevolutioninILTusehastakenplaceover

theyearsfromsimplepilehandlingintouse

duringvariousinstallations,suchas:

• Liftingofbouyancytanks

• Liftingofjackets

• Liftingoftopsidemodules

• Liftingofsubseamanifolds

Specifications Applications

16”-30”200t 20”-36”300t 24”-42”250t 42”-60”500t 60”-96”1200t

TheILT“family”consistsoffivestandardsizerangeswithdifferentliftingcapacities.

Product Range

Page 14: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

27Product overview 2014/2015

ILT

Stru

ctur

esO

il &

Gas

TheILTisequippedwithIHC’sinnovative

FailSafePrinciple:

• Mechanicalloadappliedonthetoolin

longitudinaldirectionresultsinatransversal

forceonthepilewhichcreatesthe

‘locking/failsafe’connection

2013 OSX-3-Brazil

2013 Diyabekir-Turkmenistan

2013 KMA-Malaysia

2012 EMEPMITE-A,TA-Q,TE-B-Malaysia

2012 FSOErawan-2mooringinstallation-

Thailand

2012 Bubut&Danau-Brunei

2012 EPRDEkofiskcessation-NorthSea

2012 PertaminaHuluEnergy-Indonesia

2011 PierceManifoldInstallation-NorthSea

2011 SHWEproject-Myanmar

2011 D1project-India

2011 EssoKipperTuna-Australia

2011 MHNRe-development-India

2011 Montara-Australia

2011 BienDong1-Vietnam

2010 Gumusut-Kakap-Malaysia

2010 DevilCreek-Australia

2010 GajahBaru-Indonesia

2010 CastorT&I-Spain

2010 KNPG-Bjacket-Malaysia

2010 Ekosfiskremoval-NorthSea

Projects prior to 2010 upon request

Fail Safe Principle Projects

ILTInternal Lifting Tool

Page 15: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

29Product overview 2014/2015

ELTExternal Lifting Tool

Stru

ctur

esO

il &

Gas

ELTELT’s are used for pile upending, pile

lifting and as a hang off clamp.

• Pilerange20”-112”

• Liftingcapacityupto1200t

• Max.operatingdepthof250m

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

TheELThassomespecificinnovativefeatures.

• SubseaoperationviaROVorumbilical

• ELTcanbeoptionaldeliveredwithsideopening

• Centralizingsystemimprovingpositionprior

toclamping

• Pileupendinginadualcraneoperation

• Useashang-offclamp

• Useatemporaryclampingdeviceduring

weldingoflegpiles

TheELTisequippedwithIHC’sinnovative

FailSafePrinciple

• Mechanicalloadappliedonthetoolin

longitudinaldirectionresultsinatransversal

forceonthepilewhichcreatesthe

‘locking/failsafe’connection

2012 ConocoEldfisk-Norway

2012 NorthRankinB-Austalia

2012 Jasmine-NorthSea

2010 CastorT&I-Spain

2009 NorthWestHutton-Norway

2009 Peregrino-Brasil

2009 Mexilhao-Brasil

2008 TombuaLandana-Angola

Projects prior to 2008 upon request

Specifications

Features

Applications

Fail Safe Principle

Projects

Page 16: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

31Product overview 2014/2015

UFUpending Frame

Stru

ctur

esO

il &

Gas

UF

Upending Frames enable offshore installa tion contractors to increase their sphere of activity and efficiency by upending long piles with a relatively short crane boom.

• Pilerange54”-108”

• 600tholdingcapacity

• RequiresILTatthepiletop

• Availableforrental&purchase

• Hydraulicallyoperated

• Rotationofframe0°-100°

• Lateralfreedomofmovement±10°

• Fullpileweightcanbetakenbyframe

• Framecanbeequippedwithinclinosensor

foraccuratedigitalangleinformation

• Newdesignwithhydraulichingeback

2013KPOC-Malaysia

2013 KBBNorthernHubproject-Malaysia

2012 GlobalTech1OffshoreWindFarm-

Germany

2012 HaiThach/BienDong-Vietnam

2012 Cendorphase2-Malaysia

2011 Yetagun-C-Myanmar

2011 B-193AP&B-193AQ-India

2011 BienDongMT1-Vietnam

2011 DaiHung-Vietnam

2010 F23R-Malaysia

2009 ChimSao-Vietnam

2007 KrishanaGodavari-India

Projects prior to 2007 upon request

Specifications

Features

Projects

Page 17: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

33Product overview 2014/2015

UFUpending Frame

Stru

ctur

esO

il &

Gas

UF

Thelatestframesareequippedwithahydraulic

hingebackoption,thisadditionaldeviceallows

theUpendingFrametoreturnintoitshorizontal

positionwithoutadditionaltools,suchastugger

winchesand/orcranes.Thislatestdesign

furtherimprovestheefficiencyofoffshore

operations.

Developments

Page 18: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

35Product overview 2014/2015

LTLeveling Tool

Stru

ctur

esO

il &

Gas

LT

The Leveling Equipment can be used for leveling of jackets and/or templates.

• Surfaceandsubsealevelingoperations

• Levelingcapacityupto3000t

• Failsafedesign

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforrental&purchase

• Subsealevelingtool

• Levelingcapacity1600t-3000t

• Pilerange72”-102”

• Guideconerequiresanintegratedrolled

verticalringonlytofacilitatelevelingtool

• Levelingtooloperatesindependentfrom

pilestickup

• OperatesincombinationwithaJacket

• Freeorientationduringinstallationoftool

• Abovewaterandsubseause

• Levelingcapacity200t/800t/1600t

• Adjustabletoallpilediameters

• Stroke1000mm/1800mm

• Emergencyreleaseviahot-stab(ROV)

• Stick-upheightvariable

• Recommendedtooperateincombination

withaJacketPileGripperduringsubsea

leveling

• Nospecialpreparationstojacket/template

structurearerequired:

-Connectswithpileguide/catcherplate

insubseause

-Connectswithjacketpadeyeinsurfaceuse

Specifications

Features 1600t – 3000t equipment

Features 200t – 1600t equipment

Page 19: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

37Product overview 2014/2015

LTLeveling Tool

Stru

ctur

esO

il &

Gas

LT

TheLTisequippedwithIHC’sinnovativeFail

SafePrinciple:

• Mechanicalloadappliedonthetoolin

longitudinaldirectionresultsinatransversal

forceonthepilewhichcreatesthe

‘locking/failsafe’connection

2013 ThangLongDongDoProject-Vietnam

2012 FortiesAlpha-NorthSea

2012 JasmineII-NorthSea

2012 GreaterEkofisk-Norway

2011 DaiHung-Vietnam

2011 JasmineI-NorthSea

2009 ChimSao-Vietnam

2009 alhall&Harding-NorthSea

2007 Ledong-China

2007 Xijiang23-1-China

2006 PanyPY31-China

2006 Britsats-NorthSea

Projects prior to 2006 upon request

Fail Safe Principle Projects

Page 20: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

39Product overview 2014/2015

PARCPile Anti Running Clamp

Stru

ctur

esO

il &

Gas

PARCSpecific designed Clamp to stop

pile running during pile driving.

• Pilerange30”-84”

• Topreventdamagetojacket,craneand

hammercausedbyrunningpiles

• Hydraulicallycontrolled

• Availableforpurchase

• PARCstopspilesfromrunning

• PARCoperatesincombinationwithastandard

powerpackandhighpressureaccumulatorset

• InitiallowclampingpressureofPARCduring

piledriving,tocreatepile/clampcontact

• Whenpilerunningoccursenergyfromthe

accumulatorpackageisreleaseinorderto

stopthepilerunwithinmilliseconds

• Automatedormanualsystem

• PARChastheabilitytoovercometransversal

weldsbetweenpilesections

2011 Pemex-Mexico

2009 Severalprojects-India

2007 Pemex-Mexico

Specifications

Features Projects

Page 21: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

41Product overview 2014/2015

JPGJacket Pile Gripper

Stru

ctur

esO

il &

Gas

JPGPile grippers are used to create a

temporary connection between the skirt pile and jacket.

• Capacitiesarelimitless

• Pilediametersarelimitless

• Hydraulicallyoperated

• 3rdpartycertificationisoptional

• Availableforpurchase

• Securingjacketduringbadweather

conditionsandabandonment

• Retainingelevatedpositionafterleveling

• Provideshighjacketstabilityduring

groutingprocess

• Operatedfromsurfacewithsubsea

redundancycontrol

• Optionalcompletelysubseacontrolled

• Optionalmultiplehydrauliccircuits

• Extensivetrackrecord

Specifications

Features

Page 22: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

43Product overview 2014/2015

JPGJacket Pile Gripper

Stru

ctur

esO

il &

Gas

JPG

• Re-usableJacketPileGripper;

-Specialjacketpilegripperdesigntobe

re-usedonprojectwithmultiplejackets

-Connectiontoskirtsleevebymechanicalor

hydraulicoperatedpinconnection

• Inside-outJacketPileGripper;

-Jacketpilegripperwhichispartofthepile

gripsinternallyinskirtsleeveorbucket

arrangement

2013 Laila-Malaysia

2013 EdvardGrieg-NorthSea

2013 Montrose-NorthSea

2013 MartinLinge-Norway

2013 Kepodang-Malaysia

2012 FortiesAlpha-NorthSea

2012 JasmineII-NorthSea

2011 JasmineI-NorthSea

2011 HornseaMetMast-NorthSea

2011 DaiHung-Vietnam

2010 EAPLKipperTuna-Australia

2010 GreaterEkofisk-Norway

2009 Valhall&Harding-NorthSea

2008 Baraka-Tunesia

2007 Heera-India

2007 BohaiPhaseII-China

2006 Ikalou-Congo

2006 Ikalousud-Congo

2006 Britsats-NorthSea

Projects prior to 2006 upon request

Specials Projects

Page 23: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

45Product overview 2014/2015

HRSHydraulic Release Shackle

Stru

ctur

esO

il &

Gas

HRS

Hydraulic release shackles are used for lifting and positioning structures both subsea as well as at the surface.

• Capacity17,5t-2000t

• Remotecontrolledengagementand

disengagementofshackles

• Availableforrental&purchase

• Independentofshacklebrand

• Ultradeepwaterversionsavailable

• Hydraulicoperatedpin

• Standardsuitablefor500mwaterdepth

• Several,optional,back-upactivation

methodsavailable:

-HotStab

-Secondaryback-upcylinders

-Accumulators

-Mechanicalback-up

Newpatentedmechanicalpinlockdesign.

2013 NexenGoldenEagle-NorthSea

2013 EldfiskII-NorthSea

2013 EllDolphin-Australia

2013 WashitGas-UAE

2012 Britannia-NorthSea

2012 Togi-NorthSea

2012 HST&HSDProject-Vietnam

2012 JasmineII-NorthSea

2011 OIG-Norway

2011 Liwan-China

2011 DaiHung-Vietnam

2011 LondonArrayOWF-NorthSea

2011 HornseaMeteorologicalMast-NorthSea

2011 TotalGabonAnguille-Gabon

2010 Topaz-Asia

2010 CapeLambert-Australia

2009 OrmondeOWF-Belgium

2009 AlphaVentusOWF-Germany

2009 Montara-Australia

2008 Montara-Australia

Projects prior to 2008 upon request

Specifications

Features

New

Projects

Page 24: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

47Product overview 2014/2015

PiPlPile Plug

Stru

ctur

esO

il &

Gas

PiPlPile plugs create an air and water

tight seal at one or both ends of a pile.

• Canbeusedincombinationwithall

standardfoundationpilesizes

• Hydraulicallycontrolledfromsurfaceor

byROV

• Availableforpurchase

• Suitableforupendingand/ortransportation

• Suitableforshallowwaterdepths

• Availableforstraightandangledpipeends

• Hydraulicallyoperated

SpecialILTwithafixedpileplugattached.

• PileplugintegratedwithILTwhichallows

foracombinedoperationofpileupending

andsealing

2012 SHWE-Myanmar

2009 ChimSao-Vietnam

Specifications

Features

Latest development

Projects

Page 25: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

49Product overview 2014/2015

SkSSkidding System

Stru

ctur

esO

il &

Gas

SkSSkidding systems are used for accurate

positioning, load out of heavy objects or launch of jacket structures.

• Hydraulicpush-pullsystem

• Movementofloadsupto10.000t

• Availableforrental&purchase

• Doublehydraulicsystem:grippingand

push-pull

• Easytooperate

• Controllableandaccuratepositioning

• Nospecialskidbeampreparations

• Lowmaintenancecosts

• Pressurizegripperjacksonbeam

• Extendskidjacks(=pushobject)

• Releasegripperjacks

• Retractskidjacks

2012 SHWE-Myanmar

2011 Netmak-Turkeye

2010 FDS2-Saipem

2009 Mexilhão-Brazil

2008 WellEnhancer-Helix

2007 PerencoGroup23-Congo

Projects prior to 2007 upon request

Specifications

Features

Skidding principle

Projects

Page 26: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

51Product overview 2014/2015

BCBear Cage

Stru

ctur

esO

il &

Gas

BC

Bear cages are used to line up piles prior to welding.

• Suitableforvariousdiameters

• Foruseatsurfaceonly

• Lineupoftwopilesections

• Canoperateonbatteredpiles

• Hydraulicclamping

• Capacitytoholdfullpilesectionweight

• Weldingplatformcanbeintegratedindesign

2012 Pemex-GulfofMexico

2012 Ceyhan-Caspian

2011 Pemex-GulfofMexico

2010 Block17-Angola

2009 Camarupin-Brazil

2008 India-PunjiLloyd

2007 Pemex-GulfofMexico

Projects prior to 2007 upon request

Specifications

Features

Projects

Page 27: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

53Product overview 2014/2015

ILTDeep water Internal Lifting Tool

Dee

p W

ater

Oil

& G

asIL

T

Deep water ILT’s are used for lifting and positioning mooring piles, conductors and subsea structures in ultra deep waters.

• Standardpilerange16”-96”

• Liftingcapacitiesof200t-1200t

• Maximumoperatingdepthof2500m

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforrental&purchase

• ILTcontrolpanelisROVoperated

• Built-inaccumulatorpack

TheILTisequippedwithIHC’sinnovativeFail

SafePrinciple:

• Mechanicalloadappliedonthetoolin

longitudinaldirectionresultsinatransversal

forceonthepilewhichcreatesthe

‘locking/failsafe’connection

2013 BigFoot-GulfofMexico

2010 Block31-Angola

2010 Gumusut-Kakap-Malaysia

2008 KikehII-Malaysia

2007 KikehI-Malaysia

2003 KizombaA-Angola

Specifications

Features

Fail Safe Principle

Projects

Page 28: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

55Product overview 2014/2015

PRMPin Release Mechanism

Dee

p W

ater

Oil

& G

asPR

MPin release mechanisms are operated in deep water for the installation of templates, structures and suction piles.

• Custommadedesign

• Liftingcapacitiesupto2000t

• Maximumoperatingdepthof3000m

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

• Canbeintegratedinanystructureorlifting

beamarrangement

• Hydraulicoperatedpin

• Hydraulicenergythroughaccumulators

• Mechanicalback-up

• Manyadditional(back-up)optionsavailable

-HotStab

-Secondarycylinders

-Separatehydrauliccircuits

2013 Jack&St.MaloFPU-GulfofMexico

2013 LuciusFPU-GulfofMexico

2011 KizombaSatalites-Angola

2011 CastoroII

2010 Valhall-NorthSea

2009 Mexilhão-Brazil

2008 BC-10-Brazil

2006 IndepenceHub-GulfofMexico

2005 ThortonBankOWF-Belgium

2004 Thunderhorse-GulfofMexico

2004 MadDog-GulfofMexico

2004 AtlantisChains-GulfofMexico

Projects prior to 2004 upon request

Specifications

Features

Projects

Page 29: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

57Product overview 2014/2015

CCChain Clamp

Dee

p W

ater

Oil

& G

asCC

Chain clamps are used for the positioning of deep water mooring chains.

• Projectrelatedliftingcapacities

• Unlimitedoperatingdepth

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

• Positioningofdeepwatermooringchain

• Variouschainlinksizespossible

• Failsafedesign

• HydraulicreleasebyROV

2004 Holstein-GulfofMexico

2004 Thunderhorse-GulfofMexico

2004 AtlantisChains-GulfofMexico

2003 Gunnison-GulfofMexico

2003 Vastar-GulfofMexico

2002 HornMountain-GulfofMexico

Specifications

Features Projects

Page 30: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

59Product overview 2014/2015

SPLFSuction Pile Lifting Frame

Dee

p W

ater

Oil

& G

asSP

LFSuction pile lifting frames are specifi-cally designed for upending and lifting of suction piles for deep water moorings.

• Pilediametersupto6700mm

• Operatingdepthupto3000m

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

• Upendingandpositioningofsuctionpiles

• Deepwaterapplicationswithaccumulator

• ROVoperated

• Standardmodulardesignframeadaptsto

variouspilediameters

2013 Jack&St.MaloFPU-GulfofMexico

2013 LuciusFPU-GulfofMexico

2011 KizombaSatalites-Angola

2006 IndepenceHub-GulfofMexico

2004 Thunderhorse-GulfofMexico

2004 MadDog-GulfofMexico

2004 AtlantisChains-GulfofMexico

2003 Vastar-GulfofMexico

2003 Gunnison-GulfofMexico

Projects prior to 2003 upon request

Specifications

Features Projects

Page 31: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

61Product overview 2014/2015

ASAccumulator Set

Dee

p W

ater

Oil

& G

asA

S

Hydraulic energy supply for deep water tool applications.

• Maxoperatingdepthof3000m

• Maxworkingpressure500bar

• Availableforpurchase

• Availableinvarioussizes

• FullyROVoperated

• ROVaccessfromthreesides(incl.pressure

readout)

• Severalback-upoperationspossible,

includingsubseahydraulicpump

2011 KizombaSatalites-Angola

2006 IndepenceHub-GulfofMexico

2004 Thunderhorse-GulfofMexico

2004 MadDog-GulfofMexico

2004 AtlantisChains-GulfofMexico

2003 Vastar-GulfofMexico

2003 Nikika-GulfofMexico

2003 Gunnison-GulfofMexico

2003 Valhall-Norway

2002 NaKika-GulfofMexico

2002 HornMountain-GulfofMexico

Specifications

Features Projects

Page 32: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

63Product overview 2014/2015

HRSHydraulic Release Shackle

Dee

p W

ater

Oil

& G

as

HRS

Hydraulic release shackles are used for lifting piles, subsea structures, modules and templates.

• Capacity17,5t-2000t

• Maxoperatingdepth3000m

• Remotecontrolledengagementand

disengagementofshackles

• FullyROVoperated

• Independentofshacklebrand

• Availableforpurchase

• Several,optional,back-upactivation

methodsavailable:

-HotStab

-Secondaryback-upcylinders

-Accumulators

-Mechanicalback-up

Newpatentedmechanicalpinlockdesign.

2013 Jack&St.MaloFPU-GulfofMexico

2012 Togi-Norway

2012 Laggan&Tormore-UK

2009 OrmenLange-Norway

Specifications

Features Projects

New

Page 33: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

65Product overview 2014/2015

SCF Subsea Connection Frame

Dee

p W

ater

Oil

& G

asSC

FSubsea connection frames can be used for the connection of mooring chains.

• Usedtoreconnectmooringchains

• Usedduringinstallationofnewmooring

chains

• Re-usableframeforseverallinksizes

• Availableforpurchase

• Integratedsystemredundancy

• Subseaconnectionoperation

• OperatedbyROVfromsubseacontrolpanel

• PinlockingbyROV

• Designedforre-use

2013 Banff-NorthSea

2011 Cascade&Chinook-GulfofMexico

2009 NeptuneDeepwater-BostonUSA

2009 Peregrino-Brazil

2008 FPSOBergeHelene-Mauritania

Specifications

Features Projects

Page 34: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

67Product overview 2014/2015

PRTPipe Recovery Tool

Pipe

lay

Oil

& G

asPR

TA tool specifically designed for the recovery of pipes or pipelines.

• Capacityupto1000t

• Piperange8”-42”

• Maxwaterdepth3000m

• Subseade-wateringpossible

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforrental&purchase

• Longfrictionpadspreventoverstressingof

pipewall

• Removableliftingarmallowsforretrieval

viastinger

ThePRTequippedwithIHC’sinnovativeFail

SafePrinciple:

• Mechanicalloadappliedonthetoolin

longitudinaldirectionresultsinatransversal

forceonthepipewhichcreatesthe

‘locking/failsafe’connection

2013Gorgon-Australia

2012 Desfa-Greece

2012 Castorone

2011 Castorpipeline-Spain

2009 Peregrino-Brazil

2008 Gjøa-NorthSea

2008 SouthPars-Iran

2008 Halfdan-Denmark

2006 Tangguh-Indonesia

2006 OrmenLange-Norway

Specifications

Features

Fail Safe Principle

Projects

Page 35: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

69Product overview 2014/2015

PATPipe Abandonment Tool

Pipe

lay

Oil

& G

asPA

TA tool designed to seal off a pipeline in case of abandonment.

• Moreefficientabandonmentprocess

comparedtoexistingtechniques

• Extendspipelayoperationtime

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

• Doublesealelementsealsoffpipeline

• Longfrictionpadspreventoverstressingof

pipewall

• Integratedhydraulics

• Integratedcheckvalveforsubseadewatering

ThePATisequippedwithIHC’sinnovative

FailSafePrinciple:

-Mechanicalloadappliedonthetoolin

longitudinaldirectionresultsinatransversal

forceonthepipewhichcreatesthe

‘locking/failsafe’connection

2011 Goliat-Norway

2010 Marulk-Norway

2007 Morvin-Norway

2006 Asgard-Norway

2006 FramEast-Norway

2006 Alvheim-Norway

Specifications

Features Projects

Fail Safe Principle

Page 36: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

71Product overview 2014/2015

A&R A&R Cable Connector

Pipe

lay

Oil

& G

asA

&R

• Capacityupto1000t

• Max.waterdepth3500m

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

• Constructiondesignallowstofollow

stingerradius

• Primaryreleasehydraulicallybyacoustic

signalfromthesurface

• SecondaryreleasebyROVoperatedspindle

• Sensorsforopen/closeindication

• Releaseunder50tload

1. Hull

2. Latch

3.Mainhook

4. Releasehook(2x)

5. LoadcellsandA&Rcableconnection

2009 StandardequipmentAllseas Solitaire

2009 Independencetrail-GulfofMexico

3

4

52

1

Specifications

Features Projects

Components

A tool to lay down or recover pipelines from the seabed.

Page 37: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

73Product overview 2014/2015

PRMPin Release Mechanism

Pipe

lay

Oil

& G

asPR

MPin release mechanisms can be used for the installation of pipelines or PLEM constructions.

• Custommadedesign

• Liftingcapacitiesupto2000t

• Maximumoperatingdepthof3000m

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

• Subseasystem

• Powersupplyviaintegratedaccumulator(s)

• Several,optional,back-upactivation

methodsavailable:

-HotStab

-Secondaryback-upcylinders

-Mechanicalback-up

2013FDS2assets-Italy

Various-notbyname

Specifications

Features Projects

Page 38: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

75Product overview 2014/2015

BCBear Cage

Pipe

lay

Oil

& G

asBC

Bear cages are used to line up pipes prior to welding.

• Foruseatsurfaceonly

• Suitableforavariousrangeofdiameters

• Finalweldbetweenlandfallandseapipeline

• Hydraulicclamping

• Hydrauliccontrolledweldgapadjust

• Clampandlineupoftwopipeends

2012 Baku-Azerbaijan

2010 Block17-Angola

2009 Camarupin-Brazil

2008 AlAqaba-Jordania

2007 Balgzand-TheNetherlands

Specifications

Features Projects

Page 39: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

77Product overview 2014/2015

ILTInternal Lifting Tool

Dec

omm

issi

onin

gO

il &

Gas

ILT

The ILT can be used for lifting structures, structure sections and topside modules during decommissioning operations.

• HighlongitudinalcapacityInternalLiftingTool

• ILT’sareequippedwithaccumulatorsto

overcomeuseofhoses

• ILT’sareequippedwithIHC’sinnovative

FailSafePrinciple

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforrental&purchase

2013 Ekofisk2/4S-Norway

2012 Ekofisk-Norway

2012 Togi-Norway

2010 NorthWestHutton-UK

2009 FriggDP2-Norway

2005 FriggDP1-Norway

2005 BrentSparFlareTower-Norway

20”-36”300t36”-54”1000t54”-84”1750t 84”-120”2500t

Specifications Projects

Page 40: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

79Product overview 2014/2015

ELTExternal Lifting Tool

Dec

omm

issi

onin

gO

il &

Gas

ELTELT’s can be used for lifting structures or

structure sections during decommissioning operations.

• Pilerange72”-112”

• Liftingcapacityupto1200t

• Max.operatingdepthof250m

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

• ELT’sareequippedwithIHC’sinnovative

FailSafePrinciple

• SubseaoperationviaROVorumbilical

• ELT’scanbedesignedwithsideopening

• Integratedcentralizingsystemfortool

positioning

2010 NorthWestHutton-UK

Specifications

Features Projects

Page 41: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

81Product overview 2014/2015

BuCBuoyancy Clamp

Dec

omm

issi

onin

gO

il &

Gas

BuCClamping equipment integrated in buoyancy

tanks can be used for the removal of offshore structures in floating condition.

• Fullycomputercontrolledoperation

• Availableforpurchase

2009 FriggDP2-Norway

Upperclamp

Lowerclamp

Upperpullinsystem(750t)

Lowerpullinsystem(750t)

Specifications

Components

Projects

Page 42: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

83Product overview 2014/2015

HRSHydraulic Release Shackle

Dec

omm

issi

onin

gO

il &

Gas

HRS

Remote controlled engagement and disengagement of shackles.

• Capacity17,5t-2000t

• Liftingandhandlingsupportduringthe

dismantleofstructures

• Remotecontrolledengagementand

disengagementofshackles

• Independentofshacklebrand

• Availableforrental&purchase

• Hydraulicoperatedpin

• Standardsuitablefor500mwaterdepth

• Adjustableforanyshacklebrand

• Manyadditional(back-up)optionsavailable:

-HotStab

-Mechanicalback-up

Newpatentedmechanicalpinlockdesign.

2009 FriggDP2-Norway

Specifications

Features Projects

New

Page 43: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

85Product overview 2014/2015

UTUpending Tool

Mon

opile

sU

T

Upending Tool for upending large diameter piles (monopiles).

• Liftdiametersupto6500mm

• Liftingcapacitiesof290t,700tand1000t

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforrental

• Adjustabletoanydiameter(withinrange)

• Hydraulicallyoperated

• UT’sareequippedwithIHC’sinnovative

FailSafePrinciple

• Nospecialpreparationsofpile

• Optionaljiggerwinch

• CompatiblewithIHCMonopilePlugs(pag.91)

• Optionaltoolmonitoringsystems

Specifications

Jigger Winch

Excl. Jigger Winch

Operating Steps

Features

Win

d

Page 44: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

87Product overview 2014/2015

UTUpending Tool

Mon

opile

sW

ind

UT

2014 WestermostRough-NorthSeaUK

2013 Northwind-NorthSeaBelgium

2013 GwyntyMor-IrishSeaUK

2013 HelWin&BorWinOWF-Germany

2013 WestofDuddonSands-IrishSeaUK

2012 GwyntyMor-IrishSeaUK

2012 LondonArray-NorthSeaUK

2012 Meerwind-NorthSeaGermanBight

2011 Teesside-NorthSeaUK

2011 Lincs-NorthSeaUK

2011 SheringhamShoal-NorthSeaUK

2011 LondonArray-NorthSeaUK

2010 BalticI-BalticSeaGermany

2010 Belwind-Belgium

2009 Thanet-NorthSeaUK

2009 BardI-Germany

2009 Walney1-IrishSeaUK

2008 RhylFlats-IrishSeaUk

2008HornsRevII-NorthSeaDenmark

Projects prior to 2008 upon request

Projects

New design Upending Tool 1000t

Page 45: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

89Product overview 2014/2015

FPUTFlange Pile Upending Tool

Mon

opile

sW

ind

FPU

TFlange pile upending tools are used for the upending and lifting of large diameter piles with an integrated flange.

• Usingtheflangegeometryasasupport

duringlifting

• Liftingcapacitiesupto750t

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforrental&purchase

• Remotelyoperatedusingintegratedpower

pack

• Allcontactareascoveredwithprotective

material

• Optionaltoolmonitoringsystems

• Nospecialpreparationsofpile

• Integratedredundancy

2013 Amrumbank-NorthSeaGermany

2013 HumberGateway-NorthSeaUK

2003 ScrobySands-NorthSeaUK

Specifications

Features Projects

Page 46: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

91Product overview 2014/2015

MoPIMonopile Plug

Mon

opile

sW

ind

MoP

l Monopile plugs create an air and water tight seal at one or both ends of a pile.

• Formonopilediametersupto8000mm

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

• Patenteddesign

• Towingdirectlyonplug

• Nospecialpreparationstomonopiles

required

• Canbeusedincombinationwith

UpendingTool(pag.85)

• Sealingbysolidrubber

• Hydraulicallyoperated

• Designincludesredundancy

2010 Belwind-NorthSeaBelgium

2009 Walney1-IrishSeaUK

2008 RhylFlats-IrishSeaUk

2008 GunfleetSands-NorthSeaUK

Specifications

Features Projects

Page 47: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

93Product overview 2014/2015

ILTInternal Lifting Tool

Win

dJa

cket

s &

Tri

pods

ILT

ILT’s are used for upending/lifting of piles, tripods, jackets and modules.

• Standardpilerange16”-96”

• Standardliftingcapacitiesof200t–1200t

• Specialliftingcapacitiesupto2000t

• Standardoperatingwaterdepthis500m

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforrental&purchase

ILT’sareequippedwithIHC’sinnovative

FailSafePrinciple:

-Mechanicalloadappliedonthetoolin

longitudinaldirectionresultsinatransversal

forceonthepipewhichcreatesthe

‘locking/failsafe’connection

OWF2013 WestofDuddonSands-IrishSea

2012 BorkumWest2-Germany

2011 HornseaMeteorologicalMast-NorthSea

2010Walney2-IrishSea

2007 Lynn&InnerDowsing-NorthSea

Oil & Gas2012 EMEPMITE-A,TA-Q,TE-B-Malaysia

2012 FSOErawan-2mooringinstallation-

Thailand

2012 Bubut&Danau-Brunei

2012 EPRDEkofiskcessation-NorthSea

2012 PertaminaHuluEnergy-Indonesia

2011 PierceManifoldInstallation-NorthSea

2011 SHWEproject-Myanmar

2011 D1project-India

2011 EssoKipperTuna-Australia

2011 MHNRe-development-India

2011 Montara-Australia

2011 BienDong1-Vietnam

Projects prior to 2011 upon request

Specifications

Features

Projects

Page 48: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

95Product overview 2014/2015

UFUpending Frame

Win

dJa

cket

s &

Tri

pods

UF

The upending frame enables installation contractors to increase their sphere of activity and efficiency by upending long piles with a relatively short crane boom.

• Pilerange54”-108”

• RequiresILTatthepiletop

• 600tholdingcapacity

• Otherdimensionsandcapacitiesupon

request

• Availableforrental&purchase

• Hydraulicallyoperated

• Hydraulichingebackoption

• Rotationofframe0°-100°

• Lateralfreedomofmovement±10°

• Framecanbeequippedwithinclinosensor

foraccuratedigitalangleinformation

• Newdesignwithhydraulichingeback

OWF2013 SylWin-Germany

2012 NordSeeOst-Germany

2012 GlobalTech1-Germany

Oil & Gas2013 KPOC-Malaysia

2012 HaiThach/BienDong-Vietnam

2012 Cendorphase2-Malaysia

2011 Yetagun-C-Myanmar

2011 B-193AP&B-193AQ-India

2011 BienDongMT1-Vietnam

2011 DaiHung-Vietnam

2010 F23R-Malaysia

2009 ChimSao-Vietnam

2007 KrishanaGodavari-India

Projects prior to 2007 upon request

Specifications

Features

Projects

Page 49: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

97Product overview 2014/2015

LTLeveling Tool

Win

dJa

cket

s &

Tri

pods

LT

Leveling tools can be used for leveling of jackets and tripods.

• SurfaceandSubsealevelingoperations

• Availablecapacities200t,400t,800t,3000t

• Pilerange54”-108”

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforrental&purchase

• LT’sareequippedwithIHC’sinnovative

FailSafePrinciple

• Connectstopilecatcherplate

• EmergencyreleaseviaROVhotstab

OWF2013WestofDuddonSands-IrishSea

2012 NordSeeOst-Germany

2012 GlobalTech1-Germany

Oil & Gas2012 FortiesAlpha-NorthSea

2012 JasmineII-NorthSea

2012 GreaterEkofisk-Norway

2011 DaiHung-Vietnam

2011 JasmineI-NorthSea

2009 ChimSao-Vietnam

2009 Valhall&Harding-NorthSea

2007 Ledong-China

2007 Xijiang23-1-China

2006 PanyPY31-China

2006 Britsats-NorthSea

Projects prior to 2006 upon request

Specifications

Features

Projects

Page 50: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

99Product overview 2014/2015

JPGPile Gripper

Win

dJa

cket

s &

Tri

pods

JPGPile grippers are used to create a

temporary connection between the skirt pile and jacket.

• Capacitiesarelimitless

• Pilediameterislimitless

• CertificationbyLloydsoptional

• Consumable(singleuse)orre-usable

• Forpre-pilingorpost-piling

• Availableforpurchase

• Securingjacketduringbadweather

conditionsandabandonment

• Retainingelevatedpositionafterleveling

• Provideshighjacketstabilityduringgrouting

process

• Multiplehydrauliccircuitspossible

• Extensivetrackrecord

• Optionalcompletelysubseacontrolled

• ROVoperable(clamp/release)

OWF2013WestofDuddonSands-IrishSea

2012 NordSeeOst-Germany

2011 HornseaMeteorologicalMast-NorthSea

Oil & Gas2013 Laila-Malaysia

2013 EdvardGrieg-NorthSea

2013Montrose-NorthSea

2013MartinLinge-Norway

2013 Kepodang-Malaysia

2012 FortiesAlphaNorthSea

2012 JasmineII-NorthSea

2011 JasmineI-NorthSea

2011 DaiHung-Vietnam

2010 EAPLKipperTuna-Australia

2010 GreaterEkofisk-Norway

Projects prior to 2010 upon request

Specifications

Features

Projects

Page 51: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

101Product overview 2014/2015

HRSHydraulic Release Shackle

Win

dJa

cket

s &

Tri

pods

HRS

Hydraulic release shackles are used for lifting and positioning of structures or foundation piles.

• Capacity17,5t-2000t

• Independentofshacklebrand

• Remotecontrolledengagementand

disengagementofshackles

• Availableforrental&purchase

• Hydraulicoperatedpin

• Standardsuitablefor500mwaterdepth

• Several,optional,back-upactivationmethods

available

• Mechanicalback-up

Newpatentedmechanicalpinlockdesign.

OWF2013 Northwind-Belgium

2013 Haliade-Belgium

2011 LondonArray-UK

2011 NorthSeaMeteorologicalMast-North

Sea

2009 Ormonde-Belgium

2009 AlphaVentus-Germany

Oil & Gas2012 Britannia-NorthSea

2012 Togi-NorthSea

2012 HST&HSDProject-Vietnam

2012 JasmineII-NorthSea

2011 OIGNorway

2011 Liwan-China

2011 DaiHung-Vietnam

2011 TotalGabonAnguille-Gabon

2010 Topaz-Asia

2010 CapeLambert-Australia

2009 Montara-Australia

2008 Montara-Australia

Projects prior to 2008 upon request

Specifications

Features

New

Projects

Page 52: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

103Product overview 2014/2015

PiPlPile Plug

Win

dJa

cket

s &

Tri

pods

PiPlPile plugs create an air and water

tight seal at one or both ends of a pile.

• Canbeusedincombinationwithall

standardfoundationpilesizes

• Hydraulicallycontrolledfromsurfaceor

byROV

• Availableforpurchase

• Suitableforupendingand/ortransportation

• Suitableforshallowwaterdepths

• Availableforstraightandangledpipeends

• Hydraulicallyoperated

SpecialILTwithafixedpileplugattached.

• PileplugintegratedwithILTwhichallows

foracombinedoperationofpileupending

andsealing

OWF2010Belwind-Belgium

2009Walney1-UK

2008RhylFlats-UK

2008GunfleetSands-UK

Oil & Gas2012SHWE-Myanmar

2009ChimSao-Vietnam

Specifications

Features

Latest development

Projects

Page 53: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

105Product overview 2014/2015

PRMPin Release Mechanism

Win

dG

ravi

ty B

ased

PRMPin release mechanisms are used in

custom-made lifting applications.

• Standardsuitablefor500mwaterdepth

• Custommadedesign

• Liftingcapacitiesupto2000t

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

Specificallyusedfortheconnectionbetween

thecraneandthegravitybasedfoundation.

OWF2011 HornseaMeteorologicalMast-UK

2008 ThortonBank1-Belgium

Specifications

Features Projects

Page 54: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

107Product overview 2014/2015

SFStacking Frame

Win

dD

eck

Equi

pmen

tSF

• Storageandhandlingoffoundationpiles

• Efficientuseofdeckspace

• Availableforpurchase

• Fullyhydraulicallyoperated

• Optiontouseincombinationwithupending

supportsuchas:

-saddle&hook

-pileguideandpositioningframe

OWF2009 BARDI-Germany

Stacking frames are used for stacking and handling multiple foundation piles on deck of an installation vessel.

Specifications

Features Projects

Page 55: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

109Product overview 2014/2015

PGPFPile Guide and Positioning Frame

Win

dD

eck

Equi

pmen

tPG

PFThe frame can be used for guiding of foundation piles during upending and positioning of these piles during pile-driving.

• Increaseofcraneefficiency,noverticalpile

movementafterupending

• Significantreductionofoffshoreinstallation

time

• Accuratepositioningofmonopile

• Adjustingverticalityofmonopileafter

upending

• Availableforpurchase

• Innovativedesign

• Handlingofpilediametersupto6000mm

• Hookholdingcapacity700t

• MaximumtiltingmotionofPGPF±6˚

• Upendinganglerange0°-93°

• Optiontouseincombinationwithother

IHCdeckequipment

• Upendingtoolrequiredattopofmonopile

forupending

OWF2012 Meerwind-Germany

Specifications

Features

Projects

Page 56: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

111Product overview 2014/2015

S&HSaddle & Hook

Win

dD

eck

Equi

pmen

tS&

HThe saddle and hook system creates a controlled fixed hinge point during the upending of long foundation piles.

• Providesanextendedworkingwindowfor

offshorecranes

• Significantreductionofoffshoreinstallation

time

• Availableforpurchase

• Hooktakesaxialloadofpile

• Saddletoguidepilesduringupending

• Hookretrievableviaawinch

• Liftingcapacitiesupto1000t

OWF2009BARDI-Germany

Specifications

Features Projects

Page 57: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

113Product overview 2014/2015

FSLTFlange Structure Lifting Tool

Equipment designed to lift structures equipped with a connection flange.

Vari

ous

Conc

epts

FSLT

• Liftingoftransistionpieces,jacketsand

tripods

• Nospecialarrangementonflangerequired

• Increaseinefficiencyduringoffshore

operations

• Currentdesignfor1000tandpilediameter

6000mm

• CertifiedanddesignedaccordingLloyds

LiftingAppliances

• Availableforpurchase

• Remotelyoperatedusingintegrated

powerpack

• Integratedopticalwarningsystems

• Zeroforcesonflangeduringlifting

• Integratedredundancy

• DifferentliftingpointsforCOGadjustment

• Remotelyoperated

• Integratedhydraulicpowerpack

• Minimumofbendingstressesinpile

Specifications Features

Page 58: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

115Product overview 2014/2015

PCPipe Cutter

Vari

ous

Conc

epts

PC

Equipment designed to cut jacket and structures.

• Hydraulicallyoperated

• Innovativemanipulatorarmallowsfor

subsearepositioning

• Currentdesignsforpipesize12”-36”

and24”-48”

• Pipecuttingforces1000t-1300t

• Designedformaximumwaterdepthof150m

• Costandtimeeffectivedesigncomparedto

existingalternatives

Specifications

Page 59: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

117Product overview 2014/2015

UHUpending Hinge

Vari

ous

Conc

epts

UH

Equipment designed to support the pile tip of monopiles during upending on deck.

• Piletipismechanicallockedduringupending

• Duringentireupendingsequence±6˚

transversalfreedom

• Hydraulichingeback

Specifications

Page 60: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

119Product overview 2014/2015

HGHammer Gripper

Vari

ous

Conc

epts

HG

Optional hydraulic hammer equipment.

• Gripperframedesignedforliftingpiles

withahydraulichammer

• Reducethenumberofequipmentchanges

duringanoffshoreoperation

• Timeefficientinstallation

• Liftingtoolforhydraulichammer

• Verticalpileliftandhandlingonly

GrippingTheupendingframetakesthefulllongitudinal

forcebygrippingthepilepriortolifting.

LiftingThepilecanbeliftedintopositionbya

specialgrippingframeconnectedtoahydraulic

hammeroranInternalLiftingTool.

Specifications

Page 61: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

121Product overview 2014/2015

PP5.5Hydraulic Power Pack 5,5kW

Pow

er P

ack

Supp

orti

ng E

quip

men

tPP

5.5

Power Pack ILTStandard power pack of 5,5Kw - 350 bar max

Power Pack Leveling ToolStandard power pack

5,5kW - 350 bar max (200t, 400t tools)

Power Pack PARCStandard power pack of 5,5kW - 350 bar max

Power Pack Jacket Pile GripperStandard power pack of 5,5Kw - 350 bar max

Power Pack Hydraulic Release ShackleStandard power pack of 5,5Kw - 350 bar max

Power Pack Pile PlugStandard power pack of 5,5Kw - 350 bar max

Power Pack Bear CageStandard power pack of 5,5Kw - 350 bar max

Power Pack Pin Release MechanismStandard power pack of 5.5Kw - 350 bar max,

water glycol fluid

Power Pack Chain ClampStandard power pack of 5.5Kw - 350 bar max,

water glycol fluid

Power Pack Suction Pile Lifting FrameStandard power pack of 5.5Kw - 350 bar max,

water glycol fluid

Power Pack Accumulator SetStandard power pack of 5.5Kw - 350 bar max,

water glycol fluid

Power Pack Hydraulic Release ShackleStandard power pack of 5.5Kw - 350 bar max,

water glycol fluid

Power Pack Connection FrameStandard power pack of 5.5Kw - 350 bar max,

water glycol fluid

Power Pack PRTStandard power pack of 5.5Kw - 350 bar max,

water glycol fluid

Power Pack PATStandard power pack of 5.5Kw - 350 bar max,

water glycol fluid

Power Pack Pin ReleaseStandard power pack of 5.5Kw - 350 bar max,

water glycol fluid

• Supply of hydraulic energy to operate

hydraulic equipment

• In combination with hose reel standard

supporting equipment of IHC

• Multi voltage, multi cycle E-motor

• 9 ltr/min at 1750 rpm

• Max. operating pressure 350 bar

• Hydraulic fluids; mineral or environmental

friendly oil, water glycol

• ILT - Internal Lifting Tool

• LT 200t - Leveling Tool 200t

• PARC - Pile Anti Running Clamp

• JPG - Jacket Pile Gripper

• HRS - Hydraulic Release Shackle

• PiPl - Pile Plug

• UF - Upending Frame

• BC - Bear Cage

• SPLF - Suction Pile Lifting Frame

• PRM - Pin Release Mechanism

• SCF - Subsea Connection Frame

• PRT - Pipe Recovery Tool

• PAT - Pipe Abandonment Tool

• UT - Upending Tool

Applicable for following IHC equipment

Features

Specifications

Page 62: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

123Product overview 2014/2015

PP22Hydraulic Power Pack 22kW

Pow

er P

ack

Supp

orti

ng E

quip

men

tPP

22

Power Pack ELTStandard power pack of 22kW - 350 bar max

Power Pack Upending FrameStandard power pack of 22kW - 350 bar max

Power Pack Leveling ToolStandard power pack, 22kW - 350 bar max

(800t, 3000t tools)

Power Pack Deep Water ILTStandard power pack of 22Kw - 350 bar max,

water glycol fluid

Power Pack Upending ToolStandard power pack of 22kW - 350 bar max

• Supply of hydraulic energy to operate

hydraulic equipment

• In combination with hose reel standard

supporting equipment of IHC

• Multi voltage, multi cycle E-motor

• 24 l/min at 1750 rpm

• Max. operating pressure 350 bar

• Hydraulic fluids; mineral or environmental

friendly oil, water glycol

• ELT - External Lifting Tool

• LT 800t - Leveling Tool 800t

• LT 3000t - Leveling Tool 3000t¹

• UT - Upending Tool

• UF - Upending Frame

¹ 2x 28.5 l/min at 1750 rpm – 400 bar

Applicable for following IHC equipment

Features

Specifications

Page 63: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

125Product overview 2014/2015

PP157Diesel Hydraulic Power Pack 157 kW

Pow

er P

ack

Supp

orti

ng E

quip

men

tPP

157

• Supply of hydraulic energy to operate

hydraulic equipment

• Diesel driven Volvo Penta motor

• 220 l/min at 2100 rpm

• Max operating pressure 380 bar

• Hydraulic fluids; mineral or environmental

friendly oil

• SkS - Skidding System

Applicable for following IHC equipment

Features

Specifications

Page 64: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

127Product overview 2014/2015

HRHydraulic Hose Reel 2x160m / 2x 320m / 4x 160m

Hos

ehee

lSu

ppor

ting

Equ

ipm

ent

HR

Hose Reel ILTHose reel with 2 pc 1/2”high pressure hose,

min 2x 160m

Hose Reel Leveling Tool (200t, 800t)Hose reel with 4 pc 1/2”high pressure hose,

min 2x 160m

Hose Reel PARCHose reel with 2 pc 1/2”high pressure hose,

min 2x 160m

Hose Reel Jacket Pile GripperHose reel with 2 pc 1/2”high pressure hose,

min 2x 160m

Hose Reel Pile PlugHose reel with 2 pc 1/2”high pressure hose,

min 2x 160m

Hose Reel Bear CageHose reel with 2 pc 1/2”high pressure hose,

min 2x 160m

Hose Reel Deep Water ILTHose reel with 2 pc ½” high pressure hoses 40m

Hose Reel Chain ClampHose reel with 2 pc ½” high pressure hoses 40m

Hose Reel Suction Pile Lifting FrameHose reel with 2 pc ½” high pressure hoses 40m

Hose Reel Accumulator SetHose reel with 2 pc ½” high pressure hoses 40m

Hose Reel Hydraulic Release ShackleHose reel with 2 pc 1/2”high pressure hose,

min 2x 160m

Hose Reel Connection FrameHose reel with 2 pc 1/2”high pressure hose,

min 2x 160m

Hose Reel PRTHose reel with 2 pc ½” high pressure hoses 2x

400m (depending on water depth)

Hose Reel PATHose reel with 2 pc ½” high pressure hoses 2x

400m (depending on water depth)

Hose Reel Pin Release MechanismHose reel with 2 pc 1/2”high pressure hose,

min 2x 160m

• Connection between power pack and

hydraulic equipment

• In combination with hose reel standard

supporting equipment of IHC

• Hose internal diameter ½”

• Hose length 2x 160m, 2x 320m or 4x 160m

• Average reel speed 15 m/min

• Max. pull force 580kg

• ILT - Internal Lifting Tool

• ELT - External Lifting Tool

• LT 200t - Leveling Tool 200t¹

• LT 800t - Leveling Tool 800t¹

• JPG - Jacket Pile Gripper

• HRS - Hydraulic Release Shackle

• PiPl - Pile Plug

• BC - Bear Cage

• PRT - Pipe Recovery Tool

• PAT - Pipe Abandonment Tool

• UT - Upending Tool

• PARC –-Pile Anti Running Clamp

¹ 4 hoses required

Applicable for following IHC equipment

Features

Specifications

Page 65: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

129Product overview 2014/2015

HRHydraulic Hose Reel 6x200m

Hos

ehee

lSu

ppor

ting

Equ

ipm

ent

HR

• Connection between power pack and

hydraulic equipment

• In combination with hose reel standard

supporting equipment of IHC

• Hose internal diameter ¾” & ½”

• Hose length 6x 200m

• Average reel speed 25 m/min

• Max pull force 2670kg

• LT 3000t - Leveling Tool 3000t

• ELT - External Lifting Tool

Hose Reel ELTHose reel with min 6 pc ½” high pressure hose

lines 250m

Hose Leveling Tool (3000t)Hose reel with min 6 pc ½” high pressure hose

lines 250m

Applicable for following IHC equipment

Features

Specifications

Page 66: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

131Product overview 2014/2015

HSHot Stab

Hot

Sta

bSu

ppor

ting

Equ

ipm

ent

HS

• Connection between power pack and

hydraulic equipment subsea

• Can be used in combination with hose reel

for shallow water

• ILT uses an IHC design hot stab

• Deep water applications use an

Oceaneering type hot stab

• Hydraulic fluids; mineral or environmental

friendly oil, water glycol

• LT 200t - Leveling Tool 200t

• LT 800t - Leveling Tool 800t

• LT 3000t - Leveling Tool 3000t

• JPG - Jacket Pile Gripper

• HRS - Hydraulic Release Shackle

• SPLF - Suction Pile Lifting Frame

• PRM - Pin Release Mechanism

• SCF - Subsea Connection Frame

• PRT - Pipe Recovery Tool

• PAT - Pipe Abandonment Tool

ILT hotstab Oceaneering hotstab

Hot Stab ILTMale hot stab connector (IHC type)

Hot Stab ELTMale hot stab connector dual line

(Oceaneering)

Hot Stab Leveling ToolMale hot stab connector dual line

(Oceaneering)

Hot Stab Hydraulic Release ShackleMale hot stab connector dual line

(Oceaneering)

Hot Stab Pin Release MechanismMale hot stab connector dual line

(Oceaneering)

Hot Stab ShacklesMale hot stab connector dual line

(Oceaneering)

Hot Stab Jacket Pile GripperMale hot stab connector dual line

(Oceaneering)

Hot Stab Deep Water ILTMale hot stab connector dual line

(Oceaneering)

Hot Stab Chain ClampMale hot stab connector dual line

(Oceaneering)

Hot Stab Suction Pile Lifting FrameMale hot stab connector dual line

(Oceaneering)

Hot Stab Accumulator SetMale hot stab connector dual line

(Oceaneering)

Hot Stab Connection FrameMale hot stab connector dual line

(Oceaneering)

Hot Stab PRTMale hot stab connector dual line

(Oceaneering)

Hot Stab PATMale hot stab connector dual line

(Oceaneering)

Applicable for following IHC equipment

Features

Specifications

Page 67: No limits No boundaries - greenglobalgroup3g.comgreenglobalgroup3g.com/images/sampledata/parks/landscape/IHC... · No limits, no boundaries. ... services as well as a problem solver

Colofon

text/editorial: IHC Handling Systems

photography: IHC Handling Systems & Clients

design: toelgroep, concept + creatie